153
Bidder Name: _____________________ TARRANT COUNTY PURCHASING DEPARTMENT JACK BEACHAM, C.P.M., A.P.P. MELISSA LEE, C.P.M., A.P.P. PURCHASING AGENT ASSISTANT PURCHASING AGENT VOLUME 2 – TECHNICAL SPECIFICATIONS RFB NO. 2019-123 PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ELEVATOR REPLACEMENT 350 W. BELKNAP ST. FORT WORTH, TX 76196-0104 BIDS DUE APRIL 1, 2019 2:00 P.M. Technical Specifications Prepared by Bennett Benner Partners 500 West Seventh Street, Ste. 1400 Fort Worth, TX 76102 RFB NO. 2019-123

PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Bidder Name: _____________________

TARRANT COUNTY PURCHASING DEPARTMENT JACK BEACHAM, C.P.M., A.P.P. MELISSA LEE, C.P.M., A.P.P. PURCHASING AGENT ASSISTANT PURCHASING AGENT

VOLUME 2 – TECHNICAL SPECIFICATIONS

RFB NO. 2019-123

PROJECT MANUAL FOR

350 WEST BELKNAP PARKING GARAGE ELEVATOR REPLACEMENT

350 W. BELKNAP ST. FORT WORTH, TX 76196-0104

BIDS DUE APRIL 1, 2019 2:00 P.M.

Technical Specifications Prepared by Bennett Benner Partners

500 West Seventh Street, Ste. 1400 Fort Worth, TX 76102

RFB NO. 2019-123

Page 2: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

500 West 7th Street, Suite 1400 | Fort Worth, Texas 76102 817.335.4991 | www.bbptx.com Page | 1

scope summary - elevator

date: 20 February 2019 subject: Tarrant County 350 W Belknap Parking Garage Elevator Replacement

to: Bidders re: Scope of Work from: Amanda Schulte AIA project #: 17149.00

The general scope of the project is to replace an existing 5-stop hydraulic elevator with a completely new 5-stop traction elevator. Because the new traction elevator requires additional overrun height, the existing roof of the elevator shaft will be extended up to allow for additional space. This requires modification to the existing structure, along with a new roof deck, new hoist beam, new masonry shaft walls, and new roofing materials. Additionally, the existing elevator machine room requires new wall insulation, gypsum board finish, and paint. The new traction elevator also requires updates to electrical components for both the elevator and the shaft.

Each Contractor/Vendor shall examine all the Contract Documents and shall visit the site to ensure a complete understanding of the total Scope of Work required for the performance of the requirements of this Scope Summary.

The Contractor shall furnish all labor, supervision, materials, equipment, and services as required to complete the requirements of this Scope Summary to generally include but not limited to the items listed herein:

1. All work to be per permit approved plans, specifications, and state and local requirements, unless noted otherwise. Contractor shall obtain and pay for any and all necessary sales tax, permits, licenses, and fees for this Scope of Work.

2. If the contract drawings conflict with the specifications or this scope summary, then the more stringent criteria will take precedence.

3. Contractor shall provide all warranties, guarantees, operational and maintenance manuals, maintenance plans, owner training, and other closeout documents as required to be submitted/performed in a timely manner. Retainage will not be released until all closeout documentation is received.

4. Warranty period shall begin on the date of the project's Substantial Completion. Provide any necessary manufacturers' extended warranties including the cost for this extension to accommodate the period between start-up and Substantial Completion.

5. Provide all materials, equipment, tools, rigging, saw cutting, labor, and transportation necessary for the complete installation of all work as shown or reasonably inferred by the Contract Documents.

6. Clean up and maintain clean walkways around project site stemming from your operations. 7. Adhere to any and all safety rules as designated for the site. 8. Contractor will be responsible for any cost of failed materials testing for Scope of Work. 9. Provide attic stock and/or surplus materials in accordance with the Contract Documents. 10. Contractor shall haul off all excess spoils generated under this Scope of Work and legally dispose of offsite. All items not

specifically called out to be retained for owner are to become the property of the contractor. 11. Contractor is responsible for the security and protection for this Scope of Work. 12. Provide protection of existing adjacent walls, doors, floors, and any other items not specifically called out to be demolished.

Patching, repairing, and/or replacing of surfaces damaged by this trade shall be included in this Scope of Work at no additional cost impact to the owner.

13. Contractor shall furnish a detailed schedule, shop drawings (if applicable), product submittals, product samples, and work plan, prior to commencement of all work.

14. All equipment and materials are to be in the quantities as indicated on the Contract Documents and as specified as to brand, sizes, model, color, capacity, ratings, etc.

15. Owner is to be notified of all major deliveries, night work, and work that will be performed outside the immediate work area. Interruption of electrical, fire suppression, or HVAC services to be coordinated with owner at least seven calendar days in advance of interruption.

16. Contractor is responsible for fire alarm system design and installation, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated meeting all requirements per approved plans, specifications, and state/local requirements, and related NFPA Standards to be approved by authorities having jurisdiction.

Page 3: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

500 West 7th Street, Suite 1400 | Fort Worth, Texas 76102 817.335.4991 | www.bbptx.com Page | 2

17. Provide labor and equipment for all fire alarm, lighting, and electrical work as shown or reasonably inferred by the Contract Documents.

18. The Contract Documents show the general arrangements of the work. Should project conditions require any rearrangement, or if equipment or accessories can be installed to better advantage in a different manner, the contractor shall present this information for architect’s approval.

19. Provide all electric traction elevators as indicated in the Contract Documents. 20. All other work is to be provided by another contractor, but elevator contractor shall coordinate with general contractor for

any miscellaneous elevator requirements.

Page 4: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

500 West 7th Street, Suite 1400 | Fort Worth, Texas 76102 817.335.4991 | www.bbptx.com Page | 1

scope summary - general

date: 20 February 2019 subject: Tarrant County 350 W Belknap Parking Garage Elevator Replacement

to: Bidders re: Scope of Work from: Amanda Schulte AIA project #: 17149.00

The general scope of the project is to replace an existing 5-stop hydraulic elevator with a completely new 5-stop traction elevator. Because the new traction elevator requires additional overrun height, the existing roof of the elevator shaft will be extended up to allow for additional space. This requires modification to the existing structure, along with a new roof deck, new hoist beam, new masonry shaft walls, and new roofing materials. Additionally, the existing elevator machine room requires new wall insulation, gypsum board finish, and paint. The new traction elevator also requires updates to electrical components for both the elevator and the shaft.

Each Contractor/Vendor shall examine all the Contract Documents and shall visit the site to ensure a complete understanding of the total Scope of Work required for the performance of the requirements of this Scope Summary.

The Contractor shall furnish all labor, supervision, materials, equipment, and services as required to complete the requirements of this Scope Summary to generally include but not limited to the items listed herein:

1. All work to be per permit approved plans, specifications, and state and local requirements, unless noted otherwise. Contractor shall obtain and pay for any and all necessary sales tax, permits, licenses, and fees for this Scope of Work.

2. If the contract drawings conflict with the specifications or this scope summary, then the more stringent criteria will take precedence.

3. Contractor shall provide all warranties, guarantees, operational and maintenance manuals, maintenance plans, owner training, and other closeout documents as required to be submitted/performed in a timely manner. Retainage will not be released until all closeout documentation is received.

4. Warranty period shall begin on the date of the project's Substantial Completion. Provide any necessary manufacturers' extended warranties including the cost for this extension to accommodate the period between start-up and Substantial Completion.

5. Provide all materials, equipment, tools, rigging, saw cutting, labor, and transportation necessary for the complete installation of all work as shown or reasonably inferred by the Contract Documents.

6. Clean up and maintain clean walkways around project site stemming from your operations. 7. Adhere to any and all safety rules as designated for the site. 8. Contractor will be responsible for any cost of failed materials testing for Scope of Work. 9. Provide attic stock and/or surplus materials in accordance with the Contract Documents. 10. Contractor shall haul off all excess spoils generated under this Scope of Work and legally dispose of offsite. All items not

specifically called out to be retained for owner are to become the property of the contractor. 11. Contractor is responsible for the security and protection for this Scope of Work. 12. Provide protection of existing adjacent walls, doors, floors, and any other items not specifically called out to be demolished.

Patching, repairing, and/or replacing of surfaces damaged by this trade shall be included in this Scope of Work at no additional cost impact to the owner.

13. Contractor shall furnish a detailed schedule, shop drawings (if applicable), product submittals, product samples, and work plan, prior to commencement of all work.

14. All equipment and materials are to be in the quantities as indicated on the Contract Documents and as specified as to brand, sizes, model, color, capacity, ratings, etc.

15. Owner is to be notified of all major deliveries, night work, and work that will be performed outside the immediate work area. Interruption of electrical, fire suppression, or HVAC services to be coordinated with owner at least seven calendar days in advance of interruption.

16. Contractor is responsible for fire alarm system design and installation, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated meeting all requirements per approved plans, specifications, and state/local requirements, and related NFPA Standards to be approved by authorities having jurisdiction.

Page 5: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

500 West 7th Street, Suite 1400 | Fort Worth, Texas 76102 817.335.4991 | www.bbptx.com Page | 2

17. Provide labor and equipment for all fire alarm, lighting, and electrical work as shown or reasonably inferred by the Contract Documents.

18. The Contract Documents show the general arrangements of the work. Should project conditions require any rearrangement, or if equipment or accessories can be installed to better advantage in a different manner, the contractor shall present this information for architect’s approval.

19. Provide all structural steel and masonry elements included but not limited to; structural masonry anchor rods and bond beams, neoprene bearing pads, metal decking, bent plates, bolts and wide flanges as indicated in the Contract Documents.

20. Provide all unit masonry included but not limited to; concrete masonry units, brick, mortar and grout, reinforcement, flashing and weep/cavity products as indicated in the Contract Documents.

21. Provide all bituminous dampproofing including but not limited to; asphalt dampproofing, primer, asphalt-coated glass fabric and patching compound as indicated in the Contract Documents.

22. Provide all thermal insulation including but not limited to; polyisocyanurate foam-plastic board and spray polyurethane insulation as indicated in the Contract Documents.

23. Provide all modified bituminous membrane roofing including but not limited to; modified bituminous membrane roofing, roofing membrane sheet, granule-surfaced roofing cap sheet, backer sheet, metal-foil-surfaced flashing sheet, asphalt roofing cement, fasteners, insulation cant strips, tapered edge strips and cover board as indicated in the Contract Documents.

24. Provide all sheet metal flashing and trim including but not limited to; metallic-coated steel sheet, self-adhering high temperature sheet, fasteners, sealant tape, elastomeric sealant, asphalt roofing cement, gutters and downspouts as indicated in the Contract Documents.

25. Provide all non-structural metal framing including but not limited to; framing members, studs and runners, slip-type head joints, flat strap and backing plate, cold-rolled channel bridging, hat-shaped rigid furring channels, resilient furring channels, cold-rolled furring channels, Z-shaped furring, tie wire, hanger attachments and grid suspension system for gypsum board ceilings as indicated in the Contract Documents.

26. Provide all gypsum board including but not limited to; impact-resistant gypsum board, trim accessories, joint tape, joint compound for interior gypsum board, steel drill screws, acoustical sealant and thermal insulation as indicated in the Contract Documents.

27. Provide all electrical equipment including but not limited to; nameplates, EMT conduit, rigid galvanized steel conduit, galvanized steel outlet boxes, copper conductors, flexible conduit, wiring devices for switches and receptacles, disconnect switches, fuses, circuit breakers, telephone and data system conduits, light fixtures, smoke alarm, heat detector, panelboards, elevator equipment and associated devices as indicated in the Contract Documents.

28. Elevator equipment to be provided by another contractor, but general contractor shall coordinate with elevator contractor for any miscellaneous elevator requirements.

Page 6: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Specifications Manual

Tarrant County 350 W. Belknap Parking GarageElevator Replacement

305 West Belknap StreetFort Worth, Texas 76102

20 February 2019

General Requirements and Facility Construction Subgroups

Page 7: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

20 February 2019

Specification Manual

General Requirements and Facility Construction Subgroups

Tarrant County 350 W. Belknap Parking GarageElevator Replacement

Page 8: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP – 17149.00 Elevator Replacement

TABLE OF CONTENTS 00 01 10 - 1

00 01 10 – TABLE OF CONTENTS

INTRODUCTORY INFORMATION 00 01 01 Project Title Page 00 01 10 Table of Contents

DIVISION 01 – GENERAL REQUIREMENTS 01 10 00 Summary 01 25 00 Substitution Procedures 01 26 00 Contract Modification Procedures 01 29 00 Payment Procedures 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 60 00 Product Requirements 01 73 00 Execution 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents

DIVISION 02 – EXISTING CONDITIONS 02 41 19 Selective Demolition

DIVISION 04 – MASONRY 04 20 00 Unit Masonry

DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 11 13 Bituminous Dampproofing 07 21 00 Thermal Insulation 07 52 16.13 Torch-Applied Styrene-Butadiene-Styrene (SBS) Modified Bituminous

Membrane Roofing

07 62 00 Sheet Metal Flashing and Trim

DIVISION 09 – FINISHES 09 22 13 Non-Structural Metal Framing 09 29 00 Gypsum Board

DIVISION 14 – CONVEYING EQUIPMENT 14 21 00 Electric Traction Elevators

NOTE: Additional design discipline specifications are included in the Drawings. END OF TABLE OF CONTENTS

Page 9: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUMMARY 01 10 00 - 1

SECTION 01 10 00 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information. 2. Access to site. 3. Coordination with occupants. 4. Work restrictions. 5. Specification and Drawing conventions.

1.2 PROJECT INFORMATION

A. Project Identification: Tarrant County 350 West Belknap Parking Garage Elevator Replacement Fort Worth, Texas 76102

B. Owner: Tarrant County 100 West Weatherford Street Fort Worth, Texas 76102 Contact: Mike Amador ([email protected])

C. Architect: Bennett Benner Partners 500 West Seventh Street, Suite 1400 Fort Worth, Texas 76102 Contact: Amanda Schulte ([email protected])

1.3 ACCESS TO SITE

A. General: Contractor shall have restricted use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited by Owner’s restrictions to prevent the interruption of the daily operations, and also by the Owner’s right to perform work or retain other contractors on portions of the Project.

B. Use of Site: Limit use of Project site to Work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Driveways, Walkways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances by construction operations.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

Page 10: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUMMARY 01 10 00 - 2

1.4 COORDINATION WITH OCCUPANTS

A. Full Owner Occupancy: Owner will occupy premises during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction.

1.5 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations set forth by Owner.

1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.

B. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner.

1. Notify Owner not less than seven days in advance of proposed disruptive operations.

C. Restricted Substances: Use of tobacco products and other controlled substances within the existing building is not permitted.

D. Employee Screening: Comply with Owner's requirements for background screening of Contractor personnel working on Project site.

1. Maintain list of approved screened personnel with Owner's representative.

1.6 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard.

Page 11: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUMMARY 01 10 00 - 3

3. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project Manual.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 10 00

Page 12: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUBSTITUTION PROCEDURES 01 25 00 - 1

SECTION 01 25 00 - SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for substitutions.

B. Related Requirements:

1. Section 01 60 00 "Product Requirements" for requirements for submitting comparable product submittals for products by listed manufacturers.

1.2 DEFINITIONS

A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.

1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.

2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not required in order to meet other Project requirements but may offer advantage to Contractor or Owner.

1.3 ACTION SUBMITTALS

A. Substitution Requests: Submit three copies of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

1. Substitution Request Form: Use facsimile of form provided in Project Manual. 2. Documentation: Show compliance with requirements for substitutions and the following, as

applicable:

a. Statement indicating why specified product or fabrication or installation method cannot be provided, if applicable.

b. Coordination of information, including a list of changes or revisions needed to other parts of the Work and to construction performed by Owner and separate contractors that will be necessary to accommodate proposed substitution.

c. Detailed comparison of significant qualities of proposed substitutions with those of the Work specified. Include annotated copy of applicable Specification Section. Significant qualities may include attributes, such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.

d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

e. Samples, where applicable or requested. f. Certificates and qualification data, where applicable or requested. g. List of similar installations for completed projects, with project names and addresses

as well as names and addresses of architects and owners.

Page 13: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUBSTITUTION PROCEDURES 01 25 00 - 2

h. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated.

i. Research reports evidencing compliance with building code in effect for Project, from ICC-ES.

j. Detailed comparison of Contractor's construction schedule using proposed substitutions with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.

k. Cost information, including a proposal of change, if any, in the Contract Sum. l. Contractor's certification that proposed substitution complies with requirements in the

Contract Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated.

m. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

3. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within seven days of receipt of a request for substitution. Architect will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.

a. Forms of Acceptance: Change Order, Construction Change Directive, or Architect's Supplemental Instructions for minor changes in the Work.

b. Use product specified if Architect does not issue a decision on use of a proposed substitution within time allocated.

1.4 QUALITY ASSURANCE

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.

1.5 PROCEDURES

A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions.

1.6 SUBSTITUTIONS

A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.

1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:

a. Requested substitution is consistent with the Contract Documents and will produce indicated results.

b. Substitution request is fully documented and properly submitted.

Page 14: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUBSTITUTION PROCEDURES 01 25 00 - 3

c. Requested substitution will not adversely affect Contractor's construction schedule. d. Requested substitution has received necessary approvals of authorities having

jurisdiction. e. Requested substitution is compatible with other portions of the Work. f. Requested substitution has been coordinated with other portions of the Work. g. Requested substitution provides specified warranty. h. If requested substitution involves more than one contractor, requested substitution

has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

B. Substitutions for Convenience: Not allowed unless otherwise indicated.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

ATTACHMENTS

A. Substitution Request Form.

END OF SECTION 01 25 00

Page 15: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUBSTITUTION PROCEDURES 01 25 00 - 4

SUBSTITUTION REQUEST FORM

Date: __________________________________ From: ________________________________________

To: ______________________________________ Request No.: ___________________________________ I (WE) REQUEST APPROVAL OF THE FOLLOWING PRODUCT OR SYSTEM AS AN APPROVED SUBSTITUTION IN ACCORDANCE WITH THE CONTRACT DOCUMENTS:

Name and Description of SPECIFIED product: _____________________________________________________

Section No.: ________________ Pages: ____________________ Article/Paragraph: _______________

Name and Description of PROPOSED product: ____________________________________________________

Manufacturer: _____________________________________________________________________________

Address: ______________________________________________ Phone: __________________________

Trade Name: ___________________________________________ Model No.: ______________________

Installer: ___________________________________________________________________________________

Address:______________________________________________ Phone: __________________________

History: New Product 1-4 years old 5-10 years old more than 10 years old

Differences between proposed substitution and specified product: __________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

Point-by-point comparative data attached – REQUIRED FOR ARCHITECT’S REVIEW

Reason for not providing specified item: _________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

Project with similar installation: ________________________________________________________________

Address: _______________________________ Architect: ______________________________________

Proposed substitution affects other parts of Work: No Yes; explain ____________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

Savings to Owner for accepting substitution: _____________________________________($_____________)

Proposed substitution changes Contract Time: No Yes [Add] [Deduct] __________________days.

Page 16: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUBSTITUTION PROCEDURES 01 25 00 - 5

Supporting Data Attached: Drawing Product Data Samples Test Reports _________________ The Undersigned certifies: Proposed substitution has been fully investigated and determined to be equal or superior to specified

product. Same warranty will be furnished for proposed substitution as for specified product. Same maintenance service and source of replacement parts, as applicable, is available. Proposed substitution will have no adverse effect on other trades and will not affect or delay progress

schedule. Cost data as stated above is complete. Claims for additional costs related to accepted substitution which

may subsequently become apparent are to be waived. Proposed substitution does not affect dimensions and functional clearances. Payment will be made for changes to building design, including A/E design, detailing, and construction

costs caused by the substitution. Coordination, installation, and changes in the Work as necessary for accepted substitution will be com-

plete in all respects.

Submitted by: ______________________________________________________________________________

Signed by: _________________________________________________________________________________

Firm: _____________________________________________________________________________________

Address: __________________________________________________________________________________

__________________________________________________________________________________________

Phone: ____________________________________________________________________________________

Attachments: _______________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________ A/E REVIEW AND ACTION

Substitution approved – Make submittals in accordance with Section 01 33 00. Substitution approved as noted – Make submittal in accordance with Section 01 33 00. Substitution rejected – Use specified materials. Substitution Request received too late – Use specified materials.

Signed by: ______________________________________________ Date: ___________________________

Additional Comments: _______________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

___________________________________________________________________________________________

______________________________________________________________By: __________________________

Page 17: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CONTRACT MODIFICATION PROCEDURES 01 26 00 - 1

SECTION 01 26 00 - CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for handling and processing Contract modifications.

B. Related Requirements:

1. Section 01 25 00 "Substitution Procedures" for administrative procedures for handling requests for substitutions made after the Contract award.

1.2 MINOR CHANGES IN THE WORK

A. Architect will issue supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time, on AIA Document G710.

1.3 PROPOSAL REQUESTS

A. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.

1. Work Change Proposal Requests issued by Architect are not instructions either to stop work in progress or to execute the proposed change.

2. Within time specified in Proposal Request or 20 days, when not otherwise specified, after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.

a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

c. Include costs of labor and supervision directly attributable to the change. d. Include an updated Contractor's construction schedule that indicates the effect of the

change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

e. Quotation Form: Use forms acceptable to Architect.

B. Contractor-Initiated Proposals: If latent or changed conditions require modifications to the Contract, Contractor may initiate a claim by submitting a request for a change to Architect.

1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.

Page 18: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CONTRACT MODIFICATION PROCEDURES 01 26 00 - 2

2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

4. Include costs of labor and supervision directly attributable to the change. 5. Include an updated Contractor's construction schedule that indicates the effect of the

change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

6. Comply with requirements in Section 01 25 00 "Substitution Procedures" if the proposed change requires substitution of one product or system for product or system specified.

7. Proposal Request Form: Use form acceptable to Architect.

1.4 ADMINISTRATIVE CHANGE ORDERS

A. Unit-Price Adjustment: See Section 01 22 00 "Unit Prices" for administrative procedures for preparation of Change Order Proposal for adjusting the Contract Sum to reflect measured scope of unit-price work.

1.5 CHANGE ORDER PROCEDURES

A. On Owner's approval of a Work Change Proposal Request, Architect will issue a Change Order for signatures of Owner and Contractor on AIA Document G701.

1.6 CONSTRUCTION CHANGE DIRECTIVE

A. Construction Change Directive: Architect may issue a Construction Change Directive on AIA Document G714. Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.

1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time.

B. Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive.

1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.

C. Documentation: Maintain detailed records on a time and material basis of work required by the Work Change Directive.

1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.

Page 19: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CONTRACT MODIFICATION PROCEDURES 01 26 00 - 3

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 26 00

Page 20: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PAYMENT PROCEDURES 01 29 00 - 1

SECTION 01 29 00 - PAYMENT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements necessary to prepare and process Applications for Payment.

B. Related Requirements:

1. Section 01 22 00 "Unit Prices" for administrative requirements governing the use of unit prices.

2. Section 01 26 00 "Contract Modification Procedures" for administrative procedures for handling changes to the Contract.

3. Section 01 32 00 "Construction Progress Documentation" for administrative requirements governing the preparation and submittal of the Contractor's construction schedule.

1.2 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's construction schedule.

1. Coordinate line items in the schedule of values with items required to be indicated as separate activities in Contractor's construction schedule.

2. Submit the schedule of values to Architect at earliest possible date, but no later than seven days before the date scheduled for submittal of initial Applications for Payment.

B. Format and Content: Use Project Manual table of contents as a guide to establish line items for the schedule of values. Provide at least one line item for each Specification Section.

1. Identification: Include the following Project identification on the schedule of values:

a. Project name and location. b. Name of Architect. c. Architect's Project number. d. Contractor's name and address. e. Date of submittal.

2. Arrange schedule of values consistent with format of AIA Document G703. 3. Arrange the schedule of values in tabular form, with separate columns to indicate the

following for each item listed:

a. Related Specification Section or Division. b. Description of the Work. c. Name of subcontractor. d. Name of manufacturer or fabricator. e. Name of supplier. f. Change Orders (numbers) that affect value. g. Dollar value of the following, as a percentage of the Contract Sum to nearest one-

hundredth percent, adjusted to total 100 percent. Round dollar amounts to whole dollars, with total equal to Contract Sum.

Page 21: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PAYMENT PROCEDURES 01 29 00 - 2

1) Labor. 2) Materials. 3) Equipment.

4. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Provide multiple line items for principal subcontract amounts in excess of five percent of the Contract Sum.

5. Provide a separate line item in the schedule of values for each part of the Work where Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed.

a. Differentiate between items stored on-site and items stored off-site.

6. Overhead Costs: Include total cost and proportionate share of general overhead and profit for each line item.

7. Schedule of Values Revisions: Revise the schedule of values when Change Orders or Construction Change Directives result in a change in the Contract Sum. Include at least one separate line item for each Change Order and Construction Change Directive.

1.3 APPLICATIONS FOR PAYMENT

A. Each Application for Payment following the initial Application for Payment shall be consistent with previous applications and payments as certified by Architect and paid for by Owner.

B. Payment Application Times: The date for each progress payment is indicated in the Agreement between Owner and Contractor. The period of construction work covered by each Application for Payment is the period indicated in the Agreement.

1. Submit draft copy of Application for Payment seven days prior to due date for review by Architect.

C. Application for Payment Forms: Use AIA Document G702 and AIA Document G703 as form for Applications for Payment.

D. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Architect will return incomplete applications without action.

1. Entries shall match data on the schedule of values and Contractor's construction schedule. Use updated schedules if revisions were made.

2. Include amounts for work completed following previous Application for Payment, whether or not payment has been received. Include only amounts for work completed at time of Application for Payment.

3. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application.

4. Indicate separate amounts for work being carried out under Owner-requested project acceleration.

E. Stored Materials: Include in Application for Payment amounts applied for materials or equipment purchased or fabricated and stored, but not yet installed. Differentiate between items stored on-site and items stored off-site.

1. Provide certificate of insurance, evidence of transfer of title to Owner, and consent of surety to payment for stored materials.

Page 22: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PAYMENT PROCEDURES 01 29 00 - 3

2. Provide supporting documentation that verifies amount requested, such as paid invoices. Match amount requested with amounts indicated on documentation; do not include overhead and profit on stored materials.

3. Provide summary documentation for stored materials indicating the following:

a. Value of materials previously stored and remaining stored as of date of previous Applications for Payment.

b. Value of previously stored materials put in place after date of previous Application for Payment and on or before date of current Application for Payment.

c. Value of materials stored since date of previous Application for Payment and remaining stored as of date of current Application for Payment.

F. Transmittal: Submit three signed and notarized original copies of each Application for Payment to Architect by a method ensuring receipt within 24 hours. One copy shall include waivers of lien and similar attachments if required.

1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application.

G. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's lien from entities lawfully entitled to file a mechanic's lien arising out of the Contract and related to the Work covered by the payment.

1. Submit partial waivers on each item for amount requested in previous application, after deduction for retainage, on each item.

2. When an application shows completion of an item, submit conditional final or full waivers. 3. Owner reserves the right to designate which entities involved in the Work must submit

waivers. 4. Submit final Application for Payment with or preceded by conditional final waivers from every

entity involved with performance of the Work covered by the application who is lawfully entitled to a lien.

5. Waiver Forms: Submit executed waivers of lien on forms acceptable to Owner.

H. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:

1. List of subcontractors. 2. Schedule of values. 3. Contractor's construction schedule (preliminary if not final). 4. Products list (preliminary if not final). 5. Schedule of unit prices. 6. Submittal schedule (preliminary if not final). 7. List of Contractor's staff assignments. 8. List of Contractor's principal consultants. 9. Copies of building permits. 10. Copies of authorizations and licenses from authorities having jurisdiction for performance of

the Work. 11. Initial progress report. 12. Report of preconstruction conference.

I. Application for Payment at Substantial Completion: After Architect issues the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete.

1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.

Page 23: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PAYMENT PROCEDURES 01 29 00 - 4

2. This application shall reflect Certificate(s) of Substantial Completion issued previously for Owner occupancy of designated portions of the Work.

J. Final Payment Application: After completing Project closeout requirements, submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:

1. Evidence of completion of Project closeout requirements. 2. Insurance certificates for products and completed operations where required and proof that

taxes, fees, and similar obligations were paid. 3. Updated final statement, accounting for final changes to the Contract Sum. 4. AIA Document G706. 5. AIA Document G706A. 6. AIA Document G707. 7. Evidence that claims have been settled. 8. Final meter readings for utilities, a measured record of stored fuel, and similar data as of date

of Substantial Completion or when Owner took possession of and assumed responsibility for corresponding elements of the Work.

9. Final liquidated damages settlement statement.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 29 00

Page 24: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 1

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. General coordination procedures. 2. Coordination drawings. 3. FIs. 4. Digital project management procedures. 5. Project meetings.

B. Related Requirements:

1. Section 01 32 00 "Construction Progress Documentation" for preparing and submitting Contractor's construction schedule.

2. Section 01 73 00 "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

3. Section 01 77 00 "Closeout Procedures" for coordinating closeout of the Contract.

1.2 DEFINITIONS

A. BIM: Building Information Modeling.

B. RFI: Request for Information. Request from Owner, Architect, or Contractor seeking information required by or clarifications of the Contract Documents.

1.3 INFORMATIONAL SUBMITTALS

A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:

1. Name, address, telephone number, and email address of entity performing subcontract or supplying products.

2. Number and title of related Specification Section(s) covered by subcontract. 3. Drawing number and detail references, as appropriate, covered by subcontract.

B. Key Personnel Names: Within 15 days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses and cellular telephone numbers and e-mail addresses. Provide names, addresses, and telephone numbers of individuals assigned as alternates in the absence of individuals assigned to Project.

1. Post copies of list in project meeting room, in temporary field office, and in prominent location in built facility. Keep list current at all times.

Page 25: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 2

1.4 GENERAL COORDINATION PROCEDURES

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations included in different Sections that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's construction schedule. 2. Preparation of the schedule of values. 3. Installation and removal of temporary facilities and controls. 4. Delivery and processing of submittals. 5. Progress meetings. 6. Preinstallation conferences. 7. Project closeout activities. 8. Startup and adjustment of systems.

1.5 COORDINATION DRAWINGS

A. Coordination Drawings, General: Prepare coordination drawings according to requirements in individual Sections, and additionally where installation is not completely indicated on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity.

1. Content: Project-specific information, drawn accurately to a scale large enough to indicate and resolve conflicts. Do not base coordination drawings on standard printed data. Include the following information, as applicable:

a. Use applicable Drawings as a basis for preparation of coordination drawings. Prepare sections, elevations, and details as needed to describe relationship of various systems and components.

b. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.

c. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.

d. Show location and size of access doors required for access to concealed dampers, valves, and other controls.

e. Indicate required installation sequences.

Page 26: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 3

f. Indicate dimensions shown on Drawings. Specifically note dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternative sketches to Architect indicating proposed resolution of such conflicts. Minor dimension changes and difficult installations will not be considered changes to the Contract.

B. Coordination Drawing Organization: Organize coordination drawings as follows:

1. Floor Plans and Reflected Ceiling Plans: Show architectural and structural elements, and mechanical, plumbing, fire-protection, fire-alarm, and electrical Work. Show locations of visible ceiling-mounted devices relative to acoustical ceiling grid. Supplement plan drawings with section drawings where required to adequately represent the Work.

2. Plenum Space: Indicate subframing for support of ceiling and wall systems, mechanical and electrical equipment, and related Work. Locate components within plenums to accommodate layout of light fixtures and other components indicated on Drawings. Indicate areas of conflict between light fixtures and other components.

3. Mechanical Rooms: Provide coordination drawings for mechanical rooms showing plans and elevations of mechanical, plumbing, fire-protection, fire-alarm, and electrical equipment.

4. Structural Penetrations: Indicate penetrations and openings required for all disciplines. 5. Slab Edge and Embedded Items: Indicate slab edge locations and sizes and locations of

embedded items for metal fabrications, sleeves, anchor bolts, bearing plates, angles, door floor closers, slab depressions for floor finishes, curbs and housekeeping pads, and similar items.

6. Mechanical and Plumbing Work: Show the following:

a. Sizes and bottom elevations of ductwork, piping, and conduit runs, including insulation, bracing, flanges, and support systems.

b. Dimensions of major components, such as dampers, valves, diffusers, access doors, cleanouts and electrical distribution equipment.

c. Fire-rated enclosures around ductwork.

7. Electrical Work: Show the following:

a. Runs of vertical and horizontal conduit 1-1/4 inches (32 mm) in diameter and larger. b. Light fixture, exit light, emergency battery pack, smoke detector, and other fire-alarm

locations. c. Panel board, switch board, switchgear, transformer, busway, generator, and motor-

control center locations. d. Location of pull boxes and junction boxes, dimensioned from column center lines.

8. Fire-Protection System: Show the following:

a. Locations of standpipes, mains piping, branch lines, pipe drops, and sprinkler heads.

9. Review: Architect will review coordination drawings to confirm that in general the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility. If Architect determines that coordination drawings are not being prepared in sufficient scope or detail, or are otherwise deficient, Architect will so inform Contractor, who shall make suitable modifications and resubmit.

C. Coordination Digital Data Files: Prepare coordination digital data files according to the following requirements:

1. File Preparation Format: Revit 2016, operating in Microsoft Windows operating system. 2. File Submittal Format: Submit or post coordination drawing files using PDF format.

Page 27: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 4

3. Architect will furnish Contractor one set of digital data files of Drawings for use in preparing coordination digital data files.

a. Architect makes no representations as to the accuracy or completeness of digital data files as they relate to Drawings.

b. Digital Data Software Program: Drawings are available in Revit 2016. c. Contractor shall execute a data licensing agreement in the form of

AIA Document C106.

1.6 REQUEST FOR INFORMATION (RFI)

A. General: Immediately on discovery of the need for additional information, clarification, or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.

1. Architect will return without response those RFIs submitted to Architect by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. Project name. 2. Project number. 3. Date. 4. Name of Contractor. 5. Name of Architect. 6. RFI number, numbered sequentially. 7. RFI subject. 8. Specification Section number and title and related paragraphs, as appropriate. 9. Drawing number and detail references, as appropriate. 10. Field dimensions and conditions, as appropriate. 11. Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract

Time or the Contract Sum, Contractor shall state impact in the RFI. 12. Contractor's signature. 13. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. RFI Forms: Software-generated form with substantially the same content as indicated above, acceptable to Architect.

1. Attachments shall be electronic files in PDF format.

D. Architect's Action: Architect will review each RFI, determine action required, and respond. Allow seven working days for Architect's response for each RFI. RFIs received by Architect after 1:00 p.m. will be considered as received the following working day.

1. The following Contractor-generated RFIs will be returned without action:

a. Requests for approval of submittals.

Page 28: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 5

b. Requests for approval of substitutions. c. Requests for approval of Contractor's means and methods. d. Requests for coordination information already indicated in the Contract Documents. e. Requests for adjustments in the Contract Time or the Contract Sum. f. Requests for interpretation of Architect's actions on submittals. g. Incomplete RFIs or inaccurately prepared RFIs.

2. Architect's action may include a request for additional information, in which case Architect's time for response will date from time of receipt by Architect of additional information.

3. Architect's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal according to Section 01 26 00 "Contract Modification Procedures."

a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify Architect in writing within 10 days of receipt of the RFI response.

E. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number. Submit log weekly. Software log with not less than the following:

1. Project name. 2. Name and address of Contractor. 3. Name and address of Architect. 4. RFI number including RFIs that were returned without action or withdrawn. 5. RFI description. 6. Date the RFI was submitted. 7. Date Architect's response was received. 8. Identification of related Minor Change in the Work, Construction Change Directive, and

Proposal Request, as appropriate. 9. Identification of related Field Order, Work Change Directive, and Proposal Request, as

appropriate.

F. On receipt of Architect's action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Architect within seven days if Contractor disagrees with response.

1.7 DIGITAL PROJECT MANAGEMENT PROCEDURES

A. Use of Architect's Digital Data Files: Digital data files of Architect's BIM model will be provided by Architect for Contractor's use during construction.

1. Digital data files may be used by Contractor in preparing coordination drawings, Shop Drawings, and Project record Drawings.

2. Architect makes no representations as to the accuracy or completeness of digital data files as they relate to Contract Drawings.

3. Digital Drawing Software Program: Contract Drawings are available in Revit 2016. 4. Contractor shall execute a data licensing agreement in the form of AIA Document C106 Digital

Data Licensing Agreement.

a. Subcontractors, and other parties granted access by Contractor to Architect's digital data files shall execute a data licensing agreement in the form of AIA Document C106.

B. Web-Based Project Software: Use Architect's web-based Project software site for purposes of hosting and managing Project communication and documentation until Final Completion.

1. Web-based Project software: Newforma Project Center, Version 11.7.

Page 29: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 6

C. PDF Document Preparation: Where PDFs are required to be submitted to Architect, prepare as follows:

1. Assemble complete submittal package into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form with links enabling navigation to each item.

2. Name file with submittal number or other unique identifier, including revision identifier. 3. Certifications: Where digitally submitted certificates and certifications are required, provide a

digital signature with digital certificate on where indicated.

1.8 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at Project site unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Owner and Architect of scheduled meeting dates and times a minimum of 10 working days prior to meeting.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees. 3. Minutes: Entity responsible for conducting meeting will record significant discussions and

agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner and Architect, within three days of the meeting.

B. Preconstruction Conference: Architect will schedule and conduct a preconstruction conference before starting construction, at a time convenient to Owner and Architect, but no later than 15 days after execution of the Agreement.

1. Attendees: Authorized representatives of Owner, Owner's Commissioning Authority, Architect, and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Responsibilities and personnel assignments. b. Tentative construction schedule. c. Critical work sequencing and long lead items. d. Designation of key personnel and their duties. e. Lines of communications. f. Use of web-based Project software. g. Procedures for processing field decisions and Change Orders. h. Procedures for RFIs. i. Procedures for testing and inspecting. j. Procedures for processing Applications for Payment. k. Distribution of the Contract Documents. l. Submittal procedures. m. Use of the premises. n. Work restrictions. o. Working hours. p. Owner's occupancy requirements. q. Responsibility for temporary facilities and controls. r. Procedures for moisture and mold control. s. Procedures for disruptions and shutdowns. t. Construction waste management and recycling. u. Parking availability. v. Office, work, and storage areas. w. Equipment deliveries and priorities.

Page 30: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 7

x. First aid. y. Security. z. Progress cleaning.

3. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes.

C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity when required by other sections and when required for coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise Architect, and Owner's Commissioning Authority of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. Contract Documents. b. Options. c. Related RFIs. d. Related Change Orders. e. Purchases. f. Deliveries. g. Submittals. h. Review of mockups. i. Possible conflicts. j. Compatibility requirements. k. Time schedules. l. Weather limitations. m. Manufacturer's written instructions. n. Warranty requirements. o. Compatibility of materials. p. Acceptability of substrates. q. Temporary facilities and controls. r. Space and access limitations. s. Regulations of authorities having jurisdiction. t. Testing and inspecting requirements. u. Installation procedures. v. Coordination with other work. w. Required performance results. x. Protection of adjacent work. y. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information.

5. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

D. Project Closeout Conference: Schedule and conduct a project closeout conference, at a time convenient to Owner and Architect, but no later than 90 days prior to the scheduled date of Substantial Completion.

Page 31: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 8

1. Conduct the conference to review requirements and responsibilities related to Project closeout.

2. Attendees: Authorized representatives of Owner, Owner's Commissioning Authority, Architect, and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the meeting. Participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

3. Agenda: Discuss items of significance that could affect or delay Project closeout, including the following:

a. Preparation of Record Documents. b. Procedures required prior to inspection for Substantial Completion and for final

inspection for acceptance. c. Submittal of written warranties. d. Requirements for preparing operations and maintenance data. e. Requirements for delivery of material samples, attic stock, and spare parts. f. Requirements for demonstration and training. g. Preparation of Contractor's punch list. h. Procedures for processing Applications for Payment at Substantial Completion and for

final payment. i. Submittal procedures. j. Installation of Owner's furniture, fixtures, and equipment. k. Responsibility for removing temporary facilities and controls.

4. Minutes: Entity conducting meeting will record and distribute meeting minutes.

E. Progress Meetings: Conduct progress meetings at regular intervals.

1. Coordinate dates of meetings with preparation of payment requests. 2. Attendees: In addition to representatives of Owner and Architect, each contractor,

subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

3. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.

a. Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's construction schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

1) Review schedule for next period.

b. Review present and future needs of each entity present, including the following:

1) Interface requirements. 2) Sequence of operations. 3) Status of submittals. 4) Deliveries. 5) Off-site fabrication. 6) Access. 7) Site use. 8) Temporary facilities and controls.

Page 32: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 9

9) Progress cleaning. 10) Quality and work standards. 11) Status of correction of deficient items. 12) Field observations. 13) Status of RFIs. 14) Status of Proposal Requests. 15) Pending changes. 16) Status of Change Orders. 17) Pending claims and disputes. 18) Documentation of information for payment requests.

4. Minutes: Entity responsible for conducting the meeting will record and distribute the meeting minutes to each party present and to parties requiring information.

a. Schedule Updating: Revise Contractor's construction schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 31 00

Page 33: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 1

SECTION 01 32 00 - CONSTRUCTION PROGRESS DOCUMENTATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Startup construction schedule. 2. Contractor's Construction Schedule. 3. Construction schedule updating reports. 4. Daily construction reports.

1.2 DEFINITIONS

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction Project. Activities included in a construction schedule consume time and resources.

1. Critical Activity: An activity on the critical path that must start and finish on the planned early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network. 3. Successor Activity: An activity that follows another activity in the network.

B. Cost Loading: The allocation of the schedule of values for completing an activity as scheduled. The sum of costs for all activities must equal the total Contract Sum.

C. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine when activities can be performed and the critical path of Project.

D. Critical Path: The longest connected chain of interdependent activities through the network schedule that establishes the minimum overall Project duration and contains no float.

E. Event: The starting or ending point of an activity.

F. Float: The measure of leeway in starting and completing an activity.

1. Float time is not for the exclusive use or benefit of either Owner or Contractor, but is a jointly owned, expiring Project resource available to both parties as needed to meet schedule milestones and Contract completion date.

2. Free float is the amount of time an activity can be delayed without adversely affecting the early start of the successor activity.

3. Total float is the measure of leeway in starting or completing an activity without adversely affecting the planned Project completion date.

G. Resource Loading: The allocation of manpower and equipment necessary for completing an activity as scheduled.

Page 34: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 2

1.3 INFORMATIONAL SUBMITTALS

A. Format for Submittals: Submit required submittals as PDF files.

B. Startup Network Diagram: Of size required to display entire network for entire construction period. Show logic ties for activities.

C. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period.

D. CPM Reports: Concurrent with CPM schedule, submit each of the following reports. Format for each activity in reports shall contain activity number, activity description, cost and resource loading, original duration, remaining duration, early start date, early finish date, late start date, late finish date, and total float in calendar days.

1. Activity Report: List of activities sorted by activity number and then early start date, or actual start date if known.

2. Logic Report: List of preceding and succeeding activities for each activity, sorted in ascending order by activity number and then by early start date, or actual start date if known.

3. Total Float Report: List of activities sorted in ascending order of total float. 4. Earnings Report: Compilation of Contractor's total earnings from commencement of the Work

until most recent Application for Payment.

E. Construction Schedule Updating Reports: Submit with Applications for Payment.

F. Daily Construction Reports: Submit at monthly intervals.

1.4 COORDINATION

A. Coordinate Contractor's Construction Schedule with the schedule of values, submittal schedule, progress reports, payment requests, and other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from entities involved. 2. Coordinate each construction activity in the network with other activities and schedule them

in proper sequence.

1.5 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Computer Scheduling Software: Prepare schedules using current version of a program that has been developed specifically to manage construction schedules.

B. Time Frame: Extend schedule from date established for commencement of the Work to date of Substantial Completion.

1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order.

C. Activities: Treat each floor or separate area as a separate numbered activity for each main element of the Work. Comply with the following:

1. Activity Duration: Define activities so no activity is longer than 20 days, unless specifically allowed by Architect.

2. Procurement Activities: Include procurement process activities for the following long lead items and major items, requiring a cycle of more than 60 days, as separate activities in

Page 35: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 3

schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery.

3. Submittal Review Time: Include review and resubmittal times indicated in Section 01 33 00 "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's Construction Schedule with submittal schedule.

4. Startup and Testing Time: Include no fewer than 15 days for startup and testing. 5. Commissioning Time: Include no fewer than 15 days for commissioning. 6. Substantial Completion: Indicate completion in advance of date established for Substantial

Completion, and allow time for Architect's administrative procedures necessary for certification of Substantial Completion.

7. Punch List and Final Completion: Include not more than 30 days for completion of punch list items and final completion.

D. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected.

1. Work Restrictions: Show the effect of the following items on the schedule:

a. Coordination with existing construction. b. Limitations of continued occupancies. c. Uninterruptible services.

2. Work Stages: Indicate important stages of construction for each major portion of the Work, including, but not limited to, the following:

a. Submittals. b. Mockups. c. Installation. d. Building flush-out. e. Startup and placement into final use and operation. f. Commissioning.

E. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and final completion.

F. Cost Correlation: Superimpose a cost correlation timeline, indicating planned and actual costs. On the line, show planned and actual dollar volume of the Work performed as of planned and actual dates used for preparation of payment requests.

1. See Section 01 29 00 "Payment Procedures" for cost reporting and payment procedures.

G. Upcoming Work Summary: Prepare summary report indicating activities scheduled to occur or commence prior to submittal of next schedule update. Summarize the following issues:

1. Unresolved issues. 2. Unanswered Requests for Information. 3. Rejected or unreturned submittals. 4. Notations on returned submittals. 5. Pending modifications affecting the Work and the Contract Time.

H. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting.

Page 36: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 4

1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.

2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.

3. As the Work progresses, indicate final completion percentage for each activity.

I. Recovery Schedule: When periodic update indicates the Work is 14 or more calendar days behind the current approved schedule, submit a separate recovery schedule indicating means by which Contractor intends to regain compliance with the schedule. Indicate changes to working hours, working days, crew sizes, equipment required to achieve compliance, and date by which recovery will be accomplished.

J. Distribution: Distribute copies of approved schedule to Architect Owner, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility.

1. Post copies in Project meeting rooms and temporary field offices. 2. When revisions are made, distribute updated schedules to the same parties and post in the

same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities.

1.6 CPM SCHEDULE REQUIREMENTS

A. General: Prepare network diagrams using AON (activity-on-node) format.

B. Startup Network Diagram: Submit diagram within 14 days of date established for commencement of the Work. Outline significant construction activities for the first 90 days of construction. Include skeleton diagram for the remainder of the Work and a cash requirement prediction based on indicated activities.

C. CPM Schedule: Prepare Contractor's Construction Schedule using a time-scaled CPM network analysis diagram for the Work.

1. Develop network diagram in sufficient time to submit CPM schedule so it can be accepted for use no later than 60 days after date established for commencement of the Work.

a. Failure to include any work item required for performance of this Contract shall not excuse Contractor from completing all work within applicable completion dates.

2. Conduct educational workshops to train and inform key Project personnel, including subcontractors' personnel, in proper methods of providing data and using CPM schedule information.

3. Establish procedures for monitoring and updating CPM schedule and for reporting progress. Coordinate procedures with progress meeting and payment request dates.

4. Use "one workday" as the unit of time for individual activities. Indicate nonworking days and holidays incorporated into the schedule to coordinate with the Contract Time.

D. CPM Schedule Preparation: Prepare a list of all activities required to complete the Work. Using the startup network diagram, prepare a skeleton network to identify probable critical paths.

1. Activities: Indicate the estimated time duration, sequence requirements, and relationship of each activity in relation to other activities. Include estimated time frames for the following activities:

Page 37: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 5

a. Preparation and processing of submittals. b. Mobilization and demobilization. c. Purchase of materials. d. Delivery. e. Fabrication. f. Utility interruptions. g. Installation. h. Work by Owner that may affect or be affected by Contractor's activities. i. Testing and inspection. j. Commissioning. k. Punch list and final completion. l. Activities occurring following final completion.

2. Critical Path Activities: Identify critical path activities, including those for interim completion dates. Scheduled start and completion dates shall be consistent with Contract milestone dates.

3. Processing: Process data to produce output data on a computer-drawn, time-scaled network. Revise data, reorganize activity sequences, and reproduce as often as necessary to produce the CPM schedule within the limitations of the Contract Time.

4. Format: Mark the critical path. Locate the critical path near center of network; locate paths with most float near the edges.

a. Subnetworks on separate sheets are permissible for activities clearly off the critical path.

5. Cost- and Resource-Loading of CPM Schedule: Assign cost to construction activities on the CPM schedule. Do not assign costs to submittal activities. Obtain Architect's approval prior to assigning costs to fabrication and delivery activities. Assign costs under main subcontracts for testing and commissioning activities, operation and maintenance manuals, punch list activities, Project record documents, and demonstration and training (if applicable), in the amount of 5 percent of the Contract Sum.

a. Each activity cost shall reflect an appropriate value subject to approval by Architect. b. Total cost assigned to activities shall equal the total Contract Sum.

E. Contract Modifications: For each proposed contract modification and concurrent with its submission, prepare a time-impact analysis using a network fragment to demonstrate the effect of the proposed change on the overall Project schedule.

F. Initial Issue of Schedule: Prepare initial network diagram from a sorted activity list indicating straight "early start-total float." Identify critical activities. Prepare tabulated reports showing the following:

1. Contractor or subcontractor and the Work or activity. 2. Description of activity. 3. Main events of activity. 4. Immediate preceding and succeeding activities. 5. Early and late start dates. 6. Early and late finish dates. 7. Activity duration in workdays. 8. Total float or slack time. 9. Average size of workforce. 10. Dollar value of activity (coordinated with the schedule of values).

G. Schedule Updating: Concurrent with making revisions to schedule, prepare tabulated reports showing the following:

Page 38: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 6

1. Identification of activities that have changed. 2. Changes in early and late start dates. 3. Changes in early and late finish dates. 4. Changes in activity durations in workdays. 5. Changes in the critical path. 6. Changes in total float or slack time. 7. Changes in the Contract Time.

H. Value Summaries: Prepare two cumulative value lists, sorted by finish dates.

1. In first list, tabulate activity number, early finish date, dollar value, and cumulative dollar value.

2. In second list, tabulate activity number, late finish date, dollar value, and cumulative dollar value.

3. In subsequent issues of both lists, substitute actual finish dates for activities completed as of list date.

4. Prepare list for ease of comparison with payment requests; coordinate timing with progress meetings.

a. In both value summary lists, tabulate "actual percent complete" and "cumulative value completed" with total at bottom.

b. Submit value summary printouts one week before each regularly scheduled progress meeting.

1.7 REPORTS

A. Daily Construction Reports: Prepare a daily construction report recording the following information concerning events at Project site:

1. List of subcontractors at Project site. 2. List of separate contractors at Project site. 3. Approximate count of personnel at Project site. 4. Equipment at Project site. 5. Material deliveries. 6. High and low temperatures and general weather conditions, including presence of rain or

snow. 7. Testing and inspection. 8. Accidents. 9. Meetings and significant decisions. 10. Unusual events. 11. Stoppages, delays, shortages, and losses. 12. Meter readings and similar recordings. 13. Emergency procedures. 14. Orders and requests of authorities having jurisdiction. 15. Change Orders received and implemented. 16. Construction Change Directives received and implemented. 17. Services connected and disconnected. 18. Equipment or system tests and startups. 19. Partial completions and occupancies. 20. Substantial Completions authorized.

Page 39: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 7

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 32 00

Page 40: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUBMITTAL PROCEDURES 01 33 00 - 1

SECTION 01 33 00 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Submittal schedule requirements. 2. Administrative and procedural requirements for submittals.

B. Related Requirements:

1. Section 01 29 00 "Payment Procedures" for submitting Applications for Payment and the schedule of values.

2. Section 01 31 00 "Project Management and Coordination" for submitting coordination drawings and subcontract list and for requirements for web-based Project software.

3. Section 01 32 00 "Construction Progress Documentation" for submitting schedules and reports, including Contractor's construction schedule.

4. Section 01 40 00 "Quality Requirements" for submitting test and inspection reports, and schedule of tests and inspections.

5. Section 01 77 00 "Closeout Procedures" for submitting closeout submittals and maintenance material submittals.

6. Section 01 78 23 "Operation and Maintenance Data" for submitting operation and maintenance manuals.

7. Section 01 78 39 "Project Record Documents" for submitting record Drawings, record Specifications, and record Product Data.

8. Section 01 79 00 "Demonstration and Training" for submitting video recordings of demonstration of equipment and training of Owner's personnel.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Architect's responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals."

B. Informational Submittals: Written and graphic information and physical samples that do not require Architect's and Construction Manager's responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals."

1.3 SUBMITTAL SCHEDULE

A. Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or revisions to submittals noted by Architect and additional time for handling and reviewing submittals required by those corrections.

1. Coordinate submittal schedule with list of subcontracts, the schedule of values, and Contractor's construction schedule.

Page 41: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUBMITTAL PROCEDURES 01 33 00 - 2

2. Initial Submittal: Submit concurrently with startup construction schedule. Include submittals required during the first 60 days of construction. List those submittals required to maintain orderly progress of the Work and those required early because of long lead time for manufacture or fabrication.

3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's construction schedule.

a. Submit revised submittal schedule to reflect changes in current status and timing for submittals.

4. Format: Arrange the following information in a tabular format:

a. Scheduled date for first submittal. b. Specification Section number and title. c. Submittal Category: Action; informational. d. Name of subcontractor. e. Description of the Work covered. f. Scheduled date for Architect's final release or approval. g. Scheduled dates for purchasing. h. Scheduled date of fabrication. i. Scheduled dates for installation. j. Activity or event number.

1.4 SUBMITTAL FORMATS

A. Submittal Information: Include the following information in each submittal:

1. Project name. 2. Date. 3. Name of Architect. 4. Name of Contractor. 5. Name of firm or entity that prepared submittal. 6. Names of subcontractor, manufacturer, and supplier. 7. Unique submittal number, including revision identifier. Include Specification Section number

with sequential alphanumeric identifier; and alphanumeric suffix for resubmittals. 8. Category and type of submittal. 9. Submittal purpose and description. 10. Number and title of Specification Section, with paragraph number and generic name for each

of multiple items. 11. Drawing number and detail references, as appropriate. 12. Indication of full or partial submittal. 13. Location(s) where product is to be installed, as appropriate. 14. Other necessary identification. 15. Remarks. 16. Signature of transmitter.

B. Options: Identify options requiring selection by Architect.

C. Deviations and Additional Information: On each submittal, clearly indicate deviations from requirements in the Contract Documents, including minor variations and limitations; include relevant additional information and revisions, other than those requested by Architect on previous submittals. Indicate by highlighting on each submittal or noting on attached separate sheet.

D. Submittals for Web-Based Project Software: Prepare submittals as PDF files, or other format indicated by Project software website.

Page 42: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUBMITTAL PROCEDURES 01 33 00 - 3

1.5 SUBMITTAL PROCEDURES

A. Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections.

1. Web-Based Project Software: Prepare submittals in PDF form, and upload to web-based Project software website. Enter required data in web-based software site to fully identify submittal.

B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved submittal schedule.

3. Submit action submittals and informational submittals required by the same Specification Section as separate packages under separate transmittals.

4. Coordinate transmittal of submittals for related parts of the Work specified in different Sections so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Architect reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Architect's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Architect will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Resubmittal Review: Allow 15 days for review of each resubmittal. 4. Sequential Review: Where sequential review of submittals by Architect's consultants, Owner,

or other parties is indicated, allow 21 days for initial review of each submittal.

D. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal. 2. Note date and content of revision in label or title block and clearly indicate extent of revision. 3. Resubmit submittals until they are marked with approval notation from Architect's action

stamp.

E. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

F. Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Architect's action stamp.

Page 43: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUBMITTAL PROCEDURES 01 33 00 - 4

1.6 SUBMITTAL REQUIREMENTS

A. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard published data are unsuitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable. 3. Include the following information, as applicable:

a. Manufacturer's catalog cuts. b. Manufacturer's product specifications. c. Standard color charts. d. Statement of compliance with specified referenced standards. e. Testing by recognized testing agency. f. Application of testing agency labels and seals. g. Notation of coordination requirements. h. Availability and delivery time information.

4. For equipment, include the following in addition to the above, as applicable:

a. Wiring diagrams that show factory-installed wiring. b. Printed performance curves. c. Operational range diagrams. d. Clearances required to other construction, if not indicated on accompanying Shop

Drawings.

5. Submit Product Data before Shop Drawings, and before or concurrent with Samples.

B. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Identification of products. b. Schedules. c. Compliance with specified standards. d. Notation of coordination requirements. e. Notation of dimensions established by field measurement. f. Relationship and attachment to adjoining construction clearly indicated. g. Seal and signature of professional engineer if specified.

C. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other materials.

1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.

2. Identification: Permanently attach label on unexposed side of Samples that includes the following:

a. Project name and submittal number. b. Generic description of Sample. c. Product name and name of manufacturer. d. Sample source. e. Number and title of applicable Specification Section.

Page 44: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUBMITTAL PROCEDURES 01 33 00 - 5

f. Specification paragraph number and generic name of each item.

3. Web-Based Project Software: Prepare submittals in PDF form, and upload to web-based Project software website. Enter required data in web-based software site to fully identify submittal.

4. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

a. Samples not incorporated into the Work, or otherwise designated as Owner's property, are the property of Contractor.

5. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection.

a. Number of Samples: Submit three sets of Samples. Architect will retain one Sample sets; remainder will be returned. Mark up and retain one returned Sample set as a project record Sample.

1) Submit a single Sample where assembly details, workmanship, fabrication techniques, connections, operation, and other similar characteristics are to be demonstrated.

2) If variation in color, pattern, texture, or other characteristic is inherent in material or product represented by a Sample, submit at least three sets of paired units that show approximate limits of variations.

D. Material Safety Data Sheets (MSDS): Do not include MSDS in submittals. Maintain on site for record. Submittals received containing MSDS will be returned without action.

E. Product Schedule: As required in individual Specification Sections, prepare a written summary indicating types of products required for the Work and their intended location. Include the following information in tabular form:

1. Type of product. Include unique identifier for each product indicated in the Contract Documents or assigned by Contractor if none is indicated.

2. Manufacturer and product name, and model number if applicable. 3. Number and name of room or space. 4. Location within room or space.

F. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, contact information of architects and owners, and other information specified.

G. Design Data: Prepare and submit written and graphic information indicating compliance with indicated performance and design criteria in individual Specification Sections. Include list of assumptions and summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Number each page of submittal.

H. Certificates:

Page 45: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUBMITTAL PROCEDURES 01 33 00 - 6

1. Certificates and Certifications Submittals: Submit a statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity. Provide a notarized signature where indicated.

2. Installer Certificates: Submit written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project.

3. Manufacturer Certificates: Submit written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required.

4. Material Certificates: Submit written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents.

5. Product Certificates: Submit written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.

6. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements in the Contract Documents. Submit record of Welding Procedure Specification and Procedure Qualification Record on AWS forms. Include names of firms and personnel certified.

I. Test and Research Reports:

1. Compatibility Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.

2. Field Test Reports: Submit written reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents.

3. Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.

4. Preconstruction Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents.

5. Product Test Reports: Submit written reports indicating that current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

6. Research Reports: Submit written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project. Include the following information:

a. Name of evaluation organization. b. Date of evaluation. c. Time period when report is in effect. d. Product and manufacturers' names. e. Description of product. f. Test procedures and results. g. Limitations of use.

Page 46: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUBMITTAL PROCEDURES 01 33 00 - 7

1.7 DELEGATED-DESIGN SERVICES

A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated.

1. If criteria indicated are insufficient to perform services or certification required, submit a written request for additional information to Architect.

B. Delegated-Design Services Certification: In addition to Shop Drawings, Product Data, and other required submittals, submit digitally signed PDF file of certificate, signed and sealed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional.

1. Indicate that products and systems comply with performance and design criteria in the Contract Documents. Include list of codes, loads, and other factors used in performing these services.

1.8 CONTRACTOR'S REVIEW

A. Action Submittals and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Architect.

B. Contractor's Approval: Indicate Contractor's approval for each submittal with a uniform approval stamp. Include name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

1. Architect will not review submittals received from Contractor that do not have Contractor's review and approval.

1.9 ARCHITECT'S REVIEW

A. Action Submittals: Architect will review each submittal, indicate corrections or revisions required, and return it.

1. Submittals by Web-Based Project Software: Architect will indicate, on Project software website, the appropriate action.

a. Actions taken by indication on Project software website have the following meanings:

1) NO EXCEPTIONS TAKEN; fabrication and/or installation may proceed. 2) EXCEPTIONS AS NOTED; fabrication and/or installation may proceed. 3) REVISE AND RESUBMIT; fabrication and/or installation may not proceed. Limit

resubmitted corrections only to items marked. 4) REJECTED; submit specified product.

B. Informational Submittals: Architect will review each submittal and will not return it, or will return it if it does not comply with requirements. Architect will forward each submittal to appropriate party.

C. Partial submittals prepared for a portion of the Work will be reviewed when use of partial submittals has received prior approval from Architect.

Page 47: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SUBMITTAL PROCEDURES 01 33 00 - 8

D. Incomplete submittals are unacceptable, will be considered nonresponsive, and will be returned for resubmittal without review.

E. Architect will discard submittals received from sources other than Contractor.

F. Submittals not required by the Contract Documents will be returned by Architect without action.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 33 00

Page 48: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

QUALITY REQUIREMENTS 01 40 00 - 1

SECTION 01 40 00 - QUALITY REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspection services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specific quality-assurance and quality-control requirements for individual work results are specified in their respective Specification Sections. Requirements in individual Sections may also cover production of standard products.

2. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and quality-control procedures that facilitate compliance with the Contract Document requirements.

3. Requirements for Contractor to provide quality-assurance and quality-control services required by Architect, Owner, Commissioning Authority, or authorities having jurisdiction are not limited by provisions of this Section.

4. Specific test and inspection requirements are not specified in this Section.

1.2 DEFINITIONS

A. Experienced: When used with an entity or individual, "experienced" unless otherwise further described means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.

B. Field Quality-Control Tests: Tests and inspections that are performed on-site for installation of the Work and for completed Work.

C. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, assembly, and similar operations.

1. Use of trade-specific terminology in referring to a trade or entity does not require that certain construction activities be performed by accredited or unionized individuals, or that requirements specified apply exclusively to specific trade(s).

D. Mockups: Full-size physical assemblies that are constructed on-site either as freestanding temporary built elements or as part of permanent construction. Mockups are constructed to verify selections made under Sample submittals; to demonstrate aesthetic effects and qualities of materials and execution; to review coordination, testing, or operation; to show interface between dissimilar materials; and to demonstrate compliance with specified installation tolerances. Mockups are not Samples. Unless otherwise indicated, approved mockups establish the standard by which the Work will be judged.

Page 49: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

QUALITY REQUIREMENTS 01 40 00 - 2

1. Integrated Exterior Mockups: Mockups of the exterior envelope constructed on-site as freestanding temporary built elements or as part of permanent construction, consisting of multiple products, assemblies, and subassemblies.

2. Room Mockups: Mockups of typical interior spaces complete with wall, floor, and ceiling finishes; doors; windows; millwork; casework; specialties; furnishings and equipment; and lighting.

E. Preconstruction Testing: Tests and inspections performed specifically for Project before products and materials are incorporated into the Work, to verify performance or compliance with specified criteria.

F. Product Tests: Tests and inspections that are performed by a nationally recognized testing laboratory (NRTL) according to 29 CFR 1910.7, by a testing agency accredited according to NIST's National Voluntary Laboratory Accreditation Program (NVLAP), or by a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with specified requirements.

G. Source Quality-Control Tests: Tests and inspections that are performed at the source; for example, plant, mill, factory, or shop.

H. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.

I. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.

J. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Contractor's quality-control services do not include contract administration activities performed by Architect.

1.3 DELEGATED-DESIGN SERVICES

A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated.

1. If criteria indicated are not sufficient to perform services or certification required, submit a written request for additional information to Architect.

1.4 CONFLICTING REQUIREMENTS

A. Conflicting Standards and Other Requirements: If compliance with two or more standards or requirements are specified and the standards or requirements establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer conflicting requirements that are different, but apparently equal, to Architect for direction before proceeding.

B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Architect for a decision before proceeding.

Page 50: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

QUALITY REQUIREMENTS 01 40 00 - 3

1.5 ACTION SUBMITTALS

A. Delegated-Design Services Submittal: In addition to Shop Drawings, Product Data, and other required submittals, submit a statement signed and sealed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional, indicating that the products and systems are in compliance with performance and design criteria indicated. Include list of codes, loads, and other factors used in performing these services.

1.6 INFORMATIONAL SUBMITTALS

A. Contractor's Quality-Control Plan: For quality-assurance and quality-control activities and responsibilities.

B. Qualification Data: For Contractor's quality-control personnel.

C. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority.

D. Schedule of Tests and Inspections: Prepare in tabular form and include the following:

1. Specification Section number and title. 2. Entity responsible for performing tests and inspections. 3. Description of test and inspection. 4. Identification of applicable standards. 5. Identification of test and inspection methods. 6. Number of tests and inspections required. 7. Time schedule or time span for tests and inspections. 8. Requirements for obtaining samples. 9. Unique characteristics of each quality-control service.

E. Reports: Prepare and submit certified written reports and documents as specified.

F. Permits, Licenses, and Certificates: For Owner's record, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents established for compliance with standards and regulations bearing on performance of the Work.

1.7 CONTRACTOR'S QUALITY-CONTROL PLAN

A. Quality-Control Plan, General: Submit quality-control plan within 10 days of Notice to Proceed, and not less than five days prior to preconstruction conference. Submit in format acceptable to Architect. Identify personnel, procedures, controls, instructions, tests, records, and forms to be used to carry out Contractor's quality-assurance and quality-control responsibilities. Coordinate with Contractor's Construction Schedule.

B. Quality-Control Personnel Qualifications: Engage qualified personnel trained and experienced in managing and executing quality-assurance and quality-control procedures similar in nature and extent to those required for Project.

1. Project quality-control manager may also serve as Project superintendent.

Page 51: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

QUALITY REQUIREMENTS 01 40 00 - 4

C. Submittal Procedure: Describe procedures for ensuring compliance with requirements through review and management of submittal process. Indicate qualifications of personnel responsible for submittal review.

D. Testing and Inspection: In quality-control plan, include a comprehensive schedule of Work requiring testing or inspection, including the following:

1. Contractor-performed tests and inspections including Subcontractor-performed tests and inspections. Include required tests and inspections and Contractor-elected tests and inspections. Distinguish source quality-control tests and inspections from field quality-control tests and inspections.

2. Special inspections required by authorities having jurisdiction and indicated on the Statement of Special Inspections.

3. Owner-performed tests and inspections indicated in the Contract Documents, including tests and inspections indicated to be performed by Commissioning Authority.

E. Continuous Inspection of Workmanship: Describe process for continuous inspection during construction to identify and correct deficiencies in workmanship in addition to testing and inspection specified. Indicate types of corrective actions to be required to bring work into compliance with standards of workmanship established by Contract requirements and approved mockups.

F. Monitoring and Documentation: Maintain testing and inspection reports including log of approved and rejected results. Include work Architect has indicated as nonconforming or defective. Indicate corrective actions taken to bring nonconforming work into compliance with requirements. Comply with requirements of authorities having jurisdiction.

1.8 REPORTS AND DOCUMENTS

A. Test and Inspection Reports: Prepare and submit certified written reports specified in other Sections. Include the following:

1. Date of issue. 2. Project title and number. 3. Name, address, telephone number, and email address of testing agency. 4. Dates and locations of samples and tests or inspections. 5. Names of individuals making tests and inspections. 6. Description of the Work and test and inspection method. 7. Identification of product and Specification Section. 8. Complete test or inspection data. 9. Test and inspection results and an interpretation of test results. 10. Record of temperature and weather conditions at time of sample taking and testing and

inspection. 11. Comments or professional opinion on whether tested or inspected Work complies with the

Contract Document requirements. 12. Name and signature of laboratory inspector. 13. Recommendations on retesting and reinspecting.

B. Manufacturer's Technical Representative's Field Reports: Prepare written information documenting manufacturer's technical representative's tests and inspections specified in other Sections. Include the following:

1. Name, address, telephone number, and email address of technical representative making report.

2. Statement on condition of substrates and their acceptability for installation of product. 3. Statement that products at Project site comply with requirements.

Page 52: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

QUALITY REQUIREMENTS 01 40 00 - 5

4. Summary of installation procedures being followed, whether they comply with requirements and, if not, what corrective action was taken.

5. Results of operational and other tests and a statement of whether observed performance complies with requirements.

6. Statement whether conditions, products, and installation will affect warranty. 7. Other required items indicated in individual Specification Sections.

C. Factory-Authorized Service Representative's Reports: Prepare written information documenting manufacturer's factory-authorized service representative's tests and inspections specified in other Sections. Include the following:

1. Name, address, telephone number, and email address of factory-authorized service representative making report.

2. Statement that equipment complies with requirements. 3. Results of operational and other tests and a statement of whether observed performance

complies with requirements. 4. Statement whether conditions, products, and installation will affect warranty. 5. Other required items indicated in individual Specification Sections.

1.9 QUALITY ASSURANCE

A. General: Qualifications paragraphs in this article establish the minimum qualification levels required; individual Specification Sections specify additional requirements.

B. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units. As applicable, procure products from manufacturers able to meet qualification requirements, warranty requirements, and technical or factory-authorized service representative requirements.

C. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

D. Installer Qualifications: A firm or individual experienced in installing, erecting, applying, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.

E. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of the system, assembly, or product that are similar in material, design, and extent to those indicated for this Project.

F. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspection indicated, as documented according to ASTM E 329; and with additional qualifications specified in individual Sections; and, where required by authorities having jurisdiction, that is acceptable to authorities.

G. Manufacturer's Technical Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to observe and inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.

Page 53: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

QUALITY REQUIREMENTS 01 40 00 - 6

H. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.

I. Mockups: Before installing portions of the Work requiring mockups, build mockups for each form of construction and finish required to comply with the following requirements, using materials indicated for the completed Work:

1. Build mockups of size indicated. 2. Build mockups in location indicated or, if not indicated, as directed by Architect. 3. Notify Architect seven days in advance of dates and times when mockups will be constructed. 4. Employ supervisory personnel who will oversee mockup construction. Employ workers that will

be employed to perform same tasks during the construction at Project. 5. Demonstrate the proposed range of aesthetic effects and workmanship. 6. Obtain Architect's approval of mockups before starting corresponding work, fabrication, or

construction.

a. Allow seven days for initial review and each re-review of each mockup.

7. Maintain mockups during construction in an undisturbed condition as a standard for judging the completed Work.

8. Demolish and remove mockups when directed unless otherwise indicated.

1.10 QUALITY CONTROL

A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility, Owner will engage a qualified testing agency to perform these services.

1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing agencies engaged and a description of types of testing and inspection they are engaged to perform.

2. Costs for retesting and reinspecting construction that replaces or is necessitated by work that failed to comply with the Contract Documents will be charged to Contractor, and the Contract Sum will be adjusted by Change Order.

B. Contractor Responsibilities: Tests and inspections not explicitly assigned to Owner are Contractor's responsibility. Perform additional quality-control activities, whether specified or not, to verify and document that the Work complies with requirements.

1. Unless otherwise indicated, provide quality-control services specified and those required by authorities having jurisdiction. Perform quality-control services required of Contractor by authorities having jurisdiction, whether specified or not.

2. Engage a qualified testing agency to perform quality-control services.

a. Contractor shall not employ same entity engaged by Owner, unless agreed to in writing by Owner.

3. Notify testing agencies at least 24 hours in advance of time when Work that requires testing or inspection will be performed.

4. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service.

5. Testing and inspection requested by Contractor and not required by the Contract Documents are Contractor's responsibility.

6. Submit additional copies of each written report directly to authorities having jurisdiction, when they so direct.

Page 54: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

QUALITY REQUIREMENTS 01 40 00 - 7

C. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents.

D. Testing Agency Responsibilities: Cooperate with Architect, Commissioning Authority and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.

1. Notify Architect, Commissioning Authority, and Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services.

2. Determine the locations from which test samples will be taken and in which in-situ tests are conducted.

3. Conduct and interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from requirements.

4. Submit a certified written report, in duplicate, of each test, inspection, and similar quality-control service through Contractor.

5. Do not release, revoke, alter, or increase the Contract Document requirements or approve or accept any portion of the Work.

6. Do not perform duties of Contractor.

E. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing as specified in Section 01 33 00 "Submittal Procedures."

F. Manufacturer's Technical Services: Where indicated, engage a manufacturer's technical representative to observe and inspect the Work. Manufacturer's technical representative's services include participation in preinstallation conferences, examination of substrates and conditions, verification of materials, observation of Installer activities, inspection of completed portions of the Work, and submittal of written reports.

G. Associated Contractor Services: Cooperate with agencies and representatives performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following:

1. Access to the Work. 2. Incidental labor and facilities necessary to facilitate tests and inspections. 3. Adequate quantities of representative samples of materials that require testing and

inspection. Assist agency in obtaining samples. 4. Facilities for storage and field curing of test samples. 5. Preliminary design mix proposed for use for material mixes that require control by testing

agency. 6. Security and protection for samples and for testing and inspection equipment at Project site.

H. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and quality-control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspection.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

I. Schedule of Tests and Inspections: Prepare a schedule of tests, inspections, and similar quality-control services required by the Contract Documents as a component of Contractor's quality-control plan. Coordinate and submit concurrently with Contractor's Construction Schedule. Update as the Work progresses.

Page 55: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

QUALITY REQUIREMENTS 01 40 00 - 8

1. Distribution: Distribute schedule to Owner, Architect, Commissioning Authority, testing agencies, and each party involved in performance of portions of the Work where tests and inspections are required.

1.11 SPECIAL TESTS AND INSPECTIONS

A. Special Tests and Inspections: Owner will engage a qualified testing agency to conduct special tests and inspections required by authorities having jurisdiction as the responsibility of Owner, as indicated in the Statement of Special Inspections included in the Structural Drawings, and as follows:

1. Verifying that manufacturer maintains detailed fabrication and quality-control procedures and reviewing the completeness and adequacy of those procedures to perform the Work.

2. Notifying Architect, Commissioning Authority, and Contractor promptly of irregularities and deficiencies observed in the Work during performance of its services.

3. Submitting a certified written report of each test, inspection, and similar quality-control service to Architect and Commissioning Authority with copy to Contractor and to authorities having jurisdiction.

4. Submitting a final report of special tests and inspections at Substantial Completion, which includes a list of unresolved deficiencies.

5. Interpreting tests and inspections and stating in each report whether tested and inspected work complies with or deviates from the Contract Documents.

6. Retesting and reinspecting corrected work.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 TEST AND INSPECTION LOG

A. Test and Inspection Log: Prepare a record of tests and inspections. Include the following:

1. Date test or inspection was conducted. 2. Description of the Work tested or inspected. 3. Date test or inspection results were transmitted to Architect. 4. Identification of testing agency or special inspector conducting test or inspection.

B. Maintain log at Project site. Post changes and revisions as they occur. Provide access to test and inspection log for Architect's, Commissioning Authority's, reference during normal working hours.

1. Submit log at Project closeout as part of Project Record Documents.

3.2 REPAIR AND PROTECTION

A. General: On completion of testing, inspection, sample taking, and similar services, repair damaged construction and restore substrates and finishes.

1. Provide materials and comply with installation requirements specified in other Specification Sections or matching existing substrates and finishes. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible. Comply

Page 56: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

QUALITY REQUIREMENTS 01 40 00 - 9

with the Contract Document requirements for cutting and patching in Section 01 73 00 "Execution."

B. Protect construction exposed by or for quality-control service activities.

C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.

END OF SECTION 01 40 00

Page 57: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PRODUCT REQUIREMENTS 01 60 00 - 1

SECTION 01 60 00 - PRODUCT REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for selection of products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; and comparable products.

B. Related Requirements:

1. Section 01 25 00 "Substitution Procedures" for requests for substitutions. 2. Section 01 42 00 "References" for applicable industry standards for products specified.

1.2 DEFINITIONS

A. Products: Items obtained for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent.

1. Named Products: Items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature that is current as of date of the Contract Documents.

2. New Products: Items that have not previously been incorporated into another project or facility. Products salvaged or recycled from other projects are not considered new products.

3. Comparable Product: Product that is demonstrated and approved by Architect through submittal process to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product.

B. Basis-of-Design Product Specification: A specification in which a single manufacturer's product is named and accompanied by the words "basis-of-design product," including make or model number or other designation. In addition to the basis-of-design product description, product attributes and characteristics may be listed to establish the significant qualities related to type, function, in-service performance and physical properties, weight, dimension, durability, visual characteristics, and other special features and requirements for purposes of evaluating comparable products of additional manufacturers named in the specification.

C. Subject to Compliance with Requirements: Where the phrase "Subject to compliance with requirements" introduces a product selection procedure in an individual Specification Section, provide products qualified under the specified product procedure. In the event that a named product or product by a named manufacturer does not meet the other requirements of the specifications, select another named product or product from another named manufacturer that does meet the requirements of the specifications. Submit a comparable product request, if applicable.

1.3 ACTION SUBMITTALS

A. Comparable Product Request Submittal: Submit request for consideration of each comparable product. Identify basis-of-design product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

Page 58: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PRODUCT REQUIREMENTS 01 60 00 - 2

1. Include data to indicate compliance with the requirements specified in "Comparable Products" Article.

2. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within seven days of receipt of a comparable product request. Architect will notify Contractor of approval or rejection of proposed comparable product request within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.

a. Form of Architect's Approval of Submittal: As specified in Section 01 33 00 "Submittal Procedures."

b. Use product specified if Architect does not issue a decision on use of a comparable product request within time allocated.

B. Basis-of-Design Product Specification Submittal: Comply with requirements in Section 01 33 00 "Submittal Procedures." Show compliance with requirements.

1.4 QUALITY ASSURANCE

A. Compatibility of Options: If Contractor is given option of selecting between two or more products for use on Project, select product compatible with products previously selected, even if previously selected products were also options.

B. Identification of Products: Except for required labels and operating data, do not attach or imprint manufacturer or product names or trademarks on exposed surfaces of products or equipment that will be exposed to view in occupied spaces or on the exterior.

1. Labels: Locate required product labels and stamps on a concealed surface, or, where required for observation following installation, on a visually accessible surface that is not conspicuous.

2. Equipment Nameplates: Provide a permanent nameplate on each item of service-connected or power-operated equipment. Locate on a visually accessible but inconspicuous surface. Include information essential for operation, including the following:

a. Name of product and manufacturer. b. Model and serial number. c. Capacity. d. Speed. e. Ratings.

3. See individual identification sections in Divisions 21, 22, 23, and 26 for additional identification requirements.

1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft and vandalism. Comply with manufacturer's written instructions.

B. Delivery and Handling:

1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces.

2. Coordinate delivery with installation time to ensure minimum holding time for items that are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

Page 59: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PRODUCT REQUIREMENTS 01 60 00 - 3

3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

4. Inspect products on delivery to determine compliance with the Contract Documents and to determine that products are undamaged and properly protected.

C. Storage:

1. Store products to allow for inspection and measurement of quantity or counting of units. 2. Store materials in a manner that will not endanger Project structure. 3. Store products that are subject to damage by the elements, under cover in a weathertight

enclosure above ground, with ventilation adequate to prevent condensation. 4. Protect foam plastic from exposure to sunlight, except to extent necessary for period of

installation and concealment. 5. Comply with product manufacturer's written instructions for temperature, humidity,

ventilation, and weather-protection requirements for storage. 6. Protect stored products from damage and liquids from freezing. 7. Provide a secure location and enclosure at Project site for storage of materials and

equipment by Owner's construction forces. Coordinate location with Owner.

1.6 PRODUCT WARRANTIES

A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents.

1. Manufacturer's Warranty: Written warranty furnished by individual manufacturer for a particular product and specifically endorsed by manufacturer to Owner.

2. Special Warranty: Written warranty required by the Contract Documents to provide specific rights for Owner.

B. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready for execution.

1. Manufacturer's Standard Form: Modified to include Project-specific information and properly executed.

2. Specified Form: When specified forms are included with the Specifications, prepare a written document using indicated form properly executed.

3. See other Sections for specific content requirements and particular requirements for submitting special warranties.

C. Submittal Time: Comply with requirements in Section 01 77 00 "Closeout Procedures."

PART 2 - PRODUCTS

2.1 PRODUCT SELECTION PROCEDURES

A. General Product Requirements: Provide products that comply with the Contract Documents, are undamaged and, unless otherwise indicated, are new at time of installation.

1. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect.

Page 60: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PRODUCT REQUIREMENTS 01 60 00 - 4

2. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects.

3. Owner reserves the right to limit selection to products with warranties meeting requirements of the Contract Documents.

4. Where products are accompanied by the term "as selected," Architect will make selection. 5. Descriptive, performance, and reference standard requirements in the Specifications

establish salient characteristics of products.

B. Product Selection Procedures:

1. Sole Product: Where Specifications name a single manufacturer and product, provide the named product that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered.

a. Sole product may be indicated by the phrase: "Subject to compliance with requirements, provide the following: …"

2. Sole Manufacturer/Source: Where Specifications name a single manufacturer or source, provide a product by the named manufacturer or source that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered.

a. Sole manufacturer/source may be indicated by the phrase: "Subject to compliance with requirements, provide products by the following: …"

3. Limited List of Products: Where Specifications include a list of names of both manufacturers and products, provide one of the products listed that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered unless otherwise indicated.

a. Limited list of products may be indicated by the phrase: "Subject to compliance with requirements, provide one of the following: …"

4. Non-Limited List of Products: Where Specifications include a list of names of both available manufacturers and products, provide one of the products listed, or an unnamed product, which complies with requirements.

a. Non-limited list of products is indicated by the phrase: "Subject to compliance with requirements, available products that may be incorporated in the Work include, but are not limited to, the following: …"

5. Limited List of Manufacturers: Where Specifications include a list of manufacturers' names, provide a product by one of the manufacturers listed that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered unless otherwise indicated.

a. Limited list of manufacturers is indicated by the phrase: "Subject to compliance with requirements, provide products by one of the following: …"

6. Non-Limited List of Manufacturers: Where Specifications include a list of available manufacturers, provide a product by one of the manufacturers listed, or a product by an unnamed manufacturer, which complies with requirements.

a. Non-limited list of manufacturers is indicated by the phrase: "Subject to compliance with requirements, available manufacturers whose products may be incorporated in the Work include, but are not limited to, the following: …"

Page 61: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PRODUCT REQUIREMENTS 01 60 00 - 5

7. Basis-of-Design Product: Where Specifications name a product, or refer to a product indicated on Drawings, and include a list of manufacturers, provide the specified or indicated product or a comparable product by one of the other named manufacturers. Drawings and Specifications indicate sizes, profiles, dimensions, and other characteristics that are based on the product named. Comply with requirements in "Comparable Products" Article for consideration of an unnamed product by one of the other named manufacturers.

a. For approval of products by unnamed manufacturers, comply with requirements in Section 01 25 00 "Substitution Procedures" for substitutions for convenience.

C. Visual Matching Specification: Where Specifications require "match Architect's sample," provide a product that complies with requirements and matches Architect's sample. Architect's decision will be final on whether a proposed product matches.

1. If no product available within specified category matches and complies with other specified requirements, comply with requirements in Section 01 25 00 "Substitution Procedures" for proposal of product.

D. Visual Selection Specification: Where Specifications include the phrase "as selected by Architect from manufacturer's full range" or similar phrase, select a product that complies with requirements. Architect will select color, gloss, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.

2.2 COMPARABLE PRODUCTS

A. Conditions for Consideration of Comparable Products: Architect will consider Contractor's request for comparable product when the following conditions are satisfied. If the following conditions are not satisfied, Architect may return requests without action, except to record noncompliance with these requirements:

1. Evidence that proposed product does not require revisions to the Contract Documents, is consistent with the Contract Documents, will produce the indicated results, and is compatible with other portions of the Work. Detailed comparison of significant qualities of proposed product with those named in the Specifications. Significant product qualities include attributes such as type, function, in-service performance and physical properties, weight, dimension, durability, visual characteristics, and other specific features and requirements.

2. Evidence that proposed product provides specified warranty. 3. List of similar installations for completed projects with project names and addresses and

names and addresses of architects and owners, if requested. 4. Samples, if requested.

B. Submittal Requirements: Approval by the Architect of Contractor's request for use of comparable product is not intended to satisfy other submittal requirements. Comply with specified submittal requirements.

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 60 00

Page 62: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

EXECUTION 01 73 00 - 1

SECTION 01 73 00 - EXECUTION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes general administrative and procedural requirements governing execution of the Work including, but not limited to, the following:

1. Construction layout. 2. Installation of the Work. 3. Cutting and patching. 4. Progress cleaning. 5. Starting and adjusting. 6. Protection of installed construction.

B. Related Requirements:

1. Section 01 10 00 "Summary" for limits on use of Project site. 2. Section 01 33 00 "Submittal Procedures" for submitting surveys. 3. Section 01 77 00 "Closeout Procedures" for submitting final property survey with Project

Record Documents, recording of Owner-accepted deviations from indicated lines and levels, replacing defective work, and final cleaning.

4. Section 07 84 13 "Penetration Firestopping" for patching penetrations in fire-rated construction.

1.2 DEFINITIONS

A. Cutting: Removal of in-place construction necessary to permit installation or performance of subsequent work.

B. Patching: Fitting and repair work required to restore construction to original conditions after installation of subsequent work.

1.3 QUALITY ASSURANCE

A. Land Surveyor Qualifications: A professional land surveyor who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing land-surveying services of the kind indicated.

B. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements.

1. Structural Elements: When cutting and patching structural elements, notify Architect of locations and details of cutting and await directions from Architect before proceeding. Shore, brace, and support structural elements during cutting and patching. Do not cut and patch structural elements in a manner that could change their load-carrying capacity or increase deflection.

2. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.

Page 63: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

EXECUTION 01 73 00 - 2

3. Other Construction Elements: Do not cut and patch other construction elements or components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or that results in increased maintenance or decreased operational life or safety.

4. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner that would, in Architect's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.

C. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written recommendations and instructions for installation of products and equipment.

PART 2 - PRODUCTS

2.1 MATERIALS

A. General: Comply with requirements specified in other Sections.

B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible.

1. If identical materials are unavailable or cannot be used, use materials that, when installed, will provide a match acceptable to Architect for the visual and functional performance of in-place materials.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Existing Conditions: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning sitework, investigate and verify the existence and location of underground utilities, mechanical and electrical systems, and other construction affecting the Work.

1. Before construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer, and water-service piping; underground electrical services; and other utilities.

2. Furnish location data for work related to Project that must be performed by public utilities serving Project site.

B. Examination and Acceptance of Conditions: Before proceeding with each component of the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.

1. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation.

2. Examine walls, floors, and roofs for suitable conditions where products and systems are to be installed.

3. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.

Page 64: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

EXECUTION 01 73 00 - 3

C. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.

3.2 PREPARATION

A. Existing Utility Information: Furnish information to local utility and Owner that is necessary to adjust, move, or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected by construction. Coordinate with authorities having jurisdiction.

B. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work.

C. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings.

D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents caused by differing field conditions outside the control of Contractor, submit a request for information to Architect according to requirements in Section 01 31 00 "Project Management and Coordination."

3.3 CONSTRUCTION LAYOUT

A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered, notify Architect promptly.

B. General: Engage a professional engineer to lay out the Work using accepted surveying practices.

1. Establish benchmarks and control points to set lines and levels at each story of construction and elsewhere as needed to locate each element of Project.

2. Establish limits on use of Project site. 3. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain required

dimensions. 4. Inform installers of lines and levels to which they must comply. 5. Check the location, level and plumb, of every major element as the Work progresses. 6. Notify Architect when deviations from required lines and levels exceed allowable tolerances. 7. Close site surveys with an error of closure equal to or less than the standard established by

authorities having jurisdiction.

C. Site Improvements: Locate and lay out site improvements, including pavements, grading, fill and topsoil placement, utility slopes, and rim and invert elevations.

D. Building Lines and Levels: Locate and lay out control lines and levels for structures, building foundations, column grids, and floor levels, including those required for mechanical and electrical work. Transfer survey markings and elevations for use with control lines and levels. Level foundations and piers from two or more locations.

E. Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. Include beginning and ending dates and times of surveys, weather conditions, name and duty of each survey party member, and types of instruments and tapes used. Make the log available for reference by Architect.

Page 65: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

EXECUTION 01 73 00 - 4

3.4 INSTALLATION

A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

1. Make vertical work plumb and make horizontal work level. 2. Where space is limited, install components to maximize space available for maintenance and

ease of removal for replacement. 3. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated. 4. Maintain minimum headroom clearance of 96 inches (2440 mm) in occupied spaces and 90

inches (2300 mm) in unoccupied spaces.

B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.

C. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion.

D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.

E. Sequence the Work and allow adequate clearances to accommodate movement of construction items on site and placement in permanent locations.

F. Tools and Equipment: Where possible, select tools or equipment that minimize production of excessive noise levels.

G. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed. Check Shop Drawings of other portions of the Work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements.

H. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place, accurately located and aligned with other portions of the Work. Where size and type of attachments are not indicated, verify size and type required for load conditions.

1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Architect.

2. Allow for building movement, including thermal expansion and contraction. 3. Coordinate installation of anchorages. Furnish setting drawings, templates, and directions for

installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.

I. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.

J. Repair or remove and replace damaged, defective, or nonconforming Work.

1. Comply with Section 01 77 00 "Closeout Procedures" for repairing or removing and replacing defective Work.

Page 66: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

EXECUTION 01 73 00 - 5

3.5 CUTTING AND PATCHING

A. Cutting and Patching, General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay.

1. Cut in-place construction to provide for installation of other components or performance of other construction, and subsequently patch as required to restore surfaces to their original condition.

B. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during installation or cutting and patching operations, by methods and with materials so as not to void existing warranties.

C. Temporary Support: Provide temporary support of work to be cut.

D. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.

E. Adjacent Occupied Areas: Where interference with use of adjoining areas or interruption of free passage to adjoining areas is unavoidable, coordinate cutting and patching according to requirements in Section 01 10 00 "Summary."

F. Existing Utility Services and Mechanical/Electrical Systems: Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to minimize interruption to occupied areas.

G. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations.

1. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots neatly to minimum size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces. 3. Concrete and Masonry: Cut using a cutting machine, such as an abrasive saw or a diamond-

core drill. 4. Excavating and Backfilling: Comply with requirements in applicable Sections where required

by cutting and patching operations. 5. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be

removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting.

6. Proceed with patching after construction operations requiring cutting are complete.

H. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other work. Patch with durable seams that are as invisible as practicable. Provide materials and comply with installation requirements specified in other Sections, where applicable.

1. Inspection: Where feasible, test and inspect patched areas after completion to demonstrate physical integrity of installation.

2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will minimize evidence of patching and refinishing.

Page 67: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

EXECUTION 01 73 00 - 6

a. Clean piping, conduit, and similar features before applying paint or other finishing materials.

b. Restore damaged pipe covering to its original condition.

3. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a weathertight condition and ensures thermal and moisture integrity of building enclosure.

I. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint, mortar, oils, putty, and similar materials from adjacent finished surfaces.

3.6 PROGRESS CLEANING

A. General: Clean Project site and work areas daily, including common areas. Enforce requirements strictly. Dispose of materials lawfully.

1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.

2. Do not hold waste materials more than seven days during normal weather or three days if the temperature is expected to rise above 80 deg F (27 deg C).

3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.

a. Use containers intended for holding waste materials of type to be stored.

B. Site: Maintain Project site free of waste materials and debris.

C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.

1. Remove liquid spills promptly. 2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire

work area, as appropriate.

D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.

E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.

F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.

G. Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials down sewers or into waterways. Comply with waste disposal requirements in Section 01 74 19 "Construction Waste Management and Disposal."

H. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.

I. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.

Page 68: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

EXECUTION 01 73 00 - 7

J. Limiting Exposures: Supervise construction operations to ensure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.

3.7 STARTING AND ADJUSTING

A. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, replace with new units, and retest.

B. Adjust equipment for proper operation. Adjust operating components for proper operation without binding.

C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

D. Manufacturer's Field Service: Comply with qualification requirements in Section 01 40 00 "Quality Requirements."

3.8 PROTECTION OF INSTALLED CONSTRUCTION

A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.

B. Protection of Existing Items: Provide protection and ensure that existing items to remain undisturbed by construction are maintained in condition that existed at commencement of the Work.

C. Comply with manufacturer's written instructions for temperature and relative humidity.

END OF SECTION 01 73 00

Page 69: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CLOSEOUT PROCEDURES 01 77 00 - 1

SECTION 01 77 00 - CLOSEOUT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Substantial Completion procedures. 2. Final completion procedures. 3. Warranties. 4. Final cleaning. 5. Repair of the Work.

B. Related Requirements:

1. Section 01 78 23 "Operation and Maintenance Data" for additional operation and maintenance manual requirements.

2. Section 01 78 39 "Project Record Documents" for submitting Record Drawings, Record Specifications, and Record Product Data.

1.2 ACTION SUBMITTALS

A. Contractor's List of Incomplete Items: Initial submittal at Substantial Completion.

B. Certified List of Incomplete Items: Final submittal at final completion.

1.3 CLOSEOUT SUBMITTALS

A. Certificates of Release: From authorities having jurisdiction.

B. Certificate of Insurance: For continuing coverage.

C. Field Report: For pest control inspection.

1.4 MAINTENANCE MATERIAL SUBMITTALS

A. Schedule of Maintenance Material Items: For maintenance material submittal items specified in other Sections

1.5 SUBSTANTIAL COMPLETION PROCEDURES

A. Contractor's List of Incomplete Items: Prepare and submit a list of items to be completed and corrected (Contractor's punch list), indicating the value of each item on the list and reasons why the Work is incomplete.

Page 70: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CLOSEOUT PROCEDURES 01 77 00 - 2

B. Submittals Prior to Substantial Completion: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request.

1. Certificates of Release: Obtain and submit releases from authorities having jurisdiction permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

2. Submit closeout submittals specified in other Division 01 Sections, including project record documents, operation and maintenance manuals, damage or settlement surveys, property surveys, and similar final record information.

3. Submit closeout submittals specified in individual Sections, including specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.

4. Submit maintenance material submittals specified in individual Sections, including tools, spare parts, extra materials, and similar items, and deliver to location designated by Owner. Label with manufacturer's name and model number.

a. Schedule of Maintenance Material Items: Prepare and submit schedule of maintenance material submittal items, including name and quantity of each item and name and number of related Specification Section. Obtain Owner's signature for receipt of submittals.

5. Submit testing, adjusting, and balancing records. 6. Submit changeover information related to Owner's occupancy, use, operation, and

maintenance.

C. Procedures Prior to Substantial Completion: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request.

1. Advise Owner of pending insurance changeover requirements. 2. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's

personnel of changeover in security provisions. 3. Complete startup and testing of systems and equipment. 4. Perform preventive maintenance on equipment used prior to Substantial Completion. 5. Instruct Owner's personnel in operation, adjustment, and maintenance of products,

equipment, and systems. 6. Advise Owner of changeover in utility services. 7. Participate with Owner in conducting inspection and walkthrough with local emergency

responders. 8. Terminate and remove temporary facilities from Project site, along with mockups,

construction tools, and similar elements. 9. Complete final cleaning requirements. 10. Touch up paint and otherwise repair and restore marred exposed finishes to eliminate visual

defects.

D. Inspection: Submit a written request for inspection to determine Substantial Completion a minimum of 10 days prior to date the Work will be completed and ready for final inspection and tests. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Architect, that must be completed or corrected before certificate will be issued.

1. Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for final completion.

Page 71: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CLOSEOUT PROCEDURES 01 77 00 - 3

1.6 FINAL COMPLETION PROCEDURES

A. Submittals Prior to Final Completion: Before requesting final inspection for determining final completion, complete the following:

1. Submit a final Application for Payment according to Section 01 29 00 "Payment Procedures." 2. Certified List of Incomplete Items: Submit certified copy of Architect's Substantial Completion

inspection list of items to be completed or corrected (punch list), endorsed and dated by Architect. Certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

3. Certificate of Insurance: Submit evidence of final, continuing insurance coverage complying with insurance requirements.

4. Submit pest-control final inspection report. 5. Submit final completion photographic documentation.

B. Inspection: Submit a written request for final inspection to determine acceptance a minimum of 10 days prior to date the work will be completed and ready for final inspection and tests. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

1.7 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Organization of List: Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

1. Organize list of spaces in sequential order, starting with exterior areas first and proceeding from lowest floor to highest floor.

2. Organize items applying to each space by major element, including categories for ceiling, individual walls, floors, equipment, and building systems.

3. Include the following information at the top of each page:

a. Project name. b. Date. c. Name of Architect. d. Name of Contractor. e. Page number.

4. Submit list of incomplete items in PDF electronic file format. Architect will return annotated file.

1.8 SUBMITTAL OF PROJECT WARRANTIES

A. Time of Submittal: Submit written warranties on request of Architect for designated portions of the Work where warranties are indicated to commence on dates other than date of Substantial Completion, or when delay in submittal of warranties might limit Owner's rights under warranty.

B. Partial Occupancy: Submit properly executed warranties within 15 days of completion of designated portions of the Work that are completed and occupied or used by Owner during construction period by separate agreement with Contractor.

Page 72: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CLOSEOUT PROCEDURES 01 77 00 - 4

C. Organize warranty documents into an orderly sequence based on the table of contents of Project Manual.

D. Warranty Electronic File: Provide warranties and bonds in PDF format. Assemble complete warranty and bond submittal package into a single electronic PDF file with bookmarks enabling navigation to each item. Provide bookmarked table of contents at beginning of document.

1. Submit by uploading to web-based project software site.

E. Warranties in Paper Form:

1. Bind warranties and bonds in heavy-duty, three-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 215-by-280-mm (8-1/2-by-11-inch) paper.

2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.

3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.

F. Provide additional copies of each warranty to include in operation and maintenance manuals.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

1. Use cleaning products that comply with Green Seal's GS-37, or if GS-37 is not applicable, use products that comply with the California Code of Regulations maximum allowable VOC levels.

PART 3 - EXECUTION

3.1 FINAL CLEANING

A. General: Perform final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.

1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a designated portion of Project:

a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

Page 73: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CLOSEOUT PROCEDURES 01 77 00 - 5

b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.

c. Rake grounds that are not planted, mulched, or paved to a smooth, even-textured surface.

d. Remove tools, construction equipment, machinery, and surplus material from Project site.

e. Remove snow and ice to provide safe access to building. f. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free

of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.

g. Remove debris and surface dust from limited access spaces, including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.

h. Sweep concrete floors broom clean in unoccupied spaces. i. Vacuum carpet and similar soft surfaces, removing debris and excess nap; clean

according to manufacturer's recommendations if visible soil or stains remain. j. Clean transparent materials, including mirrors and glass in doors and windows.

Remove glazing compounds and other noticeable, vision-obscuring materials. Polish mirrors and glass, taking care not to scratch surfaces.

k. Remove labels that are not permanent. l. Wipe surfaces of mechanical and electrical equipment, elevator equipment, and

similar equipment. Remove excess lubrication, paint and mortar droppings, and other foreign substances.

m. Clean plumbing fixtures to a sanitary condition, free of stains, including stains resulting from water exposure.

n. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers, registers, and grills.

o. Clean ducts, blowers, and coils if units were operated without filters during construction or that display contamination with particulate matter on inspection.

p. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency. q. Leave Project clean and ready for occupancy.

C. Pest Control: Comply with pest control requirements in Section 01 50 00 "Temporary Facilities and Controls." Prepare written report.

D. Construction Waste Disposal: Comply with waste disposal requirements in Section 01 74 19 "Construction Waste Management and Disposal."

3.2 REPAIR OF THE WORK

A. Complete repair and restoration operations before requesting inspection for determination of Substantial Completion.

B. Repair, or remove and replace, defective construction. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment. Where damaged or worn items cannot be repaired or restored, provide replacements. Remove and replace operating components that cannot be repaired. Restore damaged construction and permanent facilities used during construction to specified condition.

1. Remove and replace chipped, scratched, and broken glass, reflective surfaces, and other damaged transparent materials.

2. Touch up and otherwise repair and restore marred or exposed finishes and surfaces. Replace finishes and surfaces that that already show evidence of repair or restoration.

Page 74: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

CLOSEOUT PROCEDURES 01 77 00 - 6

a. Do not paint over "UL" and other required labels and identification, including mechanical and electrical nameplates. Remove paint applied to required labels and identification.

3. Replace parts subject to operating conditions during construction that may impede operation or reduce longevity.

4. Replace burned-out bulbs, bulbs noticeably dimmed by hours of use, and defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures.

END OF SECTION 01 77 00

Page 75: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

OPERATION AND MAINTENANCE DATA 01 78 23 - 1

SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for preparing operation and maintenance manuals, including the following:

1. Operation and maintenance documentation directory manuals. 2. Emergency manuals. 3. Systems and equipment operation manuals. 4. Systems and equipment maintenance manuals. 5. Product maintenance manuals.

B. Related Requirements:

1. Section 01 33 00 "Submittal Procedures" for submitting copies of submittals for operation and maintenance manuals.

1.2 DEFINITIONS

A. System: An organized collection of parts, equipment, or subsystems united by regular interaction.

B. Subsystem: A portion of a system with characteristics similar to a system.

1.3 CLOSEOUT SUBMITTALS

A. Submit operation and maintenance manuals indicated. Provide content for each manual as specified in individual Specification Sections, and as reviewed and approved at the time of Section submittals. Submit reviewed manual content formatted and organized as required by this Section.

1. Architect and Commissioning Authority will comment on whether content of operation and maintenance submittals is acceptable.

2. Where applicable, clarify and update reviewed manual content to correspond to revisions and field conditions.

B. Format: Submit operation and maintenance manuals in the following format:

1. Submit by uploading to web-based project software site. Enable reviewer comments on draft submittals.

C. Initial Manual Submittal: Submit draft copy of each manual at least 30 days before commencing demonstration and training. Architect and Commissioning Authority will comment on whether general scope and content of manual are acceptable.

D. Final Manual Submittal: Submit each manual in final form prior to requesting inspection for Substantial Completion and at least 15 days before commencing demonstration and training. Architect and Commissioning Authority will return copy with comments.

Page 76: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

OPERATION AND MAINTENANCE DATA 01 78 23 - 2

1. Correct or revise each manual to comply with Architect's and Commissioning Authority's comments. Submit copies of each corrected manual within 15 days of receipt of Architect's and Commissioning Authority's comments and prior to commencing demonstration and training.

E. Comply with Section 01 77 00 "Closeout Procedures" for schedule for submitting operation and maintenance documentation.

1.4 FORMAT OF OPERATION AND MAINTENANCE MANUALS

A. Manuals, Electronic Files: Submit manuals in the form of a multiple file composite electronic PDF file for each manual type required.

1. Electronic Files: Use electronic files prepared by manufacturer where available. Where scanning of paper documents is required, configure scanned file for minimum readable file size.

2. File Names and Bookmarks: Bookmark individual documents based on file names. Name document files to correspond to system, subsystem, and equipment names used in manual directory and table of contents. Group documents for each system and subsystem into individual composite bookmarked files, then create composite manual, so that resulting bookmarks reflect the system, subsystem, and equipment names in a readily navigated file tree. Configure electronic manual to display bookmark panel on opening file.

B. Manuals, Paper Copy: Submit manuals in the form of hard-copy, bound and labeled volumes.

1. Binders: Heavy-duty, three-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 215-by-280-mm (8-1/2-by-11-inch) paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets.

a. If two or more binders are necessary to accommodate data of a system, organize data in each binder into groupings by subsystem and related components. Cross-reference other binders if necessary to provide essential information for proper operation or maintenance of equipment or system.

b. Identify each binder on front and spine, with printed title "OPERATION AND MAINTENANCE MANUAL," Project title or name, subject matter of contents, and indicate Specification Section number on bottom of spine. Indicate volume number for multiple-volume sets.

2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section of the manual. Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, cross-referenced to Specification Section number and title of Project Manual.

3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software storage media for computerized electronic equipment. Enclose title pages and directories in clear plastic sleeves.

4. Supplementary Text: Prepared on 215-by-280-mm (8-1/2-by-11-inch) white bond paper. 5. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.

a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts.

b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations.

Page 77: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

OPERATION AND MAINTENANCE DATA 01 78 23 - 3

1.5 REQUIREMENTS FOR EMERGENCY, OPERATION, AND MAINTENANCE MANUALS

A. Organization of Manuals: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain the following materials, in the order listed:

1. Title page. 2. Table of contents. 3. Manual contents.

B. Title Page: Include the following information:

1. Subject matter included in manual. 2. Name and address of Project. 3. Name and address of Owner. 4. Date of submittal. 5. Name and contact information for Contractor. 6. Name and contact information for Construction Manager. 7. Name and contact information for Architect. 8. Name and contact information for Commissioning Authority. 9. Names and contact information for major consultants to the Architect that designed the

systems contained in the manuals. 10. Cross-reference to related systems in other operation and maintenance manuals.

C. Table of Contents: List each product included in manual, identified by product name, indexed to the content of the volume, and cross-referenced to Specification Section number in Project Manual.

1. If operation or maintenance documentation requires more than one volume to accommodate data, include comprehensive table of contents for all volumes in each volume of the set.

D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder.

E. Identification: In the documentation directory and in each operation and maintenance manual, identify each system, subsystem, and piece of equipment with same designation used in the Contract Documents. If no designation exists, assign a designation according to ASHRAE Guideline 4, "Preparation of Operating and Maintenance Documentation for Building Systems."

1.6 OPERATION AND MAINTENANCE DOCUMENTATION DIRECTORY MANUAL

A. Operation and Maintenance Documentation Directory: Prepare a separate manual that provides an organized reference to emergency, operation, and maintenance manuals. List items and their location to facilitate ready access to desired information. Include the following:

1. List of Systems and Subsystems: List systems alphabetically. Include references to operation and maintenance manuals that contain information about each system.

2. List of Equipment: List equipment for each system, organized alphabetically by system. For pieces of equipment not part of system, list alphabetically in separate list.

3. Tables of Contents: Include a table of contents for each emergency, operation, and maintenance manual.

Page 78: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

OPERATION AND MAINTENANCE DATA 01 78 23 - 4

1.7 EMERGENCY MANUALS

A. Emergency Manual: Assemble a complete set of emergency information indicating procedures for use by emergency personnel and by Owner's operating personnel for types of emergencies indicated.

B. Content: Organize manual into a separate section for each of the following:

1. Type of emergency. 2. Emergency instructions. 3. Emergency procedures.

C. Type of Emergency: Where applicable for each type of emergency indicated below, include instructions and procedures for each system, subsystem, piece of equipment, and component:

1. Fire. 2. Flood. 3. Gas leak. 4. Water leak. 5. Power failure. 6. Water outage. 7. System, subsystem, or equipment failure. 8. Chemical release or spill.

D. Emergency Instructions: Describe and explain warnings, trouble indications, error messages, and similar codes and signals. Include responsibilities of Owner's operating personnel for notification of Installer, supplier, and manufacturer to maintain warranties.

E. Emergency Procedures: Include the following, as applicable:

1. Instructions on stopping. 2. Shutdown instructions for each type of emergency. 3. Operating instructions for conditions outside normal operating limits. 4. Required sequences for electric or electronic systems. 5. Special operating instructions and procedures.

1.8 SYSTEMS AND EQUIPMENT OPERATION MANUALS

A. Systems and Equipment Operation Manual: Assemble a complete set of data indicating operation of each system, subsystem, and piece of equipment not part of a system. Include information required for daily operation and management, operating standards, and routine and special operating procedures.

1. Engage a factory-authorized service representative to assemble and prepare information for each system, subsystem, and piece of equipment not part of a system.

2. Prepare a separate manual for each system and subsystem, in the form of an instructional manual for use by Owner's operating personnel.

B. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections and the following information:

1. System, subsystem, and equipment descriptions. Use designations for systems and equipment indicated on Contract Documents.

2. Performance and design criteria if Contractor has delegated design responsibility. 3. Operating standards. 4. Operating procedures.

Page 79: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

OPERATION AND MAINTENANCE DATA 01 78 23 - 5

5. Operating logs. 6. Wiring diagrams. 7. Control diagrams. 8. Piped system diagrams. 9. Precautions against improper use. 10. License requirements including inspection and renewal dates.

C. Descriptions: Include the following:

1. Product name and model number. Use designations for products indicated on Contract Documents.

2. Manufacturer's name. 3. Equipment identification with serial number of each component. 4. Equipment function. 5. Operating characteristics. 6. Limiting conditions. 7. Performance curves. 8. Engineering data and tests. 9. Complete nomenclature and number of replacement parts.

D. Operating Procedures: Include the following, as applicable:

1. Startup procedures. 2. Equipment or system break-in procedures. 3. Routine and normal operating instructions. 4. Regulation and control procedures. 5. Instructions on stopping. 6. Normal shutdown instructions. 7. Seasonal and weekend operating instructions. 8. Required sequences for electric or electronic systems. 9. Special operating instructions and procedures.

E. Systems and Equipment Controls: Describe the sequence of operation, and diagram controls as installed.

F. Piped Systems: Diagram piping as installed, and identify color coding where required for identification.

1.9 SYSTEMS AND EQUIPMENT MAINTENANCE MANUALS

A. Systems and Equipment Maintenance Manuals: Assemble a complete set of data indicating maintenance of each system, subsystem, and piece of equipment not part of a system. Include manufacturers' maintenance documentation, preventive maintenance procedures and frequency, repair procedures, wiring and systems diagrams, lists of spare parts, and warranty information.

1. Engage a factory-authorized service representative to assemble and prepare information for each system, subsystem, and piece of equipment not part of a system.

2. Prepare a separate manual for each system and subsystem, in the form of an instructional manual for use by Owner's operating personnel.

B. Content: For each system, subsystem, and piece of equipment not part of a system, include source information, manufacturers' maintenance documentation, maintenance procedures, maintenance and service schedules, spare parts list and source information, maintenance service contracts, and warranties and bonds as described below.

Page 80: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

OPERATION AND MAINTENANCE DATA 01 78 23 - 6

C. Source Information: List each system, subsystem, and piece of equipment included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual and drawing or schedule designation or identifier where applicable.

D. Manufacturers' Maintenance Documentation: Include the following information for each component part or piece of equipment:

1. Standard maintenance instructions and bulletins; include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.

a. Prepare supplementary text if manufacturers' standard printed data are not available and where the information is necessary for proper operation and maintenance of equipment or systems.

2. Drawings, diagrams, and instructions required for maintenance, including disassembly and component removal, replacement, and assembly.

3. Identification and nomenclature of parts and components. 4. List of items recommended to be stocked as spare parts.

E. Maintenance Procedures: Include the following information and items that detail essential maintenance procedures:

1. Test and inspection instructions. 2. Troubleshooting guide. 3. Precautions against improper maintenance. 4. Disassembly; component removal, repair, and replacement; and reassembly instructions. 5. Aligning, adjusting, and checking instructions. 6. Demonstration and training video recording, if available.

F. Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment.

1. Scheduled Maintenance and Service: Tabulate actions for daily, weekly, monthly, quarterly, semiannual, and annual frequencies.

2. Maintenance and Service Record: Include manufacturers' forms for recording maintenance.

G. Spare Parts List and Source Information: Include lists of replacement and repair parts, with parts identified and cross-referenced to manufacturers' maintenance documentation and local sources of maintenance materials and related services.

H. Maintenance Service Contracts: Include copies of maintenance agreements with name and telephone number of service agent.

I. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.

1. Include procedures to follow and required notifications for warranty claims.

J. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams.

Page 81: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

OPERATION AND MAINTENANCE DATA 01 78 23 - 7

Coordinate these drawings with information contained in record Drawings to ensure correct illustration of completed installation.

1. Do not use original project record documents as part of maintenance manuals.

1.10 PRODUCT MAINTENANCE MANUALS

A. Product Maintenance Manual: Assemble a complete set of maintenance data indicating care and maintenance of each product, material, and finish incorporated into the Work.

B. Content: Organize manual into a separate section for each product, material, and finish. Include source information, product information, maintenance procedures, repair materials and sources, and warranties and bonds, as described below.

C. Source Information: List each product included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual and drawing or schedule designation or identifier where applicable.

D. Product Information: Include the following, as applicable:

1. Product name and model number. 2. Manufacturer's name. 3. Color, pattern, and texture. 4. Material and chemical composition. 5. Reordering information for specially manufactured products.

E. Maintenance Procedures: Include manufacturer's written recommendations and the following:

1. Inspection procedures. 2. Types of cleaning agents to be used and methods of cleaning. 3. List of cleaning agents and methods of cleaning detrimental to product. 4. Schedule for routine cleaning and maintenance. 5. Repair instructions.

F. Repair Materials and Sources: Include lists of materials and local sources of materials and related services.

G. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.

1. Include procedures to follow and required notifications for warranty claims.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 78 23

Page 82: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PROJECT RECORD DOCUMENTS 01 78 39 - 1

SECTION 01 78 39 - PROJECT RECORD DOCUMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for project record documents, including the following:

1. Record Drawings. 2. Record Specifications. 3. Record Product Data. 4. Miscellaneous record submittals.

B. Related Requirements:

1. Section 01 73 00 "Execution" for final property survey. 2. Section 01 77 00 "Closeout Procedures" for general closeout procedures. 3. Section 01 78 23 "Operation and Maintenance Data" for operation and maintenance manual

requirements.

1.2 CLOSEOUT SUBMITTALS

A. Record Drawings: Comply with the following:

1. Number of Copies: Submit copies of record Drawings as follows:

a. Initial Submittal:

1) Submit PDF electronic files of scanned record prints. 2) Architect will indicate whether general scope of changes, additional information

recorded, and quality of drafting are acceptable.

b. Final Submittal:

1) Submit PDF electronic files of scanned record prints and one set of prints. 2) Print each drawing, whether or not changes and additional information were

recorded.

B. Record Specifications: Submit annotated PDF electronic files of Project's Specifications, including addenda and contract modifications.

C. Record Product Data: Submit annotated PDF electronic files and directories of each submittal.

1. Where record Product Data are required as part of operation and maintenance manuals, submit duplicate marked-up Product Data as a component of manual.

D. Miscellaneous Record Submittals: See other Specification Sections for miscellaneous record-keeping requirements and submittals in connection with various construction activities. Submit annotated PDF electronic files and directories of each submittal.

Page 83: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PROJECT RECORD DOCUMENTS 01 78 39 - 2

1.3 RECORD DRAWINGS

A. Record Prints: Maintain one set of marked-up paper copies of the Contract Drawings and Shop Drawings, incorporating new and revised drawings as modifications are issued.

1. Preparation: Mark record prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to provide information for preparation of corresponding marked-up record prints.

a. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later.

b. Accurately record information in an acceptable drawing technique. c. Record data as soon as possible after obtaining it. d. Record and check the markup before enclosing concealed installations. e. Cross-reference record prints to corresponding photographic documentation.

2. Content: Types of items requiring marking include, but are not limited to, the following:

a. Dimensional changes to Drawings. b. Revisions to details shown on Drawings. c. Depths of foundations. d. Locations and depths of underground utilities. e. Revisions to routing of piping and conduits. f. Revisions to electrical circuitry. g. Actual equipment locations. h. Duct size and routing. i. Locations of concealed internal utilities. j. Changes made by Change Order or Construction Change Directive. k. Changes made following Architect's written orders. l. Details not on the original Contract Drawings. m. Field records for variable and concealed conditions. n. Record information on the Work that is shown only schematically.

3. Mark the Contract Drawings and Shop Drawings completely and accurately. Use personnel proficient at recording graphic information in production of marked-up record prints.

4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location.

5. Mark important additional information that was either shown schematically or omitted from original Drawings.

6. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, and similar identification, where applicable.

B. Format: Identify and date each record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location.

1. Record Prints: Organize record prints into manageable sets. Bind each set with durable paper cover sheets. Include identification on cover sheets.

2. Format: Annotated PDF electronic file with comment function enabled. 3. Identification: As follows:

a. Project name. b. Date. c. Designation "PROJECT RECORD DRAWINGS." d. Name of Architect. e. Name of Contractor.

Page 84: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PROJECT RECORD DOCUMENTS 01 78 39 - 3

1.4 RECORD SPECIFICATIONS

A. Preparation: Mark Specifications to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications.

1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.

2. Note related Change Orders, record Product Data, and record Drawings where applicable.

B. Format: Submit record Specifications as annotated PDF electronic file.

1.5 RECORD PRODUCT DATA

A. Recording: Maintain one copy of each submittal during the construction period for project record document purposes. Post changes and revisions to project record documents as they occur; do not wait until end of Project.

B. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal.

1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.

2. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation.

3. Note related Change Orders, record Specifications, and record Drawings where applicable.

C. Format: Submit record Product Data as annotated PDF electronic file.

1. Include record Product Data directory organized by Specification Section number and title, electronically linked to each item of record Product Data.

1.6 MISCELLANEOUS RECORD SUBMITTALS

A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference.

B. Format: Submit miscellaneous record submittals as PDF electronic file.

1. Include miscellaneous record submittals directory organized by Specification Section number and title, electronically linked to each item of miscellaneous record submittals.

1.7 MAINTENANCE OF RECORD DOCUMENTS

A. Maintenance of Record Documents: Store record documents in the field office apart from the Contract Documents used for construction. Do not use project record documents for construction purposes. Maintain record documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to project record documents for Architect's reference during normal working hours.

Page 85: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

PROJECT RECORD DOCUMENTS 01 78 39 - 4

PART 2 - PRODUCTS

PART 3 - EXECUTION

END OF SECTION 01 78 39

Page 86: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SELECTIVE DEMOLITION 02 41 19 - 1

SECTION 02 41 19 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes demolition and removal of selected portions of building or structure.

1.2 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, and other items of interest or value to Owner that may be uncovered during demolition remain the property of Owner.

1.3 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at Project site.

1.4 INFORMATIONAL SUBMITTALS

A. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property. Indicate proposed locations and construction of barriers.

B. Schedule of selective demolition activities with starting and ending dates for each activity.

C. Predemolition photographs or video.

D. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician.

1.5 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.

1. If suspected hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.

Page 87: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SELECTIVE DEMOLITION 02 41 19 - 2

E. Storage or sale of removed items or materials on-site is not permitted.

F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

G. Arrange selective demolition schedule so as not to interfere with Owner's operations.

1.6 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties.

1. Confirm status of existing roofing system warranty with Owner.

B. Notify warrantor on completion of selective demolition, and obtain documentation verifying that existing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ASSE A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during selective building demolition operations.

3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.

Page 88: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SELECTIVE DEMOLITION 02 41 19 - 3

1. Owner will arrange to shut off indicated services/systems when requested by Contractor. 2. Arrange to shut off utilities with utility companies. 3. If services/systems are required to be removed, relocated, or abandoned, provide temporary

services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

4. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated on Drawings to be removed.

a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.

b. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material and leave in place.

c. Equipment to Be Removed: Disconnect and cap services and remove equipment. d. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove,

clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.

e. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.

f. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.

g. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material and leave in place.

3.3 PROTECTION

A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

C. Remove temporary barricades and protections where hazards no longer exist.

3.4 SELECTIVE DEMOLITION

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.

2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

4. Maintain fire watch during and for at least four hours after flame-cutting operations. 5. Locate selective demolition equipment and remove debris and materials so as not to impose

excessive loads on supporting walls, floors, or framing.

Page 89: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SELECTIVE DEMOLITION 02 41 19 - 4

6. Dispose of demolished items and materials promptly.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and reinstalled in their original locations after selective demolition operations are complete.

3.5 CLEANING

A. Remove demolition waste materials from Project site and dispose of them in an EPA-approved construction and demolition waste landfill acceptable to authorities having jurisdiction.

1. Do not allow demolished materials to accumulate on-site. 2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and

areas. 3. Remove debris from elevated portions of building by chute, hoist, or other device that will

convey debris to grade level in a controlled descent.

B. Burning: Do not burn demolished materials.

C. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 02 41 19

Page 90: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

UNIT MASONRY 04 20 00 - 1

SECTION 04 20 00 - UNIT MASONRY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Concrete masonry units. 2. Clay face brick.

1.2 DEFINITIONS

A. CMU(s): Concrete masonry unit(s).

B. Reinforced Masonry: Masonry containing reinforcing steel in grouted cells.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Samples for Verification: For each type and color of exposed masonry unit.

1.4 INFORMATIONAL SUBMITTALS

A. Material Certificates: For each type and size of product. For masonry units, include data on material properties.

1.5 FIELD CONDITIONS

A. Cold-Weather Requirements: Do not use frozen materials or materials mixed or coated with ice or frost. Do not build on frozen substrates. Remove and replace unit masonry damaged by frost or by freezing conditions. Comply with cold-weather construction requirements contained in TMS 602/ACI 530.1/ASCE 6.

B. Hot-Weather Requirements: Comply with hot-weather construction requirements contained in TMS 602/ACI 530.1/ASCE 6.

PART 2 - PRODUCTS

2.1 UNIT MASONRY, GENERAL

A. Masonry Standard: Comply with TMS 602/ACI 530.1/ASCE 6, except as modified by requirements in the Contract Documents.

Page 91: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

UNIT MASONRY 04 20 00 - 2

B. Fire-Resistance Ratings: Comply with requirements for fire-resistance-rated assembly designs indicated.

1. Where fire-resistance-rated construction is indicated, units shall be listed and labeled by a qualified testing agency acceptable to authorities having jurisdiction.

2.2 CONCRETE MASONRY UNITS

A. CMUs: ASTM C 90.

2.3 BRICK

A. Clay Face Brick: Facing brick complying with ASTM C 216 or hollow brick complying with ASTM C 652, Class H40V (void areas between 25 and 40 percent of gross cross-sectional area).

1. Grade: SW. 2. Type: FBX or HBS. 3. Size: Matching existing units. 4. Color: Matching existing units.

a. Acme Brick Company, Denton Plant; Cinnamon Brown.

2.4 MORTAR AND GROUT MATERIALS

A. Portland Cement: ASTM C 150/C 150M, Type I or II, except Type III may be used for cold-weather construction. Provide natural color or white cement as required to produce mortar color indicated.

B. Hydrated Lime: ASTM C 207, Type S.

C. Portland Cement-Lime Mix: Packaged blend of portland cement and hydrated lime containing no other ingredients.

D. Aggregate for Mortar: ASTM C 144.

1. For joints less than 1/4 inch (6 mm) thick, use aggregate graded with 100 percent passing the No. 16 (1.18-mm) sieve.

2. White-Mortar Aggregates: Natural white sand or crushed white stone. 3. Colored-Mortar Aggregates: Natural sand or crushed stone of color necessary to produce

required mortar color.

E. Aggregate for Grout: ASTM C 404.

F. Water: Potable.

2.5 REINFORCEMENT

A. Uncoated-Steel Reinforcing Bars: ASTM A 615/A 615M or ASTM A 996/A 996M, Grade 60 (Grade 420).

B. Masonry-Joint Reinforcement, General: ASTM A 951/A 951M.

Page 92: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

UNIT MASONRY 04 20 00 - 3

1. Exterior Walls: Hot-dip galvanized carbon steel. 2. Wire Size for Side Rods: 0.187-inch (4.76-mm) diameter. 3. Wire Size for Cross Rods: 0.187-inch (4.76-mm) diameter. 4. Wire Size for Veneer Ties: 0.187-inch (4.76-mm) diameter. 5. Spacing of Cross Rods, Tabs, and Cross Ties: Not more than 16 inches (407 mm) o.c. 6. Provide in lengths of not less than 10 feet (3 m), with prefabricated corner and tee units.

C. Masonry-Joint Reinforcement for Multiwythe Masonry:

1. Ladder type with one side rod at each face shell of hollow masonry units more than 4 inches (100 mm) wide, plus one side rod at each wythe of masonry 4 inches (100 mm) wide or less.

2. Tab type, either ladder or truss design, with one side rod at each face shell of backing wythe and with rectangular tabs sized to extend at least halfway through facing wythe, but with at least 5/8-inch (16-mm) cover on outside face.

3. Adjustable (two-piece) type, either ladder or truss design, with one side rod at each face shell of backing wythe and with separate adjustable ties with pintle-and-eye connections having a maximum horizontal play of 1/16 inch (1.5 mm) and maximum vertical adjustment of 1-1/4 inches (32 mm). Size ties to extend at least halfway through facing wythe but with at least 5/8-inch (16-mm) cover on outside face.

2.6 EMBEDDED FLASHING MATERIALS

A. Flexible Flashing: Use the following unless otherwise indicated:

1. Rubberized-Asphalt Flashing: Composite flashing product consisting of a pliable, adhesive rubberized-asphalt compound, bonded to a high-density, cross-laminated polyethylene film to produce an overall thickness of not less than 0.040 inch (1.02 mm).

a. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1) Carlisle Coatings & Waterproofing Inc. 2) GCP Applied Technologies Inc. 3) Polyguard Products, Inc. 4) W.R. Meadows, Inc.

2.7 MISCELLANEOUS MASONRY ACCESSORIES

A. Weep/Cavity Vent Products: Use the following unless otherwise indicated:

1. Cellular Plastic Weep/Vent: One-piece, flexible extrusion made from UV-resistant polypropylene copolymer, full height and width of head joint and depth 1/8 inch (3 mm) less than depth of outer wythe, in color selected from manufacturer's standard.

a. Products: Subject to compliance with requirements, provide the following:

1) Hohmann & Barnard, Inc; Quadro-Vent™.

2.8 MORTAR AND GROUT MIXES

A. General: Do not use admixtures, including pigments, air-entraining agents, accelerators, retarders, water-repellent agents, antifreeze compounds, or other admixtures unless otherwise indicated.

Page 93: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

UNIT MASONRY 04 20 00 - 4

1. Do not use calcium chloride in mortar or grout. 2. Use portland cement-lime mortar unless otherwise indicated.

B. Preblended, Dry Mortar Mix: Furnish dry mortar ingredients in form of a preblended mix. Measure quantities by weight to ensure accurate proportions, and thoroughly blend ingredients before delivering to Project site.

C. Mortar for Unit Masonry: Comply with ASTM C 270, Proportion Specification. Provide the following types of mortar for applications stated unless another type is indicated.

1. For reinforced masonry, use Type S. 2. For brick veneers, use Type N.

D. Grout for Unit Masonry: Comply with ASTM C 476.

1. Use grout of type indicated or, if not otherwise indicated, of type (fine or coarse) that will comply with TMS 602/ACI 530.1/ASCE 6 for dimensions of grout spaces and pour height.

2. Proportion grout in accordance with ASTM C 476, Table 1 or paragraph 4.2.2 for specified 28-day compressive strength indicated, but not less than 2000 psi (14 MPa).

3. Provide grout with a slump of 8 to 11 inches (200 to 280 mm) as measured according to ASTM C 143/C 143M.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Use full-size units without cutting if possible. If cutting is required to provide a continuous pattern or to fit adjoining construction, cut units with motor-driven saws; provide clean, sharp, unchipped edges. Allow units to dry before laying unless wetting of units is specified. Install cut units with cut surfaces and, where possible, cut edges concealed.

B. Select and arrange units for exposed unit masonry to produce a uniform blend of colors and textures. Mix units from several pallets or cubes as they are placed.

C. Wetting of Brick: Wet brick before laying if initial rate of absorption exceeds 30 g/30 sq. in. (30 g/194 sq. cm) per minute when tested according to ASTM C 67. Allow units to absorb water so they are damp but not wet at time of laying.

3.2 TOLERANCES

A. Dimensions and Locations of Elements:

1. For dimensions in cross section or elevation, do not vary by more than plus 1/2 inch (12 mm) or minus 1/4 inch (6 mm).

2. For location of elements in plan, do not vary from that indicated by more than plus or minus 1/2 inch (12 mm).

3. For location of elements in elevation, do not vary from that indicated by more than plus or minus 1/4 inch (6 mm) in a story height or 1/2 inch (12 mm) total.

B. Lines and Levels:

1. For bed joints and top surfaces of bearing walls, do not vary from level by more than 1/4 inch in 10 feet (6 mm in 3 m), or 1/2-inch (12-mm) maximum.

Page 94: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

UNIT MASONRY 04 20 00 - 5

2. For conspicuous horizontal lines, such as lintels, sills, parapets, and reveals, do not vary from level by more than 1/8 inch in 10 feet (3 mm in 3 m), 1/4 inch in 20 feet (6 mm in 6 m), or 1/2-inch (12-mm) maximum.

3. For vertical lines and surfaces, do not vary from plumb by more than 1/4 inch in 10 feet (6 mm in 3 m), 3/8 inch in 20 feet (9 mm in 6 m), or 1/2-inch (12-mm) maximum.

4. For conspicuous vertical lines, such as external corners, door jambs, reveals, and expansion and control joints, do not vary from plumb by more than 1/8 inch in 10 feet (3 mm in 3 m), 1/4 inch in 20 feet (6 mm in 6 m), or 1/2-inch (12-mm) maximum.

5. For lines and surfaces, do not vary from straight by more than 1/4 inch in 10 feet (6 mm in 3 m), 3/8 inch in 20 feet (9 mm in 6 m), or 1/2-inch (12-mm) maximum.

C. Joints:

1. For bed joints, do not vary from thickness indicated by more than plus or minus 1/8 inch (3 mm), with a maximum thickness limited to 1/2 inch (12 mm).

2. For head and collar joints, do not vary from thickness indicated by more than plus 3/8 inch (9 mm) or minus 1/4 inch (6 mm).

3. For exposed head joints, do not vary from thickness indicated by more than plus or minus 1/8 inch (3 mm).

3.3 LAYING MASONRY WALLS

A. Lay out walls in advance for accurate spacing of surface bond patterns with uniform joint thicknesses and for accurate location of openings, movement-type joints, returns, and offsets. Avoid using less-than-half-size units, particularly at corners, jambs, and, where possible, at other locations.

B. Bond Pattern for Exposed Masonry: Unless otherwise indicated, lay exposed masonry in running bond; do not use units with less-than-nominal 4-inch (100-mm) horizontal face dimensions at corners or jambs.

C. Built-in Work: As construction progresses, build in items specified in this and other Sections. Fill in solidly with masonry around built-in items.

D. Fill space between steel frames and masonry solidly with mortar unless otherwise indicated.

E. Fill cores in hollow CMUs with grout 24 inches (600 mm) under bearing plates, beams, lintels, posts, and similar items unless otherwise indicated.

3.4 MORTAR BEDDING AND JOINTING

A. Lay CMUs as follows:

1. Bed face shells in mortar and make head joints of depth equal to bed joints. 2. Bed webs in mortar in all courses of piers, columns, and pilasters. 3. Bed webs in mortar in grouted masonry, including starting course on footings. 4. Fully bed entire units, including areas under cells, at starting course on footings where cells

are not grouted.

B. Lay solid masonry units and hollow brick with completely filled bed and head joints; butter ends with sufficient mortar to fill head joints and shove into place. Do not deeply furrow bed joints or slush head joints.

C. Tool exposed joints slightly concave when thumbprint hard, using a jointer larger than joint thickness unless otherwise indicated.

Page 95: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

UNIT MASONRY 04 20 00 - 6

D. Cut joints flush for masonry walls to receive plaster or other direct-applied finishes (other than paint) unless otherwise indicated.

3.5 COMPOSITE MASONRY

A. Bond wythes of composite masonry together using one of the following methods: 1. Masonry-Joint Reinforcement: Installed in horizontal mortar joints.

a. Where bed joints of both wythes align, use ladder-type reinforcement extending across both wythes.

b. Where bed joints of wythes do not align, use adjustable-type (two-piece-type) reinforcement.

B. Corners: Provide interlocking masonry unit bond in each wythe and course at corners unless otherwise indicated.

3.6 MASONRY-JOINT REINFORCEMENT

A. General: Install entire length of longitudinal side rods in mortar with a minimum cover of 5/8 inch (16 mm) on exterior side of walls, 1/2 inch (13 mm) elsewhere. Lap reinforcement a minimum of 6 inches (150 mm).

1. Space reinforcement not more than 16 inches (406 mm) o.c.

B. Provide continuity at wall intersections by using prefabricated T-shaped units.

C. Provide continuity at corners by using prefabricated L-shaped units.

3.7 FLASHING, WEEP HOLES, AND CAVITY VENTS

A. General: Install embedded flashing and weep holes in masonry at shelf angles, lintels, ledges, other obstructions to downward flow of water in wall, and where indicated.

3.8 REINFORCED UNIT MASONRY INSTALLATION

A. Placing Reinforcement: Comply with requirements in TMS 602/ACI 530.1/ASCE 6.

B. Grouting: Do not place grout until entire height of masonry to be grouted has attained enough strength to resist grout pressure.

1. Comply with requirements in TMS 602/ACI 530.1/ASCE 6 for cleanouts and for grout placement, including minimum grout space and maximum pour height.

3.9 FIELD QUALITY CONTROL

A. Testing and Inspecting: Owner will engage special inspectors to perform tests and inspections and prepare reports. Allow inspectors access to scaffolding and work areas as needed to perform tests and inspections. Retesting of materials that fail to comply with specified requirements shall be done at Contractor's expense.

Page 96: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

UNIT MASONRY 04 20 00 - 7

3.10 REPAIRING, POINTING, AND CLEANING

A. In-Progress Cleaning: Clean unit masonry as work progresses by dry brushing to remove mortar fins and smears before tooling joints.

B. Final Cleaning: After mortar is thoroughly set and cured, clean exposed masonry as follows:

1. Remove large mortar particles by hand with wooden paddles and nonmetallic scrape hoes or chisels.

2. Test cleaning methods on sample wall panel; leave one-half of panel uncleaned for comparison purposes.

3. Protect adjacent surfaces from contact with cleaner. 4. Wet wall surfaces with water before applying cleaners; remove cleaners promptly by rinsing

surfaces thoroughly with clear water. 5. Clean brick by bucket-and-brush hand-cleaning method described in BIA Technical Notes 20. 6. Clean masonry with a proprietary acidic cleaner applied according to manufacturer's written

instructions.

END OF SECTION 04 20 00

Page 97: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

BITUMINOUS DAMPPROOFING 07 11 13 - 1

SECTION 07 11 13 - BITUMINOUS DAMPPROOFING

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes cold-applied, emulsified-asphalt dampproofing.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

1.3 FIELD CONDITIONS

A. Weather Limitations: Proceed with application only when existing and forecasted weather conditions permit dampproofing to be performed according to manufacturers' written instructions.

B. Ventilation: Provide adequate ventilation during application of dampproofing in enclosed spaces. Maintain ventilation until dampproofing has cured.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Source Limitations: Obtain primary dampproofing materials and primers from single source from single manufacturer. Provide auxiliary materials recommended in writing by manufacturer of primary materials.

2.2 PERFORMANCE REQUIREMENTS

A. VOC Content: Products shall comply with VOC content limits of authorities having jurisdiction unless otherwise indicated.

2.3 COLD-APPLIED, EMULSIFIED-ASPHALT DAMPPROOFING

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. BASF Corp. - Construction Chemicals. 2. ChemMasters, Inc. 3. Euclid Chemical Company (The); an RPM company. 4. Henry Company. 5. W.R. Meadows, Inc.

B. Trowel Coats: ASTM D 1227, Type II, Class 1.

C. Fibered Brush and Spray Coats: ASTM D 1227, Type II, Class 1.

Page 98: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

BITUMINOUS DAMPPROOFING 07 11 13 - 2

D. Brush and Spray Coats: ASTM D 1227, Type III, Class 1.

2.4 AUXILIARY MATERIALS

A. Furnish auxiliary materials recommended in writing by dampproofing manufacturer for intended use and compatible with bituminous dampproofing.

B. Emulsified-Asphalt Primer: ASTM D 1227, Type III, Class 1, except diluted with water as recommended in writing by manufacturer.

C. Asphalt-Coated Glass Fabric: ASTM D 1668/D 1668M, Type I.

D. Patching Compound: Epoxy or latex-modified repair mortar of type recommended in writing by dampproofing manufacturer.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Applicator present, for compliance with requirements for surface smoothness, maximum surface moisture content, and other conditions affecting performance of the Work.

B. Proceed with application only after substrate construction and penetrating work have been completed and unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Clean, prepare, and treat substrates according to manufacturer's written instructions. Provide clean, dust-free, and dry substrates for dampproofing application.

B. Mask or otherwise protect adjoining exposed surfaces from being stained, spotted, or coated with dampproofing. Prevent dampproofing materials from entering and clogging weep holes and drains.

C. Clean substrates of projections and substances detrimental to dampproofing work; fill voids, seal joints, and remove bond breakers if any.

D. Apply patching compound to patch and fill tie holes, honeycombs, reveals, and other imperfections.

3.3 APPLICATION, GENERAL

A. Comply with manufacturer's written instructions for dampproofing application, cure time between coats, and drying time before backfilling unless otherwise indicated.

1. Apply dampproofing to provide continuous plane of protection. 2. Apply additional coats if recommended in writing by manufacturer or to achieve a smooth

surface and uninterrupted coverage.

B. Where dampproofing footings and foundation walls, apply from finished-grade line to top of footing; extend over top of footing and down a minimum of 6 inches (150 mm) over outside face of footing.

Page 99: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

BITUMINOUS DAMPPROOFING 07 11 13 - 3

1. Extend dampproofing 12 inches (300 mm) onto intersecting walls and footings, but do not extend onto surfaces exposed to view when Project is completed.

2. Install flashings and corner protection stripping at internal and external corners, changes in plane, construction joints, cracks, and where indicated as "reinforced," by embedding an 8-inch- (200-mm-) wide strip of asphalt-coated glass fabric in a heavy coat of dampproofing. Dampproofing coat for embedding fabric is in addition to other coats required.

C. Where dampproofing exterior face of inner wythe of exterior masonry cavity walls, lap dampproofing at least 1/4 inch (6 mm) onto flashing, masonry reinforcement, veneer ties, and other items that penetrate inner wythe.

1. Extend dampproofing over outer face of structural members and concrete slabs that interrupt inner wythe.

2. Lap dampproofing at least 1/4 inch (6 mm) onto shelf angles supporting veneer.

D. Where dampproofing interior face of above-grade, exterior masonry walls, continue dampproofing through intersecting walls by keeping vertical mortar joints at intersection temporarily open or by dampproofing wall before constructing intersecting walls.

3.4 COLD-APPLIED, EMULSIFIED-ASPHALT DAMPPROOFING

A. Exterior Face of Inner Wythe of Cavity Walls: Apply primer and one brush or spray coat at not less than 1 gal./100 sq. ft. (0.4 L/sq. m).

3.5 PROTECTION

A. Protect installed insulation drainage panels from damage due to UV light, harmful weather exposures, physical abuse, and other causes. Provide temporary coverings where panels are subject to abuse and cannot be concealed and protected by permanent construction immediately after installation.

B. Correct dampproofing that does not comply with requirements; repair substrates, and reapply dampproofing.

END OF SECTION 07 11 13

Page 100: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

THERMAL INSULATION 07 21 00 - 1

SECTION 07 21 00 - THERMAL INSULATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes polyisocyanurate foam-plastic board.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

PART 2 - PRODUCTS

2.1 POLYISOCYANURATE FOAM-PLASTIC BOARD

A. Polyisocyanurate Board, Foil Faced: ASTM C 1289, foil faced, Type I, Class 1 or 2.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Carlisle Coatings & Waterproofing Inc. b. Dow Chemical Company (The). c. Rmax, Inc.

2. Fire Propagation Characteristics: Passes NFPA 285 testing as part of an approved assembly.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Comply with insulation manufacturer's written instructions applicable to products and applications.

B. Install insulation that is undamaged, dry, and unsoiled and that has not been left exposed to ice, rain, or snow at any time.

C. Extend insulation to envelop entire area to be insulated. Fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement.

D. Provide sizes to fit applications and selected from manufacturer's standard thicknesses, widths, and lengths. Apply single layer of insulation units unless multiple layers are otherwise shown or required to make up total thickness or to achieve R-value.

E. Miscellaneous Voids: Install insulation in miscellaneous voids and cavity spaces where required to prevent gaps in insulation using the following materials:

1. Spray Polyurethane Insulation: Apply according to manufacturer's written instructions.

Page 101: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

THERMAL INSULATION 07 21 00 - 2

END OF SECTION 07 21 00

Page 102: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 16.13 - 1

SECTION 07 52 16.13 – TORCH-APPLIED STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Torch-applied, two-ply styrene-butadiene-styrene (SBS)-modified bituminous membrane roofing.

2. Roof insulation.

1.2 DEFINITIONS

A. Roofing Terminology: Definitions in ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and Waterproofing Manual" apply to work of this Section.

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Roofing Conference: Conduct conference at Project site.

1. Meet with Owner, Architect, Owner's insurer if applicable, testing and inspecting agency representative, roofing Installer, roofing system manufacturer's representative, deck Installer, and installers whose work interfaces with or affects roofing, including installers of roof accessories and roof-mounted equipment.

2. Review methods and procedures related to roofing installation, including manufacturer's written instructions.

3. Review and finalize construction schedule, and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

4. Examine deck substrate conditions and finishes for compliance with requirements, including flatness and fastening.

5. Review structural loading limitations of roof deck during and after roofing. 6. Review base flashings, special roofing details, roof drainage, roof penetrations, equipment

curbs, and condition of other construction that affects roofing system. 7. Review governing regulations and requirements for insurance and certificates if applicable. 8. Review temporary protection requirements for roofing system during and after installation. 9. Review roof observation and repair procedures after roofing installation.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Shop Drawings: For roofing system. Include plans, elevations, sections, details, and attachments to other work, including:

1. Base flashings and membrane terminations. 2. Tapered insulation, including slopes. 3. Crickets, saddles, and tapered edge strips, including slopes. 4. Insulation fastening patterns for corner, perimeter, and field-of-roof locations.

Page 103: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 16.13 - 2

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For Installer.

1. Submit evidence of complying with quality assurance requirements.

B. Manufacturer Certificates: Signed by roofing manufacturer certifying that roofing system complies with requirements specified in "Performance Requirements" Article.

1. Submit evidence of complying with performance requirements.

C. Product Test Reports: For components of membrane roofing system, for tests performed by manufacturer and witnessed by a qualified testing agency.

D. Research/Evaluation Reports: For components of membrane roofing system, from ICC-ES.

E. Field quality-control reports.

F. Sample Warranties: For manufacturer's special warranties.

1.6 CLOSEOUT SUBMITTALS

A. Maintenance Data: For roofing system to include in maintenance manuals.

1.7 QUALITY ASSURANCE

A. Manufacturer Qualifications: A qualified manufacturer that is FM Global approved for membrane roofing system identical to that used for this Project.

B. Installer Qualifications:

1. A qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty.

a. Minimum Approval Duration: 5 years.

2. Crew members handling torches shall be trained by an Authorized Certified Roofing Torch Applicator (CERTA) Trainer, be certified according to CERTA torch safety guidelines as published by the National Roofing Contractors Association (NRCA), and follow torch safety practices as required by the contractor's insurance carrier.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components.

B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing system manufacturer. Protect stored liquid material from direct sunlight.

Page 104: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 16.13 - 3

1. Discard and legally dispose of liquid material that cannot be applied within its stated shelf life.

C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation.

D. Handle and store roofing materials, and place equipment in a manner to avoid permanent deflection of deck.

1.9 FIELD CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements.

1.10 WARRANTY

A. Special Warranty: Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within specified warranty period.

1. Unlimited Penal Warranty (NDL) includes membrane roofing, base flashings, roof insulation, fasteners, and other components of roofing system.

2. Warranty Period: 20 years from date of Substantial Completion.

B. Special Project Warranty: Submit roofing Installer's warranty, on warranty form at end of this Section, signed by Installer, covering the Work of this Section, including all components of roofing system such as membrane roofing, base flashing, roof insulation, fasteners, cover boards, substrate boards, vapor retarders, and walkway products, for the following warranty period:

1. Warranty Period: Two years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Basis-of-Design System: Subject to compliance with requirements, provide Siplast, Inc.; Paradiene 20 TG/30 BW FR TG, specification 2030 IT.

B. Other Acceptable Systems:

1. GAF; Ruberoid HW Smooth/Energy Cap HW Plus Granule FR. 2. Soprema, Inc.; Elastophene Flam/Sopraster Flam.

C. Source Limitations: Obtain components including roof insulation fasteners for roofing system from same manufacturer as membrane roofing or manufacturer approved by membrane roofing manufacturer.

Page 105: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 16.13 - 4

2.2 PERFORMANCE REQUIREMENTS

A. General Performance: Installed roofing and base flashings shall withstand specified uplift pressures, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Roofing and base flashings shall remain watertight.

1. Accelerated Weathering: Roofing system shall withstand 2000 hours of exposure when tested according to ASTM G 152, ASTM G 154, or ASTM G 155.

2. Impact Resistance: Roofing system shall resist impact damage when tested according to ASTM D 3746 or ASTM D 4272.

B. Material Compatibility: Roofing materials shall be compatible with one another and adjacent materials under conditions of service and application required, as demonstrated by roofing manufacturer based on testing and field experience.

C. Roofing System Design: Tested by a qualified testing agency to resist the following uplift pressures:

1. Corner Uplift Pressure: 105 psf. 2. Perimeter Uplift Pressure: 75 psf. 3. Field-of-Roof Uplift Pressure: 60 psf.

D. Solar Reflectance Index: Not less than 78 when calculated according to ASTM E 1980, based on testing identical products by a qualified testing agency.

E. Exterior Fire-Test Exposure: ASTM E 108 or UL 790, Class A; for application and roof slopes indicated; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.

2.3 ROOFING SHEET MATERIALS

A. Roofing Membrane Sheet: ASTM D 6163/D 6163M, Grade S, Type I, SBS-modified asphalt sheet (reinforced with glass fibers); smooth surfaced; suitable for application method specified.

1. Basis-of-Design Product: Siplast; Paradiene 20 TG.

B. Granule-Surfaced Roofing Cap Sheet: ASTM D 6163/D 6163M, Grade G, Type I, SBS-modified asphalt sheet (reinforced with glass fibers); granule surfaced; suitable for application method specified, and as follows:

1. Granule Color: White. 2. Basis-of-Design Product: Siplast; Paradiene 30 BW FR TG.

2.4 BASE FLASHING SHEET MATERIALS

A. Backer Sheet: ASTM D 6163, Grade S, Type I, SBS-modified asphalt sheet (reinforced with glass fibers); smooth surfaced; suitable for application method specified.

1. Basis-of-Design Product: Siplast; Paradiene 20 TG.

B. Metal-Foil-Surfaced Flashing Sheet: ASTM D 6298, glass-fiber-reinforced SBS-modified asphalt sheet (reinforced with glass fibers); metal-foil surfaced; suitable for application method specified, and as follows:

Page 106: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 16.13 - 5

1. Foil Surfacing: Aluminum. 2. Basis-of-Design Product: Siplast; Veral Aluminum.

2.5 AUXILIARY ROOFING MATERIALS

A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with roofing.

B. Asphalt Roofing Cement: ASTM D 4586, asbestos free, of consistency required by roofing system manufacturer for application.

1. Basis-of-Design Product: Siplast; PA-1021 Plastic Cement.

C. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Global 4470, designed for fastening roofing components to substrate; tested by manufacturer for required pullout strength, and acceptable to roofing system manufacturer.

D. Miscellaneous Accessories:

1. Provide those recommended by roofing system manufacturer. 2. Roofing Signage: Refer to information at the end of this Section.

2.6 ROOF INSULATION

A. General: Preformed roof insulation boards manufactured or approved by roofing manufacturer, selected from manufacturer's standard sizes suitable for application, of thicknesses required to provide overall Long-term Thermal Resistance Value of 25.

B. Polyisocyanurate Board Insulation: ASTM C 1289, Type II, Class 1, Grade 2, felt or glass-fiber mat facer on both major surfaces.

1. Basis-of-Design Product: Siplast; Paratherm.

C. Tapered Insulation: Provide factory-tapered insulation boards fabricated to minimum net slope of 1/4 inch per 12 inches (1:48) unless otherwise indicated.

1. Basis-of-Design Product: Siplast; Tapered Paratherm.

D. Provide preformed saddles, crickets, tapered edge strips, and other insulation shapes where indicated for sloping to drain. Fabricate to slopes indicated.

2.7 INSULATION ACCESSORIES

A. General: Roof insulation accessories recommended by insulation manufacturer for intended use and compatibility with roofing.

B. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion-resistance provisions in FM Global 4470, designed for fastening roof insulation to substrate, and acceptable to roofing system manufacturer.

1. Basis-of-Design Products:

Page 107: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 16.13 - 6

a. Siplast; Parafast Fastener. b. OMG; Standard RoofGrip Drill Point Fastener.

C. Insulation Cant Strips: ASTM C 728, perlite insulation board.

D. Tapered Edge Strips: ASTM C 728, perlite insulation board.

E. Cover Board: ASTM C 1177/C 1177M, glass-mat, water-resistant gypsum substrate, 1/2 inch (12.7 mm) thick.

1. Subject to compliance with requirements, provide one of the following:

a. Georgia Pacific Corporation; DensDeck Gypsum Roof Board. b. United States Gypsum; Securock Roof Board.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements and other conditions affecting performance of the Work:

1. Verify that roof openings and penetrations are in place, curbs are set and braced, and roof-drain bodies are securely clamped in place.

2. Verify that cants, blocking, curbs, and nailers are securely anchored to roof deck at penetrations and terminations and that nailers match thicknesses of insulation.

3. Verify that surface plane flatness and fastening of steel roof deck complies with requirements in Section 05 31 00 "Steel Decking."

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing installation according to roofing system manufacturer's written instructions. Remove sharp projections.

B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast.

3.3 INSTALLATION, GENERAL

A. Comply with roofing system manufacturer's written instructions.

3.4 INSULATION INSTALLATION

A. Insulation Cant Strips: Install and secure preformed 45-degree insulation cant strips at junctures of roofing system with vertical surfaces or angle changes greater than 45 degrees.

B. Install tapered insulation under area of roofing to conform to slopes indicated.

Page 108: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 16.13 - 7

C. Install insulation in a continuous straight line, with end joints staggered between rows, abutting edges and ends between boards. Fill gaps exceeding 1/4 inch (6 mm) with insulation.

1. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and penetrations.

D. Install insulation under area of roofing to achieve required thickness. Where overall insulation thickness is 2.7 inches (68 mm) or greater, install two or more layers with joints of each succeeding layer staggered from joints of previous layer a minimum of 6 inches (150 mm) in each direction.

E. Trim surface of insulation where necessary at roof drains so completed surface is flush and does not restrict flow of water.

F. Install tapered edge strips at perimeter edges of roof that do not terminate at vertical surfaces.

G. Install cover boards over insulation with long joints in continuous straight lines with end joints staggered between rows. Offset joints of insulation below a minimum of 6 inches (150 mm) in each direction. Loosely butt cover boards together and fasten to roof deck. Tape joints if required by roofing system manufacturer.

1. Fasten cover boards to resist uplift pressure at corners, perimeter, and field of roof.

3.5 ROOFING INSTALLATION, GENERAL

A. Install roofing system according to roofing system manufacturer's written instructions and applicable recommendations in ARMA/NRCA's "Quality Control Guidelines for the Application of Polymer Modified Bitumen Roofing" and as follows:

1. Deck Type: I (insulated). 2. Adhering Method: T (torched). 3. Number of SBS-Modified Asphalt Sheets: Two. 4. Surfacing Type: M (mineral-granule-surfaced cap sheet).

B. Start installation of roofing in presence of manufacturer's technical personnel.

C. Coordinate installation of roofing system so insulation and other components of the roofing system not permanently exposed are not subjected to precipitation or left uncovered at the end of the workday or when rain is forecast.

1. Provide tie-offs at end of each day's work to cover exposed roofing sheets and insulation with a course of coated felt set in roofing cement or hot roofing asphalt, with joints and edges sealed.

2. Complete terminations and base flashings, and provide temporary seals to prevent water from entering completed sections of roofing system.

3. Remove and discard temporary seals before beginning work on adjoining roofing.

3.6 SBS-MODIFIED BITUMINOUS MEMBRANE INSTALLATION

A. Install modified bituminous roofing sheet and cap sheet according to roofing manufacturer's written instructions, starting at low point of roofing system. Extend roofing membrane sheets over and terminate beyond cants, installing as follows:

1. Unroll roofing sheets and allow them to relax for minimum time period required by manufacturer.

2. Torch apply to substrate in strict compliance with CERTA torch safety guidelines.

Page 109: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 16.13 - 8

B. Laps: Accurately align roofing sheets, without stretching, and maintain uniform side and end laps. Stagger end laps. Completely bond and seal laps, leaving no voids.

1. Repair tears and voids in laps and lapped seams not completely sealed.

C. Install roofing sheets so side and end laps shed water.

3.7 FLASHING AND STRIPPING INSTALLATION

A. Install base flashing over cant strips and other sloped and vertical surfaces, at roof edges, and at penetrations through roof, and secure to substrates according to roofing system manufacturer's written instructions and as follows:

1. Prime substrates with asphalt primer if required by roofing system manufacturer. 2. Backer-Sheet Application: Remove release film from back of backer sheet and set to prepared

substrate. 3. Flashing-Sheet Application: Torch apply flashing sheet to substrate.

B. Extend base flashing up walls or parapets a minimum of 8 inches (200 mm) above roofing membrane and 4 inches (100 mm) onto field of roofing membrane.

C. Mechanically fasten top of base flashing securely at terminations and perimeter of roofing.

D. Install roofing cap-sheet stripping where metal flanges and edgings are set on roofing according to roofing system manufacturer's written instructions.

3.8 FIELD QUALITY CONTROL

A. Testing Agency: Owner will engage a qualified testing agency to inspect substrate conditions, surface preparation, membrane application, flashings, protection, and drainage components, and to furnish reports to Architect.

B. Test Cuts: Remove test specimens to evaluate problems observed during quality-assurance inspections of roofing membrane as follows:

1. Determine approximate quantities of components within roofing membrane according to ASTM D 3617.

2. Examine test specimens for interply voids according to ASTM D 3617 and to comply with criteria established in Appendix 3 of ARMA/NRCA's "Quality Control Guidelines for the Application of Polymer Modified Bitumen Roofing."

3. Repair areas where test cuts were made according to roofing system manufacturer's written instructions.

C. Final Roof Inspection: Arrange for roofing system manufacturer's technical personnel to inspect roofing installation on completion.

1. Notify Architect and Owner 48 hours in advance of date and time of inspection.

D. Roofing system will be considered defective if it does not pass tests and inspections.

1. Additional testing and inspecting, at Contractor's expense, will be performed to determine if replaced or additional work complies with specified requirements.

Page 110: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 16.13 - 9

3.9 PROTECTING AND CLEANING

A. Protect roofing system from damage and wear during remainder of construction period. When remaining construction does not affect or endanger roofing, inspect roofing for deterioration and damage, describing its nature and extent in a written report, with copies to Architect and Owner.

B. Correct deficiencies in or remove roofing system that does not comply with requirements, repair substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements.

3.10 ROOFING INSTALLER'S WARRANTY

A. WHEREAS _______________________________ of ___________________________, herein called the "Roofing Installer," has performed roofing and associated work ("work") on the following project:

1. Owner: Tarrant County. 2. Address: _______________________. 3. Building Name: ______________________. 4. Address: _________________________. 5. Area of Work: ________________________. 6. Acceptance Date: _________________. 7. Warranty Period: 2 years. 8. Expiration Date: __________________.

B. AND WHEREAS Roofing Installer has contracted (either directly with Owner or indirectly as a subcontractor) to warrant said work against leaks and faulty or defective materials and workmanship for designated Warranty Period,

C. NOW THEREFORE Roofing Installer hereby warrants, subject to terms and conditions herein set forth, that during Warranty Period he will, at his own cost and expense, make or cause to be made such repairs to or replacements of said work as are necessary to correct faulty and defective work and as are necessary to maintain said work in a watertight condition.

D. This Warranty is made subject to the following terms and conditions:

1. Specifically excluded from this Warranty are damages to work and other parts of the building, and to building contents, caused by:

a. lightning; b. failure of roofing system substrate, including cracking, settlement, excessive

deflection, deterioration, and decomposition; c. faulty construction of parapet walls, copings, chimneys, skylights, vents, equipment

supports, and other edge conditions and penetrations of the work; d. vapor condensation on bottom of roofing; and e. activity on roofing by others, including construction contractors, maintenance

personnel, other persons, and animals, whether authorized or unauthorized by Owner.

2. When work has been damaged by any of foregoing causes, Warranty shall be null and void until such damage has been repaired by Roofing Installer and until cost and expense thereof have been paid by Owner or by another responsible party so designated.

3. Roofing Installer is responsible for damage to work covered by this Warranty but is not liable for consequential damages to building or building contents resulting from leaks or faults or defects of work.

4. During Warranty Period, if Owner allows alteration of work by anyone other than Roofing Installer, including cutting, patching, and maintenance in connection with penetrations,

Page 111: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 16.13 - 10

attachment of other work, and positioning of anything on roof, this Warranty shall become null and void on date of said alterations, but only to the extent said alterations affect work covered by this Warranty. If Owner engages Roofing Installer to perform said alterations, Warranty shall not become null and void unless Roofing Installer, before starting said work, shall have notified Owner in writing, showing reasonable cause for claim, that said alterations would likely damage or deteriorate work, thereby reasonably justifying a limitation or termination of this Warranty.

5. During Warranty Period, if original use of roof is changed and it becomes used for, but was not originally specified for, a promenade, work deck, spray-cooled surface, flooded basin, or other use or service more severe than originally specified, this Warranty shall become null and void on date of said change, but only to the extent said change affects work covered by this Warranty.

6. Owner shall promptly notify Roofing Installer of observed, known, or suspected leaks, defects, or deterioration and shall afford reasonable opportunity for Roofing Installer to inspect work and to examine evidence of such leaks, defects, or deterioration.

7. This Warranty is recognized to be the only warranty of Roofing Installer on said work and shall not operate to restrict or cut off Owner from other remedies and resources lawfully available to Owner in cases of roofing failure. Specifically, this Warranty shall not operate to relieve Roofing Installer of responsibility for performance of original work according to requirements of the Contract Documents, regardless of whether Contract was a contract directly with Owner or a subcontract with Owner's General Contractor.

E. Subscribed and sworn before me this ____ day of ___________________ 20____.

Notary Public:

My Commission expires:

1. Authorized Signature: _______________________________________. 2. Name: ______________________________________. 3. Title: _______________________________________.

3.11 ROOF SIGNAGE

A. Contractor shall provide and 10 by 12 inch (254 by 305 mm) minimum size paint signs made of aluminum with a dark background and letters of contrasting color. Use paints compatible with aluminum. Make sign to read as shown. Permanently post signs at all access points leading to the roof and prominent points on the roofs. Provide at least one sign on each roof with no more than four signs per building. Signs will appear as the following:

Page 112: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 16.13 - 11

B. Signage information:

1. Insert month and year (__years after final acceptance date). 2. Insert the Primary Roofing Manufacturer’s name, address and phone number. 3. Insert the Primary Roofing Material Manufacturer’s Guaranty Number. 4. Insert the Contractor’s name, address and phone number.

C. Signs to be posted as designated by Owner.

END OF SECTION 07 52 16.13

DO NOT MAKE REPAIRS OR ALTERATIONS

TO THIS ROOF WITHOUT APPROVAL

FROM THE DIRECTOR OF OPERATIONS AND MAINTENANCE OFFICE

This roof is guaranteed until 1. by

PRIMARY ROOFING MATERIAL MANUFACTURER 2.

Address City, State, Zip Code

Phone: Area Code/Number Guarantee # 3.

The Roofing Contractor was:

ROOFING CONTRACTOR 4.

Address City, State, Zip Code

Phone: Area Code/Number

Page 113: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SHEET METAL FLASHING AND TRIM 07 62 00 - 1

SECTION 07 62 00 - SHEET METAL FLASHING AND TRIM

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes formed roof-drainage sheet metal fabrications.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Shop Drawings: For sheet metal flashing and trim.

1. Include plans, elevations, sections, and attachment details. 2. Distinguish between shop- and field-assembled work. 3. Include identification of finish for each item. 4. Include pattern of seams and details of termination points, expansion joints and expansion-

joint covers, direction of expansion, roof-penetration flashing, and connections to adjoining work.

C. Samples: For each exposed product and for each color and texture specified.

1.3 INFORMATIONAL SUBMITTALS

A. Product certificates.

B. Product test reports.

C. Sample warranty.

1.4 QUALITY ASSURANCE

A. Fabricator Qualifications: Employs skilled workers who custom fabricate sheet metal flashing and trim similar to that required for this Project and whose products have a record of successful in-service performance.

1. For roof edge flashings that are SPRI ES-1 tested, shop shall be listed as able to fabricate required details as tested and approved.

1.5 WARRANTY

A. Special Warranty on Finishes: Manufacturer agrees to repair finish or replace sheet metal flashing and trim that shows evidence of deterioration of factory-applied finishes within specified warranty period.

1. Finish Warranty Period: 20 years from date of Substantial Completion.

Page 114: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SHEET METAL FLASHING AND TRIM 07 62 00 - 2

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. General: Sheet metal flashing and trim assemblies shall withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Completed sheet metal flashing and trim shall not rattle, leak, or loosen, and shall remain watertight.

B. Sheet Metal Standard for Flashing and Trim: Comply with NRCA's "The NRCA Roofing Manual" and SMACNA's "Architectural Sheet Metal Manual" requirements for dimensions and profiles shown unless more stringent requirements are indicated.

C. SPRI Wind Design Standard: Manufacture and install roof edge flashings tested according to SPRI ES-1 and capable of resisting the following design pressure:

1. Design Pressure: Refer to Drawing sheet S1.

D. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

2.2 SHEET METALS

A. General: Protect mechanical and other finishes on exposed surfaces from damage by applying strippable, temporary protective film before shipping.

B. Metallic-Coated Steel Sheet: Provide zinc-coated (galvanized) steel sheet according to ASTM A 653/A 653M, G90 (Z275) coating designation or aluminum-zinc alloy-coated steel sheet according to ASTM A 792/A 792M, Class AZ50 (Class AZM150) coating designation, Grade 40 (Grade 275); prepainted by coil-coating process to comply with ASTM A 755/A 755M.

1. Exposed Coil-Coated Finish:

a. Two-Coat Fluoropolymer: AAMA 621. Fluoropolymer finish containing not less than 70 percent PVDF resin by weight in color coat. Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.

2. Color: As selected by Architect from manufacturer's full range.

2.3 UNDERLAYMENT MATERIALS

A. Self-Adhering, High-Temperature Sheet: Minimum 30 mils (0.76 mm) thick, consisting of a slip-resistant polyethylene- or polypropylene-film top surface laminated to a layer of butyl- or SBS-modified asphalt adhesive, with release-paper backing; specifically designed to withstand high metal temperatures beneath metal roofing. Provide primer according to written recommendations of underlayment manufacturer.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

Page 115: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SHEET METAL FLASHING AND TRIM 07 62 00 - 3

a. Carlisle Coatings & Waterproofing Inc. b. GCP Applied Technologies Inc. c. Polyguard Products, Inc.

2. Thermal Stability: ASTM D 1970; stable after testing at 240 deg F (116 deg C) or higher.

3. Low-Temperature Flexibility: ASTM D 1970; passes after testing at minus 20 deg F (29 deg C) or lower.

2.4 MISCELLANEOUS MATERIALS

A. General: Provide materials and types of fasteners, solder, protective coatings, sealants, and other miscellaneous items as required for complete sheet metal flashing and trim installation and as recommended by manufacturer of primary sheet metal or manufactured item unless otherwise indicated.

B. Fasteners: Wood screws, annular threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners designed to withstand design loads and recommended by manufacturer of primary sheet metal or manufactured item.

1. General: Blind fasteners or self-drilling screws, gasketed, with hex-washer head.

a. Exposed Fasteners: Heads matching color of sheet metal using plastic caps or factory-applied coating. Provide metal-backed EPDM or PVC sealing washers under heads of exposed fasteners bearing on weather side of metal.

b. Blind Fasteners: High-strength aluminum or stainless-steel rivets suitable for metal being fastened.

c. Spikes and Ferrules: Same material as gutter; with spike with ferrule matching internal gutter width.

2. Fasteners for Zinc-Coated (Galvanized) or Aluminum-Zinc Alloy-Coated Steel Sheet: Series 300 stainless steel or hot-dip galvanized steel according to ASTM A 153/A 153M or ASTM F 2329.

C. Sealant Tape: Pressure-sensitive, 100 percent solids, polyisobutylene compound sealant tape with release-paper backing. Provide permanently elastic, nonsag, nontoxic, nonstaining tape 1/2 inch (13 mm) wide and 1/8 inch (3 mm) thick.

D. Elastomeric Sealant: ASTM C 920, elastomeric silicone polymer sealant; of type, grade, class, and use classifications required to seal joints in sheet metal flashing and trim and remain watertight.

E. Asphalt Roofing Cement: ASTM D 4586, asbestos free, of consistency required for application.

2.5 FABRICATION, GENERAL

A. General: Custom fabricate sheet metal flashing and trim to comply with details shown and recommendations in cited sheet metal standard that apply to design, dimensions, geometry, metal thickness, and other characteristics of item required. Fabricate sheet metal flashing and trim in shop to greatest extent possible.

1. Obtain field measurements for accurate fit before shop fabrication. 2. Form sheet metal flashing and trim to fit substrates without excessive oil canning, buckling,

and tool marks; true to line, levels, and slopes; and with exposed edges folded back to form hems.

Page 116: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SHEET METAL FLASHING AND TRIM 07 62 00 - 4

3. Conceal fasteners and expansion provisions where possible. Do not use exposed fasteners on faces exposed to view.

B. Expansion Provisions: Form metal for thermal expansion of exposed flashing and trim.

1. Form expansion joints of intermeshing hooked flanges, not less than 1 inch (25 mm) deep, filled with butyl sealant concealed within joints.

2. Use lapped expansion joints only where indicated on Drawings.

C. Sealant Joints: Where movable, nonexpansion-type joints are required, form metal to provide for proper installation of elastomeric sealant according to cited sheet metal standard.

D. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, noncorrosive metal.

E. Fabricate cleats and attachment devices of sizes as recommended by cited sheet metal standard for application, but not less than thickness of metal being secured.

F. Seams: Fabricate nonmoving seams with flat-lock seams. Form seams and seal with elastomeric sealant unless otherwise recommended by sealant manufacturer for intended use.

2.6 ROOF-DRAINAGE SHEET METAL FABRICATIONS

A. Hanging Gutters: Fabricate to cross section required, complete with end pieces, outlet tubes, and other accessories as required. Fabricate in minimum 96-inch- (2400-mm-) long sections. Furnish flat-stock gutter brackets and gutter spacers and straps fabricated from same metal as gutters, of size recommended by cited sheet metal standard but with thickness not less than twice the gutter thickness. Fabricate expansion joints, expansion-joint covers, and gutter accessories from same metal as gutters.

B. Downspouts: Fabricate rectangular downspouts to dimensions indicated, complete with mitered elbows. Furnish with metal hangers from same material as downspouts and anchors.

1. Fabricate from the following materials:

a. Galvanized Steel: 0.022 inch (0.56 mm) thick. b. Aluminum-Zinc Alloy-Coated Steel: 0.022 inch (0.56 mm) thick.

PART 3 - EXECUTION

3.1 UNDERLAYMENT INSTALLATION

A. Felt Underlayment: Install felt underlayment, wrinkle free, using adhesive to minimize use of mechanical fasteners under sheet metal flashing and trim. Apply in shingle fashion to shed water, with lapped joints of not less than 2 inches (50 mm).

B. Synthetic Underlayment: Install synthetic underlayment, wrinkle free, according to manufacturers' written instructions, and using adhesive where possible to minimize use of mechanical fasteners under sheet metal.

C. Self-Adhering Sheet Underlayment: Install self-adhering sheet underlayment, wrinkle free. Prime substrate if recommended by underlayment manufacturer. Comply with temperature restrictions of underlayment manufacturer for installation; use primer for installing underlayment at low

Page 117: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SHEET METAL FLASHING AND TRIM 07 62 00 - 5

temperatures. Apply in shingle fashion to shed water, with end laps of not less than 6 inches (150 mm) staggered 24 inches (600 mm) between courses. Overlap side edges not less than 3-1/2 inches (90 mm). Roll laps and edges with roller. Cover underlayment within 14 days.

3.2 INSTALLATION, GENERAL

A. General: Anchor sheet metal flashing and trim and other components of the Work securely in place, with provisions for thermal and structural movement. Use fasteners, solder, protective coatings, separators, sealants, and other miscellaneous items as required to complete sheet metal flashing and trim system.

1. Install sheet metal flashing and trim true to line, levels, and slopes. Provide uniform, neat seams with minimum exposure of solder, welds, and sealant.

2. Install sheet metal flashing and trim to fit substrates and to result in watertight performance. Verify shapes and dimensions of surfaces to be covered before fabricating sheet metal.

3. Space cleats not more than 12 inches (300 mm) apart. Attach each cleat with at least two fasteners. Bend tabs over fasteners.

4. Install exposed sheet metal flashing and trim with limited oil canning, and free of buckling and tool marks.

5. Torch cutting of sheet metal flashing and trim is not permitted.

B. Metal Protection: Where dissimilar metals contact each other, or where metal contacts pressure-treated wood or other corrosive substrates, protect against galvanic action or corrosion by painting contact surfaces with bituminous coating or by other permanent separation as recommended by sheet metal manufacturer or cited sheet metal standard.

1. Underlayment: Where installing sheet metal flashing and trim directly on cementitious or wood substrates, install underlayment and cover with slip sheet.

C. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim. Space movement joints at maximum of 10 feet (3 m) with no joints within 24 inches (600 mm) of corner or intersection.

1. Form expansion joints of intermeshing hooked flanges, not less than 1 inch (25 mm) deep, filled with sealant concealed within joints.

2. Use lapped expansion joints only where indicated on Drawings.

D. Fasteners: Use fastener sizes that penetrate wood blocking or sheathing not less than 1-1/4 inches (32 mm) for nails and not less than 3/4 inch (19 mm) for wood screws.

E. Conceal fasteners and expansion provisions where possible in exposed work and locate to minimize possibility of leakage. Cover and seal fasteners and anchors as required for a tight installation.

F. Seal joints as required for watertight construction. Prepare joints and apply sealants to comply with requirements in Section 07 92 00 "Joint Sealants."

3.3 ROOF-DRAINAGE SYSTEM INSTALLATION

A. General: Install sheet metal roof-drainage items to produce complete roof-drainage system according to cited sheet metal standard unless otherwise indicated. Coordinate installation of roof perimeter flashing with installation of roof-drainage system.

Page 118: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

SHEET METAL FLASHING AND TRIM 07 62 00 - 6

B. Hanging Gutters: Join sections with joints sealed with sealant. Provide for thermal expansion. Attach gutters at eave or fascia to firmly anchor them in position. Provide end closures and seal watertight with sealant. Slope to downspouts.

C. Downspouts: Join sections with 1-1/2-inch (38-mm) telescoping joints. Provide hangers with fasteners designed to hold downspouts securely to walls. Locate hangers at top and bottom and at approximately 60 inches (1500 mm) o.c.

3.4 ROOF FLASHING INSTALLATION

A. General: Install sheet metal flashing and trim to comply with performance requirements and cited sheet metal standard. Provide concealed fasteners where possible, and set units true to line, levels, and slopes. Install work with laps, joints, and seams that are permanently watertight and weather resistant.

B. Roof Edge Flashing: Anchor to resist uplift and outward forces according to recommendations in cited sheet metal standard unless otherwise indicated. Interlock bottom edge of roof edge flashing with continuous cleat anchored to substrate.

3.5 CLEANING AND PROTECTION

A. Clean exposed metal surfaces of substances that interfere with uniform oxidation and weathering.

B. Clean and neutralize flux materials. Clean off excess solder.

C. Clean off excess sealants.

D. Remove temporary protective coverings and strippable films as sheet metal flashing and trim are installed unless otherwise indicated in manufacturer's written installation instructions.

END OF SECTION 07 62 00

Page 119: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

NON-STRUCTURAL METAL FRAMING 09 22 16 - 1

SECTION 09 22 16 - NON-STRUCTURAL METAL FRAMING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Non-load-bearing steel framing systems for interior partitions. 2. Suspension systems for interior ceilings and soffits. 3. Grid suspension systems for gypsum board ceilings.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Studs and Runners: Provide documentation that framing members' certification is according to SFIA's "Code Compliance Certification Program for Cold-Formed Steel Structural and Non-Structural Framing Members."

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Fire-Test-Response Characteristics: For fire-resistance-rated assemblies that incorporate non-load-bearing steel framing, provide materials and construction identical to those tested in assembly indicated, according to ASTM E 119 by an independent testing agency.

B. STC-Rated Assemblies: For STC-rated assemblies, provide materials and construction identical to those tested in assembly indicated, according to ASTM E 90 and classified according to ASTM E 413 by an independent testing agency.

C. Horizontal Deflection: For wall assemblies, limited to 1/360 of the wall height based on horizontal loading of 5 lbf/sq. ft. (239 Pa).

2.2 FRAMING SYSTEMS

A. Framing Members, General: Comply with ASTM C 754 for conditions indicated.

1. Steel Sheet Components: Comply with ASTM C 645 requirements for metal unless otherwise indicated.

2. Protective Coating: ASTM A 653/A 653M, G40 (Z120), hot-dip galvanized unless otherwise indicated.

B. Studs and Runners: ASTM C 645.

1. Minimum Base-Metal Thickness: Unless otherwise indicated in the Drawings, thickness as required to comply with performance requirements.

Page 120: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

NON-STRUCTURAL METAL FRAMING 09 22 16 - 2

2. Maximum Stud Spacing: 16 inches on center unless otherwise indicated in the Drawings. 3. Depth: As indicated in the Drawings.

C. Slip-Type Head Joints: Where indicated, provide the following:

1. Deflection Track: Steel sheet top runner manufactured to prevent cracking of finishes applied to interior partition framing resulting from deflection of structure above; in thickness not less than indicated for studs and in width to accommodate depth of studs.

D. Flat Strap and Backing Plate: Steel sheet for blocking and bracing in length and width indicated.

1. Minimum Base-Metal Thickness: 0.0269 inch (0.683 mm).

E. Cold-Rolled Channel Bridging: Steel, 0.0538-inch (1.367-mm) minimum base-metal thickness, with minimum 1/2-inch- (13-mm-) wide flanges.

1. Depth: As indicated on Drawings. 2. Clip Angle: Not less than 1-1/2 by 1-1/2 inches (38 by 38 mm), 0.068-inch- (1.72-mm-) thick,

galvanized steel.

F. Hat-Shaped, Rigid Furring Channels: ASTM C 645.

1. Minimum Base-Metal Thickness: 0.0179 inch (0.455 mm). 2. Depth: 7/8 inch (22.2 mm).

G. Resilient Furring Channels: 1/2-inch- (13-mm-) deep, steel sheet members designed to reduce sound transmission.

1. Configuration: Asymmetrical.

H. Cold-Rolled Furring Channels: 0.053-inch (1.34-mm) uncoated-steel thickness, with minimum 1/2-inch- (13-mm-) wide flanges.

1. Depth: 3/4 inch (19 mm). 2. Furring Brackets: Adjustable, corrugated-edge-type steel sheet with minimum uncoated-steel

thickness of 0.0329 inch (0.8 mm). 3. Tie Wire: ASTM A 641/A 641M, Class 1 zinc coating, soft temper, 0.062-inch- (1.59-mm-)

diameter wire, or double strand of 0.048-inch- (1.21-mm-) diameter wire.

I. Z-Shaped Furring: With slotted or nonslotted web, face flange of 1-1/4 inches (32 mm), wall attachment flange of 7/8 inch (22 mm), minimum uncoated-metal thickness of 0.0179 inch (0.455 mm), and depth required to fit insulation thickness indicated.

2.3 SUSPENSION SYSTEMS

A. Tie Wire: ASTM A 641/A 641M, Class 1 zinc coating, soft temper, 0.062-inch- (1.59-mm-) diameter wire, or double strand of 0.048-inch- (1.21-mm-) diameter wire.

B. Hanger Attachments to Concrete:

1. Expansion Anchors: Fabricated from corrosion-resistant materials, with allowable load or strength design capacities calculated according to ICC-ES AC193 and ACI 318 greater than or equal to the design load, as determined by testing per ASTM E 488/E 488M conducted by a qualified testing agency.

Page 121: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

NON-STRUCTURAL METAL FRAMING 09 22 16 - 3

2. Power-Actuated Anchors: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with allowable load capacities calculated according to ICC-ES AC70, greater than or equal to the design load, as determined by testing per ASTM E 1190 conducted by a qualified testing agency.

C. Wire Hangers: ASTM A 641/A 641M, Class 1 zinc coating, soft temper, 0.16 inch (4.12 mm) in diameter.

D. Carrying Channels: Cold-rolled, commercial-steel sheet with a base-metal thickness of 0.0538 inch (1.367 mm) and minimum 1/2-inch- (13-mm-) wide flanges.

1. Depth: 2-1/2 inches (64 mm).

E. Furring Channels (Furring Members):

1. Cold-Rolled Channels: 0.0538-inch (1.367-mm) uncoated-steel thickness, with minimum 1/2-inch- (13-mm-) wide flanges, 3/4 inch (19 mm) deep.

2. Hat-Shaped, Rigid Furring Channels: ASTM C 645, 7/8 inch (22 mm) deep.

a. Minimum Base-Metal Thickness: 0.0179 inch (0.455 mm).

3. Resilient Furring Channels: 1/2-inch- (13-mm-) deep members designed to reduce sound transmission.

a. Configuration: Asymmetrical.

F. Grid Suspension System for Gypsum Board Ceilings: ASTM C 645, direct-hung system composed of main beams and cross-furring members that interlock.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Armstrong World Industries, Inc. b. Chicago Metallic Corporation. c. United States Gypsum Company.

2.4 AUXILIARY MATERIALS

A. General: Provide auxiliary materials that comply with referenced installation standards.

1. Fasteners for Metal Framing: Of type, material, size, corrosion resistance, holding power, and other properties required to fasten steel members to substrates.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine areas and substrates, with Installer present, and including welded hollow-metal frames, cast-in anchors, and structural framing, for compliance with requirements and other conditions affecting performance of the Work.

Page 122: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

NON-STRUCTURAL METAL FRAMING 09 22 16 - 4

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Suspended Assemblies: Coordinate installation of suspension systems with installation of overhead structure to ensure that inserts and other provisions for anchorages to building structure have been installed to receive hangers at spacing required to support the Work and that hangers will develop their full strength.

1. Furnish concrete inserts and other devices indicated to other trades for installation in advance of time needed for coordination and construction.

B. Coordination with Sprayed Fire-Resistive Materials:

1. Before sprayed fire-resistive materials are applied, attach offset anchor plates or ceiling runners (tracks) to surfaces indicated to receive sprayed fire-resistive materials. Where offset anchor plates are required, provide continuous plates fastened to building structure not more than 24 inches (610 mm) o.c.

2. After sprayed fire-resistive materials are applied, remove them only to extent necessary for installation of non-load-bearing steel framing. Do not reduce thickness of fire-resistive materials below that are required for fire-resistance ratings indicated. Protect adjacent fire-resistive materials from damage.

3.3 INSTALLATION, GENERAL

A. Installation Standard: ASTM C 754.

1. Gypsum Board Assemblies: Also comply with requirements in ASTM C 840 that apply to framing installation.

B. Install framing and accessories plumb, square, and true to line, with connections securely fastened.

C. Install supplementary framing, and blocking to support fixtures, equipment services, heavy trim, grab bars, toilet accessories, furnishings, or similar construction.

D. Install bracing at terminations in assemblies.

E. Do not bridge building control and expansion joints with non-load-bearing steel framing members. Frame both sides of joints independently.

3.4 INSTALLING FRAMED ASSEMBLIES

A. Install framing system components according to spacings indicated, but not greater than spacings required by referenced installation standards for assembly types.

B. Where studs are installed directly against exterior masonry walls or dissimilar metals at exterior walls, install isolation strip between studs and exterior wall.

C. Install studs so flanges within framing system point in same direction.

Page 123: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

NON-STRUCTURAL METAL FRAMING 09 22 16 - 5

D. Install tracks (runners) at floors and overhead supports. Extend framing full height to structural supports or substrates above suspended ceilings except where partitions are indicated to terminate at suspended ceilings. Continue framing around ducts that penetrate partitions above ceiling.

1. Slip-Type Head Joints: Where framing extends to overhead structural supports, install to produce joints at tops of framing systems that prevent axial loading of finished assemblies.

2. Door Openings: Screw vertical studs at jambs to jamb anchor clips on door frames; install runner track section (for cripple studs) at head and secure to jamb studs.

a. Install two studs at each jamb unless otherwise indicated. b. Install cripple studs at head adjacent to each jamb stud, with a minimum 1/2-inch (13-

mm) clearance from jamb stud to allow for installation of control joint in finished assembly.

c. Extend jamb studs through suspended ceilings and attach to underside of overhead structure.

3. Other Framed Openings: Frame openings other than door openings the same as required for door openings unless otherwise indicated. Install framing below sills of openings to match framing required above door heads.

4. Fire-Resistance-Rated Partitions: Install framing to comply with fire-resistance-rated assembly indicated and support closures and to make partitions continuous from floor to underside of solid structure.

5. Sound-Rated Partitions: Install framing to comply with sound-rated assembly indicated. 6. Curved Partitions:

a. Bend track to uniform curve and locate straight lengths so they are tangent to arcs. b. Begin and end each arc with a stud, and space intermediate studs equally along arcs.

On straight lengths of no fewer than two studs at ends of arcs, place studs 6 inches (150 mm) o.c.

E. Direct Furring:

1. Attach to concrete or masonry with stub nails, screws designed for masonry attachment, or powder-driven fasteners spaced 24 inches (610 mm) o.c.

F. Installation Tolerance: Install each framing member so fastening surfaces vary not more than 1/8 inch (3 mm) from the plane formed by faces of adjacent framing.

3.5 INSTALLING SUSPENSION SYSTEMS

A. Install suspension system components according to spacings indicated, but not greater than spacings required by referenced installation standards for assembly types.

1. Hangers: 48 inches (1219 mm) o.c. 2. Carrying Channels (Main Runners): 48 inches (1219 mm) o.c. 3. Furring Channels (Furring Members): 16 inches (406 mm) o.c.

B. Isolate suspension systems from building structure where they abut or are penetrated by building structure to prevent transfer of loading imposed by structural movement.

C. Suspend hangers from building structure as follows:

1. Install hangers plumb and free from contact with insulation or other objects within ceiling plenum that are not part of supporting structural or suspension system.

Page 124: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

NON-STRUCTURAL METAL FRAMING 09 22 16 - 6

a. Splay hangers only where required to miss obstructions and offset resulting horizontal forces by bracing, countersplaying, or other equally effective means.

2. Where width of ducts and other construction within ceiling plenum produces hanger spacings that interfere with locations of hangers required to support standard suspension system members, install supplemental suspension members and hangers in the form of trapezes or equivalent devices.

a. Size supplemental suspension members and hangers to support ceiling loads within performance limits established by referenced installation standards.

3. Wire Hangers: Secure by looping and wire tying, either directly to structures or to inserts, eye screws, or other devices and fasteners that are secure and appropriate for substrate, and in a manner that will not cause hangers to deteriorate or otherwise fail.

4. Flat Hangers: Secure to structure, including intermediate framing members, by attaching to inserts, eye screws, or other devices and fasteners that are secure and appropriate for structure and hanger, and in a manner that will not cause hangers to deteriorate or otherwise fail.

5. Do not attach hangers to steel roof deck. 6. Do not attach hangers to permanent metal forms. Furnish cast-in-place hanger inserts that

extend through forms. 7. Do not attach hangers to rolled-in hanger tabs of composite steel floor deck. 8. Do not connect or suspend steel framing from ducts, pipes, or conduit.

D. Fire-Resistance-Rated Assemblies: Wire tie furring channels to supports.

E. Grid Suspension Systems: Attach perimeter wall track or angle where grid suspension systems meet vertical surfaces. Mechanically join main beam and cross-furring members to each other and butt-cut to fit into wall track.

F. Installation Tolerances: Install suspension systems that are level to within 1/8 inch in 12 feet (3 mm in 3.6 m) measured lengthwise on each member that will receive finishes and transversely between parallel members that will receive finishes.

END OF SECTION 09 22 16

Page 125: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

GYPSUM BOARD 09 29 00 - 1

SECTION 09 29 00 - GYPSUM BOARD

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes interior gypsum board.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

1.3 DELIVERY, STORAGE AND HANDLING

A. Store materials inside under cover and keep them dry and protected against weather, condensation, direct sunlight, construction traffic, and other potential causes of damage. Stack panels flat and supported on risers on a flat platform to prevent sagging.

1.4 FIELD CONDITIONS

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent.

B. Do not install paper-faced gypsum panels until installation areas are enclosed and conditioned.

C. Do not install panels that are wet, moisture damaged, and mold damaged.

1. Indications that panels are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that panels are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Fire-Resistance-Rated Assemblies: For fire-resistance-rated assemblies, provide materials and construction identical to those tested in assembly indicated according to ASTM E 119 by an independent testing agency.

B. STC-Rated Assemblies: For STC-rated assemblies, provide materials and construction identical to those tested in assembly indicated according to ASTM E 90 and classified according to ASTM E 413 by an independent testing agency.

Page 126: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

GYPSUM BOARD 09 29 00 - 2

2.2 GYPSUM BOARD, GENERAL

A. Size: Provide maximum lengths and widths available that will minimize joints in each area and that correspond with support system indicated.

2.3 INTERIOR GYPSUM BOARD

A. Impact-Resistant Gypsum Board: ASTM C 1396/C 1396M gypsum board, tested according to ASTM C 1629/C 1629M.

1. Core: 5/8 inch (15.9 mm), Type X. 2. Surface Abrasion: ASTM C 1629/C 1629M, meets or exceeds Level 3 requirements. 3. Indentation: ASTM C 1629/C 1629M, meets or exceeds Level 3 requirements. 4. Soft-Body Impact: ASTM C 1629/C 1629M, meets or exceeds Level 3 requirements. 5. Hard-Body Impact: ASTM C 1629/C 1629M, meets or exceeds Level 3 requirements

according to test in Annex A1. 6. Long Edges: Tapered. 7. Mold Resistance: ASTM D 3273, score of 10 as rated according to ASTM D 3274.

2.4 TRIM ACCESSORIES

A. Interior Trim: ASTM C 1047.

1. Material: Galvanized or aluminum-coated steel sheet, rolled zinc, plastic, or paper-faced galvanized-steel sheet.

2. Shapes:

a. Cornerbead. b. LC-Bead: J-shaped; exposed long flange receives joint compound. c. L-Bead: L-shaped; exposed long flange receives joint compound. d. U-Bead: J-shaped; exposed short flange does not receive joint compound. e. Expansion (control) joint.

2.5 JOINT TREATMENT MATERIALS

A. General: Comply with ASTM C 475/C 475M.

B. Joint Tape:

1. Interior Gypsum Board: Paper. 2. Tile Backing Panels: As recommended by panel manufacturer.

C. Joint Compound for Interior Gypsum Board: For each coat, use formulation that is compatible with other compounds applied on previous or for successive coats.

1. Prefilling: At open joints and damaged surface areas, use setting-type taping compound. 2. Embedding and First Coat: For embedding tape and first coat on joints, fasteners, and trim

flanges, use setting-type taping compound.

a. Use setting-type compound for installing paper-faced metal trim accessories.

3. Fill Coat: For second coat, use setting-type, sandable topping compound. 4. Finish Coat: For third coat, use setting-type, sandable topping compound.

Page 127: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

GYPSUM BOARD 09 29 00 - 3

2.6 AUXILIARY MATERIALS

A. General: Provide auxiliary materials that comply with referenced installation standards and manufacturer's written instructions.

B. Steel Drill Screws: ASTM C 1002 unless otherwise indicated.

1. Use screws complying with ASTM C 954 for fastening panels to steel members from 0.033 to 0.112 inch (0.84 to 2.84 mm) thick.

2. For fastening cementitious backer units, use screws of type and size recommended by panel manufacturer.

C. Acoustical Sealant: Manufacturer's standard nonsag, paintable, nonstaining latex sealant complying with ASTM C 834. Product effectively reduces airborne sound transmission through perimeter joints and openings in building construction as demonstrated by testing representative assemblies according to ASTM E 90.

D. Thermal Insulation: As specified in Section 07 21 00 "Thermal Insulation."

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine areas and substrates including welded hollow-metal frames and support framing, with Installer present, for compliance with requirements and other conditions affecting performance of the Work.

B. Examine panels before installation. Reject panels that are wet, moisture damaged, and mold damaged.

C. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 APPLYING AND FINISHING PANELS, GENERAL

A. Comply with ASTM C 840.

B. Install ceiling panels across framing to minimize the number of abutting end joints and to avoid abutting end joints in central area of each ceiling. Stagger abutting end joints of adjacent panels not less than one framing member.

C. Install panels with face side out. Butt panels together for a light contact at edges and ends with not more than 1/16 inch (1.5 mm) of open space between panels. Do not force into place.

D. Locate edge and end joints over supports, except in ceiling applications where intermediate supports or gypsum board back-blocking is provided behind end joints. Do not place tapered edges against cut edges or ends. Stagger vertical joints on opposite sides of partitions. Do not make joints other than control joints at corners of framed openings.

E. Cover both faces of support framing with gypsum panels in concealed spaces (above ceilings, etc.), except in chases braced internally.

Page 128: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

GYPSUM BOARD 09 29 00 - 4

1. Unless concealed application is indicated or required for sound, fire, air, or smoke ratings, coverage may be accomplished with scraps of not less than 8 sq. ft. (0.7 sq. m) in area.

2. Fit gypsum panels around ducts, pipes, and conduits. 3. Where partitions intersect structural members projecting below underside of floor/roof slabs

and decks, cut gypsum panels to fit profile formed by structural members; allow 1/4- to 3/8-inch- (6.4- to 9.5-mm-) wide joints to install sealant.

F. Isolate perimeter of gypsum board applied to non-load-bearing partitions at structural abutments. Provide 1/4- to 1/2-inch- (6.4- to 12.7-mm-) wide spaces at these locations and trim edges with edge trim where edges of panels are exposed. Seal joints between edges and abutting structural surfaces with acoustical sealant.

G. Attachment to Steel Framing: Attach panels so leading edge or end of each panel is attached to open (unsupported) edges of stud flanges first.

3.3 APPLYING INTERIOR GYPSUM BOARD

A. Single-Layer Application:

1. On ceilings, apply gypsum panels before wall/partition board application to greatest extent possible and at right angles to framing unless otherwise indicated.

2. On partitions/walls, apply gypsum panels vertically (parallel to framing) unless otherwise indicated or required by fire-resistance-rated assembly, and minimize end joints.

a. Stagger abutting end joints not less than one framing member in alternate courses of panels.

b. At stairwells and other high walls, install panels horizontally unless otherwise indicated or required by fire-resistance-rated assembly.

3. On Z-shaped furring members, apply gypsum panels vertically (parallel to framing) with no end joints. Locate edge joints over furring members.

4. Fastening Methods: Apply gypsum panels to supports with steel drill screws.

3.4 INSTALLING TRIM ACCESSORIES

A. General: For trim with back flanges intended for fasteners, attach to framing with same fasteners used for panels. Otherwise, attach trim according to manufacturer's written instructions.

B. Interior Trim: Install in the following locations:

1. Cornerbead: Use at outside corners unless otherwise indicated. 2. LC-Bead: Use at exposed panel edges. 3. L-Bead: Use where indicated.

3.5 FINISHING GYPSUM BOARD

A. General: Treat gypsum board joints, interior angles, edge trim, control joints, penetrations, fastener heads, surface defects, and elsewhere as required to prepare gypsum board surfaces for decoration. Promptly remove residual joint compound from adjacent surfaces.

B. Prefill open joints and damaged surface areas.

Page 129: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

Tarrant County 350 West Belknap Parking Garage BBP - 17149.00 Elevator Replacement

GYPSUM BOARD 09 29 00 - 5

C. Apply joint tape over gypsum board joints, except for trim products specifically indicated as not intended to receive tape.

D. Gypsum Board Finish Levels: Finish panels to Level 3 according to ASTM C 840. Apply one coat of drywall primer complying with MPI #149.

3.6 PROTECTION

A. Protect adjacent surfaces from drywall compound and promptly remove from floors and other non-drywall surfaces. Repair surfaces stained, marred, or otherwise damaged during drywall application.

B. Protect installed products from damage from weather, condensation, direct sunlight, construction, and other causes during remainder of the construction period.

C. Remove and replace panels that are wet, moisture damaged, and mold damaged.

1. Indications that panels are wet or moisture damaged include, but are not limited to, discoloration, sagging, or irregular shape.

2. Indications that panels are mold damaged include, but are not limited to, fuzzy or splotchy surface contamination and discoloration.

END OF SECTION 09 29 00

Page 130: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 1

SECTION 14 21 00

ELECTRIC TRACTION ELEVATORS

PART 1 – GENERAL

1.1 SUMMARY

A. Section includes: 1. Removal of existing Holed Hydraulic elevator No. 7 in its entirety as required and

furnish an install One (1) electric traction MRL (Machine Room-Less) Passenger Elevator, complete in every respect, make any code and ADA/TAS required changes, and meet the requirements as indicated in the Project documents.

2. Properly removing and disposing of all existing elevator equipment is to be in compliance with all environmental codes and is the responsibility of the elevator contractor.

3. Coordinate access to elevator and elevator shaft for use by the General Contractor

during hoistway roof removal and installation.

4. Elevator is designated as Elevator No. 7.

5. Related Work Included by General Contractor: A. Electrical. B. Communications C. Structural

6. This work must be properly coordinated with Tarrant County Facilities Management so that the disruption to the building operation is minimized. Schedule the removal of the existing Elevator with Tarrant County Facilities Management. Elevator contractor shall provide all necessary and required protection in hoistway areas for the entire construction process.

7. If these specifications are not complete as to any minor detail of a required feature, or with regard to the manner of combining or installing parts, material or equipment, but there exists an acceptable trade standard for good and workmanlike practices, such detail shall be deemed by implication to have been required by these specifications in accordance with such standard.

8. ALTERNATE – Elevator contractor to submit an accelerated schedule for

completing the required elevator installation on a shift work basis or overtime basis. The alternate must include the completion time from the date the elevator is removed from service until elevator is completed and ready for Owner use.

Page 131: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 2

B. Existing Conditions:

1. Cutting and patching: if the elevator contractor requires modifications to any hoistway enclosure spaces or spaces required to install signal fixture boxes, it shall be the sole responsibility of the elevator contractor to modify as required.

2. Elevator contractor shall provide a project specific list of building related

requirements.

C. Site Visit and Inspection of Existing Equipment: 1. By submitting a bid proposal, Elevator Contractor certifies that he has visited and

inspected the site and existing facilities and has informed himself in detail as to all existing conditions that may affect the work. Failure to do so will not be considered sufficient justification for additional compensation and/or extension of contract time.

2. Elevator contractor shall advise Owner of any required changes for building smoke initiating devices for interface with proposed elevator control system. Phase I and Phase II Fire service features shall be tested in accordance with ASME A17.1.

3. Coordinate arrangements for job-site visits with Tarrant County Facilities

Management as required in the project documents.

1.2 SUBMITTALS

A. Shop Drawings, Descriptive Data: Provide project specific shop drawings, submittal information and descriptive data for all equipment that will be installed.

B. Samples: All exposed materials with finish and all custom fixture fabrications shall be

submitted with item 1.2 A.

1. Complete hall call buttons and hall lantern assembly. 2. Car panel accessibility symbol Braille and floor number 3. Omit all logos from exposed finishes or components. 4. All cab finishes including car signal fixture buttons.

C. Maintenance Data: Provide written information necessary for proper maintenance,

safety tests and adjustment of the equipment prior to final acceptance as follows:

1. Straight line wiring diagrams of as-installed elevator circuits with index of location and function of all components. Wiring diagrams must be Project specific including serial numbers of primary components. Provide 4 corrected sets for Owner’s file 60 days after acceptance. One (1) set shall be permanently mounted in elevator control room(s) and one (1) set on Auto Cad CD or acceptable electronic media.

2. Three (3) copies of lubricating instructions and recommended lubricant grade. 3. Three (3) parts catalogs and maintenance manuals-project specific.

Page 132: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 3

4. Include any special tools, pass words, fault codes, fault code solutions, software

package or manuals that are required for maintenance, trouble shooting, adjustments or performing safety tests of the installed elevator for the Owner’s use. Owner shall not incur additional cost for service tool or devices.

5. If the Contractor requires the Owner to sign a lease for the special trouble-shooting tool, a copy of the lease shall be submitted with the bid for the Owner’s consideration.

6. Provide a minimum of 2 hours of onsite Owners training in the safe use of the elevator systems and owners data outlined in 1.2 C. Training shall be accomplished by supervisory level personnel.

7. Demonstrate the ability to use non proprietary means to adjust, trouble shoot and perform Code required Safety tests as outlined in 1.2, C. 4.

8. Provide 24 hours of trouble-free operating time prior to turnover of the elevator to Tarrant County Facilities Management and/or for public use.

1.3 REFERENCES

A. Comply with applicable building codes and elevator codes at the project site, including but not limited to the following:

1. ASME A17.1 Safety Code for Elevators and Escalators, current adopted edition. 2. ASME A17.2.1 Inspectors Manual, current adopted edition. 3. NFPA 70 National Electrical Code, current adopted edition. 4. NFPA 80 Fire Doors and Windows. 5. Americans with Disabilities Act – Accessibility Guidelines (ADAAG). 6. Architectural Barriers Texas Accessibility Standards (TAS) current adopted edition. 7. ANSI A117.1, Buildings and Facilities, Providing Accessibility and Usability for

Physically Handicapped People. 8. ASME UL 10B and ASTM E152, Fire tests of door assemblies. 9. Model Building Code – IBC, current adopted edition, Fort Worth, TX 10. Fort Worth, TX applicable codes and amendments.

B. Make application for, secure and pay for all necessary permits and certificates of inspection for all equipment included herein, as required by the various departments of the Local and State Authorities. Furnish the Owner certificates and approval as required by the local governing authorities having jurisdiction.

C. In addition to the permits, inspections and test specified and the governing codes, the elevator contractor will be required to have performed speed and load carrying capacity and heat tests at his own expense.

D. Any damage of any kind to the car or the adjoining structure which may develop

through performance of any tests shall be repaired at no additional costs to the Owner.

Page 133: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 4

1.4 CONTRACTORS RESPONSIBILITY

A. The electrical and mechanical design is based on the following power characteristics and heat releases. The Contractor shall submit with bid any power characteristics or heat releases of this equipment that exceeds these listed below. Any additions or modifications requested at a later date will be at the expense of the Contractor.

Elevator Capacity Speed HP Start Amps Run Amps Heat Release No. 7 3500 Lbs.

200 fpm

40

55

38

6500/4900

BTU values are for Control Room and Machine Space Heat release given as BTU/elevator/hour All amperages based on 460/480 volt system Maintain 50 to 95 degrees F temperature with 95% non-condensing humidity. B. Store materials in a dry protected area. Protect and handle materials in accordance

with manufacturer’s recommendations to prevent damage, soiling, or deterioration.

1.5 WARRANTY

A. Provide warranty to replace, repair, or restore parts or components that fail or do not operate properly due to poor field or factory workmanship, engineering or design for a period 12 months from the date of signed final acceptance.

1.6 MAINTENANCE

A. Furnish regular maintenance for the elevator during the construction period (Interim Maintenance) until the Project elevator equipment is accepted by the Owner at time of substantial completion. The maintenance service shall include examinations of the installation by competent and trained mechanics, and shall include all necessary adjustments, greasing, oiling, cleaning, and supply of parts and accessories necessary to keep the equipment in good operating condition, except such replacement of parts made necessary by misuse, accidents not attributable to failure of equipment or workmanship, and negligence of the Owner. Include 24 hour emergency call back service with the Contractor arriving at the Property within thirty (30 minutes from time of notification of equipment problem or failure by purchaser. After hours, Contractor shall respond to callback service within sixty (60) minutes from the time of notification by TCCC.

Page 134: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 5

B. Furnish regular maintenance for the Elevator for a period of 12 months after substantial

completion and the equipment is accepted by the Owner. All routine and scheduled services shall be performed between the hours of 7:00 am and 6:00 pm. The maintenance service shall include regular examinations of the installation by competent and trained elevator mechanics on a semi monthly basis, and shall include all necessary adjustments, greasing, oiling, cleaning, and supply of parts and accessories necessary to keep the equipment in peak operating condition, except such replacement of parts made necessary by misuse, accidents not attributable to failure of equipment or workmanship, and negligence of the Owner. Include 24 hour emergency call back service with the Contractor arriving at the Property within thirty (30 minutes from time of notification of equipment problem or failure by purchaser. After hours, Contractor shall respond to callback service within sixty (60) minutes from the time of notification by the Tarrant County Facilities Management.

C. Repair work shall be carried out only by the Elevator Contractor’s personnel, using only

standard parts furnished by the Elevator Contractor and shall not be assigned or transferred to any agent.

I.7 FULL MAINTENANCE PROPOSAL

A. Elevator Contractor shall provide a full maintenance proposal for five (5) years starting from completion of the 12 months warranty maintenance period. Proposal shall include 24 hour emergency callback service and response time for normal working hours, non standard hours and passenger entrapment. Proposal shall be submitted on manufacturer and installer’s standard elevator maintenance agreement forms.

B. The maintenance proposal is to be submitted with equipment Bid for review. 1.8 QUALITY ASSURANCE

A. The specific product or material manufactured by any of the following listed manufacturers is “acceptable” only if the specific product or material can evidence exact compliance with the contract documents and governing codes.

1. Otis Elevator Company 2. KONE Elevator Company 3. Schindler Elevator Company 4. ThyssenKrupp Elevator Company 5. A & F Elevator Company

B. Elevator Contractor must be able to demonstrate that he has installed and maintained similar elevators to those specified and which have given satisfactory service; has been in successful operation for at least ten (10) years; maintains locally an adequate stock of parts for replacement or emergency purposes; has available qualified persons to do the work.

Page 135: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 6

C. The controls shall not have any software embedded that shuts the elevator down if the

equipment is not malfunctioning, and forces the Owner to call the Manufacturer for service.

1.9 PARTS AND PRINTED CIRCUIT BOARDS

A. Contractor guarantees they will sell parts and printed circuit boards to the Owner and

the Owner’s Agent. The same shall not be dependent on an exchange component.

PART 2 - PRODUCTS

2.01 ACCEPTABLE MANUFACTURERS

A. The following manufacturers and dispatching systems are acceptable:

1. For the project Elevator: Otis Elevator GEN2 Underslung GCS Controller KONE Elevator Company Mono-Space/KCM 831 Schindler Elevator Miconic GX/400 A include software 2.18b

ThyssenKrupp Elevator Synergy Performance Series TAC 32 A & F Elevator Company Smartrise

2. For Elevator cabs and Hoistway entrances:

Eklund’s

Cab Interior Design SnapCab Elevator Manufactures listed in 2.1 A. 1

2.02 TYPE AND GENERAL CHARACTERISTICS

A. Passenger Elevator: No. 1

1. Quantity: One (1) electric traction elevator 2. Capacity and Speed: 3500 Lbs. 3. Floors Served: Level 1-5 4. Stops and Openings: Five (5) Stops; Front 5. Operation and Control: Microprocessor operation, VVVF control 6. Machine Location:

Control Room: Hoistway-MRL Level 1

7. Cabs: Cab shell as specified 8. Doors: 3’ 6” x 7’ 0” Center Opening 9. Cab Height: 8’ 0” clear under canopy 10. Cab Size, Clear Inside: 7’ 0” wide x 6’ 3” deep

Clear with finishes (6’ 8”w x 5’ 5”d)

Page 136: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 7

B. Finish Schedule:

1. Cab Front Returns: Stainless steel No. 4 finish

Swing type full wrap 2. Car doors: Stainless steel No. 4 finish 3. Car sill: Nickel silver 4. Hoistway Entrances: Stainless steel No. 4 finish

Provide etched Tarrant County Seal at Level 1 and Level 3

5. 6.

Hoistway Sills: Signal Fixture Plates:

Nickel silver Stainless steel No.4 finish Stainless steel shall be type 304

2.03 PERFORMANCE

A. Speed: +/- 3% under any loading condition.

B. Capacity: Safely lower, stop and hold up to 125% rated load. C. Leveling: +/- 1/8” under any loading condition. D. Door Closing time, Thrust and Kinetic Energy shall comply with ASME Code and ADA.

Door thrust shall not exceed 30 pounds.

E. Airborne noise: measured noise level of elevator equipment and its operations shall not exceed 50 dBA in the adjacent Lobby space(s) and 60 dBA inside cab at full contract speed with the exhaust fan on its highest speed.

Provide effective sound isolation between machines, secondary deflector sheaves, and solid state drive units and filters, from building structure to reduce noise transmission to occupied spaces the elevator and elevator cab. When operating under any condition per plans and specifications, including car start or stop, door operation, and car movement, the elevator equipment shall not generate noise levels in excess of NC-35 in tenant spaces and shall be free of pure tones. For the purposes of this specification, a pure tone shall be defined as a sound level in any one-third octave band which is greater than 5 dB above both adjacent one-third octave bands, in the range 45 to 11,200 Hz. Provide the following as a minimum:

a. Support secondary deflector sheaves integrally from the unitized elevator base.

b. Resiliently isolate the entire elevator/secondary deflector integral unitized base from

the elevator machine room floor slab by means of effective neoprene-in-shear isolators having a minimum static deflection of 3/8".

c. Isolate the transformers and reactance units from the building structure by means of

approved neoprene-in-shear isolators having a minimum static deflection of 3/8".

Page 137: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 8

d. Isolate the hitch plates to the elevator cab by means of an elastomeric pad in

compression designed to provide 1/8" deflection under dynamic loading. e. Solid state rectification units shall be mounted on ¾" thick minimum, neoprene-in-

shear pad isolators and an effective electrical filter/reactance limiting electrical noise shall be provided.

f. Conduits and electrical connections shall not be fastened to or supported by elevator

machinery or solid state rectification units, except by approved flexible connections.

F. Vibration Control: all elevator equipment including but not limited to power units, hoist machines and controller cabinets shall be mechanically isolated from the building structure and electrically isolated to minimize the objectionable noise and vibration transmission to occupied spaces of the building.

G. Machine space noise levels not to exceed 80 dBA for elevator equipment.

H. Ride Quality: Adjacent peak to peak acceleration: 200 FPM – 17 mg

I. Sustained Jerk-not more than 4 feet/second3.

J. Floor to Floor Performance Time: Floor to Floor performance time (typical floor of 10.5 seconds from time door starts closing at one floor to fully opened and level on next successive typical floor, regardless of loading conditions or direction of travel).

2.04 MACHINE SPACE EQUIPMENT

A. Identification: Provide identifying numbers on hoist machine, governor, controller and all associated electrical switches and panels.

B. Gearless Machine: The machine shall be of the gearless PM traction type with the

traction sheave and brake drum mounted directly on the motor shaft-machine room less application. The machine shall be provided with a steel bed plate and beams for mounting. Reference the elevator schedule for elevator machines to be mounted in the hoistway for the MRL application per manufactures standard mounting arrangement.

C. Motors: The motor shall be alternating current, reversible type designed for elevator

service with high starting torque and low starting current. Motor armature shall be dynamically balanced and supported by appropriate ball or roller bearings.

D. Brake: The brake shall be spring applied and electrically released and designed to

provide smooth stops under variable loads. Include unintended upward movement device per ASME A17.1.

E. Sound Isolation: Provide resilient isolators, equal to Mason Industries, beneath the

machine bed plates and drive units to reduce vibration and noise transmission and vibration to the building structure.

Page 138: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 9

F. Governor: the car safety shall be operated by a centrifugal speed governor located at the top of the hoistway in the machine space. The governor shall actuate a switch when excessive descending speeds occur, disconnecting power to the motor and applying the brake application of the safety. Provide a remote reset type governor actuated from the control room space.

G. Drive System:

1. A variable voltage variable frequency AC drive system shall be provided. Power for the system will be taken from the building 3 phase power supply. The AC voltage will be changed to DC, and a power transistor inverter circuit will change the DC voltage to AC to power the elevator motor. Motor speed and torque will be controlled by varying the frequency and amplitude of the AC. A digital velocity encoder shall be provided on the motor giving feedback to the controller on motor speed and position. Provide line filters, noise spike or notching suppressors to insure other computer-operated equipment in the building will not be affected.

2. The system shall meet or exceed all requirements of IEEE 519 current standard for general systems. The position selector shall be part of the microprocessor system. The car position in the hoistway shall be digitized through a primary position encoder. The microprocessor control system shall store the floor position and slowdown points in memory.

3. The drive control system shall be a dual-loop feedback system based primarily on car position. The velocity profile shall be calculated by the microprocessor control system producing extremely smooth and accurate stops. The velocity encoder shall permit accurate position/velocity feedback shall permit a fast and accurate control of acceleration and deceleration. The vertical acceleration rate shall be not less than 2.6 ft./sec.² for speeds through 500 fpm.

2.05 AUTOMATIC TWO WAY LEVELING

A. The elevator will have two way leveling to automatically bring the car to a stop approximately level with any floor for which a stop has been initiated, regardless of load, rope stretch of direction of travel.

B. Automatic leveling control shall permit the synchronization of door opening with the

stopping of the car at a floor. 2.06 NORMAL STOPPING DEVICES

A. Provide slow-down and normal stopping devices on top of each car. 2.07 MOTION CONTROL

A. Furnish and install microprocessor motion controllers.

Page 139: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 10

B. The motion control system shall perform all of the functions of safe elevator motion and elevator door control. This shall include all of the hardware and software required to connect, transfer and interrupt power, and protect the equipment against overloads. The motion controller shall interface with the microprocessor control system.

2.08 OPERATION

A. General Operation and Control: A microprocessor based control system shall be provided to perform all of the functions of safe elevator motion and elevator door control. This shall include all of the hardware required to connect, transfer and interrupt power, and protect the motor against overloading. The system shall also perform car operational control. The controller cabinet containing memory equipment shall be properly shielded from line pollution. Micro-computer system shall be designed to accept reprogramming with minimum system down time.

B. Load Weighing Dispatching: A load weighing device shall be provided which shall

dispatch the car away from the main lobby floor when the load in the car reaches a pre-determined capacity. The load dispatch weight shall be adjustable.

C. Load Weighing Bypass: A load weighing device shall be provided which shall be set to

operate at a pre-determined percentage of the load in the car. The car shall bypass hall calls when this device is actuated. The bypass load weight shall be adjustable and separate from the load weighing dispatch weight.

D. Anti-nuisance: A system shall be provided so that when the number of car calls is

greatly disproportionate with the weight of the car all car calls shall be canceled without making any stops. The ratio of calls to weight shall be adjustable.

E. Car Button Independent Service: A key switch shall be provided in the car operating

service cabinet which, when actuated, shall disconnect the elevator from the hall buttons, and permit operation from the car buttons only.

F. Car Reversal Operation: A car without registered car call arriving at a floor where both

up and down hall calls are registered shall initially respond to the hall call in the direction that the car was traveling. If no car call or hall call is registered for further travel in that direction, the car shall close its doors and immediately reopen them in response to the hall call in the opposite direction.

2.09 GENERAL OPERATIONS AND CONTROL

A. Control of the elevator shall be automatic in operation by means of pushbuttons in the car numbered to correspond to floors served, for registering car stops and by up/down push buttons at each intermediate landing and call pushbuttons at terminal landings.

Page 140: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 11

B. The momentary pressing of one or more buttons shall dispatch the car to designated

landings in the order in which the landings are reached by the car, irrespective of the sequence in which buttons are pressed.

C. Each landing call shall be canceled when answered.

D. When the car is traveling in the up direction, it shall stop at all floors for which car

buttons or up hall buttons have been pressed. It shall not stop at floors where down buttons only have been pressed unless the stop for the floor has been registered by a car button, or unless the down call is at the highest floor for which any buttons have been pressed.

E. The pressing of an up button when the car is traveling in the down direction shall not

interrupt the travel unless the stop for that floor has been registered by a car button, or unless the up call is the lowest for which any button has been pressed.

F. When the car has responded to high or lowest stop, and stops are registered for the

opposite direction, its travel shall reverse automatically and it shall then clear the calls registered for that direction.

G. Should both up and down call be registered at an intermediate floor, only the call

corresponding to the direction in which the car is traveling shall be canceled upon the stopping of the car at the landing.

H. An adjustable time delay shall be provided so that after the car has stopped in response

to a hall button, the entering passenger may register his car button before the car will reverse to answer calls in opposite direction.

I. Car station shall contain a key operated toggle switch for the car light, a fan switch and

a door open button for stopping the closing motion of the doors and causing them to return automatically to their position.

J. The buttons in the car and hall stations shall be of the light-up type and shall indicate

that a call has been registered for that landing. K. The Elevator shall have car button independent service. When a key operated switch

in the car panel is activated the car shall be disconnected from the hall buttons and shall only respond to car buttons. Car doors shall be closed by pressing the door close button. Locate in locked service cabinet within the car operating panel.

L. Elevator contractor shall include emergency terminal speed limiting [ETSL] or reduced

stroke buffer, for any elevator that requires contract speed reduction to meet the detailed pit depth and overhead dimensions per the Project drawings.

Page 141: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 12

2.10 AUXILIARY OPERATION AND CONTROLS

A. General: In addition to primary control system features, provide the following controls or operational features for the elevator, except where otherwise indicated.

B. Firefighters Emergency Operation – Phase I Emergency Recall: The activation of a key

switch at the designated level hall station shall return all cars in the group express to the designated floor and by-pass all car and hall calls. The cars shall park at the designated floor with the doors open and will not respond to car or hall calls unless the Phase II switch in the car is activated. This system shall comply with the current ASME A17.1 Code, Section 2.27.3

Firefighters Emergency Operation - Phase II: In-car control of each elevator during the

Emergency operation, by means of a key switch, in each car shall be provided. Operation shall comply with the current ASME A17.1 Code, Section 2.27.3.3. C. Emergency Power Operation:

1. Elevator contractor shall provide all necessary equipment specific EP/ATS requirements including pre signal [if required] and time delay for transfer, to the GC and Electrical sub-contractor at time of submittal in a narrative format. Elevator contractor shall be present and participate in the EP testing prior to substantial completion.

2. Others shall furnish and install the emergency power supply, transfer switch (ATS) and wiring to the controller in each machine or control room.

3. The elevator contractor shall furnish all necessary features as detailed in ASME A17.1, Rule 2.27.2.

4. The elevator contractor’s system shall automatically run one pre-selected elevator per group down to the designated floor at full speed where it shall park with doors open. The system shall then consecutively select elevators until cars are parked at the designated floor. The assignment shall then be passed back to a pre-designated elevator to operate on full automatic operation. If any fail to run, the selection shall be passed on to the next elevator.

5. The system shall include a manual override for the use of Firemen or other authorized emergency personnel as detailed in ASME A17.1, Rule 2.27.2.4.1. The elevator contractor’s system shall include manual interlocking keyed switches. There shall be one switch for each elevator for manual control and one marked for automatic or pre-selected operation. The switches shall be located in the Life Safety Panel.

6. The elevator contractor shall furnish and install the necessary equipment and wiring from the respective elevator controllers to the switches in the Life Safety Panel.

7. The group elevator controllers shall receive signals from the generator control sequence panels before transferring from normal to emergency power, and when the power transfers from emergency to normal.

Page 142: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 13

D. Emergency Lighting and alarm Bell (Power to Car): Remote emergency alarm bell,

located where directed, so it can be heard outside the hoistway to be arranged to sound automatically in response to activation of alarm button.

2.11 GUIDE RAILS

A. Car and counterweight guide rails, brackets and bracket spacing shall conform to ASME A17.1 Code requirements. Design brackets to accommodate offsets or variations in hoistway walls. Include ladder brackets where necessary.

B. Elevator contractor shall provide all necessary guide rail bracket inserts.

C. Provide T type guide rails for main and counterweight.

2.12 ROPES

A. Suspension ropes and their connections shall conform to ASME A17.1, Section 2.20.

B. Any variations included with the elevator installation, the elevator contractor shall furnish to Tarrant County Facilities Management all required variances or other certificate’s to satisfy AHJ requirements for ASME A17.1.

2.13 ELEVATOR COUNTERWEIGHTS

A. A counterweight shall be provided for each elevator equal in weight to approximately the weight of the car plus a minimum of 40 percent of the rated load.

2.14 CAR AND COUNTERWEIGHT BUFFERS

A. Suitable oil buffers with necessary blocking and extensions shall be provided under the elevator car and counterweight.

B. Elevator buffers, buffer lateral supports where required and pit channel assembly’s shall receive a minimum of 2 coats of rust resistant paint or be manufactured of galvanized material

2.15 OVERHEAD SWITCHES

A. One emergency stop switch shall be located beside top access door.

Page 143: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 14

2.16 HOISTWAY DOOR INTERLOCK

A. Each elevator hoistway door shall be equipped with a hoistway unit system hoistway door interlock. The interlock shall prevent the operation of the elevator driving machine by the normal operating device unless the hoistway is locked in the closed position. The interlock shall also prevent the opening of the hoistway door from the landing side unless the car is either stopped or being stopped. Provide door restrictors.

2.17 HOISTWAY DOOR UNLOCKING DEVICES

A. Unlocking devices shall be provided at all floors. Escutcheons shall be provided in all openings; finish of escutcheons shall be metal and match door finish.

B. Hoistway Access: keyed hoistway access switches shall be provided at each terminal landing for each elevator as required by ASME A17.1. Access key switches shall be jamb mounted for each elevator at each terminal landing.

2.18 ELEVATOR COMPENSATION

A. Compensation, when required, shall be provided for the weight of hoisting ropes and unbalanced portion of traveling cables. Such compensation shall consist of iron or steel wire ropes attached to the underside of the car and counterweight. Where ropes are provided, pit sheaves shall be included.

B. Where applicable by travel distance Whisper-flex or Steadi flex chain type

compensation may be used. Installation shall include all necessary hardware to prevent compensation conflicting with elevator cab.

2.19 ELECTRICAL WIRING

A. Electrical wiring shall comply with the ASME A17.1 and National Electrical Codes and all applicable local codes. Wiring shall be included for all devices installed.

1. Furnish and install complete insulated wiring to connect all parts of the equipment. Properly ground all components as required by National Electric Code.

2. Insulated wiring shall have a flame retarding and moisture resisting outer cover and shall be run in a metal conduit, metallic tubing, or wire ducts.

3. Provide 10 percent spare wires between each controller, leveling device, hoistway junction box, and control panel, also, provide 6 percent spare conductors in each trail cable; all spares shall be properly tagged or otherwise identified with clear and indelible markings. Spare wiring shall be neatly bundled and stored in each elevator control panel and easily accessible.

4. Tag code all field wiring at junction points; control wiring in traveling cables at their terminals in the machine room: elevator car junction box and connections within the car. Test entire wiring system for insulation to ground.

Page 144: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 15

5. Provide total of ten (10) shielded pairs for security/card reader use in the traveling

cables for the elevator. The shielded pairs shall be located in a cable which is not used to carry alternating current circuits. The shielded wiring shall extend to junction box in the elevator machine room.

6. Additional requirements in the traveling cable. Shielded wiring in the traveling cable required for security camera and intercom system. Include two (2) fiber optic/62.5 um cables, Three (3) 18-AWG, Twelve (12) 14-AWG.

2.20 TOP OF CAR OPERATING DEVICE

A. The elevator shall be provided with an operation device mounted from or on the car crosshead which will permit slow (150 fpm or less) operation for purposes of adjustment, inspection, maintenance, and repair. A transfer switch shall be provided in the top of the car operating device fixture which will permit the disconnection of hoistway switch or switches and render the top of car operating device operative. The operating device shall be mounted in a metal box and shall be rigidly secured in a position conveniently accessible to workmen on top of the car.

2.21 LUBRICATION

A. Suitable means shall be provided for lubrication with oil or grease for all bearing surfaces in connection with the elevator installation. Grease gun fittings, if used, shall be suitable for high pressure guns. Grease cups, if used, shall be automatic compression type.

2.22 CAR TOP LIGHTS

A. Electric light with wire guard and GFI convenience outlet fixture on car top which shall meet the requirements of ASME A17.1.

2.23 DOOR OPERATOR

A. A heavy duty, DC master door operators capable of opening door at not less than 1½” fps and accomplishing reversal in 2½” maximum door movement. Doors shall open automatically when car arrives at floor to permit transfer of passengers; after timed interval door shall automatically close. Arrange operator so doors can be opened by hand from inside car in case of power failure, if car is within leveling zone.

B. Door operation shall be closed loop system which gives constant feedback of the

position and velocity of the elevator doors. System shall automatically overcome door resistance by increasing the power supply to the motor and increasing the torque required to maintain velocity. If a service tool is needed to make digital adjustments, provide the Owner with the service tool and all required manuals.

Page 145: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 16

2.24 DOOR OPENING AND DOOR CONTROL DEVICE

A. Provide proximity type door protection. B. Door open timing feature.

1. Operate in conjunction with proximity devices to provide adjustable, reduced, hold open time once beams are broken and re-established.

2. When doors are held open beyond an adjustable time, buzzer sounds and doors shall close at reduced speed.

3. There shall be a difference in door hold open times between car and hall calls. Door speed, thrust and kinetic energy shall comply with the ASME Code. Door hold open times shall comply with “Handicapped Requirements”.

2.25 FINAL LIMIT SWITCHES

A. In addition to the normal limit switches, a hoistway final limit switch shall be installed at the top and at the bottom of each hoistway.

B. Final limit switches shall be so located that they open at or about the time the buffer is

engaged by the time the buffer is engaged by the car or counterweight.

2.26 CAR FRAME AND SAFETY

A. Car frame shall be fabricated from formed or structural steel members and shall have adequate bracing to support the platform and car enclosure. The car safety shall be an integral part of the car frame with safety blocks located in the bottom members of the car frame. The safety shall be flexible guide clamp type.

B. Car frame and platform shall be rated “Class A” loading.

2.27 PLATFORM

A. The car platform shall be constructed of steel with ¾: plywood sub-floor and fire proofing on the underside. The platform shall rest on rubber pads designed to form an isolating cushion between the car and car frame.

B. The finished flooring shall be furnished by the Elevator Contractor. Provide a minimum

of 1.5” sill recess for one piece anti-slip stainless steel diamond plate flooring and installation.

C. Elevator car sill shall be full width extending to the leading edge of the front return

panel(s). Reference finish schedule for sill type and material.

Page 146: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 17

2.28 ROLLER GUIDES

A. Rubber tired roller guides shall be mounted on the top and bottom of the car and counterweight to engage the guide rails.

2.29 CAR DOOR HANGERS AND TRACKS

A. Hang doors on sheave type hangers with polyurethane that roll on a polished steel track and guided at the bottom by non metallic shoes sliding in a smooth threshold groove.

2.30 CAR DOOR ELECTRICAL CONTACT

A. Shall operate in conjunction with car door so elevator cannot operate unless doors are closed or within the tolerance allowed by Code.

2.31 HOISTWAY ENTRANCES

A. Entrances shall be complete with frames, doors, sight guards, sills, fascia plates, toe guards, headers, struts, hanger covers, tracks, hangers, miscellaneous hardware and related parts. Entrances shall carry UL label for Class “B” 1 ½ hour fire rating. Sill support angles shall be included.

B. Provide etched Tarrant County seal on hoistway doors at Level 1 and Level 3. Provide sandwich type construction for all hoistway entrance door panels.

C. Entrances shall be per the finish schedule.

D. Frames: Floor designations on hoistway door frames shall be permanently attached to

frames. Frames shall be fabricated from a minimum of # 14 gauge steel.

E. Doors and Sight Guards: Provide horizontal sliding doors of flush construction and sound deadened or sandwich type construction. Doors shall be fabricated from a minimum of #16 gauge steel

F. Sills: Sills shall be per the finish schedule for all openings.

Sills shall be level with finished floor.

G. Sill Support Angles: All support angles required shall be furnished and installed by the elevator contractor. Provide grouting as required.

H. Hanger Supports: Hanger supports or headers shall be formed sections securely

bolted to the strut angles.

I. Fascia Plates: Concealed fascia plates shall be #14 gauge steel, reinforced to insure a flat even surface throughout, and shall be securely fastened to hanger housings and sill above. Fascia plates shall be galvanized material.

Page 147: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 18

J. Struts and Closers: Structural steel angles and other similar methods shall be furnished of sufficient size to accommodate the door closers. Angles shall be continuous and be securely bolted to the sills and building beams above.

K. Header: 3/16” thick steel formed to provide stiffening flanges.

L. Door Hangers and Tracks: Hangers for each hoistway entrance shall be of the sheave

type arranged for two point suspension of the doors, and shall have brackets integral with door, or applied. Sheave and rollers shall be of steel with sealed ball bearings and there shall be adjustable ball bearings rollers to take up thrust of doors. Tracks shall be cold drawn or cold rolled steel of smooth surface and working section and shall be oiled with wick type lubrication.

M. Hanger Cover Plates: Shall be made of #14 gauge steel and shall be removable type.

Cover plates shall be arranged to assure hanger accessibility from within the car. Cover plates shall be galvanized material.

N. Floor Numbers: Provide floor numbers within the hoistway in compliance with ASME

17.1 Code.

O. Provide cast plates on each elevator entrance jamb in compliance with requirements for ASME A17.1 and ADA. Stick-on plates are not acceptable. Submit sample for approval.

2.32 CAR ENCLOSURE

A. The elevator cab shall include a cab shell fabricated of 14 gauge sheet steel from floor to canopy. Canopy of 12 gage reinforced sheet steel. Include car door, full width swing front return and car operating panels per the finish schedule. Provide a two speed squirrel cage exhaust fan, Morrison AA or equal. Cab interior shall include the following:

1. Manufacturer’s 14 gauge steel shell cab enclosure with cab stiffeners 2. Standard wall panels shall be finished with stainless steel 5 WL No. 4 finish 3. Stainless steel ceiling with recessed LED light fixtures 4, Canopy and top shall be a minimum of 12 gauge furniture steel 5. Inside of car canopy to have factory applied bright white, scratch resistant enamel 6. Front return, car doors and car operating panel shall be stainless steel No. 4 finish.

7. Provide one (1) stainless steel 4” bar hand rail on each side and rear walls; each handrail end shall be turned in towards cab wall

8. Architect shall select and approve all finishes 9. All stainless steel shall match in color, texture and direction of grain 10. One piece anti-skid stainless steel diamond plate floor

Page 148: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 19

2.33 CAR DOORS

A. Car doors shall be 1 inch thick, of flush design metal construction, with interior reinforcing and sound deadening insulation. They shall be adequately reinforced to withstand operational stresses and as required to accept hangers, interlocks and other accessories. The finish of the car doors shall match the car front return finish as specified.

B. The car return panel and car operating panel shall be full width swing type, stainless

steel No. 4 finish. The car return panels, transom and car door finish shall evenly match.

C. The car return panels and car operating panel for the Passenger/Service elevator shall be full width swing type, stainless steel No. 4 finish. The car return panels, transom and car door finish shall evenly match.

D. The car door system shall be designed so that the car doors may not be opened more

than 4” from the inside of the car if the car is outside the unlocking zone of a landing. 2.34 EMERGENCY EXITS

A. All cars shall have ceiling emergency exits sized and located per ASME A17.1. 2.35 HALL BUTTON FIXTURE

A. Provide one (1) riser of hall buttons. All pushbutton plates shall include the call station pictograph as detailed in figure 2.27.9, ASME A17.1.

B. Provide round buttons with an illuminated halo and cover plates per the finish schedule.

All face plates shall have a tamper resistant fastener.

C. Include rated boxes and wiring as required by ASME A17.1.

D. Provide integral fireman’s phone jacks and, shielded pair wiring, at each lobby, mounted in one hall station, if required by the AHJ. The designated hall station shall include Fireman’s Service Phase I key switch, engraved instructions and emergency power notification. Include all wiring and conduit to Life Safety Panel from each elevator machine room or hoistway.

E. Include manufactures premium fixture selection for all signal fixture devices including

bright white LED illumination. Submit sample pushbutton samples for approval as required in Part 1.

Page 149: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 20

2.36 HALL LANTERN FIXTURES

A. Provide a hall lantern with an audible signal at each landing entrance. The lanterns, when illuminated, shall indicate the elevator car which shall stop at the landing and in what direction the car is set to travel. When the car reaches a predetermined distance from the floor where it is going to stop, the corresponding hall lantern shall illuminate and the gongs sound once for up and twice for down. The hall lantern shall remain illuminated until the car doors close in preparation for leaving the floor.

1. Faceplates shall be per the finish schedule including tamper resistant fastener(s). 2. Include circle lens at typical floors, mounted vertical. Lantern shall be filtered white

for up direction and red for down direction. Provide field adjustable electronic chime; position indicator shall be a minimum of 2” characters with LED illumination.

3. Include manufactures premium fixture selection including LED bright white bulbs. 4. Architect shall select and approve all fixture selections.

2.37 CAR POSITION INDICATOR

A. The elevator shall have one digital readout fixture per car above the front car operating panel. Include Floor designation and direction arrow.

B. Fixtures shall be LED type, minimum of 2” high, and include floor sounding single field

adjustable chime (“buzzer” is not acceptable) of no less than 20 Decibels at not more than 1500 hertz, shall sound as the car is passing or stopping at a floor.

C. Include standard voice announcement as required by ANSI A117.1 for floor arrival and all emergency operations.

2.38 CAR OPERATING PANEL

A. Provide one (1) car operating panel. Include manufacturer’s premium fixture selection. The car operating panel shall include the following:

1. Self-illuminating floor registration without markings on buttons. Button type and style shall match the hall pushbutton for each elevator.

2. Alarm and door open, door close control buttons. 3. Firefighter’s key switch, pilot light, call cancel, buzzer and engraved instructions per

ASME A17.1. 4. Jack for Firefighter’s headset connected to shielded pair as required by AHJ. 5. All buttons shall be designated by raised markings with Braille, applied with

concealed fasteners to meet ADA requirements. Stick on markings are not acceptable.

6. Engraved elevator number and elevator capacity on faceplate or return panel. 7. Lockable service cabinet containing controls for car stop switch, fan switch, car

light switch, light rheostat, independent service, inspection service, emergency light test device and 110 volt convenience outlet.

Page 150: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 21

8. Faceplates and return panels shall be per the finish schedule. Provide full wrap

swing type return(s). 9. Locate to meet ADA requirements. 10. Emergency communication device surface mounted behind front return panel. 11. Logos or manufacturer’s name are not permitted on exposed surfaces.

2.39 COMMUNICATIONS SYSTEMS

A. The emergency communication system shall be mounted behind the main car operating panel and be designed to provide two-way communication between the elevator and a point outside the hoistway. Audio and visual two-way communication is required. System shall automatically dial a programmable number to a point outside hoistway.

B. Visual messages shall be provided to indicate the status of an emergency call. The

visual message will illuminate and shall read: “Message Received” when the emergency call button is pressed.

C. Raised letter and Braille shall be integrated and permanently marked on the faceplate

identifying the device as a speech independent emergency telephone. Surface painted or applied graphics shall not be acceptable.

D. Emergency communication system must be able to provide receiving agent with information identifying building and elevator number whenever an emergency call is placed.

E. Emergency communication system shall comply with Federal Communication

Commission (FCC) regulations and Americans with Disabilities Act (ADA).

F. When the party called by someone in the cab hangs up, the telephone shall disconnect immediately without giving a busy signal in the cab.

G. Program emergency communications device to manufacture’s emergency call center.

H. The cab communication device shall comply with all provisions of ASME A17.1, Rule 2.27.1.1.

I. The cab communication device shall be non-proprietary and easily re programmable without additional cost by the OEM.

J. Firefighters' Two-Way Telephone Communication Service: Provide flush-mounted cabinet in each cab and required conductors in traveling cable for firefighters' two-way telephone communication service specified in Division 16 Section "Fire Alarm and Emergency Voice Evacuation System."

Page 151: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 22

2.40 SMOKE SENSOR TIE-IN

A. System to interface with smoke sensors, including alternate level refuge; provide system specific requirements with submittal.

B. Elevator contractor shall coordinate for testing Phase 1 Fire Service recall with smoke

initiating devices prior to final turnover of elevator equipment. PART 3 – EXECUTION

3.01 SCOPE

A. Installation shall meet all of the standard requirements of paragraph 1.03 for installation and inspection, tolerances, and qualifications. All work required for completion of a first-class installation is the responsibility of the Contractor, even if not included in this specification.

B. Performance of the elevator shall meet requirements of Paragraph 2.03.

3.02 PAINTING

A. All elevator equipment not painted, wire duct, miscellaneous iron and steel work located within the machine room or hoistway, shall be given a finish coat of paint. Material that has factory finish paint, shall have all scratches or mars painted after installation.

B. Finish coat shall have hard, tough semi-gloss surface. Submit paint color and

specifications for approval.

3.03 CLEAN UP

A. Remove daily trash from hoistways, pits, and machine rooms including all packing material and debris resulting from this work. Leave all elevator spaces broom clean.

3.04 ACCEPTANCE TESTING

A. Tests shall be performed by the Elevator Contractor at his expense in the presence of Tarrant County Facilities Management. The elevator shall be subjected to the following acceptance inspection and tests:

1. Inspection and tests required by applicable portions of Requirements, 1.03. 2. Inspection and tests required by Federal, State, and Local codes and ordinances. 3. Test safety circuit, loop circuit, and the drive circuits at 500 volts. Minimum

resistance to ground shall be one meg ohm. 4. General riding quality, leveling accuracy, and quietness of operation shall be

acceptable to the Owner’s representative.

Page 152: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 23

3.05 USE OF ELEVATOR

A. The elevator shall not be used for construction purposes, or during the period prior to turning over the project to Tarrant County Facilities Management. Should the elevator be authorized for temporary use, the following conditions shall apply: 1. Neither the new installation period or the guarantee, shall start at this time unless

specifically approved in writing by the Tarrant County Facilities Management. 2. The user shall provide, if job conditions require, all temporary enclosures, guards

or other projection of the hoistway openings, power, signal devices, car lights, protection of any elevator entrances, cars, fixtures, and any other equipment that is installed.

3. The user shall return the elevator in the same condition it was in when placed on temporary service.

4. The Elevator Contractor is to perform routine maintenance or repairs. 5. The cost of temporary service shall be the responsibility of the Elevator Contractor

and the user.

3.06 ACCEPTANCE

A. Final acceptance of the installation shall be made only after all field inspections and tests are complete, punch list items are complete, all Owner’s information items listed in 1.02.C have been furnished, and the Owner’s representative is satisfied that the installation has been satisfactorily completed.

END OF SECTION 14 21 00

Page 153: PROJECT MANUAL FOR 350 WEST BELKNAP PARKING GARAGE ...access.tarrantcounty.com/content/dam/main... · FORT WORTH, TX 76196-0104 . BIDS DUE APRIL 1, 2019 . 2:00 P.M. Technical Specifications

350 West Belknap Garage Fort Worth, TX

Electric Traction Elevators 2018-02-08

142100- 24

THIS PAGE INTENTIONALLY BLANK