Project Management
Case Studies
Healthcare
Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.
This 66-bed specialist nursing
and dementia care home is
equipped to hotel standards
and includes a sensory gardens. Pinders were responsible for
the full suite of project
management services;
publishing an OJEU notice,
preparation of and tender
analysis, contractor
appointment and providing
assistance with the CQC
registration.
Case Study
Foxburrow Grange,
Colchester
Service: Project
Management
Value: £4.7 million
Duration: 59 weeks
Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.
This new three storey building
was constructed in the car
park behind the original
centre, which was demolished
to form a new car park. The
site is part of the Witney
Hospital complex.
Monitored on behalf of Lloyds
TSB Banking.
Case Study Windrush Health Centre,
Witney
Service: Project
Monitoring
Value: £5.68 million
Duration: 63 weeks
Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.
This two storey 22 bedroom
timber frame extension to an
existing home incorporates
ground source heat pump and
heat recovery systems to
reduce energy consumption by
a predicted 63%.
The accommodation is
designed for residents with
dementia with additional day
care provision.
Case Study Wren Hall Nursing Home,
Selston
Project: New Care Home
Service: Project Mngt.
Value: £1.3 million
Duration: 39 weeks
Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.
The 29 bed care home was
extensively extended and
refurbished to provide 64
bedrooms all with en suite
shower rooms. Carried out in
two phases to enable the home
to continue to operate, both
south and north extensions
were replaced with larger
extensions with the original
Victorian building being totally
repaired and refurbished.
Case Study St Cross Grange Care Home,
Winchester
Service: Project
Monitoring
Value: £4.9 million
Duration: 110 weeks
Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.
Extension to an existing care
home in Norfolk and the
addition of a stand-alone
dementia care unit. Local resistance to the
development demanded
enhanced public consultation,
the provision of a model and a
planning review. The home won a National
Healthcare design award in the
best extension category.
Case Study
Halsey House Care Home,
Cromer
Service: Project Mngt,
Planning & CDM-C
Value: £6.35 million
Duration: 86 weeks
Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.
Pinders achieved planning
consent for a 57 bed specialist
(dementia) nursing home on
the site of a previous hotel.
Working with the planners and
local neighbours, we were able
to prove that tourism facilities
would not be affected and
helped to provide a design and
parking facilities which would
“fit to the local street scene”.
Case Study New Nursing Home,
Fordingbridge
Service: Planning
Consultancy
Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.
The works entailed the
removal of all defective plaster
throughout the property and
re-plastering and decorating.
To enable the home to
continue to operate, only eight
bedrooms at a time could be
undertaken on a phased basis
in this 49 bedroom care home.
Case Study
Blackwell Care Centre,
Alfreton
Project: Internal Repairs
Service: Project Mngt.
Value: £295,000
Duration: 45 weeks
Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.
Internal reconfiguration to
provide additional day space
including the addition of two
conservatories, an extra
assisted bathroom and a
sensory garden.
Case Study Suffolk Lodge Care Home,
Wokingham
Project: Conservatory
Extensions &
Internal
Alterations
Service: Project Mngt.
Value: £286,300
Duration: 27 weeks
Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.
Pinders obtained the change of
use for the Greenfield site and
project managed the
construction of a 90 bed
purpose built Care Home, 53
Extra Care Apartments and
Day Care Centre with offices
above.
Case Study Summer Lane Care Home
Diamond Court Apartments
Weston Super Mare
Project: New Care Village
Service: Project Mngt.
Value:
Care Home - £4.11 million
Apartments - £4.45 million
Duration:
Care Home – 14 months
Apartments – 17 months
Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.
A development located in the
New Forest comprising 22 self
contained apartments, two
guest suites and a communal
suite. Sited in close proximity
to two existing care homes,
the scheme provides extra
care accommodation whilst
maintaining residents’
independence.
Case Study Dunwood Manor Care
Home, Romsey
Service: Project
Monitoring
Value: £4.59 million
Duration: 92 weeks
Contact the Building Services Team on 01908 350500, or email [email protected] to discuss your requirements.
Pinders secured planning
approval for this purpose built
45 bed care home on the site
of a former vicarage.
Set in a conservation area on a
site with a number of trees
subject to TPOs, extensive
liaison was required with the
planners and English Heritage
along with public consultation.
Case Study Yardley Grange Care Home,
Yardley
Project: New Care Home
Service: Project Mngt
and Monitoring
Value: £1.61 million
Duration: 42 weeks