9
Project Long Tom OTTR Team Annette Collins Tom Kinnear Jeff Scott Advisor Dr. Aziz Inan Dr. Peter Osterberg Industry Representative Mr. Mike Desmith Intel February, 2006 University of Portland School of Engineering

Project Long Tom OTTR

  • Upload
    star

  • View
    24

  • Download
    0

Embed Size (px)

DESCRIPTION

Project Long Tom OTTR. Team Annette Collins Tom Kinnear Jeff Scott. Advisor Dr. Aziz Inan Dr. Peter Osterberg Industry Representative Mr. Mike Desmith Intel. February, 2006. University of Portland School of Engineering. Overview. Milestones Scorecard Prototype - PowerPoint PPT Presentation

Citation preview

Page 1: Project Long Tom OTTR

Project Long TomOTTR

TeamAnnette Collins

Tom Kinnear

Jeff Scott

AdvisorDr. Aziz Inan

Dr. Peter Osterberg

Industry RepresentativeMr. Mike Desmith

IntelFebruary, 2006University of Portland School of Engineering

Page 2: Project Long Tom OTTR

Overview

• Milestones

• Scorecard

• Prototype

• Plans

• Issues/Concerns

• Conclusions

February, 2006University of Portland School of Engineering

Page 3: Project Long Tom OTTR

Milestones

Number

Description Original 11/6/05

Previous 1/30/05

Present 2/30/06

1 Project Approval 9/13/05 9/13/05 9/13/05

2 Plan Approval 10/28/05 10/28/05 11/6/05

3 MOSIS Due 11/23/05 11/23/05 11/23/05

4 Design Release 12/9/05 12/9/05 12/9/05

5 Hardware Design Complete (All) 12/16/05 12/16/05 12/16/05

6 TOP Approval 2/24/06 2/24/06 2/24/06

7 Software Design Complete 3/3/05 3/3/05 3/3/05

8 Macro model Complete 3/10/05 3/10/05 3/10/05

9 Prototype Release 4/7/06 4/7/06 4/7/06

10 Founder’s Day 4/11/06 4/11/06 4/11/06

11 Final Report 4/21/06 4/21/06 4/21/06

February, 2006University of Portland School of Engineering

Page 4: Project Long Tom OTTR

Scorecard

ALL COMPLETED!!!• Wrote programming for CPLDs in ABEL• TOP Approved• Continued work on all programming

– Serial– Data logging

February, 2006University of Portland School of Engineering

Page 5: Project Long Tom OTTR

Additional Accomplishments

• Serial programming 95% complete

• Data logging programming 75% complete

• Sensors wired to connectors

• Solved heat problem on 5V regulator

February, 2006University of Portland School of Engineering

Page 6: Project Long Tom OTTR

7 Segment Displays

7 Segment Decoders

UART

CPLDs

Clock (4.8 KHz)

Clock (60 Hz)Sensor Voltage Regulator

+5V & +9V Voltage Regs

Heat Sync

Page 7: Project Long Tom OTTR

Plans for March

• Put ABEL programming onto CPLDs

• Complete serial programming

• Complete data logging programming

• Buy a new sensor – one broke

• Make data cable to connect bread boards

• FINISH PROJECT BEFORE

SPRING BREAK!!!

January, 2006University of Portland School of Engineering

Page 8: Project Long Tom OTTR

Concerns/Issues

• None

January, 2006University of Portland School of Engineering

OTTR’s new snake skin boots and hat provided by Team Snake!!

Page 9: Project Long Tom OTTR

Conclusions

• Completed all tasks planned for February

• +90% of project completed

January, 2006University of Portland School of Engineering