PROJECT MANAGEMENT - Anant Dhuri.pdf

Embed Size (px)

Citation preview

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    1/67

    PROJECT MANAGEMENT Anant Dhuri

    1

    PROJECT MANAGEMENT100 Marks

    Course content:

    1. INTRODUCTION:Concept of Project Management. Scope & Coverage. Project Function in an organization Layout of Project

    Department. Role of Consultants in Project Management.

    2. PROJECT IDENTIFICATION:Selection of product identification of market preparation of feasibility study/report Project formulation -Evaluation ofrisks preparation of Project report.

    3. SELECTION OF LOCATION & SITE OF THE PROJECT:Factors affecting location policies of Central State Government towards location Legal aspects of projectmanagement.

    4. FINANCIAL ANALYSIS:Profitability Analysis Social cost Benefit Analysis preparation of Budget and Cash Flows.4a) Materials Management in Project Planning Procurement storage disposal.

    5. FINANCING OF THE PROJECT:

    Source of Finance Cost implications thereof Financial Institutions Guidelines for funding projects, Risk Analysis Sensitivity Analysis.

    6. QUANTITATIVE ASPECTS OF PROJECTS:PERT/CPM Network Analysis for monitoring of the project Other quantitative techniques for monitoring and Controlof project

    7. COMPUTER APPLICATIONS:Selection of software packages for application to Project management.

    Reference Text

    PMP - Project Management Professional - Study Guide - By Kimi Heldman Project Management - By S. Choudhary

    Text Book of Project Management - By P Gopalakrishnan, V. E. Ramamoorthy Project Management - ByPrasanna Chandra

    Project Appraisal - By P. K. Mattoo Project Management - By Vasant Desai

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    2/67

    PROJECT MANAGEMENT Anant Dhuri

    2

    1. INTRODUCTION

    Concept of Project Management. Scope & Coverage. Project Function in an organization Layout of Project Department. Role of Consultants in Project Management.

    I. FUNDAMENTALS OF PROJECT MANAGEMENT

    What is a project?

    1. A specific, finite task to be accomplished

    2. Can be of a long or short term duration

    3. Can be large or small task

    Project Definition

    A project is a temporary endeavor undertaken to create a unique product or service.

    Successful Project

    Meets or exceeds the customers requirements

    Is delivered on time Within Budget

    Projects Vary in Size and Scope

    NASA shuttle launch

    Building a boat

    Building a hospital

    Building renovation and & space modification

    Planning a party or wedding

    Organizing the Olympic games

    Developing a new software program

    Getting a university degree

    Company mergers

    Project Characteristics

    Constant communication across organizational

    boundaries

    Many people involved, across several functional

    areas

    Sequenced events

    Goal oriented

    Has an end product or service

    Multiple priorities

    Complex and numerous activities Unique, one-time set of events

    Deadlines

    Start and end dates

    Identifiable stakeholders

    Limited resources and budget

    When is a Project a Project?

    A task or set of work assignments may be done by one or more persons using a simple to do list A task become a

    project when the characteristics of a project begin to dominate and overwhelm individuals.

    Unable to meet deadlines, budgets and corporate expectations.

    Project Management

    Project management is a method and/or set of techniques based on the accepted principles of management used for

    planning, estimating and controlling work activities to reach a desired result on time, within budget, and according to the

    project specifications. Projects and project management are about people and teamwork and involves planning:

    - Who does what?

    - Who takes what risk?

    - Who else is involved or interested/affected?

    Its the application of knowledge, skills, tools, and techniques to project activities to deliver a successful project.

    Tools/techniques

    Processes and methodology

    More than time, cost and scope

    Hard and soft skills

    A discipline evolving towards a profession

    Business and Social Aspects of Project Management

    Hard and soft skills

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    3/67

    PROJECT MANAGEMENT Anant Dhuri

    3

    Technical aspects of project management

    Interpersonal skills

    Influence

    Politicking

    Negotiation

    4 Project Stages

    1. Start Up2. Planning

    3. Execution

    4. Close Down

    Project Management Challenges

    Lack of a common understanding on the question What is project management???

    Managing stakeholders, expectations, teams, projects, uncertainty

    Measuring project management results

    Methodology issues

    Value of Project Management (Why are we doing this?)

    Improve project / program / firm performance as measured by efficiency, effectiveness Competitive advantage through competency

    Be more Successful

    Proactive vs. reactive

    Root out ill-conceived, directionless projects

    Increase visibility by providing roadmaps

    Project Management Team

    Project Sponsor(s)- Decision maker, funder, champion

    Project Manager- Manages the big picture

    Project Leads- Manage parts of a project

    Project Team- Work on specific tasks

    Stakeholders - Vested interests. Many of them. Keep them happy

    Major Causes of Project Failure

    Projects fail for the following reasons:

    The project is a solution in search of a problem

    Only the project team is interested in the result

    No one is in charge

    There is no project structure

    The plan lacks detail

    The project has insufficient budget and/or

    resources

    Lack of team communication

    Straying from original goal The project is not tracked against the plan

    Major Causes of Project Success

    Stakeholders are identified

    Stakeholders expectations are known and met

    Senior Management support

    There is a clearly stated purpose and a sound plan

    Goal and objectives are understood and

    communicated

    A constructive goal-oriented culture

    Technically competent team

    Effective (and committed) team

    Excellent communication Trust

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    4/67

    PROJECT MANAGEMENT Anant Dhuri

    4

    Project to Development Relationship Model

    Project Management Vs. Methodology

    Methodologies give you templates of things to do. Project management applies them to this project.

    Roles of a Project Manager

    1. Coordinator

    2. Communicator

    3. Leader

    4. Negotiator

    5. Planner

    6 Phases of a Project

    1. Enthusiasm

    2. Disillusionment3. Panic

    4. Search for the Guilty

    5. Punishment of the Innocent

    6. Praise and Honors for the Non-Participants

    Characteristics of Effective Project Management

    Effectively plan the project

    Accurately monitor and communicate the project progress

    Ensure that all requirements are met

    Ensure the project is on time and within budget

    Schedule resources effectively

    Manage changes to the project

    II. TECHNICAL ASPECTS OF PROJECT MANAGEMENT

    Project Management Knowledge Areas

    A project manager juggles 9 + balls (knowledge areas) and many tools and techniques

    Scope

    Time

    Cost

    Human Resources

    Communication

    Procurement

    Quality

    Risk Management

    Integration

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    5/67

    PROJECT MANAGEMENT Anant Dhuri

    5

    Project Management Functions

    1. Integration Management

    2. Scope Management

    3. Risk Management

    4. Communications Management

    5. Schedule Management

    6. Human Resource Management

    7. Quality Management

    8. Cost Management

    9. Procurement Management

    1) INTEGRATION MANAGEMENT1. Pulling all the knowledge areas together

    2. As you go through the various project phases, consider the links between knowledge areas

    Plan the plan

    Execute the plan

    - Project deliverables and project management outputs

    3. Control the plan

    2) SCOPE MANAGEMENT

    Ensure that the project includes all the work required, and only the work required, to complete the project successfully.

    1. Initiate the project

    Feasibility, market, customer or business need

    Environmental analysis, business case

    Project selection practices and management decision practices

    Project link to the firms strategy or corporate goals

    Initiate the project

    Identify the project manager

    Develop a charter

    - Formally recognize the existence of the project

    - Include the business need and product description, constraints and assumptions

    - Approval to proceed

    Funding, authority, sponsor

    2. Plan and define the scope in detail

    Conduct a cost/benefit analysis, consider alternatives, get expert opinion and review historical databases,

    brainstorm

    What is in scope? What is out of scope? What are the criteria for completing phases?

    Develop a work breakdown structure (WBS)

    Create a scope statement with assumptions and constraints

    - Project justification, product description, deliverables, success criteria, scope management plan

    - Use for future project decisions

    3. Verify the scope

    What is the process and criteria for accepting the scope of work delivered?

    Work results and documents

    Inspection

    Acceptance form

    4. Control the scope

    Performance reports, change requests, issues management form, scope management plan, corrective action,

    lessons learned

    Scope tips

    1. Be inclusive involve stakeholders

    Work on securing and maintaining their commitment to the project

    Commitment: funding, approvals

    2. Spend more time planning the projectthen follow it (with updates of course)

    3. Define project success and communicate it

    4. Steering committee with authority and decision making power Supportive and decisive sponsor

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    6/67

    PROJECT MANAGEMENT Anant Dhuri

    6

    Change control

    Insure that changes are agreed upon. Determine when scope change is desired/has occurred. Managing the change

    through all other processes (schedule, cost, quality).

    3) RISK MANAGEMENT

    The process of identifying, analyzing and responding to project risk. Risk is an uncertain event or condition that will have

    an effect on the project. It has a cause and an effect and a consequence to cost, schedule, or quality.

    1. Identify risks

    - What could go wrong (harm, loss, opportunities and threats) Consider ALL knowledge areas

    - Internal and external risks

    - Sources of risk: product technology, people (misunderstandings, skills), project management etc.

    2. Quantify risks

    - Risk interactions, risk tolerance

    - High, Medium, Low (HML) - qualitative

    - Expected Monetary Value (EMV) quantitative

    3. Develop risk response plan

    Opportunities and threats to respond to and opportunities and threats to accept

    - Avoid eliminate cause

    - Mitigate reduce risk occurrence

    - Accept contingency plans, accept losses

    Its OK to do any of these

    Insurance, contingency plans, procurement, alternative strategies, contracts

    Risk management template

    4. Control risk responses

    Workarounds (defined as when it hits the fan unexpectedly and you need to deal with it then and there)

    Ongoing process of risk management

    - Corrective action

    - Update risk management plan

    Risk Management Tips

    - Start Risk Management at the beginning of the project- Review risks throughout the project (e.g. weekly, monthly)

    - Update and project schedules, budget, staffing etc. as risk management plans are changed

    Risk quantification techniques

    1. High, Medium, Low (HML)

    - Probability of occurrence and impact

    - High, Medium, Low grid

    - Focus on HHs and less on LLs

    - Keep it simple

    2. Expected Monetary Value (EMV)

    - EMV=risk event probability X risk event value

    - 25% chance of rain X $1,000 impact of damage to convertible car interior = EMV of $250- 75% chance of rain X $1,000 impact of damage to convertible car interior = EMV of $750

    4) COMMUNICATIONS MANAGEMENT

    Ensure the timely and appropriate generation, collection, dissemination, storage, and ultimate disposition of project

    information. Who needs to know what? When do they need to know it? How will it be communicated and by whom?

    1. Develop the project communication plan

    - Stakeholder analysis

    - Information to be shared (to who, what, how, when, why)

    - Technology

    2. Distribute information

    - Project databases, filing system, software / hardware

    - Report up, down and across the firm3. Report performance

    - Project plan, work results

    - Project performance reports

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    7/67

    PROJECT MANAGEMENT Anant Dhuri

    7

    - Variance reports, trend analysis, change requests

    - Report the Good, Bad & Ugly

    4. Administrative closure

    - Knowledge management

    - Archives

    - Acceptance forms

    - Lessons learned

    Sample communication formats

    Status reports

    Team meetings

    Project files

    PR initiatives

    Newsletters

    E-mail

    Databases

    Website

    RACI

    Posters

    Coffee room chats

    Milestone celebrations

    Kickoff meeting

    Close out meeting

    Lessons learned sessions

    Paraphrase & Validate

    Drawings

    Schedule update

    If you think you have communicated enoughgo back and do it again. Use different formats. Frequently use modes of

    communication that allow you to see the whites of their eyes

    5) SCHEDULE MANAGEMENT

    Ensure the timely completion of the project.

    Identify the specific activities that must be performed to meet deliverables.

    Document dependencies

    Estimate the time to complete an activity

    Schedule development (start and end dates

    Schedule control

    Klipsteins Second Law - The firmness of delivery dates is inversely proportional to the tightness of the schedule.

    Time management1. Purpose: Create a realistic schedule with the team

    2. Identify the activities (tasks)

    Activities are action steps (HOW) and different from deliverables that are tangible results (WHAT)

    Use the WBS and scope statement

    Develop activity lists and revise the WBS

    3. Sequence activities

    Consider dependencies

    4. Estimate durations (time)

    Top down, bottom up estimates, Monte Carlo simulations

    Estimating formulae (PERT estimates)

    Expert opinion

    Consider resource capabilities Look at similar projects

    5. Develop the schedule (Gantt chart)

    Document assumptions and decisions

    Use project management scheduling software e.g. MS Project

    6. Control the schedule

    Performance reports, change requests, time management plan, corrective action, lessons learned. E.g. baseline

    Gantt chart and then update

    Frequency,

    Roles and responsibilities

    Control techniques e.g. meetings, 1:1

    Estimating formulae - PERT Estimate (weighted average)

    [Pessimistic + (4 x Likely) + Optimistic]/6

    Pessimistic time to get to work = 30 min

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    8/67

    PROJECT MANAGEMENT Anant Dhuri

    8

    Optimistic time to get to work = 10 min

    Likely time to get to work = 15 minutes

    PERT Estimate = 30 + (4x15) + 10/6

    100/6=16.6 = 17 min

    6) HUMAN RESOURCES MANAGEMENT

    Make the most effective use of the people involved in the project. Planning

    Acquisition

    Development

    1. Organizational plan

    Organizational chart, roles and responsibilities

    Linkages between project and functional areas, and other business units.

    Staffing needs

    - Unions, human resources department/practices, constraints

    - RACI+

    - Staffing plan (training, orientation, job descriptions, performance evaluations, redeployment), project

    organizational chart2. Get staff

    - Assess experience, interests, personal characteristics, availability

    - Negotiate

    - Beg and borrow but dont steal

    3. Develop the team

    - Team building, reward and recognition program, support practices

    4. Dont control people

    - Managerial control is different from micromanaging

    5. Listen to understand

    6. Be responsive

    - Provide positive feedback

    - Act on problems in a timely manner

    7. Deal with problems

    - They wont go away, but will get BIGGER

    8. Provide constructive criticism

    9. Document appropriately

    10. Take time to have FUN

    RACI CHART

    7) QUALITY MANAGEMENT

    The processes required to ensure the project will satisfy the needs for which it was undertaken. Identify what to measure

    periodically review the project. Monitor specific results to determine if they meet the relevant quality standards.

    1. Plan for quality

    Quality product and quality project management practices

    Quality standards

    - Conform to specifications (project produces what it said it would)

    - Fitness for use (satisfy needs)- Prevention vs. inspection

    - Plan, do, check, act

    - Benchmark, checklists, flow charts, cause/effect diagrams

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    9/67

    PROJECT MANAGEMENT Anant Dhuri

    9

    2. Quality management plan

    Organizational structure, processes, resources, procedures, responsibilities to ensure quality plan is implemented

    Quality metrics

    Checklists

    3. Quality Assurance

    Follow the quality management plan, audits, and improvements

    4. Quality control

    Process and product results Control charts, Pareto diagrams, trend analysis

    QUALITY TIPS

    Start with a clear view of quality in mind

    What is quality?

    Implications for ALL knowledge areas

    8) COST MANAGEMENT

    Ensure the project is completed within the approved budget

    1. Plan resources(people, equipment, materials)

    Consider WBS, scope statement, organizational policies, staff pool Identify resource requirements

    2. Cost centers at Your Company?

    Time is money

    3. Cost budgeting

    Resource leveling

    Cost baseline

    4. Control costs- Performance reports, change requests, cost management plan, corrective action, lessons learned,

    e.g. budgeted, actual, variance (with explanation)

    Time and cost tips

    Its OK to ask. Talk to subject matter experts. Avoid single point estimates, use validated range estimates.

    Factor in the learning curve, resource productivity, experience level etc. Use the appropriate tools, techniques, rules of thumb

    Document assumptions for estimates

    Negotiate

    9) PROCUREMENT MANAGEMENT

    Acquire goods and services to attain project activities from outside the performing organization. (aka Vendor

    Management, Subcontractor Management, Supplier Management)

    1. Plan procurement needs(goods and services external to the firm that you need to deliver the product)

    Make or buy decisions

    Contract type options (risk sharing)

    2. Solicitation

    Procurement management plan

    Vendor selection process and criteria

    Proposals, contracts, legal issues

    3. Select and manage sources(vendors, partners)

    Negotiations Manage

    contracts

    4. Close contracts

    Formal acceptance and closure

    Procurement Tips

    1. Develop charters with vendors and partners

    Rules of the game, conflict management guidelines, escalation process2. Take lead times into account

    3. Do risk management on procurement (and all other knowledge areas)

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    10/67

    PROJECT MANAGEMENT Anant Dhuri

    10

    5-STEP PROJECT MANAGEMENT

    STEP 1- DEFINE THE PROJECT

    Agenda

    - State the problem

    - Develop project goal

    - Develop project objectives

    - Identify assumptions and risks

    - Identify stakeholders

    - Criteria for project success

    - Project Charter/overview document

    State the Problem/Opportunity1. Specific questions must be asked before a project begins:

    What is the problem and what are the opportunities?

    Do we really need the project?

    2. If these questions cannot be answered, then:

    Pick the wrong project

    The project will probably not succeed

    3. Document the need and the benefits to the organization for undertaking the project

    Short, crisp and to the point

    Descriptor for those who although not directly involved on the project team are indirectly involved in supporting

    the project

    A need that must be addressed

    - New product, service, process, facility, or system- It may involve opening a new market

    Example

    Membership in PM Association has declined in the past four years and attendance at conference has declined in the

    past three years. The viability and financial stability of the Association depends on maintaining membership and

    successful annual conference.

    State Project Goal

    A statement of purpose and direction helps to direct the course of the project effort

    Initiates the project

    - Serves as a point of reference for settling disputes and misunderstandings

    - Clarifies expectations- Helps in justifying requests for resources

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    11/67

    PROJECT MANAGEMENT Anant Dhuri

    11

    Goal Statements

    1. Action oriented

    2. Short and simple

    3. Understandable

    - Prepare and launch the International Space Station on April 21, 2000, from Cape Canaveral, Florida

    - Connect France and England via a covered tunnel and railway under the English Channel, facility to be opened to

    traffic no later than September, 1996

    4. Design and complete pilot testing by March 2002, a product accounting software package that performs basicfinancial analyses for the company

    5. Obtain a BSc degree in engineering from U of C by spring, 2004

    Example

    Reverse the downward trend in membership and annual conference attendance by organizing a highly successful

    conference.

    Develop Project Objectives

    1. Objectives represent major components or milestones

    - Objectives are sub-goals

    2. Roadmap to aid decision makers understand the purpose of the project

    3. Basis for determining project time line and resource requirements

    4. To achieve the goal all objectives must be realized

    Example

    Develop the Program

    Set the Conference Site and Date

    Design and Implement the Marketing Plan

    Criteria for Evaluating Project Success

    Project expectations:

    Project on time

    Within budget

    According to specifications

    Happy client

    Example

    At least 200 of 450 PM Association membership will register to attend

    At least 50 of previous years conferences attendees will attend

    At least 1.5% of the non-members receiving conference brochure will attend

    At least 5% of the non-member attendees will join PM Association

    Identifying Assumptions and Risks

    Each objective will have its own risks and assumptions

    Helps think through the project process and issues associated with execution

    Identifies resource needs and issues involving resource availability

    Identifies potential delays and the impact of these delays Potential cost overruns can be predicted and resolved

    Example

    Interest in PM Association can be renewed through the annual conference

    A quality professional program will attract members and non-members

    Key speaker(s) fail to show up or submit written paper

    Stakeholders

    Individual or organisations actively involved in the project or directly or indirectly affected by its execution or results

    Roles must be identified at the start of the project

    Needs and expectations must be communicated and influenced in a positive and constructive manner so that

    the project will be success for all How to find them?

    - Ask who will decide on the success of your project

    How to involve them?

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    12/67

    PROJECT MANAGEMENT Anant Dhuri

    12

    - Ask for (appropriate) advice

    - Get their buy-in to project plans

    How to work with them?

    - Active listening

    - Understand their interests and needs

    - Keep everyone informed

    How to keep them on side?

    - Respond to concerns- Manage expectations and make adjustments

    Who are the People Involved?

    Owner, Contractor, Consultant (in-house and outside)

    Sub-consultants, Subcontractors

    Suppliers (Vendors)

    Trade unions

    End users

    Operators

    External Issues

    Factors within a Project Managers sphere of responsibility, but which he or she has no formal control or authority over: Corporate interests

    Operating priorities

    Financial interests

    Government interests and actions

    Public interests

    Economic conditions

    Social priorities

    Common Concerns

    Political fallout

    Social, cultural, economic impacts

    Benefits:- Training

    - Employment

    - Business opportunity

    Way of life Just go away!

    Public Involvement - Right to know

    Environmental protection and conservation

    Loss of control Fear of change

    Power and influence

    Native land claims

    STAKEHOLDER MANAGEMENT PROCESS

    1. Monitoring

    2. Analysis

    3. Assessment

    4. Applications

    - Educate and communicate

    - Mitigate- Compensate

    5. Appraisal and feedback

    Summary

    Understand the role of the various stakeholders

    Identify the real nature of each stakeholder and their interest in the project

    Understand their motivation and behavior

    Issues external to the project that can impact the outcome of a project

    Project manager should:

    - Understand what they are

    - Consider them early

    - Analyze their potential impact- Decide which to mitigate and have a plan

    Assess how they will react to various approaches

    Remember that projects managed in ignorance of External Influences:

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    13/67

    PROJECT MANAGEMENT Anant Dhuri

    13

    - Never get off the ground

    - Mid-flight crash

    - Technical success but commercial failure

    Charter/Overview Document

    1. The define phase focuses on producing a project Charter/Overview document which is used as:

    - A tool in the initial go/no go decision by management

    - A general information document for other managers- An early statement of the project goal and direction

    - A statement of the problems and opportunities to be addressed by the project

    2. Once the project is approved for go ahead, the Project Charter/Overview becomes the foundation for the detailed

    planning activities which follow and:

    - Provides a control point for reporting project progress and an audit point

    - Reference base for addressing questions and conflicts

    - Tool for building the team

    3. When defining a project you should be able to:

    Describe what is expected

    Define the project characteristics

    Develop a project Charter/overview

    - Problem statement

    - Project goal and objectives

    - State the risks and assumptions

    - State success criteria

    STEP 2 - PLAN THE PROJECT

    Agenda

    Work Breakdown Structures (WBS)

    Estimate Time and Cost

    Work Breakdown Structure (WBS)

    1. Reduces complex projects to a series of tasks that can be planned

    2. WBS represents the project in the form of a hierarchy of goal, objectives and activities

    - Identifies activities to be done from beginning to completion of the project

    3. Foundation for the definition, planning, organising and controlling of the project

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    14/67

    PROJECT MANAGEMENT Anant Dhuri

    14

    Composition of a Project WBS

    WBS

    1. Activities in the WBS are broken-down until the entire project is displayed as a network of separately identified

    activities

    2. The breakdown of activities continues until there are no overlapping activities3. Each activity should be:

    4. Status and completion are easily measured

    - Of a specific time duration with defined beginning and end

    - Easy to derive time and cost estimates

    - Of a single purpose and have clearly understood deliverables

    - Responsibility for completion clearly assigned

    The 5-step procedure: Example

    1. Partition the project into its major objectives

    4.1 Develop the Program

    4.2 Set the Conference Site and Date

    4.3 Design and Implement the Marketing Plan

    2. Partition the objectives into activities

    1.1 Develop the Program

    1.1.1 Establish Theme and Topics

    1.1.2 Obtain Speakers

    1.1.3 Prepare Handout Materials

    1.2 Set the Conference Site and Date

    1.2.1 Set Conference Date

    1.2.2 Select and Commit Conference Site

    1.2.3 Confirm Arrangements

    1.3 Design and Implement the Marketing Plan

    1.3.1 Develop and Print Conference Brochure

    1.3.2 Obtain Label Sets for Direct Mail1.3.3 Mail Conference Brochures

    1.3.4 Receive and Acknowledge Registrations

    3. Check each activity for compliance with activity characteristics and further partition any that do not comply

    1.1.3 Prepare Handouts

    1.1.3.1 Obtain Handout Materials from Speakers

    1.1.3.2 Prepare and Print Conference Notebook

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    15/67

    PROJECT MANAGEMENT Anant Dhuri

    15

    Estimating Activity Time

    1. Time to complete a task is random:

    Skill levels and knowledge of the individuals

    Machine/equipment variations

    Material availability Unexpected events

    - Illness

    - Strikes

    - Employee turnover and accidents

    - Changed soil/site conditions

    2. We know unexpected events and occurrences will happen but are unable to predict the likelihood with any

    confidence

    - We must however account for the possibility of the occurrence of these events

    3. Use a statistical relationship if you can estimate

    4. Optimistic completion

    5. Pessimistic completion time

    - Most likely completion time- Can acquire this information from discussions with individuals that have first hand experience in projects

    - Optimistic Completion Time - is the time the activity will take if everything goes right

    6. Pessimistic Completion Time - is the time the activity will take if everything that can go wrong does go wrong but the

    project is still completed

    7. Most Likely Completion Time - is the time required under normal circumstances

    8. It can also be the completion time that has occurred most frequently in similar circumstances

    9. To compute the expected duration time the following formula is used:

    E = (O+4M+P)/6

    E = Expected duration time

    O = Optimistic time

    M = Most likely time

    P = Pessimistic time

    Estimated times for conference planning

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    16/67

    PROJECT MANAGEMENT Anant Dhuri

    16

    Sequencing Activities

    Bar chart

    Produce a Logical Network

    - Critical Path Method

    - Arrow Diagrams

    Precedence Diagrams Identify Critical Activities

    Locate the Critical Path

    Floats

    Bar Charts/Gantt Chart

    Most projects, however complex, start by being depicted on a bar chart. The principles are very simple:

    - Prepare list of project activities

    - Estimate the time and resources needed

    - Represent each activity by a bar

    - Plot activities on a chart with horizontal time scale showing start and end

    RACI Charts Responsibility - Action - Coordination - Information

    Identify the roles of participants in each element of a project

    Effective communications road map

    4 to 8 weeks look ahead

    Update weekly to:

    Reset expectations

    Ensure right people involved in detailed planning

    Ensure everyone knows what needs to be done by whom

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    17/67

    PROJECT MANAGEMENT Anant Dhuri

    17

    CPM: Critical Path Method

    1. Graphic network based scheduling technique

    - Arrow Diagrams

    - Precedence Diagrams

    2. Use activities created by the WBS process

    3. Analysis of timing and sequencing logic

    - Aids in identifying complex interrelationship of activities

    4. Allows for easy revision of schedule and simulation and evaluation of the impact of changes5. Also used as a control tool during execution of the project

    Producing a Logical Network

    The sequencing identifies activities that must be completed before another activity can start and which activities can

    occur simultaneously. Different methods:

    1. Low-tech approach: use post-it labels

    - Each label has one activity written on it

    - Through iterative process the labels can be arranged and rearranged

    2. Ask yourself the following:

    - Which activities must be completed before this activity starts?

    - Which activity cannot start until this activity is completed?

    - Which activities have no logical relationship with this activity and therefore take place at the same time

    (concurrent activities)?3. Identify immediate predecessor activities,which are activities that must be completed before another activity can

    begin

    Steps in Producing Networks

    1. List the activities

    2. Produce a logical network of activities

    3. Assess the duration of each activity

    4. Produce a schedule - determine the start and finish times and the float available for each activity

    5. Determine the time required to complete a project and the longest path on the network

    - The longest path is the Critical Path

    6. Assess the resources required

    Activity sequencing

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    18/67

    PROJECT MANAGEMENT Anant Dhuri

    18

    Sample Network

    Activity Times/Critical Path

    Critical Path

    1. Calculations for precedence diagrams and arrow diagrams are essentially the same

    2. Critical path is where there is zero slack time

    3. If an activity takes longer than estimated on the critical path then the project will be delayed

    4. The critical path can change if there is a delay that make an alternative path longer

    Float (Slack)

    - Slack or float time is amount of delay that could be tolerated in the start or completion time without causing a delay in

    completion of the project

    - Total float or calculations to determine how long each activity could be delayed without delaying the project

    - Total float = LF - ES - duration

    Summary

    - Critical path identifies the project time requirements

    - Slack or float time is amount of delay that could be tolerated in the start or completion time without causing a

    delay in completion of the project

    - Zero slack time equals the critical path

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    19/67

    PROJECT MANAGEMENT Anant Dhuri

    19

    2. PROJECT SELECTION

    A. General principles

    Programme and Measure Objectives

    Economic Impact taking account of Deadweight and Displacement

    Financial Viability PPP and productive Sector Projects

    Cost effectiveness

    Environmental Impact Impact on equality of opportunity

    Impact on poverty

    Impact on rural development

    B. Project Appraisal

    Procedure

    1. Idea

    2. Initial contact

    3. Business Plan / Formal Application

    4. Site visit to project5. Appraisal by staff

    6. Assessment by Evaluation Committee

    7. Board decision

    Criteria for Assistance - You must show:

    that the project is commercially viable

    That there is a market for the product or service

    That adequate finance will be available to fund the project

    That the promoter has the management and technical capacity to handle the project

    That the promoters tax affairs are in order and proper company structure

    Principal Appraisal Techniques

    1. Financial Analysis

    2. Cost Benefit Analysis

    3. Cost Effectiveness

    4. Scoring ; Weighting ; Ranking

    5. Multi Criteria Analysis (M.C.A)

    1) Financial Analysis

    2) Cost Benefit Analysis

    Application - Essential to demonstrate the economic costs and benefits of projects from the perspective of the

    national economy or social welfare

    Key features Comprehensive Comparison of costs and benefits, including non-market. Treatment of risk. Can

    include estimation of multipliers Limitations - Impacts require common monetary numeracies. Data demands can be considerable Can have

    inadequate political or social acceptability

    3) Cost Effectiveness

    4) Scoring, Weighting, Ranking (SWR)

    The criteria against which projects will be appraised are identified. A weighting is assigned to each criteria based on

    importance (no weighting = equal value). Each project receives numerical score against different criteria. Different project

    applications ranked against each other.

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    20/67

    PROJECT MANAGEMENT Anant Dhuri

    20

    C. Transparency Issues

    Public Promotion

    Eligibility Criteria Published

    Criteria for selection available

    Weightings for criteria available

    Decisions made by Committee

    Conflicts of interest avoided (Declarations)

    Information given to unsuccessful applicants

    Competitive or queuing basis

    Appeals system in place

    D. Project Selection

    Criteria

    Included in Operational Programme Objectives

    Measure specific objectives

    Economic Impact

    Financial Viability

    Cost-Effectiveness

    Horizontal Principles: Environment: rural development & Poverty: Equality

    Scoring: Weighting: Ranking

    Procedure

    Initial call for applications 2 stage process

    1. Assessment of Proposals

    Initial review by Regional Tourism Organisation

    Assessment and scoring of proposals by Filte Ireland

    Assessed by Filte Ireland Assessment Committee

    Considered and approved by Product Management Board

    2. Short-listed applications complete detailed proposal form

    3. Evaluation by Filte Ireland evaluation team

    4. Assessment Committee review recommendations

    5. Product Management Board consider approve, defer or reject

    E. Procedure Monitoring & Evaluation

    Monitoring of Programme at three levels

    - Implementing Agency

    - Monitoring Committee level

    - National (NDP/CSF)

    Grantee must retain all records and have available for inspection

    Retain records of account for 6 years (Irish Law)

    Retain records 3 years following closure of programme

    Grantee must file annual financial statements

    Grantee must file annual financial statements Grantee may have to provide evidence of satisfactory management and financial control procedures

    Work must comply to all planning conditions

    Regular progress reports on work

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    21/67

    PROJECT MANAGEMENT Anant Dhuri

    21

    Security Deed of Covenant or Mortgage

    Grant paid in two installments Interim and Final

    - Paid eligible expenditure

    - Evidence matching funds

    - Check no grant aid from other sources

    F. Project Financing

    1. Public Sector

    - Project provision included in annual budget estimates of Central Government Department

    - EU receipts also included

    - Recouped in arrears by Exchequer following verification of expenditure

    2. Private Sector

    - Project Approved in advance of commencement

    - Project payments made in arrears on basis of verified expenditure (stage payments allowed)

    - Balance of funding provided by promoters own resources, borrowings or other equity investment

    - Equity and loan finance also included

    G. Tendering

    Quotations and Tenders

    - Up to 800 Two oral quotations

    - 800 to 8,000 Two written quotations

    - 8,000 to 16,000 Three written quotations

    - 16,000 to 32,000 Four written tenders

    - 32,000 to 160,000 Full tender in at least two regional newspapers and/or national newspapers

    - 160,000 and over Advertisement in Official Journal of EU and national newspapers

    H. Role of Implementing Body

    - Design of overall scheme

    - Seek applications by public advertisement

    - Review and approval of project applications received from project promoters

    - Ongoing monitoring of projects- Reviewing progress expenditure, final project costs and irregularity reports if applicable

    - Review, approval and payment of project manager payment claims

    - Prepare claims for Managing Authority on to Paying Authority

    I. Project Management IT Based System

    - Financial Control Systems

    - Financial Tables

    - Physical Indicators

    - Annual Implementation Reports

    - Other Reports by period county, field of intervention

    - Actual expenditure reports

    - Claims for draw down

    - Payment details

    - Report on receipts and outstanding claims

    - Funds allocation, dispersal instructions

    J. Project Reporting to Monitoring Committee

    - Introduction description measure, commentary on progress

    - Expenditure to date

    - Performance Indicators progress to targets

    - North/South Co-operation

    - Information and Publicity Requirements

    - Horizontal Issues Environment; Gender Equality; Poverty; Rural Development

    - Future Prospects

    - Adjustments required

    - Annexes

    K. Value for Money - Definitions

    1. Additionality: Measure of economic output i.e. amount of project output compared to what would have occurredwithout intervention

    2. Deadweight: Opposite to additionality i.e. could project have proceeded without State Aid

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    22/67

    PROJECT MANAGEMENT Anant Dhuri

    22

    3. Displacement: Activities that would or could have been financed by the private sector are displaced by publicly

    subsidized activity

    4. Cost-effectiveness: Projects selected contribute the largest amount possible to policy objectives at the minimum

    possible cost.

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    23/67

    PROJECT MANAGEMENT Anant Dhuri

    23

    3. PROJECT FEASIBILITY STUDY

    Feasibility vs Business Plan

    FEASIBILITY BUSINESS PLAN

    1. The feasibility study provides an investigating function 1. The business plan provides a planning function.

    2. Answers the question: is the project viable? 2. Lays out the actions to be taken to bring the ideas to

    reality.3. The feasibility study outlines and analyses several

    alternatives or methods of achieving project success.

    Therefore it assists to narrow the scope of the project

    to identify the best project scenario(s) to about two or

    three.

    3. The business plan focuses on only one alternative or

    scenario.

    4. The feasibility study is conducted before the business

    plan.

    4. A business plan is prepared only* after the business

    venture has been deemed to be feasible.

    5. It is a decision point; to continue or not based on the

    outcome.

    5. The outcome does not provide information to continue

    or drop the project.

    6. Feasibility provides information to choose the blue

    print or roadmap.

    6. The business plan provides a blue print or roadmap.

    Some argue that:We know its feasible. An existing business is already doing it. Feasibility has been done a few years ago so there is no

    need to do another one. Feasibility studies are just a way for consultants to make money. The business is too small for a

    feasibility study. The market analysis has already been done by the business that is going to supply the equipment. By

    hiring a general manager, the study can be accomplished. Feasibility studies are a waste of time. Money is to be spent

    on building, tie up the site and bid on the equipment; why spend money on feasibility.

    Reasons For Feasibility

    Once decisions have been made about proceeding with a proposed business, they are often very difficult to change. An

    entrepreneur may have to live with these decisions for a long time. Successful businesses thoroughly examine all of the

    issues and assess the probability of business success first before going into it. Feasibility studies gives focus to the

    project and outline alternatives and narrow project alternatives Feasibility studies bring to the fore new opportunities

    through the investigative process. They identify reasons not to proceed. They enhance the probability of success byaddressing and mitigating factors earlier on that could affect the project. Feasibility studies provide quality information for

    decision-making. They help to increase likelihood of finding funds and investors for the project. And provide

    documentation that the business venture was thoroughly investigated.

    Aspects of Project Preparation and Analysis

    1. Technical

    2. Institutional-Organisational

    3. Managerial

    4. Social

    5. Commercial

    6. Financial

    7. Economic

    1. Technical - Relates to underlying principles of knowledge where the product and or the method of the project. For a

    crop production project, the concerns will be agronomy; knowledge of plants and crops, effects of weather, soil

    conditions, seeds; generally, inputs and outputs. The relationship among the various factors; with the final product or

    method in mind. Example: Internet caf project; the knowledge area is information and communications technology

    (ICT).

    Issues about computers,

    Internet connectivity,

    networking of computers

    business management

    The purpose is to assess the current status of the essentials with the view to identify gaps. The team to be selected

    or put together depends on the technical areas involved.

    2. Institutional, organisational.

    How does the proposed project relate to the various levels of power as well as the existing institutions?

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    24/67

    PROJECT MANAGEMENT Anant Dhuri

    24

    What are the links of the projects and team with existing government departments and organisations are

    considered here?

    Within the project, what are the lines of authority, delegation, line of reporting, and organisational procedures?

    Will the project keep and operate its own accounts?

    3. Managerial

    Assessment of availability of staff to manage the project; if there is a gap will there be the need to train or hire

    others locally or for expatriate staff? Are the target groups equipped to use the product or adopt the technology or innovation being introduced?

    4. Social

    Social implications of projects are important. For public projects the social aspect vis--vis the objectives are crucial.

    For non-public projects the review of social aspect is to assess the negative impact on society if the project is

    implemented. Where positive influences they are often secondary in importance. The focus is on income distribution,

    the response of the project to national objectives. Effect of project on employment, possible side effects on some

    people, issues of quality of life. For the company, how does the project fit into the mission and vision of the

    organisation? Environmental issues are social issues. Both locally and internationally, there are regulations and laws

    on governing the effects of undertakings on the environment. For example, what are the possible effects of the

    undertaking on the physical environment; water, air, soil. Noise pollution is to be considered. Projects in mining do

    have tremendous adverse effects on the environment. The outcome of these considerations is to identify the enable

    the planners to find ways of mitigating the environmental effects. At this stage environmental regulations have to be

    reviewed to appreciate the requirements and limits within which the project can or cannot operate.

    5. Commercial - This relates to the product.

    The sale of the output produced, arrangements for sale, and pricing.

    This stage is also referred to as market feasibility stage.

    The demand of the product or service is needs to be assessed; the potential demand as well as the effective

    demand, the size of the market, segments, and targets of the product.

    What advertising means are available, media consumption habits of the target market or consumers?

    Questions like what is the buying behaviour of the target market, income their income distribution and some

    other characteristics of the customers.

    On the input side what are the sources of the raw material, what are the pricing mechanisms, regularity of

    supply etc.

    6. Financial

    Under the financial aspect, the totality of the financial dimension of the proposed project is examined. In social or

    public projects, there are several participants. These participants in an agricultural project include; farmers, suppliers,

    project agencies and customers. In a production and distribution project of a manufacturer, the participants are

    customers, distributors, transporters, and finally the company or manufacturer. Financial effects must be examined

    for each participant because participants are impacted differently. The financial effects of the participants in the

    project are examined here. Their effect on them must be appropriately assessed. Separate budgets and accounts

    (income and expenditure, balance sheet and cashflow) must be prepared. The aim is to make judgements of the

    financial efficiency, incentives, creditworthiness and liquidity of the project and its participants. In private sectorprojects the proforma or projected final accounts (profit and loss, balance sheet, and cashflow) are prepared. And this

    is from the perspective of the company initiating the project. It must be stated, that, several participants (suppliers,competitors, customers) are affected differently, but the company is mostly interested in effects on her. At this stage

    what is most required to assess financial feasibility using the cashflow.

    The others only serve as an input. Indeed, some approaches to building the cashflow do not use the income

    statement and balance sheet. From the cashflow the feasibility of the project is established using measures such as

    Net Present Value (NPV), Internal Rate of Return (IRR), and Benefit Cost Ratio (BCR) among others. The aim is to

    find out if the project is viable or not. The issue of profitability does not arise here at all. If the project is viable, then, a

    detailed project plan is prepared. In the case of projects with profit motive, a detailed business plan follows. The time

    frame for considered fro projections in feasibility study is quite long, longer than that of the business plan which is the

    magic five years. In unstable economies, this can be as short as three years.

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    25/67

    PROJECT MANAGEMENT Anant Dhuri

    25

    7. Economic

    Economic aspects of project analysis use financial aspects as raw materials. Essentially, the financial analysis is

    adjusted to accomplish economic analysis. The overarching goal of economic analysis is the determination of the

    contribution of a proposed project to the total economy. The principal question is: does the level of contribution of the

    project warrant the use of scare resources of the society to execute it? Despite the complementary nature of the

    financial and economic analysis there are some differences.

    Basis Financial Analysis Economic Analysis

    1. Taxes Treated as costs to the projectPart of project benefit, treated as transferpayments and not to be considered ascost.

    2. Subsidies Treated as returns to the projectCost to society because it is expenditureof resources by government thus fromsociety

    3. Prices Market prices

    Prices adjusted to reflect economic orsocial values; the prices are shadow oraccounting prices. Subsides and taxesare used in the adjustment.

    4. Interest oncapital

    Treated thus: interest paid to capital suppliersexternal to the economy is subtracted frombenefits. The result is what is available toowners of capital. Interest imputed to theentity from whose dimension analysis isbeing done is part of total return not cost

    Used as quoted. It is total return tosociety

    5. ViewpointPrepared from the viewpoint of an individual;person, company etc.

    From the viewpoint of the economy orsociety as a whole.

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    26/67

    PROJECT MANAGEMENT Anant Dhuri

    26

    4. PROJECT RISK MANAGEMENT

    A. Risk management

    Risk management is concerned with identifying risks and drawing up plans to minimise their effect on a project.

    A risk is a probability that some adverse circumstance will occur.

    - Project risks affect schedule or resources

    - Product risks affect the quality or performance of the software being developed

    - Business risks affect the organisation developing or procuring the software

    B. The risk management process

    Risk identification

    - Identify project, product and business risks

    Risk analysis

    - Assess the likelihood and consequences of these risks

    Risk planning

    - Draw up plans to avoid or minimise the effects of the risk

    Risk monitoring

    - Monitor the risks throughout the project

    C. The risk management process

    D. Risks and risk types

    E. Risk

    1. Identification

    Technology risks

    People risks

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    27/67

    PROJECT MANAGEMENT Anant Dhuri

    27

    Organisational risks

    Requirements risks

    Estimation risks

    2. Analysis

    Assess probability and seriousness of each risk

    Probability may be very low, low, moderate, high or very high

    Risk effects might be catastrophic, serious, tolerable or insignificant

    F. Risk analysis

    Risk Probability Effects

    Organisational financial problems force reductions in the projectbudget.

    Low Catastrophic

    It is impossible to recruit staff with the skills required for the project. High Catastrophic

    Key staff is ill at critical times in the project. Moderate Serious

    Software components that should be reused contain defects whichlimit their functionality.

    Moderate Serious

    Changes to requirements that require major design rework areproposed.

    Moderate Serious

    The organisation is restructured so that different management areresponsible for the project.

    High Serious

    G. Risk planning

    Consider each risk and develop a strategy to manage that risk

    Avoidance strategies

    - The probability that the risk will arise is reduced

    Minimization strategies

    - The impact of the risk on the project or product will be reduced

    Contingency plans

    - If the risk arises, contingency plans are plans to deal with that risk

    Monitor

    - Assess identified risks regularly to decide whether or not it is becoming less or more probable

    - Assess whether the effects of the risk have changed

    H. Risk monitoring

    Assess each identified risks regularly to decide whether or not it is becoming less or more probable

    Also assess whether the effects of the risk have changed

    Each key risk should be discussed at management progress meetings

    Key points

    Risks may be project risks, product risks or business risks

    Risk management is concerned with identifying risks which may affect the project and planning to ensure that these

    risks do not develop into major threats

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    28/67

    PROJECT MANAGEMENT Anant Dhuri

    28

    5. PROJECT SELECTION

    In what steps of the methodology is financial feasibility analysis relevant?

    STEP 4 FEASIBILITY ANALYSIS

    Questions Management Will Ask

    1. Is the project profitable?

    Initial investment costs

    Annual operating costs and savings

    Cost of operating inputs

    Cost of waste management Less tangible costs

    Revenues

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    29/67

    PROJECT MANAGEMENT Anant Dhuri

    29

    2. Determine availability of internal investment funds for bigger projects

    3. Obtain external financing for remaining projects

    Capital Budgeting Process - Process by which organisation decides:

    Which investment projects are

    Needed

    Possible

    Special focus on projects that require significant up-front capital investment How to allocate available capital between different projects

    If additional capital is needed

    Capital Budgeting Practices

    Vary widely from company to company. Vary from country to country

    Larger companies tend to have more formal practices than smaller companies

    Larger companies tend to make more and larger capital investments than smaller companies

    Some industry sectors require more capital investment than others

    Typical Project Types and Costs

    Maintenance

    Maintain existing equipment and operations

    Improvement Modify existing equipment, processes, and management and information systems to improve efficiency, reduce

    costs, increase capacity, improve product quality, etc.

    Replacement

    Replace outdated, worn-out, or damaged equipment or outdated/inefficient management and information systems

    CASH FLOW

    Cash Flow Concept

    Common management planning tool. Distinguishes between

    Costs: cash outflows

    Revenues/savings: cash inflows

    Types of Cash Flow

    Outflow Inflow

    One-time Initial investment cost Equipment salvage

    value

    Annual Operating costs & taxes Operating revenues

    & savings

    Other Working capital Working capital

    Costs and Savings

    Initial investment costs

    purchase of the camera system, delivery, installation, start-up

    Annual operating costs (and savings)

    Operating input materials, energy, labour

    Incineration fuel, fuel additive, labour, ash to landfill

    Wastewater treatment chemicals, electricity, labour, sludge to landfill

    Working Capital and Salvage Value

    Working capital:total value of goods and money needed to maintain project operations

    Raw materials inventory

    Product inventory

    Accounts payable/receivable

    Cash-on-hand

    Salvage Value:resale value of equipment or other materials at the end of the project

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    30/67

    PROJECT MANAGEMENT Anant Dhuri

    30

    Timing

    Incremental Analysis

    Needed for many CP or EE projects

    Compares cash flow of implemented options to the business as usual cash flow Covers only the cash flows that change

    PROFITABILITY INDICATORS

    Definition:

    a single number that is calculated for characterisation of project profitability in a concise and understandable form

    Common indicators

    1. Simple Payback

    2. Return on Investment (ROI)

    3. Net Present Value (NPV)

    4. Internal Rate of Return (IRR)

    1. Simple Payback - Number of years it will take for the project to recover the initial investments. Usually a rule of

    thumb for selecting projects, e.g. payback must be < 3 years

    2. Return on Investment - The percentage of initial investment that is recovered each year

    3. Net Present Value - Money Loses its Value

    Question:

    If we were giving away money, would you rather have:

    (A) $10,000 today, or

    (B) $10,000 3 years from now

    Explain your answer.

    Inflation

    Money loses purchasing power over time as product/service prices rise, so a dollar today can buy more than a dollar

    next year

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    31/67

    PROJECT MANAGEMENT Anant Dhuri

    31

    Return on Investment

    A dollar that you invest today will bring you more than a dollar next year having the dollar now provides you with an

    investment opportunity

    Time Value of Money

    Money is worth more now than in the future because of

    Inflation

    Investment opportunity

    Time value of money depends on

    Rate of inflation

    Rate of return on investment

    Cash Flows from Different Years

    Before you can compare cash flows from different years, you need to convert them all to their equivalent values

    in a single year

    It is easiest to convert all project cash flows to their present value now, at the very beginning of the project

    Converting Cash Flows to Present Value

    Converting Cash Flows to Present Value

    Discount rate:

    Converts future year cash flows to their present value

    Incorporates:

    Desired return on investment

    Inflation

    Reverse of an interest rate calculation

    Discount Rate & Interest Rate

    Invested at an interest rate of 20%, how much will $10,000 now be worth after 3 years?

    $10,000 x 1.20 x 1.20 x 1.20 = $17,280

    At a discount rate of 20%, how much do I need to invest if I want to have $17,280 in 3 years?

    $17,280

    1.20 x 1.20 x 1.20 = $10,000

    Which Discount Rate? Equal to the required rate of return for the project investment, based on

    A basic return - pure compensation for deferring consumption

    Any risk premium for that projects risk

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    32/67

    PROJECT MANAGEMENT Anant Dhuri

    32

    Any expected fall in the value of money over time through inflation

    At least cover the costs

    At least cover the costs of raising the investment financing from investors or lenders (i.e. the companys cost of

    capital)

    A single Weighted Average Cost of Capital (WACC) characterises the sources and cost of capital to the company

    as a whole

    Calculating Present Value

    The Value of a Future $1

    Net Present Value (NPV)

    Definition: sum of present values of all projects cash flows

    Negative (cash outflows)

    Positive (cash inflows)

    Characterises the present value of the project to the company

    If NPV > 0, the project is profitable

    If NPV < 0, the project is not

    More reliable than Simple Payback or ROI as it considers

    Time value of money

    All future year cash flows

    Sensitivity Analysis

    In business as usual scenario PLS Company needs waste water treatment plant in year 3: $150,000 investment

    With QC project: $95,000

    Savings: $55,000

    Also consider taxes!

    Pollution taxes / fees

    Tax deductions for equipment depreciation

    Tax deduction for environmental projects

    4. Internal Rate of Return (IRR) Definition: discount rate for which NPV = 0, over the project lifetime

    Tells you exactly what discount rate makes the project just barely profitable

    Similar to NPV, considers

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    33/67

    PROJECT MANAGEMENT Anant Dhuri

    33

    Time value of money

    All future year cash flows

    Profitability Indicators Summary

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    34/67

    PROJECT MANAGEMENT Anant Dhuri

    34

    5. FINANCIAL ANALYSIS

    Financial Analysis Defined:

    Comparing the costs and benefits over time to determine whether a project is profitable or not. To achieve this the

    following financial indicators are used:

    Net Present Value (NPV)

    Internal Rate of Return (IRR)

    Sensitivity Analysis

    Steps in conducting a Financial Analysis:

    1. Identify the costs

    2. Identify the benefits

    3. Enter the costs and benefits into the financial calculator

    4. Assess the financial indicators to determine if the project is financially favourable.

    Defining Costs

    There are different ways of defining costs:

    By type:

    Capital costs

    Operating costs

    By function:

    Development costs

    Operational costs Maintenance costs

    By behaviour:

    Fixed costs

    Variable costs

    By time:

    Recurring costs

    Non-recurring costs

    Capital Costs

    Capital costs are the expenses incurred in purchase of items that are recorded as assets; their value is depreciated over

    time and they are recorded in the Balance Sheet.

    Identify the capital costs for the project for the following items:

    Equipment

    Non-consumable Materials*

    Infrastructure* Non-consumable materials are capital costs because these are materials that persist (eg. furniture, bricks)

    Operating Costs

    Operating costs are expenses incurred in the execution of the project or in the operation of the business (after the

    project) They are not depreciated over time and are recorded in the profit and loss statement.

    Identify the operating costs for the project for the following:

    Internal business resources

    Internal IT resources

    External resources

    Office accommodation

    Licenses

    Support

    Training

    System administration

    Equipment hire

    Consumable materials*

    Travel Accommodation

    Identifying the Benefits

    Identify the benefits that the project will provide, and the value that can be assigned to each benefit.

    Enter the costs and benefits into the Financial Calculator

    For each year enter the anticipated capital and operating expenses into the financial calculator spreadsheet.

    For each year enter the anticipated benefits into the spreadsheet.

    Adjust the discount rate if appropriate.

    Enter sensitivity values (% cost increase and % revenue decrease values)

    The spreadsheet will automatically calculate the financial indicators

    Assess the Financial Indicators

    Financial indicators used in the spread sheet are: Net Present Value (NPV)

    Internal Rate of Return (IRR)

    Sensitivity Analysis

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    35/67

    PROJECT MANAGEMENT Anant Dhuri

    35

    The value of Money

    The value of money changes over time.

    With most projects, the financial benefits are realised at a different time to the costs.

    Net present value (NPV) provides a means to compare these by adjusting the value to todays value.

    This is achieved by modifying the future value by a factor that represents the change in value of money from todays

    value.

    This factor is called the discount factor. It is calculated as: 1 (discount rate / 100)

    Investment Analysis

    If the Net Present Value is less than zero then this indicates the project is not financially worthwhile.

    Note: The discount factor is based on a discount rate of 13%. Hence at the end of the first year $1 is worth 87c, drops to

    75.6c in the second year, 65.8c in the third year etc.

    Internal Rate of Return

    Is defined as the discount rate at which an investment has a zero net present value. The internal rate of return equates to

    the interest rate, expressed as a percentage that would yield the same return if the funds had been invested over the

    same period of time. Therefore, if the internal rate of return for the project is less than the current bank interest rate it

    would be more profitable to put the money in the bank than execute the project

    Sensitivity Analysis

    Projects do not always run to plan. Costs and benefits estimated at an early stage of a project may indicate a profitableproject, but this profit could be eroded by an increase in costs or a decrease in the value of the benefits (the revenue).

    Sensitivity analysis provides a means of determining the financial impact of this type of fluctuation. By entering an

    anticipated percentage increase in costs or decrease in revenue the financial impact on the project can be identified by

    looking at the change to the NPV or IRR measures.

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    36/67

    PROJECT MANAGEMENT Anant Dhuri

    36

    7. PROJECT FINANCE MANAGEMENT

    PROJECT LIFE CYCLE

    Conceptualisation :Project Proposal

    - Feasibility Study

    Planning :Organisational Structure

    - Resources

    - Establishment of standards Implementation :Monitoring & Controlling

    Termination

    - Disposal & Redeployment

    CONCEPTUALISATION includes

    Project Proposal - prepared to set out clearly, the rationale, proposed methods, costs and benefits.

    Feasibility Study - resulting from careful examination of practicability, costs, markets and associated costs.

    Important Ps

    Product / Project Identification

    Process ( Manufacturing & Project management)

    Place (Project site, Markets, Sourcing)

    Partners (Financial, Commercial) Promoters (Equity holders)

    Feasibility Studies

    Evaluation of risks & returns

    Managerial potential

    Economic considerations

    Commercial feasibility

    Financial capability

    Technical Feasibility

    Social Factors

    Marketability

    Compliance with statutory regulations Insurance / Risk management

    KEY FACTORS

    1. Location of the project

    - - raw material availability

    - - infrastructure facilities, etc

    2. Size & Capacity levels

    - - large plants are more economical

    - - idle capacity is a huge loss

    3. Technological Aspects

    - - Production process, machinery

    4. Management policies

    - - Personnel, Sales, etc.

    PLANNING includes

    Project Report - prepared formally after conceptualizing the project & consists of write-up on the fine-prints of

    the project and financials of the project

    Project Appraisal & Evaluation - for the purpose of acquisition of resources

    PROJECT REPORT

    A project report is a pre-investment and comprehensive study of investment proposals of an organisation.

    Project report encompass a thorough investigation relating to economic, technical, financial, social, managerial and

    commercial aspects

    FEATURES OF A PROJECT

    Separate Entity

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    37/67

    PROJECT MANAGEMENT Anant Dhuri

    37

    Specific Purpose & Objectives

    Limited Duration

    Target dates for Commencement & completion

    Fine-prints of the Project Report

    1. Data collection, capacity determination

    2. Promoters Information

    3. Locational Advantages4. Technical Arrangement

    5. Marketing & Selling Arrangement

    6. Schedule of Implementation

    7. Project Cost & Means of Finance

    8. Profitability

    Essentials for drafting a Techno Economic Feasibility Report (TEFR)

    1. Comprehensive

    2. Clarity

    3. Elaborate

    4. Informative

    5. Synchronized

    6. User friendly

    Preparation of TEFR

    1. Detailed description of the project, product description and uses

    2. Promoters background & management profile

    3. Infrastructure

    4. Analysis of the schedule of implementation

    5. Manufacturing processes, technical arrangement and process flow chart

    6. Marketing

    7. Financial summary of the promoters, group companies

    8. Organisation Structure

    9. Basic assumptions underlying the preparation of the TEFR

    10. Analysis of the project cost11. Structuring the means of finance

    Components of Project Cost

    Land & Land Development

    Shed & Building

    Plant & Machinery- imported & indigenous

    Miscellaneous Fixed Assets

    Electrical installation

    Margin money for working capital

    Preliminary & pre-operative expenses

    Provisions & Contingencies

    Prospective Means of Finance

    Share Capital - Equity or Preference

    Term Loans - Domestic/External Commercial Borrowings or FCNR (B)

    Debentures

    Unsecured Loans & Deposits

    Lease

    Internal Accruals

    Sops & Incentives

    Venture Capital

    Grants & Subsidies

    Seed Capital Assistance

    Deferred Payment Guarantee

    Debt Securitisation Forfaiting

    Factoring

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    38/67

    PROJECT MANAGEMENT Anant Dhuri

    38

    Working Capital

    Financial Projections

    Sales Forecast

    Material Costs

    Labour

    Power & Fuel

    Freight

    Interest Costs

    Depreciation

    Taxation

    Pooling of Capital

    Term Loan

    Investment

    Acquisition of Fixed Assets

    Working Capital

    Miscellaneous Expenditure

    Deferred Revenue Expenditure

    Dividend

    RISK

    1. Assumption of Capital Budgeting

    2. The projected cash flows occur in the same quantum as forecasted by the appraiser.

    3. Quantification of Risk

    4. Variation of the actual return from what was expected during the time of projections.

    Risk analysis1. STANDARD DEVIATION

    2. PROBABILITY TREE METHOD

    3. SIMULATION METHOD

    4. SENSITIVITY ANALYSIS

    5. CERTAINTY EQUIVALENTS

    6. ADJUSTED DISCOUNT RATE

    7. CAPITAL ASSET PRICING MODEL (CAPM)

    SENSITIVITY ANALYSIS

    GOAL - Identification of variables of a project which could have an adverse effect on the overall outcome of an

    investment proposal. Variables commonly used -

    - Selling Price

    - Cost of Factors of Production

    - Initial Outflow

    - Project Life

    Role of Financial Instructions

    Critical Appraisal

    Lending

    Visits & Interactions

    Conducting feasibility tests

    Evaluation of credit worthiness

    Structuring Finance

    Period of Loan

    Grant of Moratorium

    Credit Rating

    Monitoring & Follow-up

    Interactions with Financial Institutions

    Conviction Evaluation

    Attitude

    Credit worthiness of promoters

    Knowledge of the project Detailed study of the TEFR

    Cordial & Positive Approach

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    39/67

    PROJECT MANAGEMENT Anant Dhuri

    39

    Sanction & Disbursal by Financial Institutions

    Clearance by legal department

    Acceptance of terms & conditions

    Documentation

    Creation of Charges

    Disbursal

    Term Loan Procedure

    Submission of loan application

    Processing

    Appraisal

    Issue of sanction letter

    Acceptance of terms & conditions

    Execution of loan agreement

    Disbursement of Loan

    Creation of security

    Monitoring

    ANALYSIS OF FINANCIAL RESULTS

    1. Profitability

    2. Balance Sheet - portrayal & scrutiny

    3. Cash Flows

    4. Break-even Point and Margin of Safety

    5. Debt Service Coverage Ratio6. Fixed Assets Coverage Ratio

    7. Sensitivity Analysis

    8. Pay-back period

    9. Internal Rate of Return

    Important Qualitative Ratios

    - Return on capital Employed

    - Profit Margin

    - Assets Turnover Ratio

    - Inventory Turnover Ratio

    - Pay-out Ratios

    - Liquidity Ratios

    - Current Ratio

    - Debt Equity Ratios

    - Interest Coverage Ratios

    - Debt - Service Coverage Ratios

    ANALYSIS OF FINANCIAL & OPERATING LEVERAGE

    Quantitative Ratios

    Units sold or consumed as raw materials

    Unit realisation price

    Trends in key ratios like sales, fixed assets, working capital & operating margin

    Annualizing numbers especially for companies changing accounting years

    Inter & Intra firm companies

    Guidelines for Project Appraisal

    Provision for Cost Escalation

    Scrutinise sources of finance

    Profitability adjustments

    Examine Financial viability

    Project Preference

    Appraisal & Evaluation

    Qualitative Factors

    Intuition

    Vision

    Intangible Benefits

    Strategic Aspects

    Linkage between business planning and capital budgeting

    Approach to decision making Strategic Planning & Financial Analysis

    Organisational Considerations

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    40/67

    PROJECT MANAGEMENT Anant Dhuri

    40

    Summarizing Appraisal & Evaluation

    Marketing

    Technical

    Financial

    Economical

    Managerial

    Quality Control & Improvements

    SWOT Analysis

    Monitoring includes

    Periodical Review

    Updating/Revision of plans

    Monitoring during Implementation

    Adequate formulation

    Sound project organisation

    Proper implementation planning

    Advance Action

    Timely availability of funds

    Judicious equipment, tendering & procurement

    - Better contract management- Effective monitoring

    - Applying network techniques like CPM & PERT model

    Disposal of Assets includes

    Redeployment of resources having alternative usage

    CAPITAL BUDGETING

    Planning for investment in capital assets. It involves proper project planning and commercial evaluation of projects to

    know in advance technical feasibility and financial viability of the project

    Capital Budgeting Process depends on

    Size of the organisation

    Number of projects

    Direct financial benefit

    Composition of assets

    Timing of expenditure

    Process of Capital Budgeting

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    41/67

    PROJECT MANAGEMENT Anant Dhuri

    41

    Capital budgeting techniques

    PROJECT CASH FLOWS

    Defined as the financial costs and benefits associated with a project

    Costs & benefits evaluation

    Capital Costs

    Operating Costs

    Revenue

    Depreciation

    Residual Value

    Principles used in developing Projected Cash Flows

    Incremental principle

    Long Term Funds principle

    Exclusion of Financing Costs principle Post Tax principle

    INFLATION

    Inflation has the tendency to cause a major impact on the ultimate success or failure of capital projects. The timing of

    project appraisal is significant from the point of view of appraisers. In the likelihood that the presumed normal conditions

    seldom exist for a project, inflation is bound to affect the project appraisal and implementation process.

    Effect of inflation

    Change in Projected Statement of Profitability and Cash Flows

    Increase in rate of interest by lending institutions.

    Increase in all Expenditure heads:

    - Labour, Raw Material, Fixed Assets, etc,

    - Remuneration to technicians & managerial personnel

    Dealing with Inflation

    Build into each Cash Flow element estimated rate of inflation on the basis of information available

    Role of Venture Capitalist

    Venture Capitalist fills this gap by providing Value Added Finance

    What is Venture Capital

    Spirit of partnership

    - Alignment of interest

    Active participation and Value Addition

    Long term perspective Returns linked to performance

    Risk - Reward sharing

    Investment and not Assistance

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    42/67

    PROJECT MANAGEMENT Anant Dhuri

    42

    Approaching Venture Capital

    1. Evolve Long Term Growth Strategy

    Strong Value Proposition

    - High probability of Commercialization

    Scalable Business Model

    2. Prepare well thought-out Business Plan

    Business Focus & Growth Strategy

    Milestones Realistic Projections

    Exit Options

    3. Prepare to dilute

    Owning Large Part of a Small Business or Small Part of a Large one

    4. Select a Partner (Strategic / VC) that

    Shares Vision and Objective

    Provides Strategic Inputs & Complementary Relationship

    BUSINESS PLAN - WHAT VCFs LOOK FOR

    SIMPLE -CLEARLY HIGHLIGHTING :

    CORE STRENGTHS

    Promoters & Team Value Proposition, Competitive Advantage

    Key Customers, Market, Growth Potential

    GROWTH PLANS

    STRATEGY & TIME FRAME TO ACHIEVE SET MILESTONES

    FUND REQUIREMENTS & DEPLOYMENT PLAN

    REALISTIC FINANCIAL PROJECTIONS

    Exit Options

    Investment criteria

    a) Risk Analysis

    1. Promoters Background / Quality of Management

    Vision Experience

    Ability to Innovate / Change Rapidly

    Ability to Build Team

    Marketing and Branding Skills

    2. Product / Service / Idea

    Product Concept / Value proposition

    Stage of Development / Level of Acceptance

    Competitive Advantage and its sustainability / Entry Barrier

    Scalability

    3. Valuation

    Revenue Model

    IPR

    Customer Base

    4. Exit Options

    Trade Sale

    Merger

    IPO

    b) Value Addition

    Implementation of Business Plan

    - Using Network

    - Team Building

    - Resource Planning

    Implementation of systems

    Evolving Growth Strategy Provide Outside View

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    43/67

    PROJECT MANAGEMENT Anant Dhuri

    43

    VC Expectation Post Investment

    Transparency / Corporate Governance

    Openness to Constructive suggestions

    Growth Appetite

    - Organic / Non Organic Growth

    Build Team

    Build System

    Preparedness to dilute and facilitate Exit

    Social Cost Benefit Analysis (SCBA)

    Urgency to fulfill long-term interest of the nation

    Planning Commission decided to include social rate of return in feasibility study in case of public sector projects

    Private Sector projects may be easily acceptable to Govt. institutions while granting various licenses &

    approvals

    A project with monetary loss but social benefit may be acceptable.

    Indicators of Social Desirability

    Employment Potential Criterion

    Capital Output Ratio

    Value added per unit of capital

    Foreign Exchange benefit criterion Cost benefit ratio criterion

    Relationship

    Among employees

    Between management, executives and work force

    With financial institutions, banks and suppliers of capital

    - customers

    - competitors

    - government bodies

    - suppliers of resources

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    44/67

    PROJECT MANAGEMENT Anant Dhuri

    44

    8. SOURCES OF FUNDING

    Learning Objectives

    Strategic policy objectives in setting up projects

    Investment strategies

    Tactical objectives

    Sources of funding

    Introductory Comments

    Setting up a project typically requires substantial investment

    financial implications must be addressed well in advance

    we will look at the likely costs of such projects

    focus on ideas which are most critical

    I. INVESTMENT STRATEGIES

    Private ventures range in size from large, vertically integrated firms to small backyard operations

    single common element: profit

    investment decisions vary depending upon scale

    large companies usually look at long-term trends, look at product life cycles sometimes invest in unprofitable pilot projects in order to receive better future return

    II. TACTICAL DEVELOPMENT OBJECTIVES

    Often specified with respect to desired rate of return (ROI)

    other criteria used: net profit before taxes, cash flows, net present value

    returns reflect the sources of and cost of the capital employed:

    the cost of risk venture capital or equity depends upon return expected by shareholders

    1. DEBT: EQUITY

    Cost of funds borrowed from a funding/loan institution vary according to interest rates, duration, size of

    loan cost of loans is less than the cost of risk equity

    average cost of capital is dependent upon gearing ratio (debt:equity ratio)

    when interest rates are low, D/E ratio is high

    equity-based companies do better when interest rates are high

    2. RATE OF RETURN

    What is an appropriate rate of return?

    Projects represents risk and are more hazardous compared to other ventures

    Hence higher returns needed to be worthwhile

    most banks look at 20-25% ROI as favorable

    other option is to assign a risk premiumof 5% over normal return

    the higher the intensity or more untried the technology, the higher the risk premium

    III. Sources of funding

    There are two basic sources of funding:

    1) Capital assistanceand

    2) private investmentcapital assistance = loans, grant aid, cash grants for developing nations, this comes from

    external loans (World Bank, Commonwealth Development Corporation, Banco International de Desarollo, etc.)

    grant aid: USAID, UNIDO, WHO, Swiss, Japanese, Norwegians developed countries: subsidies and enterprise

    grants

    1) CAPITAL ASSISTANCE

    Most loans provided are low interest rate, extended repayment, concessionary in nature high percentage of

    Asian Development Bank loans are of this type. 10% of all such loans are via the World Bank grant-aid/grants

    are not paid back, real benefit is in reducing trade imbalances (export promotion loans) assistance is oftenprovided in form of technology transfer from government

  • 7/22/2019 PROJECT MANAGEMENT - Anant Dhuri.pdf

    45/67

    PROJECT MANAGEMENT Anant Dhuri

    45

    2) CREDIT INSTITUTIONS

    Typically accessed by small borrowers

    Consist of state finance corporations, and cooperative credit societies with numerous branches

    Provide small loans promptlyminimum bureaucracy

    Some technical and marketing assistance also provided

    Briefing to borrowers on purpose and use of credit should also be provided (not often done)

    3) PRIVATE INVESTMENT Can be foreign or domestic

    private or public sale of equity (shares/stock)

    backed up by commercial financing

    venture capital or private equity

    venture capital avail