INTERNATIONAL COLLEGE OF BUSINESS & TECHNOLOGY Colombo, Sri Lanka
A SUITABLE INFORMATION SYSTEMS PROJECT FOR ECOM TECHNOLOGY LANKA (PVT) LTD
AN ASSIGNMENT SUBMITTED TO ICBT/UWIC AND TO ROSHINI GUNAWARDARA (MODULE TUTOR)
IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE SUBJECT OF INFORMATION SYSTEMS PROJECT MANAGEMENT
BY
ERANGA DISSANAYAKA BSC (HONS) IN SOFTWARE DEVELOPMENT
STUDENT ID: 10007933 COLOMBO, SRI LANKA
NOVEMBER, 2011
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
ii
Acknowledgments
I would like to express my deepest gratitude and warmest appreciation to the
following people, who, in any way have contributed and inspired me to the overall
success of the undertaking:
To Ms. Roshini Gunawardana, the module tutor for her guidance and priceless
support she provided me during my studies to fully understand of theories.
To my friends, who have been unselfishly gave their support to gather information.
And to the Almighty God, who always leads me to the success and never let me
down.
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
iii
Table of Contents
Acknowledgments.......................................................................................................... ii
Introduction .................................................................................................................... v
Selected Organisation ................................................................................................... vi
Proposed Information System Projects ......................................................................... vi
1. SWOT Analysis ......................................................................................................... 1
1.1 Analyses the Proposed Projects ........................................................................... 1
2. Project Appraisal and Selection ................................................................................. 4
2.1 Non Financial Appraisal ...................................................................................... 4
2.1.1 Key-factors .................................................................................................... 4
2.1.2 Scoring of Key-factors .................................................................................. 5
2.1.3 Explanation of the Scores ............................................................................. 5
2.2 Financial Appraisal .............................................................................................. 7
2.2.1 Net Present Value (NPV) .............................................................................. 7
2.2.2 Return on Investment (ROI) ......................................................................... 8
3. Stakeholder Analysis ................................................................................................. 9
3.1 Methodology ........................................................................................................ 9
3.2 Identified Stakeholders ........................................................................................ 9
3.3 Stakeholder Analysis Report.............................................................................. 10
3.4 Project Organisation Chart ................................................................................. 12
4. Project Plan .............................................................................................................. 13
4.1 Project Charter ................................................................................................... 13
4.2 Work Breakdown Structure ............................................................................... 14
4.2.1 WBS Definition .......................................................................................... 14
4.3 Responsibility Assignment Matrix .................................................................... 16
4.4 Communication Management Plan .................................................................... 18
4.4.1 Stakeholder Groups ..................................................................................... 19
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
iv
4.4.2 Communications Matrix ............................................................................. 19
4.5 Project Budget and Cost Plan ............................................................................ 21
4.6 Risk Management Plan ...................................................................................... 22
4.6.1 Risk Responsibilities ................................................................................... 23
4.6.2 Probability of Occurrence (Po) ................................................................... 24
4.6.3 Risk Impact (I) ............................................................................................ 24
4.6.4 Risk Management Matrix and Strategy ...................................................... 25
5. Microsoft Project Planning ...................................................................................... 26
6. Software Crisis ......................................................................................................... 26
6.1 Recommendations .............................................................................................. 27
Project Glossary ........................................................................................................... 29
References .................................................................................................................... 30
Appendix I ................................................................................................................... 31
Cost Estimation Facts .............................................................................................. 31
Appendix II .................................................................................................................. 32
WBS Tasks............................................................................................................... 32
Appendix III ................................................................................................................. 34
Risk Context............................................................................................................. 34
Appendix IV................................................................................................................. 35
Project Information Window ................................................................................... 35
Resource Sheet ......................................................................................................... 35
Gantt Chart ............................................................................................................... 35
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
v
Introduction
Information system is a collaboration of information technology and human activities
that support management, operations, and decision making. We are in era of where
information systems are involving in most activities and equipments. During the past
decade IS became more comprehensive and complex due to increasing of
requirements of humans nevertheless IS should be more accurate and must meet the
user requirement to be a successful system. Activity of building a IS called project
and it is typically defined as a collaborative enterprise or design, that is carefully
planned to achieve a particular aim. A project must be well planned to achieve its
objectives and this is the reason where Project Management (PM) coming to the
picture.
“Project management is the discipline of planning, organizing, securing, and
managing resources to achieve specific goals. A project is a temporary endeavor with
a defined beginning and end (usually time-constrained, and often constrained by
funding or deliverables), undertaken to meet unique goals and objectives, typically to
bring about beneficial change or added value.”
This document will demonstrate how to choose a suitable, important and project to an
organization and will discuss about important project management techniques and
documents as well.
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
vi
Selected Organisation
There are hundreds of IT firms in Sri Lanka and I chosen Ecom Technology Lanka
(Pvt) Ltd to propose new IS projects to complete this assignment.
E-com Technology Lanka is a web application development firm based in Colombo
which engaged in web design & development, hosting and domain name registration.
Also they provide various web based advertising systems. It is a well established and
very competitive organization which always uses latest technology to deliver their
products.
Proposed Information System Projects
I have identified two potential and relevant IS projects which are perfectly meet the
context and the nature of the business of Ecom.
The first one is a domain management application to organise and manage all of their
registered domain names and hosting services. This particular application will provide
following services.
• Automated domain/hosting renewal notices
• Electronic Invoices
• SMS Notifications for domain expirations
• Customer information management
• Expiration indication services
The second project is based on advertising system which provides the following
features.
• SMS advertising campaigns
• Email adverting
• Group SMS services for internal staff
1. SWOT Analysis
SWOT analysis is highly helpful for an organisation to identify the most suitable,
important and potential projects.
Figure 1.1 – SWOT Analysis Matrix
1.1 Analyses the Proposed Projects
Following is the SWOT analysis performed for Ecom.
Strengths:
• Latest technology – Ecom uses latest web development and hosting
technologies including Ajax, Java Scripts, PHP with OOP methods and
Wordpress, Drupal and Joomla hosting.
• Ecom has an ability of providing an unlimited Hosting space and email
accounts.
• Professional web designers and developers.
• High quality products and good services.
• Competitive price range.
• Ecom’s clientele consisting of well established organizations and large no of
customers.
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
2
Weaknesses:
• Lack of experience and human resource in marketing.
• Ecom is located out from Colombo and this will be a disadvantage to reach to
new customers.
• Lack of finance.
• Ecom has a limited staff.
• Underperformances of employees
Opportunities:
• Spread business to international market.
• Redesign web sites according to new web standards.
• Introduce new security systems and effective database environment.
Threats: • There are many web designing companies in Sri Lanka and the competition is
high.
• Prices between Ecom and competitors.
• Build relationship with customers.
• Legislation and ICT regulations.
• Different technology changes and latest technologies.
• Competitors can make good offers to Ecom’s employees and they may leave
the company.
Above SWOT study is very important when selecting the most effective project. Let’s
see how we can obtain advantages from these facts in each proposed projects.
Selected Project SWOT Relevance
Domain management
Application Project
Strengths:
All the facts gathered from SWOT analysis are relevant to this
particular project. But specially the last fact i.e. large no of
clients is the most important fact to choose this project.
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
3
Weaknesses:
Since Ecom has a limited staff it is very useful to have this
kind of a system.
Also Ecom has a limited finance and this system will save
huge amount of money by reducing the telephone and postal
expenses.
Threats: Since the competition is high Ecom can protect their customer
base by ensuring a high quality service and maintaining an
attractive relationship.
Advertising Application
Project
Strengths:
All the facts gathered from SWOT analysis are relevant to this
particular project too.
Weaknesses:
In our SWOT analysis we could find the Ecom has less
experience and human resource in marketing. Also Ecom has
not located in commercial area. This will be highly effects on
finding new clients.
Opportunities:
With this solution Ecom can introduce new technology to
existing and new clients. Also Ecom gets opportunity to
spread their business to international market.
Threats: To face to the high competition Ecom can use this application
to deliver effective messages to customers.
Table 1.1 – SWOT study and relevance to projects
When evaluating all the assumptions and facts which illustrate in table 1.1 and also
not in the table but we gathered from the SWOT study. Both the projects are equally
helps to Ecom to continue their business with more strength but when we look in to
customer base and the limited staff the Domain management application will be more
suitable for Ecom and will help Ecom to avoid lot of weaknesses although when we
compare the opportunities the Advertising project is more giving more advantages to
Ecom. Both the projects will equally help to avoid threats.
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
4
Also when we take the huge weakness of lack of funds in this organisation it is not
possible to invest for a project by taking a risk. Development cost for both projects
will be equal but the operational cost of Advertising project is considerably too high.
Because it is sends huge no of SMS messages. We can think about the future
opportunities and say that we can use the advertising application to provide a service
to the third party clients but the problem is we cannot assure that we can promote this
application to clients.
After evaluating all the above discussed factors we can identify the Domain
management Application is the most suitable and potential project to this organisation
and will further discuss about the this particular project.
2. Project Appraisal and Selection
2.1 Non Financial Appraisal
Non-financial factors are really important when you are selecting a potential project to
an organisation.
2.1.1 Key-factors
Following are the key factors and weightings for these proposed projects.
Key factors Weighting
Organisation requirement 20
Appropriateness of the designs and layout 15
Optimality of scale of operations 15
Feasibility and speed of Implementation 20
Strategic Value 15
Accessibility 15
Total 100
Table 2.1.1 – Key factors for non financial appraisal
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
5
2.1.2 Scoring of Key-factors
Now will score the each factor for both projects using the maximum score value is 10.
Domain management
Application
Advertising
System
Key-factor Weight Score
Weight
x
Score
Score
Weight
x
Score
Organisation requirement 20 10 200 5 100
Appropriateness of the designs
and layout 15 10 150 10 150
Optimality of scale of operations 15 8 120 3 45
Feasibility and speed of
Implementation 20 10 200 8 160
Strategic Value 15 10 150 10 150
Accessibility 15 8 120 10 150
Total 100 940 755
Rank 1 2
Table 2.1.2 – Scoring of factors
2.1.3 Explanation of the Scores
Organisation requirement
Project Score Explanation
Domain management Application 10 Ecom has a huge problem of limited staff
and they have a high requirement of such a
system to manage their work.
Advertising System 5 Ecom has a requirement of an advertising
system but at this moment they just need to
serve their existing customers well.
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
6
Appropriateness of the designs and layout
Project Score Explanation
Domain management Application 10 For both of the projects it is appropriates a
good design and layouts. Advertising System 10
Optimality of scale of operations
Project Score Explanation
Domain management Application 8 This project will help Ecom to optimise their
current operations by managing its whole
process.
Advertising System 3 Project will be helpful to send messages to
clients but may not involve highly in current
processes.
Feasibility and speed of Implementation
Project Score Explanation
Domain management Application 10 Capital investment is low
No impact on current business process.
Advertising System 8 Little capital investment required due to
requirement of high end equipments.
No impact on current business process
Strategic Value
Project Score Explanation
Domain management Application 10 Project will help to improve the services and
processes of the company.
It will provide a best service to their existing
clients.
Advertising System 10 Project will help to improve their marketing
strategy and improve their clientele.
Accessibility
Project Score Explanation
Domain management Application 8 This system is almost 75% automated and
user doesn’t have much control.
Advertising System 10 There is a high accessibility for user and
user has the power of controlling all the
features of the system.
Table 2.1.3 – Explanation of scores
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
7
2.2 Financial Appraisal
Costs and profits of 5 years for each project are displayed in table 2.2.1. All the
figures are displayed in Sri Lanka Rupees (LKR). For more details about the figures
of this table please see appendix 01.
Domain Management Application Advertising System
Year Cost Profits Cost Profits
0 400,000 - 500,000 -
1 50,000 350,000 340,000 454,000
2 60,000 396,000 360,000 616,000
3 75,000 442,000 380,000 726,000
4 90,000 488,000 400,000 936,000
5 120,000 534,000 420,000 1,096,000
Table 2.2.1 – The annual estimated costs and benefits for the projects
2.2.1 Net Present Value (NPV)
Year Cost
(LKR)
Profits
(LKR)
DF
(10%) D Cost D Profit NPV (LKR)
0 400,000 - 1.00000 400,000.00 - -400,000.00
1 50,000 350,000 0.90909 45,454.50 318,181.50 272,727.00
2 60,000 396,000 0.82645 49,587.00 327,274.20 277,687.20
3 75,000 442,000 0.75131 56,348.25 332,079.02 275,730.77
4 90,000 488,000 0.68301 61,470.90 333,308.88 271,837.98
5 120,000 534,000 0.62092 74,510.40 331,571.28 257,060.88
Total 795,000 2,210,000 687,371.05 1,642,414.88 955,043.83
Table 2.2.2 – Domain Management Application project NPV at 10% discount rate.
Net Present Value of the Domain Management Application project = 955,043.83 LKR
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
8
Year Cost
(LKR)
Profits
(LKR)
DF
(10%) D Cost D Profit NPV (LKR)
0 500,000 - 1.00000 500,000.00 - -500,000.00
1 340,000 454,000 0.90909 309,090.60 412,726.86 103,636.26
2 360,000 616,000 0.82645 297,522.00 509,093.20 211,571.20
3 380,000 726,000 0.75131 285,497.80 545,451.06 259,953.26
4 400,000 936,000 0.68301 273,204.00 639,297.36 366,093.36
5 420,000 1,096,000 0.62092 260,786.40 680,528.32 419,741.92
Total 2,400,000 3,828,000 1,926,100.80 2,787,096.80 860,996.00
Table 2.2.3 – Advertising System project NPV at 10% discount rate.
Net Present Value of the Advertising System project = 860,996.00 LKR
2.2.2 Return on Investment (ROI)
ROI for the Domain Management Application project:
ROI = 955,043.83 x 100
687,371.05
ROI = 138.94 %
ROI for the Advertising System project:
ROI = 860,996.00 x 100
1,926,100.80
ROI = 44.70 %
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
9
ROI of the Domain Management Application project is 138.94% and the Advertising
System project is 44.70%. These figures are providing a strong fact to the Ecom to
identify the efficiency of the investment. Comparing with the Advertising System
project the Domain Management Application project is more efficient.
Non-financial appraisal rated Domain Management Application project as number
one. Ultimately both the financial and non-financial appraisals are proved that the
Domain Management Application project is very efficient. Initial investment of this
project is also less than the other project and more relevant and giving more benefits
to the Ecom.
3. Stakeholder Analysis
3.1 Methodology
This analysis is based upon personal interviews, review of documents, workshop
discussions, and information gathering from secondary sources. Also the stakeholder
analysis observed the complexity and importance of stakeholders’ relations to the
project.
3.2 Identified Stakeholders
End Users Accounts Division
Sponsor Ramani Abeywickrema (Chairman/MD)
Project Manager Eranga Dissanayaka
Project Team Suranga Herath, Udani Dissanayaka,
Prasanga Karunanayake, Rasika Rajapakse
Hardware Vendor DMS Solutions
Software Vendor E-W Information Systems
ISP Sri Lanka Telecom PLC
3.3 Stakeholder Analysis Report
Stakeholder
Name Organisation Role in Project Unique Facts
Level of
Interest Level of Influence Comments
Ramani
Abeywickrema Sponsor
Project sponsor
and the chairman Ph.D in management Very High
Very High –
Everyone depends
on her
Keep update about the
progress of the project
Eranga
Dissanayaka Project Manager
Managing
company
resources
Well experienced person /
one of the oldest employees.
BSc (Hons) in SD
Very High High – Decision
maker No comments
Suranga
Herath Project Team Senior developer
Expert in Web based
application development Medium
High – Very
difficult to replace
Better provide him
maximum support he
needs to keep always
happy.
Udani
Dissanayaka Project Team Tech lead
Oldest and key employee.
BSc (Hons) in IT. High
Very High –
Principle / concept
builder
Without her we will lost
without a concept
Prasanga
Karunanayake Project Team Graphics designer
Very artistic and dynamic
person. HND in Computing Low Low Can be replaced anytime
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
11
Rasika
Rajapakse Project Team QA Consultant HND in Computing Low Low Can be replaced anytime
Accounts
Division End Users Beta testers
Well experienced about the
billing process Very High
High – experts in
pricing policy
Need their involvement in
high during the
development process
DMS Solutions Hardware
Vendor
Supplies hardware
instruments
Well known vendor and
providing best support
services
Very High
Low – many
vendors are
available
Need to give them enough
time to deliver hardware
products
E-W
Information
Systems
Software
Vendor
Supplies operating
systems and other
3rd party software
Leading vendor of open
source OS and other
software
Very High
Low - many
vendors are
available
Need to give them enough
time to deliver software
products
Sri Lanka
Telecom PLC ISP
Internet service
provider No.1 ISP all the time High
High – wired ISP in
the country
Not really need to worry.
They are the ISP of the
organisation.
Table 3.1 – Stakeholder Analysis Report
3.4 Project Organisation Chart
Figure 3.1 – Project Organisation Chart
Sponsor
Project Manager
Graphic Designer Tech Lead
QA Consultant
Senior Developer
Tech Lead
Software Vendor
Hardware Vendor
ISP
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
13
4. Project Plan
4.1 Project Charter
Project Title: Domain Management Application
Project Start Date: November 25, 2011 Projected Finish Date: January 11, 2012
Project Manager: Eranga Dissanayaka, 0773670896, [email protected]
Budget Information: The organisation has allocated Rs. 400,000.00 for this project. Salaries
of Programmers and purchasing the new server will be the major costs for this project.
Objectives: Developing of the Domain Management Application will really helpful to Ecom
Technology Lanka to keep tracking about the payment status of the each customer and
product expirations. Also the application provides customer information recording feature and
the payment history reports. Part of this application is automated and it will generate PDF
format invoices and sends them to the customers. The application is automatically generate
product expiration emails and send them to the customers. This project will help Ecom to
reduce their work load of accounts division.
Approach:
• Develop a customer management module to add information about every customer
and it will help to find them easily in future.
• Domain management module is the main feature and it will keep track of all the
domains and other products to indicate the expirations.
• Communicator module is sending expiration emails and SMS to customers.
Roles and Responsibilities:
Name Role Position Contact Details
Ramani Abeywickrema Sponsor Chairman [email protected]
Eranga Dissanayaka Project Manager Senior manager [email protected]
Suranga Herath Project Team Senior developer [email protected]
Udani Dissanayaka Project Team Tech lead [email protected]
Prasanga Karunanayake Project Team Graphics designer [email protected]
Rasika Rajapakse Project Team QA Consultant [email protected]
Accounts Division End Users Beta testers [email protected]
DMS Solutions Hardware Vendor Supplies hardware [email protected]
E-W Information Systems Software Vendor Supplies software [email protected]
Sri Lanka Telecom PLC ISP Internet services [email protected]
Prepared by: Eranga Dissanayaka (Project manager) on: November 10,2011
Approved by: Ramani Abeywickrema (Chairman) on: November 20,2011
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
14
4.2 Work Breakdown Structure
See WBS task list in appendix 02.
4.2.1 WBS Definition
WBS Code Task Name Description
1 Domain Manager Application
Project
1.1 Project management plan
1.1.1 Draft project management plan Identify the proposed system, deliverables,
WBS, timelines, resources, risks, & issues.
After that draft the project management
plan
1.1.2 Review project management
plan
Review the project plan with the
stakeholders to identify the missing areas
& get their approval for it.
1.1.3 Incorporate changes to the
project management plan if
needed
Update the project management plan with
the changes discussed & confirmed in the
review meeting
1.1.4 Get the approval Send the updated plan & get the
stakeholder's approval
1.1.5 Signed project management plan
1.2 System Engineering
1.2.1 Technical planning Planning the system for required hardware
and software components
1.2.2 System requirement definition Defining the hardware and software
requirements.
1.3 Application
1.3.1 Application design
1.3.1.1 Application requirement
specification
Conduct interviews to gather the
requirements for the system to be
developed.
1.3.1.2 Application prototyping Create the concept design as a prototype
and get the approval
1.3.1.3 Application detail design Design the principle concept
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
15
1.3.2 Application build
1.3.2.1 Database Design Design the database and required tables.
1.3.2.2 Coding Start to coding the system components
1.3.2.3 Debugging Debugging errors which are identified by
testing process
1.3.3 Unit Testing
1.3.3.1 Test planning Create a test plan to test each module.
1.3.3.2 Test case preparation Preparation of test cases to start unit
testing.
1.3.3.3 Test conduct Conducting the module wise testing
1.3.3.4 Test records Issue the test record for debugging
process.
1.4 Hardware
1.4.1 Requirements planning Planning to obtain require hardware
components which defined in system
requirements definition.
1.4.2 System definition Define the absolute hardware
infrastructure and system software.
1.4.3 Component selection Select the required hardware/software
components and order them from vendors.
1.4.4 Receiving Components Receiving hardware/software components
from vendors.
1.4.5 Component testing Testing hardware components and system
software.
1.5 System test
1.5.1 Module testing After developing the system modules test
them one by one.
1.5.2 Defect tracking Tracking the defects occurred during the
testing process for debugging.
1.6 Support service
1.6.1 Configuration management Manage the configuration with new
hardware and software. Then configure the
application with system software and
databases. Integrate the security options.
1.6.2 Quality assurance Perform QA to ensure the quality and
standards of the system.
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
16
1.6.3 Technical team training Training to the support team with test
links to teach how to troubleshoot the
system.
1.7 Implementation
1.7.1 Planning Plan the system implementation with the
account section.
1.7.2 Documentation Create the detailed user manuals
1.7.3 User training Train the users in account division with
test links.
1.7.4 Installation management Install the system in to organisation
network.
1.7.5 Testing and verification Test the system with user PC’s and verify
all the functionalities.
1.7.6 Performance monitoring Monitor the system to track performance
and security.
Table 4.2.2 – WBS Definition
4.3 Responsibility Assignment Matrix
R – Responsible C - Consulted
A – Accountable I – Informed
WBS
Code Task Name
Project Team Other Stakeholders
Pro
ject
Man
ager
Tec
h L
ead
Seni
or P
rogr
amm
er
QA
Gra
phic
Des
igne
r
Spon
sor
End
Use
r
Har
dwar
e V
endo
r
Soft
war
e V
endo
r
ISP
1.1.1 Draft project management plan R A I
1.1.2 Review project management plan A R
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
17
1.1.3 Incorporate changes R I I
1.1.4 Get the approval R I I A
1.1.5 Signed project management plan A R R R R I
1.2.1 Technical planning A R I
1.2.2 System requirement definition A R I
1.3.1.1 Requirement specification A I R
1.3.1.2 Application prototyping A I C R
1.3.1.3 Application detail design A I I R
1.3.2.1 Database Design I R A
1.3.2.2 Coding I A R
1.3.2.3 Debugging I A R I
1.3.3.1 Test planning A C R
1.3.3.2 Test case preparation I A R
1.3.3.3 Test conduct A C R
1.3.3.4 Test records A I C R
1.4.1 Hardware Requirements planning A R I I
1.4.2 System definition A R
1.4.3 Component selection A R I
1.4.4 Receiving Components I A I I R R R
1.4.5 Component testing A R I
1.5.1 Module testing A R
1.5.2 Defect tracking A R
1.6.1 Configuration management I R A
1.6.2 Quality assurance A I I R
1.6.3 Technical team training A R I I C
1.7.1 Planning A R I
1.7.2 Documentation R C A
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
18
1.7.3 User training A R I C
1.7.4 Installation management I R A
1.7.5 Testing and verification I A R I C C C
1.7.6 Performance monitoring A R I I I I I I
Table 4.3 - Responsibility Assignment Matrix (RAM)
4.4 Communication Management Plan
The Communication Management Plan identifies the formal communication
methodology, protocols, and approach that will be employed to keep all stakeholders
informed throughout the duration of the Domain Management Application Project.
The below table specifies the initial identified communications that should happens
through the entire life cycle of the project & the purpose of it along with the
stakeholders being informed or if it is a approval or feedback who provides it. This
table will be updated when new communication requirement is needed or as and when
it happens.
Planning and maintaining the communication plan provides the clear visibility of the
project among all the stakeholders & this minimize the communication gaps, which
ultimately results major risks/issues to the project later on. Since all the delays will be
highlighted to all the stakeholders including the senior management, the task owners
put more interest to finish their activities on time. Since everyone is kept informed
about all the changes & the current status of the project, it will help to initiate
immediate actions when there are risks or issues & it ultimately provides the project
schedule to be completed.
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
19
4.4.1 Stakeholder Groups
Project Team – Project manager, Tech Lead, Senior Software Engineer,
Graphic Designer, QA
All Stakeholders – Project manager, Tech Lead, Senior Software Engineer,
Graphic Designer, QA, Sponsor, Hardware vendor,
Software vendor, ISP and end users
External Stakeholders – Hardware vendor, Software vendor, ISP
Internal Stakeholders – Project manager, Tech Lead, Senior Software Engineer,
Graphic Designer, QA, Sponsor, and end users
Vendors – Hardware vendor, Software vendor
4.4.2 Communications Matrix
Description Communication Item Audience Freque
ncy
Mediu
m
Start
on
Project Status review
meeting
Milestone Update
Project Progress Update
(Completed work, Remaining
work)
Project Risks
Project Issues
Budget utilized
Project Team Weekly
(Friday)
Meeting
25th
Nov
2011
Project Status Report Milestone Update
Project Progress Update
Project Risks
Project Issues
Internal
Stakeholders
Weekly
(Tuesda
y)
Meeting
29th
Nov
2011
Review Project
Management Plan
Scope, Responsibilities,
Deliverables, WBS, Cost,
Schedule, Resources, Risks &
Issues
Internal
Stakeholders
One
time
Meeting
15th
Nov
2011
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
20
Incorporate changes
& send amended
project management
plan to the Internal
stakeholders to get
their approval
Project Management Plan Internal
Stakeholders
One
Time
Email 20th
Nov
2011
Review Technical
Specification
Infrastructure & the system
integration with new
components.
Project Team One
Time
Meeting
28th
Nov
2011
Send amended
project technical
specification to the
Internal stakeholders
to get their approval.
Amended Technical
Specification
Internal
Stakeholders
One
Time
30th
Nov
2011
Review Technical
Specification with
external stakeholders
New system Integration with
components.
External
Stakeholders
and Project
Team
One
Time
Meeting
2nd
Dec
2011
Review & Finalize
the Technical
Specification
Incorporated changes to the
technical specifications
Internal
Stakeholders
One
Time
Meeting
5th
Dec
2011
Send RFQ to the
hardware/software
vendors
Specification of the devices
and software
Terms & conditions (The
terms & conditions of the
RFQ is covered under the
already signed general
agreement between the
vendors & Ecom)
Vendors One
Time
Email 6th
Dec
2011
Issue PO to the
hardware/software
vendors
Vendors One
Time
Fax 12th
Dec
2011
Table 4.4 - Communication Management Plan
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
21
4.5 Project Budget and Cost Plan
Following budget provides the detail estimates for labor, material and other items for
the duration of the project.
# Units
/Hrs.
Cost/Unit/
Hr. Subtotals
WBS Level
2 Totals %
WBS Items
1. Project management plan Rs.3900 1.0%
Draft project management plan 8 Rs.300 Rs.2400
Review project management plan 2 Rs.600 Rs.1200
Incorporate changes to the project
management plan if needed
1 Rs.300 Rs.300
2. System Engineering Rs.11400 3.1%
Technical planning 14 Rs.600 Rs.8400
System requirement definition 5 Rs.600 Rs.3000
3. Application Rs.64400 17.6%
Application design
Application requirement
specification
16 Rs.650 Rs.10400
Application prototyping 8 Rs.200 Rs.1600
Application detail design 20 Rs.200 Rs.4000
Application build
Database Design 5 Rs.600 Rs.3000
Coding 40 Rs.650 Rs.26000
Debugging 16 Rs.650 Rs.10400
Unit Testing
Test planning 8 Rs.250 Rs.2000
Test case preparation 4 Rs.250 Rs.1000
Test conduct 16 Rs.250 Rs.4000
Test records 8 Rs.250 Rs.2000
4. Hardware Rs.206200 56.1%
Requirements planning 8 Rs.600 Rs.4800
System definition 4 Rs.600 Rs.2400
Component selection 4 Rs.600 Rs.2400
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
22
Receiving Components
New Server 1 Rs.180000 Rs.180000
System Software (RHEL) 1 Rs.3500 Rs.3500
New HSDPA modem 1 Rs.6500 Rs.6500
Mobile Subscription Rs.2000 Rs.2000
Component testing 8 Rs.600 Rs.4800
5. System test Rs.15600 4.2%
Module testing 16 Rs.650 Rs.10400
Defect tracking 8 Rs.650 Rs.5200
6. Support service Rs.16400 4.5%
Configuration management 8 Rs.600 Rs.4800
Quality assurance 8 Rs.250 Rs.2000
Technical team training 16 Rs.600 Rs.9600
7. Implementation Rs.49600 13.5%
Planning 8 Rs.600 Rs.4800
Documentation 24 Rs.300 Rs.7200
User training 24 Rs.600 Rs.14400
Installation management 8 Rs.600 Rs.4800
Testing and verification 16 Rs.250 Rs.4000
Performance monitoring 24 Rs.600 Rs.14400
Total Project Cost
Estimate
Rs.367500
Table 4.5 – Cost Estimate
4.6 Risk Management Plan
This Risk Management Plan (RMP) is the process of implementing realistic
management of risks as part of the overall management of the Domain Management
Application systems project. “Risk management is a program management tool to
assess and mitigate events that might adversely impact the program. Successful
implementation of risk management will increase the program’s likelihood of success.
The RMP describes methods for identifying, analyzing, prioritizing, and tracking risk
drivers; developing risk-handling plans; and planning for adequate resources to handle
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
23
risk. It assigns specific responsibilities for the management of risk and prescribes the
documenting, monitoring, and reporting processes to be followed.”
Figure 4.6 – Risk management process
4.6.1 Risk Responsibilities
The risk managing responsibility is shared amongst all the stakeholders of this
project. The following tables details specific responsibilities for the different aspects
of risk management.
Risk Activity Responsibility
Risk identification All stakeholders
Risk registry Project manager
Risk assessment All stakeholders
Risk statement Project manager
Risk response All stakeholders
Risk response approval Sponsor/Chairman
Risk response management Project manager
Risk reporting Project manager
Table 4.6.1 – Risk responsibility assignment
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
24
4.6.2 Probability of Occurrence (Po)
The probability of occurrence ranges and definitions used for the Ecom project are
given in the following table.
Probability Range Interpretation
01 - 10 Very unlikely to occur
11 - 40 Unlikely to occur
41 - 60 May occur about half of the time
61 - 90 Likely to occur
91 - 99 Very likely to occur
Table 4.6.2 - Probability of Occurrence (Po)
4.6.3 Risk Impact (I)
The risk impact categories and definitions used for the Ecom project are given in the following table.
Impact Category Definition
Critical (5) An event that, if it occurred, would cause program failure (inability to achieve minimum acceptable requirements).
Serious (4) An event that, if it occurred, would cause major cost/schedule increases. Secondary requirements may not be achieved.
Moderate (3) An event that, if it occurred, would cause moderate cost/schedule increases, but important requirements would still be met.
Minor (2) An event that, if it occurred, would cause only a small cost/schedule increase. Requirements would still be achieved.
Negligible (1) An event that, if it occurred, would have no effect on the program.
Table 4.6.3 – Risk Impact (I)
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
25
4.6.4 Risk Management Matrix and Strategy
Following risks are identified using the WBS and having few discussions with the
project team.
Risk
No. Risk I
Po
% Strategy
1 Project at not approve 5 5 Very low probability due to critical operation
environment of the organisation. This
application will be a very good investment.
2 Time estimation is
inefficient
4 50 Must assign additional resources or try to adjust
from other tasks
3 Unexpected scope
extension
4 20 Critical analysis of the scope required for
manage resources for the extension
4 Budget estimation is
inefficient
4 60 Already approved some additional budget of
Rs.32500.
5 Poor layout design 5 30 Have to work collaborated with the designer to
get a well expected outcome.
6 Hardware may not
available with vendor
1 10 There are many vendors for the same product
line. Will not be a serious issue.
7 Code may content
serious bug
5 15 Strongly advised the developers to follow the
error handling and exception techniques within
their codes.
8 Poor communication
in team
5 20 Scheduled the project team meeting on every
Friday.
9 Hardware conflict
during the installation
1 35 Tech head is well experienced with similar kind
of systems. He can always find a solution for
issues.
10 Staff turnover 3 25 Trying to give maximum support to team
members to motivate them.
11 Low performance of
the team
4 30 Planed to arrange meeting with such a project
members.
Table 4.6.4 – Risk matrix and strategy
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
26
5. Microsoft Project Planning
See appendix 04.
6. Software Crisis
Software crisis is a term used to express the difficulty of correct and effecting
software due to rapid development of software industry.
In early days of computer software projects there were a large number of defects due
to unmanageable tasks. To prevent from these issues various development
methodologies were introduced time to time. Fred Brooks (1986) was argument there
is “No Silver Bullet” i.e. “no single development in either technology or in
management technique promises even one order of magnitude of improvement in
productivity, reliable or simplicity”
There are many reasons to occur software crisis.
• Project budget is inaccurate
• Project time frame is inefficient
• Deliverable is not meet the requirement
• Poor quality of the software
• Software program is inefficient
• Unmanageable and difficult to maintain
• Never signed off the project
There are many reasons that lead to software crisis
• Insufficient documentation
• Shortage of skilled people
• Poor productivity improvement
According to US government research about the software crisis, less than 5% of
software could be used without making any changes. More than 95% of software had
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
27
issues and they were required changes or major rework. Some of them are delivered
but cannot used whilst some are fully paid but never delivered.
Most of the issues are directly occurs due to mismanagement of the projects. Under
estimation of budget, cost, time and poor communication is the main reasons for this
crisis. Project manager must identify all these issues and must have knowledge to
perform a good project plan with accurate budget, cost, time and rich communication
matrix.
6.1 Recommendations
To overcome the issues of a software project it is a good practice to produce a very
detail and realistic project management plan. Success of the project will almost
depend on the project plan.
Better communication plan, well analyzed risk management plan, Quality
management plan, realistic budget and cost management plan will widely helps
project managers to drive their project to the doors of success. Work break down
structure and organizational chart are another important feature of a project
management plan. Also project manager must assign responsibilities to each member
to void any misunderstandings of each member of the team.
The well analised risk management plan is an important document to identify
potential risks with their probability of occurrence and how those will impact the
project. With a probability/impact matrix project managers are able to find the level of
each risk will effect on their project. It will help them to response those risks using
response strategies. Maintaining a risk register is also very important to a project.
Project managers must be knowledgeable to make an accurate cost/budget plan to end
up their project with success. They can use various estimation techniques like
Analogy, Analysis effort, Delphi, CoCoMo or they can use their WBS to estimate the
project costs.
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
28
Communication plan is helping to keep a good relationship between all the
stakeholders during the project. Scheduling meetings to monitor the process and get
decisions using brainstorming technique is very important. Also project managers can
identify misunderstandings of task responsibilities during the meetings.
Underperformances of project members can be mitigate using various motivation
theories.
There is another most important part is quality management. Project manager must
assure the quality of the system before handover to the customer. Testing and
preparing detail documentation will help to deliver a quality software program.
Good WBS is also helps project manager to break project work to small tasks and
assign their team to each task. Gantt chart can be making with WBS to identify
critical path and assign extra resources on it or break critical tasks in to small task and
reschedule them. Milestone report is another outcome of a WBS.
All of these documents and techniques are really helps project managers to end up
with a good project to mitigate software crisis. Also following a fine system
development methodology is really helpful. Project managers know there are no
100% successful projects but they can fight against the software crisis with a perfect
project management plan.
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
29
Project Glossary
IS – Information Systems
PM – Project Management
SMS – Short Message Service
IT – Information Technology
OOP – Object Oriented Programming
ICT – Information and Communication Technology
NPV – Net Profit Value
MD – Managing Director
SD – Senior Developer
OS – Operating System
ISP – Internet Service Provider
PLC – Public Limited Company
QA – Quality Assurance
WBS – Work Breakdown Structure
RFQ – Request for Quotation
PO – Probability
I – Impact
RMP – Risk management Plan
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
30
References
• O'Brien, J A., Introduction to information systems: essentials for the e-business enterprise. McGraw-Hill: 2003, Boston, MA.
• A Guide to the Project Management Body of Knowledge (PMBOK Guide), 3rd Ed, Project Management Institute.
• Nokes, Sebastian., The Definitive Guide to Project Management. 2nd Ed. London: Financial Times / Prentice Hall: 2007. ISBN 978 0 273 71097 4.
• Lewis R., Project Management. Ireland: McGraw-Hill Professional: 2006. ISBN 0-07-147160-X. p.110.
• Joseph Phillips., PMP Project Management Professional Study Guide. McGraw-Hill Professional: 2003. ISBN 0-07-223062-2. p.354.
• David I. Cleland, Roland Gareis., Global project management handbook. Chapter 1: "The evolution of project management". McGraw-Hill Professional: 2006. ISBN 0-07-146045-4.
• Hill, T. & R. Westbrook., Long Range Planning. "SWOT Analysis: It’s Time for a Product Recall". p.46–52.
• Haugan, Gregory T., The Work Breakdown Structure in Government Contracting, Management Concepts, 2003 ISBN 978-1567261202.
• Practice Standard for Work Breakdown Structures., Project Management Institute, 2nd Ed. ISBN 1933890134, p.8.
• Crockford, Neil., An Introduction to Risk Management., 2nd Ed. Cambridge, UK: Woodhead-Faulkner: 1986. ISBN 0859413322. p. 18.
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
31
Appendix I
Cost Estimation Facts
The annual estimated costs and benefits details for the projects as Table 2.2.1. Since
the Domain management Application is automated company can release from
computer operator’s salary. Fro Advertising System, company can save advertising
cost and sales person’s salary although company has to put a new computer operator
to operate this advertising system. Salaries are increasing annually by 3,000 LKR.
Domain management Application Advertising System
Year Cost Profits Cost Profits
0 Development cost
+ Equipment
charges
- Development
cost + Equipment
charges
-
1 Hosting/Email and
SMS charges
25,000 of computer
operator’s salary +
postage and
telephone charges.
Computer
operator’s salary
+ Hosting/Email
and SMS charges
Marketing person’s
salary +
Advertising
charges
2 Hosting/Email and
SMS charges
28,000 of computer
operator’s salary +
postage and
telephone charges.
Computer
operator’s salary
+ Hosting/Email
and SMS charges
Marketing person’s
salary +
Advertising
charges
3 Hosting/Email and
SMS charges
31,000 of computer
operator’s salary +
postage and
telephone charges.
Computer
operator’s salary
+ Hosting/Email
and SMS charges
Marketing person’s
salary +
Advertising
charges
4 Hosting/Email and
SMS charges
34,000 of computer
operator’s salary +
postage and
telephone charges.
Computer
operator’s salary
+ Hosting/Email
and SMS charges
Marketing person’s
salary +
Advertising
charges
5 Hosting/Email and
SMS charges
37,000 of computer
operator’s salary +
postage and
telephone charges.
Computer
operator’s salary
+ Hosting/Email
and SMS charges
Marketing person’s
salary +
Advertising
charges
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
32
Appendix II
WBS Tasks
WBS Code Task Name
1 Domain Manager Application Project
1.1 Project management plan
1.1.1 Draft project management plan
1.1.2 Review project management plan
1.1.3 Incorporate changes to the project management plan if needed
1.1.4 Get the approval
1.1.5 Signed project management plan
1.2 System Engineering
1.2.1 Technical planning
1.2.2 System requirement definition
1.3 Application
1.3.1 Application design
1.3.1.1 Application requirement specification
1.3.1.2 Application prototyping
1.3.1.3 Application detail design
1.3.2 Application build
1.3.2.1 Database Design
1.3.2.2 Coding
1.3.2.3 Debugging
1.3.3 Unit Testing
1.3.3.1 Test planning
1.3.3.2 Test case preparation
1.3.3.3 Test conduct
1.3.3.4 Test records
1.4 Hardware
1.4.1 Requirements planning
1.4.2 System definition
1.4.3 Component selection
1.4.4 Receiving Components
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
33
1.4.5 Component testing
1.5 System test
1.5.1 Module testing
1.5.2 Defect tracking
1.6 Support service
1.6.1 Configuration management
1.6.2 Quality assurance
1.6.3 Technical team training
1.7 Implementation
1.7.1 Planning
1.7.2 Documentation
1.7.3 User training
1.7.4 Installation management
1.7.5 Testing and verification
1.7.6 Performance monitoring
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
34
Appendix III
Risk Context
Date Identified: Impact to Critical Path: Yes No
Probability of Risk: (%) Impact to Project: (1=low,
5=high)
Impact Start Date: Impact End Date:
Responsible Person:
Program Area:
Affected Project Phase:
Risk Areas: Cost, Describe:
Schedule,
Describe:
Performance,
Describe:
Other, Describe:
Risk Control: Internal, External, or Internal & External
Current Status: Candidate Risk
A Suitable Information Systems Project for Ecom Technology Lanka (Pvt) Ltd
35
Appendix IV
Project Information Window
Resource Sheet
Gantt Chart