706
Personal Time Management Software Manage Your Tasks More Effectivel And ...for complex chemical processes... Techno-Economic Models by Robert R. Odle, Ph.D. Metallurgical Viability, Inc 100 Wedgemont Drive, Elkton, MD 21921 443-616-4339 or [email protected] Website: www.metallurgicalviability.com

Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Embed Size (px)

Citation preview

Page 1: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Personal Time Management Software

Manage Your Tasks More Effectively

And ...for complex chemical processes...

Techno-Economic Modelsby

Robert R. Odle, Ph.D.Metallurgical Viability, Inc100 Wedgemont Drive, Elkton, MD 21921

443-616-4339 or [email protected]

Website: www.metallurgicalviability.com

Page 2: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Manage Your Tasks More Effectively

Techno-Economic Models

Page 3: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

DATA RESTARTTo get started:

You need to erase the data someone else put in this program:* Change the cell in row one, column 27, of the "ToDo" spreadsheet to "0" zero.

This will allow your data to write over the data in the archive file. If you don't want to see it, then delete data.* Delete all data in the "ToDo" Spreadsheet below line 3.

Enter your "To Do" list under the ToDo SpreadsheetTasks are entered on the second yellow line.When you enter a new task on the second line, hit the <Add Task> button to move the item to a listWhen you want the program to move an item to the top of the list, hit the <Prioritize> button.Items are put in chronological order. Enter something with a future date and it moves to the top on that date in the future.

ToDo SPREADSHEETRaw Rank The rank is calculated based on the Due Date. In general, you can hide this column.

When you are working on something, it is "Active", when you are done, it is "Done", see second column. You can also also say something is "Delete" when you want it not to move to the archive list.

Due Date If you are entering data, it assumes it is for now or the future.If you are entering data for yesterday, enter it for today and then change the date after the program adds it to the list.

Category Enter a one word category, such as "Report", or "Investigation", or "Entertainment"Soon you will be able to sort on this field more directly. Now you can use the Excel sort in the Project Page (later)

Enter a brief description of the activity, less than 255 characters (or excel/VBA blows up)If you need more space, you probably need to break it into sub-tasks anyway.

Project Always give your tasks a "Project" name since timesheets, etc. are sorted against the Project.Project names must be exact, but, Excel does auto-fillin on the columns to help on this requirement.

Company Enter a company for which the work is being done for, not your company. If it doesn't apply to yourtype of work, then you can use it for something else and sort on it under the Project Spreadsheet, anyway.

Status Seemed like a good idea at the time, but, I find this field generally worthless. It will probably evolve into somethingelse eventually.

HRS Programs computes hours for each task entered. Later summed up for selected projects for a given time period.

Start Time Three separate start and stop times can be entered for each activity, on a single day.End Time If the activity is continued on a second day, a new entry must be made.

For now, times are entered via milatary times with decimals. Eg. 4:30 pm would be 16.5If you are using this version, and want the next version with more flexible times, contact me in Sept 2002.

Active or Done

Action Required

Page 4: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Project SPREADSHEETThis spreadsheet pulls information from the ToDo Spreadsheet and the Archive Spreadsheet to produce a Timesheet, which only includes activities for which you entered times, or a Project Summary for all activities, with and without times.

Company Search for all tasks that occurred with a specific company in the given time period. Project input must be set to "all".

Project Search for all tasks that occurred with a specific project in the given time period. Company input must be set on "all".

Start/End Full start and end times in format 03/31/2002.Dates

After data is collected then highlight it and sort it using Excel "data" and "sort" options. Usually sort on columns 5 and 12 to sort data by time.

Page 5: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

This will allow your data to write over the data in the archive file. If you don't want to see it, then delete data.

When you enter a new task on the second line, hit the <Add Task> button to move the item to a listWhen you want the program to move an item to the top of the list, hit the <Prioritize> button.Items are put in chronological order. Enter something with a future date and it moves to the top on that date in the future.

The rank is calculated based on the Due Date. In general, you can hide this column.

When you are working on something, it is "Active", when you are done, it is "Done", see second column. You can also also say something is "Delete" when you want it not to move to the archive list.

If you are entering data for yesterday, enter it for today and then change the date after the program adds it to the list.

Soon you will be able to sort on this field more directly. Now you can use the Excel sort in the Project Page (later)

Enter a brief description of the activity, less than 255 characters (or excel/VBA blows up)

Always give your tasks a "Project" name since timesheets, etc. are sorted against the Project.Project names must be exact, but, Excel does auto-fillin on the columns to help on this requirement.

Enter a company for which the work is being done for, not your company. If it doesn't apply to yourtype of work, then you can use it for something else and sort on it under the Project Spreadsheet, anyway.

Seemed like a good idea at the time, but, I find this field generally worthless. It will probably evolve into something

Programs computes hours for each task entered. Later summed up for selected projects for a given time period.

Three separate start and stop times can be entered for each activity, on a single day.

For now, times are entered via milatary times with decimals. Eg. 4:30 pm would be 16.5If you are using this version, and want the next version with more flexible times, contact me in Sept 2002.

Page 6: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

This spreadsheet pulls information from the ToDo Spreadsheet and the Archive Spreadsheet to produce a Timesheet, which only includes activities for which you entered times, or a Project Summary for all activities, with and without times.

Search for all tasks that occurred with a specific company in the given time period. Project input must be set to "all".

Search for all tasks that occurred with a specific project in the given time period. Company input must be set on "all".

After data is collected then highlight it and sort it using Excel "data" and "sort" options. Usually sort on columns

Page 7: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

05/08/2023 Rate of Work Turn Over in Failure Analysis Department

RRO

Project ID Project Description Invoice Amount Component

BBModel 40000 Done

Carbothermal Mg MTL, TMS Effort DeadChina Proposal for Due Diligence on Mg 25000 Inactive

Cleanup cleaning up Pending

H2 via SOE Active

IM $ -

LibertyBell

Lumina Levinco Investment Company $ -

Mg via SOE

Mg_CO $ -

MgH2

model MintekNACE NACE Meeting & Relatednew sunoco

Oman PFUOverhead Non-Project Activites $ -

SiC Scoping Study $ 6,000 Taxes MVTennis OdleToth Third Party Evaluation $ 6,000

Zincox Zincox941 IRS

Timesheet MVMTL2 MTLLiBr Patent Work

Jobs

Ricketmill Odle

WMD RFP Wolf Environmental WMD Project

Dues RMMAHunt Odle

Projects MVCredit Cards OdleWedgemont Wells Fargo

Family OdleFish Pond Odle

K061 ZincoxIT MV

family OdlesRegalito Cu The Council

BAM MTLFinances Odle

Micro-silica PFUFuture Gen Wolf Eagle

Model for Carbothermal Mg Process

making hydrogen via solid oxide electrolytes

Database Inhouse, York and Webpage

LibertyBell Conference in Reading Prep & Trip

process to make Mg from MgO via solid electrolyte and H2 as

carrier gasCommercial Carbothermal Mg

ProcessWork on MgH2 Project not directly

related to modeling

Effort to find projects and/or employment

Page 8: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Due Date Category Action Required

Active MV 12/15/05

Active MV 12/15/05 Admin emails and To Do List

Active MV 12/15/05 Marketing review futuregen project on web

Active MV 12/15/05 Development

Active MV 12/15/05 Development conference call for questions

Active MV 12/15/05 Admin meeting RMMA

Active MV 12/16/05 Marketing take Franchise survey

Active MV 12/16/05 Admin

Active MV 12/17/05 Marketing fill out survey on job skills

Active MV 12/18/05 Admin

Active MV 12/20/05 Development estimate the cost of oxygen plant

Active MV 12/21/05 Development estimate mobile equipment requirements

Active MV 12/22/05 Development

Active MV 12/24/05 Development estimate the cost for boiler water DI plant

Active MV 12/25/05 Development estimate the cost of stacks

Active MV 12/27/05 Development

Active MV 12/30/05 IP

Active or Done or remove

Time Sheet KEY

Enter New Task On This

Row

continue on salt furnace design to enable costing

on Quicken, decide on MD/DE split and then do DE and MD WH Taxes

check if any accounts paid off from 2nd mortgage loan

estimate the cost of waste water treatment plant

add cost data for kilns to programs, cost still too softuse solid oxide electrolytes to clean up metal produced by nozzle then conversion effic of nozzles not critical

Add Task Sort & HRS

B1
99= Moves Item to Top of List assuming item with scheduled due date doe not pre-empt
C1
Normal input is "Active". Anything else zeros the RanK Score and moves toward bottom of list and eventually to Archive.
D1
put hours required to do job and later the hours to do job. Will eventually incorpoate into timesheet program and/or proejct summaries.
E1
If there is a deadline enter it here. It will pop the item to the top of the list 3 days before it is due -- overrides Rank Coding.
G1
Action Required: Write down what you need to get done now or later.
B2
RRO: 99 brings item to top of list as highest priority, unless an item has a Due Date that is pending, or past due.
C2
Normally add items as Active and then change code to Done, below, when you finish them. An item marked Done is sent to the Archive List when you press "Add Task".
E2
This assume you add an item within three days of doing it, or before you do it. Otherwise, change date below after it is added.
F2
Robert Odle: you must add a category: admin, Investigation, Consulting, Training, etc. Hint: Before adding task see if the task below this line is done. Change its code to Done and it will be archived as the new task is added.
C3
Robert R. Odle: As you mark this item as Done, be sure to add the next logic task to be done in the line above. Hint: Use the date you need or want to do the task and it move toward the top of the list as the day approaches.
Page 9: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Active MV 12/31/05 Programming

Active CTL 12/31/05 Admin position descriptions for FA department

Active MV 12/31/05 IP

Active mV 12/31/05 IP H2 from Matte/steam reaction

Active CTL 12/31/05 Admin

Active MV 12/31/05 Programming need to fix instructions page

Active MV 12/31/05 Development

Active MV 12/31/05 Programming add HCl analysis to raw material analysisActive MV 12/31/05 IP write up patent if York and RAC supportActive Goals 12/31/05 Goals Publish Beth

Active Goals 12/31/05 Patents

Active MV 12/31/05 Marketing add video to Juris Pro

Active Odle 12/31/05 Finances

Active Goals 12/31/05 Patents

Active MV 12/31/05 Investigation

Active MV 12/31/05 Patents making hydrogen from zinc vaporActive MV 12/31/05 Admin AMC flowsheet for Bob

Active MV 12/31/05 IP

Active MV 12/31/05 Marketing update typical contract for website

Active Goals 12/31/05 Goals publish article at TMS on Dynamic Financial Models

Active Goals 12/31/05 PatentsActive MV 12/31/05 Development estimate the cost of baghouseActive MV 12/31/05 Development estimate the cost of ingot castingActive MV 12/31/05 Development estimate the cost of cooling towerActive MV 1/6/06 Admin send the fox ejector fax again

Active MV1/15/06

Development

Active MV 1/20/06 Adminmust call IRS on 4th Qtr 2004 tax problem before the end of the month

Active CTL 1/31/06 Marketing presentation for Neil Australia

allow more user input on heat exchanger set points

carbothermal production of Mg with hydrogen and/or SOE on backside of nozzle

developing standard operating practices for FA based on ASTM standards

do thermo on using H2 as carrier gas to make Mg via MgO etc

write up patent on recovery PM while making H2

is Allison eligible for the P. Grant …. More than life?complete the patent on H2 production via SE and molten metalU.S. Patent Number 5,093,101 patent for making MgH2

Hydrometallurgical recovery of tantalum from tantalum scrap

Patent on processing electronic scrap to recover Cu, PM, and hydrogen

write or call Marius Botha, home 011 2718 748 4765 or cell 011 2782 464 1426 or email [email protected]

Page 10: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being
Page 11: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Active CTL 12/31/99 Admin logging in job, labeling samplesActive CTL 8/25/05 Admin getting background infoActive CTL 8/26/05 Investigation stereoscopic examinationActive CTL 8/31/05 Investigation mountsActive CTL 9/1/05 Pictures selecting pictures for reportActive CTL 9/3/05 Report writing reportActive CTL 9/4/05 Report writing reportActive CTL 9/5/05 Editing team editActive CTL 9/8/05 Editing changes from RAC, PDF make, send to clientActive CTL 9/9/05 Client followup on reportActive CTL 9/12/05 Admin Invoicing client

add project

Page 12: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being
Page 13: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 5 37285 test 2 test2

Page 14: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being
Page 15: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Active 2 37396 FU on Romania [email protected]

Page 16: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Project ($) HRS

Overhead MV 1 8:00 9:00

Wolf Eagle 1.25 9:45 11:00

BBModel SH 0.01 12:00

1 17:00 18:00

Ricketmill Odle 1 19:00 20:00

Overhead Franchoice 0.01 9:31

Taxes Uncle Sam 0.01 20:00

Jobs Odle 0.01 9:36

Finances Odle 0.01 9:35

BBModel SH 0

BBModel SH 0.01 11:40

BBModel SH 0.01 11:45

BBModel SH 0.01 11:48

BBModel SH 0.01 12:05

BBModel SH 0.01 18:00

MV 0

Client Company

Start Time

End Time

Start Time 2

End Time 2

Start Time 3

End Time 3

Future Gen

Gold & Silver

Kiwatt Investment

Mg via SOE

Add Task

H1
PROJECT On Project Page, Hours spent can be retrieved based on Project, exact matches only.
I1
Company: On Project Page, Items can be retrieved based on Company (exact matches only) for all projects.
K1
Robert R. Odle: use Milatary time, I.e., 13:15 for one fifteen pm.
Page 17: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BBModel MV 0

21190 0

Mg MV 0

H2 MV 0

21190 0

BBModel MV 0

MV 0

BBModel MV 0LiBr CTL 0

dream Odle 0

H2 MV 0

JurisPro MV 0

College Odle 0

H2 MV 0

BBModel SH 0

H2 MV 0none MV 0

Ta MV 0

website MV 0

BBModel 0

dream MV 0

BBModel SH 0.01 11:44BBModel SH 0.01 12:02BBModel SH 0.01 12:04BBModel SH 0.01 14:00

BAM MV0.01 17:01

Taxes IRS 0.01 8:21Carbothermal Mg MTL 0.01 9:23

0

Yuca Mountain

Yuca Mountain

Mg via SOE

Page 18: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

00000000000000000000000000

000000000000000000

Page 19: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

000000000

0 0 1 9:00 10:000 0 1 10:00 11:000 0 3 13:00 16:000 0 1 16:00 17:000 0 2 10:00 12:000 0 4 13:00 17:000 0 4 13:00 17:000 0 1 13:00 14:000 0 2 8:00 10:000 0 0.5 8:00 8:300 0 1 8:00 9:00

Page 20: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

x s

Page 21: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Romanian Admiralty Bank 0

Page 22: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

don't erase this number 5226

Add Task

Page 23: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 23 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

KEY = all all Project BBModel

Category Action Required Project Company HRS Wrkd Start End Start End Hrs/dayPERIOD 11/6/2005 TO 12/5/2005

11/08/05 Development BBModel SH 3.3 14:40 17:00 21:00 22:00 3.3

11/09/05 Development BBModel SH 3.3 10:45 14:00 3.3

11/12/05 Development BBModel SH 2.0 10:00 12:00 2.0

11/14/05 Development BBModel SH 1.8 16:40 18:301.8

11/15/05 Development BBModel SH 0.3 11:55 12:15

11/15/05 Development BBModel SH 3.0 12:00 14:00 15:15 16:15 3.3

11/16/05 Development BBModel SH 2.8 12:45 15:30

11/16/05 Development BBModel SH 3.5 17:30 21:00 6.3

11/17/05 Development finish boiler cost estimate and printouts BBModel SH 0.8 17:00 17:45 0.8

11/18/05 Development BBModel SH 0.7 6:30 7:00 12:50 13:0011/18/05 Development email to Bob about cost of ingot casting BBModel SH 0.2 15:00 15:10 0.8

11/19/05 Development BBModel SH 2.5 10:00 12:30

11/19/05 Development BBModel SH 0.8 12:45 13:303.3

11/21/05Development BBModel SH 2.3 10:00 11:30 12:15 13:00

11/21/05 Development factor to convert 2002 Rands to 2002 Dollars BBModel SH 0.3 13:00 13:15

11/21/05 Development BBModel SH 4.2 13:15 16:15 20:20 21:30 6.7

11/22/05 Development BBModel SH 1.3 12:15 13:301.3

11/23/05 Development BBModel SH 1.2 11:20 12:30 1.2

11/24/05 Development reading quarterly report, comment BBModel SH 1.0 14:30 15:30

11/24/05 Development BBModel SH 0.5 15:40 16:10 1.5

11/26/05 Development email to Andy on costs on SOM vs NBCM BBModel SH 0.5 11:30 12:0011/26/05 Development estimate cost of electric furnace, con't BBModel SH 1.3 12:15 13:30 1.811/28/05 Development cost of hydrogen Alchemix vs. Safe Hydrogen BBModel SH 0.5 17:10 17:40 0.511/30/05 Development estimate cost of kilns/preheaters BBModel SH 1.1 18:55 20:00 1.1

12/01/05 Development BBModel SH 2.4 10:15 12:40 2.4

12/03/05 Development BBModel SH 1.5 12:00 13:30 1.5

12/05/05 Development BBModel SH 6.0 11:20 12:00 13:00 18:206.0

Total Hours 48.7 hrs 6.13650.0 days

Company =

Start &End Dates =

Due Date

Stat

Start Time

End Time

develop equation for cost of scrubbers as a function of sizescrubber subroutine to produce equipment data sheet and add price to master listlooking for capital costs for electric arc furnace projects on internetasking for some quotes from electric arc furnace companies, found another electric arc project costoutlining remaining equipment needing quotes, self review of outstanding tasks

estimate cost of boiler, regression curves from Matches site

build subr to print Equip Cost and EC Summary Spreadsheetsbuild subroutine for boilers, pull data, use regression curves, print datasheet and costs

need to modify algorithm for boiler cost to include steam pressure

convert 2002 rands to June 2005 dollars, converting U.S. 2003 to U.S. 2005, Plant Index

estimate cost of steam ejectors for vacuum, also change symbol conflict, finding data on internet

function to convert dollars from past year to 2005, use function on all costs estimated to date

make computerized datasheet for ejectors to get quote from vendor

use data and fillout datasheet for "fox" ejectors to get quote to verify cost estimates, get fax throughdevelop regression curves for cost vs size for electric arc furnaces

continue on capital cost estimation for electric arc furnace … difficult

continue to find cost data on kiln to supplement Mintek dataestimate cost of salt furnace, working on general design to enable cost estimate

develop code to estimate the size, number and cost of salt furnaces to get required heat removal

Project Summary

Timesheet

L1
Company: To report by company, Project must be set on "all".
P1
Project: To enter Project, Company must be set on "all".
Page 24: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 24 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

days

Page 25: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 25 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 26: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 26 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 27: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 27 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 28: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 28 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 29: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 29 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 30: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 30 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 31: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 31 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 32: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 32 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 33: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 33 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

days

days

Page 34: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 34 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 35: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 35 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 36: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 36 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 37: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 37 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 38: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 38 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 39: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 39 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 40: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Projects Timesheet on Selected Project 05/08/202302:53:25

[email protected] 40 Robert R.Odle, Ph.D.Metallurgical Viability, Inc.

Page 41: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

05/08/2023 02:53:25 CTL Job

Project Timesheet: Robert R. Odle, Ph.D.Investigations

PERIOD 11/6/2005 TO 12/5/2005

PROJECTS DESCRIPTION HRS % of Time

BBModel Model for Carbothermal Mg Process 48.7 100.0

TOTAL 48.7174.7 $/hr

Page 42: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

KEY Due Date Category Action Required

0 0 active 4 12/12/2002 Possible Interview for Project Manager in Info Dept

25 25 active 5 7/29/2002 Potential for contract process engineering job in GSP

0 0 cancel 5 7/1/2002 Lease Items Detail -- two big ticket items

0 5 cancel 8 6/30/2002 Follow Up on any other equipment damaged by explosion

15 15 active 6 6/30/2002 Waste water problem not meeting permit, $30K/mo

0 24 done 2 6/18/2002 ck 3rd qtr 2001 return per Irs request

0 25 done 2 6/18/2002 Send Panesonic back for repair again

0 28 done 2 6/18/2002 Ta Capacitors Reclamation Market

0 0 done 2 6/9/2002 setup tent for Olesia

0 23 done 2 6/9/2002 Send IRS more tax penalties per letter

0 27 done 2 6/4/2002 Follow up with Bruce on MgO project in Spokane

16 16 Active 2 6/4/2002 FU on WWTP Inspections for NY Bank

0 0 done 5 6/4/2002 teeth cleaning

0 11 done 2 6/2/2002 Confident Agreement to Jens

0 3 repeat 5 6/1/2002

0 98 done 2 5/28/2002 Tools make new templates for CTL Reports

25 25 active 5 5/27/2002 [email protected]

0 93 done 2 5/26/2002 Admin

0 35 done 2 5/24/2002 Marketing

0 63 done 2 5/23/2002 Marketing trip to Torftech, meet with Chris Dodson

0 30 done 2 5/23/2002 Investigation

0 50 done 2 5/23/2002 Client Contact

0 97 done 2 5/22/2002 Admin learned Joe's Invoice system

RANK

Raw Rank

Active or Not

Dentist appointment

see his old email, he said x and y went to Australia and to BHP for job.

change this program to track Category and not description. Rewrite past CTL entries to reflect new structure.

Torftech pilot plant and personnel meet and discuss opportunities and trip back to Baltimore then to Newark

look at diaphrams, try to find crack initiation site. Did find 3 point fatigue cracks with some mechanical damage at crack initiation on

two of the disks. Need to understand how the all work in the machine together.

call James Rutenbar to see if we got sulfur job. Sent email, it was a no go, went to low cost bidder. Close out. 610-828-3078.

Page 43: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 36 done 2 5/22/2002 Pictures editing pictures

0 61 done 2 5/22/2002 Admin CTL Staff Meeting

0 98 done 2 5/22/2002 Admin FeMN Email Rate Quote

0 2 done 2 5/22/2002 Admin Guarantee Comfort Inn Room in Toronto

0 41 done 2 5/22/2002 Admin get CASH for trip

0 55 done 2 5/21/2002 Admin leave copy of key for landlord

0 36 done 2 5/21/2002 Pictures move to center of page

0 35 done 2 5/21/2002 Miscelaneous lunch and laundry

0 53 done 2 5/21/2002 Client write letter and quote for General Chemical

0 58 done 5/21/2002 Client pick up samples meet Benjamin

0 68 done 2 5/21/2002 Client

0 47 done Pictures Selection of pictures to tell story

0 21 done Report Edit Report 3rd Time

0 71 done

0 67 done

0 64 done 2 Report write Scope, Analysis Performed

0 done 2 5/20/2002 lunch and emails

0 2 done 5/20/2002 Pictures

0 67 done 2 Investigation

0 done 2 5/20/2002 Report section on materials received

0 HRS done 5/20/2002 Admin email, plans for Tues, timesheet last week, etc.

0 61 done 2 5/20/2002 [email protected]

0 done 5/21/2002 Finances internet banking

0 done 2 Pictures

0 67 done 5/20/2002

Met Jim, viewed tank and failure, got story of failure for General Chemical

Always give your tasks a "Project" name since timesheets, etc. are sorted against the Project. Enter a company for which the work is being done for, not your

company. If it doesn't apply to your

review pictures with Fred, then import and label best pictures, labelling and formatting

else eventually.

lay sample out on floor, sketch of lands and cracks to show layout of sample

FU on Romania Job

Start Time

End Time

If the activity is continued on a second day, a new entry must be made.

Make Excel drawing to show landings and crack locations and then export to Paint then import to Word

Information Management

Print report for Rick: copy file, take to printer,get printer to work, deliver copy to RC office

Page 44: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 26 done 2 Apply for Financial Aid for USC

0

0

0 67 done 2 5/17/2002 Report

0 52 done 2 5/17/2002 Report start with letterhead

0 62 done 2 5/17/2002 Investigation

0 0 done 2 5/17/2002 Estimate hours req for qual report for Kenet

0 64 done 2 5/17/2002 Investigation Service Conditions for Failed Component

0 65 done 2 5/17/2002 Education read prior reports on fatigue with stress corrosion cracking

0 10 done 2 5/17/2002 new reservations for Comfort Inn

0 64 done 2 5/16/2002 Education read on stress corrosion and corrosion fatigue in copper

0 64 done 2 5/16/2002 apartment lease signing and view apartment

0 63 done 2 5/16/2002 make PDF file and email to Rick

0 63 done 2 5/16/2002 Report

0 63 done 2 5/16/2002 Investigation

0 65 done 2 5/16/2002 Investigation reading file on project

0 65 done 2 5/16/2002 looking at sample from Sunnoco, notes from yesterday

0 67 done 2 5/16/2002 Marketing discussing MV with Joe

0 65 done 2 5/15/2002 Report Proof Reading

0 97 done 2 5/15/2002 Miscelaneous helping carry large valve to car

0 98 done 2 5/15/2002 Investigation received sample and eyeball examination

0 61 done 2 5/15/2002 Report writing findings and begin discussion

0 60 done 2 5/15/2002 Admin call Chris Dodson on how to get to Torftech

0 58 done 2 5/15/2002 Investigation

0 54 done 2 5/15/2002 Admin cancel rental car

Editing report after review by Rick. review tense of all verbs, be profound, remove qualifiers like probably

Discussing work with Fred. EDS for particles, x-section smaller crack on second section

Information Management

Reviewing report with Brad. Identified mostly procedural issues, font etc

Microscope work with Fred. Circumf fatigue and longitudinal intergranular attack

Looking for evidence of LiBr bypass into steam. Found crevice corrosion extending part way to steam side

Page 45: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 56 done 2 5/14/2002 Admin Apartment hunting

0 60 done 2 5/14/2002 Report writing summary, sample description

0 55 done 2 5/14/2002 Investigation

0 54 done 2 5/13/2002 Investigation read two articles on LiBr Corrosion

0 42 done 2 5/13/2002 Investigation looking thru corrosion magazines for LiBr Solution Failures

0 53 done 2 5/13/2002 Investigation viewed sample under microscope with Fred

0 0 done 2 5/13/2002 Re Do 2000 Taxes error on Schedule A

0 53 done 2 5/13/2002 Investigation Looking at cracks in Subcooler tube. need theory

0 53 done 2 5/13/2002 Education reviewed status of failure analysis of Motiva Tube with Brad

0 0 done 2 5/12/2002 Deposit Money from Odle accounts into MV to pay taxes

0 48 done 2 5/12/2002 Investigation Get mini-recorder working for CTL trip, new batteries and tape

0 0 done 2 5/12/2002 Marketing let Ray Murphey know not avail

0 0 done 2 5/11/2002 Finances Clemson Financial Aid Report

0 17 done 2 5/10/2002 Education Order Books on Failure Analysis

0 17 done 2 5/10/2002 Admin Bind and mail reports, trip to Mailbox Etc.

0 40 done 2 5/10/2002 Admin printing and collating body of report

0 25 done 2 5/10/2002 Tools Buy new laptop

0 52 done 2 5/9/2002 admin timesheets, invoice, etc

0 43 done 2 5/9/2002 compute also get old computer ready for Allison

0 0 done 2 5/9/2002 Turn in PrimAmerica Application

0 49 done 2 5/9/2002 modify add fix add to only sort going one way, sort it both ways

0 52 done 2 5/8/2002 get accounting caught up for invoicing

0 54 done 2 5/8/2002 report production printing and collating appendices

0 56 done 2 5/8/2002 admin timesheets, invoice, etc

0 39 done 2 5/7/2002 timesheets get time sheets in order for billing

identified dendritic structures took pictures on stereoscopic microscope

Page 46: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 54 done 1 5/7/2002 Find Ta Specs search logbook and Internet if necessary

0 22 done 8 5/7/2002 write draft send to Will Cassidy

0 53 done 2 5/7/2002 page setup in Excel, etc.

0 53 done 2 5/7/2002 last edit of report ndr

0 43 done 2 5/6/2002 rewrite from preliminary

0 48 done 2 5/6/2002 Options for Reclaiming Ta During Rebuild

0 51 done 2 5/6/2002 current market conditions for Ta

0 53 done 2 5/6/2002 Coordinating Appendices with text

0 41 done 2 5/5/2002 Admin roommatesservices.com, joined to find apt

0 53 done 2 5/5/2002 Admin

0 47 done 2 5/5/2002 Report Cost of Acid Room, write and calc for report

0 11 delete 2 5/5/2002 Section on Schedule

0 0 done 2 5/5/2002 Clean up hard disk on portable

0 0 done 1 5/5/2002

0 0 active 3 5/5/2002

0 69 done 1 5/5/2002 Marketing Call Charles at SWT

0 0 done 2 5/4/2002 compare to old document

0 49 done 2 5/4/2002 write section and document some equip not damaged

0 18 done 2 5/4/2002 ID improper document, equip still ok

0 38 done 2 5/3/2002 find file, est categories and sort

0 0 active 1 5/2/2002 periodic FU required.

0 43 done 2 5/1/2002 write verbage

13 3 2 1 5/1/2002 overbid on project fu with ??

0 13 done 2 5/1/2002

0 50 done 10 4/30/2002 CECON send back contract

Final Report for Hi-Temp

Formatting appendices

Executive Summary

install quicken home and business to execute MV business from Delaware

Magarity,Amy C. 610-992-4401, or (800)964-1586, 215 West Church Road, Suite 115, King Of Prussia, Pennsylvania - 19406Macken at Fluor, formerly Engineering Manager. Ron THomas,

Regional Manager of Acres, Calgary. Cliff Umpleby of Fluor, lately Project Manager, formerly head of department of E & C group

many years ago! Otherwise try Bantrell/Bechtel web site.

Review revised confidentality

agreement with Hi-Temp

Accident Description

Deductions from Invoices

Sort Invoices by Category for Hi-

Temp Acid RoomNeeded chief

engineer then mix up on cost

Write Sec 8 of report on impurities

Call Chris Dodson about job

look up info on web, call with a plan… he is in England until end of the month

Page 47: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 0 reject 5 4/30/2002 cut and paste

0 54 done 2 4/30/2002 report and mail final draft and email

0 54 done 2 4/29/2002 library document use of Ni and NiO in solder

0 54 done 2 4/29/2002 report first draft

0 0 done 2 4/28/2002 Alchemix Patent read, sign, mail back to lawyer, then bill Alchemix

0 24 done 5 4/28/2002

0 47 done 2 4/27/2002 organize outline report & appencies, start sorting invoices by category

0 49 done 2 4/26/2002 reactivate, organizing and reading files and notes

0 56 done 2 4/26/2002 game plan? two calls and emails on gameplan

0 0 done 2 4/25/2002 take to drug store

0 57 done 2 4/25/2002 Study patent read and notes

0 57 done 2 4/24/2002 initial phone call

0 0 done 2 4/23/2002 go to bank

0 5 done 10 4/21/2002

0 0 done 7 4/21/2002

0 9 done 9 4/20/2002 review if already done, then do and send

0 0 done 5 4/18/2002 find and post

0 0 done 5 4/17/2002 has black streak, call or email company

0 0 done 5 4/17/2002 obvious

0 30 done 8 4/17/2002 email with attachment

0 20 done 9 4/17/2002 email with attachment

0 0 done 5 4/16/2002 go to Kinko's

0 0 done 30 4/15/2002 Gather data, excel program, forms, then mail

0 4 7 4/15/2002 declare Ta good or bad

0 0 done 5 4/15/2002 Look at Kchservices.com webaddress for turnkey lab

Update std subs in Mg Program

Send Superior Metals a copy of my resume and review their qualifications

Report Assignment from Will

Get Film Developed for Hi-Temp

Deposit Centura Ck in MV Palmetto

take Jefferies off of eproject

Post process as a patent disclosure

941 tax form for 9/2001Put description of

hydrogenation project on Alchemix website as a patent

disclosurecall visioneer about strobe pro

take cancelled checks to Palmetto

for creditForward confidentiality

agreement to Will Cassady and Don

McIndose for reviewSend

Confidentiality Agreement to Tim

Copy Invoices for Liberty Mutual

Personal Income Taxes for 2001

not possible

Look at specs on damaged Ta

Page 48: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 0 active 6 4/15/2002

0 21 done 10 4/14/2002 list and connect tasks on Microsoft Project

0 39 done 9 4/13/2002 find and email

0 28 done 6 4/13/2002 load old contract revise for Admiralty

0 50 done 9 4/13/2002 forward email with note

0 44 repeat 8 4/13/2002 Follow Up on Lease/Purchase equipment destroyed by explosion

0 32 done 9 4/13/2002 Let Ian Masters know that someone else is involved.

0 0 done 5 4/13/2002 FU with Mike Murphey on SNC Lavalin or other

0 15 done 2 4/13/2002 Barnes and Noble

0 12 done 9 4/13/2002 Cash in MV Palmetto Account

0 0 done 0.2 4/10/2002

0 17 done 2 4/10/2002 Reserve Car for Denver Bateman Trip

0 0 active 1 4/9/2002 Design and built Ni catalyst dryer

0 0 active 5 4/9/2002 agreement to get tailings sample

0 50 done 10 4/8/2002 Get money from Scwhab for bills

0 13 done 5 4/8/2002 401K with FD

0 50 done 9 4/8/2002 call Peter

0 26 delete 7 4/8/2002 get job to write RFP for Engineering Company

0 0 done 5 4/8/2002 Get updated contract from Will Cassidy

0 0 repeat 6 4/8/2002 Confirm cost of equipment in room at $340K

0 10 repeat 10 4/8/2002 Send out 1099 Forms

0 5 done 5 4/7/2002 test 55

0 5 done 5 4/7/2002 time to go to bed

0 0 abort 2 4/5/2002 Send Report from FASFA to Sirrine

0 10 done 10 4/5/2002 Find Engineering Company for Hi-Temp Specialty Chemical

Dick Toro, SBS 589 Foothill Road, Bridgewater, NJ 08807. Ph 908-725-3097,Fx 908-575-1593, [email protected]

Project Schedule for Hi-Temp

Send typical contract to drygas

Send typcial contract to Alex at

AdmiraltySend response to

Tim Mohen on Dynatec

get book for Olesia's BD

Balance Sheet for MV for Bill

[email protected] (Pineau, Marcel), [email protected] (Mercille, Patric),[email protected] (Pierre Duhaime), [email protected] (Patric

Mercille)

ck payment history vs. my records and obtain minimum payment, then update Quicken

Request Ok to go to Lakefield

Page 49: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 0 done 2 4/4/2002 Training class Thur Nt at Primerica

0 0 done 5 4/2/2002

0 10 done 10 4/1/2002 write report and email to [email protected]

0 5 delete 5 4/1/2002

0 0 done 5 3/31/2002

0 38 done 7 3/31/2002 Leslie Harcus, [email protected]

0 0 done 1 3/31/2002 Get battery for Computer Backup Power Supply

0 0 done 5 3/31/2002 fix resume….

0 0 done 2 3/28/2002 Letter to USC on Finances

0 0 done 2 3/28/2002 Neurologist Appoint for Allison

0 0 done 2 3/25/2002

0 0 done 1 3/24/2002 Sirrine Schloarship Deadline

0 0 done 2 3/24/2002 fu with Bian Kenet on desalination plant in southern spain

0 0 done 2 3/23/2002 Modify W2's sent out by MV

0 0 done 2 3/23/2002 Deal with error on 941 for 4th quarter

0 0 done 2 3/22/2002 Test for Insurance License

0 0 done 1 3/21/2002

0 0 done 2 3/18/2002 Send contact information to Kevin Helton of KCH

0 0 done 5 3/18/2002 Doctors appoint for Allison at 3:30 Monday, Feb 18.

0 0 done 2 3/16/2002 Get current ck balance and decide on next stock to sell

0 0 done 2 3/16/2002 Deposit $900 from Okie Account into MV

0 0 done 2 3/16/2002 Training Class on Thursday at 7:30 and video at 6:30PM

0 3 done 2 3/15/2002 Get online with FASFA with new PIN number

0 0 done 2 3/15/2002 Employee Taxes for the Month

0 50 done 9 3/12/2002 MV Income Taxes

Philip Cahill, Eng Div Manager, Virtual HRD, 41 Fitzwilliam Place, Dublin 2, Ireland looking for Project Eng job for me in Ireland

Preliminary report to Peter Alejnikov

airplane test of new screen

Go to our website at www.auburn.edu/finaid , click on 2002-2003 Forms, find Dependent Student Re-evalation, and print and

complete. Forward to the AU Financial Aid Office and we will consider your request.

Best,Bruce Kehl, MA, Technical Consultant,Spherion Workforce Architects,(780) 444-6862,Phone(780) 489-2399 Fax.

[email protected]

Mr. Odle,When you have time please call me at 1-800-800-6664 to discuss job opportunities here. Thanks, John Novak,Nesco, Tulsa,

OK.

Page 50: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 0 done 1 3/11/2002 Kids off

0 0 done 1 3/10/2002 Use new PIN for FASFA

0 0 done 2 3/8/2002 Go to PrimeAmerica Meetin

0 9 done 8 3/7/2002 Review Patent Application Again

0 9 done 5 3/7/2002 Ship Pickles

0 0 done 7 3/6/2002 financil aid for allison's college

0 9 repeat 5 3/5/2002 Basic Engineering Cu Refinery

0 0 repeat 5 3/3/2002 fluid-bed reactor design

0 0 done 5 3/3/2002 Invoice Alchemix one hour for patent review

0 50 0.5 3/3/2002 Send out job emails for the day

0 0 gave up 5 3/1/2002

0 0 done 2 3/1/2002 Ask Peter to Lunch

0 0 done 5 2/26/2002 MV Income Taxes

0 8 done 5 2/25/2002 Review CC Realestate contract

0 31 done 9 2/21/2002 Get some delivery times for scrubbers

0 11 repeat 7 2/21/2002 Employer Taxes for January

0 0 done 9 2/20/2002 Call Tim about Confidentiality Agreement

0 19 done 9 2/20/2002

0 18 done 5 2/17/2002 Dentist appointment

0 6 done 1 2/15/2002 Potential new process for hydrogenation developed by Odle

0 5 delete 1 2/14/2002 Feasibility Study

0 50 done 10 2/10/2002 Get 1099 Forms, send out

0 5 delete 5 2/10/2002 Test of date function

0 6 done 10 2/9/2002 Sign and fax certification pages on resume to Alex Krem

0 9 Done 9 2/5/2002 Arrange travel etc to Hi-Temp for Thursday morning

Active or Not

Also there is news that Kvaerner has been given a contract for a study of the Mt. Grace thermal magnesium production Process.

Please let me know if you are interested in a Eng Project Manager Position in the metal industry. Please call or email me if you are

available.Thanks, Beatta

Page 51: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 4 0 2 2/2/2002 new business opportunity

0 10 Done 10 1/31/2002

0 5 Done 5 1/30/2002 Lunch with Mike

0 5 Done 10 1/30/2002 move back into office

0 0 active 1 9/9/2001 Feasibility Study on Mg Project in Netherlands

0 51 done 2 5/20/2001 Quote get ready for visit to client, view sulfur tank and info available

0 40 done 2 5/23/2002 Client Contact

0 60 done 2 5/25/2002 Report

0 55 done 2 5/25/2002 Education download some articles on FeMn

0 55 done 2 5/26/2002 Education

0 98 done 2 5/31/2002 Admin continue contract development

0 10 delete 1 8/5/2002 fu email with Gab

0 41 repeat 2 5/27/2002

0 54 done 2 5/26/2002 Tools print and mail, set up Excel mail merge

0 54 done 2 5/27/2002 Quote send scope of service and quote to KM

0 45 done 2 5/27/2002 Entertainment Rick's for supper, buy some wine

0 55 done 2 5/28/2002 Invoice complete invoice and mail, 12 hours total

0 98 done 2 6/3/2002 Report Reviewing report and failure with Rick.

0 0 delete 2 6/6/2002 go to class

0 0 delete 5 8/30/2002

0 0 delete 2 8/25/2002 Admin Incorporate tasks into a contract for Kenet

0 98 repeat 2 7/21/2002 [email protected]

0 0 done 3 4/5/2002 Marketing FU with Nancy Ashton, offer $10k on lead process engr job

0 9 done 2 6/23/2002 Report solder report

0 56 delete 5 7/1/2002 Investigation confirm inventory damaged by tungsten or not

Hi-Temp Speciality Metals Inc, Willingboro, NJ and help insurance company

call David Benjamin, get him to send P.O. to Ok job on diagram, he agreed to send P.O. for $500 plus not to exceed $3K on extrusion

die. Call 610-497-8365.Finish report, (1) add latest pictures on copper tubes not rolled in,

(2) and add serial number and location of equipment to report from Fred's notes, email to Rick

order some books on making ferro-alloys, in particular ferro-manganese

preliminary flowsheet done

supper at Rick's house

Training Class on Saturday

call Geeta Patel, Sr. Tech Recruiter at Belcan, [email protected], phone 800-763-0404 ext 17, fax 919-783-

9249

Page 52: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 0 done 2 7/2/2002 Admin internet, maps, phone search

0 0 delete 5 5/30/2002 Marketing Periodic email looking for work

0 31 done 2 5/29/2002 Admin drive over and call 425-4400

0 11 delete 5 5/30/2002 Marketing

0 10 done 2 5/30/2002 internet, local bike shops

0 12 delete 4 5/30/2002 Marketing

0 29 done 2 5/27/2002 Tools finish Excel mail merge

0 37 done 2 5/28/2002 Admin Sign In New Sample

0 34 done 2 5/28/2002 Pictures re-enter pictures with new skills

0 98 done 2 6/5/2002 Admin switch to new computer in the office

0 38 done 2 5/28/2002 Report writing, findings and discussion mostly.

0 0 done 2 5/29/2002 Invoice updated York 18336 Invoice, faxed, took to Rick's office

0 33 done 2 5/29/2002 Client Contact

0 35 done 2 5/28/2002 Education

0 36 done 2 5/29/2002 Client Contact

0 36 done 2 5/30/2002 Marketing

0 41 done 2 5/30/2002 Admin Put contract together for short term agreement with CTL

0 43 done 2 5/31/2002 Family daughters graduation and parties

0 37 done 2 5/30/2002 Finances continue model on CTL rates

0 28 done 2 5/30/2002 Admin FU on financial form for Allison

0 17 done 2 6/5/2002 Labor assemble desk from Tate

0 0 delete 5 5/30/2002 FeMn Plant startup call phone no from Paul

0 16 done 2 5/31/2002 Admin Get info to do employer taxes from DE

0 18 done 2 5/28/2002 Education study book on 304 ss tube condenser failures

0 23 done 2 5/28/2002 Tools

Call Joe Schmidt, TRS-Calgary, 403-537-4074, contract process engr support of oil sands in Calgary, one year contract

Find Bike for Newark

prefeasibility study on ADT Process applied to residues at Hazlewood Power Plant

call Randall E. Harpold at 610-209-6343, he came by and we met Don L. Kramer Sr. that does Physical Acoutics Corp,

www.pacndt.com.

get 3 copies of magazines that use the "see Figure xx" construction.

filled out Service Conditins form for 304 ss tubes per information given and asked Fed to FU with Paul for balance of information

emails to J.W. Whellock and Harper International per Chris Dodson recommendation

start local accounting files to follow expenses. Move MV accounting to lab top

Page 53: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 37 done 2 6/3/2002 Education study book on 304 ss tube condenser failures

0 29 done 2 5/30/2002 Admin download bankcards and bankstatements endo of month

0 56 done 2 5/31/2002 Accounting update Palmetto account at home with downloads

0 49 done 2 6/3/2002 Travel returning car to Enterprise

0 43 done 2 6/3/2002 Report write conclusions section of report

0 43 done 2 6/3/2002 Admin FU on EDS for 19038 with Fred and enter in report

0 47 done 2 6/3/2002 Admin

0 47 done 2 6/3/2002 Report draw schematic of failure sequence

0 50 done 2 6/4/2002 Report 4th draft of the report

0 49 done 2 6/4/2002 Investigation continue schematic of failure sequence

0 38 done 2 6/4/2002 Report continue schematic of failure sequence

0 50 done 2 6/4/2002 Report proof read report

0 52 done 2 6/5/2002 Investigation Looking for info on extrusion dies for polyproylene. Not much found

0 51 done 2 6/5/2002 Admin Making new stensil for reports

0 49 done 2 6/5/2002 Report background info

0 50 done 2 6/5/2002 Pictures selecting and adding pictures to text

0 50 done 2 6/5/2002 Admin Prepare Invoice

0 49 done 2 6/6/2002 Pictures redo pictures in report per Rick

0 48 done 2 6/6/2002 Investigation

0 29 done 2 6/4/2002 Client Contact discuss crack failure with Charles Collins

0 48 done 2 6/6/2002 Pictures re-do pictures with Photowise and reinstall all with tables.

0 51 done 2 6/6/2002 Admin looking up grammer rules for tenses

0 18 done 2 6/4/2002 Marketing Get Emails to Investment Banks .. Mineral Dept etc

0 53 done 2 6/7/2002 Report Edit per RC comments

0 52 done 2 6/7/2002 Admin Printing Report in color

set up this program on Zip Disk to accommodate new computer, making CD to transfer all CTL files to new computer

viewing large crack near weld, Fred look at products in weld and base metal analysis vs. weld with EDS, and etch.

Page 54: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

80 80 active 5 6/30/2002 Marketing contact Art Morris

0 50 done 2 6/7/2002 Admin

0 52 done 2 6/7/2002 Admin order grammer book from Amazon.com

80 80 Active 2 7/5/2002 Admin

7 7 Active 2 6/30/2002 Finances

0 50 done 2 6/7/2002 Pictures insert pictures, cont

0 76 done 2 6/3/2002 Admin

77 77 active 1 8/5/2002 Development new process for making Mg using Japenese Pyro Process

6 6 Active 2 7/10/2002 Admin Quarterly Employer Reports

0 47 done 2 6/7/2002 Admin put together a draft of a standardized method for labeling pictures

0 31 done 2 6/6/2002 Investigation looking at weld cracks after etching

0 46 done 2 6/7/2002 Admin

79 79 active 4 8/30/2002 Development SPL model using vortec or submerged arc

0 46 done 2 6/8/2002 Admin review status of CTL venture, summarize and copy Rick

0 46 done 2 6/8/2002 Admin Set up system to evaluate progress at CTL

0 26 done 2 6/7/2002 Pictures redo pictures with Photowise and reinstall all with tables.

0 33 done 2 6/7/2002 Investigation Fred, let's cross section Crack C on Die Plate and mount.

0 23 done 2 6/7/2002 Admin Invoice

0 31 done 2 6/9/2002 Report executive summary and most of background

0 46 done 2 5/28/2002 Investigation

0 98 nuts 2 6/16/2002 test testing

0 28 done 2 6/10/2002 Pictures

0 28 done 2 6/10/2002 Report Discussion

0 52 done 2 6/11/2002 Admin take Rick's truck to Martin Mazda, call Brad with estimate

0 3 done 2 5/30/2002 Admin monthly invoicing due

discussion on verb tenses, writing down rules on verb tense agreements.

2nd Mortgage Option, 8.7% on $28K. $665 for 5 years, call Keith, CMA Mortg, 800-557-1513, ext 142. 8.7%

Correct FASFA with data from income Tax Return: 7920 PIN, 600-78-2756 SS

calling Pat Schmidt, Charles Collins, and Mike Assel at Holtec on info on crack. Not In.

put together a method for reporting from data time spent on CTL stuff that is not project specific

Look at diaphram on web site www.gotoppi.com to understand how they work

recrop some pictures, two more pictures taken and imported on longitudinal crack and crack off weld

Page 55: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 32 done 2 6/11/2002 Editing Edited Brad's Report

0 12 done 2 6/9/2002 Report background and findings

0 17 done 2 6/11/2002 Admin jdbgmgr.exe restore this file to windows under c:\winnt\system32

0 19 done 2 6/10/2002 Investigation

0 23 done 2 6/11/2002 Investigation

0 23 done 2 6/11/2002 Investigation Looking up ECM and EDM

0 23 done 2 6/11/2002 Report Conclusion Section of Report, plus redo Executive Summary

0 29 done 2 6/12/2002 Admin invoice

0 28 done 2 6/12/2002 Admin phone calls with Paul Schmidt and Randall Harpold

0 28 done 2 6/12/2002 Admin Update Invoice on 18336 with dates

0 96 done 2 6/18/2002 Admin Invoicing for 19065 and 19069 and updating CTL Evaluation

0 19 done 2 6/12/2002 Admin Get hours from Fred on 19038

0 19 done 2 6/12/2002 Admin retrieve email and read

0 22 done 2 6/12/2002 Pictures select pictures for report

0 26 done 2 6/13/2002 Investigation

0 26 done 2 6/13/2002 Editing final edit from RAC

0 21 done 2 6/13/2002 Pictures Import pictures to report

0 24 done 2 6/13/2002 Labor install cable for email and internet access

0 24 done 2 6/14/2002 Admin

0 24 done 2 6/14/2002 Admin staff meeting to review status of accounts

0 22 done 2 6/14/2002 Editing

0 22 done 2 6/14/2002 Admin get a rental car, call arrange, wait for pickup, go to office, return

0 22 done 2 6/14/2002 Investigation review pictures with Dick Ervin

0 22 done 2 6/14/2002 Report executive summary and most of background

0 24 done 2 6/15/2002 Admin order battery for Toshiba and Logitech Mouse

Crack C on sample, stereoscope, cutting instructions. General viewing of sample as-s, viewing cross section of crack C under

stereoscopeLooking at cracks in die after cross sectioning. Very straight cracks

with oxide inside, not flux composition. Weld inlays noted, repair strategy

called Denny Robertson at RTW Pellet Plates and discuss with Fred and review cracks.

do invoicing and then redo with Rick's format, rebuild Joe's system to accommodate Rick's Invoice style.

another edit, center pictures on page and then fix other movement on other pages. Change fonts on headings to be different than last

report. Fix Master to reflect new headings.

Page 56: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 22 done 2 6/15/2002 Report Findings section write.

0 23 done 2 6/15/2002 Admin put bullet marks on conclusions

0 24 done 2 6/15/2002 Report Discussion

0 85 done 2 6/15/2002 Fun burn music CD for work

0 50 done 2 6/17/2002 Investigation looking at cracks in die plate that been opened.

0 48 done 2 6/17/2002 Report complete conclusions and opinion section of report

0 50 done 2 6/17/2002 Admin Update Invoices

0 50 done 2 6/17/2002 Editing Review report with Dick Ervin and then edit

55 55 active 5 6/30/2002 Marketing FU with Roland on Mg processing of asbestos

58 58 Active 2 6/30/2002 call Glen Asbough

56 56 active 99 6/30/2002 Development Make a demo techno-economic model for marketing

48 48 Active 2 6/29/2002 Admin mail insurance forms to Primerica

56 56 Active 2 7/11/2002 Admin health.xls get program working on new laptop

55 55 active 3 7/20/2002 Marketing Model for Pyro Hydrogenation Process

54 54 Active 2 6/30/2002 Jobs Get Security's License

53 53 Active 2 7/4/2002 Admin add "on error code" to this program

53 53 Active 2 10/10/2002 Admin Order 1099 on offical forms

52 52 active 4 6/30/2002 Marketing

43 43 Active 2 8/30/2002 Marketing

44 44 Active 2 8/30/2002 Marketing [email protected]

43 43 Active 2 7/11/2002 Admin Find and order battery for new laptop

43 43 active 6 7/30/2002 Marketing

42 42 Active 2 6/30/2002 Admin find and order battery for laptop

41 41 Active 2 7/10/2002 Admin

42 42 Active 2 7/12/2002 Marketing

call Glen Asbough. Might be able to convert work he needs into consulting work.

Phil Scotin of Process Design refered me on 9/10. Conway SC. Casting thin film metal foil. Casting steel, Ni, Cr. Hot spot refractory process. Problem with casting quality,Phone 843-349-6898. Gary

SchusterFU with Gary Vanegas of Vanaire Scrubbers, needs template made

for salesmen

Chesbar Resources Inc., John B. Yates, 416-363-1124, fax: 416-360-0728, [email protected] , has new project in Guatemala

Mathcad: figure out how to get applic to install from exe file on a drive.

FU..John Hoffman, Air Products, 610-481-0597, extruding Al using Port Hole Die Extrusion Process. Contamination of Al from Die,

need 3rd party to confirm. Allentown, PA.

Page 57: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

40 40 active 7 7/30/2002 Marketing SSMALLCMC, Scott Small

43 43 Active 2 7/30/2002 Development learn how to file a patent, for example on PM, H2 idea

### 36 Active 2 6/30/2002 Admin Oil Chg Honda

98 98 Active 2 8/1/2002 FU Bob Stevens, 864-281-0300, [email protected]

41 41 Active 2 7/15/2002 Marketing periodic followup with Superior Metals Scott Hamilton

69 69 active MV 7/30/2002 Marketing

0 7 done MV 6/18/2002 Proposal Letter committing to work for Safe Hydrogen

0 94 done CTL 6/18/2002 Editing complete editing of report

0 95 done CTL 6/18/2002 Investigation new FA, initial inspection

0 95 done CTL 6/18/2002 Investigation Looking at other tubes after cross sectioning

0 96 done CTL 6/18/2002 Editing complete editing of report

0 95 done CTL 6/18/2002 Editing another edit of the edit of the edit

0 73 done CTL 6/18/2002 Editing editing the editing

0 77 done MV 6/18/2002 Tools add code to sort by priority faster

9 9 active MV 8/14/2002 Marketing Prefeasibility study on brine process

0 86 done CTL 6/18/2002 Editing report for Brad

0 88 done CTL 6/18/2002 done checking magnification of picture with Rick

0 7 done CTL 6/19/2002 Admin final printing of report in color, 3X copies

0 96 done CTL 6/19/2002 Admin airline reservations Aug 6 to Aug 16

0 95 done CTL 6/19/2002 Investigation ck picture magnification with Fred

0 95 done CTL 6/19/2002 Editing Editing Rick's edits

0 46 done MV 6/20/2002 Admin add "on error code" to this program

0 98 done CTL 6/19/2002 Report trying to write report on diaphragms

0 96 done CTL 6/19/2002 Investigation labeling pieces on fire water system failure, viewing with Fred

0 89 done CTL 6/19/2002 Editing report for Brad

Quite a background, I would like to be interested - we do have a small SX project which might justify your involvement one

day.Good luck meantime. Send sample of model. Cheers,John McIntypre, Managing Director, LaCopper

Page 58: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 91 done CTL 6/19/2002 Investigation review new FA on compressor with Brad, bearing failure

0 7 done CTL 6/21/2002 Report Diaphram Report

0 7 done MV 6/21/2002 Ideas Met owner of Separation Technologies

0 94 done CTL 6/20/2002 Investigation finding particle imbeded in diaphragm

0 89 done CTL 6/20/2002 Report Letter report draft for GE Power

0 90 done CTL 6/21/2002 Admin find definitive article on verb tenses in paragraph

0 90 done CTL 6/21/2002 Admin Print and mail report to Epsilon on the Dies. Mail Invoice.

0 95 done CTL 6/22/2002 Report writing letter report

0 98 done MV 6/24/2002 Admin review and print draft MV contract with CTL

0 66 delete Odle 6/22/2002 Admin Sonic blue letter for refund

0 89 done Odle 6/22/2002 Admin go thru pile of bills, papers, etc. for MV and Odle

0 90 done CTL 6/23/2002 Report continue report

0 91 done CTL 6/24/2002 Investigation stereoscope found salt in threads

0 76 done CTL 6/20/2002 Investigation taking diamter of shaft and aluminum bearing

0 96 done CTL 7/16/2002 Admin correct minor error and send report to Firmenich again

0 52 done CTL 6/20/2002 Admin worklist for Fred

0 89 done CTL 6/24/2002 Admin emailing report again and phone call by Dave requesting report

0 90 done CTL 6/24/2002 Admin status report for all projects printed

0 82 done CTL 6/24/2002 Report continue report

0 89 done CTL 6/24/2002 Pictures Selecting cropping pictures, importing

0 71 delete CTL 6/20/2002 Admin Invoice

0 92 done CTL 6/25/2002 Pictures lost pictures from Fred, then continue cropping and importing.

0 90 done CTL 6/25/2002 Editing

0 30 delete CTL 7/30/2002 Admin

0 87 done CTL 6/25/2002 Investigation

edit report written by Rick on failure in York compressor in stagnant water

get Panesonic Camera fixed, call Mack Camera to verify status of camera

getting die pushed out of housing, instructions, instructions on how to cut bearing for pictures.

Page 59: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 89 done CTL 6/25/2002 Investigation new FA, initial inspection, call Bill Miller at 856-299-8665

0 89 done CTL 6/22/2002 Family make vacation plans and reservations

0 97 done CTL 6/26/2002 Editing editing report after RAC comments

0 87 done CTL 6/25/2002 Report begin report

0 91 done CTL 6/26/2002 Admin get inventories together for self and Rick

0 94 done CTL 6/26/2002 Admin Updating files on laptop from work via CD's

0 90 done CTL 6/26/2002 Admin Invoice make and send, report mailed, and emailed tonight

0 89 done CTL 6/26/2002 Investigation hose cutting

0 83 done CTL 6/28/2002 Invoice Invoice Epsilon for Diaghram Report

0 85 done CTL 6/26/2002 Investigation pictures of bearing surface and cross section

0 37 done CTL 6/30/2002 Admin get full install for Excel from Brad

0 99 done CTL 7/4/2002 Pictures insert pictures

0 89 done MV 7/4/2002 Admin instructions for "Projects Page Update" for Karen

0 58 delete Odle 7/5/2002 Finances write Exxon and find out how to give stocks to Allison

0 84 done CTL 7/1/2002 Investigation call Fred for x-section pictures

0 73 done MV 6/30/2002 Marketing Find Jim in Chile …. Chuqui

0 57 done CTL 6/30/2002 Education find and order books on the Internet on Failure Analysi

0 62 done MV 6/29/2002 Admin send off for rebate on computer, find bar code, receipt and address

### 98 active MV 8/3/2002 Admin get BU program for computer(s)

0 7 done CTL 7/8/2002 Priorities updating priorities for all projects

0 77 done CTL 7/8/2002 Investigation trying to see if rotor straight

0 8 done CTL 7/1/2002 Admin emailing report again and email by Fred requesting report

0 90 done CTL 7/8/2002 Editing reading editing from Rick

0 69 done CTL 7/8/2002 Admin printing report and invoicing

0 95 done CTL 6/30/2002 Report writing report, conclusions, discussion

Page 60: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 84 done CTL 7/8/2002 Investigation

0 74 done MV 7/8/2002 Admin contract to Julian at Pylsler Industires

### 75 Active MV 8/3/2002 Marketing Kemet recycling, find contact names on website, write email

### 96 Active MV 8/3/2002 Marketing Email Job Ads

0 99 done Odle 7/9/2002 Admin

0 94 done CTL 7/10/2002 Admin update status of all external and internal invoices

0 89 done CTL 7/9/2002 Report background section, findings

0 70 done CTL 7/10/2002 Report continue report

0 86 done CTL 7/10/2002 Admin add $10 to CTL costs for pushing out bearing

0 48 done MV 7/15/2002 Marketing

0 9 done CTL 7/12/2002 Admin printing, invoicing timesheet, etc.

0 95 done CTL 7/11/2002 Pictures organize pictures for the report, then put pictures into template

0 95 done CTL 7/11/2002 Admin

0 96 done CTL 7/12/2002 Editing incorporating Rick's input into report

0 91 done CTL 7/12/2002 Admin

0 85 done CTL 7/11/2002 Investigation look at and take weld pictures

0 67 done MV 7/11/2002 Admin followup on Handyman Computers

0 81 done CTL 7/11/2002 Investigation back ground info on nut and bolt

0 15 done CTL 7/17/2002 Report conversation with John Ely of Atofina on mechanism of failure

0 89 done MV 7/13/2002 Admin

0 97 done CTL 7/15/2002 Development trying to get Corbett's old database working

0 93 done CTL 7/14/2002 Report start report

0 54 delete CTL 7/13/2002 Admin write Visa not to pay Pc-Cillian

0 88 done CTL 7/14/2002 Planning outlining proposed agreement between CTL and MV

0 84 done CTL 7/13/2002 Planning cash flow model for proposed CTL/MV Deal

finding crack in stainless steel tubing, plan of attack after finding crack

get doctor's appoint for early August with xxx for nose burnoff, clesterol ck…

Review and update MV Website and FU on MRO's Site, and FA and CTL DSL line

quote to Dave Benjamin, initial look at sample, logging sample in, phone call, etc.

library at CTL reviewed with rick and computerized keyword data base

Pay monthly employee taxes, get Quicken up to date to compute taxes required,mailed to Julie

Page 61: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 84 done CTL 7/14/2002 Planning

0 97 done CTL 7/17/2002 Admin

0 16 done CTL 7/15/2002 Marketing FU on results from PMET on Bruce's sample

0 90 done CTL 7/16/2002 Investigation go back and look for scratches etc. on ID and OD

0 83 done CTL 7/15/2002 Report continue with discussion

0 84 done CTL 7/16/2002 Marketing

0 88 done CTL 7/16/2002 Investigation

0 25 done CTL 7/24/2002 Report writing Icehouse report

0 91 done CTL 7/18/2002 Report final pre-RAC draft

0 98 done MV 7/20/2002 Entertainment

0 93 done CTL 7/20/2002 Report

0 92 done CTL 7/20/2002 Report proof reading report to Rick

0 82 done MV 7/17/2002 Investigation reading literature on Toth, AlCl3 electrolyis, patents, etc.

0 87 done MV 7/19/2002 Report writing first draft of report

0 18 done CTL 7/25/2002 Investigation extrusion failure analysis.

0 9 done CTL 7/24/2002 Admin call John Hoffman about purchase order

0 96 done MV 7/22/2002 Report complete first draft of the report

0 96 done MV 7/23/2002 Admin

0 90 done CTL 7/22/2002 Report

0 84 done MV 7/20/2002 Report continue first draft

0 85 done CTL 7/23/2002 Admin fill out invoices

0 85 done CTL 7/24/2002 Admin fill out invoices

0 89 done MV 7/30/2002 Editing edit and proof read report, clean up headings, etc.

0 41 done MV 7/14/2002 Admin problem getting printer to work

0 76 done MV 7/14/2002 Admin

Reviewing Failure Analysis Sites, competition, ideas for CTL FA website

computer in office not working after installing PC6 old database program the prior day, no mouse, Fred tied up with Peter

FU..John Hoffman, Air Products, 610-481-0597, extruding Al using Port Hole Die Extrusion Process. Contamination of Al from Die, need 3rd party to confirm. Allentown, PA. Coming 7/25/02, sent quote asking for P.O.

microscope and general search for peracetic acid, epoxided oils, sulfuric acid corrosion of 316 stainless steel, Fred tied up with Dick

Mack Camera concerning video camera, 800-252-6225 cust no odl401 and Order 100417 , went on 5/2, called on 6/6

Conversation with Denny Robertson of RTW Pellet Co concerning report

at office out of work, searching patent database for interesting technical literature

sent copy of report to RTW Denny Robertson per Epsilon ok Dave Benjamin

get amount straight and update MV auto payments for health insurance

Page 62: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 37 done CTL 7/25/2002 Report figures, tables, infrared scan

0 37 done MV 7/20/2002 Admin quarterly employer reports

0 98 done CTL else eventuallyAdmin wrong address on Oxy Vinyl PO, redoing

0 70 done CTL 7/26/2002 Report finish draft

0 34 done CTL 7/29/2002 Admin making up a price list for FA to test on Dave Benjamin

0 92 done CTL 7/29/2002 Pictures adding pictures

0 83 done CTL 7/24/2002 Admin printing and mailing report, forgot second copy for file

0 77 done MV 7/24/2004 Report call Juian Ehlers to discuss report

0 78 done CTL 7/24/2002 Editing flexhose report

0 94 done MV 7/30/2002 Admin FU with Handyman computer on desk top repair

0 7 done CTL 8/1/2002 Admin copy of report to RAC again

0 88 done MV 7/31/2002 Admin pay more on auto insurance

0 7 done CTL 8/1/2002 Admin

0 94 done CTL 7/31/2002 Report 2nd half

0 95 done CTL 7/31/2002 Investigation verify where cracks start

0 93 done MV 7/31/2002 Admin enter payment by RAC, send to bank, update finacial summary

0 95 done CTL 8/1/2002 Report final post RAC edit

0 89 done CTL 7/31/2002 Investigation diaphragms

0 76 done MV 8/3/2002 Tools

66 66 Active MV 10/1/2002 Marketing

0 55 done CTL 8/20/2002 Programming set up DB, sent to Andrew

0 96 DONE MV 8/7/2002 Marketing change to Dynamic Financial Modeling on website

0 20 done Odle 8/5/2002 Admin add PSA test to blood test

0 98 done MV 8/2/2002 Admin TEM DFM

0 98 done CTL 7/24/2002 Investigation looking at diaphragms

print report, envelop, mail, stamps, make CD, label, get back printer going

Make new templates for Word on new compuer or download from home computer.

FU with Greg Wortman, Project manager. email [email protected], [email protected]

Page 63: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 83 done CTL 8/1/2002 Report report for air products

0 90 done CTL 8/2/2002 Report draft

0 90 done CTL 8/2/2002 Report finish draft, discussion

0 32 done MV 8/3/2002 Marketing send copy of this program to Jim Kaney

0 57 done MV 8/30/2002 Tools

0 37 delete Odle 8/3/2002 Admin find address, mail insurance forms to Primerica

0 7 done Odle 8/6/2002 Report tables for report

0 49 done Odle 8/3/2002 Finances

0 9 done CTL 8/9/2002 Report editing report

0 95 delete CTL 8/7/2002 Report complete supplemental report

0 96 done CTL 8/7/2002 Report writing report

0 96 done CTL 8/7/2002 Admin resent report to Ely

0 75 done CTL 8/8/2002 Report rewriting report

0 76 done CTL 8/9/2002 Report drawing diagram

11 11 Active MV 10/30/2002 Programming add HCl analysis to raw material analysis

21 21 Active MV 10/30/2002 Programming add extra MgO to Purification, add option in MgO Feed subroutine

0 96 done CTL 8/12/2002 Editing finish editing post RAC

0 97 done CTL 8/12/2002 Admin

0 25 done CTL 8/22/2002 Programming

0 62 done CTL 8/7/2002 Admin Invoice to Air Products

50 50 Active MV 11/4/2002 Networking [email protected]

0 72 done CTL 9/4/2002 Customer talking with Dave about die. Find machinist for cutting die.

0 52 done CTL 8/30/2002 Admin get options for DSL for CTL

0 78 done MV 8/13/2002 Programming get heat exchanger subroutine in leaching circuit working

48 48 Active MV 11/4/2002 Networking

Update this program to track items actually invoiced..convert HRS colmn into "I" for invoiced and then sort against on project page

call Exxon Shareholder Investment Program Statement, for account 3300-624-5900 at 1-800-252-1800 for Transfer to Allison M. Odle. Give her 120 of 121 shares for college.

print report, envelop, mail, stamps, make CD, label, get back printer going

set up of DB on back computer linked to my computer, begin modifying DB into 3 or more subparts

[email protected] (Fraser, Kevin), referred to Dr. Bert Wasmunc the manager of non-ferrous with phone number 905-403-3917

Page 64: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 91 done MV 8/12/2002 Programming find out where I am in the programming

0 18 done CTL 8/22/2002 Investigation looking for information on Kraft Black Liquor

0 18 done CTL 8/22/2002 Investigation conversation with Brian, view new samples, etc.

0 97 done MV 8/13/2002 Programming Purification Subroutine Write

0 99 done MV 8/14/2002 Programming Purification Subroutine Debug

0 16 done CTL 8/22/2002 Admin

0 8 done 2 8/14/2002 Admin negotiations with CTL

0 45 done MV 8/30/2002 Admin Order printer cartridges for MV Printer

0 63 done CTL 9/10/2002 Admin

0 21 done CTL 8/25/2002 Programming

0 54 done MV 8/15/2002 Finances enter $10.50 meal on 6/10/02 evening at Sport Bar

0 68 done Odle 8/14/2002 Admin make appointment for Dr. Bridgeman

97 97 Active MV 11/15/2002 FU

0 74 done Odle 8/15/2002 Admin

96 96 Active CTL 10/7/2002 Admin order cartridges for Allison's new printer

33 33 Active MV 11/4/2002 Networking

0 98 done CTL 8/23/2002 Programming

0 50 done CTL 9/5/2002 Customer find machinist for cutting die, email to Dave Benjamin on shop

0 44 done CTL 9/3/2002 Report

0 99 done CTL 8/23/2002 Report setting up computer and paper file folders and begin report

0 99 done CTL 8/23/2002 Investigation

0 99 done CTL 8/23/2002 Marketing

0 99 done CTL 8/25/2002 Programming

0 30 done CTL 8/28/2002 Report letter report to Chalmers & Kubeck, Inc.

68 68 Active MV 10/30/2002 Programming PctSlds_thick2 fix label for variable in FMEB

finding out what has been going on, talking, reading emails, talk with Bob Brown about potential Magcorp job

call QSL for quote, general admin work catching up on time keeping and emails

get rid of duplicates in company database and build companyID key.

Scott Small, July needs help on project, (405) 330-1276, called 7/18/02

Wachovia Customer security relations at 1-888-254-0990 regarding info req for

Phil Scoggins at 879-8033 Process Design Off Highway 101 on Proposal for Techno-Economic Model.

filling in timesheet and setting up system to track hours under new agreement with CTL

writing report mostly with some interaction with Fred on other projects and customers

looking at cracks in blackened piece, found Kraft process in Nalco water book

looking at failed plastic bushing with Joe, can we tell if it was abused or bad material? Need more history

setup Contact Database, ready for Andrew to link with company DB. Added company lookup column.

Page 65: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 38 done CTL 9/4/2002 Report

0 28 done CTL 8/29/2002 Investigation viewing SCC in 316 ss in flow enhancers

0 28 done CTL 8/29/2002 Report letter report to Chalmers & Kubeck, Inc.

76 76 active MV 12/1/2002 Marketing xmas cards Raymond Mastascuso FU on cobalt and Mg jobs

0 28 done CTL 8/29/2002 Pictures selecting pictures

0 28 done CTL 8/29/2002 Report complete report

0 95 done CTL 8/26/2002 Admin review emails, update timesheet, set priorities for the day

0 27 done CTL 8/29/2002 Pictures contact Brian Hersey and pictures

0 31 done CTL 9/4/2002 Customer

0 26 done CTL 8/29/2002 Report Report

0 92 done CTL 8/26/2002 Investigation

0 91 done CTL 8/26/2002 Report

0 91 done CTL 8/26/2002 Marketing

0 92 done CTL 8/26/2002 Marketing

0 92 done CTL 8/26/2002 Marketing

0 89 done CTL 8/27/2002 Marketing John Magee, 416-363-1124 Chesbar Associates, Inc.

0 90 done CTL 8/26/2002 Marketing

0 90 done CTL 8/28/2002 Admin emails, read mineral news, etc. Give Fred his assignments.

0 90 done CTL 8/27/2002 Admin emails, priorities, etc

0 90 done CTL 8/27/2002 Report writing on report, literature on chlorates on 304 and 316 stainless

0 90 done CTL 8/27/2002 Investigation

0 90 done CTL 8/27/2002 Investigation looking at black coating under SEM and at cracks under optical

0 90 done CTL 8/27/2002 Marketing

0 90 done CTL 8/27/2002 Investigation review new job with RAC Ag on Al ring

Writing with some interactions with this customer and Epsilon and Krier Foods

talking with Bruce Krier at Krier Foods on his 316 corrosion problem. Diagnosis of problem

finding and then reading literature on cracking of 316L in caustic solutions

begin writing report background on Kraft black liquor and cracking of 316L stainless by caustic

John Magee, Chesbar Associates, Ni-Co Laterites, Guatemala, magnesium side stream, MgCl2 vs. MgSO4

Patric Adams, 909-352-6510 baghouse using gavalum metal, replaced transite asbestors with cement board. Condensate on outside, probably inside..

Greg Alexander, 585-624-5511, Rochester, NY. Sabin Metals, General Manager now looking for work.

Randy T. Klein,, 306-652-9422 (242-1554 fax) swine pin failure and galvalume

looking at cross sections see if tubes rolled or not, plus found some ID cracks

calls from Mark Elder Dept of Justice, from John Megee Chesbar Industries, Patric Adams Kiln company

Page 66: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 90 done CTL 8/28/2002 Investigation SEM with Fred on residues on Al ring

0 90 done CTL 8/28/2002 Marketing

0 90 done CTL 8/28/2002 Client call to UCF Americas with Joe over a bushing failure, potential FA

0 90 done CTL 8/28/2002 Investigation review of results on aluminum/silver analysis

0 12 done MV 8/30/2002 Marketing Get new contract with Alchemix, call Kelly

0 11 delete 2 10/30/2002 Finances

0 71 done CTL 10/4/2002 Admin emails, timesheet from yesterday

0 23 done MV 8/31/2002 Programming

11 11 done CTL 11/1/2002 Programming get Odle resume added to CTL website

0 69 done CTL 10/4/2002 Report writing executive summary, formating report, and proof reading

0 40 done CTL 8/30/2002 Admin

10 10 Active MV 10/30/2002 Programming Add H2SO4 to liquids list

0 67 done CTL 10/4/2002 Report writing excecutive summary for report

0 9 done CTL 9/8/2002 Report mostly writing report for USFilter

0 83 done CTL 9/9/2002 Report mostly writing report for York

76 76 active MV 11/30/2002 Marketing use their site http://www.dgpa.com/ to improve MV website

0 9 done CTL 9/5/2002 Report mostly writing Chalmers report

0 79 done CTL 9/6/2002 Investigation QSL sample in, cutting first viewing

75 75 Active Odle 2/15/2003 Finances

0 80 done CTL 9/6/2002 Report Mostly writing report

61 61 Active MV 1/8/2003 Marketing

62 62 Active MV 11/4/2002 Networking [email protected]

61 61 Active CTL 10/30/2002 Admin get MV website linked to CTL

61 61 Active MV 11/4/2002 Networking [email protected]

62 62 Active MV 11/4/2002 Networking [email protected] in charge of sales in South America

response to Access, Inc engineering company after reading site info

get refund for Jumbo Corporation from Palmetto for bad charge of $44.10, send letter to Palmetto on 7/18/02

find out why acid from thickener prior to purification has an oscillating acid conc discharge

 1842 operator Bettie, Conf ID Comnewmw, cancellation number is 302-656-3370, $9.95/mo for three months, cancel anytime for fee, less than $1 franchise fee and taxes. other number 610-323-6400 or 610-828-3932

get form from High School Counselor for student aid report for Sirrine Schloarship

[email protected] FU with Brian Kenet on his desalination project

Page 67: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 24 done MV 9/30/2002 Investigation looking for distribution coefficients for ferromanganses slags

0 99 done CTL 9/11/2002 Admin send denny a copy of 19065 supplemental

0 98 done CTL 9/11/2002 Admin call machine shop to schedule cutting

0 15 done CTL 9/17/2002 Client mostly proposal to Ablemarle

0 77 done CTL 9/5/2002 FU send hard copy

0 89 done CTL 9/10/2002 Editing

0 89 done CTL 9/10/2002 Investigation steel forging for defects

0 89 done CTL 9/10/2002 Admin

0 92 done CTL 9/11/2002 Investigation steel forging for defects & phone calls

0 92 done CTL 9/11/2002 Investigation trip to machine shop

0 92 done CTL 9/11/2002 pictures start report

0 41 done CTL 10/4/2002 Consulting proof reading report for Rick

0 7 done CTL 9/18/2002 Pictures pictures for report

0 7 done CTL 9/18/2002 Report write report

0 7 done CTL 9/18/2002 Marketing update type of reports document

0 92 done CTL 9/12/2002 Admin PO

0 92 done CTL 9/12/2002 Admin Send report and PO to Krier. Print two copies.

0 92 done CTL 9/12/2002 Admin pick up die from G. James machine shop

0 91 done CTL 9/12/2002 Report steel elbow , experiment with short report

0 33 done CTL 10/4/2002 Investigation Die plate, looking at otherside of met sample

0 99 done CTL 10/1/2002 Admin

0 99 done CTL 10/1/2002 Admin advice on titration for Astro-Power

0 7 done CTL 10/1/2002 Investigation

0 7 done CTL 10/1/2002 Admin okay another $75 on cutting

0 90 done CTL 10/1/2002 Admin

changing present tense to past tense and other grammer changes. Transgular SCC change

print report, envelop, mail, stamps, make CD, label, get back printer going

Getting FA background from Rick on Job, signing project in, adding to Excel Log

view crack in bolt on either side of washer, plan work on SEM and cross section.

letter to QSL cancel agreement, PO to Shop, emails, instructions to Fred on bolts, some computer problems

Page 68: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 22 done CTL 10/4/2002 Admin preparation for meeting, meeting

0 97 done MV 10/2/2002 Marketing quote on Chinese Scrap Smelter for a Project Plan

0 87 done CTL 10/1/2002 Report

0 88 done CTL 10/1/2002 Admin

0 22 done CTL 10/4/2002 Admin New sample from York, find crate

0 64 done CTL 9/12/2002 Admin put email address into purchase orders

0 69 done CTL 9/11/2002 Admin call carmax about temp tags

0 69 done CTL 9/11/2002 Admin see karen about website

0 49 done CTL 10/9/2002 Pictures pictures for report

0 79 done CTLT 10/1/2002 Admin Attendance Record

0 88 done CTL 10/2/2002 Investigation instructions on washer, morning greetings

0 87 done CTL 10/2/2002 Admin go back to QSL again for Invoice, send fax

0 88 done CTL 10/2/2002 Investigation looking at bolt again with Fred, talking with Perry on phone

0 88 done CTL 10/2/2002 Admin

0 87 done CTL 10/2/2002 Report

0 87 done CTL 10/2/2002 Investigation discussing die with Dick Ervin and updating plans with Fred

0 87 done CTL 10/2/2002 Report verbal to client

0 87 done CTL 10/2/2002 Report writing and phones

0 87 done CTL 10/3/2002 Admin

0 87 done CTL 10/3/2002 Report executive summary on report

0 86 done CTL 10/3/2002 Investigation looking at the valve deciding where to cut

0 86 done CTL 10/3/2002 Pictures selecting key pictures and data for report

0 86 done CTL 10/3/2002 Marketing talking with Lili Wu on Chinese Smelter

0 86 done CTL 10/3/2002 Report writing, drawing sketch for report

0 38 done CTL 10/10/2002 Consulting helping joe reconcile acid titrations with Cl and F concentrations

writing report mostly with some interaction with Fred on other projects and customers

Itemizing request for a P.O. from QSL, also created Excel log for tracking FA jobs inhouse

call from QSL on purchase orders, change shop costs and get P.O. for day of consulting

change some details on report issued to GEMMA power on the tube. Background section.

finishing yesterday's timesheets, email, etc., also Odle's internet broke and can't fix it

Page 69: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 97 done CTL 10/2/2002 Admin miscelaneous, email, filing

0 95 done CTL 10/1/2002 Report

0 52 done CTL 10/15/2002 Field caustic tanking leaking inspect

0 52 done CTL 10/15/2002 Investigation discussing welds in die with Dick Ervin

0 73 done CTL 10/22/2002 Admin

0 30 done CTL 10/10/2002 Marketing call back Roy F. Weston on job, plan conversation, issues, pay, etc.

0 87 done CTL 10/5/2002 Admin checking timesheet for the week

0 87 done MV 10/5/2002 Marketing writing proposal for WestEast Job

0 92 done CTL 10/7/2002 Admin emails -- Dave Benjamin to get P.O.

0 92 done CTL 10/7/2002 Admin scanning document for Hawaii Report

0 92 done CTL 10/7/2002 Editing editing report for Hawaii

0 92 done CTL 10/7/2002 Admin merging report with scanned document, making PDF

0 92 done CTL 10/7/2002 Investigation new cuts on die

0 92 done CTL 10/7/2002 Investigation new cuts on valve

0 92 done CTL 10/7/2002 Marketing

0 92 done CTL 10/7/2002 Report finish report, get tensile test and alloy results from Fred

0 92 done CTL 10/7/2002 Client

0 92 done CTL 10/8/2002 Admin setting up method to track work done and status of Projects

0 92 done CTL 10/8/2002 Investigation

0 92 done CTL 10/8/2002 Investigation

0 91 done CTL 10/8/2002 Editing editing and then sending report

0 91 done CTL 10/8/2002 Editing editing and then sending report

0 91 done CTL 10/8/2002 Consulting

0 90 done CTL 10/9/2002 Admin emails, timesheet

0 90 done CTL 10/9/2002 Marketing finding out info on attrition mills, getting budgetary quote

writing report mostly with some interaction with Fred on other projects and customers

resend questions from Gemma Power to Mike Lang's AOL email address, personal email address

email to Westeast saying information is going to cost money , again.

intermal marketing of an Executive Summary form of report versus letter report

valve under microscope and actual piece to understand which part failed

looking at cracks discussing with Fred and Brad why the piece is cracking, where the crack started.

helping Joe figure out Acid, Salt mix in Astro Material and fluorosilic acid content

Page 70: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 90 done CTL 10/9/2002 Admin

0 90 done CTL 10/9/2002 Investigation spool piece, plan of attack … looking for fatigue cracks.

0 90 done CTL 10/9/2002 Investigation valve pictures reviewing with Fred, couple of new pictures needed

0 89 done CTL 10/9/2002 Editing editing report

0 89 done CTL 10/9/2002 Admin

0 98 done CTL 10/10/2002 Field help Joe with bid on inspection of caustic tank, $2500

0 95 done CTL 10/10/2002 Investigation looking a sections on die with Fred

0 83 done CTL 10/10/2002 Admin timesheets, emails

0 83 done CTL 10/10/2002 Consulting

0 82 done CTL 10/10/2002 Pictures final sort on pictures

0 82 done CTL 10/10/2002 Investigation die, new cut on major crack

0 82 done CTL 10/10/2002 Report

0 91 done MV 10/10/2002 Marketing reading reports sent by RFW

0 41 done CTL 10/24/2002 Admin

0 85 done CTL 10/11/2002 Admin emails, including email to RFW

0 85 done CTL 10/11/2002 Investigation plan for work on die with Fred

0 85 done CTL 10/11/2002 Report

0 88 done CTL 10/11/2002 Marketing call from Roy F. Weston saying the project has been put on hold.

0 88 done CTL 10/11/2002 Investigation die looking at etched weld patterns

0 88 done CTL 10/14/2002 Admin timesheets, emails

0 88 done odle 10/14/2002 Personal talking with Rich Hartnell

0 88 done CTL 10/14/2002 Pictures Epsilon Die, sorting and labeling pictures

0 88 done CTL 10/14/2002 Marketing answering an inquiry from PD about programming

0 88 done CTL 10/14/2002 Field getting ready for trip to Ecelon

0 87 done CTL 10/15/2002 Report writing report

resend report to Perry, his mail box was full, then it was too big a file. Also resent to his personal email address

compressing, sending report. Resent because Title of report was inadequate

proof reading report on stains on Chrysler vehicles, critique on content

writing report mostly with some interaction with Fred on other projects and customers

morning emails to Paul Schmidt, to 4 firms for cost of moving MV, Inc. to DE, timesheet update, fu on receipt of report by Excelon

writing report mostly with some interaction with Fred on other projects and phone

Page 71: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 96 done CTL 10/17/2002 Admin email, timesheet

0 7 done CTL 10/18/2002 Admin staff meeting

0 87 done CTL 10/16/2002 Editing

0 87 done CTL 10/16/2002 Admin making PFD mailing to QSL

0 87 done CTL 10/16/2002 Admin emails, talking

0 87 done CTL 10/16/2002 Pictures

0 87 done CTL 10/16/2002 Report writing report

0 88 done CTL 10/17/2002 Pictures going thru pictures for report

0 95 done CTL 10/17/2002 Report reviewing questions from Gemma Power on lawsuit

0 92 done CTL 10/17/2002 Report writing report

0 55 done CTL 11/1/2002 Admin new FA in

0 96 done CTL 10/22/2002 Admin

0 96 done CTL 10/22/2002 Marketing call from Weston about budget

0 96 done CTL 10/22/2002 Admin

0 95 done CTL 10/22/2002 Report start report again

0 95 done CTL 10/22/2002 Admin talking with Rick about needs around office, lab, etc.

0 81 done CTL 10/22/2002 Admin update status with Fred, email, timesheet

0 86 done CTL 10/22/2002 Editing Editing report

0 86 done CTL 10/22/2002 Admin making pfd, finding email address, cover email

0 33 done CTL 10/31/2002 Admin emails

0 94 done CTL 10/23/2002 Report continue writing

0 93 done Odle 10/23/2002 Admin look at house on St. Charles again

0 94 done CTL 10/23/2002 Client taking samples and conversation with Brian

0 95 done CTL 10/24/2002 Report adding analysis and fixing table 2

0 95 done CTL 10/24/2002 Investigation viewing crack and laps in the wolverine tube

making changes per Rick, confirming grammer and punctuation rules

few more pictures from Fred and loading and formatting pictures in report

resend report to Perry because problems with his server, sent by snail mail

failed to create a signature and address file for CTL mail, try again later

Page 72: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 95 done CTL 10/24/2002 Pictures

0 95 done CTL 10/24/2002 Report begin report

0 82 done CTL 10/23/2002 Admin

0 82 done CTL 10/23/2002 Investigation crack A etch and get pictures of same

0 21 done CTL 10/31/2002 Admin report to Hawaii

0 31 done CTL 11/1/2002 Admin sent copy of Eddy current report to Hawaii

0 15 done CTL 10/30/2002 Editing fixing report

0 15 done CTL 10/30/2002 Admin Invoices, sending out report

0 15 done CTL 10/30/2002 Admin checking all times on timesheet

0 16 done CTL 10/31/2002 Admin evaluating turnover times for FA business for October

0 16 done CTL 10/31/2002 Admin miscelanous

0 17 done CTL 10/31/2002 Client trip to Mike Lang at QSL

0 83 done CTL 10/25/2002 Admin emails, review requirements for metallurgical technician

0 83 done CTL 10/25/2002 Report begin background section

0 83 done CTL 10/25/2002 Admin typing qualifications for a metallurgical technician

0 83 done CTL 10/25/2002 Admin making invoices for QSL (3)

0 83 done CTL 10/25/2002 Investigation viewing crack and laps in the wolverine tube

0 83 done CTL 10/28/2002 Admin emails, timesheet, morning greetings

0 83 done CTL 10/28/2002 Admin description for metallurgical technican review, rewrite

0 83 done CTL 10/28/2002 Investigation grinding down inside of crack, worked slowed by Peter taking Fred

0 83 done CTL 10/28/2002 Report begin writing report for York

0 83 done CTL 10/28/2002 Investigation another tube from York, optical and specifying cuts

0 83 done CTL 10/29/2002 Investigation find Monel Thermoweld and give to Fred for EDS analysis

0 83 done CTL 10/29/2002 Admin emails, timesheet, trying to setup auto backup of timesheet

0 83 done CTL 10/29/2002 Investigation microscope on sections. Fred busy for Brad

sorting pictures and some going back to microscope and fred for different pictures, etc.

emails, timesheet, checking grammer book on some prior editing changes

Page 73: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 83 done CTL 10/29/2002 Report continue writing

0 83 done CTL 10/29/2002 Admin talking with Dave Benjamin about his report, and the delay

0 83 done CTL 10/30/2002 Admin emails, timesheet

0 83 done CTL 10/30/2002 Admin invoices, filing

0 83 done CTL 10/30/2002 Investigation more sections

0 9 done CTL 11/3/2002 Report writing

0 98 done CTL 11/1/2002 Investigation looking at thermoweld under stereoscope

0 29 done CTL 11/7/2002 Admin meeting with Anna Diaz

0 32 done odle 10/27/2002 Admin send notice to homestead

0 32 done MV 10/27/2002 Admin 941 forms

0 87 done odle 11/1/2002 Admin find 19168 file at home?

0 87 done CTL 11/1/2002 Admin timesheets, emails

0 88 done CTL 11/1/2002 Report writing report

0 88 done CTL 11/1/2002 Marketing tour of plant and lunch

0 97 done CTL 11/4/2002 Investigation

0 96 done CTL 11/4/2002 Admin two resumes reviewed

0 74 done CTL 11/4/2002 Report writing

48 48 active MV 12/2/2002 Marketing FU with Paul Casto on Access Company

0 13 done CTL 11/7/2002 Marketing

0 14 done CTL 11/7/2002 Editing editing report and emailing

0 14 done CTL 11/7/2002 Editing editing report and emailing

0 93 done CTL 11/5/2002 Admin emails, timesheet

0 93 done CTL 11/5/2002 Pictures selecting and editing pictures for report

0 94 done CTL 11/5/2002 Report writing report

0 94 done CTL 11/5/2002 Pictures reading file

witnessing pressure testing and suggesting labels instead of memory on tested tubes. Viewing pits under stereoscope

trying to set up Meeting with Bill Burton, QSL in Monroe, advertisement stuff, and map

Page 74: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 94 done CTL 11/6/2002 Pictures pictures review and edit, adding tables

0 93 done CTL 11/6/2002 Admin emails, timesheet

0 93 done CTL 11/6/2002 Editing Editing report

0 93 done CTL 11/6/2002 Admin shortening file names to get backup on CD's and then BU to CD's

0 99 done CTL 11/8/2002 Marketing meeting with Billy Burton including extra travel time

0 71 done CTL 11/7/2002 Admin email

0 16 done CTL 11/13/2002 Admin emails, timesheet

0 17 done CTL 11/13/2002 Report continue report

0 15 done CTL 11/14/2002 Admin emails, timesheet

0 15 done CTL 11/14/2002 Investigation dye penetrant, finding cracks, phone call Peter

0 14 done CTL 11/14/2002 Investigation

0 14 done CTL 11/14/2002 Report

0 89 done CTL 11/12/2002 Investigation

0 88 done CTL 11/12/2002 emails email from Benjamin for meeting first two weeks of December

0 88 done CTL 11/12/2002 Report background info sorting through

0 88 done CTL 11/12/2002 Admin sorting thru resumes from Franklin, discussing with Brad

0 92 done CTL 12/1/2002 Admin put together wish list for website

0 8 done CTL 11/14/2002 Investigation

0 87 done CTL 11/13/2002 Admin call Franklin setup interviews for two people

0 87 done CTL 11/13/2002 Investigation

0 87 done CTL 11/13/2002 Investigation

0 86 done CTL 11/13/2002 Client

0 86 done CTL 11/13/2002 Admin

0 96 done CTL 11/15/2002 Editing editing report

0 96 done CTL 11/15/2002 Admin email, timesheets

update from Rick on York fatigue meeting and continuing investigation

writing report on Monel thermoweld and reading Fontana on seawater corrosion

sample from motiva, heat exchanger tubing, initial examination, cutting etching

meeting with Derrick on new motiva sample and showing him results on two other motiva jobs

continue investigation, looking at ID crack, blunt intergranular attack with a lot of sensitization

getting info together for Rick for York meeting and discussing fatigue cracks

conversation with Gemma Power, David Jacobson, 860-659-0509 about availability for conference call tomorrow

calling Peter Blauvert, Material and Corrosion Engineer for Motiva concerning his sample, a lot of phone tag

Page 75: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 96 done CTL 11/15/2002 Admin clean up, putting old samples outside, half of working lunch

0 63 done MV 12/1/2002 Admin

0 95 done CTL 11/15/2002 Investigation

0 95 done CTL 11/15/2002 Investigation looking at sample and pictures

0 65 done 2 12/1/2002 Quote revise standard form and email, send Bruce standard contract

0 94 done CTL 11/15/2002 Admin merging RAC todo list system into my system

0 96 done CTL 11/18/2002 Investigation microcope and picutures of sample

0 96 done CTL 11/18/2002 Marketing

0 8 done CTL 11/18/2002 Admin

0 96 done CTL 11/18/2002 Marketing

0 96 done CTL 11/18/2002 Pictures preparting pictures for report

0 96 done CTL 11/18/2002 Investigation

0 66 done CTL 11/13/2002 Marketing

0 87 done CTL 11/18/2002 Admin email, timesheets

10 10 Active MV 12/30/2002 Development write up patent on recovery PM while making H2

0 89 done MV 12/9/2002 Marketing follow up with Gary Meyer for metal dust analysis real time

0 89 done CTL 12/9/2002 Investigation taking picutes, studying surface

0 82 done CTL 11/19/2002 Marketing email to Bryant Kuvakos, fu to voice mail

0 88 done CTL 11/19/2002 Admin emails, timesheet … one to Alex Krem about job in Romania

0 87 done CTL 11/19/2002 Report writing report

0 87 done CTL 11/19/2002 Investigation

0 93 done CTL 11/19/2002 Investigation trying to make sense of the fatigue failure on the boiler tube

0 98 done CTL 11/21/2002 Client call steve at Atofina

0 92 done CTL 11/20/2002 Admin emails, phone answering allocation, quote on Atofina job

0 92 done CTL 11/20/2002 Investigation metallograph and phone call to Deric

address issues in agreement with Rick including moving costs, MV work at CTL, MV work at apt. especially marketing part

looking at new sample, reading Brad's report 19030 on previous failure in same system

talking to phone machine, reading email, Bryant Kuvakos at York in San Antionio, Local area service manager at 210-496-6631 ext 600

talking with Leona F. fenningham of Exelon on contract sent to us. Don't sign.

studying Chemfree website for info on their technology before call Bob Patten, 312-750-1234, Hyatt Hotels Corporation.

going back and looking at samples from questions raised on selecting pictures

call Bryant at 210-496-6631 tubes problems in York Chiller AJ, Arthur Carr, gave us your number

trying to photograph striations and identify metal splash marks on surface

Page 76: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 92 done CTL 11/20/2002 Report converting full report to an Executive Summary only

0 92 done CTL 11/20/2002 Development

0 71 done CTL 11/20/2002 Report writing report

76 76 Active Goals 12/31/2003 Goals Write a book on my philosophies

97 97 Active Goals 12/31/2003 Goals Learn Spanish

0 12 done CTL 11/22/2002 Meeting meeting on priorities, not going out to lunch all at once, miscel.

0 12 done CTL 11/22/2002 Admin emails, one to Deric, phone time allocation for day

0 15 done CTL 11/22/2002 Investigation new sample from Derik, logging in etc

0 11 done CTL 11/22/2002 Report finishing report

0 11 done CTL 11/22/2002 Investigation

0 11 done CTL 11/22/2002 Investigation

0 84 done CTL 11/21/2002 Development

0 84 done CTL 11/21/2002 Admin emails, and phone allocation for the day

0 83 done CTL 11/21/2002 Client

0 83 done CTL 11/21/2002 Report writing report

0 92 done CTL 11/21/2002 Investigation looking at tubes and pits with Fred

0 71 done CTL 11/21/2002 Meeting in the hall meeting on priorities, house keeping

62 62 Active Goals 2/10/2003 Goals Publish Beth

62 62 Active Goals 12/31/2003 Goals get $500K for retirement

62 62 Active Goals 12/31/2003 Goals stay friends with kids and wife

0 58 done CTL 12/9/2002 Consulting Reading old reports on dies

84 84 Active Goals 3/28/2003 Goals complete Dynamic Financial Model and publish

0 93 done CTL 11/25/2002 Admin email, timesheets

0 94 done CTL 11/25/2002 Investigation looking at mounts

0 94 done CTL 11/25/2002 Client

loaded 2000 and 2001 corrosion papers onto computer, looked at two CDA disks and Special Metals CD's to see if I could download - negative.

looking at pits on top of ridges, SEM data, plans for mounts, phone with Tony Rossi

conversation with Deric on economizer tubes and then followup looking fo r data to make calc

research into wireless network, and email to PCMall about options and needs

follow up with Atofina on piping failure pumping tin metal, reading info and phone tag

call steve at Atofina, again. Phone machine and then he returned call

Page 77: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 94 done CTL 11/25/2002 Report finishing report

0 94 done CTL 11/26/2002 Investigation

0 15 done CTL 12/2/2002 Pictures selecting and editing pictures for report

0 13 done CTL 12/2/2002 Admin updating to do list

0 98 done CTL 11/29/2002 Reports splitting the report into 2 reports

0 98 done CTL 11/30/2002 Admin checking timesheet for month, then invoicing CTL

0 87 done CTL 11/27/2002 Admin emails

0 87 done CTL 11/27/2002 Admin invoicing

0 87 done CTL 11/27/2002 Editing making RAC changes

0 66 done CTL 11/27/2002 Admin sending out report

0 7 done CTL 12/2/2002 Development talking with Brad about network

0 99 done CTL 12/2/2002 Development talking with Joe about policing water for York Corp

0 63 done MV 12/13/2002 Admin start incorporation process

0 99 done Odle 12/2/2002 Finances arranging for cat neutering

0 88 done CTL 12/2/2002 Admin emails, timesheets, phone allowance

0 87 done CTL 12/2/2002 Editing editing report after splitting into two parts

0 70 done CTL 12/2/2002 Development reading about network router and sending email

0 47 done CTL 12/12/2002 Investigation Selecting vendor for Charpy, phone calls, etc.

14 14 Active MV 2/3/2003 Programming allow more user input on heat exchanger set points

0 72 done CTL 12/18/2002 Editing rewriting report

0 92 done CTL 12/3/2002 Report writing report

0 92 done CTL 12/3/2002 Development

0 92 done CTL 12/3/2002 Investigation looking at pits with Fred and later metallurgical mount

0 71 done CTL 12/5/2002 Marketing read file on stray current testimony

0 88 done CTL 12/4/2002 Meeting Discussing Ginna's, Fred's, and my new role with Rick

preparing for York Trip, then trip to see Frank Cakmakci, PMP, [email protected]

reading and sending emials to Brad on security on a wireless network

Page 78: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 88 done CTL 12/4/2002 Admin

0 88 done CTL 12/4/2002 Editing interenal edit of report

0 88 done CTL 12/4/2002 Development

0 88 done CTL 12/4/2002 Editing editing report written by RAC on ss rouging

0 88 done CTL 12/4/2002 Admin

0 87 done CTL 12/5/2002 Report writing

0 88 done CTL 12/5/2002 Investigation

0 88 done CTL 12/6/2002 Admin planning CTL job schedule for the month

0 88 done CTL 12/6/2002 Editing Editing 2 FA reports and emailing

0 88 done CTL 12/6/2002 Editing Editing report and emailing to York ?? List

0 88 done CTL 12/6/2002 Admin setting up file transfer capability for Frank Carmakci

0 88 done CTL 12/6/2002 Investigation initial pictures of shaft

0 88 done CTL 12/6/2002 Report finishing report

0 87 done CTL 12/6/2002 Investigation talking on phone with Matthew Brown, looking at other tubes

0 87 done CTL 12/8/2002 Report finishing report

0 87 done CTL 12/9/2002 Admin

0 86 done CTL 12/9/2002 Editing self-edit of report

0 86 done CTL 12/9/2002 Investigation

0 86 done CTL 12/9/2002 Admin new sample in, log in, label

0 86 done CTL 12/9/2002 Pictures training on picutes, etc with Gina

0 10 done CTL 12/11/2002 Consulting

0 88 done CTL 12/10/2002 Training explaining, showing what needs to be done on samples to Gina

0 85 done CTL 12/10/2002 Client making table for York and writing Matt Brown about background

0 85 done CTL 12/10/2002 Investigation General Chemical Testing, reading, phone calls, finding alloys, etc

0 88 done CTL 12/10/2002 Investigation looking at last condenser tubes

new sample login, unbox, send email to Tony asking for background info

editing pictures for report and reading the York file that is long on words and short on info

emails to Benjamin on rates, email to York on time in service for Saudi tubes

looking at tube after splitting. Black on top, scaling, Cu2O on land area, bottom only. Black on top

this week's assignments update, Profitability analysis for FA business

shoting pictures, learning to adjust gears in vertical band saw, cutting tubing

Reading old reports, preparing slide show, copying all files for meeting, printing handouts, making CD's. Getting literature on fatigue failure, preparing for questions.

Page 79: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 68 done Odle 12/5/2002 Health confirm appoint with Dr Bonder at 999-0075

0 79 done CTL 12/10/2002 Investigation trying to get more background info on failure, Matthew Brown

0 94 done CTL 12/12/2002 Consulting trip to Epsilon, meeting, trip from Epsilon

0 94 done CTL 12/12/2002 Consulting

0 94 done CTL 12/12/2002 Investigation call to Tony to update FA on shaft, look at sample again

0 94 done CTL 12/12/2002 Investigation looking at mounts for two cracks/corrosion on lands

0 59 done Odle 12/11/2002 Health

0 79 done CTL 12/12/2002 Admin cancel appointment in GSP with dermatologist

0 80 done CTL 12/10/2002 Consulting preparing slides for Epsilon Meeting

0 80 done CTL 12/11/2002 Investigation

0 80 done CTL 12/11/2002 Consulting Reading old reports on dies

0 81 done CTL 12/11/2002 Training working with Gena on stereo scope

0 81 done CTL 12/11/2002 Investigation General Chemical, defining job, phone calls, meeting with Don

0 92 done CTL 12/13/2002 Investigation follow up with Matt Brown about Service History Form

0 92 done CTL 12/13/2002 Pictures selecting pictures for report, formatting

0 92 done CTL 12/13/2002 Investigation folowup to get cross sections made, then looking at multiple grinds

0 92 done CTL 12/13/2002 Investigation

0 92 done CTL 12/13/2002 Client

0 85 done CTL 12/13/2002 Admin update on all projects with Gina and Fred

0 10 done CTL 12/18/2002 Investigation gathering additional evidence for impact theory

0 10 done CTL 12/19/2002 Report rewriting report

0 10 done CTL 12/19/2002 Admin getting work prioritized for Gina

0 11 done CTL 12/19/2002 Investigation going over new info and pictures from Gina on last tube

0 76 done Odle 12/13/2002 Admin get questions on power of attorney to John

0 76 done MV 12/14/2002 Admin incorporate in DE

Update on General Chemical, Purchase Order to Ramball, Invoice to GC, Whitker

appointment with Richard Bonder, 2:15pm, 1941 Limestone Rd, Willimgton, 999-0075

looking up alloys for General Chemical, Calling Don's voice mail, trying to find some samples from Metal Samples, Quote

helping Gena select pictures, refinding pits etc. for her to photograph

talking with Dick Ervin about Epsilon Meeting , unloading box off the truck

Page 80: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 7 done CTL 12/19/2002 Investigation discussing failure with Fred

0 83 done CTL 12/14/2002 Report writing report

0 84 done CTL 12/16/2002 Admin filling out week's time sheet, then reviewing tasks with Gina

0 84 done CTL 12/16/2002 Investigation Looking at condenser tubes with Gina

0 84 done CTL 12/16/2002 Investigation follow up with Ramball Testing and Fred

0 84 done CTL 12/16/2002 Report Letter report to General Chemical

0 84 done CTL 12/16/2002 Editing self editing report to York then submit to RAC

0 84 done CTL 12/17/2002 Admin

0 84 done CTL 12/17/2002 Investigation working with Gena to get pictures on sample

0 84 done CTL 12/17/2002 Investigation looking at microstructure with RAC, regrind (Fred), new view

0 84 done CTL 12/18/2002 Admin

0 90 done CTL 12/20/2002 Investigation looking at York Tubes

0 92 done CTL 12/20/2002 Editing redo report with Rick cmments and results on last tube

0 92 done CTL 12/20/2002 Editing Discussing report with Rick in office then followup with Fred

0 94 done Odle 12/23/2002 Finances get certified check from Bank

0 94 done Odle 12/23/2002 Finances get Power of Attorney filled out

0 11 done CTL 12/30/2002 Admin updating work list for self and Gina

0 93 done MV 12/23/2002 Finances fillout and mail article of dissolution

0 95 done CTL 12/26/2002 Editing editing report and emailing to RAC

0 95 done CTL 12/26/2002 Management

0 96 done CTL 12/26/2002 Pictures began going through pictures … a lot of bad pictures

0 86 done Odle 12/23/2002 Finances get money from Schwab

0 9 done CTL 12/31/2002 Investigation Looking at mounts for defects, plan for making cuts

0 99 done CTL 12/30/2002 Admin talking with Deric signing in new sample from Motiva

0 95 done CTL 12/30/2002 Investigation reviewing pictures made

follow up with Don Pickup, send out letters, fax copies, change letter, file, etc.

moving pictures between computers, giving Gina today's work list, email to Matt Brown

revising work list for Gina, and followup on tasks not completed during day

Page 81: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 96 done CTL 12/30/2002 Investigation reviewing pictures made

0 89 done CTL 12/27/2002 Management

0 99 done CTL 12/31/2002 Admin

0 99 done CTL 12/31/2002 Admin Invoicing for month, emails

0 77 done CTL 12/31/2002 Editing

92 92 active MV 3/3/2003 Marketing Need Mg model for business opportunity in Ohman

0 47 done CTL 1/16/2003 Investigation Reviewing findings with Fred

0 11 done CTL 1/6/2003 Editing editing York Job again, also trying to find serial number for chiller

0 99 done CTL 1/2/2003 Editing redoing report

0 99 done CTL 1/2/2003 Pictures sorting pictures for report

0 99 done CTL 1/6/2003 Editing editing report one final time

0 99 done CTL 1/6/2003 Investigation reviewing work in lab with Fred and Gina, mostly York job

0 42 done CTL 1/16/2003 Investigation Reviewing findings with Gina and Fred

18 18 Active Goals 3/28/2003 Goals get below 200 pounds in 2003

60 60 Active MV 3/3/2003 Programming need to fix instructions page

88 88 Active CTL 3/3/2003 Marketing finalize pricing strategy for FA

0 99 done CTL 1/7/2003 Admin reports sent off to York

0 99 done CTL 1/7/2003 Admin reports sent off to York

0 99 done CTL 1/7/2003 Report start report

0 93 done CTL 1/7/2003 Editing completing editing of York report

0 94 done CTL 1/7/2003 Development new phone and wireless network connection

0 10 done CTL 1/8/2003 Investigation taking another look at microstructer near failure

0 96 done CTL 1/8/2003 Report writing report

0 96 done CTL 1/8/2003 Marketing

0 96 done CTL 1/8/2003 Client

revising work list for Gina, and followup on tasks not completed during day

Network discussions, RAC, Brad, Joe. Trying to give Gina access to my files from rear computer

Reviewing report with RAC, then began editing, calling Eric who did eddy current testing

Bill Walsh, Maint Engr for 1401 Condomium in Willmington, brought by a piece of boiler tubing wanted Failure Analysis for $100

2 conversations with Otto of QSL concerning work on an agitator used in a glass plant

Page 82: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 98 done CTL 1/9/2003 Report writing report

0 7 done CTL 1/9/2003 Admin new sample in from QSL

0 99 done CTL 1/10/2003 Development reading transcripts from file on stray currents

0 99 done CTL 1/10/2003 Editing editing report and sending out

0 98 done CTL 1/10/2003 Admin attending lunch meeting after eating

0 98 done CTL 1/10/2003 Pictures going over pictures of this failure with Fred then loading in report

0 99 done CTL 1/10/2003 Investigation trying to find typical impact fatigue for 1040 steel, unsucessful

0 67 done MV 1/9/2003 Marketing sending 3 inquires to jobs on ct.monster.com

49 49 active MV 3/3/2003 Marketing update typical contract for website

50 50 Active Goals 3/30/2003 Goals own a border collie or horse

0 17 done CTL 1/16/2003 Investigation Reviewing findings with Fred and Gina

0 17 done CTL 1/16/2003 Admin update on what is going on, emails, etc.

0 17 done CTL 1/16/2003 Marketing

0 17 done CTL 1/16/2003 Pictures sorting pictures for report

0 17 done CTL 1/16/2003 Investigation looking at x-sections of tube

0 94 done CTL 1/13/2003 Report

0 94 done CTL 1/13/2003 Admin to do list and Monday morning greetings, email, etc.

0 94 done CTL 1/13/2003 Investigation looking at sections and instructions on how to cut

0 94 done CTL 1/13/2003 Admin instructions for getting rid of samples in machine shop

0 93 done CTL 1/14/2003 Editing self editing report

0 93 done CTL 1/14/2003 Admin setting up the use of lab books for FA and update on work progress

0 93 done CTL 1/14/2003 Client looking at piece to give a quote on FA on plastics

0 93 done CTL 1/14/2003 Investigation

0 72 done CTL 1/14/2003 Investigation looking at sample under stereoscope

42 42 Active MV 3/3/2003 Admin how was credit to CTL on process work booked on MV books?

talking with Waddell Engineering Company, Charles W. Coward -- not willing to pay for FA

continue report, and some general reading on fatigue failures in rotatiing shafts.

looking at X-sections on glass paddle, instructions to Gina to get a mount on the melt line.

Page 83: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

46 46 Active 2 3/3/2003 Labor fix ice maker

70 70 Active MV 3/3/2003 Marketing make new MV business cards …. Consistant marketing strategy

71 71 Active Goals 5/28/2003 Goals

0 56 done CTL 1/31/2003 Investigation discuss failure on diaphragms with Dick

0 56 done CTL 1/31/2003 Support proof-read report on sissor lift and discuss.

0 56 done CTL 1/31/2003 Program reading about Front Page

### 61 Active Odle 2/5/2003 Admin appointment with Campo for daughter

0 93 done CTL 1/17/2003 Investigation sorting diaphragms into sets

0 93 done CTL 1/17/2003 Report laying out report, bringing in selected pictures, bring writing

0 72 done CTL 1/17/2003 Investigation Motiva failure discussing with Dick

0 93 done CTL 1/18/2003 Report drawing a schematic of a finned / rifled tube

0 93 done CTL 1/20/2003 Admin weekly to do list for self and Gina, and Fred

0 93 done CTL 1/20/2003 Report finishing report and then self-editing

0 92 done CTL 1/20/2003 Pictures editing pictures for report, then adding to report

0 92 done CTL 1/21/2003 Investigation reviewing pictures with Fred and later Gina

0 92 done CTL 1/21/2003 Report writing report

0 92 done CTL 1/21/2003 Admin

0 92 done CTL 1/21/2003 Investigation trying to get more background info on failure

0 93 done CTL 1/21/2003 Admin trying to order free trial copy of "Practical Failure Analysis"

0 93 done CTL 1/22/2003 Investigation

0 93 done CTL 1/22/2003 Admin

0 93 done CTL 1/22/2003 Editing editing tenses in report

0 93 done CTL 1/22/2003 Admin

0 93 done CTL 1/22/2003 Marketing talking to McKinsey about cost estimation for moth balling a plant

0 93 done CTL 1/23/2003 Marketing talking with McKinsey about moth balling plant

Patent on processing electronic scrap to recover Cu, PM, and hydrogen

sending report again to Saudi via Fed Ex, have Gina get copies printed and CD made

reviewing SEM results with Fred asking for alternative cracks, Deric from Motiva info on cause for overloadmeeting on command chain when RAC gone, wasting office heat, and RAC one verb tense per paragraph rule. Would=past tense, Could=present tense.

writing letter, questionaire, and updating form for York Sales Managers

Page 84: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 93 done CTL 1/23/2003 Report finishing report and then self-editing

0 92 done CTL 1/23/2003 Admin estimating the economics of keeping Gina

0 92 done CTL 1/23/2003 Admin reviewing status of work, checking emails

0 92 done CTL 1/23/2003 Report writing report

0 92 done CTL 1/23/2003 Admin

0 92 done CTL 1/24/2003 Admin

0 92 done CTL 1/24/2003 Admin

0 92 done CTL 1/24/2003 Admin looking over shop samples with Fred

0 92 done CTL 1/24/2003 Report writing report

0 92 done CTL 1/24/2003 Client

0 92 done CTL 1/24/2003 Investigation diaghrams under scope

0 92 done CTL 1/27/2003 Admin emails, todo list for week, paperwork on Motiva to Gina

0 92 done CTL 1/27/2003 Admin Meeting with Brad on Gina and need for position

0 92 done CTL 1/27/2003 Investigation looking at diaphragms under stereoscope

0 92 done CTL 1/27/2003 Admin

0 92 done CTL 1/27/2003 Investigation looking at cracks in tubes

0 92 done CTL 1/27/2003 Admin training Gina on Invoicing

0 92 done CTL 1/27/2003 Admin meeting on keeping Gina

0 92 done CTL 1/28/2003 Admin

0 92 done CTL 1/28/2003 Report diaghrams report start writing

0 92 done CTL 1/28/2003 Admin making CD of invoices to give to Gina …. She has no Zip drive

0 92 done CTL 1/28/2003 Report laying out report

0 92 done CTL 1/28/2003 Investigation diaphragm, infrared, EDX

0 92 done CTL 1/29/2003 Investigation diaphragm, looking at

0 92 done CTL 1/29/2003 Admin looking at pictures, file

new sample from Motiva, talking with Deric about results on prior sample, etc.

email to Steve at York Saudi. Resending report with CTL and AOL mail.

showing new samples to Gina, instructions on as-is pictures … work update priorities

called and talked with Frank Cakmakci. Seemed upset he had not received a report on 19284. YT testing program starts mid-February. Out of town next week.

followup on accounts payable Wiltsie Construction, fax reminder first

emails, including one to Benjamin updating progress on diaphragms

Page 85: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 92 done CTL 1/29/2003 Admin looking at info for General Chemical Safety

0 92 done CTL 1/29/2003 Report writing report (Investigation not going fast enough)

0 92 done CTL 1/30/2003 Admin following up with Gina and Fred to get work done

0 92 done CTL 1/30/2003 Admin

0 92 done CTL 1/30/2003 Investigation fourier infrared on top of diaphragm, metallograph on impact

0 92 done CTL 1/31/2003 Admin invoicing seven (7) clients

0 92 done CTL 1/31/2003 Investigation email, request Fred to mount samples, look at samples

0 13 done CTL 1/9/2003 Development

0 50 done MV 1/10/2002 Finances 941 Taxes for 4th quarter for SC

0 73 done Odle 1/11/2003 Admin complete FASFA report for 2003

0 61 done CTL 2/14/2003 Development magnetic resonance, testing and talking about NY trip

0 56 done CTL 2/14/2003 Editing

0 87 done CTL 2/3/2003 Admin

0 87 done CTL 2/3/2003 Admin correct error in York report, YT on page 1 instead of YK.

0 54 done CTL 2/14/2003 Client talking with Randolph Harpold from QSL

0 85 done CTL 2/3/2003 Investigation initial look at Carrier Tubes

0 85 done CTL 2/3/2003 Investigation initial look at Motiva boiler tube, microscope mounts.

0 88 done CTL 2/3/2003 Investigation motiva finding article on caustic cracking

0 88 done CTL 2/3/2003 IMS installing Office 2000 and Front Page

0 88 done CTL 2/4/2003 Investigation SEM and metallograph on Motiva Caustic Cracking

0 87 done CTL 2/4/2003 Investigation looking at Carrier Tubes, getting EDX on deposit on ID

0 88 done CTL 2/4/2003 IMS

0 88 done CTL 2/4/2003 Client attending General Chemical Annual Safety Training

0 89 done CTL 2/5/2003 Investigation looking at pits on ID of tubes and brown coating

0 89 done CTL 2/5/2003 IMS

discussing safety meeting with Gen Chem with Fred and Joe and Scheduling at 1 PM on Feb 4 th

write letter to all York Sales personnel on sending tube failurest to CTL with standard form

editing report on diaphragms, email with more opinions, mailing report

emails, todo list for week, followup with Gina and Fred on help needed for week

serious problem with computer slowing down, fixing and downloading Service Pack 3

computer slow down still in progress, SP3 nearly installed after all night. Problem with Powerpoint discovered, freezing computer.

Page 86: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 88 done CTL 2/5/2003 Editing

0 88 done CTL 2/5/2003 Admin Editing and sending report

0 88 done CTL 2/5/2003 Admin Editing and sending report

0 88 done CTL 2/5/2003 Admin Editing and sending report

0 88 done CTL 2/5/2003 Investigation Motiva metallograph

0 88 done CTL 2/5/2003 Investigation cutting carrier tube, looking under stereoscope

0 9 done CTL 2/10/2003 Report writing report

0 87 done CTL 2/6/2003 Admin email, and problems with CTL email

0 87 done CTL 2/6/2003 Investigation

0 87 done CTL 2/6/2003 Admin get Chair at Staples and assemble

0 32 done CTL 2/14/2003 Field Engineering

0 87 done CTL 2/6/2003 Pictures getting pictures together for report

0 87 done CTL 2/6/2003 Admin

0 87 done CTL 2/6/2003 Investigation looking at new econmizer tube

0 88 done CTL 2/7/2003 Investigation economizer tube, viewing

0 88 done CTL 2/7/2003 Investigation

0 88 done CTL 2/7/2003 Investigation

0 88 done CTL 2/10/2003 Admin

0 88 done CTL 2/10/2003 Investigation looking at microhardness results on Motiva with Fred

0 88 done CTL 2/10/2003 Marketing

0 57 done MV 2/5/2003 Admin arrange for mover for GSP

0 67 done Odle 1/16/2003 Admin 1099 Report for Alex

0 75 done MV 2/7/2003 Admin W2 Forms send out

0 85 done CTL 2/10/2003 Admin followup on analysis for Carrier

0 85 done CTL 2/11/2003 Admin email, FU on backup cleanup with Gina

letter to York Sales Managers, one last clean up and then disk to RAC

call Scott Morgan about Carrier Tube and what he wants, call LTI to get EOS done on copper.

scanning and converting Gen Chem Confined Space Documents to Word

safety discussions with RAC, looking at new equip,, etc with RAC and Brad

stainless tubing lab, discussions with Fred on microhardness procedures

followup on carrier with LTI labs then to Morgan letting him know results still pending

email, to do list for week…. Calculate average time (57 days) to complete job in January

discussing call from Lester Cook on grinding wheel, from QSL, return call to Lester - he will email a picture

Page 87: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 85 done CTL 2/11/2003 Investigation Motiva economizer tube, metallography

0 85 done CTL 2/11/2003 Report finishing report and finding reading reference on caustic SCC

0 85 done CTL 2/11/2003 Admin

0 85 done Odle 2/12/2003 Admin get some chocholate for Olesia et al

0 86 done CTL 2/11/2003 Admin

0 85 done CTL 2/11/2003 Admin new york tubes in house

0 85 done CTL 2/11/2003 Report email to Scott at Carrier with results on copper analysis

0 85 done CTL 2/12/2003 Admin email from Scott at Carrier, check in with Gina

0 85 done CTL 2/12/2003 Investigation first look with stereoscope at York Tubes

0 85 done CTL 2/12/2003 Pictures looking and sorting pictures for Motiva economizer tube

0 86 done CTL 2/13/2003 Report writing report

0 86 done CTL 2/13/2003 Investigation talking to Deric about tube

0 86 done CTL 2/13/2003 Admin General Chemical on Safety Issues and Monitor

0 85 done CTL 2/13/2003 Report talking with Scott Morgan of Carrier, then talking with RAC

0 85 done CTL 2/13/2003 Editing

0 85 done CTL 2/13/2003 Editing editing report to send

0 85 done CTL 2/14/2003 Admin confined space test, movie, and related

0 85 done CTL 2/14/2003 Client meeting with Deric on New Failure

0 85 done CTL 2/14/2003 Investigation new york sample, cuts to be made, reviewing as-is pictures

0 22 done CTL 2/24/2003 Investigation viewing mounts

0 65 done CTL 2/14/2003 Finances sign up for Truck

0 21 done Odle 2/24/2003 Moving Aaron, Valerie Cooper, John Ford, Paul Hughes

0 20 done CTL 2/24/2003 Investigation viewing tubes under stereoscoope and picking features for EDX

0 20 done CTL 2/25/2003 Support proofing paper for Rick on monitoring corrosion for kiln

0 87 done MV 2/15/2003 Admin download files for Quicken

followup on carrier with LTI labs then to Morgan letting him know results still pending

showing Gina my DB for FA clients. Asked her to verify all Invoice Addresses are in DB. Moving invoicing from Excel to Access.

Motiva Report, editing, making PFD and sending Report, zipping info to Gina

Page 88: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 87 done CTL 2/16/2003 Development learning to use FrontPage, setting up webaccount

0 87 done CTL 2/18/2003 Report writing on Motiva Report, Findings section

0 87 done CTL 2/19/2003 Admin

0 87 done CTL 2/19/2003 Client

0 87 done CTL 2/19/2003 Report writing report

0 87 done CTL 2/19/2003 Investigation working with Brad and Gina on focus on stereo camera

0 86 done CTL 2/19/2003 Investigation talking with Gina on cuts on York tubes

0 86 done CTL 2/19/2003 Admin Invoicing and training Gina again, zip disk shuffle error

0 86 done CTL 2/19/2003 Client calls from Brian Hersey, miscelaneous, and getting ready for trip

0 85 done CTL 2/19/2003 Field Engineering Chiller Inspection, trip to NY

0 85 done CTL 2/20/2003 Field Engineering Chiller Inspection, trip from NY to Newark

0 85 done CTL 2/20/2003 Client talking with York personnel on chiller problems

0 85 done CTL 2/21/2003 Report downloading pictures, transferring to Zip Disk

0 85 done CTL 2/21/2003 Client

0 85 done CTL 2/21/2003 Marketing talking with Peter about an acid cooler job, potential consutling??

0 85 done CTL 2/21/2003 Client revising form for Deric Masten and Motiva's Heat Exhangers

0 85 done CTL 2/21/2003 Investigation mounts, viewing fatigure areas, viewing cut tubes

0 85 done CTL 2/21/2003 Investigation

0 85 done CTL 2/21/2003 Investigation

0 85 done CTL 2/21/2003 Investigation looking at features on large tube from Motiva with Gina

0 90 done CTL 2/25/2003 Report writing report

0 84 done CTL 2/24/2003 Pictures sorting pictures for inspection

0 99 done CTL 2/27/2003 Client

0 8 done CTL 2/27/2003 Invoicing details on invoicing to Gina

0 98 done CTL 2/27/2003 Marketing

emails, finding out what is going on, teaching Gina how to do Invoices again

conversation with Brian Hersey on two tubes. One eddy current, one deposits on outside

returning phone call Brian Hersey, email to Scott Morgan, misc email

literature search for Paller for OCP for Titanium in Sea Water Environments

getting info from Denny Dietz on two sets of tubes he sent … success on one

making a generic form for Failure Analysis in Water Heater System with high purity water

email to Joe Willson of Halliburton for FA of metal contacts (iron coated with copper and then nickel)

Page 89: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 7 done CTL 2/27/2003 Editing editing report to send

0 7 done CTL 2/28/2003 Pictures sorting pictures for report

0 7 done CTL 2/28/2003 Report writing

0 7 done CTL 2/28/2003 Editing editing report to send

0 82 done CTL 2/26/2003 Editing self editing report, then making changes from RAC

0 82 done CTL 2/26/2003 Report finishing report

0 85 done CTL 2/26/2003 Investigation

0 87 done CTL 2/27/2003 Admin catch up on timesheet, email, Gina Assignments

0 87 done CTL 2/27/2003 Report complete report, background and summary

0 32 done CTL 3/10/2003 Admin weekly to do sheet for RRO, Gina, Fred … discuss with Gina

0 20 done CTL 3/5/2003 Investigation new tube from Motiva discussing with Deric

0 27 done CTL 3/7/2003 Support

0 26 done CTL 3/7/2003 Investigation looking at mount on Motiva, and ID cracks

0 17 done CTL 3/7/2003 Editing self editing report, modifying for de-ionized water on id

0 20 done CTL 3/7/2003 Admin wish list discussions, allocation

0 20 done CTL 3/7/2003 Client talking with Ely about failure analysis

0 20 done CTL 3/7/2003 Client

0 69 done MV 3/2/2003 Development buy receivers for Internet connection

0 85 done CTL 3/2/2003 Admin send Nadeau a copy o f inspection report and invoice

0 85 done CTL 3/3/2003 Admin weekly to do sheet for RRO, Gina, Fred

0 85 done CTL 3/3/2003 Admin ordering Internet connection for internal office move

0 85 done CTL 3/3/2003 Editing completing editing on report and sending

0 85 done CTL 3/3/2003 Editing completing editing on report and sending

0 86 done CTL 3/3/2003 Investigation instructions on how to cut sample

0 86 done CTL 3/3/2003 Investigation

discussing heater failure with Scott R. Taylor of PG&E National Energy Group, then sample sign in

getting instructions on how to get to PLO for pickup of oven, company called, Brad stopped in

talking with RAC about failure analysis from York and litigation case with broken bolts, misc.

looking at tubes, instructions to Gina/Fred on sampling/analysis of CuO/Cu2O flakes

Page 90: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 86 done CTL 3/3/2003 Client

0 86 done CTL 3/4/2003 Admin email, in particular another email to Deric on info for latest pipe

0 86 done CTL 3/4/2003 Investigation looking at tubes again

0 86 done CTL 3/4/2003 Admin getting glitches out of file transfer to Gina via netscape

0 86 done CTL 3/4/2003 Report begin report

0 86 done CTL 3/5/2003 Development Wish List development. Talk with Fred, Gina on Met Lab

0 86 done CTL 3/5/2003 Investigation viewing tubes under stereoscoope before and after cleaning

0 84 done CTL 3/5/2003 Pictures cropping, editing pictures for report, adding EDX analysis to tables

0 84 done CTL 3/6/2003 Admin email and setting up my computer for the move to the new office

0 84 done CTL 3/6/2003 Report writing report

0 84 done CTL 3/6/2003 Investigation looking at large tube from Motiva after cuts made

0 96 done CTL 3/10/2003 Client

0 94 done CTL 3/10/2003 Editing editing report to send

0 88 done CTL 3/10/2003 Investigation looking at tubes again

0 87 done CTL 3/10/2003 Pictures looking through pictures and analysis files

0 88 done CTL 3/10/2003 Investigation talking with Brian about failure

0 72 done CTL 3/10/2003 Client followup with Lloyd to see if he is okay with report

0 72 done CTL 3/10/2003 Admin follow up with Gina on report for Dave Benjamin

0 72 done CTL 3/10/2003 Client meeting NACE call

0 97 done CTL 3/12/2003 Literature looking up Poultice corrosion, reading

0 97 done CTL 3/13/2003 Pictures writing report

0 97 done CTL 3/13/2003 Client

0 93 done CTL 3/13/2003 Investigation

0 89 done CTL 3/13/2003 Support reviewing work with Rick on FA Protocol for Crane Litigation Case

0 89 done Odle 3/12/2003 Admin setting up Carmax

sending Woodring copy of Inspection report in NY along with scanned invoice, miscel

email and then later talking with Brian Hersey about copper removal from LiBr solutions

sending prices to John Ely for one full investigation $3K and one Exec Summary at $2K

stereoscopic examination and mounting instructions for Gina and Fred

Page 91: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 67 done CTL 3/11/2003 Pictures sorting and editing pictures for report

0 70 done CTL 3/11/2003 Support discussing segregation in stainless steels for Taylor Forge

0 70 done CTL 3/11/2003 Client follow up email with Brian on Ion Exchange for copper removal

0 69 done CTL 3/11/2003 Client look up and send attendants on die meeting to Dick Ervin

0 67 done CTL 3/11/2003 Investigation

0 67 done CTL 3/11/2003 Literature

0 66 done CTL 3/11/2003 Report writing report

0 65 done CTL 3/11/2003 Admin

0 65 done CTL 3/12/2003 Report writing report

0 64 done CTL 3/12/2003 Investigation stereoscopic examination

0 13 done CTL 3/24/2003 Pictures adding rest of pictures to report

0 37 done MV 2/15/2003 Admin register with Delaware, need WH taxes for Jan and Feb

0 11 done MV 3/24/2003 Admin taking care of Golden Rule MSA screw up

0 11 done CTL 3/24/2003 Admin discussing FA rates with RAC

0 62 done CTL 3/14/2003 Investigation viewing mounts, tubes, etc.

0 62 done CTL 3/14/2003 Investigation reading report and then reviewing with Dick Ervin

0 62 done CTL 3/14/2003 Pictures editing pictures with report

0 61 done CTL 3/17/2003 Admin project to do list update, emails, gina's work list

0 60 done CTL 3/17/2003 Report writing report

0 58 done CTL 3/17/2003 Admin send Invoice to York

0 57 done CTL 3/17/2003 Investigation viewing mounts, tubes, etc.

0 57 done CTL 3/17/2003 Admin

0 55 done CTL 3/17/2003 Support sign off on segregation in Taylor Ford Sample

0 55 done CTL 3/17/2003 Admin call from Taylor xxx of Energy and Process for 4 pm appointment

0 56 done CTL 3/18/2003 Admin did metal analysis for part …al or Fe …

looking at tubes again, also calling Brian about background questions

reading article on corrosion from stress related problems via manufacturing of Cu tubes enhanced

new tubes in reading documentation, looking at tubes, getting Gina started

new sample coming in from Tony Pace, send him a form to complete on a mechanical failure

Page 92: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 55 done CTL 3/18/2003 Investigation more tubes on York and 3 emails and one phone conversation

0 53 done CTL 3/18/2003 Client quoting job for Carrier, Scott Morgan

0 77 done CTL 3/24/2003 Report writing report

0 51 done CTL 3/19/2003 Admin emails

0 50 done CTL 3/19/2003 Client written quote to PG&E

0 49 done CTL 3/19/2003 Editing editing report and sending to York

0 49 done CTL 3/19/2003 Report finishing report

0 49 done CTL 3/19/2003 Admin computer problems so moved offices

0 68 done CTL 3/24/2003 Admin

0 68 done CTL 3/24/2003 Investigation looking at tubes for mounts, etc.

0 46 done CTL 3/20/2003 Admin moving office continued

0 45 done CTL 3/20/2003 Admin making PDF file and sending report out

0 45 done CTL 3/20/2003 Editing editing Motiva report, printing, sent to RAC

0 44 done CTL 3/20/2003 Pictures begin pictures editing

0 43 done CTL 3/20/2003 Investigation looking at ID and OD on tubes that did not fail

0 42 done CTL 3/21/2003 Admin emails, getting network up

0 41 done CTL 3/21/2003 Investigation York OK tubes choose tube for mounting

0 40 done CTL 3/21/2003 Investigation look at Motiva tubes

0 39 done CTL 3/21/2003 Pictures edit pictures add to report

0 40 done CTL 3/21/2003 Admin biling issues, discussing York over-run

0 49 done CTL 3/24/2003 Admin

0 37 done CTL 3/24/2003 Admin

0 37 done CTL 3/24/2003 Admin putting together weeking to do list, talking with Gina, RAC

0 36 done CTL 3/24/2003 Admin email with form to Matt Brown, revised form

0 56 done CTL 3/27/2003 Admin

meeting with Brad and Rick discussing use of Internet, Email and Management of People

Looking at York Tubes, requiesting background from Matthew Brown

wireless network not starting up after disconnect for weekend, emails

email and review today's assignments with Gina … verbal reinforcement of priorities

Page 93: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 54 done CTL 3/27/2003 Client

0 53 done CTL 3/27/2003 Literature looking up reference on Monel

0 52 done CTL 3/27/2003 Editing

0 51 done CTL 3/27/2003 Editing reviewing editing by RAC, editing, and sending

0 18 delete CTL 3/24/2003 Client quote to Tony Pace on job

0 17 done CTL 3/24/2003 Admin formal quote to John Ely, revised Typcial Formal Quote

0 29 done CTL 3/25/2003 Admin email, timesheet

0 29 done CTL 3/25/2003 Management helping Gina on layout for York Pictures

0 29 done CTL 3/25/2003 Investigation looking at new York tubes after splitting

0 41 done CTL 3/27/2003 Investigation looking at more tubes under stereoscope

0 27 done CTL 3/26/2003 Admin finding report for litigation case, email

0 27 done CTL 3/26/2003 Investigation review previous El Paso Job pictures with Gina

0 27 done CTL 3/26/2003 Support editing paper from RAC on ss rouging

0 27 done CTL 3/26/2003 Pictures editing pictures for report

0 54 done CTL 3/31/2003 Admin morning emails, ToDo List for Week

0 54 done CTL 3/31/2003 Management training Gina to operate this program

0 54 done CTL 3/31/2003 Admin updating invoice, emailing, reprinting

0 55 done CTL 3/31/2003 Report writing report

0 31 done CTL 3/28/2003 Editing editing report with RAC comments

0 31 done CTL 3/28/2003 Admin

0 58 done CTL 4/1/2003 Report writing report

0 59 done CTL 4/2/2003 Investigation viewing mounts of under-deposit corrosion

0 60 done CTL 4/2/2003 Report finishing report

0 61 done CTL 4/2/2003 Admin sending out report

0 52 done CTL 4/2/2003 Admin email, tasks for Gina

redo quote to John Ely for two jobs, third one no quote pending receipt of sample

discussing revisions, rewriting, looking up info on brass brushes from Goodall

getting old invoices together for RAC, disk and computer problems with Gina

Page 94: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 69 done CTL 4/3/2003 Admin times checking for invoicing York Job

0 61 done CTL 4/3/2003 Admin emails from York mostly, coordinate Gina helping Brad

0 62 done CTL 4/3/2003 Pictures

0 63 done CTL 4/3/2003 Admin receiving new tubes from Ottawa

0 70 done CTL 4/4/2003 Support discussing with Brad new Metallurgist and new Corrosion Engineer

0 70 done CTL 4/4/2003 Report finishing report

0 66 done CTL 4/4/2003 Editing editing and sending report to Motiva

0 61 done CTL 4/4/2003 Admin email, review outstanding tasks for Gina, assign new ones

0 69 done CTL 4/7/2003 Admin Weekly ToDo List Update, Gina Update, emails

0 69 done CTL 4/7/2003 Investigation stereoscope viewing of samples

0 70 done CTL 4/7/2003 Admin

0 73 done CTL 4/7/2003 Investigation looking at pipe, instructions for Gina

0 81 done CTL 4/8/2003 Pictures editing pictures for report

0 75 done CTL 4/8/2003 Literature

0 75 done CTL 4/8/2003 Investigation looking at waterbox pieces, making pictures

0 77 done CTL 4/9/2003 Admin emails, Gina todo list

0 78 done CTL 4/9/2003 Pictures edit pictures add to report

0 83 done CTL 4/9/2003 Investigation looking at mounts before and after polishing

0 86 done CTL 4/10/2003 Investigation looking at microstructure and top layer for cavitation damage

0 86 done CTL 4/10/2003 Client

0 89 done CTL 4/10/2003 Pictures editing pictures for report

0 76 done CTL 4/10/2003 Admin

0 53 done CTL 3/25/2003 Admin updating work list for Gina

0 54 done CTL 3/25/2003 Report writing report

0 95 done CTL 4/24/2003 Admin moving band saw for better access

putting together pictures for report, editing same, transferring files from back computer twice, getting missing pictures made

setting up a dedicated directory for York Reports, moving PDF files, and relabeling names for quick access

reading about cavitation corrosion, erosion, metal dusting, carbohyrazine, etc.

email letter to York on El Paso job …. Thoroughness versus efficiency

emails, review work for the day with Gina …. Loan to David not needed

Page 95: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 57 done CTL 3/26/2003 Investigation looking at tubes on stereoscope

0 84 done MV 3/29/2003 Development changing this program to handle variable category and time formats

0 15 done CTL 4/15/2003 Admin

0 16 done CTL 4/15/2003 Investigation looking at tubes to recall prior conclusions, work, etc.

0 17 done CTL 4/15/2003 Investigation looking at tube under stereoscope, taking notes

0 18 done CTL 4/15/2003 Investigation email to Edy, questions. Also ask fred to analyze residue

0 65 done MV 4/8/2003 Admin pay IRS withholding taxes for 1st Quarter

0 75 done CTL 4/11/2003 Admin morning emails, Gina update

0 76 done CTL 4/11/2003 Investigation

0 77 done CTL 4/11/2003 Report writing report

0 78 done CTL 4/11/2003 Marketing

0 79 done CTL 4/11/2003 Investigation confirming deposits are CaCO3 with chlorides, redo on SEM

0 11 done MV 4/15/2003 Development

0 80 done CTL 4/14/2003 Investigation looking at shaft, taking pictures

0 81 done CTL 4/14/2003 Literature looking for literature on shaft failures

0 81 done CTL 4/14/2003 Editing

0 82 done CTL 4/14/2003 Investigation looking at tubes, SEM pictures, water analysis

0 85 done CTL 4/15/2003 Investigation looking at gear valleys and deciding on mounts with Gina

0 86 done CTL 4/15/2003 Admin sending email and report to Scott Thomas

0 87 done CTL 4/15/2003 Editing editing report with RAC Comments, checking for sulfides

0 67 done CTL 3/31/2003 Pictures inserting pictures in report

0 45 done CTL 3/28/2003 Admin emails, Gina todo list

0 47 done CTL 3/28/2003 Editing redoing report with RAC input about corrosion fatigue

0 11 done CTL 4/16/2003 Pictures editing pictures for report

0 10 done CTL 4/16/2003 Admin emails, work list to Gina

mailing invoice to Daniel for job with short email …. Need for standard procedures

looking at York Tubes, writing email to Edy requesting information on his system relevant to oxygen ingress.

email proposal, quote, and request for background for Benniett Kfare 203-299-1600 at [email protected]

changed code to allow times for active item to stay in order, maybe, nope didn’t work … prioritize funct screws order up

editing report with RAC comments, also checking for elastomeric-ceramic linings

Page 96: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 9 done CTL 4/16/2003 Investigation looking at microstructure, inclusions

0 8 done CTL 4/16/2003 Investigation

0 7 done CTL 4/16/2003 Investigation find literature on effect of manganese on corrosion of copper

0 61 done CTL 4/1/2003 Admin meeting for beginning of the year, also to update Project Book

0 65 done CTL 4/1/2003 Support

0 79 done CTL 4/2/2003 Investigation looking at tubes with RAC

0 72 done CTL 4/2/2003 Investigation

0 10 done CTL 4/17/2003 Investigation confirming crack origin with Fred

0 9 done CTL 4/17/2003 Pictures finish editing pictures for report

0 7 done CTL 4/17/2003 Investigation looking at denickelification of copper tubes

0 99 done CTL 4/17/2003 Report writing report

0 19 done CTL 4/18/2003 Admin time sheet modification, and check week

0 82 done CTL 4/4/2003 Admin

0 69 done Odle 4/5/2003 Admin enter 1099's, mortgage data, etc. for 2002 taxes

0 16 done CTL 4/18/2003 Admin

0 15 done CTL 4/18/2003 Investigation looking at bolts with RAC

0 14 done CTL 4/18/2003 Admin

0 13 done CTL 4/18/2003 Literature reading literature on effect of velocity on CuNi tubes

0 12 done CTL 4/18/2003 Report finish, about an hour finding mechanical specs for given alloy

0 11 done CTL 4/18/2003 Pictures editing pictures for report

0 91 done CTL 4/7/2003 Investigation looking for articles on boiler water, CO2, O2 problems

0 15 done CTL 4/21/2003 Admin Weekly ToDo List Update, Gina Update, only AOL emails

0 14 done CTL 4/21/2003 Editing editing and then mailing report

0 13 done CTL 4/21/2003 Investigation looking at bolts

0 12 done CTL 4/21/2003 Admin getting network on my computer up and running

talking with Edy, RAC, looking at tubes and mounts … trying to identify problem with two chillers versus others

making "A Project Setup File" and related for everyone, showing two groups

viewing borescope of plate in condenser, adding pictures to report, revising report

simplifying format for Comprehensive Report …. Getting rid of section divisions

finding and moving data from back computers to front computers via CD

set up email for self for [email protected] on back computer

Page 97: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 11 done CTL 4/21/2003 Report writing report, first couple of pictures and background

0 12 done MV 4/22/2003 Admin follow up on Golden Rule payment history

0 83 done CTL 4/8/2003 Admin letter from York, emails, status of work with Gina

0 87 done CTL 4/8/2003 Investigation looking at SS Pipe for Atofina, having sample cut and mounts made

0 96 done CTL 4/9/2003 Support proofing paper on inspection of coatings on York Chiller

0 14 done CTL 4/22/2003 Report writing report

0 13 done CTL 4/22/2003 Investigation looking at tubes with Gina, specifying mounts, SEM Analysis

0 12 done CTL 4/22/2003 Marketing followup to quote to Bennet Kfare, EE Linden Associates, Inc.

0 11 done CTL 4/22/2003 Investigation looking at bolts again, stopped too much wax

0 10 done CTL 4/22/2003 Admin staff meeting on housekeeping, then ck email and todo lists

0 92 done CTL 4/9/2003 Report writing executive summary

0 9 done CTL 4/10/2003 Report finishing report

0 79 done CTL 4/21/2003 Admin follow up with NC on not paying bill

0 10 done CTL 4/23/2003 Support

0 9 done CTL 4/23/2003 Report writing report

0 11 done CTL 4/23/2003 Admin

0 99 done CTL 5/9/2003 Editing editing report with help from RAC, discussions etc.

0 88 done CTL 4/10/2003 Support find article on metal dusting for one of Joe's clients

0 17 done CTL 4/24/2003 Report writing report and some picture editing

0 16 done CTL 4/24/2003 Marketing

0 60 done MV 5/2/2003 Marketing find note from Chemtech in older version of PM?

0 14 done CTL 4/24/2003 Admin resent email to Trillium because of problems with email yesterday

0 84 done MV 4/19/2003 Admin get Quicken up-to-date for Jan to April

0 12 done CTL 4/24/2003 Investigation looking at tubes after cleaning … a lot of salt and pepper pits

0 11 done CTL 4/24/2003 Investigation going over mounts to make on Atofina sample, looking at cut metal

comments and email on two samples from Trillium suspected of being fly ash

followup with Billy Burton on not paying, setting up Gina's computer so I can access the FA Database for contact info

quote to Tex Blackshear of Atofina, letter and attachments, edited standard letter to fit his scope of work ….. And cover email

Page 98: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 74 done CTL 3/28/2003 Investigation looking at mounts

0 60 done CTL 3/26/2003 Client

0 15 done CTL 4/25/2003 Investigation looking at mount and tube again

0 14 done CTL 4/25/2003 Literature finding and reading literature on manganese in copper tubes

0 13 done CTL 4/25/2003 Admin morning emails, reviewing Gina's ToDo List

0 13 done CTL 4/25/2003 Admin discussing computer access to Gina's computer with Brad

0 11 done CTL 4/25/2003 Report completing report and self-editing

0 93 done CTL 4/14/2003 Admin updating weekly to do list, Gina assignments, email

0 19 done CTL 4/28/2003 Investigation

0 13 done CTL 4/28/2003 Investigation looking at mounts and reading background info for Alloy 20 tube

0 12 done CTL 4/28/2003 Investigation some discussion on bolt design, looking at their report

0 93 done CTL 4/15/2003 Admin morning emails, Gina assignments

0 61 done CTL 3/28/2003 Investigation looking at tubes

0 17 done CTL 4/29/2003 Investigation bolt experiment with Fred

0 15 done CTL 4/29/2003 Support cleaning bolts with Aceton

0 14 done CTL 4/29/2003 Admin

0 13 done CTL 4/29/2003 Literature looking for properties of Alloy 20 in sulfuric acid concentrated

0 12 done CTL 4/29/2003 Admin mail

0 11 done CTL 4/29/2003 Support

0 10 done CTL 4/29/2003 Investigation looking at Atofina tubes

0 13 done CTL 4/30/2003 Investigation trying to figure out why atofina failed

0 12 done CTL 4/30/2003 Admin email and printing invoice

0 93 done CTL 4/3/2003 Client Client interactions, phone, RAC conversations, etc.

0 14 done CTL 5/1/2003 Marketing

0 13 done CTL 5/1/2003 Editing editing Carrier Report

formal quote for Tony Pace on pinion gear failure including initial viewing of sample

sending email to John Ely asking to confirm accuracy of background info received over phone

attempting to move data via CD to my computer (zip broken, network not up yet)

looking at CTL Website for FA trying to imagine how to change layout; why is right third of screen not used?

Talking with Scott Taylor followed by quote for services, gettting supplies together for trip

Page 99: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 10 done CTL 5/1/2003 Investigation bolts again undermicroscope and protocol

0 93 done CTL 4/17/2003 Investigation looking at bolts with RAC and Fred

0 19 done CTL 5/2/2003 Marketing

0 18 done CTL 5/2/2003 Investigation

0 17 done CTL 5/2/2003 Support followup with Jamie about webpage

0 15 done CTL 5/2/2003 Admin making PDF file, mailing and email to Scott Morgan

0 14 done CTL 5/2/2003 Investigation struggling with Atofina, cause for pits

0 13 done CTL 5/2/2003 Report call from Scott Morgan to talk about report and other related issues

0 12 done CTL 5/2/2003 Support

0 96 done CTL 4/18/2003 Report writing

0 24 done CTL 5/6/2003 Support

0 28 done CTL 5/7/2003 Report writing

0 13 done CTL 5/5/2003 Investigation

0 10 done CTL 5/5/2003 Investigation picking out mounts for Gina to make

0 9 done CTL 5/5/2003 Marketing Joe Rambaldi talking then trying to find Eddy Current Company

0 16 done CTL 5/6/2003 Pictures editing pictures

0 15 done CTL 5/6/2003 Investigation looking at York's Tubes with RAC and Gina

0 14 done CTL 5/6/2003 Investigation looking at mounts of tubes near land …. Manufacturing defects

0 13 done CTL 5/6/2003 Meeting Staff meeting on tracking jobs and samples

0 11 done CTL 5/6/2003 Marketing quote to Karen at Sunoco, got PO, confused

0 15 done CTL 5/7/2003 Marketing quote to Zygo for H2S Test for their probe

0 14 done CTL 5/7/2003 Investigation looking at mounts, instructions to Gina

0 13 done CTL 5/7/2003 Admin

0 12 done CTL 5/7/2003 Pictures finishing picture editing

0 17 done CTL 4/10/2003 Editing editing report with RAC comments

calling Joe Rambaldi with Firmenich at 609-452-1000 in Plainsboro, N.J. after two transfers left message on voice mail

first look at York tubes,manufacturing defect, then email to Denny Dietz to give first indications

talking with Joe, Brad and Fred about a tracking system for samples

trying to find Access Program on Internet, sent emails to several potential candidates

trip to PG&E on Dewpoint Corrosion, driving and on-site, submitting samples to Fred for EDX

response to two people that send resumes for Access Programming. Then email to IM Recruiter for resumes. Sent letter to Delaware Entreprenurial Center. Try to reset name to Odle instead of USER.

Page 100: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 17 done CTL 5/8/2003 Client conversation with John Ely on the Crosby Tubes, plant operation

0 14 done CTL 5/8/2003 Marketing

0 13 done CTL 5/8/2003 Support trying to get my compuer accessible by network

0 12 done CTL 5/8/2003 Support updating CTL Job Tracking Form per recommendations of DAVE

0 20 done CTL 4/23/2003 Admin

0 16 done CTL 5/9/2003 Support

0 15 done CTL 5/9/2003 Investigation looking at tubes for mounts

0 13 done CTL 5/9/2003 Report writing

0 8 done CTL 4/10/2003 Client

0 77 done CTL 3/26/2003 Report completing report and self-editing

0 22 done CTL 5/12/2003 Editing editing report with RAC comments, making PFD and sending out

0 40 done CTL 4/28/2003 Admin Update weekly ToDo List, Update Gina's Work List

0 20 done CTL 5/12/2003 Support problems with getting PDF file made, reinstalled?

0 19 done CTL 5/12/2003 Admin

0 18 done CTL 5/12/2003 Admin calling Mike Altmann of Sunoco regarding PO without samples

0 17 done CTL 5/12/2003 Admin

0 16 done CTL 5/12/2003 Marketing

0 15 done CTL 5/12/2003 Admin updating weekly to do list, Gina assignments, email

0 14 done MV 5/12/2003 Programming adding total of Project hours to timesheet

0 13 done CTL 5/12/2003 Support

0 12 done CTL 5/12/2003 Editing editing and then mailing report

0 30 done CTL 4/28/2003 Literature Alloy 20 use with sulfuric acid

0 28 done CTL 4/28/2003 Admin Revise fields on FA Database of Contacts

0 99 done CTL 4/28/2003 Marketing

0 38 done CTL 4/30/2003 Support

email to Michael of Zygo on work he wants done … on growing CuS Crystals

problem with email not sending out …. Started working again, ? Why

reading responses to my posting for Access Programmer, sending two emails to Deltech for student Access Programmers

updating instructions for sending tubes to CTL …. Need to push RAC to proceed with sending instructions to Salesmen

check that all invoices to York current and then mail Ottawa and any others not current, responding to Woodring on who authorized

followup with Tex Blackshear of Atofina about our bid compared to others

call from Mike P. from Zygo on our bid, then picking my brain on procedure

sending email to University of Delaware computer dept looking for student for part-time programming

talking with David Benjamin on Heat Exchanger Tubing and then sending questionaire for background

miscel including networking computers with brad, calling Jamie about website, reading email from Joe's customer

Page 101: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 18 done CTL 5/13/2003 Support showing Dave how to link ARTI Photos to data with hyperlink

0 17 done CTL 5/13/2003 Marketing follow up with Joe Rambaldi of Firminich on eddy current company

0 15 done CTL 5/13/2003 Pictures editing pictures for report

0 13 done CTL 5/13/2003 Admin getting hours together for Tracking Form since first of year

0 17 done CTL 5/14/2003 Support typing and sending out Credit Letter, signing job into book, etc.

0 16 done CTL 5/14/2003 Client calling Mike Greiman concerning failure of rail at DOW

0 15 done CTL 5/14/2003 Marketing

0 14 done CTL 5/14/2003 Investigation

0 13 done CTL 5/14/2003 Admin

0 12 done CTL 5/14/2003 Report drafting report on PG&E while waiting on SEM analysis

0 28 done CTL 5/1/2003 Management

0 27 done CTL 5/1/2003 Literature looking up basic literature on coatings to not be an idiot onsite

0 98 done CTL 5/1/2003 Investigation

0 31 done CTL 4/7/2003 Admin trying to link to Gina's DB for FA Customers

0 38 done MV 5/7/2003 Admin send off paper to get info from Carmax to register the car

0 17 done CTL 5/15/2003 Report writing report

0 15 done CTL 5/14/2003 Management

0 15 done CTL 5/15/2003 Support

0 13 done CTL 5/15/2003 Support carrying in sample, carrying box to back

0 12 done CTL 5/15/2003 Pictures editing pictures for report

0 11 done CTL 5/15/2003 Investigation

0 16 done CTL 5/16/2003 Literature

0 15 done CTL 5/16/2003 Support resending credit letter to Rick Santo at 860-704-5056

0 14 done CTL 5/16/2003 Support

0 13 done CTL 5/16/2003 Support receiving heavy box from Fed Ex for Brad and finding Dave

talking with Mike Greiman about crane rail failure and getting to know him, etc.

looking at Crane Rail pictures, sending picture back with question and generic form for background information

preparation of report on Analysis of FA Business, then 15 minutes reviewing mail and metal news

Discussing Gina's timesheet activities, level of detail, angled parking, and a few other issues during the day

Atofina microstructure … and trying to get in que on SEM for deposit analysis

editing as-is picture and talking with Gina about poor quality of picture, fixing up support board with nails.

writing emails to potential Access Programmers, later emails to top two candidates

GE Betz, Joe Boyle, (302) 438-5225, left voice mail, discussing with RAC failure, start literature search

searching literature for intergranular attack on condensers, also email to Joseph Boyle at Betz for info.

emails to a half a dozen professors at the Univ of Delaware for Access Programmers

Page 102: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 12 done CTL 5/16/2003 Client looking at expansion joint with Dick, also meeting

0 12 done CTL 5/16/2003 Investigation taling with Joseph Boyle at Betz about tubes at Epsilon

0 99 done CTL 5/16/2003 Admin

0 19 done CTL 5/5/2003 Admin signing some samples in from field trip

0 98 done CTL 5/6/2003 Marketing

0 38 done CTL 5/8/2003 Support proof reading report for RAC

0 37 done CTL 5/8/2003 Support

0 17 done CTL 5/19/2003 Admin send email and invoice to Dan and Dennis

0 16 done CTL 5/19/2003 Investigation looking at tubes for location of Fe3O4 location

0 13 done CTL 5/19/2003 Literature searching literature for when magnesite forms on a tube

0 12 done CTL 5/19/2003 Support CTL DB Overview and Email to top Access Programmer

0 36 done CTL 5/22/2003 Admin

0 18 done CTL 5/20/2003 Education

0 11 done CTL 5/19/2003 Milestone advised RAC on long term personal needs for FA Department

0 16 done CTL 5/20/2003 Management

0 15 done CTL 5/20/2003 Admin email, est. avg. price charged on FA

0 14 done CTL 5/20/2003 Management

0 13 done CTL 5/20/2003 Report writing report

0 12 done CTL 5/20/2003 Pictures adding pictures to report

0 11 done CTL 5/20/2003 Programming

0 82 done MV 5/21/2003 Client showing Joe the program for father-in-law

0 14 done CTL 5/21/2003 Admin contacting Jamie again about access to webpage

0 13 done CTL 5/21/2003 Investigation looking at mounts before etching

0 12 done CTL 5/21/2003 Report completing report and self-editing

0 12 done CTL 5/21/2003 Programming

followup on Invoice for job with Steve Heidron … then look up contact of James Stevens Heidron number is 518-464-6500 ext 16. No answer. Then restarted work, then call again

email to [email protected] recommending eddy current company

Reading emails and resumes of Access Programmers. Looking for Goldey College professors to contact.

emails, print updated Job Tracking Form, add revision, continue turning off Programmers for CTL DB

leaning how we estimate copper grain size with our metallograph, no written procedure

discussion with Gina on timesheet for last week. Why times were so long for pictures and mount. Copied notes to RAC and electronic file

followup on SEM analysis and status of equipment, call Dick Ervin to schedule meeting, Brad how much does he need Gina for day, etc., ask Gina for pictures

downloading CTL files from webpage, but, unable to upload. Ck password, etc. with Jamie

setup uploading to site, all files in sync. Trying to Max size of page, and match color of color on FA page

Page 103: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 19 done CTL 5/22/2003 Support

0 14 done CTL 5/22/2003 Support

0 13 done CTL 5/22/2003 Management talking with Gina on work plans for the day

0 11 done Odle 5/22/2003 Admin lunch

0 11 done CTL 5/13/2003 Investigation looking at mounts for tube

0 21 done MV 5/7/2003 Admin 1st quarter withholding taxes and form for Delaware

0 14 done CTL 5/23/2003 Investigation discussing results with RAC, also reviewing in lab

0 12 done CTL 5/23/2003 Support

0 11 done CTL 5/23/2003 Support

0 10 done CTL 5/23/2003 Support

0 11 done CTL 5/23/2003 Marketing

0 17 done CTL 5/23/2003 Investigation Looking at York Rail with Fred, mounts with Gina

0 16 done CTL 5/23/2003 Editing

0 15 done CTL 5/23/2003 Editing rewriting Epsilon report

0 22 done CTL 5/27/2003 Editing editing report

0 40 done CTL 5/15/2003 Client

0 12 done CTL 5/24/2003 Programming creating DB for sample tracking

0 12 done CTL 5/26/2003 Programming continuing DB development for sample entry

0 16 done CTL 5/27/2003 Admin

0 50 done CTL 5/2/2003 Investigation talking with RAC on Jean's Hospital, LiBr

0 34 done CTL 5/15/2003 Admin

0 54 done CTL 5/5/2003 Support CTL Tracking Form, Example DB, Word Form

0 43 done CTL 5/16/2003 Management discussing staffing requirments with RAC

0 11 done CTL 5/27/2003 Marketing

0 97 done CTL 5/27/2003 Admin

Brad came to discuss just adding a DB to track samples, reduce scope of automation. Xeroxed paper system to allow creation of same; reviewed again, in part with Brad

proof reading report for RAC for flexhose failure at a gas station, then looking at hose and old report

looking for Brad and then calling him at home to discuss Sample Tracking Programming, on Monday or not?

email to James Corbett on coordinating efforts on adding content while he is redesigning

Joe asked if I could automate his relabeling of reports, he had 20 reports to edit. Showed me, I said yes with a few hours of programming

phone calls with Ron from Plymouth Tube, and then joint with Southern Company

discussing report with RAC and then starting to edit, also email Scott asking for P.O.

215-339-2328 Dick Ervin, Sunoco discussing the job, machining costs, etc.

chair broke, computer wouldn't start, email wouldn't download, and Weekly ToDo List Print out

emails, review outstanding tasks for Gina; reminder on Sunoco as-is pictures before machine shop

talking with Andy Simkins, Mannington Resilant Floors about cast hammers that are failing. Looking at his digital pictures, sending him questions and background form.

send Plymouth and Southern Company an email with address, background information

Page 104: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 9 done CTL 5/27/2003 Editing rewriting Epsilon report

0 8 done CTL 5/27/2003 Education reading about Dew Point Corrosion

0 12 done Odle 5/27/2003 Support helping wife assemble chair

0 37 done CTL 5/16/2003 Investigation working with Dave to cut out sample from expansion joint

0 37 done MV 5/17/2003 Programming

0 13 done CTL 5/28/2003 Admin

0 12 done CTL 5/28/2003 Report typing data into tables from printout ….. Need to use network more.'

0 11 done CTL 5/28/2003 Pictures editing pictures for report

0 8 done CTL 5/28/2003 Support discussing protocol for tests with RAC

0 39 done CTL 5/19/2003 Support

0 15 done CTL 5/29/2003 Investigation email to Caren asking several questions about environment on OD

0 14 done MV 5/29/2003 Development reading reclaimation file to begin work again

0 13 done CTL 5/29/2003 Admin

0 12 done CTL 5/29/2003 Report writing report

0 11 done CTL 5/29/2003 Editing editing and sending report to Dan Woodring

0 99 done CTL 5/8/2003 Report writing

0 31 done CTL 5/9/2003 Pictures viewing and editing pictures for report

0 37 done CTL 5/20/2003 Milestone

0 21 done CTL 5/21/2003 Marketing

0 79 done CTL 4/28/2003 Editing

0 12 done CTL 5/30/2003 Investigation looking at deposits on scope, talking with Benjamin

0 10 done CTL 5/30/2003 Management talk with Gina on reduced hours, email to summarize meeting

0 8 done CTL 5/30/2003 Marketing

0 64 done CTL 5/13/2003 Marketing

0 63 done CTL 5/13/2003 Literature

programming Project Report to get relative profitability, misc improvements on report formats

adding a few items to Gina's worklist and printing report for file for Epsilon

trying to find info on CTL website from Brad, Jamie, back computer, etc

measure samples, request quote for radiography, discuss with Joe vs. ultrasonics

RAC decided cost of computerizing company too expensive, sent Brad to tell me

call from Ron Roth of Plymouth Tube Co at 318-388-3360 ext 3013, then Brad credit report, RAC for spoilation of evidence, called back, we got the job.

editing and then mailing report including discussions with RAC on cathodic protection principals for CuNi with ss tubesheets

call to Benjamin to get ok for more work, left voice mail. Sent email on same

followup with phone and then email to Karen at Sunoco … also send forms for background info

reading literature on condenser tube failures, oxygen attack probably

Page 105: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 40 done CTL 5/22/2003 Investigation looking at mounts and cut-out section again on Sunoco

0 18 done CTL 5/22/2003 Support

0 44 done CTL 5/23/2003 Management

0 14 done CTL 6/2/2003 Admin

0 13 done CTL 6/2/2003 Admin trying to get quotes from Lehigh and QSL on radiography

0 12 done CTL 6/2/2003 Management discussing work for week with Gina

0 11 done CTL 6/2/2003 Literature reading on capabilities of radiography for finding defects in metals

0 10 done CTL 6/2/2003 Report writing report

0 9 done CTL 6/2/2003 Investigation looking for rail sample, Gina gone

0 32 done CTL 6/4/2003 Admin

0 39 delete CTL 6/5/2003 Admin test

0 22 done Odle 5/24/2003 Admin buy tickets for AMO's visit

0 19 done CTL 6/3/2003 Management written instructions to Gina on work to be performed

0 18 done CTL 6/3/2003 Investigation email to Michael, questions on rail

0 17 done CTL 6/3/2003 Literature reading literature on hydrogen embrittlement of galvanized steel

0 15 done Odle 6/3/2003 Admin car broke down Julie

0 14 done CTL 6/3/2003 Admin cleaning off desk, filing, trash can, back to library etc.

0 13 done CTL 6/3/2003 Investigation discussion with Fred on the York rails

0 12 done CTL 6/3/2003 Management asking Fred to interview Albert M. Olszewski with me on Thursday

0 11 done CTL 6/3/2003 Management reading sample report from Albert Olszewski

0 10 done CTL 6/3/2003 Investigation

0 50 done CTL 5/28/2003 Editing editing report and making PDF file

0 49 done CTL 5/28/2003 Admin discussing hours for FA on Epsilon versus $155/hr with RAC

0 13 done CTL 6/4/2003 Client

0 12 done CTL 6/4/2003 Client

discussing webpage with Jamie, and follow up looking at website, followed by discussions with RAC

selecting cuts for mounts for Gina, see Fred about opening up other crack

talking with QSL for quote (again), getting PO, getting Map for Andrew, looking at samples, email Andy costs, getting okay, then call from Otto of QSL

trying to get drawing printouts for attachments to report, problems with inadequate RAM on computer for detailed drawings

looking at boiler tubes, two ends with fatigue, erosion on ID?, red iron oxide

calling Ron Roth from Plymouth Tube to get background on the tube, sending out forms again to him and Southern Company

contact Mike of York about rail, specs on steel, background info on rail, get Fred/Gina to get tensile test and analysis of steel

Page 106: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 11 done CTL 6/4/2003 Investigation

0 10 done MV 6/4/2003 Marketing proposal for Acid Plant

0 17 done CTL 6/5/2003 Investigation

0 16 done CTL 6/5/2003 Literature

0 15 done CTL 6/5/2003 Admin

0 14 done CTL 6/5/2003 Client

0 13 done Odle 6/5/2003 Admin wasted time trying to make sense of what RAC wants

0 12 done CTL 6/5/2003 Management

0 11 done CTL 6/5/2003 Admin

0 17 done CTL 6/6/2003 Development

0 34 done CTL 5/28/2003 Marketing

0 17 done CTL 6/6/2003 Management talking with Albert O. about job here

0 9 done CTL 6/6/2003 Marketing

0 9 done CTL 6/6/2003 Admin forgot to record activities, don’t remember

0 11 done CTL 6/6/2003 Client talk with Mike A. at York on what he wants and results so far

0 10 done CTL 6/6/2003 Investigation

0 9 done CTL 6/6/2003 Development

0 41 done Odle 5/29/2003 Admin calling lawn mower company

0 15 done CTL 5/29/2003 Admin filing emails by company, discussing cutting Gina's hours with Brad

0 34 done CTL 5/29/2003 Client

0 22 done CTL 6/9/2003 Investigation problems with cutting hammer, Rc 45.

0 11 done CTL 6/6/2003 Admin

0 20 done CTL 6/9/2003 Editing

0 19 done CTL 6/9/2003 Admin

0 18 done CTL 6/9/2003 Marketing proposal to Bud at Campbell soup

looking at tubes under stereoscope. Scouring marks, a lot of metallic debris in tube

looking at zinc coating on polished sample, need EDX for inclusions in crack

reading on hydrogen embrittlement in Volume 13, looking at CTL website …. Needs high resolution pictures (opinion)

left Terry Miller of Weirton Steel, 304-797-2891 a phone message …. Prior contace with Bob Goodhart with GalFan… HIC

mini-report via email to Mike concerning status of investigation, requesting his feedback

interview with Albert M. Olszewski and preparation, 585-905-8399, then talk with RAC about hiring

meeting with RAC about spending too much time on jobs and getting results from QSL by phone and not having enough jobs and spending customers pot of money, confused

working on resume layout on CTL website. Changing format to match RAC …. Doesn't work well on Odle resume

tour to M.V. (Mike) Desai, Raymond C. Quinter, and Dick Ervin from Sunoco

Reading industry news, cost of ads on google and how the system works, and what other failure analysis sites look like

review radiographs, view on stereoscope, talk with Andy three times, mark sample for cutting

conversation with Brad on computers, our network, sample tracking, where we are going, Zygo results

email correspondence with Dan over grain-size pictures in the report

calling Rambo about typo in analysis they sent to us, have them redo and fax back to us. Looking up Alloy Spec in book

Going over report with RAC, campbell proposal. Edit, resubmit to RAC.

reading company benefits to convey to Albert O. Calling Franklin, summarized in email, call back from Franklin, Albert considering

Page 107: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 53 done Odle 6/7/2003 Admin resubmit FASFA, or FAFSA for Allison

0 16 done CTL 6/9/2003 Investigation

0 15 done CTL 6/9/2003 Support

0 14 done CTL 6/9/2003 Admin filling out Weekly Assignment Reports, checking email

0 13 done CTL 6/9/2003 Admin

0 12 done CTL 6/9/2003 Management followup with Fred on samples backlogged on EDX, verbal

0 69 done CTL 5/22/2003 Report writing

0 32 done CTL 5/30/2003 Admin

0 10 done CTL 5/30/2003 Support

0 29 done CTL 5/30/2003 Admin

0 21 done CTL 6/2/2003 Admin

0 34 done CTL 6/3/2003 Admin

0 35 done CTL 5/19/2003 Admin work status review, weekly assignment list

0 50 done CTL 6/13/2003 Pictures Mannington Hammer picture editing

0 11 done CTL 6/10/2003 Client

0 10 done CTL 6/10/2003 Investigation

0 9 done CTL 6/10/2003 Client

0 9 done CTL 6/10/2003 Support showing RAC the Google ads, discussing office layout, related

0 8 done CTL 6/10/2003 Report revising report for Epsilon

0 98 done CTL 6/10/2003 Marketing

0 54 done CTL 6/4/2003 Client

0 32 done CTL 6/4/2003 Investigation looking at pictues and sample again

0 74 done CTL 5/29/2003 Pictures gathering and editing pictures for report

0 18 done CTL 6/11/2003 Support Fred asked about role of Albert and how it fits with him, etc.

0 11 done CTL 6/10/2003 Support setting up account and ad, 1st draft, on Google

looking at mount under 500x no cracks on ID or OD of any significance? Compared to stereoscope … ? What next ? Email to Ron et al

helping Joe and Fred figure out that our SEM / EDX does not do oxygen

rewriting "Typical FA" to state projects are bid on a time and material basis

getting info together for Gina to finish completion sheets on this month's and some old projects, sending reports for printouts for paper files

phone interview with Albert M. Olszewski at 585-905-8399, talk with RAC, Brad, call back set up Thurs interview

review priorities, followup on getting prices from QSL, follow up on QSL debt, fu on PG&E PO, update project list

weekly Assignment Sheets, printing timesheet for may invoice, emails

finding and downloading Myraid Software to veiw drawings sent by York. Looking at drawings printing hard and electronic copies

going over report with Edy of Ottawa, then revise since 2 pass in evaporator changes velocity in tubes. Wanted small change in report. Also FU about invoice.

looking at spectrum with Fred …. Understanding impact of no oxygen on results

letter to Andy about not being able to cut hammer …. Machine shop option discussed.

Proposal to Albemarle for FA, added section on Root Cause Analysis via Process Audits and added to our "handout"send picture of what is in tube to Plymouth asking them if they have any idea where stuff comes from, also read background info sent by Joe … telling me what SCC is, etc.

Page 108: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 16 done CTL 6/11/2003 Management

0 15 done CTL 6/11/2003 Marketing

0 14 done CTL 6/11/2003 Investigation looking at hammer with Gina, showing pictures I need

0 13 done CTL 6/11/2003 Marketing separate ads for Corrosion Testing and Failure Analysis

0 12 done CTL 6/11/2003 Clean Up walk around with RAC, clean up in shop, metallography, etc.

0 11 done CTL 6/11/2003 Pictures sorting pictures of deposits and EDX analysis for report

0 10 done CTL 6/11/2003 Support emails and discussing advertising on google with RAC

0 9 done CTL 6/11/2003 Marketing

0 19 done CTL 6/12/2003 Marketing Quote to Paul Miller of Milliken via email and attachments

0 18 done CTL 6/12/2003 Marketing

0 17 done CTL 6/12/2003 Investigation

0 16 done CTL 6/12/2003 Client talking with Digan about Ohio State and use of video camera

0 11 done CTL 6/11/2003 Programming

0 14 done CTL 6/12/2003 Marketing

0 13 done CTL 6/12/2003 Admin read emails

0 12 done CTL 6/12/2003 Admin Miscelanous filing on desk and customer emails

0 11 done CTL 6/12/2003 Client

0 50 done CTL 6/18/2003 Admin

0 17 done CTL 6/13/2003 Report rewrite on Epsilon Report

0 16 done CTL 6/13/2003 Client talk with Dick Ervin about jobs in house and miscelaneous

0 15 done CTL 6/13/2003 Report writing and getting background straight

0 14 done CTL 6/13/2003 Investigation reviewing SEM work needed on various jobs with Fred and Gina

0 13 done CTL 6/13/2003 Marketing

0 12 done CTL 6/13/2003 Support getting Gina set on Access to enter sample tracking data

0 43 done CTL 6/18/2003 Client talk with Dick Ervin about jobs in house and miscelaneous

discussing layoff with Gina, then outlining work to finish over next week

looking at piece under the scope, calling Jeff Rike at Metaldyne voice mail, talking with Brad about job, sales pitch

Paul miller from milliken (enterprise plant ) can you give me a call at 864-250-5300 , I would like to talk to you about a shaft failure we had.

quote to Jeff Rike at metaldyne … add to build up price from Brad's $500 quote

taking stereoscopic pictures to get one for picture for bid to Metaldyne

fixing the linkage between the resumes on the site and editing Odle resume based on RAC commentsPaul miller from milliken (enterprise plant ) at 864-250-5300 , needs quote for failure analysis on shaft. Roger Reeves gave referral?

allowance for discussions with Dignan, RAC … various topics over the course of the afternoon.

getting invoice straight on Motiva …. Sent in March then resent in April

fixing our ads to meet editing review by Google, redistributing funds to three campaigns, adding a few keywords

Page 109: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 55 done CTL 6/9/2003 Development

0 20 done CTL 6/16/2003 Report writing report

0 19 done CTL 6/16/2003 Editing editing Sunco Report, PDF file and sending

0 91 done CTL 6/16/2003 Client

0 16 done CTL 6/16/2003 Admin can't remember morning

0 15 done CTL 6/16/2003 Admin Call from Dave Benjamin looking for report

0 14 done CTL 6/16/2003 Admin weekly Assignment Sheets

0 13 done CTL 6/16/2003 Admin followup with Deric on Invoice 20027 their SO#2003010852

0 18 done CTL 6/17/2003 Admin

0 17 done CTL 6/17/2003 Investigation looking at tubes

0 16 done CTL 6/17/2003 Editing editing report

0 15 done CTL 6/17/2003 Editing editing report, pdf file, email to client

0 14 done CTL 6/17/2003 Client correspondence with Edy and Andy, York and Mannington

0 72 done CTL 5/19/2003 Admin

0 12 done CTL 6/17/2003 Report writing report

0 11 done Odle 6/17/2003 Admin van pickup and related

0 56 done CTL 5/16/2003 Management discussing potential programmers for Access with RAC

0 27 done MV 6/10/2003 Marketing filling out ad on Google for MV …keywords

0 21 done CTL 6/18/2003 Client tour to Doug from Chalmers and Kubec

0 20 done CTL 6/18/2003 Marketing

0 19 done CTL 6/18/2003 Management

0 18 done CTL 6/18/2003 Support helping move furniture

0 17 done CTL 6/18/2003 Investigation looking at mounts on Valero

0 16 done CTL 6/18/2003 Calculations

0 17 done MV 6/19/2003 Development discussion with Alex Wolf on Project

adding Odle to CTL website, 8 pages need to change … not quite right

10 am conference call with Edy et al at York over Tunney , talked with Edy wants to reschedule

looking over 4 invoices and times with Gina, comparing to quoted prices

discussion with RAC on billing jobs at $155/hr or $4500/job not $3500/job and recovery time

calls and emails back to Albemarle, Campbell, Metaldyne, and ?? concerning quotes sent out last week.

talking with Gina about assignments for week, getting files up to date, sending reports to printing to put in files, etc.

redoing velocities in tubes for Edy …. OD dimension includes OD fins

Page 110: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 16 done CTL 6/19/2003 Investigation review with Gina on Job status

0 15 done CTL 6/19/2003 Report writing report

0 14 done CTL 6/19/2003 Support moving furniture and distractions therefrom

0 13 done CTL 6/19/2003 Literature looking for R-19 or R-259 specification for galvanized steel

0 12 done CTL 6/19/2003 Client Scott Taylor bringing in a tube from cooling water system

0 56 done CTL 6/12/2003 Report rewrriting report based on new evidence

0 16 done CTL 6/20/2003 Investigation looking at pictures and samples, refreshing what we learned

0 15 done CTL 6/20/2003 Editing cleanup of York Job

0 14 done CTL 6/20/2003 Admin trying to transfer all of Gina's work files, records, accounting to Odle

0 13 done CTL 6/20/2003 Pictures sorting pictures for plmouth tube

0 12 done CTL 6/20/2003 Programming getting information together on Failure Analysis to add to webpage

0 41 done CTL 6/26/2003 Investigation

0 20 done CTL 6/23/2003 Editing

0 19 done CTL 6/23/2003 Training

0 17 done CTL 6/23/2003 Programming setting up job progress tracking for FA

0 16 done CTL 6/23/2003 Pictures editing pictures for report

0 15 done CTL 6/23/2003 Admin weekly Assignment Sheets

0 14 done MV 6/23/2003 Admin talking with Parrish, editing confidentiality agreement with Wolf

0 13 done CTL 6/23/2003 Training followup with Albert on mount for Plymouth

0 13 done CTL 6/23/2003 Meeting

0 11 done CTL 6/23/2003 Investigation looking at Plymouth tubes with Albert

0 36 done CTL 6/27/2003 Client

0 43 done CTL 6/30/2003 Investigation working with Al on mount on galvanized pipe and course of action

0 19 done CTL 6/25/2003 Admin making and sending PDF and summary to York

0 18 done CTL 6/25/2003 Meeting

getting Al setup to take pictures on bolt and cut, then Fred came and said he was supposed to do it since it was legal case

implementing suggestions from RAC, confusion on G90 spec discussing with Brad

introduction to Albert on work in progress, intial assignments, and reading material

meeting with RAC on bolts, timeoff wo pay form, and G90 specification for galvanizing, several other topics

emails and calls to Dave Benjamin about why he did not get file and resending

phone call with RAC, Edy's voice mail, Perry's voice mail, emails from Deric and Edy

Page 111: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 17 done CTL 6/25/2003 Investigation looking at shaft understereoscope

0 81 done Goals 12/31/2003 Goals Publish Tantalum Flowsheet on Web

0 14 done CTL 6/25/2003 Literature looking for Galvanizing specification

0 13 done CTL 6/25/2003 Editing editing report and sending

0 12 done CTL 6/25/2003 Training talking with Al about what he did for the day

0 20 done CTL 6/26/2003 Pictures editing pictures for report

0 25 done CTL 6/27/2003 Client

0 24 done CTL 6/27/2003 Investigation

0 36 done MV 6/15/2003 Meeting meeting with Alex Wolf in Elkton concerning future work

0 16 done CTL 6/26/2003 Programming job progress tracking for FA

0 21 done CTL 6/27/2003 Training Al with files, forms, and similar

0 41 done CTL 6/16/2003 Admin

0 19 done CTL 6/27/2003 Client

0 60 done MV 6/21/2003 Admin letter to IRS on latest fine

0 17 done CTL 6/27/2003 Pictures starting pictures again … too many disruptions

0 10 done CTL 6/26/2003 Client peter of Motiva dropping off samples

0 92 done CTL 6/26/2003 Client

0 8 done CTL 6/26/2003 Training paperwork for new sample procedures, computer sign on also

0 7 done CTL 6/26/2003 Admin filing, emails, clean desk

0 99 done CTL 6/26/2003 Investigation looking at tube with Al, instructions for cutting

0 54 done CTL 6/30/2003 Admin try depositing Fed Taxes with old coupons

0 18 done CTL 6/30/2003 Admin Invoicing York

0 17 done CTL 6/30/2003 Admin weekly Assignment Sheets, doing 3 duplicate systems

0 16 done CTL 6/30/2003 Client talking with Ron about his failure and what we need to go from here

0 15 done CTL 6/30/2003 Pictures finished picture editing, adding to word document

call from MERC, 215-652-2070 Chaudra Magwood gave info to rick via email and print out

bolt oxide thickness procedures and measurements, defining fatigue area on all clean bolts

followup with Google advertising … corrosion word is the only thing working …

email to Sunoco asking about why two different tubes frm condenser, talk with Dick on same issue

preparing for conference call, 3 attemps at conference call, conference call itself

Page 112: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 14 done CTL 6/30/2003 Investigation

0 13 done MV 6/30/2003 Admin email to Wolf

0 12 done CTL 6/30/2003 Admin

0 12 done CTL 6/28/2003 Investigation looking up calculations for calling stress on bolt from torque

0 44 done CTL 6/18/2003 Admin don't know, didn't record in time, but was here

0 43 done CTL 6/18/2003 Pictures inserting pictures and data into report

0 42 done MV 6/18/2003 Admin send money to SC Dept of Revenue

0 10 done CTL 7/1/2003 Admin emails, printing timesheets, printing time for lawyer

0 11 done CTL 7/1/2003 Report writing report

0 38 done CTL 6/18/2003 Client three emails to Dick Ervin on questions on his email

0 16 done CTL 7/2/2003 Admin

0 15 done CTL 7/2/2003 Admin taking chair back to Staples, etc.

0 14 done CTL 7/2/2003 Editing conversations with RAC and looking at sample again

0 13 done CTL 7/2/2003 Literature

0 12 done CTL 7/2/2003 Editing self editing report after 3 emails on background to Joe Shelton

0 14 done CTL 7/3/2003 Training

0 13 done CTL 7/3/2003 Editing editing, making pdf and emailing report

0 12 done CTL 7/3/2003 Admin email and then sending Summary and Invoice to Dan Woodring

0 11 done CTL 7/3/2003 Pictures editing pictures for report

0 27 done CTL 6/18/2003 Client talking with Edy about meeting, calculations, tube dimensions

0 62 done CTL 6/25/2003 Client

0 61 done CTL 6/25/2003 Training

0 28 done CTL 6/23/2003 Support looking for G48 articles for Brad on database

0 38 done CTL 6/25/2003 Training going over sample with Al

0 55 done CTL 7/11/2003 Support setting up invoicing for FA on database

looking at two new samples with Fred and RAC, later looking for calculation for torque, etc. done in report

moving invoicing to common computer for Al and me and learning how to do invoicing again

Using new DB on Job Tracking to get current with where Gina and I left off with all jobs… and to assign Al priorities

general tech reading , chemical engineering, talkin with Al about day and work we need to do tomorrow.

working with Al reviewing progress of all inhouse sample what he needs to do

phone call with Belmont … what we know … what he wants to know

looking at Valero tubes with Al and discussing background info, crevice corrosion and galvanic corrosion …. Relative to samples

Page 113: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 66 done CTL 7/15/2003 Calculations calculating stress from torque

0 17 done CTL 7/7/2003 Admin updating weekly to do list, emails

0 16 done CTL 7/7/2003 Investigation

0 15 done CTL 7/7/2003 Investigation looking at SEM picture of rods with Fred & Al

0 14 done CTL 7/7/2003 Investigation EDX analysis of material in valleys, looking at tubes with Fred

0 13 done CTL 7/7/2003 Report writing report

0 12 done CTL 7/7/2003 Training

0 76 done CTL 7/1/2003 Admin

0 18 done CTL 7/8/2003 Investigation selecting location for mounts with Al

0 17 done CTL 7/8/2003 Editing editing report, making PDF, and sending

0 16 done CTL 7/8/2003 Investigation cleaning issues on bolt

0 15 done CTL 7/8/2003 Client

0 14 done CTL 7/8/2003 Admin

0 13 done CTL 7/8/2003 Client making CD, printing report, finding labels, mailing to Perry

0 12 done CTL 7/8/2003 Investigation looking at mount scc and dendritic attack on weld

0 13 done CTL 7/8/2003 Investigation studying stress calculation for torque

0 97 done Odle 7/9/2003 Admin

0 9 done CTL 7/8/2003 Investigation

0 35 done CTL 7/11/2003 Support

0 52 done CTL 7/2/2003 Admin followup on QSL invoice for job 19310

0 70 done CTL 7/7/2003 Training Training Dave on entering samples into the database

0 26 done CTL 7/10/2003 Marketing updating keywords on our ads, morning emails, greetings

0 25 done CTL 7/10/2003 Client call from Belmont to discuss failure again

0 17 done CTL 7/9/2003 Investigation taking pictures to show erosion-corrosion better

0 16 done CTL 7/9/2003 Training

reading deposition on oxide … whether or not all the bolts were cleaned

talking with Al about as-is pictures on the Motiva tubes, too long, and looking at software for putting pictures together

reprinting report, making CD's, setting up Airborne, delivering to airborne twice, etc.

email to Scott Taylor on price for work and request for P.O., read back ground info

transferring files to common directory for Al, looking for Gina's tool box and emailing her

find survey's of houses and fax to Jennifer .. Her phone number is 800-226-6308 ext 58375

looking at tubes trying to develop a consistant theory … erosion corrosion

modifying FA tracking page on database, modifying sample log-in, adding special assignment DB for FA

looking at etched tubes with Al, problems with pits caused by etching

Page 114: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 15 done CTL 7/9/2003 Client

0 14 done CTL 7/9/2003 Pictures editing pictures for report

0 13 done CTL 7/9/2003 Report organizing report

0 12 done CTL 7/9/2003 Client

0 11 done CTL 7/9/2003 Admin emails

0 10 done CTL 7/10/2003 Pictures importing new pictures, editing same

0 14 done CTL 7/11/2003 Report finishing report

0 13 done CTL 7/11/2003 Training working with Al off and on …. PG&E mostly

0 12 done MV 7/11/2003 Planning putting together cost estimate for Proof of Concept

0 14 done CTL 7/14/2003 Support training Fred to use sample database, then training Andrew

0 16 done CTL 7/14/2003 Support setting up CTL Tracking Report on the database

0 15 done CTL 7/14/2003 Marketing talking with RAC on Ottowa opportunity

0 14 done CTL 7/14/2003 Training talking with Al on cutting up and matching tubes

0 10 done CTL 7/14/2003 Support trying to setup invoicing on database

0 9 done CTL 7/14/2003 Training PG&E Tubes with Al

0 12 done CTL 7/14/2003 Admin making invoice, envelope for PO

0 74 done CTL 7/24/2003 Admin some sample cleanup and throw out with Dave

0 16 done CTL 7/15/2003 Meeting with RAC on bolts

0 15 done CTL 7/15/2003 Editing editing Al's report

0 14 done CTL 7/15/2003 Admin emails

0 13 done CTL 7/15/2003 Editing reading RAC comments

0 12 done CTL 7/15/2003 Meeting on copper tubes air cooler

0 16 done CTL 7/16/2003 Admin training Megan on sample log

0 16 done CTL 7/16/2003 Investigation looking at mounts etc. on Motiva

0 14 done CTL 7/16/2003 Investigation

going back to Valero for more money, $500 more and discussing failure, operating conditions at plant

talking with Belmont, resending report to a different email address [email protected]

working with RAC on questions to lawyer and measuring fatigue areas on bolt

Page 115: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 15 done CTL 7/16/2003 Support problems with color control on Stereo camera

0 12 done CTL 7/16/2003 Client talking with Deric Masten and looking at tubing on stereoscope

0 11 done CTL 7/16/2003 Admin emails, calls

0 10 done CTL 7/16/2003 Support moving library to networked computer

0 16 done CTL 7/17/2003 Editing editing, making pdf and emailing report

0 15 done CTL 7/17/2003 Client unknown

0 14 done CTL 7/17/2003 Client conversation with Edy and RAC about potential York job

0 13 done CTL 7/17/2003 Support proof read and then discuss with RAC

0 12 done MV 7/17/2003 Marketing discuss development of a technical plan for MTL

0 11 done CTL 7/17/2003 Investigation looking at tube sample on metallograph, directing work to SEM

0 18 done CTL 7/18/2003 Investigation diagnosis of failure with Al

0 17 done CTL 7/18/2003 Admin emails, updating work status on jobs with Al

0 16 done CTL 7/18/2003 Investigation looking at SEM picture of fatigue and mixed mode with Fred

0 15 done CTL 7/18/2003 Support

0 14 done CTL 7/18/2003 Admin invoices

0 13 done CTL 7/18/2003 Investigation looking at Motiva sample

0 12 done CTL 7/18/2003 Admin getting info from Fred, Al, Gina, self for job tracking

0 38 done CTL 7/9/2003 Support sorting corrosion coupons for Brad and Mike his client

0 17 done CTL 7/21/2003 Programming

0 16 done CTL 7/21/2003 Admin problem with paperport program not loading … reinstalled

0 15 done CTL 7/21/2003 Investigation discussing results on MIC with RAC and Al

0 14 done CTL 7/21/2003 Admin

0 13 done CTL 7/21/2003 Editing editing report from Al

0 12 done CTL 7/21/2003 Training

0 11 done CTL 7/21/2003 Investigation looking at ID, instruct Al to get green and brown stuff identified

modifying sample tracking to handle more (8) inputs for time spent on project

added space for two more entries for Tracking Form activities, got Al and Fred to add times to enable quote for Motiva's rush work

emails to Edy, Scott Taylor, Dick Ervin … phone call from Dick. Weekly to do list

problems with picture and table format on Al's report as a result of formating changes by Al …. Training??

Page 116: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 10 done CTL 7/21/2003 Investigation looking at fracture surface and pitting on OD

0 54 done CTL 7/10/2003 Training

0 18 done CTL 7/22/2003 Literature reading industry news in metals field

0 26 done CTL 7/23/2003 Report

0 16 done CTL 7/22/2003 Support setting up Paperport for electronic technical library for CTL

0 15 done CTL 7/22/2003 Investigation denickelification of cupro-nickel tubes

0 14 done CTL 7/22/2003 Investigation copper hydroxide on surface followed by soluble iron precipitate

0 13 done CTL 7/22/2003 Proposal looking up costs for proposal to Edy in Ottawa

0 12 done CTL 7/22/2003 Editing editing report from Al

0 11 done CTL 7/22/2003 Training talking with Rick and Al about Zeks job, analogies on medical

0 10 done CTL 7/22/2003 Admin

0 18 done CTL 7/23/2003 Admin

0 17 done CTL 7/23/2003 Investigation mounts of denickelification of cupro-nickel

0 16 done CTL 7/23/2003 Investigation reviewing pictures with Al

0 15 done CTL 7/23/2003 Client

0 14 done CTL 7/23/2003 Support salary compile for 2002 and 2003

0 13 done CTL 7/23/2003 Client Meeting with John and subsequent talking with RAC, JOE, and Al

0 12 done CTL 7/23/2003 Pictures selecting and editing pictures for report

0 11 done CTL 7/23/2003 Client another email to Edy on Plan B for Ottawa

0 36 done CTL 7/10/2003 Investigation getting better deposit thickness picture

0 13 done CTL 7/24/2003 Report writing, editing

0 16 done CTL 7/24/2003 Programming

0 15 done CTL 7/24/2003 Training editing

0 14 done CTL 7/24/2003 Investigation training Al on epoxy mount and finding pits, etc.

0 8 done CTL 7/24/2003 Support proof reading paper for RAC on absorber at hospital

Al looking at PG&E again, discussing results on Valero and Cambell

writing Sunoco Report and some more tube measurements, also email to sunoco contact

email to Deric asking for PO for job, email to Scott Taylor asking for PO

morning emails including downloading an article from ASM on SCC Failure Analysis

redirecting Al after RAC discussion, outling work that needs to be done to get job out of here

working with Al to adapt database sample login to Brad's need for 85 samples on one job number

Page 117: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 7 done CTL 7/24/2003 Admin morning emails, greetings

0 8 done CTL 7/10/2003 Report writing report

0 21 done CTL 7/9/2003 Admin looking for purchase orders

0 20 done CTL 7/9/2003 Meeting staff meeting … need to do more administrative tasks

0 19 done CTL 7/9/2003 Support updating wish list per RAC request

8 8 Active Odle 12/5/2003 Health call to set a new appointment with Bonder, get prescription

0 36 done CTL 7/29/2003 Admin emails, greetings

0 22 done CTL 7/25/2003 Pictures selecting and editing pictures for report

0 24 done CTL 7/28/2003 Admin emails, To Do Lists Update

0 19 done CTL 7/25/2003 Admin Amazon Orders

0 18 done CTL 7/25/2003 Editing editing report, pdf and emailing

0 17 done CTL 7/25/2003 Editing editing report and sending to Dick Ervin for review

0 16 done CTL 7/25/2003 Investigation activities around formicary corrosion findings

0 15 done CTL 7/25/2003 Admin

0 18 done CTL 7/28/2003 Admin

0 17 done CTL 7/28/2003 Report writing

0 16 done CTL 7/28/2003 Report phone meeting, email report, review of data with Joe and RAC

0 11 done CTL 7/25/2003 Support access consulting and miscel

0 10 done CTL 7/25/2003 Marketing calls to voice mail to Drew Chemical, Ottawa

0 9 done CTL 7/25/2003 Admin checking status of Google Ads … need more thought on keywords

0 8 done CTL 7/25/2003 Admin emails, greetings

0 20 done CTL 7/29/2003 Report

0 19 done Odle 7/29/2003 Admin to bank to get cashier's check for closing

0 18 done CTL 7/29/2003 Editing editing report from Al

0 95 done CTL 8/15/2003 Report report and investigation followup for report

emailing report to Martha T after changing a few words for Dick Ervin

sending report to house for completion and editing … however, email system seems to be off

finishing report, calling Deric and Peter and emailing to confirm source of cooling water

Page 118: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 15 done CTL 7/29/2003 Investigation looking at tubes with Al, discussing work

0 14 done MV 7/29/2003 Admin depositing personal checks into business account

0 13 done CTL 7/29/2003 Report email report, getting quotes from RAC and JP, phone call with John

0 12 done CTL 7/29/2003 Marketing reviewing file and calling Drew for Ottawa job

0 11 done CTL 7/29/2003 Client problems with Ron receiving file

0 31 done CTL 8/4/2003 Admin email, weekly todo list, mail Zaks invoice

0 13 done CTL 7/31/2003 Editing minor edit on report to include new info from client and then sent

0 12 done CTL 7/31/2003 Admin

0 11 done CTL 7/31/2003 Programming

0 10 done CTL 7/31/2003 Admin emails and then correction in Plymouth tube report and resending

0 9 done CTL 7/31/2003 Investigation looking at mounts etc. on Motiva

0 15 done CTL 8/1/2003 Editing editing and then emailing report

0 23 done CTL 8/4/2003 Support walk around lab to see what is going on at CTL

0 22 done CTL 8/4/2003 Investigation looking at tubes while writing report

0 21 done CTL 8/4/2003 Pictures selecting and editing pictures for report

0 20 done CTL 8/4/2003 Report writing report

0 10 done CTL 8/1/2003 Admin Invoices and Job Tracking Sheets

0 8 done CTL 8/1/2003 Support proof reading report for RAC

0 7 done CTL 8/1/2003 Editing editing and then emailing report

0 99 done CTL 8/1/2003 Client Phone meeting with Ron Roth and Joe at Southern Co

0 14 done CTL 8/4/2003 Marketing quote to Robert Courtney

0 13 done CTL 8/4/2003 Support talking with Brad about uniform weld

0 12 done CTL 8/4/2003 Programming consultation with Al on programming

0 17 done Odle 8/5/2003 Admin more papers on closing, getting fees back from bank

0 48 done MV 6/30/2003 Admin withholding taxes for April to June for Delaware

invoices, etc. , projected. Will modify time allocation after the afternoon

discussing database, next steps, and freezeup problem on my computer?

Page 119: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 15 done CTL 8/5/2003 Support conversation with RAC on trip to Taiwan and York opportunities

0 14 done CTL 8/5/2003 Admin backing up reports etc to CD for the year

0 13 done CTL 8/5/2003 Admin emails, morning greetings, reading

0 12 done CTL 8/5/2003 Report writing report

0 40 done CTL 8/11/2003 Report writing

0 22 done CTL 8/7/2003 Marketing proposal to Pat at General Chemical

0 17 done CTL 8/6/2003 Support converting 3 documents to web page case studies

0 16 done CTL 8/6/2003 Editing editing report, pdf and emailing

0 14 done CTL 8/6/2003 Support help unload metal from shelves

0 12 done CTL 8/6/2003 Investigation looking at monel catalyst under the stereoscope

0 9 done MV 8/3/2003 Admin withholding taxes for April to June for IRS

0 13 done CTL 8/7/2003 Admin emails, greetings

0 11 done CTL 8/7/2003 Investigation SEM and EDX with Al and Fred

0 25 done CTL 8/11/2003 Client followup with Brian Hersey on Cu from LiBr soln

0 17 done CTL 8/8/2003 Admin purchase order, envelop, mail

0 16 done CTL 8/8/2003 Support proofing reading report for Joe on candles

0 22 done CTL 8/11/2003 Literature miscel technical reading

0 14 done CTL 8/8/2003 Client email to PG&E questions on report from Scott

0 13 done CTL 8/8/2003 Literature reading about monel and oil refineries and corrosion therein

0 11 done CTL 8/8/2003 Admin cleanup throwing out old samples

0 10 done CTL 8/8/2003 Marketing small 15 gal tank leaking interruption

0 9 done CTL 8/8/2003 Report writing

0 8 done CTL 8/8/2003 Admin emails, greetings

0 94 done CTL 9/3/2003 Marketing various emails to Edy over consulting work

0 12 done CTL 8/11/2003 Pictures preparing pictures for short report on crack depth measurements

Page 120: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 11 done CTL 8/11/2003 Support discussing adding invoicing to DB with Al

0 10 done CTL 8/11/2003 Client followup with Pat at General Chemical on sample, again

0 16 done CTL 8/12/2003 Investigation began to measure bolt areas, ended by discussing with RAC

0 16 done CTL 8/12/2003 Client questions from Bob Courtney on report, small revision

0 98 done CTL 9/8/2003 Marketing

0 12 done CTL 8/12/2003 Report formatting pictures and short note on Fatigue crack measurements

0 11 done MV 8/12/2003 Admin emissions testing on Honda Civic

0 10 done CTL 8/12/2003 Support

0 9 done CTL 8/12/2003 Editing

0 8 done CTL 8/12/2003 Client followup questions to report to Pieter

0 18 done CTL 8/13/2003 Support working on database reports

0 15 done CTL 8/13/2003 Support discussion of invoicing from DB

0 14 done CTL 8/13/2003 Training looking at bolts with Al

0 13 done CTL 8/13/2003 Admin emails, assignment for Valero for Al

0 12 done CTL 8/13/2003 Client

0 11 done CTL 8/13/2003 Editing second edit on report

0 10 done CTL 8/13/2003 Client discussion with Robert at Valero and process engrs

0 98 done CTL 9/10/2003 Client sending background form to Carl Bakley of Valero for new failure

0 80 done CTL 8/13/2003 Literature technical reading

0 10 done CTL 8/14/2003 Investigation reviewing file and pictures for report

0 11 done CTL 8/15/2003 Support cleanup on reports and reviewing Al's work

0 8 done CTL 8/14/2003 Support working on database reports

0 21 done CTL 6/30/2003 Report write report on molybdate and antimony not in deposits

0 14 done CTL 8/18/2003 Report working on report

0 13 done CTL 8/18/2003 Support

Corliss Tottle, Chubb Insurance, on broken tail piece nut from bath tube, strainer, washer, bolt, gasket

finding and reading article on antimony pentachloride leak at Honeywell Plant in Baton Rouge

editing report, making PFD and emailing. Re did base metal analysis

logging in samples including splitting condensate into three containers with less head space

followup on operating temperatures for electrochemical testing for Zeks

Page 121: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 12 done CTL 8/18/2003 Support receiving sample, Access DB with Brad and Al

0 98 done CTL 9/15/2003 Support tasks related to database

0 10 done CTL 8/18/2003 Admin emails, weekly To Do Lists

0 55 done CTL 8/6/2003 Admin emails, greetings

0 13 done CTL 8/19/2003 Admin emails

0 11 done CTL 8/19/2003 Investigation

0 9 done CTL 8/19/2003 Report writing on report

0 12 done CTL 8/20/2003 Report writing report, developing logic

0 11 done CTL 8/20/2003 Admin emails, astra zeneca call about P.O.

0 10 done CTL 8/20/2003 Investigation looking at mounts

0 12 done CTL 8/21/2003 Report self editing

0 11 done CTL 8/21/2003 Support looking at case history file with Brad, classes of fatigue

0 36 done CTL 8/29/2003 Investigation looking at return piping after cleaning

0 12 done CTL 8/22/2003 Report

0 11 done CTL 8/22/2003 Investigation looking at pipe from Astraceneca, revised scope to Astrazeneca

0 10 done CTL 8/22/2003 Support gathering some files to post on webpage

0 15 done CTL 8/25/2003 Meeting meeting with RAC and Brad on upcoming failure analysis

0 98 done CTL 9/19/2003 Investigation looking at roots of threads with Al

0 13 done CTL 8/25/2003 Investigation call into Bob Unger on Avaguard 715, talked to voice mail

0 13 done CTL 8/26/2003 Report report writing

0 11 done CTL 8/25/2003 Admin signing in sample, reading papers

0 10 done CTL 8/25/2003 Admin updating contact info Astrazeneca, weekly ToDo, emails

0 9 done CTL 8/25/2003 Investigation looking at cleaned sample from Astrazeneca

0 19 done CTL 8/28/2003 Investigation looking at more pipe and mounts

0 18 done CTL 8/28/2003 Client discussions with Brian on absorption unit

lab work and followup with Unger for water, select mount, stereoscope, calls with Brian

editing report, calling Denny Gray, talking with RAC, Brad. Reading WJL report on bolts

Page 122: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 9 done CTL 8/27/2003 Investigation microscope and discussions on weld

0 8 done CTL 8/27/2003 Report report and related work

0 14 done CTL 8/28/2003 Admin emails, reading, miscel

0 21 done Odle 7/30/2003 Admin refile state income tax for SC

0 12 done CTL 8/28/2003 Pictures sorting and editing pictures

0 94 done CTL 9/22/2003 Investigation looking at bolt threads

0 10 done CTL 8/28/2003 Report writing report

0 15 done CTL 8/29/2003 Report finish report

0 14 done CTL 8/29/2003 Investigation looking at tube and instructions for Al

0 21 done CTL 8/7/2003 Development LiBr

0 12 done CTL 8/29/2003 Admin

0 49 done Odle 8/30/2003 Admin sell Bond shares

0 11 done CTL 8/29/2003 Admin emails, morning greetings, walk around

0 81 done CTL 8/1/2003 Programming discussion with Brad and Al on sample database

0 97 done CTL 9/25/2003 Support

0 22 done CTL 9/4/2003 Support webpage with Al

0 10 done CTL 9/2/2003 Client followup email for status

0 9 done CTL 9/2/2003 Report writing

0 55 done CTL 9/2/2003 Investigation looking at return piping after mounting

0 58 done MV 9/30/2003 Development

0 11 done CTL 9/3/2003 Pictures editing pictures

0 13 done CTL 9/4/2003 Investigation mounts and talking to Vic

0 9 done CTL 9/3/2003 Investigation looking at tube and instructions for Al

0 98 done CTL 9/29/2003 Report switching ES Report to CR format

0 80 done CTL 9/3/2003 Admin emails, organizing files

file cleanup, looking at generating report on status of projects from database?

first review of quality control procedures for sample login, and redoing numbering of figures in report to comply

Larry Kwart of Stereo Chemical suggested I call Len Spalding of Colonial Metals in Triump Industrial Park

Page 123: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 89 done CTL 8/11/2003 Admin emails, weekly To Do Lists

0 14 done CTL 9/8/2003 Client call on positions he is taking for his consultants

0 13 done CTL 9/8/2003 Editing editing draft made by Al, rewriting sections

0 12 done CTL 9/8/2003 Support

0 91 done CTL 8/12/2003 Client request and followup on carbon analysis on HK-40 , assign to Al

0 23 done CTL 9/10/2003 Support webpage with Al

0 14 done CTL 9/9/2003 Admin morning emails, reading

0 97 done CTL 9/30/2003 Client reading patent on removing CuO from solution and storing in library

0 11 done CTL 9/9/2003 Support

0 10 done CTL 9/9/2003 Client helping Edy on getting proposal from Ashland

0 9 done CTL 9/9/2003 Report writing report, AL out

0 96 done CTL 10/1/2003 Admin emails, reading metal news

0 14 done CTL 9/10/2003 Admin emails, talking with Al about tasks

0 13 done CTL 9/10/2003 Editing editing Al's 2nd draft

0 11 done CTL 9/10/2003 Support technical reading

0 88 done MV 8/13/2003 Marketing discussing Toth, Alchemix, Nickel etc. with Willem Duyvesteyn

0 71 done CTL 8/6/2003 Marketing letter to Zaks on testing, note to Scott Taylor

0 97 done CTL 10/2/2003 Support discussing solution to concerns by Brad and Joe

0 28 done CTL 8/19/2003 Marketing quotes to AstraZeneca, phone calls, email

0 14 done CTL 9/12/2003 Support tasks related to database

0 95 done CTL 10/3/2003 Report third draft of report, wall thickness statistics

0 80 done CTL 9/11/2003 Admin emails, greetings

0 97 done CTL 10/7/2003 Client Dennis Pickering, calls from hospital, home

0 23 done CTL 8/19/2003 Marketing talking with John Ely 610-878-6906

0 9 done CTL 9/11/2003 Support task with database, billing

working with Al about problem with posting webpages … exceeded memory allocation

answering phones, John Kastle, 803-256-4242 and Dan Graham 708-417-6096

Page 124: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 14 done CTL 9/16/2003 Client phone call with Brian Hersey, request additional work

0 12 done CTL 9/16/2003 Support entering data into database for Job Log tracking

0 97 done CTL 10/8/2003 Investigation looking at mounts

0 11 done CTL 9/16/2003 Admin emails, greetings during day

0 80 done CTL 9/16/2003 Investigation looking at mount, drawing with RAC, tubes

0 80 done CTL 9/16/2003 Investigation looking at nipples from Valero understereoscope

0 23 done CTL 8/21/2003 Admin emails

0 96 done CTL 9/17/2003 Admin emails

0 13 done CTL 9/17/2003 Investigation looking at tubes under stereoscope

0 8 done CTL 9/17/2003 Editing editing report

0 95 done CTL 10/9/2003 Admin emails, cleaning off desk per RAC

0 10 done CTL 9/17/2003 Support working on database reports and entering back data

0 17 done CTL 8/21/2003 Investigation trip to Asta-Zeneca, on-site inspect of piping

0 10 done CTL 9/18/2003 Investigation looking at mount on hole, revising report with additional picture

0 97 done CTL 10/13/2003 Client call to Mike Albert AstraZeneca

0 90 done CTL 8/22/2003 Marketing checking charges and status of Google advertising

0 14 done CTL 9/19/2003 Admin emails, reading metal news

0 13 done CTL 9/19/2003 Support database mostly

0 12 done CTL 9/19/2003 Support discussing web site needs

0 11 done CTL 9/19/2003 Admin sorting pictures and files for job

0 91 done CTL 8/25/2003 Investigation questions on refrigerant system

0 97 done CTL 10/14/2003 Admin emails, good mornings

0 93 done CTL 8/27/2003 Investigation discussions with Brian and emails on same

0 21 done CTL 9/23/2003 Study reading Eng-tips site on corrosion forum and miscel

0 16 done CTL 9/22/2003 Support looking at failure of airplane shaft with Peter

Page 125: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 15 done CTL 9/22/2003 Support looking for work for Al with Brad, Joe

0 14 done CTL 9/22/2003 Admin weekly to do, emails, and database to do's

0 97 done CTL 10/15/2003 Admin unloading truck and clean up for E76HE

0 15 done CTL 9/23/2003 Admin emails, greetings

0 14 done CTL 9/23/2003 Marketing

0 9 done MV 10/14/2003 Admin deposit taxes for Sept IRS

0 80 done CTL 9/22/2003 Client two calls from Astrazenca setting up meetings for next Monday

0 80 done CTL 9/22/2003 Pictures sorting pictures for report

0 80 done CTL 9/22/2003 Client updating client on results

0 10 done CTL 9/24/2003 Editing editing changes per RAC

0 9 done CTL 9/24/2003 Support proof reading and editing new web pages

0 15 done CTL 9/25/2003 Investigation looking at one more mount

0 14 done CTL 9/25/2003 Investigation looking up process conditions for Al

0 11 done CTL 9/25/2003 Editing editing report

0 10 done CTL 9/25/2003 Marketing looking at Indotherm copper coils for potential FA job

0 91 done CTL 10/17/2003 Development reading some data on resins

0 89 done CTL 10/20/2003 Admin technical reading

0 86 done CTL 9/2/2003 Admin

0 22 done CTL 9/4/2003 Support helping on report for Atheim on medical implant testing

0 9 done CTL 9/26/2003 Admin CTL tracking form, invoice, hours together

0 8 done CTL 9/26/2003 Admin emails

0 7 done CTL 9/26/2003 Editing editing Al's draft report, trying to find info on Honeywell

0 99 done CTL 9/26/2003 Support reviewing QC document for signing in samples

0 86 done CTL 9/3/2003 Marketing

0 10 done CTL 9/29/2003 Consulting trip to Asta-Zeneca discussing report

talking with Clark Henry of Environmental 1, [email protected] about pump failure

emails, weekly To Do Lists, finding copies of 20110 Invoices for RAC, problems with [email protected] email

talking with [email protected] about passivating tubes for Tunney's Pasture in Ottawa for York

Page 126: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 8 done CTL 9/26/2003 Support database mostly, creating reports for future

0 8 done CTL 9/29/2003 Support

0 7 done CTL 9/29/2003 Support editing Active Reports per RAC

0 92 done CTL 10/23/2003 Admin trying to get ID on valves for Dick

0 17 done CTL 9/8/2003 Admin emails, greetings, todo list for week

0 89 done CTL 9/8/2003 Investigation

0 21 done CTL 9/9/2003 Study reading Eng-tips site on corrosion forum

0 12 done CTL 9/30/2003 Investigation new tubes in from E32

0 11 done CTL 9/30/2003 Support discussing Peter's Law firm

0 99 done CTL 10/29/2003 Support reading about chlorine explosions, Merv data

0 9 done CTL 9/30/2003 Support database issues with scrolling

0 80 done CTL 9/30/2003 Investigation reviewing work done on Aztrazeneca

0 80 done CTL 9/30/2003 Client discussing removing Cu from LiBr with Brian Hersey

0 99 done CTL 9/30/2003 Admin email

0 63 done MV 9/10/2003 Admin deposit taxes for July IRS

0 20 done CTL 9/10/2003 Editing discussing report with RAC

0 9 done CTL 10/1/2003 Support

0 95 done CTL 10/28/2003 Development planning tasks with Al, running Fe2O3 experiment

0 94 done CTL 10/1/2003 Investigation looking at OD of pipes and some SEM / EDX results

0 16 done CTL 9/10/2003 Client

0 87 done CTL 9/10/2003 Editing editing report and sending draft to Brian Hersey and Rick Nadeau

0 9 done CTL 10/2/2003 Editing making changes suggested by RAC

0 8 done CTL 10/2/2003 Meeting meeting with RAC on report and research

0 91 done CTL 10/30/2003 Admin emails, reading

0 80 done CTL 10/2/2003 Support webpage issues

addressing database issues including sample labeling and RAC concerns on DB

looking under refrigerant and for ductile tears to identify OD or ID start of crack

issues on scrolling solution not working discussed with Brad, Joe and solutions with Al

talking with Paoul Lefe of Drew about Tunney's Creek, 613-832-0887

Page 127: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 13 done CTL 9/11/2003 Editing editing report, making PDF, sending with email

0 7 done CTL 10/6/2003 Report fourth draft

0 97 done CTL 10/31/2003 Admin Invoice to Cytec (and Valero)

0 11 done CTL 9/12/2003 Meeting phone meeting with Denny Gray, strategy

0 92 done CTL 8/18/2003 Investigation York generator tube in

0 86 done CTL 9/16/2003 Report rewrite the report

0 98 done CTL 10/8/2003 Investigation calls from Dennis, sending background form

0 98 done CTL 10/8/2003 Editing editing report RAC comments, PDF and sending

0 97 done CTL 10/8/2003 Admin working on new contract with RAC, then discussing

0 89 done CTL 11/3/2003 Development proposal for York

0 27 done CTL 8/21/2003 Admin looking at file size problem with figures

0 9 done CTL 10/9/2003 Investigation looking at crack section with Al, determing if chloride in crack

0 11 done CTL 10/10/2003 Admin email, etc

0 7 done CTL 10/9/2003 Admin update Active clients and some bugs with Al

0 9 done CTL 10/10/2003 Admin invoice to

0 8 done CTL 10/10/2003 Investigation lab work

0 97 done CTL 11/5/2003 Admin emails, review to do list

0 85 done CTL 9/18/2003 Support discussions on report on stress, reviewing old report assumptions

0 13 done CTL 9/18/2003 Support database mostly

0 80 done CTL 10/13/2003 Support plan for fluoride in the presence of iron experiments

0 99 done CTL 10/13/2003 Admin

0 7 done CTL 9/19/2003 Admin get hours together for D. Gray

0 12 done CTL 10/14/2003 Support looking over new articles on ERW welding

0 96 done CTL 11/7/2003 Investigation looking at tooling marks on tube

0 9 done CTL 10/14/2003 Investigation

emails, morning to do list, cleaning up CTL mail box -- warning it was full.

fluoride coorelations to intensities using multiple regression analysis

Page 128: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 80 done CTL 10/14/2003 Report writing report

0 7 done CTL 10/14/2003 Client communication with Brian and planning copper removal from LiBr

0 20 done CTL 9/22/2003 Report writing report

0 10 done CTL 10/15/2003 Support discussing fluoride with Brad, and changes to tracking sheet

0 97 done CTL 11/10/2003 Admin updating my active reports, emails

0 80 done CTL 10/15/2003 Admin

0 80 done CTL 10/15/2003 Client design criteria and finding resins for copper removal from LiBr

0 17 done CTL 9/23/2003 Report writing report

0 97 done CTL 11/11/2003 Investigation taking apart Sunoco Valves

0 80 done CTL 10/16/2003 Report writing report

0 98 done CTL 10/16/2003 Investigation

0 59 done MV 7/1/2003 Admin income tax for MV

0 96 done CTL 10/17/2003 Report writing report

0 8 done CTL 10/21/2003 Report writing report

0 96 done CTL 10/21/2003 Admin technical reading

0 97 done CTL 10/22/2003 Investigation E76HE

0 98 done CTL 11/13/2003 Investigation calls and discussion with RTI, Dominic Perrone, 724-342-1011

0 91 done CTL 10/17/2003 Pictures selecting and editing pictures for report

0 90 done CTL 10/17/2003 Literature trying to find info on iodine stress cracking, not much found

0 78 done MV 9/14/2003 Admin deposit taxes for August for IRS

0 96 done CTL 11/13/2003 Investigation reviewing days work with RAC and Al

0 76 done CTL 8/8/2003 Client follow with Pat at General Chemical on sample

0 97 done CTL 11/14/2003 Investigation York Investigation, most on phone with Wolverine, York

0 80 done CTL 9/26/2003 Editing

0 12 done CTL 10/27/2003 Admin emails, to do's

emails and trying to reduce the number of programs that start on bootup

fluoride in the presence of iron, looking at new results, discussing how to improve

editing report, checking sample numbering, making PDF and sending

Page 129: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 7 done CTL 10/24/2003 Admin miscelaneous emails and admin

0 91 done CTL 10/23/2003 Support

0 90 done CTL 11/17/2003 Admin morning emails, planning day/resources

0 95 done CTL 11/18/2003 Admin trips to QSL

0 89 done CTL 10/23/2003 Support create format for EDS Report

0 12 done CTL 9/30/2003 Admin adding piping spec A53 to technical library

0 12 done CTL 10/29/2003 Literature trying to find info on intergranular thermal cracking

0 11 done CTL 10/29/2003 Development working on proposal for York

0 10 done CTL 10/29/2003 Client

0 9 done CTL 10/29/2003 Client talking to Dennis regarding water in his system

0 95 done CTL 11/19/2003 Admin cleaning up RAC projects on Database

0 80 done CTL 10/29/2003 Admin emails, reading

0 79 done CTL 9/30/2003 Editing discussing report with RAC

0 95 done CTL 10/28/2003 Support reviewing protocol addendum for RAC

0 94 done CTL 10/28/2003 Development reading on resins

0 93 done CTL 10/28/2003 Admin emails, reading

0 94 done CTL 10/28/2003 Development reading technical literatue

0 94 done CTL 10/30/2003 Client talking with AstraZeneca about upcoming work

0 98 done CTL 11/20/2003 Client

0 92 done CTL 10/30/2003 Investigation looking at E05 tubes

0 92 done CTL 10/30/2003 Investigation getting more info on Cytec's reactor, calls and emails

0 95 done CTL 10/30/2003 Admin sending analysis to Valero, pdf file, cover email

0 94 done CTL 10/30/2003 Development proposal

0 80 done MV 10/7/2003 Support Julie at the Hospital

0 96 done CTL 10/3/2003 Support helping RAC on letter

explosion, going for coffee with Murphey, figuring out cause of explosion

email and forms to client trying to get background information, looking for pits

email to Sunoco asking for P.O., summarizing progress, pressure test with Al, etc

Page 130: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 97 done CTL 10/31/2003 Development proposal

0 90 done CTL 11/20/2003 Admin morning emails, reading

0 95 done CTL 10/31/2003 Admin emails, reading, checking & publishing timesheet

0 94 done CTL 10/31/2003 Editing

0 95 done CTL 10/8/2003 Admin emails, greetings

0 99 done CTL 10/8/2003 Support discussing, reviewing data, F with Fe analysis challenge,

0 94 done CTL 11/3/2003 Admin emails, reading

0 96 done CTL 11/24/2003 Marketing writing email proposal to Eli Lilly

0 92 done CTL 11/3/2003 Support proofreading formicary corrosion for RAC

0 92 done CTL 11/3/2003 Investigation looking at titanium tubes

0 93 done CTL 11/4/2003 Development preparation, meeting, trip

0 80 done CTL 10/9/2003 Admin updating potential agreement with CTL on patents

0 98 done CTL 11/25/2003 Editing adding graphs to report, final editing

0 97 done CTL 11/5/2003 Client phone call and reading letter, return email

0 96 done MV 11/5/2003 Client phone call from Willem on Toth Process consulting

0 97 done CTL 11/28/2003 Investigation

0 94 done CTL 11/5/2003 Management outlining work for Al for tomorrow

0 92 done CTL 10/9/2003 Pictures reviewing pictures

0 79 done CTL 10/13/2003 Investigation

0 98 done CTL 11/7/2003 Admin catch up with emails

0 96 done CTL 11/7/2003 Editing editing changes on report per Dennis Pickering

0 95 done CTL 11/7/2003 Pictures reviewing pictures for report

0 94 done CTL 11/7/2003 Development technical reading

0 80 done CTL 10/14/2003 Investigation looking at etched samples

0 90 done CTL 12/1/2003 Support finding info on gouging for RAC

revising report, adding new background, hardness data, making PDF

Preparation for Meeting including Powerpoint Presentation on Mothballing and Reviewing Documents from Lilly

going through Honeywell notebook for background on E32HE and general process flowsheets

Page 131: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 9 done CTL 10/15/2003 Admin clean up of microscope room with Al

0 97 done CTL 11/10/2003 Investigation looking at fracture face, directions for mounting to Al

0 96 done CTL 11/10/2003 Investigation taking some more pictures of laps

0 95 done CTL 11/10/2003 Report starting report

0 94 done CTL 11/10/2003 Editing editing pictures

0 80 done CTL 10/16/2003 Development miscelaneous technical reading

0 96 done CTL 11/11/2003 Report writing report

0 97 done CTL 12/3/2003 Admin filing, clearing desk, getting time records up to date for Lilly et al

0 93 done CTL 11/11/2003 Admin emails, reading, searching info on alpha phase

0 19 done CTL 9/25/2003 Development technical miscel reading

0 80 done CTL 10/17/2003 Admin looking over samples for Honeywell and general setup

0 94 done CTL 11/12/2003 Admin

0 93 done CTL 11/12/2003 Literature looking for information on alpha and beta phase in titanium

0 92 done CTL 11/12/2003 Pictures getting pictures together for York et al

0 98 done CTL 11/12/2003 Investigation looking at tubes with Fred

0 96 done CTL 12/4/2003 Report writing report and editing/selecting pictures for report

0 98 done CTL 11/12/2003 Support

0 94 done CTL 10/17/2003 Client

0 20 done CTL 9/2/2003 Pictures editing pictures

0 7 done CTL 11/13/2003 Report editing report, revising based on RAC & Robin Mendoza comments

0 99 done CTL 11/13/2003 Investigation

0 8 done CTL 10/20/2003 Investigation follow up with pictures and samples, and reviewing EDS analysis

0 8 done CTL 11/14/2003 Report editing report

0 97 done CTL 12/8/2003 Support followup on cross-sectional area of 3/4 enhanced titanium tubes

0 85 done CTL 10/24/2003 Investigation

emails, computer bootup problems, coordinating meeting tonight at NACE

attendance at NACE Meeting, 2.5 hour free to CTL, two hrs meeting potential clients & talking & listening to Rick Porter of RTI

Barbara Finch 215-592-2503 Rohm Haas, Amberlite IRC 748 chelating resin, faxing info

revising pictures and analysis for email to York et al for RAC to send out. Then meeting on same.

meeting with RAC and Merv on Honeywell and then followup meeting

Page 132: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 87 done CTL 10/27/2003 Support reading for proposal for York

0 97 done CTL 11/17/2003 Report edit report and send

0 97 done CTL 11/17/2003 Investigation York task force on Wolverine Embedments

0 85 done CTL 10/27/2003 Admin discussion with Tatnell his input on epoxy

0 98 done CTL 10/23/2003 Support

0 98 done CTL 12/9/2003 Admin check emails

0 97 done CTL 12/9/2003 Report slide presentation cleanup, general prep

0 80 done CTL 11/18/2003 Investigation working with task force on embedments

0 94 done CTL 10/23/2003 Admin updating and printing "Active Jobs Report

0 98 done CTL 12/10/2003 Consult Astrazeneca Meeting with Contractors plus travel

0 11 done CTL 11/19/2003 Admin morning emails, reading

0 10 done CTL 11/19/2003 Report email report to fatigue failure

0 9 done CTL 11/19/2003 Admin invoicing

0 98 done CTL 12/11/2003 Investigation talking with Rod and then RAC on Astrazeneca

0 80 done CTL 11/19/2003 Development summarizing proposal for York

0 96 done CTL 11/19/2003 Investigation

0 80 done CTL 10/28/2003 Editing reviewing Cytec report and samples with RAC

0 93 done CTL 10/2/2003 Report completing draft of report

0 15 done CTL 11/20/2003 Admin followup with QSL to get invoice amount

0 98 done CTL 12/12/2003 Investigation looking at sample and discussing with Dick

0 13 done CTL 11/20/2003 Development packing proposal and costs, making invoice

0 12 done CTL 11/20/2003 Support

0 11 done CTL 11/20/2003 Client followup with Astrazenca

0 10 done CTL 11/20/2003 Admin weekly Active Report update and printing

0 9 done CTL 11/20/2003 Marketing

reading on how to make methyl chloride and health effects of exposure/lungs

conference call York and Wolverine, and followup email to Al Dickensheets

followup with Al on web-database for York and front page picture, etc., allowance for discussion of database anomalies

called Jim Petroski of Cortis Corp 908-412-3727 about boiler tube, 2nd voice mail

Page 133: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 8 done CTL 11/20/2003 Client writing email to Clark about purchase order

0 7 done CTL 10/30/2003 Client call from Denny Dietz, followup emai, setting up Project

0 8 done CTL 11/21/2003 Investigation working with Al on way to summarize erosion data on tubes

0 7 done CTL 11/21/2003 Editing rewrite of report with RAC editing

0 98 done CTL 12/15/2003 Editing clean up report, print, to RAC

0 80 done CTL 11/21/2003 Client

0 80 done CTL 11/22/2003 Investigation scanning Al's erosion summary sheets into computer

0 80 done CTL 11/21/2003 Admin filing, clearing desk

0 99 done CTL 10/31/2003 Admin database problems, some filing

0 97 done CTL 12/16/2003 Admin email

0 10 done CTL 11/24/2003 Marketing talking with Nanthan Parker at Eli Lilly and trying to plan trip

0 9 done CTL 11/24/2003 Admin emails, plans for week

0 80 done CTL 11/24/2003 Investigation going over tube distribution data with Al

0 80 done CTL 11/24/2003 Client contact two laboratories about fatigue testing of titanium tubes

0 98 done CTL 11/4/2003 Client Meeting with Sam et al on problem with Wolverine Tubes

0 89 done CTL 11/5/2003 Admin outlining work required for Resins

0 14 done CTL 11/5/2003 Investigation looking at titanium tooling problem

0 98 done CTL 12/17/2003 Editing editing York report again

0 11 done CTL 11/25/2003 Investigation proof reading lab notes on misc tasks for Al

0 10 done CTL 11/25/2003 Admin moring emails, reading metal news

0 9 done CTL 11/25/2003 Client followup with Brian Hersey

0 80 done CTL 11/25/2003 Support database for York discussing with Al

0 7 done CTL 11/25/2003 Literature

0 7 done CTL 11/5/2003 Investigation alpha phase on titanium

0 98 done CTL 12/18/2003 Admin email

discussing with RAC, Sam's email on addressing embeddments statistically

miscelaneous technical reading, looking alternate sources for mothball info

Page 134: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 98 done CTL 11/5/2003 Admin completing form and delivery for day off per RAC's request

0 80 done CTL 11/29/2003 Support going to get tapes for Video Camera for trip to Lilly

0 17 done CTL 10/14/2003 Client

0 9 done CTL 11/7/2003 Investigation look at blinds on valves

0 96 done CTL 12/19/2003 Editing editing Lilly report

0 10 done CTL 12/2/2003 Consult meeting at Tech Center

0 98 done CTL 12/22/2003 Development

0 9 done CTL 12/2/2003 Travel trip from Indianapolis to Elkton

0 80 done CTL 12/1/2003 Client followup with Ron on meeting

0 80 done CTL 12/1/2003 Admin followup on flight times, hotel and car verify

0 91 done CTL 12/1/2003 Travel travel to Eli Lilly

0 93 done CTL 12/23/2003 Client email to Dick then phone call

0 97 done CTL 12/23/2003 Admin trying to organize electronic files

0 20 done CTL 9/22/2003 Support reading Eng-tips site on corrosion forum

0 11 done CTL 11/11/2003 Investigation York tubes examing OD

0 97 done CTL 12/24/2003 Admin invoicing plus redo's , updating CTL Tracking Report

0 12 done CTL 12/3/2003 Admin followup with Boyle

0 11 done CTL 12/3/2003 Investigation reading info from Lilly on systems and insulation

0 10 done CTL 12/3/2003 Admin call from Astazeneca

0 9 done CTL 12/3/2003 Report starting background

0 8 done CTL 12/3/2003 Admin emails

0 7 done CTL 12/3/2003 Investigation getting updated on status of investigation

0 96 done CTL 12/26/2003 Support looking for Honeywell mounts, pictures and actual mounts

0 80 done CTL 11/12/2003 Report wrapping up background as best as possible

0 11 done CTL 12/4/2003 Support finding tensile machine, used for ti tubes

called Bill Long - said report looks good, probably schedule meeting soon

water specs for pharmaceutical industry, reading article on industrial cleaning solutions

Page 135: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 10 done CTL 12/4/2003 Client followup call from Rod

0 98 done CTL 12/29/2003 Admin verifying all data present and organized, making CD

0 80 done CTL 12/4/2003 Support unknown

0 97 done CTL 12/29/2003 Client

0 80 done CTL 12/5/2003 Later astrazeneca, york tensile, some lilly

0 91 done CTL 12/3/2003 Admin email, scanning and download spyware cleaning of computer

0 13 done CTL 12/8/2003 Report loading car and trip to Astrazeneca, plus meeting, plus drive back

0 99 done CTL 12/30/2003 Editing reading RAC comments on York Proposal

0 11 done CTL 12/8/2003 Investigation dropping 2 tubes by Lehigh for tensile testing

0 10 done CTL 12/8/2003 Admin emails, getting RAC and Odle active project list current and printing

0 9 done CTL 12/8/2003 Support

0 98 done MV 12/31/2003 Development

0 80 done CTL 12/8/2003 Report writing

0 19 done CTL 10/27/2003 Investigation review status of investigation with Al and RAC, steroscope on E18

0 13 done CTL 12/9/2003 Report writing

0 95 done CTL 1/2/2004 Admin email

0 11 done CTL 12/9/2003 Admin filing, clearing desk

0 10 done CTL 12/9/2003 Client

0 9 done CTL 12/9/2003 Admin delivering tubes to Lehigh

0 8 done CTL 12/9/2003 Admin xmas card list

0 97 done CTL 1/5/2004 Investigation looking at tubes under stereoscope, measuring walls

0 16 done CTL 11/19/2003 Admin fixing RAC errors on job file

0 98 done CTL 12/10/2003 Admin email, review status on York Job

0 98 done CTL 1/6/2004 Investigation looking at tubes

0 99 done CTL 1/7/2004 Investigation trip to AstraZeneca, inspecting chillers et al, trip back

talking with Public works about consulting … advising on materials for tubes and process problems

plan tomorrow for Lehigh, Al then Al and RAC, calling and email with labels,excel file, ok to use stereoscope

writing up and thinking about idea of making hydrogen, email to McClaine

Eddy from York Ottawa and Martin Lepage from public works called about tubes

Page 136: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 9 done CTL 12/11/2003 Report writing

0 80 done CTL 12/11/2003 Literature reading on mothballing

0 97 done CTL 12/11/2003 Admin email and timesheet

0 13 done CTL 12/12/2003 Admin cleaning up address book

0 98 done CTL 1/8/2004 Editing editing Honeywell report

0 11 done CTL 12/12/2003 Admin email

0 97 done CTL 1/8/2004 Editing editing York MOU

0 9 done CTL 12/12/2003 Marketing [email protected] Cynthia Todd

0 80 done CTL 12/12/2003 Client talking with Dick

0 88 done CTL 11/20/2003 Admin moring emails, reading metal news

0 16 done CTL 12/15/2003 Support proof reading tubercle paper from RAC

0 15 done CTL 12/15/2003 Support reviewing York database, suggestions, miscel

0 95 done CTL 1/9/2004 Admin emails and fu on miscel clients

0 13 done CTL 12/15/2003 Support review status of active jobs then print

0 12 done CTL 12/15/2003 Client

0 11 done CTL 12/15/2003 Investigation review cuts made on sample

0 94 done CTL 1/12/2004 Admin emails

0 79 done CTL 12/15/2003 Marketing followup quote to Cynthia from Applied Technologies, Ca

0 98 done CTL 1/13/2004 Admin filing old job folders, bringing folders up to date

0 10 done CTL 12/16/2003 Investigation reviewing cut sample for making mounts, view on stereoscope

0 9 done CTL 12/16/2003 Investigation helping Peter with his failure analysis

0 80 done CTL 12/16/2003 Client proofing report for Rod Knauer

0 87 done CTL 11/24/2003 Marketing

0 14 done CTL 12/17/2003 Investigation emails to Astrazeneca on pipe sampling, water sampling

0 98 done CTL 1/14/2004 Report

followup with Astrazeneca on meeting, water analysis, meeting notes

talking with Ellen Link, Link's Materials Consulting 610-868-8640 [email protected]

adding section on economics and responding to questions on carbon steel system

Page 137: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 12 done CTL 12/17/2003 Literature

0 11 done CTL 12/17/2003 Investigation looking at mount

0 9 done CTL 12/17/2003 Editing editing York report again

0 87 done CTL 11/25/2003 Marketing getting ready for Lilly job, including reservations, literature

0 8 done CTL 12/18/2003 Admin notifying one half day away from office

0 87 done CTL 12/1/2003 Admin emails

0 9 done CTL 12/19/2003 Admin email

0 97 done CTL 1/15/2004 Support work slow, reading and filing

0 80 done CTL 12/19/2003 Literature discussing passivation with RAC then reading literature on same

0 14 done CTL 12/1/2003 Management followup with Al on status of work, including slide show for Astra

0 9 done CTL 12/22/2003 Support

0 8 done CTL 12/22/2003 Editing editing Lilly report

0 16 done CTL 11/10/2003 Admin

0 98 done CTL 1/16/2004 Client followup with email to Brian

0 86 done CTL 11/10/2003 Investigation looking at leak test on first valve

0 9 done CTL 12/23/2003 Pictures reviewing all pictures (500?)

0 80 done CTL 12/23/2003 Admin email

0 7 done CTL 12/23/2003 Investigation

0 93 done CTL 1/19/2004 Admin emails, active projects report

0 89 done CTL 12/3/2003 Admin followup with Brian Hersey on proposal

0 88 done CTL 12/3/2003 Admin

0 99 done CTL 12/24/2003 Admin emails

0 12 done CTL 12/26/2003 Support proof reading article for RAC

0 95 done CTL 1/20/2004 Investigation making sense of data

0 97 done CTL 1/20/2004 Investigation finding articles on FMEA, reading

reading book on cooling water treatment, getting RAC and Al to update the honeywell files

new website for York, new pictures for our website -- testing & setup on York

trying to warm up, allowance for productivity fall off, office 52 degrees F

rechecking valve ID and sending followup emails to Fran, Dick for material specs

followup with Clark Henry and Eone for PO and Dunn and Bradstreet Number

Page 138: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 8 done CTL 12/26/2003 Support helping cleanup shop

0 90 done CTL 1/20/2004 Admin getting equipment ready for tomorrow

0 9 done CTL 12/29/2003 Admin

0 9 done CTL 12/29/2003 Admin letter to Cassidy for more mounts started

0 80 done CTL 12/29/2003 Admin update and then publish Active Jobs list

0 92 done CTL 11/13/2003 Development estimating costs for IX Resin Lab Study

0 92 done CTL 1/22/2004 Investigation slide presentation

0 12 done CTL 12/30/2003 Admin

0 11 done CTL 12/30/2003 Pictures editing pictures, looking at samples, arranging in report

0 10 done CTL 12/30/2003 Admin

0 9 done CTL 12/30/2003 Client email to Edy about public works contact yesterday

0 10 done CTL 12/31/2003 Client talking with Rod then Michael Albert

0 98 done CTL 1/26/2004 Development

0 80 done CTL 12/31/2003 Report pictures and report writing

0 18 done CTL 12/9/2003 Support cutting titanium tubes, extras for testing

0 9 done MV 1/4/2004 Development working on patent for H2 via SOE

0 80 done CTL 1/2/2004 Report writing report

0 87 done CTL 12/9/2003 Admin looking for lost paperwork on desk

0 13 done CTL 10/23/2003 Report rewrite of report in alternative format

0 98 done CTL 1/27/2004 Client attempted followup with K. Wiley, Piller, email and phone

0 10 done CTL 1/5/2004 Report writing

0 9 done CTL 1/5/2004 Admin email and timesheet catchup

0 80 done CTL 1/5/2004 Admin active report update then publish, then followup with others

0 80 done CTL 1/5/2004 Client followup with Chung on NYC pending chiller inspections

0 10 done CTL 1/6/2004 Report writing

email and then review profitability of FA for 2003, biggest company, etc.

letter to Cassidy asking for ok to make more mounts, look at originals made plan first

morning emails, tubercle article to Al, talk with Al about remote database

searching literature for info on glycol degradation, and email question to Slime company about H2O as ballast

Page 139: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 9 done CTL 1/6/2004 Admin emails

0 89 done CTL 11/19/2003 Admin invoicing

0 25 done CTL 10/1/2003 Report revising report

0 12 done CTL 1/8/2004 Editing editing York report with Al

0 97 done CTL 1/28/2004 Admin problems with virus, running scan, loosing timesheet records, etc.

0 10 done CTL 1/8/2004 Investigation followup up tube sample locations, viewing samples, weld mount

0 9 done CTL 1/8/2004 Marketing fu with York NYC, Cynthia Todd, Dennis Pickering, and Jim Fouris

0 80 done CTL 1/8/2004 Admin emails, yesterday's timesheet

0 14 done CTL 12/12/2003 Report writing

0 13 done CTL 1/10/2004 Investigation building model to calc time to remove Cu from LiBr absorption unit

0 12 done CTL 1/9/2004 Editing editing report from Al & looking up welding specs

0 11 done CTL 1/9/2004 Marketing meeting with Randolph Harpold

0 98 done CTL 1/30/2004 Investigation discuss samples with Al and Joe, download pictures

0 9 done CTL 1/9/2004 Investigation

0 80 done CTL 1/9/2004 Investigation calculations for LiBr in Brookland

0 80 done CTL 1/9/2004 Client talking with Dick Ervin about sunoco job

0 16 done CTL 12/15/2003 Support proof reading York job for Al

0 98 done CTL 2/2/2004 Admin requesting off tomorrow, printing invoice

0 80 done CTL 1/12/2004 Admin filing old job folders, bringing folders up to date

0 96 done CTL 2/3/2004 Report

0 91 done CTL 11/23/2003 Investigation counting area under pits for all 25 tubes

0 16 done CTL 12/16/2003 Support

0 8 done CTL 1/13/2004 Client conversations with Lilly (Jeff & Nathaniel)

0 97 done CTL 2/4/2004 Investigation planning LiBr initial capacity experiments with Dave

0 80 done CTL 1/13/2004 Admin morning emails

talking with Brian Hersey & then getting two phone numbers and resins for RAC

making sketch of AstraZeneca pipe system from their large drawings

York database, extra webspace, supporting other metallurgists via web

Page 140: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 11 done CTL 1/14/2004 Client follow up call from Bill Long, witness bug test for latest pipe

0 10 done CTL 1/14/2004 Admin clearing last of job files on desk

0 9 done CTL 1/14/2004 Client followup with joe hauser

0 87 done CTL 12/17/2003 Admin miscel reading, talking with Brad about webserver

0 88 done CTL 12/17/2003 Admin emails

0 20 done CTL 12/18/2003 Admin selecting/buying webhost provider for www.york.corrosionlab.net

0 19 done CTL 12/18/2003 Client emails/phone to Maureen, Dick, Maurin, Francis for info

0 95 done CTL 2/5/2004 Investigation Libr solution setup with resin column

0 97 done CTL 2/6/2004 Report editing report send to Merv, adding timeline

0 88 done CTL 12/18/2003 Admin getting Andrew setup to do xmas cards

0 88 done CTL 12/18/2003 Support draft MOU for York

0 13 done CTL 1/15/2004 Investigation looking at failed nipple from chemical feed line

0 95 done CTL 2/8/2004 Report drawing North Campus map on Excel

0 11 done CTL 1/15/2004 Investigation looking at pipe sections, tubercles, pictures, MIC test

0 10 done CTL 1/15/2004 Marketing following up quote to Steve at Slime, Inc.

0 9 done CTL 1/15/2004 Development working on what CTL needs to rejuvenate the resin

0 88 done CTL 12/22/2003 Investigation

99 done CTL 2/9/2004 Editing editing slimes report

0 96 done CTL 2/9/2004 Client call from Deric Masten

0 11 done CTL 1/16/2004 Investigation

0 10 done CTL 1/16/2004 Client reviewing options proposed by Lilly, discussing with RAC

0 9 done CTL 1/16/2004 Client followup with Mike on slime project NDA

0 80 done CTL 1/16/2004 Client

0 86 done MV 12/23/2003 Admin mailed in $1500 presciptions from ACME

0 8 done CTL 1/19/2004 Investigation putting a table together of all Alchemix Samples

looking at etched mount, polished section of metal, followup with Fran

looking at data for pipe loss, how to present data, pictures, MIC results

followup with Clark Henry and Eone for PO and Dunn and Bradstreet Number

Page 141: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 98 done CTL 2/10/2004 Marketing

0 85 done CTL 12/24/2003 Admin organizing pictures

0 98 done CTL 2/10/2004 Marketing on phone with potential clients

0 80 done CTL 1/20/2004 Client phone call to Rod, call from M. Albert

0 98 done CTL 2/12/2004 Admin invoicing, sending report drafts

0 79 done CTL 5/30/2004 Support finish the quality control manual for signing in samples

0 98 done MV 2/13/2004 Consulting meeting with Willem and Toth

0 80 done CTL 1/21/2004 Investigation

0 97 done CTL 2/14/2004 Admin answering emails from CTL

0 99 done MV 2/14/2004 Travel travel back

0 80 done CTL 1/21/2004 Client talking with RAC on FMEA for York, other end of day misc

0 99 done CTL 2/18/2004 Admin

0 88 done CTL 12/7/2003 Report completing preparation, two more slides for presentation

0 9 done CTL 1/23/2004 Support meeting Ed ? Metallurgist, misc in office

0 80 done CTL 1/23/2004 Client Meeting with Astra Zeneca, slide presentation

0 95 done CTL 2/18/2004 Investigation looking at mounts, pipes

0 91 done CTL 12/8/2003 Admin vendor paperwork Cortis

0 15 done MV 12/31/2003 Development signing up for Jurispro

0 10 done CTL 1/26/2004 Admin emails

0 9 done CTL 1/26/2004 Report reviewing report with RAC then revising

0 95 done CTL 2/19/2004 Investigation York Chiller Inspection

0 80 done CTL 1/26/2004 Report revising report

0 80 done CTL 1/26/2004 Investigation looking for chemical cleaning companies

0 10 done CTL 1/2/2004 Investigation receiving and initial look at copper samples

0 97 done CTL 2/22/2004 Report writing report

selling Steve on analyzing all components of slimes for chlorides … done

inspection of chillers on southside with boroscope including prep are return

getting status of all work, answering emails, packing stuff for two NYC trips

Page 142: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 10 done CTL 1/27/2004 Admin

0 9 done CTL 1/27/2004 Client followup with Dick Ervin on report and send out after final edit

0 79 done MV 1/27/2004 Admin checking on Golden Rule Bill

0 80 done CTL 1/27/2004 Admin invoicing and hours for three clients

0 90 done CTL 12/10/2003 Marketing

0 98 done CTL 2/23/2004 Admin weekly active report, emails, job status, filing papers from trips

0 11 done CTL 1/28/2004 Admin finishing invoicing

0 10 done CTL 1/28/2004 Investigation

0 9 done CTL 1/28/2004 Admin send sam chatteron report .. Pdf

0 80 done CTL 1/28/2004 Client followup with Brian on LiBr work, plans

0 80 done CTL 1/29/2004 Investigation trip, inspection, trip back

0 80 done CTL 1/28/2004 Admin emails

0 98 done CTL 1/28/2004 Support talking with RAC on CSI and slide shows, and back technical library

0 44 done MV 11/30/2003 Admin return digital camera for repairs

0 12 done CTL 1/30/2004 Investigation

0 11 done CTL 1/30/2004 Literature finding articles on insulators

0 9 done CTL 1/30/2004 Admin two days emails

0 91 done CTL 2/24/2004 Development

0 98 done CTL 1/29/2004 Investigation literature search on insulators

0 99 done CTL 1/30/2004 Admin fixing errors in invoices and resending

0 20 done CTL 12/15/2003 Admin reviewing work to set priorities for week

0 9 done CTL 2/2/2004 Report

0 93 done CTL 2/25/2004 Development reviewing data on resins

0 93 done CTL 2/25/2004 Report working on graphics for report

followup verbally and then on active reports status of jobs, sign in new job w Piller

miscelaneous and talk with David Kaylin, Chiller Technologies 732-274-0900 Al dust

slimes looking at pits, cracks, setting up experiment with evap vs pH

looking at mounts of cracks and pits, pH vs drying data, and corrosion sample

looking for filter canister and filters …. And email from York on subject

4 attempts to send presentation to Ron … file size problem … note, office cold

Page 143: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 93 done CTL 2/25/2004 Admin email, status work with al

0 93 done CTL 2/25/2004 Admin getting hours together and entering for several invoices

0 93 done CTL 2/25/2004 Marketing Dave Kriss, Gencopr rouging 585-303-4779 at Rochester, NY

0 93 done CTL 2/25/2004 Admin followup on casing inspection for York

0 95 done MV 2/25/2004 Report writing report, finishing Exec Summary

0 94 done CTL 2/25/2004 Investigation looking at fracture surface

0 93 done CTL 2/25/2004 Support talking with Brad about email problem, etc

0 75 done CTL 1/30/2004 Client conversation with Ron on pathforward

0 81 done CTL 2/24/2004 Client correspondence with Raum about vents, chlorides, etc.

0 79 done CTL 2/24/2004 Editing Editing Al's report

0 89 done CTL 2/24/2004 Support

0 88 done CTL 2/24/2004 Editing editing report from AL

0 87 done CTL 2/24/2004 Support

0 74 done CTL 1/30/2004 Investigation

0 86 done CTL 1/28/2004 Marketing followup with Randall, Tatnell, 2 or 3 times

0 79 done CTL 2/23/2004 Investigation update on resin work, including resin from Afeefi

0 79 done CTL 2/23/2004 Editing talking with Sam, editing report for York

0 79 done CTL 2/23/2004 Investigation looking at bolts

0 79 done CTL 2/23/2004 Miscel

0 79 done CTL 2/23/2004 Marketing talking to Roosvelt about Cu-Ni job, then fix form, and email him

0 79 done CTL 2/23/2004 Editing editing report with RAC input

0 86 done CTL 1/28/2004 Client

0 57 done CTL 1/27/2004 Admin selecting resins and ordering

0 69 done CTL 2/21/2004 Development

0 68 done CTL 2/21/2004 Admin timesheet catch up, emails

addressing Sam's need for info, redoing report twice to make clear to Sam

looking up data on Methyl Chloride from HCl and methanol for Brad Proposal

LiBr solution and M4195 resin receive, looking for specifics on regeneration of resin

miscelaneous around office, talking with Brad about computers, toilet won't stop

followup with Piller, AOL several calls trying to get contact at AOL, prep for trip

trying to find good articles on how generators work and insulation fails

Page 144: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 68 done CTL 2/21/2004 Report writing report

0 77 done CTL 1/27/2004 Marketing Randall Harpold calls and emails on two potential jobs

0 64 done CTL 2/19/2004 Management trying to get data from Joe et al at office

0 64 done CTL 2/19/2004 Report making tables for report

0 67 done CTL 2/20/2004 Admin downloading pictures, files. Emails. Check status of all jobs.

0 65 done CTL 2/20/2004 Investigation trip to Piller, site inspection, and trip to Newark

0 65 done CTL 2/20/2004 Report Piller revision

0 64 done CTL 2/19/2004 Report writing report

0 49 done CTL 1/26/2004 Report editing report from AL on std. Deviations

0 59 done CTL 2/18/2004 Report making tables for report

0 43 done CTL 1/23/2004 Marketing followup with Peller with email, etc.

0 44 done CTL 1/23/2004 Report discuss glycol with Jeff …. Then ctl

0 57 done CTL 1/22/2004 Marketing

0 59 done CTL 2/18/2004 Travel Amtrak trip

0 64 done CTL 12/29/2003 Investigation studying metallography pictures

0 36 done CTL 1/21/2004 Marketing quote to Randolph on pipe

0 52 done CTL 2/17/2004 Editing Report editing from Al

0 35 done CTL 1/21/2004 Investigation initial inspection of rim

0 68 done CTL 12/4/2003 Investigation getting updated on status of investigation

0 50 done MV 2/12/2004 Travel car ride, airline travel

0 37 done CTL 12/26/2003 Admin organizing pictures

0 48 done CTL 2/11/2004 Admin

0 58 done CTL 12/26/2003 Management discussing work to do on York DB, Honeywell, Sunoco etc with Al

0 29 done CTL 1/20/2004 Admin emails, followup with Al on work, followup with Fred on message

0 45 done CTL 2/10/2004 Client conversation with Brian and listening

talking with Joe about AOL Generator corrosion problem, and then Piller

unknown, busy at work didn't record times, study word files to figure out

Page 145: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 47 done MV 1/31/2004 Admin deposit annual report on WH Taxes for Delaware

0 45 done CTL 2/10/2004 Investigation

0 45 done CTL 2/10/2004 Marketing mostly working on proposal …. Other odds and ends

0 45 done CTL 2/10/2004 Admin weekly active report

0 45 done CTL 2/10/2004 Support installing software moving files to Ref Computer

0 42 done CTL 2/9/2004 Admin unaccounted for ?

0 45 done CTL 1/19/2004 Admin getting data copied and miscel office stuff done to leave cold office

0 23 done CTL 1/16/2004 Client

0 34 done CTL 2/9/2004 Investigation drawing on North campus map

0 34 done CTL 2/9/2004 Investigation checking results on column, email to Brian

0 34 done CTL 2/9/2004 Client taling with Steve about results

0 34 done CTL 2/9/2004 Investigation sendinging south campus map to Astrazeneca for review

0 34 done CTL 2/9/2004 Client trying to get magnaflux from Duane

0 34 done CTL 2/9/2004 Marketing trying to get ok on Westec doing job on Saturday for casing

0 43 done CTL 1/16/2004 Admin emails

0 15 done CTL 1/15/2004 Admin cleaning off some disk space

0 25 done CTL 2/7/2004 Report finishing South Campus drawing on Excel

0 36 done CTL 1/15/2004 Admin email

0 24 done CTL 2/6/2004 Investigation setup full column with resin, find minimum copper conc obtainable

0 24 done CTL 2/6/2004 Report south campus map continued

0 37 done CTL 12/18/2003 Investigation looking at mount reviewing EDS data

0 21 done CTL 2/5/2004 Report drawing south campus map

0 21 done CTL 2/5/2004 Report starting picture for report

0 21 done CTL 2/5/2004 Marketing followup with Joe Hauser on casing problem, contact Randall

0 21 done CTL 2/5/2004 Client resend emails to Piller …. Not working

phone conversation with John Brotherton, Germans consider insulator etc prioritary

filling out NACE registration and looking at NACE site for program, hotels, etc.

Page 146: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 21 done CTL 2/5/2004 Client

0 21 done CTL 2/5/2004 Investigation looking at mounts and calling J.Banks with overview of findings

0 30 done CTL 12/17/2003 Support

0 94 done CTL 1/14/2004 Marketing

0 13 done CTL 2/4/2004 Development meeting and discussion on boiler investigation

0 11 done CTL 2/4/2004 Investigation selecting areas to mount, viewing gouge mount

0 11 done CTL 2/4/2004 Marketing reviewing analysis and phone call with Kathrin

0 8 done CTL 2/4/2004 Investigation slimes … reviewing analysis writing email on crystallization

0 95 done CTL 12/16/2003 Client trip, meeting with client, sampling plan

0 88 done CTL 1/13/2004 Report meeting on report and then editing Rick's version

0 13 done CTL 1/12/2004 Investigation

0 7 done CTL 2/2/2004 Investigation discussing results on al corrosion coupon, old report, other findings

0 93 done CTL 2/25/2004 Support reviewing reports from Joe

0 79 done CTL 2/2/2004 Admin emails, weekly Active Project Report

0 79 done CTL 2/2/2004 Admin clearing out some virus reports and emails

0 97 done CTL 2/26/2004 Editing chiller report editing, sending to RAC

0 97 done CTL 2/26/2004 Investigation outlining work that needs to be one with resin

0 97 done CTL 2/26/2004 Client talking with John on AOL report

0 97 done CTL 2/26/2004 Admin book keeping on expenses to NYC

0 96 done CTL 2/26/2004 Admin

0 97 done CTL 2/26/2004 Report findings section

0 97 done CTL 2/26/2004 Admin followup with casing inspection again

0 97 done CTL 2/26/2004 Development reviewing lab notebook

0 73 done CTL 2/27/2004 Admin

0 99 done MV 2/28/2004 Development fix this program to rank top 20 by date

followup with John Ely and setting time for review of his samples, initial look at samples

figuring out how to share space on another website for York and other remote metallurgists

discussion with Slime company, Steve about corrosion of aluminum wheel

looking at samples and phone call with Rod to get table on samples completed

emails, talking with Brad on email problem, then testing after Cavtel fixed it

converting Cooperheat fax report to pdf report and sending to Joe Hauser

Page 147: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 99 done CTL 2/28/2004 Report proof reading, adding some pictures

0 73 done CTL 2/27/2004 Admin reviewing goals for year, not finished

0 73 done CTL 2/27/2004 Report writing

0 73 done CTL 2/27/2004 Admin problems with email, sending email to cavtel, testing on fax line

0 0 done CTL 2/27/2004 Report writing

0 0 done CTL 2/27/2004 Admin finishing completion reports with Al for Piller and York

0 0 done CTL 2/27/2004 Admin finishing completion reports with Al for Piller and York

0 0 done CTL 2/27/2004 Admin

0 0 done CTL 2/28/2004 Admin

0 0 done MV 2/28/2004 Report writing

0 0 done CTL 3/1/2004 Admin weekly active report, emails, invoice, trying email settings again

0 0 done CTL 3/1/2004 Client news on Burnham Job to RAC

0 0 done CTL 3/1/2004 Client

0 0 done CTL 3/1/2004 Editing editing report for Piller

0 0 done CTL 3/1/2004 Report discuss report with Merv then update RAC

0 0 done CTL 3/1/2004 Client call Ron Crooks, 239-6563 about Cytec HT reactor

0 0 done CTL 3/1/2004 Admin print report and Appendix, to RAC

0 0 done CTL 3/1/2004 Support discussing expense report with RAC

33 0 done CTL 3/31/2004 Blank test

0 0 done CTL 3/1/2004 Client talking with Rod on when we would have the report

0 0 done CTL 3/2/2004 Admin working on joint agreement for CTL/MV

0 0 done CTL 3/2/2004 Development review resin data with Al

0 0 done CTL 3/2/2004 Admin emails, file financials for Piller and York, update records on Projects

0 0 done CTL 3/2/2004 Support proof reading

0 0 done CTL 3/2/2004 Report writing report and looking up reactions of chlorine with methanol

filing, followup on Burnham Boiler proposal, note to RAC on Gencorp

trying to get [email protected] outbound working with new stuff from Brad

Charley Sturdizant, 615-591-0058 ext 227 on heat treating reactor, Brad, RAC

Page 148: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 0 done CTL 3/2/2004 Marketing

### 0 done CTL 3/3/2004 Admin

0 0 done CTL 3/2/2004 Editing finish editing report, made PDF, send to Piller

0 0 done CTL 3/2/2004 Marketing Tim Sayer from Florida sending four nails for OES Alloy ID

0 0 done CTL 3/2/2004 Development

0 0 done MV 3/2/2004 Report writing opinion

### 0 done CTL 3/3/2004 Client call from Astrazeneca on potential work next week

0 0 done CTL 3/3/2004 Development reviewing data with Al on copper balance

0 0 done CTL 3/3/2004 Admin

0 0 done CTL 3/3/2004 Report rewrite Honeywell report

0 0 done CTL 3/3/2004 Admin

### 0 done MV 3/3/2004 Report writing on report, SiCl4 diagram

### 0 done CTL 3/4/2004 Support helping unload old SEM

### 0 done CTL 3/4/2004 Admin correct spelling error and resend Piller report

### 0 done CTL 3/4/2004 Editing edit and send out report

### 0 done CTL 3/4/2004 Support listen to Joe on corrosion problem

### 0 done CTL 3/4/2004 Admin new sample in from Mississippi Power

### 0 done CTL 3/4/2004 Admin call customer in Florida on new price

### 0 done CTL 3/4/2004 Admin morning emails, planning day's activities

### 0 done MV 3/4/2004 Report writing on SiCl4 suppression

### 0 done CTL 3/5/2004 Admin setting up a Fed Ex Account and using for first time

### 0 done CTL 3/5/2004 Edit edit Al's report

### 0 done CTL 3/5/2004 Investigation looking at ID's under stereoscope

### 0 done CTL 3/5/2004 Report revise report with visual inspection info, reprint and send again

### 0 done CTL 3/5/2004 Admin morning emails, planning day's activities

call Jack Taylor 856-384-7233 via Randall Harpold, discuss Randall, inhouse

morning email, followup with Steve on slime work, walk around review status

learning how to alter the resolution on PDF documents, details on program

customer complained that my email gave him a virus, scanning my computer … slow

giving homeowner pricing on nails, finding out about certificed analysis, messing with nails.

Page 149: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 3/5/2004 Client call Steve with chloride results, after FU with Joe

### 0 done CTL 3/5/2004 Admin invoice Piller

### 0 done MV 3/5/2004 Admin adding up taxes 941 per IRS

### 0 done CTL 3/5/2004 Client find and talk with pipe cleaning companies

### 0 done MV 3/6/2004 Report writing

### 0 done MV 3/7/2004 Report why Toth site was a superfund site and market info

0 0 done CTL 3/8/2004 Support find articles on SCC of brass via ammonia

0 0 done CTL 3/8/2004 Investigation call from Rod Knauer concerning version of the report

0 0 done CTL 3/8/2004 Unknown at work, didn’t write down

0 0 done CTL 3/8/2004 Client Nathan Parker wants written copy of report

0 0 done CTL 3/8/2004 Investigation calling companies to clean pipes, internet search also

0 0 done CTL 3/8/2004 Marketing

0 0 done CTL 3/8/2004 Admin problem with printer not working, with Brad

0 0 done CTL 3/8/2004 Investigation referral to QED Systems, Carl Sprayberry 757-413-7010

0 0 done CTL 3/8/2004 Investigation conversation with Carolyn Palmer of Astra Pak, 1-800-347-5444

0 0 done MV 3/8/2004 Admin email report to Willem, last minute editing

0 0 done CTL 3/8/2004 Report memo on pipe cleaning companies

0 0 done CTL 3/9/2004 Admin checking messages, putting away equipment, cking emails

0 0 done CTL 3/9/2004 Investigation trip to AZ, chiller inspection

### 0 done CTL 3/10/2004 Report short email report on chiller inspections

### 0 done CTL 3/10/2004 Admin sign in two samples from AZ boiler and discuss with Joe

### 0 done CTL 3/10/2004 Development summarize lab results

### 0 done CTL 3/10/2004 Client talking to RAC about AstraZeneca, RAC talking about appearance

### 0 done CTL 3/10/2004 Admin

### 0 done CTL 3/10/2004 Investigation discussing molten tin failure with Brad and Al

call from Don Kerr 215-282-2185 from AkF Engineers about Cu pipe leaking

active jobs reports, transferring pictures from laptop Astrazeneca, emails, plan day

Page 150: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 3/10/2004 Admin take Fed Ex to box

### 0 done CTL 3/10/2004 Report memo on cleaning companies available

### 0 done MV 3/10/2004 Admin invoice to WOS

### 0 done CTL 3/11/2004 Admin invoice York for resin work in February

### 0 done CTL 3/11/2004 Admin trying to collect charges for Piller Invoice

### 0 done CTL 3/11/2004 Client call 3rd cleaning company

### 0 done CTL 3/11/2004 Support talking with RAC about details on IE resin

### 0 done Odle 3/11/2004 Meeting Elkton High School with counciler Olesia classes

### 0 done CTL 3/11/2004 Investigation looking at mounts

### 0 done CTL 3/11/2004 Literature

### 0 done CTL 3/11/2004 Support

### 0 done CTL 3/11/2004 Investigation questions on resin to Dow

### 0 done CTL 3/11/2004 Literature looking for molten metal embrittlement literature

### 0 done CTL 3/11/2004 Admin invoice for Feb, Mar

### 0 done CTL 3/12/2004 Admin morning emails, Brian Hersey et al

### 0 done CTL 3/12/2004 Report updating summary report for RAC for York visit

### 0 done CTL 3/12/2004 Admin looking for printer paper

### 0 done CTL 3/12/2004 Admin invoice, getting hours and analysis from Joe also

### 0 done CTL 3/12/2004 Literature reading literature on pipe cleaning chemicals

### 0 done CTL 3/12/2004 Admin

### 0 done CTL 3/12/2004 Client talking with Robin and RAC about new tubes

### 0 done CTL 3/12/2004 Admin meeting on prices

### 0 done CTL 3/12/2004 Investigation looking for rectifer for copper plating, 3 amps max

### 0 done CTL 3/12/2004 Client follow up with Randall on Westec/

### 0 done CTL 3/12/2004 Support rate on Paris trip .. Advise

looking at mounts and trying to find book on Amazon on embrittlement via metal

looking at Miller test for nickel laterite ore slurry testing, [email protected] G75

followup with QED about their capabilities, email back to Rod and Paul Johnson

Page 151: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done Odle 3/12/2004 Support add printer driver to AMO's new computer

### 0 done MV 3/13/2004 Admin doing income statement for 2003 for taxes

### 0 done MV 3/14/2004 Admin Income statement for 2003

### 0 done MV 3/13/2004 Development fixing this program to sort times better

### 0 done CTL 3/15/2004 Admin morning emails, active projects report, planning week

### 0 done CTL 3/15/2004 Client answer questions on AOL report

### 0 done CTL 3/15/2004 Development getting and reviewing bulk prices on M4195 Resin

### 0 done CTL 3/15/2004 Admin

### 0 done CTL 3/15/2004 Client

### 0 done CTL 3/15/2004 Client sort feedstock based on chloride content

### 0 done CTL 3/15/2004 Client visit by Deric, brought two small jobs

### 0 done CTL 3/15/2004 Admin

### 0 done Odle 3/15/2004 Admin send check of $177.19 to Bancorp to close Okie's account

### 0 done CTL 3/15/2004 Admin samples back to Westec

### 0 done MV 3/15/2004 Admin add life insurance on RAC paid to workers if RAC dies

### 0 done CTL 3/16/2004 Admin reviewing work for the day, emails, voice mails

### 0 done CTL 3/16/2004 Edit review report ok to send

### 0 done CTL 3/16/2004 Investigation

### 0 done CTL 3/16/2004 Edit Atofina Report

### 0 done CTL 3/16/2004 Admin email to Al on ferrites in weld and talking about work in progress

### 0 done CTL 3/16/2004 Client ok to start work

### 0 done CTL 3/16/2004 Edit edit report

### 0 done CTL 3/16/2004 Report add new info to Honeywell, rewrite discussion

### 0 done CTL 3/17/2004 Admin morning email, getting setting up cell phone for future offsite work

### 0 done CTL 3/17/2004 Report continue to work on report revision

making hotel and plane reservations for NACE, problems NACE hotel reservations

call from Kevin on deisel emmissions at AOL, 8000 cfm to 100,000 cfm when operationg

clearing desk, filing, problem on SC40 computer with video recording

looking at mount again … trying to develop an hypothesis consistent with evidence

Page 152: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 3/17/2004 Investigation talking with Dave/Al to get Dave doing part of work on resins

### 0 done CTL 3/17/2004 Client

### 0 done CTL 3/17/2004 Marketing

### 0 done CTL 3/17/2004 Support three calls from RAC into Building, disruptive

### 0 done CTL 3/18/2004 Admin

### 0 done CTL 3/18/2004 Support looking at setup for pressure testing Ti Tubes no idea how to fix

### 0 done CTL 3/18/2004 Report continuing revising report

### 0 done CTL 3/18/2004 Report

### 0 done CTL 3/18/2004 Admin getting cheaper hotel for NACE

### 0 done CTL 3/19/2004 Admin emails and review work for the day

### 0 done CTL 3/19/2004 Development trying to get quote on 1 and 2 cubic ft quantities of resin

### 0 done CTL 3/19/2004 Development plan out work on resin for the day with Al and Dave

### 0 done CTL 3/19/2004 Development discussing resin performance and regeneration with Marten of Dow

### 0 done CTL 3/19/2004 Marketing reviewing new job with John Ely, quoting price

### 0 done CTL 3/19/2004 Marketing

### 0 done CTL 3/19/2004 Editing edit report, make pdf and send

### 0 done CTL 3/19/2004 Development

### 0 done CTL 3/20/2004 Report short report on inspection

### 0 done MV 3/20/2004 Development working on agreement with CTL

### 0 done CTL 3/22/2004 Admin emails, weekly active projects report

### 0 done CTL 3/22/2004 FU on chlorides in slimes, email to Steve

### 0 done CTL 3/22/2004 Development

### 0 done CTL 3/22/2004 Support entering times for several jobs for invoicing

### 0 done CTL 3/22/2004 Admin follow up on purchase orders with John Ely, Clark Henry,

### 0 done CTL 3/22/2004 Editing sending draft of report to Mike Albert & RAC for comments

review report from German Lab on AOL Generators, fu with Joe and Al

call from Ed Miller, 306-732-4424, [email protected] reference buried iron pipe with jacket

emails, RAC comments on quick report for York Update on copper from LiBr

a bullet report for RAC on resins, then fix up model for RAC questions

sending form to Ed Miller, ERM Asswociates, 732-4424 .. [email protected]

update on resins from York via RAC, checking Dave results and procedures

reviewing work on resin, how to best regenerate, LiBr stripping with copper

Page 153: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 3/22/2004 Client printing and faxing 63 page paper on cleaning metal to Rod

### 0 done Odle 3/20/2004 Admin call M. Angie Davila of Odyssey at 915-778-9058

### 0 done CTL 3/23/2004 Admin

### 0 done CTL 3/23/2004 Editing adding RAC's input to report

### 0 done CTL 3/23/2004 Development reviewing resin performance for the evening

### 0 done CTL 3/23/2004 Support reviewing report for RAC

0 0 done MV 3/23/2004 Admin working on CTL agreement

### 0 done CTL 3/24/2004 Admin emails, planning work

### 0 done CTL 3/24/2004 Development discussing next phase of work with Al and Dave, drawing sketch

### 0 done CTL 3/24/2004 Marketing

### 0 done CTL 3/24/2004 Editing review revision for Al

### 0 done CTL 3/24/2004 Pictures start report for Pillar NYC

### 0 done CTL 3/24/2004 Investigation looking at mounts for tin into iron/nickel

### 0 done CTL 3/24/2004 Admin

### 0 done CTL 3/24/2004 Investigation looking at motiva rod sample

### 0 done CTL 3/24/2004 Support review NACE slides for RAC

### 0 done CTL 3/25/2004 Development work with Dave on work for the day

### 0 done CTL 3/25/2004 Marketing

### 0 done CTL 3/25/2004 Investigation looking at boiler tubes under stereoscope

### 0 done CTL 3/25/2004 Report pictures and start report

### 0 done CTL 3/25/2004 Marketing talking with Alfi about making resin and evaluation

### 0 done CTL 3/25/2004 Admin print chemical cleaning article 2nd half because on old report

0 0 done CTL 3/26/2004 Development

0 0 done CTL 3/26/2004 Admin morning emails and discuss work plans with Al and Dave

0 0 done CTL 3/26/2004 Development

morning emails and planning work, updating address book & getting reservations for NO straight

converting email printout from RAC back into electronic format and then responding

followup with Carman Sims 931-379-1332 of Cytec on payment, email, 2 phone calls

call Ryan Jensen, White-Rodgers, 314-865-8715 on contamination in valve

Talk with Jeffery of Resintech 856-768-9600 ext 156 refer science to Peter Myers

trying to get file transfer to corrosionlab.net working for transferring files to N.O.

Page 154: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 0 done MV 3/26/2004 Marketing

0 0 done CTL 3/26/2004 Report Piller report

0 0 done CTL 3/26/2004 Admin calculations on resin, solution makeup

0 0 done CTL 3/26/2004 Admin mail report to Rod

0 0 done CTL 3/26/2004 Development

0 0 done CTL 3/28/2004 Travel trip to NACE

0 0 done CTL 3/29/2004 Development Attending NACE Conference

0 0 done CTL 3/30/2004 Development Attending NACE Conference

0 0 done CTL 3/31/2004 Development Attending NACE Conference

0 0 done CTL 4/1/2004 Travel travel from NACE conference

### 0 done CTL 4/2/2004 Admin emails, printing MV invoice, status on jobs

### 0 done CTL 4/2/2004 Development update on status of project, experimental plans

### 0 done CTL 4/2/2004 Analysis giving samples to Joe and Al for analysis

### 0 done CTL 4/2/2004 Investigation

### 0 done CTL 4/2/2004 Investigation looking at pipe sample for cracks, etc.

### 0 done CTL 4/2/2004 Report adding tables to report

### 0 done CTL 4/2/2004 Marketing

### 0 done CTL 4/2/2004 Admin

### 0 done MV 4/4/2004 Marketing worked on MV, new phone, rates, etc. Also, joined Overture

### 0 done CTL 4/5/2004 Admin Active Project Report, plan for week, emails

talking with Nichole about Pb waste [email protected], then sending email

talk with Mike Warren, 410-420-8001 at ACM, Anion Cation Mixed Bed and RAC

talking with Al Borrelli, 267-968-9766 on algae in water, Herman Gloder Company

talking to York and Pall Trincor, then packing and shipping filters to Washington

Page 155: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 4/5/2004 Development review titrations on ammonia, determine useage

### 0 done MV 4/5/2004 Development error in this program when 4/31/04 used as date in Project sheet

### 0 done CTL 4/5/2004 Client email to IMC, questions on pipe

### 0 done CTL 4/5/2004 Admin email to Tatnell on epoxy pumps

### 0 done CTL 4/5/2004 report Pillar tables, analysis, discussion section

### 0 done CTL 4/5/2004 Development talking about workloads, Dave, Fred, Brad

### 0 done CTL 4/6/2004 Admin emails, review work with Al and Dave

### 0 done CTL 4/6/2004 Development review results on resin data, plan next run

### 0 done CTL 4/6/2004 Report finish draft of Piller NYC

### 0 done CTL 4/6/2004 Investigation looking at pipes under stereoscope

### 0 done CTL 4/6/2004 Admin organizing data to address RAC concerns about % booked

### 0 done CTL 4/7/2004 Marketing looking into Overture as a place to advertise Failure Investigations

### 0 done CTL 4/6/2004 Admin contacting Bob Tatnall about job

### 0 done CTL 4/7/2004 Editing editing Al's report, discuss with Al, then RAC, then Al

### 0 done CTL 4/7/2004 Admin emails

### 0 done CTL 4/7/2004 Admin receiving new pump

### 0 done MV 4/7/2004 Admin followup on potential environmental investigation

### 0 done CTL 4/7/2004 Support helping Henry "nail" guy carry stuff in

### 0 done CTL 4/7/2004 Marketing joining the NACE email forum corrosion discussion group

### 0 done CTL 4/7/2004 Investigation email on source of oil sample

### 0 done CTL 4/7/2004 Editing revising AOL report

### 0 done CTL 4/7/2004 Editing editing report for AOL, discuss with Piller

### 0 done CTL 4/7/2004 Literature trying to find out how to measure amount of nitriding

### 0 done CTL 4/7/2004 Literature RAC discussing hydrophicity with me, etc.

0 0 done Odle 4/9/2004 Admin personal income taxes

Page 156: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 0 done CTL 4/8/2004 Editing finishing editing report for AOL

0 0 done CTL 4/8/2004 Investigation

0 0 done CTL 4/8/2004 Editing finishing draft of NetAbove

0 0 done CTL 4/8/2004 Literature trying to find out about properties of insulation and listening to RAC

0 0 done Odle 4/11/2004 Admin personal income taxes

### 0 done CTL 4/12/2004 Admin active projects reports, emails, plan week

### 0 done CTL 4/12/2004 Client phone call and emails from Astrazeneca

### 0 done CTL 4/12/2004 Investigation dealing with decisions on spill of LiBr into secondary containment

### 0 done CTL 4/12/2004 Admin credit issues with Eone, emails to Clark

### 0 done CTL 4/12/2004 Support editing report on sprinkler heads

### 0 done CTL 4/12/2004 Admin getting info together for invoicing

### 0 done CTL 4/13/2004 Admin emails, plans

### 0 done Odle 4/13/2004 Vacation dealing with car wreck, talking

### 0 done CTL 4/13/2004 Admin mostly invoicing and collecting data for same

### 0 done Odle 4/13/2004 Admin

### 0 done MV 4/13/2004 Editing edit Toth report, send to Willem

0 0 Done CTL 4/13/2004 Investigation resin regeneration with Dave, cannister evaluate, email to Brian

### 0 done CTL 4/13/2004 Support reviewing part of report by rac on sprinklers

### 0 done CTL 4/14/2004 Investigation review resin data with Dave

### 0 done CTL 4/14/2004 Admin getting hours and past invoices correct

### 0 done CTL 4/14/2004 Admin

### 0 done CTL 4/14/2004 Client cleaning proposals

### 0 done CTL 4/14/2004 Report helping RAC on misc items on Honeywell report

### 0 done CTL 4/15/2004 Investigation why the filter cartridge will not work

### 0 done CTL 4/15/2004 Client advise to AstraZeneca on chemical cleaning options

nitriding of stainless steel measure how for Ron Roth 318-388-3360 vs. argon

call state farm Jennifer, send email, then call claims sherri 888-613-3966

making disks for Honeywell … probs with verification of disk contents

Page 157: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 4/15/2004 Report review results and email to Plymouth tube

### 0 done CTL 4/15/2004 Investigation

### 0 done CTL 4/15/2004 Investigation

### 0 done CTL 4/15/2004 Admin call from Clark Henry about money

### 0 done CTL 4/15/2004 Investigation looking at xsection on SEM with fred

### 0 done CTL 4/15/2004 Marketing miscel office task, calling lead from Internet

### 0 done Odle 4/15/2004 Admin personal income taxes

### 0 done CTL 4/16/2004 Client call from Clark Henry about status of project

### 0 done CTL 4/16/2004 Investigation Honeywell chlorine drain line

### 0 done CTL 4/16/2004 Investigation ridges on samples analyzed by Fred in SEM, not base metal

### 0 done CTL 4/16/2004 Investigation samples 1-5 in report origin investigate for RAC with Al call RAC

### 0 done CTL 4/16/2004 Marketing call from Scott Fletcher mechanical equip co about welding

### 0 done CTL 4/16/2004 Editing report from Atofina

### 0 done CTL 4/16/2004 Pictures

### 0 done CTL 4/18/2004 Report rewriting summary again

### 0 done CTL 4/19/2004 Admin weekly active projects report to RAC, emails

### 0 done CTL 4/19/2004 Client preparation for meeting at AZ

### 0 done CTL 4/19/2004 Meeting meeting with AZ on chemical cleaning and travel

### 0 done CTL 4/19/2004 Client reviewing notes from meeting and calling AstroPak

### 0 done CTL 4/19/2004 Admin followup on Cytec

### 0 done CTL 4/19/2004 Admin clean up desk throw away papers

### 0 done CTL 4/20/2004 Client trying to get AstroPak added pack into the bidders

### 0 done CTL 4/20/2004 Admin walking through old samples in shed to select throw aways

### 0 done CTL 4/20/2004 Investigation questions for chemical cleaning

### 0 done MV 4/20/2004 Admin getting addresses and FEDEx to WOS and Willem

getting drain tube from heat exchanger from shed and consulting on work

review Al's report and ask Fred to analyze projections found on surface

getting pictures edited for report, get Fred to shoot SEM to go with Analysis

Page 158: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 4/20/2004 Marketing calls from Sergi Easy flow, call to Stan Surkoski 792-8622

### 0 done CTL 4/21/2004 Client John Brotherton on samples for another generator

### 0 done CTL 4/21/2004 Client feedback on questions, RAC and Mike Albert

### 0 done CTL 4/21/2004 Investigation

### 0 done CTL 4/21/2004 Investigation going over graphs for report for titanium project with Al

### 0 done CTL 4/21/2004 Report

### 0 done CTL 4/22/2004 Admin emails, update timesheet yesterday

### 0 done CTL 4/22/2004 Pictures pictures and data for report

### 0 done MV 4/21/2004 Admin on phone to State Farm about settlement on car

### 0 done CTL 4/22/2004 Report write report, first edit

### 0 done CTL 4/22/2004 Investigation looking at piping section under stereoscope and at pipes for welds

### 0 done CTL 4/22/2004 Marketing

### 0 done CTL 4/22/2004 Investigation trying to find upper temperature limit for resins

### 0 done CTL 4/26/2004 Admin

### 0 done CTL 4/23/2004 Client background information on nitriding, read and forwarded

### 0 done CTL 4/23/2004 Client followup email to Brian et al on Rocky results

### 0 done CTL 4/23/2004 Investigation followup email to Tatnall on epoxy specs

### 0 done CTL 4/23/2004 Admin misc, tasks not recorded … left work about 11:30

### 0 done CTL 4/26/2004 Client preparing and going to meeting with AstraZeneca and ACC

### 0 done CTL 4/27/2004 Client preparing for meeting and then meeting with QED

### 0 done CTL 4/27/2004 Investigation boiler corrosion problems

### 0 done CTL 4/27/2004 Admin

### 0 done CTL 4/27/2004 Editing editing report, making pdf and emailing

### 0 done CTL 4/27/2004 Admin proof reading report from Al on embedments

### 0 done CTL 4/28/2004 Admin followup with email and phone calls to Cytec, contact headquarters

setup experimental grid to determine amount and conc of ammonia required for regeneration, experimental issues with Dave on quant of soln

second draft on Questions for Vendors, fu with Albert on galvanizing and by-passing Cu lines

called Larry Smith cell 215-534-3270, office 215-957-9260 office per Jay Carsch 215-345-7000 , oil line failure in home, Doylestown, Pa

miscelaneous followup, email, getting status of work, calling people back

getting up to speed with inhouse projects, emailing potential client GSP refrig

Page 159: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 4/28/2004 Investigation phone calls with Kevin and Dupont on resin and varnish

### 0 done CTL 4/28/2004 Admin reinstall email program …

### 0 done CTL 4/28/2004 Admin

### 0 done CTL 4/28/2004 Marketing quote to John on new work

### 0 done CTL 4/28/2004 Admin

### 0 done CTL 4/28/2004 Investigation call to Mike Warren

### 0 done CTL 4/28/2004 Admin

### 0 done CTL 4/29/2004 Blank

### 0 done CTL 4/29/2004 Admin meeting with staff on active projects

### 0 done CTL 4/29/2004 Marketing phone call and second quote to Piller on samples from Pueto Rico

### 0 done CTL 4/29/2004 Investigation looking at 30 tubes for embedments

### 0 done CTL 4/29/2004 Admin phone call from Cytec accounting

### 0 done CTL 4/29/2004 Report revising AboveNet report with new info from Dupont

### 0 done CTL 4/29/2004 Client update York on status

### 0 done CTL 4/29/2004 Support adapting database to verify that all FA Jobs are invoiced

### 0 done CTL 4/30/2004 Support

### 0 done CTL 4/30/2004 Support stitching picture and making new timeline for report

### 0 done CTL 4/30/2004 Investigation looking at 20 tubes for embedments.

### 0 done CTL 4/30/2004 Client sending pictures to Lou for his internal presentation

### 0 done CTL 4/30/2004 Marketing giving quote to Dave for work on boiler tubes

### 0 done CTL 4/30/2004 Editing reading RAC latest version, discussing

### 0 done MV 5/2/2004 Admin getting books up to date

0 0 done CTL 5/3/2004 Investigation looking at flex hose carrying steam

0 0 done MV 5/4/2004 Marketing looking for articles and pictures for website

0 0 done CTL 5/4/2004 Investigation questions to Deric on sample

throwing away paper sent to office and retyping into electronic format

active projects report and signing in new projects, and getting rid of more paper

cleaning pump in LiBr, conversations on same and ammonia use optimization with RAC

setting up system on DB to verify all invoices have been sent out for each FA

Page 160: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 0 done CTL 5/4/2004 Process drawing sketch of resin tank and sending several questions to ACM

0 0 done CTL 5/4/2004 Investigation iron balls in IMC samples

0 0 done CTL 5/4/2004 Client trip to ACM for resin tank and see plant

0 0 done CTL 5/4/2004 Editing making requested changes on report from Collins

0 0 done CTL 5/4/2004 Investigation looking at samples

0 0 done MV 5/3/2004 Marketing redoing website to remove frames

0 0 done CTL 5/3/2004 Investigation balls on surface

0 0 done CTL 5/3/2004 Marketing quote to Deric for two jobs, reviewing FA with Deric at CTL

0 0 done MV 5/1/2004 Admin doing 941 taxes and Delaware wh

0 0 done CTL 5/3/2004 Admin weekly review of jobs, updating active jobs per RAC

0 0 done CTL 5/3/2004 Marketing quoting Dave Benjamin on pipes, looking at pipes

0 0 done CTL 5/3/2004 Investigation setting up meetings with AMC/Resintech

### 0 done CTL 5/5/2004 Admin

### 0 done CTL 5/5/2004 Client email to IMC on questions about black balls, viewing new ones

### 0 done CTL 5/5/2004 Investigation drawing pdf and resin canister, short report on same to RAC

### 0 done CTL 5/5/2004 Investigation more looking at pipes, balls screened out

### 0 done CTL 5/5/2004 Management

### 0 done CTL 5/5/2004 Admin invoicing Piller 2, Astrazeneca 2, York

### 0 done MV 5/5/2004 Marketing updating Assoc & Process pages

### 0 done CTL 5/6/2004 Admin transfer times from this program to Track Report

### 0 done CTL 5/6/2004 Investigation inspecting steam and syngas flex hoses

### 0 done CTL 5/6/2004 Investigation looking at turbines from Volvo first look

### 0 done CTL 5/6/2004 Investigation looking at epoxy with tatnall

### 0 done CTL 5/6/2004 Client new sample from Deric

### 0 done CTL 5/6/2004 Investigation water takes chlorides and sulfates from resin

dealing with unpaid invoices from Westech, Accessories, York, Piller, Cytec

helping Dave on experiment, collecting costs and timesheet for this job

Page 161: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 5/6/2004 Admin emails to Piller on invoices

### 0 done CTL 5/6/2004 Client emails to Nancy on black balls in pipe

### 0 done CTL 5/6/2004 Literature

### 0 done CTL 5/6/2004 Investigation reading old emails, studying pipe pictures

### 0 done CTL 5/7/2004 Blank

### 0 done CTL 5/7/2004 Literature looking for literature on MIC in brine

### 0 done CTL 5/7/2004 Admin times together for Honeywell and followup with Piller on invoices

### 0 done CTL 5/7/2004 Investigation trying to figure out failure mode

### 0 done CTL 5/7/2004 Investigation report from Tatnall on epoxy, review, talk with Bob

### 0 done CTL 5/7/2004 Pictures selecting editing pictures for report

### 0 done CTL 5/10/2004 Admin active projects report, emails

### 0 done MV 5/10/2004 Marketing talking with Jens on Safe Hydrogen Project

### 0 done CTL 5/10/2004 Report writing

### 0 done CTL 5/10/2004 Client conversation with Dom on meeting

### 0 done CTL 5/10/2004 Investigation editing Al's report

### 0 done CTL 5/11/2004 Editing comments from Al into report

### 0 done CTL 5/11/2004 Development

### 0 done CTL 5/11/2004 Investigation Dave on resin regeneration data

### 0 done CTL 5/11/2004 Marketing

### 0 done CTL 5/11/2004 Client preparation, read proposals, meeting on acid cleaning

### 0 done MV 5/11/2004 Admin reviewing, modifying contract to include stuff important to MV

### 0 done CTL 5/12/2004 Investigation discussing boiler problems with Lou, Bill and Mike

### 0 done CTL 5/12/2004 Admin updating RAC on AZ meetings, discussions

### 0 done CTL 5/12/2004 Admin emails, priorities

### 0 done CTL 5/12/2004 Admin

literature database trying to find information on microbes in brine lines

revising PDF for cannister to include viewport, editing per Al and RAC

Philip Newman-Sanders 302-574-7011, agitator shaft, weld suspcect, Uniqema 315 Cherry lane new castle philip.newman-sanders@uniqema

discussion on tenses, rewriting IMC to conform to RAC dictates on same

Page 162: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 5/12/2004 Investigation looking at shaft with RAC and then Al

### 0 done CTL 5/12/2004 Editing rewrite on report, then rewrite again

### 0 done CTL 5/12/2004 Investigation looking at pipes with RAC

### 0 done CTL 5/12/2004 Investigation

### 0 done CTL 5/12/2004 Editing proof reading, minor rewrite

### 0 done CTL 5/12/2004 Admin

### 0 done CTL 5/12/2004 Support converting Joe's QC Manual from paper to electronic

### 0 done CTL 5/13/2004 Admin resumes for technician, part-time students narrow to 3

### 0 done CTL 5/13/2004 Investigation looking at mount, getting data from Fred on older jobs

### 0 done CTL 5/13/2004 Investigation email letter to Michael Warner on canisters

### 0 done CTL 5/13/2004 Marketing

### 0 done CTL 5/13/2004 Investigation looking at mount under epoxy, porous epoxy

### 0 done CTL 5/13/2004 Investigation

### 0 done CTL 5/13/2004 Admin interview with Jason, subsequent discussions

### 0 done CTL 5/13/2004 Admin getting CD's together to sort out files at home

### 0 done CTL 5/13/2004 Admin looking over files Casey wants

### 0 done CTL 5/14/2004 Development reading a couple of FA articles

### 0 done CTL 5/14/2004 Editing editing, making PDF, and emailing IMC job

### 0 done CTL 5/14/2004 Editing titanium report, editing, discuss with RAC, Al

### 0 done CTL 5/14/2004 Investigation looking at Ti cracks

### 0 done CTL 5/14/2004 Admin making CD's and Fed Ex label for Casey

### 0 done MV 5/16/2004 Development

### 0 done CTL 5/17/2004 Investigation Looking at failed copper tubes and quoting job

### 0 done CTL 5/17/2004 Investigation Contacting ACM on iron canisters for resins, sent York the Quote

### 0 done CTL 5/17/2004 Investigation getting info and writing one page for Peter on V2O5

discussing wall thickness results and deciding to make mounts across weld and 2 other base metals

organizing and gathering 2 reports, etc. to take home and catch up on work

quote to John Ely on replciation work in birdsburro. Phone call then email

literature search, talking with Brad about past corrosion work, read old reports

working on H2 from SOE , revising drawings for commercial application

Page 163: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 5/17/2004 Admin showing Fred how to use literature search

### 0 done CTL 5/17/2004 Admin filling out performance evaluation on Al

### 0 done CTL 5/17/2004 Investigation talking with Brad about design canister for resin

### 0 done CTL 5/17/2004 Development reading articles on desk

### 0 done CTL 5/18/2004 Admin new hire

### 0 done CTL 5/18/2004 Library looking for materials of construction for HCl environment wet

### 0 done CTL 5/18/2004 Investigation stereoscopic pictures of pipe ID

### 0 done CTL 5/18/2004 Investigation looking at ID of tube sample with tubular pits, stereoscope of same

### 0 done CTL 5/18/2004 Investigation

### 0 done CTL 5/18/2004 Admin update form for mechanical failures

### 0 done CTL 5/19/2004 Admin send form to Phil and ask for background

### 0 done CTL 5/19/2004 Blank

### 0 done CTL 5/19/2004 Investigation looking at etched mount, choose new mounts

### 0 done CTL 5/19/2004 Admin getting some project numbers file straight

### 0 done MV 5/19/2004 Admin trying to fix scanner

### 0 done CTL 5/19/2004 Client finding email for Peter resending info on Va, edited again

### 0 done CTL 5/19/2004 Management talking with Al about review

### 0 done CTL 5/19/2004 Investigation Show Al where to make a mount and get chloride rinse

### 0 done CTL 5/19/2004 Management evaluation of Al

### 0 done CTL 5/19/2004 Admin making 2nd disk the 3rd time for Casey

### 0 done CTL 5/19/2004 Admin followup with Slimes Accounting

### 0 done CTL 5/19/2004 Admin followup with accounting

### 0 done CTL 5/20/2004 Library more info for materials for HCl

### 0 done MV 5/20/2004 Development improving Overture listings

### 0 done CTL 5/20/2004 Editing editing latest version of titanium report

Page 164: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 5/20/2004 Marketing reviewing website of www.materialsengineering.com from RAC

### 0 done CTL 5/20/2004 Investigation looking at boiler tubes, ID pits

### 0 done CTL 5/20/2004 Investigation stereoscopic review of ID pitting

### 0 done CTL 5/20/2004 Investigation observing removal of inserts and looking at removed internals

### 0 done CTL 5/21/2004 Admin morning emails

### 0 done CTL 5/21/2004 Development instructions to Dave to order cannister and build valving

### 0 done CTL 5/21/2004 Editing looking at report with Al

### 0 done CTL 5/21/2004 Marketing

### 0 done CTL 5/21/2004 Report writing report

### 0 done CTL 5/21/2004 Investigation making one more mount, crack on border of weld unclear

### 0 done CTL 5/21/2004 Investigation looking at damage in stereoscope … straw like texture

### 0 done CTL 5/24/2004 Admin weekly active projects report, emails, work to do

### 0 done CTL 5/24/2004 Investigation fatigue marks on flat area found, stereoscope Fred

### 0 done CTL 5/24/2004 Client call from Dave to discuss explosion at his plant, us to help?

### 0 done CTL 5/24/2004 Investigation

### 0 done CTL 5/24/2004 Investigation figuring out chemistry in sunoco's process

### 0 done CTL 5/24/2004 Report writing report

### 0 done CTL 5/24/2004 Investigation

### 0 done CTL 5/25/2004 Admin morning email, Joe good morning

### 0 done CTL 5/25/2004 Investigation

### 0 done CTL 5/25/2004 Client

### 0 done CTL 5/25/2004 Report writing

### 0 done CTL 5/25/2004 Investigation

### 0 done CTL 5/25/2004 Investigation followup on progress on Volvo propeller disassembly

### 0 done CTL 5/25/2004 Marketing

quote Carl Park, Josam Inc. 215-339-5370 316L piping in hospital, push fit vs. list of chemicals

looking at mounts from Volvo. Test on 2205 to see if segregation during casting .. Brad

discuss PFD with Brad … questions about flowrate and pressure drop, specs on valves

view new mount, view SEM of fracture face with Fred … high stress fatigue

talking with RAC and then Dave about installing Alloy 59 tube in plant for corrosion test

looking at tubes under stereoscope, pictures, selecting areas for mounting

talking with Mark P. from Delphi about "black copper in potassium formate

Page 165: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 5/25/2004 Admin reading, scanning and throwing away paper on my desk

### 0 done CTL 5/26/2004 Management bringing Al up to speed on SEM work with Fred

### 0 done CTL 5/26/2004 Investigation viewing mounts, update Al on 2205 corrosion tests

### 0 done CTL 5/26/2004 Report writing

0 0 done CTL 5/27/2004 Report finishing discussion

0 0 done CTL 5/26/2004 Investigation Volvo discuss samples for certified analysis

0 0 done CTL 5/27/2004 Admin collecting some times for invoicing and correcting some errors

0 0 done CTL 5/28/2004 Admin looking up UNS codes for nickel alloys

0 0 done CTL 5/31/2004 Editing editing Al's report

0 0 done CTL 5/28/2004 Admin organizing files, folders throwing away papers

0 0 done CTL 5/26/2004 Investigation looking at mounts

0 0 done CTL 5/26/2004 Investigation formicary corrosion per mounts

0 0 done CTL 5/26/2004 Investigation looking at tubes under stereoscope, discussing with RAC

0 0 done CTL 5/27/2004 Admin

0 0 done CTL 5/26/2004 Library reading on duplex alloy, discussing

0 0 done CTL 5/27/2004 Development reading technical and discarding papers

0 0 done CTL 5/27/2004 Marketing

0 0 done CTL 5/28/2004 Admin considering liberty bell corrosion course 2004

0 0 done CTL 5/28/2004 Investigation picking out mounts on other prop

0 0 done CTL 5/28/2004 Investigation

### 0 done CTL 6/1/2004 Admin emails, call from RAC, printing invoices

### 0 done CTL 6/1/2004 Investigation

### 0 done CTL 6/1/2004 Investigation looking at SEM pictures with Al and Fred

### 0 done CTL 6/1/2004 Investigation looking at mounts from other propellor

### 0 done CTL 6/1/2004 Investigation discussing wrapping up investigation, need report

emails, reading then scanning papers from RAC on chemical cleaning

Mike Vaughn, homeowner with corrosion in pipes from well anabolic bateria

reviewing prior work, taking pictures of mount, studying Eone website

specifying to Jason where to make a mount, cut, etc., editing pictures for report

Page 166: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 6/1/2004 Admin

### 0 done CTL 6/1/2004 Admin walk around to see what Al and Jason, and others are working on

### 0 done CTL 6/1/2004 Marketing

### 0 done CTL 6/2/2004 Admin

### 0 done CTL 6/2/2004 Support finding FRP expert/buddy for joe

### 0 done CTL 6/2/2004 Marketing

### 0 done CTL 6/2/2004 Editing editing report with RAC's comments

0 0 done CTL 6/2/2004 Marketing

0 0 done CTL 6/2/2004 Support Jason accident review and disruption

0 0 done CTL 6/2/2004 Marketing

0 0 done CTL 6/3/2004 Admin housekeeping office

0 0 done CTL 6/3/2004 Marketing more on proposal to Michael Bacic of Honeywell

### 0 done CTL 6/2/2004 Development Technical reading, filing, housekeeping

### 0 done CTL 6/3/2004 Investigation

### 0 done CTL 6/3/2004 Pictures editing pictures for report

### 0 done CTL 6/3/2004 Development

### 0 done CTL 6/3/2004 Development new invoice report, verifies all invoiced

### 0 done CTL 6/4/2004 Admin mornings emails

### 0 done CTL 6/4/2004 Client reading scope document for cleaning, call Dom LaMastra 885-0290

### 0 done CTL 6/4/2004 Editing

### 0 done CTL 6/4/2004 Development technical reading on MIC in Waste Water

### 0 done CTL 6/4/2004 Support tracking system for invoices being paid in FA Dept

### 0 done CTL 6/4/2004 Report writing

### 0 done CTL 6/7/2004 Admin emails, RAC's card, active reports

### 0 done CTL 6/7/2004 Admin meeting with RAC on jobs

eliminating one pile of papers, magazines from my desk, trash or home scanner

reworking resume for email proposal to [email protected]

editing proposal and trying to get laptop connected to network to send email to michael Bacic, emails, organizing work

call from Merville Orr about suitable material for a gate valve in WWTP

talking with guy at WWTP about material choices …. Wanted free advise

Cresshan Bahana, hot water pipe and problems with insurance company …. Does not sound like good risk … has diagnosis wants confirmation

reviewing Volvo analytical results with Al, discuss SEM work to do, two phases

technical reading, sorting out good articles in magazines to read, housekeeping

editing Al's report, then going back to check statements made in report, suggestions to Al

Page 167: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 6/7/2004 Development

### 0 done CTL 6/7/2004 Development

### 0 done CTL 6/7/2004 Report finishing report

### 0 done CTL 6/7/2004 Admin filling out, copying and turning in non-vacation leave time

### 0 done CTL 6/7/2004 Editing

### 0 done CTL 6/8/2004 Admin emails and response to Loraine about talk in Sept

### 0 done CTL 6/8/2004 Housekeeping reviewing samples with Al an Dave to throw away

### 0 done CTL 6/8/2004 Report writing

### 0 done CTL 6/8/2004 Investigation finding formicary and underdeposit corrosion

### 0 done CTL 6/8/2004 Investigation erosion marks in tube and bumps on other side

### 0 done CTL 6/9/2004 Editing editing report before RAC review

### 0 done CTL 6/9/2004 Admin listening to Peter about his trip to SA

### 0 done CTL 6/9/2004 Development emails with Brian, discussion with Brad on building resin piping

### 0 done CTL 6/9/2004 Admin looking at flanges with Dwaine, moisture in Vinyl Chloride

### 0 done CTL 6/9/2004 Investigation

### 0 done CTL 6/10/2004 Admin emails and making a todo list for work for the balance of week

### 0 done CTL 6/10/2004 Admin reviewing profitability of FA

### 0 done CTL 6/10/2004 Admin followup with Dom on schedule for pipe cleaning

### 0 done CTL 6/10/2004 Development PDF update for cannister

### 0 done CTL 6/10/2004 Marketing follow up with Parker at Josam, job went to PMET

### 0 done CTL 6/10/2004 Client help Dave for corrosion coupons source

### 0 done CTL 6/10/2004 Admin changing everything to blue signature

### 0 done CTL 6/10/2004 Admin

### 0 done CTL 6/10/2004 Admin invoicing CM, Sunoco, York

### 0 done CTL 6/10/2004 Admin working with Al to improve our financial tracking on FA Jobs

going over valve specs with Brad, email back to Brian with questions.

new report tracking invoices, go over errors with Al for Jason to update

talking with Kevin then revising paragraph for AOL and AboveNet report

revising PDF based on being side stream on a side stream and 1/2 14 npt thread

contact Bill about meeting with vendor/engr company next week, phone call

Page 168: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 6/13/2004 Development working on website, convert to common boards, fix some errors

### 0 done CTL 6/11/2004 Admin reinvoice CMC. Invoice Eone. Call Clark about Invoice.

### 0 done CTL 6/11/2004 Client write Tatnall again about product sheet for wax coating

### 0 done CTL 6/11/2004 Development working with Al on Profitability Report and Invoice Tracking Report

### 0 done CTL 6/11/2004 Editing

### 0 done CTL 6/11/2004 House Cleaning getting rid of paper in office

### 0 done CTL 6/11/2004 Editing editing Al's report

### 0 done CTL 6/11/2004 Admin purchase order for resin

### 0 done CTL 6/11/2004 Editing editing Al's report

### 0 done CTL 6/14/2004 Admin emails, time for invoices, response to Peter

### 0 done CTL 6/14/2004 Investigation looking at pipe after cut, discussing approach with mounting

### 0 done CTL 6/14/2004 Investigation selecting pipes to cut open

### 0 done CTL 6/14/2004 Admin active reports, updating before printing

### 0 done CTL 6/14/2004 Development discuss pdf assignment with Jason

### 0 done CTL 6/14/2004 House Cleaning throwing out paper, filing

### 0 done CTL 6/14/2004 Investigation viewing microstructures

### 0 done CTL 6/14/2004 Editing comments on Al's report

### 0 done CTL 6/14/2004 Development modifying PDF, discussions with Brian & Rick Nadeau

### 0 done CTL 6/14/2004 Marketing

### 0 done CTL 6/15/2004 Marketing proposal to Concord Engineering

### 0 done CTL 6/15/2004 Admin emails

### 0 done CTL 6/15/2004 Investigation viewing new pipes cut open

### 0 done CTL 6/15/2004 Investigation looking at pipe polished mount

### 0 done CTL 6/15/2004 Development discussing pdf with Brad & Jason, ordering bottom run of pipes

### 0 done CTL 6/15/2004 Editing editing Al's report

RAC editing to report, also clean up one paragraph on off-season recommendation

talking with Concord engineering about pipe evaluation, getting background on Concord

Page 169: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 6/16/2004 Admin virus on computer, slowing work to crawl

### 0 done CTL 6/16/2004 Literature reading about oxygen corrosion of boilers

### 0 done CTL 6/16/2004 Report writing report

### 0 done CTL 6/17/2004 Development design issues on sight canister

### 0 done CTL 6/17/2004 Editing Proofreading Al's report again

### 0 done CTL 6/17/2004 Marketing mounts, microscope, stereo pictures

### 0 done CTL 6/17/2004 Editing editing report after Al's input

### 0 done CTL 6/17/2004 Marketing complete summary for Libertybell talk

### 0 done CTL 6/17/2004 Admin followup on invoice with Linda at 805-489-0490

### 0 done CTL 6/17/2004 Client reading manual on air requirements for generator, talk with Chris

### 0 done CTL 6/18/2004 Admin filing back reports, setup for Jason

### 0 done CTL 6/18/2004 Investigation mounts, microscope, stereo pictures

### 0 done CTL 6/18/2004 Development new Access program for tracking invoices and profit differential

### 0 done CTL 6/18/2004 Editing opinions and conclusion in present tense discussion

### 0 done CTL 6/18/2004 Marketing

### 0 done CTL 6/21/2004 Admin emails, morning walk around

### 0 done CTL 6/21/2004 Investigation SEM analysis, looking at results with Fred on different phases

### 0 done CTL 6/21/2004 Admin followup with Linda on check on Friday

### 0 done CTL 6/21/2004 Development

### 0 done CTL 6/21/2004 Editing editing report after RAC input, making PDF and sending

### 0 done CTL 6/21/2004 Admin problem with email not working

### 0 done CTL 6/21/2004 Client talking with Dick about the report

### 0 done CTL 6/21/2004 Client email to Kevin with sentence added

### 0 done CTL 6/21/2004 Investigation looking at mount, more grinding needed

### 0 done CTL 6/22/2004 Admin emails, ready to leave

Excel program with addresses of York managers, discuss RAC & Al

discussing plywood mount, also looking at pump capacities to have option regen inhouse

Page 170: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 6/22/2004 Development Nickel Institute Presentation

### 0 done CTL 6/22/2004 Investigation lab looking at mount, instructions for new mount

### 0 done CTL 6/22/2004 Admin followup with Linda on check on Friday

### 0 done CTL 6/22/2004 Admin followup with Brian on unpaid invoice

### 0 done CTL 6/22/2004 Admin walk around talk with RAC, check out work in progress

### 0 done CTL 6/23/2004 Admin emails

### 0 done CTL 6/23/2004 Marketing

### 0 done CTL 6/23/2004 Client email to Kevin on their standard for 95% relative humidity

### 0 done CTL 6/23/2004 Admin update Active project data

### 0 done CTL 6/23/2004 Admin total hours ask Al to bill 6.5 hours

### 0 done CTL 6/23/2004 Management walk around see what Al and Jason doing, working on, etc.

### 0 done CTL 6/24/2004 Admin emails from Kevin, Piller and others

### 0 done CTL 6/24/2004 Investigation looking at mount for tube, more stereoscope

### 0 done MV 6/24/2004 Marketing talking with Jean Boulle, Peter Saxby about potential process work

### 0 done MV 6/24/2004 Meeting Meeting and Travel in NYC with Andy McClaine

### 0 done CTL 6/25/2004 Admin emails

### 0 done CTL 6/25/2004 Client followup with Steve on cost of job

### 0 done CTL 6/25/2004 Management find work for Jason with Brad, basin cleaning etc.

### 0 done CTL 6/25/2004 Client followup with York on tubes, voicemail and email to RAC

### 0 done CTL 6/25/2004 Marketing email to potential client for process work

### 0 done CTL 6/25/2004 Development

### 0 done CTL 6/25/2004 Marketing

### 0 done CTL 6/25/2004 Editing editing Al's report

### 0 done CTL 6/25/2004 House Cleaning updating active projects and clearing desk, area etc

### 0 done CTL 6/28/2004 Admin staff meeting

discussion with Jens and emails on MgH2 and Mg project in general at CTL offices

reviewing status of resin canister suggesting some modifications on assembly

discussion with Kevin Collins and Joe about a resin/grease compatibility study estimate

Page 171: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 6/28/2004 Admin discuss RAC reviewing FA work as it comes in

### 0 done CTL 6/28/2004 Investigation discuss FeCl3 test and samples with Al

### 0 done MV 6/28/2004 Marketing proposal for MTL

### 0 done CTL 6/28/2004 Development discuss 221 gal chiller in gatherburg MD with brian for July 19 week

### 0 done CTL 6/28/2004 Admin active project report

### 0 done CTL 6/28/2004 Marketing letter to York Regional Managers

### 0 done CTL 6/28/2004 Development reading technical paper on MIC

### 0 done CTL 6/28/2004 Marketing proposal to Beth Hunker for Merck

### 0 done MV 6/28/2004 Marketing continue with proposal

### 0 done CTL 6/29/2004 Admin

### 0 done MV 6/29/2004 Marketing continue with proposal and contract

### 0 done CTL 6/29/2004 Marketing

### 0 done CTL 6/29/2004 Editing reviewing Al's report

### 0 done CTL 6/29/2004 Marketing

### 0 done CTL 6/29/2004 Editing editing pictures

### 0 done CTL 6/29/2004 Editing final revision of report for AOL with language of holiday

### 0 done CTL 6/29/2004 Marketing

### 0 done CTL 6/29/2004 Admin typing in new policy statement

### 0 done CTL 6/30/2004 Development update on the status of the resin canister assembly with Jason

### 0 done MV 6/30/2004 Development questions to Andy on MgO form, composition, quantity

### 0 done CTL 6/30/2004 Investigation update on FeCl3 test from Al

### 0 done CTL 6/30/2004 Marketing

### 0 done CTL 6/30/2004 Client

### 0 done CTL 6/30/2004 Client phone conversation, fax, and email to Ron Box

### 0 done CTL 6/30/2004 Admin printing Invoice tracking to answer RAC

email, talk with Al, call from Jason, new scanner, new policy statemnt

talking with Brad, Kevin Collins, and Joe about compatibility testing of resin/varnish with grease, writing proposal

proposal quote to Dave Fanok at atofina for some heat exchanger tubes 215-826-2613

proposal and quote to Piller on resin/grease compatiability study by Brad

letter to york regional managers and discussing mechanics & ideas with Al, instructions for tubes

going over report with client, making changes in report, discussing new work

Page 172: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 6/30/2004 Editing Al's report second draft

### 0 done CTL 6/30/2004 Admin trying out new scanner

### 0 done CTL 6/30/2004 Pictures editing pictures

0 0 done CTL 6/30/2004 Marketing

### 0 done CTL 7/1/2004 Admin emails, Al discuss work to do

### 0 done CTL 7/1/2004 Admin get rid of virus on computer, optimize drive, file management

### 0 done CTL 7/1/2004 Client

### 0 done CTL 7/1/2004 Development canister assembly with Jason, details on N2 bottle

### 0 done CTL 7/1/2004 Editing going over editing of Al's report with RAC then Al

### 0 done CTL 7/1/2004 Admin fixing RAC active report status

### 0 done CTL 7/1/2004 house keeping getting rid of papers in office

### 0 done CTL 7/1/2004 Editing working on Al's paper on propellers

### 0 done CTL 7/1/2004 Literature trying to find info on non-Ta plugs for glass reactors

### 0 done CTL 7/1/2004 Admin

### 0 done MV 7/1/2004 MV question on making CH4 with hydrogen

### 0 done CTL 7/1/2004 Marketing quote to Eric Chapin & Robert Courtney for impact testing

### 0 done CTL 7/1/2004 Report writing

### 0 done MV 7/2/2004 Marketing

### 0 done CTL 7/2/2004 Report writing report

### 0 done CTL 7/2/2004 Development trying to find sieves for sight glass

### 0 done CTL 7/2/2004 Client

### 0 done CTL 7/2/2004 Editing editing rewriting report again

### 0 done MV 7/2/2004 Development

### 0 done MV 7/2/2004 Development PFD for reduction plant

### 0 done MV 7/3/2004 Development PFD for reduction plant

email to Kevin Collins on resin/grease compatiability with grease with impurities

Deric asking about 316 ss sigma phase if at 1220F for an hour, look in library

updating report template with new disclaimer, filling out expense report for $77

email to Bruce Williams BOCEdwards on his gas conversion project

various correspondence with Eric Cohen and Leigh concerning rush sample for impact testing

email to Bruce Williams BOCEdwards on data for vacuum steam ejectors

Page 173: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 7/4/2004 Development Utilities PFD drawing

### 0 done MV 7/5/2004 Development abstract for TMS paper

### 0 done MV 7/5/2004 Marketing email to Neil Thomas

### 0 done MV 7/5/2004 Development PFD issues on MgO reduction flowsheet

### 0 done MV 7/5/2004 Development labeling and numbering streams on flowsheet, loading into model

### 0 done MV 7/6/2004 Development labeling streams on the utility diagram. Name streams on MB file

### 0 done MV 7/6/2004 Development separate cost file from Inputs file

### 0 done CTL 7/8/2004 Client Kevin Collins discussion on wording on AOL report

### 0 done CTL 7/8/2004 Marketing answering questions on proposed testing and past results, fu email

### 0 done CTL 7/8/2004 Admin review specs of new computer with Brad

### 0 done CTL 7/8/2004 Management discussion status of projects with Al

### 0 done CTL 7/8/2004 Development

### 0 done CTL 7/8/2004 Admin Tracking reports, hours for several projects

### 0 done CTL 7/8/2004 Investigation

### 0 done CTL 7/8/2004 Report 5th revision of report per Kevin's request

### 0 done CTL 7/8/2004 Development reading literature on pumps, pollution magazine

0 0 done CTL 7/9/2004 Marketing followup with CAE engineering

0 0 done CTL 7/9/2004 Development checking status of work on resin system

0 0 done CTL 7/9/2004 Housekeeping taking several items being thrown out to car

0 0 done CTL 7/9/2004 Admin updating address book

0 0 done Odle 7/9/2004 Admin went to computer shop to get Olesia's computer fixed, closed

0 0 done CTL 7/9/2004 Admin problem with computer, HD full, cant send emails for invoicing

0 0 done CTL 7/9/2004 Housekeeping getting rid of papers from office

0 0 done CTL 7/9/2004 Marketing

0 0 done CTL 7/9/2004 Admin trying to verify $7125 Honey invoice was done

review status, find us pump to test and look at new seive with Joe for containing resin. FU with Brian on potential test site in Baltimore

looking at pipes under stereoscope and then fu email to Dave on temperatures involved

phone call from Jim Nelson CTL18208 need estimate on cost of metallurgy opinion

Page 174: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 0 done CTL 7/9/2004 Admin invoicing

0 0 done CTL 7/9/2004 Admin invoicing

0 0 done Odle 7/9/2004 Admin

0 0 done CTL 7/9/2004 Editing editing report for Al

0 0 done CTL 7/9/2004 Admin emails

0 0 done CTL 7/9/2004 Development canister leaking problem

0 0 done CTL 7/9/2004 Editing editing report for Al

### 0 done CTL 7/10/2004 Development setting up Prices file

### 0 done CTL 7/10/2004 Development

### 0 done CTL 7/11/2004 Development revising CTL agreement pulling IP into separate agreement

### 0 done CTL 7/11/2004 Development adding analysis of Mg(OH)2 to raw materials analysis

### 0 done CTL 7/11/2004 Development

### 0 done CTL 7/12/2004 Admin emails

### 0 done CTL 7/12/2004 Admin sending version 5 with Table 1 corrected

### 0 done CTL 7/12/2004 Housekeeping walk around and clean coffee area

### 0 done CTL 7/12/2004 Marketing quote to Orbital Engineering

### 0 done CTL 7/12/2004 Investigation taking pictures on stereo scope

### 0 done CTL 7/12/2004 Development direction to Jason on leaking pipes, sight glass, etc

### 0 done CTL 7/12/2004 Pictures cropping, editing pictures

### 0 done CTL 7/12/2004 Report writing

### 0 done CTL 7/12/2004 Development

### 0 done CTL 7/13/2004 Admin emails and walk around

### 0 done CTL 7/13/2004 Admin active project report

### 0 done CTL 7/13/2004 Investigation looking at mounts unetched and etched

### 0 done CTL 7/13/2004 Marketing sending quote again to Kevin Collins on resin

filling out form for petty cash, getting receipts from Jason, giving Jason form also

adding prices, costs file to main program updating Inpts file. Creating analysis for Mg(OH)2 based on pure ingots.

moving MgOH2 to top, adding function to normalized analysis to 100%

Adding additional compounds to material balance subroutine and dimension statements

Page 175: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 7/13/2004 Report writing

### 0 done CTL 7/13/2004 Investigation new tubes in from York

### 0 done CTL 7/13/2004 Marketing accounting stuff with Jim Nelson

### 0 done CTL 7/13/2004 Editing

### 0 done CTL 7/13/2004 Development

### 0 done Odle 7/13/2004 Admin olesias computer shop and then hot glue

### 0 done CTL 7/14/2004 Admin

### 0 done CTL 7/14/2004 Client

### 0 done CTL 7/14/2004 Admin

### 0 done CTL 7/14/2004 Development fu on leak testing on canister

### 0 done CTL 7/14/2004 Report writing discussion

### 0 done CTL 7/14/2004 Development leaking thread on one joint with air, go ahead with water test

### 0 done CTL 7/14/2004 Support editing log-in procedure

### 0 done CTL 7/14/2004 Support finding MIC description in tech library for Al

### 0 done CTL 7/15/2004 Admin morning emails, walk around

### 0 done CTL 7/15/2004 Development

### 0 done CTL 7/15/2004 Client discussion with Dave Fanok on kettle problem

### 0 done CTL 7/15/2004 Report writing on discussion

### 0 done CTL 7/15/2004 Marketing discussing potential Atofina discussion with RAC

### 0 done CTL 7/15/2004 Support proof-reading MIC add on

### 0 done CTL 7/15/2004 Development

### 0 done MV 7/15/2004 Admin working on books for 2nd quarter

### 0 done CTL 7/16/2004 Admin email, talk with Al, then Peter

### 0 done CTL 7/16/2004 Editing comments, editing on paper … need C analysis

### 0 done CTL 7/16/2004 Marketing talking with Tom Drygas … PMS, safety guy

revision 6 on report. Added comments about grease/resin need compatiability testing

bringing RAC up to date on proposed pilot testing and status of work

emails, call John Ely, call Mike Albert, call about tax, fu on Honey Invoice, etc.

call to and from Mike on cleaning plans & Joe Boil from GE Betz new water co

sorting out billing discrepancy for 20138 and 20189 then invoicing Pat

dealing with leak and reviewing plans for testing, regeneration requirements, rental car, etc.

discussing / dreaming with RAC where business is going Dupont coming etc

Page 176: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 7/16/2004 Report writing summary

### 0 done CTL 7/16/2004 Development advising on placement on dolly, N2 bottle needs cap, testing pump

### 0 done CTL 7/16/2004 Tech Reading reading on temperature limits for carbon steel and alloy 20

### 0 done MV 7/17/2004 Admin books and 941 wH records

### 0 done CTL 7/16/2004 Client call from Box to separate out which tubes pulled

### 0 done CTL 7/16/2004 Client email to Dave on items for Agenda

### 0 done CTL 7/16/2004 Marketing

### 0 done CTL 7/16/2004 Tech Reading specific info for report for Orbital Engineering

### 0 done CTL 7/19/2004 Admin email, walk around

### 0 done CTL 7/19/2004 Development

### 0 done CTL 7/19/2004 Report writing

### 0 done CTL 7/19/2004 Admin Staples for labels, Shoprite for ammonia

### 0 done CTL 7/19/2004 Admin setting up meeting with Dave for plant meeting

### 0 done CTL 7/19/2004 Marketing bid to Scott Kovel

### 0 done CTL 7/19/2004 Admin

### 0 done CTL 7/19/2004 Client call from Dom for cleaning schedule

### 0 done CTL 7/20/2004 Admin emails and walk around

### 0 done CTL 7/20/2004 Admin Sears for Vise and pipe glue

### 0 done CTL 7/20/2004 Client

### 0 done CTL 7/20/2004 Report finishing report

### 0 done CTL 7/20/2004 Client talk with John Ely

### 0 done CTL 7/20/2004 Admin new computer file transfer, sign on problems

### 0 done CTL 7/20/2004 Client

### 0 done MV 7/20/2004 Report Intro and part of Progress Section

### 0 done CTL 7/21/2004 Client references for work on V2O5 for Peter's work

Scott Covell 845-355-5478 , UPS equipment circiuit board problems

last minute details on CuES system including ammonia supply, N2 tank cover, checking leaks and flow rates

Rick Duffy Service Tech 202-437-3306 and Fred Lohr 301-621-3638 setting up test at Asbury Methodist, Gaithersburg

calling Fred Lohr 301-621-3638, then setting up vacuum testing for leaks

emails & conversations with Dom on pipe cleaning, rodene effect on ss

Page 177: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 7/21/2004 Admin

### 0 done CTL 7/21/2004 Investigation review work done todate and literature on 304HS

### 0 done CTL 7/21/2004 Marketing proposal to Kim at Taylor Forge on more work

### 0 done CTL 7/21/2004 Editing fixing report … retype part lost on new computer

### 0 done CTL 7/21/2004 Client call on setting up pictures before and after

### 0 done CTL 7/21/2004 Development inquiry on canisters with vacuum, letter to Mike Warner

### 0 done CTL 7/22/2004 Admin emails, walk around

### 0 done CTL 7/22/2004 Investigation looking for pits etc. in York samples … formicary

### 0 done CTL 7/22/2004 Support Delhi from Dupont Meeting

### 0 done CTL 7/22/2004 Investigation alternatives for canister for York

### 0 done CTL 7/22/2004 Client agenda for meeting

### 0 done CTL 7/22/2004 Support Metallurgist looking for job

### 0 done CTL 7/22/2004 Editing going over paper with RAC

### 0 done CTL 7/22/2004 Marketing quote to syntech on HE evaluation

### 0 done CTL 7/22/2004 Admin adding paperport, omnipro, and pcanywhere to new computer

### 0 done CTL 7/22/2004 Marketing quote to Valero Mike K

### 0 done CTL 7/22/2004 Support helping Joe with compound id

### 0 done MV 7/22/2004 Report complete progress section and make PDF printouts

### 0 done CTL 7/20/2004 Investigation stereoscope looking for pits

### 0 done CTL 7/23/2004 Admin emails, talk with Al about pricing Valero Job

### 0 done CTL 7/23/2004 Client preparation for meeting

### 0 done CTL 7/23/2004 Client trip to Aztrazeneca and pictures

### 0 done CTL 7/23/2004 Client trip to Bristol

### 0 done CTL 7/23/2004 Investigation RAC fill in background

### 0 done CTL 7/24/2004 Investigation stereoscope, SEM, short email report

getting files transferred including email accounts, and other misc problems with same

Page 178: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 7/24/2004 Editing final edit of July Progress Report

### 0 done CTL 7/25/2004 Client trip to AstraZeneca for pipes

### 0 done CTL 7/26/2004 Admin active project report

### 0 done CTL 7/26/2004 Client revising report for Jim

### 0 done CTL 7/26/2004 Development design on pipe canister with Al and James Machinery

### 0 done CTL 7/26/2004 Investigation viewing mounts, etc. Then travel and meeting at Valero

### 0 done CTL 7/26/2004 Client email to Dave Fanok, starting editing report

### 0 done CTL 7/26/2004 Admin

### 0 done CTL 7/26/2004 Admin checking emails, phone messages, house keeping

### 0 done CTL 7/26/2004 Report printing, making PDF

### 0 done CTL 7/27/2004 Admin

### 0 done CTL 7/27/2004 Investigation another look under the stereoscope at sample

### 0 done CTL 7/27/2004 Client call from Bill Long restart boiler project

### 0 done CTL 7/27/2004 Report revise AOL report remove speculation on resin/epoxy

### 0 done CTL 7/27/2004 Admin info together for invoicing

### 0 done CTL 7/27/2004 Client call Joe Boil

### 0 done CTL 7/27/2004 Admin follow up on PO for Valero

### 0 done CTL 7/27/2004 Admin follow up on PO for Atofina

### 0 done CTL 7/27/2004 Development

### 0 done CTL 7/28/2004 Admin emails, Az about boiler PFD needed

### 0 done CTL 7/28/2004 Editing report for Al

### 0 done CTL 7/28/2004 Pictures selecting and editing pictures for report

### 0 done CTL 7/28/2004 Report writing report

0 0 done CTL 8/1/2004 Admin timesheet this month starts with 07/28/04

0 0 done CTL 8/3/2004 Pictures going through pictures from site, selecting, editing

updating active projects, setting up computer with website for data transfer

emils, getting laptop loaded with projects for vacation, website with Al

emails and discussions with Al on options for resin traps, pipe design, flowrates

Page 179: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0 0 done CTL 8/4/2004 Report revising report based on plant discussions

0 0 done MV 8/5/2004 Report reading monthly report from SH

### 0 done CTL 8/5/2004 Investigation looking at micrographs from three samples

### 0 done MV 8/6/2004 Development setting up general flow of program

### 0 done MV 8/7/2004 Development modifying calcining flowsheet to show recycle of dust

### 0 done MV 8/9/2004 Development

### 0 done CTL 8/9/2004 Admin finding out what has gone on while away

### 0 done CTL 8/9/2004 Investigation reviewing data collected

### 0 done CTL 8/9/2004 Admin follow up with AZ to let them know I am back

### 0 done CTL 8/9/2004 Investigation looking at pictures and photos

### 0 done CTL 8/9/2004 Marketing

### 0 done CTL 8/9/2004 Development looking at pipes and flanges Al had made, guage too heavy

### 0 done CTL 8/9/2004 Admin trying to get on Al's computer to final copy of Valero report

### 0 done CTL 8/9/2004 Marketing personalizing presentation for Liberty Bell Conference

### 0 done CTL 8/9/2004 Admin

### 0 done CTL 8/10/2004 Admin emails, update from Al on projects

### 0 done CTL 8/10/2004 Development looking over sketches for resin column supports, piping layout

### 0 done CTL 8/10/2004 Admin getting supplies for new cannisters, bolts, nuts, washers

### 0 done CTL 8/10/2004 Investigation looking at OD/ID with steroscope and microscope at mounts

### 0 done CTL 8/10/2004 Support showing Fred how to make calcium carbonate and checking emails

### 0 done CTL 8/10/2004 Marketing calling Joe Schluck 302 886 7971

### 0 done CTL 8/10/2004 Editing editing report based on RAC marks

### 0 done MV 8/11/2004 Development debugging "selected" column in price file

### 0 done CTL 8/11/2004 Admin emails

### 0 done CTL 8/11/2004 Editing final read over and resend

general flow of program, reading new price file, file management program not writing price file

call then email Jerry Smith about high copper and zinc in hydrotest tank

talking with RAC about disclaimer bottom of report, AZ, 3M, verb tense, present York job

Page 180: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 8/11/2004 Investigation

### 0 done CTL 8/11/2004 Development

### 0 done CTL 8/11/2004 Admin investigating why some emails are sending out over and over

### 0 done CTL 8/11/2004 Investigation looking at channeling, worm like on mount

### 0 done MV 8/12/2004 Development

### 0 done CTL 8/12/2004 Admin emails, review longer term to do items

### 0 done CTL 8/12/2004 Development

### 0 done CTL 8/12/2004 Investigation

### 0 done CTL 8/12/2004 Admin documenting File Management Procedures for FA Dept.

### 0 done CTL 8/12/2004 Pictures reviewing editing pictures for report

### 0 done CTL 8/12/2004 Investigation looking at mounts of original material for inclusions

### 0 done CTL 8/12/2004 Admin going to pick up plasticware from PTE

### 0 done CTL 8/13/2004 Admin emails, touch base with Al

### 0 done MV 8/13/2004 Development email to company in Ohio for thermo and heat balance

### 0 done CTL 8/13/2004 Investigation

### 0 done CTL 8/13/2004 Pictures editing, adding to report

### 0 done CTL 8/13/2004 Development

### 0 done CTL 8/13/2004 Investigation mapping out location of cracks in samples

### 0 done MV 8/14/2004 Development

### 0 done MV 8/14/2004 Development set up design criteria for calcining

### 0 done MV 8/14/2004 Development starting MB for calcining

### 0 done MV 8/15/2004 Development

### 0 done CTL 8/16/2004 Admin morning emails

### 0 done CTL 8/16/2004 Editing editing report from Al

### 0 done CTL 8/16/2004 Report writing

looking at mounts on samples, then looking at "before" pipe for better place to sample

technical reading on sentization, desensitation and time and temp requirements for same, Cr and Mn scans to show no sensitazation

cost and price files correctly dumping to log file upon program execution, all values transfer ok

Brian Hersey conversation set early to mid Sept as target date for test, reviewing status of work on columns

selecting mount area, blue tunnels in copper tube, viewing mounts, pictures

looking at mounts again, SEM again, call from Kim, Steve, and Exxon

reading on sources for sodium, sulfur, Mn in steel, and effects of high temperature

working on this program, same starting time problem, making Active change color

add several more design criteria for calcining, modify some compounds, continue MB

Page 181: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 8/16/2004 Investigation looking at sample under stereoscope for additional cracks

### 0 done CTL 8/16/2004 Marketing Proposal to BASF for Failure Investigation of circuit board corrosion

### 0 done CTL 8/16/2004 Literature reading about GB problems in steel

### 0 done MV 8/17/2004 Development

### 0 done CTL 8/17/2004 Report writing, then final edit after Al reviewed

### 0 done CTL 8/17/2004 Development followup on construction of new resin canisters

### 0 done CTL 8/17/2004 Admin housekeeping desk, some technical reading

### 0 done CTL 8/17/2004 Investigation viewing circuit board under stereoscope

### 0 done CTL 8/17/2004 Report report on pipe cleaning inspection

### 0 done MV 8/18/2004 Development calciner code, add SnO, ZnO to compound list

### 0 done CTL 8/18/2004 Admin emails and Active Projects Report

### 0 done CTL 8/18/2004 Investigation circuit board results on SEM viewing

### 0 done CTL 8/18/2004 Admin set up trip to MERC, Rolla NJ

### 0 done CTL 8/18/2004 Development moving some technical articles scanned at home to technical library

### 0 done CTL 8/18/2004 Report writing

### 0 done CTL 8/18/2004 Development reading a FA on cold cracking in a HAZ

### 0 done CTL 8/18/2004 Admin helping Al on problem with making PDF

### 0 done CTL 8/18/2004 Development testing lifting of new resin cannister into position

### 0 done CTL 8/18/2004 Editing edit and discuss with RAC … resubmit to RAC

### 0 done MV 8/18/2004 Development

### 0 done CTL 8/19/2004 Report PDF and send off report

### 0 done CTL 8/19/2004 Investigation mounts of circuit board

### 0 done MV 8/19/2004 Development

### 0 done MV 8/19/2004 Admin estimating project cost and schedule

### 0 done CTL 8/19/2004 Admin morning emails, need to respond to MERC, updating to do list

debugging calciner code, adding missing compounds PbO and SnO to dimension statements in FMEB and Main Code

splitting MB into two sheets, checking all oxidation reactions in calciner

oxygen balance around calciner check, use splitter functiont to calc dust from calciner

Page 182: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 8/19/2004 Editing edit again and return to RAC

### 0 done CTL 8/19/2004 Editing editing report with client's comments

### 0 done CTL 8/19/2004 Investigation

### 0 done CTL 8/19/2004 Support helping RAC with fatigue issues on corrogated pipe

### 0 done CTL 8/19/2004 Admin send process form to MERC

### 0 done CTL 8/20/2004 Development getting Dust from calciner correct

### 0 done CTL 8/20/2004 Admin

### 0 done CTL 8/20/2004 Report rewriting report again

### 0 done CTL 8/20/2004 Investigation

### 0 done MV 8/21/2004 Admin making todo list for upcoming week

### 0 done MV 8/21/2004 Development

### 0 done MV 8/21/2004 Admin remove data/PDF for more generic model for MTL's process

### 0 done MV 8/21/2004 Development initial estimate of gas flow for calciner

### 0 done MV 8/21/2004 Development heat balance around calciner

### 0 done MV 8/22/2004 Development

### 0 done MV 8/22/2004 Development debug calciner circuit, start furnace subroutine

### 0 done MV 8/23/2004 Development

### 0 done CTL 8/23/2004 Admin house cleaning office, staff meeting

### 0 done CTL 8/23/2004 Investigation

### 0 done CTL 8/23/2004 Editing fourth edit on report, returned to RAC

### 0 done CTL 8/23/2004 Investigation

### 0 done MV 8/23/2004 Development adding new gas species for furnace

### 0 done CTL 8/23/2004 Client review results, then email update to clients on results to date

### 0 done CTL 8/23/2004 Investigation questions to MERC about process

### 0 done CTL 8/23/2004 Development technical reading on Inconnel

additional investigation per RAC, picture of crack below main crack, element mapping

internet problem, cking modem, sidetracked, copying files from metallography etc on disk

more SEM analysis, another mount, problem with Ce analysis in sample

fix a few minor errors on solids around calciner and then initial estimate

Baghouse, move temp streams to above 200, dust recycle, fix H2 balance

furnace subroutine, get lime analysis, setup furnace dsgn assumptions, start air leak

discussing Ce in sample with Brad, then Brad an d Al …CeO in polishing fluid

studying sample under stereoscope & then cutting out sample from board for mount

Page 183: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 8/24/2004 Development

### 0 done CTL 8/24/2004 Investigation getting ready for trip, sampling supplies, email on chlorides

### 0 done CTL 8/24/2004 Admin problems with Adobe, then reinstalling

### 0 done CTL 8/24/2004 Development technical reading on Inconnel

### 0 done CTL 8/24/2004 Admin looking up Franklin, calling Joann, then call from Jason

### 0 done CTL 8/24/2004 Report Edit al's, then send PDF

### 0 done CTL 8/24/2004 Investigation looking at new mounts

### 0 done CTL 8/24/2004 Pictures selecting pictures for report

### 0 done CTL 8/24/2004 Support showing RAC copper dendrites on boards

### 0 done CTL 8/25/2004 Editing editing report and sending out via PDF

### 0 done CTL 8/25/2004 Investigation trip to Ralway

### 0 done MV 8/25/2004 Support email replying to energy consumption on carbothermal process

### 0 done MV 8/26/2004 Development selecting coke, setting up input screen

### 0 done CTL 8/26/2004 Admin morning emails, samples turn over to Al

### 0 done CTL 8/26/2004 Investigation looking at samples under microscope, update Al and then RAC

### 0 done CTL 8/26/2004 Support

### 0 done CTL 8/26/2004 Client

### 0 done CTL 8/26/2004 Marketing Beth talk on more testing, scanning articles, reading part of articles

### 0 done CTL 8/26/2004 Marketing call from Rodney on future work, selling site visit

### 0 done CTL 8/26/2004 Admin two new samples in, carrying back

### 0 done CTL 8/26/2004 Development reading technical articles

### 0 done CTL 8/27/2004 Investigation

### 0 done CTL 8/27/2004 Marketing

### 0 done CTL 8/27/2004 Marketing proposal to BASF for site audit

### 0 done MV 8/27/2004 Development Pay TMS dues on line

start furnace reactions, estimate vapor pressures of Mg and impurities

looking at sodium arsenate crystals with Joe for superfund at highschool

discussing problem with RAC and Al on crevice, reviewing email, background

trying to get good picture of coating pullaway on circuit board … contrast too much

off and on emails and phone calls to Beth, sending her articles …. Est. relationship, read articles

Page 184: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 8/27/2004 Report writing

### 0 done CTL 8/27/2004 Support exchanging plastic jug at PLE

### 0 done CTL 8/28/2004 Support reading report and sending comments to RAC, Al

### 0 done MV 8/28/2004 Development

### 0 done MV 8/28/2004 Development

### 0 done Overhe 8/29/2004 Blank

### 0 done MV 8/29/2004 Development code to present MB in horizontal format for streams

### 0 done MV 8/29/2004 Development

### 0 done MV 8/30/2004 Development debugging elemental analysis code

### 0 done CTL 8/30/2004 Admin morning emails, lost active project markup from RAC, clean desk

### 0 done CTL 8/30/2004 Editing

### 0 done CTL 8/30/2004 Client correspondence with Rodney over upcoming site audit to BASF

### 0 done CTL 8/30/2004 Marketing

### 0 done CTL 8/30/2004 Development

### 0 done CTL 8/30/2004 Admin billing info together for AstraZeneca

### 0 done CTL 8/30/2004 Report writing ES

### 0 done MV 8/30/2004 Development

### 0 done MV 8/31/2004 Development discussions on coke versus coal

### 0 done CTL 8/31/2004 Admin morning emails, making todo list, discuss with Al his plans for day

### 0 done CTL 8/31/2004 Investigation initial look at sample under stereoscope

### 0 done CTL 8/31/2004 Development look over resin container, new bag setup, picture but no goo

### 0 done CTL 8/31/2004 Report finishing report

### 0 done MV 8/31/2004 Marketing talking with Jens about MgH2, olivine processing, etc.

### 0 done CTL 8/31/2004 Investigation

### 0 done CTL 8/31/2004 Support discussion on cleaning probes, then proofing RAC's draft

this time program, problem with time1 zeroing out, not initialize timeold

dealing with furnace assumptions and how to deal with elemental vs. compound analysis

code to track elemental analysis for all streams including coke & ck closure on each stream

editing report, making PDF and sending, typo made, resent as revision 1

added slides to presentation, made CD's, mailed them to Loraine Huxler

info on courier service for FA sample pickup and delivery, and sharing info

debugging elemental analysis code, getting MB to 100% elements & compounds

trying to find addtl crystals for analysis, problems with limited analysis

Page 185: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 8/31/2004 Admin getting supplies together for audit

### 0 done CTL 9/1/2004 Travel travel to Mt. Olive and back

### 0 done CTL 9/1/2004 Investigation site audit, taking samples, viewing site

### 0 done MV 9/1/2004 Marketing email from Jens on MgH2 project

### 0 done CTL 9/2/2004 Development

### 0 done CTL 9/2/2004 Admin

### 0 done CTL 9/2/2004 Development reviewing articles to read out of Practical FA

### 0 done CTL 9/2/2004 Meeting discussing trip with RAC then into meeting on FA with RAC and Al

### 0 done MV 9/2/2004 Marketing talking with Andy on behalf of Jens

### 0 done CTL 9/2/2004 Investigation

### 0 done CTL 9/2/2004 Editing comments on RAC's last version and discuss

### 0 done CTL 9/2/2004 Editing Editing report with RAC's comments

### 0 done CTL 9/2/2004 Admin talking with RAC about work load and hours for Jason

### 0 done MV 9/2/2004 Development

### 0 done MV 9/3/2004 Development finish coke input and back to furnace reactions

### 0 done CTL 9/3/2004 Meeting

### 0 done CTL 9/3/2004 Investigation looking at shaft under scope and getting feedback from Dick Ervin

### 0 done CTL 9/3/2004 Marketing

### 0 done CTL 9/3/2004 Editing rewriting Al's report

### 0 done CTL 9/3/2004 Admin

### 0 done CTL 9/4/2004 Marketing edit talk, make CD and then go to postoffice and send to Lorraine

### 0 done CTL 9/4/2004 Admin edit new agreement MV and CTL and send to RAC

### 0 done Odle 9/4/2004 Admin calling HP support for Pressario chkdsk /r and then repair xp

### 0 done MV 9/4/2004 Development furnace reactions, identify new species, add vapor pressure cacl

### 0 done Overhe 9/5/2004 Blank

talking with lab about what cartridge to use for different types of air samples

emails, Al update on his and my projects, reading RAC's comments on a report

looking at tube ID's under stereoscope, discussing with Al how to document

bringing in coke composition as a mixture of elements and compounds/ash

meeting with RAC on hourly wages system versus fixed $/mo and related

link for Loraine Huckler to download libertybell talk and correspondence

documenting meeting with RAC, running numbers on %process to CTL

Page 186: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 9/5/2004 Development modifying this program to produce a project timesheet

### 0 done MV 9/5/2004 Development

### 0 done MV 9/6/2004 Development

### 0 done CTL 9/7/2004 Admin emails, hi to Brad, Joe, Al

### 0 done CTL 9/7/2004 Editing editing Al's draft

### 0 done CTL 9/7/2004 Admin active projects report

### 0 done Odle 9/7/2004 Admin check if check cleared bank

### 0 done CTL 9/7/2004 Pictures selecting pictures for report

### 0 done CTL 9/7/2004 Client

### 0 done CTL 9/7/2004 Investigation looking at tubes, slag everywhere, discussing with RAC and Al

### 0 done CTL 9/7/2004 Admin discussing Jason's schedule with Brad and RAC

### 0 done CTL 9/7/2004 Development setting up new MB format with all new elements from furnace

### 0 done CTL 9/8/2004 Investigation review analysis from IC, EDX

### 0 done CTL 9/8/2004 Admin emails, talk to Al, RAC on endemic definition

### 0 done CTL 9/8/2004 Admin talk to Joe about IC analysis for BASF

### 0 done MV 9/8/2004 Development technical reading on SOE

### 0 done CTL 9/8/2004 Admin waiting on Jason to polish mount and Joe to run IC's

### 0 done CTL 9/8/2004 Development

### 0 done CTL 9/8/2004 Investigation

### 0 done CTL 9/8/2004 Admin check NACE balance for Joe

### 0 done MV 9/8/2004 Development send Jens info on H2 production via wind mills

### 0 done CTL 9/8/2004 Report writing

### 0 done CTL 9/9/2004 Admin emails, talk to Joe about IC results, Al about EDX results

### 0 done CTL 9/9/2004 Investigation typing results to tables then normalizing

### 0 done CTL 9/9/2004 Clients emails back and forth to Beth Junker

vapor pressure subroutine, and then use to determine which metals volatilize in furnace

furnace reactions, adding new vapor and liquid species to subroutines based on VP calc

Preliminary results back to Rodney, looking through MSDS's from site

improvement of MB printout … a lot of new compounds in furnace sub

looking at mount on keyway, before and after investigation, reviewing background, info on ratch marks

Page 187: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 9/9/2004 Investigation looking at pipe under stereoscope, red stuff

### 0 done CTL 9/9/2004 Development

### 0 done CTL 9/9/2004 Development technical reading on different types of fracture surfaces

### 0 done CTL 9/9/2004 Investigation discussing job with RAC

### 0 done CTL 9/9/2004 Investigation reviewing results from lab on tensile, yield, etc.

### 0 done CTL 9/10/2004 Admin emails, then going over cost overruns on two jobs with RAC

### 0 done CTL 9/10/2004 Investigation comparing tensile tests and elongation with published values

### 0 done CTL 9/10/2004 Report writing report and asking Tony Pace Questions

### 0 done CTL 9/10/2004 Investigation tabulating reviewing data, asking Rodney questions

### 0 done CTL 9/10/2004 Pictures writing report asking Rodney questions

### 0 done MV 9/11/2004 Development completed furnace reactions to 99.8% closure, including debugging

### 0 done CTL 9/13/2004 Meeting staff meeting on cleanup for insurance

### 0 done CTL 9/13/2004 Admin morning emails

### 0 done CTL 9/13/2004 Housekeeping

### 0 done CTL 9/13/2004 Development setup Sept 23 for pilot test, need soln report

### 0 done CTL 9/13/2004 Report data, writing

### 0 done CTL 9/13/2004 Investigation new FA in, getting background information, visual of new pieces

### 0 done CTL 9/13/2004 Editing editing report per RAC

### 0 done MV 9/14/2004 Development adding option in design criteria to set target level of CaO in slag

### 0 done CTL 9/14/2004 Meeting house keeping meeting followed by talk with Al in metallography lab

### 0 done CTL 9/14/2004 Admin morning emails

### 0 done CTL 9/14/2004 Report continuing report

### 0 done CTL 9/14/2004 Client talk with brian hersey about upcoming test and contacting Duffy

### 0 done CTL 9/14/2004 Client taling and emails to Tony Pace on report details

### 0 done CTL 9/14/2004 Development researching about diesel, Nox, So2, and similar

improvement of MB printout … a lot of new compounds in furnace sub, continued

walk around, then MSDS and moving LiBr, cross contamination with RAC, moving stuff to shed

Page 188: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 9/15/2004 Development

### 0 done CTL 9/15/2004 Admin morning emails

### 0 done CTL 9/15/2004 Marketing new job on leaking pipe at dorms, discuss quote for Al to write up

### 0 done CTL 9/15/2004 Report writing on report

### 0 done CTL 9/15/2004 Client talking with Scott Coval of Piller on BASF job

### 0 done CTL 9/15/2004 Marketing proposal and cost estimate

### 0 done CTL 9/15/2004 Meeting

### 0 done CTL 9/15/2004 Client conversation with Rodney about room

### 0 done CTL 9/15/2004 Development looking over plans with Jason on resin canister

### 0 done CTL 9/15/2004 Investigation discussing with Jason on to cut up sample

### 0 done CTL 9/15/2004 Editing editing Al's report and then discussing with him

### 0 done CTL 9/16/2004 Admin review email, list of projects set priorities for aftn

### 0 done CTL 9/16/2004 Investigation looking at mount

### 0 done CTL 9/16/2004 Meeting talk with RAC and Al on Atofina mostly

### 0 done CTL 9/16/2004 Literature information on Inconel and Carpenter 450

### 0 done CTL 9/16/2004 Development talking with Mark of EverestVit video probes

### 0 done CTL 9/17/2004 Investigation site trip to Atofina

### 0 done MV 9/18/2004 Development combine total elments with mtpy subroutine, make program simpler

### 0 done MV 9/18/2004 Development

### 0 done MV 9/19/2004 Development

### 0 done CTL 9/20/2004 Investigation directions to Jason, Al on shaft

### 0 done CTL 9/20/2004 Development discussion of trip, status of all equipment, etc

### 0 done CTL 9/20/2004 Investigation planning for trip to

### 0 done CTL 9/20/2004 Report Discussion of report with RAC

### 0 done CTL 9/20/2004 Marketing practice for talk at Libertybell, making CD's

control loop on adding enough lime to reach target level of CaO in slag

meeting with RAC on proposal and cost estimate, then questions from Al on how to do quote

finding and compling data (heat cap etc) for heat balance calculations

continuing data compliation for heat balance, than adding to program

Page 189: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 9/20/2004 Editing edit report with RAC corrections

### 0 done CTL 9/20/2004 Development talking with Mark of EverestVit video probes

### 0 done CTL 9/20/2004 Editing editing Al's report

### 0 done CTL 9/20/2004 Housekeeping office throw away stuff

### 0 done CTL 9/21/2004 Marketing driving and talk with Libertybell

### 0 done CTL 9/21/2004 Investigation stereoscope and selecting where to cut for Dave, call from John Ely

### 0 done CTL 9/21/2004 Client trying to setup Astrazeneca with probe, etc

### 0 done CTL 9/21/2004 Development planning for trip to Baltimore, pp setup, calls from Al at site

### 0 done MV 9/22/2004 Development adding CaO heat capacity, bringing calcine temp in to furnace

### 0 done CTL 9/22/2004 Investigation showing Cory the cut sample

### 0 done CTL 9/22/2004 Admin plans for day with Al

### 0 done CTL 9/22/2004 Editing editing Al's report, rewriting Discussion

### 0 done CTL 9/22/2004 Investigation heat exchanger and pump inspections

### 0 done CTL 9/22/2004 Development loading truck, getting truck

### 0 done CTL 9/23/2004 Development Asbury site with resin

### 0 done CTL 9/24/2004 Investigation trip to STV 250 miles RT

### 0 done CTL 9/24/2004 Development getting stuff together for Al for Haack etc

### 0 done MV 9/25/2004 Admin getting timesheet for Sept up-to-date

### 0 done MV 9/25/2004 Development discussing nozzle calculations with Jens and John Engels

### 0 done MV 9/25/2004 Marketing reviewing Oman sprdsheet & notes

### 0 done MV 9/27/2004 Marketing email to Jens on Oman … how to approach

### 0 done CTL 9/27/2004 Admin getting Jason and Fred started on several projects

### 0 done CTL 9/27/2004 Development talking with Al and RAC on progress at York Chiller in Baltimore

### 0 done CTL 9/27/2004 Report writing fax report for Ms. X

### 0 done CTL 9/27/2004 Investigation looking at shaft with Fred, Jason cutting up

Page 190: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 9/27/2004 Investigation organizing work, pictures Jason,

### 0 done CTL 9/27/2004 Editing editing report, pdf and sending … talk with RAC

### 0 done CTL 9/27/2004 Admin problem with email, couldn't send email

### 0 done CTL 9/27/2004 Client call into Ed Wasack and then talk on inspection tomorrow

### 0 done CTL 9/27/2004 Housekeeping walk around for visitors

### 0 done MV 9/27/2004 Marketing email to Jens on Proposal Contents

### 0 done MV 9/27/2004 Development trying to find books or articles on steam requirements for injectors

### 0 done CTL 9/28/2004 Admin talk with Al on plans for the next two days

### 0 done CTL 9/28/2004 Admin problems with CTL email address

### 0 done CTL 9/28/2004 Investigation cutting and mounting otherside with Dave

### 0 done CTL 9/28/2004 Marketing

### 0 done CTL 9/28/2004 Client conference call with Piller and BASF over Unit#3 at Mount Olive

### 0 done CTL 9/28/2004 Admin problems with CTL email address

### 0 done CTL 9/28/2004 Development pickup truck in rain storm

### 0 done CTL 9/29/2004 Admin morning emails and update to do list

### 0 done CTL 9/29/2004 Editing editing Al's report

### 0 done CTL 9/29/2004 Investigation collecting another IC sample, adding to report

### 0 done CTL 9/29/2004 Investigation mounts on crack section, intergranular

### 0 done CTL 9/29/2004 Admin return truck

### 0 done CTL 9/29/2004 Admin review price requote for STV

### 0 done CTL 9/29/2004 Investigation taking pictures of mounts

### 0 done CTL 9/29/2004 Pictures selecting pictures for report

### 0 done CTL 9/29/2004 Admin update, check timesheet for monthly billings

### 0 Done MV 9/29/2004 Development develop equations to estimate steam requirements from ejectors

### 0 Done MV 9/30/2004 Marketing email on hydrogen patents, offer to co-develop

Ray Pratt 717-246-4254, Neale Hoppen 717-246-4208 cement in 1006 carbon steel

Page 191: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 Done CTL 9/30/2004 Admin still trying to get AOL communicator working after windows update

### 0 Done CTL 9/30/2004 Admin get together all expenses for the month, new format $/mo only

### 0 Done CTL 9/30/2004 Support reading proposal

### 0 Done CTL 9/30/2004 Support yucca mountain meeting and discussions

### 0 Done CTL 9/30/2004 Report writing

### 0 done CTL 10/1/2004 Literature technical reading on ejectors

### 0 done CTL 10/1/2004 Support discuss with Brad, autoclaves and space, Joe on data collection

### 0 done MV 10/1/2004 Development

### 0 done CTL 10/1/2004 Admin morning talk with Al on work to do, emails, updating active projects

### 0 done CTL 10/1/2004 Report writing

### 0 done CTL 10/1/2004 Marketing proposal for job in San Antonio

### 0 done MV 10/2/2004 Development subroutine for salt box mb and heat balance

### 0 done CTL 10/4/2004 Marketing working on proposal, forms, etc.

### 0 done CTL 10/4/2004 Development picking up drums for waste disposal

### 0 done CTL 10/4/2004 Investigation

### 0 done MV 10/5/2004 Development mass per unit area of nozzle calc

### 0 done CTL 10/5/2004 Meeting meeting on project

### 0 done CTL 10/5/2004 Admin working on forms

### 0 done CTL 10/5/2004 Investigation water rinse again to get higher conc, unsucessful

### 0 done CTL 10/5/2004 Editing editing report again

### 0 done CTL 10/5/2004 Marketing quote to Phillip at Valero of $2K each for each shaft failure

### 0 done CTL 10/5/2004 Marketing two quotes to Carl Barkley $3K each for two ES

### 0 done CTL 10/5/2004 Investigation looking at pump sections under stereoscope

### 0 done CTL 10/5/2004 Admin returning samples to AstraZeneca

### 0 done none 10/6/2004 Blank

idea of using H2 as a carrier gas for O2 from MgO then reduce H2O with SOE

discussion with Griffin on failure, internal discussion and stereoscope

Page 192: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 10/6/2004 Marketing working on forms, proof reading documents from team

### 0 done Odle 10/6/2004 Finances went to Elkton P.O. for notice on yard not cut

### 0 done CTL 10/6/2004 Marketing talk with DOM on new samples

### 0 done MV 10/7/2004 Development

### 0 done CTL 10/7/2004 Admin meetings, proposal for bid

### 0 done CTL 10/7/2004 Admin picking up sample and viewing deaerotor tank

### 0 done MV 10/8/2004 Development

### 0 done MV 10/8/2004 Development feedback loop salt out replaced by salt in

### 0 done CTL 10/8/2004 Admin

### 0 done CTL 10/8/2004 Writing restart writing report

### 0 done CTL 10/8/2004 Meeting staff meeting, problem with unstable word file also

### 0 done MV 10/8/2004 Marketing email to Bob Brown with regard to consulting opportunity in Korea

### 0 done CTL 10/8/2004 Development update email on progress to Andy

### 0 done CTL 10/8/2004 Investigation looking at new mount

### 0 done MV 10/8/2004 Development Add MB check to salt bath

### 0 done MV 10/9/2004 Development correcting errors in minor elements MB around salt bath

### 0 done MV 10/9/2004 Development ingot casting subroutine

### 0 done MV 10/9/2004 Development Ejector subroutine finish and connect to salt furnace exhaust

### 0 done MV 10/10/2004 Development complete ejector subroutine

### 0 done MV 10/10/2004 Development

### 0 done MV 10/11/2004 Development finish heat balance printout for EA furnace, correct some errors

### 0 done MV 10/11/2004 Marketing looking for folder on white dust processing

### 0 done CTL 10/11/2004 Editing editing report to give to RAC, editing with and after RAC

### 0 done CTL 10/11/2004 Admin trying to get meeting moved to Wed

### 0 done CTL 10/11/2004 Investigation sample #1 … trying to find attack, cracks initiation stage

add salt make up analysis to INPUTS screen, add new cmpds to MB

add design criteria about %salt carried out with Mg, calc salt entrained

samples from AstraZeneca, go over work to do with Al, talk about proposal with Brad & Joe

modify heat balance reporting subroutine and then use to print HB for calciner and furnace

Page 193: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 10/11/2004 Editing editing report after RAC

### 0 done CTL 10/11/2004 Development discussions on data from pilot test

### 0 done MV 10/11/2004 Marketing scanning dust articles for Jim Pittinger

### 0 done MV 10/12/2004 Marketing email to Bob B on Trent shopping list

### 0 done MV 10/12/2004 Development changing assumptions on how to deal with air leaks in furnace

### 0 done MV 10/12/2004 Report working on MB/HB to reduce size for inclusion in report

### 0 done CTL 10/12/2004 Development

### 0 done CTL 10/12/2004 Investigation SEM results with Al on two bellows

### 0 done MV 10/13/2004 Marketing response to Trent on due diligence study

### 0 done CTL 10/13/2004 Development meeting with York on first pilot test and the future

### 0 done CTL 10/13/2004 Marketing meeting with others on potential work

### 0 done CTL 10/13/2004 Admin email to Sandi PhD on FA work at CTL, reading emails also

### 0 done CTL 10/13/2004 Client call from Carl Barkley Valero, sending samples

### 0 done CTL 10/13/2004 Investigation

### 0 done MV 10/13/2004 Development formating modifying MB, Design Criteria, Inputs for Report

### 0 done MV 10/14/2004 Development finishing Inputs modification,

### 0 done MV 10/14/2004 Report working on quarterly report

### 0 done CTL 10/14/2004 Admin active project update

### 0 done CTL 10/14/2004 Admin

### 0 done CTL 10/14/2004 Development Nerco Information company demonstrating capabilities …

### 0 done CTL 10/14/2004 Investigation Valero bellows, mount and stereoscope

### 0 done CTL 10/14/2004 Marketing talking with Dennis sunoco, new customer

### 0 done CTL 10/14/2004 Marketing talking with John Ely on Inconnel 600 tube heater failure

### 0 done CTL 10/14/2004 Investigation review what Al is doing with pipes

### 0 done CTL 10/14/2004 Investigation instructing Dave for cut-outs two sections

preparation for meeting with York, reviewing data from first pilot test of resin

looking at Ti tubes with RAC, signing tubes into computer, labeling samples

call, talk about, emails back to Sari Rosenbloom about interview Tues vs Wed

Page 194: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 10/14/2004 Development call Charles 989-636-5065 about NH3 removal

### 0 done CTL 10/14/2004 Development call Brian and emails about Renaissance and Gene's Hotel

### 0 done CTL 10/14/2004 Investigation looking at tubes with Al under stereoscope

### 0 done CTL 10/14/2004 Investigation

### 0 done CTL 10/14/2004 Pictures selecting pictures for ES

### 0 done MV 10/14/2004 Marketing contract to AIMS

### 0 done CTL 10/14/2004 Support discussion Dillion article with RAC, look over briefly

### 0 done MV 10/15/2004 Report working on quarterly report

### 0 done CTL 10/15/2004 Support read article by Dillion, read CTL corrosion report

### 0 done CTL 10/15/2004 Development discussion work on resin canister with Al

### 0 done CTL 10/15/2004 Investigation Instruction to dave on concrete cutting

### 0 done CTL 10/15/2004 Investigation instructions to dave on Na2S, observing test and results

### 0 done CTL 10/15/2004 Pictures selecting pictures for ES

### 0 done CTL 10/15/2004 Investigation looking at mounts, samples

### 0 done CTL 10/15/2004 Marketing talking with John Ely, closing deal

### 0 done CTL 10/15/2004 Admin trying to sort out job priorities, tasks, etc.

### 0 done CTL 10/15/2004 Report finishing report and talking to Steve Immordino

### 0 done MV 10/16/2004 Report

### 0 done MV 10/17/2004 Report finishing up quarterly report

### 0 done MV 10/17/2004 Investigation reading scoping article from South Wales

### 0 done CTL 10/18/2004 Support editing report for RAC

### 0 done CTL 10/18/2004 Meeting Monday meeting about misc

### 0 done CTL 10/18/2004 Investigation

### 0 done MV 10/18/2004 Report splitting report into two halfs, resening

### 0 done CTL 10/18/2004 Report transferring report to office computer, resending

instructions to Dave for Na2S and H2S to remove Cu from waste ammonia

writing quarterly report …difficulty in getting MB etc from Excel to Word

boiling residue from aqua regia dissolution in water .. Give to Fred to check Pd, etc

Page 195: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 10/18/2004 Investigation ordering proceedings on SiC from Barnes and Noble

### 0 done CTL 10/18/2004 Investigation talk with Dave on new samples to pull, optical again, speculation

### 0 done CTL 10/18/2004 Investigation stereoscope on A-50 Board

### 0 done CTL 10/18/2004 Edit editing, PDF and send

### 0 done CTL 10/18/2004 Marketing John R at glenro.com 973-279-5900 idler shaft no quote given

### 0 done MV 10/19/2004 Investigation

### 0 done CTL 10/19/2004 Admin emails etc. talk with Al and Fred about tasks for day

### 0 done CTL 10/19/2004 Investigation

### 0 done CTL 10/19/2004 Report setting up quarterly report on MV website for downloading to Andy

### 0 done CTL 10/19/2004 Admin microohm meter to work and looking for batteries

### 0 done CTL 10/19/2004 Investigation SEM with board, attempting to measure shorts

### 0 done CTL 10/19/2004 Edit editing Al's report

### 0 done CTL 10/20/2004 Admin emails, work instructions for Jason, yesterday's timesheet recall

### 0 done CTL 10/20/2004 Pictures organizing pictures and data

### 0 done CTL 10/20/2004 Management interviewing with Shari Nathanson Rosenbloom

### 0 done CTL 10/20/2004 Investigation discovery of formicary, dendrites, deliquest theory etc

### 0 done CTL 10/20/2004 Admin reading invoices, emails sent by Al

### 0 done MV 10/21/2004 Development

### 0 done CTL 10/21/2004 Marketing collection of phone calls 3 new FA's

### 0 done CTL 10/21/2004 Client talking with Ray about corrosion problem

### 0 done CTL 10/21/2004 Admin contined problems with email and related programs

### 0 done CTL 10/21/2004 Admin conversation with RAC and Shari

### 0 done CTL 10/21/2004 Development discussion of distribution of impurities from flux, lime with Jens

### 0 done CTL 10/21/2004 Report writing

### 0 done CTL 10/22/2004 Admin details with getting Shari onboard, RAC, Shari, Franklin, etc

collect and organize numbers from Wales study onto a spreadsheet with simple block flow diagram

stereoscope on section of boiler plate, reading on deaerators, discuss Dom and Joe & Rick

discussing impurity distribution in the furnace, reading other paper on same from Jens

Page 196: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 10/22/2004 Report writing

### 0 done CTL 10/22/2004 Report proposal for next activities with the resin, edit Al's

### 0 done CTL 10/22/2004 Development discussions on distribution of impurities in furnace, especially CaC

### 0 done CTL 10/22/2004 Housekeeping clean desk, throw away stuff

### 0 done MV 10/23/2004 Report fix errors in report that Jens pointed out

### 0 done MV 10/23/2004 Investigation

### 0 done MV 10/24/2004 Investigation reading, notes on TMS article

### 0 done MV 10/24/2004 Investigation trying to get MB on Australian Scoping Study to balance

### 0 done CTL 10/25/2004 Report writing report, need mount pictures

### 0 done CTL 10/25/2004 Investigation taking mount pictures

### 0 done CTL 10/25/2004 Development reading technical papers on nickel alloys

### 0 done CTL 10/25/2004 Meeting look at samples, go over background with John Ely

### 0 done CTL 10/25/2004 Investigation looking at cracks in weld

### 0 done CTL 10/25/2004 Admin talking with Al then Shari, emails to both

### 0 done CTL 10/26/2004 Admin caught up on yesterday's timesheet

### 0 done MV 10/26/2004 Development adapt boiler subroutine to current needs

### 0 done Odle 10/26/2004 Finances check bills MV and Odle

### 0 done CTL 10/26/2004 Editing last edit on report to BASF

### 0 done CTL 10/26/2004 Management coordinating training for Shari

### 0 done CTL 10/26/2004 Report finishing report

### 0 done CTL 10/26/2004 Editing editing report for Deric

### 0 done CTL 10/26/2004 Investigation stereoscopic pictures of scc

### 0 done MV 10/25/2004 Development simplify boiler circuit

### 0 done MV 10/25/2004 Development begin adapting exisitng boiler sub to need

### 0 done CTL 10/25/2004 Admin talking with Joe, Jason, Rick, Al etc. about work and misc

summarizing all information from Willem and internet on SiC, found article TMS, ordered

Page 197: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 10/25/2004 Editing attack by RAC on analysis used in report, then get Brad to check Br

### 0 done MV 10/27/2004 Development setup the printout of the MB for Utilities

### 0 done MV 10/27/2004 Development

### 0 done CTL 10/27/2004 Admin

### 0 done CTL 10/27/2004 Investigation looking at carbon steel, metal discolored

### 0 done CTL 10/27/2004 Management

### 0 done CTL 10/27/2004 Report finish up details about heat damage to metal

### 0 done CTL 10/27/2004 Management assisting Shari off and on through day on FA

### 0 done CTL 10/27/2004 Admin email to John Ely requesting pictures .. Intro to Shari

### 0 done CTL 10/27/2004 Editing rewriting paragraph from Al on explanation of corrosion

### 0 done CTL 10/27/2004 Support help Joe on writeup on Task 4, more positive

### 0 done CTL 10/27/2004 Client discussion with Ed on sampling plans

### 0 done CTL 10/27/2004 Admin planning work with Al

### 0 done CTL 10/27/2004 Marketing looking at HD job

### 0 done CTL 10/28/2004 Admin downloading cc expenses for CTL, expense report for same

### 0 done CTL 10/28/2004 Support

### 0 done CTL 10/28/2004 Editing edit Al's report

### 0 done CTL 10/28/2004 Marketing Joe ask for a proposal for coating failure on silicon disks

### 0 done CTL 10/28/2004 Marketing discussing proposal for disk failure investigation

### 0 done CTL 10/28/2004 Admin assign valero job to Shari, 21225

### 0 done CTL 10/28/2004 Investigation looking at powercircuit board

### 0 done CTL 10/28/2004 Admin Tate Floors

### 0 done CTL 10/28/2004 Investigation looking at mount with Shari, Al

### 0 done CTL 10/28/2004 Admin making invoice for October

### 0 done MV 10/29/2004 Development zero out values in FMEB for Utilities MB

setup design criteria for boiler, debug boiler not estimate quant CO correctly, est. demin water

getting active job list up to date, updating timesheet with all project numbers

showing Shari project list, update on Arkema sample, setup time tracking

edit Joe's response to task 4, help with cost estimate, discuss with Brad

Page 198: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 10/29/2004 Admin getting monthly timesheet report together

### 0 done CTL 10/29/2004 Marketing proposal for HD investigation

### 0 done CTL 10/29/2004 Investigation Mount and SEM results review

### 0 done CTL 10/29/2004 Investigation mount and steroscope of pinholes, caverns, etc

### 0 done CTL 10/29/2004 Investigation weld material, correspondence with john

### 0 done CTL 10/29/2004 Admin misc … interview setup, reading, etc.

### 0 done MV 10/29/2004 Admin deposit check from GR

### 0 done MV 10/30/2004 Admin working on books to be able to do qtrly taxes

### 0 done MV 10/31/2004 Admin taxes quarterly

### 0 done MV 10/29/2004 Development

### 0 done CTL 11/1/2004 Report short report to Piller

### 0 done CTL 11/1/2004 Marketing proposal for GE silicon defect investigation

### 0 done MV 11/1/2004 Development work on scrubber for CO

### 0 done CTL 11/1/2004 Admin planning work with Al, especially trip to San Antonio

### 0 done CTL 11/1/2004 Investigation looking at mount on floor

### 0 done CTL 11/1/2004 House Cleaning throwing away papers on desk

### 0 done CTL 11/1/2004 Training timesheet, comprehensive report example, arkema discuss

### 0 done CTL 11/1/2004 Report adding to report manway cover

### 0 done CTL 11/1/2004 Marketing talking with Dennis Davis on FA

### 0 done CTL 11/1/2004 Admin discussions on trip, probe, etc.

### 0 done CTL 11/1/2004 Report converting report to CR from ES

### 0 done MV 11/1/2004 Development questions on ejectors, temperatures

### 0 done MV 11/1/2004 Development notes from Acheson model for report

### 0 done MV 11/2/2004 Development adding efficiency to desgn criteria for furnace

### 0 done MV 11/2/2004 Development back to caustic scrubber

Page 199: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 11/2/2004 Admin at work, don't know

### 0 done CTL 11/2/2004 Investigation stereoscope of tube ID

### 0 done CTL 11/2/2004 Report Piller A400 board

### 0 done CTL 11/2/2004 Admin interview with Charles for technician position

### 0 done CTL 11/2/2004 Marketing proposal for GE silicon defect investigation

### 0 done MV 11/2/2004 Marketing working on guide to commercialization for website

### 0 done CTL 11/2/2004 Admin packing for trip to San Antonio

### 0 done MV 11/3/2004 Development scrubber subroutine

### 0 done CTL 11/3/2004 Admin getting ready for trip, loose ends on jobs, load up laptop with work

### 0 done CTL 11/3/2004 Investigation questions from Dom, email to joe Boyle

### 0 done CTL 11/3/2004 Travel car ride then plane

### 0 done MV 11/3/2004 Development notes from article on Acheson furnace

### 0 done MV 11/4/2004 Development cooler in front of scrubber

### 0 done CTL 11/4/2004 Report editing report from Shari

### 0 done CTL 11/4/2004 Investigation preparation then onsite inspection, video probe

### 0 done MV 11/5/2004 Development cooler continued, then scrubber

### 0 done CTL 11/5/2004 Investigation inspection of domestic water line, travel

### 0 done MV 11/6/2004 Development scubber continued

### 0 done CTL 11/6/2004 Investigation end of travel

### 0 done MV 11/7/2004 Development become income statement tied into flowsheet and assumptions

### 0 done MV 11/8/2004 Development error in scrubber, add MBCK for scrubber

### 0 done CTL 11/8/2004 Admin review status of jobs, assignments to Shari, review her report

### 0 done CTL 11/8/2004 Investigation ask shari to analyze floor, rust area on SEM show sample

### 0 done MV 11/8/2004 Development value of CO, continue on income statement

### 0 done MV 11/9/2004 Development check minor impurities tracking ok through scrubber

Page 200: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 11/9/2004 Admin problems with email, installing office updates

### 0 done CTL 11/9/2004 Editing editing report to Piller

### 0 done CTL 11/9/2004 Marketing

### 0 done CTL 11/9/2004 Editing final edit of report

### 0 done CTL 11/9/2004 Editing editing report for Shari

### 0 done CTL 11/9/2004 Development looking over design of resin column

### 0 done CTL 11/9/2004 Admin reviewing proposal to Ed

### 0 done CTL 11/9/2004 Admin updating Shari on her progress per her request

### 0 done CTL 11/9/2004 Admin unknown

### 0 done MV 11/10/2004 Admin letter to Willem on electrode consumption

### 0 done MV 11/10/2004 Development

### 0 done CTL 11/10/2004 Admin email to Piller on purchase order, setup a new job

### 0 done CTL 11/10/2004 Admin meeting in Rick's office to review Active Projects

### 0 done CTL 11/10/2004 Investigation discussing job with Al and Shari

### 0 done CTL 11/10/2004 Admin preparation for trip

### 0 done CTL 11/10/2004 Admin travel

### 0 done CTL 11/11/2004 Investigation using microscope to view boards

### 0 done CTL 11/11/2004 Travel Middletown to Strousberg PA

### 0 done MV 11/12/2004 Development CO cool then compress, energy req also

### 0 done MV 11/12/2004 Travel Strousberg PA to Newark, DE then unpack equip

### 0 done CTL 11/12/2004 Investigation look at new board, pictures and then DHL back to Jeff Vaughn

### 0 done CTL 11/12/2004 Management review with Shari other work

### 0 done CTL 11/12/2004 Investigation review EDX results on Tate Floors

### 0 done MV 11/13/2004 Development finishing compressor subr for CO

### 0 done MV 11/14/2004 Development read & summarizing article on making electrodes

thinking about, looking at manual on proposal to Piller, looking at samples for microscope

finished impurity distribution in CO scrubber, add process water streams

Page 201: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 11/15/2004 Development summarizing articles on making electrodes

### 0 done CTL 11/15/2004 Admin active projects review for meeting

### 0 done CTL 11/15/2004 Investigation discuss with Rich at tate

### 0 done CTL 11/15/2004 Investigation reviewing flowsheet with Shari

### 0 done CTL 11/15/2004 Report meeting with RAC, Brad and FA

### 0 done CTL 11/15/2004 Admin interview with Dennis

### 0 done CTL 11/15/2004 Admin picking out account managers

### 0 done CTL 11/15/2004 Report add to report visa via Dom's questions, call to Joe Boyle

### 0 done MV 11/16/2004 Development

### 0 done CTL 11/16/2004 Editing review finished report already sent out

### 0 done CTL 11/16/2004 Investigation rewriting report with input from Dom, Joe Boyle and RAC

### 0 done CTL 11/16/2004 Investigation looking under stereoscope, email from Bakley

### 0 done CTL 11/16/2004 Editing edit Al's report

### 0 done CTL 11/16/2004 Editing edit Al's report

### 0 done CTL 11/16/2004 Admin fixing problem with timesheet

### 0 done MV 11/17/2004 Marketing letter last night and this morning to Trent

### 0 done MV 11/17/2004 Development working on spreadsheet economics

### 0 done CTL 11/17/2004 Admin emails look over projects, good morning

### 0 done CTL 11/17/2004 Investigation stereoscope and pictures of defects, mark mount

### 0 done CTL 11/17/2004 Marketing proposal for inspection of nickel tube

### 0 done CTL 11/17/2004 Marketing talking with Perry about life and the analysis he wants

### 0 done CTL 11/17/2004 Edit edit Shari's report one more time

### 0 done MV 11/18/2004 Marketing call to Jens on internet phone on Oman project

### 0 done CTL 11/18/2004 Admin

### 0 done CTL 11/18/2004 Investigation

checking Australian scoping summary against calc based around furnace

attempting to download costs for trip to San Antonio … statement not ready. Copying current projects to laptop

going through Tate literature, then seperating out particles in cement and XDM for EDS. Evap soln for salts.

Page 202: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 11/18/2004 Edit comments on Shari report

### 0 done CTL 11/18/2004 Admin unknown at office

### 0 done CTL 11/18/2004 Investigation discussing velocity/erosion of pipe

### 0 done CTL 11/18/2004 Admin interview with Jim

### 0 done CTL 11/18/2004 Pictures working on pictures for report

### 0 done CTL 11/18/2004 Admin finding old letter to York managers

### 0 done CTL 11/18/2004 Investigation talking with insurance fund from Farm's Fund and Stan from hotel

### 0 done MV 11/18/2004 Development assumptions for income statement

### 0 done MV 11/19/2004 Development assumptions for income statement

### 0 done CTL 11/19/2004 Admin sorting receipts and collecting bills from Internet for San Antonio

### 0 done CTL 11/19/2004 Admin talking with Jim Casho and Franklin off and on

### 0 done CTL 11/19/2004 Investigation observing microcavitation in mounts

### 0 done CTL 11/19/2004 Investigation sample of dispersant to IC analysis, evaporate to crystals

### 0 done CTL 11/19/2004 Edit reviewing report with RAC

### 0 done CTL 11/19/2004 Investigation viewing shaft under microscope and viewing with Dick Ervin

### 0 done CTL 11/19/2004 Investigation looking at shaft with Al under stereoscop

### 0 done CTL 11/19/2004 Edit edit report

### 0 done CTL 11/19/2004 Admin unknown

### 0 done MV 11/20/2004 Development completing income statement and revision on flowsheet

### 0 done MV 11/22/2004 Development cleaning up spreadsheet assumptions/calc to include in report

### 0 done CTL 11/22/2004 Support proof-reading report by RAC

### 0 done CTL 11/22/2004 Investigation

### 0 done CTL 11/22/2004 Admin meeting & preparation to discuss FA

### 0 done MV 11/23/2004 Development writing on report

### 0 done CTL 11/23/2004 Admin miscel

going over IC results, trying to find particles ID in SEM with chlorides on optical

Page 203: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 11/23/2004 Report completing report questions

### 0 done CTL 11/23/2004 Marketing meeting and plant inspection with Carl Bakley

### 0 done CTL 11/23/2004 Admin developing bid for resin jobs at Courtland and Westpoint

### 0 done CTL 11/24/2004 Admin trying to find tapes for Valencia job

### 0 done CTL 11/24/2004 pictures sorting pictures, editing same for report

### 0 done CTL 11/24/2004 Admin phone call with Andrew Mclaine, then travel arrangements

### 0 done CTL 11/24/2004 Edit editing trip report

### 0 done CTL 11/24/2004 Admin unknown

### 0 done MV 11/25/2004 Report writing on report

### 0 done MV 11/28/2004 Report Editing report

### 0 done MV 11/29/2004 Report writing on report

### 0 done MV 11/29/2004 Development writing on report

### 0 done MV 11/29/2004 Report environmental section

### 0 done CTL 11/29/2004 Admin

### 0 done CTL 11/29/2004 Edit edit report

### 0 done CTL 11/29/2004 Report writing on report

### 0 done CTL 11/29/2004 Development

### 0 done CTL 11/29/2004 Investigation stereo scope with brass fittings

### 0 done CTL 11/29/2004 Admin unknown

### 0 done none 11/30/2004 Blank

### 0 done MV 11/30/2004 Development finishing appendix, binder and Acheson furnace summaries

### 0 done CTL 11/30/2004 Admin change assignments for Shari and Al

### 0 done CTL 11/30/2004 Marketing sale of new job to Panama

### 0 done CTL 11/30/2004 Development discuss plans on resin and canister with Al

### 0 done CTL 11/30/2004 Support edit RAC report

Jim starting, morning mail, review status of projects assign to Shari ABB

resin, call from Brian with Phil, reviewing with Al what needs to be done

Page 204: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 11/30/2004 Admin expense records for CTL invoice

### 0 done CTL 11/30/2004 Report writing on report

### 0 done CTL 11/30/2004 Admin unknown

### 0 done MV 12/1/2004 Report final edit of appendix and then email to Willem

### 0 done CTL 12/1/2004 Report writing on report

### 0 done CTL 12/1/2004 Admin reviewing website for any company names left in reports

### 0 done CTL 12/2/2004 Client

### 0 done CTL 12/2/2004 Marketing proposal to Victor in Panama

### 0 done CTL 12/2/2004 travel car/Wilmington/amtrak to Boston

### 0 done MV 12/2/2004 travel balance of trip on Amtrak

### 0 done MV 12/2/2004 Report revising report based on accurate energy estimation

### 0 done CTL 12/3/2004 Meeting DOE meeting at Boston University and local travel

### 0 done MV 12/3/2004 travel trip home on Amtrak

### 0 done MV 12/5/2004 Editing editing report

### 0 done MV 12/6/2004 Editing final edit of appendix and then email to Willem

### 0 done CTL 12/6/2004 Admin

### 0 done CTL 12/6/2004 Editing editing Shari's report

### 0 done CTL 12/6/2004 Editing editing Al's report

### 0 done CTL 12/6/2004 Marketing

### 0 done CTL 12/6/2004 Report writing report

### 0 done CTL 12/6/2004 Investigation looking over drawings with Al for kitchen, laundry and domestic

### 0 done CTL 12/6/2004 Investigation looking at ABB and discussing with Shari

### 0 done CTL 12/7/2004 Admin technical reading

### 0 done CTL 12/7/2004 Report writing report

### 0 done CTL 12/7/2004 Investigation looking at Pipe … several days …several times with Shari

email to Scott Koval and Jeff Vaughn on status of work, showing Shari what needs to done on SEM

reviewing status of work of Al and Shar, then lunch meeting on same

two new failure analysis jobs from Dave Benjamin 856-251-2942, mapquest for Shari

Page 205: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 12/7/2004 Client talking with Jeff Vaugh

### 0 done CTL 12/7/2004 Investigation discussions with Ray about panels

### 0 done MV 12/8/2004 Development

### 0 done CTL 12/8/2004 Miscel various management functions, phone, etc

### 0 done CTL 12/8/2004 Report writing report

### 0 done CTL 12/8/2004 Report discussion about report with RAC

### 0 done CTL 12/8/2004 Investigation looking at aluminum shell

### 0 done CTL 12/8/2004 Marketing proposal to tate floors on site visit

### 0 done CTL 12/1/2004 Admin failed to record times

### 0 done CTL 12/2/2004 Admin failed to record times

### 0 done CTL 12/7/2004 Admin failed to record times

### 0 done MV 12/9/2004 Admin paying Juris Pro

### 0 done CTL 12/9/2004 Development discussing CuES modification, V2-B

### 0 done CTL 12/9/2004 Investigation viewing second phases and attacked area in microstruture

### 0 done CTL 12/9/2004 Report writing report

### 0 done CTL 12/9/2004 Marketing review bid to Indiana pipe failure

### 0 done CTL 12/9/2004 Miscel walk around, check what everyone is working on

### 0 done CTL 12/9/2004 Admin failed to record times

### 0 done MV 12/10/2004 Development switching MgO calciner to oxygen vs. air

### 0 done CTL 12/10/2004 Editing proof-reading propeller report

### 0 done CTL 12/10/2004 Admin active projects, reviewing reassigning projects

### 0 done CTL 12/10/2004 Editing editing report for Piller, draft to Piller and RAC

### 0 done CTL 12/10/2004 Investigation discussing crack or corrosion first with Shari

### 0 done CTL 12/10/2004 Admin failed to record times

### 0 done CTL 12/10/2004 Meeting lunch meeting on policies and similar

Page 206: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 12/10/2004 Report writing report

### 0 done CTL 12/10/2004 Investigation looking for zn on interface

### 0 done MV 12/11/2004 Development time program

### 0 done MV 12/11/2004 Development

### 0 done MV 12/12/2004 Development coke heater

### 0 done MV 12/13/2004 Development coke heater debug, name getting changed

### 0 done CTL 12/13/2004 Admin

### 0 done CTL 12/13/2004 Report writing

### 0 done CTL 12/13/2004 Marketing looking at Field Testing for Website

### 0 done CTL 12/13/2004 Meeting weekly active projects meeting with RAC and Brad

### 0 done CTL 12/13/2004 Editing editing report for Brad

### 0 done CTL 12/13/2004 Pictures helping Shari figure out picture problem

### 0 done MV 12/13/2004 Development

### 0 done CTL 12/14/2004 Personal checking bank balance, insurance problem

### 0 done CTL 12/14/2004 Investigation looking at mounts, stereoscope

### 0 done CTL 12/14/2004 Editing tate floor review

### 0 done CTL 12/14/2004 Development selecting post filter options after resin with Al

### 0 done CTL 12/14/2004 Admin developing position descriptions

### 0 done CTL 12/14/2004 Investigation looking at fracture surface, first mount (no good)

### 0 done CTL 12/14/2004 Editing looking at mount, editing report

### 0 done CTL 12/14/2004 Development cking out CTL files on concrete, 600 hits

### 0 done CTL 12/14/2004 Editing editing report, looking at transition again

### 0 done CTL 12/14/2004 Misc adding google search to desktop, testing

### 0 done MV 12/15/2004 Development

### 0 done CTL 12/15/2004 Admin working on 2005 agreement

new calciner for MgO with oxygen, modify element MB ck to find MB error, CO management logic start

emails from Valero, etc., listen Joe's assembly for electrode comment

implemented overall CO control logic, heat exchanger on boiler using hot CO2 added

get rid of cooling tower in Utility flowsheet, stream 120 water empty to scrubber circuit

Page 207: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 12/15/2004 Investigation looking at incoming and under stereo scope, discuss Dick and Al

### 0 done CTL 12/15/2004 Misc at office, times/tasks not recorded

### 0 done CTL 12/15/2004 Investigation meeting with Vendor on quick-disconnects

### 0 done CTL 12/15/2004 Editing tate floor discusss with RAC then reissue

### 0 done CTL 12/15/2004 Investigation discussing fatigue sample, what can they do to fix problem

### 0 done CTL 12/15/2004 Investigation discussion on letter, next testing, report

### 0 done CTL 12/16/2004 Miscel non-project work, times not recorded

### 0 done CTL 12/16/2004 Investigation looking at valves with stereoscope, later at mounts

### 0 done CTL 12/16/2004 Investigation

### 0 done CTL 12/16/2004 Editing review letter and printed draft of report

### 0 done CTL 12/16/2004 Development business model for CuES

### 0 done MV 12/16/2004 Development

### 0 done MV 12/17/2004 Development

### 0 done CTL 12/17/2004 Development business model for CuES

### 0 done CTL 12/17/2004 Misc non-project work, not recorded

### 0 done CTL 12/17/2004 Investigation looking at many mounts

### 0 done MV 12/18/2004 Development

### 0 done MV 12/20/2004 Development debugging last MB routine, steam out of scrubber not correct

### 0 done CTL 12/20/2004 Marketing followup on potential jobs

### 0 done CTL 12/20/2004 Development stereoscope and discuss, call Shawn

### 0 done CTL 12/20/2004 Development reading about corrosion in concrete

### 0 done CTL 12/20/2004 Marketing talking with Deric about tubes, receiving tubes

### 0 done CTL 12/21/2004 Investigation trip to Tate Access Floors

### 0 done MV 12/21/2004 Development debugging scrubber routine

### 0 done MV 12/22/2004 Development debugging scrubber routine

looking at cutout tubes, stereoscope, more tubes, ID specculed and black

fix errors caused in scrubber circuit from eliminating cooling water circuit

fix simplified demin circuit, fuel circuit need flag to say when solid or gaseous fuel, in progress

flag on energy value of fuel, gaseous or solid, debug error on water balance caused by new preheater on boiler

Page 208: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 12/22/2004 Misc in office, time not recorded

### 0 done CTL 12/22/2004 Investigation looking at mounts, stereoscope other tubes

### 0 done CTL 12/22/2004 Investigation shari's story review on brass fittings

### 0 done CTL 12/22/2004 Editing editing report with Scott Koval's comments

### 0 done CTL 12/22/2004 Investigation looking at sample under stereoscope

### 0 done CTL 12/22/2004 Marketing proposal for more work

### 0 done CTL 12/23/2004 Investigation discussions on failure mode, reviewing pictures on file

### 0 done CTL 12/23/2004 Misc in office, time not recorded

### 0 done CTL 12/23/2004 Admin discussions, firing Jim

### 0 done CTL 12/23/2004 Editing making changes on report and sending out

### 0 done CTL 12/23/2004 Editing editing and commenting

### 0 done CTL 12/23/2004 Investigation marking mount, instructions to Jim

### 0 done CTL 12/24/2004 Admin getting timesheet up to date to start billing

### 0 done CTL 12/24/2004 Misc in office, time not recorded

### 0 done CTL 12/24/2004 Editing edited Al's report

### 0 done CTL 12/24/2004 Development economics of resin business

### 0 done MV 12/25/2004 Development debugging scrubber routine finished

### 0 done MV 12/26/2004 Development checking overall mb for all three PFD

### 0 done MV 12/27/2004 Development mb ck for entire process all in and outs, updating heat balances

### 0 done CTL 12/28/2004 Misc technical reading, emails, in office project work load slow

### 0 done CTL 12/28/2004 Marketing

### 0 done CTL 12/28/2004 Investigation

### 0 done CTL 12/28/2004 Editing editing CR, comments on discussion

### 0 done CTL 12/28/2004 Meeting weekly FA meeting

### 0 done CTL 12/28/2004 Investigation moving ES to CS format, sketch of picture on cooling of concrete

returning call again to Stan Sukoski at 302-792-8622, price proposal to Stan, accepted

outlining work for Dave, first on mount and then on chloride content of cement and XPM

Page 209: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 12/29/2004 Development setting up printout of coke preheater

### 0 done CTL 12/29/2004 Misc technical reading, emails, in office project work load slow

### 0 done CTL 12/29/2004 Investigation

### 0 done CTL 12/29/2004 Meeting meeting with Dick on report to Dennis

### 0 done CTL 12/29/2004 Meeting lunch meeting with RAC about Shari and FA business in general

### 0 done CTL 12/29/2004 Development working on costs of regenerating the resin

### 0 done CTL 12/30/2004 Misc in office, non project work, times not recorded

### 0 done CTL 12/30/2004 Meetings meeting on FA's then lunch meeting

### 0 done CTL 12/30/2004 Meeting interview with Terry

### 0 done MV 12/31/2004 Development

### 0 done MV 1/1/2005 Editing proof-reading report after letting sit for several weeks

### 0 done MV 1/2/2005 Editing proof-reading report after letting sit for several weeks

### 0 done CTL 1/3/2005 Admin cleaning off desk, filing, etc. per RAC request

### 0 done CTL 1/3/2005 Editing editing Al's report

### 0 done CTL 1/3/2005 Editing brief edit of Shari's report again …

### 0 done MV 1/3/2005 Development

### 0 done CTL 12/31/2004 Marketing revised quote to Stan at General Chemical

### 0 done MV 12/31/2004 Admin update resume on website, transfer MV economics to portable disk

### 0 done MV 1/4/2005 Development outling work for economics

### 0 done CTL 1/4/2005 House keeping onsite, cleaning desk, misc

### 0 done CTL 1/4/2005 Meeting morning meeting in microscopy

### 0 done CTL 1/4/2005 Development questions on regeneration, connectors, etc. from Al … off and on

### 0 done CTL 1/4/2005 Photos selecting photos for pictures

### 0 done CTL 1/4/2005 Investigation discussing hypothesis with Shari

### 0 done CTL 1/4/2005 Editing editing Capstone again

looking at mount with Dave, SEM results with Shari, IC results with Joe

updating heat balance page to include coke preheater, define benefit of preheating

modifications on Heat Balance printout, add option to Design to verify excess O2 to calcine

Page 210: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 1/4/2005 Development

### 0 done MV 1/7/2005 Development raw material costs adding to Income Statement

### 0 done MV 1/6/2005 Investigation raw material costs adding to Income Statement

### 0 done CTL 1/6/2005 Investigation onsite inspection of KOH plant

### 0 done CTL 1/6/2005 Marketing

### 0 done CTL 1/6/2005 Marketing Introductions with Victor about Panama job

### 0 done CTL 1/6/2005 Investigation discussion of mechanism with DicK/Shari

### 0 done CTL 1/6/2005 Investigation metallography

### 0 done CTL 1/6/2005 Investigation discussion of tube corrosion with Shari

### 0 done CTL 1/7/2005 Investigation in lab discussing ultrasonic measurements, etc., profile of oxidation

### 0 done CTL 1/7/2005 Meeting meeting on DOE task then review of qualification folders

### 0 done CTL 1/7/2005 Miscelaneous onsite, various tasks

### 0 done CTL 1/7/2005 Report writing

### 0 done CTL 1/7/2005 Marketing quote for Arkema, followup on sample size

### 0 done CTL 1/7/2005 Editing editing report from Al

### 0 done MV 1/8/2005 Development finishing raw materials then moving into Utilities

### 0 done MV 1/9/2005 Development Utility Costs

### 0 done MV 1/10/2005 Development error in boiler water rate for Utilities

### 0 done CTL 1/10/2005 miscel onsite

### 0 done CTL 1/10/2005 Editing editing Al's report from Capstone

### 0 done CTL 1/10/2005 Investigation looking at tube with Shari

### 0 done CTL 1/10/2005 Development working with Al on the phone about filtering problems at York

### 0 done CTL 1/10/2005 Marketing talking with Steve about size of sample, followed by Quote

### 0 done CTL 1/11/2005 Marketing followup with Steve if he got the email quote

### 0 done MV 1/11/2005 Development working on environmental costs

reading articles on corrosion of nickel by caustic, getting ready for visit

talking with Steve Gossett 502-732-4411 ext 367 about work on Hastalloy 276

Page 211: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 1/11/2005 Miscelaneous onsite, misc activities

### 0 done CTL 1/11/2005 Editing final pre-RAC edit

### 0 done CTL 1/11/2005 Investigation discussing nickel column

### 0 done CTL 1/11/2005 Development phone calls with Al, emails to York et al, solids problems at Merck

### 0 done CTL 1/11/2005 Marketing followup with Shari on giving quote to William at Debhering

### 0 done CTL 1/11/2005 Marketing setting time for inspection

### 0 done CTL 1/11/2005 Report writing

### 0 done Odle 1/12/2005 Admin followup with check balances both accounts

### 0 done MV 1/12/2005 Development tracking Pb through process as check of impurity distribution

### 0 done CTL 1/12/2005 Miscelaneous onsite, misc activities

### 0 done CTL 1/12/2005 Admin

### 0 done CTL 1/12/2005 Investigation Ehlingham diagram to confirm H2O can not oxidize nickel

### 0 done CTL 1/12/2005 Report writing

### 0 done CTL 1/12/2005 Investigation instructions on shipping information

### 0 done CTL 1/12/2005 Development reviewing forms from York

### 0 done MV 1/13/2005 Marketing letter to Neil Thomas

### 0 done MV 1/13/2005 Development

### 0 done CTL 1/13/2005 Admin banking info to BTU

### 0 done CTL 1/13/2005 Miscelaneous onsite, times not recorded

### 0 done CTL 1/13/2005 Marketing meeting with Bill Hoffman

### 0 done CTL 1/13/2005 Admin email Shan a draft of report

### 0 done CTL 1/13/2005 Investigation copper contamination of polished sample, have Shari redo

### 0 done MV 1/14/2005 Development estimate electrode consumption and cost

### 0 done CTL 1/14/2005 Miscelaneous onsite, times not recorded

### 0 done CTL 1/14/2005 Report writing

getting resumes and related together for audit, discussions with various on same

add cost of carbon electrodes, and design criteria for SO2 additions, and SO2 price

Page 212: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 1/15/2005 Development

### 0 done CTL 1/17/2005 Editing fixing up Figure and Table labels, formatting

### 0 done CTL 1/17/2005 Marketing

### 0 done CTL 1/17/2005 Development finding info on FeS

### 0 done CTL 1/17/2005 Editing editing report

### 0 done CTL 1/17/2005 Marketing call Ed Healy 904 359 3207

### 0 done MV 1/17/2005 Development manpower code

### 0 done Odle 1/17/2005 Admin buying books for Allison at Amazon

### 0 done CTL 1/17/2005 Admin misc, onsite

### 0 done CTL 1/17/2005 Meeting meeting discussing hiring Terry and other work

### 0 done MV 1/18/2005 Development update summary income statement and log file

### 0 done CTL 1/18/2005 Miscelaneous miscelaneous, onsite, non-project work

### 0 done CTL 1/18/2005 Editing complete editing

### 0 done CTL 1/18/2005 Marketing call Ed Healy 904 359 3207

### 0 done CTL 1/18/2005 Marketing

### 0 done CTL 1/18/2005 Marketing

### 0 done CTL 1/18/2005 Admin updating resume and statement of qualifications

### 0 done MV 1/18/2005 Admin went to Kinkos for business cards

### 0 done MV 1/19/2005 Development Clean up instruction page, eliminate unused sheet in spreadsheet

### 0 done CTL 1/19/2005 Admin updating resume and statement of qualifications again

### 0 done CTL 1/19/2005 Meeting interview with Terry

### 0 done CTL 1/19/2005 Marketing call stan

electrode costs continued, allow more loops to converge, start manpower estimation. Error in carbon balance.

CSX Transportation 500 Water St. J-430 > Jacksonville, FL 32202> Phone: 904 359 3207 >Ed Healy,> [email protected]

Philadelphi Mixing Solutions, 717-832-8859, Wojtek Wyczalkowski propeller mix of 316ss and 410ss in stagnant waste water

called. Wanted Duane Edwards for mechanical inspections, 574-1555, [email protected]

Page 213: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 1/19/2005 Editing editing, revising Shari's report, sending draft to Stan

### 0 done MV 1/20/2005 Development

### 0 done CTL 1/20/2005 Investigation select areas to mount

### 0 done CTL 1/20/2005 Client phone call going over results with Stan

### 0 done CTL 1/20/2005 editing editing email from Shari

### 0 done CTL 1/20/2005 editing editing with Al's input

### 0 done MV 1/20/2005 Admin pickup business cards, tried cards crooked

### 0 done CTL 1/20/2005 Admin working on quality control manual, group meeting

### 0 done CTL 1/20/2005 editing editing report 2nd time

### 0 done MV 1/21/2005 Development

### 0 done CTL 1/21/2005 Admin working on quality control program and related

### 0 done CTL 1/21/2005 Admin trying to get email to work, phone call and email to Cavtel

### 0 done CTL 1/21/2005 Admin emailed report to Deric

### 0 done MV 1/21/2005 Admin pickup business cards

### 0 done MV 1/22/2005 Development

### 0 done MV 1/23/2005 Development running cases, change coke preheater to go to CO not CO2

### 0 done CTL 1/21/2005 Admin email problems off and on all day messing with and calling

### 0 done MV 1/25/2005 Development figures for Progress Report con't

### 0 done CTL 1/25/2005 Admin audit, walk around check all okay

### 0 done CTL 1/25/2005 Development reviewing status with Al, plans for today

### 0 done CTL 1/25/2005 Admin updating job status, reviewing, followup with quotes and drafts out

### 0 done CTL 1/25/2005 Marketing

### 0 done CTL 1/25/2005 Marketing

### 0 done CTL 1/25/2005 Miscelaneous onsite, reading, miscelaneous

### 0 done CTL 1/25/2005 Development filling out patent forms, looking for documentation for same

update all menu's and menu buttons, general house cleaning on model

making model available from website, test download and zip program for same

income statement, log copy get in agreement with spreadsheet copy

Chat Patterson, implant, MDR event, 316L sending sample in, lawsuit

Philadelphi Mixing Solutions, 717-832-8859, Wojtek Wyczalkowski propeller mix of 316ss and 410ss in stagnant waste water… FU

Page 214: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 1/24/2005 Admin on phone off and on to Cavtel

### 0 done CTL 1/24/2005 Investigation discussing with Shari

### 0 done CTL 1/24/2005 Admin followup on soil samples with Fred

### 0 done CTL 1/24/2005 Development phone support to Al at Westpoint

### 0 done CTL 1/24/2005 Development getting info together to work on Patent

### 0 done CTL 1/24/2005 Admin email and misc

### 0 done CTL 1/24/2005 Admin signing in samples from BTU Energia, inspected two

### 0 done MV 1/24/2005 Development working on Progress Report, Figures mostly, introduction

### 0 done CTL 1/26/2005 Admin

### 0 done CTL 1/26/2005 Development searching for earliest documentation of LiBr patent

### 0 done CTL 1/26/2005 Miscelaneous onsite, various, reading, news on QC audit

### 0 done CTL 1/26/2005 Investigation looking at mounts of threaded holes with Shari

### 0 done CTL 1/26/2005 Editing editing report for Shari

### 0 done MV 1/26/2005 Development

### 0 done CTL 1/27/2005 Development Patent on resin

### 0 done CTL 1/27/2005 Admin looking for software to backup system

### 0 done CTL 1/27/2005 Editing reading email report again, comments

### 0 done CTL 1/27/2005 Investigation showing Brad sample for corrosion testing

### 0 done CTL 1/27/2005 Development

### 0 done CTL 1/27/2005 Miscelaneous Onsite, times not recorded

### 0 done CTL 1/27/2005 Meeting lunch meeting with RAC

### 0 done CTL 1/27/2005 Admin unloading truck

### 0 done MV 1/27/2005 Development

### 0 done MV 1/28/2005 Development

### 0 done CTL 1/28/2005 Miscelaneous Onsite, times not recorded

correcting errors in timesheet for end of month billing, emails, discuss with Al work, update Shari timesheet program

running various cases for quarterly report, more figures, correct caustic levels

email responses to Andy on heat balance, adding Nozzle efficiency and new code for MgO

Nozzle code, check and fix. Upload model. Plot of cost versus power for QR

run model for three power costs with different salt box pressures… problem with low pressures!!

Page 215: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 1/28/2005 Editing reworking report with RAC comments

### 0 done CTL 1/28/2005 Investigation two emails to Robert Miles on copper samples

### 0 done CTL 1/29/2005 Marketing developing sales goals for 2005 for FA Dept

### 0 done MV 1/29/2005 Development fixing CO balance problem, cking MB around Utilities again

### 0 done MV 1/30/2005 Development

### 0 done MV 1/31/2005 Development rerun cases with variable power and coal costs

### 0 done CTL 1/31/2005 Admin QC meeting and misc accounting

### 0 done CTL 1/31/2005 Development developing estimating sheet for FA Assessments

### 0 done MV 1/31/2005 Development

### 0 done CTL 2/1/2005 Development

### 0 done CTL 2/1/2005 Investigation initial look at sample under stereoscope, under plastic. Rust stains

### 0 done CTL 2/1/2005 Investigation conference call with Mike Kell 248-647-2333

### 0 done CTL 2/1/2005 Miscelaneous on-site, non-project work

### 0 done CTL 2/1/2005 Admin setting up Aged Report

### 0 done CTL 2/1/2005 Investigation update on use of device by Shari, prebend on installation

### 0 done CTL 2/1/2005 Editing editing Al's report

### 0 done MV 2/1/2005 Report writing QR for project

### 0 done MV 2/2/2005 Writing writing QR for project

### 0 done CTL 2/2/2005 Admin

### 0 done CTL 2/2/2005 Editing editing Al's report

### 0 done CTL 2/2/2005 Miscelaneous onsite, nonproject work

### 0 done CTL 2/2/2005 Admin

### 0 done CTL 2/3/2005 Admin making a template for CR Reports, testing

### 0 done CTL 2/3/2005 Investigation looking at fracture under stereo scope

### 0 done CTL 2/3/2005 Miscelaneous onsite, nonproject work

change control on vacuum level, based on temp. in salt box. Also control fraction coke burned let temp float for CO demand

change increment on fraction of coal burned, documented importance of vacuum level on costs

changing case report to be separate file for each case run, testing convergence with smaller fractionburned increment

emails including Terry "to hire or not" email, talk with Al about work today

a lot of procedures and proclamations by RAC on FA procedures. New Template for CR

Page 216: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 2/3/2005 Admin making grid with investigation options

### 0 done CTL 2/4/2005 Miscelaneous onsite, nonproject work

### 0 done CTL 2/4/2005 Marketing

### 0 done CTL 2/4/2005 Editing edit Valencia report, second time from Al

### 0 done CTL 2/4/2005 Editing edit report again with RAC second round of editing input

### 0 done MV 2/5/2005 Development

### 0 done MV 2/5/2005 Admin make withholding payment for taxes, Federal for January

### 0 done MV 2/5/2005 Admin invoice SH

### 0 done CTL 2/6/2005 Development discussion on costs via email

### 0 done MV 2/6/2005 Marketing Powerpoint presentation of model:

### 0 done CTL 2/7/2005 Miscelaneous in office, non project work

### 0 done CTL 2/7/2005 Admin trying to recover file, email to Joe Hauser

### 0 done CTL 2/7/2005 Marketing rush job for John Ely, weigh corrosion coupon

### 0 done CTL 2/7/2005 Editing editing report third time, new rules and format

### 0 done CTL 2/7/2005 Inspection leave for NY for NY Met Life Chiller Inspection

### 0 done MV 2/7/2005 Development slide presentation, program flowchart

### 0 done CTL 2/8/2005 Inspection NY Met Life Chiller

### 0 done MV 2/8/2005 Development slide presentation, program flowchart

### 0 done MV 2/9/2005 Marketing working on presentation

### 0 done CTL 2/9/2005 Editing editing comments, two times combined here

### 0 done CTL 2/9/2005 Client

### 0 done CTL 2/9/2005 Miscelaneous onsite, non-project work, talk with Shari about York editing

### 0 done CTL 2/9/2005 Editing 4th or 5th edit from RAC

### 0 done CTL 2/9/2005 Marketing

### 0 done CTL 2/9/2005 Investigation update on stereoscopic examination thus far by Shari.

Paul Saunier, Virginia OSHA 434-385-0806 ext 101. 44lb, 20 psig CO2 cylinder. Auto accident with Pepsi supplied cyclinder

switching over to methane vs CO for boiler, rework logic for CO distribution, test and debug new code. Zip, make exe upload

email on regeneration costs Merck, combined with related phone calls Brian

talking with Scott Fletcher about cast iron casting valve 1400 pounds, Kevin Humphrey

Page 217: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 2/9/2005 Editing editing Al's report

### 0 done MV 2/10/2005 Marketing presentation for TMS

### 0 done CTL 2/10/2005 Miscelaneous onsite, nonproject work

### 0 done CTL 2/10/2005 Editing editing Al's report

### 0 done CTL 2/10/2005 Investigation looking at mounts with Al

### 0 done CTL 2/10/2005 Investigation working with Shari on etched zinc, or not

### 0 done CTL 2/10/2005 Admin looking at safety movie, 75% of part I

### 0 done CTL 2/11/2005 Client revising report to send IGA definition to Shan

### 0 done CTL 2/11/2005 Investigation looking at zinc surface, brown deposits and discussing light polish

### 0 done CTL 2/11/2005 Writing writing email report on brazing

### 0 done CTL 2/11/2005 Marketing Shane Hubak, Technet, Cranford, NJ 908-272-5500 ext 208.

### 0 done CTL 2/11/2005 Development assisting Al in developing grid for different sized units

### 0 done CTL 2/11/2005 Miscelaneous onsite, times not recorded

### 0 done CTL 2/17/2005 Management reviewing status of Shari's work

### 0 done CTL 2/17/2005 Meeting Meeting on QC

### 0 done CTL 2/17/2005 Management reviewing status of Al and my work

### 0 done CTL 2/17/2005 Marketing responding to several requests, nothing important

### 0 done CTL 2/17/2005 Editing editing Shari's report

### 0 done CTL 2/18/2005 Miscelaneous email problems

### 0 done CTL 2/18/2005 Investigation stereoscope then SEM

### 0 done CTL 2/18/2005 Consulting phone call

### 0 done CTL 2/18/2005 Editing editing Al's report

### 0 done MV 2/18/2005 Consulting reading AMEC report on Lumina

### 0 done MV 2/19/2005 Consulting report to Henry Levin

### 0 done MV 2/12/2005 Marketing TMS conference, travel day

Page 218: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 2/13/2005 Marketing TMS conference

### 0 done MV 2/14/2005 Marketing TMS conference

### 0 done MV 2/15/2005 Marketing TMS Conference

### 0 done CTL 2/21/2005 Miscelaneous non-project activities

### 0 done CTL 2/21/2005 Investigation looking under stereoscope with Al, intergranular attack

### 0 done CTL 2/21/2005 Marketing talking Shari about bid for Marcopia County Bid

### 0 done CTL 2/21/2005 Editing editing report from Al

### 0 done CTL 2/21/2005 Support phone call and emails on Lumina deposit

### 0 done CTL 2/21/2005 Investigation stereoscope of cracks in wire mesh

### 0 done CTL 2/21/2005 Editing

### 0 done MV 2/24/2005 Admin working on income statement for MV

### 0 done CTL 2/24/2005 Miscelaneous onsite, non-project work

### 0 done CTL 2/24/2005 Marketing preliminary Proposal

### 0 done CTL 2/24/2005 Miscelaneous discussing shed options for samples with RAC and Brad

### 0 done CTL 2/24/2005 Marketing talking with Joe and RAC about job on Wednesday

### 0 done CTL 2/24/2005 Marketing

### 0 done CTL 2/24/2005 Marketing three calls to voice mail, discussing job with RAC and AMO

### 0 done CTL 2/22/2005 Miscelaneous non-project work, waiting on technician work

### 0 done CTL 2/22/2005 Investigation looking at mount, SEM results

### 0 done CTL 2/22/2005 Marketing need quote for zinc coated wire fence

### 0 done MV 2/23/2005 Admin working on income statement for MV

### 0 done CTL 2/23/2005 Miscelaneous non-project work

### 0 done CTL 2/23/2005 Development working on York's pricing for resin business

### 0 done CTL 2/23/2005 Investigation

### 0 done CTL 2/23/2005 Editing discussing report with RAC and Shari

adding two sentences to address concern on amount of steam being produced by Stan

Marc Brown, Maint Manager, Inolex, 215-271-0800 ext 279, [email protected]. Pitting in tank

discussing options on what could be wrong, between design, this implant or patient, then estimating hrs for investigation,email same

Page 219: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 2/27/2005 Admin Income statement for MV for 2004

### 0 done CTL 2/25/2005 Miscelaneous

### 0 done CTL 2/25/2005 Marketing developing template for estimates

### 0 done CTL 2/25/2005 Marketing proposal to Joe Green, 609-978-8900 ext 2281

### 0 done CTL 2/25/2005 Investigation hand-off of the job to Shari

### 0 done MV 2/26/2005 Admin Income statement for MV for 2004

### 0 done MV 2/27/2005 Admin Income statement for MV for 2004

### 0 done CTL 2/28/2005 Admin monthly billing, collecting bills and invoicing

### 0 done CTL 2/28/2005 Development working on economics for resin venture

### 0 done CTL 2/28/2005 Marketing

### 0 done CTL 3/1/2005 Miscelaneous non-project work, learning to use O2 analyzer and getting batteries

### 0 done CTL 3/1/2005 Investigation making sure O2 probe is working

### 0 done CTL 3/1/2005 Admin

### 0 done CTL 3/1/2005 Development working on York report on the canister

### 0 done CTL 3/2/2005 Investigation field trip to Southern Ocean County Hospital

### 0 done CTL 3/3/2005 Miscelaneous non-project work

### 0 done CTL 3/3/2005 Development conference call with York on resin business

### 0 done CTL 3/3/2005 Development thought on potential work to be done, then email

### 0 done CTL 3/3/2005 Admin

### 0 done CTL 3/3/2005 Admin quote revised

### 0 done CTL 3/4/2005 Miscelaneous non-project work

### 0 done CTL 3/4/2005 Development resumes, etc. for new 400K application

### 0 done CTL 3/4/2005 Editing editing report

### 0 done CTL 3/4/2005 Development call discussing options on work to do, notes on same

### 0 done MV 3/6/2005 Development updating flowsheet for taking heat from salt box

moving computer from broken desk, clean up, catching up on timesheet for week

Mike Brewer, Abbott Power Plant 217-333-2082, Champaign IL 61820

calling Ray about water sample and Tonya accounting at 410-799-4751 about past due

engineering issue with Peggy at Delaware Professional Engineers Act

Page 220: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 3/7/2005 Admin select date, propose schedule for Oman

### 0 done MV 3/7/2005 Development emails on asbestos, read and save

### 0 done MV 3/7/2005 Development VBA for cooling salt box with steam

### 0 done CTL 3/7/2005 Miscelaneous non-project work, outline changes on website with Shari

### 0 done CTL 3/7/2005 Development finish costs on two cases for York

### 0 done CTL 3/8/2005 Miscelaneous non-project work

### 0 done CTL 3/8/2005 Admin followup on status of job, domestic water samples

### 0 done CTL 3/8/2005 Admin question to DAPE on website changes

### 0 done CTL 3/8/2005 Admin

### 0 done CTL 3/8/2005 Development incorporating total costs into report and sending to Rick Nadeau

### 0 done CTL 3/8/2005 Pictures selecting pictures for report

### 0 done MV 3/8/2005 Development heat balance printout for salt bath

### 0 done CTL 3/9/2005 Development debugging heat balance for salt bath

### 0 done MV 3/9/2005 Admin find and buy new laptop toshiba

### 0 done CTL 3/9/2005 Miscelaneous non-project work

### 0 done CTL 3/9/2005 Marketing followup on status of shutdown, ask if need proposal

### 0 done CTL 3/9/2005 Marketing

### 0 done CTL 3/9/2005 Marketing proposal to Marc Brown, Inolex

### 0 done CTL 3/9/2005 Marketing working on survey for CTL FA customers

### 0 done MV 3/10/2005 Admin revise W2, W3 for Odle for MV for 2004

### 0 done MV 3/10/2005 Development bug in heat balance in salt furnace

### 0 done CTL 3/10/2005 Miscelaneous non-project work

### 0 done CTL 3/10/2005 Investigation look at Zn coating, breaks and deposits with Shari

### 0 done CTL 3/10/2005 Development bug in heat balance around salt furnace, got it

### 0 done CTL 3/10/2005 Investigation start report

send chain of custody forms to BTU, fill out discrepancy report, assign Shari

fu with Daryl Snow, 714-436-3209 of AGI on potential consulting at haz.waste site

Page 221: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 3/10/2005 Admin make Dec withholding for Delaware, or annual reconcilation

### 0 done MV 3/11/2005 Admin send off DE reconcilation report with check for $3K

### 0 done CTL 3/11/2005 Miscelaneous non-project work

### 0 done CTL 3/11/2005 Report start report

### 0 done CTL 3/11/2005 Admin letter to DE Prof Engr Assoc

### 0 done CTL 3/11/2005 Meeting meeting on procurement QC

### 0 done CTL 3/11/2005 Development

### 0 done MV 3/12/2005 Admin

### 0 done Odle 3/12/2005 Admin personal income taxes

### 0 done MV 3/14/2005 Development looking for data on low cost energy, coal for power generation

### 0 done CTL 3/14/2005 Admin making QC forms

### 0 done CTL 3/14/2005 Report writing report

### 0 done CTL 3/14/2005 Miscelaneous non-project work

### 0 done CTL 3/14/2005 Editing editing report

### 0 done Odle 3/14/2005 Admin income taxes

### 0 done CTL 3/15/2005 Miscelaneous non-project work

### 0 done CTL 3/15/2005 Admin making forms again

### 0 done CTL 3/15/2005 Report writing report

### 0 done MV 3/15/2005 Admin Leon Gibson, for non-compete agreement for tantalum

### 0 done MV 3/15/2005 Development testing model at larger plant capacities, problems with convergence

### 0 done MV 3/16/2005 Development testing model at larger plant capacities, problems with convergence

### 0 done CTL 3/16/2005 Miscelaneous non-project work: Aged Report To Do List

### 0 done CTL 3/16/2005 Admin write Jo Green about tube bundle

### 0 done CTL 3/16/2005 Marketing answering email from Trent

### 0 done CTL 3/16/2005 Development

schematic of Mg facility with MgH2 infrastructure …. Case 1 for Large Size

working on labtop computer, clean HD download upgrades, power supply bad

allowing model to go to larger plant capacities, upgrading iteration algorithms to accomplish same

Page 222: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 3/16/2005 Report final draft after SNR and AMO reviewed

### 0 done CTL 3/17/2005 Miscelaneous non-project work

### 0 done CTL 3/17/2005 Development debugging model, testing for large capacities, running cases

### 0 done CTL 3/17/2005 Report redo after RAC edit, back to stereoscope on same

### 0 done CTL 3/17/2005 Investigation discussion RAC and Shari, RAC switched Expert to Shari

### 0 done CTL 3/17/2005 Investigation sign in samples

### 0 done MV 3/17/2005 Development

### 0 done CTL 3/18/2005 Admin

### 0 done CTL 3/18/2005 Admin reviewing Shari's quote for additional testing

### 0 done CTL 3/18/2005 Miscelaneous non-project work

### 0 done CTL 3/18/2005 Investigation Cotherm microscope, sem, infrared

### 0 done CTL 3/21/2005 Miscelaneous non-project work

### 0 done CTL 3/21/2005 Investigation view mounts, photos

### 0 done CTL 3/21/2005 Meeting meeting on QC stuff and cleanup

### 0 done CTL 3/21/2005 Pictures selecting pictures and editing for report

### 0 done CTL 3/22/2005 Miscelaneous non-project work

### 0 done CTL 3/22/2005 Report draft of report, aborted report switched to picture story only

### 0 done CTL 3/22/2005 Admin data backup, connect drive, procedures

### 0 done CTL 3/23/2005 Miscelaneous non-project work

### 0 done CTL 3/23/2005 Editing

### 0 done CTL 3/23/2005 Marketing review write up of different types of FA for website

### 0 done CTL 3/23/2005 Editing editing Shari's report

### 0 done CTL 3/23/2005 Development reviewing setup of equip for regenerating resin

### 0 done CTL 3/24/2005 Miscelaneous non-project work

### 0 done CTL 3/24/2005 Admin templates for other report types

water costs too high, water management poor, improved but need water towers for any addtl improvement

Cotherm quote and running down address info etc., signing in addtl samples

editing report with RAC's comments, RAC reveiwed again and then sent out

Page 223: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 3/24/2005 Meeting phone conference

### 0 done MV 3/25/2005 Marketing proposal to Trent H., reading some of papers

### 0 done MV 3/27/2005 Development working on paper

### 0 done CTL 3/28/2005 miscelaneous non-project work

### 0 done CTL 3/28/2005 Marketing editing paper on carbothermal magnesium paper

### 0 done CTL 3/28/2005 Marketing

### 0 done CTL 3/28/2005 Development

### 0 done CTL 3/29/2005 Miscelaneous non-project work

### 0 done CTL 3/29/2005 Marketing

### 0 done CTL 3/29/2005 Development

### 0 done CTL 3/30/2005 Miscelaneous non-project work

### 0 done CTL 3/30/2005 Development outlining report for Cost Minimization for Mg Production

### 0 done CTL 3/30/2005 Marketing quote for GAF for tank failure, inspection, FA

### 0 done CTL 3/30/2005 Report

### 0 done MV 3/30/2005 Development writing report on Cost Minimization for Mg Production

### 0 done CTL 3/31/2005 Admin monthly invoice due

### 0 done CTL 3/31/2005 Miscelaneous non-project work

### 0 done CTL 3/31/2005 Admin estimating interst on loan

### 0 done CTL 3/31/2005 Development

### 0 done CTL 4/1/2005 Development adapting code for MAC

### 0 done CTL 4/2/2005 Development adapting code for MAC

### 0 done CTL 4/1/2005 Miscelaneous non-project work

### 0 done CTL 4/4/2005 Sick at home

### 0 done CTL 4/4/2005 Development looking for references on the capital costs, answering emails

### 0 done CTL 4/4/2005 Miscelaneous non-project work

Walt Steimel, [email protected] flexible metal hose, root cause of failure

working on least-cost scenario, drawing and then trying to find marginal, off-peak power rates, email to Andy

quote to Robert Courtney on chloride determination and SCC on OD or ID

research into the costs of the factors of production for electric power production

email report to Robert Courtney, checking chloride content of insulation

making some changes to model per Andy, answering email questions

Page 224: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 4/5/2005 Miscelaneous non-project work

### 0 done CTL 4/5/2005 Admin

### 0 done CTL 4/5/2005 Development fix MB CK for Phosphorus

### 0 done Odle 4/5/2005 Admin Zenas Gardner 302-731-0191

### 0 done CTL 4/5/2005 Admin email questions

### 0 done CTL 4/6/2005 Investigation tank inspection, cutting samples

### 0 done CTL 4/7/2005 Investigation logging in sample, getting work started on mount

### 0 done CTL 4/7/2005 Miscelaneous non-project work

### 0 done CTL 4/8/2005 Investigation travel to and onsite tank inspection Kraft

### 0 done CTL 4/11/2005 Miscelaneous non-project work

### 0 done CTL 4/11/2005 Investigation looking at samples under microscope

### 0 done CTL 4/11/2005 Pictures drawing schematic of floor and corrosion path

### 0 done CTL 4/11/2005 Report start report for GAF

### 0 done CTL 4/12/2005 Miscelaneous non-project work

### 0 done CTL 4/13/2005 Admin preparation for trip, then driving to Wilkes-Barre Pa

### 0 done CTL 4/14/2005 Investigation onsite visit and driving

### 0 done CTL 4/15/2005 Investigation samples signin, instructions to Al

### 0 done CTL 4/15/2005 Miscelaneous non-project work

### 0 done CTL 4/15/2005 Pictures editing pictures

### 0 done CTL 4/13/2005 Miscelaneous non-project work

### 0 done MV 4/18/2005 Development reading last quarter's MR from SH

### 0 done MV 4/18/2005 Marketing Russ Melton, Foley Mansfield, 612-338-8788, Mg

### 0 done CTL 4/18/2005 Miscelaneous non-project work

### 0 done CTL 4/18/2005 Development proof reading report, checking calculations

### 0 done CTL 4/18/2005 Report writing

Frucon set date for visit and purchase order, email T&M versus Lump Sum

Page 225: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 4/19/2005 Development

### 0 done MV 4/19/2005 Admin send Melton an MV contract

### 0 done CTL 4/19/2005 Marketing sending Melton CTL info for FA Job

### 0 done CTL 4/19/2005 Investigation listening to Shari's hypothesis on failure, commenting

### 0 done CTL 4/19/2005 Miscelaneous non-project work

### 0 done CTL 4/19/2005 Report writing report

### 0 done CTL 4/20/2005 Miscelaneous non-project work

### 0 done CTL 4/20/2005 Report finish report

### 0 done CTL 4/21/2005 Miscelaneous non-project work

### 0 done CTL 4/21/2005 Marketing getting Invista contract, Invoice squared away

### 0 done CTL 4/22/2005 Miscelaneous non-project work

### 0 done CTL 4/22/2005 Investigation looking at elbows with Al, dye penetrant

### 0 done CTL 4/22/2005 Editing editing report

### 0 done CTL 4/22/2005 Admin looking for scanner

### 0 done CTL 4/22/2005 Development organizing for writing QR

### 0 done MV 4/23/2005 Development getting data for new base case, executing on model for report

### 0 done MV 4/24/2005 Development

### 0 done MV 4/25/2005 Development debugging new coke boiler

### 0 done CTL 4/25/2005 Miscelaneous Non-project work

### 0 done CTL 4/25/2005 Investigation looking at mount with indications/cracks

### 0 done CTL 4/25/2005 Development debugging new coke boiler

### 0 done CTL 4/25/2005 Investigation looking at second bolt with fatigue

### 0 done CTL 4/25/2005 Admin scanner meeting with John Amry, 302-367-5571

### 0 done CTL 4/27/2005 Miscelaneous Non-project work

### 0 done CTL 4/27/2005 Report writing QR

trying to combine MAC and IBM program into one program with "if" statements

reworking model to make steam via coke fired boiler instead of natural gas

Page 226: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 4/27/2005 Investigation open circuit data

### 0 done MV 4/26/2005 Development

### 0 done CTL 4/26/2005 Miscelaneous Non-project work

### 0 done CTL 4/26/2005 Development upload model

### 0 done CTL 4/26/2005 Development

### 0 done CTL 4/28/2005 Miscelaneous Non-project work

### 0 done CTL 4/28/2005 Investigation looking at forgings and ferrite indications with detector

### 0 done CTL 4/28/2005 Investigation initial inspection of panels

### 0 done CTL 4/28/2005 Report writing QR

### 0 done CTL 4/29/2005 Investigation email on getting galvanic tests run

### 0 done CTL 4/29/2005 Investigation call from Ray, picking out bump areas for mount with Al

### 0 done CTL 4/29/2005 Miscelaneous Non-project work

### 0 done CTL 4/29/2005 Editing Editing report

### 0 done MV 4/30/2005 Report justifying data for QR, looking for references, writing

### 0 done CTL 5/2/2005 Miscelaneous non-project work

### 0 done CTL 5/2/2005 Pictures sorting pictures for report

### 0 done CTL 5/2/2005 Report writing

### 0 done CTL 5/3/2005 Miscelaneous non-project work

### 0 done CTL 5/3/2005 Investigation galvanic results

### 0 done CTL 5/3/2005 Investigation emails on River levels

### 0 done CTL 5/3/2005 Editing proof reading report

### 0 done CTL 5/4/2005 Miscelaneous non-project work

### 0 done CTL 5/4/2005 Admin update report and email

### 0 done CTL 5/4/2005 Admin reading overview of project

### 0 done CTL 5/4/2005 Editing editing Al's report

updating emissions from boiler fired with coke, operational at 101%, ok but not perfect

run new model, with coke-fired boiler, on several cases then add to report

Page 227: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 5/4/2005 Editing editing Shari's report

### 0 done CTL 5/4/2005 Planning outlining work flow

### 0 done CTL 5/5/2005 Miscelaneous non-project work

### 0 done CTL 5/5/2005 Investigation looking at mount, OD pitting

### 0 done CTL 5/5/2005 Development electrode assembly with Joe

### 0 done CTL 5/5/2005 Investigation galvanic corrosion rates

### 0 done MV 5/6/2005 Admin delaware WH Taxes first quarter

### 0 done CTL 5/6/2005 Miscelaneous non-project work

### 0 done CTL 5/6/2005 Editing editing Invista report

### 0 done CTL 5/6/2005 Development work flow diagrams

### 0 done MV 5/9/2005 Development proposal for future work, email, trying to clean up QR

### 0 done CTL 5/9/2005 Miscelaneous non-project work

### 0 done CTL 5/9/2005 Marketing getting job, phone conversations

### 0 done CTL 5/9/2005 Investigation looking at mount, stereoscope, proof report

### 0 done CTL 5/9/2005 Investigation cutting apart in shop

### 0 done CTL 5/10/2005 Development organizing

### 0 done CTL 5/10/2005 Miscelaneous non-project work

### 0 done CTL 5/10/2005 Investigation stereoscope and mount

### 0 done CTL 5/11/2005 Investigation reviewing work done

### 0 done CTL 5/11/2005 Miscelaneous non-project work

### 0 done CTL 5/11/2005 Investigation looking at mount, discussions prior

### 0 done CTL 5/12/2005 Admin getting job, phone conversations

### 0 done CTL 5/12/2005 Admin looking for cheap project management software

### 0 done CTL 5/12/2005 Miscelaneous non-project work

### 0 done MV 5/16/2005 Developmentutilities flowsheet, cooling tower and assoc changes in scrubber circuits

Page 228: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 5/13/2005 Development reviewing resumes for machanist

### 0 done CTL 5/13/2005 Miscelaneous non-project work

### 0 done CTL 5/13/2005 Development talking with disposal companies

### 0 done CTL 5/16/2005 Admin scanning documents for Bechtel

### 0 done CTL 5/16/2005 Marketing talking with Foley and Mansfield about potential legal FA

### 0 done CTL 5/16/2005 Miscelaneous non-project work

### 0 done CTL 5/16/2005 Editing

### 0 done CTL 5/17/2005 Admin scanning documents for Bechtel

### 0 done CTL 5/17/2005 Investigation looking at mounts on first HX

### 0 done CTL 5/17/2005 Miscelaneous non-project work

### 0 done CTL 5/17/2005 Investigation getting ready for tank inspection

### 0 done CTL 5/18/2005 Investigation tank inspection

### 0 done CTL 5/19/2005 Investigation looking at mounts on second HX

### 0 done CTL 5/19/2005 Investigation discussing results, phone calls Ray Pratt

### 0 done CTL 5/19/2005 Investigation looking at mounts

### 0 done CTL 5/19/2005 Miscelaneous non-project work

### 0 done MV 5/19/2005 Development comparing steam production with coke and methane fired boilers

### 0 done CTL 5/20/2005 Miscelaneous non-project work

### 0 done CTL 5/20/2005 Development

### 0 done CTL 5/20/2005 Investigation microscope, two mounts, braze corroded

### 0 done CTL 5/20/2005 Investigation microscope, two mounts

### 0 done CTL 5/20/2005 Report

### 0 done MV 5/21/2005 Development

### 0 done CTL 5/23/2005 Miscelaneous non-project work

### 0 done CTL 5/23/2005 Admin NS6NL62C34N4B667 registered Handy BU

getting page numbering to work after rotating table sideways per RAC

waste disposal, several calls and emails… checking out records of companies with EPA

setting up energy summation page and fixing adiabatic temp calc for coke which affects boiler

Page 229: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 5/23/2005 Admin reading and sorting articles into files

### 0 done CTL 5/23/2005 Admin making first draft of schedule components

### 0 done CTL 5/24/2005 Development

### 0 done CTL 5/24/2005 Investigation studying zipper crack reports

### 0 done CTL 5/24/2005 Miscelaneous non-project work

### 0 done CTL 5/24/2005 Investigation discussion on layers and FTIR with Joe and Shari

### 0 Done MV 5/25/2005 Development

### 0 done CTL 5/25/2005 Miscelaneous non-project work

### 0 done CTL 5/25/2005 Admin return to schedule again

### 0 done CTL 5/25/2005 Editing editing Al's draft

### 0 done CTL 5/25/2005 Investigation discussion on layers and FTIR with Joe and Shari

### 0 done CTL 5/26/2005 Development working on steam/water mix to boiler from preheater

### 0 done CTL 5/26/2005 Admin meeting with RAC and Brad to kickoff project and then walk around

### 0 done CTL 5/26/2005 Editing editing Al's draft

### 0 done CTL 5/26/2005 Miscelaneous non-project work

### 0 done CTL 5/27/2005 Miscelaneous non-project work

### 0 done CTL 5/27/2005 Development

### 0 done CTL 5/27/2005 Editing editing al's drat

### 0 done CTL 5/27/2005 Editing editing Shari's report

### 0 done CTL 5/31/2005 Admin monthly billing with calculations

### 0 done CTL 5/31/2005 Admin Whaley Grice starting, misc activities … time allowance for all day

### 0 done MV 5/31/2005 Admin quarterly report for IRS for 941, print and mail

### 0 done CTL 5/31/2005 Admin discuss schedule with Brad, then rework

### 0 done CTL 5/31/2005 Investigation looking at mount

### 0 done CTL 5/31/2005 Investigation look at with RAC, Shirey, Al

energy consumption broken down for carbothermal process with coke boiler, identify where energy lost

sending steam from ejectors through the heat exchanger before the scrubber

discussions various on potentiostats and other equipment for project. News from RAC

Page 230: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 6/1/2005 Investigation getting Al & Whaley to cut samples

### 0 done CTL 6/1/2005 Admin review and revise quote from Al

### 0 done CTL 6/1/2005 Admin schedule

### 0 done CTL 6/1/2005 Investigation discussing IGA with RAC and Al

### 0 done CTL 6/2/2005 Investigation discussing results with Shari

### 0 done CTL 6/2/2005 Investigation looking at mounts again for IGA with Al

### 0 done CTL 6/2/2005 Editing editing Capstone report again

### 0 done CTL 6/2/2005 Miscelaneous non-project tasks

### 0 done CTL 6/2/2005 Editing editing Tate Report

### 0 done CTL 6/2/2005 Admin quoting new job, discussion on same

### 0 done CTL 6/2/2005 Admin discussing new job, overlook quote

### 0 done CTL 6/2/2005 Investigation looking at tubes under stereo scope, underdeposit corrosion

### 0 done CTL 6/2/2005 Admin

### 0 done CTL 6/2/2005 Development fixing project management software

### 0 done CTL 6/6/2005 Miscelaneous non-project work

### 0 done CTL 6/6/2005 Admin sign in samples then voice mail/call Paul Toblin 304-453-5907

### 0 done CTL 6/6/2005 Admin signing in new samples

### 0 done CTL 6/6/2005 Development project management add tasks

### 0 done CTL 6/6/2005 Editing proof reading

### 0 done CTL 6/6/2005 Editing proof reading

### 0 done MV 6/7/2005 Development editing changes on "Nozzle Based …" per Andy's suggestions

### 0 done CTL 6/7/2005 Editing editing report

### 0 done CTL 6/7/2005 Editing editing report on Toyota

### 0 done CTL 6/7/2005 Development discuss test grid on excel with brad and lab layout with Joe

### 0 done CTL 6/7/2005 Investigation discussing samples with Bob Moore of Sunoco

talk with Ben Moore and D.Ervin 740-533-5269 on new boiler tube failure

Page 231: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 6/7/2005 Meeting meeting and preparation

### 0 done CTL 6/7/2005 Miscelaneous non-project work

### 0 done MV 6/8/2005 Investigation

### 0 done CTL 6/8/2005 Miscelaneous non-project work

### 0 done CTL 6/8/2005 Investigation looking at pits, discussing

### 0 done CTL 6/8/2005 Editing discussing report with RAC and SNO

### 0 done CTL 6/8/2005 Investigation list of questions for Shepard T. Powell

### 0 done CTL 6/9/2005 Miscelaneous non-project work

### 0 done CTL 6/9/2005 Investigation finding cracks in pits caused by crevice corrosion

### 0 done CTL 6/9/2005 Investigation discussing with concrete institute

### 0 done MV 6/12/2005 Development second email to Andy on future options for work by MV for SH

### 0 done CTL 6/10/2005 Editing revise report again

### 0 done CTL 6/13/2005 Miscelaneous non-project work

### 0 done CTL 6/13/2005 Admin discussing schedule with JP, updating schedule

### 0 done CTL 6/13/2005 Editing editing Shari's report

### 0 done CTL 6/13/2005 Editing editing Al's report

### 0 done CTL 6/13/2005 Editing editing Shari's summary for Kraft

### 0 done CTL 6/13/2005 Admin getting out quote

### 0 done CTL 6/10/2005 Admin Bechtel schedule

### 0 done CTL 6/10/2005 Miscelaneous non-project tasks

### 0 done CTL 6/14/2005 Miscelaneous non-project work

### 0 done CTL 6/14/2005 Editing edit summary of findings

### 0 done CTL 6/14/2005 Editing york subcooler

### 0 done CTL 6/14/2005 Report writing, shaft

### 0 done CTL 6/15/2005 Miscelaneous non-project work

noting reviewing concept of using CO in a water shift reaction to produce the H2 needed for the hydriding.

Page 232: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 6/15/2005 Admin get hours for

### 0 done CTL 6/15/2005 Admin schedule updates with Joe

### 0 done CTL 6/15/2005 Admin quote to Randy Steel, 419-697-6591 at [email protected]

### 0 done CTL 6/20/2005 miscelaneous non-project work

### 0 done CTL 6/20/2005 Editing editing and rewriting

### 0 done CTL 6/20/2005 Editing editing and rewriting

### 0 done CTL 6/20/2005 Editing editing and rewriting

### 0 done CTL 6/21/2005 miscelaneous non-project work

### 0 done CTL 6/21/2005 Marketing

### 0 done CTL 6/21/2005 Admin fu with Sunoco for PO

### 0 done CTL 6/21/2005 Investigation boiler tubes, photo cracks, etc.

### 0 done CTL 6/21/2005 Development finish Patent stuff

### 0 done CTL 6/16/2005 miscelaneous non-project work, quotes

### 0 done CTL 6/16/2005 Editing toyota

### 0 done CTL 6/16/2005 Investigation looking mounts, discussing

### 0 done CTL 6/17/2005 Miscelaneous non-project work

### 0 done CTL 6/17/2005 Editing edit Shari's report

### 0 done CTL 6/17/2005 Editing edit report

### 0 done CTL 6/17/2005 Editing rewriting

### 0 done CTL 6/17/2005 Client conference call

### 0 done CTL 6/22/2005 miscelaneous non-project work, quotes

### 0 done CTL 6/22/2005 Investigation background info on boiler tubes, looking at ID in lab

### 0 done CTL 6/22/2005 Admin schedule update, review, reprint

### 0 done CTL 6/22/2005 Investigation

### 0 done CTL 6/23/2005 miscelaneous non-project work, quotes

call Paul Tomblin 304-453-5907, 200 Big Sandy Rd, Kenova WV, 25530, 2nd phone 304-453-1371

discussing with RAC and looking at white powder under microscope, pH 4.5?

Page 233: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 6/23/2005 Investigation marking second mount, reviewing pictures

### 0 done CTL 6/23/2005 Client discussion with Ray and production manager

### 0 done CTL 6/23/2005 Editing reviewing

### 0 done CTL 6/24/2005 miscelaneous non-project work, quotes

### 0 done CTL 6/24/2005 Marketing talking with Duane and then quote for work

### 0 done CTL 6/24/2005 Report writing report

### 0 done CTL 6/27/2005 Client call from client, re-edit report submit to RAC again

### 0 done CTL 6/27/2005 Marketing quote

### 0 done CTL 6/27/2005 Admin review schedule

### 0 done CTL 6/27/2005 miscelaneous non-project work, quotes

### 0 done CTL 6/27/2005 Editing one final read through

### 0 done CTL 6/28/2005 Editing editing Al's report

### 0 done CTL 6/28/2005 miscelaneous non-project work, quotes

### 0 done CTL 6/28/2005 Admin add times for project

### 0 done CTL 6/28/2005 Investigation mount etched, SEM on deposits

### 0 done CTL 6/28/2005 Admin quote for boiler tubes

### 0 done CTL 6/28/2005 Editing review shari's draft

### 0 done CTL 6/29/2005 Admin review Aged Report, discuss job status with Al

### 0 done CTL 6/29/2005 Investigation discuss, listen to Shari

### 0 done CTL 6/29/2005 Investigation trying to get max. temp for test

### 0 done CTL 6/29/2005 Admin get tests expedited call Bryan and Fortune

### 0 done CTL 6/29/2005 Investigation literature on admiralty brass

### 0 done CTL 6/29/2005 Admin collect hours, report

### 0 done CTL 6/30/2005 Investigation discuss, listen to Shari

### 0 done CTL 6/30/2005 Miscelaneous non-project work

Page 234: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 6/30/2005 Editing edit Al's report

### 0 done CTL 6/30/2005 Report writing, economizer tubes

### 0 done CTL 6/30/2005 Report admiralty brass

### 0 done CTL 7/1/2005 Meeting discuss with Andy what should be done next on Project

### 0 done CTL 7/1/2005 Miscelaneous non-project work

### 0 done CTL 7/1/2005 Report writing, economizer tubes

### 0 done CTL 7/1/2005 Admin schedule, discuss connections with Joe, ck calc for Brad

### 0 done MV 7/3/2005 Investigation

### 0 done CTL 7/5/2005 Admin enter hours

### 0 done CTL 7/5/2005 Admin enter hours

### 0 done CTL 7/5/2005 Editing edit report and submit to RAC

### 0 done CTL 7/5/2005 Miscelaneous non-project work

### 0 done CTL 7/5/2005 Editing edit Shari's report on cement lined pipe

### 0 done CTL 7/6/2005 Miscelaneous non-project work

### 0 done CTL 7/6/2005 Writing discussion

### 0 done CTL 7/6/2005 Admin print schedule, read audit of QC program

### 0 done CTL 7/5/2005 Investigation discussing

### 0 done CTL 7/7/2005 Investigation

### 0 done CTL 7/7/2005 Editing editing report

### 0 done CTL 7/7/2005 Report writing, learning about Ec/Rp tests

### 0 done CTL 7/7/2005 Marketing

### 0 done CTL 7/7/2005 Editing review report on shaft from Shari

### 0 done CTL 7/7/2005 Editing editing report

### 0 done CTL 7/8/2005 Miscelaneous non-project work

### 0 done CTL 7/8/2005 Editing editing report again

reviewing books on capital costs to help establish scope of work for carbothermal capital costs

Rick Jennings, boiler feed pump failure, 302-886-8552 and cells 302-690-3479

Sean Mann of Sunoco called again looking to speak to you about their phenol HX problems. He suspects the tubes in HX are leaking again and would like either upgrade the alloy or change the process. His phone #215-807-8486.

Page 235: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 7/8/2005 Marketing letter to capstone on QC

### 0 done CTL 7/8/2005 Investigation looking at tube under microscope

### 0 done CTL 7/8/2005 Investigation looking at shaft under stereoscope

### 0 done CTL 7/11/2005 Miscelaneous non-project work

### 0 done CTL 7/11/2005 Admin print schedule

### 0 done CTL 7/11/2005 Investigation looking at bolt under stereoscope

### 0 done CTL 7/11/2005 Editing

### 0 done CTL 7/11/2005 Marketing preparing quote

### 0 done CTL 7/12/2005 Marketing getting job

### 0 done CTL 7/12/2005 Editing rewriting part of report

### 0 done CTL 7/12/2005 Investigation developing Phase 1 experimental plan, learning process

### 0 done CTL 7/12/2005 Miscelaneous non-project work

### 0 done CTL 7/13/2005 Admin reviewing quote, looking at samples

### 0 done CTL 7/13/2005 Miscelaneous non-project work

### 0 done CTL 7/13/2005 Report writing

### 0 done CTL 7/14/2005 Miscelaneous non-project work

### 0 done CTL 7/14/2005 Investigation

### 0 done CTL 7/14/2005 Investigation

### 0 done CTL 7/14/2005 Reading reading met trans b articles

### 0 done CTL 7/14/2005 Investigation looking at pumps with Shari

### 0 done CTL 7/14/2005 Investigation reading two articles on corrosion in phosphoric acid plants

### 0 done CTL 7/14/2005 Investigation call from Brian

### 0 done CTL 7/15/2005 Editing discuss with Al, several times

### 0 done CTL 7/15/2005 Editing edit Shari's report

### 0 done CTL 7/15/2005 Miscelaneous Non-project work

Jim Ball, 410-785-2033 Blazona coating for chillers sending info … will they guarantee

looking at screen on filter of alloy 20 under stereoscope, talking with Andy about NaHS

Page 236: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 7/15/2005 Marketing pumping requirements

### 0 done CTL 7/15/2005 Investigation email to Andy Chao on literature for corrosion tests

### 0 done MV 7/16/2005 Development

### 0 done CTL 7/18/2005 miscelaneous non-project work

### 0 done CTL 7/18/2005 Investigation email to andy Chao on recommended tests

### 0 done CTL 7/18/2005 Marketing proposal to Silmet

### 0 done CTL 7/18/2005 Investigation

### 0 done CTL 7/19/2005 Admin email to Capstone on visit

### 0 done CTL 7/19/2005 Investigation Andy cell, 225-572-1104, use concenctrated sulfuric acid

### 0 done CTL 7/19/2005 Investigation discuss results with Shari, help in lab setup initial

### 0 done CTL 7/19/2005 Marketing reading emails from Jeffrey Hilbert, then conference call

### 0 done CTL 7/19/2005 Report reissue report

### 0 done CTL 7/20/2005 Miscelaneous non-project work

### 0 done CTL 7/20/2005 Investigation

### 0 done CTL 7/20/2005 Investigation

### 0 done CTL 7/20/2005 Editing edit Shari's report

### 0 done CTL 7/20/2005 Marketing proposal for more Tate Access R&D, discuss

### 0 done CTL 7/20/2005 Marketing

### 0 done CTL 7/20/2005 Investigation talking with John Mann about York's view on job and coatings

### 0 done CTL 7/20/2005 Investigation looking at sample in stereoscope, picking spot for mount

### 0 done MV 7/20/2005 Development

### 0 done CTL 7/21/2005 Miscelaneous non-project work

### 0 done CTL 7/21/2005 Marketing put together a quote with terms

### 0 done CTL 7/21/2005 Investigation looking at pumps with Shari

### 0 done CTL 7/21/2005 Report writing email report to Dan Norgrand

develop plan outline, time and money estimate for capital costs for carbothermal magnesium

read Belzona brochure, wrote email to John Ball, copied John Mann at York

email on overnight results, observe monitor sulfate tests and preliminary hydrogen peroxide test

contact Waylon Crisp, San Antonio on Enecon.com ceramic alloy CL coatings (210) 662-5700

Sean at Primcor, carbon content of nozzle need 2 grams, 3 phone calls and voice mail

reviewing stream changes required to add cooling water circuit to flowsheet

Page 237: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 7/21/2005 Marketing proposal for tube inspection

### 0 done CTL 7/22/2005 Investigation

### 0 done MV 7/20/2005 Development download Met Trans B from site

### 0 done CTL 7/31/2005 Development

### 0 done MV 7/25/2005 Development

### 0 done CTL 7/25/2005 Miscelaneous non-project work

### 0 done CTL 7/25/2005 Marketing outline of corrosion course on implants with Shari

### 0 done CTL 7/25/2005 Report sending final draft of report

### 0 done CTL 7/25/2005 Report email proof and send

### 0 done CTL 7/26/2005 Miscelaneous non-project work

### 0 done CTL 7/26/2005 Investigation

### 0 done CTL 7/26/2005 Editing editing email report before sending

### 0 done CTL 7/26/2005 Marketing discussing course options with Shari, reviewing outline

### 0 done CTL 7/26/2005 Investigation chiller issue discussions

### 0 done CTL 7/27/2005 Miscelaneous non-project work

### 0 done CTL 7/27/2005 Admin creating job in Database

### 0 done CTL 7/27/2005 Safety slide show by RAC of lab messy

### 0 done CTL 7/27/2005 Marketing proposal to FVB for pumping, not finished

### 0 done CTL 7/27/2005 Marketing helping with proposal

### 0 done CTL 7/27/2005 Marketing proposal to Sunoco for condenser, read old report refresh mind

### 0 done CTL 7/28/2005 Investigation lab experiments, finding info on corrosion probes, phone consulting

### 0 done CTL 7/28/2005 Marketing talking with Dr. XX about price for job, quote with Al

### 0 done CTL 7/28/2005 Marketing meeting XX for new job

### 0 done CTL 7/28/2005 Marketing two phone calls from Dave

### 0 done CTL 7/29/2005 Investigation running NaHS test with Joe

lab working on getting aluminum sulfate, aluminum into solution various ways, talking with Andy

preliminary code for cooling tower to allow it to connect with rest of flowsheet

begin code for adding cooling water circuit to process to reduce process water consumption

investigate low temperature 60C again. Unstable last night. Discuss with Joe and Andy

Page 238: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 7/29/2005 Development writing program to read data

### 0 done CTL 7/29/2005 Marketing proposal to Sunoco for condenser

### 0 done CTL 7/29/2005 Admin handoff of job from RAC

### 0 done CTL 7/29/2005 Admin handoff of job from RAC

### 0 done CTL 7/29/2005 Report writing revision and emailing

### 0 done CTL 8/1/2005 Editing editing shari's report

### 0 done CTL 8/1/2005 Miscelaneous non-project work

### 0 done CTL 8/1/2005 Investigation pump research

### 0 done CTL 8/1/2005 Development working on program to manage data for Joe

### 0 done CTL 8/2/2005 Development working on program to manage data for Joe

### 0 done CTL 8/2/2005 Editing editing report, forgot to enter last month

### 0 done CTL 8/2/2005 miscelaneous non-project work

### 0 done CTL 8/2/2005 Investigation new corrosion test with Al2SO4 with Paller

### 0 done CTL 8/3/2005 Miscelaneous non-project work

### 0 done CTL 8/3/2005 Editing editing report

### 0 done CTL 8/3/2005 Investigation helping joe with data again

### 0 done CTL 8/3/2005 Marketing inquiry from Mexico

### 0 done CTL 8/3/2005 Admin revising quote, resubmitting

### 0 done CTL 8/3/2005 Calculations checking/doing calc for amount of CaCl2 required for Joe

### 0 done CTL 8/3/2005 Consulting

### 0 done CTL 8/4/2005 Miscelaneous non-project work

### 0 done CTL 8/4/2005 Editing editing Shari's report, trip to lab to look at mounts

### 0 done CTL 8/4/2005 Labor trip to back to unload chiller

### 0 done CTL 8/4/2005 Editing editing Al's report

### 0 done CTL 8/4/2005 Report writing

reviewing results with Joe and advising to continue test. Talking with Jo on Invoice.

Page 239: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 8/5/2005 Development

### 0 done MV 8/7/2005 Development process water composition and normalization added in Inputs

### 0 done CTL 8/11/2005 Admin

### 0 done MV 8/11/2005 Development

### 0 done CTL 8/5/2005 Admin quote for job

### 0 done CTL 8/5/2005 Report editing?

### 0 done CTL 8/5/2005 Report writing, editing

### 0 done CTL 8/5/2005 Marketing talking with client about pump request, preparing quote

### 0 done CTL 8/4/2005 Marketing estimate and quote, several phone calls

### 0 done CTL 8/5/2005 Miscelaneous non-project work

### 0 done CTL 8/8/2005 Pictures selecting pictures for report

### 0 done CTL 8/8/2005 Admin quote, half pipe

### 0 done CTL 8/8/2005 Report writing

### 0 done CTL 8/8/2005 Investigation mounts

### 0 done CTL 8/9/2005 Report report

### 0 done CTL 8/9/2005 Miscelaneous non-project work

### 0 done CTL 8/9/2005 Marketing reading background info

### 0 done CTL 8/9/2005 Miscelaneous non-project work

### 0 done CTL 8/10/2005 Miscelaneous non-project work

### 0 done CTL 8/10/2005 Bill Collect Southern Ocean, CTL#22136, $860

### 0 done CTL 8/10/2005 Bill Collect

### 0 done CTL 8/10/2005 Bill Collect Invoice 22133 and 22134 past due, $240 and $4000

### 0 done CTL 8/10/2005 Bill Collect

### 0 done CTL 8/10/2005 Report writing report

### 0 done CTL 8/10/2005 Marketing Nick Fradette, Rodia, cell 973-652-9458, work 609-860-3248

setting Design Criteria for cooling tower, start DC for Process Water, first test code CT

finding bank info: Swift#PNCCUS 33, Account # 5615566708, ACH Routing #031100089.

adding missing equipment, mostly conveyors to calcining flowsheet, reviewing methodology

General Chemical invoice 22140 and 153, call Stan, oleum parts, 973-515-0900, Stan gone

General Chemical invoice 22140 and 153, call Stan, impeller $1925, talked to voice mail

Page 240: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 8/11/2005 Miscelaneous non-project work

### 0 done CTL 8/11/2005 Admin resending quote

### 0 done CTL 8/11/2005 Admin

### 0 done CTL 8/11/2005 Report writing report

### 0 done CTL 8/11/2005 Investigation called Ron Knerr, Senior Process Engr, 215-302-1503.

### 0 done MV 8/12/2005 Development

### 0 done CTL 8/12/2005 Admin logging time onto job files

### 0 done CTL 8/12/2005 Report writing

### 0 done CTL 8/12/2005 Editing team edit

### 0 done CTL 8/12/2005 Admin timesheet catch up

### 0 done MV 8/14/2005 Development setting up file structure to print an equipment list file

### 0 done MV 8/15/2005 Development getting equipment sub started for sizing equipment

### 0 done CTL 8/15/2005 Editing changes from RAC, PDF make, send to client

### 0 done CTL 8/15/2005 Miscelaneous non-project work

### 0 done CTL 8/15/2005 Admin sample sign in, first look

### 0 done CTL 8/15/2005 Investigation under stereoscope pictures

### 0 done CTL 8/15/2005 Marketing

### 0 done CTL 8/15/2005 Client call from Clark Henry

### 0 done CTL 8/16/2005 Client followup on report

### 0 done CTL 8/16/2005 Client call from Clark Henry, going over yesterday's call

### 0 done CTL 8/16/2005 Admin preparation for meeting

### 0 done CTL 8/16/2005 Marketing Nick Fradette, Rodia, cell 973-652-9458, work 609-860-3248

### 0 done CTL 8/16/2005 Investigation trip to Astrazeneca

### 0 done CTL 8/16/2005 Miscelaneous non-project work

### 0 done CTL 8/17/2005 Investigation site visit at plant

get chemical analysis request form, fill out, take to joe, sign in sample, put in refrig

adding missing equipment, mostly conveyors to calcining flowsheet, reviewing methodology

Jorege Equihua, application engineer, Ina USA corp, 248-528-4278, cell 803-517-3818, quote

Page 241: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 8/18/2005 Report writing email report

### 0 done CTL 8/18/2005 Admin quote for job, done earlier, not logged

### 0 done CTL 8/18/2005 Admin logging in job, labeling samples

### 0 done CTL 8/18/2005 Meeting discussion of audit of Taylor Forge, blackball Exxon

### 0 done CTL 8/18/2005 Marketing revised quote and phone call, banking info

### 0 done CTL 8/18/2005 Miscelaneous non-project work

### 0 done MV 8/19/2005 Development working on equipment list for calcining flowsheet

### 0 done CTL 8/19/2005 Admin quote for job

### 0 done CTL 8/19/2005 Marketing quote for job

### 0 done CTL 8/19/2005 Miscelaneous non-project work

### 0 done CTL 8/19/2005 Investigation looking at cut up sections under microscop with Shari

### 0 done CTL 8/19/2005 Report correct ID/OD error, talk with Randy

### 0 done MV 8/20/2005 Development working on equipment list for calcining flowsheet

### 0 done MV 8/22/2005 Development

### 0 done MV 8/22/2005 Development

### 0 done CTL 8/22/2005 Miscelaneous non-project work

### 0 done CTL 8/22/2005 Admin getting background info

### 0 done CTL 8/22/2005 Billing figure out final invoice

### 0 done CTL 8/22/2005 Billing figure out final invoice

### 0 done CTL 8/22/2005 Marketing put marketing stuff from Innophos in this number

### 0 done CTL 8/22/2005 Investigation talk with Shann about get project started

### 0 done CTL 8/22/2005 FU FU on Joe IC and Al for bugs

### 0 done CTL 8/22/2005 Marketing fu and reading proposal. Questions making

### 0 done CTL 8/22/2005 Marketing close out job, didn't get

### 0 done MV 8/24/2005 Development

finishing cooler by dilution in front of baghouse, start fix high T calciner

correcting oversight in heat bal. In calciner. MgOH2--> MgO heat of reaction added

temperature control in calciner sub too coarse, adverse affect on heat balance

Page 242: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 8/24/2005 Development improving algorithm to minimize gas consumption in calciner

### 0 done CTL 8/24/2005 Editing editing report

### 0 done CTL 8/24/2005 Admin sending out draft report again RAC holding

### 0 done CTL 8/24/2005 Report sending out report again with correction

### 0 done CTL 8/24/2005 Investigation looking at slides

### 0 done CTL 8/24/2005 Miscelaneous non-project work

### 0 done CTL 8/24/2005 Investigation preparation for trip

### 0 done CTL 8/25/2005 Investigation site visit, survey and audit

### 0 done MV 8/26/2005 Development trying to get heat bal in calciner working after changes

### 0 done CTL 8/26/2005 Miscelaneous non-project work

### 0 done CTL 8/26/2005 Editing editing Shari's report

### 0 done CTL 8/26/2005 Admin getting background info

### 0 done CTL 8/26/2005 Investigation stereoscopic examination

### 0 done CTL 8/26/2005 Admin logging in job, labeling samples

### 0 done CTL 8/26/2005 Pictures reviewing pictures

### 0 done MV 8/27/2005 Development heat bal in calciner not converging consistantly, modify again

### 0 done MV 8/27/2005 Development updating "ck material bal" code for equip added for major elements

### 0 done MV 8/28/2005 Development changing air cooler to water cooler for baghouse

### 0 done CTL 8/29/2005 Miscelaneous non-project work

### 0 done CTL 8/29/2005 Pictures selecting pictures for report

### 0 done CTL 8/29/2005 Admin Brian Pekny, 708-774-3239, look at drawings, email

### 0 done CTL 8/29/2005 Admin phone call and emails

### 0 done CTL 8/29/2005 Report writing report

### 0 done MV 8/30/2005 Development

### 0 done CTL 8/30/2005 Miscelaneous non-project work, catch up timesheet, email

setting up standard data sheet for equipment, looking at internet examples

Page 243: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 8/30/2005 Report writing report

### 0 done CTL 8/30/2005 Client call from Werlinger about report

### 0 done CTL 8/30/2005 Consulting phone consulting on corrosion problem

### 0 done MV 8/31/2005 Development

### 0 done CTL 8/31/2005 Miscelaneous

### 0 done CTL 8/31/2005 Report writing report, scanning documents

### 0 done CTL 8/31/2005 Investigation stereoscopic examination

### 0 done CTL 8/31/2005 Investigation discussing with Al

### 0 done CTL 8/31/2005 Investigation looking at bearing under stereoscope

### 0 done CTL 8/31/2005 Investigation packing for trip

### 0 done MV 9/3/2005 Development setting up file structure to produce equipment data sheets

### 0 done MV 9/3/2005 Admin

### 0 done MV 9/5/2005 Development refining and debugging file structure, testing structure on conveyors

### 0 done MV 9/5/2005 Development fixing error on quant of water in recycle dust

### 0 done CTL 9/1/2005 Investigation trip to Innophos, Chicago

### 0 done CTL 9/2/2005 Investigation cooling wheel materials of construction discussions and travel

### 0 done MV 9/11/2005 Development

### 0 done MV 9/12/2005 Development Blenders, blowers subroutine and add to equip list

### 0 done CTL 9/5/2005 Holiday holiday at home

### 0 done CTL 9/6/2005 Miscelaneous

### 0 done CTL 9/6/2005 Report writing report

### 0 done CTL 9/7/2005 Miscelaneous adminstrative catch up

### 0 done CTL 9/7/2005 Admin sending out draft of report, reading John Dewitt's report

### 0 done CTL 9/8/2005 Miscelaneous misc admin stuff

### 0 done CTL 9/8/2005 Marketing discussing golf cart corrosion

identified source of capital costs and tried to order book from Mintek

non-project work, airline reservation, car, shoes, maps, addresses, invoicing CTL, expense reports

finding and ordering book on capital cost estimating Amazon and ordering Mintek book

size storage silo, more conveyors, blenders, conveyors equip and subs for each

non-project work, catch up timesheet, email, discuss jobs with group

Page 244: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 9/8/2005 Pictures Taylor forge pictures organizing for report

### 0 done CTL 9/9/2005 Report working on drafts for report

### 0 done CTL 9/9/2005 Miscelaneous non-project work

### 0 done CTL 9/10/2005 Report followup on report

### 0 done CTL 9/12/2005 Miscelaneous non-project work

### 0 done CTL 9/12/2005 Editing editing report from RAC

### 0 done CTL 9/12/2005 Investigation new information from TF for report, scanning then phone call

### 0 done CTL 9/12/2005 Editing update report with RAC comments

### 0 done CTL 9/12/2005 Editing editing Al's report

### 0 done CTL 9/12/2005 Marketing quote for job

### 0 done MV 9/13/2005 SH blowers on calcine flowsheet

### 0 done CTL 9/13/2005 Admin Invoicing client

### 0 done CTL 9/13/2005 Miscelaneous non-project work

### 0 done CTL 9/13/2005 Editing editing report from RAC

### 0 done CTL 9/13/2005 Investigation reviewing past work done on reactor

### 0 done MV 9/14/2005 Development debug new blower sizing subroutine

### 0 done CTL 9/14/2005 Investigation trip and experimental pieces

### 0 done CTL 9/15/2005 Miscelaneous trying to get computer connected for work, monitor gone

### 0 done CTL 9/15/2005 Development finishing flowsheet

### 0 done CTL 9/15/2005 Miscelaneous non-project work

### 0 done CTL 9/15/2005 Meeting lunch meeting

### 0 done CTL 9/15/2005 Admin sick with tooth

### 0 done MV 9/17/2005 Development add equipment function, add more equipment to list

### 0 done CTL 9/16/2005 Report working on Addendum to report then RAC took over

### 0 done CTL 9/16/2005 Investigation mounts, stereoscope

Page 245: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done CTL 9/16/2005 Miscelaneous non-project work

### 0 done CTL 9/16/2005 Investigation stereoscopic examination

### 0 done MV 9/19/2005 Development pump equipment subroutine

### 0 done MV 9/20/2005 Development pump equipment subroutine cont and add blowers to old sub

### 0 done CTL 9/19/2005 Editing editing Shari's report

### 0 done CTL 9/19/2005 Meeting review meeting with Shari and Al

### 0 done CTL 9/19/2005 Editing editing Al's report

### 0 done CTL 9/19/2005 Miscelaneous non-project work

### 0 done CTL 9/20/2005 Editing discuss review conclusions with Shari

### 0 done CTL 9/20/2005 Editing editing Shari's report

### 0 done CTL 9/20/2005 Investigation information together for RAC for TF and discuss

### 0 done CTL 9/20/2005 Investigation mounts

### 0 done CTL 9/20/2005 Editing editing

### 0 done CTL 9/21/2005 Report writing report

### 0 done CTL 9/21/2005 Investigation taylor forge, 4 pieces air cooled ..ferrite and email

### 0 done CTL 9/21/2005 Editing editing Shari's report

### 0 done CTL 9/21/2005 Editing editing Al's report

### 0 done CTL 9/22/2005 Client followup on report

### 0 done CTL 9/22/2005 Miscelaneous non-project work

### 0 done CTL 9/22/2005 Note from 9/22 to 101405 lost due to a bu malfunction

### 0 done CTL 9/22/2005 Development review file send email on AMS Condenser

### 0 done CTL 9/22/2005 Editing editing Shari's report

### 0 done CTL 9/25/2005 Report writing report

### 0 done CTL 10/14/2005 Miscelaneous

### 0 done MV 10/14/2005 Development continue with adding pumps to list

Sept 8 to Sept 13, charge 3 days of 6 to MTL. Trip to Hot Springs, Ar then Knoxville, Ky to BAM

Page 246: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 10/15/2005 Development

### 0 done MV 10/16/2005 Development reworking design criteria based on meeting with Rod Beatty

### 0 done MV 10/17/2005 Development continue work on Design Criteria and RFQ for BAM

### 0 done MV 10/18/2005 Development Design Criteria, supporting calculations

### 0 done MV 10/19/2005 Development incorporate changes from Jens/drawing redo/PDF to Ron/ck calcs

### 0 done MV 10/20/2005 Development drawing pictures and text

### 0 done MV 10/21/2005 Development checking maximum reasonable size for pumps

### 0 done MV 10/22/2005 Development

### 0 done MV 10/23/2005 Development

### 0 done MV 10/24/2005 Development

### 0 done MV 10/24/2005 Development

### 0 done MV 10/27/2005 Marketing send Mintek info on Magnesium Model

### 0 done MV 10/25/2005 Development

### 0 done MV 10/26/2005 Admin typing in addresses for Home Owners Assoc

### 0 done MV 10/26/2005 Admin sending out resumes

### 0 done MV 10/26/2005 Report

### 0 done MV 10/27/2005 Report QPR continued

### 0 done MV 10/28/2005 Report

### 0 done MV 10/28/2005 Development

### 0 done MV 10/29/2005 Development

### 0 done MV 10/31/2005 Development sending out resumes

### 0 done MV 10/31/2005 Admin RFP review for Alisa

### 0 done MV 10/31/2005 Report proof-read QPR Report one more time

### 0 done MV 11/1/2005 Development

### 0 done MV 11/1/2005 Development HX-03 add, check

adding pump costs, equipment description report some cleanup, bu data

add into cost routine dealing with multiple units of the same equipment

heat exchangers, cost as a function of area and pressure rating, finding typical heat transfer per unit area

Wrting subroutine for sizing heat exchangers from material balance data

changing CO heat exchanger to counter-current from co-current reduce capital and operating costs

writing subroutine for sizing heat exchangers from MB data, continued. Formatting HE printouts.

working on QPR, finding parametric factors for scaleup, what's available. Best in Perry's.

QPR continued, formatting data examples for report, organizing data better.

reformating datasheets after trying to use in QPR … inadequate as-is.

change boiler preheater to counter-current flow from co-current to reduce capital cost

problem with MB not in balance in calciner circuit ? What changed?moisture to BH. Fixed.

Page 247: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 11/1/2005 Development

### 0 done MV 11/2/2005 Development

### 0 done MV 11/2/2005 Development subroutine for selecting pressure vessels

### 0 done MV 11/3/2005 Development continue sub for pressure vessels

### 0 done MV 11/4/2005 Development continue sub for pressure vessels

### 0 done MV 11/5/2005 Development printout of pressure vessel data sheets and costs

### 0 done MV 11/5/2005 Development looking at sizing and costing scrubbers

### 0 done MV 11/8/2005 Development develop equation for cost of scrubbers as a function of size

### 0 done MV 11/9/2005 Development

### 0 done MV 11/10/2005 Development discussion with Jens, then Peter Saxby

### 0 done MV 11/10/2005 Development discussion with Ron Beatty on furnace, then work on schedule

### 0 done MV 11/11/2005 Development second revision of schedule

### 0 done MV 11/12/2005 Development looking for capital costs for electric arc furnace projects on internet

### 0 done MV 11/14/2005 Development

### 0 done MV 11/15/2005 Development

### 0 done MV 11/15/2005 Development estimate cost of boiler, regression curves from Matches site

### 0 done MV 11/16/2005 Development

### 0 done MV 11/16/2005 Development build subr to print Equip Cost and EC Summary Spreadsheets

### 0 done MV 11/16/2005 Development

### 0 done MV 11/17/2005 Admin conversation with Jens, then Mike, on MDI Shares, calling Marius

### 0 done MV 11/17/2005 Development getting proposal from Ron, reading, and sending to all

### 0 done MV 11/17/2005 Development finish boiler cost estimate and printouts

### 0 done MV 11/18/2005 Development need to modify algorithm for boiler cost to include steam pressure

### 0 done MV 11/18/2005 Admin computer files, full disk bu problem

### 0 done MV 11/18/2005 Development

create subroutine for sizing tanks, add tanks to equipment list to test sub

continue tank subroutine, regression analysis for CS & 316 tanks, add TK-02 to TK-03, debug

scrubber subroutine to produce equipment data sheet and add price to master list

asking for some quotes from electric arc furnace companies, found another electric arc project cost

outlining remaining equipment needing quotes, self review of outstanding tasks

discuss with Jens "carried" and non-dilutable shares, then wife and iternet for terms

build subroutine for boilers, pull data, use regression curves, print datasheet and costs

conversation with Jens about Ron's furnace design, need for budget and cash flow, upcoming activities

Page 248: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 11/18/2005 Development email to Ron on furnace questions, mostly dimensions

### 0 done MV 11/18/2005 Admin

### 0 done MV 11/18/2005 Admin

### 0 done MV 11/18/2005 Development email to Bob about cost of ingot casting

### 0 done MV 11/19/2005 Admin looking through job ads

### 0 done MV 11/19/2005 Development

### 0 done MV 11/19/2005 Development

### 0 done MV 11/20/2005 Admin letter to Marshal and Gabb about going to lawyer

### 0 done MV 11/21/2005 Admin job ads and mail

### 0 done MV 11/21/2005 Development

### 0 done MV 11/21/2005 Marketing make email advertisement to send to mining journal ads

### 0 done MV 11/21/2005 Development factor to convert 2002 Rands to 2002 Dollars

### 0 done MV 11/21/2005 Development make computerized datasheet for ejectors to get quote from vendor

### 0 done MV 11/22/2005 Admin job ads and mail

### 0 done MV 11/22/2005 Development

### 0 done MV 11/23/2005 Development develop regression curves for cost vs size for electric arc furnaces

### 0 done MV 11/24/2005 Marketing sending emails to Delaware dept of material science

### 0 done MV 11/24/2005 Development

### 0 done MV 11/24/2005 Development reading quarterly report, comment

### 0 done MV 11/26/2005 Development email to Andy on costs on SOM vs NBCM

### 0 done MV 11/26/2005 Development estimate cost of electric furnace, con't

### 0 done Odle 11/28/2005 Admin AMO back to airport

### 0 done Odle 11/28/2005 Admin get Wells Fargo Forms notarized and sent back

### 0 done Odle 11/28/2005 Entertainment liner in fish pond

### 0 done MV 11/28/2005 Development cost of hydrogen Alchemix vs. Safe Hydrogen

email to Marius per Mike's request, Mike wants Marius up to date on project, starting

getting electricity and dealing with Christine on getting the house rented

convert 2002 rands to June 2005 dollars, converting U.S. 2003 to U.S. 2005, Plant Index

estimate cost of steam ejectors for vacuum, also change symbol conflict, finding data on internet

function to convert dollars from past year to 2005, use function on all costs estimated to date

use data and fillout datasheet for "fox" ejectors to get quote to verify cost estimates, get fax through

continue on capital cost estimation for electric arc furnace … difficult

Page 249: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 11/28/2005 Admin 3rd quarter taxes

### 0 done MV 11/28/2005 Marketing call from Woollett

### 0 done MV 11/28/2005 Admin pick up notice on 2004 taxes due

### 0 done MV 11/29/2005 Admin emails and To Do List

### 0 done Odle 11/29/2005 Admin call about unknown charge on Wachovia

### 0 done MV 11/29/2005 Marketing send email to references, if ok, then send references to Woollett

### 0 done MV 11/29/2005 Admin 3rd quarter taxes, cont.

### 0 done MV 11/29/2005 Admin get DSL line from Verizon working

### 0 Done MV 11/30/2005 Admin emails and To Do List

### 0 Done MV 11/30/2005 Admin try to download diagnosist software then call Verizon if unsucessful

### 0 Done MV 11/30/2005 Development project update with Jens

### 0 Done MV 11/30/2005 Admin update schedule with MDI and Odle contract delays

### 0 Done MV 12/1/2005 Admin send out 3rd quarter with check

### 0 Done Goals 12/31/2005 Goals complete Dynamic Financial Model and publish

### 0 done MV 11/30/2005 Admin emails and To Do List

### 0 done Odle 11/30/2005 Entertainment fish pond, then accessories for DVD camera

### 0 done MV 11/30/2005 Development

### 0 done MV 11/30/2005 Development estimate cost of kilns/preheaters

### 0 done MV 12/1/2005 Admin emails and To Do List

### 0 Done MV 12/1/2005 Admin

### 0 done MV 12/1/2005 Consulting talk with Dave V. and Tim about leaching and project in general

### 0 done MV 12/1/2005 Development continue to find cost data on kiln to supplement Mintek data

### 0 done MV 12/1/2005 Admin call Ron Beatty about routing number and starting the project

### 0 done MV 12/2/2005 Admin emails and To Do List

### 0 done MV 12/2/2005 Admin get Error Guard working on desktop computer

Regalito Copper Project, updating self on project especially biologically assisted leaching results

talk with Michael M. on project and on getting routing number for project

Page 250: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 12/2/2005 Development work on purchase order for BAM

### 0 done MV 12/2/2005 Development look up oxide content of ore, look over model, conference call

### 0 done MV 12/3/2005 Admin emails and To Do List

### 0 done Odle 12/3/2005 Admin

### 0 done MV 12/3/2005 Development

### 0 done MV 12/4/2005 Admin

### 0 done MV 12/4/2005 Admin purchase order

### 0 done MV 12/5/2005 Admin emails and To Do List

### 0 done MV 12/5/2005 Admin fu on invoice to GLG

### 0 done MV 12/5/2005 Development

### 0 done MV 12/5/2005 Development

### 0 done MV 12/6/2005 Admin emails and To Do List

### 0 done MV 12/6/2005 Admin invoicing, contract,

### 0 done MV 12/6/2005 Admin Sent NDA via fax, problems with fax but ok

### 0 done MV 12/6/2005 Development

### 0 done MV 12/7/2005 Admin emails and To Do List

### 0 done MV 12/7/2005 Admin get directions to Mike's and Tmobile coverage

### 0 done MV 12/7/2005 Development continue on salt furnace design to enable costing

### 0 done MV 12/7/2005 Admin address 2004 notice on taxes due

### 0 done MV 12/7/2005 Admin have cash sent from IRA

### 0 done MV 12/12/2005 Development reading proposal

### 0 done MV 12/14/2005 Admin emails and To Do List

### 0 done MV 12/14/2005 Marketing Mike Martuza of Franchoice about Franchises

### 0 done MV 12/14/2005 Writing update on Houdini Device with wife first attempt

### 0 done MV 12/14/2005 Marketing

personal finances, selling shares SNXFX to get some cash out of IRA

estimate cost of salt furnace, working on general design to enable cost estimate

overlooking proposal for new project, setting up contract, reading NDA,proposed contract, reorganizing info.

talking with Jens about microsilicia from asbestos or serpentine from Australia

develop code to estimate the size, number and cost of salt furnaces to get required heat removal

work on purchase order for BAM, Ron okay on Furnace Run clause, 2 emails

call Mary at Wolf Eagle Environmental to get proposal description faxed here

Page 251: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

### 0 done MV 12/14/2005 Admin sending off 2nd mortgage loan papers and notary

### 0 done MV 12/14/2005 Marketing

### 0 done MV 12/14/2005 Admin send Simon Brownlie the furnace papers

### 0 done MV 12/14/2005 Admin overdraft on personal acct transfer funds from business

### 0 done MV 12/14/2005 Development Get questions together for conference call

This is to confirm your scheduled teleconference with Managing Director Mr. Brian Schlotfeldt on Wednesday, December 14 at 3:00 PM EST. He will call you at 443-616-4339.

Page 252: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Project Company Status Start Time End Time Start Time 2

Jobs Ahold0.6 4:48 PM 7:12 AM

Jobs Eybl Cartex0

Hi-Temp7.5 12:00 PM 12:00 AM

Hi-Temp0.3 12:00 AM 7:12 AM

Jobs Hobby0

taxes mv0.3 12:00 AM 7:12 AM

misc mv3.5 12:00 PM 12:00 AM

Ta Reclaim MV6 12:00 AM 12:00 AM

Odles Odle2 12:00 PM 12:00 PM

taxes mv0

MgO Spokane3 12:00 AM 12:00 AM

NY WWTP0

0

1.4 2:24 AM 12:00 PM

Jobs AMEC1 12:00 AM 12:00 AM

Startup CTL1 12:00 AM 12:00 AM

Sand Removal RFW0

Tools CTL2 12:00 AM 12:00 AM

Torftech Torftech1.5 12:00 AM 12:00 AM 12:00 AM 12:00 PM

Torftech Torftech12 12:00 PM 12:00 PM

19063 Epsilon1 12:00 AM 12:00 AM

190620

Invoices CTL1 12:00 AM 12:00 AM

Computed Time (Decimal Hrs)

End Time 2

Start Time 3

End Time 3

waiting on Lydia to return2 emails sent, no

responseLMG Property and

Hi-Temp Specialty Metals

in progress.

Hi-Temp Specialty Metals

waiting for Tim to

inform Proposal submitted by Lorencompletel

y screwed

upgot address and box

not started

not started

MgO Spokane

phone conversat

ion on 04/04/02

NY Bank unknown

George to talk on

Monday or Tues 040802

emailed me in mid January

sent email end

of Feb 2002

General Chemical

Page 253: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

18336 York4 12:00 AM 12:00 AM

1.85 10:48 AM 12:00 AM 12:00 AM 7:12 AM

FeMn Komo1 12:00 AM 12:00 AM

Torftech Torftech0

Torftech Torftech0

locate CTL0.1 12:00 AM 2:24 AM

18336 York6.85 12:00 AM 12:00 AM 3:36 AM 12:00 AM

locate Odle0.4 12:00 PM 7:12 PM 6:00 PM 8:24 PM

19062 CTL1.75 12:00 AM 6:00 PM

19063 Epsilon0.25 6:00 AM 12:00 PM

19062 CTL2.75 12:00 PM 6:00 AM

19038 York0

18336 York1.2 7:12 AM 12:00 PM

Odle0.75 6:00 AM 12:00 AM

York0.75 12:00 PM 6:00 AM

19038 York0.75 6:00 PM 12:00 PM

1.19 12:00 AM

19038 York5.5 12:00 AM 12:00 PM 12:00 AM 12:00 AM

19038 York1 12:00 AM 12:00 AM

19038 York0.8 4:48 AM 12:00 AM

CTL CTL1.2 12:00 AM 4:48 AM

Romanian0

banking CTL1 6:00 PM 6:00 PM 12:00 AM

19038 CTL1.5 12:00 AM 12:00 PM

18336 York0.4 2:24 AM 12:00 PM

have number

from Chris

pictures at left of

pageFORGOT CLOTHE

S

looked at tank

recording made

marked up by

Rick 2nd time

Admiralty Bank

down to finals on

one phase of

the project

Page 254: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

College Odle1 12:00 PM 12:00 PM

18336 York1.1 12:00 AM

19038 York1.2 7:12 PM 12:00 AM

19038 York0.5 12:00 PM 12:00 AM

Salt MV2 12:00 PM 12:00 PM

Forms CTL1.5 12:00 AM 12:00 PM

19038 York1 12:00 PM 12:00 PM

locate CTL0

19038 York1 12:00 AM 12:00 AM

locate CTL2.5 12:00 PM 12:00 AM

18336 York0.5 12:00 AM 12:00 PM

18336 York1 12:00 AM 12:00 AM

19038 York1 12:00 AM 12:00 AM

19038 York0.5 12:00 PM 12:00 AM

Sunnoco Sunnoco0.5 12:00 AM 12:00 PM

MV1 12:00 AM 12:00 AM

18336 York1 12:00 AM 12:00 AM

misc CTL2 12:00 AM 12:00 AM

19062 Epsilon1 12:00 AM 12:00 AM

18336 York writing6.7 12:00 AM 12:00 AM 12:00 PM 12:00 PM 7:12 AM 12:00 AM

Torftech Torftech0.25 12:00 AM 6:00 AM

183361 12:00 PM 12:00 PM

Torftech Torftech0

not started

work in progress

not started

have report on

disk

make correction

scame up with plan on where

to cut tubes

put on hold

shortly after this

entry

Fred signing in

take a taxi

not started

Page 255: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

relocate MV4 12:00 PM 12:00 PM

18336 York5 12:00 PM 12:00 PM 12:00 PM 12:00 PM

18336 York1 12:00 PM 12:00 PM

18336 York2 12:00 PM 12:00 PM

18336 York1 12:00 PM 12:00 PM

18336 York1.5 12:00 PM 12:00 AM

Finances Odle2 12:00 PM 12:00 PM

19038 York0.5 12:00 AM 12:00 PM

19030 Motiva1 12:00 PM 12:00 PM

MV Taxes MV2 12:00 AM 12:00 AM

Tools CTL0

0

College Odle2.5 12:00 AM 12:00 PM

educate CTL1.75 12:00 AM 6:00 PM

Hi-Temp1 12:00 AM 12:00 AM

Hi-Temp1 12:00 AM 12:00 AM

compute MV0

Hi-Temp done1.5 12:00 AM 12:00 PM

compute MV0

Jobs MV0

PM MV0

Accounting MV0

Hi-Temp0

Solder Flehr0

Accounting MV0

Spring Run lead

have template

ready to write report

not started

early in FA

pictures, see notes

not started

Webster Univ

not started

received blank form

not started

Hi-Temp Specialty Metals

not started

Hi-Temp Specialty Metals

not started

Hi-Temp Specialty Metals

applic completed need to notarize

and deliver

Hi-Temp Specialty Metals

Page 256: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Hi-Temp0

Hi-Temp0

Hi-Temp0

Hi-Temp0

Hi-Temp0

Hi-Temp0

Hi-Temp0

Hi-Temp0

locate CTL done0

locate MV0

Hi-Temp0

Hi-Temp0

Info MV0

Jobs MV0

Jobs MV0

SWT0

Hi-Temp0

Hi-Temp0

Hi-Temp0

Hi-Temp0

Houghton0

Hi-Temp0

superfund rfw0

Torftech Torftech0

Jobs MV0

Hi-Temp Specialty Metals

not started

Hi-Temp Specialty Metals

use preliminary report to start.Hi-Temp

Specialty Metals

not started

Hi-Temp Specialty Metals

not started

Hi-Temp Specialty Metals

preliminary report

draft available,

rewriteHi-Temp Specialty Metals

not started

Hi-Temp Specialty Metals

not started

Hi-Temp Specialty Metals

refernces in text

not started

Hi-Temp Specialty Metals

costs collected, need to import

and add textHi-Temp

Specialty Metals

have old schedule

s

not startedsent resume,

called left my phone numbernot started

not started

Hi-Temp Specialty Metals

downloaded

Hi-Temp Specialty Metals

pictures scanned

Hi-Temp Specialty Metals

sorted some

invoices out, have

some pics Hi-Temp

Specialty Metals

got file from David

Process Support

being ignored

Hi-Temp Specialty Metals

draft done, need tableslost

contactpositive email

from him, no

response from my

email

Edward G.

Brame, Jr. (PhD) 302-994-8000 or, toll-free, 888-263-

8000, sent

email and packet by

mail.

Page 257: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Marketing MV0

Solder Flehr0

Solder Flehr0

Solder Flehr0

H2 Alchemix0

Hi-Temp0

Hi-Temp4 12:00 AM 12:00 AM

Hi-Temp3 12:00 AM 12:00 AM

Solder Flehr

Hi-Temp

Solder Flehr

Solder Flehr

taxes MV

Alchemix Alchemix

Alchemix

Taxes MV

Alchemix Alchemix

MV MV12:00 AM

Finances Odle sorting

Hi-Temp

Hi-Temp

Hi-Temp

Finances na

Hi-Temp

Hi-Temp

new subs on file in

Basic Subs

have patent

Superior Engineering

not started

Hi-Temp Specialty Metals

Hi-Temp Specialty Metals

Hi-Temp Specialty Metals

not started

not started

not started

not started

not started

not started

Hi-Temp Specialty Metals

fixing to do

Hi-Temp Specialty Metals

not started

Hi-Temp Specialty Metals

not started

not started

Hi-Temp Specialty Metals

waiting on specs from Tim MahonHi-Temp

Specialty Metals

not started

Page 258: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Jobs

Hi-Temp

admiralty Admiralty

admiralty Admiralty

Hi-Temp

Hi-Temp

Hi-Temp

Jobs MV

Personal Odles

Taxes MV

Jobs SNC Lavalin

Dry Ni Cat Tri-equity

PM Recovery Seltrust

finances Odle

Finances Odle

Hi-Temp

Hi-Temp

Hi-Temp

Hi-Temp

Taxes

College Odle

Hi-Temp Specialty Metals

not started

not started

not started

Hi-Temp Specialty Metals

not started

Hi-Temp Specialty Metals

1 follow up,

another needed, 2 fu so far.Hi-Temp

Specialty Metals

not started

not startedhave

data, look up and sendemail

received in French

lost contactdidn't write

summary letter as

promised.sold stock,

now send money

last statement

filed in Paperport

files., sent email

requesting lowest payment.

Hi-Temp Specialty Metals

not started

Hi-Temp Specialty Metals

not started

Hi-Temp Specialty Metals

in the mail

Hi-Temp Specialty Metals

waiting on Lease Payments

not started

Page 259: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Finances Primerica

Jobs na

College Auburn

Jobs RLG

Jobs

Jobs

College Odle

Medical Odle

Jobs MV

College

Salt Stailnt

MV Taxes MV

MV Taxes MV

Primerica Primerica

Jobs Nesco

Hi-Temp

Finances Odle

MV Taxes MV

training Primerica

College Odle

MV Taxes MV periodic

Taxes

tried to get one

job for me

Hi-Temp Acid Room

LMG Property and

Hi-Temp Specialty Metals

trip to plant,

notes in progress.

Dr John received.

need to mail

not started

FU after initial

meeting

faxed resume

had phone

conversation, sent email. Waiting

his "Scope of Services"

found error in Odle SS withheld, now 941

issue complicat

es

pay before 3/25/02paid for waiting

for course materials

called no answer many

times, no answer.

Sent email told problem.

Hi-Temp Specialty Metals

not started

not started

not started

not startednot started

but have pin on

form from FASFA

Metallurgical Viability, Inc

Income statement

done

Page 260: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

College na

Jobs Odle

Alchemix

College na

Jobs SNC Lavalin

Jobs Kvaerner1 6:00 AM 6:00 AM

Alchemix Alchemix

Jobs MV

Jobs MT Grace

finances Odle

Hi-Temp

Taxes MV

Hi-Temp

Jobs

Medical Odle waiting

Jobs Alchemix

v Kavaener proposed1.2 7:12 PM 12:00 AM

Taxes MV

Romania Admiralty

filled out paper

copy and mailed in

Hydrogen Project

3 prior reviews,

Kelly updated.

email received

from AuburnSNC Lavalin has won

bid.waiting on word

from Charley Jonesnot started

repeating process

not started

need to scan then

mail

not started

Hi-Temp Specialty Metals

not startedneed to update

Quicken files, then calc, then

send forms.

Coast-to-Coast

sent resume, called and

discussed Proj

Manager for metal stamping processin

gJust Presente

d to Alchemix

need to do now

not started

Page 261: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

LWT4 12:00 AM 12:00 AM

na na

na MV

Jobs FD proposed0.2 12:00 PM 4:48 PM

190620.75 12:00 AM 6:00 PM

19063 Epsilon0.5 12:00 AM 12:00 PM

18336 York2 12:00 AM 12:00 AM

FeMn MV0.6 7:12 AM 9:36 PM

FeMn MV1 12:00 AM 12:00 AM

Contract CTL1.3 12:00 AM 7:12 AM

bioscrub RFW0

all4 12:00 AM 12:00 AM

Startup York1 12:00 AM 12:00 AM

FeMn MV2.75 12:00 AM 6:00 PM

locate Odle5 12:00 AM 12:00 AM

18336 York1 12:00 AM 12:00 AM

18336 York1.1 12:00 PM 2:24 PM

training Primerica0

Jobs MV0

Salt MV0

Jobs0

Jobs Powerspan0

Solder MacIntosh0

Hi-Temp MV0

Discount H2O Project

Proposal ignored. All but dead.Douglas

Patterson and Assoc

leaving on jet

plane in am.

waiting for time

painting in

progress

General Chemical

read brief and view pictures

pictures emailed by Fred

wants quotationfound

some used

books out of stock, ck other dealers

lost contact

draft of contract

done

not started

waiting for

comments on Qual

TasksSuperior Engineering

email sent

042202

Resume and

questions send,

waiting on

response. Send FU

3/12

in progress.

email sent on subject

Page 262: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Startup CTL0

Jobs Mv0

Startup CTL0

Jobs TRS-Calgary0

new life Odle0

Jobs PMET0

Startup CTL1 12:00 AM 12:00 AM

19069 QSL0.4 2:24 PM 12:00 AM

19038 York3.5 12:00 AM 12:00 AM 12:00 AM 12:00 PM

Tools CTL3 12:00 AM 12:00 AM

19038 York3 12:00 AM 12:00 AM 12:00 AM 12:00 AM

18336 York0.4 12:00 AM 9:36 AM

19069 QSL1 12:00 AM 12:00 AM

Startup CTL1 12:00 AM 12:00 AM

19069 QSL1 12:00 AM 12:00 AM

Torftech MV1 12:00 AM 12:00 AM

Contract CTL6 12:00 PM 12:00 PM 12:00 AM 12:00 AM

family Odle6.5 12:00 PM 12:00 AM

CTL Model CTL2 12:00 AM 12:00 AM

Finances Odle0

locate CTL1 12:00 AM 12:00 AM

casto Overhead0

Taxes MV0

19069 QSL1 12:00 AM 12:00 AM

Finances CTL1.19 12:00 AM 12:00 AM

have map from Rick and xerox

from travel book

He was going to discuss

with Process Manager and call

me back, never

happened.

saw article in Forbes

on portable

bike

Meeting with

Slyvestor. Agreed to work

thru PMET

not started

not started

have a pile of

receipts

Page 263: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Education CTL3 12:00 AM 12:00 AM

Finances M0

Finances Odle0

Overhead CTL0

19038 York1.6 12:00 PM 12:00 PM 2:24 PM 4:48 AM

19038 York0.8 12:00 PM 12:00 AM 4:48 AM 12:00 PM

Tools MV1.05 10:48 AM 12:00 PM

18336 York1.5 12:00 PM 12:00 AM 12:00 AM 12:00 AM

18336 York9.5 12:00 PM 12:00 AM 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19069 QSL1 12:00 AM 12:00 AM

18336 York1.5 12:00 AM 12:00 PM

19038 York1 12:00 AM 12:00 AM

19065 Epsilon1 12:00 PM 12:00 PM

tools CTL1 12:00 PM 12:00 PM

19069 QSL1.5 12:00 PM 12:00 AM

19069 QSL1.2 7:12 AM 12:00 PM

Hi-Temp DGPA0.3 6:00 AM 1:12 PM

19038 York3 12:00 PM 12:00 PM 12:00 AM 12:00 AM

19069 QSL0.5 12:00 PM 12:00 AM

19069 QSL0.25 6:00 AM 12:00 PM

18336 York3 12:00 AM 12:00 AM

admin CTL1 12:00 AM 12:00 AM

MV0

18336 York0.5 12:00 AM 12:00 PM

18336 York0.5 12:00 PM 12:00 AM

downloaded last month

forgot to load into Quicken

testing with this

entry

Investment Banks

have list of banks

Page 264: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Work MV0

18336 York0.5 12:00 AM 12:00 PM

grammer CTL1 12:00 AM 12:00 AM

Finances Odle0

College0

19069 QSL2.5 12:00 AM 12:00 PM

19069 QSL0.5 12:00 AM 12:00 PM

Demo MV0

Taxes MV periodic0

Tools CTL0.5 12:00 AM 12:00 PM

19069 QSL1 12:00 AM 12:00 AM

timesheet CTL3.5 12:00 PM 12:00 AM

Jobs Alcoa 0

finances CTL3 12:00 AM 12:00 AM

finances CTL5 12:00 AM 12:00 AM

18336 York1.5 12:00 PM 12:00 AM

19062 Epsilon0

19038 York0

19069 Epsilon1.5 12:00 PM 12:00 AM

19063 Epsilon1 12:00 AM 12:00 AM

0

19069 QSL1 12:00 AM 12:00 AM

19069 QSL3 12:00 PM 12:00 PM 12:00 AM 12:00 AM

Startup CTL1.5 12:00 AM 12:00 PM

Invoice MV0

loan approved

and prelimary proposal

sent

all not in, no voice

mailneed to model after demo model.

speculative model

to present to

D.Evans (Alcan)

and Cayhill(Al

coa). Requires

150 unpaid

hours to make

happen.

Page 265: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19030 CTL1.19 12:00 AM 12:00 PM

19069 QSL1.6 12:00 AM 2:24 PM 12:00 AM 12:00 AM

compute MV0

19065 Epsilon2.25 12:00 AM 6:00 PM 12:00 AM 12:00 PM

19065 Epsilon3 12:00 PM 12:00 PM 12:00 PM 12:00 PM 12:00 AM 12:00 AM

19065 Epsilon1 12:00 PM 12:00 PM

19069 QSL1.19 12:00 AM 12:00 AM

19038 York1.19 12:00 PM 8,75

19069 QSL0.5 6:00 PM 6:00 AM

18336 York0.25 6:00 AM 12:00 PM

Invoicing CTL0.6 12:00 AM 2:24 PM

19038 York0.25 12:00 PM 6:00 PM

email CTL0.25 6:00 PM 12:00 AM

19065 Epsilon2 12:00 PM 12:00 PM

19065 Epsilon2 12:00 AM 12:00 AM

19038 York1 12:00 PM 12:00 PM

19065 Epsilon1 12:00 AM 12:00 AM

IM CTL1.5 12:00 AM 12:00 PM

Invoice CTL2 12:00 AM 12:00 AM

Meetings CTL1 12:00 AM 12:00 AM

19038 York1 12:00 AM 12:00 AM

Transportation CTL1.5 12:00 AM 12:00 PM

19065 Epsilon1 12:00 PM 12:00 PM

19065 Epsilon1 12:00 PM 12:00 PM

IM CTL1.5 12:00 AM 12:00 PM

Page 266: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

190653 2:24 PM 2:24 PM

19038 York0

19065 Epsilon1.5 12:00 AM 12:00 PM

Fun Odle0

19065 Epsilon1 12:00 AM 12:00 AM

19065 Epsilon3.5 12:00 AM 12:00 AM 12:00 PM 12:00 AM

accounting CTL1.5 12:00 AM 12:00 PM

19065 Epsilon2 12:00 AM 12:00 AM 12:00 PM 12:00 PM

Asbestos MV0

Marketing CTL0

Demo MV0

Primerica MV0

compute Odle0

Pyro Alchemix0

Primerica Primerica0

tools MV0

Taxes MV0

Casting MV0

Fans Vanaire0

0

compute MV0

0

Tools MV0

compute MV 0

Marketing CTL0

Waiting for visit

by Roland

about half done

need address

not startedsimilar model done

otherwise not

started.got web address

no contact with him for six

months

not started

Buena Vista Nickel-

Magnesium Project

Chesbar Resources

Inc.

sent resume, Thorne said he

would not be back

until March 6.

Wrote 2nd

email.

Page 267: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Work MV0

Patent MV0

Honda Odle periodic0

Jobs MV0

open periodic0

LaCopper MV0

SH0.6 2:24 AM 4:48 PM

19065 Epsilon1.2 7:12 PM 12:00 AM

190100.5 12:00 AM 12:00 PM

19069 QSL1 12:00 AM 12:00 AM

19069 QSL3.1 12:00 PM 12:00 PM 4:48 PM 7:12 PM

19038 York1.2 7:12 PM 12:00 AM

19069 QSL1 12:00 AM 12:00 AM

computer MV0

CMC MV proposed0

19030 CTL0.5 12:00 PM 12:00 AM

19038 York0.5 12:00 AM 12:00 PM

19065 QSL1.8 12:00 PM 7:12 AM 12:00 AM 12:00 AM

Travel CTL1 12:00 AM 12:00 AM

19038 York0.5 12:00 AM 12:00 PM

19038 York1.119 12:00 PM

Tools MV1.5 12:00 AM 12:00 PM

19063 Epsilon1 12:00 AM 12:00 AM

fire1 12:00 AM 12:00 AM

19030 CTL1 12:00 AM 12:00 AM

just sent fu on

2/10/02

not started

Superior Engineering

need to go pick

up diaphragms again

Page 268: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

18275 York1 12:00 AM 12:00 AM

19063 Epsilon3 12:00 AM 12:00 AM 12:00 AM 12:00 AM

R&D MV1 12:00 AM 12:00 AM

19063 Epsilon1.5 12:00 AM 12:00 PM

19080 GE Power3 12:00 AM 12:00 PM 12:00 PM 12:00 AM

grammer CTL1 12:00 AM 12:00 AM

19065 Epsilon2.5 12:00 AM 12:00 PM

19080 GE Power1.5 12:00 PM 12:00 AM

contacts MV1 12:00 AM 12:00 AM

finances Odle0

filing Odle5 12:00 AM 12:00 AM

19080 GE Power0.75 6:00 AM 12:00 AM

19010 Firmenich1 12:00 AM 12:00 AM

18275 York1.5 12:00 PM 12:00 AM

19010 Firmenich1.5 12:00 AM 12:00 PM

IM CTL0.5 12:00 AM 12:00 PM

19065 Epsilon0.4 6:00 PM 3:36 AM

finances CTL1 12:00 AM 12:00 AM

19080 GE Power2 12:00 AM 12:00 AM

19010 Firmenich1.75 12:00 PM 12:00 AM 6:00 PM 12:00 AM

19069 QSL0

19010 Firmenich2.05 12:00 AM 12:00 AM 6:00 AM 12:00 AM 12:00 PM 7:12 PM

York CTL0.5 6:00 AM 6:00 PM

Home Odle0

18275 York0.65 12:00 AM 6:00 AM 12:00 AM 9:36 AM

mailed, waiting return

Page 269: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19097 Polyone0.6 9:36 AM 12:00 AM

vacation Odle0

19063 Epsilon1 12:00 AM 12:00 AM

19010 Firmenich5 6:00 PM 12:00 AM 6:00 AM 12:00 AM 12:00 AM 12:00 AM

Invoices CTL1.5 12:00 PM 12:00 AM

filing CTL0

19063 Epsilon0.8 12:00 AM 12:00 PM 7:12 PM 2:24 AM

190990.5 12:00 PM 12:00 AM

19063 Epsilon0

18275 York1 12:00 PM 12:00 PM

computer CTL0

18275 York2 12:00 AM 12:00 AM

IM mv1 12:00 AM 12:00 AM

College Odle0

18275 York0

contacts MV0

FA Educ CTL not started 2 12:00 AM 12:00 AM

compute MV 0

compute MV not started 0

CTL CTL 1 12:00 PM 12:00 PM

18275 York 1 12:00 PM 12:00 PM

19010 Firmenich 2 12:00 AM 12:00 AM

19010 Firmenich 1 12:00 PM 12:00 AM 12:00 AM 12:00 PM

19010 Firmenich 2 12:00 PM 12:00 PM

19010 Firmenich 2.5 12:00 AM 12:00 PM

Page 270: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19097 Polyone 2 12:00 PM 12:00 PM 12:00 AM 12:00 AM

Toth MV 3 12:00 AM 12:00 AM

Ta MV have old n 0

0

health Odle 0

Invoices CTL 1.25 6:00 AM 12:00 PM

18275 York 3 12:00 AM 12:00 AM

18275 York 6.3 12:00 AM 12:00 PM 12:00 PM 7:12 AM

18275 York 0

Marketing MV 0

18275 York 3 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19097 Polyone 3 12:00 AM 12:00 AM 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19112 Epsilon 1.5 12:00 AM 12:00 PM

18275 York 3 12:00 AM 12:00 AM

IM CTL 0

19097 Polyone 1 12:00 AM 12:00 AM

Computers MV 0

19094 Atofina 1 12:00 AM 12:00 AM

19094 Atofina 0.5 12:00 AM 12:00 PM

Taxes MV 3.5 12:00 PM 12:00 AM

IM CTL 1 12:00 PM 12:00 PM

19097 Polyone 3.5 12:00 AM 12:00 AM 12:00 AM 12:00 PM

compute MV 0

Alliance CTL MV 0

Overhead 2 12:00 AM 12:00 AM

Page 271: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

IM CTL 1 12:00 AM 12:00 AM

IM CTL 4 12:00 AM 12:00 AM

MgO Spokane MgO Spokaneemail setti 0

19097 Polyone 2 12:00 AM 12:00 AM

19097 Polyone 4.5 12:00 PM 12:00 AM 12:00 AM 12:00 AM

Marketing CTL 1 12:00 AM 12:00 AM

19094 Atofina 3 12:00 AM 12:00 AM

19040 Ice House 2.5 12:00 AM 12:00 PM

19094 Atofina 7 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Video Camera MV send back 0

19065 Epsilon 2.5 12:00 AM 12:00 PM

19094 Atofina 2 12:00 AM 12:00 AM 12:00 PM 12:00 PM

Toth Pildysh 5 12:00 AM 12:00 AM

Toth Pildysh 5 12:00 AM 12:00 AM

19126 Air Products 3 12:00 AM 12:00 AM

FA Lab Air Products 0.2 12:00 AM 4:48 AM

Toth Pildysh 5 12:00 AM 12:00 AM

Education MV 2 12:00 AM 12:00 AM

19065 Epsilon 1 12:00 AM 12:00 AM

Toth Pildysh 3 12:00 AM 12:00 AM

19094 Atofina 1.119 12:00 AM

19097 Oxy Vinyls 0.5 12:00 PM 12:00 AM

Toth Pildysh 3 12:00 AM 12:00 AM

Equipment MV 1 12:00 AM 12:00 AM

finances MV bill at hom 0

Page 272: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19040 Ice House 3 12:00 AM 12:00 AM

taxes MV 2 12:00 AM 12:00 AM

19097 Polyone 1 12:00 AM 12:00 AM

19040 Ice House 2.75 12:00 AM 6:00 PM

Marketing CTL 3 12:00 AM 12:00 AM

19126 Air Products 2 12:00 AM 12:00 AM

19097 Oxy Vinyls 1 12:00 AM 12:00 AM

Toth Pildysh 0.4 7:12 AM 4:48 PM

19097 Oxy Vinyls 2 12:00 AM 12:00 AM

Overhead MV 0

18275 York 0.5 12:00 AM 12:00 PM

finances MV 0

19094 Atofina 1.5 12:00 AM 12:00 PM

19124 Air Products 1.5 12:00 AM 12:00 PM

19124 Air Products 1 12:00 AM 12:00 AM

finances MV 1 12:00 AM 12:00 AM

19094 Atofina 1 12:00 AM 12:00 AM

19133 Epsilon 5 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Quotes MV 0

mejellones SNC Lavalin on 3/15/02 0

IM CTL 5 12:00 AM 12:00 AM

IM MV 0

Health Odle 0

Finances MV 2 12:00 AM 12:00 AM

19133 MV not started 0

Page 273: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19126 Air Products 2.4 12:00 PM 12:00 PM 2:24 PM 12:00 AM

19133 Epsilon 5 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19126 Air Products 3.5 12:00 PM 12:00 AM

PM MV 0

admin CTL plan in hea 0

Primerica MV know where 0

19065 Epsilon 2 12:00 AM 12:00 AM

College Odle 0

19065 Epsilon 5 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19065 Epsilon 2 12:00 AM 12:00 AM

19065 Epsilon 6 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19094 Atofina 1 12:00 AM 12:00 AM

19065S Epsilon 7 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19133 2 12:00 AM 12:00 AM

BBModel MV 0

BBModel MV 0

19133 Epsilon 1.5 12:00 AM 12:00 PM

19133 Epsilon 1.5 12:00 PM 12:00 AM

IM CTL 3 12:00 AM 12:00 AM

19126 Air Products 1 12:00 AM 12:00 AM

Overhead 0

na Epsilon 1 12:00 AM 12:00 AM

IM CTL 0

BBModel MV 1.5 12:00 PM 12:00 AM

0

Page 274: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BBModel MV 3 12:00 PM 12:00 PM

19144 US Filter 2 12:00 AM 12:00 AM

19146 York 1 12:00 AM 12:00 AM

BBModel MV 5.75 6:00 AM 12:00 AM 12:00 AM 12:00 AM

BBModel MV 1 12:00 AM 12:00 AM

update CTL 1 12:00 AM 12:00 AM

LT Agreement MV 8 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Equipment MV 0

Overhead CTL 2 12:00 AM 12:00 AM

IM CTL 2 12:00 AM 12:00 AM

Delaware MV 0

Health Odle 0

Jobs MV 0

Overhead Odle 0

Finances Odle 0

0

timesheet CTL 2.5 12:00 AM 12:00 PM

Epsilon 1 12:00 AM 12:00 AM

19144 US Filter 9.5 12:00 AM 12:00 AM 12:00 AM 12:00 PM

19144 US Filter 1.3 4:48 PM 12:00 AM

19144 US Filter 1.5 12:00 AM 12:00 PM

UCF America CTL 0.9 2:24 PM 12:00 PM

IM CTL 2 12:00 AM 12:00 AM

19155 chalmers 2 12:00 AM 12:00 AM

BBModel MV 0

Page 275: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19144 US Filter 7.5 12:00 AM 12:00 AM 12:00 AM 12:00 PM

19144 US Filter 2 12:00 AM 12:00 AM

19155 chalmers 4 12:00 AM 12:00 PM 12:00 PM 12:00 AM

xmas cards MV sent email 0

19144 US Filter 2 12:00 AM 12:00 AM

19144 US Filter 3 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19146 York/Pfister 1 12:00 AM 12:00 AM

19149 Krier 1 12:00 AM 12:00 AM

19146 York/Pfister 1 12:00 AM 12:00 AM

19144 CTL 3 12:00 AM 12:00 AM

19144 CTL 1 12:00 AM 12:00 AM

Process Consult MV 0.5 12:00 AM 12:00 PM

Overhead Cement Kiln 0.5 12:00 PM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

Process Consult MV 0

MacDermid Lamarsh & Sol 0.5 12:00 AM 12:00 PM

CTL 1 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19144 US Filter 3.5 12:00 AM 12:00 PM

19146 York/Pfister 1 12:00 PM 12:00 PM

19144 US Filter 1 12:00 PM 12:00 PM

Overhead CTL 1 12:00 PM 12:00 PM

19155 chalmers 1 12:00 PM 12:00 PM

Page 276: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19155 chalmers 1 12:00 AM 12:00 AM

IM CTL 1 12:00 PM 12:00 PM

Overhead CTL 0.5 12:00 AM 12:00 PM

19155 chalmers 1 12:00 PM 12:00 PM

Alchemix MV MAG has my 0

Banking MV wrote Jumb 0

Overhead CTL 0.5 2:24 PM 2:24 AM

BBModel MV 1 12:00 AM 12:00 AM

IM CTL 0

19138 CTL 1.8 2:24 AM 12:00 AM 2:24 AM 12:00 AM

cable tv Odle never turn 0

BBModel MV 0

19184 CTL 2 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19144 US Filter 9 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19146 York 9 12:00 AM 12:00 AM 12:00 AM 12:00 AM

mvodle MV not started 0

19155 9 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19168 2.5 12:00 AM 12:00 PM

College Odle 0

19149 Briar 7 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Salt Stailant 8/26/02 FU 0

Overhead 0

IM MV 0

Overhead 0

Overhead 0

Page 277: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

FeMn MV 0.8 9:36 AM 4:48 AM

19065S Epsilon 0

19171 Epsilon 1 12:00 AM 12:00 AM

19179 Albemarle 4.5 12:00 AM 12:00 PM

19155 chalmers 0

19144 US Filter 2 12:00 AM 12:00 AM

19168 QSL 1 12:00 AM 12:00 AM

19144 US Filter 2 12:00 AM 12:00 AM

19168 QSL 2 12:00 AM 12:00 AM

19171 Epsilon 2.5 12:00 AM 12:00 PM

19168 QSL 2 12:00 AM 12:00 AM

RAC Pharmacia 0.5 12:00 AM 12:00 PM

19168 QSL 2 12:00 AM 12:00 AM

19168 QSL 5 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Overhead FA 1 12:00 AM 12:00 AM

19144 US Filter 1 12:00 AM 12:00 AM

19149 Krier 1 12:00 AM 12:00 AM

19171 Epsilon 1.5 12:00 AM 12:00 PM

19168 QSL 1 12:00 AM 12:00 AM

19171 Epsilon 1 12:00 AM 12:00 AM

19187 York 0.5 12:00 PM 12:00 AM

Overhead Brandywine 0.5 12:00 PM 12:00 AM

19184 Chalmers & Kubeck 0.7 7:12 AM 12:00 AM

19189 QSL 0.1 12:00 AM 2:24 AM

RAC CTL 2.5 12:00 AM 12:00 PM

Page 278: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 3.1 12:00 PM 2:24 PM

China Scrap WestEast 1.3 12:00 AM 7:12 AM

19183 QSL 4.9 2:24 AM 12:00 AM

19189 QSL 0.5 12:00 AM 12:00 PM

19999 York 0.5 12:00 PM 12:00 AM

IM CTL 0

Finances Odle 0

IM CTL 0

19189 QSL 1.2 12:00 AM 4:48 AM

IM CTL 10 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19184 Chalmers & Kubeck 0.2 7:12 AM 12:00 PM

19189 QSL 0.5 12:00 PM 12:00 AM

19183 Chalmers & Kubeck 1.3 12:00 AM 12:00 PM

19189 QSL 0.3 12:00 PM 7:12 PM

19069 QSL 1.4 7:12 PM 4:48 AM

19171 Epsilon 1 4:48 AM 4:48 AM

19184 Chalmers & Kubeck 0.5 12:00 AM 12:00 PM

19183 QSL 3.8 4:48 AM 12:00 AM

IM CTL 1.5 12:00 AM 12:00 PM

19183 QSL 1 12:00 PM 12:00 PM

19189 QSL 1 12:00 PM 12:00 PM

19184 Chalmers & Kubeck 2 12:00 AM 12:00 AM

MV 0.7 12:00 PM 4:48 AM

19184 Chalmers & Kubeck 2 12:00 AM 12:00 AM

CTL Astro Power 1 12:00 AM 12:00 AM

Page 279: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 1.3 12:00 AM 7:12 AM

19183 QSL 3.5 12:00 AM 12:00 PM

19207 Excelon 7.5 12:00 AM 12:00 PM 12:00 PM 12:00 PM

19171 Epsilon 0.5 12:00 PM 12:00 AM

19069 QSL 0.3 7:12 PM 2:24 AM

plutonium Roy F Westin 1 12:00 AM 12:00 AM

non-billable CTL 1 12:00 PM 12:00 PM

Overhead MV 9 12:00 PM 12:00 PM 12:00 AM 12:00 AM

19171 Epsilon 0.6 4:48 AM 7:12 PM

19138 Hawaii 1.2 7:12 PM 12:00 AM

19138 Hawaii 0.8 2:24 PM 9:36 AM

19138 Hawaii 0.6 9:36 AM 12:00 AM

19171 Epsilon 0.3 12:00 AM 7:12 AM

19189 QSL 0.3 7:12 AM 2:24 PM

China Scrap WestEast 0.25 12:00 AM 6:00 AM

19184 Chalmers & Kubeck 3.7 7:12 AM 12:00 AM

19184 Chalmers & Kubeck 0.5 12:00 AM 12:00 PM

IM CTL 1.25 6:00 PM 12:00 AM

19189 QSL 1.5 12:00 AM 12:00 PM

19171 QSL 1.5 12:00 PM 12:00 AM

19184 Chalmers & Kubeck 2 12:00 AM 12:00 AM

19183 QSL 2 12:00 AM 12:00 AM

Overhead Astro Power 1 12:00 AM 12:00 AM

Overhead CTL 0.5 7:12 AM 7:12 PM

RFW3 Roy F Westin 1.2 7:12 PM 12:00 AM

Page 280: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19184 Chalmers & Kubeck 0.5 12:00 AM 12:00 PM

19189 QSL 1.5 12:00 PM 12:00 AM

19189 QSL 1 12:00 AM 12:00 AM

19183 QSL 1 12:00 AM 12:00 AM

19183 QSL 1 12:00 AM 12:00 AM

RAC Epsilon 0.5 12:00 AM 12:00 PM

19171 Epsilon 1 6:00 PM 6:00 PM

IM CTL 0.8 4:48 AM 12:00 AM

RAC Brandywine 0.5 12:00 AM 12:00 PM

19189 QSL 1 12:00 PM 12:00 PM

19171 Epsilon 0.5 12:00 PM 12:00 AM

19189 QSL 2.3 12:00 AM 12:00 AM 12:00 PM 7:12 PM

plutonium Roy F Westin 2 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

Overhead CTL 0.75 6:00 AM 12:00 AM

19171 Epsilon 0.6 12:00 AM 2:24 PM

19189 QSL 5.4 2:24 PM 12:00 AM 12:00 AM 12:00 AM 12:00 AM 12:00 AM

plutonium Roy F Westin 1 12:00 AM 12:00 AM

19171 Epsilon 1 12:00 AM 12:00 AM

Overhead CTL 0.4 4:48 AM 2:24 PM

Overhead Odle 0.9 2:24 PM 12:00 PM

19171 Epsilon 5 12:00 PM 12:00 PM 12:00 AM 12:00 AM 12:00 AM 12:00 AM

MV PD 0.5 12:00 PM 12:00 AM

19207 Excelon 1 12:00 AM 12:00 AM

19171 Epsilon 2.6 12:00 AM 2:24 PM

Page 281: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

CTL CTL 0.4 2:24 AM 12:00 PM

Overhead CTL 1.5 12:00 AM 12:00 PM

19189 QSL 1.5 12:00 AM 12:00 PM

19189 QSL 0.5 12:00 PM 12:00 AM

CTL CTL 0.8 4:48 AM 12:00 AM

19171 Epsilon 3 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19171 Epsilon 2.3 12:00 AM 7:12 AM

19207 Excelon 1.5 12:00 PM 12:00 AM

19063 QSL 2 12:00 AM 12:00 AM

19207 Excelon 6 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19237 York 0.5 12:00 AM 12:00 PM

19184 Chalmers & Kubeck 0.4 2:24 AM 12:00 PM

RFW3 MV 0.3 12:00 PM 7:12 PM

CTL CTL 0.3 2:24 AM 9:36 AM

19171 Epsilon 6.1 9:36 AM 12:00 AM 12:00 AM 12:00 PM

RAC CTL 0.5 12:00 PM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19207 Excelon 0.7 12:00 AM 4:48 PM

19207 Excelon 0.4 4:48 PM 2:24 AM

Overhead CTL 0.5 6:00 AM 6:00 PM

19171 Epsilon 7.4 2:24 PM 12:00 AM 12:00 AM 12:00 PM 12:00 AM 12:00 PM

Finances DE 1 12:00 AM 12:00 AM

Overhead Astro Power 0.5 12:00 PM 12:00 AM

19171 Epsilon 1 12:00 AM 12:00 AM

19187 York 1.5 12:00 AM 12:00 PM

Page 282: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19187 York 4.5 12:00 PM 12:00 AM

19187 York 0.5 12:00 AM 12:00 PM

Overhead CTL 0.6 12:00 AM 2:24 PM

19171 Epsilon 1 12:00 AM 12:00 AM

19138 CTL 0.35 6:00 PM 2:24 AM

19138 Hawaii 0.5 12:00 PM 12:00 AM

19171 Epsilon 1.5 12:00 AM 12:00 PM

19171 Epsilon 1 12:00 PM 12:00 PM

Overhead CTL 1.5 12:00 PM 12:00 AM

Overhead York 1.9 2:24 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

Overhead QSL 3.7 7:12 AM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19187 CTL 1 12:00 AM 12:00 AM

Overhead CTL 2.5 12:00 AM 12:00 AM 12:00 AM 12:00 AM 12:00 PM 12:00 AM

19189 QSL 1 12:00 AM 12:00 AM

19187 York 2.5 12:00 AM 12:00 PM

Overhead CTL 0.5 12:00 AM 12:00 PM

Overhead CTL 0.7 12:00 PM 4:48 AM

19187 CTL 1.7 7:12 AM 12:00 AM

19187 CTL 4.25 12:00 AM 12:00 AM 12:00 AM 6:00 AM

19188 CTL 1 12:00 AM 12:00 AM

19211 Hotel 0.75 12:00 AM 6:00 AM 12:00 AM 12:00 PM

Overhead CTL 0.75 6:00 AM 12:00 AM

19188 York 2.25 12:00 PM 12:00 PM 6:00 PM 12:00 AM

Page 283: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19187 York 3 12:00 AM 12:00 PM 12:00 AM 12:00 PM

19171 Epsilon 0.5 12:00 PM 12:00 AM

Overhead CTL 0.5 6:00 AM 6:00 PM

Overhead CTL 3.25 6:00 PM 12:00 AM

19188 York 2.25 6:00 PM 12:00 AM 12:00 PM 12:00 PM

19187 York 2 12:00 AM 12:00 AM

19211 York 0.5 12:00 AM 12:00 PM

Overhead York 2 12:00 PM 12:00 PM

Finances Odle 0

taxes MV 2 12:00 AM 12:00 AM

BU MV 0

Overhead CTL 0.3 12:00 AM 7:12 AM

19187 York 3.2 7:12 AM 12:00 AM 12:00 PM 12:00 AM

Overhead Astro Power 2 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19192 York 1.6 12:00 PM 12:00 AM 9:36 AM 12:00 PM

Overhead CTL 0.15 4:48 AM 8:24 AM

19187 York 6.65 12:00 PM 12:00 AM 12:00 AM 6:00 AM 12:00 PM 9:36 AM

Casto IM had breakf 0

Overhead CTL 1.2 7:12 AM 12:00 PM

19188 York 1 12:00 PM 12:00 PM

19187 York 1 12:00 PM 12:00 PM

Overhead CTL 0.3 2:24 AM 9:36 AM

19189 York 2.6 9:36 AM 12:00 AM

19189 York 4.75 12:00 AM 12:00 AM 12:00 AM 6:00 PM

19211 York 0.7 7:12 PM 12:00 PM

Page 284: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19211 York 2.75 6:00 AM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 0.25 6:00 PM 12:00 AM

19188 York 0.25 12:00 AM 6:00 AM

Overhead CTL 2.4 12:00 AM 9:36 AM

Overhead QSL 3 12:00 AM 12:00 AM

Overhead CTL 0.05 6:00 AM 7:12 AM

Overhead CTL 0.4 7:12 PM 4:48 AM

19211 York 3.8 4:48 AM 12:00 AM

Overhead CTL 0.3 12:00 AM 7:12 AM

19251 CTL 1.7 7:12 AM 12:00 AM

19189 York 1 7:12 AM 7:12 AM

19211 York 5.7 12:00 AM 2:24 PM 9:36 AM 12:00 AM 12:00 PM 12:00 AM

19251 Motiva 2.5 12:00 PM 12:00 AM 12:00 AM 12:00 AM

19171 Epsilon 0.5 12:00 AM 12:00 PM

19211 York 1 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

IM CTL 0

19251 York 2.5 12:00 AM 12:00 PM

Overhead CTL 0.6 12:00 AM 7:12 AM 12:00 PM 7:12 PM

19251 Motiva 1 7:12 AM 7:12 AM

19188 York 1.75 4:48 AM 6:00 PM 7:12 AM 12:00 PM

19069 QSL 0.25 6:00 PM 12:00 AM

19251 Motiva 0.5 7:12 AM 12:00 PM 12:00 AM 7:12 AM

19211 York 2.5 12:00 PM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 0.3 4:48 AM 12:00 PM

Page 285: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 2.5 12:00 AM 12:00 PM

Overhead MV 0

19266 Motiva 1 12:00 AM 12:00 AM

19251 Motiva 2 12:00 AM 12:00 AM

MgO Spokane MgO Spokanenot started 0

Overhead CTL 1 12:00 AM 12:00 AM

19266 CTL 2.1 12:00 PM 2:24 PM

Overhead CTL 0.4 2:24 PM 12:00 AM

19207 Exelon 0.5 12:00 AM 12:00 PM

IM CTL 1 12:00 AM 12:00 AM

19251 Motiva 2.4 2:24 PM 12:00 AM

19251 Motiva 1.9 4:48 PM 2:24 PM

Overhead York 0.2 12:00 AM 4:48 AM

Overhead CTL 0.4 4:48 AM 2:24 PM

Inventions MV notes in la 0

Overhead proanalyticsllc 1 12:00 AM 12:00 AM

19273 York-El Paso 1.5 12:00 AM 12:00 PM

Overhead CTL 0.5 12:00 PM 12:00 AM

Overhead CTL 0.5 12:00 AM 12:00 PM

19251 CTL 4.2 12:00 AM 12:00 PM 12:00 AM 4:48 PM

19266 Motiva 1 12:00 AM 12:00 AM

19266 Motiva 2.5 12:00 PM 12:00 AM

Overhead Atofina 0.4 12:00 AM 9:36 AM

Overhead CTL 0.5 12:00 AM 12:00 PM

19266 Motiva 2 12:00 PM 12:00 PM

Page 286: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19251 Motiva 1.7 12:00 PM 4:48 AM

Overhead CTL 1.8 4:48 AM 12:00 AM

19266 CTL 2.5 12:00 AM 12:00 PM

dream Odle 0

dream Odle 0

Overhead CTL 0.7 12:00 AM 4:48 PM

Overhead CTL 0.5 4:48 PM 4:48 AM

19272 Motiva 0.5 12:00 PM 12:00 AM

19266 Motiva 1 12:00 AM 12:00 AM

19237 York 4.8 4:48 AM 12:00 AM 12:00 AM 12:00 AM

19266 Motiva 2.5 12:00 AM 12:00 PM

Overhead CTL 1 12:00 PM 12:00 PM

Overhead CTL 0.5 12:00 AM 12:00 PM

Overhead Atofina 1 12:00 PM 12:00 PM

19266 Motiva 4.2 12:00 PM 4:48 AM 7:12 AM 7:12 AM 12:00 AM 12:00 PM

19192 York 1.7 7:12 AM 12:00 AM

Overhead CTL 0.5 12:00 PM 12:00 AM

dream Odle 0

dream Odle 0

dream Odle 0

19290 Epsilon 1 12:00 AM 12:00 AM

dream MV 0

Overhead CTL 0.5 12:00 AM 12:00 PM

19192 CTL 3 12:00 AM 12:00 AM

Overhead Atofina 0.5 12:00 PM 12:00 AM

Page 287: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19266 Motiva 4.5 12:00 AM 12:00 PM

19237 York 8.5 12:00 PM 12:00 PM 12:00 AM 12:00 PM

19237 York 3 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 1 12:00 PM 12:00 PM

19251 Motiva 2 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

Overhead CTL 0.5 2:24 AM 2:24 PM

Overhead CTL 3.4 2:24 PM 12:00 AM

19266 Motiva 0.5 12:00 AM 12:00 PM

19266 Motiva 0.5 12:00 PM 12:00 AM

IM CTL 1 12:00 AM 12:00 AM

RAC York 1 12:00 AM 12:00 AM

Incoporate MV 0.5 12:00 AM 12:00 PM

Cats Odle 1 12:00 AM 12:00 AM

Overhead CTL 0.1 9:36 AM 12:00 PM

19251 Motiva 1 12:00 AM 12:00 AM

Overhead CTL 1.5 12:00 PM 12:00 AM

19291 General Chemical 1.5 12:00 AM 12:00 PM

BBModel MV 0

19273 York-El Paso 1.5 12:00 AM 12:00 PM 12:00 PM 12:00 PM

19237 York-SmithKline 6.5 12:00 AM 12:00 AM 12:00 PM 12:00 AM 12:00 PM 12:00 PM

network CTL 0.5 12:00 AM 12:00 PM

19192 York 0.5 12:00 AM 12:00 PM

Overhead CTL 0

Overhead CTL 0.5 4:48 AM 4:48 PM

Page 288: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19281 Chalmers & Kubeck 1 12:00 AM 12:00 AM

19237 York-SmithKline 2 12:00 AM 12:00 AM

19192 York 2.5 12:00 AM 12:00 AM 12:00 AM 12:00 PM

RAC CTL 1 12:00 AM 12:00 AM

Overhead CTL 0.8 12:00 PM 7:12 AM

19192 York 4.8 4:48 AM 12:00 AM 12:00 AM 12:00 AM

19273 York-El Paso 1.2 12:00 AM 4:48 AM

Overhead CTL 0.5 12:00 PM 12:00 AM

19251 Motiva 0.75 12:00 AM 6:00 PM

19237 York 1 6:00 AM 6:00 AM

19212 York 0.5 6:00 PM 6:00 AM

19281 Chalmers & Kubeck 0.75 6:00 AM 12:00 AM

19192 York 3.5 12:00 AM 12:00 PM

19273 York-El Paso 0.5 12:00 PM 12:00 AM

19192 York-GlaxoSK 2 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19192 York 2 12:00 AM 12:00 AM

19273 York-El Paso 2 12:00 AM 12:00 AM

19284 York-Wolverine 1 12:00 AM 12:00 AM

19273 1 12:00 AM 12:00 AM

19290 Epsilon 2.5 12:00 AM 12:00 AM 12:00 PM 12:00 AM

Overhead CTL 3 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19212 York-Fatigue 2 12:00 AM 12:00 AM

1 12:00 AM 12:00 AM

19192 York-Saudi 1.5 12:00 AM 12:00 PM

Page 289: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Finances MV 1 12:00 AM 12:00 AM

19273 York-El Paso 0.5 12:00 PM 12:00 AM

19290 Epsilon 3.1 12:00 PM 2:24 PM

19291 General Chemical 1.5 12:00 PM 12:00 AM

19281 Chalmers & Kubeck 1 12:00 AM 12:00 AM

19273 York-El Paso 1.5 12:00 AM 12:00 PM

Finances MV 2 12:00 AM 12:00 AM

0

19290 Epsilon 2 12:00 AM 12:00 AM

19291 General Chemical 2 12:00 AM 12:00 AM 12:00 PM 12:00 PM

19290 Epsilon 2.5 12:00 AM 12:00 PM

Overhead CTL 2.5 12:00 PM 12:00 AM

19291 General Chemical 1.5 12:00 AM 12:00 PM

19273 York-El Paso 0.5 12:00 PM 12:00 AM

19273 York-El Paso 2 12:00 AM 12:00 AM

19273 York-El Paso 2 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19192 York-Saudi 1.5 12:00 AM 12:00 PM

Overhead Epsilon 1 12:00 AM 12:00 AM

Overhead CTL 0.5 12:00 PM 12:00 AM

19273 York-El Paso 3 12:00 PM 12:00 AM 12:00 PM 12:00 AM

19273 York-El Paso 5 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19192 York-Saudi 1 12:00 AM 12:00 AM

Finances Odle 0

Incoporate MV 0

Page 290: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19281 Chalmers & Kubeck 1 12:00 AM 12:00 AM

19273 York 6 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19192 CTL 1 12:00 AM 12:00 AM

19291 General Chemical 2 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19291 General Chemical 3 12:00 AM 12:00 AM

19273 York-El Paso 1 12:00 AM 12:00 AM

19291 General Chemical 2 12:00 AM 12:00 AM

19272 Motiva 4 12:00 AM 12:00 AM 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19273 York-El Paso 2 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19184 York-Gantley 2 12:00 PM 12:00 PM

19192 York-Saudi 3 12:00 PM 12:00 AM 12:00 AM 12:00 PM

19273 York-El Paso 1.5 12:00 PM 12:00 AM

DE Home Odle 0

DE Home Odle 0

Overhead CTL 1 12:00 AM 12:00 AM

Incoporate MV 0

19192 York 2 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19272 Motiva 1 12:00 AM 12:00 AM

DE Home Odle 0

19284 York-Gantley 1 12:00 AM 12:00 AM

19301 Motiva 0.5 12:00 PM 12:00 AM

19284 York-Gantley 1 12:00 AM 12:00 AM

Page 291: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19272 Motiva 1.5 12:00 AM 12:00 PM

Overhead CTL 0.6 12:00 PM 2:24 AM

Overhead CTL 1.5 12:00 AM 12:00 PM

Overhead CTL 2.25 6:00 PM 12:00 AM

19273 York-El Paso 2.5 12:00 AM 12:00 AM 12:00 PM 12:00 AM

Jobs MDI need flows 0

19284 York-Gantley 1 12:00 PM 12:00 PM

19192 York-Saudi 2 12:00 AM 12:00 AM

19273 York 4.5 12:00 AM 12:00 PM 12:00 AM 12:00 AM

19272 Motiva 2.4 12:00 AM 9:36 AM

19273 York-El Paso 3 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19284 York-Gantley 1 12:00 AM 12:00 AM

19301 Motiva 1 12:00 PM 12:00 PM

dream Odle 0

BBModel MV 0

Overhead CTL 0

19192 York-Saudi 0.5 12:00 PM 12:00 AM

19273 York-El Paso 0.5 12:00 AM 12:00 PM

19272 Motiva 0.5 12:00 PM 12:00 AM

19192 York-Saudi 2 12:00 PM 12:00 PM

Overhead CTL 2 12:00 PM 12:00 PM

19272 MV 1 12:00 AM 12:00 AM

19272 Motiva 5 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

Page 292: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19272 Motiva 3 12:00 PM 12:00 AM 12:00 PM 12:00 AM

Overhead 0.5 12:00 AM 12:00 PM

Stray Currents CTL 1 12:00 AM 12:00 AM

19272 Motiva 2 12:00 AM 12:00 AM

Overhead CTL 1 12:00 PM 12:00 PM

19281 Chalmers & Kubeck 3 12:00 AM 12:00 AM 12:00 PM 12:00 PM

19281 Chalmers & Kubeck 1 12:00 PM 12:00 PM

Overhead MV 0.5 12:00 AM 12:00 PM

IM MV not started 0

dream Odle 0

19310 QSL 1 12:00 PM 12:00 PM

Overhead CTL 0.5 12:00 AM 12:00 PM

Overhead Walden Engineering 1 12:00 PM 12:00 PM

19284 York 3 12:00 AM 12:00 AM

19301 Motiva 1.2 12:00 AM 4:48 AM

19281 Chalmers & Kubeck 6 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19310 QSL 0.5 12:00 AM 12:00 PM

Overhead CTL 0.5 12:00 PM 12:00 AM

19281 Chalmers & Kubeck 2 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

Overhead Walden Engineering 0.7 12:00 AM 4:48 PM

19310 QSL 0.4 4:48 PM 2:24 AM

19301 Motiva 0.9 2:24 AM 12:00 AM

taxes CTL 0

Page 293: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Finances Odle not started 0

strategy MV 0

dream MV 0

19321 Epsilon 0.5 12:00 PM 12:00 AM

RAC Unknown 1.5 12:00 AM 12:00 PM

Overhead CTL 2 12:00 AM 12:00 AM

Medical Odle 0

19321 Epsilon 1 12:00 AM 12:00 AM

19284 York 4.4 12:00 AM 12:00 AM 12:00 PM 12:00 AM 2:24 PM 12:00 PM

19301 Motiva 1.5 12:00 AM 12:00 PM

19284 York-Gantley 1 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19284 York-Gantley 4.5 12:00 AM 12:00 PM

19301 Motiva 3.5 12:00 PM 12:00 AM

19301 Motiva 1 12:00 PM 12:00 PM

19301 Motiva 5 12:00 PM 12:00 PM 12:00 PM 12:00 PM

19192 York-Saudi 0.5 12:00 PM 12:00 AM

19301 Motiva 0.5 12:00 AM 12:00 PM

Overhead CTL 0.5 12:00 PM 12:00 AM

19301 Motiva 1 12:00 PM 12:00 PM

Overhead CTL 0.5 12:00 AM 12:00 PM

19281 Chalmers & Kubeck 1 12:00 PM 12:00 PM

Overhead York 5.5 12:00 PM 12:00 AM 12:00 PM 12:00 PM

Overhead Mckinsey 0.5 12:00 PM 12:00 AM

Overhead Mckinsey 0.5 12:00 AM 12:00 PM

Page 294: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19301 Motiva 3 12:00 AM 12:00 AM

Overhead CTL 0.5 12:00 PM 12:00 AM

Overhead CTL 0.5 12:00 AM 12:00 PM

19310 QSL-Guardian 2 12:00 PM 12:00 PM

19330 Motiva 1.5 12:00 PM 12:00 AM

19192 York 0.5 12:00 AM 12:00 PM

Overhead CTL 0.5 12:00 PM 12:00 AM

Overhead CTL 0.5 12:00 AM 12:00 PM

19310 CTL 3 12:00 PM 7:12 AM 7:12 AM 12:00 PM

Overhead York 0.5 12:00 PM 12:00 AM

19321 Epsilon 1 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

Overhead CTL 0.5 12:00 AM 12:00 PM

19321 Epsilon 3 12:00 PM 12:00 PM 12:00 PM 12:00 PM

19291 General Chemical 0.5 12:00 PM 12:00 AM

19330 Motiva 2.4 12:00 PM 12:00 AM 12:00 AM 9:36 PM

Overhead CTL 1 12:00 AM 12:00 AM

Overhead CTL 0.6 9:36 PM 12:00 PM

Overhead CTL 0.5 12:00 AM 12:00 PM

19321 Epsilon 3 12:00 AM 12:00 AM

Overhead CTL 0.5 12:00 PM 12:00 AM

19330 Motiva 2 12:00 AM 12:00 AM

19321 Epsilon 2 12:00 AM 12:00 AM

19321 Epsilon 2 12:00 AM 12:00 AM

19339 Carrier 0.5 12:00 PM 12:00 AM

Page 295: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead General Chemical 0.5 12:00 AM 12:00 PM

19321 Epsilon 4 12:00 PM 12:00 PM

Overhead CTL 0.5 12:00 AM 12:00 PM

Overhead CTL 0.5 12:00 PM 12:00 AM

19321 Epsilon 1 12:00 AM 12:00 AM

Overhead CTL 3 12:00 AM 12:00 AM

19330 Motiva 1.5 12:00 AM 12:00 PM 12:00 AM 12:00 AM

Overhead York 0

Finances MV 0

USC Odle 0

Overhead York 1 12:00 AM 12:00 AM

19321 Epsilon 1 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19273 CTL 0.5 12:00 AM 12:00 PM

Overhead QSL 0.5 12:00 PM 12:00 AM

19339 CTL 0.5 12:00 AM 12:00 PM

19330 Motiva 2 12:00 PM 12:00 AM 12:00 PM 12:00 AM

19330 Motiva 3 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19330 Motiva 1 12:00 AM 12:00 AM

19339 Carrier 1 12:00 AM 12:00 AM

Overhead CTL 3 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Overhead General Chemical 2.5 12:00 PM 12:00 AM

19339 Carrier 1 12:00 AM 12:00 AM

Overhead CTL 2.7 12:00 AM 12:00 PM 12:00 AM 4:48 AM

Page 296: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 1.5 12:00 AM 12:00 PM 12:00 PM 12:00 PM

19301 Motiva 0.5 12:00 PM 12:00 AM

19284 York 0.5 12:00 AM 12:00 PM

19310 QSL-Guardian Glass 0.5 12:00 PM 12:00 AM

19330 Motiva 1.5 12:00 PM 12:00 AM

19339 Carrier 1 12:00 PM 12:00 PM

19339 Motiva 5.5 12:00 AM 12:00 AM 12:00 AM 12:00 PM

Overhead CTL 1 12:00 AM 12:00 PM 12:00 PM 12:00 AM

19339 Carrier 1 12:00 PM 12:00 PM

Overhead CTL 2 12:00 AM 12:00 AM

safety CTL 1.25 12:00 AM 6:00 AM

19330 Motiva 2 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 PM 12:00 AM 12:00 PM

19343 Motiva 1.5 12:00 PM 12:00 AM

19343 Motiva 1.5 12:00 AM 12:00 PM

19330 Motiva 0.5 12:00 PM 12:00 AM

19339 Carrier 1 12:00 AM 12:00 AM

Overhead CTL 1 12:00 PM 12:00 PM

19339 Motiva 0.5 12:00 PM 12:00 AM

Overhead QSL 0.5 12:00 AM 12:00 PM

Moving MV 0

Overhead Odle 0

taxes MV 0

19339 Carrier 0.5 12:00 PM 12:00 AM

Overhead CTL 0.5 12:00 AM 12:00 PM

Page 297: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19343 Motiva 1.5 12:00 PM 12:00 AM

19330 Motiva 4 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19339 Carrier 1 12:00 AM 12:00 AM

gifts Odle 0

IM CTL 0.5 12:00 AM 12:00 PM

19353 York 0.25 12:00 PM 6:00 PM

19339 Carrier 0.25 6:00 PM 12:00 AM

19339 Carrier 0.2 2:24 AM 7:12 AM

19353 York 0.7 7:12 AM 12:00 AM

19343 Motiva 4 12:00 AM 2:24 AM 2:24 PM 12:00 PM

19343 Motiva 2 12:00 AM 12:00 AM 12:00 PM 12:00 PM

19343 Motiva 0.5 12:00 AM 12:00 PM

Overhead General Chemical 3.5 12:00 PM 12:00 PM 12:00 PM 12:00 AM

19339 Carrier 1 12:00 PM 12:00 PM

19330 Motiva 0.5 12:00 AM 12:00 PM

19321 Epsilon 1.2 12:00 AM 4:48 AM

safety CTL 2 12:00 AM 12:00 AM

19357 Motiva 2 12:00 AM 12:00 AM

19353 York 1 12:00 AM 12:00 AM

19353 York 1 7:12 AM 7:12 AM

DE Home Odle 0

Moving Odle 1.7 7:12 AM 12:00 AM

19364 York 2 12:00 AM 12:00 AM

RAC CTL 1 12:00 AM 12:00 AM

WH Taxes IRS & DE 2 12:00 AM 12:00 AM

Page 298: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 1 12:00 AM 12:00 AM

19343 Motiva 2 12:00 AM 12:00 AM

Overhead CTL 1 4:48 AM 4:48 AM

Overhead York 0.3 4:48 AM 12:00 PM

19343 York 1 12:00 AM 12:00 AM

19343 Motiva 1 12:00 PM 12:00 PM

19353 York 0.5 12:00 PM 12:00 AM

Overhead CTL 1.5 12:00 AM 12:00 AM 12:00 PM 12:00 AM

Overhead York 1.5 12:00 AM 12:00 PM

19358 York 3 12:00 PM 12:00 PM

19358 York 8.5 12:00 AM 12:00 AM 12:00 AM 12:00 AM 12:00 AM 12:00 PM

Overhead York 1 12:00 AM 12:00 AM

19358 York 0.4 12:00 PM 9:36 PM

Overhead 0.5 6:00 AM 6:00 PM

Overhead Elloit 0.45 6:00 PM 4:48 AM

Overhead Motiva 0.8 4:48 AM 12:00 AM

19357 Motiva 2 12:00 AM 12:00 AM

Overhead Brandywine 1 12:00 AM 12:00 AM

19363 York 1 12:00 AM 12:00 AM

19357 Motiva 1 12:00 AM 12:00 AM

19358 York-NYC 7 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19358 York-NYC 3 7:12 AM 7:12 AM 12:00 AM 12:00 AM

Overhead PG&E 1 7:12 AM 7:12 AM

Overhead CTL 1 12:00 AM 12:00 AM

Overhead Halliburton 0.6 7:12 AM 9:36 PM

Page 299: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19343 Motiva 1 12:00 AM 12:00 AM

19353 York 3 12:00 AM 12:00 AM

19353 York 5 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19353 York 0.5 12:00 AM 12:00 PM

19358 York-NYC 2 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19343 Motiva 5 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19373 PG&E 1.3 12:00 AM 7:12 AM

Overhead CTL 0.5 12:00 AM 12:00 PM

19343 Motiva 3.4 9:36 PM 12:00 AM 4:48 PM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19383 Motiva 0.5 12:00 PM 12:00 AM

Overhead CTL 0.5 12:00 AM 12:00 PM

19357 Motiva 1.5 12:00 PM 12:00 AM

19363 York 4 12:00 AM 12:00 AM

Overhead York 1 12:00 AM 12:00 AM

Overhead Atofina 0.5 12:00 AM 12:00 PM

Overhead CTL 0.5 12:00 PM 12:00 AM

Info ManagemenMV 0

19358 York 0.3 4:48 PM 12:00 AM

Overhead CTL 1 4:48 AM 4:48 AM

Overhead CTL 0.4 4:48 AM 2:24 PM

19353 York 0.9 2:24 PM 4:48 AM 4:48 AM 12:00 PM

19343 Motiva 1 4:48 AM 4:48 PM 12:00 PM 12:00 AM

19357 Motiva 0.6 4:48 PM 7:12 AM

19363 York 0.9 7:12 AM 4:48 AM

Page 300: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19358 York 1.2 12:00 AM 4:48 AM

19357 Motiva 0.5 12:00 AM 12:00 PM

19363 York 3 12:00 PM 12:00 PM 12:00 AM 12:00 AM

Overhead CTL 0.5 12:00 PM 12:00 AM

19363 York 4 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 2 12:00 AM 12:00 AM

19363 CTL 1.5 12:00 AM 12:00 AM 12:00 AM 12:00 PM

19363 CTL 4 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19363 York 6 12:00 AM 12:00 AM 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19357 Motiva 1 12:00 AM 12:00 AM

Overhead York 1.95 12:00 AM 12:00 AM 6:00 PM 4:48 PM

19363 York 2 12:00 AM 12:00 AM

19364 York 2 12:00 AM 12:00 AM

19364 York 1 12:00 AM 12:00 AM

19364 York 0.75 12:00 AM 6:00 PM

Overhead York 0

Overhead Epsilon 0

Overhead CTL 0

19364 York 1 12:00 AM 12:00 AM

19357 Motiva 2.5 12:00 AM 12:00 PM

Overhead Atofina 2 12:00 AM 12:00 AM

19387 York 2 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19389 Peter's Law Firm 1 12:00 AM 12:00 AM

Finances Odle 1 12:00 AM 12:00 AM

Page 301: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19364 York 2 12:00 AM 12:00 AM

RAC Taylor Forge 0.5 12:00 AM 12:00 PM

Overhead York 0.5 12:00 PM 12:00 AM

Overhead Epsilon 0.300000191 12:00 AM 7:12 AM

19364 York 2 12:00 AM 12:00 AM 12:00 AM 12:00 AM

Overhead York 0.699999809 7:12 AM 12:00 AM

19364 York 1 12:00 AM 12:00 AM

19387 York 1 12:00 AM 12:00 AM

19364 York 5 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19387 York 2 12:00 AM 12:00 AM

19387 York-Merc 1.5 12:00 AM 12:00 PM

WH Taxes IRS & DE 0

Insuance Golden Rule 0.5 12:00 PM 12:00 AM

Overhead CTL 0.199999809 2:24 AM 7:12 AM

19387 York 3.5 12:00 AM 12:00 PM

19389 Peter's Law Firm 1.5 12:00 PM 12:00 AM

19357 Motiva 2.5 12:00 AM 12:00 PM

Overhead CTL 1 12:00 AM 12:00 AM

19357 Motiva 3 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19353 York 0.300000191 12:00 AM 7:12 AM

19387 York 5 12:00 PM 12:00 AM 12:00 AM 12:00 PM

19401 Chalmers & Kubeck 0.699999809 7:12 AM 12:00 AM

RAC Taylor Forge 0.300000191 12:00 AM 7:12 AM

19373 PG&E 0.699999809 7:12 AM 12:00 PM 12:00 PM 12:00 AM

19373 PG&E 1 12:00 AM 12:00 AM

Page 302: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19387 York 6 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19339 Carrier 1 12:00 AM 12:00 AM

19387 CTL 2.399999619 2:24 PM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 0.300000191 12:00 AM 7:12 AM

Overhead CTL 0.699999809 7:12 AM 12:00 AM

19364 York-Merc 1.5 12:00 AM 12:00 PM

19357 Motiva 2.5 12:00 PM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 3 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19383 Motiva 1 12:00 AM 12:00 AM

Overhead CTL 3 12:00 AM 12:00 AM

19364 York-Merc 0.300000191 12:00 AM 7:12 AM

19357 Motiva 1.699999809 7:12 AM 12:00 AM 12:00 AM 12:00 AM

19387 York 1 12:00 AM 12:00 AM

19387 York 1 12:00 AM 12:00 AM

Overhead CTL 0.300000191 12:00 AM 7:12 AM

19387 York 0.300000191 7:12 AM 2:24 PM

19383 Motiva 1.199999809 2:24 PM 7:12 PM

19387 York 5.199999809 7:12 PM 12:00 AM 12:00 AM 12:00 AM

Overhead CTL 1 12:00 AM 12:00 AM

19398 York-El Paso 1 12:00 AM 12:00 AM

Overhead CTL 0.600000381 12:00 AM 2:24 PM

Overhead CTL 0.899999619 2:24 PM 12:00 PM

19398 York-El Paso 0.5 12:00 PM 12:00 AM

Overhead CTL 0.600000381 12:00 AM 2:24 PM

Page 303: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19391 Atofina-Crosby 0.899999619 2:24 PM 12:00 PM

19383 Motiva 1.5 12:00 PM 12:00 AM

19387 York-IBM 2 12:00 AM 12:00 PM 12:00 AM 12:00 PM

19357 Motiva 1.5 12:00 PM 12:00 AM 12:00 AM 12:00 AM

19401 Chalmers & Kubeck 0

19388 Atofina-Crosby 1.100000381 9:36 PM 12:00 AM

Overhead CTL 0.300000191 12:00 AM 7:12 AM

Overhead CTL 0.599999428 7:12 AM 9:36 PM

19398 York-El Paso 3 12:00 AM 12:00 AM

19398 York-El Paso 1.5 12:00 AM 12:00 PM

Overhead CTL 0.5 12:00 AM 12:00 PM

19398 York 0.5 12:00 PM 12:00 AM

Rouging & Coati unknown 1 12:00 PM 12:00 PM

19383 Motiva 1.5 12:00 PM 12:00 AM

Overhead CTL 0.5 12:00 AM 12:00 PM

Overhead CTL 1.5 12:00 PM 12:00 PM 12:00 AM 12:00 PM

19364 York-Merc 0.5 12:00 PM 12:00 AM

19383 Motiva 3 12:00 PM 12:00 AM 12:00 PM 12:00 AM

19383 Motiva 2 12:00 PM 12:00 PM

Overhead CTL 1 12:00 AM 12:00 AM

19383 Motiva 4.433334351 11:20 AM 12:06 PM 12:50 PM 2:00 PM 3:00 PM 5:30 PM

19398 York 1 9:00 AM 10:00 AM

19383 Motiva 2 11:00 AM 12:00 PM 1:30 PM 2:30 PM

19387 York-IBM 0.25 3:30 PM 3:45 PM

Overhead CTL 0.416666985 8:30 AM 8:55 AM

Page 304: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19387 York-IBM 0.333333015 11:00 AM 11:20 AM

Overhead CTL 0.5 8:00 AM 8:30 AM

19398 York-El Paso 5.116666794 8:30 AM 9:00 AM 11:20 AM 12:07 PM 1:10 PM 5:00 PM

20001 York-Ottawa 0.25 10:45 AM 11:00 AM

Overhead CTL 0.5 10:00 AM 10:30 AM

19398 York-El Paso 4.166666031 1:30 PM 5:40 PM

19383 Motiva 1.75 10:30 AM 12:15 PM

Overhead CTL 1 8:00 AM 9:00 AM

Overhead CTL 1 8:00 AM 9:00 AM

19373 PG&E 1.5 9:00 AM 10:30 AM

IM York 1 11:00 AM 12:00 PM

19391 Atofina-Crosby 0.666666985 1:20 PM 2:00 PM

19373 PG&E 1.666666031 4:00 PM 5:40 PM

19373 PG&E 3 10:30 AM 11:30 AM 1:30 PM 3:30 PM

19373 PG&E 2 8:30 AM 10:30 AM

Overhead CTL 0.333333015 9:00 AM 9:20 AM

19373 PG&E 1.916666985 9:20 AM 11:15 AM

19391 Atofina-Crosby 1 3:00 PM 4:00 PM

19373 PG&E 1 11:30 AM 12:00 PM 1:00 PM 1:30 PM

Overhead York-Corporate 1 1:30 PM 2:30 PM

19391 Atofina 1 4:00 PM 5:00 PM

Overhead CTL 0.5 9:00 AM 9:30 AM

Overhead CTL 0.600000381 12:00 AM 7:12 AM 4:48 PM 12:00 AM

19387 York-IBM 2 12:00 AM 12:00 AM

Overhead CTL 0.5 9:15 AM 9:45 AM

Page 305: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19398 York 1.5 12:00 AM 12:00 PM

Task Master MV 14 12:00 AM 12:00 AM 12:00 AM 12:00 AM

19398 York-El Paso 0.5 2:00 PM 2:30 PM

19339 Carrier 1.5 2:30 PM 4:00 PM

19388 Atofina-Crosby 1 4:30 PM 5:30 PM

20001 York-Ottawa 0.5 4:00 PM 4:30 PM

taxes IRS 0

Overhead CTL 0.583333015 8:30 AM 9:05 AM

20001 York-Ottawa 1.5 2:00 PM 3:30 PM

19391 Atofina-Birdsboro 2.916666985 9:05 AM 12:00 PM

Overhead EE Linden 1 1:15 PM 2:15 PM

19391 Atofina-Birdsboro 1.75 3:30 PM 5:15 PM

Task Master MV 0.333333969 5:30 PM 5:50 PM

19401 Chalmers & Kubeck 4.25 9:00 AM 12:15 PM 2:15 PM 3:15 PM

19401 Chalmers & Kubeck 1 1:00 PM 2:00 PM

19373 PG&E 1.25 3:15 PM 4:30 PM

20001 York-Ottawa 1 4:30 PM 5:30 PM

19401 Atofina-Birdsboro 2.166666985 8:20 AM 10:30 AM

19373 PG&E 0.75 10:30 AM 11:15 AM

19391 Atofina-Birdsboro 1.75 11:15 AM 12:00 PM 1:00 PM 2:00 PM

19383 Motiva 3 12:00 AM 12:00 AM 12:00 PM 12:00 PM

Overhead CTL 0.5 12:00 AM 12:00 PM

19387 York-IBM 1.5 12:00 AM 12:00 PM

19401 Chalmers & Kubeck 1.5 2:30 PM 4:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

Page 306: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19401 Chalmers & Kubeck 2.25 10:00 AM 11:00 AM 4:00 PM 5:15 PM

20001 York-Ottawa 2.5 11:00 AM 12:30 PM 1:30 PM 2:30 PM

19339 Carrier 1.5 8:30 AM 10:00 AM

Overhead CTL 1.333333015 8:00 AM 9:20 AM

Overhead CTL 3 9:20 AM 11:20 AM 2:00 PM 3:00 PM

19398 York- El Paso 0.75 3:45 PM 4:30 PM

19387 York- IBM 3 10:00 AM 11:00 AM 2:30 PM 3:30 PM 4:30 PM 5:30 PM

19401 Chalmers & Kubeck 1.166666031 4:00 PM 5:10 PM

19401 Chalmers & Kubeck 1 10:00 AM 11:00 AM

20001 0.5 11:00 AM 11:30 AM

19401 Chalmers & Kubeck 3.5 11:30 AM 12:30 PM 1:30 PM 4:00 PM

Overhead CTL 0.25 8:00 AM 8:15 AM

Overhead CTL 1 9:00 AM 10:00 AM

Income Taxes IRS 0

Overhead CTL 0.416666031 12:40 PM 1:05 PM

19389 Peter's Law Firm 0.5 3:00 PM 3:30 PM

Overhead CTL 0.5 3:30 PM 4:00 PM

Overhead CTL 0.75 11:15 AM 12:00 PM

19401 Chalmers & Kubeck 3 8:15 AM 11:15 AM

19339 Carrier 1.916666985 1:05 PM 3:00 PM

19373 PG&E 1 2:00 PM 3:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

19401 Chalmers & Kubeck 0.5 10:30 AM 11:00 AM

19389 Peter's Law Firm 1.5 4:00 PM 5:30 PM

Overhead CTL 2.5 11:00 AM 12:30 PM 1:30 PM 2:30 PM

Page 307: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20001 York-Ottawa 3.5 8:30 AM 10:30 AM 2:30 PM 4:00 PM

Finances MV 0

Overhead CTL 0.5 8:00 AM 8:30 AM

19391 Atofina-Crosby 1.5 11:30 AM 12:30 PM 3:30 PM 4:00 PM

RAC York-Boston 0.5 11:15 AM 11:45 AM

20001 York-Ottawa 6.333333015 10:30 AM 12:15 PM 1:25 PM 5:00 PM 8:00 PM 9:00 PM

19339 Carrier 0.5 8:40 AM 9:10 AM

Overhead EE Linden 0.833333015 9:10 AM 10:00 AM

19389 Peter's Law Firm 0.5 10:00 AM 10:30 AM

Overhead CTL 0.666666985 8:00 AM 8:40 AM

19373 PG&E 3.583333969 11:45 AM 12:30 PM 1:30 PM 3:00 PM 4:00 PM 5:20 PM

19373 PG&E 1.5 2:30 PM 4:00 PM

19284 QSL-Glass 0

19390 Trillium 1.25 11:00 AM 12:15 PM

20001 York-Ottawa 6.25 9:00 AM 11:00 AM 12:45 PM 3:00 PM 4:30 PM 6:30 PM

IM QSL- Glass 1 3:30 PM 4:30 PM

19388 Atofina-Crosby 1 2:00 PM 3:00 PM

Overhead Brandywine 0.5 9:30 AM 10:00 AM

19339 Carrier 2.416666031 3:00 PM 5:25 PM

20020 Atofina-Texas 1.5 10:30 AM 12:00 PM

Chemtech MV 0

19390 Trillium 0.25 9:00 AM 9:15 AM

WH Taxes IRS & DE 0

19339 Carrier 0.75 2:15 PM 3:00 PM

19388 Atofina 1 9:45 AM 10:30 AM 2:00 PM 2:15 PM

Page 308: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19383 Motiva 0.5 12:00 PM 12:00 AM

19401 Chalmers & Kubeck 1 12:00 PM 12:00 PM

19391 Atofina 1.5 10:30 AM 12:00 PM

19339 Carrier 2.166666985 8:20 AM 10:30 AM

Overhead CTL 0.333333015 8:00 AM 8:20 AM

IM CTL 0.333333969 5:10 PM 5:30 PM

19339 Carrier 4.166666031 1:00 PM 5:10 PM

Overhead CTL 1 8:00 AM 9:00 AM

19391 Atofina 1 4:00 PM 5:00 PM

19391 Atofina 2.25 1:15 PM 3:30 PM

19389 Peter's Law Firm 0.5 3:30 PM 4:00 PM

Overhead CTL 0.333333015 8:00 AM 8:20 AM

19398 York-El Paso 2.5 12:00 PM 12:00 AM 12:00 AM 12:00 AM

19389 Peter's Law Firm 3.5 2:00 PM 5:30 PM

19389 Peter's Law Firm 0.5 1:30 PM 2:00 PM

Overhead CTL 0.666666985 10:30 AM 11:10 AM

19388 Atofina-Crosby 0.583333015 11:10 AM 11:45 AM

Overhead CTL 0.25 8:30 AM 8:45 AM

IM CTL 0.75 12:45 PM 1:30 PM

19388 Atofina-Crosby 1.75 8:45 AM 10:30 AM

19388 Atofina-Crosby 5 9:00 AM 12:00 PM 1:00 PM 3:00 PM

Overhead CTL 0.75 8:15 AM 9:00 AM

19398 York-El Paso 1.75 9:00 AM 10:45 AM

20033 PG&E 1 8:00 AM 9:00 AM

19339 Carrier 1 9:00 PM 10:00 PM

Page 309: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19389 Peter's Law Firm 3 1:00 PM 4:00 PM

19389 Peter's Law Firm 0.333333969 5:10 PM 5:30 PM

Overhead Firmenich 0.5 11:30 AM 12:00 PM

20006 York-Fort Worth 1.5 3:30 PM 5:00 PM

IM CTL 0.25 5:00 PM 5:15 PM

19339 Carrier 0.5 8:00 AM 8:30 AM

19388 Atofina-Crosby 3 8:30 AM 11:30 AM

19339 Carrier 1 1:00 PM 2:00 PM

Overhead CTL 0.5 3:00 PM 3:30 PM

19339 Carrier-MS 1.25 4:00 PM 5:15 PM

IM CTL 1.75 10:30 AM 12:15 PM

19388 Atofina-Crosby 4.5 10:30 AM 12:15 PM 12:15 PM 3:00 PM

20033 PG&E 3.833333492 7:40 AM 11:30 AM

20006 York-Fort Worth 0.5 1:30 PM 2:00 PM

Overhead CTL 1.5 11:30 AM 12:15 PM 1:15 PM 2:00 PM

19388 Atofina 3.25 1:30 PM 4:00 PM 4:30 PM 5:15 PM

20006 York-Fort Worth 0.75 4:00 PM 4:30 PM 5:15 PM 5:30 PM

20006 York-El Paso 0.75 12:45 PM 1:30 PM

Overhead CTL 2 8:00 AM 10:00 AM

Overhead Sunoco 0.25 10:15 AM 10:30 AM

20044 ZYGO 1.666666031 4:00 PM 5:40 PM

20006 York-Fort Worth 1 3:00 PM 4:00 PM

IM CTL 1.75 8:00 AM 9:45 AM

19388 Atofina-Crosby 0.75 9:45 AM 10:30 AM

19398 York-El Paso 1.5 10:00 AM 11:30 AM

Page 310: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19388 Atofina-Crosby 0.25 11:15 AM 11:30 AM

20044 ZYGO 1 9:00 AM 10:00 AM

IM CTL 0.5 10:00 AM 10:30 AM

IM CTL 0.5 10:30 AM 11:00 AM

IM CTL 0.5 3:00 PM 3:30 PM

IM CTL 1 8:00 AM 9:00 AM

20027 Epsilon 1 9:00 AM 10:00 AM

20006 CTL 3.333333969 1:00 PM 2:00 PM 3:00 PM 5:20 PM

Overhead York 1 2:30 PM 3:30 PM

19387 York-IBM 2.5 12:00 AM 12:00 PM

19388 Atofina-Crosby 1.666666985 10:15 AM 11:00 AM 11:20 AM 12:15 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

Overhead CTL 1.5 3:00 PM 4:30 PM

Overhead York 0.333333969 9:05 AM 9:25 AM

Overhead CTL 0.25 9:25 AM 9:40 AM

Overhead Atofina 0.25 10:00 AM 10:15 AM

20044 ZYGO 0.333333015 11:00 AM 11:20 AM

Overhead CTL 0.916666031 8:30 AM 9:05 AM 9:40 AM 10:00 AM

Timesheet MV 2 5:30 AM 7:00 AM 8:00 AM 8:30 AM

IM CTL 0.5 1:15 PM 1:45 PM

20006 York-Fort Worth 1.5 2:00 PM 3:00 PM 4:30 PM 5:00 PM

Overhead Atofina- Crosby 0.75 5:00 PM 5:45 PM

IM CTL 0.75 8:30 AM 9:15 AM

20027 Epsilon 0.5 12:45 PM 1:15 PM

IM CTL 2.25 3:00 PM 4:15 PM 4:30 PM 5:30 PM

Page 311: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

IM CTL 0.5 11:00 AM 11:30 AM

Overhead Firmenich 0.5 11:30 AM 12:00 PM

20033 PG&E 1 4:00 PM 5:00 PM

Overhead CTL 3.5 8:30 AM 10:30 AM 12:00 PM 12:15 PM 1:15 PM 2:30 PM

20044 ZYGO 1 10:45 AM 11:45 AM

20045 York-Dow 0.25 11:45 AM 12:00 PM

20045 York-Dow 0.25 2:30 PM 2:45 PM

20045 York-Dow 0.75 2:45 PM 3:30 PM

Overhead CTL 1.25 8:00 AM 9:15 AM

20033 PG&E 3 9:15 AM 10:45 AM 1:00 PM 2:30 PM

Overhead CTL 0.5 4:00 PM 4:30 PM

Overhead PG&E 2.5 9:00 AM 11:00 AM 4:30 PM 5:00 PM

19388 Atofina-Crosby 1 11:00 AM 12:00 PM

Overhead CTL 0.833333015 10:30 AM 11:00 AM 1:00 PM 1:20 PM

Overhead MV 0

20027 Epsilon 1.333333969 3:00 PM 4:00 PM 4:10 PM 4:30 PM

Overhead Epsilon 1.5 3:30 PM 5:00 PM

IM CTL 1.166666985 9:15 AM 9:40 AM 1:30 PM 2:15 PM

Overhead CTL 0.25 12:00 PM 12:15 PM

20027 Epsilon 2.833333015 9:40 AM 12:00 PM 2:30 PM 3:00 PM

20027 Epsilon 1 4:00 PM 4:10 PM 4:30 PM 5:20 PM

Overhead Epsilon 1.25 10:15 AM 10:30 AM 11:00 AM 12:00 PM

20044 ZYGO 0.25 10:30 AM 10:45 AM

IM CTL 0.75 8:30 AM 9:15 AM

Overhead CTL 0.25 10:45 AM 11:00 AM

Page 312: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead Sunoco 1 1:00 PM 2:00 PM

20027 Epsilon 0.5 3:00 PM 3:30 PM

19387 York-IBM 1 9:15 AM 10:15 AM

20033 PG&E 0.333333969 5:30 PM 5:50 PM

Overhead CTL 0.25 10:00 AM 10:15 AM

RAC CTL 0.75 11:00 AM 11:15 AM 11:30 AM 12:00 PM

IM CTL 1.75 8:00 AM 9:00 AM 4:00 PM 4:45 PM

20006 York-Fort Worth 0.333333015 11:40 AM 12:00 PM

20027 CTL 1 1:00 PM 2:00 PM

Overhead Epsilon 1 3:00 PM 4:00 PM

IM CTL 2.416666985 9:15 AM 11:40 AM

IM CTL 0.5 8:30 AM 9:00 AM

Overhead CTL 0.5 1:00 PM 1:30 PM

Overhead CTL 0.25 4:45 PM 5:00 PM

Overhead CTL 0.5 3:00 PM 3:30 PM

Overhead CTL 0.5 8:30 AM 9:00 AM

Overhead CTL 0.75 9:00 AM 9:45 AM

20027 Epsilon 3.75 11:15 AM 12:00 PM 1:30 PM 3:00 PM 3:30 PM 5:00 PM

20027 Epsilon 1.25 9:45 AM 11:00 AM

IM CTL 1 8:00 PM 9:00 PM

Timesheet Dupont 1 8:00 AM 9:00 AM

IM CTL 0.25 9:00 AM 9:15 AM

20046 Sunoco 0.25 10:30 AM 10:45 AM

20027 MV 4.25 10:45 AM 12:00 PM 1:15 PM 4:15 PM

IM CTL 2 8:00 PM 10:00 PM

Page 313: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

IM CTL 1 12:00 PM 12:30 PM 3:30 PM 4:00 PM

RAC CTL 1 4:00 PM 5:00 PM

Overhead CTL 0.333333015 9:00 AM 9:20 AM

0.5 1:00 PM 1:30 PM

20027 Epsilon 0.5 10:30 AM 11:00 AM

WH Taxes MV 0

20027 Epsilon 1.166666985 9:50 AM 11:00 AM

Overhead CTL 0.25 8:45 AM 9:00 AM

IM CTL 0.333333015 9:30 AM 9:50 AM

Overhead Brandywine 0.5 8:15 AM 8:45 AM

Overhead Plymouth 1.25 11:00 AM 12:15 PM

20045 York-Mexico 2.25 1:45 PM 4:00 PM

20033 PG&E 0.5 4:30 PM 5:00 PM

20027 Epsilon 0.5 4:00 PM 4:30 PM

20033 PG&E 1.166666031 4:20 PM 5:30 PM

Overhead Sunoco 0.25 1:15 PM 1:30 PM

IM CTL 4.75 3:30 PM 4:15 PM 6:00 PM 10:00 PM

IM CTL 2.166666031 5:35 PM 6:40 PM 8:40 PM 9:45 PM

Overhead CTL 1.333333015 8:00 AM 9:20 AM

20033 Jeanes Hospital 1 2:00 PM 3:00 PM

Overhead CTL 0.5 9:00 AM 9:15 AM 2:15 PM 2:30 PM

Overhead CTL 3.5 2:00 PM 5:30 PM

Overhead CTL 1 2:00 PM 3:00 PM

Overhead MSF 1.166666985 11:30 AM 12:00 PM 2:30 PM 3:10 PM

Overhead Plymouth 0.666666985 9:20 AM 10:00 AM

Page 314: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead Epsilon 3 10:00 AM 11:30 AM 1:00 PM 2:30 PM

Overhead PG&E 1.166666985 3:10 PM 4:20 PM

Overhead Odle 3.5 7:00 PM 10:30 PM

Overhead Sunoco 1.5 3:30 PM 5:00 PM

Timesheet MV 8 10:00 AM 6:00 PM

Overhead Epsilon 0.5 9:30 AM 10:00 AM

20037 York-Mexico 1.833333969 11:00 AM 11:30 AM 4:10 PM 5:30 PM

20037 York-Mexico 1 10:00 AM 11:00 AM

19389 Peter's Law Firm 0.499999046 3:40 PM 4:10 PM

IM CTL 1 2:00 PM 3:00 PM

20046 Sunoco 0.25 9:00 AM 9:15 AM

Tantalum MV 1 6:00 AM 7:00 AM

Overhead Mannington 0.5 1:30 PM 2:00 PM

20046 Sunoco 2 3:00 PM 4:00 PM 4:30 PM 5:30 PM

20037 York-Mexico 0.5 2:00 PM 2:30 PM

19388 CTL 3 1:00 PM 4:00 PM

20006 CTL 2 10:00 AM 12:00 PM

Overhead CTL 0.25 11:00 AM 11:15 AM

Overhead Plymouth 1.75 9:15 AM 10:30 AM 4:15 PM 4:45 PM

20001 York-Ottawa 2 9:15 AM 11:15 AM

20027 Epsilon 2 10:00 AM 12:00 PM

Overhead CTL 0.75 2:30 PM 3:15 PM

Overhead Epsilon 0.25 2:15 PM 2:30 PM

Overhead Sunoco 0.5 3:30 PM 4:00 PM

Overhead Epsilon 1 2:30 PM 3:30 PM

Page 315: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20046 Sunoco 0.5 3:00 PM 3:30 PM

IM 0.75 11:15 AM 12:00 PM

20045 CTL 0.5 9:00 AM 9:30 AM

20058 Mannington 1.333333969 1:40 PM 2:40 PM 4:10 PM 4:30 PM

Overhead CTL 0.5 9:00 AM 9:30 AM

Overhead CTL 0.5 9:30 AM 10:00 AM

Overhead Mannington 0.666666985 10:00 AM 10:40 AM

20046 Sunoco 3.083332062 10:40 AM 12:15 PM 2:40 PM 4:10 PM

Overhead York 0.25 4:30 PM 4:45 PM

Overhead York 1 9:00 AM 10:00 AM

Overhead hod 2.833333969 2:00 PM 4:50 PM

Overhead Odle 0

Overhead Plymouth 0.25 11:45 AM 12:00 PM

20045 York 0.166666985 12:00 PM 12:10 PM

Overhead York 1.583333015 1:40 PM 3:15 PM

Overhead Odle 1.166666985 9:50 AM 11:00 AM

Overhead CTL 1.166666985 8:00 AM 9:10 AM

20045 York 0.333333015 9:10 AM 9:30 AM

Overhead 0.333333015 9:30 AM 9:50 AM

Overhead CTL 0.5 4:00 PM 4:30 PM

20054 Plymouth 0.75 11:00 AM 11:45 AM

20027 Epsilon 0.5 9:00 AM 9:30 AM

Overhead CTL 0.5 11:30 AM 12:00 PM

20054 Plymouth 0.5 10:30 AM 11:00 AM

20045 York 0.5 11:00 AM 11:30 AM

Page 316: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20054 Plymouth 0.75 11:30 AM 12:15 PM

Acid Plant Iran 3 6:00 AM 9:00 AM

20045 York 0.5 3:00 PM 3:30 PM

IM CTL 0.75 4:15 PM 5:00 PM

Overhead CTL 0.083333015 9:00 AM 9:05 AM

20045 CTL 0.75 3:30 PM 4:15 PM

Overhead Odle 0.666666985 9:05 AM 9:45 AM

Overhead CTL 5.25 9:45 AM 3:00 PM

Overhead CTL 1 8:00 AM 9:00 AM

IM CTL 2 8:00 PM 10:00 PM

Overhead Sunoco 2.666666985 1:00 PM 3:40 PM

Overhead CTL 0.25 5:15 PM 5:30 PM

Overhead CTL 1 8:00 AM 9:00 AM

Overhead CTL 2.5 9:00 AM 11:30 AM

20045 York 0.5 4:00 PM 4:30 PM

20058 Mannington 3 1:00 PM 4:00 PM

Overhead CTL 0.75 4:30 PM 5:15 PM

Yard Odle 0.5 2:30 PM 3:00 PM

Overhead CTL 0.5 8:30 AM 9:00 AM

20037 York-Mexico 0.5 4:00 PM 4:30 PM

20058 Mannington 0.5 3:30 PM 4:00 PM

Overhead Sunoco 0.5 11:30 AM 12:00 PM

20046 Sunoco 1.25 8:30 AM 8:45 AM 4:00 PM 5:00 PM

Overhead CTL 1.083333015 9:30 AM 10:00 AM 10:30 AM 11:00 AM 11:40 AM 11:45 AM

Overhead Campbell 0.5 10:00 AM 10:30 AM

Page 317: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

2 10:00 AM 12:00 PM

20054 Plymouth 2.166666985 11:00 AM 11:40 AM 2:00 PM 3:30 PM

Overhead Brandy Wine 0.5 1:30 PM 2:00 PM

Overhead CTL 0.916666985 8:00 AM 8:30 AM 8:45 AM 9:10 AM

Overhead CTL 0.333333015 9:10 AM 9:30 AM

Overhead CTL 0.25 5:00 PM 5:15 PM

20033 PG&E 3.916666985 9:20 AM 11:15 AM 12:30 PM 1:00 PM 1:30 PM 3:00 PM

Overhead CTL 1.75 3:15 PM 5:00 PM

Overhead CTL 1.25 1:00 PM 2:15 PM

Overhead CTL 0.833333015 8:30 AM 9:20 AM

Overhead CTL 0.75 8:15 AM 9:00 AM

Overhead York 0.75 3:15 PM 4:00 PM

Overhead CTL 0.75 8:30 AM 9:15 AM

20058 Mannington 1.75 11:15 AM 12:00 PM 1:00 PM 2:00 PM

20001 York-Ottawa 2.25 9:00 AM 10:15 AM 3:15 PM 4:15 PM

Overhead Epsilon 0.5 10:15 AM 10:45 AM

20058 Mannington 0.25 10:45 AM 11:00 AM

Overhead CTL 0.75 5:00 PM 5:45 PM

20027 Epsilon 0.75 4:15 PM 5:00 PM

Overhead Albemarle 2 11:15 AM 12:00 PM 2:00 PM 3:15 PM

20054 Plymouth 1 1:30 PM 2:30 PM

20045 York 2 2:30 PM 4:30 PM

20046 Sunoco 3 9:15 AM 12:15 PM

Overhead 0.5 10:30 AM 11:00 AM

Overhead CTL 1 10:00 PM 11:00 PM

Page 318: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 1.416666985 8:35 AM 10:00 AM

Overhead Metaldyne 1 11:00 AM 12:00 PM

20058 CTL 0.5 10:00 AM 10:30 AM

Overhead CTL 1 1:00 PM 2:00 PM

Overhead CTL 1 2:00 PM 3:00 PM

20027 Epsilon 2 3:00 PM 5:00 PM

Overhead CTL 0.5 8:05 AM 8:35 AM

Overhead Milliken 0.25 5:00 PM 5:15 PM

Overhead Milliken 0.5 2:30 PM 3:00 PM

Overhead Metaldyne 0.5 2:00 PM 2:30 PM

Overhead Metaldyne 1 12:30 PM 1:30 PM

Overhead CTL 0.5 1:30 PM 2:00 PM

IM CTL 1 10:00 PM 11:00 PM

Overhead Epsilon 0.333333969 8:20 AM 8:40 AM

Overhead CTL 0.216666222 8:07 AM 8:20 AM

Overhead CTL 0.5 8:40 AM 9:10 AM

Overhead CTL 0.5 4:30 PM 5:00 PM

Overhead Motiva 0.5 2:00 PM 2:30 PM

20027 Epsilon 1 9:30 AM 10:30 AM

Overhead CTL 0.5 2:00 PM 2:30 PM

20058 Mannington 2.25 3:00 PM 5:15 PM

Overhead CTL 0.5 9:00 AM 9:30 AM

Overhead CTL 1 8:00 AM 9:00 AM

IM CTL 1.25 10:30 AM 11:15 AM 2:30 PM 3:00 PM

Overhead Sunoco 0.5 3:30 PM 4:00 PM

Page 319: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

IM CTL 2.75 8:30 PM 11:15 PM

20058 Mannington 3 1:00 PM 4:00 PM

20046 Sunoco 1.25 4:00 PM 5:15 PM

20001 York-Ottawa 0.25 10:00 AM 10:15 AM

Overhead CTL 0.5 11:30 AM 12:00 PM

20027 Epsilon 0.25 10:15 AM 10:30 AM

Overhead CTL 0.5 10:30 AM 11:00 AM

Overhead Motiva 0.25 11:00 AM 11:15 AM

Overhead CTL 1 1:00 PM 2:00 PM

20067 Valero 1.5 8:00 AM 9:30 AM

20027 Epsilon 2 9:30 AM 11:30 AM

20058 Mannington 0.5 2:00 PM 2:30 PM

Overhead CTL 0.5 11:30 AM 12:00 PM

Overhead CTL 0.75 4:00 PM 4:45 PM

20045 York 1.25 4:00 PM 5:15 PM

Van Julie 1.5 2:30 PM 4:00 PM

IM CTL 0.5 5:00 PM 5:30 PM

IM MV 1 8:00 AM 9:00 AM

Overhead CTL 0.5 9:00 AM 9:30 AM

Overhead CTL 1 9:30 AM 10:30 AM

Overhead CTL 0.666666031 11:00 AM 11:20 AM 11:40 AM 12:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

20067 Valero 0.333333969 11:20 AM 11:40 AM

20001 York-Ottawa 0.5 2:30 PM 3:00 PM

Tantalum MV 0.5 9:30 AM 10:00 AM

Page 320: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 0.25 10:00 AM 10:15 AM

20045 York-Dallas 4.083333015 10:15 AM 12:00 PM 3:40 PM 6:00 PM

Overhead CTL 1 8:00 AM 9:00 AM

20045 York-Dallas 2.666666985 1:00 PM 3:40 PM

20083 PG&E 0.5 9:00 AM 9:30 AM

20027 Epsilon 2 3:00 PM 4:30 PM 5:00 PM 5:30 PM

20054 Plymouth 2 1:00 PM 3:00 PM

20045 York-Dallas 1 8:00 AM 9:00 AM

Overhead CTL 3.5 9:00 AM 10:00 AM 3:00 PM 5:30 PM

20054 Plymouth 1 11:00 AM 12:00 PM

IM CTL 0.5 10:30 AM 11:00 AM

19389 York 0.5 11:00 AM 11:30 AM

20045 York 1.5 3:45 PM 5:15 PM

Overhead CTL 1.25 8:45 AM 10:00 AM

Overhead CTL 1 10:30 AM 11:30 AM

20054 Plymouth 0.5 11:30 AM 12:00 PM

Overhead CTL 0.75 8:00 AM 8:45 AM

Tantalum MV 1.25 2:00 PM 3:15 PM

Overhead Plymouth 0.75 3:00 PM 3:45 PM

Overhead CTL 0.75 5:15 PM 6:00 PM

Overhead Plymouth 1 1:00 PM 2:00 PM

Overhead Epsilon 0.5 3:30 PM 4:00 PM

20083 PG&E 1 3:30 PM 4:30 PM

20045 York 0.333332062 5:20 PM 5:40 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

Page 321: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20078 Chalmers & Kubeck 1 8:30 AM 9:30 AM

Tantalum MV 0

Overhead York-Dallas 0.833333969 11:30 AM 12:10 PM 1:20 PM 1:30 PM

20045 York 3.083333015 1:30 PM 3:15 PM 3:40 PM 5:00 PM

Overhead CTL 0.333333969 5:00 PM 5:20 PM

20054 Plymouth 1 2:00 PM 3:00 PM

Overhead MERC 0.25 5:30 PM 5:45 PM

19389 Peters law firm 5.5 8:00 AM 1:30 PM

Overhead Wolf 2 9:30 AM 11:30 AM

IM CTL 0.5 11:30 AM 12:00 PM

Overhead CTL 1.5 1:30 PM 3:00 PM

Overhead CTL 0.25 11:15 AM 11:30 AM

Overhead Sunoco 0.5 3:00 PM 3:30 PM

Taxes MV 0

Overhead Plymouth 1 4:30 PM 5:30 PM

Overhead Motiva 1 1:00 PM 2:00 PM

Overhead York-Ottawa 1.75 8:30 AM 10:15 AM

Overhead CTL 1 3:00 PM 4:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

20083 PG&E 1.75 10:15 AM 11:00 AM 4:00 PM 5:00 PM

Taxes MV 0

20045 York-Dallas 0.5 3:00 PM 3:30 PM

Overhead CTL 0.75 8:05 AM 8:50 AM

20054 Plymouth 0.666666031 4:30 PM 5:10 PM

20054 Plymouth 0.5 6:15 AM 6:45 AM

Page 322: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19389 Peters law firm 3.666666985 8:50 AM 11:30 AM 1:00 PM 2:00 PM

Tantalum MV 0.5 11:30 AM 12:00 PM

Overhead CTL 1 2:00 PM 3:00 PM

19389 Peters law firm 0.5 6:00 PM 6:30 PM

Overhead CTL 0.5 1:30 PM 2:00 PM

20045 York-Dallas 1.25 4:00 PM 5:15 PM

Taxes SC Dept of Revenue 0.5 10:30 AM 11:00 AM

Overhead CTL 0.5 10:00 AM 10:30 AM

20054 Plymouth 3.5 1:30 PM 5:00 PM

20046 Sunoco 0.5 8:30 AM 9:00 AM

Overhead CTL 4 8:00 AM 12:00 PM

Overhead CTL 0.666666985 3:00 PM 3:40 PM

20054 Plymouth 0.666666985 3:40 PM 4:20 PM

Overhead CTL 0.666666031 4:20 PM 5:00 PM

20054 Plymouth 1.5 1:30 PM 3:00 PM

Overhead CTL 2 2:00 PM 4:00 PM

20054 Plymouth 1.833333015 8:45 AM 10:35 AM

Overhead York-Dallas 0.75 8:00 AM 8:45 AM

20078 Chalmers & Kubeck 2 4:00 PM 6:00 PM

20001 York-Ottawa 0.5 3:00 PM 3:30 PM

20078 Chalmers & Kubeck 0.5 11:00 AM 11:30 AM

20067 Valero 1 10:00 AM 11:00 AM

RAC CTL 0.5 10:00 AM 10:30 AM

20078 Chalmers & Kubeck 0.5 9:30 AM 10:00 AM

IM CTL 3.5 1:00 PM 4:00 PM 5:00 PM 5:30 PM

Page 323: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

19389 Peters law firm 4.25 1:45 PM 6:00 PM

Overhead CTL 0.75 8:00 AM 8:45 AM

19389 Peters law firm 1.5 4:30 PM 6:00 PM

20083 PG&E 0.5 4:00 PM 4:30 PM

20067 Valero 0.5 8:45 AM 9:15 AM

20078 Chalmers & Kubeck 4.166666985 10:00 AM 11:30 AM 1:20 PM 4:00 PM

20094 Motiva 0.75 9:15 AM 10:00 AM

20027 Epsilon 2 10:30 AM 12:30 PM

20060 Campbell Soup 0.5 9:00 AM 9:30 AM

20078 Chalmers & Kubeck 0.833333015 9:30 AM 10:20 AM

19389 Peters law firm 0.666666985 10:20 AM 11:00 AM

20083 PG&E 0.5 11:00 AM 11:30 AM

Overhead CTL 0.5 11:30 AM 12:00 PM

20078 Chalmers & Kubeck 1 1:00 PM 2:00 PM

20060 Campbell Soup 1 2:00 PM 3:00 PM

19389 CTL 0.333333969 7:00 PM 7:20 PM

mortgage Odle 0

20067 Valero 2.666666031 3:00 PM 5:40 PM

IM CTL 2.25 8:00 AM 10:15 AM

19310 QSL 0.5 1:00 PM 1:30 PM

IM CTL 0.5 11:30 AM 12:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

20078 CTL 0.25 10:00 AM 10:15 AM

20067 CTL 1.216667175 11:12 AM 12:25 PM

20067 Valero 0.5 1:45 PM 2:15 PM

Page 324: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20067 Valero 0.5 3:15 PM 3:45 PM

20067 Valero 1 2:15 PM 3:15 PM

20067 Valero 1 4:00 PM 5:00 PM

20078 Chalmers & Kubeck 0.25 3:45 PM 4:00 PM

Overhead CTL 0.25 10:30 AM 10:45 AM

20067 CTL 1 9:00 AM 10:00 AM

20067 Valero 1.75 10:15 AM 12:00 PM

Overhead CTL 1 4:00 PM 5:00 PM

Ta MV 3 8:30 PM 11:30 PM

IM CTL 0.916666985 8:05 AM 8:30 AM 9:00 AM 9:30 AM

IM CTL 4 12:45 PM 4:00 PM 5:00 PM 5:45 PM

20001 York-Ottawa 0.5 4:30 PM 5:00 PM

20076 Sunoco 0.25 11:30 AM 11:45 AM

IM CTL 1.5 8:30 AM 9:00 AM 9:30 AM 10:30 AM

20083 PG&E 1 10:30 AM 11:30 AM

20054 Plymouth 0.5 4:00 PM 4:30 PM

Overhead CTL 0.333333015 10:40 AM 11:00 AM

19389 Peters law firm 1 9:00 AM 10:00 AM

20083 PG&E 0.75 11:30 AM 11:45 AM 12:45 PM 1:15 PM

Overhead CTL 0.25 8:00 AM 8:15 AM

20067 Valero 0.5 1:15 PM 1:45 PM

20109 Zaks 1.5 10:00 AM 11:30 AM

Overhead CTL 0.333333015 10:10 AM 10:30 AM

20110 CTL 0.5 5:00 PM 5:30 PM

19389 CTL 4.5 10:30 AM 12:30 PM 1:30 PM 4:00 PM

Page 325: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 1 4:00 PM 5:00 PM

20110 Motiva 0.666666985 9:30 AM 10:10 AM

Overhead CTL 0.5 8:00 AM 8:30 AM

1 8:30 AM 9:30 AM

20060 Valero 1.5 2:00 PM 3:30 PM

Overhead CTL 2 10:00 AM 12:00 PM

20001A York 1 3:30 PM 4:30 PM

RAC MERC 0.75 4:30 PM 5:15 PM

Mg MTL 1 8:00 AM 9:00 AM

20110 Motiva 2 9:00 AM 10:00 AM 1:00 PM 2:00 PM

20076 Sunoco 1 4:00 PM 5:00 PM

Overhead CTL 1 8:00 AM 9:00 AM

19389 Peters law firm 1 3:00 PM 4:00 PM

IM CTL 2 1:00 PM 3:00 PM

Overhead CTL 1 9:15 AM 10:15 AM

20110 CTL 1 10:15 AM 11:15 AM

Overhead CTL 0.75 11:15 AM 12:00 PM

RAC CTL 0.25 10:15 AM 10:30 AM

IM CTL 1.666666985 9:00 AM 9:40 AM 10:00 AM 11:00 AM

Overhead CTL 1 11:00 AM 12:00 PM

20083 PG&E 0.333333969 5:00 PM 5:20 PM

Overhead CTL 1 8:00 AM 9:00 AM

20083 PG&E 2 1:00 PM 3:00 PM

20083 CTL 1 3:00 PM 4:00 PM

20109 Zeks 0.5 4:00 PM 4:30 PM

Page 326: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20095 Motiva 0.5 4:30 PM 5:00 PM

Overhead CTL 1 3:00 PM 4:00 PM

Overhead CTL 0.75 8:00 AM 8:45 AM

20076 Sunoco 2.5 2:00 PM 4:30 PM

Overhead CTL 0.5 11:30 AM 12:00 PM

20095 Motiva 1.25 8:45 AM 9:30 AM 11:00 AM 11:30 AM

20109 Zeks 1.5 9:30 AM 10:30 AM 1:00 PM 1:30 PM

20001 York-Ottawa 2 3:00 PM 5:00 PM

20060 Campbell Soup 1 2:00 PM 3:00 PM

20109 Zeks 0.5 1:30 PM 2:00 PM

Overhead CTL 0.5 10:30 AM 11:00 AM

Overhead CTL 0.75 8:00 AM 8:45 AM

20095 Motiva 0.5 9:00 AM 9:30 AM

20076 Sunoco 0.5 9:30 AM 10:00 AM

20109 Zeks 0.5 10:00 AM 10:30 AM

Overhead CTL 0.416666985 11:00 AM 11:25 AM

20109 Zeks 1 1:00 PM 2:00 PM

20076 Sunoco 1.083333015 10:30 AM 11:00 AM 11:25 AM 12:00 PM

20001 York-Ottawa 0.5 4:30 PM 5:00 PM

20067 Valero 0.5 8:30 AM 9:00 AM

20076 Sunoco 1 9:40 AM 10:40 AM

IM CTL 2 3:00 PM 5:00 PM

20060 Campbell Soup 2 1:00 PM 3:00 PM

20109 Zeks 1 11:00 AM 12:00 PM

RAC York 0.5 9:10 AM 9:40 AM

Page 327: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 0.5 8:00 AM 8:30 AM

20067 Valero 6 10:15 AM 12:00 PM 12:30 PM 3:00 PM 4:00 PM 5:45 PM

Overhead CTL 1.5 8:45 AM 10:15 AM

Overhead CTL 0.75 8:00 AM 8:45 AM

Overhead CTL 0.449999809 10:45 AM 11:12 AM

Finances Odle 0

Overhead CTL 0.5 8:00 AM 8:30 AM

20094 Motiva 1.5 1:00 PM 2:00 PM 4:30 PM 5:00 PM

Overhead CTL 1 8:00 AM 9:00 AM

Overhead CTL 0.5 3:30 PM 4:00 PM

20060 Campbell Soup 0.5 8:30 AM 9:00 AM

20076 Sunoco 0.5 9:00 AM 9:30 AM

20109 Zeks 1.5 2:00 PM 3:30 PM

20076 Sunoco 0.5 4:00 PM 4:30 PM

Overhead CTL 0.25 5:30 PM 5:45 PM

20094 Motiva 3 10:00 AM 12:00 PM 1:00 PM 2:00 PM

20109 Zeks 3.5 2:00 PM 5:30 PM

IM CTL 2 10:00 AM 12:00 PM

20001 York-Ottawa 0.25 9:30 AM 9:45 AM

Overhead CTL 0.5 12:30 PM 1:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

20094 Motiva 1.583333015 1:00 PM 2:35 PM

Finances Odle 0.25 3:15 PM 3:30 PM

20110 Motiva 1.75 3:30 PM 5:15 PM

19389 Peter's Law Firm 6.333333969 10:00 AM 12:00 PM 1:00 PM 5:20 PM

Page 328: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20095 Motiva 1 8:30 AM 9:30 AM

Finances MV 0.25 11:15 AM 11:30 AM

20109 Zeks 2.5 9:30 AM 11:15 AM 11:15 AM 12:00 PM

20001 York-Ottawa 0.666666985 2:35 PM 3:15 PM

20054 Plymouth Tube 0.916666031 5:15 PM 6:10 PM

Overhead CTL 1.083333969 8:15 AM 8:40 AM 9:00 AM 9:40 AM

20083 PG&E 1 11:00 AM 12:00 PM

Overhead CTL 4 1:00 PM 5:00 PM

IM CTL 1 10:00 AM 11:00 AM

20054 Plymouth Tube 1 8:00 AM 9:00 AM

20095 Motiva 1 9:00 AM 10:00 AM

20094 Motiva 0.333333969 5:00 PM 5:20 PM

Overhead CTL 0.333333015 10:40 AM 11:00 AM

20095 Motiva 1 11:00 AM 12:00 PM

20095 Motiva 2 1:00 PM 3:00 PM

20095 Motiva 2.166666031 3:00 PM 5:10 PM

Overhead CTL 3.5 9:30 AM 11:00 AM 1:00 PM 2:00 PM 3:30 PM 4:30 PM

RAC York 0.5 3:00 PM 3:30 PM

20110 Motiva 0.5 4:30 PM 5:00 PM

20054 Plymouth Tube 1 11:00 AM 12:00 PM

20124 Valero 0.25 8:00 AM 8:15 AM

Overhead CTL 0.333333015 8:40 AM 9:00 AM

IM CTL 1 9:40 AM 10:40 AM

Finances Odle 0.75 9:00 AM 9:45 AM

Taxes MV 4 2:00 PM 6:00 PM

Page 329: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 0.5 11:00 AM 11:30 AM

Overhead CTL 1.25 4:00 PM 5:15 PM

Overhead CTL 1 8:00 AM 9:00 AM

20095 Motiva 4.75 9:45 AM 11:00 AM 11:30 AM 12:00 PM 1:00 PM 4:00 PM

20124 Valero 2.5 10:00 AM 12:00 PM 1:00 PM 1:30 PM

Proposal General Chemical 1.5 2:00 PM 3:30 PM

IM CTL 5.25 11:00 AM 12:00 PM 1:00 PM 5:15 PM

20095 Motiva 0.833333015 9:10 AM 10:00 AM

Overhead CTL 0.916666985 8:15 AM 9:10 AM

20124 Valero 0.5 10:30 AM 11:00 AM

Taxes MV 4 10:00 AM 2:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

20124 Valero 0.5 11:30 AM 12:00 PM

Overhead York 0.25 9:45 AM 10:00 AM

20095 Motiva 0.5 11:30 AM 12:00 PM

RAC CTL 0.399999619 5:00 PM 5:24 PM

Overhead CTL 1 1:30 PM 2:30 PM

20083 CTL 0.75 8:30 AM 9:15 AM

Overhead CTL 2.25 9:15 AM 11:30 AM

Overhead CTL 0.5 3:30 PM 4:00 PM

Overhead CTL 0.5 1:30 PM 2:00 PM

20124 Valero 2.5 2:00 PM 3:30 PM 4:00 PM 5:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

20001 York-Ottawa 1 10:30 AM 11:30 AM

19389 Peter's Law Firm 2.75 2:30 PM 5:15 PM

Page 330: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

IM CTL 0.5 9:00 AM 9:30 AM

Overhead General Chemical 0.25 9:30 AM 9:45 AM

19389 Peter's Law Firm 2.5 3:00 PM 4:30 PM 5:00 PM 6:00 PM

20124 Valero 0.5 4:30 PM 5:00 PM

Overhead CTL 1 10:00 AM 11:00 AM

19389 Peter's Law Firm 1.5 9:00 AM 10:30 AM

Overhead MV 1 8:00 AM 9:00 AM

20138 Honeywell 1.5 10:30 AM 12:00 PM

20124 Valero 1 1:00 PM 2:00 PM

20095 Motiva 0.5 2:00 PM 2:30 PM

IM CTL 1.75 3:30 PM 5:15 PM

IM CTL 0.5 10:30 AM 11:00 AM

19389 Peter's Law Firm 1 11:00 AM 12:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

20133 Zeks 0.5 3:00 PM 3:30 PM

20124 Valero 1 8:30 AM 9:30 AM

20124 Valero 1 9:30 AM 10:30 AM

Overhead Valero 0.5 2:00 PM 2:30 PM

Overhead CTL 2 1:00 PM 3:00 PM

19380 Peter's Law Firm 3 2:00 PM 5:00 PM

IM CTL 2 8:00 AM 10:00 AM

IM CTL 5 8:00 AM 12:00 PM 1:00 PM 2:00 PM

19363 York 0

19389 Peter's Law Firm 3 1:00 PM 3:00 PM 4:00 PM 5:00 PM

Overhead CTL 0.5 9:30 AM 10:00 AM

Page 331: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

IM CTL 1 9:00 AM 9:30 AM 11:30 AM 12:00 PM

IM CTL 8 8:00 AM 12:00 PM 1:00 PM 5:00 PM

Overhead CTL 1 8:00 AM 9:00 AM

Overhead CTL 0.25 8:00 AM 8:15 AM

Overhead CTL 0.5 8:00 AM 8:30 AM

20115 York 2 11:00 AM 12:00 PM 1:00 PM 2:00 PM

19389 Peter's Law Firm 4.5 9:30 AM 11:00 AM 2:00 PM 5:00 PM

19389 Peter's Law Firm 6 9:00 AM 12:00 PM 1:00 PM 3:00 PM 3:30 PM 4:30 PM

Overhead CTL 0.5 8:30 AM 9:00 AM

20115 York 0.5 3:00 PM 3:30 PM

19389 Peter's Law Firm 3.25 1:15 PM 2:15 PM 2:30 PM 4:45 PM

IM CTL 0.75 11:15 AM 11:45 AM 2:15 PM 2:30 PM

20148 Astrazeneca 1 11:00 AM 12:00 PM

19389 Peter's Law Firm 4 8:00 AM 11:00 AM 1:00 PM 2:00 PM

20148 Astrazeneca 2 11:00 AM 12:00 PM 2:00 PM 3:00 PM

IM CTL 1.5 3:30 PM 5:00 PM

20152 Honeywell 3.333333015 9:00 AM 12:20 PM

20171 Valero 1 1:00 PM 2:00 PM

20115 York 0.25 2:00 PM 2:15 PM

19389 Peter's Law Firm 10 8:00 AM 12:00 PM 1:00 PM 7:00 PM

20153 York 0.5 2:15 PM 2:45 PM

Overhead CTL 1 8:00 AM 9:00 AM

20148 Astrazeneca 1.5 1:00 PM 2:00 PM 4:30 PM 5:00 PM

20148 Astrazeneca 2 10:00 AM 11:00 AM 1:00 PM 2:00 PM

20115 York 1 9:00 AM 10:00 AM

Page 332: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20148 Astrazeneca 1 1:00 PM 2:00 PM

19389 Peter's Law Firm 6.5 8:00 AM 11:30 AM 2:00 PM 5:00 PM

Overhead CTL 1 11:00 AM 12:00 PM

Finances Odle 0

20115 York 1 2:00 PM 3:00 PM

20171 Valero 0.583333969 4:30 PM 5:05 PM

20115 York 2 3:00 PM 5:00 PM

20115 York 5 8:30 AM 11:00 AM 1:30 PM 4:00 PM

20153 York 0.5 1:00 PM 1:30 PM

20225 CTL 5.766666412 8:30 AM 11:30 AM 1:00 PM 2:00 PM 3:30 PM 5:16 PM

IM CTL 1 4:00 PM 5:00 PM

Finances Odle 0

Overhead CTL 0.5 8:00 AM 8:30 AM

IM CTL 1 2:00 PM 3:00 PM

Overhead CTL 2 10:30 AM 12:30 PM

IM CTL 2 10:00 AM 12:00 PM

20148 Astrazeneca 0.416666985 10:00 AM 10:25 AM

20148 Astrazeneca 3.666666031 1:30 PM 3:00 PM 3:15 PM 5:25 PM

20148 Astrazeneca 0.5 9:00 AM 9:30 AM

Tantalum Colonial Metals 0

20153 York 4 1:15 PM 5:15 PM

20153 York 2 8:00 AM 10:00 AM

20153 York 1.333333015 9:10 AM 10:00 AM 11:30 AM 12:00 PM

20148 CTL 1 4:00 PM 5:00 PM

Overhead CTL 0.666666985 8:30 AM 9:10 AM

Page 333: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 1 8:00 AM 9:00 AM

19389 CTL 1 11:00 AM 12:00 PM

20153 York 3 2:00 PM 5:00 PM

IM CTL 1 9:00 AM 10:00 AM

20110 Motiva 0.5 2:30 PM 3:00 PM

IM CTL 1.5 10:30 AM 12:00 PM

Overhead CTL 1 8:00 AM 9:00 AM

Overhead CTL 1.25 9:00 AM 10:15 AM

Overhead CTL 1 2:00 PM 3:00 PM

20001 CTL 2 3:00 PM 5:00 PM

20153 York 2 9:00 AM 11:00 AM

Overhead CTL 0.5 8:00 AM 8:30 AM

Overhead CTL 1 8:00 AM 9:00 AM

20153 York 1 9:00 AM 10:00 AM

Overhead CTL 1.75 2:30 PM 4:15 PM

Overhead MV 0.833333969 5:15 PM 6:05 PM

Overhead CTL 0.5 10:00 AM 10:30 AM

IM CTL 0.5 2:00 PM 2:30 PM

20148 Astrazeneca 1 8:30 AM 9:00 AM 5:00 PM 5:30 PM

IM CTL 7 8:15 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 5:15 PM

20148 Astrazeneca 5.5 8:00 AM 10:30 AM 3:30 PM 6:30 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

20197 Cytec 0.5 1:00 PM 1:30 PM

Overhead Atofina 0.5 9:00 AM 9:30 AM

IM CTL 5.5 10:30 AM 12:00 PM 1:00 PM 5:00 PM

Page 334: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20115 York 0.5 10:30 AM 11:00 AM

IM CTL 3 1:00 PM 2:00 PM 3:00 PM 5:00 PM

20189 Honeywell 1 2:00 PM 3:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

20138 Honeywell 1 11:00 AM 12:00 PM

20171 Valero 1 2:00 PM 3:00 PM

Overhead CTL 0.5 11:15 AM 11:45 AM

Overhead CTL 0.5 8:00 AM 8:30 AM

20171 Valero 1 1:00 PM 2:00 PM

20153 York 1 3:30 PM 4:30 PM

Overhead CTL 1 8:00 AM 9:00 AM

IM CTL 5.5 8:30 AM 12:00 PM 2:00 PM 3:30 PM 4:30 PM 5:00 PM

20148 Astrazeneca 4 7:15 AM 11:15 AM

20115 York 1 9:00 AM 10:00 AM

20148 Astrazeneca 0.166666985 9:30 AM 9:40 AM

Overhead CTL 0.5 3:00 PM 3:30 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

IM CTL 4.5 8:30 AM 10:00 AM 2:00 PM 5:00 PM

IM CTL 0.75 11:15 AM 12:00 PM

19389 CTL 1 10:00 AM 11:00 AM

20152 Honeywell 2.25 2:45 PM 4:30 PM 5:00 PM 5:30 PM

Overhead CTL 0.75 8:15 AM 9:00 AM

20115 York 0.5 11:30 AM 12:00 PM

Overhead CTL 1.5 1:00 PM 2:30 PM

Overhead CTL 0.5 11:30 AM 12:00 PM

Page 335: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 0.5 3:00 PM 3:30 PM

Overhead CTL 1 8:00 AM 9:00 AM

20138 Honeywell 2 12:30 PM 2:30 PM

Overhead CTL 0.333333015 8:40 AM 9:00 AM

20210 Environment One 0.5 2:30 PM 3:00 PM

Taxes MV 0

20148 Astrazeneca 0.5 9:00 AM 9:30 AM

20171 Valero 1.5 9:30 AM 11:00 AM

20171 Valero 0.5 11:00 AM 11:30 AM

20171 Valero 0.5 4:20 PM 4:50 PM

IM CTL 7.333333969 8:00 AM 12:00 PM 1:00 PM 4:20 PM

20171 CTL 0.5 8:00 AM 8:30 AM

20138 Honeywell 0.5 1:40 PM 2:10 PM

20171 CTL 2 8:30 AM 10:30 AM

Overhead Indotherm 0.5 2:10 PM 2:40 PM

20225 York 1 1:30 PM 2:30 PM

Overhead CTL 3.833333015 8:10 AM 12:00 PM

Overhead CTL 1.5 8:00 AM 9:00 AM 9:30 AM 10:00 AM

Overhead CTL 4 1:00 PM 5:00 PM

20171 Valero 0.5 1:15 PM 1:45 PM

Overhead CTL 0.25 8:00 AM 8:15 AM

20138 Honeywell 1 10:30 AM 11:30 AM

Overhead CTL 0.75 11:30 AM 12:15 PM

20001 York-Ottawa 0.5 10:00 AM 10:30 AM

20148 CTL 4 8:00 AM 12:00 PM

Page 336: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

IM CTL 3.25 1:45 PM 5:00 PM

IM CTL 2 2:00 PM 4:00 PM

IM CTL 1 1:00 PM 2:00 PM

20201 Sunoco 0.5 2:30 PM 3:00 PM

Overhead CTL 1 8:00 AM 9:00 AM

20153 York-Northbrook 1 1:00 PM 2:00 PM

Overhead CTL 2 11:00 AM 12:00 PM 1:00 PM 2:00 PM

20189 Honeywell 2 1:00 PM 3:00 PM

19389 Peter's Law Firm 0.25 5:00 PM 5:15 PM

20138 Honeywell 1 9:00 AM 10:00 AM

IM CTL 1 11:00 AM 12:00 PM

20148 Astrazeneca 2 3:00 PM 5:00 PM

Overhead York 0.5 10:30 AM 11:00 AM

Overhead CTL 0.5 8:30 AM 9:00 AM

Taxes MV 0

20148 Astrazeneca 1 4:15 PM 5:15 PM

IM CTL 1.5 10:30 AM 12:00 PM

20138 Honeywell 1 9:30 AM 10:30 AM

20189 Honeywell 2 8:30 AM 10:30 AM

20001 York 0.5 10:00 AM 10:30 AM

20115 York 1 1:00 PM 2:00 PM

20148 Astrazeneca 2.75 2:30 PM 5:15 PM

20148 Astrazeneca 2 11:00 AM 12:00 PM 1:00 PM 2:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

IM CTL 1 2:30 PM 3:30 PM

Page 337: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20148 Astrazeneca 2 8:30 AM 10:30 AM

20148 Astrazeneca 7.833333015 8:15 AM 11:50 AM 1:30 PM 5:45 PM

20197 Cytec 1 1:00 PM 2:00 PM

19389 Peter's Law Firm 1 10:00 AM 11:00 AM

20115 York 2.5 10:00 AM 11:30 AM 3:00 PM 4:00 PM

19389 Peter's Law Firm 2 8:30 AM 10:30 AM

20197 Cytec 0.5 8:45 AM 9:15 AM

20148 Astrazeneca 2 9:15 AM 11:15 AM

Overhead CTL 3.25 3:00 PM 6:15 PM

20225 York 5.5 8:30 AM 11:00 AM 2:00 PM 5:00 PM

19389 Peter's Law Firm 0.5 11:45 AM 12:15 PM

20197 Cytec 3 9:00 AM 12:00 PM

Overhead CTL 0.333333015 8:10 AM 8:30 AM

Overhead CTL 1 1:00 PM 2:00 PM

20148 Astrazeneca 1.166666985 10:30 AM 11:40 AM

20197 Cytec 2 8:30 AM 10:30 AM

Overhead CTL 0.666666985 8:05 AM 8:45 AM

19389 Peter's Law Firm 1 10:00 AM 11:00 AM

IM CTL 6 8:00 AM 9:00 AM 11:00 AM 12:00 PM 1:00 PM 5:00 PM

RAC CTL 0.5 9:40 AM 10:10 AM

Overhead CTL 1.333333015 8:10 AM 9:30 AM

19389 Peter's Law Firm 0.25 11:00 AM 11:15 AM

Overhead CTL 0.5 12:00 PM 12:30 PM

20227 York 1 11:00 AM 12:00 PM

RAC CTL 2.5 2:00 PM 4:30 PM

Page 338: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20189 Honeywell 1 4:30 PM 5:30 PM

20225 York 2.5 10:00 AM 12:00 PM 1:30 PM 2:00 PM

20171 Valero 2 1:00 PM 3:00 PM

RAC CTL 0.75 4:30 PM 5:15 PM

Overhead CTL 0.833333015 8:10 AM 9:00 AM

Overhead CTL 0.833333015 8:15 AM 9:05 AM

20225 York 2.916666985 9:05 AM 12:00 PM

20171 Valero 5.166666031 9:00 AM 9:50 AM 10:10 AM 12:00 PM 3:00 PM 5:30 PM

20201 Sunoco 2 10:00 AM 12:00 PM

20189 Honeywell 3 1:00 PM 4:00 PM

RAC York 2.25 11:00 AM 12:00 PM 4:00 PM 5:15 PM

Income Taxes MV 0

20197 Cytec 1.25 4:00 PM 5:15 PM

20197 Cytec 4.583333969 12:30 PM 5:05 PM

Overhead CTL 3.416666985 8:05 AM 11:30 AM

20138 Honeywell 8.5 8:00 AM 12:00 PM 1:00 PM 5:30 PM

20227 CTL 1 10:00 AM 11:00 AM

20197 Cytec 1 3:00 PM 4:00 PM

Overhead CTL 3.916666985 8:05 AM 10:30 AM 11:00 AM 12:30 PM

Taxes MV 0

20227 York 0.5 5:00 PM 5:30 PM

Overhead General Chemical 0.5 1:00 PM 1:30 PM

20227 York 4.5 1:00 PM 5:30 PM

20171 Valero 2.25 8:15 AM 10:30 AM

Overhead CTL 1 8:00 AM 9:00 AM

Page 339: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 1 8:00 AM 9:00 AM

Overhead CTL 3.833333015 8:10 AM 12:00 PM

Overhead York 0.333333015 8:10 AM 8:30 AM

20227 York 3 8:00 AM 11:00 AM

Overhead CTL 0.5 1:00 PM 1:30 PM

Overhead CTL 0.25 10:15 AM 10:30 AM

Overhead CTL 0.5 8:30 AM 9:00 AM

20225 CTL 4.333333969 1:00 PM 5:20 PM

20201 Sunoco 1 11:00 AM 12:00 PM

20197 Cytec 1 10:00 AM 11:00 AM

IM CTL 0.75 3:45 PM 4:30 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

20148 Astrazeneca 0.5 8:15 AM 8:30 AM 5:15 PM 5:30 PM

20128 Honeywell 1 8:30 AM 9:30 AM

20225 York 4 1:00 PM 5:00 PM

Overhead CTL 0.333333015 8:10 AM 8:30 AM

Overhead CTL 1.5 10:30 AM 12:00 PM

20148 Astrazeneca 0.5 11:30 AM 12:00 PM

20201 Sunoco 0.75 10:30 AM 11:15 AM

20189 Honeywell 1 8:30 AM 9:30 AM

20197 Cytec 2 9:30 AM 11:30 AM

20198 Valero 0.5 1:00 PM 1:30 PM

20225 York 3 2:00 PM 5:00 PM

illness Odle 7 8:00 AM 3:00 PM

19389 Peter's Law Firm 3.5 10:30 AM 12:30 PM 1:30 PM 3:00 PM

Page 340: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20225 York 3 2:00 PM 5:00 PM

Overhead CTL 0.666666985 8:05 AM 8:45 AM

Overhead CTL 1 8:00 AM 9:00 AM

20197 Cytec 2 10:00 AM 12:00 PM

Overhead CTL 0.5 8:15 AM 8:45 AM

Overhead CTL 1.75 11:15 AM 12:00 PM 1:00 PM 2:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

20248 Lilly 1 8:00 PM 9:00 PM

Overhead CTL 1 1:00 PM 2:00 PM

20223 York 1 11:00 AM 12:00 PM

20225 York 4.416666985 8:05 AM 12:30 PM

Overhead CTL 1.25 4:00 PM 5:15 PM

20189 Honeywell 1 11:00 AM 12:00 PM

20148 Astrazeneca 0.5 2:30 PM 3:00 PM

Toth WTC 0.25 3:00 PM 3:15 PM

20248 Lilly 8 10:00 AM 12:30 PM 1:00 PM 6:30 PM

Overhead CTL 1 4:00 PM 5:00 PM

20189 Honeywell 2 2:00 PM 4:00 PM

20189 Honeywell 3.833333015 10:10 AM 12:00 PM 12:30 PM 2:30 PM

Overhead CTL 0.416666985 9:05 AM 9:30 AM

20197 Sunoco 1 10:00 AM 11:00 AM

20223 York 1 2:45 PM 3:45 PM

Overhead CTL 1.75 1:00 PM 2:45 PM

20197 Cytec 0.666666985 9:20 AM 10:00 AM

20138 Honeywell 2 8:30 AM 10:30 AM

Page 341: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Cleanup CTL 2 2:30 PM 4:30 PM

20224 York 0.416666985 9:15 AM 9:40 AM

20223 York 1 1:00 PM 2:00 PM

20223 York 1.25 3:30 PM 4:45 PM

20223 York 1.5 2:00 PM 3:30 PM

Overhead CTL 2.833333015 8:10 AM 11:00 AM

20223 York 3 9:00 AM 10:00 AM 1:00 PM 2:00 PM 4:30 PM 5:30 PM

Overhead CTL 0.75 10:30 AM 11:15 AM

Overhead CTL 0.833333015 8:10 AM 9:00 AM

Overhead CTL 2.583333015 2:40 PM 5:15 PM

20138 Honeywell 0.5 2:30 PM 3:00 PM

Overhead CTL 0.833333015 8:10 AM 9:00 AM

Overhead CTL 2 10:00 AM 12:00 PM

20227 York 5.333333969 2:00 PM 5:30 PM 10:00 PM 11:50 PM

20224 CTL 1 1:00 PM 2:00 PM

20248 Lilly 2 1:00 PM 3:00 PM

Overhead CTL 1.833333969 7:00 PM 8:50 PM

20225 York 0.5 10:30 AM 11:00 AM

20148 Astrazeneca 2.083333015 10:25 AM 12:00 PM 1:00 PM 1:30 PM

20223 York 1.5 11:00 AM 12:00 PM 1:00 PM 1:30 PM

20227 York 1.833333015 8:10 AM 10:00 AM

20197 Cytec 3.25 1:00 PM 4:15 PM

20223 York 1.166666031 11:10 AM 12:20 PM

20227 York 0.5 3:30 PM 4:00 PM

Overhead CTL 7.333333969 9:00 AM 12:00 PM 1:00 PM 5:20 PM

Page 342: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20225 York 3.333333969 2:00 PM 5:20 PM

20223 York 1.5 8:30 AM 10:00 AM

20227 York 7 10:00 AM 12:00 PM 1:00 PM 6:00 PM

20210 Eone 0.5 11:30 AM 12:00 PM

Overhead CTL 2.166666031 3:00 PM 5:10 PM

Overhead CTL 0.333333015 8:10 AM 8:30 AM

20148 Astrazeneca 1 3:00 PM 4:00 PM

20227 York 3.5 11:15 AM 12:30 PM 1:00 PM 3:15 PM

Overhead CTL 0.5 2:00 PM 2:30 PM

20148 Astrazeneca 4.75 8:45 AM 1:30 PM

Overhead CTL 0.5 8:15 AM 8:45 AM

20224 York 1 10:00 AM 11:00 AM

20224 York 1 1:45 PM 2:45 PM

20148 Astrazeneca 1 5:00 PM 6:00 PM

20225 York 0.833333969 4:30 PM 5:20 PM

20227 York 1.75 11:00 AM 12:00 PM 1:00 PM 1:45 PM

20197 Cytec 1 5:00 PM 6:00 PM

20148 Astrazeneca 2.5 8:30 AM 11:00 AM

20227 York 0.75 11:15 AM 11:30 AM 2:30 PM 3:00 PM

Overhead Sunoco 0.333333015 1:40 PM 2:00 PM

20225 York 2.5 11:30 AM 12:00 PM 12:30 PM 2:30 PM

IM CTL 1.5 3:00 PM 4:30 PM

20148 Astrazeneca 0.333333969 4:30 PM 4:50 PM

Overhead CTL 1 8:45 AM 9:45 AM

Overhead CTl 0.333332062 4:50 PM 5:10 PM

Page 343: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20210 Eone 0.75 9:45 AM 10:30 AM

20223 York 0.5 1:30 PM 2:00 PM

20189 Honeywell 1.75 8:45 AM 10:30 AM

20189 Honeywell 4 1:00 PM 5:00 PM

20248 Lilly 1 11:00 AM 12:00 PM

20227 York 1 5:00 PM 6:00 PM

20189 Honeywell 2 9:00 AM 11:00 AM

Overhead CTL 1.5 10:30 AM 12:00 PM

IM CTL 1 9:00 AM 10:00 AM

Overhead CTL 0.333333015 8:10 AM 8:30 AM

20248 Lilly 1.833333015 3:40 PM 5:30 PM

Overhead CTL 0.833333015 8:10 AM 9:00 AM

20189 Honeywell 1 9:00 AM 10:00 AM

20227 York 1 10:00 AM 11:00 AM

20227 York 5.5 1:00 PM 6:30 PM

20225 York 2.5 9:30 AM 12:00 PM

20227 York 0.75 8:45 AM 9:30 AM

20227 York 1.25 8:30 AM 9:45 AM

20189 Honeywell 1 10:00 AM 11:00 AM

Overhead CTL 0.333333015 8:10 AM 8:30 AM

20225 York 0.5 2:00 PM 2:30 PM

IM York 1.5 2:30 PM 4:00 PM

Overhead CTL 1.166666031 4:00 PM 5:10 PM

20223 York 2 1:00 PM 2:30 PM 3:30 PM 4:00 PM

Overhead CTL 0.333333015 8:10 AM 8:30 AM

Page 344: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 0.25 3:15 PM 3:30 PM

20248 Lilly 1 3:00 PM 4:00 PM

20148 CTL 0.333333015 9:00 AM 9:20 AM

20201 Sunoco 0.5 9:30 AM 10:00 AM

20248 CTL 1.5 10:30 AM 12:00 PM

20248 Lilly 6.5 8:00 AM 11:30 AM 12:00 PM 3:00 PM

Overhead Lilly 2 1:00 PM 3:00 PM

20248 Lilly 7 4:00 PM 11:00 PM

20148 Astrazeneca 0.5 10:30 AM 11:00 AM

Overhead Lilly 0.5 11:30 AM 12:00 PM

20248 Lilly 6.333333015 1:40 PM 8:00 PM

20201 Sunoco 0.25 8:15 AM 8:30 AM

20138 Honeywell 2.5 9:30 AM 12:00 PM

Overhead CTL 1 3:30 PM 4:30 PM

20227 York 2.5 2:00 PM 4:30 PM

Overhead CTL 2.5 9:30 AM 12:00 PM

20201 Sunoco 0.333333254 2:10 AM 2:30 AM

20248 Lilly 1 8:30 AM 9:30 AM

20148 Astrazeneca 0.25 3:15 AM 3:30 AM

20248 Lilly 1.25 4:00 AM 5:15 AM

Overhead CTL 0.333333015 8:10 AM 8:30 AM

20138 Honeywell 1.5 9:30 AM 10:30 AM 3:30 AM 4:00 AM

Overhead CTL 0.5 11:30 AM 12:00 PM

20223 York 1 9:00 AM 10:00 AM

20227 York 1 9:00 AM 10:00 AM

Page 345: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20148 Astrazeneca 0.25 10:00 AM 10:15 AM

20138 Honeywell 2.5 10:10 AM 12:40 PM

Overhead CTL 2.5 10:15 AM 11:00 AM 3:30 PM 5:15 PM

20001 York 0.5 1:30 PM 2:00 PM

Overhead CTL 7.833333015 8:40 AM 12:00 PM 1:00 PM 5:30 PM

Overhead CTL 0.833333015 8:10 AM 9:00 AM

20148 Astrazeneca 3.333333015 8:10 AM 11:30 AM

Overhead CTL 0.25 9:00 AM 9:15 AM

20227 York 1 11:30 AM 12:30 PM

Overhead CTL 1 1:30 PM 2:30 PM

20227 York 1.166666031 2:30 PM 3:00 PM 4:00 PM 4:40 PM

H2 via zirconia MV 1 1:00 PM 2:00 PM

20248 Lilly 0.5 4:40 PM 5:10 PM

20138 Honeywell 3.5 9:00 AM 11:30 AM 1:00 PM 2:00 PM

20248 Lilly 2 8:30 AM 10:30 AM

Overhead CTL 0.333333015 8:10 AM 8:30 AM

Overhead CTL 0.5 10:30 AM 11:00 AM

20001 York 0.416666985 12:15 PM 12:40 PM

20227 York 0.75 1:15 PM 2:00 PM

Overhead CTL 1.666666031 4:00 PM 5:40 PM

20148 Astrazeneca 2 11:00 AM 12:00 PM 1:00 PM 2:00 PM

Overhead CTL 1.25 8:45 AM 10:00 AM

Overhead CTL 0.583333015 8:10 AM 8:45 AM

20148 Astrazeneca 2 1:00 PM 3:00 PM

20148 Astrazeneca 7.75 8:15 AM 11:15 AM 11:45 AM 4:30 PM

Page 346: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20248 Lilly 5.416666985 8:35 AM 12:00 PM 3:00 PM 5:00 PM

Overhead Lilly 2 1:00 PM 3:00 PM

Overhead CTL 0.333333015 8:15 AM 8:35 AM

Overhead CTL 1 8:15 AM 9:15 AM

20138 Honeywell 3 10:00 AM 1:00 PM

Overhead CTL 0.25 8:00 AM 8:15 AM

20225 York 1 8:00 PM 9:00 PM

Overhead Applied Technologies 0.5 5:00 PM 5:30 PM

Overhead CTL 0.666666985 1:00 PM 1:40 PM

Overhead CTL 0.5 8:15 AM 8:45 AM

RAC CTL 1 4:00 PM 5:00 PM

IM CTL 1.5 9:30 AM 11:00 AM

Overhead CTL 0.5 8:15 AM 8:45 AM

Overhead CTL 1 1:00 PM 2:00 PM

20148 Astrazeneca 0.5 2:00 PM 2:30 PM

20201 CTL 0.5 2:30 PM 3:00 PM

Overhead CTL 0.333333015 8:15 AM 8:35 AM

Overhead CTL 1 8:30 AM 9:30 AM

Overhead CTL 4.75 8:15 AM 9:30 AM 10:30 AM 12:00 PM 2:00 PM 4:00 PM

20201 CTL 0.5 8:30 AM 9:00 AM

Overhead CTL 1 9:00 AM 10:00 AM

20148 Astrazeneca 1 2:30 PM 3:30 PM

Overhead CTL 1 11:30 AM 12:30 PM

20148 Astrazeneca 1 9:45 AM 10:45 AM

20248 Lilly 2 9:30 AM 11:30 AM

Page 347: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 0.75 10:45 AM 11:30 AM

20201 Sunoco 0.5 11:30 AM 12:00 PM

20227 York 1 12:00 PM 1:00 PM

20248 Lilly 2.5 8:30 AM 10:00 AM 1:00 PM 2:00 PM

Overhead CTL 0.25 2:15 PM 2:30 PM

Overhead CTL 0.333333015 8:10 AM 8:30 AM

Overhead CTL 0.333333015 8:10 AM 8:30 AM

Overhead CTL 2.5 11:00 AM 12:00 PM 3:00 PM 4:30 PM

Overhead CTL 2 8:30 AM 10:30 AM

Overhead CTL 0.5 11:00 AM 11:30 AM

IM York 1.5 4:00 PM 5:30 PM

20248 Lilly 1 3:00 PM 4:00 PM

Overhead CTL 0.25 9:00 AM 9:15 AM

20225 York 0.25 3:00 PM 3:15 PM

20201 Sunoco 0.833333015 12:40 PM 1:00 PM 4:45 PM 5:15 PM

20138 Honeywell 3.749999046 1:10 PM 4:55 PM

Overhead CTL 0.25 8:00 AM 8:15 AM

20201 CTL 0.75 8:45 AM 9:30 AM

Overhead CTL 1 8:15 AM 9:15 AM

20225 York 0.25 3:00 AM 3:15 AM

20210 Eone 0.5 2:30 AM 3:00 AM

Overhead CTL 0.5 9:00 AM 9:30 AM

Overhead National Refrig 1 1:00 PM 2:00 PM

20148 Astrazeneca 5.75 9:15 AM 12:00 PM 1:00 PM 4:00 PM

20227 York 2 8:00 PM 10:00 PM

Page 348: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 1 10:30 AM 11:30 AM

Overhead Astrazeneca 1.25 4:00 PM 5:15 PM

Overhead CTL 1 8:10 AM 9:10 AM

20138 Honeywell 0.5 5:30 PM 6:00 PM

Overhead CTL 1 9:10 AM 10:10 AM

20225 York 3.5 1:30 PM 5:00 PM

20148 Astrazeneca 6 11:00 AM 12:30 PM 1:30 PM 4:00 PM 8:00 PM 10:00 PM

20138 Honeywell 2 9:15 AM 11:15 AM

20001 Honeywell 5.083333969 11:15 AM 12:30 PM 1:45 PM 3:45 PM 4:00 PM 5:50 PM

IM CTL 0.75 8:15 AM 9:00 AM

20001 York 0.25 3:45 PM 4:00 PM

20148 Astrazeneca 1 11:00 AM 12:00 PM

Overhead CTL 2 1:00 PM 3:00 PM

20138 Honeywell 4.75 9:15 AM 11:00 AM 2:00 PM 5:00 PM

20227 York 1.25 11:00 AM 12:15 PM

H2 via SOE MV 9 10:00 AM 2:00 PM 3:00 PM 8:00 PM

20138 Honeywell 5.5 8:30 AM 10:30 AM 11:30 AM 12:00 PM 1:00 PM 4:00 PM

Overhead CTL 1 2:00 PM 3:00 PM

20194 Valero 0.5 1:30 PM 2:00 PM

Overhead Piller 0.416666985 8:15 AM 8:40 AM

20138 Honeywell 5.25 9:45 AM 11:00 AM 2:00 PM 6:00 PM

Overhead CTL 0.416666031 8:10 AM 8:35 AM

Overhead CTL 0.916666985 8:35 AM 9:10 AM 9:25 AM 9:45 AM

Overhead York 0.25 9:10 AM 9:25 AM

20138 Honeywell 5.666666985 9:20 AM 12:00 PM 3:00 PM 6:00 PM

Page 349: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 0.333333015 9:00 AM 9:20 AM

20223 York 1 2:45 PM 3:45 PM

20148 Astrazeneca 4 1:00 PM 5:00 PM

20227 York 3 1:30 PM 4:30 PM

Overhead CTL 1 11:15 AM 12:15 PM

20148 Astrazeneca 1.333333015 8:40 AM 10:00 AM

Overhead CTL 1 4:30 PM 5:30 PM

Overhead CTL 0.416666985 8:15 AM 8:40 AM

20248 Lilly 5.75 9:15 AM 12:00 PM 2:00 PM 5:00 PM

20225 York 4 3:00 PM 7:00 PM

20201 Sunoco 1.25 9:45 AM 11:00 AM

Overhead CTL 1 8:45 AM 9:45 AM

20289 Piller 1.5 8:30 AM 10:00 AM

20225 York 1.5 11:00 AM 12:30 PM

20225 York 3 2:30 PM 5:30 PM

20201 York 1 1:30 PM 2:30 PM

20227 York 1 3:00 PM 4:00 PM

Overhead CTL 0.25 11:00 AM 11:15 AM

Overhead CTL 6.666666985 8:35 AM 12:00 PM 2:00 PM 5:15 PM

20148 Astrazeneca 2.5 10:00 AM 12:30 PM

20189 Honeywell 4 1:00 PM 5:00 PM

IM CTL 2 3:30 PM 5:30 PM

20248 Lilly 1 1:00 PM 2:00 PM

20225 York 2 4:00 PM 6:00 PM

Overhead CTL 0.25 8:15 AM 8:30 AM

Page 350: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20148 Astrazeneca 0.5 9:00 AM 9:30 AM

Overhead CTL 4.5 11:30 AM 12:00 PM 1:30 PM 5:30 PM

20279 York 0.5 8:30 AM 9:00 AM

Overhead CTL 1 4:00 PM 5:00 PM

Overhead CTL 0.333333015 8:10 AM 8:30 AM

IM CTL 2 8:30 AM 10:30 AM

20201 Sunoco 0.5 11:00 AM 11:15 AM 1:00 PM 1:15 PM

20225 York 3.25 9:15 AM 10:15 AM 2:00 PM 3:00 PM 4:00 PM 5:15 PM

20138 Honeywell 3.833333015 1:30 PM 2:20 PM 6:00 PM 9:00 PM

Overhead CTL 1 1:15 PM 2:15 PM

20225 York 2.916666031 2:30 PM 5:25 PM

20148 Astrazeneca 1 9:00 AM 10:00 AM

20148 Astrazeneca 1 2:00 PM 3:00 PM

20148 Astrazeneca 2 10:00 AM 11:00 AM 2:00 PM 3:00 PM

Overhead CTL 0.5 8:30 AM 9:00 AM

20225 York 0.833333969 4:30 PM 5:20 PM

20201 Sunoco 1 11:00 AM 12:00 PM

20286 Slime 1 3:00 PM 4:00 PM

Overhead Motiva 0.25 9:15 AM 9:30 AM

20148 Astrazeneca 3 8:30 AM 10:30 AM 2:00 PM 3:00 PM

20248 Lilly 1.75 1:00 PM 2:00 PM 3:15 PM 4:00 PM

Overhead Slime 0.5 10:30 AM 11:00 AM

20210 Astrazeneca 0.5 11:00 AM 11:30 AM

Overhead CTL 0.25 8:30 AM 8:45 AM

20148 CTL 4.5 11:00 AM 12:00 PM 1:00 PM 4:30 PM

Page 351: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 0.5 9:15 AM 9:45 AM

20138 Honeywell 1 2:00 PM 3:00 PM

Overhead CTL 1.75 10:15 AM 12:00 PM

20148 Astrazeneca 0.25 9:00 AM 9:15 AM

Overhead CTL 2.75 8:15 AM 11:00 AM

Overhead CTL 0

Toth WOS 5.5 7:30 AM 1:00 PM

20148 Astrazeneca 6.75 8:15 AM 11:30 AM 12:00 PM 3:30 PM

Overhead CTL 0.5 9:00 AM 9:30 AM

Toth WOS 8 8:00 AM 4:00 PM

Overhead York 0.75 4:30 PM 5:15 PM

Overhead CTL 4.25 8:15 AM 12:30 PM

20148 Astrazeneca 1.5 2:00 PM 3:30 PM

Overhead CTL 1.25 4:00 PM 5:15 PM

20148 Astrazeneca 4 8:00 AM 12:00 PM

20269 Westec 1.5 8:30 PM 10:00 PM

Overhead CTL 0.5 3:00 PM 3:30 PM

Overhead MV 1.083333015 8:10 AM 9:15 AM

Overhead CTL 0.5 8:15 AM 8:45 AM

20201 Sunoco 0.5 10:00 AM 10:30 AM

20279 York 4.333333015 8:00 AM 12:20 PM

20248 Lilly 3 10:30 AM 12:00 PM 3:45 PM 5:15 PM

20148 Astrazeneca 0.75 3:00 PM 3:45 PM

20148 Astrazeneca 2 10:30 AM 11:30 AM 4:00 PM 5:00 PM

20289 Piller 3 7:30 PM 10:30 PM

Page 352: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 1 10:00 AM 11:00 AM

20201 Sunoco 1 11:00 AM 12:00 PM

Overhead MV 0.5 3:00 PM 3:30 PM

Overhead CTL 2 3:30 PM 5:30 PM

Overhead CTL 0.833333015 2:30 PM 3:20 PM

Overhead CTL 1.083333015 8:10 AM 9:15 AM

Overhead CTL 2 3:30 PM 5:30 PM

20286 Slime 1 2:30 PM 3:30 PM

20227 York 0.333333969 5:30 PM 5:50 PM

20225 York 0.5 10:45 AM 11:15 AM

20289 Piller 8.5 7:30 AM 1:30 PM 3:00 PM 5:30 PM

Overhead CTL 0.75 8:30 AM 9:15 AM

Overhead CTL 0.5 10:15 AM 10:45 AM

Overhead MV 0

20286 Slime 1 11:00 AM 12:00 PM

Overhead CTL 1.25 4:00 PM 5:15 PM

Overhead CTL 0.25 8:15 AM 8:30 AM

20225 York 1 4:00 PM 5:00 PM

Overhead Piller 1 10:00 PM 11:00 PM

Overhead CTL 1 10:00 AM 11:00 AM

Overhead CTL 0.25 5:00 PM 5:15 PM

Overhead Astrazeneca 0.75 11:15 AM 12:00 PM

20225 York 0.5 11:30 AM 12:00 PM

20148 Astrazeneca 1.5 2:00 PM 3:30 PM

Page 353: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 0.5 9:00 AM 9:30 AM

Overhead CTL 0.5 10:00 AM 10:30 AM

RAC Gencorp 0.5 9:30 AM 10:00 AM

20279 York 1 1:00 PM 2:00 PM

Toth WOS 1 10:00 PM 11:00 PM

20321 C&K 1 4:00 PM 5:00 PM

Overhead CTL 0.5 3:30 PM 4:00 PM

20148 Astrazeneca 1 1:00 PM 2:00 PM

20289 Piller 1.25 9:15 AM 10:30 AM

20247 Motiva 1 8:15 AM 9:15 AM

20227 York 2 2:00 PM 4:00 PM

20269 Westec 1.5 10:30 AM 12:00 PM

Overhead Tantalum 1 1:00 PM 2:00 PM

20225 York 2 2:00 PM 4:00 PM

Overhead CTL 1 9:15 AM 10:15 AM

20225 York 0.5 10:15 AM 10:45 AM

20227 York 1 9:15 AM 10:15 AM

20247 Motiva 0.5 3:30 PM 4:00 PM

Overhead CTL 1.5 2:00 PM 3:30 PM

Overhead Southern 1.25 4:00 PM 5:15 PM

20289 Piller 2.75 10:45 AM 1:00 PM 1:30 PM 2:00 PM

Overhead Piller 1.666666985 12:50 PM 2:30 PM

20225 York 2 1:00 PM 3:00 PM

Overhead Piller 3 10:00 AM 1:00 PM

Overhead CTL 0.333333015 12:00 PM 12:20 PM

Page 354: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20289 Piller 5 1:00 PM 3:00 PM 4:00 PM 7:00 PM

Overhead CTL 1.333333015 8:40 AM 10:00 AM

Overhead Piller 0.5 3:00 PM 3:30 PM

20289 Piller 1 3:30 PM 4:30 PM

Overhead CTL 2.333333969 2:30 PM 4:50 PM

20317 Piller 6 8:30 AM 2:30 PM

20289 Piller 1 7:30 AM 8:30 AM

20289 Piller 4.483333588 4:30 PM 7:30 PM 10:30 PM 11:59 PM

20227 York 1.25 8:45 AM 10:00 AM

20317 Piller 1.5 10:00 PM 11:30 PM

Overhead Piller 1 1:00 PM 2:00 PM

20248 Lilly 2 2:00 PM 4:00 PM

Overhead Piller 2.5 10:00 AM 11:00 AM 4:00 PM 5:00 PM 10:00 PM 10:30 PM

20279 York 4 1:30 PM 5:30 PM

20138 Honeywell 3.5 2:00 PM 5:30 PM

Overhead Westec 0.5 4:00 PM 4:30 PM

20269 Westec 1 10:00 AM 11:00 AM

20286 Slime 0.5 3:30 PM 4:00 PM

20138 Honeywell 1.5 11:00 AM 12:00 PM 3:00 PM 3:30 PM

Toth WOS 8 11:00 AM 7:00 PM

20138 Honeywell 3 8:30 AM 10:30 AM 2:00 PM 3:00 PM

Overhead CTL 8 8:15 AM 12:00 PM 1:00 PM 5:15 PM

Overhead CTL 0.5 3:00 PM 3:30 PM

Overhead CTL 0.75 8:15 AM 9:00 AM

Overhead York 0.5 9:45 AM 10:15 AM

Page 355: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Taxes MV 0

20289 Piller 0.5 1:00 PM 1:30 PM

20301 Burnham 3.5 1:30 PM 5:00 PM

Overhead CTL 1 8:15 AM 9:15 AM

Overhead CTL 1 5:00 PM 6:00 PM

Overhead CTL 1 4:00 PM 5:00 PM

Overhead CTL 0.75 9:15 AM 10:00 AM

Overhead CTL 0.75 11:30 AM 12:00 PM 4:00 PM 4:15 PM

20148 Astrazeneca 2 2:00 PM 3:00 PM 7:00 PM 8:00 PM

20225 York 2.5 8:15 AM 9:15 AM 1:00 PM 2:00 PM 5:00 PM 5:30 PM

20286 slimes 0.25 11:15 AM 11:30 AM

20148 Astrazeneca 0.25 11:00 AM 11:15 AM

Overhead CTL 0.5 10:30 AM 11:00 AM

Overhead York 1.5 9:30 AM 10:30 AM 11:00 AM 11:30 AM

Overhead CTL 0.25 8:15 AM 8:30 AM

Overhead CTL 1 1:00 PM 2:00 PM

20148 Astrazeneca 3 10:00 AM 1:00 PM

Overhead CTL 0.25 8:15 AM 8:30 AM

20225 York 2.25 10:15 AM 12:30 PM

20148 Astrazeneca 1 8:15 AM 9:15 AM

20201 Sunoco 0.5 10:30 AM 11:00 AM

20148 Astrazeneca 2 9:00 PM 11:00 PM

20148 Astrazeneca 0.75 3:15 PM 4:00 PM

Overhead York 1 8:15 AM 9:15 AM

Overhead Piller 0.5 1:30 PM 2:00 PM

Page 356: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20297 Atofina 0.5 1:00 PM 1:30 PM

20138 Honeywell 2 10:15 AM 12:00 PM 3:00 PM 3:15 PM

IM York 2 2:00 PM 4:00 PM

Overhead CTL 0.5 1:00 PM 1:30 PM

20301 Burnham 1 1:00 PM 2:00 PM

20138 Honeywell 2 11:00 AM 12:00 PM 2:00 PM 3:00 PM

Overhead Piller 1 3:00 PM 4:00 PM

20286 Slime 1 10:00 AM 11:00 AM

20148 Astrazeneca 4 10:00 AM 1:30 PM 2:00 PM 2:30 PM

20227 York 2.416666031 9:30 AM 10:30 AM 4:00 PM 5:25 PM

20148 Astrazeneca 1 1:00 PM 2:00 PM

20286 Slime 1.5 9:30 AM 11:00 AM

Overhead CTL 1 10:30 AM 11:30 AM

Overhead CTL 1 8:30 AM 9:30 AM

Overhead CTL 0.25 8:15 AM 8:30 AM

20279 York 1 10:00 AM 11:00 AM

20225 York 1 11:00 AM 12:00 PM

Overhead Piller 1 12:00 PM 1:00 PM

Overhead CTL 1 2:00 PM 3:00 PM

Overhead CTL 1 8:30 AM 9:00 AM 9:30 AM 10:00 AM

20148 Astrazeneca 2 3:00 PM 5:00 PM

20279 York 0.5 9:00 AM 9:30 AM

20225 York 0.333333969 5:00 PM 5:20 PM

Overhead CTL 1 9:30 AM 10:30 AM

Taskmaster MV 1.5 10:00 AM 11:30 AM

Page 357: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20148 AstraZeneca 3.5 11:45 AM 1:00 PM 2:15 PM 4:30 AM

Overhead CTL 0.5 10:30 AM 11:00 AM

20148 CTL 1 11:00 AM 12:00 PM

Overhead CTL 1.25 8:15 AM 9:30 AM

20148 Astrazeneca 2.25 2:00 PM 4:15 PM

20279 York 0.5 1:00 PM 1:30 PM

20317 Piller 0.5 1:30 PM 2:00 PM

Overhead CTL 1 4:15 PM 5:15 PM

Overhead CTL 1 2:00 PM 3:00 PM

Toth WOS 2 6:00 PM 8:00 PM

Overhead CTL 1.5 8:10 AM 9:40 AM

20301 Burnham 0.5 3:30 PM 4:00 PM

20197 Cytec 1.5 10:30 AM 12:00 PM

20289 Piller 2 1:00 PM 3:00 PM

20138 Honeywell 1.833333969 4:00 PM 5:50 PM

20197 Cytec 0.5 3:00 PM 3:30 PM

20148 AstraZeneca 0.333333015 9:40 AM 10:00 AM

Overhead CTL 0.416666031 5:50 PM 6:15 PM

0

20148 AstraZeneca 0.5 10:00 AM 10:30 AM

Overhead CTL 1.333333015 8:30 AM 8:50 AM 2:00 PM 3:00 PM

20225 York 0.333333015 9:10 AM 9:30 AM

Overhead CTL 0.5 8:00 AM 8:30 AM

20103 York 0.5 3:30 PM 4:00 PM

20138 Honeywell 2.166666985 1:50 PM 2:00 PM 3:00 PM 3:30 PM 4:00 PM 5:30 PM

Page 358: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead Johnson Mathey 0.5 9:30 AM 10:00 AM

Overhead CTL 0.75 8:15 AM 9:00 AM

20289 Piller 1 11:00 AM 12:00 PM

Overhead homeowner 0.25 12:00 PM 12:15 PM

Overhead CTL 1 10:00 AM 11:00 AM

Toth WOS 1.983333588 10:00 PM 11:59 PM

20148 AstraZeneca 0.5 3:00 PM 3:30 PM

20225 York 1 2:00 PM 3:00 PM

Overhead CTL 0.75 9:15 AM 10:00 AM

20138 Honeywell 2 10:00 AM 12:00 PM

20334 Homeowner 3 1:00 PM 2:00 PM 3:30 PM 5:30 PM

Toth WOS 1.983333588 10:00 PM 11:59 PM

Overhead CTL 1 2:00 PM 3:00 PM

20289 Piller 0.333333015 10:00 AM 10:20 AM

20148 AstraZeneca 4.666666985 10:20 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 5:00 PM

RAC CTL 0.333333015 9:40 AM 10:00 AM

20336 Mississippi Power 0.333333969 9:20 AM 9:40 AM

20334 Homeowner 0.333333015 9:00 AM 9:20 AM

Overhead CTL 0.5 8:30 AM 9:00 AM

Toth WOS 1 10:00 PM 11:00 PM

Overhead CTL 1 2:00 PM 3:00 PM

20321 Chalmers & Kubeck 1 3:00 PM 4:00 PM

20336 Mississippi Power 0.5 4:30 PM 5:00 PM

20148 AstraZeneca 2 8:30 AM 10:30 AM

Overhead CTL 0.5 8:00 AM 8:30 AM

Page 359: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead Slime 0.5 10:30 AM 11:00 AM

20289 Piller 0

941 IRS 2 8:00 PM 10:00 PM

20148 AstraZeneca 2.5 11:00 AM 12:00 PM 1:00 PM 2:00 PM 4:00 PM 4:30 PM

Toth WOS 8 8:30 AM 9:30 AM 10:30 AM 2:30 PM 3:30 PM 6:30 PM

Toth WOS 4 7:30 AM 11:30 AM

Overhead CTL 1 1:00 PM 2:00 PM

20148 AstraZeneca 0.25 2:00 PM 2:15 PM

Overhead CTL 0.75 2:15 PM 3:00 PM

20248 Lilly 1 3:00 PM 4:00 PM

20148 AstraZeneca 1 4:15 PM 5:15 PM

Overhead AKF Engineers 0.25 4:00 PM 4:15 PM

Overhead CTL 1 8:30 AM 9:30 AM

20148 AstraZeneca 0.25 9:45 AM 10:00 AM

20148 AstraZeneca 0.25 9:30 AM 9:45 AM

Toth WOS 2 10:00 AM 12:00 PM

20148 AstraZeneca 0

Overhead CTL 0.5 3:30 PM 4:00 PM

20148 AstraZeneca 7 7:30 AM 11:00 AM 12:00 PM 3:30 PM

20148 AstraZeneca 1.5 1:00 PM 2:30 PM

20148 AstraZeneca 0.5 2:30 PM 3:00 PM

20225 York 2 2:30 PM 4:30 PM

Overhead CTL 0.75 4:30 PM 5:15 PM

Overhead CTL 1 8:10 AM 9:10 AM

20297 Atofina 0.583333015 9:10 AM 9:45 AM

Page 360: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20248 Lilly 0.25 9:45 AM 10:00 AM

20148 2 10:00 AM 12:00 PM

Toth WOS 0 7:00 PM 8:00 PM

20225 York 1.5 1:30 PM 3:00 PM

Overhead Piller 1 3:00 PM 4:00 PM

20148 Astrazeneca 0.5 4:00 PM 4:30 PM

20225 York 0.5 4:30 PM 5:10 PM

Overhead 2.5 6:30 PM 9:00 PM

20336 Mississippi Power 0.5 8:10 AM 8:40 AM

RAC CTL 0.833333015 8:40 AM 9:30 AM

RAC pcce.co.za 0.5 9:30 AM 10:00 AM

20225 York 0.5 10:00 AM 10:30 AM

Overhead CTL 0.5 10:30 AM 11:00 AM

20148 Astrazeneca 1.5 11:00 AM 12:00 PM 1:00 PM 1:30 PM

Overhead CTL 0.333333015 8:10 AM 8:30 AM

20225 York 2 8:30 AM 10:30 AM

Overhead CTL 0.25 10:30 AM 10:45 AM

20289 Pillar 1.25 10:45 AM 11:30 AM 2:00 PM 2:30 PM

Overhead CTL 0.5 11:30 AM 12:00 PM

20148 Astrazeneca 1 1:00 PM 2:00 PM

20227 York 0.5 2:30 PM 3:00 PM

Overhead CTL 1 3:00 PM 4:00 PM

20225 York 0.5 4:00 PM 4:30 PM

Overhead CTL 0.25 4:30 PM 4:45 PM

RAC 0.5 4:45 PM 5:15 PM

Page 361: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

AMO Laptop AMO 1 9:00 PM 10:00 PM

Taxes MV 8 11:00 AM 7:00 PM

Taxes MV 0 2:00 PM 6:00 PM

Taskmaster MV 2.333333015 8:00 AM 10:20 AM

Overhead CTL 0.833333015 8:10 AM 9:00 AM

20289 Piller 0.5 9:00 AM 9:30 AM

20225 York 0.5 9:30 AM 10:00 AM

NACE CTL 3 10:00 AM 1:00 PM

20289 Piller 0.333333015 2:00 PM 2:20 PM

20286 Slime 1.166666985 2:20 PM 3:30 PM

Overhead Motiva 1 3:30 PM 4:30 PM

Overhead CTL 0.666666031 4:30 PM 5:10 PM

Finances Okie 0.01 8:00 PM 9:00 PM

20269 Westec 0

Overhead CTL 0 8:00 PM 9:00 PM

Overhead CTL 0.583333015 8:15 AM 8:50 AM

20334 Homeowner 0.666666985 8:50 AM 9:30 AM

20297 CTL 1 9:30 AM 10:30 AM

20297 Atofina 1 10:30 AM 11:30 AM

19189 Merck 0.25 11:30 AM 11:45 AM

20210 Eone 0.25 11:45 AM 12:00 PM

20336 Mississippi Power 1 12:30 PM 1:30 PM

20138 Honeywell 3.5 1:30 PM 5:00 PM

Overhead CTL 1 8:15 AM 9:15 AM

20138 Honeywell 3.75 9:15 AM 12:00 PM 3:00 PM 4:00 PM

Page 362: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20225 York 1 1:00 PM 2:00 PM

20289 Piller 1 2:00 PM 3:00 PM

20214 IMC 0.5 4:00 PM 4:30 PM

Overhead CTL 0.75 4:30 PM 5:15 PM

Overhead CTL 0.5 8:10 AM 8:40 AM

20227 York 0.5 8:40 AM 9:10 AM

20138 Honeywell 2.833333015 9:10 AM 12:00 PM

20225 York 3.5 1:00 PM 4:30 PM

Overhead CTL 0.5 4:30 PM 5:00 PM

Overhead CTL 0.5 8:15 AM 8:45 AM

20225 York 0.5 8:45 AM 9:15 AM

20225 York 0.5 9:15 AM 9:45 AM

20225 York 0.75 9:45 AM 10:30 AM

20347 Atofina 1 10:30 AM 11:30 AM

Overhead ERM 0.666666985 11:30 AM 12:10 PM

20138 Honeywell 3.25 1:10 PM 3:10 PM 4:00 PM 5:15 PM

20225 York 0.833333015 3:10 PM 4:00 PM

20148 Astrazeneca 3.75 10:45 AM 1:00 PM 3:00 PM 4:30 PM

Overhead CTL 4 2:00 PM 6:00 PM

Overhead CTL 1 8:10 AM 9:10 AM

20286 Slime 0.833333015 9:10 AM 10:00 AM

20225 York 3.5 10:00 AM 12:00 PM 2:30 PM 4:00 PM

Overhead CTL 0.5 1:00 PM 1:30 PM

Overhead CTL 0.5 1:30 PM 2:00 PM

20148 AstraZeneca 0.5 2:00 PM 2:30 PM

Page 363: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20148 AstraZeneca 1.25 4:00 PM 5:15 PM

Okie Overhead 0

Overhead CTL 0.833333015 8:10 AM 9:00 AM

20138 Honeywell 6.5 9:00 AM 11:00 AM 11:30 AM 12:00 PM 1:00 PM 5:00 PM

20225 0.5 11:00 AM 11:30 AM

20345 Merck 1 5:00 PM 6:00 PM

Overhead CTL 1 10:00 PM 11:00 PM

Overhead CTL 0.333333015 8:10 AM 8:30 AM

20225 York 2 8:30 AM 10:30 AM

Overhead Objective Enterprises 0.5 10:30 AM 11:00 AM

20247 Motiva 1 11:00 AM 12:00 PM

20317 Piller 2 12:00 PM 12:30 PM 4:00 PM 5:30 PM

20347 Atofina 1 1:30 PM 2:30 PM

20197 Cytec 1 2:30 PM 3:30 PM

20318 Motiva 0.5 3:30 PM 4:00 PM

Overhead CTL 0.416666031 5:00 PM 5:25 PM

20225 York 3 8:15 AM 10:15 AM 11:15 AM 12:15 PM

Overhead White-Rodgers 0.5 10:15 AM 10:45 AM

20312 Cordis 0.5 10:45 AM 11:15 AM

20317 Piller 2.5 1:30 PM 4:00 PM

Overhead CTL 1 4:00 PM 5:00 PM

20148 AstraZeneca 0.25 5:00 PM 5:15 PM

20225 York 1 1:30 PM 2:30 PM

Overhead CTL 0.75 8:15 AM 9:00 AM

Overhead CTL 1.25 4:00 PM 5:15 PM

Page 364: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Foundry lawyers 1 9:00 AM 10:00 AM

20317 Piller 2 11:15 AM 12:30 PM 3:15 PM 4:00 PM

20225 York 1 10:15 AM 11:15 AM

20148 AstraZeneca 0.25 10:00 AM 10:15 AM

20225 York 0.75 2:30 PM 3:15 PM

NACE CTL 8 8:15 AM 4:15 PM

NACE CTL 8 8:00 AM 12:00 PM 1:00 PM 5:00 PM

NACE CTL 8 8:00 AM 12:00 PM 1:00 PM 5:00 PM

NACE CTL 8 8:00 AM 12:00 PM 1:00 PM 5:00 PM

NACE CTL 8 9:00 AM 5:00 PM

Overhead CTL 0.983333588 8:01 AM 9:00 AM

20225 York 3 9:00 AM 10:00 AM 2:00 PM 3:00 PM 3:30 PM 4:30 PM

20289 Piller 0.25 10:00 AM 10:15 AM

20312 Cordis 0.5 10:15 AM 10:45 AM

20347 Atofina 1 10:45 AM 11:15 AM 1:30 PM 2:00 PM

20317 Piller 1 11:30 AM 12:30 PM

Overhead Herman Gloer 0.5 3:00 PM 3:30 PM

20225 York 0.5 4:30 PM 5:00 PM

Overhead MV 4 10:00 AM 2:00 PM

Overhead CTL 0.833333015 8:10 AM 9:00 AM

Page 365: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20225 York 1.75 9:00 AM 10:00 AM 11:45 AM 12:30 PM

Tasks MV 0.25 10:00 AM 10:15 AM

20214 IMC 1 10:15 AM 11:15 AM

20210 Eone 0.5 11:15 AM 11:45 AM

20317 Piller 3 1:30 PM 4:30 PM

Overhead CTL 0.5 4:30 PM 5:00 PM

Overhead CTL 0.75 8:15 AM 9:00 AM

20225 York 1 9:00 AM 10:00 AM

20317 Piller 2.5 10:00 AM 12:30 PM

20310 Cordis 2 1:30 PM 3:30 PM

Overhead CTL 1 3:30 PM 4:30 PM

Overhead CTL 0.583333969 4:30 PM 5:05 PM

20210 Eone 0.25 5:15 PM 5:30 PM

20227 York 2.75 8:15 AM 9:15 AM 12:00 PM 12:45 PM 1:45 PM 2:45 PM

Overhead CTL 0.25 9:15 AM 9:30 AM

20210 Eone 0.25 9:30 AM 9:45 AM

Foundry IKS 0.25 9:45 AM 10:00 AM

Overhead CTL 0.25 10:00 AM 10:15 AM

Overhead CTL 0.25 10:15 AM 10:30 AM

20214 IMS 0.25 10:30 AM 10:45 AM

20289 Piller 1.25 10:45 AM 12:00 PM

20289 Piller 1 2:45 PM 3:30 PM 5:00 PM 5:15 PM

Overhead Plymouth Tube 0.5 3:30 PM 4:00 PM

Overhead CTL 1 4:00 PM 5:00 PM

Taxes Odle 8 9:00 AM 12:00 PM 12:30 PM 5:30 PM

Page 366: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20289 Piller 2.083333015 9:25 AM 11:30 AM

Plymouth Tube 1.25 8:10 AM 9:25 AM

20317 Piller 2 3:30 PM 5:30 PM

Overhead CTL 3 11:30 AM 12:00 PM 1:00 PM 3:30 PM

Taxes Odle 8 8:30 AM 12:30 PM 1:30 PM 5:30 PM

Overhead CTL 1 8:10 AM 9:10 AM

20148 Astrazeneca 0.333333015 9:10 AM 9:30 AM

20225 York 0.75 9:30 AM 10:15 AM

20210 EnvirOverhead 0.5 10:15 AM 10:45 AM

RAC lawyer 1.75 10:45 AM 12:00 PM 1:00 PM 1:30 PM

Overhead CTL 1.5 1:30 PM 3:00 PM

Overhead CTL 0.333333015 8:10 AM 8:30 AM

Finances Odle 0.5 8:30 AM 9:00 AM

Overhead CTL 6 9:00 AM 12:00 PM 1:00 PM 4:00 PM

Celica 2000 Odle 0.5 12:30 PM 1:00 PM

Toth WOS 3.983333588 8:00 PM 11:59 PM

20225 York 1.5 4:30 PM 6:00 PM

Overhead CTL 0.5 4:00 PM 4:30 PM

20225 York 0.75 8:15 AM 9:00 AM

20227 York 1 9:00 AM 10:00 AM

20138 Honeywell 1.5 10:00 AM 11:30 AM

20148 Astrazeneca 1.75 1:00 PM 2:45 PM

20138 Honeywell 3.25 2:45 PM 6:00 PM

20225 York 0.833333015 8:10 AM 9:00 AM

20148 Astrazeneca 2 9:00 AM 11:00 AM

Page 367: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21006 Plymouth Tube 1 11:00 AM 12:00 PM

20138 Honeywell 1 12:00 PM 1:00 PM

20347 Atofina 1 2:00 PM 3:00 PM

20210 Eone 0.5 3:00 PM 3:30 PM

20312 Cordis 1 3:30 PM 4:30 PM

Overhead CTL 0.75 4:30 PM 5:15 PM

taxes Odle 5 6:00 PM 11:00 PM

20210 Eone 0 10:00 AM 10:15 AM

20138 Honeywell 3 8:15 AM 10:00 AM 1:00 PM 2:00 PM

20347 Atofina 0.75 10:15 AM 11:00 AM

20138 Honeywell 0.5 11:00 AM 11:30 AM

Overhead CTL 0.5 11:30 AM 12:00 PM

20347 Atofina 2 2:00 PM 4:00 PM

20312 Cordis 1 4:00 PM 5:00 PM

Toth WOS 1 6:00 PM 7:00 PM

Overhead CTL 0.75 8:15 AM 9:00 AM

20148 CTL 1.5 9:00 AM 10:30 AM

20148 AstraZeneca 3.5 10:30 AM 2:00 PM

20148 CTL 1 3:00 PM 4:00 PM

Cytec 0.5 4:00 PM 4:30 PM

Overhead CTL 0.75 4:30 PM 5:15 PM

20148 Astrazeneca 0.75 8:15 AM 9:00 AM

Overhead CTL 0.75 9:00 AM 9:45 AM

20148 Astrazeneca 4.75 9:45 AM 12:00 PM 2:30 PM 5:00 PM

Toth WOS 1 12:00 PM 1:00 PM

Page 368: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 0.5 2:00 PM 2:30 PM

20317 Piller 0.25 8:15 AM 8:30 AM

20148 AstraZeneca 0.5 8:30 AM 9:00 AM

20225 York 2.5 9:00 AM 11:00 AM 3:00 PM 3:30 PM

20227 York 0.75 11:00 AM 11:45 AM

20148 AstraZeneca 2.583333015 11:45 AM 12:30 PM 1:40 PM 3:00 PM 3:30 PM 4:00 PM

Overhead CTL 0.25 8:15 AM 8:30 AM

20312 Cordis 2 8:30 AM 10:30 AM

Auto MV 1 4:00 PM 5:00 PM

20312 Cordis 2 10:30 AM 12:30 PM

20214 IMC 1 1:30 PM 2:30 PM

Overhead CTL 0.5 2:30 PM 3:00 PM

20225 York 0.5 3:00 PM 3:30 PM

Overhead CTL 0.75 4:00 PM 4:45 PM

21006 Plymouth Tube 0.75 8:15 AM 9:00 AM

20225 York 1 9:00 AM 10:00 AM

20210 Eone 1 10:00 AM 11:00 AM

Overhead CTL 0.5 11:00 AM 11:30 AM

20148 AstraZeneca 5.25 8:45 AM 11:00 AM 1:00 PM 4:00 PM

20148 AstraZeneca 5.25 8:15 AM 1:30 PM

21026 AstraZeneca 1 1:30 PM 2:30 PM

Overhead CTL 0.5 2:30 PM 3:00 PM

20312 Cordis 1 3:00 PM 4:00 PM

20227 York 0.5 4:00 PM 4:30 PM

20197 Cytec 1.5 8:15 AM 9:15 AM 10:30 AM 11:00 AM

Page 369: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20317 Piller 1.25 9:15 AM 10:30 AM

Overhead CTL 0.5 11:00 AM 11:30 AM

Overhead CTL 0.5 11:30 AM 12:00 PM

21031 Piller 0.5 1:00 PM 1:30 PM

Overhead CTL 1.5 1:30 PM 3:00 PM

20225 York 0.5 3:00 PM 3:30 PM

20225 York 0.5 3:30 PM 4:00 PM

0

Overhead CTL 1 8:15 AM 9:15 AM

21031 Piller 0.5 9:15 AM 9:45 AM

20227 York 3.583333015 9:45 AM 12:00 PM 1:00 PM 2:20 PM

20197 Cytec 0.166666985 2:20 PM 2:30 PM

20317 Piller 2 2:30 PM 4:30 PM

20225 York 0.166666031 4:30 PM 4:40 PM

IM CTL 1 4:40 PM 5:40 PM

Overhead CTL 2.166666985 8:15 AM 9:15 AM 1:20 PM 2:30 PM

20148 Honeywell 1 9:15 AM 10:15 AM

20227 York 2 10:15 AM 12:15 PM

20148 Astrazeneca 0.5 2:30 PM 3:00 PM

Overhead Sunoco 0.5 3:00 PM 3:30 PM

20148 Astrazeneca 2 3:30 PM 5:30 PM

book keeping MV 0.01 5:00 PM 11:59 AM

21002 Motiva 2 1:30 PM 3:30 PM

website MV 0.01 7:00 PM 11:59 AM

21037 Primco 0.75 4:30 PM 5:15 PM

Page 370: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20225 York 1 3:30 PM 4:30 PM

20214 IMC 1 2:30 PM 3:30 PM

20225 York 3 10:30 AM 12:30 PM 1:30 PM 2:30 PM

20289 Piller 2 8:30 AM 10:30 AM

21037 Primco 0.333333015 8:10 AM 8:30 AM

website MV 0.01 7:00 PM 11:59 AM

IMC IMC 1 3:30 PM 4:30 PM

21037 Primco 1.5 9:00 AM 10:00 AM 11:00 AM 11:30 AM

taxes MV 5 2:00 PM 7:00 PM

Overhead CTL 0.916666985 8:05 AM 9:00 AM

21309 Sunoco 1 11:30 AM 12:00 PM 1:00 PM 1:30 PM

20225 York 1 10:00 AM 11:00 AM

Overhead CTL 1.333333015 8:10 AM 9:30 AM

20214 IMC 1 9:30 AM 10:00 AM 1:00 PM 1:30 PM

20225 York 2 10:00 AM 12:00 PM

20214 IMC 1 1:30 PM 2:30 PM

20225 York 0.5 2:30 PM 3:00 PM

Overhead CTL 2.5 3:00 PM 5:30 PM

website MV 3.983333588 8:30 PM 11:59 PM 12:01 PM 12:31 PM

Overhead CTL 0.416666985 8:05 AM 8:30 AM

21002 Motiva 2.5 8:30 AM 10:30 AM 11:30 AM 12:00 PM

21019 Volvo 0.5 10:30 AM 11:00 AM

20210 Eone 0.5 11:00 AM 11:30 AM

21037 Primcor 0.5 1:10 PM 1:40 PM

20225 York 0.333333015 1:40 PM 2:00 PM

Page 371: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead Piller 0.25 2:00 PM 2:15 PM

20214 ImC 0.5 2:15 PM 2:45 PM

Overhead CTL 1.25 2:45 PM 4:00 PM

20214 ImC 1.166666031 4:00 PM 5:10 PM

0

Overhead CTL 2 8:30 AM 10:30 AM

Overhead CTL 1 10:30 AM 11:30 AM

20214 IMC 1.5 11:30 AM 12:00 PM 1:00 PM 2:00 PM

20210 Eone 1 2:00 PM 3:00 PM

20214 IMC 1.5 3:00 PM 4:30 PM

Overhead CTL 0.75 8:15 AM 9:00 AM

BBModel SH 1 9:00 AM 10:00 AM

20214 ImC 5.75 10:00 AM 12:00 PM 1:15 PM 5:00 PM

0.25 1:00 PM 1:15 PM

20225 York 0.5 5:00 PM 5:30 PM

20214 IMC 0.5 8:15 AM 8:45 AM

20225 York 2 9:00 AM 11:00 AM

20225 York 0.75 11:00 AM 11:45 AM

Overhead Uniqema 0.25 11:45 AM 12:00 PM

20148 AstraZeneca 3.5 12:30 PM 4:00 PM

BBModel SH 4.13333416 9:00 PM 11:59 PM 12:01 PM 1:10 PM

21026 AstraZeneca 1.5 4:00 PM 5:30 PM

21026 AstraZeneca 0.5 5:30 PM 6:00 PM

Overhead CTL 0.25 8:15 AM 8:30 AM

Overhead CTL 1 8:30 AM 9:30 AM

Page 372: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21048 Uniqema 0.5 9:30 AM 10:00 AM

20214 IMC 2.666666985 10:00 AM 11:00 AM 1:20 PM 3:00 PM

20214 IMC 1.333333015 11:00 AM 12:20 PM

21029 Sunoco 1 3:00 PM 4:00 PM

21002 Premcor 0.5 4:00 PM 4:30 PM

Overhead CTL 1 4:30 PM 5:30 PM

Overhead CTL 0.5 10:00 PM 10:30 PM

Overhead CTL 2 8:15 AM 10:15 AM

21029 Sunoco 0.5 10:15 AM 10:45 AM

20225 York 0.25 10:45 AM 11:00 AM

Overhead Atofina 0.5 11:00 AM 11:30 AM

20210 Environe 1 11:30 AM 12:30 PM

21029 Sunoco 2.5 1:30 PM 2:30 PM 3:30 PM 5:00 PM

Overhead CTL 1 2:30 PM 3:30 PM

20148 Honeywell 0.5 5:00 PM 5:30 PM

20138 Honeywell 1 10:00 PM 11:00 PM

Overhead CTL 1 8:15 AM 9:15 AM

20214 IMC 1 9:15 AM 10:15 AM

20227 York 2.5 10:15 AM 12:45 PM

20227 York 2 1:45 PM 3:45 PM

20138 Honeywell 1.75 3:45 PM 5:30 PM

SOE MV 4 2:00 PM 6:00 PM

Overhead York 0.416666985 8:15 AM 8:40 AM

20225 York 0.666666985 8:40 AM 9:00 AM 4:00 PM 4:20 PM

21073 Peter 4.666666985 9:00 AM 12:15 PM 1:15 PM 2:40 PM

Page 373: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 0.333333015 2:40 PM 3:00 PM

Overhead CTL 1 3:00 PM 4:00 PM

20225 York 0.333332062 4:20 PM 4:40 PM

Overhead CTL 0.5 4:40 PM 5:10 PM

Overhead CTL 0.25 8:15 AM 8:30 AM

21029 Sunoco 2 8:30 AM 10:30 AM

21029 Sunoco 1 10:30 AM 11:30 AM

21041 Premcor 1.5 11:30 AM 1:00 PM

21048 Uniqema 2.25 2:00 PM 4:15 PM

Overhead CTL 0.5 4:15 PM 4:45 PM

21048 Uniqema 0.25 4:45 PM 5:00 PM

0

21048 Uniqema 2.25 8:15 AM 8:45 AM 11:15 AM 12:00 PM 1:00 PM 2:00 PM

Overhead CTL 1 8:45 AM 9:45 AM

Overhead CTL 0.5 9:45 AM 10:15 AM

21073 Elliot 0.75 10:15 AM 11:00 AM

Overhead CTL 0.25 11:00 AM 11:15 AM

21029 Sunoco 0.5 2:00 PM 2:30 PM

Overhead CTL 1 2:30 PM 3:30 PM

20138 Honeywell 1 3:30 PM 4:30 PM

20286 Slimes 0.5 4:30 PM 5:00 PM

21031 Piller 0.5 5:00 PM 5:30 PM

21029 Sunoco 3.833333015 8:15 AM 9:15 AM 2:50 PM 5:40 PM

Overture MV 0.75 9:15 AM 10:00 AM

20227 York 1 10:00 AM 11:00 AM

Page 374: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 1 11:00 AM 12:00 PM

21041 Premcor 1 1:00 PM 2:00 PM

21044 York 0.5 2:00 PM 2:30 PM

21019 Volvo 0.333333015 2:30 PM 2:50 PM

Overhead CTL 0.25 8:15 AM 8:30 AM

20225 York 0.75 8:30 AM 9:15 AM

20227 York 0.25 9:15 AM 9:30 AM

Overhead Josam 0.5 9:30 AM 10:00 AM

21029 Sunoco 5.333333969 10:00 AM 1:00 PM 3:00 PM 5:20 PM

21048 Uniqema 0.5 2:00 PM 2:30 PM

21019 Volvo 0.5 2:30 PM 3:00 PM

Overhead CTL 1 8:15 AM 9:15 AM

21048 Uniqema 1 9:15 AM 10:15 AM

Overhead Sunoco 0.5 10:15 AM 10:45 AM

21019 Volvo 1.25 10:45 AM 12:00 PM

21029 Sunoco 1 1:00 PM 2:00 PM

21029 Sunoco 2 2:00 PM 4:00 PM

20225 York 1 4:00 PM 5:00 PM

Overhead CTL 0.416666985 8:05 AM 8:30 AM

21048 Uniqema 2 8:30 AM 9:30 AM 2:00 PM 3:00 PM

Overhead CTL 1 9:30 AM 10:30 AM

21029 Sunoco 3 10:30 AM 12:00 PM 3:00 PM 4:30 PM

21044 York 1 1:00 PM 2:00 PM

21019 Volvo 0.5 2:00 PM 2:30 PM

Overhead Delphi 0.5 2:30 PM 3:00 PM

Page 375: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 1.5 3:00 PM 4:30 PM

21048 Uniqema 0.5 8:15 AM 8:45 AM

21019 Volvo 0.75 8:45 AM 9:30 AM

21029 Sunoco 2 9:30 AM 10:30 AM 1:00 PM 2:00 PM

21029 Sunoco 4.5 10:30 AM 12:00 PM 1:30 PM 4:00 PM 5:00 PM 5:30 PM

21019 Volvo 1 2:00 PM 3:00 PM

Overhead CTL 0.5 4:30 PM 5:00 PM

Overhead Sunoco 0.75 8:15 AM 9:00 AM

21041 Premcor 0.5 2:00 PM 2:30 PM

Overhead CTL 0.666666031 4:30 PM 5:10 PM

21041 Premcor 1 3:00 PM 4:00 PM

21044 York 1 4:00 PM 5:00 PM

21054 York 1 10:30 AM 11:30 AM

Overhead CTL 0.75 9:45 AM 10:30 AM

Overhead CTL 0.5 11:30 AM 12:00 PM

Overhead CTL 0.5 4:00 PM 4:30 PM

Overhead CTL 0.5 1:00 PM 1:30 PM

Overhead CTL 0.5 4:00 PM 4:30 PM

21019 Volvo 1 11:00 AM 12:00 PM

20210 Eone 5 9:00 AM 11:00 AM 1:00 PM 4:00 PM

Overhead CTL 0.75 8:15 AM 9:00 AM

20210 Eone 1.5 9:00 AM 9:30 AM 2:00 PM 3:00 PM

21048 Uniqema 0.5 9:30 AM 10:00 AM

21019 Volvo 0.5 10:00 AM 10:30 AM

21054 York 0.5 10:30 AM 11:00 AM

Page 376: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 1.5 11:00 AM 12:00 PM 1:00 PM 1:30 PM

Overhead CTL 0.5 1:30 PM 2:00 PM

Overhead Honeywell 2.25 3:00 PM 4:15 PM 6:00 PM 7:00 PM

Overhead Honeywell 1 8:15 AM 9:15 AM

Overhead CTL 0.25 9:15 AM 9:30 AM

Overhead CTL 0.333333015 9:30 AM 9:50 AM

21029 Sunoco 1.166666985 9:50 AM 11:00 AM

Overhead CTL 0.5 11:00 AM 11:30 AM

Overhead CTL 1 11:30 AM 12:30 PM

Overhead CTL 0.5 1:30 PM 2:00 PM

Overhead CTL 2 8:15 AM 10:15 AM

Overhead Honeywell 0.5 10:15 AM 10:45 AM

Overhead CTL 3 2:00 PM 5:00 PM

21019 Volvo 1.25 10:45 AM 12:00 PM

20210 Eone 2 1:00 PM 3:00 PM

Overhead CTL 2 3:00 PM 4:00 PM

Overhead CTL 1 4:00 PM 5:00 PM

Overhead CTL 0.25 8:15 AM 8:30 AM

21048 AstraZeneca 0.5 8:30 AM 9:00 AM

21044 York 2 9:00 AM 11:00 AM

Overhead CTL 2 11:00 AM 12:00 PM 1:00 PM 2:00 PM

IM CTL 2 2:00 PM 4:00 PM

20210 Eone 1.25 4:00 PM 5:15 PM

Overhead CTL 0.833333015 8:10 AM 9:00 AM

Overhead CTL 0.5 9:00 AM 9:30 AM

Page 377: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20225 York 0.75 9:30 AM 10:15 AM

Overhead CTL 0.25 10:15 AM 10:30 AM

20210 Eone 2.75 10:30 AM 12:00 PM 1:15 PM 2:30 PM

Overhead CTL 0.25 1:00 PM 1:15 PM

20289 Piller 3 2:30 PM 5:30 PM

Overhead CTL 0.5 8:30 AM 9:00 AM

Overhead CTL 0.5 9:30 AM 10:00 AM

20210 Eone 3.333333969 10:00 AM 12:00 PM 3:00 PM 4:20 PM

21054 York 1 1:00 PM 2:00 PM

21038 Premco 1 2:00 PM 3:00 PM

20210 Eone 2 8:15 AM 10:15 AM

V205 Peter 0.75 10:15 AM 11:00 AM

20225 York 1.5 11:00 AM 12:00 PM 1:00 PM 1:30 PM

Overhead Dwaine 1 1:30 PM 2:30 PM

20225 York 3 2:30 PM 5:30 PM

Overhead CTL 0.75 8:15 AM 9:00 AM

Overhead CTL 0.25 9:00 AM 9:15 AM

20148 AstraZeneca 0.25 9:15 AM 9:30 AM

20225 York 2 9:30 AM 11:30 AM

21059 Josam 0.5 11:30 AM 12:00 PM

Overhead Sunoco 0.5 1:00 PM 1:30 PM

Overhead CTL 0.5 1:30 PM 2:00 PM

21026 AstraZeneca 0.25 2:00 PM 2:15 PM

Overhead CTL 2.25 2:15 PM 4:00 PM 5:00 PM 5:30 PM

Overhead CTL 1 4:00 PM 5:00 PM

Page 378: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead MV 6 2:00 PM 8:00 PM

Overhead CTL 1.5 8:30 AM 10:00 AM

Overhead Eone 0.25 10:00 AM 10:15 AM

IM CTL 1.75 10:15 AM 11:00 AM 3:30 PM 4:30 PM

20210 Eone 1 11:00 AM 12:00 PM

Overhead CTL 0.5 1:00 PM 1:30 PM

21048 Uniqema 1 1:30 PM 2:30 PM

20225 York 1 2:30 PM 3:30 PM

21054 York 1 4:30 PM 5:30 PM

Overhead CTL 0.5 9:30 AM 10:00 AM

21038 Premcor 0.5 10:00 AM 10:30 AM

21026 AstraZeneca 0.5 10:30 AM 11:00 AM

Overhead CTL 0.5 11:00 AM 11:30 AM

20225 York 1 11:30 AM 12:30 PM

Overhead CTL 0.5 12:30 PM 1:00 PM

21019 Volvo 1 1:00 PM 2:00 PM

21048 Uniqema 0.5 2:00 PM 2:30 PM

20225 York 2 2:30 PM 4:00 PM 5:00 PM 5:30 PM

Overhead CTL 1 4:00 PM 5:00 PM

Overhead Concord Engr 1 8:30 AM 9:30 AM

Overhead CTL 0.25 8:15 AM 8:30 AM

21026 AstraZeneca 1 9:30 AM 10:30 AM

21038 Premcor 1 10:30 AM 11:30 AM

20225 York 3 11:30 AM 12:30 PM 2:30 PM 4:30 PM

21038 Premcor 1 1:30 PM 2:30 PM

Page 379: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 2.75 8:00 AM 9:20 AM 9:35 AM 11:00 AM

Overhead CTL 2 11:00 AM 1:00 PM

21026 AstraZeneca 3.5 2:00 PM 5:30 PM

20225 York 1 8:00 AM 9:00 AM

21038 Premcor 1.5 9:00 AM 10:00 AM 4:00 PM 4:30 PM

21083 Atofina 2 10:00 AM 10:20 AM 1:20 PM 3:00 PM

21026 AstraZeneca 0.5 10:20 AM 10:50 AM

Overhead CTL 1.166666985 10:50 AM 12:00 PM

20286 Slime 0.333333015 12:00 PM 12:20 PM

20289 Piller 1 3:00 PM 4:00 PM

Overhead CTL 1.5 8:30 AM 9:00 AM 1:00 PM 2:00 PM

21083 Atofina 4 9:00 AM 11:00 AM 2:00 PM 4:00 PM

IM CTL 1 3:00 PM 4:00 PM

21038 Premcor 0.5 4:00 PM 4:30 PM

Overhead York 0.75 4:30 PM 5:15 PM

0.25 8:00 AM 8:15 AM

21083 Atofina 2.75 8:15 AM 11:00 AM

20286 Slime 0.333333015 11:00 AM 11:20 AM

20225 York 0.833333969 11:20 AM 12:10 PM

21026 AstraZeneca 0.5 1:10 PM 1:40 PM

Overhead CTL 0.5 2:00 PM 2:30 PM

21029 Sunoco 1 2:30 PM 3:30 PM

20289 Piller 0.5 3:30 PM 4:00 PM

21068 York 0.5 4:00 PM 4:30 PM

Overhead CTL 0.25 8:00 AM 8:15 AM

Page 380: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 5.25 8:15 AM 12:30 PM 1:30 PM 2:30 PM

21068 York 1 2:30 PM 3:30 PM

20286 Slime 0.333333015 3:30 PM 3:50 PM

20225 York 0.166666985 3:50 PM 4:00 PM

Overhead CTL 0.5 4:00 PM 4:30 PM

Overhead CTL 0.25 8:00 AM 8:15 AM

BBModel MTL 1.25 8:15 AM 9:30 AM

20289 Piller 0.5 9:30 AM 10:00 AM

Overhead CTL 0.25 10:00 AM 10:15 AM

21026 AstraZeneca 0.25 10:15 AM 10:30 AM

Overhead CTL 0.5 10:30 AM 11:00 AM

Overhead CTL 0.25 8:00 AM 8:15 AM

21068 York 0.75 8:15 AM 9:00 AM

Mg_CO MTL 1 9:30 AM 10:30 AM

BBModel SH 8 10:30 AM 1:30 PM 2:30 PM 7:30 PM

Overhead CTL 0.25 8:00 AM 8:15 AM

21083 Atofina 0.25 8:15 AM 8:30 AM

Overhead CTL 0.75 8:30 AM 9:15 AM

21068 York 0.5 9:15 AM 9:45 AM

Overhead MTL 1 9:45 AM 10:45 AM

20225 York 1.75 10:45 AM 11:30 AM 1:00 PM 2:00 PM

Overhead Piller 0.5 11:30 AM 12:00 PM

21019 Volvo 1 2:00 PM 3:00 PM

Overhead CTL 2 3:00 PM 5:00 PM

Overhead CTL 1.333333015 8:00 AM 9:20 AM

Page 381: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 0.166666985 9:20 AM 9:30 AM

21019 Volvo 0.333333015 9:30 AM 9:50 AM

Mg_CO MTL 1 9:50 AM 10:50 AM

20225 York 0.333333969 10:50 AM 11:10 AM

Overhead CTL 0.25 11:10 AM 11:25 AM

Overhead CTL 1.833333015 11:25 AM 12:15 PM 2:15 PM 3:15 PM

Overhead CTL 1 1:15 PM 2:15 PM

Overhead Merck 2 3:15 PM 5:15 PM

Mg_CO MTL 2 6:30 PM 8:30 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

Mg_CO MTL 2 8:30 AM 10:30 AM

Overhead Piller 1.5 10:30 AM 12:00 PM

21068 York 1 12:40 PM 1:40 PM

Overhead Atofina 0.833333015 1:40 PM 2:30 PM

21083 Atofina 0.5 2:30 PM 3:00 PM

20289 Piller 1 3:00 PM 4:00 PM

Overhead Piller 1 4:00 PM 5:00 PM

Overhead CTL 0.25 5:00 PM 5:15 PM

20225 York 0.799999237 8:02 AM 8:20 AM 4:00 PM 4:30 PM

BBModel SH 0.75 8:20 AM 8:35 AM 1:15 PM 1:45 PM

21019 Volvo 0.25 9:00 AM 9:15 AM

Overhead York 1.75 9:15 AM 10:15 AM 12:00 PM 12:45 PM

20210 Eone 1.5 10:15 AM 11:15 AM 1:45 PM 2:15 PM

21098 York 0.75 11:15 AM 11:45 AM 2:15 PM 2:30 PM

Overhead Eone 0.25 11:45 AM 12:00 PM

Page 382: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21019 Volvo 1 2:30 PM 3:30 PM

Overhead CTL 0.5 3:30 PM 4:00 PM

21083 Atofina 0.833333969 4:30 PM 5:20 PM

Overhead Piller 0.416666985 8:35 AM 9:00 AM

Overhead CTL 0.5 8:00 AM 8:30 AM

Overhead CTL 0.5 8:30 AM 9:00 AM

Overhead Premcor 1 9:00 AM 10:00 AM

20225 York 1 10:00 AM 11:00 AM

21068 York 0.5 11:00 AM 11:30 AM

Overhead CTL 0.75 11:30 AM 12:15 PM

Overhead CTL 0.25 12:15 PM 12:30 PM

training Volvo 1 1:00 PM 2:00 PM

Overhead Atofina 2 2:00 PM 4:00 PM

Overhead CTL 0.25 4:00 PM 4:15 PM

Overhead BOC 0.5 4:15 PM 4:45 PM

Overhead Valero 0.25 4:45 PM 5:00 PM

21083 Atofina 0.5 5:00 PM 5:30 PM

Hydrogenation BOC 1 8:00 AM 9:00 AM

21083 Atofina 3.5 9:00 AM 12:30 PM

20225 York 1.5 1:30 PM 3:00 PM

Overhead Valero 1.166666031 3:00 PM 3:30 PM 4:30 PM 5:10 PM

21019 Volvo 1 3:30 PM 4:30 PM

BBModel SH 0.5 6:00 PM 6:30 PM

BBModel SH 2.983333588 9:00 PM 11:59 PM

BBModel SH 4 11:00 AM 3:00 PM

Page 383: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BBModel SH 2 2:30 PM 4:30 PM

BBModel SH 0.5 10:30 AM 11:00 AM

Carbothermal M Tasmania 0.5 11:00 AM 11:30 AM

BBModel SH 1.5 11:30 AM 1:00 PM

BBModel SH 4 2:00 PM 6:00 PM

BBModel SH 2.666666985 10:20 AM 12:00 PM 1:00 PM 2:00 PM

BBModel SH 2 2:00 PM 4:00 PM

20289 Piller 0.5 8:00 AM 8:30 AM

21100 Piller 0.666666985 8:30 AM 8:40 AM 4:00 PM 4:30 PM

Overhead CTL 0.333333015 8:40 AM 9:00 AM

Overhead CTL 0.333333015 9:00 AM 9:20 AM

20225 York 1.416666985 9:20 AM 10:30 AM 4:30 PM 4:45 PM

Overhead CTL 0.25 10:30 AM 10:45 AM

21099 Atofina 1 1:00 PM 1:30 PM 3:30 PM 4:00 PM

20289 Piller 2 1:30 PM 3:30 PM

Overhead CTL 0.416666031 4:45 PM 5:10 PM

21075 CAE 0.25 9:10 AM 9:25 AM

20225 York 0.25 9:45 AM 10:00 AM

Overhead CTL 0.333333015 9:25 AM 9:45 AM

Overhead CTL 0.25 10:00 AM 10:15 AM

Overhead Olesia 0.25 3:30 PM 3:45 PM

Overhead CTL 1 2:30 PM 3:30 PM

Overhead CTL 0.5 11:45 AM 12:15 PM

Overhead CTL 0.25 11:30 AM 11:45 AM

20189 Honeywell 0.25 11:15 AM 11:30 AM

Page 384: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20225 York 1 10:45 AM 11:15 AM 2:00 PM 2:30 PM

20289 Piller 1 10:15 AM 10:45 AM 1:30 PM 2:00 PM

Overhead CTL 0.5 3:45 PM 4:15 PM

20227 York 0.666666985 8:30 AM 9:10 AM

Overhead CTL 0.25 8:00 AM 8:15 AM

20225 York 0.833333969 4:15 PM 5:05 PM

21104 Valero 0.25 8:15 AM 8:30 AM

BBModel SH 1.25 9:45 AM 11:00 AM

BBModel SH 4 12:00 PM 4:00 PM

Overhead CTL 1.25 11:45 AM 1:00 PM

BBModel SH 1 1:00 PM 2:00 PM

BBModel SH 1 8:00 PM 9:00 PM

Overhead CTL 0.266666889 7:54 AM 8:10 AM

20839 Piller 0.333333015 8:10 AM 8:30 AM

Overhead CTL 0.5 8:30 AM 9:00 AM

Overhead Orbital 0.5 9:00 AM 9:30 AM

21099 Atofina 1.5 9:30 AM 10:30 AM 12:00 PM 12:30 PM

20225 CTL 0.5 10:30 AM 11:00 AM

21099 Atofina 2.083333015 11:00 AM 12:00 PM 12:55 PM 2:00 PM

21099 Atofina 3.25 2:00 PM 5:15 PM

BBModel SH 1 7:00 PM 8:00 PM

Overhead CTL 0.333333015 8:00 AM 8:20 AM

Overhead CTL 1.166666985 8:20 AM 9:00 AM 10:00 AM 10:30 AM

21099 Atofina 1 9:00 AM 10:00 AM

Overhead Piller 0.5 10:30 AM 11:00 AM

Page 385: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21099 Atofina 3.25 11:00 AM 12:30 PM 3:45 PM 5:30 PM

21098 York 0.25 1:30 PM 1:45 PM

Overhead Orbital 0.25 1:45 PM 2:00 PM

20289 Piller 1 2:00 PM 3:00 PM

21081 York 0.25 3:00 PM 3:15 PM

Overhead Odle 0.5 3:15 PM 3:45 PM

Overhead CTL 1 8:00 AM 9:00 AM

20148 AstraZeneca 0.25 9:00 AM 9:15 AM

20189 Honeywell 2 9:15 AM 11:15 AM

20225 York 0.25 11:15 AM 11:30 AM

21099 Atofina 2.833333969 11:30 AM 12:00 PM 1:30 PM 2:30 PM 4:00 PM 5:20 PM

20225 CTL 0.5 1:00 PM 1:30 PM

Overhead CTL 1 2:30 PM 3:30 PM

Overhead CTL 0.5 3:30 PM 4:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

20225 York 2 8:30 AM 9:30 AM 2:00 PM 3:00 PM

21099 Atofina 1 9:30 AM 10:30 AM

21099 Atofina 2.5 10:30 AM 12:00 PM 3:30 PM 4:30 PM

21099 Atofina 1 1:00 PM 2:00 PM

21019 Volvo 0.5 3:00 PM 3:30 PM

Overhead CTL 0.5 4:30 PM 5:00 PM

Taxes IRS 5 6:00 PM 11:00 PM

Overhead CTL 0.75 8:00 AM 8:45 AM

21096 Taylor Forge 0.5 9:15 AM 9:45 AM

Overhead CTL 0.5 9:45 AM 10:15 AM

Page 386: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21099 Atofina 1 10:45 AM 11:45 AM

20225 York 0.75 11:45 AM 12:30 PM

Overhead CTL 2 3:00 PM 5:00 PM

Taxes IRS 4 6:00 PM 10:00 PM

21098 York 0.5 8:45 AM 9:15 AM

Overhead Atofina 0.5 10:15 AM 10:45 AM

Overhead Piller 0.5 1:30 PM 2:00 PM

21110 Orbital 1 2:00 PM 3:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

20225 York 2 8:30 AM 9:30 AM 1:30 PM 2:30 PM

21110 Orbital 1.833333015 9:30 AM 11:20 AM

20225 York 0.666666985 11:20 AM 12:00 PM

Overhead Atofina 0.5 1:00 PM 1:30 PM

21117 Piller 1 2:30 PM 3:30 PM

20225 York 2.166666031 3:30 PM 5:40 PM

20148 Astrazeneca 0.333333969 5:40 PM 6:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

Overhead CTL 0.666666985 8:30 AM 9:10 AM

20225 York 2.333333015 9:10 AM 10:30 AM 1:00 PM 2:00 PM

21110 Orbital 1.5 10:30 AM 12:00 PM

Overhead Atofina 0.75 2:00 PM 2:45 PM

Overhead CTL 1.5 2:45 PM 3:00 PM 4:00 PM 5:15 PM

20148 Astrazeneca 1 3:00 PM 4:00 PM

BBModel SH 1.5 7:00 PM 8:30 PM

V2O5 CMC 0

Page 387: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 4 8:00 AM 9:00 AM 11:00 AM 12:00 PM 1:30 PM 3:30 PM

21096 Taylor Forge 1 9:00 AM 10:00 AM

Overhead Taylor Forge 1 10:00 AM 11:00 AM

21110 Orbital 0.5 1:00 PM 1:30 PM

20148 Astrazeneca 0.5 3:30 PM 4:00 PM

20225 York 1.25 4:00 PM 5:15 PM

Overhead CTL 0.416666985 8:05 AM 8:30 AM

21098 York 1.5 8:30 AM 10:00 AM

Overhead Dupont 1 10:00 AM 11:00 AM

20225 York 1 11:00 AM 12:00 PM

Overhead Atofina 1 1:00 PM 2:00 PM

Overhead CTL 0.5 2:00 PM 2:30 PM

21099 Atofina 0.5 2:30 PM 3:00 PM

Overhead Snytech 0.5 3:00 PM 3:30 PM

Overhead CTL 0.5 3:30 PM 4:00 PM

Overhead Valero 0.5 4:00 PM 4:30 PM

BW Lonza 0.75 4:30 PM 5:15 PM

BBModel SH 2 7:00 PM 9:00 PM

21098 York 0

Overhead CTL 0.5 8:00 AM 8:30 AM

21099 Atofina 1 8:30 AM 9:30 AM

20148 Astrazeneca 2 9:30 AM 11:30 AM

21099 Atofina 6.5 11:30 AM 1:00 PM 1:00 PM 4:00 PM 4:00 PM 6:00 PM

21116 Valero 0.5 6:00 PM 6:30 PM

21116 Valero 4.25 8:45 AM 12:00 PM 12:30 PM 1:30 PM

Page 388: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BBModel SH 1.333333015 2:40 PM 4:00 PM

20148 Astrazeneca 2.75 10:45 AM 1:30 PM

Overhead CTL 0

21110 Orbital 1 8:00 AM 9:00 AM

20225 York 1 9:00 AM 10:00 AM

21116 Valero 6.166666031 10:00 AM 11:30 AM 1:30 PM 6:10 PM

21099 Atofina 0.5 11:30 AM 12:00 PM

Overhead CTL 0.5 1:00 PM 1:30 PM

Overhead CTL 0.25 6:10 PM 6:25 PM

BBModel SH 0.5 6:30 PM 7:00 PM

Overhead CTL 2.75 8:00 AM 8:30 AM 10:00 AM 12:00 PM 4:45 PM 5:00 PM

21116 Valero 0.25 8:30 AM 8:45 AM

21026 AstraZeneca 0.25 8:45 AM 9:00 AM

20289 Piller 1 9:00 AM 10:00 AM

Overhead CTL 0.75 1:00 PM 1:45 PM

21026 AstraZeneca 1 1:45 PM 2:00 PM 3:00 PM 3:45 PM

21116 Valero 0.5 2:00 PM 2:30 PM

21099 Atofina 0.5 2:30 PM 3:00 PM

20225 York 1 3:45 PM 4:45 PM

Overhead CTL 0.25 8:45 AM 9:00 AM

21098 York 1 9:00 AM 10:00 AM

21116 Valero 2 11:00 AM 1:00 PM

21116 Valero 3 3:00 PM 6:00 PM

Overhead CTL 0.083333492 7:55 AM 8:00 AM

21099 Atofina 1 6:00 PM 7:00 PM

Page 389: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21099 Atofina 5.75 9:15 AM 12:00 PM 1:00 PM 2:00 PM 4:30 PM 6:30 PM

BBModel SH 1 11:00 AM 12:00 PM

21096 Taylor Forge 0.5 1:15 PM 1:45 PM

BBModel SH 1 1:00 PM 2:00 PM

BBModel SH 1 4:00 PM 5:00 PM

BBModel SH 0.01 5:00 AM 6:35 AM

Overhead CTL 1.133333206 7:52 AM 9:00 AM

21096 Valero 1 9:00 AM 10:00 AM

21026 AstraZeneca 0.25 10:00 AM 10:15 AM

21137 York 0.333333015 10:15 AM 10:35 AM

Overhead York 0.416666985 10:35 AM 11:00 AM

20225 York 0.25 11:00 AM 11:15 AM

Overhead CTL 0.25 11:15 AM 11:30 AM

Overhead CTL 4.916666985 11:30 AM 12:15 PM 1:20 PM 5:30 PM

Overhead CTL 0.5 5:30 PM 6:00 PM

Overhead CTL 0.75 8:00 AM 8:45 AM

20225 York 0.75 8:45 AM 9:30 AM

20225 York 1.666666985 9:30 AM 11:10 AM

21137 York 2.416666031 11:10 AM 12:20 PM 2:15 PM 3:30 PM

Overhead CTL 0.583333015 1:25 PM 2:00 PM

21026 AstraZeneca 0.25 2:00 PM 2:15 PM

21099 Atofina 2.083333969 3:30 PM 5:35 PM

BBModel SH 1.5 5:00 AM 6:30 AM

Overhead CTL 0.01 8:00 AM 8:30 AM

21099 Atofina 1.600000381 8:30 AM 10:00 AM

Page 390: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21096 Taylor Forge 4.166666031 10:00 AM 12:20 PM 1:10 PM 3:00 PM

21096 Taylor Forge 1 3:00 PM 4:00 PM

Overhead CTL 0.5 4:00 PM 4:30 PM

21137 York 0.5 4:30 PM 5:00 PM

BBModel SH 1.5 5:00 AM 6:30 AM

Overhead CTL 0.483333588 8:01 AM 8:30 AM

20225 York 0.75 8:30 AM 8:45 AM 8:45 AM 9:15 AM

21137 York 1.5 9:15 AM 10:00 AM 1:15 PM 2:00 PM

IM CTL 2.25 10:00 AM 12:15 PM

21096 Taylor Forge 1 2:00 PM 3:00 PM

21096 Taylor Forge 1.5 3:00 PM 4:30 PM

Overhead CTL 0.5 4:30 PM 5:00 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

Overhead unknown 0.5 8:30 AM 9:00 AM

21096 Taylor Forge 3 9:00 AM 12:00 PM

21096 Taylor Forge 2 1:00 PM 3:00 PM

Overhead CTL 1.5 3:00 PM 4:00 PM 5:00 PM 5:30 PM

21096 Taylor Forge 1 4:00 PM 5:00 PM

TaskMaster MV 1.5 9:00 AM 10:30 AM

BBModel SH 2 11:00 AM 1:00 PM

BBModel SH 2 1:00 PM 3:00 PM

BBModel SH 4 10:00 AM 2:00 PM

Overhead CTL 0.416666985 8:05 AM 8:30 AM

21137 York 1 8:30 AM 9:30 AM

21096 Taylor Forge 2.5 9:30 AM 12:00 PM

Page 391: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21146 York 1 1:00 PM 2:00 PM

21117 Piller/BASF 1 2:00 PM 3:00 PM

Overhead CTL 2 3:00 PM 5:00 PM

BBModel SH 1 5:00 AM 6:00 AM

21096 Taylor Forge 5 9:00 AM 12:30 PM 2:00 PM 3:00 PM 5:00 PM 5:30 PM

20225 York 0.5 1:30 PM 2:00 PM

Overhead CTL 1 2:00 PM 3:00 PM

21117 BASF 1 3:00 PM 4:00 PM

20148 AstraZeneca 1.5 4:00 PM 5:00 PM 5:30 PM 6:00 PM

BBModel SH 1 5:30 AM 6:30 AM

Overhead CTL 0.75 8:00 AM 8:45 AM

21117 BASF 0.75 8:45 AM 9:30 AM

21088 MERC 0.25 9:30 AM 9:45 AM

Overhead CTL 0.25 9:45 AM 10:00 AM

20148 AstraZeneca 3.5 10:00 AM 12:00 PM 1:00 PM 2:30 PM

Overhead CTL 0.5 2:30 PM 3:00 PM

Overhead CTL 0.5 3:00 PM 3:30 PM

20225 York 0.25 3:30 PM 3:45 PM

21096 Taylor Forge 1.5 3:45 PM 5:15 PM

BBModel SH 1 7:00 PM 8:00 PM

20148 AstraZeneca 0

21117 BASF 0

BBModel SH 1.333333492 5:10 AM 6:30 AM

MgH2 SH 1 7:30 AM 8:30 AM

Overhead CTL 0.5 8:30 AM 9:00 AM

Page 392: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21096 Taylor Forge 0.5 9:00 AM 9:30 AM

21099 Atofina 1 9:30 AM 10:30 AM

21096 Taylor Forge 5.5 10:30 AM 12:15 PM 12:30 PM 4:15 PM

Overhead CTL 0.75 4:15 PM 5:00 PM

21088 MERC 0.25 5:00 PM 5:15 PM

BBModel SH 1.25 5:15 AM 6:30 AM

Overhead CTL 0.5 8:00 AM 8:30 AM

21096 Taylor Forge 6.5 8:30 AM 12:00 PM 2:00 PM 5:00 PM

21096 Taylor Forge 2 1:00 PM 2:00 PM 5:00 PM 6:00 PM

Overhead CTL 8.25 12:00 AM 8:15 AM

BBModel SH 1 8:15 AM 9:15 AM

BBModel SH 0.5 9:15 AM 9:45 AM

BBModel SH 1 12:30 PM 1:30 PM

BBModel SH 2 3:00 PM 5:00 PM

BBModel SH 3 8:00 AM 11:00 AM

BBModel SH 2 6:00 PM 8:00 PM

BBModel SH 1.25 5:15 AM 6:30 AM

Overhead CTL 0.800000191 7:52 AM 8:40 AM

21096 Taylor Forge 0.583333015 8:40 AM 9:15 AM

21096 Taylor Forge 1.833333969 9:15 AM 10:15 AM 4:30 PM 5:20 PM

21117 BASF 2 10:15 AM 12:15 PM

BBModel SH 0.583333015 12:40 PM 1:15 PM

21117 BASF 1 1:15 PM 2:15 PM

21088 MERC 0.5 2:15 PM 2:45 PM

Overhead CTL 1.75 2:45 PM 4:30 PM

Page 393: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BBModel SH 2 3:00 AM 5:00 AM

21088 MERC 1 8:00 AM 9:00 AM

Overhead CTL 1 9:00 AM 10:00 AM

Overhead CTL 2.5 10:00 AM 10:30 AM 1:00 PM 3:00 PM

Overhead CTL 0.5 10:30 AM 11:00 AM

20148 AstraZeneca 1 11:00 AM 12:00 PM

21117 BASF 0.5 3:00 PM 3:30 PM

21117 BASF 1.25 3:30 PM 4:30 PM 5:00 PM 5:15 PM

Overhead CTL 0.5 4:30 PM 5:00 PM

21096 Taylor Forge 9.5 12:00 AM 9:30 AM

21088 MERC 8.5 9:30 AM 12:30 PM 12:30 PM 6:00 PM

BBModel SH 0.333333969 7:00 PM 7:20 PM

BBModel SH 1.5 5:00 AM 6:30 AM

Overhead CTL 0.333333015 8:00 AM 8:20 AM

21088 MERC 0.666666985 8:20 AM 9:00 AM

Overhead Brandywine 1 9:00 AM 10:00 AM

21137 York 1 10:00 AM 11:00 AM

Overhead MERC 2 11:00 AM 12:15 PM 1:15 PM 2:00 PM

Overhead BASF 0.199999809 1:00 PM 1:12 PM

Overhead CTL 0.5 2:00 PM 2:30 PM

Overhead CTL 2.5 2:30 PM 5:00 PM

21117 BASF 2 8:00 AM 10:00 AM

Overhead MERC 1 10:00 AM 11:00 AM

Overhead BASF 1 11:00 AM 12:00 PM

Overhead CTL 0.25 1:00 PM 1:15 PM

Page 394: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21117 BASF 3.25 1:15 PM 4:30 PM

Overhead CTL 0.5 4:30 PM 5:00 PM

211137 York 1.166666508 7:50 AM 9:00 AM

Tasks MV 1.25 9:00 AM 10:15 AM

BBModel SH 2.75 12:15 PM 3:00 PM

0

BBModel SH 3 8:00 AM 11:00 AM

BBModel SH 5 12:00 PM 5:00 PM

BBModel SH 1.25 5:15 AM 6:30 AM

Overhead CTL 0.333333015 8:00 AM 8:20 AM

21117 BASF 1 8:20 AM 9:20 AM

21117 BASF 0.666666985 9:20 AM 10:00 AM

LibertyBell CTL 2.5 10:00 AM 12:30 PM

Overhead CTL 0.25 1:30 PM 1:45 PM

20148 AstraZeneca 0.25 1:45 PM 2:00 PM

21088 Merck 3 2:00 PM 5:00 PM

BBModel SH 2 8:00 PM 10:00 PM

BBModel SH 0.5 8:00 AM 8:30 AM

Overhead CTL 0.333333015 8:30 AM 8:50 AM

21159 Chalmers& Kubeck 0.5 8:50 AM 9:20 AM

20225 York 0.25 9:20 AM 9:35 AM

21088 Merck 4.833333969 9:35 AM 11:30 AM 12:50 PM 2:00 PM 2:30 PM 4:15 PM

Overhead PFU 1 11:30 AM 12:30 PM

21088 Merck 1.166666985 12:50 PM 2:00 PM

21120 Cotherm 0.75 2:00 PM 2:30 PM 4:15 PM 4:30 PM

Page 395: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21117 BASF 1 4:30 PM 5:30 PM

21117 BASF 6.75 8:00 AM 11:30 AM 4:45 PM 8:00 PM

21117 BASF 4.75 11:30 AM 12:00 PM 12:30 PM 4:45 PM

MgH2 PFU 0.5 9:00 PM 9:30 PM

Overhead CTL 0.5 8:15 AM 8:45 AM

Overhead CTL 0.75 8:45 AM 9:30 AM

Overhead CTL 0.25 9:45 AM 10:00 AM

Overhead CTL 2 10:00 AM 12:00 PM

MgH2 PFU 0.5 1:00 PM 1:30 PM

21158 York 1 2:00 PM 3:00 PM

21137 York 1 3:00 PM 4:00 PM

21088 Merck 1 4:00 PM 5:00 PM

Overhead CTL 0.25 5:00 PM 5:15 PM

BBModel SH 1 8:00 PM 9:00 PM

BBModel SH 1.75 5:00 AM 6:45 AM

Overhead CTL 2 8:30 AM 10:30 AM

21159 Chalmers& Kubeck 1.5 10:30 AM 12:00 PM

Overhead CTL 0.5 2:00 PM 2:30 PM

21146 York 2 2:30 PM 4:30 PM

Overhead CTL 1.666666031 4:30 PM 5:10 PM 7:00 PM 8:00 PM

LibertyBell CTL 1 8:00 AM 9:00 AM

Overhead CTL 1 9:00 AM 10:00 AM

Pressario Olesia 2 11:30 AM 1:30 PM

BBModel SH 2 1:30 PM 3:30 PM

0

Page 396: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Taskmaster MV 2.583333492 4:45 AM 7:20 AM

BBModel SH 2 9:00 AM 11:00 AM

BBModel SH 1.5 7:00 AM 8:30 AM

Overhead CTL 0.333333015 8:00 AM 8:20 AM

21146 York 0.666666985 8:20 AM 9:00 AM

Overhead CTL 0.75 9:00 AM 9:45 AM

Finances Odle 0.25 9:45 AM 10:00 AM

21159 Chalmers & Kubeck 1 10:00 AM 11:00 AM

21117 BASF 1.916666031 11:00 AM 12:15 PM 4:30 PM 5:10 PM

21158 York 1.75 1:15 PM 2:30 PM 4:00 PM 4:30 PM

Overhead CTL 0.25 2:30 PM 2:45 PM

BBModel SH 1.25 2:45 PM 4:00 PM

21117 BASF 0

Overhead CTL 0.5 8:00 AM 8:30 AM

Overhead BASF 0.5 8:30 AM 9:00 AM

H2 via SOE PFU 0.5 9:00 AM 9:30 AM

Overhead CTL 1 9:30 AM 10:30 AM

BBModel SH 1.833333015 10:30 AM 12:20 PM

21159 Chalmers & Kubeck 1.416666985 1:20 PM 1:45 PM 3:00 PM 4:00 PM

Overhead NACE 0.25 1:45 PM 2:00 PM

H2 via SOE PFU 1 2:00 PM 3:00 PM

21159 Chalmers & Kubeck 1.166666031 4:00 PM 5:10 PM

Overhead CTL 0.583333015 8:00 AM 8:35 AM

21117 BASF 2.166666985 8:35 AM 10:45 AM

21088 Merck 1.25 10:45 AM 12:00 PM

Page 397: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21129 Building 1 1:00 PM 2:00 PM

BBModel SH 1 2:00 PM 3:00 PM

Overhead CTL 1.5 3:00 PM 4:30 PM

21117 BASF 0.25 5:00 PM 5:15 PM

21159 Chalmers & Kubeck 0.5 4:30 PM 5:00 PM

Overhead CTL 1 8:00 AM 9:00 AM

21159 Chalmers & Kubeck 0.25 9:00 AM 9:15 AM

21159 Chalmers & Kubeck 2.75 9:15 AM 12:00 PM

21117 BASF 2 1:00 PM 3:00 PM

21117 BASF 2 3:00 PM 5:00 PM

BBModel SH 6 8:00 AM 2:00 PM

Overhead CTL 0.333333015 8:00 AM 8:20 AM

Overhead CTL 0.333333969 8:20 AM 8:40 AM

Overhead CTL 2.583333015 8:40 AM 11:00 AM 5:00 PM 5:15 PM

20225 York 0.166666985 11:00 AM 11:10 AM

21117 BASF 3.833333015 11:10 AM 12:15 PM 1:15 PM 4:00 PM

21179 Valero 0.5 1:30 PM 2:00 PM

21159 Chalmers & Kubeck 1 4:00 PM 5:00 PM

BBModel SH 1 5:10 AM 6:10 AM

Overhead CTL 0.75 8:00 AM 8:45 AM

Overhead CTL 0.25 8:45 AM 9:00 AM

21117 BASF 5.666666031 9:00 AM 11:00 AM 11:40 AM 12:20 PM 2:00 PM 5:00 PM

20225 York 0.333333015 11:00 AM 11:20 AM

21159 Chalmers & Kubeck 0.333333969 11:20 AM 11:40 AM

Overhead CTL 1 1:00 PM 2:00 PM

Page 398: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BBModel SH 1.583333492 4:55 AM 6:30 AM

Overhead CTL 0.25 8:15 AM 8:30 AM

Overhead CTL 0.333333015 8:30 AM 8:50 AM

21117 BASF 1.166666985 8:50 AM 10:00 AM

Overhead BASF 1 10:00 AM 11:00 AM

21186 STV 1 11:00 AM 12:00 PM

21186 STV 1 1:00 PM 2:00 PM

21117 BASF 0.5 2:30 PM 3:00 PM

20225 York 0.5 3:00 PM 3:30 PM

21179 Valero 0.5 3:30 PM 4:00 PM

21158 York 1 4:00 PM 5:00 PM

Overhead CTL 0.5 12:45 PM 1:15 PM

21129 Stonehedge 0.5 1:15 PM 1:45 PM

21168 Atofina 0.5 1:45 PM 2:15 PM

Overhead Atofina 1 2:15 PM 3:15 PM

Overhead CTL 1 3:15 PM 4:15 PM

21168 Atofina 9 8:00 AM 5:00 PM

BBModel SH 0.25 12:30 PM 12:45 PM

BBModel SH 1 1:00 PM 2:00 PM

BBModel SH 2 10:00 AM 12:00 PM

21168 Atofina 0.5 9:00 AM 9:30 AM

21081 York 1 9:30 AM 10:00 AM 4:00 PM 4:30 PM

21186 STV Inc 0.5 10:00 AM 10:30 AM

21117 BASF 0.25 10:30 AM 10:45 AM

LibertyBell NACE 1.25 10:45 AM 11:15 AM 12:15 PM 1:00 PM

Page 399: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21117 BASF 1 1:00 PM 2:00 PM

Overhead CTL 0.5 2:00 PM 2:30 PM

21158 York 2 2:30 PM 4:30 PM

Overhead CTL 0.5 4:30 PM 5:00 PM

LibertyBell NACE 7.75 8:00 AM 9:00 AM 12:15 PM 7:00 PM

21168 Atofina 1 9:00 AM 10:00 AM

21194 AstraZeneca 1 10:00 AM 11:00 AM

21081 York 0.5 11:00 AM 11:30 AM

BBModel SH 1 5:00 AM 6:00 AM

21168 Atofina 0.333333015 8:00 AM 8:20 AM

Overhead CTL 0.333333969 8:20 AM 8:40 AM

21158 York 1.25 11:00 AM 12:15 PM

21194 AstraZeneca 3.5 12:30 PM 4:00 PM

21081 York 1.666666031 4:00 PM 5:40 PM

21081 York 12.5 6:00 AM 6:30 PM

21186 STV Inc 14 6:30 AM 8:30 PM

21081 York 0.5 8:30 PM 9:00 PM

Overhead CTL 1.5 8:00 AM 9:30 AM

BBModel SH 1 9:30 AM 10:30 AM

Oman PFU 1.5 12:15 PM 1:45 PM

Oman PFU 0.5 8:00 AM 8:30 AM

Overhead CTL 1 8:30 AM 9:30 AM

20225 York 1 9:30 AM 10:30 AM

21129 StoneHedge 0.75 10:30 AM 11:15 AM

21168 Atofina 1 11:30 AM 12:30 PM

Page 400: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21186 STV 1 12:30 PM 1:30 PM

21158 York 1 2:30 PM 3:30 PM

Overhead CTL 1 3:30 PM 4:30 PM

21194 AstraZeneca 0.333333969 4:30 PM 4:50 PM

Overhead CTL 0.416666031 4:50 PM 5:15 PM

Oman PFU 1 8:00 PM 9:00 PM

BBModel SH 1 9:00 PM 10:00 PM

Overhead CTL 0.5 9:15 AM 9:45 AM

Overhead CTL 1 9:45 AM 10:45 AM

21117 BASF 0.583333015 10:45 AM 11:00 AM 2:15 PM 2:35 PM

Overhead Redline 1 11:00 AM 12:00 PM

21117 BASF 1.25 1:00 PM 2:15 PM

Overhead CTL 0.416666985 2:35 PM 3:00 PM

21081 York 2 3:00 PM 5:00 PM

Overhead CTL 0.333333015 8:00 AM 8:20 AM

21129 StoneHedge 2.166666985 8:20 AM 10:30 AM

21129 StoneHedge 1 10:30 AM 11:30 AM

21179 Valero 1 11:30 AM 12:00 PM 2:00 PM 2:30 PM

21081 York 1 1:00 PM 2:00 PM

21186 STV 0.25 2:30 PM 2:45 PM

21168 Atofina 1 2:45 PM 3:45 PM

21168 Atofina 1 3:45 PM 4:45 PM

Overhead CTL 0.5 4:45 PM 5:15 PM

BBModel SH 2 8:00 PM 10:00 PM

H2 via SOE PFU 0.5 8:00 AM 8:30 AM

Page 401: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 0.666666985 8:30 AM 9:10 AM

Overhead CTL 2.833333015 9:10 AM 12:00 PM

21190 Bechtel 1 1:00 PM 2:00 PM

21190 Bechtel 2 2:00 PM 4:00 PM

21168 Atofina 1 4:00 PM 5:00 PM

BBModel SH 0.5 8:00 AM 8:30 AM

21190 Bechtel 2.25 8:30 AM 8:45 AM 1:30 PM 3:30 PM

Mg via SOE MV 0.25 8:45 AM 9:00 AM

Overhead CTL 1 9:00 AM 10:00 AM

21168 Atofina 2.5 10:00 AM 12:30 PM

21206 Valencia Group 1.5 3:30 PM 5:00 PM

BBModel SH 7.333333015 10:10 AM 12:10 PM 1:10 PM 6:30 PM

21190 Bechtel 5.5 8:00 AM 12:00 PM 2:30 PM 4:00 PM

20225 York 1.5 1:00 PM 2:30 PM

21158 York 1.5 4:00 PM 5:30 PM

BBModel SH 1 5:30 AM 6:30 AM

21190 Bechtel 1.833333969 8:00 AM 8:30 AM 4:10 PM 5:30 PM

21190 Bechtel 3.333333015 8:30 AM 9:00 AM 1:20 PM 4:10 PM

21129 Stonehedge 1 9:00 AM 10:00 AM

21129 York 1.5 10:00 AM 11:30 AM

Overhead Valero 0.333333015 11:30 AM 11:50 AM

Overhead Valero 0.5 11:50 AM 12:20 PM

21194 AstraZeneca 0.333333969 12:20 PM 12:40 PM

21194 AstraZeneca 0.666666031 12:40 PM 1:20 PM

0

Page 402: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21190 Bechtel 10 8:00 AM 11:15 AM 1:15 PM 8:00 PM

6702 Hunt Odle 0.75 11:15 AM 12:00 PM

Overhead AstraZeneca 0.25 1:00 PM 1:15 PM

BBModel SH 2.833333492 4:10 AM 6:30 AM 8:00 PM 8:30 PM

21190 Bechtel 8.25 8:00 AM 12:00 PM 12:30 PM 4:45 PM

21212 AstraZeneca 1.25 4:45 PM 6:00 PM

BBModel SH 1.25 4:15 AM 5:30 AM

BBModel SH 1.166666508 5:30 AM 6:40 AM

Overhead CTL 1 8:00 AM 9:00 AM

21168 Atofina 5 9:00 AM 10:00 AM 11:15 AM 12:00 PM 2:00 PM 5:15 PM

Overhead CTL 1.25 10:00 AM 11:15 AM

Korea Magic 0.25 1:30 PM 1:45 PM

BBModel SH 0.25 1:45 PM 2:00 PM

21179 Valero 0.5 2:00 PM 2:30 PM

BBModel SH 1 8:30 PM 9:30 PM

BBModel SH 1 8:00 AM 9:00 AM

BBModel SH 5.25 10:45 AM 12:00 PM 1:00 PM 5:00 PM

BBModel SH 1 5:00 PM 6:00 PM

BBModel SH 2.25 7:30 AM 8:30 AM 11:00 AM 12:15 PM

BBModel SH 2 6:00 PM 8:00 PM

BBModel SH 1.416666985 5:25 AM 6:50 AM

Overhead FD 0.5 8:00 AM 8:30 AM

21168 Atofina 1.5 8:30 AM 9:30 AM 12:00 PM 12:30 PM

21081 York 0.25 9:30 AM 9:45 AM

21179 Valero 1.25 9:45 AM 11:00 AM

Page 403: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21158 York 1 11:00 AM 12:00 PM

21081 York 1 1:30 PM 2:30 PM

Dust FD 3.5 6:30 PM 10:00 PM

China Trent 0.666666508 4:50 AM 5:30 AM

BBModel SH 0.333333492 5:30 AM 5:50 AM

BBModel SH 0.833333015 5:50 AM 6:40 AM

20225 York 7.833333969 8:00 AM 9:00 AM 9:30 AM 11:00 AM 1:00 PM 6:20 PM

21179 Valero 1 11:00 AM 12:00 PM

China Trent 0.833333015 5:50 AM 6:40 AM

20225 York 6 8:00 AM 12:00 PM 1:00 PM 3:00 PM

Overhead York 2 1:00 PM 3:00 PM

Overhead CTL 1 3:00 PM 4:00 PM

21225 Valero 0.25 4:00 PM 4:15 PM

21227 York 0.75 4:15 PM 5:00 PM

BBModel SH 1.5 9:00 PM 10:30 PM

BBModel SH 0.333333492 4:40 AM 5:00 AM

BBModel SH 1.5 5:00 AM 6:30 AM

Overhead CTL 1 8:00 AM 9:00 AM

Overhead CTL 1 9:00 AM 10:00 AM

Overhead CTL 1 10:00 AM 11:00 AM

21179 Valero 0.5 11:00 AM 11:30 AM

Overhead Sunoco 0.5 11:00 AM 11:30 AM

21230 Arkema 0.5 11:30 AM 12:00 PM

21186 STV Inc 0.25 1:30 PM 1:45 PM

21205 Tate Access Floors 0.416666985 1:45 PM 2:10 PM

Page 404: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

20225 York 0.333333015 2:10 PM 2:30 PM

20225 York 0.5 2:30 PM 3:00 PM

21227 York 0.5 3:00 PM 3:30 PM

20225 York 0.25 3:30 PM 3:45 PM

21227 Valero 1.25 3:45 PM 4:00 PM

AIMS AIMS 2.5 7:00 PM 9:30 PM

21082 CorMat 1 4:00 PM 5:00 PM

BBModel SH 0.833333015 5:50 AM 6:40 AM

21082 CorMat 2 8:00 AM 10:00 AM

20225 York 0.5 10:00 AM 10:30 AM

21205 Access Floors 0.25 10:30 AM 10:45 AM

20225 York 0.75 10:45 AM 11:30 AM

21179 Valero 1 1:00 PM 2:00 PM

21205 Access Floors 1 2:00 PM 3:00 PM

Overhead Atofina 0.333333015 3:00 PM 3:20 PM

Overhead CTL 0.666666985 3:20 PM 4:00 PM

21179 Valero 1.25 4:00 PM 5:15 PM

BBModel SH 9.5 8:00 AM 12:00 PM 1:00 PM 6:30 PM

BBModel SH 4 11:00 AM 3:00 PM

SiC WOS 1 6:00 PM 7:00 PM

21229 York 0.333333015 8:00 AM 8:20 AM

Overhead CTL 0.666666985 8:20 AM 9:00 AM

21129 Stonehedge 1.25 9:00 AM 10:15 AM

BBModel SH 0.333333015 9:30 AM 9:50 AM

BBModel SH 0.25 10:15 AM 10:30 AM

Page 405: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

SiC WOS 0.25 10:30 AM 10:45 AM

21205 Access Floors 0.75 10:45 AM 11:15 AM 1:00 PM 1:15 PM

21117 BASF 3.499999046 11:15 AM 12:00 PM 1:15 PM 3:35 PM 4:35 PM 5:00 PM

21179 Valero 1.000000954 3:35 PM 4:35 PM

Overhead glenro 0.333333969 5:00 PM 5:20 PM

SiC WOS 0.75 5:45 AM 6:30 AM

Overhead CTL 0.666666985 8:00 AM 8:15 AM 10:15 AM 10:40 AM

21212 Astrazeneca 3.5 8:15 AM 10:15 AM 2:30 PM 4:00 PM

BBModel SH 0.333333015 10:40 AM 11:00 AM

Overhead CTL 0.5 1:00 PM 1:30 PM

21117 BASF 1 1:30 PM 2:30 PM

21129 Stonehedge 1.166666031 4:00 PM 5:10 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

21117 BASF 2 8:30 AM 10:30 AM

Overhead CTL 3.5 10:30 AM 2:00 PM

21117 BASF 3 2:00 PM 5:00 PM

Overhead CTL 0.5 5:00 PM 5:30 PM

BBModel SH 1.166666508 5:30 AM 6:40 AM

Overhead CTL 2 8:00 AM 10:00 AM

21205 Access Floors 0.5 10:00 AM 10:30 AM

Overhead CTL 1 10:30 AM 11:30 AM

Overhead CTL 0.5 11:30 AM 12:00 PM

BBModel SH 0.5 1:00 PM 1:30 PM

21117 BASF 3.5 1:30 PM 5:00 PM

Overhead CTL 4 8:00 AM 11:00 AM 1:00 PM 2:00 PM

Page 406: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21117 BASF 2 11:00 AM 12:00 PM 2:00 PM 3:00 PM

21081 York 1 3:00 PM 4:00 PM

BBModel SH 0.5 4:00 PM 4:30 PM

Overhead CTL 0.5 4:30 PM 5:00 PM

BBModel SH 1 8:15 AM 9:15 AM

SiC WOS 2.75 10:15 AM 1:00 PM

SiC WOS 2.666666985 8:20 AM 9:00 AM 11:30 AM 1:30 PM

SiC WOS 1.5 6:00 PM 7:30 PM

21212 AstraZeneca 2 9:30 AM 11:30 AM

21117 BASF 0.5 11:30 AM 12:00 PM

Overhead CTL 1 1:00 PM 2:00 PM

21230 Arkema 1 2:00 PM 3:00 PM

21230 Arkema 0.5 3:00 PM 3:30 PM

Overhead CTL 1.5 3:30 PM 5:00 PM

Overhead CTL 0.333333492 5:00 AM 5:20 AM

BBModel SH 1.166666508 5:20 AM 6:30 AM

Quicken Odle 1 8:00 AM 9:00 AM

21117 BASF 0.5 9:00 AM 9:30 AM

Overhead CTL 2 9:30 AM 10:30 AM 2:15 PM 3:15 PM

21212 AstraZeneca 2.5 10:30 AM 12:00 PM 1:15 PM 2:15 PM

21241 Primcor 0.75 3:15 PM 4:00 PM

21212 AstraZeneca 1 4:00 PM 5:00 PM

BBModel SH 0.5 4:40 AM 5:10 AM

BBModel SH 0.916666508 5:15 AM 6:10 AM

Overhead CTL 0.5 8:00 AM 8:30 AM

Page 407: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21117 BASF 1 8:30 AM 9:30 AM

BBModel SH 1.166666985 4:40 AM 5:50 AM

BBModel SH 1.5 5:50 AM 6:35 AM 8:45 AM 9:30 AM

Overhead CTL 1 8:00 AM 9:00 AM

21212 AstraZeneca 0.5 9:00 AM 9:30 AM

Overhead CTL 1.333333015 9:30 AM 10:50 AM

21212 AstraZeneca 0.666666985 10:50 AM 11:30 AM

Overhead CTL 1.25 11:30 AM 12:45 PM

21230 Arkema 0.25 1:45 PM 2:00 PM

21186 STV 1 2:00 PM 3:00 PM

21190 CTL 1 3:00 PM 4:00 PM

21206 Valencia Group 0.75 4:00 PM 4:45 PM

Overhead CTL 0.25 4:45 PM 5:00 PM

Overhead pending 0.25 5:00 PM 5:15 PM

Overhead CTL 1 8:00 AM 9:00 AM

21190 Bechtel 1 9:00 AM 9:30 AM 11:00 AM 11:30 AM

21191 York 1.5 9:30 AM 10:30 AM 11:30 AM 12:00 PM

Overhead GE 0.5 10:30 AM 11:00 AM

Overhead pending 0.666666985 12:00 PM 12:40 PM

Overhead Valero 0.166666031 12:40 PM 12:50 PM

21117 BASF 2.166666985 1:50 PM 4:00 PM

21205 Tate Floors 0.5 4:00 PM 4:30 PM

21230 Arkema 0.5 4:30 PM 5:00 PM

Overhead CTL 1 8:00 PM 9:00 PM

BBModel SH 0.166666985 5:40 AM 5:50 AM

Page 408: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 1.166666985 8:00 AM 9:10 AM

21234 Greece 3.833333015 9:10 AM 12:00 PM 2:00 PM 3:00 PM

21211 General Chemical 1 1:00 PM 2:00 PM

21238 Plymouth Tube 0.5 3:00 PM 3:30 PM

21230 Arkema 1 3:30 PM 4:30 PM

Overhead CTL 0.75 4:30 PM 5:15 PM

Overhead MV 0.25 5:15 PM 5:30 PM

Taxes MV 4 8:00 AM 12:00 PM

Taxes MV 4 9:00 AM 1:00 PM

BBModel SH 0.833333015 5:50 AM 6:40 AM

21117 Piller 0

Overhead GE 0

BBModel SH 1.25 5:25 AM 6:40 AM

Overhead CTL 1 8:00 AM 9:00 AM

21205 Tate Floors 0.833333015 9:00 AM 9:20 AM 1:00 PM 1:30 PM

Overhead CTL 0.333333969 9:20 AM 9:40 AM

Overhead CTL 0.333333015 9:40 AM 10:00 AM

21212 Astrazeneca 1.75 10:15 AM 12:00 PM

Overhead Sunoco 1.5 1:30 PM 3:00 PM

21206 Valencia Group 1 3:00 PM 4:00 PM

21212 Astrazeneca 1 4:00 PM 5:00 PM

BBModel SH 0.666666031 6:30 PM 7:10 PM

SiC WOS 1.5 7:30 PM 9:00 PM

BBModel SH 0.75 5:15 AM 6:00 AM

BBModel SH 0.5 6:00 AM 6:30 AM

Page 409: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 2.5 8:00 AM 10:30 AM

21238 Plymouth Tube 0.5 10:30 AM 11:00 AM

21117 Piller 2 11:00 AM 12:00 PM 1:00 PM 2:00 PM

Overhead CTL 1 2:00 PM 3:00 PM

21252 GE Energy 2 3:00 PM 5:00 PM

Overhead MV 2 7:00 PM 9:00 PM

Overhead CTL 1 9:00 PM 10:00 PM

BBModel SH 1 5:30 AM 6:30 AM

Overhead CTL 3 8:00 AM 10:00 AM 11:00 AM 12:00 PM

21212 AstraZeneca 1 10:00 AM 11:00 AM

21206 Valencia Group 6 1:00 PM 7:00 PM

SiC WOS 1 10:30 PM 11:30 PM

BBModel SH 1 6:30 AM 7:30 AM

21230 Arkema 1 9:00 AM 10:00 AM

21206 Valencia Group 9 10:00 AM 7:00 PM

BBModel SH 2 6:30 AM 7:30 AM 8:15 PM 9:15 PM

21206 Valencia Group 1.733333588 8:15 AM 3:00 PM 5:00 PM 11:59 AM

BBModel SH 3 11:00 AM 1:00 PM 2:30 PM 3:30 PM

21206 Valencia Group 0.483333588 12:01 PM 12:30 PM

SiC WOS 2 6:00 PM 8:00 PM

BBModel SH 1.25 5:25 AM 6:40 AM

Overhead CTL 2 9:00 AM 11:00 AM

21205 Tate Floors 0.5 11:00 AM 11:30 AM

SiC WOS 1 7:00 PM 8:00 PM

BBModel SH 1 5:30 AM 6:30 AM

Page 410: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 2 8:00 AM 8:30 AM 11:30 AM 12:30 PM 2:30 PM 3:00 PM

21117 Piller 0.5 8:30 AM 9:00 AM

21117 Piller 2 9:00 AM 10:00 AM 4:00 PM 5:00 PM

21230 Arkema 0.5 10:00 AM 10:30 AM

21225 Valero 0.5 10:30 AM 11:00 AM

20225 York 0.5 11:00 AM 11:30 AM

21206 Valencia Group 1 1:30 PM 2:30 PM

Overhead CTL 0.5 3:00 PM 3:30 PM

Overhead CTL 0.5 3:30 PM 4:00 PM

SiC WOS 0.25 5:15 AM 5:30 AM

BBModel SH 1 5:30 AM 6:30 AM

21262 Piller 0.5 8:00 AM 8:30 AM

Overhead CTL 1 8:30 AM 9:30 AM

21225 Valero 0.5 9:30 AM 10:00 AM

Overhead CTL 1.5 10:00 AM 11:30 AM

21262 Piller 5 11:30 AM 1:00 PM 1:30 PM 5:00 PM

21262 Piller 8 8:00 AM 12:00 PM 1:00 PM 5:00 PM

21262 Piller 1.25 5:00 PM 6:15 PM

BBModel SH 1.333333492 5:30 AM 6:50 AM

21262 Piller 4 8:00 AM 12:00 PM

21262 Piller 1 1:00 PM 2:00 PM

Overhead CTL 1 2:00 PM 3:00 PM

21205 Tate Floors 1 3:00 PM 4:00 PM

BBModel SH 6 8:30 AM 2:30 PM

SiC WOS 3 8:00 AM 9:00 AM 12:00 PM 2:00 PM

Page 411: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

SiC WOS 0.833333015 5:50 AM 6:40 AM

Overhead CTL 0.916666985 9:20 AM 10:15 AM

21205 Tate Floors 0.25 10:15 AM 10:30 AM

21226 Valero 0.5 10:30 AM 11:00 AM

Overhead CTL 1.5 12:15 PM 1:45 PM

Overhead CTL 0.5 3:00 PM 3:30 PM

Overhead CTL 1.483333588 3:30 PM 4:00 PM 11:00 PM 11:59 PM

21212 AstraZeneca 1.5 4:00 PM 5:30 PM

SiC WOS 2.25 12:30 AM 2:45 AM

21211 General Chemical 1 8:00 AM 9:00 AM

21212 AstraZeneca 3.833333015 9:00 AM 12:50 PM

21226 Valero 1 1:50 PM 2:50 PM

21238 Plymouth Tube 0.666666985 2:50 PM 3:30 PM

21227 York 1 3:30 PM 4:30 PM

Overhead CTL 1 4:30 PM 5:30 PM

Chinese AIMS 1 5:00 AM 6:00 AM

SiC WOS 0.5 6:00 AM 6:30 AM

Overhead CTL 1.25 8:00 AM 9:00 AM 4:45 PM 5:00 PM

21262 Piller 3 9:00 AM 12:00 PM

Overhead General Chemical 2.5 1:00 PM 3:30 PM

Overhead Chalmers and Kubeck 0.5 3:30 PM 4:00 PM

21225 Valero 0.75 4:00 PM 4:45 PM

Oman PFU 0.5 6:00 AM 6:30 AM

Overhead CTL 0.666666985 8:00 AM 8:40 AM

21205 Tate Floors 2.333333015 8:40 AM 10:30 AM 4:40 PM 5:10 PM

Page 412: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21225 Valero 0.5 10:30 AM 11:00 AM

Overhead CTL 1 11:00 AM 12:00 PM

21226 Valero 1 1:00 PM 2:00 PM

Overhead CTL 1 2:00 PM 3:00 PM

21262 Piller 0.666666985 3:00 PM 3:40 PM

Overhead CTL 0.499999046 3:40 PM 4:10 PM

21206 Valencia Group 0.5 4:10 PM 4:40 PM

SiC WOS 1 7:00 PM 8:00 PM

SiC WOS 0.833333492 5:40 AM 6:30 AM

Overhead CTL 1 8:00 AM 9:00 AM

Overhead CTL 1 9:00 AM 10:00 AM

21226 Valero 0.5 10:00 AM 10:30 AM

21205 Tate Floors 0.5 1:00 PM 1:30 PM

21212 AstraZeneca 1 1:30 PM 2:00 PM 3:00 PM 3:30 PM

21215 Valero 1 2:00 PM 2:30 PM 4:00 PM 4:30 PM

21214 Valero 0.5 2:30 PM 3:00 PM

21214 Valero 1 3:00 PM 4:00 PM

Overhead CTL 1.166666031 4:30 PM 5:40 PM

SiC WOS 5 11:10 AM 1:10 PM 4:00 PM 7:00 PM

SiC WOS 1 5:40 AM 6:40 AM

20272 Unilever 0.5 8:00 AM 8:30 AM

21205 Tate Floors 2 8:30 AM 9:00 AM 3:00 PM 4:30 PM

Overhead CTL 3 11:30 AM 2:30 PM

SiC WOS 0.75 5:45 AM 6:30 AM

Overhead CTL 0.5 8:00 AM 8:30 AM

Page 413: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21212 AstraZeneca 1 8:30 AM 9:30 AM

Overhead Valero 5.5 9:30 AM 3:00 PM

21081 York 2 3:00 PM 5:00 PM

21206 Valencia Group 0.5 8:00 AM 8:30 AM

21262 Piller 2.5 8:30 AM 9:45 AM 10:45 AM 12:00 PM

BBModel SH 1 9:45 AM 10:45 AM

21206 Valencia Group 1 2:00 PM 3:00 PM

Overhead CTL 3 2:00 PM 5:00 PM

SiC WOS 2.5 11:30 AM 2:00 PM

SiC WOS 2.5 10:30 AM 1:00 PM

SiC WOS 1.150000095 5:21 AM 6:30 AM

SiC WOS 2.25 5:30 AM 6:15 AM 8:30 PM 10:00 PM

SiC WOS 0.983333111 5:31 AM 6:30 AM

Overhead CTL 2 8:00 AM 9:00 AM 1:00 PM 2:00 PM

21215 Valero 1 9:00 AM 10:00 AM

21262 Piller 2 10:00 AM 12:00 PM

21081 York 1 2:00 PM 3:00 PM

21272 York 1 3:00 PM 4:00 PM

Overhead CTL 1 4:00 PM 5:00 PM

0

SiC WOS 1 5:30 AM 6:30 AM

Overhead CTL 1 8:00 AM 9:00 AM

Overhead BTU 1 9:00 AM 10:00 AM

21081 York 1 10:00 AM 11:00 AM

21291 AstraZeneca 1 11:00 AM 12:00 PM

Page 414: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 2 1:00 PM 3:00 PM

21262 Piller 0.5 3:00 PM 3:30 PM

Overhead CTL 1.5 3:30 PM 5:00 PM

SiC WOS 1 5:30 AM 6:30 AM

21262 Piller 2 9:00 AM 11:00 AM

Overhead CTL 2 3:00 PM 5:00 PM

21262 Piller 1 11:00 AM 12:00 PM

Overhead BTU 1.5 12:00 PM 1:30 PM

BBModel SH 2.5 2:30 PM 5:00 PM

BBModel SH 4.5 5:00 PM 9:30 PM

SiC WOS 1.833333969 10:00 PM 11:50 PM

BBModel SH 8 8:30 AM 4:30 PM 12:00 AM 12:00 AM

BBModel SH 5.5 4:30 PM 10:00 PM

SiC WOS 2 2:00 PM 4:00 PM

SiC WOS 1 5:30 AM 6:30 AM

Overhead CTL 3.5 8:00 AM 10:00 AM 12:30 PM 2:00 PM

21226 Valero 1 10:00 AM 11:00 AM

21206 Valencia Group 1 11:00 AM 12:00 PM

Overhead Sunoco Eagle Point 0.5 2:00 PM 2:30 PM

21262 Piller 0.75 2:30 PM 3:00 PM 5:00 PM 5:15 PM

21206 Valencia Group 2 3:00 PM 5:00 PM

21263 ABB 0.333333969 5:15 PM 5:35 PM

Overhead CTL 0.5 8:00 AM 8:30 AM

21262 Piller 2 8:30 AM 10:30 AM

21254 Sunoco 1 10:30 AM 11:30 AM

Page 415: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21262 Piller 0.5 1:00 PM 1:30 PM

21205 Tate Floors 1.5 4:00 PM 5:30 PM

BBModel SH 1.5 5:00 AM 6:30 AM

Overhead CTL 3.5 8:00 AM 8:30 AM 11:00 AM 12:00 PM 1:00 PM 3:00 PM

21262 Piller 1.5 8:30 AM 10:00 AM

21206 Valencia Group 1 10:00 AM 11:00 AM

21263 ABB 1 3:00 PM 4:00 PM

Overhead Tate Floors 1 4:00 PM 5:00 PM

Overhead CTL 4 8:00 AM 9:00 AM 11:00 AM 12:00 PM 1:00 PM 3:00 PM

Overhead CTL 3 8:00 AM 11:00 AM

Overhead CTL 3 11:30 AM 12:00 PM 1:30 PM 4:00 PM

Finances MV 0.5 8:00 AM 8:30 AM

21081 York 0.25 8:30 AM 8:45 AM

21263 ABB 1 8:45 AM 9:15 AM 4:00 PM 4:30 PM

21205 Tate Floors 4.25 9:15 AM 12:00 PM 1:30 PM 3:00 PM

Overhead 0.5 1:00 PM 1:30 PM

Overhead CTL 1 3:00 PM 4:00 PM

Overhead CTL 1 4:00 PM 5:00 PM

BBModel SH 1.25 5:15 AM 6:30 AM

21279 Volvo Penta 0.25 8:00 AM 8:15 AM

Overhead CTL 0.5 8:15 AM 8:45 AM

21262 Piller 0.75 10:00 AM 10:45 AM

21263 ABB 0.75 10:45 AM 11:30 AM

Overhead CTL 1.5 11:30 AM 12:00 PM 3:00 PM 4:00 PM

Overhead CTL 2 12:00 PM 2:00 PM

Page 416: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21205 Tate Floors 1 2:00 PM 3:00 PM

21205 Tate Floors 1 4:00 PM 5:00 PM

Taskmaster MV 1 10:00 AM 11:00 AM

BBModel SH 5 11:00 AM 4:00 PM

BBModel SH 3 4:00 PM 7:00 PM

BBModel SH 0.75 5:45 AM 6:30 AM

Overhead CTL 1 8:00 AM 9:00 AM

21205 CTL 1.5 9:00 AM 10:00 AM 4:30 PM 5:00 PM

Overhead CTL 0.5 10:00 AM 10:30 AM

Overhead CTL 2 10:30 AM 12:30 PM

21190 Yuca Mountain 2 1:30 PM 3:30 PM

Overhead CTL 1 3:30 PM 4:30 PM

BBModel SH 2 6:00 PM 8:00 PM

Overhead CTL 0.666666985 8:00 AM 8:40 AM

21298 Capstone 1.083333015 8:40 AM 9:15 AM 2:00 PM 2:30 PM

21205 Tate Access Floors 1 9:15 AM 10:15 AM

20225 York 0.75 10:15 AM 11:00 AM

Overhead CTL 2 11:00 AM 12:00 PM 1:00 PM 2:00 PM

21301 Chalmers & Kubeck 0.5 2:30 PM 3:00 PM

21263 ABB 0.5 3:00 PM 3:30 PM

Overhead CTL 0.5 3:30 PM 4:00 PM

21301 Chalmers & Kubeck 0.5 3:30 PM 4:00 PM

Overhead CTL 1.25 4:00 PM 5:15 PM

BBModel SH 1 5:30 AM 6:30 AM

Overhead CTL 2 8:00 AM 10:00 AM

Page 417: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21308 Westech 1 10:00 AM 11:00 AM

Overhead CTL 2.5 11:00 AM 12:30 PM 2:00 PM 3:00 PM

21081 York 0.5 1:30 PM 2:00 PM

21205 Tate Access Floors 1 3:00 PM 4:00 PM

21301 Chalmers & Kubeck 0.75 4:00 PM 4:45 PM

21206 Valencia Group 0.5 4:45 PM 5:15 PM

Overhead CTL 3.5 8:00 AM 8:30 AM 1:00 PM 2:00 PM 3:00 PM 5:00 PM

21272 York 1.5 8:30 AM 9:30 AM 2:30 PM 3:00 PM

21298 Capstone 1 9:30 AM 10:00 AM 2:00 PM 2:30 PM

21206 Valencia Group 0.5 10:00 AM 10:30 AM

20225 York 1.5 10:30 AM 12:00 PM

BBModel SH 1 7:30 PM 8:30 PM

BBModel SH 1.166666508 5:20 AM 6:30 AM

20225 CTL 4 8:10 AM 10:10 AM 1:00 PM 3:00 PM

Overhead CTL 1.833333015 10:10 AM 12:00 PM

21298 Capstone 2 3:00 PM 5:00 PM

BBModel SH 2.25 11:00 AM 12:00 PM 1:00 PM 2:15 PM

BBModel SH 1 5:30 AM 6:30 AM

Overhead CTL 1.5 8:00 AM 9:30 AM

21298 Capstone 2 8:30 AM 9:30 AM 1:00 PM 2:00 PM

Overhead CTL 2.75 9:30 AM 11:00 AM 5:00 PM 6:15 PM

Overhead Premcor 1 2:00 PM 3:00 PM

21205 Tate Access Floors 9.75 7:00 AM 12:30 PM 1:00 PM 5:15 PM

BBModel SH 1.5 8:00 PM 9:30 PM

BBModel SH 1 5:30 AM 6:30 AM

Page 418: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 3 8:00 AM 9:00 AM 10:00 AM 11:00 AM 3:00 PM 4:00 PM

21298 Capstone 1 9:00 AM 10:00 AM

21291 York 1 11:00 AM 12:00 PM

21262 Piller 1 1:00 PM 2:00 PM

21308 Westech 1 2:00 PM 3:00 PM

21205 Tate Access Floors 1 4:00 PM 5:00 PM

21308 Westech 0.5 8:00 AM 8:30 AM

Overhead CTL 2.666666031 8:30 AM 9:00 AM 2:30 PM 4:00 PM 4:30 PM 5:10 PM

Overhead CTL 2 9:00 AM 11:00 AM

21262 Piller 1.5 11:00 AM 12:00 PM 4:00 PM 4:30 PM

21272 York 1 12:00 PM 1:00 PM

21205 Tate Access Floors 0.5 2:00 PM 2:30 PM

Overhead CTL 0.833333015 8:00 AM 8:50 AM

Overhead CTL 1.416666985 8:50 AM 10:00 AM 10:45 AM 11:00 AM

21308 Westech 0.75 10:00 AM 10:45 AM

20225 York 1 11:00 AM 12:00 PM

BBModel York 3 7:00 AM 10:00 AM

BBModel York 4 4:00 PM 8:00 PM

BBModel York 6 10:30 AM 11:30 AM 1:30 PM 6:30 PM

Overhead CTL 3.75 8:00 AM 9:00 AM 10:30 AM 11:30 AM 2:15 PM 4:00 PM

Overhead CTL 0.75 9:00 AM 9:15 AM 1:45 PM 2:15 PM

21205 Tate Access Floors 0.5 9:15 AM 9:30 AM 1:30 PM 1:45 PM

21272 York 1 9:30 AM 10:30 AM

Overhead CTL 1 11:30 AM 12:30 PM

21205 Tate Access Floors 1 4:00 PM 5:00 PM

Page 419: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BBModel SH 1 5:30 AM 6:30 AM

Overhead CTL 3 8:00 AM 9:00 AM 2:00 PM 4:00 PM

21205 Tate Access Floors 2.5 9:00 AM 11:30 AM

Overhead Sunoco 1 11:30 AM 12:30 PM

Overhead CTL 1.5 12:30 PM 2:00 PM

20225 York 1.5 4:00 PM 5:30 PM

Overhead CTL 5.25 8:00 AM 9:30 AM 10:30 AM 12:00 PM 3:00 PM 5:15 PM

Overhead CTL 3 9:30 AM 10:30 AM 12:00 PM 2:00 PM

Overhead CTL 1 2:00 PM 3:00 PM

BBModel SH 4 11:00 AM 3:00 PM

SiC WOS 1.5 10:30 AM 12:00 PM

SiC WOS 3.166666985 12:50 PM 4:00 PM

Overhead CTL 4 8:00 AM 10:00 AM 1:00 PM 3:00 PM

21298 Capstone 1 10:00 AM 11:00 AM

21272 York 0.5 4:00 PM 4:30 PM

BBModel SH 1 8:00 PM 9:00 PM

Overhead CTL 1 1:00 AM 2:00 AM

Overhead MV 1 10:00 AM 11:00 AM

BBModel SH 0.75 5:45 AM 6:30 AM

Overhead CTL 3 8:00 AM 11:00 AM

Overhead CTL 1 11:00 AM 12:00 PM

21081 York 0.5 1:00 PM 1:30 PM

21205 Tate Access Floors 1.5 1:30 PM 3:00 PM

21323 Premcor 1 3:00 PM 4:00 PM

21298 Capstone 1 4:00 PM 5:00 PM

Page 420: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead General Chemcial 2 5:00 PM 6:00 PM 8:00 PM 9:00 PM

BBModel SH 0.75 5:45 AM 6:30 AM

BBModel SH 1.416666508 5:15 AM 6:40 AM

21324 General Chemcial 4 8:00 AM 12:00 PM

Overhead Arkema 0.5 1:00 PM 1:30 PM

Overhead BTU 0.5 1:30 PM 2:00 PM

21323 Premcor 1 2:00 PM 3:00 PM

21298 Capstone 1 3:00 PM 4:00 PM

21324 General Chemcial 1 4:00 PM 5:00 PM

21324 General Chemcial 0.5 8:00 AM 8:30 AM

21190 DOE 1 8:30 AM 9:30 AM

Overhead CTL 3.5 9:30 AM 12:00 PM 1:00 PM 2:00 PM

21205 Tate Access Floors 0.5 2:00 PM 2:30 PM

Overhead Arkema 0.5 2:00 PM 2:30 PM

21298 Capstone 2.5 2:30 PM 5:00 PM

BBModel SH 2 9:10 AM 11:10 AM

BBModel SH 2 3:00 PM 5:00 PM

BBModel SH 1 5:40 AM 6:40 AM

Overhead CTL 3.5 8:00 AM 9:00 AM 11:00 AM 12:00 PM 1:00 PM 2:30 PM

21298 Capstone 1 9:00 AM 10:00 AM

21324 General Chemical 0.5 10:00 AM 10:30 AM

21383 York - Merck 2 10:30 AM 11:00 AM 2:30 PM 4:00 PM

21349 Arkema 1 4:00 PM 5:00 PM

21349 Arkema 0.25

BBModel SH 1.25 5:30 AM 6:45 AM

Page 421: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 2.25 8:00 AM 8:30 AM 3:30 PM 5:15 PM

21298 Capstone 1.5 8:30 AM 10:00 AM

21324 General Chemical 0.5 10:00 AM 10:30 AM

21383 York 1 10:30 AM 11:30 AM

Overhead Dade Behring 0.5 11:30 AM 12:00 PM

21336 York 0.25 12:00 PM 12:15 PM

21205 Tate Access Floors 2 1:30 PM 3:30 PM

finances Odle 0

BBModel SH 0.666666508 6:00 AM 6:40 AM

Overhead CTL 2.5 8:00 AM 8:30 AM 2:30 PM 4:30 PM

21190 Bechtel 2 8:30 AM 10:30 AM

21234 General Chemical 0.5 10:30 AM 11:00 AM

21205 Tate Access Floors 2 11:00 AM 12:00 PM 1:00 PM 2:00 PM

21325 BTU Energia 0.5 2:00 PM 2:30 PM

20225 York 0.5 4:30 PM 5:00 PM

Overhead MV 0.5 5:00 AM 5:30 AM

BBModel SH 1.166666508 5:30 AM 6:40 AM

21325 BTU Energia 0.25 8:00 AM 8:15 AM

Overhead CTL 5.75 8:15 AM 12:00 PM 3:30 PM 5:30 PM

21351 Dade Behring 1 1:00 PM 2:00 PM

21298 Capstone 0.5 2:00 PM 2:30 PM

Overhead CTL 1 2:30 PM 3:30 PM

BBModel SH 1 5:30 AM 6:30 AM

Overhead CTL 4 8:00 AM 12:00 PM

21205 Tate Access Floors 4.5 1:00 PM 5:30 PM

Page 422: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BBModel SH 4 9:00 AM 2:00 PM

21205 Tate Access Floors 0.75 11:15 AM 12:00 PM

Overhead CSX 0.25 2:45 PM 3:00 PM

Overhead CTL 1.5 3:00 PM 4:30 PM

21323 Premcor 0.75 4:30 PM 5:00 PM 5:15 PM 5:30 PM

Overhead CSX 0.25 5:00 PM 5:15 PM

BBModel SH 1.5 8:00 PM 9:30 PM

College Odle 0.5 8:00 AM 8:30 AM

Overhead CTL 3.5 8:30 AM 10:15 AM 1:00 PM 2:45 PM

Overhead CTL 1 10:15 AM 11:15 AM

BBModel SH 1 5:30 AM 6:30 AM

Overhead CTL 3.166666985 8:00 AM 8:30 AM 10:20 AM 12:00 PM 4:15 PM 5:15 PM

21323 Premcor 0.5 8:30 AM 9:00 AM

Overhead CSX 0.5 9:00 AM 9:30 AM

Overhead Philadelphi Mixing Soluti 0.5 9:30 AM 10:00 AM

Overhead Uniqema 0.333333015 10:00 AM 10:20 AM

21190 Bechtel 2.5 1:00 PM 3:30 PM

TMS Meeting MV 0.75 3:30 PM 4:15 PM

BBModel SH 3 5:30 AM 6:30 AM 7:30 PM 9:30 PM

21190 Bechtel 4.25 8:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:15 PM

Overhead CTL 1 10:00 AM 11:00 AM

Overhead General Chemical 0.25 2:15 PM 2:30 PM

Page 423: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21324 General Chemical 3 3:00 PM 6:00 PM

BBModel SH 1 5:30 AM 6:30 AM

21331 General Chemical 0.5 8:30 AM 9:00 AM

21324 General Chemical 0.25 9:00 AM 9:15 AM

21351 Dade Behring 0.5 10:00 AM 10:30 AM

21205 Tate Access Floors 1 10:30 AM 11:30 AM

Overhead MV 0.666666985 11:30 AM 12:10 PM

21190 Bechtel 5 12:00 PM 3:00 PM 3:30 PM 5:30 PM

21323 Premcor 0.5 3:00 PM 3:30 PM

BBModel SH 1.5 5:30 AM 7:00 AM

21190 Bechtel 6.166666031 8:00 AM 12:00 PM 3:00 PM 4:00 PM 4:15 PM 5:25 PM

Overhead CTL 1 1:00 PM 2:00 PM

21323 Premcor 0.25 4:00 PM 4:15 PM

TMS MV 0.5 5:30 PM 6:00 PM

BBModel SH 3 10:00 AM 1:00 PM

BBModel SH 4 1:00 PM 5:00 PM

Overhead CTL 2 2:00 PM 3:00 PM

BBModel SH 3.25 5:30 AM 6:45 AM 8:00 PM 10:00 PM

Overhead CTL 1 8:00 AM 9:00 AM

21383 York 0.5 9:00 AM 9:30 AM

Overhead CTL 1 9:00 AM 10:00 AM

Overhead CTL 0.25 10:00 AM 10:15 AM

Overhead Philadelphia Mixing 0.25 10:15 AM 10:30 AM

Overhead CTL 1.5 10:30 AM 12:00 PM

21350 York 4 1:00 PM 5:00 PM

Page 424: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 3 8:00 AM 10:00 AM 4:30 PM 5:30 PM

21351 Dade Behring 1 10:00 AM 11:00 AM

21359 Taylor Wiseman & Taylor 0.25 11:00 AM 11:15 AM

21383 York 0.75 11:15 AM 12:00 PM

21350 York 1 1:00 PM 2:00 PM

Overhead CTL 2 2:00 PM 4:00 PM

21325 BTU Energia 0.5 4:00 PM 4:30 PM

BBModel SH 2 8:00 PM 10:00 PM

Overhead CTL 1.5 8:00 AM 9:00 AM 11:30 AM 12:00 PM

21350 York 0.5 9:00 AM 9:30 AM

Overhead CTL 4 9:30 AM 10:30 AM 1:00 PM 4:00 PM

21331 General Chemical 1 10:30 AM 11:30 AM

21351 Dade Behring 1.25 4:00 PM 5:15 PM

BBModel SH 3 8:00 PM 11:00 PM

20225 York 0

21190 Bechtel 1.5 8:30 AM 10:00 AM

21331 General Chemical 0.333333015 10:00 AM 10:20 AM

21349 Arkema 0.333333969 10:20 AM 10:40 AM

BBModel SH 1.5 10:45 AM 11:15 AM 4:00 PM 5:00 PM

Overhead CTL 2.916666985 11:15 AM 12:00 PM 1:50 PM 4:00 PM

21190 Bechtel 1.5 12:00 PM 1:30 PM

Overhead CTL 0.333333015 1:30 PM 1:50 PM

BBModel SH 1.166666031 6:00 PM 7:10 PM

BBModel SH 1.083333492 5:40 AM 6:45 AM

Overhead CTL 6.25 8:00 AM 11:00 AM 1:15 PM 2:00 PM 3:00 PM 5:30 PM

Page 425: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21205 Tate Access Floors 1.75 11:00 AM 11:45 AM 2:00 PM 3:00 PM

21206 Valencia Group 0.5 11:45 AM 12:15 PM

Overhead CTL 3.333333015 9:00 AM 12:20 PM

BBModel SH 3 12:30 PM 2:30 PM 6:00 PM 7:00 PM

BBModel SH 2.5 2:00 PM 4:30 PM

BBModel SH 1 5:40 AM 6:40 AM

Overhead CTL 4 8:00 AM 12:00 PM

Overhead CTL 4 1:00 PM 5:00 PM

BBModel SH 2 8:00 PM 10:00 PM

BBModel SH 1 8:00 AM 9:00 AM

21372 Wright 1 9:00 AM 10:00 AM

21372 Wright 1 10:00 AM 11:00 AM

Overhead CTL 1.5 11:00 AM 12:30 PM

Overhead CTL 1.5 1:30 PM 2:00 PM 2:30 PM 3:30 PM

21372 Wright 0.5 2:00 PM 2:30 PM

21206 Valencia Group 1.75 3:30 PM 5:15 PM

BBModel SH 1 7:00 PM 8:00 PM

BBModel SH 5.416666031 5:30 AM 6:30 AM 7:30 PM 11:55 PM

Overhead CTL 1 8:00 AM 9:00 AM

21206 Valencia Group 2 9:00 AM 11:00 AM

Overhead CTL 3 11:00 AM 12:00 PM 1:00 PM 3:00 PM

Overhead CTL 3 3:00 PM 6:00 PM

Overhead CTL 4 8:00 AM 11:00 AM 1:00 PM 2:00 PM

21363 RA Mueller 1 11:00 AM 12:00 PM

Overhead CTL 1 2:00 PM 3:00 PM

Page 426: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 2.166666031 3:00 PM 5:10 PM

Overhead CTL 2.75 8:00 AM 8:45 AM 3:00 PM 5:00 PM

Overhead Virginia OSHA 0.25 8:45 AM 9:00 AM

21206 Valencia Group 2 9:00 AM 11:00 AM

21298 Capstone 3 11:00 AM 12:00 PM 1:00 PM 3:00 PM

BBModel SH 7 9:30 AM 12:30 PM 2:30 PM 4:30 PM 6:30 PM 8:30 PM

Taxes MV 0.5 12:30 PM 1:00 PM

Invoicing SH 0.5 8:30 PM 9:00 PM

BBModel SH 0.333333015 11:00 AM 11:20 AM

Carbothermal M MTL 4 12:30 PM 4:30 PM

Overhead CTL 1 8:00 AM 9:00 AM

Overhead CTL 0.5 9:00 AM 9:30 AM

Overhead CTL 0.5 9:30 AM 10:00 AM

21298 Capstone 3 10:00 AM 12:00 PM 7:00 PM 8:00 PM

21336 York 4 1:00 PM 5:00 PM

Carbothermal M MTL 2 8:00 PM 10:00 PM

21336 York 8.5 8:00 AM 2:00 PM 3:00 PM 5:30 PM

Carbothermal M MTL 2 7:00 PM 9:00 PM

Carbothermal M MTL 1 5:30 AM 6:30 AM

21349 Arkema 1 8:00 AM 9:00 AM

21383 York 0.333333015 9:00 AM 9:20 AM

Overhead CTL 2.166666985 9:20 AM 10:30 AM 1:00 PM 2:00 PM

21298 York 1.25 10:00 AM 11:15 AM

Overhead CTL 0.583333015 11:15 AM 11:50 AM

21372 Wright 0.75 2:00 PM 2:45 PM

Page 427: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21206 Valencia Group 2.25 2:45 PM 5:00 PM

Carbothermal M MTL 1 5:30 AM 6:30 AM

Overhead CTL 1.5 8:00 AM 9:00 AM 1:30 PM 2:00 PM

21206 Valencia Group 3 9:00 AM 12:00 PM

21367 Capstone 0.5 1:00 PM 1:30 PM

21325 BTU Energia 1 2:00 PM 3:00 PM

Safety CTL 2 3:00 PM 5:00 PM

21298 Capstone 0.5 8:00 AM 8:30 AM

21325 Btu Energia 0.5 8:30 AM 9:00 AM

21367 Capstone 2 9:00 AM 11:00 AM

Overhead Technet 0.25 11:00 AM 11:15 AM

21350 York 0.25 11:15 AM 11:30 AM

Overhead CTL 4.5 11:30 AM 12:00 PM 1:00 PM 5:00 PM

Overhead CTL 1 8:00 AM 9:00 AM

Overhead CTL 1.5 9:00 AM 10:30 AM

Overhead CTL 1.25 10:30 AM 11:45 AM

Overhead CTL 1.416666985 11:45 AM 12:30 PM 1:30 PM 2:10 PM

21325 BTU Energia 2.999999046 2:10 PM 4:10 PM 4:10 PM 5:10 PM

Overhead CTL 2 8:00 AM 10:00 AM

21372 Wright 4 10:00 AM 12:00 PM 1:00 PM 3:00 PM

Lumina Levinco 0.333333015 12:00 PM 12:20 PM

21336 York 1 3:00 PM 4:00 PM

Lumina Levinco 3 8:00 PM 11:00 PM

Lumina Levinco 3 8:00 AM 11:00 AM

Carbothermal M MTL 8 8:00 AM 4:00 PM

Page 428: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Carbothermal M MTL 8 8:00 AM 4:00 PM

Carbothermal M MTL 8 8:00 AM 4:00 PM

Carbothermal M MTL 8 8:00 AM 4:00 PM

Overhead CTL 2.5 8:00 AM 9:30 AM 11:00 AM 12:00 PM

21370 Rinnai America 0.25 9:15 AM 9:30 AM

Overhead Maricopia County 0.5 9:30 AM 10:00 AM

21336 York 1 10:00 AM 11:00 AM

Lumina Levinco 1 1:00 PM 2:00 PM

21390 Tecknit 2 2:00 PM 4:00 PM

21324 General Chemical 1 4:00 PM 5:00 PM

Taxes MV 3.75 5:00 AM 6:45 AM 7:00 PM 9:00 PM

Overhead CTL 1.75 8:00 AM 9:00 AM 10:15 AM 11:00 AM

21410 Maricopa 1 9:00 AM 10:00 AM

Overhead CTL 0.25 10:00 AM 10:15 AM

21415 Southern Ocean County H 3 11:00 AM 12:00 PM 3:00 PM 5:00 PM

21412 Inolex 1 1:00 PM 2:00 PM

21413 Kraft Foods 1 2:00 PM 3:00 PM

Overhead CTL 1 8:00 AM 9:00 AM 10:00 AM 12:00 PM 2:00 PM 5:00 PM

21390 Tecknit 1 9:00 AM 10:00 AM

21386 Maccaferri 1 1:00 PM 2:00 PM

Taxes MV 3.75 5:00 AM 6:45 AM 7:30 AM 9:30 AM

Overhead CTL 2 8:00 AM 10:00 AM

20225 York 4 10:00 AM 12:00 PM 2:00 PM 4:00 PM

21372 Wright 1.5 1:00 PM 2:00 PM 8:00 PM 8:30 PM

21325 BTU Energia 1.5 4:00 PM 5:30 PM

Page 429: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Taxes MV 5 12:00 PM 5:00 PM

Overhead CTL 4.5 8:00 AM 10:00 AM 2:00 PM 3:00 PM 3:30 PM 5:00 PM

Overhead CTL 1 10:00 AM 11:00 AM

21415 Southern Ocean County H 2 11:00 AM 1:00 PM

21390 Technik 0.5 3:00 PM 3:30 PM

Taxes MV 8 8:00 AM 4:00 PM

Taxes MV 6 12:00 PM 6:00 PM

Overhead CTL 1.5 8:00 AM 9:30 AM

20225 York 5.5 9:30 AM 12:00 PM 2:00 PM 5:00 PM

Overhead CTL 1 1:00 PM 2:00 PM

Overhead CTL 4 8:00 AM 9:00 AM 2:00 PM 5:00 PM

21415 Southern Ocean County H 1 9:00 AM 10:00 AM

Overhead Tate Access Floors 0.5 10:00 AM 10:30 AM

20225 York 2.5 10:30 AM 12:00 PM 1:00 PM 2:00 PM

21415 Southern Ocean County H 9 7:30 AM 3:00 PM 4:00 PM 5:30 PM

Overhead CTL 1.5 8:00 AM 8:30 AM 9:00 AM 10:00 AM

20225 York 1.5 8:30 AM 9:00 AM 10:00 AM 11:00 AM

BBModel SH 0.666666985 9:00 AM 9:40 AM

Overhead CTL 5 11:00 AM 12:00 PM 1:00 PM 5:00 PM

21391 Frucon 0.5 3:00 PM 3:30 PM

Overhead CTL 4 8:00 AM 10:00 AM 1:30 PM 3:30 PM

21190 Yuca Mountain 3.5 10:00 AM 12:00 PM 3:30 PM 5:00 PM

21405 Chalmers & Kubeck 0.5 1:00 PM 1:30 PM

BBModel SH 0.333333492 7:50 AM 8:10 AM

BBModel SH 1.333333015 1:40 PM 3:00 PM

Page 430: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Oman PFU 0.25 4:45 AM 5:00 AM

Carbothermal M MTL 0.25 5:00 AM 5:15 AM

BBModel SH 4.166666508 5:30 AM 6:40 AM 10:00 AM 1:00 PM

Overhead CTL 7.5 8:00 AM 1:00 PM 2:00 PM 4:30 PM

20225 York 0.75 4:30 PM 5:15 PM

Overhead CTL 4.916666031 8:00 AM 9:00 AM 9:45 AM 12:20 PM 3:40 PM 5:00 PM

21206 Valencia 0.25 9:00 AM 9:15 AM

Overhead CTL 0.25 9:15 AM 9:30 AM

Overhead CTL 0.25 9:30 AM 9:45 AM

20225 CTL 2.333333969 1:20 PM 3:40 PM

21370 Rinnai America 0.5 4:30 PM 5:00 PM

BBModel SH 1 7:00 PM 8:00 PM

BBModel SH 1 5:30 AM 6:30 AM

Overhead MV 1 8:00 AM 9:00 AM

Overhead CTL 3.25 9:00 AM 10:45 AM 11:00 AM 12:30 PM

21412 Inolex 0.25 10:45 AM 11:00 AM

Overhead AGI 0.5 1:30 PM 2:00 PM

21412 Inolex 0.5 2:00 PM 2:30 PM

Overhead CTL 2.5 2:30 PM 5:00 PM

Taxes MV 0

Overhead CTL 1 5:30 AM 6:30 AM

Overhead CTL 4.5 8:00 AM 9:00 AM 11:00 AM 1:00 PM 2:00 PM 3:30 PM

21386 Maccaferri 1 9:00 AM 10:00 AM

BBModel SH 1 10:00 AM 11:00 AM

21370 Rinnai 1.5 3:30 PM 5:00 PM

Page 431: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Taxes MV 1 5:00 PM 6:00 PM

Overhead MV 1 8:00 AM 9:00 AM

Overhead CTL 3.25 9:00 AM 10:30 AM 1:15 PM 2:00 PM 3:00 PM 4:00 PM

21370 Rinnai 0.5 10:30 AM 11:00 AM

Overhead CTL 1.25 11:00 AM 12:15 PM

Overhead CTL 1 2:00 PM 3:00 PM

BBModel SH 1 4:00 PM 5:00 PM

IM MV 4 8:00 AM 12:00 PM

Taxes Odle 6 12:00 PM 6:00 PM

BBModel SH 1 5:00 AM 6:00 AM

21190 Bechtel 2 8:00 AM 10:00 AM

21370 Rinnai 2 10:00 AM 12:00 PM

Overhead CTL 3 1:00 PM 4:00 PM

21386 Maccaferri 1 4:00 PM 5:00 PM

Taxes IRS 4 6:00 PM 10:00 PM

Overhead CTL 4 8:00 AM 10:00 AM 11:00 AM 12:00 PM 4:00 PM 5:00 PM

21190 Bechtel 1 10:00 AM 11:00 AM

21370 Rinnai 3 1:00 PM 4:00 PM

Overhead MV 0.25 5:00 PM 5:15 PM

BBModel SH 2 8:00 PM 10:00 PM

BBModel SH 1 5:30 AM 6:30 AM

Overhead CTL 2.75 8:00 AM 9:15 AM 3:30 PM 5:00 PM

21415 South Ocean County Hosp 0.5 9:15 AM 9:45 AM

China Trent 0.25 9:45 AM 10:00 AM

BBModel SH 3 10:00 AM 12:00 PM 1:00 PM 2:00 PM

Page 432: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21370 Rinnai 1.5 2:00 PM 3:30 PM

Overhead CTL 4 8:00 AM 12:00 PM

BBModel SH 2 1:00 PM 3:00 PM

21370 Rinnai 1 3:00 PM 4:00 PM

21372 Wright Medical Technolo 0.5 4:00 PM 4:30 PM

21441 Coltherm 1.25 4:30 PM 5:45 PM

BBModel SH 3 7:00 PM 10:00 PM

21441 Cotherm 3 8:00 AM 11:00 AM

21372 Wright Medical Technolo 0.5 11:00 AM 11:30 AM

Overhead CTL 1.5 11:30 AM 1:00 PM

21441 Cotherm 3 2:00 PM 5:00 PM

Overhead CTL 3.916666031 8:00 AM 9:00 AM 10:30 AM 11:45 AM 3:30 PM 5:10 PM

21441 Cotherm 1.5 9:00 AM 10:30 AM

21190 Yuca Mountain 1.75 11:45 AM 1:30 PM

21441 Cotherm 2 1:30 PM 3:30 PM

Overhead CTL 2 8:00 AM 9:00 AM 2:00 PM 3:00 PM

21441 Cotherm 5.25 9:00 AM 12:00 PM 3:00 PM 5:15 PM

21190 Yuca Mountain 1 1:00 PM 2:00 PM

Overhead CTL 4 8:00 AM 9:00 AM 10:30 AM 12:30 PM 3:00 PM 4:00 PM

21370 Rinnai 2 9:00 AM 10:00 AM 4:00 PM 5:00 PM

Overhead CTL 0.5 10:00 AM 10:30 AM

21411 Valero 1 1:30 PM 2:30 PM

21383 York 0.5 2:30 PM 3:00 PM

Overhead CTL 5 8:00 AM 9:00 AM 10:00 AM 12:00 PM 1:00 PM 3:00 PM

Overhead CTL 1 9:00 AM 10:00 AM

Page 433: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21441 Cotherm 2 3:00 PM 5:00 PM

China Trent 2 10:00 AM 12:00 PM

Carbothermal M MV 10 10:00 AM 8:00 PM

Overhead CTL 2.666666985 8:00 AM 10:00 AM 1:20 PM 2:00 PM

Carbothermal M MV 2 10:00 AM 12:00 PM

21454 Premcor 0.333333015 1:00 PM 1:20 PM

BBModel SH 3 2:00 PM 5:00 PM

Overhead CTL 3.666666985 8:00 AM 9:00 AM 9:20 AM 12:00 PM

21457 Valero 0.333333015 9:00 AM 9:20 AM

BBModel SH 3 2:00 PM 5:00 PM

Overhead CTL 3 8:00 AM 11:00 AM

BBModel SH 1 11:00 AM 12:00 PM

21462 GAF 3.5 1:00 PM 4:30 PM

21457 Valero 1 4:30 PM 5:30 PM

BBModel SH 1.833333969 8:10 PM 10:00 PM

Overhead CTL 2 8:00 AM 10:00 AM

Overhead CTL 3 10:00 AM 11:00 AM 1:00 PM 3:00 PM

21190 Bechtel 1 11:00 AM 12:00 PM

BBModel SH 2 3:00 PM 5:00 PM

BBModel SH 2 3:00 PM 5:00 PM

BBModel SH 4 9:00 AM 1:00 PM

Overhead CTL 6 8:00 AM 12:00 PM 1:00 PM 3:00 PM

Overhead CTL 4 8:00 AM 12:00 PM

BBModel SH 2 1:00 PM 3:00 PM

Overhead CTL 2 3:00 PM 5:00 PM

Page 434: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 5.5 8:00 AM 11:30 AM 3:00 PM 5:00 PM

21391 Frucon 0.5 11:30 AM 12:00 PM

BBModel SH 2 1:00 PM 3:00 PM

Tennis Odle 0.25 8:00 PM 8:15 PM

BBModel SH 0.5 9:00 PM 9:30 PM

21462 GAF 8 8:00 AM 12:30 PM 1:30 PM 5:00 PM

21462 GAF 2 8:00 AM 10:00 AM

Overhead CTL 6 10:00 AM 12:00 PM 1:00 PM 5:00 PM

21413 Kraft 8 8:00 AM 12:00 PM 1:00 PM 5:00 PM

Overhead CTL 5 8:00 AM 10:00 AM 1:00 PM 2:00 PM 3:00 PM 5:00 PM

21462 GAF 1 10:00 AM 11:00 AM

21462 GAF 1 11:00 AM 12:00 PM

21462 GAF 1 2:00 PM 3:00 PM

Overhead CTL 8 8:00 AM 12:00 PM 1:00 PM 5:00 PM

21391 Frucon 5.5 1:00 PM 6:30 PM

21391 Frucon 10 8:00 AM 2:30 PM 3:00 PM 6:30 PM

21391 Frucon 3 8:00 AM 11:00 AM

Overhead CTL 3 11:00 AM 12:00 PM 1:00 PM 3:00 PM

21462 GAF 2 3:00 PM 5:00 PM

Overhead CTL 4 8:00 AM 12:00 PM

BBModel SH 1 8:00 PM 9:00 PM

Overhead Foley Mansfield 0.25 8:00 AM 8:15 AM

Overhead CTL 5.25 8:15 AM 10:00 AM 10:30 AM 12:00 PM 3:00 PM 5:00 PM

21383 York-Merck 0.5 10:00 AM 10:30 AM

21462 GAF 2 1:00 PM 3:00 PM

Page 435: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BBModel SH 1.166666508 5:30 AM 6:40 AM

Terrace Foley Mansfield 0.5 10:00 AM 10:30 AM

22032 Foley Mansfield 1 8:00 AM 9:00 AM

21372 Wright 1 9:00 AM 10:00 AM

Overhead CTL 2 10:00 AM 12:00 PM

21462 GAF 4 1:00 PM 5:00 PM

Overhead CTL 5 8:00 AM 9:00 AM 1:00 PM 5:00 PM

21462 GAF 3 9:00 AM 12:00 PM

Overhead CTL 7 8:00 AM 12:00 PM 2:00 PM 5:00 PM

22034 Invista 1 1:00 PM 2:00 PM

Overhead CTL 4 8:00 AM 12:00 PM

22037 Taylor Forge 0.5 1:00 PM 1:30 PM

21462 GAF 1.5 1:30 PM 3:00 PM

Scanner Savin 1 3:00 PM 4:00 PM

BBModel SH 1 4:00 PM 5:00 PM

BBModel SH 4 10:00 AM 2:00 PM

BBModel SH 4 12:00 PM 4:00 PM

BBModel SH 1 5:30 AM 6:30 AM

Overhead CTL 1.833333969 8:05 AM 8:55 AM 1:00 PM 2:00 PM

22037 Taylor Forge 0.333333015 8:55 AM 9:15 AM

BBModel SH 4 9:15 AM 11:15 AM 3:00 PM 5:00 PM

22016 York 0.75 11:15 AM 12:00 PM

Scanner Savin 1 2:00 PM 3:00 PM

Overhead CTL 4 8:00 AM 12:00 PM

BBModel SH 2 1:00 PM 3:00 PM

Page 436: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21391 Frucon 2 3:00 PM 5:00 PM

BBModel SH 1 5:30 AM 6:30 AM

Overhead CTL 5.5 8:00 AM 9:30 AM 1:00 PM 5:00 PM

BBModel SH 0.25 9:30 AM 9:45 AM

BBModel SH 2 10:00 AM 12:00 PM

Overhead CTL 3.5 8:00 AM 11:00 AM 4:30 PM 5:00 PM

22037 Taylor Forge 1 11:00 AM 12:00 PM

22056 Tate Access Floors 0.5 1:00 PM 1:30 PM

BBModel SH 3 1:30 PM 4:30 PM

21391 Frucon 0.5 8:00 AM 8:30 AM

22056 Tate Access Floors 0.5 8:30 AM 9:00 AM

Overhead CTL 7 9:30 AM 1:30 PM 2:00 PM 5:00 PM

22037 Taylor Forge 0.5 1:30 PM 2:00 PM

BBModel SH 4 9:00 AM 1:00 PM

Overhead CTL 4 8:00 AM 10:00 AM 3:00 PM 5:00 PM

21391 Frucon 2 10:00 AM 12:00 PM

21391 Frucon 2 1:00 PM 3:00 PM

Overhead CTL 5.5 8:00 AM 1:00 PM 3:00 PM 3:30 PM

21391 Frucon 1 2:00 PM 3:00 PM

21391 Frucon 0.5 3:30 PM 4:00 PM

22036 Unilever 1 4:00 PM 5:00 PM

Overhead CTL 1 8:00 AM 9:00 AM

21462 GAF 0.5 9:00 AM 9:30 AM

22059 Bechtel 1.5 9:30 AM 11:00 AM

22016 York 1 11:00 AM 12:00 PM

Page 437: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

22046 Dade Behring 1 1:00 PM 2:00 PM

22059 Bechtel 3 2:00 PM 5:00 PM

Overhead CTL 3 8:00 AM 10:00 AM 4:00 PM 5:00 PM

22034 Invista 0.5 10:00 AM 10:30 AM

22059 Bechtel 1.5 10:30 AM 12:00 PM

2139.1 Frucon 2 2:00 PM 4:00 PM

Taxes MV 0.5 8:00 AM 8:30 AM

Overhead CTL 4.5 8:30 AM 9:00 AM 1:00 PM 5:00 PM

22034 Invista 0.5 9:00 AM 9:30 AM

22059 Bechtel 2.5 9:30 AM 12:00 PM

BBModel SH 1.5 5:00 AM 6:30 AM

Overhead CTL 6.333333015 8:00 AM 9:00 AM 9:30 AM 1:00 PM 2:00 PM 3:50 PM

22063 Rohm Haus 0.5 9:00 AM 9:30 AM

22046 Dade Behring 0.166666985 3:50 PM 4:00 PM

22056 Tate Access 1 4:00 PM 5:00 PM

22059 Bechtel 0.01 10:00 AM 12:00 PM

Overhead CTL 2 8:00 AM 10:00 AM 1:00 PM 4:00 PM

22036 Unilever 1 4:00 PM 5:00 PM

22056 Tate Access 1 8:00 AM 9:00 AM

Overhead CTL 5 10:00 AM 11:00 AM 1:00 PM 5:00 PM

22040 Toyota 1 11:00 AM 12:00 PM

22045 GBQC 0.5 9:00 AM 9:30 AM

22059 Bechtel 2.5 9:30 AM 12:30 PM

Overhead CTL 0.01 8:00 AM 9:00 AM 1:30 PM 5:00 PM

BBModel MV 3 5:30 AM 6:30 AM 7:00 PM 9:00 PM

Page 438: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

22059 Bechtel 2 10:00 AM 12:00 PM

Overhead CTL 0.01 8:00 AM 10:00 AM 2:00 PM 5:00 PM

21081 York 1 1:00 PM 2:00 PM

22059 Bechtel 1 8:00 AM 9:00 AM

22032 Foley & Mansfield 1 9:00 AM 10:00 AM

Overhead CTL 2 10:00 AM 12:00 PM

21391 Fru-Con 4 1:00 PM 5:00 PM

22059 Bechtel 2 8:00 AM 10:00 AM

22005 Capstone 1 10:00 AM 11:00 AM

Overhead CTL 4 11:00 AM 12:00 PM 1:00 PM 4:00 PM

21413 Kraft 1 4:00 PM 5:00 PM

21413 Kraft 8 8:00 AM 4:00 PM

22005 Capstone 1 8:00 AM 9:00 AM

22056 Tate 2 9:00 AM 10:00 AM 4:00 PM 5:00 PM

22040 Toyota 1 10:00 AM 11:00 AM

Overhead CTL 4 11:00 AM 12:00 PM 1:00 PM 4:00 PM

BBModel SH 0.5 8:00 PM 8:30 PM

Overhead CTL 2 8:00 AM 9:00 AM 4:00 PM 5:00 PM

21081 York 1 9:00 AM 10:00 AM

22005 Capstone 1 10:00 AM 11:00 AM

22078 York 1 11:00 AM 12:00 PM

22056 Tate 3 1:00 PM 4:00 PM

BBModel SH 4 10:00 AM 2:00 PM

Overhead CTL 1 9:00 AM 10:00 AM

Overhead CTL 0.166666985 10:00 AM 10:10 AM

Page 439: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

22059 Bechtel 1.833333015 10:10 AM 12:00 PM

22059 Bechtel 4 1:00 PM 5:00 PM

BBModel SH 4 8:00 AM 12:00 PM

22078 York 1 1:00 PM 2:00 PM

Overhead CTL 1 2:00 PM 3:00 PM

22040 Toyota 1 3:00 PM 4:00 PM

BBModel SH 1.5 5:00 AM 6:30 AM

Overhead CTL 3 8:00 AM 10:00 AM 1:00 PM 2:00 PM

22059 Bechtel 2 10:00 AM 12:00 PM

22005 Capstone 1 2:00 PM 3:00 PM

22040 Toyota 2 3:00 PM 5:00 PM

BBModel SH 3.5 8:00 AM 10:00 AM 2:30 PM 4:00 PM

22059 Bechtel 2.5 10:00 AM 12:30 PM

22005 Capstone 1 1:30 PM 2:30 PM

Overhead CTL 1 4:00 PM 5:00 PM

Overhead CTL 3.5 8:00 AM 10:00 AM 3:30 PM 5:00 PM

22059 Bechtel 2 10:00 AM 12:00 PM

22005 Capstone 0.5 1:00 PM 1:30 PM

22056 Tate Access Floors 2 1:30 PM 3:30 PM

Overhead CTL 1.083333015 8:10 AM 9:15 AM

Overhead CTL 2 9:15 AM 11:15 AM

941 IRS 0.5 11:15 AM 11:45 AM

22059 Bechtel 2 1:00 PM 3:00 PM

22018 General Chemical 0.5 3:00 PM 3:30 PM

22093 American Management Re 1 3:30 PM 4:30 PM

Page 440: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

21413 Kraft Foods 0.5 8:00 AM 8:30 AM

22093 American Management Re 0.75 8:30 AM 9:15 AM

22059 Bechtel 7.75 9:15 AM 12:00 PM 1:00 PM 4:00 PM 9:00 PM 11:00 PM

22005 Capstone 1 4:00 PM 5:00 PM

22056 Tate Access Floors 1 8:00 AM 8:30 AM 9:15 AM 9:45 AM

22005 Capstone 0.75 8:30 AM 9:15 AM

22005 Capstone 1.25 9:45 AM 11:00 AM

Overhead CTL 1 11:00 AM 12:00 PM

22056 Tate Access Floors 1 1:00 PM 2:00 PM

22097 Sheppard T. Powell 0.5 2:00 PM 2:30 PM

22093 American Management Re 0.25 2:30 PM 2:45 PM

22088 York 0.5 2:45 PM 3:15 PM

22101 Sunoco 0.5 3:15 PM 3:45 PM

22059 Bechtel 1.583333969 3:45 PM 5:20 PM

Overhead CTL 1.75 8:00 AM 9:45 AM

22102 Sunoco 1.2 3:00 PM 4:10 PM 4:30 PM 4:40 PM

22101 Sunoco 0.25 9:45 AM 10:00 AM

22059 Bechtel 4 10:00 AM 12:30 PM 1:30 PM 3:00 PM

22060 Tate Access Floors 0.333333969 4:10 PM 4:30 PM

22063 Rohm Haas 0.333333969 4:40 PM 5:00 PM

BBModel SH 1.5 5:30 AM 7:00 AM

22063 Rohm Haas 0.5 8:00 AM 8:30 AM

22040 Toyota 1 8:30 AM 9:30 AM

22059 Bechtel 1 9:30 AM 10:30 AM

22101 Sunoco 0.5 10:30 AM 11:00 AM

Page 441: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 2.5 11:00 AM 1:30 PM

Overhead CTL 3.5 1:30 PM 5:00 PM

BBModel SH 0.25 8:00 AM 8:15 AM

Overhead CTL 4 8:15 AM 9:15 AM 2:00 PM 5:00 PM

22093 American Management 0.75 9:15 AM 10:00 AM

22060 Tate Access Floors 0.5 10:00 AM 10:30 AM

22097 Shepard T Powell 2.5 10:30 AM 12:00 PM 1:00 PM 2:00 PM

Overhead CTL 3.5 8:00 AM 9:00 AM 2:00 PM 4:30 PM

22097 Shepard T Powell 4 9:00 AM 12:00 PM 1:00 PM 2:00 PM

22056 Tate Access Floors 1 4:30 PM 5:30 PM

BBModel SH 1 4:00 PM 5:00 PM

22040 Toyota 2 10:00 AM 12:00 PM

Overhead CTL 4.333333015 8:10 AM 8:30 AM 12:00 PM 4:00 PM

22059 Bechtel 2 8:30 AM 9:30 AM 1:00 PM 2:00 PM

22040 Toyota 1 9:30 AM 10:30 AM

22088 York 0.5 10:30 AM 11:00 AM

21413 Kraft 1 11:00 AM 12:00 PM

22108 North American Energy S 1 4:00 PM 5:00 PM

22059 Bechtel 3 8:00 AM 10:00 AM 1:00 PM 2:00 PM

Overhead CTL 3 2:00 PM 5:00 PM

Overhead CTL 2 8:00 AM 10:00 AM

22093 North American Energy S 1 10:00 AM 11:00 AM

22088 York 1 11:00 AM 12:00 PM

22097 STPA 4 1:00 PM 5:00 PM

Overhead CTL 6 8:00 AM 11:30 AM 1:30 PM 4:00 PM

Page 442: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

22045 GBQC 0.25 11:30 AM 11:45 AM

22059 Bechtel 0.5 12:30 PM 1:00 PM

22087 Sunoco 1 4:00 PM 5:00 PM

Overhead CTL 3 8:00 AM 10:00 AM 11:30 AM 12:30 PM

21415 South Ocean County Hosp 1.5 10:00 AM 11:30 AM

21413 Kraft 1.5 2:00 PM 3:30 PM

22018 General Chemical 1.666666031 3:30 PM 5:10 PM

Overhead CTL 1.5 8:00 AM 9:30 AM

Overhead Sunoco 0.25 9:30 AM 9:45 AM

22087 Sunoco 0.25 9:45 AM 10:00 AM

22101 Sunoco 2 10:00 AM 12:00 PM

21350 York 4 1:00 PM 5:00 PM

Overhead CTL 6 8:00 AM 10:30 AM 11:30 AM 12:30 PM 2:30 PM 5:00 PM

22040 Toyota 1 10:30 AM 11:30 AM

22088 York 1 1:30 PM 2:30 PM

Overhead CTL 2 8:00 AM 9:00 AM 11:00 AM 12:00 PM

21413 Kraft 1 9:00 AM 10:00 AM

21415 South Ocean County Hosp 1 10:00 AM 11:00 AM

22056 Tate Access Floors 3 1:00 PM 3:00 PM 4:00 PM 5:00 PM

22063 Rohm Haas 1 3:00 PM 4:00 PM

Overhead CTL 4.75 8:00 AM 9:15 AM 10:00 AM 10:30 AM 2:00 PM 5:00 PM

22101 Sunoco 1.25 9:15 AM 9:30 AM 10:30 AM 11:30 AM

22059 Bechtel 0.5 9:30 AM 10:00 AM

22056 Tate Access Floors 1.5 11:30 AM 12:30 PM 1:30 PM 2:00 PM

Overhead CTL 5 8:00 AM 11:00 AM 3:00 PM 5:00 PM

Page 443: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

22101 Sunoco 1 11:00 AM 12:00 PM

22056 Tate Access Floors 1 1:00 PM 2:00 PM

22097 Sheppard T. Powell 1 2:00 PM 3:00 PM

Overhead CTL 2.5 8:00 AM 10:00 AM 4:30 PM 5:00 PM

22122 Rockwood 2 10:00 AM 11:00 AM 3:30 PM 4:30 PM

22087 Sunoco 3.5 11:00 AM 12:00 PM 1:00 PM 3:30 PM

22097 Sheppard T. Powell 2 8:00 AM 10:00 AM

22124 FVB Energy 1 10:00 AM 11:00 AM

22059 Bechtel 1 11:00 AM 12:00 PM

Overhead CTL 3 1:00 PM 3:00 PM 4:00 PM 5:00 PM

22056 Tate Access Floors 1 3:00 PM 4:00 PM

22079 General Chemical 3.666666031 8:00 AM 9:00 AM 2:00 PM 4:00 PM 4:20 PM 5:00 PM

Overhead CTL 1.75 9:00 AM 10:45 AM

22097 Sheppard T. Powell 0.25 10:45 AM 11:00 AM

22102 Sunoco 1 11:00 AM 12:00 PM

22123 Sunoco 1 1:00 PM 2:00 PM

22106 Toyota 0.333333969 4:00 PM 4:20 PM

Overhead CTL 1.5 8:00 AM 9:30 AM

21372 Wright Medical Technolo 1 9:30 AM 10:30 AM

22124 FVB Energy 1.5 10:30 AM 12:00 PM

22124 FVB Energy 2 1:00 PM 3:00 PM

22087 Sunoco 1.75 3:00 PM 4:45 PM

21413 Kraft 0.25 4:45 PM 5:00 PM

22063 Rohm Haas 0.25 8:15 AM 8:30 AM

Overhead CTL 4 8:30 AM 9:30 AM 2:30 PM 5:30 PM

Page 444: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

22108 North American Energy S 1 9:30 AM 10:30 AM

22101 sunoco 1 10:30 AM 11:30 AM

22087 sunoco 2 1:30 PM 3:30 PM

BBModel SH 0.999999523 7:50 AM 8:50 AM

Overhead CTL 3 9:00 AM 12:00 PM

22101 sunoco 3 1:00 PM 4:00 PM

22059 Bechtel 1 4:00 PM 5:00 PM

BBModel SH 1.5 6:00 PM 7:30 PM

22079 General Chemical 0.25 8:00 AM 8:15 AM

22108 North American Energy S 0.25 8:15 AM 8:30 AM

22087 sunoco 3 8:30 AM 9:30 AM 1:30 PM 3:30 PM

Overhead CTL 3 10:30 AM 12:00 PM 3:30 PM 5:00 PM

22102 sunoco 0.75 12:45 PM 1:30 PM

Overhead CTL 3 8:00 AM 9:00 AM 3:00 PM 5:00 PM

22101 Sunoco 2.5 9:00 AM 10:00 AM 10:30 AM 12:00 PM

22059 Bechtel 2.5 10:00 AM 10:30 AM 1:00 PM 3:00 PM

22106 Toyota 1 9:30 AM 10:30 AM

22132 AstraZeneca 2.25 9:00 AM 9:15 AM 1:00 PM 3:00 PM

22005 Capstone 1 9:30 AM 10:30 AM

22124 FVB Energy 4 1:00 PM 5:00 PM

22170 sunoco 0.25 3:45 PM 4:00 PM

22058 sunoco 0.75 4:00 PM 4:45 PM

22005 Capstone 0.75 4:45 PM 5:30 PM

Overhead CTL 2 8:00 AM 10:00 AM 3:45 PM 5:00 PM

22108 North American Energy 1 10:00 AM 11:00 AM

Page 445: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

22005 Capstone 2 11:00 AM 12:00 PM 1:00 PM 2:00 PM

22085 sunoco 1 2:00 PM 3:00 PM

22058 sunoco 0.75 3:00 PM 3:45 PM

Overhead CTL 5.75 8:00 AM 9:00 AM 9:15 AM 10:00 AM 1:00 PM 5:00 PM

22059 Bechtel 0.25 9:00 AM 9:15 AM

22130 York 1.5 10:30 AM 12:00 PM

22058 sunoco 0.5 5:00 PM 5:30 PM

22139 Innophos 0.01 5:35 PM

22139i Innophos 4 8:00 AM 12:00 PM

22108 North American Energy 1 1:00 PM 2:00 PM

22139 Innophos 2 2:00 PM 4:00 PM

Overhead CTL 1 4:00 PM 5:00 PM

22136 Arkema 1 8:00 AM 9:00 AM

Overhead CTL 6 9:00 AM 12:00 PM 2:00 PM 5:00 PM

22101 Sunoco 1 1:00 PM 2:00 PM

Overhead CTL 3 8:00 AM 10:00 AM 11:30 AM 12:30 PM

22124 FVB Energy 0.5 10:00 AM 10:30 AM

22139 Innophos 1 10:30 AM 11:30 AM

Overhead CTL 1 1:30 PM 2:30 PM

22132 AstraZeneca 0.5 2:30 PM 3:00 PM

22139 Innophos 2 3:00 PM 5:00 PM

22124 FVB Energy 1 6:00 PM 7:00 PM

22137 York 1 7:50 AM 8:45 AM

22085 Sunoco 1.25 8:45 AM 10:00 AM

Overhead CTL 4 10:00 AM 12:00 PM 1:00 PM 3:00 PM

Page 446: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

22124 FVB Energy 1 3:00 PM 4:00 PM

22139 Innophos 1 4:00 PM 5:00 PM

BBModel SH 2 6:00 PM 8:00 PM

Overhead CTL 4.75 8:00 AM 9:30 AM 10:45 AM 12:00 PM 1:00 PM 3:00 PM

22139 Innophos 1 9:30 AM 10:30 AM

22151 Silmet 0.25 10:30 AM 10:45 AM

22124 FVB Energy 2 3:00 PM 5:00 PM

22153 Capstone 0.5 8:30 AM 9:00 AM

22139 Innophos 3 9:00 AM 10:00 AM 2:30 PM 4:30 PM

22133 Tate Access Floors 1.5 10:00 AM 11:00 AM 2:00 PM 2:30 PM

22152 York 2 11:00 AM 12:00 PM 1:00 PM 2:00 PM

22124 FVB Energy 1 4:30 PM 5:30 PM

Overhead CTL 2.5 8:00 AM 8:30 AM 10:05 AM 12:05 PM

22139 Innophos 1 8:30 AM 9:00 AM 4:00 PM 4:30 PM

22124 FVB Energy 0.25 9:00 AM 9:15 AM

22133 Tate Access Floors 0.5 9:15 AM 9:45 AM

22161 Tate Access Floors 0.5 9:45 AM 10:15 AM

Overhead Primcor 1 1:00 PM 2:00 PM

22124 FVB Energy 1 2:00 PM 3:00 PM

22122 Rockwood 1 3:00 PM 4:00 PM

BBModel SH 0.5 7:00 PM 7:30 PM

Overhead CTL 4.75 8:00 AM 9:00 AM 9:15 AM 11:00 AM 3:00 PM 5:00 PM

22151 Silmet 0.25 9:00 AM 9:15 AM

22132 AstraZeneca 1.25 11:00 AM 12:15 PM

22130 York 2 1:00 PM 3:00 PM

Page 447: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

22151 Silmet 0.01 7:05 PM

22139 Innophos 8 8:00 AM 12:00 PM 1:00 PM 5:00 PM

R&D MV 0 6:00 PM 7:00 PM

BBModel SH 0.75 6:00 PM 6:45 PM

BBModel SH 1 5:00 AM 6:00 AM

Overhead CTL 6 8:00 AM 11:00 AM 1:00 PM 2:00 PM 3:00 PM 5:00 PM

22155 Edwards Lifescience 1.083333015 11:00 AM 12:05 PM

22101 Sunoco 0.5 2:00 PM 2:30 PM

22130 York 0.5 2:30 PM 3:00 PM

Overhead CTL 4.5 8:00 AM 9:00 AM 12:30 PM 4:00 PM

22139 Innophos 1 9:00 AM 10:00 AM

22130 York 1 10:00 AM 11:00 AM

22155 Edwards Lifescience 0.5 11:00 AM 11:30 AM

22059 Bechtel 1 4:00 PM 5:00 PM

Overhead CTL 1 8:00 AM 8:30 AM 11:15 AM 11:45 AM

22160 FVB Energy 1 8:30 AM 9:30 AM

Overhead CTL 1 9:30 AM 10:30 AM

22124 FVB Energy 0.75 10:30 AM 11:15 AM

22161 Tate Access Floors 2 1:00 PM 3:00 PM

22170 Sunoco 2 3:00 PM 5:00 PM

22139 Innophos 7 8:00 AM 9:30 AM 10:00 AM 1:00 PM 2:00 PM 4:30 PM

22159 Werlinger & Assoc 0.5 9:30 AM 10:00 AM

22156 Sunoco 0.333333969 4:00 PM 4:20 PM

22166 Arkema 0.5 4:30 PM 5:00 PM

22139 Innophos 1 8:00 AM 9:00 AM

Page 448: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

22038 Edwards Lifescience 2 9:00 AM 11:00 AM

22170 Sunoco 2 11:00 AM 12:00 PM 1:00 PM 2:00 PM

22171 Outokumpu Oy 0.25 2:00 PM 2:15 PM

22168 York 0.25 2:15 PM 2:30 PM

22124 FVB Energy 3 2:30 PM 5:30 PM

22123 Sunoco 1 8:00 AM 9:00 AM

Overhead CTL 1 9:00 AM 10:00 AM

22124 FVB Energy 1 10:00 AM 11:00 AM

22038 Edwards Life Science 5 11:00 AM 12:00 PM 1:00 PM 5:00 PM

22038 Edwards Life Science 5 8:00 AM 12:00 PM 1:00 PM 2:00 PM

22132 AstraZeneca 1 2:00 PM 3:00 PM

Overhead CTL 1 3:00 PM 4:00 PM

22139 Innophos 1 4:00 PM 5:00 PM

Overhead CTL 1 8:00 AM 9:00 AM

22151 Silmet 1 9:00 AM 10:00 AM

22038 Edwards Life Science 2 10:00 AM 12:00 PM

22176 General Cable 1 1:00 PM 2:00 PM

22167 Innophos II 1 2:00 PM 3:00 PM

22059 Bechtel 1 3:00 PM 4:00 PM

22139 Innophos 1 4:00 PM 5:00 PM

Overhead CTL 3.5 8:00 AM 8:30 AM 3:00 PM 6:00 PM

22123 Sunoco 1 8:30 AM 9:30 AM

22059 Bechtel 0.5 9:30 AM 10:00 AM

22156 Sunoco 1 11:00 AM 12:00 PM

22139 Innophos 1 1:00 PM 2:00 PM

Page 449: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BBModel SH 2 7:00 PM 9:00 PM

BBModel SH 1 5:00 AM 6:00 AM

22176 General Cable 0.5 8:30 AM 9:00 AM

BBModel SH 0.75 6:15 AM 7:00 AM

22122 Rockwood Services 1 8:00 AM 9:00 AM

22132 AstraZeneca 1 9:00 AM 10:00 AM

22124 FVB Energy 2 10:00 AM 12:00 PM

22160 FVB Energy 2 3:00 PM 5:00 PM

22181 Environment One 1 2:00 PM 3:00 PM

Overhead CTL 2 3:00 PM 5:00 PM

22122 Rockwood Services 2 10:00 AM 12:00 PM

22166 Arkema 1 11:00 AM 12:00 PM

22139 Innophos 4 1:00 PM 5:00 PM

22122 Rockwood Services 1 4:00 PM 5:00 PM

22139 Innophos 4 8:00 AM 12:00 PM

Overhead CTL 2 1:00 PM 3:00 PM

22195 Honeywell 1 3:00 PM 4:00 PM

Overhead CTL 1.25 4:00 PM 5:30 PM

Overhead CTL 2.5 8:00 AM 10:30 AM

22136 Southern Ocean County H 0.5 10:30 AM 11:00 AM

22018 General Cable 0.5 11:00 AM 11:30 AM

22056 Tate Access Floors 0.25 11:30 AM 11:45 AM

22079 General Cable 0.25 11:45 AM 12:00 PM

22122 Rockwood Services 4 1:00 PM 5:00 PM

22167 Innophos 0.5 5:00 PM 5:30 PM

Page 450: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 3.916666985 8:00 AM 9:45 AM 10:20 AM 12:00 PM 5:00 PM 5:30 PM

22166Q Arkema 0.25 9:45 AM 10:00 AM

22176 General Cable 0.333333015 10:00 AM 10:20 AM

22122 Rockwood Services 3.5 1:30 PM 5:00 PM

22122 Rockwood 0.5 1:00 PM 1:30 PM

BBModel SH 1 6:00 AM 7:00 AM

Overhead CTL 1 8:00 AM 9:00 AM

22122 Rockwood Services 7 9:00 AM 4:00 PM

22122 Rockwood Services 1 4:00 PM 5:00 PM

Overhead CTL 0.5 5:00 PM 5:30 PM

BBModel SH 0.01 3:51 PM 5:00 PM

BBModel SH 1 5:45 AM 6:45 AM

22122 Rockwood Services 2 8:00 AM 10:00 AM

Overhead CTL 1.75 10:00 AM 11:00 AM 3:00 PM 3:45 PM

22186 Cytec 1 11:00 AM 12:00 PM

22166 Arkema 2 1:00 PM 3:00 PM

22191 Ina USA Corp 1 3:45 PM 4:45 PM

22181 Environment One 0.5 4:45 PM 5:15 PM

22122 Rockwood Services 0.5 8:00 AM 8:30 AM

22181 Environment One 0.5 8:30 AM 9:00 AM

22139 Innophos 1 10:00 AM 11:00 AM

Overhead Innophos 3.5 11:00 AM 2:30 PM

22192 AstraZeneca 2 2:30 PM 4:30 PM

Overhead CTL 1 4:30 PM 5:30 PM

22161 Tate Access Floors 11 8:00 AM 12:00 PM 1:00 PM 8:00 PM

Page 451: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

22192 AstraZeneca 2 8:00 AM 10:00 AM

22186 Cytec 1 10:00 AM 11:00 AM

22186 Cytec 1 11:00 AM 12:00 PM

22205 Taylor Forge 1 1:00 PM 2:00 PM

22191Q Ina USA Corp 1 2:00 PM 3:00 PM

Overhead CTL 2.25 3:00 PM 5:15 PM

BBModel SH 1.25 5:30 AM 6:45 AM

22205 Taylor Forge 1 8:00 AM 9:00 AM

22204 WaterFurnace 1 9:00 AM 10:00 AM

Overhead CTL 5 10:00 AM 1:00 PM 3:00 PM 5:00 PM

22159 Werlinger & Associates 0.75 2:00 PM 2:45 PM

22087 Sunoco 0.25 2:45 PM 3:00 PM

BBModel SH 2 12:30 PM 2:30 PM

BBModel SH 2 5:00 AM 7:00 AM

BBModel SH 1 6:00 AM 7:00 AM

Overhead CTL 3.583333969 8:00 AM 10:00 AM 3:45 PM 5:20 PM

22122 Rockwood Services 1 10:00 AM 11:00 AM

22124 FVB Energy 0.333333015 11:00 AM 11:20 AM

22139 Innophos 0.333333969 11:20 AM 11:40 AM

22167 Innophos 0.833333015 11:40 AM 12:30 PM

22170 Sunoco 0.333333015 1:30 PM 1:50 PM

22176 General Cable 0.333333969 1:50 PM 2:10 PM

22179 Siemens Westinghouse 1.083333015 2:10 PM 3:15 PM

22204 WaterFurnace 0.5 3:15 PM 3:45 PM

BBModel SH 2 5:00 AM 7:00 AM

Page 452: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BBModel SH 1 6:30 PM 7:30 PM

22190 York 1 8:00 AM 9:00 AM

22122 Rockwood Service 0.5 9:00 AM 9:30 AM

22087 Sunoco 1 9:30 AM 10:30 AM

22159 Werlinger & Associates 1 10:30 AM 11:30 AM

Overhead CTL 3.5 11:30 AM 12:30 PM 1:30 PM 4:00 PM

22205 Taylor Forge 1.5 4:00 PM 5:30 PM

22205 Taylor Forge 12.16666603 7:20 AM 12:00 PM 1:00 PM 8:30 PM

BBModel SH 1 5:30 AM 6:30 AM

Overhead CTL 4.416666031 8:00 AM 9:00 AM 2:00 PM 5:25 PM

22159 Werlinger & Associates 1 9:00 AM 10:00 AM

22186 Cytec 0.5 10:00 AM 10:30 AM

22186 Cytec 0.5 10:30 AM 11:00 AM

22205 Taylor Forge 1 11:00 AM 12:00 PM

22205 Taylor Forge 1 1:00 PM 2:00 PM

BBModel SH 2 8:40 AM 10:40 AM

BBModel SH 5 1:30 PM 6:30 PM

BBModel SH 1 7:00 PM 8:00 PM

Overhead CTL 2 8:00 AM 10:00 AM

22205 Taylor Forge 2 10:00 AM 12:00 PM

22223 Innophos 0.5 1:00 PM 1:30 PM

new Eone 1 2:30 PM 3:30 PM

22205 Taylor Forge 2 3:30 PM 5:30 PM

BBModel SH 0.5 6:00 AM 6:30 AM

Overhead CTL 2 8:00 AM 10:00 AM

Page 453: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

22205 Taylor Forge 4.333333015 10:00 AM 12:00 PM 1:40 PM 4:00 PM

22159 Werlinger & Assoc 0.5 1:00 PM 1:30 PM

22223 Innophos 2.5 4:00 PM 6:30 PM

BBModel SH 1 6:00 AM 7:00 AM

Overhead CTL 4 8:00 AM 11:30 AM 3:15 PM 3:45 PM

22205 Taylor Forge 1.5 1:00 PM 2:00 PM 3:15 PM 3:45 PM

22220 York 1 2:00 PM 3:00 PM

22186 Cytec 0.25 3:00 PM 3:15 PM

22152 York 0.5 3:45 PM 4:15 PM

22223 Innophos 1 4:15 PM 5:15 PM

BBModel SH 4 8:00 AM 12:00 PM

BBModel SH 1 9:00 PM 10:00 PM

BBModel SH 4 9:00 AM 1:00 PM

BBModel SH 1 3:00 PM 4:00 PM

22223 Innophos Chicago 11 6:30 AM 12:00 PM 1:00 PM 6:30 PM

22223 Innophos Chicago 9.25 8:00 AM 11:00 AM 11:00 AM 5:15 PM

BBModel SH 3 1:00 PM 4:00 PM

BBModel SH 1 5:30 AM 6:30 AM

Overhead CTL 2

Overhead CTL 3 8:00 AM 9:00 AM 1:00 PM 2:00 PM 4:00 PM 5:00 PM

22223 Innophos Chicago 5 9:00 AM 12:00 PM 2:00 PM 4:00 PM

Overhead CTL 6 8:30 AM 9:30 AM 11:00 AM 12:00 PM 1:00 PM 5:00 PM

22223 Innophos Chicago 1.5 9:30 AM 11:00 AM

Overhead CTL 4.25 8:00 AM 10:00 AM 11:00 AM 12:00 PM 4:00 PM 5:15 PM

22235 Telefax 1 10:00 AM 11:00 AM

Page 454: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

22205 Taylor Forge 3 1:00 PM 4:00 PM

22205 Taylor Forge 6.5 8:00 AM 11:30 AM 1:00 PM 4:00 PM

Overhead CTL 1.5 4:00 PM 5:30 PM

22205 Taylor Forge 0.5 8:00 AM 8:30 AM

Overhead CTL 1 8:00 AM 9:00 AM

22122 Rockwood 1 9:00 AM 10:00 AM

22205 Taylor Forge 2 10:00 AM 12:00 PM

22139 Innophos LA 2 1:00 PM 3:00 PM

22220 York 1 3:00 PM 4:00 PM

22235 Telefax 1 4:00 PM 5:00 PM

BBModel SH 1 5:40 AM 6:40 AM

22205 Taylor Forge 1 8:00 AM 9:00 AM

Overhead CTL 4 9:00 AM 11:00 AM 3:00 PM 5:00 PM

22223 Innophos Chicago 1 11:00 AM 12:00 PM

22166 Arkema 2 1:00 PM 3:00 PM

BBModel SH 1 5:00 AM 6:00 AM

22205 Taylor Forge 11.75 7:45 AM 12:00 PM 1:00 PM 8:30 PM

Overhead CTL 2 8:00 AM 10:00 AM

22218 MTI 1 10:00 AM 11:00 AM

Overhead CTL 1 11:00 AM 12:00 PM

Overhead CTL 1.5 12:00 PM 1:30 PM

Sick CTL 3.5 1:30 PM 5:00 PM

BBModel SH 6 8:00 AM 2:00 PM

22205 Taylor Forge 1.5 8:00 AM 9:30 AM

22166 Arkema 2 9:30 AM 11:30 AM

Page 455: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Overhead CTL 3.5 11:30 AM 12:00 PM 2:00 PM 5:00 PM

22240 Sunoco 1 1:00 PM 2:00 PM

BBModel SH 0.5 5:30 AM 6:00 AM

BBModel SH 1.166666508 5:30 AM 6:40 AM

22196 CTL 1 8:00 AM 9:00 AM

Overhead CTL 1 9:00 AM 10:00 AM

22136 Arkema 1 10:00 AM 11:00 AM

Overhead CTL 1 11:00 AM 12:00 PM

22186 Cytec 1 9:00 AM 10:00 AM

22210 Sunoco 1.5 2:00 PM 3:30 PM

22205 Taylor Forge 2.5 3:00 PM 5:30 PM

22186 Cytec 1 4:00 PM 5:00 PM

22136 Arkema 1 4:00 PM 5:00 PM

22186 Cytec 4 1:00 PM 5:00 PM

22205 Taylor Forge 1 2:00 PM 3:00 PM

22234 Sunoco 0.5 3:00 PM 3:30 PM

22136 Arkema 0.5 5:00 PM 5:30 PM

22186 Cytec 0.5 8:00 AM 8:30 AM

Overhead CTL 2 8:00 AM 10:00 AM

Timesheet MV 12 8:30 AM 8:30 PM

22170 Sunoco 2 9:00 AM 11:00 AM

22210 Sunoco 0.5 2:00 PM 2:30 PM

22186 Cytec 4 1:00 PM 5:00 PM

BAM MTL 36

BBModel SH 3 6:30 PM 9:30 PM

Page 456: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BBModel SH 3 10:30 AM 1:30 PM

BAM MTL 3 4:00 PM 7:00 PM

BAM MTL 8.333333969 8:15 AM 11:30 AM 12:30 PM 5:35 PM

BAM MTL 8.083333015 8:15 AM 12:15 PM 1:35 PM 5:40 PM

BAM MTL 3 9:00 AM 12:00 PM

LiBr York 5.833333969 6:00 PM 11:50 PM

BBModel SH 0.583333969 2:35 PM 3:10 PM

BBModel SH 2 10:45 AM 12:45 PM

BBModel SH 2 1:00 PM 2:00 PM 6:00 PM 7:00 PM

BBModel SH 3.5 8:30 AM 12:00 PM

BBModel SH 2.5 1:00 PM 3:30 PM

model Mintek 0.01 1:00 PM 2:00 PM

BBModel SH 5 9:00 AM 11:30 AM 6:30 PM 9:00 PM

Ricketmill Odle 1.5 7:30 AM 9:00 AM

Jobs Odle 2 9:00 AM 11:00 AM

BBModel SH 6.5 11:00 AM 1:30 PM 1:30 PM 5:30 PM

BBModel SH 3 2:00 PM 5:00 PM

BBModel SH 3.5 11:00 AM 2:30 PM

BBModel SH 1.75 5:15 PM 7:00 PM

BBModel SH 2 12:00 PM 2:00 PM

Jobs Odle 4 8:00 AM 12:00 PM

WMD RFP Wolf Environmental 1 12:00 PM 12:30 PM 4:00 PM 4:30 PM

BBModel SH 0.333333969 1:20 PM 1:40 PM

BBModel SH 1 6:45 AM 7:45 AM

BBModel SH 1 8:30 AM 9:30 AM

Page 457: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BBModel SH 4 9:30 AM 11:30 AM 1:00 PM 3:00 PM

BBModel SH 6.5 7:00 AM 12:00 PM 1:00 PM 2:30 PM

BBModel SH 1.5 2:30 PM 4:00 PM

BBModel SH 2.833333015 11:00 AM 12:30 PM 1:40 PM 3:00 PM

BBModel SH 3 1:30 PM 4:30 PM

BBModel SH 1.5 12:00 PM 1:30 PM

BBModel SH 1 7:00 PM 8:00 PM

BBModel SH 3.333333015 2:40 PM 5:00 PM 9:00 PM 10:00 PM

BBModel SH 3.25 10:45 AM 2:00 PM

BAM MTL 1.5 10:00 AM 11:30 AM

BAM MTL 1.333333015 12:10 PM 12:50 PM 1:20 PM 2:00 PM

BAM MTL 1.5 10:00 AM 11:30 AM

BBModel SH 2 10:00 AM 12:00 PM

BBModel SH 1.833333969 4:40 PM 6:30 PM

BBModel SH 0.333333015 11:55 AM 12:15 PM

BBModel SH 3 12:00 PM 2:00 PM 3:15 PM 4:15 PM

MTL MV 1.5 8:30 AM 10:00 AM

BBModel SH 2.75 12:45 PM 3:30 PM

BBModel SH 3.5 5:30 PM 9:00 PM

BAM MTL 1 9:30 AM 10:00 AM 12:00 PM 12:30 PM

BAM MTL 2 10:00 AM 12:00 PM

BBModel SH 0.75 5:00 PM 5:45 PM

BBModel SH 0.666666985 6:30 AM 7:00 AM 12:50 PM 1:00 PM

Overhead MV 2.416666985 8:00 AM 9:30 AM 11:35 AM 12:30 PM

BAM MTL 1.5 9:30 AM 11:00 AM

Page 458: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BAM MTL 0.333333015 11:00 AM 11:20 AM

BAM MTL 0.25 11:20 AM 11:35 AM

Hunt Odle 0.333333015 12:30 PM 12:50 PM

BBModel SH 0.166666985 3:00 PM 3:10 PM

Jobs Odle 1.5 8:30 AM 10:00 AM

BBModel SH 2.5 10:00 AM 12:30 PM

BBModel SH 0.75 12:45 PM 1:30 PM

Dues RMMA 2 7:00 PM 9:00 PM

Jobs Odle 1.75 8:15 AM 10:00 AM

BBModel SH 2.25 10:00 AM 11:30 AM 12:15 PM 1:00 PM

Projects MV 0.01 5:00 PM 8:00 PM

BBModel SH 0.25 1:00 PM 1:15 PM

BBModel SH 4.166666031 1:15 PM 4:15 PM 8:20 PM 9:30 PM

Jobs Odle 3.5 8:45 AM 12:15 PM

BBModel SH 1.25 12:15 PM 1:30 PM

BBModel SH 1.166666985 11:20 AM 12:30 PM

Projects MV 5.5 9:00 AM 2:30 PM

BBModel SH 0.499999046 3:40 PM 4:10 PM

BBModel SH 1 2:30 PM 3:30 PM

BBModel SH 0.5 11:30 AM 12:00 PM

BBModel SH 1.25 12:15 PM 1:30 PM

Family Odle 3.5 6:00 AM 9:30 AM

Wedgemont Wells Fargo 1.5 9:30 AM 11:00 AM

Fish Pond Odle 2 2:00 PM 4:00 PM

BBModel SH 0.5 5:10 PM 5:40 PM

Page 459: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Taxes Uncle Sam 2 11:30 AM 1:30 PM

K061 Zincox 0.5 4:00 PM 4:30 PM

Taxes Uncle Sam 0.5 11:00 AM 11:30 AM

Overhead MV 0.75 6:15 AM 7:00 AM

Credit Cards Odle 0.333333015 8:00 AM 8:20 AM

K061 Zincox 2 8:40 AM 9:40 AM 2:00 PM 3:00 PM

Taxes Uncle Sam 4.333333015 9:40 AM 12:00 PM 1:00 PM 3:00 PM

IM MV 3 3:00 PM 6:00 PM

Overhead MV 0.5 8:00 AM 8:30 AM

IM MV 2.5 8:30 AM 11:00 AM

BAM MTL 0.25 11:30 AM 11:45 AM

BAM MTL 0.5 1:00 PM 1:30 PM

Taxes Uncle Sam 1.25 8:00 AM 9:15 AM

dream MV 0

Overhead MV 0.25 9:30 AM 9:45 AM

family Odles 2.5 1:30 PM 4:00 PM

Regalito Cu GLC 1.666667938 4:40 PM 6:20 PM

BBModel SH 1.083333969 6:55 PM 8:00 PM

Overhead MV 0.75 9:30 AM 10:15 AM

BAM MTL 0.166666031 3:25 PM 3:35 PM

Regalito Cu GLG 1.216667175 2:08 PM 3:21 PM

BBModel SH 2.416666985 10:15 AM 12:40 PM

BAM MTL 0.166666985 3:35 PM 3:45 PM

Overhead MV 1 8:00 AM 9:00 AM

IM MV 1 10:45 AM 11:45 AM

Page 460: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

BAM MTL 1 12:15 PM 1:15 PM

Regalito Cu GLG 2.066666603 1:15 PM 2:45 PM 3:03 PM 3:37 PM

Overhead MV 1 10:00 AM 11:00 AM

Finances Odle 1 11:00 AM 12:00 PM

BBModel SH 1.5 12:00 PM 1:30 PM

Gold & Silver Kiwatt Investment 3 8:00 AM 9:00 AM 5:00 PM 7:00 PM

BAM MTL 1 4:00 PM 5:00 PM

Overhead MV 0.75 9:00 AM 9:45 AM

Regalito Cu GLG 0.25 9:45 AM 10:00 AM

Micro-silica PFU 1 10:00 AM 11:00 AM

BBModel SH 6.000000954 11:20 AM 12:00 PM 1:00 PM 6:20 PM

Overhead MV 0.833333015 8:40 AM 9:15 AM 10:15 AM 10:30 AM

BBModel SH 0.25 10:30 AM 10:45 AM

Gold & Silver Kiwatt Investment 0.416666985 10:45 AM 11:10 AM

BAM MTL 0.333333015 2:00 PM 2:20 PM

Overhead MV 0.5 8:00 AM 8:30 AM

Family Odle 0.75 8:30 AM 9:15 AM

BBModel SH 4.75 9:30 AM 12:45 PM 1:15 PM 2:45 PM

Taxes IRS 2 3:00 PM 5:00 PM

Finances Odle 0.25 5:00 PM 5:15 PM

Gold & Silver Kiwatt Investment 3 6:00 PM 9:00 PM

Overhead MV 1 8:00 AM 9:00 AM

Overhead Franchoice 0.5 9:00 AM 9:30 AM

Houdini Device Betha 0.5 9:45 AM 10:15 AM

Future Gen Wolf Eagle 1.5 10:30 AM 12:00 PM

Page 461: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Finances Odle 1 1:00 PM 2:00 PM

Jobs Odle 0.5 3:00 PM 3:30 PM

BAM MTL 0.333333969 5:00 PM 5:20 PM

Overhead Odle 0.333332062 5:20 PM 5:40 PM

Gold & Silver Kiwatt Investment 3.833333969 8:00 PM 11:50 PM

Page 462: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Distribution of Odle's Time on Various Types of Activities 05/08/202302:53:35

document.xlsCategory Report Robert R. Odle

PERIOD 11/6/2005 TO 12/5/2005

Category of Activity Hours

Development Working on long term projects, programming, patents, similar 48.7 100.0Other Items Not Included Above 0.0 0.0

Total Hours 48.7

Support Total Hours 1398.8 11.1Other Total Hours 1927.617 5.5

% of Time

Timesheet

Page 463: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

COMPANY HRS % of Time

SH 48.7 100.0

TOTAL 48.7 100.0

Page 464: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

05/08/2023 02:53:35

RRO

Catagories Task DescriptionsAdmin timesheets, invoicing, sample log-in, emails, planning workClient Client interactions, phone and email, for non-funded projectsDevelopment Working on long term projects, programming, patents, similarEducation Learning out to do various technician functions around labEditing Editing reports and publishingInvestigation time spent in the metallography lab with stereoscope, metallography, pictures, etc.Literature looking up literature on technical issuesManagement directing, supervising, training of othersMarketing activities to get new clientsMeeting formal and informal meetings to discuss a specific agendaMilestone meetings in which critical decisions were made to select future direction of company or its staffPictures Editing pictures, making drawings, inserting into ReportsReport Writing ReportSupport General support to MV Client

Page 465: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

0.0236 inches 199000 btu/hr 8 gpm0.060 cm 50147.2 calories, kg/hr 30.3 lpm0.599 mm 1817.0 l/hr

1.8 m^3/hr

19.81 ksec 9.707 inch330.2 min 24.65578 cm

5.5 hrs 246.5578 mm

40 ft12.192 meters

20 microns0.02 mm

0.002 cm0.000787 inches0.787402 mils

800 C is 1472 deg F1400 F is 760 deg C

Page 466: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Cost of Operating Heater in Office

1300 watts50% time on

3 months/yr4.3 weeks/mo

8 hrs/day5 days/wk

258 hrs/yr335400 watts

335.4 kwatts0.07 $/KW

23.478 $/yr

Page 467: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Inflation Adjusted SalaCPIJan-03 8500 8500 114.6Feb-03 8548 8500 115.25Mar-03 8596 8500 115.9Apr-03 8589 8500 115.8

May-03 8582 8500 115.7Jun-03 8622 8500 116.25Jul-03 8663 8500 116.8

Aug-03 8678 8500 117Sep-03 8693 8500 117.2Oct-03 8674 8500 116.95Nov-03 8656 8500 116.7Dec-03 8671 8500 116.9

2004 Jan-04 8685 8500 117.1Feb-04 8723 8500 117.6Mar-04 8760 8500 118.1Apr-04 8789 8500 118.5

May-04 8819 8500 118.9Jun-04 8867 8500 119.55Jul-04 8915 8500 120.2

Aug-04 8938 8500 120.5Sep-04 8960 8500 120.8Oct-04 8964 8500 120.85Nov-04 8967 8500 120.9Dec-04 8982 8500 121.1

2005 Jan-05 8997 8500 121.3Feb-05 9049 8500 122Mar-05 9101 8500 122.7Apr-05 9123 8500 123 Ja

n-03

Mar-03

May-03

Jul-0

3

Sep-03

Nov-03

Jan-0

4

Mar-04

May-04

Jul-0

4

Sep-04

Nov-04

Jan-0

5

Mar-05

8000

8200

8400

8600

8800

9000

9200

Salary Cut vs. Time

Column DColumn E

Page 468: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Jan-0

3

Mar-03

May-03

Jul-0

3

Sep-03

Nov-03

Jan-0

4

Mar-04

May-04

Jul-0

4

Sep-04

Nov-04

Jan-0

5

Mar-05

8000

8200

8400

8600

8800

9000

9200

Salary Cut vs. Time

Column DColumn E

Page 469: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

Profitability of FA Business by Project

document.xlsProfitability Report Robert R. Odle

Project Profitability ReportInvestigations

PERIOD 4/1/2005 TO 4/30/2005

PROJECTS DESCRIPTION INVOICED $ EST.COST HRS % of Time Earned $/hr

TOTAL

% of Revenues

Relative Profitability

Timesheet

Page 470: Project Manager by Odle - Metallurgical Viability · XLS file · Web viewreviewing QC document for signing in samples CTL tracking form, invoice, ... revising PDF based on being

2005 actualSept 7500 4575Oct 4500 4575November 4500

2006 16500 9150Dec 6206.5Jan 6206.5Mar 0

2007 12,413

44800 2005 budge16500 2005 new budge

73,713 total approved?28,913 total for capital costs

SH Original Prediction