APPENDIX
I
ProjectLists
Appendix I • Project List
2004 RTP • TECHNICAL APPENDIX I - 1
Table of ContentsThe RTP is comprised of three parts: Baseline, Tier 2, and Plan. The Unconstrained projects areprovided as information only, and are not part of the financially constrained RTP.
Category Description Page
Baseline Projects programmed in the adopted 2002 RegionalTransportation Improvement Program (RTIP) that are currentlyunder construction or undergoing right-of-way acquisition,come from the first year of the RTIP or previous RTP, or havecompleted the National Environmental Policy Act (NEPA)process by December 2002. Projects are listed by county andby type (State Highways, Local Highways, Transit).
I - 2
Tier 2 The remaining projects programmed in the 2002 RTIP that arenot included in the Baseline, and additional non-RTIP projectscommitted through other programming or budget documents.Projects are listed by county and by type (State Highways,Local Highways, Transit).
I - 97
Plan Projects above and beyond Baseline and Tier 2. Projects arelisted by county.
• Major Plan projects in 5-year increments.• Arterial Projects subject to constrained funding amounts.• Grade Crossing Projects subject to constrained funding amounts.• ITS Projects subject to constrained funding amounts.
I - 161
I - 175I - 180I - 214I - 221
Unconstrained Projects above and beyond the RTP. These projects are notpart of the financially constrained RTP, but represent identifiedneeds that could be funded if additional revenues wereavailable.
I - 235
Figure I.1 – Generalized Project Framework
Baseline
Tier 2
Plan
2002RTIP
2004RTP
BASELINEIMPERIAL COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS 7400a SSAB 0 0 0 AT VARIOUS LOCATIONS IN IMPERIAL VALLEY ROADSIDE CULTURAL RESOURCE INVENTORY
20041230 EXEMPT/TRAFFIC SIGNALIZATION
IMPERIAL COUNTY IMP990811 SSAB 0 0 0 YMPO/YUMA (TEA PROJECT) BEAUTIFICATION OF INTERSTATE 8
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS imp0051G SSAB 7 1.2 6.7 NEAR CALEXICO FROM ROUTE 98 TO ROUTE 8 - 4 LANE EXPRESSWAY (FROM IMP-6800)
20041127 <OTHER>
CALTRANS 0515 SSAB 8 36.5 37.4 I-8 / IMPERIAL OVERPASS RECONSTRUCT INCLUDES PA & ED ENVIRONMENTAL WORK AND DOCUMENTATION
20050331 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS imp0021 SSAB 78 7.2 15.7 BRAWLEY BYPASS CORRIDOR -- IN AND NEAR BRAWLEY FROM 0.5 MILES SOUTH OF BAUGHMAN ROAD TO MEAD RD - 4 LANE EXPRESSWAY ON SR 86 TO 0.3 MILE OF MEAD RD. ON SR 111
20071030 <OTHER>
CALTRANS 10072 SSAB 86 41.9 0 NEAR WESTMORLAND AT KANE SPRINGS - BIOLOGICAL MITIGATION
20031231 <OTHER>
CALTRANS IMPL505 SSAB 98 0 0 LUMP SUM AT VARIOUS LOCATIONS IN IMPERIAL COUNTY, SAFETY PROJECTS (NON-CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20040530
CALTRANS 6070 SSAB 98 35.3 37.6 NEAR CALEXICO FROM EAST OF COLE RD. TO ANDERHOLT RD PASSING LANES
20021030 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 1993U SSAB 111 8 12.9 NEAR EL CENTRO FROM ROSS ROAD TO WORTHINGTON ROAD - 4 LANE EXPRESSWAY COMBINES PROJECTS 19931 AND 19932
20030201 <OTHER>
CALTRANS IMP0564 SSAB 111 8.7 13.3 NEAR EL CENTRO FROM SOUTH OF GILLETTE RD. TO NORTH OF WORTHINGTON RD. PAVEMENT REHABILITATION PRIOR TO RELINQUISHMENT AS A FRONTAGE ROAD.
20031230 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 19934 SSAB 111 12.9 17.8 NEAR EL CENTRO FROM WORTHINGTON ROAD TO KEYSTONE ROAD - 2 LANE HIGHWAY TO 4 LANE EXPRESSWAY
20031030 <OTHER>
CALTRANS 19936 SSAB 111 17.7 22.1 NEAR EL CENTRO FROM KEYSTONE ROAD TO ROUTE 78 - 2 LANE HIGHWAY TO 4 LANE EXPRESSWAY
20041030 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 2
BASELINEIMPERIAL COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
BRAWLEY 010202 SSAB 0 0 0 RECONSTRUCTION AND OVERLAY OF SHANK ROAD FROM 1500 FT EAST OF THE RAILROAD TRACKS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
BRAWLEY IMP990802 SSAB 0 0 0 H STREET RECONSTRUCTION FROM S. IMPERIAL AVE TO 8TH STREET (.3 MI ON 8TH ST.)
20021231 EXEMPT/TRAFFIC SIGNALIZATION
BRAWLEY IMP990803 SSAB 0 0 0 I STREET REHABILITATION FROM S PALM AVE TO S EASTERN AVE
20030630 EXEMPT/TRAFFIC SIGNALIZATION
BRAWLEY IMP990808 SSAB 0 0 0 BRAWLEY BICYCLE TEA BEAUTIFICATION PROJECT
20020630 EXEMPT/TRAFFIC SIGNALIZATION
BRAWLEY IMP991101 SSAB 0 0 0 D STREET RECONSTRUCTION FROM N.PALM AVE TO EASTERN AND OVERLAY FROM 10TH STREET TO PALM AVE.
20030630
CALEXICO IMP010201 SSAB 98 33.25 33.25 NEAR CALEXICO ROADWORK AND SIGNALIZATION OF THE INTERSECTION OF SR 98 AT MEADOWS AND ANDRADE AVES
20020630 EXEMPT/TRAFFIC SIGNALIZATION
CALIPATRIA IMP990809 SSAB 0 0 0 SR111 AND SR115 INTERSECTION BEAUTIFICATION; LANDSCAPING AND TOWN CLOCK - TEA PROJECT
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CALIPATRIA IMP990812 SSAB 0 0 0 MAIN STREET RECONSTRUCTION; FROM LYERLY ROAD 700 FEET EAST
20020630 EXEMPT/TRAFFIC SIGNALIZATION
EL CENTRO IMP990303 SSAB 0 0 0 PRELIMINARY DESIGN DOGWOOD RD TRAFFIC BRIDGE OVER I-8 -- ACCELERATED
20031230 EXEMPT/TRAFFIC SIGNALIZATION
EL CENTRO IMP990810 SSAB 0 0 0 BICYCLE/PEDESTRIAN/LANDSCAPING DOWNTOWN AREA - TEA PROJECT
20020630 EXEMPT/TRAFFIC SIGNALIZATION
HOLTVILLE IMP990307 SSAB 0 0 0 9TH STREET REHABILITATION BETWEEN MELON AND OLIVE STS
20020630 EXEMPT/TRAFFIC SIGNALIZATION
IMPERIAL COUNTY IMP990309 SSAB 0 0 0 VARIOUS ASPHALT CONCRETE STREET OVERLAYS
20031230 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 3
BASELINEIMPERIAL COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
BRAWLEY IMP33004 SSAB 0 0 0 BRAWLEY DIAL-A-RIDE - OPERATING ASSISTANCE
20060630 EXEMPT/TRAFFIC SIGNALIZATION
CALEXICO IMP33021 SSAB 0 0 0 CALEXICO DIAL-A-RIDE OPERATING ASSISTANCE
20060630 NON-FEDERAL/NON-REGIONAL
IMPERIAL CITY IMP33006 SSAB 0 0 0 CITY OF IMPERIAL DIAL-A-RIDE - OPERATING ASSISTANCE
20060630 EXEMPT/TRAFFIC SIGNALIZATION
IMPERIAL COUNTY IMP33000 SSAB 0 0 0 COUNTY WIDE TRANSIT SYSTEM - OPERATING ASSISTANCE
20060630 EXEMPT/TRAFFIC SIGNALIZATION
IMPERIAL COUNTY IMP33003 SSAB 0 0 0 ADA PARATRANSIT SERVICE OPERATING ASSISTANCE
20060630 EXEMPT/TRAFFIC SIGNALIZATION
IMPERIAL COUNTY IMP33023 SSAB 0 0 0 MED-EXPRESS SHUTTLE OPERATIONAL ASSISTANCE
20060630 EXEMPT/TRAFFIC SIGNALIZATION
IMPERIAL COUNTY IMP43000 SSAB 0 0 0 WEST SHORES DIAL-A-RIDE OPERATIONAL ASSISTANCE
20060630 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 4
BASELINELOS ANGELES COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS LA990921 SCAB 0 0 0 ON VARIOUS HIGHWAYS, LUMP SUM FOR SOUNDWALL
20031231 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LA962214 SCAB 1 0 0 PACIFIC COAST HIGHWAY TRAFFIC MANAGEMENT SYSTEM FROM MCCLURE TUNNEL TO TRANCAS CANYON RD TRAFFIC MAN. & BUS SPEED IMPROVEMNT(TEA21-#707)
20030630 TCM
LONG BEACH 12024 SCAB 1 3.5 0 IN LONG BEACH AT LAKEWOOD BLVD MODIFY INTERCHANGE
20020630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA974320 SCAB 1 3.6 3.6 SEPULVEDA BLVD/STATE HWY 1 WIDENING BETWEEN 92ND AND GRAND AVE: FROM 3 TO 4 LANES IN BOTH NORTH AND SOUTH DIRECTIONS INTERSECTION IMPROVEMENTS (SOUTH BAY, COG)
20021231 <OTHER>
CALTRANS LA000353 SCAB 1 8.8 9.5 WILMINGTON STREET NEAR ALAMEDA ST PCH CONSTRUCT GRADE SEPARATION PCH (PCH GRADE SEP BETWEEN COIL ST AND DOMINQUEZ CHANNEL) (ACTA) (EA# 145501, 466284) PPNO# 0012J, 2826).
20021101 <OTHER>
REDONDO BEACH
LA0C8072 SCAB 1 20.5 20.6 PCH TRAFFIC AND INTERSECTION IMPROVEMENT, FROM HERONDO ST TO CATALINA AVE. (PPNO#3126)
20051231 TCM
CALTRANS LA0C8080 SCAB 1 22.7 23.9 ROUTE 1 WIDENING BETWEEN 33RD STREET AND ROSECRANS AVENUE- TO WIDEN SEPULVEDA BLVD FROM SIX TO EIGHT LANES AND INCREASE THE LANE WIDTH. (EA# 22050, PPNO# 2947)
20060731 <OTHER>
MANHATTAN BEACH
LAOB418 SCAB 1 23.4 23.4 IN MANHATTAN BEACH - MARINE AVENUE BETWEEN SEPULVEDA BLVD (STATE ROUTE 1) AND VALLEY/ARDOMOR PEDESTRIAN AND AESTHETIC IMPROVEMENTS. (EA# 220201, PPNO #2841). STATE TEA.
20031231 TCM
EL SEGUNDO LAOB417 SCAB 1 0 24.91 IN EL SEGUNDO - SEPULVEDA BLVD (STATE ROUTE 1) -- INSTALL LANDSCAPING AND IRRIGATION
20021231 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 16602 SCAB 1 28.7 29.6 NEAR MARINA DEL REY FROM HUGHES TERRACE TO LA TIJERA BLVD, WIDEN FROM 7 TO 8 LANES, ADD LEFT TURN LANE, MODIFY SIGNALS. (2001 CFP 8104). (EA# 166021, PPNO# 0027K)
20070111 <OTHER>
CALTRANS 16601 SCAB 1 29.8 30.8 NEAR MARINA DEL REY FROM HUGHES TERRACE TO FIJI WAY - VIROUS WIDEN UP TO 4-LANE IN EACH DIRECTION VARIOUS INTERSECTION IMPROVEMENTS -- WIDENING FROM 6 TO 8 LANES. 2001 CFP 8105
20040301 <OTHER>
CALTRANS 16607 SCAB 1 30.1 30.7 NEAR MARINA DEL REY ON LINCOLN BLVD FROM JEFFERSON BOULEVARD TO FIJI WAY - WIDEN FROM 3 TO 4 THROUGH LANES IN EA. DIR., PLUS A 5TH LANE IN EACH DIR. FOR RAMP CONNECT (2001, 8106)
20030601 <OTHER>
CALTRANS 16605 SCAB 1 30.4 30.6 NEAR MARINA DEL REY AT CULVER BOULEVARD - OVERCROSSING DEMOLISH EXISTING OVERCROSSING & REPLACE WITH NEW 6-LANE OVERCROSS- ING WITH LONGER SPAN -- WIDEN FROM 4 TO 6 LANES.
20030601 <OTHER>
CALTRANS 16606 SCAB 1 30.4 0 NEAR MARINA DEL REY AT BALLONA CREEK - CONTRUCT NEW 5-LANE BRIDGE N.B. FOR 4 THROUGH LANES PLUS ONE RIGHT TURN LANE -- WIDEN FROM 4 TO 8 LANES. (EA# 166061, PPNO# 0027P)
20030601 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 5
BASELINELOS ANGELES COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES COUNTY MTA
LA000274 SCAB 2 3.6 5.9 FROM SEPULVEDA TO MORENO CONTRUCT DIVIDED PKWAY WITH TRANSIT PKWAY IMPROVEMENTS, BIKE LANES & RT. 2/405 INTERCHANGE (94CFP; CAT. 2, 210, 98STIP00027) TEA21-#1531
20031231 TCM
CALTRANS LA996376 SCAB 5 2.41 0 RTE. 5 - CARMENITA RD ACCESS IMPROVEMENTS -- RECONSTRUCT INTERCHANGE
20051231 <OTHER>
CALTRANS LA000358 SCAB 5 26.7 36.4 --- FROM ROUTE 134 TO ROUTE 170 HOV LANES (8 TO 10 LANES) (CFP 346)(2001 CFP 8355). (EA# 121801, PPNO# 0142F)
2012 TCM
CALTRANS LA0C8012 SCAB 5 27.4 28.1 I-5 WESTERN AVENUE I/C PHASE I -REALIGNMENT OF I-5 NB OFF & ON RAMPS @ WESTERN. NB EXIT RAMP BEGINS AS 2 AND WIDENS TO 4 LANES AT FLOWER ST. (EA# 1786A0, PPNO# 2120)
20050531 <OTHER>
GLENDALE 17860 SCAB 5 27.4 28.1 ON RTE 5 BETWEEN SONORA AVE AND ALLEN ST - MODIFY RTE 5/WESTERN AVE INTERCHANGE (REALIGNING THE 8 EXISTING ON & OFF RAMPS).RTE.5/WESTERN AVE ACCESS PROGRAM GLENDALE.
20060630 <OTHER>
CALTRANS LA996375 SCAB 5 30.5 31.2 RTE. 5 / EMPIRE AVE - ACCESS IMP. CONSTRUCT MODIFIED IC @ I-5 EMPIRE AVE; AUXILIARY LN N/B & S/B BETWEEN BURBANK BLVD & EMPIRE AVE. & MODIFY EXISTING STRUCTURES; -- (EA# 133501)
20041231 <OTHER>
CALTRANS LA000357 SCAB 5 36.4 39.4 --- FROM ROUTE 170 TO ROUTE 118 HOV LANES (10 TO 12 LANES) (CFP 345) (2001 CFP 8339; CFP2197). (EA# 121901, PPNO# 0158K)
2008 TCM
CALTRANS LA01344 SCAB 5 39.4 45.6 RT 5 FROM RT 118 TO RT 14 FROM 10 TO 12 LANES HOV LANES. EA# 122001, PPNO# 0162P
20050219 TCM
CALTRANS LA000359 SCAB 10 28 31.2 IN EL MONTE AND BALDWIN PARK FROM BALDWIN AVE TO ROUTE 605 HOV LANES (8+0 TO 8+2) AND TOS PROJECTS. (EA#10691. PPN0# 0295M)
2004 TCM
CALTRANS 5354 SCAB 10 28.5 29.3 IN EL MONTE FROM 0.2 MILE WEST OF SANTA ANITA TO MEEKERS ROAD - SOUNDWALL WESTBOUND SIDE. (EA# 053541, PPNO# 0296)
20021231 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LA01342 SCAB 10 31.2 33.4 RT 10 FROM RT 605 TO PUENTE AVE HOV LANES(8+0 TO 8+2). (EA# 117070, PPNO# 0306N)
2008 TCM
CALTRANS 0309S SCAB 10 33.4 37.5 BALDWIN PARK AND WEST COVINA - PUENTE AVE TO CITRUS STREET SOUNDWALL PROJECT (95 STIP-IIP) (EA# 111720, PPNO# 0309S)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LA000548 SCAB 10 33.4 37.5 FROM PUENTE TO CITRUS HOV LANES FROM 8 TO 10 LANES (C-ISTEA 77720)
2030 TCM
CALTRANS LA0B875 SCAB 10 37.5 42.4 HOV LANES FROM CITRUS TO ROUTE 57/210
2030 TCM
CALTRANS LA000543 SCAB 10 42.4 48.3 IN POMONA AND CLAREMONT FROM ROUTE 57 TO SAN BERNARDINO COUNTY LINE HOV LANE IN EACH DIRECTION (C-I: 77719; CFP 350; PPNO 00362) ALSO SOUNDWALL AND REHAB. (EA# 122401,PPNO# 0315P).
20051018 TCM
CALTRANS LA962201 SCAB 14 24.3 27.08 NEAR SANTA CLARITA, FROM RT 5 TO 126/S.F. RD HOV PROJECT (EA# 119843, PPNO# 0380G)
20031226 TCM
LOS ANGELES COUNTY MTA
LA0B411 SCAB 14 24.8 77 NORTH COUNTY SR 14 (I-5 TO KERN COUNTY LINE & I-5 FROM SR14 TOKERN COUNTY LINE) MIS PROJECT
20040731 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 6
BASELINELOS ANGELES COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS LA349 SCAB 14 31.7 33.4 SOUNDWALL ON ROUTE 14 FROM HUMPHREYS OVERHEAD TO SAND CANYON ROAD, MITIGATION FOR HOV PROJECT
20021230 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LA01348 SCAB 14 44 54.5 --- RT 14 FROM ESCONDIDO CYN RD. TO PEARBLOSSOM HWY HOV LANES (4 TO 6 LANES) ONE LANE IN EACH DIRECTION. (EA-117101, PPNO# 0389N)
2002 TCM
CALTRANS 12010 SCAB 19 1.6 0 IN LONG BEACH AT LAKEWOOD BLVD WIDEN ROADWAY, AT TURN LANES, MODIFY TRAFFIC SIGNALS (ISTEA DEMO 102 240 1108 (B) 51)
20021130 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LA963724 SCAB 30 2.4 8.3 IN LA VERNE AND CLAREMONT, FROM FOOTHILL BOULEVARD TO SAN BERNAR- DINO COUNTY LINE - CONSTRUCT 8-LANE FREEWAY INCLUDING 2-HOV LANES (12620, 12640, 12630, 10501, 17210)
20030721 TCM
PORT OF LOS ANGELES
10885 SCAB 47 2.2 0 TERMINAL ISLAND EAST OF SEASIDE TOLL PLAZA - GRADE SEPARATION/HIGH- WAY IMPROVEMENT (STIP/FCRL 437B) SR 47 EAST OF TOLL PLAZA
20020801 <OTHER>
POMONA LA0B314 SCAB 60 3.2 3.3 NEAR POMONA - INTERSECTION OF SR 71 & 60 FREEWAYS ON EAST& WEST SIDES OF SOUTH GATE AV - LANDSCAPING ON APPROX 10 ACRES OF SLOPES
20031231 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 12570 SCAB 60 22.4 25 RTE. 57/60 HOV CONNECTOR INDUSTRY FROM OLD BREA CANYON ROAD TO GRAND AVENUE - HOV DIRECT CONNECTORS AND COLLECTOR ROAD (BOTH DIRECTIONS)
2006 TCM
LOS ANGELES COUNTY MTA
LA0B412 SCAB 60 23.5 0 ROUTE 57/60 INTERCHANGE MIS 20041231 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LA0B951 SCAB 71 0.5 4.5 ROUTE 10 TO ROUTE 60 -- EXPRESSWAY TO FREEWAY CONVERSION -- ADD 1 HOV LANE AND 1 MIXED FLOW LANE . (2001 CFP 8349, TCRP #50) (EA# 210600, PPNO# 2741)
2030 TCM
CALTRANS 16931 SCAB 90 1.2 1.8 IN MAR VISTA FROM MINDANAO WAY TO CULVER BOULEVARD - CONSTRUCT UNDER- CROSSING, WIDEN CULVER BOULEVARD FROM 6 TO 8 LANES, AND MODIFY RAMPS (DREAMWORKS) (EA# 169311, PPNO# 2012A)
20070820 <OTHER>
CALTRANS 16932 SCAB 90 1.8 1.8 IN MAR VISTA AT CENTINELA AVENUE INTERCHANGE - MODIFY SIGNALS, WIDEN OFF RAMPS FROM 2 TO 3 LANES, AND RESTRIPE CENTINELLA AVENUE. (EA# 169321, PPNO# 2012B)
20030331 <OTHER>
CALTRANS 19020 SCAB 91 17.1 19.2 CERRITOS/ ARTESIA - STUDEBAKER RD TO PIONEER BLVD SOUNDWALLS
20031231 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LA98STIP4 SCAB 101 0.4 0.9 RT. 101 SOUTHBOUND IMPROVEMENTS FROM LOS ANGELES ST TO CENTER ST ELIMINATE HEWITT ST ON/OFF RAMPS & VIGNES OFF RAMP & ADD NEW ON RAMP AT GAREY STREET.
20061004 <OTHER>
LOS ANGELES COUNTY
LAOB416 SCAB 101 0.8 1.2 IN LOS ANGELES - DOWNTOWN OVER FREEWAY 101 - PEDESTRIAN BRIDGE ENHANCEMENT
20041231 TCM
CALTRANS 17850 SCAB 105 0.7 0.9 LOS ANGELES - SEPULVEDA BLVD TO NASH STREET - WIDEN N/B OFF-RAMP @ SEPULVEDA BL FROM W/B RTE 105. FROM 1 LANE TO 2 LANES. (PPNO# 2119, EA# 17850K) (IIP $7,394)
20031028 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 7
BASELINELOS ANGELES COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
TORRANCE LA0B7223 SCAB 107 3.01 0 HAWTHORNE/DEL AMO INTERSECTION; WIDEN AT THE INTERSECTION OF HAWTHRONE BLVD TO ADD 1 LANE IN EACH DIRECTION FOR TURN LANE TO REDUCE DELAY
20031231 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LA962210 SCAB 126 5.8 7.1 MAGIC MTN. PKWAY FROM I-5 TO MCBEAN PKWAY IMPROVEMENT PROJECT WIDEN EXISTING, CONV. HWY FROM 2 TO 6 LANES
20030809 NON-FEDERAL/NON-REGIONAL
CALTRANS LA98STIP8 SCAB 134 0 0 RT. 134 FROM 101/170 TO 5 CARPOOL LANE SOUNDWALL
20021231 NON-FEDERAL/NON-REGIONAL
CALTRANS 18850 SCAB 134 1.4 2.3 ON STATE RTE 134, BETWEEN PASS AVE AND CALIFORNIA ST (MEDIA DISTRICT) -- MODIFY RTE 134/HOLLYWOOD WAY I/C, NEW RAMPS RAMPS BET. HOLLYWOD WAY AND ALAMEDA (2001 CFP, 8415)
20050830 <OTHER>
CALTRANS 17870 SCAB 134 5.6 6.6 RTE 134 BETWEEN I-5 & PACIFIC AVE MODIFY 134/SAN FERNANDO RD I/C & GRADE SEP AT UPRR SAN FERNANDO/FLOW- ER (WIDEN 1 BRIDGE & 1 OFF RAMP) NON-CAPACITY INCREASING
20040420 <OTHER>
LOS ANGELES COUNTY MTA
LA0B410 SCAB 138 0 43.4 NORTH COUNTY SR 138 (I-5 TO ROUTE 14 AND ROUTE 14 TO SAN BERNADINO COUNTY LINE) MIS PROJ
20030731 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 12043 MDAB 138 43.4 46.7 IN PALMDALE FROM RTE. 14 WEST TO 30TH STREET EAST - RESTRIPE AND WIDEN ARTERIAL HIGHWAY FROM 4 TO 6 LANES. (EA# 120430,PPNO# 0694B).
20111123 <OTHER>
CALTRANS 11672 MDAB 138 43.4 48.7 IN PALMDALE @ AVENUE P-8 FROM ROUTE 14 TO 50TH STREET - ACQUISITION OF ROW FOR FUTURE RTE 138 (TIER 2 ENV NEED FULL EIR) (CFP 2212 $3540 2001 CFP 8021)(EA# 116720,PPNO# 0393F)
20111130 <OTHER>
CALTRANS 12720 MDAB 138 51.4 60.2 NEAR PALMDALE FROM AVENUE T TO LONGVIEW ROAD - WIDEN ARTERIAL HIGHWAY FROM 2 TO 4 LANES. EA# 127200, PPNO# 0694Q
20070801 <OTHER>
CALTRANS 10483 MDAB 138 60.2 63.7 NEAR PALMDALE FROM LONGVIEW ROAD TO 165TH ST. - WIDEN 2 LANE ARTERIAL HIGHWAY TO 4 LANES (PORTIONS) (2001 CFP 8417, 8417A) (EA# 104830, PPNO# 0693J)
20070802 <OTHER>
CALTRANS LA188410 MDAB 138 63.7 65.5 165TH ST. TO AVENUE W -- FROM 2 LANES TO 4 LANES. (PPNO# 2220A, EA# 188410)
20050630 <OTHER>
CALTRANS LA188420 MDAB 138 65.5 67.3 AVENUE W TO 199TH ST. -- WIDEN FROM 2 LANES TO 4 LANES. (EA# 188420, PPNO# 2220B)
20051101 <OTHER>
CALTRANS LA188430 SCAB 138 67.3 69.4 ROUTE 138 WIDENING -- 199TH ST TO RTE 18 -- WIDEN FROM 2 TO 4 LANES (EA# 188430, PPNO# 2220C).
20040630 <OTHER>
CALTRANS LA98STIP9 SCAB 170 16.6 16.9 RT. 170 FROM 101/134 TO 5 CARPOOL LANE SOUNDWALL
20021231 NON-FEDERAL/NON-REGIONAL
CALTRANS 13690 SCAB 210 32.2 32.7 IN ARCADIA FROM SANTA ANITA WEST BRIDGE TO 5TH AVENUE - SOUNDWALL WESTBOUND SIDE. (PPNO# 0756F, EA# 13690K)
20040714 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LA98STIP5 SCAB 405 0 0 RT. 405 FROM 110 TO 120TH ST CARPOOL LANE SOUNDWALL
20021231 NON-FEDERAL/NON-REGIONAL
CALTRANS 5328 SCAB 405 8.3 8.6 IN LONG BEACH FROM EAST N OF SANTA FE AVE TO ALAMEDA ST SOUNDWALLS NORTHBOUND
20041231 NON-FEDERAL/NON-REGIONAL
CARSON, CITY OF
927835SS SCAB 405 12.5 0 IN CARSON CITY AT DEL AMO BOULEVARD - NEW 6 LANE OVERCROSSING (TEA21-#1173)
20030301 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 8
BASELINELOS ANGELES COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS 11985 SCAB 405 21.5 26.3 NEAR HAWTHORNE AND CULVER CITY FROM ROUTE 105 TO ROUTE 90 - 6 LANE FREEWAY, ADD 2 HOV LANES AND SOUNDWALLS. (EA# 119851, PPNO# 0824B)
2005 TCM
CALTRANS 49160 SCAB 405 22.2 23.4 IN INGLEWOOD AT ARBOR VITAE AVENUE-CONSTRUCT SOUTH HALF OF INTER-CHANGE. EA# 491601, PPNO# 0831)
20071010 <OTHER>
CALTRANS 1178A SCAB 405 25.9 29.5 IN LOS ANGELES AND CULVER CITY FROM ROUTE 90 TO ROUTE 10 - HOV LANES (SB 5+0 TO 5+1; NB 5+0 TO 5+1 HOV) 98CTIP $ FUND NB LN, ALSO PAYS FOR SB $ DELETED FROM 96STIP
2006 TCM
CALTRANS LA195900 SCAB 405 29.2 32.1 RTE. 405 - WATERFORD AVE. TO RTE 10 - AUX LANE: LOS ANGELES - WATERFORD AV. TO RTE 10 - CONSTRUCT S/B AUX LANE & S/B HOV LANE (2001 CFP 8354) (EA# 195900,PPNO# 2333)
2006 TCM
CALTRANS LA996135 SCAB 405 37 39 RTE. 405 N/B MULHOLLAND TO VENTURA BLVD. AUX. LANE NORTHBOUND. (EA# 191001, PPNO# 2242).
20050802 <OTHER>
CALTRANS 20120K SCAB 405 38.7 39.4 IN LOS ANGELES ON ROUTE 405/101 CONNECTOR GAP CLOSURE (2001 CFP 7248, 2001 CFP 8347) (EA# 20120K, PPNO# 2336)
2007 <OTHER>
CALTRANS LA8STIP10 SCAB 405 39 0 RT. 405 FROM 101 TO 5 CARPOOL LANE SOUNDWALL
20021231 NON-FEDERAL/NON-REGIONAL
CALTRANS LA996136 SCAB 405 39 39.4 RTE. 405 N/B FROM VENTURA BLVD. TO S/B 101 KESLER AVE.(WIDEN RAMP TO ADD LANE) CONNECTOR WIDENING (EA# 191300,PPNO# 2244)
20041124 <OTHER>
CALTRANS 05357 SCAB 405 41 42.4 LOS ANGELES VICTORY BLVD TO SHERMAN WAY SOUNDWALLS REPLACEMENT PLANTING (NB & SB) (EA# 0535A1, PPNO# 0866).
20030210 EXEMPT/TRAFFIC SIGNALIZATION
LONG BEACH LA960190 SCAB 605 1.6 2.1 I-605 AT CARSON STREETRECONFIGURATION OF ON AND OFF RAMPS IN BOTH DIRECTIONS AND INTERCHANGE RECONFIGURATION TO ACCESS NEW RETAIL CENTER
20021231 NON-FEDERAL/NON-REGIONAL
CALTRANS LA0B952 SCAB 710 0 0 ROUTE 710 CORRIDOR STUDY BETWEEN ROUTE 60 AND THE PORT OF LONG BEACH & LOS ANGELES
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 17190 SCAB 710 21.9 22 BETWEEN ATLANTIC BLVD AND BANDINI BLVD -- UNDER CROSSINGS -- PHASE I MODIFY I/C AND RELOCATATE i-710 N/B ON RAMP & EXTEND S/B ON RAMP @ ATLANTIC & N/B OFF RAMP @ BANDINI BLVD.
20021231 <OTHER>
CALTRANS 2009 SCAB 710 26.5 32.7 NEAR SOUTH PASADENA FROM ROUTE 10 TO ROUTE 210 - PARTIAL RIGHT OF WAY FOR NEW 6 LANE FREEWAY WITH 2 HOV LANES
20021231 TCM
CALTRANS 18790 SCAB 710 26.5 32.7 RTE 10 TO DEL MAR BLVD OVERCROSSING FOR THE 710 FWY -- PROPOSES WORK ON THE ENVIRONMENTAL CLEARANCE ISSUES & TO FUND INITIAL DESIGN WRK. (EA# 187901, PPNO# 2215) (IIP)
20040810 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LA9918770 SCAB 710 26.7 32.1 RTE. 710 - RTE 10 TO RTE 210 - INTERIM IMPROVEMENT. ALSO, LA, ALHAMBRA, SOUTH PASADENA, - RTE 10 TO RTE 210 - INTERIM TRAFFIC IMPROVEMENTS. (IIP). EA# 187701, PPNO# 2213
20040730 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 9
BASELINELOS ANGELES COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS 0219N SCAB 710 29.4 31.8 FROM BONITA DR TO CALIFORNIA BLVD REPAIR HISTORIC BUILDINGS, (RIGHT OF WAY ONLY). (EA# 0200A1, PPNO# 0219N).
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 0200A SCAB 710 29.4 31.8 NEAR SOUTH PASADENA FROM ROUTE 10 TO ROUTE 210 - REPAIR AND PRESERVATION OF HISTORIC BUILDINGS. (EA# 0200A1, PPNO# 0219N)
20040630 <OTHER>
CALTRANS LA000555 SCAB 999 0 0 TOS #3 RT.110 RT.405/RT.5 RT.605 ORA CO LINE/RT.105 RT.605 RT.105/RT.10 RT.605 RT.10/RT.210 (C-ISTEA 77723)
20021031 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LALS01 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN LOS ANGELES COUNTY, SAFETY PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL FUNDS AND STATE FUNDS)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LALS02 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN LOS ANGELES COUNTY, ROADWAY PRESERVATION PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL AND STATE FUNDS)
20030630 <OTHER>
CALTRANS LALS03 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN LOS ANGELES COUNTY, ROADSIDE PRESERVATION PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS).
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LALS04 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN LOS ANGELES COUNTY, BRIDGE PRESERVATION PROJECTS PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL FUNDS OR STATE FUNDS)
20060630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LALS06 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN LOS ANGELES COUNTY MOBILITY PROJECTS (NON CAPACITY TYPE PROJECTS AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 10
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
AGOURA HILLS LA0B7058 SCAB 0 0 0 CITY OF AGOURA HILLS SIGNAL SYNC PROJECT.INSTALL CENTRAL TRAFFIC SYS, HARDWARE, WIRELESS INTERCONNECT COMM & VEHICLE VIDEO DETECTION SYS ALONG KANAN, THOUSAND OAKS & REYES ADOBE RD
20041231 EXEMPT/TRAFFIC SIGNALIZATION
AGOURA HILLS LA990362 SCAB 0 0 0 CITYWIDE STREET AND BIKE PATH PROJ (T21-939). US 101 REGIONAL BIKE LANE GAP CLOSURE. TCSP
20030630 TCM
AGOURA HILLS LA996343 SCAB 0 0 0 U.S. 101 FWY/KANAN RD. INTERCHANGE IMPROVEMENTS
20040630 <OTHER>
ALHAMBRA LA0C8024 SCAB 0 0 0 GARFIELD AV WIDENING AT GLENDON WAY. ON EASTSIDE OF GARFIELD FRM I-10 W/B OFFRAMP WIDEN RAMP 1 LN TO APPRX 600' N. OF GLENDON. PROVIDES ADDT'L LNE FOR TRAFFIC MERG ONTO GARFIELD
20070630 <OTHER>
ALHAMBRA LA0C8026 SCAB 0 0 0 FREMONT AVE WIDENING AT E/B I-10. WIDEN EAST SIDE OF FREMONT FROM I-10 E/B OFF-RAMP TO HELLMAN AVE TO PROVIDE TRAFFIC MERGING ONTO HELLMAN. WIDEN RAMP 1 LANE.
20070630 <OTHER>
ALHAMBRA LA927107 SCAB 0 0 0 ON FREMONT AVE FROM COMMONWEALTH RD TO VALLEY BL -- ADD SOUTHBOUND THROUGH LANE AND RIGHT TURN LANE
20021231 <OTHER>
ALHAMBRA LA990356 SCAB 0 0 0 MISSION RD RECONSTRUCTION & WIDEN FROM 1ST ST TO EAST C/L (TEA21#-654) -- FROM 2 TO 5 LANES IN EACH DIRECTION (3,000 FT)
20030530 <OTHER>
ALHAMBRA LA996337 SCAB 0 0 0 RECONSRTUCT AND WIDEN MISSION ROAD BET. 1ST AND EASTERLY CITY LIMITS.
20040630 NON-FEDERAL/NON-REGIONAL
ALHAMBRA LAOB7057 SCAB 0 0 0 INSTALLATION OF "SHARED ARTERIAL FIBER TRUNK" ALONG FREMONT AVE.BETWEEN I-210 & I-10. INC ALHAMBRA RD SOUTH TO I-10.CONNECT WITH SGV TRAFFIC FORUM SIGNAL SYNC PROJECT.
20021231 EXEMPT/TRAFFIC SIGNALIZATION
AVALON LA996091 SCAB 0 0 0 AVALON SHUTTLE- INCREASING SERVICE FROM CABRILLO MOLE FERRY TERMINAL TO CENTRAL AREA OF CITY (NO VEHICLE PURCHASE).
20030630 <OTHER>
BALDWIN PARK LA0D42 SCAB 0 0 0 EVALUATE EXISTING CONDITIONS AND PREPARE MASTER PLAN, DESIGN GUIDELINES, PLANS/SPECIFICATIONS, CONST. DRAWINGS AND SURVEY DATA FOR MAINE AVE./DOWNTOWN/CIVIC CENTER REDESIGN PROJECT
20030630 <OTHER>
BALDWIN PARK LA996438 SCAB 0 0 0 TRANSIT EXISTING FIXED-ROUTE FEEDER SHUTTLE METROLINK FEEDER SERVICE, CURB TO CURB
20021231 <OTHER>
BELLFLOWER LA996092 SCAB 0 0 0 PARKING DEMAND PROGRAM IMPLEMENT PRKING ORDINANCE, IMPROV ARTERIAL STREETS W/ GEOMETRIC IMPRVMENTS
20021231 <OTHER>
BEVERLY HILLS LA0B7110 SCAB 0 0 0 SIGNAL SYNC ON ROADWAYS FUNCTIONING AS ARTERIAL.5 CRITICAL SIGNALIZED INTERSECTIONS ON MAJOR ARTERIALS. EQUIPMENT UPGRADE AND INTERCONNECTION AMONG INTERSECTIONS AND CITY'S CENT
20031231 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 11
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
BEVERLY HILLS LA974253 SCAB 0 0 0 SUNSET BLVD SIGNAL SYNCHRONIZATION PROJECT CONSTRUCTION OF SIGNAL INTERCONNECT UPGRADE OF FOUR INTERSECTIONS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
BURBANK LA000443 SCAB 0 0 0 BARHAM BLVD FROM CAHUENGA BLVD TO ROUTE 134 WIDEN FROM 4 TO 6 LANES
20040601 <OTHER>
BURBANK LA000789 SCAB 0 0 0 BURBANK-GLENDALE-PASADENA AIRPORT INTERMODAL GROUND ACCESS LINK PROJECT STUDY
20021231 EXEMPT/TRAFFIC SIGNALIZATION
BURBANK LA0B7056 SCAB 0 0 0 BURBANK MEDIA DISTRICT ITS PHASE I & II. REAL-TIME ROUTE GUIDANCE WITH CMS AT KEY INTERSECTIONS. WITH HOLLYWD WAY & OLIVE AVE, IT WILL FORM CONTINUOUS SYS FROM SR134 TO I-5
20031231 EXEMPT/TRAFFIC SIGNALIZATION
BURBANK LA960143 SCAB 0 0 0 MAGNOLIA BLVD MARIPOSA ST TO CLYBOURN AVE TRAFFIC SIGNAL CORRDINATION INTERCONNECT
20021231 EXEMPT/TRAFFIC SIGNALIZATION
BURBANK LA996168 SCAB 0 0 0 TRANSIT CTR. STAT LANDSCAPING LANDSCAPE NEW PARCEL CREATED BY REALIGNMENT OF FRONT STREET
20021231 EXEMPT/TRAFFIC SIGNALIZATION
BURBANK LA996371 SCAB 0 0 0 BURBANK BLVD./VICTORY BLVD. INTERSECTION REALIGNMENT
20030630 <OTHER>
CALABASAS LA974100 SCAB 0 0 0 U.S. 101 INTERJURISDICTIONAL BIKELANE GAP CLOSURE CONSTRUCTION 4.5 MILES OF BIKEWAY IMPROVEMENTS TO CLOSE SEVERAL GAPS WITHIN A 12 MILE CORRIDOR(TEA21-#69)
20031231 TCM
CALABASAS LA974346 SCAB 0 0 0 OLD TOWN CALABASAS ROAD IMPROVEMENT BETWEEN PARK GRANADA AND MULHOLLAND DRIVE (WIDEN & SAFETY PRJ) WIDENING FROM 2 TO 2 LANES
20021231 NON-FEDERAL/NON-REGIONAL
CALABASAS LA990924 SCAB 0 0 0 CALABASAS TRAIL USDOT RECREATIONAL TRAIL PROGRAM
20021231 EXEMPT/TRAFFIC SIGNALIZATION
CALABASAS LA996323 SCAB 0 0 0 CALABASAS REGIONAL TRAFFIC CENTER
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CALIF DEPARTMENT OF PARKS & RECREATION
LA9911111 SCAB 0 0 0 BALLONA CREEK TRAIL - IIMPROVE AND DEVELOP PUBLIC ACCESS POINTS, STAGING AREAS, TRAIL HEAD, SAFETY LIGHTING AND LANDSCAPING ALONG FOUR MILES OF TRAIL
20030630 <OTHER>
CALIF DEPARTMENT OF PARKS & RECREATION
LA9911112 SCAB 0 0 0 CALABASAS/COLD CREEK TRAIL - ACQUISITION OF A 40 ACRE PARCEL AS PART OF THE CONTINUING EFFORT TO PLACE THE ENTIRE TRAIL IN PUBLIC OWNERSHIP
20031231 <OTHER>
CALIF DEPARTMENT OF PARKS & RECREATION
LA9911113 SCAB 0 0 0 FLINT WASH TRAIL - CONSTRUCTION OF A BRIDGE ACROSS FLINT WASH - TRAIL USE ONLY.
20031231 <OTHER>
CALIF DEPARTMENT OF PARKS & RECREATION
LA9911114 SCAB 0 0 0 TOPANGA LOOKOUT TRAIL - ACQUISITION OF A 11.82 ACRE INHOLDING ON THE 1.5 MILE RIDGE TRAIL TO THE TOPANGA LOOKOUT.
20031231 <OTHER>
CALIF DEPARTMENT OF PARKS & RECREATION
LA9911115 SCAB 0 0 0 INDIAN CANYON TRAIL HEAD AND RESTROOM FACILITY - DEVELOP TRAIL HEAD INCLUDING PAVED PARKING LOT. PURCHASE AND INSTALL SWEET SMELLING TOILET (SST).
20021130 <OTHER>
CALTRANS LA0B420 SCAB 0 0 0 IN VAN NUYS - MULTIMODAL TRANSPORTATION CENTER - PEDESTRIAN IMPROVEMENTS AND LANDSCAPING
20021231 TCM
2004 RTP * TECHNICAL APPENDIX I - 12
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS LA962216 SCAB 0 0 0 TOPANGA CANYON BLVD. BIKE LANE (96 CFP PROJ) CLASS II (RESTRIPE TO ADD LANE_- 7 MILES)
20030630 TCM
CARSON, CITY OF
LA960163 SCAB 0 0 0 ARNOLD CENTER ROAD BETWEEN CARSON ST & DOMINGUEZ ST CLOSURE OF DOMINGUEZ ST & REPLACEMENT W/ CONNECTOR ROAD
20021231 NON-FEDERAL/NON-REGIONAL
CARSON, CITY OF
LA960166 SCAB 0 0 0 SEPULVEDA BLVD ALAMEDA TO EAST CITY LIMITS STREET WIDENING, MEDIAN ISLANDS WIDEN FROM 2 LANES TO 4 LANES
20020701 <OTHER>
CARSON, CITY OF
LA960167 SCAB 0 0 0 SEPULVEDA BLVD @ALAMEDA BLVD, SPRR & SEPULVEDA GRADE SEPARATION
20021231 <OTHER>
CLAREMONT LA996349 SCAB 0 0 0 WIDEN A PORTION OF TOWNE AVE, BET. BASE LINE RD (RTE. 30) AND FOOTHILL BLVD. (RTE. 66), FROM ONE SOUTHBOUND LANE TO TWO SOUTHBOUND LANES (400 FT)
20021231 <OTHER>
COMMERCE 927108 SCAB 0 0 0 ALAMEDA CORRIDOR IN COMMERCE AT ATLANTIC BOULEVARD AND TELEGRAPH ROAD - INTERSECTION IMPROVEMENTS
20021231 TCM
COMPTON LA996297 SCAB 0 0 0 TMOC & RETROFIT OF CITY TRAFFIC SIGNAL SYSTEM (TEA21-#940)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
COMPTON LAOB7326 SCAB 0 0 0 COMPTON CREEK BIKEWAY EXTENSION - PHASE III.DESIGN & CONSTRUCT .6 MI OF CLASS 1 BIKE/PED PATH FROM GREENLEAF BLVD TO ARTESIA FWY.WILL INC BIKE PATH, PED WALKWAY SIGNAGE, STRIPING
20050630 TCM
CULVER CITY LA974255 SCAB 0 0 0 JEFFERSON BLVD ATSAC GAP CLOSURE UPGRADE 12 SIGNALIZED INTERSECTIONS PROVIDE FOUR CCTV CAMERAS FIBER OPTICS INSTALLATION
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CULVER CITY LA996329 SCAB 0 0 0 VIDEO SURVEILLANCE INTEGRATION GAP CLOSURE: INSTL TEN MONITORING CAMERAS AT STRATEGIC INTERSCTNS. TO MONITOR EXISTING AND FUTURE TRAFFIC CONDITIONS.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
DOWNEY LA0B7051 SCAB 19 7.8 12.3 LAKEWOOD BLVD SIGNAL INTERCONNECT (FIBER OPTIC COMMUNICATION SYSTEM). INTEGRATION OF SYSTEM WITH TOC.INSTALLATION OF VIDEO EQUIPMENT. APPROX 18 SIGNALS.
20030731 EXEMPT/TRAFFIC SIGNALIZATION
DOWNEY LA0B7052 SCAB 0 0 0 FIRESTONE BLVD. SIGNAL INTERCONNECT (FIBER OPTIC COMM. SYS) CONNECTS 14 SIGNALS ON 2.9 MILE SEGMENT & BE PRIMARY E-W FIBER TRUNK LINE BETWN OLD RIVER SCHOOL RD STEWART & GRAY RD
20030731 EXEMPT/TRAFFIC SIGNALIZATION
EL SEGUNDO LA0C8079 SCAB 0 0 0 NASH ST/DOUGLAS ST ONE-WAY TO TWO-WAY CONVERSION. CONVERT ONE-WAY COUPLET SYSTEM TO A TWO-WAY STREET.
20060731 <OTHER>
EL SEGUNDO LA996330 SCAB 0 0 0 SBCOG - DOUGLAS ST. GAP CLOSURE/RAILROAD GRADE SEPARATION
20040630 <OTHER>
GLENDALE LA960149 SCAB 0 0 0 ARROYO VERDUGO TRAFFIC FORUM ATIS IMPLEMENT 14 KIOSKS AT KEY LOCATION WITHIN THE ARROYO VERDUGO TRAFFIC FORUM
20021231 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 13
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
GLENDALE LA974377 SCAB 0 0 0 AVTF REGIONWIDE INCIDENT MANAGEMENT STRATEGIES FUNDING FOR CCTV SYSTEM CHANGEABLE MESSAGE SIGNS DIVERSION PLANS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
HAWTHORNE LA0C73 SCAB 0 0 0 118TH ST-INGLEWOOD AVE TO PRAIRIE AVE RECONSTRUCTION OF ROADWAY AND DRAINAGE IMPROVEMENTS. NO CAPACITY INCREASE.
20030930 EXEMPT/TRAFFIC SIGNALIZATION
HERMOSA BEACH
LA974080 SCAB 0 0 0 RE-ROUTE HERMOSA BIKEWAY TO STRAND AND RECONSTRUCT BIKEWAY PROJECT WILL RELOCATE THE BIKEWAY FROM HERMOSA AVE TO STRAND AND THERBY ALLEVIATE CONGESTION
20031231 <OTHER>
INGLEWOOD LA000170 SCAB 0 0 0 ARBOR VITAE STREET FROM LA BREA TO ROUTE 405 PHASE II WIDENING FROM 2 TO 4 LANES WITH A LEFT TURN LANE.
20020601 <OTHER>
INGLEWOOD LA0C8003 SCAB 0 0 0 WIDENING OF LA CIENEGA BLVD-VESTA ST TO INDUSTRIAL AVE. ADD A RIGHT-TURN LANE ON LA CIENEGA NRTHBND BET. VESTA & INDUSTRIAL, ALLOW SEGREGATION OF ACCELERATING & DECELERATING TRAFFC
20070430 <OTHER>
INGLEWOOD LA0C8135 SCAB 0 0 0 INGLEWOOD ITS DEPLOYMENT AND INTEGRATION PROJECT. CITYWIDE IMPLEMENTATION AND INTEEGRATION OF VARIOUS ITS TECHNOLOGIES AND ELEMENTS.
20070331 EXEMPT/TRAFFIC SIGNALIZATION
LANCASTER LA0B002 MDAB 0 0 0 IMPROVE AVE I/SR-14 INTERCHANGE BY WIDENING AVE I FROM 4 TO 6 LANES, MODIFYING EXISTING ON AND OFF RAMPS TO SR-14. AND ADDING A NEW RAMP. NOT 2000 CTP
20050630 TCM
LANCASTER LA0B7321 SCAB 0 0 0 SIERRA HIGHWAY BIKEWAY-GAP CLOSURE/SIERRA HWY FROM AVE M TO AVE J-2 (2.8 MILES) ADD A CLASS I BIKEWAY
20031231 <OTHER>
LANCASTER LA960113 MDAB 0 0 0 AVENUE M 10TH STREET EAST TO 10TH STREET WEST SIGNAL SYNCHRONIZATION
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LANCASTER LA9708289 MDAB 0 0 0 AVE G, FROM RT 14 TO 25TH ST WEST WIDEN FROM 2 TO 4 LANES (0.2 MIME) (TOTAL 4 LANES BOTH DIR)
20021231 <OTHER>
LANCASTER LA990363 MDAB 0 0 0 AVE H & SR 14 INTERCHANGE IMPROVE. WIDEN AVE H FROM 2 TO 7 LANES FROM 2OTH ST. WEST TO 25TH ST WEST (TEA21-#987)
20030630 <OTHER>
LANCASTER LA9910001 MDAB 0 0 0 AVE E FROM 120th EAST TO 140th ST ES, 140th ST. EST FROM AVE E TO AVE G, AND AVE G FROM 14Oth ST EAST TO 22Oth ST EAST. CONST 8 LANES FOR ACCESS TO PROP. SPACEPORT AT EDWARDS AFB.
20050630 <OTHER>
LANCASTER LA9910005 MDAB 0 0 0 AVENUE G FROM SR-14 TO 50TH STREET WEST - WIDEN FROM 2 TO 6 LANES (3 MILES).
20030630 <OTHER>
LANCASTER LA9910006 MDAB 0 0 0 50TH ST EAST FROM AVE M TO AVE D - WIDEN FROM 2 TO 4 LANES FOR ACCESS TO PROPOSED SPACEPORT AT EDWARDS AFB (9 MILES).
20040630 <OTHER>
LANCASTER LA9910007 MDAB 0 0 0 AVE D FROM SR-14 TO 120TH ST EAST AND 120TH ST EAST FRM AVE D TO AVE B - WIDEN FROM 2 TO 8 LANES FOR ACCESS TO PROPOSED SPACEPORT AT EDWARDS AFB (15.5 MILES)
20050630 TCM
2004 RTP * TECHNICAL APPENDIX I - 14
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LANCASTER LA996334 MDAB 0 0 0 WIDEN AVE H OVRCRSNG, AMARGOSA BRDGE, AVE H FROM 20TH TO 25TH ST. AND MOD SR-14 RAMPS TO ACCOM 3 LNS IN EACH DIRECTION (1/2 MI)
20021231 <OTHER>
LAWNDALE LA996356 SCAB 0 0 0 SBCOG/LAWNDALE (LEAD AGENCY) HAWTHORNE BLVD. IMPROVEMENTS: ELIM. EXISTING GAP BY DEMO. & REMOVING THE EXTRA-WIDE FOR-PARKING MEDIAN ISLANDS.
20030630 <OTHER>
LOMITA LA0B213 SCAB 0 0 0 LOMITA BLVD. BETWEEN CRENSHAW AND PENNSYLVANIA WIDENING FROM FOUR TO SIX LANES
20040630 NON-FEDERAL/NON-REGIONAL
LOMITA LAOB421 SCAB 0 0 0 IN LOMITA - PACIFIC COAST HIGHWAY - INSTALL STAMPED CONCRETE PARKWAY AND LANDSCAPE PLANTING
20021231 <OTHER>
LONG BEACH LA000440 SCAB 0 0 0 OCEAN ALMITOS GRADE CROSSING 20030630 <OTHER>LONG BEACH LA0C8163 SCAB 0 0 0 BIKEWAY AND PEDESTRIAN
IMPROVEMENTS. 1.2 MILE CLASS I BIKE/PED PATH FROM WALNUT AVE TO WILLOW ST AT THE BLUE LINE STATION.
20051231 TCM
LONG BEACH LA960150 SCAB 0 0 0 SPRING ST PH. II - LONG BEACH_BLVD TO 300' E/O ATLANTIC AVE WIDEN ROADWAY WIDEN 2 TO 4 LANES
20031231 <OTHER>
LONG BEACH LA996085 SCAB 0 0 0 COMMUNITY KIOSK NETWORK -II UPDATE INFO ON ADV. INTERACTIVE TRAVLR INFO. KIOSK NETWORK
20031231 <OTHER>
LONG BEACH LA996322 SCAB 0 0 0 DWNTWN. SHORELINE DR. TRAFFIC MGMT. SYSTEM: DEPLOYMENT OF ITS ELEMENTS IN THE DWNTWN AREA TO RESPOND TO SPECIAL GENERATOR TRAFFIC.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
46738 SCAB 0 0 0 SAN GABRIEL AREA PILOT PROJET AT VARIOUS LOCATIONS - SYNCHRONIZED SIGNALS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
927064 SCAB 0 0 0 NEAR MARINA DE REY (DREAMWORKS) AT CENTINELA, SEPULVEDA, JEFFERSON, AND CULVER BOULEVARDS - LOCAL ROAD IMPROVEMENTS
20031231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY
927109 SCAB 0 0 0 IN EL SEGUNDO AND HAWTHORNE AT ROSECRANS AVENUE AND AVIATION BLVD #NAME? RAILROAD OVERPASS FOR ADDITIONAL TURN AND THROUGH LANES
20030630 <OTHER>
LOS ANGELES COUNTY
LA000192A SCAB 0 0 0 TRAFFIC SIGNAL SYCRONHIZATION & INTERCONNECT SIGNAL COORDINATION & TIMINGS AT VARIOUS LOCATIONS PHASE I AND II (95 RECER CAT 7; DB/MB; VB/HB)
20020630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA000373 SCAB 0 0 0 AVIATION BLVD FROM MANHATTAN BEACH BLVD TO ARBOR VITAE WIDEN FROM 4 TO 6 LANES
20040601 <OTHER>
LOS ANGELES COUNTY
LA002033 SCAB 0 0 0 ALEMEDA STREET DEL AMO TO RTE 91 (NO SYNCHRONIZATION; PLUS T21-834) WIDEN FROM 4 TO 6 LANES. CONSTRUCT GRADE SEPERATION, INSTALL TS.
20030630 <OTHER>
LOS ANGELES COUNTY
LA002633 SCAB 0 0 0 THOMPSON CREEK BICYCLE TRAIL (93/97 CFP; BIKE PROGRAM) CLASS I (2 MILES)
20030630 TCM
LOS ANGELES COUNTY
la0b414 SCAB 0 0 0 NEAR PASADENA - ARROYO SECO PARKWAY -- SCENIC BEAUTIFICATION OF HISTORIC CORRIDOR
20031231 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 15
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES COUNTY
LA0B7050 SCAB 0 0 0 GATEWAY CITY FORUM/CARSON STREET SIGNAL SYNCHRONIZATION-VARIETY OF MULTI-JURISDICTIONAL TRAFFIC SIGNAL IMPROVEMENT, INCREASE MOBILITY AND RELIEVE EXISTING CONGESTION ON CARSON
20031130 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA0B7288 SCAB 0 0 0 GRAND AVE. REALIGNMENT AND PEDESTRIAN ENHANCEMENTS-GRAND AVENUE BETWEEN TEMPLE AND SECOND STREET; CONSTRUCTION OF A TWO BLOCK REALIGNMENT OF GRAND AVENUE IN DOWNTOWN L.A
20031231 TCM
LOS ANGELES COUNTY
LA0C8179 SCAB 0 0 0 GRAND AVE RALIGN & PED ENHANCEMENTS-TEMPLE ST TO 300 S/O 2ND ST. STREETSCAPE ENHANCEMENTS TO IMPROVE PED. CONNECTIONS BETWEEN MAJOR CULTURAL & GOVERNMENT FACILITY.
20050630 TCM
LOS ANGELES COUNTY
LA0C8316 SCAB 0 0 0 TRANSPORTATION INFORMATION PROJECT (TIP). EQUIP COUNTY EMPLOYEES AT 41 SITES THROUGHOUT LA COUNTY WITH THE TOOLS NEEDED TO PROVIDE INDIVIDUALIZED TRANSIT ITINERARIES ETC.
20051230 TCM
LOS ANGELES COUNTY
LA960017 SCAB 0 0 0 BEVERLY BOULEVARD AT POPLAR AVENUE WIDEN INTERSECTION WIDEN FROM 4 TO 6 LANES
20021231 <OTHER>
LOS ANGELES COUNTY
LA960018 SCAB 0 0 0 BEVERLY BOULEVARD MONTEBELLO BLVD TO W/O POPLAR AVE RECONSTRUCT & WIDEN WIDEN FROM 4 TO 6 LANES
20021231 <OTHER>
LOS ANGELES COUNTY
LA960019 SCAB 0 0 0 BEVERLY BOULEVARD POPLAR AVENUE TO REA DRIVE RECONSTRUCT & WIDEN WIDEN FROM 4 TO 6 LANES
20021231 <OTHER>
LOS ANGELES COUNTY
LA960021 SCAB 0 0 0 PECK ROAD OVER 605 FWY WIDEN BRIDGE WIDEN FROM 2 TO 4 LANES
20031231 <OTHER>
LOS ANGELES COUNTY
LA960022 SCAB 0 0 0 SAN FRANCISQUITO CANYON ROAD N/O POWERHOUSE #2 TO 1.8 MILES CONSTRUCT NEW TWO LANE ROAD
20070630 <OTHER>
LOS ANGELES COUNTY
LA960023 SCAB 0 0 0 SAN FRANCISQUITO CANYON ROAD CASTAIC CUTOFF TO N/O POWERHOUSE #2 CONSTRUCT NEW TWO LANE ROAD
20060630 <OTHER>
LOS ANGELES COUNTY
LA960024 SCAB 0 0 0 BEVERLY BOULEVARD OVER RIO HONDO CHANNEL BRIDGE REPLACEMENT WIDEN FROM 4 TO 6 LANES
20021231 <OTHER>
LOS ANGELES COUNTY
LA960027 SCAB 0 0 0 ALONDRA BOULEVARD BROADWAY TO LA MIRADA BOULEVARD TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20021201 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960028 SCAB 0 0 0 ATLANTIC BOULEVARD/LOS ROBLES AVE MISSION STREET TO OCEAN BOULEVARD TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20030601 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960031 SCAB 0 0 0 BELLFLOWER BOULEVARD STEWART & GRAY RD TO ANAHEIM STREET TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20031201 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960033 SCAB 0 0 0 BEVERLY BOULEVARD DOHENY DRIVE TO SAN VICENTE BLVD TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 16
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES COUNTY
LA960034 SCAB 0 0 0 CARSON STREET HAWTHORNE BLVD TO WILMINGTON AVE TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20021201 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960035 SCAB 0 0 0 COLIMA ROAD/GOLDEN SPRINGS DRIVE BREA CANYON CUT-OFF TO TEMPLE AVE TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20030630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960037 SCAB 0 0 0 EASTERN AVENUE STEVENS PLACE TO GARFIEL AVENUE TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20031201 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960038 SCAB 0 0 0 FOUNTAIN AVENUE LA CIENEGA BLVD TO LA BREA AVENUE TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960040 SCAB 0 0 0 GAGE AVENUE HOOPER AVENUE TO SLAUSON AVENUE TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20041201 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960041 SCAB 0 0 0 GARFIELD AVENUE/CHERRY AVENUE HUNTINGTON DRIVE TO OCEAN BOULEVARD TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20030630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960042 SCAB 0 0 0 IRWINDALE AVENUE GLADSTONE STREET TO BADILLO STREET TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20040401 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960043 SCAB 0 0 0 LOMITA BOULEVARD CRENSHAW BOULEVARD TO WESTERN AVE TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20040101 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960044 SCAB 0 0 0 NORMANDIE AVENUE 228TH STREET TO LOMITA BOULEVARD TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960046 SCAB 0 0 0 SAN FERNANDO RD VERDUGO AVENUE TO GLENDALE AVENUE TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960047 SCAB 0 0 0 SEPULVEDA BLVD/WILLOW STREET PALOS VERDES BLVD STUDEBAKER RD TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20020930 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960052 SCAB 0 0 0 TRUMAN STREET HUBBARD STREET TO WOLFSKILL STREET TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20031231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA960055 SCAB 0 0 0 183RD STREET STUDEBAKER RD TO MARQUARDT AVE TRAFFIC SIGNAL SYNCHRONIZATION ALL SIGNALIZED INTERSECTIONS BETWEEN PROJECT LIMITS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA962314 SCAB 0 0 0 EAST SAN GABRIEL VALLEY SOM PILOT PROJECT TRAFFIC SIGNALS INTERCONNECT PROJECT
20030601 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 17
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES COUNTY
LA962316 SCAB 0 0 0 SELAC-TRAFFIC SIGNAL SYNCH. CORRIDORS PROJECT SIGNAL SYNCH & BUS SPEED IMPROVEMENT PROJECT
20050630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA9711031 SCAB 0 0 0 CASTAIC CUTOFF FROM LAKE HUGHES RD TO SAN FRANCISQUITO CANYON RD CONTRUCT NEW ROAD 4 12-FOOT LANES AND 10-FOOT SHOULDERS
20021231 <OTHER>
LOS ANGELES COUNTY
LA974221 SCAB 0 0 0 GATEWAY CITIES TRAFFIC SIGNAL CORRIDORS PROJECT PHASE II IMRPOVE REGIONAL TRAFFIC MOBILITY REDUCE CONGESTION ALONG 7 MAJOR TRAVEL CORRIDOR
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA974242 SCAB 0 0 0 SOUTH BAY SIGNAL SYNCHRONIZATION IMPROVEMENTS PHASE III INSTALLATION OF COMMUNICATIONS INFRASTRUCTURE
20031201 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA974243 SCAB 0 0 0 WEST SAN GABRIEL VALLEY SIGNAL SOM AND BUS SPEED IMPROVEMENTS PROVIDE LOCAL INTERSECTION IMPRVMNT SIGNAL SYNCHRONIZATION PASSIVE TRABSIT PRIORITY IMPRVEMENT
20031201 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA974244 SCAB 0 0 0 SAN GABRIEL VALLEY TRAFFIC FORUM PROJECT PHASE III TRAFFIC SIGNAL SYNCHRONIZATION IMPROVEMENTS ON SELECTED ARTERIALS IN THE 12 CITY FORUM AREA
20031201 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA974245 SCAB 0 0 0 POMONA VALLEY SIGNAL SOM AND BUS SPEED IMPROVEMENTS TRAFFIC SIGNAL SYNCHRONIZATION FAIRPLEX TRAFFIC MANAGEMENT PLAN
20031101 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA990358 SCAB 0 0 0 EL SEGUNDO EMPLOYMENT CTR ITS PRJ (T21-1477)
20030530 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA990926 SCAB 0 0 0 SCHABARUM TRAIL USDOT RECREATIONAL TRAIL PROGRAM
20021231 <OTHER>
LOS ANGELES COUNTY
LA990927 SCAB 0 0 0 WALNUT CREEK BRIDGE USDOT RECREATIONAL TRAIL PROGRAM
20021231 <OTHER>
LOS ANGELES COUNTY
LA996284 SCAB 0 0 0 EL SEGUNDO AREA ITS: ATMS/ATIS TO PROVIDE FOR IMPROVED MOBILITY AND ASSIST MOVEMENT OF GOODS AND PEOPLE W/I THE PROJECT AREA
20030630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA996285 SCAB 0 0 0 SOUTH BAY BIKE TRAIL RECONSTRCT AT PLAYA DEL REY - DESIGN AND RECONSTRCT SEGMENT OF THE TRAIL AT DOCKWEILER STATE BEACH.
20050630 TCM
LOS ANGELES COUNTY
LA996288 SCAB 0 0 0 SAN GABRIEL RVR. BIKE TRAIL REHAB PHASE I - FROM WHITTIER NARROWS DAM TO FLORENCE AVE.
20050630 TCM
LOS ANGELES COUNTY
LA996289 SCAB 0 0 0 SOUTH BAY BIKE TRAIL PED. ACCESS RAMPS/SIDEWALKS - DESIGN OF RAMPS, WALKWAYS TO PROVIDE ACCESS TO THE STH. BAY TRAIL AT DOCKWEILER STATE BEACH
20080630 TCM
LOS ANGELES COUNTY
LA996292 SCAB 0 0 0 SOUTH BAY FORUM TRAFFIC SIGNAL CORRIDORS - DESIGN AND CONSTRCT. MULTIJURISDICT. TRAFFIC SIGNAL SYNCH. ON REGIONAL ARTERIALS IN THE SOUTH BAY AREA
20050630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA996293 SCAB 0 0 0 LOS ANGELES COUNTY TRAFFIC MANAGEMENT CENTER (TMC) PHII- SEISMIC ENGINEERING AND UPGRADES BECAUSE OF NEW SEISMIC CODE REQUIREMENTS
20040630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 18
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES COUNTY
LA996294 SCAB 0 0 0 SAN GABRIEL VALLEY FORUM TRAFFIC SIGNAL CORRIDORS: DESIGN AND CONSTRCT OF MULTIJURISDICT. TRAFFIC SIGNAL SYNCH. ON REGIONAL ARTERIALS IN THE SAN GAB. VALLEY AREA OF L.A. CNTY.
20050630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA996295 SCAB 0 0 0 GATEWAY CITIES TRAFFIC SIGNAL CORRIDORS PHASE III: DESIGN & CONSTRUCT MULTIJURIS. SIGNAL SYSTEM IMPROVMENTS ON REGIONAL ARTERIALS IN THE GATEWAY CITIES
20050630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA996381 SCAB 0 0 0 HASLEY CANYON/I-5 INTERCHANGE RECONSTRUCTION
20030630 <OTHER>
LOS ANGELES COUNTY
LA996383 SCAB 0 0 0 HACIENDA BLVD. REALIGNMENT -- WIDEN & REALIGN FROM GLENMARK DR TO ORANGE COUNTY LINE -- 1 TO 2 LANES IN EACH DIRECTION (2.4 MI)
20030630 <OTHER>
LOS ANGELES COUNTY MTA
46508 SCAB 0 0 0 IN LOS ANGELES, CULVER CITY, AND SANTA MONICA - CLASS I BIKEWAY ON RAILROAD RIGHT OF WAY (EXPOSITION RIGHT-OF-WAY REGIONAL BIKEWAY)
20040630 <OTHER>
LOS ANGELES COUNTY MTA
927190 SCAB 0 0 0 IN LOS ANGELES & MALIBU AT VARIOUS LOCATIONS - SIGNAL MODIFICIATION AND VIDEO DETECTION, HIGHWAY ADVISORY RADIOS, CLOSED CIRCUIT TV CAMERAS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
927333 SCAB 0 0 0 RIDESHARE ACTIVITIES 20051231 TCM
LOS ANGELES COUNTY MTA
LA000312 SCAB 0 0 0 SANTA FE SPRINGS NORWALK BLVD GRADE SEPARATION OVER SF AND SP (TEA21-#87)
2008 <OTHER>
LOS ANGELES COUNTY MTA
LA000320 SCAB 0 0 0 ATLANTIC BLVD FROM OLYMPIC TO WHITTIER WIDEN FROM 4 TO 6 LANES WITH LEFT TURN LANES
20030601 <OTHER>
LOS ANGELES COUNTY MTA
LA000487 SCAB 0 0 0 PARK AND RIDE LOT (850 SPACES) LANKERSHIM AND CHANDLER - METRO RED LINE
20020630 TCM
LOS ANGELES COUNTY MTA
LA000489 SCAB 0 0 0 PARK AND RIDE LOT (700 SPACES) UNIVERSAL CITY - METRO RED LINE
20031231 TCM
LOS ANGELES COUNTY MTA
LA000536 SCAB 0 0 0 COORDINATE INTERAGENCY MAJOR INCIDENT PROGRAM FOR FREEWAY, METRO BLUE & GREEN LINE, METROLINK INCIDENT RESPONSE
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA002279 SCAB 0 0 0 INNER CITY STUDY AREA SUBSIDIZED COMMUNITY BASED
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA002665 SCAB 0 0 0 LA COUNTY TRANSPORTATION MARKET MANAGEMENT STUDY
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA00351A SCAB 0 0 0 IMPERIAL HIGHWAY SEPARATION OVER WILMINGTON AVE/BLUE LINE GRADE SEPARATION
20030630 <OTHER>
LOS ANGELES COUNTY MTA
LA022367 SCAB 0 0 0 SOUTH BAY SIGNAL SYSTEM SYNCH PILOT PROJECT (S. BAY JPA)
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA0B0071 SCAB 0 0 0 TRANSPORTATION MUSEUM AT EL PUEBLO DE LOS ANGELES HISTORICAL MONUMENT
20021231 <OTHER>
LOS ANGELES COUNTY MTA
LA0B100 SCAB 0 0 0 LUMP SUM TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCLUDING CATEGORY 7)
20050701 <OTHER>
LOS ANGELES COUNTY MTA
LA0B7337 SCAB 0 0 0 CHANDLER BLVD ROW BIKE PATH: 170 FWY TO LA VALLEY COLLEGE-DESIGN OF 2.3 MILES OF BIKEWAY AND OPTIONAL PEDESTRIAN WALKWAY FROM 170 FWY TO LOS ANGELES VALLEY COLLEGE
20050630 TCM
2004 RTP * TECHNICAL APPENDIX I - 19
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES COUNTY MTA
LA0C8109 SCAB 0 0 0 COUNTYWIDE TRANSPORTATION SYS. AWARENESS & SATISFACTION. PROJECT WILL USE AND EXPAND UPON IT'S PREDECESSOR'S WORK, THE SERVICE PLANNING MARKET RESEARCH PROGRAM (SPMRP) FOR TRANSIT
20071230 TCM
LOS ANGELES COUNTY MTA
LA0C8111 SCAB 0 0 0 EXPANSION OF COUNTYWIDE BUS SIGNAL PRIORITY - EXPANSION OF BSP TO ADD CORRIDORS WILL ENABLE MTA TO FOCUS ON PROVIDING PRIORITY ON CORRIDORS TRAVERSING MULTIPLE JURISDICTIONS.
20061231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA0C8113 SCAB 0 0 0 ITS INVENTORY & NATIONAL ITS ARCHITECTURE MAPPING PROJECT, ENSURE CURRENT AND FUTURE TSM PROJECTS CAN BE SPECIFICALLY TAILORED TO COUNTYWIDE ARTERIAL MANAGEMENT SYSTEM.
20050630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA0C8993 SCAB 0 0 0 SYSTEM PRESERVATION NEEDS ASSESMENT STUDY-TO WORK WITH SUB-REGIONS AND IND. JURISDICTIONS TO EVA. LOCAL SYSTEM PRESERVATION & CAPACITY ENHANCING NEEDS/ISSUES.
20040330 <OTHER>
LOS ANGELES COUNTY MTA
LA0D35 SCAB 0 0 0 TSM IMPRMTS DNTOWN LOS ANGELES BETWEEN TERMINUS OF HARBOR FWY TRANSITWAY AT ADAMS BLVD & ENTRANCE TO EL MONTE BUSWAY TO IMPROVE BUS FLOW & EXPEDITE BUS TURNING MOVEMENTS.
20041231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA0D36 SCAB 0 0 0 ALAMEDA ST. CORRIDOR STUDY; DETERMINE FEASIBILITY OF UTILIZING CORRIDOR AS A BY-PASS RTE FOR HOV'S AND TRUCKS; & AN ANALYSIS OF THE I-110 FOR ENHANCED GOODS MOVEMENT (DEMO ID 043)
20030724 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA210465 SCAB 0 0 0 SO. CENTRAL LOS ANGELES EXPOSITION PARK INTERMODAL URBAN ACCESS PRJ (STATE OF CAL. DEPT. OF GEN. SERV.) RENEW /RENOVATION PARKING FACILITY IMPROVE PARK/TRAFFIC ACCESS PROGRAM
20030630 TCM
LOS ANGELES COUNTY MTA
LA29202N SCAB 0 0 0 MTA TIP ADMINISTRATION-PLANNING, PROGRAMMING AND MONITORING FOR STIP PROJECTS THROUGH OUT LA COUNTY (200 CFP 7116 STATE ONLY 3594,2001 CFP 8401)
20041231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA450021 SCAB 0 0 0 SAFETY PROJECTS LUMP SUM PROJECT CAT. 1
20021231 <OTHER>
LOS ANGELES COUNTY MTA
LA450022 SCAB 0 0 0 REHABLITATION AND RECONSTRUCTION LUMP SUM PROJECT CAT. 2
20021231 <OTHER>
LOS ANGELES COUNTY MTA
LA450023 SCAB 0 0 0 HIGHWAY OPERATION IMPROVEMENT PROJ. LUMP SUM PROJECT CAT. 3
20021231 <OTHER>
LOS ANGELES COUNTY MTA
LA450024 SCAB 0 0 0 TRANSPORATION SYSTEM BETTERMENTS LUMP SUM PROJECT CAT. 5
20021231 <OTHER>
LOS ANGELES COUNTY MTA
LA962394 SCAB 0 0 0 SOUTH BAY COG PALOS VERDES PENINSULA & TRI CITIES NEW BIKEWAY PROJ. (96 CALL) CLASS I AND CLASS II (24.8 MILES) GAP CLOSURE & IMPROVED SAFETY
20061231 <OTHER>
LOS ANGELES COUNTY MTA
LA962431 SCAB 0 0 0 CITYWIDE TRAINING & DEVELOPMENT PROGRAM FOR SIGNAL SYNC/BUS SYSTEM
20021231 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 20
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES COUNTY MTA
LA974000 SCAB 0 0 0 BICYCLE PARKING AT FACILITIES LOCKERS AND RACKS AT 20 LOCATIONS 134 BIKE RACKS AND 54 BIKE LOCKERS
20031231 <OTHER>
LOS ANGELES COUNTY MTA
LA974001 SCAB 0 0 0 REGIONAL BIKE-RACKS-ON BUSES INSTALL BICYCLE RACKS ON ALL 2,020 BUSES IN MTA'S TRANSIT FLEET
20021231 <OTHER>
LOS ANGELES COUNTY MTA
LA974012 SCAB 0 0 0 REAL TIME TRANSIT TECH PROGRAM AN EDUCATIONAL TRAINING PROGRAM A TRANSIT USAGE AND SERVICE IMPROVEMENT STUDY FOR COMMUNITY COLLEGE STUDENTS
20021231 <OTHER>
LOS ANGELES COUNTY MTA
LA974038 SCAB 0 0 0 WE CAN MOVE IT AND IMPROVE IT DEVELOP AND IMPLEMENT A MARKETING PROJECT CONSISTING OF ONE HOUR DOCUMENTARY AND A NUMBER OF PUBLIC SERVICE ANNOUNCEMENTS
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA974083 SCAB 0 0 0 CHANDLER/BURBANK BIKE PATH-WHITEOAK TO PIERCE COLLEGE A 3.2 MILE CLASS I BIKEWAY ON MTA'S CHANDLER/BURBANK RAIL RIGHT-OF-WAY WILL IMPROVE NON-MOTORIZED ACCESS (COMBINED W/LA974078)
20030630 TCM
LOS ANGELES COUNTY MTA
LA974094 SCAB 0 0 0 EL PUEBLO PED IMPROVEMENTS/GENERAL ANGELS' WALK WILL IMPROVE INTERMODAL EXCHANGES WITHIN THE 3 BLOCK AREA ADJACENT TO OLVERA STREET
20030630 <OTHER>
LOS ANGELES COUNTY MTA
LA974101 SCAB 0 0 0 MARIACHI PLAZA PEDESTRIAN IMPROVEMENTS FOR BUS SHELTER AND PED IMPROVEMENT ON PLEASANT AVE
20031231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA974124 SCAB 0 0 0 SANTA MONICA BOULEVARD TRANSIT PARKWAY TRANSIT PEDESTRIAN AND BIKEWAY IMPROVEMENTS ALONG SANTA MONICA BLVD IN WEST LOS ANGELES, SPANS 2.5
20021101 TCM
LOS ANGELES COUNTY MTA
LA974223 SCAB 0 0 0 CITYWIDE TRAINING & DEVELOPMENT PROGRAM FOR SIGNAL SYNC/BUS SYSTEM
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA974227 SCAB 0 0 0 LOS ANGELES/VENTURA REGIONAL ADVANC TRAVELER INFORMATION SYSTEM PLACE AN ADVANCED TRAVELER INFO SYSTEM (ATIS)
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA974235 SCAB 0 0 0 SIGNAL SYSTEM TECHNICIAN TRAINING PROGRAM CURRICULUM DEVELOPMENT PROGRAM AT COMMUNITY COLLEGE
20021231 TCM
LOS ANGELES COUNTY MTA
LA974294 SCAB 0 0 0 101 FREEWAY OVERCROSSING PEDESTRIAN BRIDGE OVER RTE101 BETWEEN LOS ANGELES AND MAIN STS
20021231 <OTHER>
LOS ANGELES COUNTY MTA
LA974295 SCAB 0 0 0 WESTLAKE INTERMODAL/INTERCEPT FACILITY REDUCE TRAFFIC CONGESTION INCREASE BUS TRAVEL TIME IMPROVE LEVEL OF SERVICE
20021231 <OTHER>
LOS ANGELES COUNTY MTA
LA974319 SCAB 0 0 0 INTELLIGENT TRANSPORTATION INFASTRUCTURE PROGRAM INSTALLATION OF A TRAFFIC MANAGEMNT CENTER INTERACTIVE KIOSKS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA9811096 SCAB 0 0 0 PLANNING/PROGRAMMING MANAGEMENT OF HIGHWAY FUNDS - TIP DATA BASE DEVELOPMENT
20050630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 21
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES COUNTY MTA
LA990351 SCAB 0 0 0 IMPROVE GLENDALE BLVD/FWY RT 2 STREET RECONFIG/REDSIGN, TRAFFIC MGMT. NEIGHORHOOD SAFETY MEASURES (TEA21-#413)
20030630 <OTHER>
LOS ANGELES COUNTY MTA
LA991301 SCAB 0 0 0 PROJECT ADMINISTRATION AND EVALUATION
20050630 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA991304 SCAB 0 0 0 TRANSPORTATION RESEARCH CENTER - CREATE TRANS.-DISCIPLINED MUSEUM AND RESEARCH CNTR TO PROCURE AND ACQUIRE PRINT AND NON-PRINT MATERIALS RELATING TO TRANSPORTATION.
20031231 <OTHER>
LOS ANGELES COUNTY MTA
LA991305 SCAB 0 0 0 RIDESHARE 2000/CLUB METRO- EXTEND AND EXPAND IMPLEMNT. INCNTIVE PRGM. TO ENCOURAGE USE OF ALT. MODES OF TRAVEL OTHER THAN DRIVING ALONE.
20050630 TCM
LOS ANGELES COUNTY MTA
LA996344 SCAB 0 0 0 SPRING ST. CORRIDOR JPA (LEAD AGENCY) - SPRING ST. REVITALIZATION CORRIDOR
20030630 <OTHER>
LOS ANGELES COUNTY MTA
LA996374 SCAB 0 0 0 GCCOG (LEAD AGENCY) - GOODS MOVEMENT & IMPLEMENTATION - IMPRVE INTRSCTNS THAT ARE HGLY IMPACTD: INCREASE CURB RADII, LANE WIDNG, SIGNAL ENHANCEMNTS, SIGNAGE, STRIPING 45 +31 INTRSC
20040630 <OTHER>
LOS ANGELES COUNTY MTA
LA996500 SCAB 0 0 0 SIGNAL SYSTEM TECHNICAL TRAININGS 20051231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES REDEVELOPMENT AGENCY
LA0C53 SCAB 0 0 0 HOLLYWOOD INTERMODAL TRANSPORTATION AND PUBLIC PARKING CENTER ON HAWTHORNE AVE. BETWEEN HIGHLAND AVENUE AND NORTH ORANGE DRIVE.
20041230 TCM
LOS ANGELES REDEVELOPMENT AGENCY
LA9800995 SCAB 0 0 0 IMPROVE STREETS IN CANOGA PARK AND RESEDA AREAS OF LOS ANGELES TEA21-#995, STREET LIGHTING & ELEC REWIRING ON SHERMAN WAY & PUB. ART
20040630 <OTHER>
LOS ANGELES, CITY OF
17180 SCAB 0 0 0 JEFFERSON, MARTIN LUTHER KING JR., EXPOSITION BOULEVARDS, VERNON, AND RODEO ROAD - SMART CORRIDOR ATSAC SYSTEM, SIGNAL CORRDINATION (PHASE 3) ( ATSAC - WEST ADAMS)
20020630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA000327 SCAB 0 0 0 OVERLAND AVE FROM PALMS BLVD TO REGENT STREET WIDEN FROM 2 TO 4 LANES
20021231 <OTHER>
LOS ANGELES, CITY OF
LA000331 SCAB 0 0 0 VERMONT AVE FROM NORMANDIE AVE TO ANAHEIM ST IMPROVE ALIGNMENT
20031231 <OTHER>
LOS ANGELES, CITY OF
LA000397 SCAB 0 0 0 OVERLAND AVE FROM PALMS BLVD TO WASHINGTON BLVD WIDEN FROM 2 TO 4 LANES
20020630 <OTHER>
LOS ANGELES, CITY OF
LA000513 SCAB 0 0 0 ALAMEDA STREET. FROM ROUTE 1 TO HENRY FORD WIDEN FROM 4 TO 6 LANES.(CAT2 , CFP 2144)
20031231 <OTHER>
LOS ANGELES, CITY OF
LA000515 SCAB 0 0 0 HENRY FORD AVE FROM ALAMEDA STREET TO ANAHEIM ST ROADWAY REHAB. & RECONSTRUCTION WIDENING TURN LANES (NO ADDED LANES)
20021231 <OTHER>
LOS ANGELES, CITY OF
LA000625 SCAB 0 0 0 EAST TUJUNGA WASH/L.A. RIVER BIKEWAY - PHASE 1
20030630 <OTHER>
LOS ANGELES, CITY OF
LA002738 SCAB 0 0 0 BIKEWAY/PEDESTRIAN BRIDGE OVER LA R RIVER AT TAYLOR YARD CLASS I (CFP 738, 2077)
20021231 TCM
2004 RTP * TECHNICAL APPENDIX I - 22
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES, CITY OF
LA0B7066 SCAB 0 0 0 ELYSIAN PARK AVE/SUNSET BLVD TRAFFIC MANAGEMENT SYSTEM-PROVIDE EXTRA CAPACITY FOR ELYSIAN PARK AVE NEAR DODGER STADIUM, ALLIATE CONGESTION ON BY INSTALL ELECTRONICALLY-CONTROL LANE
20030630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA0B7078 SCAB 0 0 0 LA TIJERA BL. BRIDGE WIDENING OVER I-405 -- INCLUDES ENVIRON. STUDIES & PREP. OF PLANS, SPECIFICATIONS, & ESTIMATES FOR WIDENING EXISTING LA TIJERA BL.
20030630 <OTHER>
LOS ANGELES, CITY OF
LA0B7207 SCAB 0 0 0 LOS ANGELES ST REALIGNMENT NEAR EL PUEBLO-MAINTAIN OR IMPROVE CURRENT LEVELS OF SERVICE, REDUCE DRIVERS' CONFUSION, IMPROVE DRIVER SAFETY & ACCOMMODATE PROJECTED TRAFFIC GROWTH.
20031231 <OTHER>
LOS ANGELES, CITY OF
LA0B7233 SCAB 0 0 0 PIER 400 INTERMODAL RAIL YARD-PROVIDE ON DOCK RAIL ACCESS TO THE PIER 400 CONTAINER TERMINAL IN THE PORT OF LOS ANGELES, ALLOW UP TO 50% OF THE CARGO TO BE TRANSFERRED.
20040121 <OTHER>
LOS ANGELES, CITY OF
LA0B7330 SCAB 0 0 0 SAN FERNANDO ROAD ROW BIKE PATH PHASE II-CONSTRUCT 2.75 MILES CLASS I FROM FIRST ST TO BRANFORD ST, ON MTA-OWNED ROW PARALLEL TO SAN FERNANDO RD. LINK CYCLISTS TO NUMEROUS BUS LINE
20050630 TCM
LOS ANGELES, CITY OF
LA0C8031 SCAB 0 0 0 TAMPA AVE BRDGE WIDENING. WIDEN RIVER CROSSING FROM 4 LNS TO 6 LNS ON TAMPA AVE BRDGE, CONSTRUCT BIKE PATH. GRADE SEPARATION & ADD 2 LNS.
20050630 <OTHER>
LOS ANGELES, CITY OF
LA0C8037 SCAB 0 0 0 SOTO ST BRIDGE OVER MISSION RD & HUNTINGTON DR REPLACEMENT. PROJECT WILL INCREASE TRAFFIC FLOW ABOVE & BELOW THE STRUCTURE BY ADDING A SOUTHBOUND LANE & A BIKE PATH.
20050531 <OTHER>
LOS ANGELES, CITY OF
LA0C8038 SCAB 0 0 0 LAUREL CANYON BLVD BRIDGE OVER TUJUNGA WASH WIDENING. PROJECT WILL WIDEN LAUREL CANYON BRDGE FROM 4 TO 6 LANES TO IMPROVE ITS LOS, IT WILL ALSO ADD SHOULDERS & 6 FT BIKE LANES
20071031 <OTHER>
LOS ANGELES, CITY OF
LA0C8042 SCAB 0 0 0 VANOWEN ST BRIDGE WIDENING AND REHABILITATION. PROJECT WILL WIDEN THE EXISTING BRIDGE TO MATCH THE STREET, IT WILL ALLOW INC TRAFFIC FLOW AND SAFETY. CONSTRUCT A BIKE PATH UNDER
20060731 <OTHER>
LOS ANGELES, CITY OF
LA0C8043 SCAB 0 0 0 COMMERCIAL ST WIDENING BET ALAMEDA ST & CENTER ST. FROM 1 LN IN EACH DIR TO 2 LNS IN EACH DIRECTION W/A 2-WAY LEFT TURN LN TO ALLOW W/B TRAFFIC TO ACCESS THE S/B US-101 FWY.
20050822 <OTHER>
LOS ANGELES, CITY OF
LA0C8049 SCAB 0 0 0 ANAHEIM ST WIDENING-FARRAGUT AVE TO DOMINGUEZ CHANNEL. PROJECT WILL WIDEN THE EXISTING ROADWAY FROM 4 TO 6 LANES AND UPGRADE THE HIGHWAY TO MAJOR HIGHWAY STANDARDS.
20071231 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 23
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES, CITY OF
LA0C8058 SCAB 0 0 0 LA TIJERA BRIDGE WIDENING OVER I-405 FREEWAY; PROVIDE SIDE-BY-SIDE DUAL LEFT -TURN LANES IN EAST & WESTBOUND DIRECTION ONTO FREEWAY RAMPS.
20080731 <OTHER>
LOS ANGELES, CITY OF
LA0C8060 SCAB 0 0 0 VALLEY CIRCLE BLVD I/C IMPROVEMENT AT 101FWY. WIDEN AND RESTRIPE TO INCLUDE A 2ND S/B RIGHT TURN LANE. FROM 1 TO 2 W/B LANES AND FROM 1 TO 2 S/B RIGHT TURN ONLY LNS
20041231 <OTHER>
LOS ANGELES, CITY OF
LA0C8084 SCAB 0 0 0 WINNETKA AVE BRDGE WIDENING & REHABILITATION. PROJ. WILL WIDEN THE RIVER CROSSING FROM 4 TO 6 LANES, AND ADDING 6-FT WIDE BIKE LANES ON THE SHOULDER OF THE BRIDGE.
20040731 <OTHER>
LOS ANGELES, CITY OF
LA0C8090 SCAB 0 0 0 VERMONT AV BRIDGE WIDENING N/B ACCESS FREEWAY. WIDEN VERMONT AV BRIDGE AT RTE 101 FWY BY PROVIDING ADDTNL LEFT-TURN LANE ON N/B VERMONT AV ONTO N/B RTE
20070830 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA0C8122 SCAB 0 0 0 CANOGA PARK ATSAC/ATCS PROJ. PROVIDE ATSAC/ATCS RELATED IMPRVMNTS TO 105 SIGNALIZED INTERSCTIONS THRU IMPLEMENTATION OF A COMPUTER BASED REAL TIME TRFFIC SIGNAL MONITORING CTRL SY
20070731 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA0C8123 SCAB 0 0 0 SAN PEDRO ATSAC/ATSC PROJ. PROVIDE ATSAC/ATCS RELATED IMPRVMNTS TO 57 SIGNALIZED INTERSECTIONS THRU IMPLEMENTATION OF A COMPUTER-BASED REAL TIME TRFFC SIGNAL MONITORING CNTRL SYS.
20071101 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA0C8133 SCAB 0 0 0 RESEDA ATSAC/ATCS PROJ.PROVIDE ATSAC/ATCS TYPE IMPROVEMENTS TO 107 SIGNALIZED INTERSECTIONS THRU IMPLEMENTATION OF A COMPUTER-BASED REAL TIME TRAFFIC SIGNAL MONITORING & CONTRL SYS
20070630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA0C8164 SCAB 0 0 0 EXPOSITION BLVD RIGHT-OF-WAY BIKE PATH-WESTSIDE EXTENSION. DESIGN AND CONSTRUCTION OF 2.5 MILES OF CLASS 1 BIKEWAY, LIGHTING, LANDSCAPING & INTERSECTION IMPROVEMENTS.
20070101 TCM
LOS ANGELES, CITY OF
LA0C8171 SCAB 0 0 0 GAYLEY AVE BIKE LANES & STREET WIDENING. DESIGN AND CONSTRUCTION OF .25 MILES OF CLASS II BIKE LANES ON GAYLEY AVE FROM EXISTING BIKE LANES AT LEVERING AVENUE TO THE UCLA CAMPUS
20080530 TCM
LOS ANGELES, CITY OF
LA0C8174 SCAB 0 0 0 LITTLE TOKYO PEDESTRIAN LINKAGES. CONSTRUCTION OF IMPROVEMENTS: SIDEWALK AND CROSSWALK ENHANCEMENTS, STREET FURNITURE & LANDSCAPING TO PROMOTE PEDESTRIAN TRAVEL W/IN LITTLE TOKYO.
20040630 TCM
2004 RTP * TECHNICAL APPENDIX I - 24
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES, CITY OF
LA0C8319 SCAB 0 0 0 TAXI/SHUTTLE STANDS AT METRO RED LINE STA AT N HLWD & UNIVERSAL. CITY AUTHORIZED TAXI STANDS AT TWO METRO RED LINE STATIONS (UNIVERSAL CITY ON LANKERSHIM AND N. HLWD ON CHANDLER.
20031230 TCM
LOS ANGELES, CITY OF
LA0C8321 SCAB 0 0 0 LA CULTURAL TOURISM WEB PAGE DEVELOP & TRANSIT PROMOTION. ENCOURAGES THE USE OF MASS TRANSIT AT TARGETED TRIP GENERATION NODES AND FACILITATE MASS TRANSIT USE TO REG. DESTINATIONS.
20051230 TCM
LOS ANGELES, CITY OF
LA0C8327 SCAB 0 0 0 PUBLIC INTERNET ACCESS TO ROADWAY CLOSURE. INFORMATION ABOUT VARIOUS CONSTRUCTION PROJECTS AND/OR STREET ACTIVITIES.
20051230 <OTHER>
LOS ANGELES, CITY OF
LA0C8329 SCAB 0 0 0 BICYCLE RACKS ON COMMUTER EXPRESS BUSES. ADDITION OF FRONT-LOADING BICYCLE RACKS TO A TOTAL OF 93 COMMUTER EXPRESS BUSES AND SPARES THAT SERVE THE CITY AND COUNTY OF LA.
20031230 TCM
LOS ANGELES, CITY OF
LA0C8330 SCAB 0 0 0 BICYCLE COMMUTER TECHNOLOGY ACCESS, CITY'S WEB PAGE FOR BICYCLE PROGRAM
20061231 TCM
LOS ANGELES, CITY OF
LA0D108 SCAB 0 0 0 L.A RIVER BIKE PATH PHASE 1C- CLASS 1 BIKEWAY ALONG WEST BANK OF LA RIVER FROM FLETCHER DR TO BARCLAY ST INCLUDES LIGHTING, SIGNAGE, PAVEMENT MARKINGS AND FENCING (LA996245)
20060630 <OTHER>
LOS ANGELES, CITY OF
LA960001 SCAB 0 0 0 ANAHEIM ST FROM FARRAGUT AVE TO DOMINGUEZ CHNL WIDENING WIDEN FROM 4 TO 6 LANES
20021231 <OTHER>
LOS ANGELES, CITY OF
LA960002 SCAB 0 0 0 BARRINGTON AVE - ALLEY NORTH OF GORHAM AVE TO DARLINGTON AVE WIDENING TO PROVIDE LEFT TURN LN WIDEN FROM 2 TO 4 LANES
20021231 <OTHER>
LOS ANGELES, CITY OF
LA960004 SCAB 0 0 0 DE SOTO BRIDGE WIDENING OVER THE LA RIVER WIDENING WIDEN FROM 4 TO 6 LANES
20031231 <OTHER>
LOS ANGELES, CITY OF
LA9600041 SCAB 0 0 0 PARTHENIA ST LURLINE AVE TO CANOGA AVE WIDENING_& STORM DRAIN WIDEN FROM 2 TO 4 LANES
20021231 <OTHER>
LOS ANGELES, CITY OF
LA960005 SCAB 0 0 0 FIGUEROA ST N/O 146TH ST TO W COMPTON BL WIDENING, CURB & GUTTER WIDEN FROM 4 TO 6 LANES
20021101 <OTHER>
LOS ANGELES, CITY OF
LA960006 SCAB 0 0 0 MAGNOLIA BL HOLLYWOOD FWY TO COLFAX AV WIDENING WIDEN FROM 2 TO 4 LANES
20021231 <OTHER>
LOS ANGELES, CITY OF
LA960009 SCAB 0 0 0 MULHOLLAND DR - E/O MULHOLLAND HWY TO W/O SAN FELICIANO DR WIDENING WIDEN FROM 2 TO 4 LANES
20041231 <OTHER>
LOS ANGELES, CITY OF
LA960015 SCAB 0 0 0 STRATHERN ST (N/S) - WHITE ST TO 180 FEET EAST OF VINLAND AVENUE - WIDEN FROM TWO TO FOUR LANES
20021231 <OTHER>
LOS ANGELES, CITY OF
LA962071 SCAB 0 0 0 L.A. RIVER BIKE PATH OVER LOS FELIZ BLVD. CLASS I AND CLASS II [CALL # 2071, MOU P.0002-071 ON 6/30/99]
20031231 TCM
LOS ANGELES, CITY OF
LA962104 SCAB 0 0 0 WESTSIDE BUS SPEED IMPROVEMENT PRJ. - SIGNAL PRIORITY
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA962129 SCAB 0 0 0 METROLINK ROW MITIGATION PEDESTRIAN & CROSSING IMPROVEMENTS
20021231 TCM
2004 RTP * TECHNICAL APPENDIX I - 25
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES, CITY OF
LA962148 SCAB 0 0 0 WESTLAKE COMMUNITY BASED INTERCEPT INTERMODAL FACILITY (96 CALL, CAT 2) [CALL #2445]
20031231 TCM
LOS ANGELES, CITY OF
LA970904 SCAB 0 0 0 PC BASED SIGNAL SYNCHRONIZATION REAL TIME TRAFFIC SIGNAL MONITORING SYSTEM
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA970906 SCAB 0 0 0 RESEDA BLVD BRIDGE WIDENING OVER L.A. RIVER WIDEN FROM 4 TO 6 (0.1 MILE BRIDGE WIDEN)
20031231 <OTHER>
LOS ANGELES, CITY OF
LA974058 SCAB 0 0 0 EXPOSITION PARK COMPLEX BICYCLE INSTALL APPROX 80 BICYCLE PARKING SPACES AT 10 HIGHLY VISIBLE ENTRY LOCATIONS AT MAJOR INSTITUTIONS AT EXPOSITION PARK
20021231 <OTHER>
LOS ANGELES, CITY OF
LA974119 SCAB 0 0 0 VERMONT AVENUE TRANSIT/PEDESTRIAN IMPROVEMENT LOCATED IN THE CITY OF LOS ANGELES ALONG VERMONT AVE BETWEEN HOLLYWOOD BLVD AND 3RD STREET
20021231 <OTHER>
LOS ANGELES, CITY OF
LA974231 SCAB 0 0 0 MAJOR LINE BUS ON-TIME PERFORMANCE IMPROVEMNT PROGRAM INSTALL BUS PRIORITY SYSTEMS QUEUE JUMPERS [CALL # 4237, NO MOU]
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA974234 SCAB 0 0 0 SAN DIEGO FWY CORRIDOR PHASE I ATSAC BUS PRIORITY PROJECT ADD 109 INTERSECTIONS ON THE CITY'S ATSAC SYSTEM PROVIDE CCTC CAMERA COVERAGE
20021031 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA974237 SCAB 0 0 0 SYNCHRONIZATION IMRPOVEMENTS ALONG DASH ROUTES IN LOS ANGELES WILL CONCENTRATE ON ARTERIALS HEAVILY USED BY DASH
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA974238 SCAB 0 0 0 ATSAC HIGHLAND PARK REPLACE OBSOLETE SIGNALS AT 42 INTERSECTIONS PRIMARILY ALONG YORK AND FIGUEROA STREETS
20031231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA974248 SCAB 0 0 0 LA CIENEGA BLVD BETWEEN 3RD ST AND SAN VICENTE BLVD WIDENING AND RESTRIPING CONSTRUCT DUAL LEFT TURN LANES
20021231 <OTHER>
LOS ANGELES, CITY OF
LA974251 SCAB 0 0 0 ARTERIAL INCIDENT DETECTION ALGORIT (AIDA) INTEGRATE AIDA WITH THE ADAPTIVE TRAFFIC CONTROL SYSTEM
20031231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA974303 SCAB 0 0 0 EAST-WEST OLYMPIC BLVD LINKAGE IN DOWNTOWN LOS ANGELES RE-ALIGNED INTERSECTION FOR EAST BOUND TRAFFIC (INTERSECTION REALIGEMENT)
20021231 <OTHER>
LOS ANGELES, CITY OF
LA974304 SCAB 0 0 0 HIGHLAND AVE WIDENING AT FRANKLIN AVE INCREASE LEFT AND RIGHT TURN LANES (INTERSECTION TURN LANES ONLY, FOR TRAFFIC CIRCILATION)
20041231 <OTHER>
LOS ANGELES, CITY OF
LA974313 SCAB 0 0 0 SEPULVEDA BLVD/I-105 WESTBOUND OFF RAMP WIDENING NORTHBOUND SEPULVEDA BLVD 1 TO 2 LANES ADD WESTBOUND EXIT LANE
20021231 <OTHER>
LOS ANGELES, CITY OF
LA974326 SCAB 0 0 0 MASON AVE AT GRADE CROSSING AT SPRR EXTEND MASON AVE ACROSS SPRR TRACK BETWEEN NORDHOFF AND PLUMMER STRETS [CALL # 2153, NO MOU]
20031231 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 26
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES, CITY OF
LA974336 SCAB 0 0 0 WILSHIRE BLVD AND FEDERAL SAN VICENTE INTERSECTION IMPROVEMEN PROVIDE ADDITIONAL TRAFFIC LANE 2 NORTHBOUND LANES ON FEDERAL AVE
20021231 <OTHER>
LOS ANGELES, CITY OF
LA974340 SCAB 0 0 0 FAIRFAX AVE/OLYMPIC BLVD/SAN VICENT INTERSECTION IMPROVEMENTS WIDENING SAN VICENTE BLVD CONSTRUCT DUAL LEFT TURN N & S BOUND LANES
20021231 <OTHER>
LOS ANGELES, CITY OF
LA974424 SCAB 0 0 0 LOS ANGELES WORLD AIRPORT (LAWA) INTELLIGENT TRANSPORTATION SYSTEMS (ITS) PROGRAM FOR THE AIRPORT AREA TRAFFIC CIRCULATION SYSTEM
20030630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA9811089 SCAB 0 0 0 SUNSET BL BARRINGTON PL TO GRANVILLE AVE IMPROVE HORIZONTAL & VERTICAL REALIGMENTS PROVIDE DOUBLE LEFT TURN POCKET AT INTERSECTION
20041231 <OTHER>
LOS ANGELES, CITY OF
LA9812101 SCAB 0 0 0 UPGRADE ACCESS TO SYLMAR/SAN FERNA- DO METROLINK STATION AND WESTFIELD VILLAGE PROJECT (TEA21-#226)
20030630 <OTHER>
LOS ANGELES, CITY OF
LA990364 SCAB 0 0 0 HANSEN DAM RECREATION AREA ACCESS ROADWAY IMPROVEMENT FROM DRONEFIELD TO FOOTHILL BLVD ON KAGEL CANYON BL FROM 2 TO 4 LANES (0.25 MILE) (TEA21-#972)
20030630 <OTHER>
LOS ANGELES, CITY OF
LA996097 SCAB 0 0 0 BUSINESS BICYCLE PARKING PROGRAM 20021231 <OTHER>
LOS ANGELES, CITY OF
LA996099 SCAB 0 0 0 METROLINK SHUTTLE (CHATSWORTH) 20030630 TCM
LOS ANGELES, CITY OF
LA996100 SCAB 0 0 0 NRTHRIDGE METROLNK STATION/ SHUTTLE - SHUTTLE SERVICE WHICH PROVIDES RAIL FEEDER CONNECTION FROM NORTHRIDGE METROLINK TO PORTER RANCH.
20021231 <OTHER>
LOS ANGELES, CITY OF
LA996105 SCAB 0 0 0 DNTOWN WAYFNDNG/ TRAN. CONNECT. DESIGN&INSTALL WAYFNDNG SYS., AT: RED/BLUE/AMTRAK STNS, BUS STOPS
20021231 <OTHER>
LOS ANGELES, CITY OF
LA996106 SCAB 0 0 0 DOWNTOWN PRKING MGMT ORDINANCE PRKNG ORD. TO MANAGE PRKNG SUPPLY
20031230 TCM
LOS ANGELES, CITY OF
LA996108 SCAB 0 0 0 METRO RED LINE - MELROSE SHUTTLE HLYWOOD/VINE NORTH TO WILSHIRE/ WESTERN
20021231 <OTHER>
LOS ANGELES, CITY OF
LA996109 SCAB 0 0 0 METRO RED LNE/W. HLYWD/BEV CNTR CEDARS SINAI SHUTTLE
20030630 <OTHER>
LOS ANGELES, CITY OF
LA996110 SCAB 0 0 0 TRANSIT INFO DISSEMINATION PROVIDE INFO ON COMM, LOCAL TRANSIT AT VAN NUYS CIVIC CNTR
20021231 <OTHER>
LOS ANGELES, CITY OF
LA996116 SCAB 0 0 0 SMART SHUTTLE PROG. EXTENSION SHUTTLE SERVICE TO 3 METRO RED LINE STATIONS: WSTRN, VERMONT, ALVARADO
20021231 <OTHER>
LOS ANGELES, CITY OF
LA996203 SCAB 0 0 0 REUSE HIST WATTS TRAIN STAT- MUSEUM REFURBISH STAT HOUSE & FENCING
20021231 <OTHER>
LOS ANGELES, CITY OF
LA996205 SCAB 0 0 0 REHAB LANKERSHIM SP STATION REFURBISH HISTORIC DEPOT, LNDSCPE. PRKING FACILITIES, BUS SHLTRS, BIKE LOCKERS
20031231 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 27
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES, CITY OF
LA996206 SCAB 0 0 0 CHATSWRTH HISTORC TRANS & MUSEUM CONSRTCT & INSTALL DISPLAY CASES, RACKS, APPROP. LIGHTING
20021231 <OTHER>
LOS ANGELES, CITY OF
LA996299 SCAB 0 0 0 WESTCHESTER TRANSPORTATION MGMT. ENHANCEMENTS (ATCS) - UPGRADE THE EXISTING AUTOMATED TRAFFIC SURVEILLANCE AND CONTROL SYSTEM
20050630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA996300 SCAB 0 0 0 CITY/COUNTY TRAFFIC MANAGEMENT INTEGRATION
20060701 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA996301 SCAB 0 0 0 ATSAC GOLDEN STATE FWY. CORRIDOR: APPROX. 98 SIGNALIZED INTERSECTIONS
20050630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA996302 SCAB 0 0 0 INTERCONNECT GAP CLOSURE-CITYWIDE: PROV. SYNCH. TIME FOR UP TO 752 NON-INTERCONNECTED SIGNALIZED INTERSCTNS. NOT CONNECTED TO THE ATSAC SYSTEM
20050630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA996303 SCAB 0 0 0 ATSAC SAN DIEGO FWY. CORRIDOR PHASE II - APPROX. 73 SIGNALIZED INTERSECTIONS THRU IMPLEMENTATION OF ATSAC.
20050630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA996310 SCAB 0 0 0 EXPOSITION PARK TRAFFIC MANAGEMENT PLAN (ATSC) - UPGRADE THE EXISTING ATSAC BY INSTLNG THE ADAPTIVE TRAFFIC CONTROL SYSTEM (ATCS)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA996390 SCAB 0 0 0 SEPULVEDA BLVD. FROM CENTINELA AVE. TO LINCOLN BLVD - WIDEN SEPUL BLVD. BET. LINCOLN AND CENTINELA TO PROVIDE BUS/CARPOOL PRIORITY LANE.
20040630 TCM
LOS ANGELES, CITY OF
LA996393 SCAB 0 0 0 EAST DOWNTOWN TRUCK ACCESS IMPROVEMENTS: WIDENINGS, IMPRVMNTS, STRIPING, AT 6 LOCATIONS IN THE EAST DOWNTOWN L.A. AREA
20040630 <OTHER>
LOS ANGELES, CITY OF
LA996404 SCAB 0 0 0 WIDEN AND RESTRIPE LAUREL CNYN BLVD. AT ITS INTERSECTION WITH CANTON DR. TO PROVIDE A LEFT TURN POCKET FOR SOUTHBOUND TRAFFIC.
20030630 <OTHER>
LOS ANGELES, CITY OF
LA996408 SCAB 0 0 0 WIDEN ARBOR VITAE ST TO PROVIDE FOR TWO LANES IN EACH DIRECTION AND TWO-LEFT TRN LNE FROM LA CIENEGA BLVD TO AIRPORT BLVD (FROM 2 TO 4 LANES)
20030630 <OTHER>
LOS ANGELES, CITY OF
LA996413 SCAB 0 0 0 CENTINELA AVE. -WASHINGTON BLVD. TO SHORT AVE. - WIDN CENTINELA AVE. FROM WASHINGTON BLVD. TO SHORT AVE. FROM 2 S/B & 1 N/B LANE TO 2 S/B, 2 N/B & 2 WIDE LEFT TURN LANES
20030630 <OTHER>
LOS ANGELES, CITY OF
LA996415 SCAB 0 0 0 UPPER 2ND ST-- ENHANCE CIRCULATION W/IN THE BUNKER HILL AREA FROM GRAND AVE TO OLIVE ST (FROM 0 TO 1 LANE IN EACH DIRECTION -- 350 FT.)
20030630 <OTHER>
LOS ANGELES, CITY OF
LA996416 SCAB 0 0 0 VERMONT AVE. SIDEWALK WIDENING AND TRANSIT AVENIDA - BUS STOP ENHANCMNTS, EXTENDED CURBS, MEDIAN ISLANDS, ENHANCED CROSSWALKS, LIGHTING AND LANDSCAPING
20031231 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 28
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES, CITY OF
LA996418 SCAB 0 0 0 WIDEN NORTH LEG OF SEPULVEDA BLVD/BURBANK BLVD. INTRSECTION TO ALLOW FOR STRIPING TWO EXCLUSVE RGHT TURN LNS AND WDN W. LEG OF INTRSCTN TO ALLOW STRIPING FOR TWO RIGHT TURN LANES.
20040630 <OTHER>
LOS ANGELES, CITY OF
LA996421 SCAB 0 0 0 EXTENDING MASON AVE. ACROSS THE LACMTA/AMTRAK/UPRR. INSTL RAIL AND VEH TRAFIC CONTRL EQUIP AND DEVICES. INSTL SAFTY IMPROVEMNT AT FIVE ADJACENT CROSSINGS.
20030630 <OTHER>
LOS ANGELES, CITY OF
LA996425 SCAB 0 0 0 SEPULVEDA BLVD. REVERSIBLE LANE, BIKE LANE, AND INTERSECTION IMPROVEMENT
20050630 <OTHER>
LOS ANGELES, CITY OF
LA996439 SCAB 0 0 0 BICYCLE RACK AND PARKING PHASE II INSTALL ESTIMATED 833 INVERTED BIKE RACKS,
20021231 TCM
MALIBU LA996355 SCAB 0 0 0 ROADWAY REALIGNMENT TO ELIMINATE THE OFFSET OF ZUMIREZ DRIVE AT PACIFIC COAST HIGHWAY
20030630 <OTHER>
MONTEBELLO LA000388 SCAB 0 0 0 WHITTIER BLVD FROM WILCOX TO EAST CITY LIMITS WIDEN FROM 4 TO 6 LANES
20030630 <OTHER>
MONTEREY PARK
LA0B7237 SCAB 0 0 0 NORTH ATLANTIC BLVD WIDENING AND CHANNELIZATION-INCLUDES THE ENVIRONMENTAL ANALYSIS AND PREPARATION OF PLANS, SPCIFICATIONS, AND ESTIMATES FOR THE WIDENING OF ATLANTIC
20041231 <OTHER>
MONTEREY PARK
LA974020 SCAB 0 0 0 MONTEREY PARK DOWNTOWN PARKING COMPLEMENT CURRENT EFFORTS INDERWAY FOR IMPLEMENTATION OF A PEDESTRIAN PLAZA WITHIN THE PROJECT AREA
20021231 <OTHER>
PALMDALE LA0C8147 SCAB 0 0 0 SIERRA BIKEWAY RAILROAD OVERCROSSING. PROPOSE A .34 MILE CLASS 1 BIKE PATH PROVIDING A GRADE SEPARATION AT AVE. Q OVER THE UNION PACIFIC/METROLINK RAILS.
20081130 TCM
PALMDALE LA960123 MDAB 0 0 0 MASTER TRAFFIC SIGNAL CONTROL SYSTEM CITYWIDE AT APPROXIMATELY 75 SIGNAL LOCATIONS
20040630 EXEMPT/TRAFFIC SIGNALIZATION
PALMDALE LA960124 MDAB 0 0 0 AVENUE O - STREET WIDENING FROM 10TH STREET WEST TO SIERRA HIGHWAY (1.42 MILES) FROM 2 TO 4 LANES
20060630 <OTHER>
PALMDALE LA9708001 MDAB 0 0 0 AVE S FROM SIERRA HWY TO 40TH ST EAST (3.2 MILES) FIBER OPTIC INTERCONNECT (TO TOC & SIGNAL TIMEING)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
PALMDALE LA974386 SCAB 0 0 0 AVENUE S INTERCONNECT INVOLVES INSTALLATION OF FIBER OPTI VIDOE IMAGE DETECTION SYSTEM (VIDS)
20030301 EXEMPT/TRAFFIC SIGNALIZATION
PALMDALE LA981101 MDAB 0 0 0 AVENUE S FROM SHEFFIELD TO 25TH ST STREET EAST WIDEN FROM 2 TO 4 LANES
20040630 <OTHER>
PALMDALE LA9811095 MDAB 0 0 0 PALMDALE - AVENUE S AVE-S SPRR ( RAILROAD) @20TH ST EAST RAILROAD OVERPASS
20040630 <OTHER>
PALMDALE LA9811102 MDAB 0 0 0 AVENUE S RAIROAD OVERPASS WEST OF SIERRA HIGHWAY
20050630 <OTHER>
PALMDALE LA996281 MDAB 0 0 0 NORTH COUNTY/ANTELOPE VALLEY TRAFFIC IMPROVEMENT: DESIGN AND CONSTRUCT. SIGNAL IMPRVMNTS ON MAJOR CORRIDORS
20030630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 29
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
PALMDALE LA996365 MDAB 0 0 0 AVENUE S WIDENING- WIDEN 2 MILES FROM 20TH STREET EAST TO RTE. 14 FROM 2 LANES TO 4 LANES IN EACH DIRECTION AND 1 LEFT TURN LANE. 4 TO 6 LANES WILL BE DONE AT A LATER DATE.
20040630 <OTHER>
PALOS VERDES ESTATES
LA990357 SCAB 0 0 0 OVERLAY AND PARTIAL RECONSTRUCTION OF PALOS VERDES DRIVE NORTH FROM PASEO DEL CAMPO TO THE ROLLING HILLS ESTATES CITY LIMITS (TEA21-#1275))
20030530 <OTHER>
PASADENA LA0B7055 SCAB 110 0 0 ARROYO PKWAY CORR TRANS IMP(UPGRADE 6 SIGNALS) -BETWEEN GREEN & HOLLY ST COMPLIMENT & AUGMENT PLANNED CALTRANS RELINQUISHMENT OF ARROYO PKW, BETWEEN COLORADO BLVD & GLENARM ST
20061231 EXEMPT/TRAFFIC SIGNALIZATION
PASADENA LA0C8155 SCAB 0 0 0 8 SEGMENTS OF PASADENA BIKEWAY; INCLUDES IMPROVEMENTS TO SIGNALIZED INTERSECTIONS FOR BICYCLE DETECTION, SIGNAGE, RESTRIPING OF TRAFFIC LANES & STRIPING OF BIKE LANES.
20080331 TCM
PASADENA LA974129 SCAB 0 0 0 PASADENA BLUE LINE COMMUNITY LINKAGES PEDESTRIAN IMPROVEMENTS TO TWO PLANNED METRO PASADENA BLUE LINE STATIONS WITHIN THE CITY
20030630 TCM
PASADENA LA990360 SCAB 0 0 0 LA LOMA BRIDGE CONTRUCTION (TEA21-#1208) THE LENGHT OF THE PROJECT IS 379 FT. RECONSTRUCT THE ONE LANE IN EACH DIRECTION.
20070630 <OTHER>
PASADENA LA996086 SCAB 0 0 0 OPER 3 ALTER FUEL SHUTTLES 20031231 <OTHER>POMONA LA0C8258 SCAB 0 0 0 STREETSCAPE-GAREY AVE MEDIAN
BEAUTIFICATION.LANDSCAPING IMPROVEMENTS OF NEW MEDIAN ISLANDS ON GAREY AVE FROM THE SOURTHERLY CITY LIMITS OF POMONA TO TH SR-60 FWY.
20021031 NON-FEDERAL/NON-REGIONAL
POMONA LA996340 SCAB 0 0 0 MISSION BLVD. GRADE SEPARATION AT SR. 71(FROM UPRR UNDERCROSSING TO 9TH ST. MISSION BLVD FROM WESTERN TO CURRAN PLACE (CFP 6340, 8400)
20040630 <OTHER>
PORT OF LONG BEACH
LA000512 SCAB 0 0 0 GERALD DESMOND BRIDGE REPLACEMENT (ENGINEERING ONLY)
20021231 <OTHER>
PORT OF LONG BEACH
LA57000 SCAB 0 0 0 OCEAN BLVD/TERMINAL ISLAND FREEWAY INTERCHANGE (PORT OF LONG BEACH -- PADP #30) (T21-#742)
20041231 <OTHER>
PORT OF LONG BEACH
LA996369 SCAB 0 0 0 TERMINAL ISLAND FWY/OCEAN BLVD. INTERCHANGE
20040630 <OTHER>
PORT OF LOS ANGELES
LA0C8129 SCAB 0 0 0 PORTS OF LONG BEACH AND LOS ANGELES ATMS/ATIS PROJ.. ADDT'N OF UP TO 16 CLOSED CIRCUIT TV CAMERAS & 9 CHANGEABLE SIGNS TO IMPROVE TRAFFIC OPERATIONS ON THE: I-710, I-110, SR47/103.
20081231 EXEMPT/TRAFFIC SIGNALIZATION
PORT OF LOS ANGELES
LA960177 SCAB 0 0 0 WATER STREET FIGUEROA STREET AND FRIES AVE 4 LANE ROADWAY (NEW ROADWAY)
20021201 <OTHER>
PORT OF LOS ANGELES
LA960179 SCAB 0 0 0 NEPTUNE AVE GRADE SEPARATION (RAIL-ROADWAY)
20041201 <OTHER>
REDONDO BEACH
LA996094 SCAB 0 0 0 STH BAY TRAN. PROV. COMM. SRV. CTR IMPLMENT 3 STATIONARY FACILITIES & 2 SRVCE CNTRS TO PROVIDE 24-HOUR OF ACCESSIBLE TRANS. INFORMATION.
20021231 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 30
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SAN DIMAS LA960146 SCAB 0 0 0 SAN DIMAS AVENUE VIA VAQUERO - BONITA AVE STREET WIDENING, LIGHTS, DRAINAGE, RAILROAD CROSSING, LANDSCAPE SPOT WIDEN 2-4 LANES
20021231 <OTHER>
SAN FERNANDO
LA0C8259 SCAB 0 0 0 CAESAR CHAVEZ MEMORIAL TRANSIT PLAZA. PUBLIC ART PROJECT FOR SCENIC BEAUTIFICATION AND LANDSCAPING PROJECT ADJACENT TO MAJOR TRANSPORTATION LINKAGES AND ROUTES.
20040215 <OTHER>
SAN GABRIEL LA9910011 SCAB 0 0 0 SAN GABRIEL BLVD REHAB PHASE 1 - FRM MISSION TO BRDWAY PVEMNT RECONST & OVERLAY, CONCRET REPRS, MED ISLND INSTALL W/ LNDSCPNG & TREES
20030730 <OTHER>
SAN GABRIEL LA9910012 SCAB 0 0 0 SAN GABRIEL BLVD REHAB PHASE II - FROM BROADWY TO LAS TUNAS: PVEMNT RESONSTRCT & OVERLAY, CONCRT REPRS, MEDIAN ISLND INSTALL W/ LANDSCAPNG AND TREES
20040730 <OTHER>
SAN GABRIEL VALLEY COG
LA0C57 SCAB 0 0 0 ACE/GATEWAY CITIES-CONSTRUCT GRADE SEPARATION AT PASSONS BLVD IN PICO RIVERA (AND MODIFY PROFILE OF SERAPIS AVENUE)(PART OF ALAMEDA CORRIDOR EAST PROJECT).
2006 TCM
SAN GABRIEL VALLEY COG
LA974367 SCAB 0 0 0 ALAMEDA CORRIDOR EAST - GATEWAY TO AMERICA; RAIL ROAD OVERCROSS SAFETY REALIGNMENT ALONG SO. PACIFIC & UNION PACIFIC RR (SGVCOG)
20060630 TCM
SAN GABRIEL VALLEY COG
LA974423 SCAB 0 0 0 ALAMEDA CORRIDOR EAST - GATEWAY TO AMERICA (SGVCOG) IMPLEMENTATION OF TRAFFIC CONTROL MEASURES TO MODIFY OPERATION OF TRAFFIC SIGNALS AT GRADE CROSSINGS (TEA21-#198)
20031231 TCM
SAN GABRIEL VALLEY COG
LA990353 SCAB 0 0 0 ALAMEDA CORRIDOR EAST - NOGALES ST GRADE SEP (T21-491, SGVCG)
20060630 TCM
SAN GABRIEL VALLEY COG
LA990359 SCAB 0 0 0 ALAMEDA CORRIDOR-EAST GRADE SEP (T21-1533)
20030530 TCM
SANTA CLARITA
LA0B103 SCAB 0 0 0 CONSTRUCT GOLDEN VALLEY ROAD FROM SOLEDAD CANYON TO NEWHALL RANCH ROAD.0 TO 6 LANES. LESS THAN 0.5 MILES- INCLUDES BRIDGE OVER SANTA CLARA RIVER
20061231 <OTHER>
SANTA CLARITA
LA0B104 SCAB 0 0 0 GOLDEN VALLEY ROAD. NEWHALL RANCH ROAD TO PLUM CANYON ROAD. 0 TO 4 LANES APPROXIMATELY 1.5 MILES.
20070630 NON-FEDERAL/NON-REGIONAL
SANTA CLARITA
LA0B105 SCAB 0 0 0 GOLDEN VALLEY ROAD - FROM SIERRA HIGHWAY TO SR-14 INTERCHANGE . 0 TO 4 LANES APPROXIMATELY 1.0 MILE
20020630 <OTHER>
SANTA CLARITA
LA0B106 SCAB 0 0 0 NEWHALL RANCH ROAD FROM GOLDEN VALLEY ROAD TO BOUQUET CANYON ROAD. 0 TO 6 LANES APPROXIMATELY 1.5 MILES
20040630 NON-FEDERAL/NON-REGIONAL
SANTA CLARITA
LA0B107 SCAB 0 0 0 GOLDEN VALLEY ROAD FROM VIA PRINCESSA TO SOLEDAD CANYON ROAD. 0 TO 6 LANES . APPROXIMATELY ONE MILE
20040630 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 31
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SANTA CLARITA
LA0B7235 SCAB 0 0 0 GOLDEN VALLEY ROAD/SOLEDAD CANYON ROAD INTERCHANGE. WILL ACQUIRE ROW AND CONSTRUCT A GRADE-SEPARATED INTERCHANGE FOR THE GOLDEN VALLEY ROAD
20030630 <OTHER>
SANTA CLARITA
LA0B7335 SCAB 0 0 0 SANTA CLARA RIVER REGIONAL TRAIL-DESIGNING OF 7 MILES OF CLASS I BIKE/PED PATH ALONG THE NORTH SIDE OF THE RIVER FROM I-5 ON THE WEST TO DISCOVERY PARK ON THE EAST
20050630 TCM
SANTA CLARITA
LA960170 SCAB 0 0 0 VIA PRINCISSA EXTENSION- MAGIC MTN. PKY TO RAINBOW MAGIC MTN. EXTENSION- SAN FERNANDO RD TO VIA PRINCISSA 0 TO 6 LANES
20020601 EXEMPT/TRAFFIC SIGNALIZATION
SANTA CLARITA
LA9708004 SCAB 0 0 0 SANTA CLARITA PARKWAY FROM BOUQUET CYN RD/SOLEDAD CYN INSTALL NEW ROADWAY (0 TO 4 LANES) (2.5 MILE)
20030601 <OTHER>
SANTA CLARITA
LA9910008 SCAB 0 0 0 BOUQUET CYN OVER SANTA CLARA RIVR TO 500 FT FROM VALENCIA BL - REHAB, WIDEN, LINING RESTORATION FROM 6 TO 8 LANES AND A BIKE LANE -- 525 FT.
20020630 <OTHER>
SANTA CLARITA
LA9910009 SCAB 0 0 0 HASKELL CYN OVER BOUQUET CHANNEL FROM GROVEPARK TO BOUQUET CYN RD ROAD/BRIDGE WIDENING FROM 2 TO 4 LANES; LESS THEN ONE MILE
20020501 <OTHER>
SANTA CLARITA
LA9910010 SCAB 0 0 0 SIERRA HWY OVER THE SANTA CLARA RVR WIDENING OF BOTH NORTH AND SOUTHBOUND BRIDGES FROM 6 NARROW TO 6 WIDE LANES AND A BIKE LANE
20021231 <OTHER>
SANTA CLARITA
LA9910015 SCAB 0 0 0 GOLDEN VALLEY RD FROM SIERRA HWY TO VIA PRINCESSA. APPROX ONE MILE; FROM 0 TO 4 LANES IN EACH DIRECTION
20031231 <OTHER>
SANTA CLARITA
LA996282 SCAB 0 0 0 REGIONAL CENTER CORRIDOR/GAP CLOSURE SIGNAL INTERCONNECT
20050630 EXEMPT/TRAFFIC SIGNALIZATION
SANTA CLARITA
LA996283 SCAB 0 0 0 AUTOMATED INCIDENT MANAGEMENT SYSTEM
20050630 EXEMPT/TRAFFIC SIGNALIZATION
SANTA CLARITA
LA996363 SCAB 0 0 0 I-5/MAGIC MT. PKWY (SR-126) INTERCHANGE RECONSTRUCTION: CONSTRCT. S/B AUXILLARY LANE TO THE OFF-RAMP. WDN MAG. MTN PKWY AT FREEWAY (FROM 6 TO 8 LANES)
20050630 <OTHER>
SANTA CLARITA
LA996364 SCAB 0 0 0 SIERRA HWY (CMP RTE) OVER THE RAILROAD: WIDN W/ REHAB TO S/B BRIDGE AND REPLACEMENT OF N/B BRIDGE. BRIDGES TO SIX LANES AND ADD A PED WALKWAY. (WIDEN FROM 4 TO 6 LANES)
20040630 <OTHER>
SANTA MONICA LA030001 SCAB 0 0 0 CALIFORNIA INCLINE SIDEHILL VIADUCT BR 53C0543 ADD, INCLUDED INSTATE IN STATE HBRR PROGRAM (0.3 MILE, 1-S, 1-N) SIDEWALK/BIKEWAY WIDENING & SEISMIC
20060228 TCM
SANTA MONICA LA0B302 SCAB 0 0 0 SOUNDWALL SOUTH SIDE OF I-10 BETWEEN CLOVERFIELD BLVD ANF STEWART (RTAA)
20031231 NON-FEDERAL/NON-REGIONAL
SANTA MONICA LA0B7267 SCAB 0 0 0 CROSSWAY ENHANCEMENTS ALONG TRANSIT CORRIDOR-ENHANCEMENTS DESIGNED TO IMPROVE PEDESTRIAN ACCESS TO EXISTING AND PLANNED TRANSIT FACILITIES ALONG SANTA
20021231 TCM
2004 RTP * TECHNICAL APPENDIX I - 32
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SANTA MONICA LA960191 SCAB 0 0 0 COLORADO AVE. AT THE COLORADO VIADUCT OCEAN AVE. & SANTA MONICA MUNICIPAL PIER. (2 LANES TO 2 LANES) -- BRIDGE WIDENING (TO STANDARD WIDTH/NON-CAPACITY) SEISMIC
20060930 <OTHER>
SANTA MONICA LA960192 SCAB 0 0 0 THROUGHOUT THE CITY OF SANTA MONICA VARIOUS BIKE RACKS AND LOCKERS
20021231 TCM
SANTA MONICA LA960193 SCAB 0 0 0 OLYMPIC DR. -NEW ROADWAY SOUTH OF CITY HALL FROM MAIN ST. TO FOURTH ST. ROADWAY, SIGNAGE, STRIPING,SIGNAL MOD. FROM 0 TO 2 LANES
20030630 NON-FEDERAL/NON-REGIONAL
SANTA MONICA LA990352 SCAB 0 0 0 PALISADES BLUFF STABILIZATION PROJ. (TEA21-#453)
20030630 <OTHER>
SANTA MONICA LA996327 SCAB 0 0 0 OCEAN AVENUE SIGNAL SYSTEM 20030630 EXEMPT/TRAFFIC SIGNALIZATION
SANTA MONICA MOUNTAIN
LA0B353 SCAB 0 0 0 98.6 ACRE -- 11.1 ACRE PARCEL PRESERVATION OF OPEN SPACE AND VIEWSHIP
20031231 <OTHER>
SANTA MONICA MOUNTAIN
LA990361 SCAB 0 0 0 RECREATIONAL TRAIL CREATION (TEA21-#779)
20030630 <OTHER>
SCAG LA996082 SCAB 0 0 0 WEB ACCESS VANPOOL INFO SYS DEV & IMPLMENT DATABSE FOR VANPOOLS, VACANCIES
20021231 TCM
SCAG LA996083 SCAB 0 0 0 COMMUTER CHANNEL NON-MONETARY SUBSCRIPTION SRVCE
20021231 TCM
SIERRA MADRE LA0B876 SCAB 0 0 0 REMOVAL OF FLOOD DEBRIS & RECONSTRUCTION OF EXISTING RDWY & DRAINAGE SYSTEM (CHANTRY FLATS RD RECONSTRUCTION PROJECT)
20031231 <OTHER>
SIGNAL HILL LA960168 SCAB 0 0 0 SPRING STREET - FROM LONG BEACH BLVD TO ORANGE AVENUE (2 TO 4 LANES)
20031231 <OTHER>
SIGNAL HILL LA990925 SCAB 0 0 0 PANORAMA SEGMENT OF LOOP TRAIL USDOT RECREATIONAL TRAIL PROGRAM
20021231 <OTHER>
SOUTH GATE LA996348 SCAB 0 0 0 WIDEN FIRESTONE BLVD BRDGE OVER THE RIO HONDO CHANNEL AND MINOR STREET WIDENING BETWEEN THE BRIDGE AND GARFIELD AVE.
20031231 <OTHER>
SOUTH PASADENA
LA0B701 SCAB 0 0 0 ORANGE GROVE AT 110 FREEWAY INTERSECTION, INSTALLATION OF TRAFFIC SIGNALS AND NEW SIGNAGE (ROGAN $; HR5394)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH PASADENA
LA0B702 SCAB 0 0 0 FAIR OAKS AV & COLUMBIA ST INTERSECTION IMPROVEMENTS -- MEDIAN AND TRAFFIC SIGNAL IMPROVEMENTS (ROGAN FUNDS; HR5394)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH PASADENA
LA0B703 SCAB 0 0 0 HUNTINGTON DR IMPRV AT INTERSEC. W/FREMONT AV & FAIR OAKS AV -- MEDIAN & TRAFFIC SIGNAL IMPRV & RESTRIP TO ADD LEFT TURN LN (ROGAN $; HR5394)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH PASADENA
LA996090 SCAB 0 0 0 MISSION MERIDIAN TRAN. ORIENTED PARKING EXPANSION CONSTRUCT 142-CAR PRKNG GARAGE
20031231 <OTHER>
SOUTH PASADENA
LAOB422 SCAB 0 0 0 FAIR OAKS AV & 110 FWY I/C, TRAFFIC SIG MOD, RDWY FRM 2-4 LNS TO COLUMBIA, WIDEN SR110 E/B OFF RMP FRM 2-3 LNS, CONSTR HOOK RMP FOR W/B TRAFFIC ENTERING FWY (ROGAN FUNDS, HR5394)
20030630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 33
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA0C8315 SCAB 0 0 0 ELECTRIC BIKE AND SCOOTER DEMONSTRATION PROJECT. PURCHASE OF ELECTRIC BIKES AND SCOOTERS AS A TEST FOR FEASIBILITY AS SUBSTITUTES FOR SHORT COMMUTE TRIPS TO PARK AND RIDE LOTS.
20051230 TCM
TEMPLE CITY LA0D34 SCAB 0 0 0 CITY PUBLIC WORKS FACILITY -- FRINGE AND AREA PARKING PROGRAM
20051231 EXEMPT/TRAFFIC SIGNALIZATION
TEMPLE CITY LA0D96 SCAB 0 0 0 LOCATED AT LAS TUNAS DR. AND SULTANA AV. INCLUDE WIDENING OF LAS TUNAS DR. ON THE SOUTH SIDE EAST OF SULTAN AV. INSTALL DRAINAGE, LIGHTING, SIDEWALK, PAVEMENT; AND PARKING FACILITY
20030530 <OTHER>
TORRANCE LA002064 SCAB 0 0 0 --- 190TH ST CORRIDOR, PHASE II VAN NESS TO CRENSHAW REAHABILITATION WIDENING FROM_4 TO 6 LANES
20031231 <OTHER>
TORRANCE LA960100 SCAB 0 0 0 SEPULVEDA - ARLINGTON AVE TO ANZA AVE INSTALL HARDWIRE INTERCONNECT AT FIVE LOCATIONS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA960101 SCAB 0 0 0 TORRANCE BLVD. AMIE AVE TO PALOS VERDES BLVD INSTALL HARDWIRE INTERCONNECT
20021231 NON-FEDERAL/NON-REGIONAL
TORRANCE LA960102 SCAB 0 0 0 HAWTHORNE BLVD PACIFIC COAST HIGHWAY TO ROLLING HILLS ROAD UPGRADE THE INTERCONNECT SYSTEM FOUR LOCATIONS
20021130 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA960159 SCAB 0 0 0 HAWTHORNE BLVD AT LOMITA BLVD INTERSECTION REDUCE MEDIAN WIDTH TO PROVIDE NORTHBOUND DOUBLE LEFTS AND SOUTHBOUND THROUGH LANE
20021231 <OTHER>
TORRANCE LA990673 SCAB 0 0 0 ARTESIA BLVD, FROM HAWTHORNE & WESTERN- RECONSTRUCTION, TRAFFIC SINGAL, LANDSCAPING. (T21-DEMO PROJ-673; OLD RT 91 PM 2.4/4.9)
20031231 EXEMPT/TRAFFIC SIGNALIZATION
WEST COVINA LA0B7243 SCAB 0 0 0 SOUTH AZUSA AVE CAPACITY ENHANCEMENT-INCLUDES ENVIR. STUDIES & PREPARATION OF PLANS, SPECIFICATIONS & ESTIMATES FOR CAPACITY ENHANCEMENT OF S. AZUSA AVE FROM I-10 TO S. CITY LIMIT
20031231 EXEMPT/TRAFFIC SIGNALIZATION
WEST COVINA LA996078 SCAB 0 0 0 SHUTTLE EXPANSION, TO PROVIDE TRANSIT LINK TO COVINA METROLINK STATION AT 2 PARK RIDE LOTS & OTHER MAJOR DESTINATION POINTS
20021231 <OTHER>
WEST HOLLYWOOD
LA974059 SCAB 0 0 0 WEST HOLLYWOOD COMMUTER CENTER TO BE LOCATED IN A HIGHLY VISIBLE STORE FRONT ALONG SANTA MONICA BLVD
20031231 EXEMPT/TRAFFIC SIGNALIZATION
WEST HOLLYWOOD
LA974246 SCAB 0 0 0 WESTSIDE NORTH-SOUTH ARTERIAL CORRIDOR PROJECT COORDINATE 68 SIGNALS ON 12.8 MILES UPGRADE OF CONTROLLERS TRAFFIC SIGNAL INTERCONNECT
20031231 EXEMPT/TRAFFIC SIGNALIZATION
WESTLAKE VILLAGE
LA960142 SCAB 0 0 0 LINDERO CANYON ROAD FROM AGOURA RD TO JANLOR DR CONSTRUCT BIKE PATH, RESTRIPE STREET, INTERSECTION WIDENING, SIGNAL COORDINATION, RAMP WIDENING (TEA21-#65)
20030630 TCM
WHITTIER LA0B7322 SCAB 0 0 0 WHITTIER GREENWAY TRAIL-ACQUISITION, DESIGN, AND CONSTRUCT OF 2 MILES CLASS I BIKE/PED PATH ON AN ABANDONED RAIL ROW FROM NORWALK TO FIVE POINTS
20040603 TCM
2004 RTP * TECHNICAL APPENDIX I - 34
BASELINELOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
WHITTIER LA0C8161 SCAB 0 0 0 WHITTIER GREENWAY TRAIL: SEGMENT 1 DEVT& SEGMENT 3 P/E AND DEVT. DESIGN, CONSTRCT & SOME ACQUISITION OF 2.86 MLES CLASS I BIKE/PED FACILITIES ON ABANDONED R.O.W IN WHITTIER
20081231 TCM
WHITTIER LA996174 SCAB 0 0 0 HISTORIC DEPOT SURF. TRANS MUSEUM DEV SURFACE TRANS MUSEUM, MEETING ROOMS, AND ARTIFACTS
20021231 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 35
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
ACCESS SERVICES INC.
LA0C55 SCAB 0 0 0 PURCHASE SOFTWARE AND HARDWARE FOR SCHEDULING AND SCANNING DOCUMENTS.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
ACCESS SERVICES INC.
LA900520 SCAB 0 0 0 PURCHASE OF ADD'L 591 VEHICLES FROM FY01 TO FY05. 110 VEHICLES IN FY01, 161 VEHICLES IN FY02, 125 VEHICLES IN FY03, 149 VEHICLES IN FY04, AND 92 VEHICLES IN FY05.
20051231 TCM
ACCESS SERVICES INC.
LA970501 SCAB 0 0 0 ANNUAL EXPENDITURES INCLUDING SERVICE PROVIDER CONTRACTS & CAPITAL EXPENSES
20070630 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA000501 MDAB 0 0 0 TRANSFER FACILITY - (SITE OF ANTELOPE VALLEY MALL COMPLEX) (LANCASTER/PALMDALE UZA)
20040630 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0B7008 VAR 0 0 0 3 EXPANSION 40 FT. LOW FLOOR CLEAN DIESEL BUSES; LOCAL FIXED-ROUTE BUSES; TO RELIEVE PEAK PERIOD OVERCROWDING ON CORE ROUTES.
20030930 TCM
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0C06 MDAB 0 0 0 PURCHASE EXPANSION PARATRANSIT (DAR) VEHICLES (3)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0C59 MDAB 0 0 0 PURCHASE AND INSTALLATION OF SECURITY CAMERA SYSTEM ON BUSES. (FUNDS FROM LA UZA)
20040630 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0C60 MDAB 0 0 0 PURCHASE REPLACEMENT NON-REVENUE VEHICLES (FUNDS FROM LOS ANGELES UZA). (1 IN FY03, 2 IN FY04)
20040630 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0D102 SCAB 0 0 0 DISPATCH CENTER SOFTWARE - PURCHASE/INSTALLATION. (LA UZA)
20040930 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0D83 MDAB 0 0 0 PURCHASE/INSTALL MOBILE DATA COMPUTER (MDC) SYSTEM IN PARATRANSIT REVENUE VEHICLES (LANCASTER/PALMDALE UZA)
20040930 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0D84 MDAB 0 0 0 PURCHASE/INSTALL AVL/GPS IN REVENUE VEHICLES (LANCASTER/PALMDALE UZA)
20040930 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0D85 MDAB 0 0 0 PURCHASE/INSTALL SEVEN (7) RADIO REPEATERS (LA UZA)
20040930 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0D86 MDAB 0 0 0 PURCHASE MAINTENANCE SUPPORT VEHICLE (LA UZA).
20040930 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0D89 MDAB 0 0 0 UPGRADE FAREBOX SYSTEM TO UNIVERSAL FARE SYSTEM-FUNDS TO BE REPROGRAMMED FROM TIP# LA990313.
20050930 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA960202 MDAB 0 0 0 FACILITY ACQUISITION/CONSTRUCTION (UZA-LA) (MTA CFP 8215)
20051231 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA960204 MDAB 0 0 0 TRANSIT FACILITY IMPROVEMENT (LANCASTER/PALMDALE UZA)
20040630 TCM
ANTELOPE VALLEY TRANSIT AUTHORITY
LA960205 VAR 0 0 0 CAPITAL MAINTENANCE PROGRAMS (MIDLIFE OVER THE ROAD COACHES)
20040930 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 36
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
ANTELOPE VALLEY TRANSIT AUTHORITY
LA9802182 SCAB 0 0 0 CAPITAL MAINTENANCE/ RETROFITS 20040630 <OTHER>
ARCADIA LA50300 SCAB 0 0 0 OPERATING ASSISTANCE -- TRANIST OPERATIONS AND DIAL-A -RIDE
20051231 <OTHER>
ARCADIA LA9811004 SCAB 0 0 0 PURCHASE OF TEN (10) DIAL-A-RIDE VANS IN FY03-04 FOR THE ARCADIA TRANSIT SYSTEM REPLACEMENT VEHICLES (MODEL YEAR 1998)
20041231 EXEMPT/TRAFFIC SIGNALIZATION
ARCADIA LA990708 SCAB 0 0 0 PURCHASE OF INTEGRATED RADIO COMMUNICATIONS EQUIPMENT INCLUDING: MDT'S, RADIOS, SERVER, BASE STATION MONITORING EQUIPMENT (GPS SYSTEM).
20041231 EXEMPT/TRAFFIC SIGNALIZATION
ARCADIA LA990712 SCAB 0 0 0 NEW & EXPANDED SHUTTLE SERVICE THRU DOWNTOWN ARCADIA CONNECTING HOTELS & BUSINESSES TO SANTA ANITA RACE TRAK & FASHION MALL (HUNTINGTON ST) & PROPOSED TRANSIT STATION
20031231 TCM
AVALON LA0B7112 SCAB 0 0 0 AVALON CABRILLO MOLE FERRY TERMINAL EXPANSION.UPGRADE EXPAND TERMINAL FACILITIES.EXTEND 2 FLOATS & STRENGTHEN & EXPAND MOLE AREA.
20030131 EXEMPT/TRAFFIC SIGNALIZATION
AVALON LA0C8313 SCAB 0 0 0 AVALON TRANSPORTATION PROGRAM-PROJECT WILL FUND THE PURCHASE OF A NUMBER OF TAXI CABS AND CONSTRUCTION OF A STAGING AREA AT THE CABRILLO MOLE FERRY TERMINAL.
20040830 <OTHER>
BALDWIN PARK LA0B7012 SCAB 0 0 0 LOCAL NTD REPORTERS' BUS FLEET EXPANSION.19 BUSES FOR 5 CITIES.BALDWIN PARK, COMPTON, EL MONTE, MONTEREY PARK & WEST COVINA (CNG,DIESEL & PROPANE FUEL 30-35 FT. VEH).
20050630 TCM
BURBANK LA0D25 SCAB 0 0 0 PROCUREMENT OF (3) ALTERNATIVE FUEL TRANSIT VEHICLES
20040630 TCM
BURBANK LA8STIP13 SCAB 0 0 0 BURBANK LOCAL TRANSIT PURCHASE OF THREE ALT. FUEL BUSES FOR ONGOING TDM PROGRAM
20040630 TCM
CALABASAS LA0B305 SCAB 0 0 0 PURCHASE OF 8 BUSES FOR EXPANDED SERVICE. THREE CNG BUSES, TWO TROLLEY BUSES AND 3 CUTAWAY BUSES.
20040630 <OTHER>
CALTRANS LA963519 SCAB 0 0 0 ADD 3 MILES OF TRIPLE TRACK AT BANDINI, MP 148.5 & 151.7 BETWEEN FULLERTON & LAUS
20021231 TCM
CARSON, CITY OF
LA0C8219 SCAB 0 0 0 SOUTH BAY PAVILION REGIONAL TRANSIT CTR. CONSTRUCTION OF A TRANSIT CTR AT THE SOUTH BAY PAVILION SHOPPING CTR TO BE SERVED BY ALL 8 CARSON CIRCUIT RTES & MTA LINES #205 & #446-447.
20060228 TCM
CARSON, CITY OF
LA996045 SCAB 0 0 0 REG. SIGNIFICANT BUS STOPS INSTALL BUS SHELTERS AT FOUR INTERSECTIONS
20021231 NON-FEDERAL/NON-REGIONAL
CLAREMONT LA0D80 SCAB 0 0 0 THE PURCHASE OF ALTERNATIVE FUEL EQUIPMENT FOR A STATION AT THE NEW CITY YARD.
20041231 <OTHER>
CLAREMONT LA51600 SCAB 0 0 0 OPERATING ASSISTANCE TRANSIT OPERATIONS: DIAL-A-RIDE
20061231 EXEMPT/TRAFFIC SIGNALIZATION
CLAREMONT LA990715 SCAB 0 0 0 DISPATCH/RADIO SYSTEM REPLACEMENT FOR PARATRANSIT SYSTEM
20031231 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 37
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CLAREMONT LA990716 SCAB 0 0 0 EXPANSION OF BUS FLEET BY 2 VEHICLES. THE VEHICLES WILL HOLD 21 PASSENGERS AND COST $124K
20031231 NON-FEDERAL/NON-REGIONAL
COMMERCE LA0C15 SCAB 0 0 0 PURCHASE TWO REPLACEMENT TRANSIT SUPPORT VEHICLES
20031231 <OTHER>
COMMERCE LA0C36 SCAB 0 0 0 PURCHASE FOUR REPLACEMENT PARATRANSIT VEHICLES
20020630 EXEMPT/TRAFFIC SIGNALIZATION
COMMERCE LA0C37 SCAB 0 0 0 BUS STOP IMPROVEMENTS CONSTRUCTION OF PASSENGER SHELTERS AND INFORMATION KIOSKS
20020630 TCM
COMMERCE LA0C38 SCAB 0 0 0 PURCHASE FIVE FULL-SIZE REPLACEMENT TRANSIT BUSES
20030630 EXEMPT/TRAFFIC SIGNALIZATION
COMMERCE LA51700 SCAB 0 0 0 OPERATING ASSISTANCE - TRANSIT OPERATIONS AND DIAL-A-RIDE
20021231 <OTHER>
COMMERCE LA71702 SCAB 0 0 0 REPLACE TWO FIXED ROUTE BUSES 20021231 EXEMPT/TRAFFIC SIGNALIZATION
COMMERCE R615TA SCAB 0 0 0 METROLINK - RIV/LA VIA FULLERTON AT COMMERCE METROLINK STATION - PLATFORM CONSTRUCTION
20021231 TCM
COMPTON LA0C8223 SCAB 0 0 0 COMPTON MLK TRANSIT CENTER EXPANSION AND MULTI-MODAL/WILL ALLOW THE TRANSIT SYSTEM TO REDUCE OPERATING COST BY PROVIDING THE TRANSIT CONTRACTOR WITH A BUS YARD AND MAINT. CENTER.
20030630 NON-FEDERAL/NON-REGIONAL
COMPTON LA0C8246 SCAB 0 0 0 MTA BLUE LINE SAFETY CROSSING AT ARTERIAL ST. INTERSECTION-INSTALLATION OF QUAD GATES TO PREVENT TRAIN-RELATED ACCIDENTS AT THREE ARTERIAL STREET CROSSINGS ALONG THE MBL IN COMPTON
20020930 EXEMPT/TRAFFIC SIGNALIZATION
COVINA LA963753 SCAB 0 0 0 COVINA GRADE CROSSING SAFETY ENHANCEMENTS 97-98 TCI
20040619 NON-FEDERAL/NON-REGIONAL
COVINA LA9811080 SCAB 0 0 0 EASTLAND SATELLITE PARK n RIDE LOT (REPLACEMENT PARKING FOR EASTLAND SHOPPING CENTER -- 429 SPACES) (CROSS STREETS ARE BARRANCA/WORKMAN)
20021231 TCM
CULVER CITY MUNI BUS LINES
LA0B358 SCAB 0 0 0 PREVENTATIVE MAINTENANCE FOR THE CULVER CITYBUS OPERATION
20060630 EXEMPT/TRAFFIC SIGNALIZATION
CULVER CITY MUNI BUS LINES
LA0B400 SCAB 0 0 0 PROCUREMENT OF FOUR (4) 40' CNG EXPANSION BUSES/400K PER BUS
20041231 TCM
CULVER CITY MUNI BUS LINES
LA0B401 SCAB 0 0 0 PROCUREMENT OF ON-BOARD SECURITY. CAMERAS FOR THE ENTIRE CULVER CITY BUS FLEET TO INCREASE SECURITY AND AWARENESS
20031231 NON-FEDERAL/NON-REGIONAL
CULVER CITY MUNI BUS LINES
LA0B402 SCAB 0 0 0 PROCUREMENT OF REPLACEMENT NON-REVENUE VEHICLES. 1 VEHICLE IN FY02, 1 IN FY03, AND 3 IN FY04. ALL VEHICLES WILL BE CHG POWERED
20050630 EXEMPT/TRAFFIC SIGNALIZATION
CULVER CITY MUNI BUS LINES
LA0B403 SCAB 0 0 0 PROCUREMENT OF EIGHT (8) REPLACEMENT 40FT. CNG BUSES FOR THE CULVER CITY BUS LOCAL SERVICE. ALL BUSES WILL BE CNG AND REPLACE AN EQUAL NUMBER OF 1991 DIESEL BUSES.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CULVER CITY MUNI BUS LINES
LA0B407 SCAB 0 0 0 PROCUREMENT OF NEW RADIO COMMUNICATIONS
20050630 EXEMPT/TRAFFIC SIGNALIZATION
CULVER CITY MUNI BUS LINES
LA0C8382 SCAB 0 0 0 SEPULVEDA BLVD BUS STOP IMPROVEMENT PROGRAM. BUS STOP AMENITIES INC LIGHTING SIGNAGE, LANDSCAPING, SHELTERS, SEATING, LANDINGS AND TRASH RECEPTACLES.
20080831 TCM
2004 RTP * TECHNICAL APPENDIX I - 38
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CULVER CITY MUNI BUS LINES
LA0D90 SCAB 0 0 0 UNIVERSAL FARE SYSTEM/SMART CARD EQUIPMENT FOR 66 BUSES. REGIONAL PROJECT PREVIOUSLY APPROVED AS LA990313.
20050630 <OTHER>
CULVER CITY MUNI BUS LINES
LA52100 SCAB 0 0 0 OPERATING ASSISTANCE 20061231 EXEMPT/TRAFFIC SIGNALIZATION
CULVER CITY MUNI BUS LINES
LA52101 SCAB 0 0 0 COP DEBT SERVICE LOCAL MATCH IS IN-KIND THROUGH REAL ESTATE
20041231 <OTHER>
CULVER CITY MUNI BUS LINES
LA52104 SCAB 0 0 0 BODY AND PAINT REHAB PROGRAM 20061231 EXEMPT/TRAFFIC SIGNALIZATION
CULVER CITY MUNI BUS LINES
LA52105 SCAB 0 0 0 TIRE LEASING 20061231 EXEMPT/TRAFFIC SIGNALIZATION
CULVER CITY MUNI BUS LINES
LA52107 SCAB 0 0 0 PURCHASE ENGINES, TRANSMISSIONS, & OTHER SUBSTANTIAL BUS COMPONENTS.
20061231 EXEMPT/TRAFFIC SIGNALIZATION
CULVER CITY MUNI BUS LINES
LA963575 SCAB 0 0 0 ELECTRONIC FAREBOX UPGRADE 20021231 NON-FEDERAL/NON-REGIONAL
DOWNEY LA982251 SCAB 0 0 0 DEVELOP DOWNEY TRANSPO/TRANSIT CTR AND TRANSIT YARD- BUS SYSTEMS, METROLINK, AND LIGHT RAIL ACCESS IMPROVEMENTS- LA TO ORANGE CO INTERMODAL FACILITY- 68,000 SQ/FT - NANCE/LORENA
20021231 TCM
EL MONTE LA0B7296 SCAB 0 0 0 CROSSWALK IMPROVEMENT PROJECT.LOCATED AT RAMONA BL/VALLEY BL, PECK RD/VALLEY BL, PECK RD/LOWER AZUSA RD, PECK RD/RAMONA BL, RAMONA BL/SANTA ANITA
20040630 TCM
EL MONTE LA0C8323 SCAB 0 0 0 SAN GABRIEL VALLEY METRO HUB-IMPLEMENT NEW TRANSPORTATION STRATEGIES, INCLUDING AN ELECTRIC BIKE/SHUTTLE SERVICE/PARKING CONTROL PROGRAM.
20030830 TCM
FOOTHILL TRANSIT ZONE
LA01B118 SCAB 0 0 0 BUS SIMULATOR 20041231 EXEMPT/TRAFFIC SIGNALIZATION
FOOTHILL TRANSIT ZONE
LA0B0825 SCAB 0 0 0 BUS SYSTEM OPERATING EQUIPMENT -- EMISSION CONTROL EQUIPMENT
20041231 <OTHER>
FOOTHILL TRANSIT ZONE
LA0B308 SCAB 0 0 0 FOOTHILL TRANSIT ADMINISTRATIVE OFFICES
20040630 NON-FEDERAL/NON-REGIONAL
FOOTHILL TRANSIT ZONE
LA0B309 SCAB 0 0 0 CNG FUELING STATION 20050630 <OTHER>
FOOTHILL TRANSIT ZONE
LA0B310 SCAB 0 0 0 REPLACE (109) 40' BUSES (CNG) -- 51 IN FY03 AND 58 IN FY04.
20050601 EXEMPT/TRAFFIC SIGNALIZATION
FOOTHILL TRANSIT ZONE
LA0B311 SCAB 0 0 0 PARK AND RIDE FACILITY TRANSIT ORIENTED NEIGHBORHOOD PROGRAM
20030630 TCM
FOOTHILL TRANSIT ZONE
LA0C8362 SCAB 0 0 0 EL MONTE STATION IMPROVEMENT PROJECT-FUNDING WILL PROVIDE FOR NEW LIGHTING, INFORMATION SIGNAGE, AND OTHER PASSENGER AMENITIES.
20041230 TCM
FOOTHILL TRANSIT ZONE
LA0D12 SCAB 0 0 0 MINOR FACILITY IMPROVEMENTS -- POMONA, IRWINDALE, TRANSIT STORES, W. COVINA OFFICE AND IRWINDALE WAREHOUSE.
20050630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 39
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
FOOTHILL TRANSIT ZONE
LA0D13 SCAB 0 0 0 REPLACE FAREBOX/UFS 20050630 EXEMPT/TRAFFIC SIGNALIZATION
FOOTHILL TRANSIT ZONE
LA52400 SCAB 0 0 0 FY 2004-2005 OPERATING ASSISTANCE- TRANSIT OPERATIONS
20050630 <OTHER>
FOOTHILL TRANSIT ZONE
LA52402 SCAB 0 0 0 FY 2001/03 EXISTING BUS FLEET COP SUTRO A -- TRANSIT OPERATIONS
20040630 <OTHER>
FOOTHILL TRANSIT ZONE
LA52403 SCAB 0 0 0 COMPUTER EQUIPMENT/MAINTENANCE AND EIS
20050630 NON-FEDERAL/NON-REGIONAL
FOOTHILL TRANSIT ZONE
LA52411 SCAB 0 0 0 BUS COMPONENTS - RADIO, ANNUNTIATION AND RM
20050630 <OTHER>
FOOTHILL TRANSIT ZONE
LA62407 SCAB 0 0 0 LAND ACQUISITION AND CONSTRUCTION OF REPLACEMENT BUS PARKING AND_2ND MAINTENANCE FACILITY AT 4469 LIVEOAK AVE. IRWINDALE, CA IN LA UNINCORPORATED AREA
20021231 <OTHER>
FOOTHILL TRANSIT ZONE
LA963526 SCAB 0 0 0 BUS STOP ENHANCEMENT 20050630 TCM
FOOTHILL TRANSIT ZONE
LA963762 SCAB 0 0 0 MONROVIA TIMED TRANSFER CENTER 20040630 TCM
FOOTHILL TRANSIT ZONE
LA9811007 SCAB 0 0 0 AVL SYSTEM, ARRIVAL SIGNS, FUEL MGMT. SYSTEM AND CAROUSEL
20051231 TCM
GARDENA LA000507 SCAB 0 0 0 SECURITY/SURVEILLANCE EQUIPMENT 20041231 <OTHER>
GARDENA LA0C54 SCAB 0 0 0 PURCHASE OF FIVE TRANSIT SERVICE VEHICLES-GASOLINE POWERED-3 DRIVER RELIEF CARS, 1 SERVICE TRUCK, AND 1 ADMINISTRATIVE STAFF CAR.
20040630 <OTHER>
GARDENA LA0D21 SCAB 0 0 0 BUS STOP IMPROVEMENT PROJECT. PURCHASE NEW STOPS AND ZONES EQUIPMENT FOR GARDENA MUNICIPAL BUS LINE BUS STOPS.
20041101 EXEMPT/TRAFFIC SIGNALIZATION
GARDENA LA0D82 SCAB 0 0 0 PURCHASE OF THREE (3) 40 FT. EXPANSION BUSES.
20041231 <OTHER>
GARDENA LA0D91 SCAB 0 0 0 PURCHASE OF 'UNIVERSAL FARE SYSTEM' FARE COLLECTION EQUIPMENT FOR ALL GARDENA MUNICIPAL BUS LINES FIXED ROUTE BUSES. INCLUDES ALL RELATED COMPUTER EQUIPMENT, SOFTWARE, TESTING ETC.
20061231 <OTHER>
GARDENA LA52600 SCAB 0 0 0 FY 2001/02 OPERATING ASSISTANCE -- TRANSIT OPERATIONS
20031231 <OTHER>
GARDENA LA52603 SCAB 0 0 0 ANNUAL TIRE PURCHASE 20050630 EXEMPT/TRAFFIC SIGNALIZATION
GARDENA LA973010 SCAB 0 0 0 ENGINE REBUILDS FOR SERVICE FLEET 20051001 EXEMPT/TRAFFIC SIGNALIZATION
GARDENA LA973018 SCAB 0 0 0 TRANSMISSION REBUILDS FOR SERVICE FLEET
20051001 EXEMPT/TRAFFIC SIGNALIZATION
GARDENA LA9811008 SCAB 0 0 0 CONSTRUCTION OF A NEW ADMIN. & MAINTENANCE TRANSIT FACILITY. CROSS STREETS ARE 139TH ST AND WESTERN AVE..
20040530 EXEMPT/TRAFFIC SIGNALIZATION
GLENDALE LA0C8221 SCAB 0 0 0 COMPRESSED NATURAL GAS FUELING AND MAINTENANCE FACILITY; NEW PUMPING STATION WILL ALLOW FOR FLEET EXPANSION, AND REDUCE OPERATING COST.
20040331 <OTHER>
GLENDALE LA8STIP14 SCAB 0 0 0 METROLINK - SANTA CLARITA LINE PURCHASE 2 CNG HEAVY DUTY BUSES THEY ARE REPLACED EVERY 10 YEARS
20031231 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 40
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
GLENDALE LA963751 SCAB 0 0 0 METROLINK - SANTA CLARITA LINE GLENDALE TRANSPORTATION CENTER - UPGRADE STATION 96-97 TCI
20061231 TCM
GLENDALE LA996065 SCAB 0 0 0 CNG HVY DUTY TRANSIT VEHICLES PURCH 6 BUSES TO REMEDY EXISTING OVERCROWDING
20040630 TCM
INGLEWOOD LA990701 SCAB 0 0 0 PASSENGER TRANSFER FACILITY: OFF STREET, NE CRNR OF LA BREA & KELSO. WILL NOT ADD NEW SVC. PROVIDES SAFE OFF STREET TRANSFER FOR PASSENGERS.INGLEWOOD BUS. TRANSIT CENTER PHASE 2.
20021231 TCM
LA MIRADA LA53900 SCAB 0 0 0 OPERATING ASSISTANCE - TRANSIT OPERATIONS- DIAL-A-RIDE
20041231 EXEMPT/TRAFFIC SIGNALIZATION
LA MIRADA LA53902 SCAB 0 0 0 MAINTENANCE EQUIPMENT REPLACEMENT
20021231 NON-FEDERAL/NON-REGIONAL
LA MIRADA LA53903 SCAB 0 0 0 PURCHASE REPLACEMENT VANS:FY97=3 FY98=6,FY99=3,FY01=2,FY02=3,FY03=6 FY00=5
20041231 EXEMPT/TRAFFIC SIGNALIZATION
LA MIRADA LA73901 SCAB 0 0 0 TRANSIT FACILITY IMPROVEMENTS (LA MIRADA TRANSIT OFFICE FACILITY) 15679 PHOEBE, LA MIRADA, CA
20021231 NON-FEDERAL/NON-REGIONAL
LANCASTER LA974389 MDAB 0 0 0 RAILROAD PREEMPTION DEVELOP AN IMPROVED PREEMPTION FOR AT GRADE CROSSINGS ON A MAJOR RAILROAD LINE RUNNING THROUGH THE CITIES OF PALMDALE AND LANDCASTER
20061231 NON-FEDERAL/NON-REGIONAL
LONG BEACH LA0C8237 SCAB 0 0 0 FIRST ST PARKING STRUCTURE-LONG BEACH REDEVELOPMENT AGENCY. BUILD A 756-SPCE, 5 LEVEL PARKING STRUCTURE NEAR SOUTHERLY TERMINUS OF THE LONG BEACH BLUE LINE IN DOWNTOWN LONG BEACH.
20071231 NON-FEDERAL/NON-REGIONAL
LONG BEACH LA0C8331 SCAB 0 0 0 LONG BEACH WAYFINDING/TRANSIT CONNECTION PROGRAM-MAJORITY OF SIGNS WILL BE PEDESTRIAN, AND WILL INCLUDE MAPPING THAT DISPLAYS DESTINATIONS AND TRANSIT OPTIONS.
20040830 TCM
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA01B107 SCAB 0 0 0 CAPITALIZATION OF PREVENTIVE MAINTENANCE
20030630 EXEMPT/TRAFFIC SIGNALIZATION
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA01B108 SCAB 0 0 0 EMPLOYEE TUITION AND DIRECT EDUCATIONAL EXPENSES RELATING TO TRANSIT
20031231 EXEMPT/TRAFFIC SIGNALIZATION
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA01B109 SCAB 0 0 0 SHOP EQUIPMENT (MISCELLANEOUS) 20030630 EXEMPT/TRAFFIC SIGNALIZATION
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA01B110 SCAB 0 0 0 BIKE RACKS ON BUSES 20030630 TCM
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA01B119 SCAB 0 0 0 OFFICE EQUIPMENT 20030630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 41
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA0B0842 SCAB 0 0 0 INFORMATION SYSTEMS/EDP EQUIPMENT
20030630 EXEMPT/TRAFFIC SIGNALIZATION
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA0C8320 SCAB 0 0 0 SOUTHEAST REGIONAL TRANSIT INFORMATION NETWORK-WILL MAKE USERS IDENTIFY THE TRANSIT OPTION THAT BEST MEETS THEIR INDIVIDUAL NEEDS BY SERVING AS A ONE STOP SOURCE.
20030830 TCM
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA0C8383 SCAB 0 0 0 LONG BEACH TRANSIT: BUS STOP IMPROVEMENT PROJ. ENHANCE 9 OF RAIL STATION FEEDER BUS STOPS TO EASE TRANSFERS, MAKE PUBLIC TRANSIT MORE AESTHETICALLY PLEASING & SAFER, INC RIDERSHIP.
20041231 TCM
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA0D15 SCAB 0 0 0 AUTOMATIC PASSENGER COUNTERS PASSPORTS
20040630 EXEMPT/TRAFFIC SIGNALIZATION
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA0D16 SCAB 0 0 0 TRANSIT MALL INFORMATION SYSTEM AND REGIONAL BUS SIGNAGE
20040330 EXEMPT/TRAFFIC SIGNALIZATION
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA0D17 SCAB 0 0 0 JOINT SIGNAGE PROJECT BETWEEN LONG BEACH TRANSIT AND MTA
20030630 EXEMPT/TRAFFIC SIGNALIZATION
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA0D18 SCAB 0 0 0 FLEET REPLACEMENT UP TO 20 9200'S HEAVY DUTY ALTERNATIVE FUEL WITH ADA EQUIPMENT.
20050630 EXEMPT/TRAFFIC SIGNALIZATION
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA0D19 SCAB 0 0 0 UP TO 20 FLEET REPLACEMENT 9300'S HEAVY DUTY ALTERNATIVE FUEL WITH ADA EQUIPMENT
20060630 EXEMPT/TRAFFIC SIGNALIZATION
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA0D20 SCAB 0 0 0 TIRE LEASE 20040630 EXEMPT/TRAFFIC SIGNALIZATION
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA54600 SCAB 0 0 0 OPERATING ASSISTANCE 20031231 EXEMPT/TRAFFIC SIGNALIZATION
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA64802 SCAB 0 0 0 FLEET REHABILITATION 20021231 NON-FEDERAL/NON-REGIONAL
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA900514 SCAB 0 0 0 MISCELLANEOUS FACILITY IMPROVEMENTS
20040630 EXEMPT/TRAFFIC SIGNALIZATION
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA973027 SCAB 0 0 0 SUPPORT VEHICLES 20030630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 42
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA973028 SCAB 0 0 0 PURCHASING ENGINES AND OTHER BUS PARTS
20040630 EXEMPT/TRAFFIC SIGNALIZATION
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA973029 SCAB 0 0 0 BUS STOP AMENITIES 20040630 TCM
LONG BEACH PUBLIC TRANSPORTATION COMPANY
LA973030 SCAB 0 0 0 SAFETY PROJECTS_FOR BUS MNTC. FACILITY
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA0B7004 SCAB 0 0 0 VEHICLE ACQUISITION FOR EAST LOS ANGELES FIXED ROUTE SHUTTLE SERVICE PHASE II-PURCHASE OF 3 VEHICLES WILL INCREASE FREQUENCY OF THE EXISTING 3 SHUTTLES SERVICE ROUTES
20021231 TCM
LOS ANGELES COUNTY
LA963535 SCAB 0 0 0 LOS ANGELES CO.,DEPT. OF PUB. WRKS ANTELOPE VALLEY RURAL FIXED ROUTE AND DIAL-A-RIDE SERVICES
20041231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA974181 SCAB 0 0 0 LAC+USC MEDICAL CENTER BUS TRANSIT STATION FACILITY WILL HAVE 4 BUS BAYS AND 4 LAYOVER BAYS BUS STOP IMPROVEMENT PRJ
20021231 TCM
LOS ANGELES COUNTY
LA996044 SCAB 0 0 0 VEH ACQ FOR EST L.A. SHUTTLE PURCH 4 VEH'S TO REMEDY EXISTING OVERCROWDED CONDITIONS
20021231 TCM
LOS ANGELES COUNTY
LA996075 SCAB 0 0 0 HAHN'S TROLLEY & SHUTTLE SRV REHAB REHAB 3 TROLLEY TYPE VEH & 3 VANS TO REDUCE OVERCROWDING
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
R616TA SCAB 0 0 0 METROLINK - SANTA CLARITA LINE AT VINCENT HILL/ACTON GRADE METROLING STATION - INSTALL TRAFFIC SIGNALS, CANOPY, PAVING, LIGHTING
20021231 TCM
LOS ANGELES COUNTY MTA
(Rapid) SCAB 0 0 0 METRO RAPID EXPANSION - SOUTH BROADWAY '02, VERMONT '02, FLORENCE '03, VAN NUYS '03, SOTO '04, CRENSHAW-ROSSMORE '04, HAWTHORNE '05, LONG BEACH BLVD '05, HOLLYWOOD-FAIRFAX-PASADENA '05, BEVERLY '05, VERNON-LA CIENEGA '04, SEPULVEDA (NORTH) '05
2005
LOS ANGELES COUNTY MTA
7050 SCAB 0 0 0 METRO RAIL BLUE LINE-LONG BEACH/LA WILMINGTON AVENUE AT IMPERIAL HIGHWAY - OVERCROSSING
20021231 TCM
LOS ANGELES COUNTY MTA
LA01B101 SCAB 0 0 0 COOPERATIVE PURCHASE OF HYBRID ELECTRIC COACHES BY MTA AND INTERESTED MUNICIPAL OPERATORS AS A TEST PROGRAM ( 2001 CFP 8116 )
20061031 TCM
LOS ANGELES COUNTY MTA
LA01B120 SCAB 0 0 0 EXPANSION OF DIVISION 1 TO ADD ADDITIONAL CAPACITY OF APPROX 67 BUSES AND ADDITIONAL PARKING SPACE OF EMPLOYEES. ACQUISITION OF A VACANT PARCEL SOUTH OF DIV 1
20031231 TCM
LOS ANGELES COUNTY MTA
LA0B0831 SCAB 0 0 0 MAYWOOD, COMMERCE, BELL, CUDAHY BUS & BUS FACILITY UPGRADE/IMPROVEMENTS
20040630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA0B303 SCAB 0 0 0 ACQUISITION OF TROLLEY BUSES (2) AND CHARGING STATIONS FOR THE CITY OF MONROVIA'S DOWNTOWN TROLLEY SERVICE
20040630 TCM
2004 RTP * TECHNICAL APPENDIX I - 43
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES COUNTY MTA
LA0B304 SCAB 0 0 0 PLAYA VISTA EARNMARK, PURCHASE NEW (5) LOW-EMISSION BUSES, TRACKING EQUIP & BUS AMENITIES INCLUDING PASSENGER SHELTERES, INFO KIOSKS & APPURTENANT EQUIP - TRANSIT SERVICE UPGRADE.
20040630 TCM
LOS ANGELES COUNTY MTA
LA0B7023 SCAB 0 0 0 GET ABOUT FLEET IMPROVE (POMONA VAL TRANS. AUTHORITY)-PURCHASE 18, 21 PASSENGER VEHIC TO INCR CAPACITY OF SUBREG PARATRANSIT SYS
20021231 TCM
LOS ANGELES COUNTY MTA
LA0B7101 SCAB 0 0 0 METRO BLUE LINE SAFETY IMPROVEMENTS-INSTALLATION OF TYPES OF SAFETY DEVICES ALONG THE EXISTING LONG BEACH BLUE LINE INCLUDING QUAD GATES, PED. GATES, AND SECURITY DEVICES
20041231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA0C8114 SCAB 0 0 0 LOS ANGELES COUNTY RIDESHARE SERVICES; PROVIDE COMMUTE INFORMATION, EMPLOYER ASSISTANCE AND INCENTIVE PROGRAMS THROUGH CORE & EMPLOYER RIDESHARE SERVICES & MTA INCENTIVE PROGRAMS.
20090630 TCM
LOS ANGELES COUNTY MTA
LA0C8118 SCAB 0 0 0 TDM PROGRAM ENHANCEMENT 20041230 TCM
LOS ANGELES COUNTY MTA
LA0C8228 SCAB 0 0 0 EL SERENO BUS OPERATOR RESTROOM. DESIGN AND CONSTRUCT A UNISEX BUS OPERATOR RESTROOM TO SERVE MTA BUS OPERATOR AT THE EL SERENO TRANSIT CTR.
20080531 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA0C8311 SCAB 0 0 0 UCLA BRUIN GO! TRANSIT PASS DEMONSTRATION. DEMONSTRATION PROJECT WILL INITIALLY OPERATE IN CONJUNCTION WITH SANTA MONICA BIG BLUE BUS (BBB), BY USING UCLA'S ID/DEBIT CARD.
20030830 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA0D22 SCAB 0 0 0 CAPITAL COSTS OF CONTRACTING -- LEASES OF TRANSIT VEHICLES
20100731 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA0D23 SCAB 0 0 0 ADVANCED TRANSPORTATION MANAGEMENT SYSTEM (ATMS); INCLUDES GPS, RADIOS, AND OTHER RELATED EQUIPMENT (CMAQ-RTAA)
20100730 <OTHER>
LOS ANGELES COUNTY MTA
LA0D38 SCAB 0 0 0 PURCHASE A MINIMUM OF 200 CLEAN AIR LIGHT-DUTY VEHICLES (UP TO 225, DEPENDING ON ULTIMATE PURCHASE ORDER) ALL VEHICLES WILL BE OPERATIONAL WITHIN 6 TO 12 MONTHS.
20030630 TCM
LOS ANGELES COUNTY MTA
LA29202U1 SCAB 0 0 0 SAN FERNANDO VALLEY EAST/WEST BRT (FROM THE TERMINUS OF THE METRO RED LINE HEAVY RAIL IN NO HOLLYWOOD TO WARNER CENTER)14-MILE EXCLUSIVE BUS LANES LOCATED IN FORMER RAIL ROAD ROW
20050430 TCM
LOS ANGELES COUNTY MTA
LA29202V SCAB 0 0 0 EASTSIDE TRANSIT CORRIDOR - UNION STATION TO ATLANTIC VIA 1ST ST. TO LORENA, THEN 3RD ST. VIA 3RD/BEVERLY BLVD. TO ATLANTIC (EASTSIDE LRT)
2009 TCM
LOS ANGELES COUNTY MTA
LA29202W SCAB 0 0 0 MID -CITY TRANSIT CORRIDOR: WILSHIRE BLVD. METRO RAPID TO WESTERN, RAPID TRANSITWAY FROM WESTERN TO SANTA MONICA
2009 TCM
2004 RTP * TECHNICAL APPENDIX I - 44
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES COUNTY MTA
LA29202X SCAB 0 0 0 METRO RED LINE MOS-3: N. HOLLYWOOD 5.9-MILE W/ 3 STATIONS, HIGHLAND TO N.HOLLYWOOD STA. 15,370+ 746= 16,117 118,630+5,754=124,384
20021231 TCM
LOS ANGELES COUNTY MTA
LA29212X SCAB 0 0 0 METRO RAIL BLUE LINE - PASADENA EXT UNION STA TO SIERRA MADRE VILLASTA 13.5 MILES, 12 STATIONS
20030731 TCM
LOS ANGELES COUNTY MTA
LA59814 SCAB 0 0 0 RAIL CAPITAL SUPPORT 20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA962165 SCAB 0 0 0 HOLLYWOOD TRANSPORTATION MANAGEMENT ORGANIZATION IMPROVE TRANSIT ACCESSIBILITY
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA962241 SCAB 0 0 0 INTRACOMMUNITY BUS, VANPOOL AND PARATRANSIT TRACKING SYSTEM
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA962243 SCAB 0 0 0 SAN GABRIEL VALLEY COUNCIL OF GOVERNMENTS TRANSIT RESTRUCTING STUDY
20031231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA962352 SCAB 0 0 0 SOUTH BAY PARK & RIDE SMART SHUTTLE GREEN LINE CIRCULATOR NO SHUTTLE NUMBER
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA962405 SCAB 0 0 0 CUSTOMER SATISFACTION/SERVICE PLANNING/MARKET RESEARCH PROJECT
20021231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA963542 SCAB 0 0 0 ACQUISTION REVENUE VEHICLES - 2,513 CLEAN FUEL BUSES: LEASED VEH, FY02 (370); +30 HC; FY03 -FY06 TOTAL OF 516
20051231 TCM
LOS ANGELES COUNTY MTA
LA963543 SCAB 0 0 0 PREVENTIVE MAINTENANCE (CAPITAL & OPERATING MAINTENANCE ITEMS ONLY)
20041231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA963546 SCAB 0 0 0 BUS & RAIL CAPITAL, INCLUDES FACILITY UPGRADE, EQUIP, SPARE PARTS, NON-REV VEHICLES, MAINTENANCE SUPPORT, UNIV FARE COLLECTION.
20050630 <OTHER>
LOS ANGELES COUNTY MTA
LA963549 SCAB 0 0 0 TAYLOR YARD ART PROGRAM -- PUBLIC ART PROGRAM REQUIRED TO MITIGATE IMPACTS OF METROLINK MAINTENANCE FACILITY ON COMMUNITY
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA963755 SCAB 0 0 0 CHINATOWN INTERMODAL IMPROVEMENT TO DEVELOP A CONNECTION FROM BLUE LINE - PASADENA (CHINATOWN STATION TO BROADWAY STREET) 97-98 TCI
20021231 TCM
LOS ANGELES COUNTY MTA
LA972013 SCAB 0 0 0 AUTOMATED TRANSPORTATION MONITORING DEMO SYSTEM (MTA 96 RECERTIFICATION PROJ)
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA972133 SCAB 0 0 0 METRO REDLINE WILSHIRE/WESTERN STATION ENHANCEMENTS PASSENGER AMENITY PROJECT (MTA 96 RECERTIFICATION PROJ)
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA974036 SCAB 0 0 0 EL SEGUNDO GREEN LINE SHUTTLE OPERATE THREE SEPARATE PEAK HOUR SHUTTLE SERVICES CONNECTING METRO GREEN LINE WITH EMPLOYMENT DISTRICT SERVICE OPERATES ON WEEKDAYS ONLY
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA974049 SCAB 0 0 0 METRO GREEN LINE SHUTTLE-LAKEWOOD. STATION LINE 631 A RAIL FEEDER SERVICE FIXED ROUTE DURING PEAK HOURS FLEXIBLE UNSCHEDULED STOPS AT MIDAY
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
LA974158 SCAB 0 0 0 SOUTHBAY TRANSIT STOP IMPROVEMENTS PROJECT WILL FUND 13 BUS SHELTERS AND 6 BUS PADS (SBCOG)
20021231 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 45
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES COUNTY MTA
LA974176 SCAB 0 0 0 AUTOMATED PASSENGER COUNTER SYSTEM INCLUDES HARDWARE AND SOFTWARE TO BE INSTALLED ON 25% OF THE OPERATIONAL FLEET OF REVENUE VEHICLES IN PASSENGER SERVICE
20021130 <OTHER>
LOS ANGELES COUNTY MTA
LA990305 SCAB 0 0 0 LIGHT RAIL TRANSIT FLEET- 50 NEW RAIL CAR
20031231 TCM
LOS ANGELES COUNTY MTA
LA990306 SCAB 0 0 0 RAPID BUS PROGRAM - 4 - FORTY FOOT BUSES. ALSO FACILITY: BUS STOP DESIGN AND CONSTRUCTION, TECHNOLOGY UPGRADING, OPERATING SUPPORT.
20070630 TCM
LOS ANGELES COUNTY MTA
LA990764 SCAB 0 0 0 ACCESS TO JOBS - WELFARE TO WORK OPERATIONS, PLANNING, CAPITAL ACUISITION (EARMARK)
20070630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA996435 SCAB 0 0 0 FUEL CELL POWERD ADV TECH TRAN BUS (FUEL CELL BUYERS CONSORTIUM) DEV COMMERCIALY VIABLE FUEL CELL PWRD REPLCNG DIESEL-PWRD BUSES
20031231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
R626TA SCAB 0 0 0 METRO RAIL BLUE LINE - PASADENA EXT AT CHINATOWN METROLINK STATION - ACCESS IMPROVMENTS
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES COUNTY MTA
T613TA SCAB 0 0 0 SPIRIT BUS REHABILITATION AND UPGRADE TO INCLUDE ADA IMPROVMENTS
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA0B7002 SCAB 0 0 0 ATHENS/LENNOX/WILLOWBROOK/FLORENCE ET AL BUS SHELTER INSTALLATION-ENHANCE PASSENGER FACILITIES AT BUS STOPS, IMPROVE PASSENGER COVENIENCE
20021231 TCM
LOS ANGELES, CITY OF
LA0B7024 SCAB 0 0 0 METRO RED LINE MELROSE SHUTTLE-ACQUISITION OF 2 LOW FLOOR, PROPANE-POWERED, 30-FOOT BUSES WILL BE USED IN THE OPERATION OF A NEW HIGH FREQUENCY SHUTTLE
20021231 TCM
LOS ANGELES, CITY OF
LA0B7026 SCAB 0 0 0 METRO RED LINE/WEST HOLLYWOOD/BEVERLY CENTER/CEDER SINAI SHUTTLE-ACQUIRE 7 NEW 30-FOOT, PROPANE-FUELED, DASH STYLE BUSES FOR THE OPERATION OF A HIGH FREQUENCY SHUTTLE
20021231 TCM
LOS ANGELES, CITY OF
LA0B7029 SCAB 0 0 0 MID-CITIES ET AL TRANSIT HUBS-TWO AREAS INCLUDE MID-CITIES TRANSIT HUBS (5), WINDWARD CIRCLE TRANSIT HUB (1)
20031231 <OTHER>
LOS ANGELES, CITY OF
LA0B7034 SCAB 0 0 0 SUN VALLEY INTERMODAL TRANSIT CENTER; PEDESTRIAN CROSSING/BUS STOP IMPROVEMENT-PROVIDE PED. CROSSINGS AT EACH END OF THE PLATFORM OF SOON TO BE BUILT SUN VALLEY METROLINK STATION
20031231 TCM
LOS ANGELES, CITY OF
LA0B7274 SCAB 0 0 0 CITYWIDE ST PEDESTRIAN IMPROVEMENT-CONSISTS OF A SERIES OF STREETSCAPE ENHANCEMENTS WITHIN DOWNTOWN LA DESIGNED TO STRENGTHEN THE PEDESTRIAN LINKAGE BETWEEN DOWNTOWN DESTINATIONS.
20021231 TCM
LOS ANGELES, CITY OF
LA0B7278 SCAB 0 0 0 NORTHEAST COMMUNITY LINKAGES PHASE II-HIGHLIGHT PEDESTRIAN CONNCTNS W/RAIL & BUS LINES ALONG MARMION WAY AND AT PASADENA AVE, FIGUEROA ST, FRENCH AVE, AND AVE 45, 50, 60, 61.
20021231 TCM
2004 RTP * TECHNICAL APPENDIX I - 46
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES, CITY OF
LA0B7285 SCAB 0 0 0 ALISO VILLAGE PEDESTRIAN LINKAGE PROJECT-LINK THE NEW RECONSTRUCTED ALISO VILLAGE PUBLIC HOUSING DEVELOPMENT TO THE 2ND ST TRANSIT WAY & METRO RAIL STATION AT FIRST AND BOYLE ST.
20021231 TCM
LOS ANGELES, CITY OF
LA0B7290 SCAB 0 0 0 VERMONT SIDEWALK WIDENING/TRANSIT AVENIDA: EXPOSITION BLVD TO I-10-ENHANCE THE PEDESTRIAN ENVIRONMENT/INCREASE SAFETY ON VERMONT AVE
20031231 TCM
LOS ANGELES, CITY OF
LA0B7293 SCAB 0 0 0 SAN PEDRO PEDESTRIAN WAY-PROVIDE PEDESTRIAN ACCESS WAYS LINKING EXISTING TRANSIT FACILITIES AND PROPOSED PARKING STRUCTURE TO SURROUNDING & OTHER DESTINATIONS IN DOWNTOWN SAN PEDRO
20031231 TCM
LOS ANGELES, CITY OF
LA0C08 SCAB 0 0 0 REPLACE FIFTY-THREE (53) PARATRANSIT VEHICLES. FOURTEEN (14) ULEV GASOLINE VEHICLES IN YEAR 02 AND THIRTY-NINE (39) ULEV GASOLINE VEHICLES IN 03.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA0C8241 SCAB 0 0 0 PICO UNION/ECHO PARK DASH VEHICLE PROCUREMENT. PURCHASE (3) LOW-FLOOR, PROPANE-POWERED 30' BUSES FOR THE PICO/UNION ECHO PARK SHUTTLE SERVICE.
20041231 TCM
LOS ANGELES, CITY OF
LA0C8303 SCAB 0 0 0 ANGELS FLIGHT RAILWAY PLAZA. ENHNCMENT OF SYSTM & DEVT OF LOWER PLAZA INCL KIOSKS, INCLDS INSTALLING, WAITING & SEATING AREAS, LIGHTING, CNNCTIONS BET HILL ST & ADJCENT RED LINE ST
20050630 TCM
LOS ANGELES, CITY OF
LA0C8318 SCAB 0 0 0 LA CITY AND SORROUNDING COMMUNITIES BICYCLE MAP-PROJECT WILL UPDATE BIKEWAY MAPPING INFO. FOR THE CITY OF LA AND PLOT BYCYCLE LANE AND PATH INFORMATION ON A NEW MAP.
20040830 TCM
LOS ANGELES, CITY OF
LA0C8324 SCAB 0 0 0 BICYCLE PARKING AT FIVE GOLD LINE STATIONS-PROJECT WILL INSTALL BICYCLE PARKING AND LOCKERS AT FIVE OF THE SIX PASADENA BLUE LINE STATIONS LOCATED WITHIN THE CITY OF LA.
20030830 TCM
LOS ANGELES, CITY OF
LA0C8385 SCAB 0 0 0 EL SERENO DASH PROCUREMENT. PURCHASE (2) LOW-FLOOR, PROPANE POWERED, 30' FOOT BUSES FOR THE EL SERENO DASH SERVICE.
20081231 TCM
LOS ANGELES, CITY OF
LA54900 SCAB 0 0 0 OPERATING ASSISTANCE (TRANSIT OPERATIONS)
20041231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA8STIP11 SCAB 0 0 0 DASH UNION/ECHO PARK VEHICLE PURCHASE
20021231 <OTHER>
LOS ANGELES, CITY OF
LA8STIP12 SCAB 0 0 0 DASH EL SERENO VEHICLE PURCHASE 20031231 <OTHER>
LOS ANGELES, CITY OF
LA962123 SCAB 0 0 0 TRANSIT SHELTERS IN 8 LANI AREAS 20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA962445 SCAB 0 0 0 WESTLAKE COMMUNITY BASED INTERCEPT INTERMODAL FACILITY
20021230 TCM
2004 RTP * TECHNICAL APPENDIX I - 47
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES, CITY OF
LA974002 SCAB 0 0 0 DOWNTOWN DESTINATIONS BY TRANSIT DEMO PROJECT A PUBLIC/PRIVATE VENTURE PUBLIC TRANSIT INFORMATION DISPLAY/ KIOSKS AT 10 DIFFERENT LOCATIONS
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA974004 SCAB 0 0 0 TRANSPORTATION INFORMATION ACCESS TERMINALS INSTALL IN THE NORTHEAST TRANSIT STORE IN LINCOLN HEIGHTS AND THE CONSTITUENT SERVICE CENTER IN LA
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA974040 SCAB 0 0 0 METRO GREEN LINE SHUTTLE - AVIATION STATION TO CITY BUS CENTER OPERATE TWO WEEKDAY, PEAK HOUR SHUTTLE SERVICE
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA974068 SCAB 0 0 0 TRIP INFORMATION ELECTRONIC KIOSK AT TRANSIT CENTERS PURCHASE, RETROFIT, INSTALL AND MAINTAIN 5 TRAVELER INFORMATION KIOSKS AT METROLINK STATIONS
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA974153 SCAB 0 0 0 WILSHIRE/WESTERN TRANSIT CENTER ACQUIRE PARCELS OF LAND SURROUNDING THE EXISTING METRO RED LINE WILSHIRE/WESTERN STATION
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA974159 SCAB 0 0 0 WARNER CENTER TRANSIT HUB WILL PROVIDE 15 LAYOVER BAYS AND 5 BUS BAYS FOR PASSENGER LOADING
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA974165 SCAB 0 0 0 MACARTHUR PARK STATION IMPROVEMENTS INCLUDE DESIGN AND CONSTRUCTION OF A PLAZA TO ACCOMODATE PUBLIC ACCESS (PEDESTRIAN ENTRABCES, WALKWAYS, BICYCLE FACILITIES)
20021231 TCM
LOS ANGELES, CITY OF
LA974193 SCAB 0 0 0 TRANSIT CENTERS DEVELOP OR EXPAND 3 TRANSIT CENTERS (IMPROVE EXISTING BUS STOP/CENTER)
20021231 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA996000 SCAB 0 0 0 DASH PICO UNION/ ECHO PRK VEH ACQ PURCHASE ONE BUS TO RELIEVE OVERCROWDING
20031231 TCM
LOS ANGELES, CITY OF
LA996001 SCAB 0 0 0 DASH EL SERENO/CTY TERR VEH ACQ PURCHASE2 BUSES TO REDUCE OVERCROWDING
20031231 TCM
LOS ANGELES, CITY OF
LA996002 SCAB 0 0 0 DASH WILMINTON VEH ACQUISITION PURCHASE 2 BUSES TO RELIEVE OVERCROWDING
20031231 TCM
LOS ANGELES, CITY OF
LA996003 SCAB 0 0 0 DASH WATTS VEH ACQUISITION PURCH 2 VEH'S TO REDUCE EXISTING OVERCROWDING
20031231 TCM
LOS ANGELES, CITY OF
LA996004 SCAB 0 0 0 DASH KING-EAST VEH ACQUISITION FINANCE THE ACQ OF 5 BUSES TO REDUCE OVERCROWDING
20061231 TCM
LOS ANGELES, CITY OF
LA996005 SCAB 0 0 0 DASH HLLYWOOD VEH ACQUISITION ACQUIRE TWO BUSES TO REDUCE EXISTING OVERCROWDING
20031231 TCM
LOS ANGELES, CITY OF
LA996006 SCAB 0 0 0 DASH VERMNT-MAIN VEH ACQUISITION PURCH 5 BUSESTO RELIEVE EXISTING OVERCROWDING
20061231 TCM
LOS ANGELES, CITY OF
LA996007 SCAB 0 0 0 DASH MANCHSTR-FLORNCE VEH ACQ PURCH 5 BUSES TO RELIEVE EXISTING OVERCROWDING
20061231 TCM
LOS ANGELES, CITY OF
LA996010 SCAB 0 0 0 COMM EXPRESS 448 VEH ACQUISITION PURCH 3 BUSES TO REDUCE EXISTING OVERCROWDING
20030630 TCM
LOS ANGELES, CITY OF
LA996011 SCAB 0 0 0 ROWAN SHUTTLE VEH ACQUISITION PURCH 2 BUSES TO REDUCE EXISTING OVERCROWDED CONDITIONS
20030630 TCM
2004 RTP * TECHNICAL APPENDIX I - 48
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES, CITY OF
LA996012 SCAB 0 0 0 DNTWN SAN PEDRO TRAN HUB DEV DEV MIXED TRANSIT HUB IN SAN PEDRO P/E ONLY.
20080630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA996015 SCAB 0 0 0 EAST LA/MID-CTY TRANS STOP IMPROV DESGN BUS STP IMPRVMNTS ALONG PICO, WHITTIER BD, WILSHIRE BD, 1ST ST, 6TH ST, CESAR CHAVEZ AVE.
20030630 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA996017 SCAB 0 0 0 WESTSIDE TRANSIT HUBS PASS SHELTERS AND BUS STOP IMPROVEMENTS
20030630 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA996020 SCAB 0 0 0 VERMONT AVE. BUS STP IMPROVMNT DESIGN BUS STP IMPRVMNTS ALONG VERMONT CORR, SHELTERS, BENCHES, LIGHTING
20030630 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA996027 SCAB 0 0 0 SAN FERN VLY TRANSIT HUBS BUS STOP IMPROV TO INCLUDE, SHELTER BENCHES, LIGHTING
20030630 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA996028 SCAB 0 0 0 CNTRL/EAST/NRTHEST TRANS HUBS BUS STOP IMPRVMNTS TO INCLUDE BNCHS SHELTER, LIGHTING, TRSH RECEPTACLES
20030630 NON-FEDERAL/NON-REGIONAL
LOS ANGELES, CITY OF
LA996241 SCAB 0 0 0 CHANDLER BIKEWAY EXTENSION-DESIGN & CONSTRUCT .5 MILE EXT, CYCLIST SHOWER AND LOCKER FACILITY AT HISTORIC TRAIN STATION ACROSS FROM CHANDLER BLVD. FROM THE METRO RED LINE STATION.
20040630 TCM
LOS ANGELES, CITY OF
R627TA SCAB 0 0 0 METRO RAIL RED LINE AT WESTLAKE COMMUNITY INTERMODAL INTERCEPT FACILITY - DESIGN 1,100 SPACE PARKING STRUCTURE CROSSSTREETS ARE ALVARADO/MACARTHUR
20021230 TCM
MONROVIA LA0C8250 SCAB 0 0 0 MONROVIA RAILROAD DEPOT MULTI-MODAL TRANSIT CENTER; STABILIZING STRUCTURE AND THEN OVERALL STRUCTURAL ELEMENTS WILL BE REPAIRED FOLLOWED BY RESTORING KEY ARCHITECTURAL FEATURES.
20050228 TCM
MONROVIA LA0D27 SCAB 0 0 0 DESIGN AND CONSTRUCT CNG FUELING STATION
20051231 EXEMPT/TRAFFIC SIGNALIZATION
MONTEBELLO LA000504 SCAB 0 0 0 PURCHASE AND INSTALLATION OF ON BOARD BIKE RACKS.
20031231 TCM
MONTEBELLO LA000508 SCAB 0 0 0 BUS TECHNOLOGY FOR TRANSIT VEHICLES (PASSENGER INFORMATION SYSTEMS, DIGITAL RECORDING)
20031231 NON-FEDERAL/NON-REGIONAL
MONTEBELLO LA0B357 SCAB 0 0 0 TECHNOLOGY SYSTEMS -- SOFTWARE 20060630 EXEMPT/TRAFFIC SIGNALIZATION
MONTEBELLO LA0D94 SCAB 0 0 0 PURCHASE OF AUTOMATED FARE COLLECTION SYSTEM FOR PARTICIPATION IN THE LOS ANGELES COUNTY UNIVERSAL FARE SYSTEM PROGRAM. PREVIOUSLY TIP# LA0D07
20061231 <OTHER>
MONTEBELLO LA45212 SCAB 0 0 0 LAND ACQUISITION FOR TRANSIT PURPOSES (ONGOING)
20100630 NON-FEDERAL/NON-REGIONAL
MONTEBELLO LA55012 SCAB 0 0 0 REPLACE BUSES- 2000 (5) 40' BUSES AND (10) 40' EXPANSION BUSES
20031231 TCM
MONTEBELLO LA55201 SCAB 0 0 0 CONTINUING PROJECT - BUS STOP IMPROVEMENTS ,AMENITIES ,SHELTERS ,ETC
20101231 TCM
MONTEBELLO LA55205 SCAB 0 0 0 ASSOCIATED CAPITAL MAINTENANCE ITEMS (ONGOING)
20100630 EXEMPT/TRAFFIC SIGNALIZATION
MONTEBELLO LA55206 SCAB 0 0 0 DAR REPLACEMENT VANS; 2 REPLACEMENT VANS
20050630 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 49
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
MONTEBELLO LA55207 SCAB 0 0 0 TRANSIT COACH TIRE (LEASE) (ONGOING)
20101231 EXEMPT/TRAFFIC SIGNALIZATION
MONTEBELLO LA55216 SCAB 0 0 0 ONGOING CORPORATE YARD MISCELANEOUS IMPROVEMENTS FOR THE TRANSIT FACILITY AT THE EXISTING LOCATION: 311 SOUTH GREENWOOD AVE. MONTEBELLO & 400 S. TAYLOR AVE. MONTEBELLO
20101231 EXEMPT/TRAFFIC SIGNALIZATION
MONTEBELLO LA962037 SCAB 0 0 0 IMPROVEMENTS AND RECONSTRUCTION OF THE MONTEBELLO/COMMERCE METROLINK TRANSIT CENTER 96-97 TCI
20021231 NON-FEDERAL/NON-REGIONAL
MONTEBELLO LA963522 SCAB 0 0 0 TRANSIT SECURITY PROJECT:1997 -- SURVEILLANCE SYSTEM FOR NEW ADMIN FACILITY & METROLINK STA; 98-00 ON BOARD CAMERA SYSTEM; TRANSIT CENTER SYSTEM (3) SECURITY SERVICES
20031231 NON-FEDERAL/NON-REGIONAL
MONTEBELLO LA963525 SCAB 0 0 0 FARE COLLECTION EQUIPMENT 20051231 EXEMPT/TRAFFIC SIGNALIZATION
NORWALK LA0B0841 SCAB 0 0 0 PURCHASE TWO (2) 40-FT GILLIG + SHORTFALL
20031231 TCM
NORWALK LA0D43 SCAB 0 0 0 CAPITALIZATION OF PREVENTIVE MAINTENANCE FY02/03.
20030630 <OTHER>
NORWALK LA0D93 SCAB 0 0 0 IMPLEMENTATION OF THE UNIVERSAL FARE SYSTEM (UFS) PROJECT AT NORWALK TRANSIT. REFERENCE TIP# LA990313 MUNICIPAL UFS PROGRAM COORDINATION THROUGH SANTA MONICA'S BIG BLUE BUS.
20071230 <OTHER>
NORWALK LA55400 SCAB 0 0 0 OPERATING ASSISTANCE FOR TRANSIT OPERATIONS AND DIAL-A-RIDE
20031231 NON-FEDERAL/NON-REGIONAL
NORWALK LA65406 SCAB 0 0 0 REPLACE 2 BUSES (30FT) ALTERNATIVE FUEL / TRANSIT STORE OPERATIONS
20030630 EXEMPT/TRAFFIC SIGNALIZATION
NORWALK LA982252 SCAB 0 0 0 CONSTRUCT OPERATIONS SUPPORT FACILITY TRANSPO ADMIN, OPERATIONS, MAIN- TENCE PUBLIC SERVICE TRANSIT CTR AT CIVIC CENTER DR.
20021230 <OTHER>
PALMDALE LA0C8326 SCAB 0 0 0 PALMDALE TRANSPORTATION CENTER COMMUTER SERVICE CENTER-A REGIONAL MULTI-MODAL TRANSIT FACILITY IS CURRENTLY IN DESIGN.
20040630 TCM
PALMDALE LA0C8361 SCAB 0 0 0 PALMDALE TRANSIT AMENITIES PROGRAM. PROVIDE BUS SHELTERS ALONG VARIOUS REGIONAL AND LOCAL STOPS WITHIN THE CITY OF PALMDALE.
20070630 TCM
PALMDALE LA996054 MDAB 0 0 0 MULTI-MODAL TRANSPORTATION CENTER AT THE SO WEST CORNER OF 6TH ST AND TECHNOLOGY DR (2000 CFP 7039)
20031130 TCM
PALOS VERDES ESTATES
LA0C8226 SCAB 0 0 0 PV TRANSIT CAPITAL IMPROVEMENT PROGRAM II. PURCHASE 3 EXPANSION CLEAN-FUEL VEHICLES.
20051231 TCM
PASADENA LA0B215 SCAB 0 0 0 PURCHASE OF (5) 30-FOOT ALTERNATIVE FUEL EXTENSION VEHICLES (GTIP)
20031231 TCM
PASADENA LA0B7043 SCAB 0 0 0 TRANSIT ALTERNATIVE FUELING AND MAINTENANCE FACILITY FOR THE PASADENA ARTS AND DIAL-A-RIDE
20031231 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 50
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
PASADENA LA0B7270 SCAB 0 0 0 BLUE LINE PEDESTRIAN ENHANCEMENTS-IMPROVE PEDESTRIAN ACCESS TO PLANNED BLUE LINE STATIONS IN THE CITY OF PASADENA, LOCATED ALONG THE PASADENA BLUE LINE ALIGNMENT
20031231 TCM
PASADENA LA0D99 SCAB 0 0 0 PURCHASE 2 EXPANSION LOW-FLOOR, HANDICAPPED ACCESSIBLE, ALTERNATIVE FUEL TRANSIT BUSES.
20040630 TCM
REDONDO BEACH
LA0C58 SCAB 0 0 0 ACQUISITION OF (5-9) ALTER. FUEL REPLACEMENT TRANSIT/PARATRANSIT VEHICLES (NOT TO EXCEED 30') SUPPLIED BY THE CONTRACTOR AND THE CITY PLANS TO REPLACE THEM WITH CITY OWNED VEH.
20041231 EXEMPT/TRAFFIC SIGNALIZATION
REDONDO BEACH
LA56200 SCAB 0 0 0 FY 2002-2003 OPERATING ASSISTANCE FOR TRANSIT OPERATIONS (DIAL-A-RIDE)
20031231 EXEMPT/TRAFFIC SIGNALIZATION
SANTA CLARITA LA0B7020 SCAB 0 0 0 ADDITIONAL (150) PARKING AT NEWHALL METROLINK STATION-CONSTRUCT ADEQUATE PARKING AT THE NEWHALL METROLINK STATION, INCLUDE PARK & RIDE, KISS & RIDE AND DISABLED-ACCESS SPACES
20031231 TCM
SANTA CLARITA LA0C09 SCAB 0 0 0 TRANSIT CENTER PASSENGER AMENITIES
20030630 TCM
SANTA CLARITA LA0D92 SCAB 0 0 0 COUNTYWIDE UNIVERSAL FARE SYSTEM (UFS) PROJECT.
20041231 <OTHER>
SANTA CLARITA LA56702 SCAB 0 0 0 BUS VEHICLE LEASE 20040615 EXEMPT/TRAFFIC SIGNALIZATION
SANTA CLARITA LA973022 SCAB 0 0 0 CONSTRUCT TRANSIT MNTC./ADMINISTRATION FACILITY TO ACOMDATE 150 VEHICLES. PROJ. IS EXEMPT -- TEA21 HIGH PRIORITY PROJ. (CFP 8222)
20061231 EXEMPT/TRAFFIC SIGNALIZATION
SANTA CLARITA LA973024 SCAB 0 0 0 IMPROVE PEDESTRIAN ACCESS TO TRNSIT STOPS, INSTALLING CROSSWALKS, SIDE- WALKS, AND PEDESTRIAN-ACTUATED TRAFFIC SIGNALS.@ 17 TRANSIT STOPS VARIOUS LOCATIONS, PROJECT EXEMPT
20030630 TCM
SANTA CLARITA LA990723 SCAB 0 0 0 BUS REPLACEMENT - (11) 40' COMMUTER AND (5) 40' LOCAL BUSES -- NATURAL GAS
20050301 EXEMPT/TRAFFIC SIGNALIZATION
SANTA CLARITA LA990724 SCAB 0 0 0 RADIOS ON BUSES 72 VEHICLES TO INCLUDE AVL SYSTEM
20050630 EXEMPT/TRAFFIC SIGNALIZATION
SANTA MONICA LA0D121 SCAB 0 0 0 SANTA MONICA TRANSIT - SERVING PARKING FACILITY (CFP 6032)
20041231 <OTHER>
SANTA MONICA LA57101 SCAB 0 0 0 BUS FACILITY IMPROVEMENTS 20051231 TCM
SANTA MONICA LA57110 SCAB 0 0 0 BUS REPLACEMENT: FIFTY TWO 40-FOOT LNG BUSES IN FY04.
20050630 EXEMPT/TRAFFIC SIGNALIZATION
SANTA MONICA LA963580 SCAB 0 0 0 RADIO SYSTEM; REPLACEMENT OF EXISTING RADIO/DISPATCH SYSTEM / ADVANCED BUS TECHNOLOGY
20020630 EXEMPT/TRAFFIC SIGNALIZATION
SANTA MONICA LA973503 SCAB 0 0 0 DOWNTOWN TRANSIT MALL: ENHANCEMENTS: TRANSIT OPERATIONS & CUSTOMER SERVICE IMPV. PROJECT SANTA MONICA BLVD., & BROADWAY FROM OCEAN AVE. TO FIFTH STREET
20040630 NON-FEDERAL/NON-REGIONAL
SANTA MONICA LA974421 SCAB 0 0 0 WESTSIDE ADVANCED PASSENGER INFOR. DEMO. PROJECT
20021231 EXEMPT/TRAFFIC SIGNALIZATION
SANTA MONICA MUNICIPAL BUS
LA0D123 SCAB 0 0 0 CAPITAL PREVENTIVE MAINTENANCE: SPARE PARTS AND LABOR EXPENSES RELATED TO VEHICLE MAINTENANCE UNDER THE FTA POLICIES GOVERNING CAPITAL PROJECTS.
20061231 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 51
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SANTA MONICA MUNICIPAL BUS
LA990313 SCAB 0 0 0 UNIVERSAL FARE SYSTEM (UFS) PROGRAM
20051231 <OTHER>
SIERRA MADRE LA0C8372 SCAB 0 0 0 EXPANSION OF SIERRA MADRE BUS ROUTE. PURCHASE OF 3 CNG VANS TO EXPAND SIERRA MADRE ROUNDABOUT SYSTEM.
20071231 TCM
SOUTH PASADENA
LA0B7041 SCAB 0 0 0 CIRCULATOR BUS STUDY WITHIN CITY OF SOUTH PASADENA
20061231 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH PASADENA
LA0B7271 SCAB 0 0 0 BLUE LINE PEDESTRIAN LINKAGE AND SAFETY IMPROVEMENTS-INCLUDE SIGNAGE, UPGRADES CROSSWALKS, PEDESTRIAN LIGHTING, ENHANCED SIDEWALK AROUND THE STATION IN THE AREA MISSION ST STATION
20031230 TCM
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA0B7009 VAR 0 0 0 ANTELOPE VALLEY LINE IMPROVEMENTS- INCREASE CAPACITY AND REDUCE TRAVEL TIME ON THIS COMMUTER RAIL AND FREIGHT SERVICE LINE BETWEEN LANCASTER AND LOS ANGELES
20031231 TCM
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA0C14 SCAB 0 0 0 CONSTRUCT SIDING AT SUN VALLEY ON ANTELOPE VALLEY LINE
20031230 NON-FEDERAL/NON-REGIONAL
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA0C8231 SCAB 0 0 0 METROLINK ROLLING STOCK-PHASE II (SCRRA). PURCHASE ADDITIONAL METROLINK ROLLING STOCK TO ALLOW EXPANSION OF THE METROLINK SYSTEM, WILL INCLUDE 3-7 LOCOMOTIVES AND 8-22 CARS.
20080630 NON-FEDERAL/NON-REGIONAL
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA0C8232 SCAB 0 0 0 ANTELOPE VALLY LINE CHANGES AT SANTA CLARITA-ALIGNMENT CHANGES WILL PERMIT HIGHER SPEEDS OF OPERATION AND REDUCE MAINTENANCE COST- (SCRRA)
20071231 <OTHER>
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA0C8314 SCAB 0 0 0 SCRRA GPS AND SOFTWARE FOR PAGING, INTERNET AND INTERACTIVE VOICE RESPONSE. PROVIDE REAL TIME INFO FOR METROLINK USERS AND AUTOMATED OPERATIONAL RECORDS FOR SCRRA REPORTNG NEEDS.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA0C8369 SCAB 0 0 0 ROLLING STOCK MAINTENANCE FACILITY IN SAN BERNARDINO-FUNDING TO BUILD NEW COMMUTER TRAIN STORAGE AND MAINTENANCE FACILITIES AND CONNECTING TRACKS IN THE INLAND EMPIRE. (SCRRA)
20051231 <OTHER>
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA0D87 SCAB 0 0 0 SCRRA -ROLLING STOCK STORAGE FACILITY IN THE PACIFIC SURFLINER CORRIDOR NEAR LA UNION STATION AND CONTROL POINT SAN DIEGO JUNCTION AT KELLER STREET YARD. 2002 STIP IIP.
20050630 <OTHER>
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA29204 SCAB 0 0 0 LA-SAN BERNARDINO CR (SF UNION STATION-SAN BERNARDINO) CAPACITY IMPROVEMENTS (DEMO TEA21) (JARC $991).
20031231 TCM
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA29228 SCAB 0 0 0 METROLINK COMMUTER RAIL OPERATING ASSISTANCE
20041231 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 52
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA963505 SCAB 0 0 0 CAPITAL MAINTENANCE VENTURA CO.LINE (TRACK, SIGNAL, STRUCTURE AND ROLLING STOCK)
20041231 NON-FEDERAL/NON-REGIONAL
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA963507 SCAB 0 0 0 CAPITAL MAINTENANCE ON SAN BERNARDINO LINE, BRIDGE/SIGNAL/XING/BRIDGE ROLLING STOCK 256(MTA:150)
20041231 NON-FEDERAL/NON-REGIONAL
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA963516 SCAB 0 0 0 ANTELOPE VALLEY LINE-CAPITAL MNTC. -- TRACK, SIGNAL, STRUCTURES, ROLLING STOCK
20041231 NON-FEDERAL/NON-REGIONAL
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA963550 SCAB 0 0 0 SECURITY OF L.A. COUNTY RAIL ROW ON WHICH SCRRA OPERATES. SERVICES PROVIDED BY L.A. CO. SHERIFF
20081231 NON-FEDERAL/NON-REGIONAL
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA963758 SCAB 0 0 0 PURCHASE METROLINK CARS & LOCOMOTIVES
20050630 TCM
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA973512 SCAB 0 0 0 SIDING IN THE I-10 CORRIDOR AND ON EAST BANK OF LA RIVER JOINT PROJECT WITH SAN BERNARDINO NEW START FTA3 EARMARK IN FY00
20031230 <OTHER>
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA973515 SCAB 0 0 0 SIDING IN FONTANA AND DOUBLE TRACK -- COMBINED SIDING IN FONTANA AND DOUBLE TRACK EAST OF POMONA IN LA COUNTY
20031230 NON-FEDERAL/NON-REGIONAL
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA9811025 SCAB 0 0 0 SYSTEM WIDE CAPITAL MAINTENANCE (SIGNAL/COMMUNICATION, RAIL GRIND, STORM DAMAGE MITIG, ROLLING STOCK) (MTA SHARE)
20040630 NON-FEDERAL/NON-REGIONAL
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA9811028 SCAB 0 0 0 PUBLIC ADDRESS SYSTEM / CHANGEABLE MESSAGE SIGNS
20061231 EXEMPT/TRAFFIC SIGNALIZATION
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA990307 SCAB 0 0 0 SCRRA TVM UPGRADES/RETROFITS/EXPANSION WITH UFS COMPATIBILITY.
20041231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA000665 SCAB 0 0 0 LINE #8 - OPERATING SUBSIDY 20061231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA000666 SCAB 0 0 0 LINE #6 - BLUE LINE FEEDER SERVICE 20061231 NON-FEDERAL/NON-REGIONAL
TORRANCE LA01B111 SCAB 0 0 0 BUS SYSTEM -- PREVENTIVE MAINTENANCE
20030630 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA01B112 SCAB 0 0 0 BUS SUPPORT EQUIPMENT (ENGINES AND TRANSMISSIONS)
20041231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA01B113 SCAB 0 0 0 BUS SUPPORT EQUIPMENT -- SECURITY CAMERAS
20031231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA01B114 SCAB 0 0 0 BUS REHABILITATION -- TWO (2) 40' BUSES -- DIESEL FUEL. BUS REHAB. -- ELEVEN (11) 40' BUSES -- DIESEL FUEL (FY04) BUS REHAB. --TEN (10) 40' BUSES--DIESEL FUEL (FY05)
20051231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA01B115 SCAB 0 0 0 BUS SUPPORT EQUIPMENT -- ITS HARDWARE AND SOFTWARE REPLACEMENT
20070630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 53
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
TORRANCE LA01B116 SCAB 0 0 0 BUS SUPPORT EQUIPMENT -- AIR COMPRESSOR. PURCHASE OF OPERATIONS ADP MANAGEMENT INFORMATION SYSTEM SOFTWARE
20031231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA01B117 SCAB 0 0 0 BUS SYSTEM -- MAINTENANCE FACILITY EQUIPMENT (HOISTS)
20051231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA0B201 SCAB 0 0 0 OPERATIONS OFFICE AND FACILITY MODIFICATIONS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA0B202 SCAB 0 0 0 REPLACEMENT OF THREE (3) SERVICE VEHICLES
20031231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA0B203 SCAB 0 0 0 PURCHASE OF SUPPORT EQUIPMENT - TIRES
20061231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA0B204 SCAB 0 0 0 REPLACEMENT OF SUPPORT EQUIPMENT - FAREBOXES FOR THE UNIVERSAL FARE SYSTEM
20041231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA0B205 SCAB 0 0 0 REPLACEMENT OF FIVE (5) RELIEF VEHICLES
20031231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA0B206 SCAB 0 0 0 BUS SUPPORT EQUIPMENT - DIESEL EXHAUST AFTER - TREATMENT DEVICES
20021231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA0B207 SCAB 0 0 0 BUS SUPPORT EQUIPMENT - MOBILE SURVEILLANCE
20021231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA0B208 SCAB 0 0 0 BUS SUPPORT EQUIPMENT - (1) SWEEPER, SCRUBBER (2) PARTS CLEAN VATS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA0D09 SCAB 0 0 0 TRANSIT -- ADMIN EQUIP -- PHOTOCOPIER
20030630 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA0D10 SCAB 0 0 0 TRANSIT -- ADMIN EQUIPMENT -- VEHICLES
20030630 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA0D11 SCAB 0 0 0 TRANSIT -- ENHANCEMENTS 20070630 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA57808 SCAB 0 0 0 DEBT SERVICE ON COPS 20061231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA97034 SCAB 0 0 0 PURCHASE OF OPERATIONS MANAGEMENT INFORMATION SYSTEM SOFTWARE AND HARDWARE
20021231 EXEMPT/TRAFFIC SIGNALIZATION
TORRANCE LA990729 SCAB 0 0 0 PURCHASE AND INSTALLATION OF AN AUTOMATIC VEHICLE LOCATOR SYSTEM WITH VOICE ANNUNCIATOR SYSTEM AND AUTOMATED PASSENGER COUNTER SYSTEM.
20060630 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
LA0B860 SCAB 0 0 0 KOREAN HEALTH EDUCATION INFORMATION AND RESEARCH CENTER. EXPANSION VEHICLES - THREE 10 PASSENGER SMALL BUSES.
20031231 TCM
VARIOUS AGENCIES
LA0B863 SCAB 0 0 0 VILLA ESPERANZA. EXPANSION VEHICLE - ONE 17 PASSENGER MEDIUM BUS.
20030331 TCM
VARIOUS AGENCIES
LA0B864 SCAB 0 0 0 VILLA ESPERANZA. VEHICLE REPLACEMENT - ONE 17 PASSENGER MEDIUM BUS.
20030331 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
LA0C16 SCAB 0 0 0 EAST L.A. REMARKABLE CITIZENS ASSOC (EI ARCA) - VEHICLE REPLACEMENT - 2 17-PASSENGER MEDUM BUSES
20031231 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
LA0C17 SCAB 0 0 0 ALTAMED HEALTH SERVICES - COMPUTER HARDWARE AND SOFTWARE
20030731 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
LA0C18 SCAB 0 0 0 ALTAMED HEALTH SERVICES - VEHICLE REPLACEMENT. (2) 10-PASSENGER SMALL BUSES
20030731 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
LA0C19 SCAB 0 0 0 ALTAMED HEALTH SERVICES - VEHICLE REPLACEMENT. (2) 17-PASSENGER MEDIUM BUSES.
20030731 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
LA0C21 SCAB 0 0 0 COMMUNITY SENIOR SERVICES - VEHICLE REPLACEMENT - (5) 22-PASSENGER LARGE BUSES
20030930 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
LA0C23 SCAB 0 0 0 HEALTHVIEW - EXPANSION VEHICLE - (1) 17-PASSENGER MEDIUM BUS
20030731 TCM
2004 RTP * TECHNICAL APPENDIX I - 54
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
VARIOUS AGENCIES
LA0C24 SCAB 0 0 0 HEALTHVIEW - VEHICLE REPLACEMENT - (1) 17-PASSENGER MEDIUM BUS.
20030731 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
LA0C25 SCAB 0 0 0 KOREAN HEALTH EDUCATION INFORMATION (KHEIR) - EXPANSION VEHICLES - (3) 10-PASSENGER SMALL BUSES.
20031231 TCM
VARIOUS AGENCIES
LA0C28 SCAB 0 0 0 SHIELDS FOR FAMILIES - VEHICLE REPLACEMENT - (2) 10-PASSENGER SMALL BUSES
20031231 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
LA0C29 SCAB 0 0 0 OLDTIMERS (STEEL WORKERS OLDTIMERS FOUNDATION) - VEHICLE REPLACEMENT - (3), 17-PASSENGER SMALL BUSES.
20031231 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
LA0C30 SCAB 0 0 0 ULTRALIFE ADULT DAY HEALTH CARE- EXPANSION VEHICLE - (1) 10-PASSENGER SMALL BUS.
20030731 TCM
VARIOUS AGENCIES
LA0C31 SCAB 0 0 0 ULTRALIFE ADULT DAY HEALTH CARE - EXPANSION VEHICLES - (2) 5-PASSENGER MINIVANS.
20030731 TCM
VARIOUS AGENCIES
LA0C32 SCAB 0 0 0 VISTA DEL MAR CHILD AND FAMILY SERVICES - VEHICLE REPLACEMENT - (2) 5-PASSENGER MINIVANS.
20031231 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
LA0C33 SCAB 0 0 0 WHITE MEMORIAL MEDICAL CENTER - EXPANSION VEHICLES - (5) 10-PASSENGER SMALL BUSES.
20030630 TCM
VARIOUS AGENCIES
LA0C34 SCAB 0 0 0 WHITE MEMORIAL MEDICAL CENTER - EXPANSION VEHICLE - (1) 5-PASSENGER MINIVAN.
20030630 TCM
VARIOUS AGENCIES
LA0C35 SCAB 0 0 0 WHITE MEMORIAL MEDICAL CENTER - EXPANSION VEHICLE - (1) 17-PASSENGER MEDIUM BUS.
20030630 TCM
VARIOUS AGENCIES
LA0D49 SCAB 0 0 0 CALIFORNIA HOME FOR THE ADULT DEAF--EXPANSION VEHICLE--ONE, 10-PASSENGER SMALL BUS.
20040330 <OTHER>
VARIOUS AGENCIES
LA0D50 SCAB 0 0 0 CALIFORNIA HOME FOR THE ADULT DEAF--VEHICLE REPLEMENT--ONE, 10-PASSENGER SMALL BUS
20040330 <OTHER>
VARIOUS AGENCIES
LA0D51 SCAB 0 0 0 CENTRAL ADULT DAY HEALTH CARE CENTER--VEHICLE REPLACEMENT--ONE, 11-PASSENGER MODIFIED VAN.
20040330 <OTHER>
VARIOUS AGENCIES
LA0D52 SCAB 0 0 0 EAST L.A. REMARKABLE CITIZENS ASSOCIATIONS (EL ARCA)--EXPANSION VEHICLES--3, 17-PASSENGER MEDIUM BUSES WITH RADIOS
20040330 <OTHER>
VARIOUS AGENCIES
LA0D53 SCAB 0 0 0 EAST L.A. REMARKABLE CITIZENS ASSOCIATION (EL ARCA)--VEHICLE REPLACEMENT--TWO, 17-PASSENGER MEDIUM BUSES WITH RADIOS.
20040330 <OTHER>
VARIOUS AGENCIES
LA0D54 SCAB 0 0 0 GOODWILL INDUSTRIES OF SOUTHERN CALIFORNIA--EXPANSION VEHICLE--ONE, 17-PASSENGER MEDIUM BUS.
20040330 <OTHER>
VARIOUS AGENCIES
LA0D55 SCAB 0 0 0 HARBOR DEVELOPMENTAL DISABILITIES--VEHICLE REPLACEMENT--7, 22-PASSENGER LARGE BUSES.
20040330 <OTHER>
VARIOUS AGENCIES
LA0D56 SCAB 0 0 0 HARBOR DEVELOPMENTAL DISABILITIES--COMPUTER SOFTWARE (AVL SYSTEM)
20040330 <OTHER>
VARIOUS AGENCIES
LA0D57 SCAB 0 0 0 INSTITUTE FOR THE REDESIGN OF LEARNING-VEHICLE REPLACEMENT--3, 11-PASSENGER MODIFIED VANS.
20040430 <OTHER>
VARIOUS AGENCIES
LA0D58 SCAB 0 0 0 INSTITUTE FOR THE DESIGN OF LEARNING--EXPANSION VEHICLES--2, 11-PASSENGER MODIFIED VANS.
20041230 <OTHER>
VARIOUS AGENCIES
LA0D59 SCAB 0 0 0 LIFE STEPS FOUNDATION--EXPANSION VEHICLE--ONE, 22-PASSENGER LARGE BUS.
20040330 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 55
BASELINELOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
VARIOUS AGENCIES
LA0D60 SCAB 0 0 0 MERCI (MENTALLY AND EDUCATIONALLY RETARDED CITIZENS INC)--VEHICLE REPLACEMENT--ONE, 11-PASSENGER MODIFIED VAN.
20040430 <OTHER>
VARIOUS AGENCIES
LA0D61 SCAB 0 0 0 NORTHRIDGE HOSPITAL FOUNDATION--VEHICLE REPLACEMENT--2, 10-PASSENGER SMALL BUSES.
20040430 <OTHER>
VARIOUS AGENCIES
LA0D62 SCAB 0 0 0 NORTHRIDGE HOSPITAL FOUNDATION--VEHICLE REPLACEMENT--ONE, 17-PASSENGER MEDIUM BUS.
20040430 <OTHER>
VARIOUS AGENCIES
LA0D63 SCAB 0 0 0 PROTOTYPES--VEHICLE REPLACEMENT--ONE, 5-PASSENGER MINIVAN
20040430 <OTHER>
VARIOUS AGENCIES
LA0D64 SCAB 0 0 0 PROTOTYPES--VEHICLE REPLACEMENT--ONE, 10-PASSENGER SMALL BUS
20040330 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
LA0D65 SCAB 0 0 0 SANTA CLARITA VALLEY COMMITTEE ON AGING--EXPANSION VEHICLES--2, 17-PASSENGER MEDIUM BUSES.
20040330 <OTHER>
VARIOUS AGENCIES
LA0D66 SCAB 0 0 0 SHIELDS FOR FAMILIES--VEHICLE REPLACEMENT--2, 10-PASSENGER SMALL BUSES.
20040430 <OTHER>
VARIOUS AGENCIES
LA0D67 SCAB 0 0 0 STEELWORKERS OLTIMERS FOUNDATION--VEHICLE REPLACEMENT--3, 11-PASSENGER MODIFIED VANS.
20040330 <OTHER>
VARIOUS AGENCIES
LA0D68 SCAB 0 0 0 TARZANA TREATMENT CENTERS--EXPANSION VEHICLES--2, 11-PASSENGER MODIFIED VANS
20040430 <OTHER>
VARIOUS AGENCIES
LA0D69 SCAB 0 0 0 HEALTH VIEW--EXPANSION VEHICLE--ONE, 17-PASSENGER MEDIUM BUS
20040330 <OTHER>
VARIOUS AGENCIES
LA0D70 SCAB 0 0 0 SUNSHINE ADULT DAY HEALTHCARE--VEHICLE REPLACEMENT--ONE, 17-PASSENGER MEDIUM BUS
20040330 <OTHER>
VARIOUS AGENCIES
LA0D71 SCAB 0 0 0 SUNSHINE ADULT DAY HEALTHCARE--VEHICLE REPLACEMENT--ONE, 11-PASSENGER MODIFIED VAN
20040330 <OTHER>
VARIOUS AGENCIES
LA973039 SCAB 0 0 0 ACESS SERVICES INC. FLEET EXPANSION VEHICLES 46 MINI -- VANS
20021231 TCM
VARIOUS AGENCIES
LA990744 SCAB 0 0 0 KOREAN HEALTH, EDUCATION, INFO & RESEARCH CENTER (KHEIR)- EXPANSION THREE (3) 17-PASSENGER SMALL BUSES.
20031231 TCM
VARIOUS AGENCIES
LA990758 SCAB 0 0 0 ST MARY'S CARE PROGRAM - VEHICLE REPLACEMENT (1) 8-PASSENGER MODIFIED VAN
20031231 EXEMPT/TRAFFIC SIGNALIZATION
WEST HOLLYWOOD
LA962389 SCAB 0 0 0 PUBLIC PRIVATE PARKING MANAGEMENT WEST HOLLYWOOD
20021231 NON-FEDERAL/NON-REGIONAL
WEST HOLLYWOOD
LA996063 SCAB 0 0 0 SANTA MONICA BUS FAC IMPRVMNTS IMPRVE SHELTERS, BENCHES, AND DESGN NEW BUS STOPS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 56
BASELINEORANGE COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
DANA POINT ORA010200 SCAB 1 4.32 4.32 PACIFIC COAST HWY @ DEL OBISPO, WIDEN INTERSECTION, ADD A WB RIGHT TURN LANE ON PCH AND A SECOND NB THROUGH LANE ON DEL OBISPO STREET. FRM 2 TO 3. (00-DPNT-IIP-3059)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
SAN CLEMENTE
10287 SCAB 5 3.7 4.5 AVENIDA VISTA HERMOSA @ I-5 NEW INTERCHANGE FROM 0 TO 5 LANES ON OVERPASS.
20021201 <OTHER>
LAGUNA NIGUEL
ORA55063 SCAB 5 12.8 13.1 I-5 @ AVERY PARKWAY (MARGUERITE TO CAMINO CAPISTRANO) INTERCHANGE IMPROVEMENTS. WIDEN FROM 4 TO 5 LANES (FOR TURN LANE) UNDER FREEWAY BRIDGE.
20010801 <OTHER>
SAN JUAN CAPISTRANO
40177 SCAB 5 11.4 0 ( I-5 AND CAMINO CAPISTRANO) IN SAN JUAN CAPISTRANO ENHANCEMENT OF HISTORIC VIEW AND LANDSCAPING AND HISTORIC PRESERVATION
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 6490 SCAB 5 33.9 43.5 I-5 (ROUTE 5/22/57 INTERCHANGETO BEACH BLVD) IN ANAHEIM - CONSTRUCT TMA.
20040630 <OTHER>
ANAHEIM ORA000100 SCAB 5 34 43.5 GENE AUTRY WAY WEST@ I-5 (I-5 HOV TRANSITWAY TO HASTER) ADD OVERCROSSING ON I-5 (S)/MANCHESTER AND EXTEND GENE AUTRY WAY WEST FROM I-5 TO HARBOR.
20041230 TCM
CALTRANS 10167 SCAB 5 42.1 44.4 I-5 FROM SR-91 TO LA COUNTY LINE IN BUENA PARK - ADD 1 MIXED FLOW LN AND 1 HOV LN IN EACH DIRECTION. FROM 6 - 0 TO 8 - 2 LANES.
20081231 TCM
BUENA PARK ORA55059 SCAB 5 44.3 0 ARETESIA @ I-5 (KNOTT TO BOTRYOIDES) INTERSECTION IMP REALIGN N/B OFFRAMP AND S/B ONRAMP; IN CONJ W/ I-5 WIDENING. FROM 2 TO 3 LANES. I-5 E TO BOTRYOIDES BLVD
20030620 <OTHER>
CALTRANS ORA020124 SCAB 22 0.34 13.16 SR-22 SOUNDWALLS (INCLUDES TCRP/HB311)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS ORA000801 SCAB 22 1.9 6.8 IN GARDEN GROVE (SPRINGDALE TO KNOTT- N AND S SIDES) AND (MAGNOLIA TO EUCLID - S SIDE) RETROFIT THREE (3) SOUNDWALLS ON SR-22.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
GARDEN GROVE
ORA981104 SCAB 22 7.83 0 RECONSTRUCT HARBOR BLVD INTERCHANGE. 4 LANES EACH DIRECTION. (1/4 MILE BEFORE AND AFTER SR-22 RAMPS) 2 HOV LNES(1 E/B & 1 W/B) AND PROPOSED SR-22 HOV LANES.
20070830 TCM
ORANGE, CITY OF
ORA55282 SCAB 22 9.7 0 BUILD NEW RAMP FROM THE SR-57 TO THE SR22 WEST BOUND (INCLS WIDENING OF LEWIS ST BRIDGE FROM LAMPSON TO GARDEN GROVE BL) & BUILD OFFRAMP FROM THE SR-57 DIRECTLY TO THE CITY DRIVE.
20070930 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 57
BASELINEORANGE COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
ORANGE, CITY OF
ORA990443 SCAB 22 10.48 0 SR-22 AND CITY DRIVE INTERCHANGE IMPROVEMENTS. RECONFIGURE FREEWAY INTERCHANGE AT SR-22 FROM SR-57 TO LEWIS STREET -- FROM 6/0 TO 6/2 LANES (ADDING 2 HOV LANES)
20070930 TCM
HUNTINGTON BEACH
ORA000149 SCAB 39 5.7 5.7 BEACH BLVD @ EDINGER. WIDEN S/E CORNER TO CONSTRUCT NB RT-TURN LANE TO EDINGER. 3 LANES TO 3 LANES.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
SANTA ANA 550 SCAB 55 7.5 7.6 ALTON AVE IN SANTA ANA CONSTRUCT A NEW 4-LANE (2E/B AND 2W/B) OVERCROSSING & HOV ACCESS RAMPS @SR-55
20060501 <OTHER>
TUSTIN ORA55261 SCAB 55 9 9.44 NEWPORT AVENUE@ SR 55 INTERCHANGE MODIFY NORTHBOUND ROUTE 55 ON AND OFF RAMPS TO CONNECT TO NEWPORT AVE EXTENSION (frm 0 TO 6 LNS) (BTWN EDINGER & VALENCIA) (00-TUST-RIP-3190)
20040601 <OTHER>
SANTA ANA ORA55037 SCAB 55 11.79 11.79 17TH STREET IN CITY OF SANTA ANA (TUSTIN AVE TO YORBA) OVERCROSSING APPROACH WIDENING STREET. FROM 2 TO 3 LANES
20030630 <OTHER>
CALTRANS 1332 SCAB 55 12.7 17.6 (RTE SR-22 TO RTE SR-91) IN CITY OF ORANGE_WIDEN EXIST 8-LN FWY INCL. 2 STND HOV LNS ADD 2 MIXED FLOW LANES AND_AUX LNS; OC @ LAVETA, MEATS & KATELLA (98 STIP PROJECT)
20021230 TCM
BREA ORA000107 SCAB 57 19.86 20.88 AT LAMBERT AND IMPERIAL IN CITY OF BREA. FWY/ARTERIAL (FROM 2 TO 3 LANES) ON RAMP; AND ADD (FROM 3 TO 4 RIGHT LANES AT LAMBERT.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS ORA55073 SCAB 73 5.4 7.8 BIRCH TO I-405 WIDENING; ADD (1) MIXED FLOW LANE IN NB DIR; NB AUX LANE; SOUNDWALLS; AND (1) HOV LANE (2010) IN EACH DIR. NEAR SR55 INTERCHANGE (98 STIP)
20030730 <OTHER>
SAN JUAN CAPISTRANO
ORA000152 SCAB 74 0 0.24 ORTEGA HWY ( RANCHO VIEJO RD TO JUST EAST OF I-5/SR-74 INTERCHAGE) ROADWAY WIDENING ADD RT TRN LNE TO CAPAC & REDUCE QUE ON WB SR-74 TO NB I-5 TRN. N/B FRM 2TO3 AND S/B 2TO3
20010221 <OTHER>
LA HABRA ORA000115 SCAB 90 0 2.5 IMPERIAL HWY SMART ST (LAC TO HARBOR); RESTRIPE 4 TO 6 LNS( LAC LINE TO IDAHO ST. ADD RAISED MEDIAN. MODFY MEDIANS AT 4 INTSECS. ADD BUS PADS, TURNOUTS.(COMBINES ORA028 AND ORA029)
20050901 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 58
BASELINEORANGE COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
FULLERTON ORA021201 SCAB 90 0 2.5 IMPERIAL HWY- SMART ST (HARBOR TO SR57) RESTRIPE 4 - 6 LNS (HARBOR BLVD & BERRY ST MEDIAN MODIFICATNS AT PUENTE INTERSEC. BUS PADS, BUS TURNOUTS & SOUNDWALLS AT VAR LOCATIONS
20060630 <OTHER>
BREA ORA000105 SCAB 90 5.45 7.96 IMPERIAL HWY SMART ST (SR-57 TO ROSE) . WIDENING EB BY 1 LANE FROM E. OF VALENCIA TO CITY LIMITS. MEDIAN MODIFICS AT INTERSECTS: ASSOCIATED, VALENCIA, AND ROSE. BUS PADS, S.S.
20070901 <OTHER>
BREA ORA990405 SCAB 90 6.58 0 Imperial Highway@Kraemer Boulevard Add northbound through lane & west bound rightturn lane along Imperial Hwy at the Kramer Blvd intersection
20030930 EXEMPT/TRAFFIC SIGNALIZATION
YORBA LINDA ORA000188 SCAB 90 7.15 12.28 IMPERIAL HWY SMART ST. (ROSE TO ORANGETHROPE)- SMART STREET PROGRAM. WIDEN TO 4 LNES. SIGNAL COORD. IMPROVE RAMPS AT KELLOGG; RAISED MEDIANS; TURNOUTS; BUS PADS, AND SOUNDWALLS.
20020601 <OTHER>
CALTRANS 5620 SCAB 90 11.8 12.4 AT ORANGETHORPE AVENUE IN YORBA LINDA, IMPERIAL HWY GRADE SEPERATION AT ORANGETHROPE/ESPERANZA RD AND BSNF RR (DEMO ID#1215 RELATED TO ORA99060)
20040930 <OTHER>
CALTRANS ORA020928 SCAB 91 9 10.1 IN ANAHEIM - PERALTA HILLS. CONSTRUCT SOUNDWALL ON EB SR-91 (FROM SR-55/SR-91 SEPARATION TO LAKEVIEW AVENUE OVERCROSSING).
20060630 EXEMPT/TRAFFIC SIGNALIZATION
BREA ORA55278 SCAB 142 1.8 2.8 CARBON CANYON AND VALENCIA WIDEN ROADWAY FROM TWO TO FIVE LANE (THREE WESTBOUND AND TWO EASTBOUND) WITH STRIPED MEDIAN & INTERSECTION IMPROVEMENTS
20021001 <OTHER>
IRVINE ORA010201 SCAB 405 2.88 0 SAND CYN @ I-405 ADD 1 LEFT TURN LANE ON NB SAND CYN TO SB I-405 ON-RAMP. BUILD NEW 2 LANE ON-RAMP ON SAND CYN TO NB I-405; WIDEN SAND CYN BRIDGE FROM 4 TO 6 LANES.
20030630 <OTHER>
IRVINE ORA990445 SCAB 405 3.95 0 JEFFREY/I-405 INTERCHANGE. WIDEN FROM 4 TO 6 LANES, WIDEN RAMP, MODIFY SIGNAL, AND IMPROVE RAMP AT 1000' SOUTH OF INTERCHANGETO 1000' NORTH OF INTERCHANGE.
20051230 <OTHER>
IRVINE ORA55105 SCAB 405 7.4 7.4 VON KARMAN OVERCROSSING IN IRVINE WIDENING FROM 4 TO 6 LANES (NON REGIONALLY SIGNIFICANT)
20060630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 59
BASELINEORANGE COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS 6951 SCAB 405 7.7 8.7 405/55 INTERCHANGE SOUTH TRANSITWAY MOS1_EXISTING 4 MIXED 1 HOV_ON SR55 AND I-405 EXIST IS 5 MF AND 1 HOV ADD HOV DIRECT TRANSITWAY FROM SR55 TO I-405
20021130 TCM
COSTA MESA 3090 SCAB 405 8.7 10.1 IN CITY OF COSTA MESA_(MOS 2&3) N/B I-405/BRISTOL OFF-RAMP AND S/B RTE-55 TO N/B I-405_(NORTH TRNSTWY) WIDEN NB OFF RAMP BRAID WITH CONNECTOR_FROM 6 TO 8 LANES
20040401 <OTHER>
COSTA MESA 720 SCAB 405 9.7 12.5 (BRISTOL STREET TO EUCLID) I-405 WIDENING AND RAMP IMPROVMENTS INCLUDING THE I-405/SR-73 INTERCHANGE IN CONJUNCTION WITH ORA55073
20040730 <OTHER>
CALTRANS 86 SCAB 405 9.9 10 AT BEAR ST OVERCROSSING IN COSTA MESA, REMOVE AND RECONSTRUCT OVERCROSSING FROM 4 TO 6 LANES. WIDEN BRIDGE STRUCTURE OVER FREEWAY ONLY.
20050601 <OTHER>
COSTA MESA ORA000109 SCAB 405 11.45 11.45 NB HARBOR BLVD (SB ON RAMP TO S. COAST DR.) CAPACITY AND OPERATIONAL IMP. AT I-405 INTERCHANGE WIDENING OF NB HARBOR OFF RAMP AND APPROACH @I405 FROM 3 TO 4 LANES.
20050630 <OTHER>
WESTMINSTER
ORA045 SCAB 405 17.8 0 BOLSA AVENUE (CHESTNUT TO GOLDENWEST) WIDEN BOLSA AVENUE BRIDGE FROM 4 TO 6 LANES.
20101201 <OTHER>
SEAL BEACH ORA55094 SCAB 405 22.6 23.3 SEAL BEACH BOULEVARD OVERPASS IN THE CITY OF SEAL BEACH WIDENING FROM 4 TO 6 LANES
20031001 <OTHER>
CALTRANS 5242 SCAB 605 0 1.6 I-405 TO LA CO LINE -- ADD ONE HOV LANE IN EACH DIRECTION. THIS PROJECT WILL COMPLETE THE I-605 INTERCOUNTY GAP IN THE HOV SYSTEM IN SO. CALIF. ( ITIP PROJECT)
2002 TCM
2004 RTP * TECHNICAL APPENDIX I - 60
BASELINEORANGE COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
ANAHEIM ORA000110 SCAB 0 0 0 KATELLA AVE SMART ST ( HUMOR TO JEAN) Widen frm 4 to 6 Lanes (EB & WB: ADD 2ND LFT, 3RD THROUGH, 1 RT; NB: ADD 1 RT; SB: ADD 2ND LFT) Nutwood @Brookhurst and Euclid(Striping Mod).
20101230 <OTHER>
ANAHEIM ORA55014 SCAB 0 0 0 TUSTIN AVE, (LA PALMA TO SR-91) WIDEN FROM 4 TO 6 LANES (1500' TOTAL)
20030601 <OTHER>
ANAHEIM ORA990428 SCAB 0 0 0 HARBOR BLVD (LINCOLN TO BALL) ITS PROJECT SIGNAL COORDINATION FOR 7 SIGNALS AND INTEGRATED WITH SCOOT SYSTEM .
20021001 EXEMPT/TRAFFIC SIGNALIZATION
ANAHEIM ORA990430 SCAB 0 0 0 HARBOR BLVD (BROADWAY TO SOUTH CITY LIMITS) ITS PROJECT SIGNAL COORDINATION INVOLVES 6 CONTROLLER UPGRADES, 1 CCTV, AND SCOOT DETECTORS.
20031230 EXEMPT/TRAFFIC SIGNALIZATION
BUENA PARK ORA55024 SCAB 0 0 0 VALLEY VIEW ST (LINCOLN TO ARTESIA) WIDEN FROM 6 LANES TO 8 LANES.
20040630 <OTHER>
COSTA MESA ORA990410 SCAB 0 0 0 HARBOR BLVD @ GISLER AVE. INTERSECTION CHANNELIZATION. ADD 5TH NB LANE ON HARBOR BLVD. AND RT LANE ON GISLER TO NB HARBOR.
20041201 EXEMPT/TRAFFIC SIGNALIZATION
COSTA MESA ORA990429 SCAB 0 0.008 0 COSTA MESA (CITYWIDE) ITS EXPANSION PROJEC. INSTALL FIBER OPTIC CABLES, CCTV CAMERAS, AND TMC HARDWARE AND SOFTWARE FOR EXPANSION.
20020830 EXEMPT/TRAFFIC SIGNALIZATION
CYPRESS ORA990435 SCAB 0 0 0 CYPRESS (CITYWIDE) Signal Timing of Arterial Grid Study and implement new signal timing on a grid network comprised of 96 existing interconnected traffic signals in west county.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CYPRESS ORA990439 SCAB 0 0 0 KATELLA AVE (@VALLEY VIEW, SIBONEY, KNOTT) AND BALL RD @VALLEY VIEW ST INSTALLATION OF CLOSED CIRCUIT TV AT THE INTERSECTIONS FOR TRAFFIC MONITORING.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CYPRESS ORA990607 SCAB 0 0 0 KATELLA AT VALLEYVIEW ST. INSTALL 4TH EB LANE ON KATELLA AVE AT VALLEYVIEW. SOUTHSIDE OF KATELLA WEST OF VALLEYVIEW FOR .25 MILES.
20031230 <OTHER>
FOUNTAIN VALLEY
ORA000192 SCAB 0 0 0 WARNER AVE@ LOS JARDINES WEST SIGNAL INTERCONNECT
20050630 EXEMPT/TRAFFIC SIGNALIZATION
FOUNTAIN VALLEY
ORA990432 SCAB 0 0 0 WARNER BLVD. VIDEO DETECTION SYST. Install video detection system at traffic signals on the Warner Street intersections.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
GARDEN GROVE
ORA000165 SCAB 0 0 0 HARBOR BLVD. (TRASK AVE. TO WOODBURY STREET) / WIDENING FROM 5 TO 8 DIV LANES. PART OF THE HARBOR BLVD. SMART STREET PROJECT
20040801 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 61
BASELINEORANGE COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
GARDEN GROVE
ORA000167 SCAB 0 8.21 8.49 HARBOR BLVD. (WOODBURY TO WESTMINSTER AVE) WIDENING FROM 5 TO 8 DIV LANES. PART OF THE HARBOR BLVD. SMART STREET PROJECT
20040801 <OTHER>
GARDEN GROVE
ORA55031 SCAB 0 0 0 HARBOR BOULEVARD SMART STREET (SR-91 TO I-405) WIDENING FROM 4 TO 6 LANES AND INTERSECTION IMPROVEMENTS.
20081030 <OTHER>
HUNTINGTON BEACH
ORA990403 SCAB 0 0 0 ADAMS @ BROOKHURST INTERSECTION CHANNELIZATION - ADD EAST AND WEST BOUND RIGHT TURN LANES AT THE INTERSECTION
20031231 EXEMPT/TRAFFIC SIGNALIZATION
HUNTINGTON BEACH
ORA990901 SCAB 0 0 0 HUNTINGTON BEACH TO CALTRANS TMC FIBER OPTIC INTERTIE BETWEEN CITY CALTRANS. UPGRADE TRAFFIC SIGNAL CONTROL SYSTEM AND ADD CCTV CAMERAS
20031230 EXEMPT/TRAFFIC SIGNALIZATION
IRVINE ORA000118 SCAB 0 0 0 SAND CYN RD@ SCRRA TRACKS (BURT ROAD TO LAGUNA CANYON/OAK CANYON) - RAIL ROAD GRADE SEPARATION. WIDENS FROM 4 TO 6 LANES.
20071231 <OTHER>
IRVINE ORA000169 SCAB 0 0 0 CULVER DR. (CAMPUS DR. TO BONITA CYN) WIDENING FROM 2 LANE UNDIVIDED TO 4 LANE DIVDED FACILITY AND REALIGN.
20040801 <OTHER>
IRVINE ORA112 SCAB 0 0 0 MOULTON SMART STREET ( HARVARD TO LAKE FOREST) WIDEN 4 TO 6 LANES.
20070630 <OTHER>
IRVINE ORA37075 SCAB 0 0 0 BARRANCA PKWY (RED HILL TO JAMBOREE - ROAD WIDEN FROM 6 TO 8 LANES - PHASE II
20060601 <OTHER>
IRVINE ORA48 SCAB 0 0 0 JEFFERY RD (IRVINE CENTER DRIVE TO WALNUT) RAILROAD GRADE SEPARATION. FROM 4 TO 6 LANES.
20050630 <OTHER>
IRVINE ORA990433 SCAB 0 0 0 IRVINE CENTER DRIVE (SAND CANYON TO BAKE PKWY) COORDINATE SIGNALS, UPDATES TIMING, INTERCONNECTS CABLE AND CONDUIT, & CCTVs AT 4 LOCATIONS.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
IRVINE ORA990441 SCAB 0 0 0 IRVINE CENTER DRIVE (HARVARD TO SAND CANYON) SIGNAL COORDINATION REPLACE EQUIPMENT, UPDATE TIMING, CABLE AND CCTV.
20021230 EXEMPT/TRAFFIC SIGNALIZATION
LA HABRA ORA990431 SCAB 0 0 0 HARBOR BLVD (ARBOLITA DR TO LAS PALMAS DR) INTERCONNECT AND COORDINATE SIGNALS .
20041230 EXEMPT/TRAFFIC SIGNALIZATION
LA PALMA ORA990437 SCAB 0 0 0 Orangethrope Ave (@ Walker And SR-91 connection between signals and ramp signal. Install new software & hardware for 4 signals.
20020228 EXEMPT/TRAFFIC SIGNALIZATION
LAGUNA HILLS
ORA000119 SCAB 0 0 0 ALICIA PRKWY @ I-5. ADD 4TH EB LANE FROM PASEO DE ALICIA TO I-5 SB RAMP
20070630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 62
BASELINEORANGE COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LAGUNA HILLS
ORA000124 SCAB 0 0 0 MOULTON PKWY (LAKE FOREST to EL PACIFICO) WIDEN FRM 8 TO 9 LNS. N/B FRM 4 TO 4 AND S/B FRM 4 TO 5. WIDEN INTERSECTIONS AND LANDSCAPE.
20040630 <OTHER>
LAGUNA HILLS
ORA000125 SCAB 0 0 0 MOULTON PKWY (SANTA MARIA to EL PACIFICO) WIDEN FRM 7 TO 9 LANES. ( N/B 3 TO 4 AND S/B 4 TO 5), WIDEN INTERSECTIONS, ADD SIDEWALK AND LANDSCAPING.
20031030 <OTHER>
LAGUNA HILLS
ORA000130 SCAB 0 0 0 LAGUNA HILLS (CITYWIDE) UPGRADE TRAFFIC SIGNAL CONTROL TECHNOLOGY.
20071230 EXEMPT/TRAFFIC SIGNALIZATION
LAGUNA NIGUEL
ORA000134 SCAB 0 0 0 CROWN VALLEY PKWY@ FORBES RD INTERSECTION WIDENING. ADD DEDICATED WB RT LANE.
20031230 EXEMPT/TRAFFIC SIGNALIZATION
LAGUNA NIGUEL
ORA000135 SCAB 0 0 0 GOLDEN LANTERN @ CAMINO DEL AVION INTERSECTION WIDENING. ADD DEDICATED SB LT LANE/ WB RT LANE/ AND NB RT LANE.
20041230 EXEMPT/TRAFFIC SIGNALIZATION
LAGUNA NIGUEL
ORA000136 SCAB 0 0 0 CROWN VALLEY PKWY @ NIGUEL ROAD INTERSECTION WIDENING. ADD DEDICATED NB RT LANE.
20041230 EXEMPT/TRAFFIC SIGNALIZATION
LAKE FOREST ORA000181 SCAB 0 0 0 EL TORO RD (BRIDGER RD TO TRABUCO RD) TIMING STUDY AND INTERCONNECT SYSTEM. INSTALL HARDWARE AND SIGNAL TIMING.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ALAMITOS
ORA000182 SCAB 0 0 0 KATELLA AVE SMART STREET (KNOTT TO I-605) WIDEN 6 TO 8 LANES, SIGNAL COORDINATION, AND INTERSECTION IMPROVEMENTS. ADD BUS TURNOUTS AT VARIOUS LOCATIONS.
20090601 <OTHER>
MISSION VIEJO
ORA000163 SCAB 0 0 0 CROWN VALLEY PARKWAY (PUERTA REAL TO CITY LIMITS, NEAR JARDINES) / WIDENING FROM 6 LANE DIVIDED TO 8 LANE DIVIDED.
20030630 <OTHER>
MISSION VIEJO
ORA000173 SCAB 0 0 0 LA PAZ RD (MURILANDS BLVD TO CHRISANTA DR) WIDENING FROM 4 TO 6 LANES.
20060630 <OTHER>
MISSION VIEJO
ORA010400 SCAB 0 0 0 ALICIA PARKWAY (CHARLINDA DR TO MUIRLANDS BLVD) WIDEN FROM 6 TO 7 LANES NORTHBOUND
20030630 <OTHER>
MISSION VIEJO
ORA990438 SCAB 0 0 0 MISSION VIEJO (CITYWIDE) Install video detection equipment at various city intersections
20030630 EXEMPT/TRAFFIC SIGNALIZATION
MISSION VIEJO
ORA990902 SCAB 0 0 0 MISSION VIEJO (CITYWIDE) REMOTE TMC AND TRAVLER/PUBLIC INFO ACCESS CENTER. PROVIDES TRAFFIC INFO TO PUBLIC LIBRARIES. EST COMM INTERTIE BETWEEN CITY AND CALTRANS
20030630 TCM
NEWPORT BEACH
ORA990407 SCAB 0 0 0 MacArthur Blvd @ Jamboree Rd. Intersection channelization ADD NB AND SB LEFT TURN LANE 1 N/B RIGHT TURN LANE
20031230 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 63
BASELINEORANGE COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
ORANGE COUNTY
ORA37101 SCAB 0 0 0 EL TORO RD (AVE. DE LA CARLOTA TO BRIDGER RD) WIDENING 6 TO 7 LANES TO PROVIDE ADDNL. EASTBOUND LANE.
20040630 <OTHER>
ORANGE COUNTY/EMA
ORA000191 SCAB 0 0 0 KATELLA AVE SMART STREET (100' E/O JEAN TO MAGNOLIA) WIDEN FROM 4 TO 6 LANES. STRIP AND MODIFY CURB LINES AT INTERSECTION. SIGNAL COORDINATION.
20060630 <OTHER>
ORANGE, CITY OF
ORA000162 SCAB 0 0 0 CHAPMAN AVE (TUSTIN TO SR-55). WIDEN FROM 4 TO 6 LANES. ADD 2 DEDIC. RT TURN LANES (1@ WB CHAPMAN & 1@NB TUSTIN) PLUS, 2 BUS TURNOUTS (1@NB TUSTIN AND 1@WB CHAPMAN INTERSECTION.)
20050601 <OTHER>
PLACENTIA ORA000166 SCAB 0 0 0 ORANGETHORPE AVE (MELROSE TO TEMPLE)/WIDENING FROM 4 TO 6 LANES.
20050630 <OTHER>
PLACENTIA ORA55280 SCAB 0 0 0 GOLDEN AVE @ CARBON CREEK CHANNEL BRIDGE REPLACEMENT. ONE LANE IN EA CH DIRECTION FOR APPROX. 100 FT.
20031230 EXEMPT/TRAFFIC SIGNALIZATION
SAN CLEMENTE
ORA990451 SCAB 0 0 0 MULTI-USE TRAIL IN SAN CLEMENTE CONSTUCTED PARALLEL TO RAILROAD TRACKS. 2.6 MILES LONG.
20050630 TCM
SANTA ANA 1430 SCAB 0 0 0 MOULTON SMART STREET (RICHEY TO REDHILL) RESTRIPE 6 LNS, ADD BIKE LANES, & CONSTRUCT RAISED MEDIAN. ADD RT LANE FOR ON/OFF RAMP @ SR-55. WIDEN INTERSECTION
20060601 <OTHER>
SANTA ANA ORA000171 SCAB 0 0 0 MEMORY LANE BRIDGE (PACIFIC AVE. TO CITY DRIVE)/WIDENING FROM 4 TO 6 LANES.
20041230 <OTHER>
SANTA ANA ORA001120 SCAB 0 0 0 ADJACENT TO PATRICIA LANE SCENIC ENHANCEMENTS (6TH ST AND EASTSIDE). AQUIRE ROW FROM CALTRANS AND LANDSCAPE EMPTY LOT TO CREATE PASSIVE PARK. (STATE TEA SHARE)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
SANTA ANA ORA001121 SCAB 0 0 0 SANTA ANA REG. TRANSP. CENTER. INSTALL ART PANELS ONTO CINDER BLOCK WALLS. (STATE TEA SHARE)
20031030 EXEMPT/TRAFFIC SIGNALIZATION
SANTA ANA ORA125 SCAB 0 0 0 BRISTOL ST (WARNER TO MEMORY LANE) WIDEN FROM 4 TO 6 LANES (IMPV AT BRISTOL/WARNER (ADD NB/EB/SB THRU LNS; WB RT TRN LN) AND BRISTOL/FIRST (ADD NB/SB THRU LNS; SB LFT/RT/TRN LNS
20070201 <OTHER>
SANTA ANA ORA55240 SCAB 0 0 0 FAIRVIEW AVE.(CIVIC CENTER TO GARDEN GROVE BLVD) WIDEN FROM 4 TO 6 LANES
20071230 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 64
BASELINEORANGE COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SANTA ANA ORA990404 SCAB 0 0 0 HARBOR BLVD@WARNER AVE. INTERSECTION (CHANNELIZATION), ADD A W/B THROUGH LANE AND AN E/B RIGHT TURN ONLY LANE ON WARNER AVE.
20041230 EXEMPT/TRAFFIC SIGNALIZATION
STANTON ORA000186 SCAB 0 0 0 KATELLA AVE SMART STREET (MAGNOLIA TO BEACH AND BEACH TO KNOTT) WIDEN FROM 4 TO 6 LANES, BUS TURNOUTS, INTERSECTION WIDENING, CURBLINE/MEDIAN MODIFICATIONS, AND RAISED MEDIANS.
20071230 <OTHER>
TUSTIN ORA55011 SCAB 0 0 0 IRVINE BOULEVARD AT NEWPORT AVENUE. INTERSECTION WIDENING AND MINOR REALIGNMEN. INLCUDES ALTERNATION TO 3 THRU, 2 LEFT, 1 RIGHT ALL LEGS
20031201 EXEMPT/TRAFFIC SIGNALIZATION
TUSTIN ORA55244 SCAB 0 0 0 TUSTIN RANCH RD (WALNUT AVE TO EDINGER AVE) NEW 6 LANE MAJOR ARTERIAL WITH NEW GRADE SEPARATION AT EDINGER AVE.
20030601 EXEMPT/TRAFFIC SIGNALIZATION
WESTMINSTER
ORA000158 SCAB 0 0 0 BOLSA CHICA RD ( DUNCANNON TO CHURCHILL) TRAFFIC SIGNAL COORDINATION.
20020330 EXEMPT/TRAFFIC SIGNALIZATION
WESTMINSTER
ORA000159 SCAB 0 0 0 BOLSA AVE (MAGNOLIA TO NEWLAND) TRAFFIC SIGNAL COORDINATION.
20041230 EXEMPT/TRAFFIC SIGNALIZATION
WESTMINSTER
ORA000160 SCAB 0 0 0 BOLSA@EDWARDS ST. TRAFFIC SIGNAL IMPROVEMENTS- INCLUDE PROTECTED LT LANE PHASING AND REMOVAL OF OBSTRUCTIONS FROM MEDIANS.
20041230 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 65
BASELINEORANGE COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
BUENA PARK ORA55286 SCAB 0 0 0 COMMUTER RAIL STATION (DALE STREET AND MALVERN) IN BUENA PARK. CONSTRUCT NEW RAIL STATION. 308 PARKING SPACES.
20061231 TCM
IRVINE ORA990802 SCAB 0 0 0 IRVINE AMTRAK STATION BUILD PEDESTRIAN OVERCROSSING AND LANDSCAPING
20030630 TCM
LAGUNA NIGUEL
ORA9530 SCAB 0 0 0 MISSION VIEJO/LAGUNA NIGUEL STATION LOS ANGELES/SAN DIEGO CORRIDOR
20030330 TCM
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA000104 SCAB 0 0 0 TRANSITWAY IMPROVEMENTS AT IRVINE TRANSPORTATION CENTER; BUILD 900 SPACE PARKING STRUCTURE, INCLUDING ENVIRONMENTAL, DESIGN AND CONSTRUCTION.
20040601 TCM
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA37111 SCAB 0 0 0 CAPITAL MAINTENANCE ON METROLINK SYSTEM. (REHAB. OF TRACK, SIGNAL, COMMUNICATIONS, STRUCTURES, FACILITIES, AND ROLLING STOCK)
20070630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANSIT DISTRICT (OCTD)
ORA000800 SCAB 0 0 0 MACARTHUR @ HYLAND- SANTA ANA BUS/MAINT. BASE. CONSTRUCT FACILITY TO ACCOMMODATE 250 BUSES, BUS MAIN. OPERATIONS, FUEL/VACUUM, BRAKE CKS, WASHES,& OTHER MISC. BUS RELATED SERVICES
20050930 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
ORA55285 SCAB 0 0 0 LOSSAN CORRIDOR DOUBLE TRACK ALONG LINCOLN AVENUE (17TH ST. TO ALMOND AVE.)
20031201 <OTHER>
YORBA LINDA ORA981103 SCAB 0 0 0 IN YORBA LINDA, CONSTRUCT COMMUTER RAIL STATION AND PARK AND RIDE (347 SPACES) NEAR ESPERANZA RD AND NEW RIVER ST
20050630 TCM
2004 RTP * TECHNICAL APPENDIX I - 66
BASELINERIVERSIDE COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
TEMECULA 990914 SCAB 15 0 0 I-15 TRAFFIC SURVEILLANCE AND SIGNAL SYSTEM INTEGRATION (I-215/ County Line) TEA 21 Demonstration Project
20021201 EXEMPT/TRAFFIC SIGNALIZATION
TEMECULA RIV62031 SCAB 15 3.4 0 AT I-15 AND SR79 SOUTH IC RECONFIGURATION OF RAMPS
20050601 NON-FEDERAL/NON-REGIONAL
CALTRANS RIV020907 SCAB 15 40.2 40.6 AT I-15/MAGNOLIA AVE, IC IMPROVEMENTS (EL SOBRANTE RD TO ACCESS CONTROL LINE) E/O PROPOSED NB OFF RAMP - RECONSTRUCT NB ON RAMP, REALIGN NB EXIT RAMP, SIG INSTALL/MOD (PPNO: 1003)
20070630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY
32750 SCAB 15 48.2 51.47 IN RIVERSIDE COUNTY AT GALENA ST CONSTRUCT INTERCHANGE
20050801 <OTHER>
CALTRANS 354801 SCAB 60 0 8.5 JCT RTE 15 TO VALLEY WAY - ADD 1 HOV LN AND 1 M/ F LN IN EA. DIR. INCLUDING OPERATIONAL STRIPING (IN SBD CNTY 9.05 - 9.95 & AT THE EAST END) ALSO WIDEN 5 UC'S & 1 OH
20060401 TCM
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
46360 SCAB 60 12.2 20.4 IN RIVERSIDE AND MORENO VALLEY ON SR60 FROM RT 215 TO REDLANDS BLVD ADD 2 HOV LANES
20050201 TCM
MORENO VALLEY
36040 SCAB 60 15.8 16 IN MORENO VALLEY AT INDIAN ST OVERCROSSING FROM HEMLOCK N/O SR60 AND SUNNYMEAD BLVD S/O SR60 WIDEN OVERCROSSING FROM 2 TO 4 LANE
20050601 NON-FEDERAL/NON-REGIONAL
CALTRANS 44651 SCAB 71 0 2.7 NEAR CORONA/CHINO HILLS FROM SBD CO LINE TO SANTA ANA RIVER BRIDGE- WIDEN TO 4 LANE DIVIDED EXPRESSWAY-- (WERE 2 LANES NOW 4) INCLUDING 2 ADDITIONAL ANIMAL CROSSINGS
20050201 <OTHER>
CALTRANS 44655 SCAB 71 2.4 3 NEAR CORONA -CONSTRUCT EASTBOUND 91 TO NORTHBOUND 71 CONNECTOR - (DESIGN/ ENGINEERING PORTION AND MINOR R/W) (PPNO: 0048W)
20080901 <OTHER>
CALTRANS 35641 SCAB 71 2.6 3 NEAR CORONA FROM SANTA ANA RIVER BRIDGE TO ROUTE 91; BRIDGE WIDENING FROM 2 TO 4 LANES AND RAMP MODIFICATION (EA 356411 combined with EA 446531 to form EA 3564U0)
20030701 <OTHER>
CALTRANS 446531 SCAB 71 2.6 3 NEAR CHINO, SANTA ANA BRIDGE #56-379 TO JCT RTE 91 GAP CLOSURE ON BRIDGE (EA 446531 combined with EA 35641 to form 3564U1)
20030701 <OTHER>
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
46410 SCAB 74 17.3 25.8 IN PERRIS AND LAKE ELSINORE WIDEN & REALIGN FROM 2 TO 4 LANES FROM JCT RTE 15 TO 7TH ST IN PERRIS (Combines EAs 464111and 464121)
20040701 <OTHER>
TEMECULA RIV030301 SCAB 79 3 4.78 ITS DEMO - SIGNAL INTERCONNECT ON SR79 NORTH (DESIGN/INSTALL CONDUIT/ INTERCONNECT CABLE) FROM MARGARITA TO MURRIETA HOT SPRINGS & CCTV AT VARIOUS SIGNALIZED LOCATIONS
20040830 TCM
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV62024 SCAB 79 15.8 29.88 PREPARE PA&ED REALIGNMENT ALTERNATIVES - BETWEEN DOMENIGONI PKWY TO GILMAN SPRINGS ROAD (TEA21-#193 $4.5M total appropriation)
20030630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 67
BASELINERIVERSIDE COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
TEMECULA RIV62029 SCAB 79 19.4 0 AT HWY 79 SO AND LA PAZ, ACQUIRE LAND, DESIGN AND CONSTRUCT PARK AND RIDE - 250 SPACES
20040601 TCM
CALTRANS RIV991209 SSAB 86 2.4 17.3 IN EASTERN RIVERSIDE COUNTY ON ROUTES 86, 111 (PM 18.4/24.5), AND 195 (PM R0.0/6.6) REHABILITATION FOR RELINQUISHMENT. (EA 428161) (PPNO 0075F)
20030501 <OTHER>
CALTRANS 0075H SSAB 86 2.4 10.8 NEAR MECCA S/O 82ND AVE TO 66TH AVE (RTE 195) AND ON RTE 10 AT 0.5 MILE S/O JACKSON ST - ACQUISITION OF SINK SCRUB MITIGATION PROPERTY (EA 428151)
20031031 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 42814 SSAB 86 3.2 5.2 NEAR OASIS FROM 0.2 KM S/O AVENUE 81 TO 0.2 KM N/O AVENUE 78 - CONSTRUCT 2 LANE FRONTAGE ROADS ON EITHER SIDE OF RTE 86 (PPNO: 0075G)
20030501 <OTHER>
CALTRANS 43390 SSAB 86 17 21.9 NEAR COACHELLA FROM 0.5 MILE NORTH OF AIRPORT ROAD TO DILLON RD - BIOLOGICAL MITIGATION FOR 4 LANE EXPRESSWAY (PPNO:0078K) (EA 43390K)
20041101 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 0075J SSAB 86 17.3 22.8 IN EASTERN RIVERSIDE COUNTY IN COACHELLA AND INDIO ON ROUTES 86 AND 111 (PM 24.5/28.5) REHABILITATION FOR RELINQUISHMENT (EA 428171)
20040401 <OTHER>
CALTRANS RIV991208 SSAB 86 21.1 21.8 ON RTE 86 IN COACHELLA, .4 MI S/O TO .3 MI N/O DILLON RD, VISUAL MITIGATION PLANTING (EA 428121)
20050401 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 43530 SCAB 91 11.1 17.4 IN RIVERSIDE FROM MAGNOLIA AVE TO MARY STREET, PORTIONS (3 WB AND 2 EB LOCATIONS), CONSTRUCT FIVE AUX LNS NOT THROUGH INTERCHANGES
20070701 <OTHER>
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV62037 SSAB 111 0 0 IN COACHELLA VALLEY VARIOUS LOCATIONS INTERSECTION IMPROVEMENTS SIGNALIZATION, LEFT TURN POCKETS (NOT SYNCHRONIZATION PROJECTS)
20040601 EXEMPT/TRAFFIC SIGNALIZATION
MURRIETA RIV62040 SCAB 215 10.6 0 I-215/LOS ALAMOS IC RECONSTRUCT IC, HANCOCK AVE WEST OF I215 AND WHITEWOOD RD EAST OF I-215 ; WIDEN OC FROM 2 TO 6 LNS (3 EA DIR)
20040830 NON-FEDERAL/NON-REGIONAL
CALTRANS 0121D SCAB 215 37.7 43.9 ON I-215/SR91/SR60, RIV I215 COR IMPROV PROJ - FROM 60/91/215 JCT TO 60/215 SPLIT - WIDEN 6 TO 8 LNS, INCLUDING MAINLINE/IC IMPROVS, ADD HOV, AUX, & SB TRUCK CLIMB LN (EA: 3348U1)
20060931 TCM
CALTRANS RIV030642 SCAB 215 37.7 43.9 DEBT SERVICE FOR GARVEE PROJECT - PPNO# 0121D: EL CERRITO DRIVE TO JCT 60/91/215 IC - CONSTRUCT IC, ADD 2 HOV LANES AND TRUCK CLIMBING LANE (SB) (EA 3348U1) (FTIP ID: 0121D)
20160630 <OTHER>
CALTRANS 45300 SCAB 215 38.4 41.5 RIVERSIDE, 0.1 MI S/O RTE 60/215 IC TO MARTIN LUTHER KING BLVD CONSTRUCT SOUTHBOUND TRUCK CLIMBING LANE
20020315 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 68
BASELINERIVERSIDE COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
BEAUMONT RIV011207 SCAB 0 0 0 IN BEAUMONT - SIXTH ST. REHAB AND MULTI-MODAL PROJECT FROM PALM AVE TO 500' E/O HIGHLAND SPRINGS AVE, SIGNAL INTERCONNECT, AND CONSTRUCT BIKE/PED PATH & INTERMODAL TEAM TRACK DOCK
20040630 EXEMPT/TRAFFIC SIGNALIZATION
BLYTHE RIV010201 MDAB 0 0 0 ON HOBSONWAY ST, RECONSTRUCT ROADWAY, CHANNELIZATION, INSTALL MEDIAN ISLAND, DRAINAGE IMPROVEMENTS AND SIGNALIZATION.
20050601 EXEMPT/TRAFFIC SIGNALIZATION
CALIF DEPARTMENT OF FISH AND GAME
RIV030303 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY EAST OF I-15 NEAR THE CITY OF LAKE ELSINORE - PURCHASE APPROX. 289 ACRES OF LAND IN THE ALBERHILL SCENIC VIEWSHED PROJECT
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS RIV990313 SSAB 0 0 0 RESURFACE/OVERLAY MORONGO STREETS (6.8MI), TORRES MARTINEZ ROADS (6.2 MI), SANTA ROSA STS. (1.6MI)
20001201 EXEMPT/TRAFFIC SIGNALIZATION
CATHEDERAL CITY
RIV32595 SSAB 0 0 0 DATE PALM FROM ROUTE 10 TO VARNER ROAD - WIDEN FROM TWO TO SIX LANES
20031201 NON-FEDERAL/NON-REGIONAL
CITIES & COUNTY
RIV52000 SCAB 0 0 0 IN RIVERSIDE COUNTY LUMP SUM HWY OPERATION IMPROVEMENT PROJECTS-INTERSECTION SIGNALIZATION AT INDIVIDUAL LOCATIONS
20030630 NON-FEDERAL/NON-REGIONAL
CITIES & COUNTY
RIV52001 SCAB 0 0 0 IN RIVERSIDE COUNTY LUMP SUM FOR REHABILITATION AND RECONSTRUCTION PROJECTS (NON CAPACITY ENHANCING PROJECTS)
20020630 EXEMPT/TRAFFIC SIGNALIZATION
CITIES & COUNTY
RIV52002 SCAB 0 0 0 IN RIVERSIDE COUNTY LUMP SUM HWY OPERATION IMPROVEMENT PROJECTS - INTERSECTION CHANNELIZATION
20020401 EXEMPT/TRAFFIC SIGNALIZATION
CITIES & COUNTY
RIV520154 SCAB 0 0 0 LUMP SUM SIGNAL SYNCHRONIZATION PROJECTS AT VARIOUS LOCATIONS
20030601 EXEMPT/TRAFFIC SIGNALIZATION
COACHELLA RIV52014 SSAB 0 0 0 IN COACHELLA ON AVENUE 50 AT SP RR TRACKS CONSTRUCT GRADE SEPARATION
20031201 EXEMPT/TRAFFIC SIGNALIZATION
COACHELLA VALLEY ASSOC OF GOVERNMENTS
RIV32090 SSAB 0 0 0 IN COACHELLA VALLEY CVAG PM10 PROGRAM - TO MEET NAAQS AND IMPLEMENTATION OF SIP
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CORONA RIV010224 SCAB 0 0 0 ON LINCOLN AV FROM 6TH ST TO POMONA RD & POMONA RD FROM LINCOLN TO 91 ON/OFF RAMPS, CHANNELIZATION/WIDENING TO PROVIDE FOR TURNING LANES/SIGNAL MODIFICATIONS
20040630 <OTHER>
CORONA RIV010225 SCAB 0 0 0 ON LINCOLN AV AT RTE91 E/B & W/B RAMPS, WIDEN TO PROVIDE FOR ADDITIONAL LANE ON RAMPS/RAMP WIDENING
20061231 NON-FEDERAL/NON-REGIONAL
CORONA RIV010226 SCAB 0 0 0 INSTALL 10 NEW TRAFFIC SIGNALS IN CORONA
20041231 EXEMPT/TRAFFIC SIGNALIZATION
CORONA RIV010227 SCAB 0 0 0 CORONA ADVANCED TRAFFIC MANAGEMENT SYSTEM (ATMS)
20050630 TCM
CORONA RIV011237 SCAB 0 0 0 NEAR CORONA WIDEN GREEN RIVER ROAD FROM 3 TO 6 LANES FROM SR91 SOUTHSIDE OFF/ON RAMPS TO DOMINGUEZ RANCH ROAD
20060630 NON-FEDERAL/NON-REGIONAL
CORONA RIV011240 SCAB 0 0 0 IN CORONA ON MCKINLEY ST - CONSTRUCT 6 LANE OVERCROSSING (GRADE SEPARATION) OVER SANTA FE RAILROAD
20070630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 69
BASELINERIVERSIDE COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
DESERT HOT SPRINGS
RIV011231 SSAB 0 0 0 IN DESERT HOT SPRINGS PIERSON BLVD REHAB/WIDENING FROM PALM DR TO LITTLE MORONO RD - 2 TO 4 LANES (LITTLE MORONGO TO ATLANTIC), 3 TO 4 LANES (VIA LORETO TO CHOLLA) (1.5 MILES TOT)
20030830 <OTHER>
HEMET RIV990302 SCAB 0 0 0 IN HEMET ON STATE ST. FROM CHAMBERS TO DOMENIGONI PKWY & GIBBEL WIDEN FROM 2 TO 4 LANES PAVED SHOULDERS, OVERLAY
20050228 NON-FEDERAL/NON-REGIONAL
INDIAN WELLS RIV010220 SSAB 0 0 0 ON MILES AV AT THE WHITEWATER RIVER CROSSING NEAR HWY 111, REPLACE EXISTING 2-LN LOW -FLOW BRIDGE W/2 LN ALL WEATHER BRIDGE W/SHOULDERS AND REQUIRED APPROACHES
20031231 <OTHER>
INDIO RIV010907 SSAB 0 0 0 IN THE CITY OF INDIO PAVEMENT REHAB/RECONSTRUCTION ON INDIO BLVD FROM JACKSON STREET TO STATE ROUTE 111 (APPROX 2/3 OF A MILE)
20030701 EXEMPT/TRAFFIC SIGNALIZATION
INDIO RIV62011 SSAB 0 0 0 ON VARNER RD FROM MADISON TO MONROE WIDEN FROM 2 TO 4 LANES
20030401 NON-FEDERAL/NON-REGIONAL
INDIO RIV62012 SSAB 0 0 0 ON VARNER RD FROM JACKSON TO VAN BUREN WIDEN FROM 2 TO 4 LANES
20030401 NON-FEDERAL/NON-REGIONAL
MORENO VALLEY
RIV010913 SCAB 0 0 0 IN THE CITY OF MORENO VALLEY INSTALL SIGNAL AT IRIS AND INDIAN STREET
20021201 EXEMPT/TRAFFIC SIGNALIZATION
MORENO VALLEY
RIV991211 SCAB 0 0 0 ON SAN MICHELLE AVE FROM INDIAN ST. E TO PERRIS BLVD NEW ROAD, DESIGN AND CONSTRUCT 52' WIDE PAVED 2 LN (1 EA. DIR.) RDWAY W/ UTILITY LINES
20021231 NON-FEDERAL/NON-REGIONAL
MURRIETA RIV010906 SCAB 0 0 0 IN THE CITY OF MURRIETA TRAFFIC SIGNAL INSTALLATION AND INTERCONNECT AT CALIFORNIA OAKS ROAD AND HANCOCK AVE
20021101 EXEMPT/TRAFFIC SIGNALIZATION
MURRIETA RIV990710 SCAB 0 0 0 INSTALL SIGNAL AT INTERSECTION OF JEFFERSON AVE AND KALMIA ST.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
MURRIETA RIV990714 SCAB 0 0 0 SIGNAL INSTALLATION AT INTERSECTION OF JEFFERSON AVE AND MURRIETA HOT SPRINGS RD.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
MURRIETA RIV990715 SCAB 0 0 0 SIGNAL INSTALLATION AT INTERSECTION OF ADAMS AVE AND KALMIA ST.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
PALM DESERT RIV990726 SSAB 0 0 0 WIDEN FRED WARING DR FROM 4 TO 6 LANES FROM HWY 111 TO FAIRHAVEN DR INCLUDING THE BRIDGE SPANNING THE PALM VALLEY CHANNEL
20020601 <OTHER>
PALM SPRINGS RIV000103 SSAB 0 0 0 CONSTRUCT BELARDO RD BRIDGE AND MISSING GAP, PARKING LOT AND AMENITIES FOR INDIAN INTERPRETIVE CENTER AT TAHQUITZ CANYON
20031231 <OTHER>
PALM SPRINGS RIV010213 SSAB 0 0 0 AT GENE AUTRY TRAIL RAILROAD BRIDGE, SOUTHSIDE OF I10 AT SALVIA RD TO SOUTHSIDE OF RAILROAD BRIDGE AT WHITEWATER WASH, WIDEN FROM 2 FROM 6 LANES
20040630 <OTHER>
PALM SPRINGS RIV010513 SSAB 0 0 0 IN THE CITY OF PALM SPRINGS, ON SUNRISE WAY FROM EAST PALM CANYON DRIVE TO VISTA CHINO ROAD, SIGNAL INTERCONNECT 8 TRAFFIC SIGNALS
20030430 EXEMPT/TRAFFIC SIGNALIZATION
PALM SPRINGS RIV011203 SSAB 0 0 0 IN PALM SPRINGS - WIDEN INDIAN CANYON DRIVE FROM 2 TO 4 LANES FROM THE UPRR BRIDGE TO TRAMVIEW ROAD (APPROX. 2 MILES)
20040630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 70
BASELINERIVERSIDE COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
PALM SPRINGS RIV32596 SSAB 0 0 0 RAMON ROAD FROM SUNRISE WAY TO EL CIELO - WIDEN FROM TWO TO FOUR LANES
20061201 NON-FEDERAL/NON-REGIONAL
PERRIS RIV010215 SCAB 0 0 0 IN THE CITY OF PERRIS TRAFFIC SIGNAL INSTALLATION/INTERCONNECT AND MINOR STREET IMPROVEMENTS ON NUEVO ROAD FROM WILSON AVE TO I-215
20021130 EXEMPT/TRAFFIC SIGNALIZATION
PERRIS RIV990709 SCAB 0 0 0 IN THE CITY OF PERRIS - RECONSTRUCT INTERSECTION AT 4TH ST AND REDLANDS AVE INCLUDING ROUND ABOUT, MINOR LANDSCAPING AND MINOR R/W ACQUISITION
20040601 TCM
RANCHO MIRAGE
RIV010216 SCAB 0 0 0 IN RANCHO MIRAGE ON RAMON ROAD FROM DA VALL TO LOS ALAMOS - WIDEN FROM 2 TO 6 LANES
20020630 <OTHER>
RIVERSIDE CITY
RIV011208 SCAB 0 0 0 IN CITY OF RIVERSIDE - WIDEN VAN BUREN BLVD FROM 4 TO 6 LANES FROM JACKSON STREET TO THE SANTA ANA RIVER (APPROX 1.7 MILES)
20070630 <OTHER>
RIVERSIDE CITY
RIV990703 SCAB 0 0 0 IN RIVERSIDE AT JURUPA AVE AND UP RR - CONSTRUCT UNDERPASS AND CLOSE DOWN MOUNTAIN VIEW AVE AT UPRR TRACKS
20050930 <OTHER>
RIVERSIDE COUNTY
RIV010202 MDAB 0 0 0 LOVEKIN BLVD CHANNELIZATION, FROM APPROX. 0.25 NORTH OF AND 0.5 MILES SOUTH OF SEELEY AVE IN THE PALO VERDE VALLEY
20030315 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY
RIV010205 SCAB 0 0 0 IN RIVERSIDE COUNTY NEAR MURRIETA RECONSTRUCT AND WIDEN SCOTT ROAD FROM 2 TO 6 LANES BETWEEN I-215 AND SR79 (WINCHESTER ROAD)
20050301 NON-FEDERAL/NON-REGIONAL
RIVERSIDE COUNTY
RIV010218 SCAB 0 0 0 IN RIV COUNTY ON NEWPORT RD - CONSTRUCTION OF 6 LANE RD FROM BRIGGS RD TO WINCHESTER RD (GAP CLOSURE) AND REALIGNMENT & WIDENING FROM 2 TO 6 LANES FROM MENIFEE RD TO BRIGGS RD
20050630 <OTHER>
RIVERSIDE COUNTY
RIV010219 SCAB 0 0 0 VALLEY WAY/ARMSTRONG ROAD RECONSTRUCTION AND WIDENING FROM 2 TO 4 LANES FROM SR60 TO SIERRA AVE IN NORTHWESTERN RIVERSIDE COUNTY
20051130 <OTHER>
RIVERSIDE COUNTY
RIV010221 SSAB 0 0 0 ON MILES AV FROM COACHELLA VALLEY STORMWATER CHNL TO CLINTON CONSTRUCT 4-LN BRIDGE OVER CHANNEL/WIDEN RD 2 TO 4 LNS AND ON CLINTON FROM MILES AV TO FRED WARING, WIDEN 3 TO 4 LNS
20061015 <OTHER>
RIVERSIDE COUNTY
RIV011202 SCAB 0 0 0 IN RIVERSIDE COUNTY ON VAN BUREN BLVD - CONSTRUCT MEDIAN, CURB & GUTTERS, AND 12 BUS TURNOUTS FROM WASHINGTON ST TO ORANGE TERRACE PKWY (APPROX 3.5 MILES)
20040430 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY
RIV011235 SCAB 0 0 0 ON VAN BUREN BLVD FROM 260 M N/O CLAY ST TO 315 M S/O JURUPA AVE - REPLACE EXISTING 4 LN BR WITH 6 LN BR, WIDEN VAN BUREN 4 TO 6 LNS, & TRANSITION RECONSTRUCTION ON CLAY & JURUPA
20070801 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 71
BASELINERIVERSIDE COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
RIVERSIDE COUNTY
RIV62102 SCAB 0 0 0 ON OLEANDER FROM PATTERSON TO INDIAN, REALIGN & RECSTRUCT RD; ON INDIAN FROM OLEANDER TO SAN MICHELE, CONSTRUCT BRIDGE&RECONSTR RD.ON SAN MICHELE EXT RD - HEACOCK -- APPROP $7.2
20020531 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY
RIV990306 SCAB 0 0 0 IN RIV COUNTY, PAVEMENT REHAB & RECONSTRUCT ON RECHE CYN RD FROM SAN BDNO CO LINE TO RECHE VISTA AND RECHE VISTA FROM RECHE CYN RD TO MORENO VALLEY CL (TOTAL OF 3.5 MI)
20030131 <OTHER>
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV000101 SCAB 0 0 0 CLEAN FUELS INFRASTRUCTURE PROGRAM
20030630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV62046 SCAB 0 0 0 LUMP SUM TRANSPORTATION ENHANCEMENT ACTIVITIES (EXCLUDING CATEGORY 7)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
SAN JACINTO RIV32337 SCAB 0 0 0 IN SAN JACINTO COMPLETION OF RAMONA EXPRESSWAY BTWN SEVENTH ST/CEDAR GAP CLOSURE - CONSTRUCT 4 LANE SEGMENT
20050401 NON-FEDERAL/NON-REGIONAL
SAN JACINTO RIV990706 SCAB 0 0 0 INSTALL SIGNAL AT INTERSECTION OF RAMONA BLVD/EAST MAIN ST/SAN JACINTO AVE/DE ANZA DR
20030630 EXEMPT/TRAFFIC SIGNALIZATION
TEMECULA 991205 SCAB 0 0 0 AT MURRIETA CREEK ON RANCHO CALIFORNIA RD WIDEN BRIDGE CROSSING FROM 4 TO 6 LANES.
20030630 NON-FEDERAL/NON-REGIONAL
TEMECULA 991206 SCAB 0 0 0 IN TEMECULA - EXTEND MURRIETA HOT SPRINGS ROAD 4 LANES FROM BUTTERFIELD STAGE RD TO WEST CITY LIMITS (SERAPHINA RD) (APPROX 1.25 MI)
20030630 NON-FEDERAL/NON-REGIONAL
TEMECULA RIV010217 SCAB 0 0 0 ON BUTTERFIELD STAGE RD - CONSTRUCT 4 LANE ARTERIAL EXTENSION FROM RANCHO CALIF. RD TO MURRIETA HOT SPRINGS RD.
20060630 <OTHER>
TEMECULA RIV62019 SCAB 0 0 0 WESTERN BYPASS CORRIDOR, PHASE 1 SR79 TO VINCENT MORAGA DRIVE DESIGN AND CONSTRUCT FOUR LANE ROAD
20060601 NON-FEDERAL/NON-REGIONAL
TEMECULA RIV62020 SCAB 0 0 0 WESTERN BYPASS CORRIDOR, PHASE II RANCHO CALIFORNIA TO NORTHERN LIMIT DESIGN AND CONSTRUCT FOUR LANE ROAD
20060601 NON-FEDERAL/NON-REGIONAL
TEMECULA RIV990729 SCAB 0 0 0 EXTEND DIAZ RD (4 LANES) TO NORTH OF DENDY WAY
20040830 <OTHER>
TEMECULA RIV991201 SCAB 0 0 0 ON JEFFERSON AVE FROM SANTA GERTRUDIS CHANNEL TO RANCHO CALIFORNIA RD, ENVIRONMENTAL, PE, DESIGN, CONSTRUCT MEDIANS.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 72
BASELINERIVERSIDE COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
HEMET RIV990708 SCAB 0 0 0 CONSTRUCT TRANSPORTATION/ TRANSIT CENTER/PARK-N-RIDE LOT ON CORNER OF HARVARD AND LATHAM AVE, APP 100 SPACES
20030430 TCM
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
0006S SCAB 0 0 0 METROLINK - SAN BERNARDINO SUBDIVISION TIER II NEW STATIONS AT MAIN ST IN CORONA
20031031 TCM
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV011234 SCAB 0 0 0 AT LA SIERRA METROLINK STATION - PURCHASE UP TO 21.19 ACRES TO EXPAND EXISTING PARKING FROM 348 SPACES TO ULTIMATELY 2000 SPACES (First 2 phases up to 1,050 spaces)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
RIV011242 SCAB 0 0 0 PURCHASE EXPANSION ROLLING STOCK (2 CAB CARS AND 3 LOCOMOTIVES) FOR METROLINK IEOC AND RIVERSIDE/FULLERTON/LA LINES (EA: RIVFUL, PPNO: 0079E)
20040630 TCM
SUNLINE TRANSIT AGENCY
RIV010502 SSAB 0 0 0 IN COACHELLA VALLEY, PROPERTY ACQUISITION OF APPROXIMATELY 2.27 ACRES FOR BUS PARKING/MAINTENANCE FACILITY EXPANSION AND ALTERNATE FUELS INFRASTRUCTURE EXPANSION
20060630 EXEMPT/TRAFFIC SIGNALIZATION
SUNLINE TRANSIT AGENCY
RIV020906 SSAB 0 0 0 UPGRADE EXISTING HYDROGEN FUELING INFRASTRUCTURE AT 32-505 HARRY OLIVER TRAIL, THOUSAND PALMS
20041231 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 73
BASELINESAN BERNARDINO COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
ONTARIO SBD32225 SCAB 10 0 0 AIRPORT GROUND ACCESS AT I-10/HAVEN LANDSCAPING & IRRIGATION
20030630 <OTHER>
COLTON SBD41244 SCAB 10 0 0 MT. VERNON AT I-10 INTERSECTION SIGNALIZATION, REVISION AND COORDIN ATION AND WIDENING INTERSECTION TO INCLUDE LEFT TURN LANE (BOTH DIRECTIONS)
20040101 <OTHER>
COLTON SBD41245 SCAB 10 0 0 PARK AND RIDE ALT. FUEL FACILITY AT I-10 AND SPERRY
20031101 TCM
ONTARIO SBD41147 SCAB 10 6.7 7.5 AIRPORT GROUND ACCESS -I-10 AT ARCHIBALD AVE - INSTALL IRRIGATION SYSTEM AND LANDSCAPE PLANTING
20030630 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
35450 SCAB 10 11 12.6 I-10 AT ETIWANDA AVENUE INTERCHANGE RECONSTRUCT INTERCHANGE FROM EXISTING 4-QUADRANT FULL CLOVERLEAF TO A PARTIAL CLOVERLEAF INTERCHANGE AND REALIGN VALLEY BL RAMPS
20040201 <OTHER>
FONTANA SBD41247 SCAB 10 16.2 0 I-10 AT SIERRA AVE.(WIDEN O/C ONLY) RECONSTRUCT IC. W/6 THRU LNS_ON SIERRA & REPLACE BRIDGES OVER I10 & THE RR-IT'S CURRENTLY DESIGNED AS URBAN I/C W/SIGNALS & RAMP WIDE (T21-#60)
20030630 <OTHER>
RIALTO SBD31808 SCAB 10 18.7 20.8 I-I0 AT RIVERISDE AVE - 2.1 KM W/O RIVERSIDE AVE TO 1.3 KM E/O RIVERSIDE AVE. MODIFY IC 4 TO 9 LNS (INCL TURN LNS) FROM SLOVER TO VALLEY & ADD AUX LANES & OPER IMPRV
20060701 <OTHER>
COLTON 31320 SCAB 10 23.1 23.4 IN COLTON AT MOUNT VERNON AVE MODIFY INTERCHANGE
20060401 <OTHER>
REDLANDS SBD31717 SCAB 10 28.3 0 IN REDLANDS AT CALIFORNIA STREET INTERCHANGE WIDEN UNDERCROSSING FROM 2 TO 5 LANES, RAMP MODIFICATION & SIGNALS
20030701 <OTHER>
SANBAG 41920 SCAB 10 33.3 36.9 IN REDLANDS AND YUCAIPA, FROM 0.2 MILES EAST OF FORD ST. O/C TO LIVE OAK CANYON RD. OFFRAMP-CONSTRUCT EAST BOUND TRUCK CLIMBING LANE AND AUXILIARY LANE
20050501 <OTHER>
YUCAIPA 43320 SCAB 10 35.5 39.2 IN YUCAIPA @ LIVE OAK CANYON ROAD INTERCHANGE RECONFIGURE INTERCHANGE AND WIDEN LIVE OAK CANYON ROAD FROM 2 TO 6 THRU LANES (I-10/LIVE OAK CANYON)
20060701 <OTHER>
VICTORVILLE 200078 MDAB 15 0 0 PARK-N-RIDE LOT EXPANSION AND FACILITIES AT BEAR VALLEY RD & I-15 (70 EXISTING SPACES TO 300 SPACES)
20031031 EXEMPT/TRAFFIC SIGNALIZATION
RANCHO CUCAMONGA
SBD41203 SCAB 15 6.8 0 I-15 AT BASELINE -WIDEN SOUTHBOUND OFF RAMP FROM 1-2 LANES, INSTALL RAMP METERS AND OTHER OPERATIONAL IMPROVEMENTS AND TRAFFIC SIGNALS
20030601 NON-FEDERAL/NON-REGIONAL
CALTRANS 20430 SCAB 15 7.1 10 IN FONTANA AND RANCHO CUCAMONGA AT ROUTE 30 - NEW FREEWAY TO FREEWAY INTERCHANGE
20001201 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 74
BASELINESAN BERNARDINO COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS 44850 MDAB 15 21.3 28.6 CAJON PASS, N/B FROM 0.1 KM S/O RTE 138 TO 0.1 KM S/O OAK HILL RD O/C -ADD N/B LANE TO MEDIAN & CONVERT RT. LANE TO TRUCK CLIMBING LANE
20040202 <OTHER>
VICTORVILLE 33390 MDAB 15 41.7 42.4 IN VICTORVILLE AT MOJAVE DR OVERCROSSING (ROY ROGERS INTERCHANGE) WIDEN BRIDGE ON NORTH SIDE, WIDEN RAMPS
20041201 <OTHER>
CALTRANS 35552 MDAB 15 42 70.1 NEAR BARSTOW FROM MOJAVE DR. I/C IN VICTORVILLE TO JCT. RTE 58 IN BARSTOW TO WILDWASH BRIDGE ADD S/B MIXED FLOW (WAS EA 35551)
20050801 <OTHER>
CALTRANS 35557 MDAB 15 42 70.6 ON I-15 FROM MOJAVE DRIVE IN VICTORVILLE TO JCT. 58 IN BARSTOW - ADD N/B OUTSIDE MIXED FLOW LANE - PHASE 1
20061201 <OTHER>
CALTRANS 35554 MDAB 15 53.3 55.7 I-15 NEAR BARSTOW FROM 2.4 KM N/O POWERLINE RD.O/C TO WILDWASH BRGE EMBANKMENT & GRADING NEEDED FOR FUTURE WIDENING (PARENT EA IS 35551)
20050801 <OTHER>
CALTRANS 35553 MDAB 15 65 68.1 NEAR BARSTOW FROM 1.3 KM S/O SIDEWINDER ROAD OC TO 0.2 KM S/O DRIFT WASH BRIDGE ROADWAY EXCAVATION, ROADWAY EMBANKM & GRADING NEEDED FOR FUTURE WIDENIN
20001201 <OTHER>
CALTRANS 42780 MDAB 15 65 68.1 NEAR BARSTOW FROM 1.3 KM SOUTH OF SIDEWINDER ROAD OVERCROSSING TO DRIFT WASH BRIDGE - SOUTHBOUND TRUCK CLIMBING LANE
20010601 <OTHER>
CALTRANS 35072 MDAB 15 69.2 74.1 IN BARSTOW 0.5 MILES N/O LENWOOD RD. TO 0.1 MILES S/O EAST MAIN ST. ADD ONE LANE N/B WIDEN FROM 2 LANES TO 3 LANES RD. OVERCROSSING TO 0.1 MILES SO OF EAST MAIN ST. OVERCROSSING
20030501 <OTHER>
BARSTOW SBD55015 MDAB 15 76.8 76.9 IN BARSTOW I-15 AT OLD RTE. SR58 - CONSTRUCT NEW INTERCHANGE (T21-#926) BUILD OVERCROSSING AND UNDERCROSSING/BRIDGE AND PROVIDE CONNECTORS
20040801 <OTHER>
CALTRANS 44780 MDAB 15 138 156.4 NEAR BAKER,0.8 KM SOUTH OF EAST BAKER OVERCROSSING TO 1.3 KM NORTH OF HALLORAN SUMMIT -- CONSTRUCT SOUTHBOUND TRUCK DESCENDING LANE
20011001 <OTHER>
SAN BERNARDINO CO
SBD41337 SCAB 18 0 0 DIVISION DR. AT SH 18 INSTALL TRAFFIC SIGNAL
20021001 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
SBD031487 SCAB 18 23.38 0 DALEY CANYON ROAD - CONSTRUCT INTERCHANGE AT SH-18 (CONSTRUCT 4 LANE)
20031201 NON-FEDERAL/NON-REGIONAL
BIG BEAR LAKE
34I80 SCAB 18 48.5 49.1 IN BIG BEAR LAKE FROM PAINE RD TO LAKEVIEW DR RELOCATE HIGHWAY
20020601 EXEMPT/TRAFFIC SIGNALIZATION
BIG BEAR LAKE
200105 SCAB 18 48.5 48.5 SR18/BIG BEAR BL/PAINE RD/VILLAGE DR - INTERSECTION IMPROVEMENTS - ADDING RIGHT/LEFT TURNS LANES AND SIDEWALKS
20030831 EXEMPT/TRAFFIC SIGNALIZATION
SANBAG 20621 SCAB 30 0 1.5 RTE 30 FROM LA COUNTY LINE TO MOUNTAIN AV - SEG 1 OF SR 30 HOV 8 LANE FWY
20031201 TCM
2004 RTP * TECHNICAL APPENDIX I - 75
BASELINESAN BERNARDINO COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS 44301 SCAB 30 0 1.5 IN UPLAND, LA/SBD CO LINE TO MOUNTAIN AVE. CONSTRUCT 6 LANE FREEWAY & 2 HOV LANES (SEGMENT 1)
20021201 TCM
CALTRANS 44311 SCAB 30 1.5 3.9 IN UPLAND, MOUNTAIN AVE. TO 0.1 MILE W/O CUCAMONGA CANNYON WASH CONSTRUCT 6 LANE FREEWAY & 2 HOV LANES & CAMPUS AVE. UC (SEGMENT 2)
20021201 TCM
CALTRANS 44321 SCAB 30 3.9 6.4 IN RANCHO CUCAMONGA, 0.1 MILE W/O CUCAMONGA CANYON WASH TO HERMOSA AV CONSTRUCT 6 LANE FREEWAY & 2 HOV LANES (SEGMENT 3)
20021201 TCM
CALTRANS 44331 SCAB 30 6.4 8.3 IN RANCHO CUCAMONGA, HERMOSA AVE TO 0.6 KM E/O MILLIKEN AVE. CONSTRUCT 6 LANE FREEWAY & 2 HOV LANES (SEGMENT4)
20021201 TCM
SANBAG 44340 SCAB 30 7.9 10 IN SAN BERNARDINO COUNTY FROM MILLIKEN AVE TO 0.4 MI WEST OF EAST AVE CONSTRUCT 8-LN FWY WITH 2 HOV LANES **SEE STIP PPNO #193B, C & S FOR
20020601 TCM
SANBAG SBD0194 SCAB 30 13.1 15.1 NEAR FONTANA FROM 0.5 MI E OF HEMLOCK TO 0.2 MI E OF SIERRA AVE CONSTRUCT 6-LANE FWY & 2 HOV LANES
20020601 TCM
SAN BERNARDINO
59207 SCAB 30 24.2 26.7 ON RTE. 30 FROM VALENCIA TO ARDEN AVENUES NOISE ATTENUATION FREEWAY SOUNDWALL__(LENGTH-2.5 MILES)
20040801 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD41248 SCAB 66 0 0 FOOTHILL BLVD.(66) INTERSECTION OF BANANA - INSTALL TRAFFIC SIGNAL AND ADD UP TO 6FT. TO 4 FT. SHOULDERS TO PROVIDE LEFT TURN LANES FOR ALL APPROACHES TO THE INTERSECTION
20021201 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031247 SCAB 66 10.7 13.2 IN FONTANA FROM EAST AVENUE TO HEMLOCK AVE -WIDEN FROM 4 TO 6 LANES WIDEN TO STATE STANDARDS FOR 6 LANE (SCHEDULE DELAY ALSO)
20040201 <OTHER>
FONTANA 200005 SCAB 66 10.8 12.27 FOOTHILL BLVD. FROM EAST ST. TO CHERRY AVE. (1.5 MILES) INSTALL LANDSCAPING ON NORTHSIDE OF PROJECT
20010630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 43670 SCAB 71 0 8.4 IN CHINO FROM RIVERSIDE DRIVE TO RIVERSIDE COUNTY LINE - LANDSCAPING
20011201 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 46970 MDAB 138 0 14.2 ON RTE138 FROM LA CO LINE TO 0.23KM E/O LONE PINE CANYON RD - CONSTRUCT TRUCK CLIMBING LANES AND TURNOUTS, WIDEN SHOULDERS TO 8FT, IMPROVE VERTICAL CURVE
20050901 <OTHER>
CALTRANS 34012 MDAB 138 4.6 9 NEAR WRIGHTWOOD APPROX. 1.2 MILES WEST OF SHEEP CREEK RD. TO 2.3 MILES EAST OF SR 2 - WIDEN FROM 2-4 LANES WITH MEDIAN LEFT TURN
20070601 <OTHER>
CALTRANS 26831 MDAB 138 16.3 19.7 NEAR CAJON, FROM 1 MILE EAST OF ROUTE 15 TO SUMMIT POST OFFICE ROAD - 4 LANE CONTROLLED ACCESS HIGHWAY
20030401 <OTHER>
CALTRANS 20620 SCAB 210 0 22.8 UPLAND TO SAN BERNARDINO FROM LOS ANGELES COUNTY LINE TO ROUTE 215 - 8 LANE FREEWAY INCLUDING 2 HOV LANES (6+2) - 210 CORRIDOR PROJECT
20071201 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 76
BASELINESAN BERNARDINO COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS 49800 SCAB 210 8.3 15 IN SAN BERNARDINO CO. ON NEW RTE. 30/210 FREEWAY IN RANCHO CUCAMONGA AND FONTANA FROM 0.6 KM WEST OF ROCHESTER TO 0.8 KM EAST OF SIERRA O/C - HIGHWAY LANDSCAPING
20031201 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 711 SCAB 215 4 7.2 NEAR COLTON AND SAN BERNARDINO FROM ROUTE 10 TO ROUTE 66 AT VARIOUS LOCATIONS - NORTHBOUND AND SOUTHBOUND AUXILIARY LANES WITH RIGHT OF WAY FOR FUTURE HOV LANES
20000601 <OTHER>
CALTRANS 713 SCAB 215 4 10.1 I-215 CORRIDOR NORTH - IN SAN BERNARDINO, ON I-215 FROM RTE 10 TO RTE 30- ADD 2 HOV LANES 1 LANE IN EA. DIR. AND OPERATIONAL IMPROVEMENTS
20051201 TCM
2004 RTP * TECHNICAL APPENDIX I - 77
BASELINESAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
ADELANTO 200010 MDAB 0 0 0 ASTER RD FROM VIOLET-AIR BASE TO BARTLETT-CRIPPEN - PAVE EXISTING 2 LANE DIRT ROAD (1.25 MILES, NON-CAPACITY)
20031101 EXEMPT/TRAFFIC SIGNALIZATION
ADELANTO 200150 MDAB 0 0 0 ADELANTO ROAD FROM AUBURN TO CHAPARRAL, AUBURN AVENUE FROM ADELANTO RD. TO JONATHAN AND JONATHAN FROM AUBURN TO LA HABRA- PAVE DIRT ROADS
20030901 EXEMPT/TRAFFIC SIGNALIZATION
ADELANTO 200151 MDAB 0 0 0 EL MIRAGE RD. FROM RICHARDSON RD. (CITY LIMITS) TO SR 395 - PAVE EXISTING 2 LANE DIRT ROAD AND RESURFACE
20031001 EXEMPT/TRAFFIC SIGNALIZATION
APPLE VALLEY 20020111 MDAB 0 0 0 JOSHUA ROAD REHABILITATION PROJECT - FROM CAHUILLA ROAD TO STANDING ROCK (1.5 MILES) PAVE AN EXISTING DIRT ROAD WITH ASPHALT CONCRETE - 1 LANE IN EACH DIRECTION
20030421 EXEMPT/TRAFFIC SIGNALIZATION
APPLE VALLEY SBD55001 MDAB 0 0 0 CORWIN ROAD AT HIGHWAY 18 INTERSECTION. CONNECTING SR 18 AND CORWIN ROAD (NEW CONNECTOR) AND TRAFFIC SIGNAL
20021201 EXEMPT/TRAFFIC SIGNALIZATION
BARSTOW 200103 MDAB 0 0 0 LENWOOD RD - COMMERCE PKWY TO 3/4MI WEST - RECONSTRUCT 2-LANE ROADWAY
20020601 EXEMPT/TRAFFIC SIGNALIZATION
BARSTOW SBD99004 MDAB 0 0 0 EAST MAIN STREET BARSTOW ROAD TO YUCCA AVENUE RECONSTRUCT 4 LANE ROADWAY SHOULDER WIDENING
20030131 EXEMPT/TRAFFIC SIGNALIZATION
BIG BEAR LAKE SBD990301 SCAB 0 0 0 VARIOUS COLLECTOR STREETS REHABILITATION OF EXISTING STREET PAVEMENT INCLUDING SOME CULVERT REPLACEMENT(STPL FUNDS OBLIGATED)
20011201 EXEMPT/TRAFFIC SIGNALIZATION
CALIF DEPARTMENT OF PARKS & RECREATION
200079 SCAB 0 0 0 SPERRY WASH ROUTE IMPROVEMENT - INSTALL TRAVEL MANAGEMENT SIGNS, WATER CROSSING MARKERS AND INTERPRETIVE SIGNS. INSTALL 2 INTERPRETIVE KIOSKS, REPLACE BARRIERS.
20021201 EXEMPT/TRAFFIC SIGNALIZATION
CHINO 200002 SCAB 0 0 0 CENTRAL AVENUE AT EL PRADO - INSTALL TRAFFIC SIGNAL
20020601 EXEMPT/TRAFFIC SIGNALIZATION
CHINO 200003 SCAB 0 0 0 EL PRADO RD. AT KIMBALL AVENUE - INSTALL TRAFFIC SIGNAL
20030601 EXEMPT/TRAFFIC SIGNALIZATION
CHINO 200203 SCAB 0 0 0 IN CHINO - ON GRAND AVENUE REALIGNMENT FROM ROSWELL AVENUE TO PIPELINE - WIDEN SOUTHSIDE OF GRAND AVE. FROM 3 TO 4 LANES AND ON THE WESTSIDE OF PIPELINE AVE. FROM 2-3 LANES
20020601 NON-FEDERAL/NON-REGIONAL
CHINO 200205 SCAB 0 0 0 IN CHINO, MONTCLAIR, AND UPLAND- ON MOUNTAIN AVE. FROM EDISON AVENUE TO 21ST STREET-SIGNAL COORDINATION PROJECT (APPROX. 40 INTERSECTIONS)
20030601 EXEMPT/TRAFFIC SIGNALIZATION
CHINO SBD031127 SCAB 0 0 0 EDISON AVENUE FROM CYPRESS CHANNEL TO EUCLID AVE WIDEN FROM 2 LANES TO 4 LANES
20020701 NON-FEDERAL/NON-REGIONAL
CHINO SBD031137 SCAB 0 0 0 EDISON AVENUE AT FERN INSTALL TRAFFIC SIGNAL
20040601 EXEMPT/TRAFFIC SIGNALIZATION
CHINO SBD031142 SCAB 0 0 0 RIVERSIDE DRIVE AT FERN AVENUE INSTALL TRAFFIC SIGNAL
20030601 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 78
BASELINESAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CHINO SBD31933 SCAB 0 0 0 CENTRAL AVE EL PRADO RD TO SR 71/FAIRFIELD RANCH & @ SAN ANTONIO FLOOD CHANNEL & LITTLE CHINO CRK- REALIGN & WIDEN 2-6 LNS BTWN FAIRFIELD RANCH INCLUDE CHINO CRK BRG.-EL PRADO-4LN
20021201 NON-FEDERAL/NON-REGIONAL
CHINO SBD41226 SCAB 0 0 0 RIVERSIDE DRIVE AT SAN ANTONIO TRAFFIC SIGNAL
20031201 EXEMPT/TRAFFIC SIGNALIZATION
CHINO HILLS 2001016 SCAB 0 0 0 CHINO HILLS - INSTALL 2 CNG TIME FILL REFUELING APPLIANCES - LOCATED AT CITY HALL AND CITY YARD - 2001 GRAND AVENUE AND 15091 LA PALMA AVENUE - CHINO
20030601 EXEMPT/TRAFFIC SIGNALIZATION
CHINO HILLS SBD31785 SCAB 0 0 0 EUCALYPTUS AVENUE PEYTON DRIVE TO GALLOPING HILLS RD. CONSTRUCT 2 LANE ROAD
20041201 NON-FEDERAL/NON-REGIONAL
CHINO HILLS SBD41236 SCAB 0 0 0 CENTRAL AVE AT FAIRFIELD RANCH RD. TO EAST CITY LIMITS CONSTRUCT CENTRAL AVE CONSTRUCTING NEW 6 LANE RD AND BRIDGE W/IN THESE LIMITS
20020331 NON-FEDERAL/NON-REGIONAL
CHINO HILLS SBD41237 SCAB 0 0 0 CHINO HILLS PARKWAY AT SAN ANTONIO CHANNEL WIDEN SOUTHSIDE OF BRIDGE ON CHINO HILLS OVERCROSSING-PROVIDING 2 LNS IN THE EASTBOUND DIRECTION (1-2 LNS
20020430 NON-FEDERAL/NON-REGIONAL
CHINO HILLS SBD41239 SCAB 0 0 0 WOODVIEW AVE/PIPELINE TO PEYTON DR. WIDEN WOODVIEW AVE. FROM 30FT.-52FT W/2LANES AND MARKED BIKE LANES IN EACH DIRECTION, INCLUDES CURB, GUTTER AND SIDEWALK IMPROVEMENTS
20040101 NON-FEDERAL/NON-REGIONAL
CHINO HILLS SBD41242 SCAB 0 0 0 PEYTON DRIVE/EUCALPYTUS TO SR142 WIDEN PEYTON DRIVE FROM 2 TO 4 LNS WITH MARKED BIKE LANES IN EA.DIRECT
20041201 NON-FEDERAL/NON-REGIONAL
CHINO HILLS SBD41243 SCAB 0 0 0 WOODVIEW RD./PEYTON - SOQUEL CANYON CONSTRUCT NEW 2 LANE ROAD TO INCLUDE MARKED BIKE LANE IN EACH DIRECTION
20040101 NON-FEDERAL/NON-REGIONAL
CHINO HILLS SBD88106 SCAB 0 0 0 PEYTON DRIVE PAYNE RANCH RD TO EUCALYPTUS WIDEN PEYTON DRIVE FROM 2-6 LANES AND INCLUDE MARKED BICYCLE LANES IN EACH DIRECTION
20040101 NON-FEDERAL/NON-REGIONAL
COLTON 200064 SCAB 0 0 0 WASHINGTON ST FROM RECHE CANYON TO HUNTS LANE - ELIMINATE BOTTLENECK, ADD 2 LANES TO 4 LANE ROAD USING EXISTING STREET WIDTH AT INTERSECTIONS, TRAFFIC SIGNAL IMPROVEMENTS
20021230 NON-FEDERAL/NON-REGIONAL
COLTON 200157 SCAB 0 0 0 AT MAIN STREET AND IOWA AVENUE AND APPROX. 300' NORTH AND 300' EAST OF EACH SIDE OF STREET-INTERSECTION IMPROVEMENTS, CURB & GUTTER, REMOVE BILLBOARD AND TRAFFIC SIGNAL
20031231 EXEMPT/TRAFFIC SIGNALIZATION
COLTON SBD031154 SCAB 0 0 0 RECHE CANYON ROAD WASHINGTON STREET TO CITY LIMITS WIDEN FROM 2 LANES TO 4 LANES
20041201 NON-FEDERAL/NON-REGIONAL
COLTON SBD031155 SCAB 0 0 0 WASHINGTON ST FROM BLUFF RD TO COOLEY DR. WIDEN ROAD FOR RIGHT AND LEFT TURN LANES AND INSTALL CURB & GUTTERS
20041201 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 79
BASELINESAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
COLTON SBD031156 SCAB 0 0 0 COLTON AVENUE - FROM MT. VERNON TO EAST CITY LIMITS WIDEN ROAD FROM 2 LANES TO 4 LANES
20020801 NON-FEDERAL/NON-REGIONAL
COLTON SBD31786 SCAB 0 0 0 HUNTS LANE AT COOLEY LANE INSTALL TRAFFIC SIGNALS
20031101 EXEMPT/TRAFFIC SIGNALIZATION
COLTON SBD31790 SCAB 0 0 0 BARTON ROAD AT TERRACE AVENUE INSTALL TRAFFIC SIGNALS
20021201 EXEMPT/TRAFFIC SIGNALIZATION
COLTON SBD31796 SCAB 0 0 0 SOUTH MT. VERNON AVENUE WASHINGTON STREET TO TERRACE ROAD REHABILITATE ROADWAY
20030601 EXEMPT/TRAFFIC SIGNALIZATION
COLTON SBD78022 SCAB 0 0 0 WASHINGTON STREET WATERMAN AVENUE TO HUNTS LANE WIDEN FROM 4 TO 6 LANES & IMPROVE INTERSECTION
20031101 NON-FEDERAL/NON-REGIONAL
COLTON SBD90063 SCAB 0 0 0 VALLEY BOULEVARD RANCHO AVENUE TO MT. VERNON SIGNAL UPGRADE AND REHABILITATION
20061101 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA 2001010 SCAB 0 0 0 (ATMIS) ADVANCED TRAFFIC MANAGEMENT INFORMATION SYSTEM PROJECT - INSTALL AND DESIGN COMPUTER SOFTWARE, HARDWARE, AND COMMUNICATION SYSTEM - PHASE 1
20030701 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA 2001011 SCAB 0 0 0 ON MULBERRY AVENUE FROM PHILADELPHIA TO THE I-10 AND ON SIERRA AVENUE FROM JURUPA TO SUMMIT AVENUE - INSTALL FIBER OPTICS AND CCTV
20030801 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031164 SCAB 0 0 0 BASELINE AVENUE AT CHERRY, EAST, & HERITAGE AVENUES INSTALL TRAFFIC SIGNALS
20010601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031166 SCAB 0 0 0 ALDER AVENUE AT BASELINE AVENUE INSTALL TRAFFIC SIGNAL
20020601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031207 SCAB 0 0 0 SIERRA AVENUE AT SANTA FE RAILROAD CONSTRUCT 4 LANE UNDERCROSSING
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031265 SCAB 0 0 0 SIERRA AVENUE FROM BASELINE TO WALNUT- WIDEN FROM 4 TO 6 LANES (PROJECT SPLIT WITH #20020112)
20040601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031270 SCAB 0 0 0 SUMMIT AVENUE CITRUS AVENUE TO SIERRA AVENUE WIDEN FROM 2 TO 4 LANES
20040601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD41254 SCAB 0 0 0 BASELINE AVE. AT CYPRESS INTERSECT INSTALL TRAFFIC SIGNAL AND ADD UP TO 6 FT. TO ALL SHOULDERS FOR LEFT TURN LANES AT INTERSECTION
20020601 EXEMPT/TRAFFIC SIGNALIZATION
GRAND TERRACE
SBD31791 SCAB 0 0 0 BARTON ROAD SOUTH LA CADENA TO TERRACE REPLACE BARTON ROAD BRIDGE (NO NEW LANES ADDED) AT AT&SF RAILROAD
20001201 EXEMPT/TRAFFIC SIGNALIZATION
HIGHLAND 20010110 SCAB 0 0 0 IN HIGHLAND - 5TH STREET SIGNAL INTERCONNECT FROM PALM TO BOULDER AVENUES
20030601 EXEMPT/TRAFFIC SIGNALIZATION
HIGHLAND 20010111 SCAB 0 0 0 PALM AVENUE SIGNAL INTERCONNECT FROM 3RD TO 5TH STREETS
20021201 EXEMPT/TRAFFIC SIGNALIZATION
HIGHLAND SBD031606 SCAB 0 0 0 BASELINE FROM PALM AVE TO 300' E/O BOULDER AVE - TRAFFIC SIGNAL INTERCONNECT
20031030 EXEMPT/TRAFFIC SIGNALIZATION
HIGHLAND SBD31891 SCAB 0 0 0 BOULDER AVENUE AT WEBSTER STREET - INSTALL TRAFFIC SIGNAL
20020601 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 80
BASELINESAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
HIGHLAND SBD31900 SCAB 0 0 0 FIFTH STREET FROM PALM AVENUE TO STATE ROUTE 30 - WIDEN FROM 2 TO 4 LANES INCLUDING CITY CREEK BRIDGE AND SIGNALS (T-21 - 105 178 1602 #852)
20030630 NON-FEDERAL/NON-REGIONAL
HIGHLAND SBD41292 SCAB 0 0 0 BOULDER AVE. FROM CITY CREEK TO 5TH ST. - WIDEN FROM 2 TO 4 LANES
20040630 NON-FEDERAL/NON-REGIONAL
HIGHLAND SBD41293 SCAB 0 0 0 BASELINE AVE. FROM CLUB VIEW DRIVE TO WEAVER ST. - WIDEN FROM 2 TO 4 LANES (BOTTLENECK)-TO BE COMPLETED BY 01/01/01(UNDER CONSTRUCTION)
20010130 NON-FEDERAL/NON-REGIONAL
HIGHLAND SBD41294 SCAB 0 0 0 BASELINE AVE. FROM BOULDER AVE. TO CHURCH ST. - WIDEN FROM 2 TO 4 LANES(UNDER CONSTRUCTION - TO BE COMPLETED BY 01/30/02)
20020130 NON-FEDERAL/NON-REGIONAL
HIGHLAND SBD41295 SCAB 0 0 0 FIFTH STREET FROM CHURCH ST TO BOULDER AVE - WIDEN FROM 2-4 LANES(TO BE COMPLETED BY 1/30/02-UNDER CONSTRUCTION)
20020130 NON-FEDERAL/NON-REGIONAL
LOMA LINDA 200073 SCAB 0 0 0 ANDERSON STREET/TIPPECANOE FROM UNIVERSITY COURT TO HOSPITALITY LANE - PROVIDE TRAFFIC SIGNAL COORDINATION AND TIMING INTERCONNECT 7 TRAFFIC SIGNALS, INSTALL EMERGENCY PRE-EMPTION
20020601 EXEMPT/TRAFFIC SIGNALIZATION
MOJAVE DESERT AIR QUALITY MGMT DISTRICT
200067 MDAB 0 0 0 INCENTIVE PROGRAM FOR THE EARLY INTRODUCTION OF CLEANER HEAVY-DUTY ENGINES IN ON- AND OFF-ROAD VEHICLES
20020630 <OTHER>
MONTCLAIR 200021 SCAB 0 0 0 RAMONA AV AT STATE ST - RAILROAD CROSSING GRADE SEPARATION-FUNDED WITH TCRP (PART OF ALAMEDA CORRIDOR STUDY)
20041201 EXEMPT/TRAFFIC SIGNALIZATION
MONTCLAIR 20010115 SCAB 0 0 0 ON MONTE VISTA FROM ARROW RTE TO SAN JOSE;MORENO FROM MONTE VISTA TO VERNON;ARROW FROM MONTE VISTA TO FREMONT; BENITO FROM CENTRAL TO FREMONT - SIGNAL
20031201 EXEMPT/TRAFFIC SIGNALIZATION
MONTCLAIR 20010135 SCAB 0 0 0 MONTE VISTA AVENUE @ UNION PACIFIC RAILROAD CROSSING - GRADE SEPARATION PART OF ALAMEDA CORRIDOR GRADE SEPARATION PROJECTS FUNDED WITH TCRP FUNDS
20061201 <OTHER>
MONTCLAIR SBD41299 SCAB 0 0 0 RAMONA AVE. FROM HOWARD ST TO 600' N/O MISSION BLVD - WIDENING FROM 2 TO 3 LANES, REHABILITATION - REMOVE EXISTING ASPHALT AND CONSTRUCT NEW ROADWAY SECTION
20011201 NON-FEDERAL/NON-REGIONAL
NEEDLES SBD31814 MDAB 0 0 0 K STREET FRONT STREET TO COLORADO RIVER RESURFACING
19990201 EXEMPT/TRAFFIC SIGNALIZATION
ONTARIO 20010139 SCAB 0 0 0 IN ONTARIO; ON MILLIKEN AT UNION PACIFIC RAILROAD - GRADE SEPARATION - PART OF ALAMEDA CORRIDOR STUDY - TCRP FUNDED
20061201 EXEMPT/TRAFFIC SIGNALIZATION
ONTARIO SBD031314 SCAB 0 0 0 GROVE AVENUE AT HOLT AVENUE INTERSECTION IMPROVEMENTS: RIGHT TURN POCKETS, DOUBLE LEFT TURN
20030601 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 81
BASELINESAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
ONTARIO SBD32236 SCAB 0 0 0 CITY OF ONTARIO REGIONAL TRAFFIC INFORMATION SYSTEM VARIOUS ST-AROUND AIRPORT FIXED SIGNAGE, CHANGEABLE MESSAGE SIGNS AND BOARDS (T21-#60)
20010630 EXEMPT/TRAFFIC SIGNALIZATION
ONTARIO SBD41301 SCAB 0 0 0 GROVE AV AT 4TH STREET INTERSECTION IMPROVMTS- ADD ADDITIONAL LEFT TURN LANE IN ALL DIRECTIONS, ADD RIGHT TURN LANE OF GROVE NORTHBOUND AND SIGNAL MODIF.
20030630 <OTHER>
ONTARIO SBD59003 SCAB 0 0 0 MISSION BLVD. AT BENSON AVENUE INSTALL TRAFFIC SIGNAL
20020630 EXEMPT/TRAFFIC SIGNALIZATION
ONTARIO SBD59004 SCAB 0 0 0 FRANCIS ST. FROM BON VIEW AVE TO GROVE WIDENING 2 TO 4 LANES
20030101 NON-FEDERAL/NON-REGIONAL
ONTARIO SBD59006 SCAB 0 0 0 GROVE AVENUE FROM STATE ST. TO 350' NORTH OF HOLT BLVD. WIDENING FROM 2 TO 4 LANES WIDENING RAILROAD BRIDGE ALSO (1,450')
20030630 NON-FEDERAL/NON-REGIONAL
ONTARIO SBD94171 SCAB 0 0 0 AIRPORT GROUND ACCESS- PHASE 8 GROVE AVENUE: BELMONT TO AIRPORT DR WIDENING, RECONSTRUCTION, & CONSTRUCT RAILROAD GRADE SEPARATION
20030630 <OTHER>
ONTARIO SBD97150 SCAB 0 0 0 PHILADELPHIA STREET AT CAMPUS AVENUE INSTALL TRAFFIC SIGNAL
20040630 EXEMPT/TRAFFIC SIGNALIZATION
ONTARIO SBD981129 SCAB 0 0 0 WALNUT ST. AT CAMPUS AVENUE INSTALL TRAFFIC SIGNAL
20030630 EXEMPT/TRAFFIC SIGNALIZATION
RANCHO CUCAMONGA
200024 SCAB 0 0 0 DAY CREEK BL FROM ROCHESTER AV TO FOOTHILL BL - CONSTRUCT NEW 4 LANE ROAD
20040701 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
200025 SCAB 0 0 0 DAY CREEK BL FROM FOOTHILL BL TO BASELINE RD - CONSTRUCT NEW 6 LANE ROAD
20040601 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
200026 SCAB 0 0 0 HAVEN AV UNDERPASS AT METROLINK (SCRRA) RAILROAD - GRADE SEPARATION, 6 LANES, MEDIAN ISLAND, ADJACENT STREET RE-ROUTING(ALSO COST INCREASE)
20060601 <OTHER>
RANCHO CUCAMONGA
200028 SCAB 0 0 0 HERMOSA AV FROM 8TH ST TO N/O METROLINK TRACKS - WIDEN FROM 2 TO 4 LANES, INSTALL NEW GATES & CROSSING PAD, AND INSTALL TRAFFIC SIGNAL AT 8TH ST
20030601 <OTHER>
RANCHO CUCAMONGA
200030 SCAB 0 0 0 MILLIKEN AV FROM ARROW RT TO FOOTHILL BL - WIDEN FROM 4 TO 6 LANES
20030601 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
200031 SCAB 0 0 0 MILLIKEN AV FROM BANYAN ST TO WILSON AV - CONSTRUCT NEW 4 LANE STREET
20020601 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
20010117 SCAB 0 0 0 IN UPLAND & RANCHO CUCAMONGA - ON BASELINE RD FROM BENSON AVE IN UPLAND TO ETIWANDA AVE IN RANCHO CUCAMONGA - SIGNAL INTERCONNECT/COORDINATION
20031201 EXEMPT/TRAFFIC SIGNALIZATION
RANCHO CUCAMONGA
SBD031324 SCAB 0 0 0 ARROW ROUTE GROVE AVENUE TO BAKER STREET - WIDEN FROM 2 LANES TO 4 LANES, ADD TRAFFIC SIGNALS, REHABILITATION
20030501 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
SBD20091 SCAB 0 0 0 VARIOUS LOCATIONS - TRAFFIC SIGNAL INSTALLATIONS AND UPGRADES AT INDIVIDUAL INTERSECTIONS (NO SYNCHRONIZATION)(ON GOING PROGRAM)
20050701 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 82
BASELINESAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
RANCHO CUCAMONGA
SBD88039 SCAB 0 0 0 VARIOUS LOCATIONS - OVERLAYS(ADDING ON NEW FY IMPROVEMENTS)
20051201 EXEMPT/TRAFFIC SIGNALIZATION
REDLANDS 20020202 SCAB 0 0 0 REDLANDS PARK ONCE PROGRAM - ON CITRUS BETWEEN 6TH AND 7TH STS. AND GENERAL VICINITY OF STUART/EUREKA INTERSECTION-PSE ON PARKING STRUCTURES FOR DOWNTOWN REDLANDS
20040630
REDLANDS SBD58044 SCAB 0 0 0 CITRUS AVENUE AUBURN CT. TO WABASH AVENUE WIDEN FROM 2 TO 4 LANES
20031201 NON-FEDERAL/NON-REGIONAL
REDLANDS SBD59012 SCAB 0 0 0 CHURCH STREET CLARK STREET TO COLTON AVENUE WIDEN FROM 2-4 LANES (0.6 MILES)
20031201 NON-FEDERAL/NON-REGIONAL
RIALTO 2002170 SCAB 0 0 0 PEPPER AVE: FOOTHILL BLVD TO HIGHLAND AVE. -- WIDEN EXISTING 2 LANES TO 6 LANES (3 EACH DIR)
20030601 <OTHER>
RIALTO SBD031359 SCAB 0 0 0 RIVERSIDE AVENUE INTERSTATE 10 TO SAN BERNARDINO AVENUE ADD LANDSCAPED MEDIAN WITH LEFT TURN POCKETS
20030601 EXEMPT/TRAFFIC SIGNALIZATION
RIALTO SBD41312 SCAB 0 0 0 PEPPER AVE. ( WINCHESTER RD. TO HIGHLAND AVE) (FUTURE SR 30/210 FWY) - EXTEND PEPPER AVE. NO. TO PROVIDE ACCESS TO RT 30 FWY NEW 6 LN RD.
20030601 NON-FEDERAL/NON-REGIONAL
RIALTO SBD59203 SCAB 0 0 0 PEDESTRIAN FACILITY IMPROVEMENTS AT RIALTO METROLINK STATION IN BETWEEN ORANGE AND RIVERSIDE AVENUES (IN ALLEY WAY IN BETWEEN METROLINK AND DOWNTOWN BUSINESS DISTRICT
20030601 TCM
RIALTO SBD97121 SCAB 0 0 0 RIVERSIDE AVENUE AT LIVE OAK AVENUE TRAFFIC SIGNALS, LIGHTS, AND STREET IMPROVEMENTS
20030601 EXEMPT/TRAFFIC SIGNALIZATION
RIALTO SBD97125 SCAB 0 0 0 RIVERSIDE AVE AT ALDER AVE SIGNALS/LIGHTS/ST IMPROVEMENTS
20030601 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
200038 SCAB 0 0 0 NORTHPARK BL FROM UNIVERSITY PARKWAY TO ELECTRIC AVE. - PAVEMENT REHAB
20021001 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
200060 SCAB 0 0 0 16TH ST AT MEDICAL CENTER DR - INSTALL TRAFFIC SIGNAL
20020201 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
200061 SCAB 0 0 0 RIALTO AV AT SIERRA WAY - INSTALL TRAFFIC SIGNAL
20020201 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
200062 SCAB 0 0 0 40TH ST FROM KENDALL DR TO SEPULVEDA AV - SIGNAL INTERCONNECT A TOTAL OF 6 TRAFFIC SIGNALS USING SPEED SPECTRUM TECHNOLOGY (EXISTING SIGNAL COMPRISED OF 3 SIGNALS)
20020201 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
SBD31905 SCAB 0 0 0 MT. VERNON AVENUE AT SANTA FE RAILROAD REPLACE GRADE SEPARATION, WIDEN FROM 2 TO 4 LANES
20041201 NON-FEDERAL/NON-REGIONAL
SAN BERNARDINO
SBD31908 SCAB 0 0 0 PEPPER/LINDEN DRIVE KENDALL DRIVE TO N/O COLLEGE CONSTRUCT 2 LANE ROAD
20031001 NON-FEDERAL/NON-REGIONAL
SAN BERNARDINO
SBD41316 SCAB 0 0 0 MT. VIEW AVE. RAILWAY GRADE CROSSING, 1500 FT. NORTH OF I-10 WIDEN RAILWAY GRADE CROSSING FROM 1 LANE NORTH & SOUTH TO 2 LANES NORTH & SOUTH & UPGRADE GATES
20031201 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 83
BASELINESAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SAN BERNARDINO
SBD41317 SCAB 0 0 0 MT. VIEW AVE. BRIDGE AT MISSION CREEK CHANNEL WIDEN ROADWAY & SHOULDER WORK AND EXISTING BRIDGE AT MT. VIEW -1 LN. NO. & SO. TO 2 LNS N/S & LFT_TURNS
20040601 NON-FEDERAL/NON-REGIONAL
SAN BERNARDINO
SBD41319 SCAB 0 0 0 RIALTO AVE. - 1400' EAST OF WATERMAN AVE. WIDEN BRIDGE FROM 1-2 LANES IN EACH DIRECTION
20021201 NON-FEDERAL/NON-REGIONAL
SAN BERNARDINO
SBD59019 SCAB 0 0 0 40TH ST. FROM ACRE LANE TO ELECTRIC AVENUE; ACQUIRE ROW AND WIDEN ROAD TO 4 LANES (1,200 FT.)
20040601 NON-FEDERAL/NON-REGIONAL
SAN BERNARDINO
SBD59021 SCAB 0 0 0 STATE STREET FROM 16TH STREET TO FOOTHILL BLVD.; EXTEND AND CONSTRUCT (2) LANES OF ROADWAY (1.5 MILES) TO CONNECT STATE STREET TO RANCHO AVENUE (NEW ROAD)4 PHASES TOTAL IN PROJECT
20041201 NON-FEDERAL/NON-REGIONAL
SAN BERNARDINO
SBD59024 SCAB 0 0 0 ROSEWOOD REALIGNMENT (IN CONNECTION WITH I-10 TIPPECANOE INTERCHANGE) REALIGN ROSEWOOD DRIVE TO NORTH- BOUND ORCHARD DRIVE TO EASTBOUND LAURELWOOD DRIVE(WIDEN 2-4 LANES)
20031201 NON-FEDERAL/NON-REGIONAL
SAN BERNARDINO
SBD59208 SCAB 0 0 0 LUMP SUM - VARIOUS LOCATIONS UPDATE DOWNTOWN INTERCONNECT SIGNAL SYSTEM, NEW SOFTWARE, RADIO INTERCONNECT, COUNT CAPABILITY W/ VEHICLE CLASSIFICATION
20031201 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
SBD59500 SCAB 0 0 0 TIPPECANOE AVENUE FROM MISSION CREEK TO SAN BERNARDINO AVENUE - PAVEMENT REHAB. AND CONSTRUCT MEDIAN
20040601 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
SBD94119 SCAB 0 0 0 DEL ROSA DRIVE 6TH STREET TO BASELINE WIDEN FROM 2 LANES TO 4 LANES
20040101 NON-FEDERAL/NON-REGIONAL
SAN BERNARDINO CO
200059 SCAB 38 0 0 SH-38 AT WABASH AV - INSTALL NEW TRAFFIC SIGNALS
20020630 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
200106 MDAB 0 0 0 NATIONAL TRAILS HIGHWAY FROM .75 MILES NORTH OF ORO GRANDE UNDERPASS NORTH 1.75 MILES - WIDEN EXISTING 2 LANE RD FOR PASSING LANES-1 IN EA. DIRECTION INCLUDING TRANSITIONS
20041231 NON-FEDERAL/NON-REGIONAL
SAN BERNARDINO CO
200155 MDAB 0 0 0 IN BARSTOW/YERMO AREA - FT IRWIN RD, FROM I-15 NORTH TO FT. IRWIN BOUNDARY. REHAB, EXISTING ROADWAY (T21- 105 178 1602 #213)
20011130 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
SBD031426 MDAB 0 0 0 NEEDLES HIGHWAY FROM 'N' STREET TO NEVADA STATE LINE-REALIGN, REHABILITATE, WIDEN SHOULDERS, TURN LANES, PASSING LANES, AND ACCELERATION LANES (1 LANE IN EACH DIR.) RELOCATE UTIL.
20051230 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
SBD031438 SCAB 0 0 0 ARROW ROUTE AT BEECH & LIME AVENUES DRAINAGE IMPROVEMENTS
20011201 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
SBD031450 MDAB 0 0 0 PHELAN ROAD FROM BALDY MESA ROAD TO 2.5 MILES EAST RECONST. & ADD LEFT TURN POCKETS
20011201 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 84
BASELINESAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SAN BERNARDINO CO
SBD031502 SCAB 0 0 0 VARIOUS LOCATION MINOR IMPROVEMENTS, REHABILITATION, AND MAINTENANCE
20011230 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
SBD32207 MDAB 0 0 0 EL EVADO ROAD FROM LA MESA TO PALMDALE ROAD REMOVAL OF DIP CROSSINGS AND SURFACE AC OVERLAY
20011230 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
SBD41374 SCAB 0 0 0 LA CADENA DRIVE FROM LA LOMA AV TO PALM AV - ROAD REHABILITATION - ASPHALT COVER
20020331 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
SBD59027 SCAB 0 0 0 FT IRWIN RD- I-15 TO FT IRWIN BOUNDARY-REHAB EXISTING RDWY(22.46 MILES), WIDEN SHOULDERS,RELOCATE UTILITIES,ADD LEFT/RIGHT TURN LANES,CONSTRUCT 5 PASSING LANES, 1 ACCELERATION LANE
20040301 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
SBD59032 SCAB 0 0 0 VALLEY BLVD. AT OLEANDER AND LOCUST - TRAFFIC SIGNAL AND NEW TECHNOLOGY, SIGNAL COORDINATION (11 SIGNALS)
20030130 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
SBD59033 SCAB 0 0 0 VARIOUS LOCATIONS - COUNTYWIDE REHABILITATION-ON GOING MAINTENANCE PROGRAM
20081231 EXEMPT/TRAFFIC SIGNALIZATION
SANBAG 200068 SCAB 0 0 0 UPGRADE AND SYNCHRONIZE TRAFFIC SIGNALS ON PARALLEL/INTERSECTING ARTERIALS ALONG I-10 AND SR-60 FREEWAY CORRIDORS
20040401 EXEMPT/TRAFFIC SIGNALIZATION
SANBAG 200074 VAR 0 0 0 LUMP SUM - TRANSPORTATION ENHANCEMENT ACTIVITIES PROJECTS FOR SAN BERNARDINO COUNTY-BIKE/PED PROJECTS
20041201 TCM
SANBAG 200075 VAR 0 0 0 LUMP SUM - TRANSPORTATION ENHANCEMENT ACTIVITIES PROJECTS - LANDSCAPE, ETC. FOR SAN BERNARDINO COUNTY
20041201 EXEMPT/TRAFFIC SIGNALIZATION
SANBAG 20010137 SCAB 0 0 0 HUNTS LANE @ UNION PACIFIC RAILROAD CROSSING - -GRADE SEPARATION -PART OF ALAMEDA CORRIDOR STUDY (TCRP FUNDED)
20051201 EXEMPT/TRAFFIC SIGNALIZATION
SANBAG 20010138 SCAB 0 0 0 STATE STREET/UNIVERSITY AVENUE AT SAN BERNARDINO LINE - GRADE SEPARATION-(PART OF ALAMEDA CORRIDOR STUDY - TCRP FUNDED PROJECT
20041201 EXEMPT/TRAFFIC SIGNALIZATION
TWENTYNINE PALMS
SBD41429 MDAB 0 0 0 TWO MILE ROAD - SUNRISE AVE. TO LEAR AVE. (2.5 MILES) REHAB. 2 LANE GRADED ROAD NO NEW LANES ADDED
20041201 EXEMPT/TRAFFIC SIGNALIZATION
TWENTYNINE PALMS
SBD41430 MDAB 0 0 0 ADOBE RD. FROM TWO MILE RD. TO AMBOY RD. (1 MILE) REHABILITATION OF 4 LANE ROAD TO INCLUDE PAVEMENT RESURFACING (NO LANES ADDED)
20010630 EXEMPT/TRAFFIC SIGNALIZATION
UPLAND 200041 SCAB 0 0 0 ON 19TH STREET (SR 30) FROM CUCAMONGA CANYON CHANNEL TO CAMPUS AVENUE - STREET IMPROVEMTS. BRIDGE WIDEN FROM 2-4 LANES, SIGNAL
20020601 NON-FEDERAL/NON-REGIONAL
UPLAND SBD31867 SCAB 0 0 0 CAMPUS AVENUE 19TH STREET TO 20TH STREET CONSTRUCT 4 LANE CONNECTION
20031201 NON-FEDERAL/NON-REGIONAL
UPLAND SBD41443 SCAB 0 0 0 CENTRAL AVE. AT ARROW HIGHWAY INTERSECTION IMPROVEMENTS AND SIGNAL UPGRADES
20041201 EXEMPT/TRAFFIC SIGNALIZATION
UPLAND SBD88086 SCAB 83 11.86 12.49 EUCLID AVENUE FROM D ST TO FOOTHILL BOULEVARD - STORM DRAIN EXTENSION
20031201 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 85
BASELINESAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
VICTORVILLE 200070 MDAB 0 0 0 CONSTRUCT CNG FUELING FACILITY ON MCCART RD BETWEEN PALMDALE RD AND SENECA RD
20030501 EXEMPT/TRAFFIC SIGNALIZATION
VICTORVILLE 200104 MDAB 0 0 0 BEAR VALLEY ROAD FROM I-15 TO KIOWA ROAD - RECONSTRUCT/REHAB, SIGNAL UPGRADES & COORDINATION, ENHANCEMENTS
20030829 EXEMPT/TRAFFIC SIGNALIZATION
VICTORVILLE 200110 MDAB 0 0 0 PURCHASE 2 ALT. FUEL STREET SWEEPERS TO REPLACE EXISTING DIESEL SWEEPERS
20030630 EXEMPT/TRAFFIC SIGNALIZATION
VICTORVILLE SBD031395 MDAB 0 0 0 7TH AVENUE BEAR VALLEY ROAD TO NISQUALLI ROAD WIDEN FROM 2 LANES TO 4 LANES
20041001 NON-FEDERAL/NON-REGIONAL
VICTORVILLE SBD031398 MDAB 0 0 0 COTTONWOOD AVENUE MARIPOSA ROAD TO BEAR VALLEY WIDEN FROM 2 LANES TO 4 LANES
20031001 NON-FEDERAL/NON-REGIONAL
VICTORVILLE SBD031400 MDAB 0 0 0 CIVIC DRIVE ROY RODGERS MUSEUM TO ROY RODGERS DRIVE CONSTRUCT 4 LANE ROAD
20041001 NON-FEDERAL/NON-REGIONAL
VICTORVILLE SBD031412 MDAB 0 0 0 NISQUALLI RD FROM BALSAM RD TO HESPERIA RD - WIDEN FROM 2 LANES TO 4 LANES, DRAINAGE IMPROVEMENTS, AND VERTICAL REALIGNMENT
20041201 NON-FEDERAL/NON-REGIONAL
VICTORVILLE SBD031416 MDAB 0 0 0 LA MESA ROAD TOPAZ ROAD TO STATE ROUTE 395 CONSTRUCT 4 LANE ROAD
20041001 NON-FEDERAL/NON-REGIONAL
VICTORVILLE SBD031417 MDAB 0 0 0 LA MESA ROAD AT STATE ROUTE 395 INSTALL TRAFFIC SIGNALS
20041001 EXEMPT/TRAFFIC SIGNALIZATION
VICTORVILLE SBD031421 MDAB 0 0 0 3RD AVENUE BEAR VALLEY TO NISQUALLI ROAD WIDEN FROM 2 LANES TO 4 LANES, EXTEND ROAD WITH 4 LANES
20051001 NON-FEDERAL/NON-REGIONAL
VICTORVILLE SBD88140 MDAB 0 0 0 NATIONAL TRAILS ROAD BETWEEN INTERSTATE 15 & AIRBASE RD. WIDEN FROM 2 LANES TO 4 LANES
20040630 NON-FEDERAL/NON-REGIONAL
YUCAIPA 20020302 SCAB 0 0 0 IN YUCAIPA ON YUCAIPA BLVD AND 13TH STREET - TRAFFIC SIGNAL
20031201
YUCAIPA SBD031523 SCAB 0 0 0 AVENUE F"" AT INTERSTATE 10, SOUTH SIDE RAMPS INSTALL TRAFFIC SIGNAL
20001001 EXEMPT/TRAFFIC SIGNALIZATION
YUCCA VALLEY 200107 MDAB 0 0 0 HILLCREST DRIVE FROM SR247 TO PAISANO LN. - PAVE DIRT ROAD
20021201 EXEMPT/TRAFFIC SIGNALIZATION
YUCCA VALLEY 200108 MDAB 0 0 0 FOX TRAIL FROM NAVAJO TO .44 MI. SOUTH - PAVE DIRT ROAD
20021201 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 86
BASELINESAN BERNARDINO COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CHINO SBD41220 SCAB 0 0 0 CHINO AVENUE/CENTRAL TO 6TH STS. MULTI-MODAL TRANSPORTATION CENTER INCLUDES PARK-N-RIDE LOT WITH 125 SPACES(PHASE 1 FUNDED-PHASE 2 AWAITING FUNDING)
20031001 TCM
MORONGO BASIN TRANSIT AUTHORITY
SBD990201 MDAB 0 0 0 BUS SYSTEM - MAINTENENCE FACILITY IN LOCATION OF JOSHUA TREE
20041201 <OTHER>
OMNITRANS 200077 SCAB 0 0 0 BUS SYSTEM - PURCHASE EXPANSION ALT FUEL BUSES (01-13), (02-14)
20020630 TCM
OMNITRANS 20010116 SCAB 0 0 0 COLTON JOINT UNIFIED SCHOOL DISTRICT - CNG SCHOOL BUS REPLACEMENT - 5 BUSES REPLACED
20030601 <OTHER>
ONTARIO 200094 SCAB 0 0 0 EAST ONTARIO METROLINK PHASE II DEVELOPMENT
20031001 <OTHER>
REDLANDS 200037 SCAB 0 0 0 4 MILE ROUTE WITHIN THE CITY OF REDLANDS - LOCAL TRANSPORTATION SERVICE UTILIZING CNG POWERED, RUBBER WHEEL TROLLEYS
20010101 EXEMPT/TRAFFIC SIGNALIZATION
SANBAG SBD59253 SCAB 0 0 0 METROLINK - INLAND EMPIRE MAINTENANCE FACILITY - NEW CON- STRUCTION SITE IN SAN BERNARDINO AT RIALTO AND 3RD STREET (THIS IS A JOINT PROJECT WITH MTA)
20021201 <OTHER>
UPLAND 955825 SCAB 0 0 0 METROLINK - SAN BERNARDINO LINE AT UPLAND STATION - REHABILITATE STATION AND BICYCLE/PEDESTRIAN IMPROVEMENTS
20001201 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 87
BASELINEVENTURA COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN54187 SCCAB 0 0 0 2% FOR PLANNING, PROGRAMMING & MONITORING
20070601 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 11704 SCCAB 1 15 0 IN OXNARD, AT PLEASANT VALLEY RD - MODIFY INTERCHANGE
20030831 EXEMPT/TRAFFIC SIGNALIZATION
OXNARD VEN54126 SCCAB 1 15.9 15.9 IN OXNARD OXNARD BLVD AT FIVE POINTS PE & EIR TO RE-ROUTE N/B ROUTE 1 TO INTERSECT WOOLEY ROAD EAST OF FIVE POINTS
20021201 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 1167B SCCAB 23 3.5 11.4 IN THOUSAND OAKS & MOORPARK WIDEN RT 23 FROM HWY 118 TO HWY 101 (WIDEN FROM 4 TO 6 LANES) ALTERNATIVE 1 (ENGR. = SUPPORT COSTS) (T21-#1142) INC SOUNDWALLS, ITS FEATURES
20060130 <OTHER>
THOUSAND OAKS VEN54152 SCCAB 101 4.06 4.06 IN THOUSAND OAKS RT 101 AT MOORPARK RD - IMPROVE S/B ON & OFF RAMPS & N/B ON-RAMP & SIGNAL IMPROVEMENTS
20011230 NON-FEDERAL/NON-REGIONAL
CALTRANS 10495 SCCAB 101 12.7 14.2 IN CAMARILLO AT RT 34 (LEWIS RD) - RECONSTRUCT NORTH SIDE AND SOUTH SIDE OF INTERCHANGE
20030430 EXEMPT/TRAFFIC SIGNALIZATION
CAMARILLO VEN54020 SCCAB 101 16.6 17 IN CAMARILLO CONSTRUCT AIRPORT NORTH (SPRINGVILLE) INTERCHANGE (CONNECTING FUTURE EXTENSIONS OF VERDULERA ST & PONDEROSA DR) INTERSECTING US 101
20030630 <OTHER>
OXNARD VEN990339 SCCAB 101 19.1 20 IN OXNARD LANDSCAPE/IRRIGATION ENHANCEMENTS NORTH SIDE OF ROUTE 101 FROM DEL NORTE TO RICE
20021201 EXEMPT/TRAFFIC SIGNALIZATION
OXNARD 343 SCCAB 101 20.1 0 IN OXNARD AT RICE AVE (SANTA CLARA) RECONSTRUCT INTERCHANGE (T21-#664)
20050630 <OTHER>
CALTRANS 6073 SCCAB 101 22 24 NEAR OXNARD FROM RT 232 TO MONTALVO SPUR OVERHEAD - WIDEN ROADWAY, RECONSTRUCT BRIDGE, AND MODIFY INTERCHANGES FROM 6 TO 8 LANES WITH 4 AUXILIARY LANES
20060701 <OTHER>
OXNARD VEN54125 SCCAB 101 22.1 0 IN OXNARD MODIFY OXNARD BLVD INTERCHANGE AT HWY 101
20060601 <OTHER>
SAN BUENAVENTURA
VEN54037 SCCAB 101 24.6 0 IN SAN BUENAVENTURA-FRM 4 TO 6 LANE AT VICTORIA INTERCHANGE RECONFIGURATION: IMPR N/B OFFRAMP (PHASE II)
20060101 <OTHER>
SAN BUENAVENTURA
VEN010202 SCCAB 101 30.1 30.1 RECONFIGURE N/B CALIFORNIA ST OFFRAMP (RECONFIGURE RAMP TO TERMINATE AT OAKS ST INSTEAD OF THE CURRENT CALIFORNIA ST LOCATION)
20061231 <OTHER>
CALTRANS 10596 SCCAB 118 10.9 11 AT SOMIS FROM RT 34 TO DONLON RD - REALIGN INTERSECTION
20070701 <OTHER>
VENTURA COUNTY VEN34364 SCCAB 118 10.9 11 NEAR CAMARILLO INTERSECTION IMPROVEMENT AT RT 118/RT 34 WIDEN (FOR TURN LANES), REALIGN & UPGRADE SIGNALS
20070701 <OTHER>
MOORPARK VEN54170 SCCAB 118 16.4 18.5 TRAFFIC SIGNAL INTERCONNECTION LOS ANGELES AVE (SR 118) THROUGH THE CITY OF MOORPARK
20031231 EXEMPT/TRAFFIC SIGNALIZATION
MOORPARK 12020 SCCAB 118 16.9 17.3 IN MOORPARK LOS ANGELES AVE AT SHASTA AVE AND MAUREEN LN INSTALL SIGNALS & ASSOCIATED ROAD WIDENING (PAVEOUT WIDENING)
20030701 NON-FEDERAL/NON-REGIONAL
MOORPARK VEN34089 SCCAB 118 17.4 17.8 NEW LOS ANGELES AVE SPRING ST TO RT 23 (MOORPARK AVE) WIDEN FROM 4 TO 6 LANES
20040601 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 88
BASELINEVENTURA COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SIMI VALLEY 6566 SCCAB 118 21.9 0 NEAR SIMI VALLEY AT ALAMOS CYN RD ADD RAMPS
20031201 <OTHER>
SIMI VALLEY VEN000401 SCCAB 118 23.2 27.3 IN SIMI VALLEY - LANDSCAPING ENHANCEMENTS FROM MADERA RD TO TAPO CYN RD
20030701 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 1238J SCCAB 118 27.3 32.6 IN SIMI VALLEY WIDEN RT 118 FROM TAPO CYN TO LA COUNTY LINE (WIDEN FROM 6 TO 8 LNS & FROM 8 TO 10 LNS) & CONSTRUCT SOUNDWALLS & ITS ITEMS (ITS ITEMS RT 23 / LA CNTY LINE)
20050601 <OTHER>
CALTRANS VEN010201 SCCAB 118 32 32.5 IN SIMI VALLEY AT ROCKY PEAK RD CONSTRUCT W/B ONE LANE ONRAMP & E/B ONE LANE OFFRAMP TO PROVIDE FULL DIAMOND INTERCHANGE
20050601 <OTHER>
CALTRANS 1246D SCCAB 126 0.8 1.3 IN VENTURA RETROFIT SOUNDWALL - CONSTRUCT SOUNDWALL AT VICTORIA AVE W/B (ENGR = SUPPORT COSTS) NH = 1989 SOUNDWALL LIST FUNDS
20050601 EXEMPT/TRAFFIC SIGNALIZATION
SAN BUENAVENTURA
VEN990340 SCCAB 126 1.4 5 IN VENTURA ENHANCED LANDSCAPING RT 126 INTERCHANGES AT VICTORIA, KIMBALL, & WELLS (RT 118)
20050101 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS VEN020906 SCCAB 126 29.3 34.6 IN VENTURA COUNTY NEAR PIRU FROM 0.1 MILE WEST OF CENTER ST TO LOS ANGELES COUNTY LINE - WIDEN EXISTING ROADWAY (RIGHT-OF-WAY PURCHASE FOR PREVIOUSLY COMPLETED WIDENING)
20031231 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY VEN990907 SCCAB 150 15 0 ROUTE 150 AT LOMA DR INSTALL SIGNAL (SAFETY PROJECT)
20020701 EXEMPT/TRAFFIC SIGNALIZATION
OJAI VEN990316 SCCAB 150 18.8 18.8 ROUTE 150 @ SAN ANTONIO CREEK BRIDGE WIDEN TO ACCOMMODATE PEDESTRIAN/EQUESTRIAN/BICYCLE
20050701 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN001004 SCCAB 999 0 0 SOUNDWALL PROGRAM ON STATE HWYS THROUGHOUT VENTURA COUNTY - LUMP SUM
20030601 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS VENLS01 SCCAB 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN VENTURA COUNTY SAFETY PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20020630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS VENLS02 SCCAB 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN VENTURA COUNTY, ROADWAY PRESERVATION PROJECTS (NON CAPACITY TYPE PROJECTS ONLY ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS VENLS03 SCCAB 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN VENTURA COUNTY,BRIDGE PRESERVATION PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 89
BASELINEVENTURA COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CAMARILLO VEN990305 SCCAB 0 0 0 PONDEROSA EXTENSION FROM EARL JOSEPH TO VENTURA BL & VENTURA BLVD EXTENSION FROM PONDEROSA TO EAST OF CENTRAL AVE CONSTRUCT BIKE LANES
20030630 TCM
CAMARILLO VEN991218 SCCAB 0 0 0 PLEASANT VALLEY RD - WIDEN FROM 2 TO 4 LANES & BIKE LANES FOR 1.7 MILES FROM CALLEGUAS CR TO RT 101
20030701 <OTHER>
CAMARILLO VEN991225 SCCAB 0 0 0 CALLEGUAS BIKE PATH - CONSTRUCT CLASS I BIKE PATH FROM MISSION OAKS BLVD TO UPLAND RD
20021201 TCM
FILLMORE VEN990337 SCCAB 0 0 0 FILLMORE DEPOT RESTORATION 20021231 <OTHER>FILLMORE VEN990342 SCCAB 0 0 0 FILLMORE RAILROAD INTERPRETIVE
CENTER20021231 EXEMPT/TRAFFIC
SIGNALIZATIONMOORPARK VEN54171 SCCAB 0 0 0 IN MOORPARK ARROYO SIMI TRAIL
STUDY20031201 EXEMPT/TRAFFIC
SIGNALIZATIONMOORPARK VEN54172 SCCAB 0 0 0 IN MOORPARK PEDESTRIAN
IMPROVEMENTS ON LOS ANGELES AVE (SR 118) WITHIN THE CITY
20031201 TCM
MOORPARK VEN990315 SCCAB 0 0 0 TIERRA REJADA RD LOS ANGELES AVE/RT 23 SIGNAL INTERCONNECT
20031231 EXEMPT/TRAFFIC SIGNALIZATION
MOORPARK VEN990338 SCCAB 0 0 0 MOORPARK RAIL STATION ENTRANCE LANDSCAPING
20031201 EXEMPT/TRAFFIC SIGNALIZATION
OJAI VEN000613 SCCAB 0 0 0 CONVERT (3) CITY VEHICLES TO ALTERNATE FUEL
20020101 EXEMPT/TRAFFIC SIGNALIZATION
OJAI VEN010203 SCCAB 0 0 0 OJAI VALLEY BIKE TRAIL EXTENSION/FULTON ST EXTENSION
20021001 TCM
OJAI VEN54164 SCCAB 0 0 0 BICYCLE & PEDESTRIAN TRAIL EXTENSION: FOX CYN BARRANCA FROM RT 150 TO OJAI VALLEY TRAIL
20030601 TCM
OJAI VEN990350 SCCAB 0 0 0 GAP CLOSURE - EXTEND WILLOW ST TO CONNECT WITH MONTGOMERY ST
20040401 <OTHER>
OJAI VEN990902 SCCAB 0 0 0 PURCHASE SCENIC EASEMENTS NEAR HWY 33/150
20030930 EXEMPT/TRAFFIC SIGNALIZATION
OXNARD VEN34094 SCCAB 0 0 0 IN OXNARD HUENEME RD SAVIERS TO INDUSTRIAL WIDEN AND CONSTRUCT FROM 2 TO 4 LANES
20030701 <OTHER>
OXNARD VEN34095 SCCAB 0 0 0 IN OXNARD COLONIA RD/CAMINO DEL SOL RT 1 TO JUANITA AVE CONSTRUCT 4 LANES
20040630 <OTHER>
OXNARD VEN54039 SCCAB 0 0 0 IN OXNARD ROAD RECONSTRUCTION & REHAB VARIOUS LOCATIONS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
OXNARD VEN54136 SCCAB 0 0 0 IN OXNARD WIDEN ROSE AVE FROM FIFTH ST TO EMERSON (FROM TWO TO FOUR LANES)
20021201 <OTHER>
OXNARD VEN54137 SCCAB 0 0 0 IN OXNARD WIDEN PLEASANT VALLEY FROM OLDS RD TO RT 1 & INSTALL SIGNAL AT OLDS/PLEASANT VALLEY RD WIDEN 2 TO 4 LANES
20040901 <OTHER>
OXNARD VEN990317 SCCAB 0 0 0 OXNARD BLVD 5TH/VINEYARD & ON 5TH ST (RT 34) OXNARD BLVD/ROSE AVE CONSTRUCT NEW BICYCLE & PEDESTRIAN FACILITIES
20031201 TCM
PORT HUENEME VEN991219 SCCAB 0 0 0 CHANNEL ISLANDS BLVD FROM VICTORIA AVE TO PATTERSON RD WIDEN E/B FROM 2 LANES TO 3 LANES + BIKE LANE
20031231 <OTHER>
SAN BUENAVENTURA
VEN990319 SCCAB 0 0 0 CALIFORNIA ST BRIDGE OVER RT 101 PEDESTRIAN ENHANCEMENTS
20040101 TCM
SAN BUENAVENTURA
VEN990320 SCCAB 0 0 0 ROUTE 126 BIKE PATH (CLASS I) PARALLEL TO RT 126 FROM KIMBALL TO HARMON BARRANCA, & ALONG HARMON BARRANCA FROM 126 TO TELEPHONE RD
20040101 TCM
SAN BUENAVENTURA
VEN990341 SCCAB 0 0 0 SURFERS' POINT BIKEPATH RESTORATION RESTORE 2 KM BIKEWAY SEGMENT DESTROYED BY STORMS ENVIRONMENTAL/PE ONLY
20040101 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 90
BASELINEVENTURA COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SAN BUENAVENTURA
VEN990605 SCCAB 0 0 0 STANLEY AVE FROM VENTURA AVE TO SR 33 CONSTRUCT SIDEWALK & BICYCLE LANE
20030401 TCM
SANTA PAULA VEN54168 SCCAB 0 0 0 FACILITY INCL BIKEWAY/WALKWAY FROM SANTA PAULA CREEK TO PECK RD FENCING, LANDSCAPING, BRIDGE & DRAINAGE, PUBLIC ACCESS POINTS/ SAFETY ITEMS
20030701 TCM
SIMI VALLEY VEN000607 SCCAB 0 0 0 MADERA RD AT IRVINE RD & VISTA DEL LAGO - ADD RIGHT-TURN LANES & REALIGN INTERSECTIONS AT BOTH INTERSECTIONS
20030701 <OTHER>
SIMI VALLEY VEN54051 SCCAB 0 0 0 IN SIMI VALLEY ARROYO SIMI BIKE TRAIL FROM END OF EXISTING TRAIL TO CORRIGANVILLE PARK. CONSTRUCT BIKE PATH AND LANES
20030701 TCM
SIMI VALLEY VEN54155 SCCAB 0 0 0 IN SIMI VALLEY STEARNS ST FROM COCHRAN ST TO LEEDS ST REHAB AND WIDEN FROM 2 TO 4 LANES
20031201 <OTHER>
THOUSAND OAKS VEN011209 SCCAB 0 0 0 CONSTRUCT BIKEWAY ADJACENT TO RT 101 (SOUTH SIDE) FROM RANCHO RD TO WILLOW LN (TEA21 #221)
20021001 EXEMPT/TRAFFIC SIGNALIZATION
THOUSAND OAKS VEN34303 SCCAB 0 0 0 IN THOUSAND OAKS BORCHARD/MICHAEL WIDEN TO ADD TURN LANES & IMPROVE INTERSECTION
20041201 NON-FEDERAL/NON-REGIONAL
THOUSAND OAKS VEN34304 SCCAB 0 0 0 IN THOUSAND OAKS OLD CONEJO RD FROM REINO TO WENDY WIDEN FROM 2 TO 4 LANES
20060630 <OTHER>
THOUSAND OAKS VEN34305 SCCAB 0 0 0 IN THOUSAND OAKS HILLCREST FROM RANCHO CONEJO TO CAMINO DOS RIOS WIDEN FROM 2 TO 4 LANES
20050630 <OTHER>
THOUSAND OAKS VEN981117 SCCAB 0 0 0 REHABILITATION OVERLAYS & ASSOCIATED ACCESSIBILITY IMPROVEMENTS CITYWIDE CITY OF THOUSAND OAKS (T21-#731)
20030701 EXEMPT/TRAFFIC SIGNALIZATION
THOUSAND OAKS VEN990331 SCCAB 0 0 0 EXPAND TRAFFIC SIGNAL COORDINATION SYSTEM BY ADDING SEVEN ARTERIAL ROADWAYS TO CITY'S COMPUTERIZED SYSTEM
20030630 TCM
THOUSAND OAKS VEN990332 SCCAB 0 0 0 UPGRADE EXISTING MASTER TRAFFIC SIGNAL COORDINATION SYSTEM, ADDING NEW SOFTWARE, VIDEO DETECTION & SEVERAL HARD WIRE CONNECTIONS
20030630 TCM
VENTURA COUNTY VEN000606 SCCAB 0 0 0 INSTALL SIGNAL AT LAS POSAS RD & CAWELTI RD
20030701 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY VEN000806 SCCAB 0 0 0 CENTRAL AV- CAMARILLO CL TO VINEYARD AV RESURFACE & IMPRV TO CENTRAL/VINEYARD INTERSECT INCL ADDITIONAL LEFT/RIGHT TURN LNS & GEOMETRIC IMPROV
20030630 <OTHER>
VENTURA COUNTY VEN011202 SCCAB 0 0 0 HUENEME RD FROM OXNARD CITY LIMITS TO THE FUTURE RICE RD (PER 07-VEN990613) - WIDEN FROM 2 TO 4 LANES
20050701 <OTHER>
VENTURA COUNTY VEN011203 SCCAB 0 0 0 LAS POSAS RD FROM CAWELTI RD TO PLEASANT VALLEY RD - WIDEN FROM 2 TO 4 LANES
20050701 <OTHER>
VENTURA COUNTY VEN54047 SCCAB 0 0 0 COUNTY OF VENTURA CONSTRUCT SPRINGVILLE BIKEWAY AT BEARDSLEY CHANNEL
20030101 TCM
VENTURA COUNTY VEN54117 SCCAB 0 0 0 INSTALL TRAFFIC SIGNAL ON HUENEME RD AT NAVALAIR ROAD (SAFETY PROJECT)
20030701 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY VEN54122 SCCAB 0 0 0 NEAR CAMARILLO LEWIS RD WIDEN FROM 2 TO 4 LANES PLUS BIKE LANES BETWEEN RT 101 & HUENEME RD, & PROVIDE SIGNAL IMPROVEMENTS
20030701 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 91
BASELINEVENTURA COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
VENTURA COUNTY VEN54123 SCCAB 0 0 0 CONSTRUCT BICYCLE LANES ON CENTRAL AVE BTWN ROSE AVE & VINEYARD AVE (TWO 8' CLASS II BICYCLE LANES)
20030701 TCM
VENTURA COUNTY VEN54124 SCCAB 0 0 0 CONSTRUCT BICYCLE LANES ON CENTRAL AVE BTWN CAMARILLO CITY LIMITS & SANTA CLARA AVE
20030701 TCM
VENTURA COUNTY VEN54131 SCCAB 0 0 0 REALIGN DONLON RD TO CREATE A FOUR-WAY INTERSECTION AT LA AVE (SR 118) & SOMIS RD (SR 34)
20040701 <OTHER>
VENTURA COUNTY VEN54132 SCCAB 0 0 0 SANTA CLARA AVE IMPROVEMENTS-PH II BTW OXNARD CITY LIMITS & SR 118 WIDEN TO ADD EXTRA LANE IN EACH DIRECTION (FROM 2 TO 4 LANES TOTAL); GEOM & DRAIN IMPR, OVERLAY, MODIFY SIGNALS
20030701 <OTHER>
VENTURA COUNTY VEN990306 SCCAB 0 0 0 CALWELTI RD LAS POSAS RD/LEWIS RD ADD BIKE LANES
20030701 TCM
VENTURA COUNTY VEN990310 SCCAB 0 0 0 PIRU/RANCHO CAMULOS CONSTRUCT CLASS I BIKE PATH AND ADJACENT PEDESTRIAN PATH, FENCING RE-LAY TRACK, INSTALL PLATFORM AT RANCHO CAMULOS
20030701 TCM
VENTURA COUNTY VEN990335 SCCAB 0 0 0 PIRU COMMUNITY BIKE PATH CONSTRUCT BICYCLE/PEDESTRIAN PATH & ADJACENT FENCING/LIGHTING MAIN ST ALONG VIA FUSTERO & RAILROAD CORRIDOR TO ORCHARD ST
20021201 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY VEN990336 SCCAB 0 0 0 RANCHO CAMULOS ROADSIDE REST STOP CONSTRUCT REST STOP, INCLUDING REHAB OF ADOBE BLDG, RE-ESTABLISH ENTRANCE TO SITE, BUILD PARKING, RESTROOMS, & FRONTAGE ROAD
20030101 <OTHER>
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN010901 SCCAB 0 0 0 GUARANTEED RIDE HOME PROGRAM (RIDESHARE MARKETING PROGRAM)
20030701 TCM
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN020402 SCCAB 0 0 0 VIDEO MONITORING CAMERAS IN VENTURA COUNTY
20031231 <OTHER>
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN020408 SCCAB 0 0 0 LUMP SUM - VENTURA COUNTY COMPREHENSIVE STREET TREE PROGRAM - PLANTING OF 2200 TREES COUNTYWIDE
20030701 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN54032 SCCAB 0 0 0 REHABILITATION & RECONSTRUCTION PROJECTS - LUMP SUM PROJECTS THAT DO NOT INCREASE CAPACITY.
20030701 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN54151 SCCAB 0 0 0 REGIONAL RIDESHARE PROGRAM CORE RIDESHARE SERVICES (INCLUDES RIDE MATCHING)
20040630 TCM
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN54169 SCCAB 0 0 0 COUNTYWIDE BIKE LOCKER/RACKS & BUS SHELTER PROGRAM
20021231 TCM
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN93017 SCCAB 0 0 0 REGIONAL RIDESHARE PROGRAM 20040630 TCM
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN990313 SCCAB 0 0 0 CALIFORNIA STATE UNIVERSITY AT CHANNEL ISLANDS (CSUCI) ELECTRIC BICYCLE PROGRAM PURCHASE ELECTRIC BI/TRICYCLES & RELATED EQUIPMENT/FACILITIES
20021001 TCM
2004 RTP * TECHNICAL APPENDIX I - 92
BASELINEVENTURA COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN990613 SCCAB 0 0 0 EXTEND RICE AVE AS 4 LANE ROAD FROM RT 1 TO HUENEME RD
20030201 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 93
BASELINEVENTURA COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS VEN020904 SCCAB 0 0 0 ARC VENTURA COUNTY - PURCHASE TWO MODIFIED VANS FOR REPLACEMENT FOR PARATRANSIT SERVICE
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS VEN020905 SCCAB 0 0 0 CAMARILLO HEALTH CARE DISTRICT - PURCHASE COMPUTER HARDWARE
20030630 EXEMPT/TRAFFIC SIGNALIZATION
FILLMORE VEN020410 SCCAB 0 0 0 WEEKEND TROLLEY BUS SHUTTLE OPERATION 3-YEAR DEMO BTWN SANTA PAULA & FILLMORE
20050630 EXEMPT/TRAFFIC SIGNALIZATION
FILLMORE VEN54167 SCCAB 0 0 0 IN FILLMORE INTERMODAL TRANSPORTATION CENTER IN DOWNTOWN FILLMORE ON SANTA CLARA AVENUE AT SENIOR CENTER,
20030701 TCM
MOORPARK VEN001003 SCCAB 0 0 0 PURCHASE TWO 16-24 PASSENGER BUSES, ONE REPLACEMENT, ONE EXPANSION, FOR MOORPARK BUS SYSTEM
20030701 EXEMPT/TRAFFIC SIGNALIZATION
OJAI VEN54163 SCCAB 0 0 0 INTERMODAL TRANSPORTATION CENTER & PARKING HUB IMPROVEMENTS AT SR33/SR150
20050701 TCM
OXNARD VEN54165 SCCAB 0 0 0 OXNARD TRANSPORTATION CENTER IMPROVEMENTS: ADD BUS ISLAND; PED & VEHICLE FLOW IMPROVEMENTS; LIGHTING & SECURITY IMPROVEMENTS
20041201 TCM
OXNARD VEN990318 SCCAB 0 0 0 OXNARD HARBOR/BEACHES TRANSIT SERVICE OPERATING ASSISTANCE 3 YEAR DEMO
20030701 TCM
OXNARD VEN990903 SCCAB 0 0 0 OXNARD TRANSPORTATION CENTER PARKING EXPANSION / IMPROVEMENTS STP = STIP-IRR FUNDS
20030630 EXEMPT/TRAFFIC SIGNALIZATION
SANTA PAULA T638TA SCCAB 0 0 0 SANTA PAULA DEPOT - REHABILITATE 1887 RAIL DEPOT AS INTERMODAL TRANSFER CENTER (PHASE 1)
20020901 EXEMPT/TRAFFIC SIGNALIZATION
SANTA PAULA VEN000612 SCCAB 0 0 0 TWO BUS STATIONS (BIG BUS SHELTERS): ONE AT CORNER OF MILL ST & VENTURA ST OTHER NEAR K-MART AT FAULKNE RD WILL CONSIST OF SHELTERS & BENCHES
20030101 TCM
SIMI VALLEY VEN011210 SCCAB 0 0 0 CNG MECHANIC TRAINING 20030701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN011211 SCCAB 0 0 0 CNG COMPRESSOR SPARE PARTS 20030701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN011212 SCCAB 0 0 0 NATIONAL TRANSIT DATABASE ANALYSIS - PASSENGER MILES
20030701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN011213 SCCAB 0 0 0 CNG BUS SPARE PARTS 20030701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN011214 SCCAB 0 0 0 DBE GOAL EVALUATION/SETTING CONSULTING SERVICE
20030701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN011215 SCCAB 0 0 0 COMPUTERS - 7 REPLACEMENT - ADMIN (3) / OPERATIONS (4); 1 EXPANSION
20030701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN011216 SCCAB 0 0 0 ONE COLOR LASER PRINTER 20030701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN011217 SCCAB 0 0 0 ONE REPLACEMENT COPIER 20030701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN011218 SCCAB 0 0 0 MOBILE DATA TERMINALS 20030701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN011219 SCCAB 0 0 0 BUS WASHER REPLACEMENT 20030701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN54139 SCCAB 0 0 0 ONE (1) EXPANSION UTILITY VAN (NON-REVENUE)
20020601 <OTHER>
SIMI VALLEY VEN990324 SCCAB 0 0 0 DEVELOP FAST FILL CAPABILITY (CNG) 20020630 TCM
SIMI VALLEY VEN990325 SCCAB 0 0 0 ONE ALTERNATIVE FUELED PARATRANSIT VAN FOR EXPANSION & TWO ALTERNATIVE FUELED PARATRANSIT VANS FOR REPLACEMENT
20031231 TCM
2004 RTP * TECHNICAL APPENDIX I - 94
BASELINEVENTURA COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SIMI VALLEY VEN990326 SCCAB 0 0 0 ONE ALTERNATIVE FUEL CNG TRANSIT BUS FOR EXPANSION
20030701 TCM
SOUTH COAST AREA TRANSIT
VEN010404 SCCAB 0 0 0 REPLACE (2) ALTERNATIVE FUEL TRANSIT BUSES
20020630 TCM
SOUTH COAST AREA TRANSIT
VEN010405 SCCAB 0 0 0 REFURBISH (25) ALTERNATIVE FUEL TRANSIT BUSES
20030630 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN010413 SCCAB 0 0 0 EVALUATION OF FACILITY REQUIREMENTS
20020701 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN020401 SCCAB 0 0 0 BUS STOP ENHANCEMENTS 20030701 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN020403 SCCAB 0 0 0 ADMINISTRATION BUILDING MODIFICATIONS
20030701 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN020405 SCCAB 0 0 0 REFURBISH SIXTEEN (16) BUSES 20030701 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN020406 SCCAB 0 0 0 REPLACE RADIO TRANSMITTER 20021001 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN020409 SCCAB 0 0 0 PURCHASE TWO CNG (2) BUSES FOR EXPANSION
20031231 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN34232 SCCAB 0 0 0 OPERATING ASSISTANCE FIXED ROUTE & ADA PARATRANSIT
20020601 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN54054 SCCAB 0 0 0 PASSENGER AWARENESS ACTIVITY 20041230 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN54055 SCCAB 0 0 0 RIDERSHIP & PASSENGER ON-BOARD DATA COLLECTION
20041230 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN54056 SCCAB 0 0 0 PLANNING/IMPLEMENTATION OF COORDINATED PARATRANSIT
20030630 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN54057 SCCAB 0 0 0 MARKETING ACTIVITIES IMPLEMENTATION (PLANNING: PROGRAM SUPPORT & ADM)
20041230 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN54059 SCCAB 0 0 0 DRUG & ALCOHOL TRAINING PROGRAM 20041230 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN54095 SCCAB 0 0 0 ADA PARATRANSIT SERVICE 20041230 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN54098 SCCAB 0 0 0 PURCHASE (4) SERVICE VEHICLES (REPLACEMENT)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN54149 SCCAB 0 0 0 TWO-WAY RADIO SYSTEM REPLACEMENT
20010601 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN54150 SCCAB 0 0 0 PURCHASE MAINTENANCE EQUIPMENT (REPLACEMENT)
20020630 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN64003 SCCAB 0 0 0 PREVENTIVE MAINTENANCE 20040701 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN990602 SCCAB 0 0 0 TRANSIT PLANNING & PROGRAMMING 20041230 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN991202 SCCAB 0 0 0 REMOVAL OF UNDERGROUND HYDRAULIC LIFTS
20030630 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN991203 SCCAB 0 0 0 INSTALLATION OF ABOVE GROUND HOIST SYSTEM
20030630 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN991204 SCCAB 0 0 0 REPLACEMENT OF BUS DRIVER SEATS 20030630 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN991205 SCCAB 0 0 0 REPLACEMENT OF CNG FUEL TANKS ON BUSES
20030630 EXEMPT/TRAFFIC SIGNALIZATION
THOUSAND OAKS VEN030616 SCCAB 0 0 0 PURCHASE TWO CNG BUSES FOR EXPANSION - COST INCREASE OF 07-VEN54174
20041231
VENTURA COUNTY
020907 SCCAB 0 0 0 EAST OJAI/LAKE CASITAS TRANSIT STUDY
20031231 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY
VEN000605 SCCAB 0 0 0 PURCHASE (4) WATER TAXIS FOR OXNARD HARBOR TRANSIT SERVICE
20020701 TCM
VENTURA COUNTY
VEN990309 SCCAB 0 0 0 SHUTTLE SERVICE FROM OJAI TO MIRA MONTE OPERATING ASSISTANCE THIRD YEAR OF 3-YEAR DEMO
20030630 TCM
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN010406 SCCAB 0 0 0 SMART CARD DATA MANAGEMENT 20060630 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN010408 SCCAB 0 0 0 VISTA SERVICE CAPITAL LEASE COSTS 20030630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 95
BASELINEVENTURA COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN010409 SCCAB 0 0 0 EAST COUNTY ADA PARATRANSIT SERVICE OPERATIONS
20030630 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN011206 SCCAB 0 0 0 REPLACE TEMPORARY CAMARILLO STATION PLATFORM WITH PERMANENT PLATFORM, INCORPORATING LIGHTING PUBLIC ART ENHANCEMENTS
20021231 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN011225 SCCAB 0 0 0 METROLINK SAFETY IMPROVEMENTS CROSSINGS MOORPARK TO SIMI VALLEY
20031231 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN011226 SCCAB 0 0 0 METROLINK RAIL REPLACEMENT MOORPARK TO SIMI VALLEY
20031231 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN020407 SCCAB 0 0 0 NEXTBUS ENHANCEMENT - REAL-TIME TRANSIT INFORMATION SIGNS AT BUS STOPS
20030701 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN54070 SCCAB 0 0 0 TRANSIT MARKETING 20041230 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN54084 SCCAB 0 0 0 SMART CARD PROGRAM IMPLEMENTATION & EQUIPMENT, INCLUDING RIDERSHIP & PASSENGER ONBOARD DATA COLLECTION
20040701 TCM
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN54166 SCCAB 0 0 0 S PAULA BRANCH LINE EXTENSION STUDY (PE/DESIGN)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN990303 SCCAB 0 0 0 EXPAND CAMARILLO METROLINK STA TO PROVIDE ADDED PARKING, SITE AMENITIES, BUS LOADING ZONE, SHELTER, BICYCLE STORAGE, PEDESTRIAN STRUCTURES, PUBLIC ART,PLATFORM UPGRADE
20031231 TCM
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN990312 SCCAB 0 0 0 SHUTTLE SERVICE TO CALIFORNIA STATE UNIVERSITY AT CHANNEL ISLANDS (CSUCI) OPERATING ASSISTANCE THIRD YEAR OF DEMO
20020630 TCM
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN990609 SCCAB 0 0 0 SYSTEMWIDE REHABILITATION INCLUDING TRACK, SIGNALS, PLATFORMS, POWER SYSTEMS, FACILITIES, ROLLING STOCK, EQUIPMENT, SIGNAGE STP=STIP-RIP FUNDS
20060630 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN990906 SCCAB 0 0 0 IN VENTURA AT MONTALVO- CONSTRUCT METROLINK STATION, IMPROVE TRACK, SIGNALS, AND CROSSINGS FROM VENTURA BLVD TO MONTGOMERY STP = STIP-RIP FUNDS
20030101 TCM
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN990909 SCCAB 0 0 0 CAMARILLO METROLINK STATION AESTHETIC ENHANCEMENTS INCLUDING PUBLIC ART
20020901 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 96
TIER 2IMPERIAL COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS 7670 SSAB 0 0 0 NEAR EL CENTRO AT THE EL CENTRO MAINTENNACE FACILITY CONSTRUCT MAINTENENACE STATION - L5708 2000 SHOPP CANDIDATE
20041130 <OTHER>
CALTRANS impL506 SSAB 0 0 0 LUMP SUM CATEGORY - MINOR PROJECTS
20081230
CALTRANS IMP0044Y SSAB 78 0 0 IN IMPERIAL CO -- NEAR BRAWLEY -- ON SR 78 FRM JCT RT 111/BEST RD TO 0.5KM E OF DREASHER RD & ON RT 111 FRM 0.3 KM S OF ROSS RD TO B ST -- LANDSCAPING & HIGHWAY PLANTING
20080830
CALTRANS 8020 SSAB 98 30.8 32.3 IN CALEXICO FROM 0.5 KM WEST OF NARARRO AVE TO SR 111 WIDEN HWY FROM 1 TO 2 LANES IN EACH DIRECTION WITH TURN POCKETS AT MAJOR INTERSECTIONS.
20050530 <OTHER>
CALTRANS IMP0042A SSAB 98 31.9 39.7 IN AND NEAR CALEXICO FROM 0.6 KM WEST OF SR 111 EASTERLY TO ALAMO RIVER BRIDGE WIDEN TO 4 LANE HWY (ENV. WORK & DOC. FOR SR98) ENVIRONMENTAL WORKAND DOCUMENTATION FOR SR 98
20120330 <OTHER>
CALTRANS IMPL501 SSAB 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN IMPERIAL COUNTY, BRIDGE PRESERVATION PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS IMPL502 SSAB 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN IMPERIAL COUNTY, ROADWAY PRESERVATION PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS IMPL503 SSAB 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN IMPERIAL COUNTY, ROADSIDE PRESERVATION PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS IMPL504 SSAB 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN IMPERIAL COUNTY, FACILITIES PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS IMPLS01 SSAB 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN IMPERIAL COUNTY. ROADWAY PROJECTS (NONCAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL FUNDS AND STATE FUNDS)
20051231 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS IMPLS02 SSAB 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN IMPERIAL COUNTY. ROADSIDE PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL FUNDS AND STATE FUNDS)
20051231 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS IMPLS03 SSAB 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN IMPERIAL COUNTY. OPERATIONS PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL FUNDS AND STATE FUNDS)
20051231 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 97
TIER 2IMPERIAL COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
EL CENTRO imp020802 SSAB 0 0 0 PRELIMINARY DESIGN OF TRAFFIC BRIDGE ON 8TH STREET OVER I-8
20031231 EXEMPT/TRAFFIC SIGNALIZATION
IMPERIAL COUNTY imp020801 SSAB 0 0 0 BAUGHMAN ROAD RECONSTRUCTION 0.3 mile of County Rd. funds transferred from 11-imp990308
20041231 EXEMPT/TRAFFIC SIGNALIZATION
IMPERIAL COUNTY IMP991102 SSAB 0 0 0 COLE ROAD WIDENING FROM 2 LANES TO FOUR LANES WITH RECONSTRUCTION; FROM RAILROAD TRACKS TO KLOKE ROAD (.33) MILES
20050630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 98
TIER 2LOS ANGELES COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS LA0D74 SCAB 5 0 0 SOUNDWALL HOV LANES, RT 118-RT 14. (PPNO# 3236)
20081230 <OTHER>
CALTRANS 16881 SCAB 5 0 3.4 IN LA MIRADA TO SANTA FE SPRINGS FROM ORANGE COUNTY LINE TO ROSECRANS AVENUE - INTERIM HOV LANES; I-5 Rail Grade Crossing between RTE. 605/91.
2014 TCM
CALTRANS LA0D73 SCAB 5 0.1 6.8 LA MIRADA, NORWALK & SANTA FE SPRINGS-ORANGE CO LINE TO RTE 605 JUNCTION. WIDEN FOR HOV & MIXED FLOW LNS, RECONSTRUCT VALLEY VIEW & CARMENITA RD I/C. MODEL #1404
2014 TCM
CALTRANS LA0B7215 SCAB 5 1 2 RTE 5 CORRIDOR WIDENING & RECONSTRUCT IC SEGMENT A - OCL TO RTE 605 WIDEN FROM 6 TO 10 LNS ( 1 HOV & ONE MF IN EA. DIR). VALLEY VIEW & CARMENITA IC; MODIFY FWY TO FWY IC @ RTE 605
2014 TCM
CALTRANS LA996138 SCAB 5 6.5 8.31 RTE.5 HOV LNS. FROM FLORENCE AVE TO RTE.19 -- ADD ONE LANE IN EACH DIRECTION
2025 TCM
CALTRANS (TCRP42) SCAB 5 8.31 13.78 HOV LNS FROM RTE 19 TO RTE 710 -- ADD ONE LANE IN EACH DIRECTION
2025
CALTRANS LA996134 SCAB 5 44.6 45.6 RTE. 5/14 INTERCHANGE & HOV LNS ON RTE. 14 -- CONSTRUCT 2 ELEVATED LANES -- HOV CONNECTOR (DIRECT CONNECTORS) (EA# 16800)(2001 CFP 8343) (PPNO# 0168M)
2014 TCM
CALTRANS LA990366 SCAB 5 54.7 56.2 INTERCHANGE WIDEN AND IMPROVEMENT I-5/ROUTE 126 (TEA-21, H.P. 173) (EA# 187200)(EA# 187200, PPNO# 2209).
20030630 <OTHER>
CALTRANS LA01347 MDAB 14 54.5 60.7 --- RT 14 FROM PEARBLOSSOM HWY TO AVE P-8 HOV LANES (4 TO 6 LANES)(2001 CFP,8348). (EA # 125201, PPNO# 0391A)
2012 TCM
LANCASTER LA0C8102 SCAB 14 68.9 0 SR-14 FREEWAY/AVENUE I INTERCHANGE IMPROVEMENTS-WIDENING AVE I FROM 2 TO 3 LANES IN EACH DIRECTION, ADDING DUAL LEFT TURN LANES, AND WIDENING A BRIGE STRUCTURE.
20060630 <OTHER>
ALAMEDA TRANSPORTATION CORRIDOR AGENCY
LA960173 SCAB 47 0 0 INTERSECTION OF HENRY FORD AVE WITH TERMINAL ACCESS ROAD & TERMINAL ISLAND FREEWAY RAMPS INTERSECTION IMPROVMENETS
20021231 <OTHER>
ALAMEDA TRANSPORTATION CORRIDOR AGENCY
LA0D45 SCAB 47 2.8 3.9 ALAMEDA CORRIDOR TRUCK EXPRESSWAY . ELEVATED 4-LANE EXPRESSWAY BETWEEN COMMODORE HELM BRIDGE AND ALAMEDA STREET (SR-47).
20051201 TCM
CALTRANS LA996137 SCAB 60 11.7 23 RTE. 60 HOV LNS. FROM RTE. 605 TO BREA CANYON RD. -- HOV LANE (FROM 8 TO 10 LANES TO 10 TO 12 LANES) (CFP: 358, 4262, 6137=67,150+IIP: 5,100)
2008 TCM
CALTRANS LA0D31 SCAB 101 15.3 16.1 CONSTRUCT ONE ADDITIONAL LANE FOR BOTH NORTH AND SOUTH BOUND OFF-RAMPS AT VAN NUYS BLVD. (RIP 1 M, IIP 8 M) (EA # 199630) (PPNO# 2789)
20071203 <OTHER>
CALTRANS LA0D76 SCAB 110 23.3 23.6 IN DOWNTOWN LA-ON ROUTE 110-TEMPLE STREET. ACCESS IMPROVEMENTS.
20051230 TCM
2004 RTP * TECHNICAL APPENDIX I - 99
TIER 2LOS ANGELES COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES COUNTY
LA0C8099 SCAB 126 0.49 0.53 SR-126/COMMERCE CTR DR NEW IC. CONSTRUCT A PARTIAL CLOVERLEAF, GRADE SEPARATED IC AND WIDEN ST 126 FROM .76 KM EAST OF IC TO .85 KM WEST 4-6 LANES. (2001 CFP 8099) (PPNO# 3118)
20070630 <OTHER>
CALTRANS 10483A SCAB 138 60.2 61.6 ROUTE 138 WIDENING - 0.2 KM WEST OF LONG VIEW ROAD TO 146TH STREET EAST (SEG. 10) (EA# 127251, PPNO# 3329)
20051201 <OTHER>
CALTRANS LA0C50 SCAB 210 0.8 1.5 CONSTRUCT SOUND WALL IN THE CITY OF SAN DIMAS, BETWEEN SAN DIMAS AVENUE AND AMELIA AVENUE. (EA# 220401, PPNO# 2946)
20030827 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA0B408 SCAB 405 29.5 39.4 I-405/SEPULVEDA PASS -- NB 405 HOV LANE FROM RTE. 10 TO RTE. 101. (EA# 120300)
2030
CALTRANS LA0C8344 SCAB 405 38.9 40.1 EXTENSION OF N/B I-405 HOV LANE-TO EXTEND THE HOV LANE ON N/B I-405 FROM SOUTH OF VENTURA BL TO SO. BURBANK BLVD WHERE IT WILL JOIN THE EXISTING HOV LANE. (EA# 199620, PPNO# 2788).
2007 TCM
CALTRANS LA0D77 SCAB 405 40.3 40.3 CITY OF LOS ANGELES-AT ROUTE 405 & US 101 INTERCHANGE. CONSTRUCT FREEWAY CONNECTOR FROM SB RTE 405 TO NB&SB US 101
20160826 TCM
LONG BEACH LA996143 SCAB 710 6.8 7.9 RTE. 710 PCH TO DOWNTOWN L.B., PAVEMENT RECON, MEDIAN, LANDSCAPING IMPROVE.
20041231 <OTHER>
SOUTH GATE LA996347 SCAB 710 18.44 18.44 I-710/FIRESTONE BLVD. INTERCHANGE RECONSTRUCTION
20081231 <OTHER>
CALTRANS LA98STIP2 SCAB 710 21.9 22 710 INERCHANGE IMPROVEMENTS AT ATLANTIC AND BANDINI PHASE I RAMP RECONSTRUCT - INCREASE RADIUS FOR TRUCKS. NO CAPACITY INCREASE. (EA# 17190, PPNO# 2019) (NH IIP)
20041231 <OTHER>
CALTRANS LALS07 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN LOS ANGELES COUNTY FACILITY PROJECTS (NON CAPACITY TYPE PROJECTS AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20060630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS LALS08 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN LOS ANGELES COUNTY SHOPP ENVIRONMENTAL IMPROVMENT PROJECTS (NON CAPACITY TYPE PROJECTS AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20060630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 100
TIER 2LOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
AGOURA HILLS LA0D118 SCAB 0 0 0 USE FEDERAL APPROPRIATIONS AND CITY MATCH FUNDS FOR THE HIGHWAY BEAUTIFICATION PROJECT ALONG THE VENTURA FWY CORRIDOR IN AGOURA HILLS (NATIONAL SCENIC BYWAY PROJECT)
20041231 <OTHER>
ALAMEDA TRANSPORTATION CORRIDOR AGENCY
LA963731 SCAB 0 0 0 ALAMEDA CORRIDOR - NORTH END RAIL ROAD/ARTERIAL GRADE SEPS. & RELATED IMPROVEMENTS EIS/EIR COMPLETE; 8100+1394 P.E. 10517+305 R/W; 29483+5300 CONS.
20041231 TCM
ALAMEDA TRANSPORTATION CORRIDOR AGENCY
LA963732 SCAB 0 0 0 ALAMEDA CORRIDOR - MID CORRIDOR SEGMENT 10 MI TRENCH >20 ARTERIAL GRADE SEPS, ENVIRONMENTAL CLEARANCE
20031231 TCM
ALAMEDA TRANSPORTATION CORRIDOR AGENCY
LA963733 SCAB 0 0 0 ALAMEDA CORRIDOR - SOUTH END 7 RAILROAD / ARTERIAL GRADE SEPS. + RELATED IMPROVEMENTS ENV. CLEARANCE #NAME?
20021231 TCM
ARCADIA LA0D122 SCAB 0 0 0 SANTA ANITA-CITY OF ARCADIA ITS INTEGRATION PROJECT: THE PROJECT PROPOSES TO INTEGRATE THE CITY OF ARCADIA INTELLIGENT TRANSPORTATION SYSTEM TO THE COUNTY OF LA
20050130 <OTHER>
ARTESIA LA0D120 SCAB 0 0 0 ARTESIA TRAFFIC ENHANCEMENT PROJECT FOR ARTESIA BLVD, PIONEER BLVD AND 183RD STREET RESURFACING, STREETSCAPING, TRAFFIC CALMING, ANGLE-PARKING SIGNALS, ETC.
20050930 <OTHER>
BELLFLOWER LA996275 SCAB 0 0 0 WEST BRANCH GREENWAY MULTI-MODAL TRANS. CORRIDOR DESIGN AND CONSTRUCT 2.5 MILE CLASS I BIKE PATH ALONG MTA-OWNED SANTA ANA BRANCH ROW INCL. PEDESTRIAN AND LANDSCAPING
20030630 TCM
BEVERLY HILLS LA0C8098 SCAB 0 0 0 SANTA MONICA BLVD WIDEN FROM DOHENY DR TO WILSHIRE BLVD (WIDEN FROM 4 TO 5)
20081231 <OTHER>
BEVERLY HILLS LA996328 SCAB 0 0 0 CCTV CAMERA INSTALLATION 20040630 NON-FEDERAL/NON-REGIONAL
CALTRANS 9061D SCAB 0 0 0 ALAMEDA CORRIDOR IN LOS ANGELES COUNTY AT PACIFIC COAST HIGHWAY - GRADE SEPARATION
20021231 TCM
CALTRANS LA962212 SCAB 0 0 0 AVE. P-8 FROM RTE 14 TO 50TH STREET -- WIDEN FROM 2 TO 4 LANES
20021231 TCM
CALTRANS R5046C SCAB 0 0 0 ALAMEDA CORRIDOR IN LOS ANGELES COUNTY AT PACIFIC COAST HIGHWAY, SEPULVEDA BOULEVARD, DEL AMO BLVD, & ALAMEDA ST AT LAUREL PARK ROAD - GRADE SEPARATION
20021231 TCM
CULVER CITY LA0C8128 SCAB 0 0 0 FOX HILLS AREA TRAF SIG SYNCH EFFORT & CITY-WIDE AUTO TRAF SIGNAL CONTROL AND MONITORING PROJECT. INCORPORATE 11 SIGNALIZED INTERSECTIONS INTO AN ATSAC / ADAPTIVE TRAF CONTROL SYS.
20071130 EXEMPT/TRAFFIC SIGNALIZATION
GLENDALE LA996321 SCAB 0 0 0 SAN FERNANDO CORRIDOR ITS: MAXIMIZE CAPACITY AND EFFICIENCY OF THE FWY. SURFACE ST. NETWORK BY THE INTEGRATION AND EXPANSION OF EXISTING SYSTEMS.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 101
TIER 2LOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
HAWTHORNE LA000720 SCAB 0 0 0 ROSECRANS/AVIATION INTERSECTION (ROSECRANS 4 TO 6 LANES; AVIATION 6 TO 9 LANES) BRIDGE WIDENING & LANE ADDITTION (C-I:44419)
20030630 <OTHER>
LA CANADA-FLINTRIDGE
LA0C8159 SCAB 0 0 0 LA CANADA FLINTRIDGE EAST/WEST BIKEWAY CORRIDOR. DESIGN AND CONSTRUCTION OF 3.42 MILES OF EAST/WEST DIRECTIONAL CLASS II BIKE LANES IN THE CITY OF LA CANADA FLINTRIDGE.
20080930 TCM
LANCASTER LA9708287 MDAB 0 0 0 30TH ST WEST FROM AVE I TO AVE G-4 WIDEN FROM 2 TO 4 LANES (1.75 MIMES)
20030630 <OTHER>
LOMITA LA0C8091 SCAB 0 0 0 LOMITA BLVD WIDENING-CRENSHAW BLVD TO PENNSYLVANIA AVE. WIDEN A SECTION OF LOMITA BLVD TO INC CAPACITY FROM 4 TO 6 LANES, 3 DIRECTIONS.
20061231 <OTHER>
LOS ANGELES COUNTY
LA0B7085 SCAB 0 0 0 AVENUE S GRADE SEPARATION WEST OF SIERRA HWY-INCLUDES THE ENVIRONMENTAL STUDIES AND PREPARATION OF PLANS, SPECIFICATIONS & ESTIMATES FOR CONSTRUCTION OF A GRADE SEPARATION AT AVE S
20031231 <OTHER>
LOS ANGELES COUNTY
LA0C52 MDAB 0 0 0 SIERRA HWY RAILROAD OVERPASS, NORTH OF AVE Q
20050630 <OTHER>
LOS ANGELES COUNTY
LA0C8120 SCAB 0 0 0 SOUTH BAY FORUM TRAFFIC SIGNAL CORRIDORS PROJECT. DESIGN & CONSTRUCTION OF MULTI JURISDICTIONAL, SIGNAL SYSTEM IMPROVEMENTS ON REGIONAL ARTERIALS & ADVANCED ITS TECHNOLOGY.
20101231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA0C8121 SCAB 0 0 0 SAN GABRIEL VALLEY FORUM TRAFFIC SIGNAL CORRIDORS PROJECT OF MULTI JURISDICTION- AL, SIGNAL SYS IMPRVMENT ON REGIONAL ARTERIALS USING CONVENTNAL & ADVANCED ITS.
20101231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA0C8127 SCAB 0 0 0 GATEWAY CITIES FORUM TRAFFIC SIGNAL CORRIDORS PROJ, PHASE IV.DESIGN &CONSTRCTION OF MULTI-JURISDICTIONAL,SIGNAL SYS IMPRVMENT ON REGIONAL ARTERIALS USING CONVENTNAL & ADVANCED ITS.
20101230 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA0D117 SCAB 0 0 0 CALIF. STATE POLYTECHNIC UNIVERSITY POMONA ROADWAYS TO TRANSIT CENTER REHABILITATION RECONSTRUCTING PAVEMENT SECTIONS BETWEEN EDGE OF GUTTERS, REPLACING DAMAGE CURB & GUTTER SEC.
20031231 <OTHER>
LOS ANGELES COUNTY
LA0D8297 SCAB 0 0 0 CONST. A WILDLIFE CORRIDOR UNDERPASS, TO PROVIDE SAFE PASSAGE FOR WILDLIFE TRAVERSING FROM OPEN SPACE HABITAT ON EITHER SIDE OF A HEAVILY TRAFFICKED HARBOR BLVD (STATE TEA)
20040228
LOS ANGELES COUNTY MTA
LA974318 SCAB 0 0 0 ARBOR VITAE STREET IMPROVEMENTS BETWEEN INGLEWOOD AVE AND OAK ST INTERSECTION IMPROVEMENTS (SBCOG) (PART OF INGLEWWOD LA960106) (TEA21-#1454)
20031230 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 102
TIER 2LOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES, CITY OF
LA0B7061 SCAB 0 0 0 EAGLE ROCK ATSAC/ATCS PROJECT-TIE THE IMPROVEMENT ALONG HOLLYWOOD W & OLIVE AVE, FORMING A CONTI. SYSTEM FROM SR-134 TO I-5 AND CONNECT SEVERAL BURBANK AREAS
20040830 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA0B7065 SCAB 0 0 0 NORTH HOLLYWOOD ATSAC/ATCS PROJECT-BOUNDED BY ROSCOE BLVD AND TUXFORD ST, AND VICTORY AND VAN NUYS BLVD WILL REPLACE OBSOLETE TRAFFIC SIGNAL CONTROLLERS, INSTALL CONDUIT AND CABLES
20070130 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA0B7234 SCAB 0 0 0 OVERLAND BRIDGE WIDENING OVER I-10 FREEWAY -WIDEN E SIDE OF OVERLAND AVE BRIDGE OVER THE I-10 FROM NATIONAL BLVD/I-10 WESTBOUND RAMPS TO NATIONAL BLVD/NATIONAL PLACE.
20081231 <OTHER>
LOS ANGELES, CITY OF
LA0C40 SCAB 0 0 0 VALLEY BLVD/WEST MISSION ROAD I-710 CONNECTOR, CONSTRUCT FRONTAGE RD IN I-710 ALIGNMENT FROM VALLEY BLVD & WEST MISSION RD IN THE EXIS.T STATE ROW & BUILD GRADE SEP, 2 LN EA DIR.
20061231 <OTHER>
LOS ANGELES, CITY OF
LA0C8032 SCAB 0 0 0 SEPULVEDA BL TUNNEL UNDR MULHOLLAND DR WIDENING. WIDEN TUNNEL STRUCTURE FRM 3 TO 4 LNS - MATCH RDWY APPROACH, INC VERTICAL CLEARANCE & ADD BIKE LNS EACH DIRECTION
20070731 <OTHER>
LOS ANGELES, CITY OF
LA0C8036 SCAB 0 0 0 HYPERION AVE UNDER WAVERLY DR BRIDGE REPLACEMENT. WILL REMOVE & REPLACE WAVERLY BRIDGE W/ A LONGER SPAN STRUCTURE, PROVIDE SAFETY SHOULDERS, BIKE LANES & SIDEWALKS ALONG HYPERION.
20070630 <OTHER>
LOS ANGELES, CITY OF
LA0C8046 SCAB 0 0 0 BURBANK BLVD WIDENING-LANKERSHIM BLVD TO CLEON AVE. FROM VARYING ROADWAY WIDTH TO FULL SECONDARY HIGHWAY STANDARDS. FROM 1 LN TO 2 LNS IN EACH DIRECTION
20070630 <OTHER>
LOS ANGELES, CITY OF
LA0C8047 SCAB 0 0 0 BALBOA BL. & VICTORY BL INTERSECTION IMPROVEMENTS; INSTALL A 2ND LEFT TURN TURN. SOUTHBOUND 600 LINEAR FT., NORTHBOUND 300 FT.
20071231 <OTHER>
LOS ANGELES, CITY OF
LA0C8048 SCAB 0 0 0 CAHUENGA BLVD WIDENING - MAGNOLIA BLVD TO LANKERSHIM BLVD. TO PROVIDE 4 TRAVEL LANES, 2 PARKING LANES & CONTINOUS MEDIAN TURNING LANE. NON-CAPACITY ENHANCING.
20070630 <OTHER>
LOS ANGELES, CITY OF
LA0C8050 SCAB 0 0 0 WILSHIRE BL CORRDR IMPRVMNTS-SELBY AV TO COMSTOCK AV WIDEN WILSHIRE BL INTERSECT IN WESTWOOD AT KEY SIGNALIZED INTERSECT & INSTALL RAISED LANDSCAPE MEDIAN
20080731 <OTHER>
LOS ANGELES, CITY OF
LA0C8052 SCAB 0 0 0 SAN FERNANDO ROAD WIDEN BETWEEN AVE 26TH & UNION PACIFIC DR. PROVIDE LEFT TURN LANEA AT 12 INTERSECTION.
20071231 <OTHER>
LOS ANGELES, CITY OF
LA0C8053 SCAB 0 0 0 SAWTELLE BLVD WIDENING AT VENICE BLVD. WIDEN WEST SIDE OF SAWTELLE BLVD, RESTRIPE TO PROVIDE A NORTHBOUND LEFT TURN LANE FROM SAWTELLE BLVD TO WESTBOUND VENICE BLVD.
20060228 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 103
TIER 2LOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES, CITY OF
LA0C8054 SCAB 0 0 0 SKIRBALL CNTR DR WIDENING FROM I-405 FWY TO MULHOLLAND DR. OVERPASS, PROVIDE ADDN'L S/B LNE, RESTRIPE SKIRBALL CTR DR. FROM 1 S/B, 2 N/B LANES TO 2 LANES IN EACH DIRECTION.
20080831 <OTHER>
LOS ANGELES, CITY OF
LA0C8055 SCAB 0 0 0 MOORPARK AVE WIDENING - WOODMAN AVE TO MURIETTA AVE.- EXISTING 1 LN EA. DIR. ADD 1 LANE IN EA. DIR. & UPGRADE HIGHWAY TO SECONDARY HWY STANDARDS.
20070630 <OTHER>
LOS ANGELES, CITY OF
LA0C8057 SCAB 0 0 0 FIRST ST BRIDGE APPROACH WIDENING & HISTORICAL RAILING REPLACEMENT. INC TRAFFIC FLOW, LEFT TURN LNS WILL BE INSTALLED AT EITHER END OF THE BRIDGE & INVOLVES APPROACH RAMP WIDENING
20071031 <OTHER>
LOS ANGELES, CITY OF
LA0C8063 SCAB 0 0 0 RIVERSIDE DRIVE VIADUCT WIDENING AND REPLACEMENT. REPLACEMENT & UPGRADE OF THE EXISTING TWO-LANE BRIDGE WITH A FOUR LANE BRIDGE & BIKE PATH RAMPS WILL RESULT IN INCR. CIRCULATION.
20061031 <OTHER>
LOS ANGELES, CITY OF
LA0C8064 SCAB 0 0 0 SAN FERNANDO MISSION BLVD WIDENING BET SEPULVEDA BLVD & I-5 FWY. FROM 1 LANE TO 2 LANES IN EACH DIRECTION.
20070630 <OTHER>
LOS ANGELES, CITY OF
LA0C8075 SCAB 0 0 0 CESAR CHAVEZ / LORENA / INDIANA INTERSECTION IMPROVEMENT - RECONSRTUCTION OF A COMPLICATED 5-LEGGED SIGNAL-CONTROLLED INTERSECTION FOR TRAFFIC SAFETY AND CAPACITY IMPROVEMENT
20081231 <OTHER>
LOS ANGELES, CITY OF
LA0C8086 SCAB 0 0 0 NORTH SPRING ST BRIDGE WIDENING & REHABILITATION. INCLUDES WIDENING THE STRUCTURE & THE WEST APPROACH FROM 4 TO 6 LANES, A BIKE LANE WILL BE ADDED IN EACH DIRECTION.
20080930 <OTHER>
LOS ANGELES, CITY OF
LA0C8087 SCAB 0 0 0 MAGNOLIA BLVD WIDENING-CAHUENGA BLVD TO VINELAND AVE. FROM THE EXISTING ROADWY STANDARD TO SECONDARY HWY STANDARD. FROM 1 LANE TO 2 LANES IN EACH DIRECTION.
20070630 <OTHER>
LOS ANGELES, CITY OF
LA0C8089 SCAB 0 0 0 BARHAM / CAHUENGA / INTERSECTION WIDEN IMPROVEMENT, FOR LEFT/RIGHT TURN IMPROV.
20081231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA0C8124 SCAB 0 0 0 WILMINGTON ATSAC/ATCS PROJECT; IMPROVEMENTS TO 70 SIGNALIZED INTERSECTIONS THROUGH IMPLEMENTATION OF COMPUTER BASED REAL TIME TRAFFIC SIGNAL MONITORING AND CONTROL SYSTEM.
20080131 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA0C8126 SCAB 0 0 0 HARBOR-GATEWAY ATSAC/ATCS PROJECT; IMPROVEMENTS TO 109 SIGNALIZED INTERSECTIONS THROUGH IMPLEMENTATION OF A COMPUTER-BASED REAL TIME TRAFFIC SIGNAL MONITORING & CONTROL SYSTEM.
20081031 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 104
TIER 2LOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES, CITY OF
LA0C8209 SCAB 0 0 0 HOLLYWOOD MEDIA DISTRICT-PEDESTRIAN IMPROVEMENTS. INCLUDING SMART CROSSWALKS, TRAFFIC SIGNAL, LANDSCAPING ETC. BET. BUS STOPS ALONG SANTA MONICA BLVD, VINE ST AND HIGHLAND AVE.
20051130 TCM
LOS ANGELES, CITY OF
LA2013 SCAB 0 0 0 TUJUNGA CANYON BL. AND LA TUNA CANYON ROAD SAFETY PROJECT FROM 2 TO 4 LANES WIDENING
20041231 <OTHER>
LOS ANGELES, CITY OF
LA960014 SCAB 0 0 0 PORT ACCESS DEMO #5: HENRY FORD AV- ANAHEIM ST TO RT 47 WIDENING WIDEN FROM 4 TO 6 LANES
20031231 <OTHER>
LOS ANGELES, CITY OF
LA98STIP3 SCAB 0 0 0 ALAMEDA ST AND N SPRING ST ARTERIAL REDESIGN -REALIGN ALAMEDA/N.SPRING ELIMINATING INEFFICENT INTERSECTN WITH MAIN ST/N. MAIN STREET. 3 NB LANES & 3 SB LANES.
20031231 <OTHER>
LOS ANGELES, CITY OF
LA996304 SCAB 0 0 0 ATSAC HYDE PARK EAST: APPROX 63 SIGNALIZED INTERSECTIONS
20060630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA996305 SCAB 0 0 0 ATSAC HYDE PARK WEST: APPROX. 69 SIGNALIZED INTERSECTIONS
20060630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA996412 SCAB 0 0 0 WIDN OR IMPRVE 3 INTRSCTIONS ALONG NORMANDIE AVE CORRIDOR SOUTH OF THE SAN DIEGO FWY. TO IMPRV REGIONAL ACCESS TO PROPSED 2.9 MILLION SF HARBOR GATEWAY INDUST. DEV
20030630 <OTHER>
LOS ANGELES, CITY OF
LA996419 SCAB 0 0 0 WIDN NATIONAL BLVD. & ALLO FOR A 2ND W/B LEFT-TRN LNE & ADDTNL E/B RGHT-TURN ONLY LNE FOR THE I-405 S/B ON RAMP. 2ND LFT-TRN LNE ON NATIONAL AT SEPULVEDA AND A 2ND (SEE COMMENTS)
20030630 <OTHER>
LOS ANGELES, CITY OF
LA996424 SCAB 0 0 0 WIDN SOUTHBND CURB LANE ON SEPULVEDA BLVD. FROM 10FT. TO 18FT. PREVENTING THE BOTTLENECKING CAUSED BY THE BLOCKAGE OF THIS LANE BY VEH'S WAITING TO GET ONTO THE I-405 ON RAMP
20030630 <OTHER>
LOS ANGELES, CITY OF
LA996427 SCAB 0 0 0 VALLEY BLVD. GRADE SEPARATION 20071231 <OTHER>
MANHATTAN BEACH
LA0C8056 SCAB 0 0 0 NASH ST/DOUGLAS ST & ROSECRANS AVE. INTERSECTION IMPROVEMENTS. PROVIDES A 2ND WESTBOUND LEFT TURN LANE & A SEPARATE EASTBOUND RIGHT TURN LANE ON ROSECRANS AVE AT NASH ST/PRKWAY.
20070630 <OTHER>
MONTEBELLO LA996345 SCAB 0 0 0 BEVERLY BLVD. WIDENING PHASE III - WIDEN FROM 56 FT. TO 76 FT. BET. CURB TO PROVIDE FOUR 11- FT. TRAVEL LANES, 10 FT. TURN LANE, AND TWO 11-FT. SHOULDERS
20050331 <OTHER>
PALMDALE LA0C51 MDAB 0 0 0 RANCHO VISTA BLVD/AVE P WIDENING FROM FAIRWAY DR. TO 30TH ST. EAST - 4 TO 6 LANES; W/SIDEWALKS, BIKE LNS, LANDSCAPING, SIGNAL MODIFICATION, DRAINAGE IMPROVE.
20060630 <OTHER>
PALMDALE LA960104 MDAB 0 0 0 30TH STREET EAST WIDENING FROM AVENUE R TO PALMDALE BLVD. WIDENING FOR SECOND NORTH BOUND TRAFFIC LANE
20040630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 105
TIER 2LOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
PALMDALE LA960122 MDAB 0 0 0 10TH STREET EAST IMPROVEMENTS FROM AVENUE S TO AVENUE R STREET WIDENING, CURB, GUTTERS, AND SIDEWALK (WIDEN 2 TO 4)
20050630 <OTHER>
PALMDALE LA960128 MDAB 0 0 0 AVENUE Q - WIDEN FROM 2 TO 4 LANES FROM SIERRA HIGHWAY TO 30TH ST EAST
20040630 <OTHER>
PALMDALE LA960131 MDAB 0 0 0 AVENUE R-8 IMPROVEMENTS PALM VISTA/TO 47TH ST. EAST -- NON-CAPACITY
20060630 <OTHER>
PALMDALE LA960132 MDAB 0 0 0 AVENUE R-TIERRA SUBIDA TO/47TH ST EAST WIDEN TO ADD EAST BOUND & WEST BOUND TRAFFIC LANES
20040630 <OTHER>
PALMDALE LA960134 MDAB 0 0 0 AVENUE S HIGHWAY 14/DOWNING ST (WIDEN 4 TO 6 LANES) 3 LANES IN EA. DIR.).
20060630 NON-FEDERAL/NON-REGIONAL
PALMDALE LA9811094 MDAB 0 0 0 SIERRA HIGHWAY, AVE. R-8 TO AVE. S WIDENING 0.5 MILE STREET (FROM 2 TO 6 LANES)
20050630 <OTHER>
PALMDALE LA9811097 MDAB 0 0 0 DIVISION STREET AVENUE M TO PALMDALE BLVD MILE STREET EXTENSION AND WIDENING FROM 2 TO 4 LANES
20040630 <OTHER>
PALMDALE LA9811099 MDAB 0 0 0 20TH STREET WEST FROM AVENUE P-8 TO ELIZABETH LAKE ROAD 1 MILE STREET EXTENSION AND WIDENING FROM 0 TO 4 LANES
20060630 <OTHER>
PALMDALE LA9811103 MDAB 0 0 0 SR 14 AND AVENUE S INTERCHANGE IMPROVEMENTS; UPGRADE TO RAMP
20050630 NON-FEDERAL/NON-REGIONAL
PASADENA LA0C41 SCAB 0 0 0 SR710 MITIGATION PROJECT-RAYMOND AVE. TO SR 110 CONNECTOR. THIS PROJECT WILL IMPROVE THE CONN. BETWEEN THE SOUTHERN TERMINUS OF RAYMOND AVENUE AND THE PASADENA FWY (SR 110).
20060830 <OTHER>
PASADENA LA0C42 SCAB 0 0 0 SR710 MITIGATION PROJECT-CALIF. BLVD. RIGHT TURN LANE AT FAIR OAKS AVE. THIS PROJECT WILL CONSTRUCT A SEPARATE RIGHT TURN LANE ON EASTBOUND CALIF. BLVD. AT FAIR OAKS AVENUE.
20050630 <OTHER>
PASADENA LA0C44 SCAB 0 0 0 SR710 MITIGATION PROJECT-CALIFORNIA BLVD. RIGHT TURN LANE AT RAYMOND AVE. THIS PROJECT WILL CONSTRUCT A SEPARATE RIGHT TURN LANE WESTBOUND CALIFORNIA BLVD. AT RAYMOND AVENUE.
20061230 <OTHER>
PASADENA LA0C46 SCAB 0 0 0 SR710 MITIGATION PROJECT-RAYMOND AVENUE WIDENING. (RAYMOND AVENUE BETWEEN DEL MAR BLVD AND GLENARM STREET) RAYMOND AVENUE IS CURRENTLY CONSTRUCTED WITH A 56 FEET WIDE ROADWAY
20081230 <OTHER>
PASADENA LA0C48 SCAB 0 0 0 SR710 MITIGATION PROJECT-ARROYO PARKWAY STREET ENHANCEMENT PROJECT (ARROYO PKWY FROM COLORADO BLVD AND GLENARM STREET). THIS PROJECT CONSISTS OF ITS ELEMENTS, TRAFFIC SIGNAL
20051130 <OTHER>
PASADENA LA0D46 SCAB 0 0 0 SR 710 MITIGATION PROJECT-LAKE AVE/WALNUT ST AND HILL AVE/WALNUT ST INTERSECTION MOBILITY IMPROVEMENTS. THIS PROJECT INCLUDES WIDENING OF THE EAST SIDE OF LAKE AVE. FROM WALNUT
20051230 TCM
2004 RTP * TECHNICAL APPENDIX I - 106
TIER 2LOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
PASADENA LA0D47 SCAB 0 0 0 SR 710 MITIGATION PROJECT-TRAFFIC CONTROL AND MONITORING SYSTEM-INTELLIGENT TRANSPORTATION SYSTEMS (ITS). CONSTRUCT AND INSTALL ITS TECHNOLOGY AND VARIOUS DEGREES OF SMART SIGNALS
20081230 TCM
PASADENA LA0D48 SCAB 0 0 0 SR 710 MITIGATION PROJECT-110 FWY TO 210 FWY CONNECTOR.MARENGO INTERCHANGE EMPHASIS. THIS PROJECT INCLUDES THE INSTALLATION OF DIRECTIONAL SIGNS, CHANGEABLE MESSAGE SIGNS
20061230 TCM
PASADENA LA996324 SCAB 0 0 0 ITS IMPROVEMENTS: LAKE AVENUE AND DEL MAR BLVD.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
PICO RIVERA LA0D119 SCAB 0 0 0 PERFORM PRELIMINARY ENGINEERING PE TO WIDEN WASHINGTON BLVD. BRIDGE 450 OVER THE SAN GABRIEL RIVER. THE BRIDGE WILL BE WIDENED FROM 4 TO 6 LANES, INCLUDING SHOULDERS AND SIDEWALKS.
20051231 <OTHER>
PORT OF LONG BEACH
LA0C8094 SCAB 0 0 0 PIER B ST INTERMODAL RAILYARD EXPANSION. PROJECT WILL EXPAND PIER B ST INTERMODAL RAILYARD TO FACILITATE ADDITIONAL RAIL SHIPMENTS AND REALIGN AND WIDEN PIER B STREET.
20080430 <OTHER>
PORT OF LOS ANGELES
LA960176 SCAB 0 0 0 HARRY S BRIDGES BLVD RELOCATION/CONSOLIDATION OF STREETS STREET INTERSECTIONS, TRAFFIC CHANNELIZATION AND SIGNALIZATION (TEA21-#978)
20030630 <OTHER>
REDONDO BEACH
LA960105 SCAB 0 0 0 MANHATTAN BEACH BLVD FROM VAIL AVENUE TO INGLEWOOD AVE WIDENING (WIDEN FROM 4 TO 6 LANES)
20090630 <OTHER>
SAN GABRIEL VALLEY COG
LA0C56 SCAB 0 0 0 ACE/GATEWAY CITIES-CONSTRUCT GRADE SEPARATION AT VALLEY VIEW AVENUE IN SANTA FE SPRINGS (PART OF ALAMEDA CORRIDOR EAST PROJECT)
2007 TCM
SAN GABRIEL VALLEY COG
LA990354 SCAB 0 0 0 ALAMEDA CORRIDOR EAST (SGCG) (T21-1017) RAILROAD CROSSING IMPROVEMENT
20060630 TCM
SAN GABRIEL VALLEY COG
LA990355 SCAB 0 0 0 ALMEDA CORRIDOR EAST - SYNCHRONIZE & TRAFFIC LIGHTS UPGRADE (T21-1138)
20060630 TCM
SANTA CLARITA
LA0B7096 SCAB 0 0 0 CROSS VALLEY CONNECTOR GAP CLOSURE-I-5 TO COPPER HILL DR.-INCLUDES THE ENVIRONMENTAL STUDIES AND PREPARATION OF PLANS, SPECIFICATION, AND ESTIMATES FOR A FWY CONNECT. 0 TO 8 LANES
20041231 <OTHER>
SANTA CLARITA
LA0C8096 SCAB 0 0 0 CROSS VALLEY CONNECTOR GAP CLOSURE; I-5 TO COPPER HILL DR - INCLUDES THE CONSTRUCTION OF AN 8-LANE DIVIDED ARTERIAL, OUTSIDE CURB AND GUTTER, & DRAINAGE IMPROVEMENTS.
20071231 <OTHER>
SANTA CLARITA
LA0C8130 SCAB 0 0 0 INCIDENT MANAGEMENT - TRAVELER INFORMATION SUBSYSTEM; INSTALLATION CONSISTS OF 4 STATIONARY ELECTRONIC CHANGEABLE MESSAGE SIGNS & A HIGHWAY ADVISORY RADIO SYSTEM.
20060630 TCM
2004 RTP * TECHNICAL APPENDIX I - 107
TIER 2LOS ANGELES COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SANTA CLARITA
LA0C8156 SCAB 0 0 0 SANTA CLARITA REGIONAL COMMUTER TRAIL - I-5 TO FAIRWAYS DRIVE; CONSTRUCTION AND SOME ACQUISITION OF 1.0 MILES OF CLASS I BIKE PATH AND A BRIDGE RESTORATION ADJACENT TO SANTA CLARA.
20060630 TCM
SANTA CLARITA
LA9910013 SCAB 0 0 0 VIA PRINCESSA FROM GOLDEN VALLEY RD TO RAINBOW GLEN FROM 0 - 6 LANES; LESS THAN ONE MILE
20051231 <OTHER>
SANTA CLARITA
LA9910014 SCAB 0 0 0 VIA PRINCESSA FROM CIRCLE J TO MAGIC MTN PRKWAY. FROM 0 - 6 LANES; LESS THAN ONE MILE.
20061231 <OTHER>
SANTA CLARITA
LA9910016 SCAB 0 0 0 SANTA CLARITA PRKWY FROM SOLEDAD CYN RD TO VIA PRINCESSA (1.6 MILES); FROM 0 TO 6 LANES.
20050630 NON-FEDERAL/NON-REGIONAL
SANTA CLARITA
LA9910017 SCAB 0 0 0 SANTA CLARITA PRKWY FROM VIA PRINCESSA TO STATE HWY 14 (1 MILE) FROM 0 TO 6 LANES.
20050630 NON-FEDERAL/NON-REGIONAL
SANTA MONICA MOUNTAIN
LA0D106 SCAB 0 0 0 PEDESTRIAN/BICYCLE FACILITIES, LANDSCAPE AND ARTWORK ENHANCEMENTS DIRECTLY ADJACENT TO OR UNDER SORROUNDING THE I-5/SR 110 INTERCHANGE AT THE CONFLUENCE OF THE LA RIVER AND ARROYO
20061230 <OTHER>
SIGNAL HILL LA0C8095 SCAB 0 0 0 CHERRY AVE. WIDENING PROJECT. BET 19TH ST AND PACIFIC COAST HIGHWAY BY WIDENING THE ARTERIAL FROM ONE TO TWO LANES IN EACH DIRECTION.
20081231 <OTHER>
TORRANCE LA000389 SCAB 0 0 0 DEL AMO BLVD FROM MADRONA AVE TO CRENSHAW BLVD CONSTRUCT 0 TO 4 LANES NEW GRADE SEPARATION (CFP 6361, 4314)
20060601 <OTHER>
TORRANCE LA0C8009 SCAB 0 0 0 TORRANCE BLVD. AT MAPLE AVE. INTERSECTION CAPACITY ENHANCEMENT; CONSTRUCT EASTBOUND LEFT-TURN LANE, WESTBOUND RIGHT-TURN LANE, AND NORTHBOUND THROUGH-LANE.
20071231 <OTHER>
TORRANCE LA0C8082 SCAB 0 0 0 HAWTHORNE AT SEPULVEDA INTERSECTION CAPACITY ENHANCEMENT; INSTALL WESTBOUND RIGHT-TURN LANE TO MITIGATE PEDESTRIAN CONFLICTS AND TO IMPROVE OPERATION OF INTERSECTION.
20071231 <OTHER>
TORRANCE LA0C8083 SCAB 0 0 0 190TH ST AT ANZA AVE & INGLEWOOD AVE INTERSECT CAPACITY ENHANCEMENT; INSTALL ADDITIONAL LEFT-TURN LANES TO PROVIDE DUAL LEFT-TURN LANES.
20071231 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 108
TIER 2LOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
ACCESS SERVICES INC.
LA0C8224 SCAB 0 0 0 ACCESS PARATRANSIT UNIFORM SCHEDULING SYSTEM
20080930 EXEMPT/TRAFFIC SIGNALIZATION
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0C02 MDAB 0 0 0 PURCHASE REPLACEMENT OVER-THE ROAD COACHES (11)
20041231 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0C03 MDAB 0 0 0 PURCHASE REPLACEMENT PARATRANSIT (DAR) VEHICLES (9).
20040630 EXEMPT/TRAFFIC SIGNALIZATION
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0C04 MDAB 0 0 0 PURCHASE EXPANSION LOCAL TRANSIT BUSES (5)
20040630 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0C05 MDAB 0 0 0 PURCHASE EXPANSION OVER THE ROAD COACHES (COMMUTER) (2)
20041231 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0C8217 MDAB 0 0 0 PURCHASE EXPANSION OVER THE ROAD COMMUTER COACHES (11) (FUNDS FROM LA UZA). RELIEVE OVERCROWDING ON THE 40-FOOT BUSES WILL ALLOW AVTA TO OPERATE TWO NEW ROUTES IN SFV/GLEN./PAS.
20080630 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA0D72 MDAB 0 0 0 PURCHASE 10 LOCAL FIXED ROUTE REPLACEMENT BUSES (LA UZA).
20041231 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA50200 MDAB 0 0 0 OPERATING ASSISTANCE/PREVENTIVE MAINTENANCE (LANCASTER/PALMDALE UZA).
20040630 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA50201 VAR 0 0 0 CAPITAL ASSISTANCE - LEASE PAYMENT (LANCASTER/PALMDALE UZA)
20040630 <OTHER>
ANTELOPE VALLEY TRANSIT AUTHORITY
LA960203 VAR 0 0 0 ADMINISTRATIVE CAPITAL 20040630 <OTHER>
CALTRANS (TCRP35) SCAB 0 0 0 SAN DIEGAN (PACIFIC SURFLINER); TRIPLE TRACK INTERCITY RAIL LINE WITHIN LA COUNTY AND ADD RUN-THROUGH TRACKS THROUGH LA UNION STATION
2007
CLAREMONT LA0D103 SCAB 0 0 0 THE CITY OF CLAREMONT AND THE CLAREMONT REDEVELOPMENT AGENCY WILL BE CONSTRUCTING A NEW 400 SPACE PARKING STRUCTURE FOR ADDITIONAL USE BY TRANSIT PATRONS.
20041201 <OTHER>
CLAREMONT LA0D81 SCAB 0 0 0 CITY YARD FACILITY, INCLUDING TRANSPORTATION, SANITATION, MAINTENANCE AND FLEET MAINTENANCE (SMALL PORTION CONSIDERED AS TRANSPORTATION RELATED) CLAREMONT DIAL-A-RIDE.
20051031 <OTHER>
COMMERCE LA963759 SCAB 0 0 0 TELEGRAPH ROAD TRACK CAPACITY ENHANCEMENT 97-98 TCI
20021231 TCM
COMPTON LA0D107 SCAB 0 0 0 PURCHASE ONE REPLACEMENT CNG BUS FOR THE CITY'S RENAISSANCE TRANSIT SYSTEM.
20040630 <OTHER>
COVINA LA0C8216 SCAB 0 0 0 MITIGATE PARKING DEFICIENCY FOR COVINA METROLINK STATION-PROJECT PROPOSES TO CONSTRUCT 330 NEW PARKING SPACES IN A STRUCTURE OVER AN EXISTING STATION PARKING LOT. (PPNO# 3224)
20061031 TCM
2004 RTP * TECHNICAL APPENDIX I - 109
TIER 2LOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CULVER CITY MUNI BUS LINES
LA0D104 SCAB 0 0 0 INSTALLATION OF ENHANCED STREET LIGHTS ON WASHINGTON BLVD TO IMPROVE PASSENGER SAFETY AND SECURITY.
20041231 <OTHER>
CULVER CITY MUNI BUS LINES
LA0D105 SCAB 0 0 0 EXPANSION OF CULVER CITY COMPRESSED NATURAL GAS FUELING STATION TO SERVICE EXPANDING CNG FLEET.
20041231 <OTHER>
FOOTHILL TRANSIT ZONE
LA0D115 SCAB 0 0 0 LINE 187/189 SIGNAL PRIORITY. 20050630 <OTHER>
GARDENA LA0C8386 SCAB 0 0 0 BUS SYSTEM ALTERNATE FUEL FACILITY (FY 2001 CALL-FOR-PROJECTS)-CROSS STREETS: 139TH ST & WESTERN AVE.
20080530 <OTHER>
GARDENA LA0D100 SCAB 0 0 0 BUS WINDOW AND BODY REHABILITATION
20041231 <OTHER>
GARDENA LA0D111 SCAB 0 0 0 PURCHASE OF 150 BUS STOP TRASH RECEPTACLES
20041231 <OTHER>
GLENDALE LA0B7037 SCAB 0 0 0 COMPRESSED NATURAL GAS AND MAINTENANCE FACILITY-FOR ENVIRONMENTAL REVIEW, PERMITS, PROJECT APPROVALS.
20031231 EXEMPT/TRAFFIC SIGNALIZATION
GLENDALE LA0C8220 SCAB 0 0 0 PURCHASE OF (8) 35-FOOT LOW FLOOR CNG HEAVY-DUTY TRANSIT VEHICLES.
20050630 TCM
GLENDALE LA0D78 SCCAB 0 0 0 PURCHASE OF FIVE, REPLACEMENT, ALTERNATIVE FUEL TRANSIT BUSES BY THE CITY OF GLENDALE 'GLENDALE BEELINE' FOR REVENUE SERVICE.
20051001 <OTHER>
LOS ANGELES COUNTY
LA0C8092 SCAB 0 0 0 VALLEY VIEW AVE GRADE SEPARATION AT BNSF RAILWAY SOUTH OF SAGE ROAD. CONSTRUCT A GRADE SEPARATION FOR VALLEY VIEW AVE FROM EXISTING BNSF TRACKS BY CONSTRUCTING A HWY UNDERPASS.
20060930 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY
LA0C8364 SCAB 0 0 0 NORTH LA COUNTY NON-ADVERTISING BUS STOP SHELTERS. INSTALLATION OF BUS SHELTERS WITH SEATING AT BUS STOPS WITH GREATEST # OF DAILY BOARDING IN NORTH LOS ANGELES COUNTY.
20070630 TCM
LOS ANGELES COUNTY MTA
(Rapid) SCAB 0 0 0 METRO RAPID EXPANSION - PICO '07, SANTA MONICA '06, WESTERN '06, ATLANTIC '07, CENTRAL '07, SAN FERNANDO-LANKERSHIM '07, WEST OLYMIC '08, GARVEY-CHAVEZ '08, MANCHESTER '08, SAN FERNANDO (SOUTH) '08, SEPULVEDA (SOUTH) '08, TORRANCE-LONG BEACH '08, LINCOLN '06
2008
LOS ANGELES COUNTY MTA
LA0C10 SCAB 0 0 0 MID-CITY/EXPOSITION CORRIDOR LIGHT RAIL TRANSIT PROJECT - DOWNTOWN LA TO SANTA MONICA
2011 TCM
LOS ANGELES COUNTY MTA
LA0C8413 SCAB 0 0 0 METRO RAPID BUS STATIONS-PHASE II; INCLUDES COMMUNICATIONS & EQUIPMENT
20051230 TCM
LOS ANGELES COUNTY MTA
LA0D07 SCAB 0 0 0 UNIVERSAL FARE SYSTEM REGIONAL PROJECT
20100731 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA0D08 VAR 0 0 0 UNIVERSAL FARE SYSTEM MTA PROJECT -- (PROGRAMMING APPROVED BOD 11/2001)
20100731 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES COUNTY MTA
LA0D41 SCAB 0 0 0 A PERMANENT FACILITY IS NEEDED TO SUPPORT THE CUSTODIAL FUNCTION ON THE BLUE AND GREEN LINES.
20050731 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 110
TIER 2LOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ANGELES COUNTY MTA
LA0D44 SCAB 0 0 0 BOYLE HEIGHTS BUS FACILITY - PASSENGER RELATED AMENITIES AND IMPROVEMENTS.
20040630 <OTHER>
LOS ANGELES COUNTY MTA
LA29202U2 SCAB 0 0 0 SAN FERNANDO VALLEY NORTH/SOUTH BRT EXTENSION
2009 TCM
LOS ANGELES COUNTY MTA
LA963537 SCAB 0 0 0 GOLD LINE OPERATING ASSISTANCE 20071231 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA0C8173 SCAB 0 0 0 NORTHRIDGE METROLINK STN PARKING IMPRVMENT. CONSTRCT ADDT'L 100 PRKING SPCS & RECONFIGURE SOUTHERN PRTION OF EXISTNG PRKNG LOT TO YIELD AN ADDT'L 40 NET PRKING SPCES TOTAL 400 SPC.
20071031 TCM
LOS ANGELES, CITY OF
LA0C8242 SCAB 0 0 0 BUS STOP IMPROVEMENTS ON SAN FERNANDO ROAD & TC LIGHTING; ENHANCE PASSENGER FACILITIES AT THREE BUS STOPS WITH GREATEST NUMBER OF DAILY BOARDINGS ON EAST SIDE OF SAN FERNANDO ROAD.
20080731 TCM
LOS ANGELES, CITY OF
LA0C8380 SCAB 0 0 0 CHINATOWN/COLLEGE STREET BLUE LINE STATION ENHANCEMENT-FEATURES CONSIST OF A PEDESTRIAN WALKWAY BRIDGE; A BUS STATION AND A BIKE STATION.
20041231 TCM
LOS ANGELES, CITY OF
LA0D101 SCAB 0 0 0 PURCHASE TWO (2) ALTERNATIVE FUEL 30 FT DASH VEHICLES
20041230 <OTHER>
LOS ANGELES, CITY OF
LA0D109 SCAB 0 0 0 PURCHASE LAND FOR TRANSIT FACILITY 20051231 <OTHER>
LOS ANGELES, CITY OF
LA0D110 SCAB 0 0 0 PURCHASE 9-LOW FLOOR, ALTERNATIVE-FUEL 30-FOOT BUSES
20051231 <OTHER>
LOS ANGELES, CITY OF
LA0D32 SCAB 0 0 0 VEHICLE EMISSION REDUCTION PROGRAM -- PURCHASE REPLACEMENT ENGINE PACKAGES FOR 58 VEHICLES WITH NEW ENGINE PACKAGES UTILIZING THE LATEST IN EFFICIENT DIESEL TECHNOLOGY
20030630 EXEMPT/TRAFFIC SIGNALIZATION
LOS ANGELES, CITY OF
LA0D95 SCAB 0 0 0 IMPLEMENTATION OF UNIVERSAL FARE SYSTEM PROJECT AT LADOT PREVIOUSLY PART OF LAOD07.
20041231 <OTHER>
MONTEBELLO LA0D28 SCAB 0 0 0 PURCHASE OF (1) EXPANSION BUS. ONE HYBRID (DIESEL-ELECTRIC) LOW FLOOR 40' COACH FOR INSERVICE TESTING.
20051231 TCM
NORWALK LA0C61 SCAB 0 0 0 INTEGRATED RADIO COMMUNICATIONS SYSTEM (INCLUDING AUTOMATED VEHICLE LOCATOR)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
NORWALK LA0C62 SCAB 0 0 0 STATION MASTER PLAN TO DEVELOP A REMOTE FLYAWAY BAGGAGE CHECK IN FOR LOS ANGELES WORLD AIRPORTS (LAWA).
20040630 EXEMPT/TRAFFIC SIGNALIZATION
NORWALK LA0C63 SCAB 0 0 0 PURCHASE OF MISC OFFICE EQUIPMENT- FY02/03
20040630 EXEMPT/TRAFFIC SIGNALIZATION
NORWALK LA0C64 SCAB 0 0 0 PURCHASE OF MAJOR BUS COMPONENTS FY02/03
20040630 EXEMPT/TRAFFIC SIGNALIZATION
NORWALK LA0C65 SCAB 0 0 0 PURCHASE OF MAINTENANCE SERVICE EQUIPMENT FY02/03.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
NORWALK LA0C66 SCAB 0 0 0 REHABILITATE (2) ORION BUSES 20040630 EXEMPT/TRAFFIC SIGNALIZATION
NORWALK LA0C67 SCAB 0 0 0 PURCHASE OF STAFF AND RELIEF VEHICLES FY02/03.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
NORWALK LA0C68 SCAB 0 0 0 PURCHASE OF AUTOMATED DISPATCH SYSTEM.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
NORWALK LA0C69 SCAB 0 0 0 PURCHASE OF PARATRANSIT DISPATCH SYSTEM.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 111
TIER 2LOS ANGELES COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
NORWALK LA0C70 SCAB 0 0 0 PURCHASE OF BUS OPERATING EQUIPMENT (HEADSIGN AND MISC. EQUIPMENT)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
NORWALK LA0C71 SCAB 0 0 0 PURCHASE OF (4) FOUR ALTERNATIVELY FUELED EXPANSION BUSES.
20040630 TCM
NORWALK LA0C72 SCAB 0 0 0 CAPITALIZATION OF MAINTENANCE COST (TIRE LEASE).
20040630 EXEMPT/TRAFFIC SIGNALIZATION
NORWALK LA0D01 SCAB 0 0 0 NORWALK ON BEHALF OF SANTA FE SPRINGS - ALTERNATIVE FUEL VEHICLES AND TRANSIT RELATED FACILITIES.
20041231 TCM
NORWALK LA0D02 SCAB 0 0 0 PURCHASE (2) EXPANSION PARATRANSIT VEHICLES
20031231 TCM
NORWALK LA0D03 SCAB 0 0 0 PHASE II FACILITY ALT FUEL CONVERSION/ON-SITE FUELING STATION
20041231 EXEMPT/TRAFFIC SIGNALIZATION
NORWALK LA0D04 SCAB 0 0 0 NORWALK/SANTA FE SPRINGS TRANSPORTATION CENTER EXPANSION - PARKING & RELATED IMPROVEMENTS
20041231 TCM
REDONDO BEACH
LA0D29 SCAB 0 0 0 HEART OF THE CITY BUS TRANSFER STATION - CONSTRUCTION IN CITY REDEVELOPMENT AREA. SERVICE BY 5 LACMTA LINES, 2 TORRANCE LINES AND 1 LADOT COMMUTER EXPRESS LINE.
20051231 NON-FEDERAL/NON-REGIONAL
SANTA CLARITA LA0C8371 SCAB 0 0 0 SANTA CLARITA TRANSIT EXPANSION BUSES; WILL ALLOW PHASE 1 OF 5 YEAR MASTER PLAN TO BE IMPLEMENTED WITH SEVEN LOCAL BUSES AND FOUR COMMUTER BUSES.
20080630 TCM
SANTA CLARITA LA0D125 SCAB 0 0 0 BUS STOP AMENITIES PROJECT 20051231 <OTHER>
SCRAA/LACMTA/SANBAG
LA0B7107 SCAB 0 0 0 CHATSWORTH INTERMODAL PARK AND RIDE-INCLUDE DESIGN AND CONS. OF ADDITIONAL 150 SPACES-CONSTRUCTION WILL INCL GRADING, ASPHALT PAVING, INSTALLATION OF CONCRETE BUMPERS ETC (PE ONLY)
20031231 TCM
SIERRA MADRE LA0D98 SCAB 0 0 0 ACQUISITION OF TWO REPLACEMENT 16 OR 20 PASSENGER, CNG-FUELED VEHICLES FOR SIERRA MADRE'S ROUNDABOUT SYSTEM.
20040630 <OTHER>
SOUTH PASADENA
LA0D112 SCAB 0 0 0 ACQUISITION OF AN ALTERNATIVE FUELED TRANSIT VEHICLE TO IMPLEMENT AN INTRA-CITY CIRCULATOR ROUTE FOR THE MISSION MERDIAN METRO GOLD LINE LIGHT RAIL STATION (LOCAL TDM)
20051231 <OTHER>
SOUTH PASADENA
LA0D79 SCAB 0 0 0 ACQUISITION OF THREE, 22-FOOT, 22-PASSENGER ALTERNATIVE FUEL TRANSIT VEHICLES FOR IMPLEMENTATION OF AN INTRA-CITY CIRCULATOR SYSTEM WITH CONNECTIVITY TO THE METRO GOLD LINE RAIL
20040630 <OTHER>
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA0D113 SCAB 0 0 0 INTEGRATION OF SCRRA'S PASSENGER INFORMATION DELIVERY SYSTEM.
20041231 <OTHER>
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
LA0D114 SCAB 0 0 0 PARKING AT CHATSWORTH METROLINK STATION OF THE VENTURA COUNTY LINE.
20041231 <OTHER>
TORRANCE LA0D116 SCAB 0 0 0 REPLACEMENT OF HVAC SYSTEM AT TORRANCE TRANSIT FACILITY
20040630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 112
TIER 2ORANGE COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS ORA001102 SCAB 0 0 0 LUMP SUMS IN VARIOUS LOCATIONS IN ORANGE COUNTY, SAFETY PROJECTS (NON CAPACITY TYPE ONLY AND ELIGIBLE FOR ALL FEDERAL AND STATE FUNDS)
20070630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS ORA001103 SCAB 0 0 0 LUMP SUM AT VARIOUS LOCATIONS IN ORANGE COUNTY, ROADWAY PRESERVATION PROJECTS (NON CAPACITY TYPE ONLY AND ELIGIBLE FOR ALL FEDERAL AND STATE FUNDS)
20060630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS ORA001104 SCAB 0 0 0 LUMP SUM AT VARIOUS LOCATIONS IN ORANGE COUNTY, ROADSIDE PRESERVATION PROJECTS (NON CAPACITY TYPE ONLY AND ELIGIBLE FOR ALL FEDERAL AND STATE FUNDS)
20060630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS ORA001105 SCAB 0 0 0 LUMP SUM AT VARIOUS LOCATIONS IN ORANGE COUNTY, MOBILITY PROJECTS (NON CAPACITY TYPE ONLY AND ELIGIBLE FOR ALL FEDERAL AND STATE FUNDS)
20060630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS ORA001106 SCAB 0 0 0 LUMP SUM AT VARIOUS LOCATIONS IN ORANGE COUNTY, MINOR PROJECTS (NON CAPACITY TYPE ONLY AND ELIGIBLE FOR ALL FEDERAL AND STATE FUNDS)
20060630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS ORA001107 SCAB 0 0 0 LUMP SUM AT VARIOUS LOCATIONS IN ORANGE COUNTY, FACILITIES PROJECTS (NON CAPACITY TYPE ONLY AND ELIGIBLE FOR ALL FEDERAL AND STATE FUNDS)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS ORA001108 SCAB 0 0 0 LUMP SUM AT VARIOUS LOCATIONS IN ORANGE COUNTY, ENVIRONMENTAL IMPROVEMENT PROJECTS (NON CAPACITY TYPE ONLY AND ELIGIBLE FOR ALL FEDERAL AND STATE FUNDS)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA040607 SCAB 0 0 0 Orange County - Countywide activities: Planning, Programming and Monitoring (PPM)
20090630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA020122 SCAB 0 0 0 DEVELOP AND IMPLEMENT COUNTYWIDE RETROFIT SOUNDWALL PROGRAM (LUMP SUM)
20080630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY/EMA
ORA000178 SCAB 1 29.89 32 PACIFIC COAST HWY (GOLDEN WEST TO WARNER AND WARNER TO ANDERSON) IMPROVE DRAINAGE, PAVEMENT SURFACE, AND CURB//GUTTER/SIDEWALK AT VARIOUS LOCATIONS.
20070630 EXEMPT/TRAFFIC SIGNALIZATION
SEAL BEACH ORA000185 SCAB 1 32.72 32.72 PACIFIC COAST HWY@SEAL BEACH BLVD INTERSECTION IMPROVEMENTS. ADD2 LANES, 1 E/B AND1 W/B,1 RETRN N/B PCH ONTO S.B. BLVD. 800FT N/BTO 800 FT S/B. WIDEN TO ACCOM.THU BICYCLE LNES
20030630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 113
TIER 2ORANGE COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA020111 SCAB 5 3.4 3.6 I-5 AT AVENIDA PICO SOUTHBOUND OFF RAMP WIDENING FROM 1 TO 2 LANES AND EXTEND THE EXISTING AUX LANE TO CONNECT WITH S/B AUX LANE VISTA HERMOSA ON RAMP.
20040630 <OTHER>
CALTRANS 11068 SCAB 5 5.4 5.6 CAMINO DE ESTRELLA TO CALIFORNIA IN DANA POINT, N/B & S/B SOUNDWALL.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA020109 SCAB 5 8.4 8.7 I-5 AT CAMINO CAPISTRANO INTERSECTION IMPROVEMENT. WIDEN S/B OFFRAMP FROM 2 TO 3 LANES AND AUX LANE.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
LAGUNA NIGUEL
ORA000141 SCAB 5 13.78 13.78 CROWN VALLEY AT 1-5 SB OFF RAMP. ADD OPTIONAL RT/LT OFF RAMP LANE (EXTRA TURN LANE AT INTERSECTION) AND AUX LANE
20090630 <OTHER>
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA020112 SCAB 5 15.1 16.3 I-5 SOUTHBOUND AT OSO PARKWAY EXIT LANE AND INTERCHANGE IMPROVEMENTS: WIDEN FROM 1 TO 2 LANES AND ADD AN EXIT/STORAGE LANE. SIGHT DISTANCE IMPROV TO N/B ON RAMP. WIDEN NB OFF-RAMP FROM 2 TO 3 LANES.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
LAGUNA HILLS
ORA000122 SCAB 5 16.53 16.53 I-5 @ LA PAZ INTERCHANGE IMPROVEMENTS. EXPAND LA PAZ RD. FROM 4 TO 6 LANES TOTAL. (99-LHILL-GMA-1125)
20070630 <OTHER>
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA020108 SCAB 5 26.86 26.86 I-5 AT CULVER DRIVE S/B OFFRAMP WIDENING FROM ONE TO TWO LANES.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
TUSTIN ORA55262 SCAB 5 29.09 29.09 I-5 @ RED HILL AVE (EL CAMINO REAL & NISSON RD) WIDENING. ADD DEDICATED RIGHT TURN LANE TO FREEWAY ON RAMPS BOTH N/S ADD BIKELANES (97-TUST-RIP-1159)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
ANAHEIM ORA990904 SCAB 5 34.4 43.5 I-5 (SR-22/SR-57 TO BEACH BLVD)LANDSCAPING IN ANAHEIM, BUENA PARK, ORANGE AND FULLERTON OUTSIDE STATE ROW. IN CONJUNCTION WITH ORA990905 TEA PROJECT
20021230 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA000193 SCAB 22 0 0.65 SR-22/I-405 AND I-405/I-605 INTERCHANGES. DESIGN HOV TO HOV LANE CONNECTORS.
20100630 TCM
CALTRANS ORA000195 SCAB 22 0.66 13.23 ON SR-22 (I-405 TO SR55) ADD 2 HOV LANES/1 EA DIR (FRM 0 - 2); & 2 AUX LANES/1 EA DIR (FRM 0- 2) (I-5 TO BEACH) & OPERATING IMPROVMENTS
20070930 TCM
CALTRANS ORA020123 SCAB 22 0.66 13.23 SR-22 REPLACMENT PLANTING FOR HOV WIDENING PROJECT
20070630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 114
TIER 2ORANGE COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
COSTA MESA ORA000161 SCAB 55 1.5 2.02 NEWPORT BLVD. (SR-55 TO 17TH ST) - WIDENING FROM 6 TO 8 THROUGH LANES. WIDEN 1 LANE N/B FROM 17TH TO 19TH AND 1 LANE S/B FROM 19TH TO BROADWAY
20050601 <OTHER>
COSTA MESA ORA015 SCAB 55 5.3 5.3 BAKER STREET AND SR-55; N/B & S/B FRONTAGE ROAD IMPROVEMENTS. S/B FREE RIGHT TURN, N/B LEFT-TURN AND 2ND E/B LEFT.
20050630 EXEMPT/TRAFFIC SIGNALIZATION
COSTA MESA ORA016 SCAB 55 5.8 5.8 PAULARINO AVE (SR-55 @ PAULARINO AVE) IN COSTA MESA INTERSECTION IMPROVEMENT. ADDING A N/B RAMP AND W/B RIGHT-TURN-LANE.
20050630 EXEMPT/TRAFFIC SIGNALIZATION
COSTA MESA ORA017 SCAB 55 5.8 5.8 PAULARINO AVE IN COSTA MESA. INTERSECTION IMPROVEMENT ADD S/B RIGHT-TURN LANE.
20050630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE, CITY OF
ORA000146 SCAB 55 16.12 16.12 MEATS AVE @ SR55 INTERCHANGE. CONSTRUCT ON-RAMP/OFF-RAMPS. PART OF SR-55 ENHANCEMENT PROJECTS.(0 TO 2 LANES)
20080630 <OTHER>
BREA 929371 SCAB 57 13.4 20.9 ROUTE 57 TO LAMBERT ROAD IN BREA - INSTALL CLOSED CIRCUIT TELEVISION CAMERAS
20030630 EXEMPT/TRAFFIC SIGNALIZATION
TCA 10254 SCAB 73 9.6 25.45 SJHC, 15 MI TOLL RD BETWEEN I-5 IN SAN JUAN CAPISTRANO & RTE 73 IN IRVINE, EXISTING 3/M/F EA.DIR.1 ADD'L M/F EA DIR, PLUS CLIMBING & AUX LNS AS REQ, BY 2015 PER SCAG/TCA MOU 4/5/01
2015 TCM
CALTRANS ORA990602 SCAB 74 1.0 2.9 (CALLE ENTRADERO TO ANTONIO PKWY) IN SAN JUAN CAPISTRANO, WIDEN AND REALIGN FROM 2 TO 4 LANES
2010 <OTHER>
ANAHEIM ORA990601 SCAB 90 12.3 13.8 IN YORBA LINDA AND ANAHEIM, ORANGETHROPE SOUNDWALL IN ANAHEIM SOUNDWALL ALONG RR TRACKS NEAR IMPERIAL HWY/ORANGETHROPE AVE.(DEMO id#215, RELATED TO PROJ.#5620)
20031030 EXEMPT/TRAFFIC SIGNALIZATION
ANAHEIM ORA990434 SCAB 90 12.4 12.85 Imperial Hwy (La Palma and Nohl Ranch) ITS Project ITS/Signal Coordination
20041030 EXEMPT/TRAFFIC SIGNALIZATION
FULLERTON REDEVELOPMENT AGENCY
ORA000148 SCAB 91 1.23 2.23 AT BROOKHURST & EUCLID RAMP IMPROVMENTS. BRKHRST: FROM SINGLE TO DUAL LT-TURN LANES ON EB/WB OFF RAMPS. ECLD: ADD LT-TURN LANE ON WB AND RT-TURN LANE ON EB OFF RAMPS. RECONSTRUCT
20030630 <OTHER>
ANAHEIM ORA000114 SCAB 91 5.26 5.26 STATE COLLEGE BLVD. AT SR-91 - INTERCHANGE IMPROVEMENTS. ADD THIRD THROUGH LANE AND SECOND LEFT TURN LANE ON STATE COLLEGE BLVD. ADD EXCLUSIVE RT TURN LANE ON EB/ WB SR91 OFF-RAMPS
20030630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 115
TIER 2ORANGE COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS ORA020116 SCAB 91 17.9 18.9 SR-91 LANE DROP RESTORATION-EXTEND EXIST. AUX LANE FROM W/B TO SR-91 TO S/B SR-241 FRM 400 MTRS W OF COAL CANYON RD UNDERCROSSING TO 1000 MTRS E OF COAL CNY RD UNDERCROSSING.
20040101 <OTHER>
ORANGE COUNTY
ORA55250 SCAB 133 3 3.3 LAGUNA CANYON ROAD (EL TORO ROAD TO SR-73) ADD 4- LANE ROADWAY
20040630 <OTHER>
CALTRANS 1072U SCAB 133 4.1 8.1 LAGUNA CANYON RD (SR-73 TO SR-405) IN IRVINE AND LAGUNA BEACH - REALIGN AND WIDEN ROADWAY - WIDEN 2 TO 4 LANES- REALIGN AND DRAINAGE (SEGMENTS 2 & 3)
20030630 <OTHER>
TCA ORA052 SCAB 241 0 15.9 (FTC-S) TOLL RD (I-5 TO OSO PKWY) (15MI) 2 MF EA. DIR BY 2006; AND 2 ADDITIONAL M/F EA. DIR. PLS CLMBNG & AUX LANES AS REQ BY 2015 PER SCAG/TCA MOU 4/05/01.
2006 (2+2) and 2015 (4+4)
TCM
TCA ORA051 SCAB 241 13.8 26.5 (FTC-N) TOLL RD ( OSO PKWY TO ETC) (13MI) EXISTING 2 MF IN EA. DIR; 3 MF EA. DIR BY 2010; 4 MF EA. DIR BY 2015, PLS CLMBNG & AUX LANS PER SCAG/TCA MOU 4/05/01.
2010 (3+3) and 2015 (4+4)
TCM
TCA ORA050 SCAB 241 38.8 12.4 ETC (RTE 241/261/133) TOLL RD (RTE 91TO I-5/JAMBOREE) EXISTING 2 M/F EA.DIR, 2 ADD'L M/F IN EA. DIR, PLUS CLIMB AND AUX LNS AS REQ, BY 2015 PER SCAG/TCA MOU 4/05/01.
2015 TCM
IRVINE ORA55258 SCAB 405 4.7 0 YALE AVENUE: CONSTRUCT NEW 2 LANE OVERCROSSING AT I-405
20061230 <OTHER>
CALTRANS ORA990603 SCAB 405 5.6 7.6 (MACARTHUR TO CULVER) IN IRVINE, ADD AUX. LN. FROM MACARTHUR ONRAMP THROUGH JAMBOREE BLVD. INTERCHANGE TO CULVER DR OFF RAMP; ADD ONE AUX LANE IN SB DIRECTION. (ITIP PROJECT)
20030331 <OTHER>
COSTA MESA ORA000111 SCAB 405 10.79 11.45 NEW OFF-RAMP ON I-405 AT SUSAN STREET@ S. COAST DRIVE (REPLACED W/ORA000186, ORA000110, ORA000182, ORA000191. (FROM 0 TO 1 LANE)
20040601 <OTHER>
COSTA MESA ORA020104 SCAB 405 11.45 11.45 COSTA MESA (HARBOR BLVD @ I405) PROVIDE 4TH N/B THRU LANE AND WIDEN N/B AND S/B OFF RAMPS FROM 3 TO 4 LANES.
20041120 <OTHER>
COSTA MESA ORA020103 SCAB 405 11.8 11.8 COSTA MESA (FAIRVIEW RD @ I-405 INTERCHANGE) ADD 3RD S/B LEFT-TURN LANE AND 3RD S/B I-405 ONRAMP LANE.
20050630 <OTHER>
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA020110 SCAB 405 15.21 16.54 I-405 NORTHBOUND AUXILIARY LANE (MAGNOLIA TO BEACH BLVD). ADD ONE AUX. LANE N/B & S/B -- FROM 5 TO 6 LANES IN EACH DIRECTION.
20060630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 116
TIER 2ORANGE COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LOS ALAMITOS
ORA55018 SCAB 605 1.4 1.4 KATALLA AVENUE IN LOS ALAMITOS NORTHBOUND I-605 FREEWAY RAMP/INTERSECTION RESTRIPING FROM 1 TO 3 LANES.
20021230 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 117
TIER 2ORANGE COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
BUENA PARK ORA990606 SCAB 0 0 0 VALLEYVIEW ST @ ORANGETHROPE AVE INTERSECTION IMPROVEMENT. IMPROVE PAVEMENT AND ADD RT LANE FROM VALLEYVIEW TO ORANGETHROPE FOR 0.1 MILE.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS ORA981101 SCAB 0 0 0 VARIOUS LOCATIONS (COUNTYWIDE) EMERGENCY REPAIRS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20041201 EXEMPT/TRAFFIC SIGNALIZATION
COSTA MESA ORA040603 SCAB 405 0 0 Fairview Rd/I-405: widen Fairview Rd bridge over I-405 & I-405 SB onramp to provide 3rd SB left turn lane to SB 1-405 (200' south of South Coast Dr - 200' south of I-405 SB onramp)
20060630 NON-FEDERAL/NON-REGIONAL
FULLERTON ORA02925 SCAB 0 0 0 BNSF RAILWAY LINE (RAYMOND TO PLACENTIA) ALONG SS OF ORANGETHORPE. GRADE SEPARATION/ CORRIDOR IMPROVEMENTS AT 3 ARTERIAL STREETS.
20090630 NON-FEDERAL/NON-REGIONAL
FULLERTON ORA040602 SCAB 0 0 0 State College Grade Separation: construct a grade separation on State College Blvd at the BNSF RR tracks (Commonwealth Ave to Kimberley Ave).
20050701 EXEMPT/TRAFFIC SIGNALIZATION
HUNTINGTON BEACH
ORA02105 SCAB 0 0 0 HUNTINGTON BEACH ITS INTEGRATION PROJECT - PHASE II
20041230 EXEMPT/TRAFFIC SIGNALIZATION
LAGUNA HILLS
ORA000121 SCAB 0 0 0 EL TORO@PASEO DE VALENCIA. ADD ONE RIGHT TURN AND ONE LEFT TURN LANE IN EACH DIRECTION.
20050630 EXEMPT/TRAFFIC SIGNALIZATION
LAGUNA HILLS
ORA000127 SCAB 0 0 0 PASEO DE VALENCIA (LAGUNA HILLS DR TO EL TORO RD) WIDEN FROM 4 TO 6 LANES.
20060601 <OTHER>
LAGUNA HILLS
ORA000131 SCAB 0 0 0 CONSRUCT NEW OVERPASS ON RIDGE ROUTE DR AT I-5 FROM WEST SIDE OF I-5 TO EAST SIDE OF I-5 ON RIDGE ROUTE (FROM 0 TO 4 LANES).
20070630 <OTHER>
LAGUNA NIGUEL
ORA000132 SCAB 0 0 0 GOLDEN LANTERN SMART STREET (ALOMA TO SARDINA);WIDEN FROM 4 TO 6 LANES.
20060630 <OTHER>
LAGUNA NIGUEL
ORA000138 SCAB 0 0 0 CROWN VALLEY PKWY@GREENFIELD INTERSECTION WIDENING. ADD SB RT LANE, WIDEN SOUTHBOUND FRM 5 TO 6 LNES, FRM GREENFIELD TO 200 FT. NORTH.
20060630 EXEMPT/TRAFFIC SIGNALIZATION
LAGUNA NIGUEL
ORA000139 SCAB 0 0 0 CROWN VALLEY PKWY@LA PAZ INTERSECTION WIDENING. ADD 2ND NB LT LANE AT CROWN VALLEY PKWY N/B FRM 4 TO 5 LNES. FRM LA PAZ TO 200 FT. NORTH.
20060630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 118
TIER 2ORANGE COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
LAGUNA NIGUEL
ORA000140 SCAB 0 0 0 INTERSECTION WIDENING. CROWN VALLEY PKWY- WEST OF CABOT TO I-5 SB RAMPS. ADD WB THROUGH LANE/ LT AND RT LANES ON CROWN VALLEY PKWY/CABOT AND CORWN VALLEY PKWY/FORBES.
20100630 <OTHER>
LAKE FOREST ORA040604 SCAB 0 0 0 El Toro Road: Improvements of El Toro Rd from 6 to 8/9 lanes and associated intersections (I-5 to Jutewood Pl/Cornelius Dr)
20050701
MISSION VIEJO
ORA020115 SCAB 0 0 0 CABOT ROAD BRIDGE TO CAMINO CAPISTRANO
20050630 EXEMPT/TRAFFIC SIGNALIZATION
NEWPORT BEACH
ORA000142 SCAB 0 0 0 JAMBOREE RD @ BISON ST. WIDEN INTERSECTION TO 4 THROUGH LANES IN EACH DIRECTION ON JAMBOREE RD AND ADD ADDITIONAL WB TURN LANE ON BISON
20060601 <OTHER>
NEWPORT BEACH
ORA000143 SCAB 0 0 0 EAST COAST HWY (SEAWARD RD TO EAST CITY LIMITS) ADD CURB AND GUTTER.
20040630 EXEMPT/TRAFFIC SIGNALIZATION
NEWPORT BEACH
ORA040605 SCAB 0 0 0 Newport Beach - Jamboree Rd widening (between Bayview Way & MacArthur Blvd)
20080630
NEWPORT BEACH
ORA990412 SCAB 0 0 0 JAMBOREE RD @ FORD RD. INTERSECTION IMPROVEMENTS INCLUDING ROADWAY WIDENING FRM 3 TO 4 LNS. TRAFFIC SIGNAL MODIFICATIONS, STREET LIGHTING MODIFICATIONS, LANDSCAPING.
20060630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY
ORA37164 SCAB 0 0 0 EL TORO RD @ ROCKFIELD BLVD INTERSECTION IMPROVEMENTS; ROCKFIELD TO MURILANDS 3 TO 4 LNS IN EA. DIR.; FROM MUIRLANDS TO I-5 (NORTHBND) 3 TO 5 LANES. THE OTHERSIDE IS 3 TO 4 LNS
20041201 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA65011 SCAB 0 0 0 PACIFIC ELECTRIC RIGHT OF WAY (LA PALMA TO SANTA ANA) LANDSCAPING AT STREET INTERSECTIONS AND BIKE TRAILS TEA PROJECT
20031230 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE, CITY OF
ORA990452 SCAB 0 0 0 TUSTIN BRANCH RAIL TRAIL (SANTA ANA RIVER TO FAIRHAVEN ST) CONVERT RAILS TO BIKE TRAIL THROUGH VILLA PARK AND ORANGE. CONNECTS 9 MILE TRAIL.
20030228 TCM
PLACENTIA ORA000147 SCAB 0 0 0 BNSF RWY LINE (PLACENTIA TO IMPERIAL HWY) ALONG SS OF ORANGETHROPE. LOWERING/GRADE SEPARATION - PRELIM ENG. WORK INCLUD. TECH STUDIES, PROJ. REPRT & EIR ACROSS NUMEROUS STS.
20090630 EXEMPT/TRAFFIC SIGNALIZATION
PLACENTIA ORA02926 SCAB 0 0 0 BNSF RAILWAY LINE (KRAEMER BLVD TO KELLOGG DR) ALONG SS OF ORANGETHORPE. INSTALL SUPPLEMENTAL SAFETY MEASURES AT 8 AT-GRADE CROSSINGS (4.4 MILES).
20050630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 119
TIER 2ORANGE COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SANTA ANA ORA000153 SCAB 0 0 0 SANTA ANA (CITYWIDE) TMC & CITYWIDE TRAFFIC CONTROL SYSTEM. UPGRADE TO NTCIP COMPATIBLE.
20081230 EXEMPT/TRAFFIC SIGNALIZATION
SANTA ANA ORA000154 SCAB 0 0 0 ITS INTEGRATION PROJECT - SANTA ANA; ORANGE; OCTA; AND CALTRANS TMC.
20081230 <OTHER>
SEAL BEACH ORA000156 SCAB 0 0 0 MARINA DRIVE (N. MARINA DR TO 1ST ST) BRIDGE REPLACEMENT OVER SAN GABRIEL RIVER.
20031201 EXEMPT/TRAFFIC SIGNALIZATION
TUSTIN ORA000177 SCAB 0 0 0 RED HILL@ EDINGER AVE/RR TRACKS. GRADE SEPARATION.
20070630 EXEMPT/TRAFFIC SIGNALIZATION
TUSTIN ORA000187 SCAB 0 0 0 IRVINE AVE @ NEWPORT AVE SIGNAL COORDINATION. INSTALL NEW CONTROLLERS AND CABINETS AT 6 INTERSECTIONS. ALSO REPLACE HARDWIRE AND CONDUIT.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
ORA55013 SCAB 0 0 0 COUNTYWIDE: ROADWAY REHABILITATION OF MAJOR AND PRIMARY ARTERIALS NON-CAPACITY ADDING IMPROVEMENTS
20070630 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
ORA990906 SCAB 0 0 0 LUMP SUM. TEA FUNDS FOR BICYCLE AND PEDESTRIAN FACILITY PROJECTS THROUGHOUT ORANGE COUNTY.
20091230 TCM
VARIOUS AGENCIES
ORA990907 SCAB 0 0 0 LUMP SUM. TEA FUNDS FOR LANDSCAPING AND OTHER SCENIC IMPROVEMENTS THROUGHOUT ORANGE COUNTY.
20091230 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
ORA990908 SCAB 0 0 0 LUMP SUM. TEA FUNDS FOR WATER RUNOFF CONTROL, MORTALITY REDUCTION HISTORIC PRESERVATION, & BIKE/PED EDUCATION PROGRAMS THROUGHOUT ORANGE COUNTY
20090630 EXEMPT/TRAFFIC SIGNALIZATION
WESTMINSTER
ORA151 SCAB 0 0 0 BOLSA CHICA RD (DUNCANNON TO ROUTE 405). WIDEN FROM 4 TO 6 LANES.
20100601 <OTHER>
YORBA LINDA ORA040606 SCAB 0 0 0 Yorba Linda - Weir Canyon Rd widening add 1 NB Lane (from SR91 to La Palma).
20050301
2004 RTP * TECHNICAL APPENDIX I - 120
TIER 2ORANGE COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
ANAHEIM ORA010202 SCAB 0 0 0 PURCHASE (10) 22 FOOT ELECTRIC BUSES FOR ANAHEIM RESORT AREA AND MISC. SUPPORT EQUIPMENT.
20030630 TCM
BREA ORA020502 SCAB 0 0 0 (2) Transit Vehicles, Misc. Bus and Equipment
20021101 EXEMPT/TRAFFIC SIGNALIZATION
FULLERTON ORA020113 SCAB 0 0 0 FULLERTON TRAIN STATION - PARKING STRUCTURE, PHASE I AND II. TOTAL OF 670 SPACES.
20040630 TCM
LA HABRA ORA990420 SCAB 0 0 0 Bus Stop Amenities. Install non-advertising custom bus shelters
20021230 EXEMPT/TRAFFIC SIGNALIZATION
LAGUNA BEACH
ORA198 SCAB 0 0 0 PURCHASE OF SHOP, GARAGE AND MISCELLANEOUS EQUIPMENT (6 BUSES, AND 3 ELECTRIC TROLLEY CARS)
20050101 EXEMPT/TRAFFIC SIGNALIZATION
LAGUNA BEACH
ORA199 SCAB 0 0 0 OPERATING ASSISTANCE 20050101 EXEMPT/TRAFFIC SIGNALIZATION
LAGUNA BEACH
ORA201 SCAB 0 0 0 REPLACEMENT BUSES -6 20041230 EXEMPT/TRAFFIC SIGNALIZATION
LAGUNA BEACH
ORA203 SCAB 0 0 0 BUS BENCHES AND SIGNS 20060101 EXEMPT/TRAFFIC SIGNALIZATION
LAGUNA BEACH
ORA55022 SCAB 0 0 0 REPLACEMENT CLEAN AIRAND FESTIVAL TROLLIES
20040101 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA020105 SCAB 0 0 0 HYBRID ELECTRIC URBAN 40 FT BUSES (10) EXPANSION
20040630 TCM
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA020106 SCAB 0 0 0 PREVENTATIVE MAINTENANCE 20070630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA020107 SCAB 0 0 0 60 FT ARTICULATED BUSES (20) 20040630 TCM
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA020114 SCAB 0 0 0 WEST ORANGE COUNTY TRANSIT GUIDEWAY - BUS RAPID TRANSIT
20070630 TCM
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA020118 SCAB 0 0 0 PURCHASE REPLACEMENT PARATRANSIT VANS (394) - (126) in FY02/03, (25) in FY03/04, (39) in FY04/05, (58) in FY05/06, (78) in FY06/07 and (68) in FY07/08.
20070630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA020120 SCAB 0 0 0 FIXED ROUTE OPERATING COSTS 20070630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA021202 SCAB 0 0 0 BUS OPERATING ASSISTANCE FTA9 - FOR PARATRANSIT - MISSION VIEJO - UZA
20080630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA021203 SCAB 0 0 0 PREVENTATIVE MAINTENANCE (MISSION VIEJO)
20080630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA021204 SCAB 0 0 0 '1%' TRANSIT ENHANCEMENTS BUS STOP ADA IMPROVEMENTS COUNTYWIDE (MISSION VIEJO)
20080630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 121
TIER 2ORANGE COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA174 SCAB 0 0 0 BUS OPERATING ASSISTANCE FTA9 -- FOR PARATRANSIT
20070630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA177 SCAB 0 0 0 REPLACE SUPPORT VEHICLES AND EQUIPMENT.
20070630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA194 SCAB 0 0 0 CENTRAL ORANGE COUNTY FIXED GUIDEWY (CENTERLINE) FOR CONSTRUCTION FROM JOHN WAYNE AIRPORT TO SANTA ANA TRANSPORTATION CENTER PLUS LINK TO SANTA ANA COLLEGE
20101231 TCM
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA194B SCAB 0 0 0 INTRACOUNTY RAIL SERVICE - METROLINK FULLERTON STATION TO LAGUNA NIGUEL STATION (28 MI.) ON 30-MIN. HEADWAYS 5AM TO MIDNIGHT (TCM1 REPLACEMENT FOR CENTERLINE)
20101231 TCM
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA194C SCAB 0 0 0 UPGRADED BUS SERVICES - JOHN WAYNE AIRPORT, UC IRVINE, IRVINE TRANSPORTATION CENTER - 402 NEW WEEKDAY BUS TRIPS (TCM1 REPLACEMENT FOR CENTERLINE)
20101231 TCM
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA37115 SCAB 0 0 0 OPERATING ASSISTANCE FOR COMMUTER RAIL
20080630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA37122 SCAB 0 0 0 VEHICLE MODIFICATIONS/MISC. BUS AND FACILITY EQUIPMENT
20070630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA55134 SCAB 0 0 0 FACILITY MODIFICATIONS FOR BUS TRANSIT
20070630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA65002 SCAB 0 0 0 RIDESHARE SERVICES RIDEGUIDE, DATABASE, CUSTOMER INFO, AND MARKETING. (ORANGE COUNTY PORTION).
20050630 TCM
ORANGE COUNTY TRANS AUTHORITY (OCTA)
ORA981102 SCAB 0 0 0 '1%' TRANSIT ENHANCEMENTS BUS STOP ADA IMPROVEMENTS COUNTYWIDE
20050630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANSIT DISTRICT (OCTD)
ORA020119 SCAB 0 0 0 PURCHASE PARATRANSIT VEHICLES EXPANSION (30) - (14) IN FY02/03; (4) IN FY 03/04; (5) IN FY 05/06 , (5) IN FY 06/07 AND (2) IN FY07/08.
20070630 TCM
ORANGE COUNTY TRANSIT DISTRICT (OCTD)
ORA020121 SCAB 0 0 0 PURCHASE STANDARD 40 FT REPLACEMENT LNG BUSES (23)
20070630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANSIT DISTRICT (OCTD)
ORA187 SCAB 0 0 0 DEBT SERVICE FOR 1990 AND 1993 COPS FUNDING OF CAPITAL PROJECTS
20080630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 122
TIER 2ORANGE COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
ORANGE COUNTY TRANSIT DISTRICT (OCTD)
ORA1870 SCAB 0 0 0 PURCHASE STANDARD 40FT REPLACEMENT BUSES - ALTERNATIVE FUEL (222) - (45) IN FY04/05, (60) IN FY05/06, (52) IN FY06/07 AND (65) IN FY07/08.
20070630 EXEMPT/TRAFFIC SIGNALIZATION
ORANGE COUNTY TRANSIT DISTRICT (OCTD)
ORA55241 SCAB 0 0 0 PURCHASE (17) STANDARD 40FT EXPANSION ALTERNATIVE FUEL BUSES - (3) IN FY05/06 AND (14) IN FY06/07.
20090630 TCM
VARIOUS AGENCIES
ORA020125 SCAB 0 0 0 (5) EXPANSION MINIVANS WITH RADIOS, (5) EXPANSION MODIFIED VANS WITH RADIOS, (1) RADIO BASE STATION, (1) SET OF SERVER AND SOFTWARE.
20030630 TCM
VARIOUS AGENCIES
ORA020126 SCAB 0 0 0 (2) REPLACEMENT LARGE BUSES (CITY OF LA HABRA - PROVIDE SERVICES TO SENIOR CITIZENS AND DISABLED PERSONS)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
ORA020127 SCAB 0 0 0 (1) REPLACEMENT MINIVAN AND (3) EXPANSION MINIVANS - VANTAGE FOUNDTATION - PROVIDE SERVICES TO SENIOR CITIZENS AND DISABLED PERSONS.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
ORA030301 SCAB 0 0 0 (1) EXPANSION MINIVAN - A.S. FOUNDATION - PROVIDE SERVICES TO SENIORS AND DISABLED PERSONS.
20041231 TCM
VARIOUS AGENCIES
ORA030302 SCAB 0 0 0 (9) EXPANSION MEDIUM BUSES (TYPE II) AND (11) MOBILE RADIOS - ORANGE COUNTY ARC - PROVIDE SERVICES TO SENIORS AND DISABLED PERSONS.
20041231 TCM
2004 RTP * TECHNICAL APPENDIX I - 123
TIER 2RIVERSIDE COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS RIV010210 SCAB 10 18 18.8 ON I-10 AT & E/O APACHE TRAIL - CONSTRUCT NEW MORONGO PKWY IC (4 LNS, RAMPS - 2 LNS), CONSTRUCT AUX LANE, WIDEN APACHE TRAIL 3 TO 5 LNS, WIDEN SEMINOLE DR 2 TO 5 LNS (EA: OA650G)
20100701 <OTHER>
PALM SPRINGS RIV62036 SSAB 10 32.7 33.6 ON I-10 AT INDIAN AVE NEAR PALM SPRINGS - WIDEN OC 2 TO 6 LNS FROM 20TH AVE NO. OF I-10 & GARNET AVE SO. OF I-10 & RAMPS 1 TO 2 LNS (TEA21-#377 ) (EA# 45570)
20051001 <OTHER>
RIVERSIDE COUNTY
45580 SSAB 10 35.6 36.6 ON GENE AUTRY TRAIL /PALM DRIVE FROM I-10 INTERCHANGE SOUTH TO SALVIA ROAD; WIDEN FROM 2 TO 6 LANES, I-10 IC IMPROVS. MODIFY RAMPS FROM 1 TO 2 LANES
20070101 <OTHER>
RIVERSIDE COUNTY
45590 SSAB 10 39 40 ON I-10 AT DATE PALM IC IN CATHEDRAL CITY - WIDEN OVERCROSSING FROM 2 TO 6 LNS AND RAMPS FROM 1 TO 2 LNS
20060301 NON-FEDERAL/NON-REGIONAL
CALTRANS 45600 SSAB 10 42.4 43.9 ON I-10 NEAR RANCHO MIRAGE FROM 1.5 KM EAST TO 0.9 KM WEST OF RAMON RD IC - CONSTRUCT BOB HOPE DR EXTENSION (6 LANES) WITH A NEW DIAMOND IC PLUS MODIFY RAMON RD IC AND RAMPS
20060301 EXEMPT/TRAFFIC SIGNALIZATION
INDIO 47520 SSAB 10 51.8 53.1 AT I-10 AND JEFFERSON ST IC, MODIFY/WIDEN EXISTING IC FROM 2 TO 6 LANES
20080401 EXEMPT/TRAFFIC SIGNALIZATION
INDIO RIV62032 SSAB 10 R53.4 R54.3 CONSTRUCT NEW IC AT MADISON 20040601 NON-FEDERAL/NON-REGIONAL
TEMECULA 991202 SCAB 15 5.5 8.8 AT I-15/CHERRY ST IN TEMECULA - CONSTRUCT NEW IC AND EXTEND CHERRY ST - PHASE I: EXTEND CHERRY ST (4 LNS - FROM JEFFERSON TO MADISON) AND CONSTRUCT SB OFF RAMP (3 LNS)
20070801 <OTHER>
MURRIETA RIV010204 SCAB 15 10.3 10.8 IN MURRIETA AT I-15/CALIFORNIA OAKS/KALMIA ST IC - RECONFIGURE RAMPS (CONSTRUCT NB/SB LOOP ON RAMPS, RELOCATE SB OFF RAMP ), WIDEN CAL OAKS 4 TO 6 LNS FROM UC TO CAL OAKS PLAZA
20060701 <OTHER>
RIVERSIDE COUNTY
RIV62034 SCAB 15 13.1 14.1 AT I-15 AND CLINTON KEITH ROAD WIDEN OVERCROSSING FROM 2 TO 4 LNS AND WIDEN RAMPS FROM 1 TO 2 LNS
20060331 NON-FEDERAL/NON-REGIONAL
LAKE ELSINORE
RIV010206 SCAB 15 16.5 20.7 AT RAILROAD CANYON ROAD/I-15 INTERCHANGE, RAMP RECONFIGURATION
20061231 NON-FEDERAL/NON-REGIONAL
CORONA RIV011239 SCAB 15 35.15 36.1 AT I-15/WEIRICK ROAD IC IN CORONA - WIDEN RAMPS 1 TO 2 LANES, WIDEN WEIRICK ROAD 2 TO 4 LANES FROM TEMESCAL CANYON RD TO I-15, AND INSTALL SIGNALS AT RAMPS/WEIRICK RD
20070630 <OTHER>
CORONA RIV010208 SCAB 15 36.8 37.4 I-15/CAJALCO ROAD, WIDEN CAJALCO RD I/C WIDEN 2 TO 4 LNS FROM TEMESCAL CYN RD TO BEDFORD CYN RD AND WIDEN RAMPS 1 TO 2 LANES.
20061231 NON-FEDERAL/NON-REGIONAL
CORONA RIV62101 SCAB 15 37.33 38.23 AT I-15/EL CERRITO RD IC IN CORONA - WIDEN ON/OFF RAMPS 1 TO 2 LANES, WIDEN 2 TO 4 LANES EL CERRITO RD BETWEEN RAMPS, INSTALL SIGNALS, REALIGN BEDFORD CYN RD AND ADD SOUNDWALLS
20060630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 124
TIER 2RIVERSIDE COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CORONA RIV010207 SCAB 15 38.6 39.3 ON I-15 AT ONTARIO AVE, WIDEN SB OFF & NB ON RAMPS 2 TO 3 LNS, & WIDEN ONTARIO 4 TO 6 LNS (COMPTON AVE TO STATE ST) & INSTALL SIGNALS
20061231 NON-FEDERAL/NON-REGIONAL
RIVERSIDE COUNTY
RIV011233 SCAB 15 47.75 48.75 IN RIV COUNTY AT I-15/LIMONITE AVE IC - WIDEN IC 4 TO 6 LNS, RAMPS 1 TO 2 LNS, & WIDEN LIMONITE AVE FROM HAMNER TO WINEVILLE 4 TO 6 LNS (APPROX 1 MI)
20080630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY
RIV990701 SCAB 60 6.5 7.6 SR60/VALLEY WAY IC - RELOCATE OFF-RAMP (1 TO 2LNS) & CONSTRUCT NEW EB ON-RAMP 2 LNS, SIGNALS & WIDEN VALLEY WAY/MISSION BL. INTERSECTION.
20050701 EXEMPT/TRAFFIC SIGNALIZATION
MORENO VALLEY
32300 SCAB 60 17.8 19.5 IN MORENO VALLEY AT NASON ST MODIFY INTERCHANGE AND ADD AUX LANES (TEA-21-#27)
20050930 <OTHER>
CALTRANS 34140 SSAB 60 28 30.2 ON ROUTE 60 FROM JACKRABBIT TRAIL TO BEAUMONT OVERHEAD CONSTRUCTION OF A NEW INTERCHANGE - POTRERO BOULEVARD
20061231 NON-FEDERAL/NON-REGIONAL
CALTRANS 46460 SCAB 79 6 15.8 IN WESTERN RIVERSIDE COUNTY ON STATE ROUTE 79 - WIDEN FROM 2 TO 6 LANES FROM HUNTER RD TO DOMENIGONI PKWY
20080601 <OTHER>
CALTRANS RIV030701 SCAB 91 0 2.1 ON WB SR91 FROM SR71 JCT TO OC LINE - RESTRIPE AND SIGN THE TRANSITION ZONE BETWEEN THE HOV AND TOLL LANE (RIV CO SEGMENT TO OC PROJECT ORA020116) (EA:0E3600)
20040301 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 45661 SCAB 91 0.9 2.2 NEAR CORONA ON RTE 91 FROM GREEN RIVER DR IC TO RTE 71/91 SEPARATION - RECONSTRUCT/REPLACE IC INCLUDING OC WIDENING 3 TO 6 LANES AND WB RAMPS WIDENING (TEA21-#24) (PPNO:0076B)
20051101 <OTHER>
RIVERSIDE CITY
RIV0084 SCAB 91 13.6 14.5 AT VAN BUREN ST IC RECONSTRUCT RAMPS (INCLDS HOV RAMPS), WIDEN OC ON VAN BUREN FROM 4 TO 6 LN & ADD AUX LANES; ADD NEW EB ONRAMP W/ENTRANCE @ INDIANA
20071201 TCM
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV010212 SCAB 91 17 20.45 ADD HOV LANES THROUGH DOWNTOWN RIVERSIDE - MARY STREET TO RTE 60/215 JCT IN RIVERSIDE
20020630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE CITY
RIV990702 SCAB 91 18.5 19.5 SR91 AT LA SIERRA AVE IC - RECONSTRUCT IC TO A SPREAD DIAMOND INCLUDING FWY OC & BNSF RR BRIDGE WIDENING (4 TO 6 LNS), RAMPS WIDENING, REALIGN DIANA AVE, & ROADWAY IMPROVEMENTS
20080630 <OTHER>
MURRIETA RIV010203 SCAB 215 19.73 20.56 AT I-215/CLINTON KEITH ROAD INTERCHANGE, WIDEN BRIDGE OVERCROSSING FROM 2 TO 6 LANES
20080630 <OTHER>
MURRIETA RIV030641 SCAB 215 19.73 20.56 AT I-215/CLINTON KEITH ROAD IC - RECONSTRUCT RAMPS INCLUDING WIDENING TO EXISTING NB/SB DIAMOND RAMPS AND CONSTRUCT NEW NB/SB LOOP ON RAMPS
20080630 <OTHER>
RIVERSIDE COUNTY
RIV011232 SCAB 215 24.1 25.7 AT I-215/SCOTT ROAD IC NEAR MURRIETA - WIDEN IC FROM 2 TO 6 LANES AND RAMPS FROM 1 TO 2 LANES
20060630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 125
TIER 2RIVERSIDE COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS RIV32531 SCAB 215 24.7 26.1 IN PERRIS AT EVANS ROAD/ELLIS AVENUE CONSTRUCT INTERCHANGE;WIDEN ELLIS AVE. TO 6 LANES.
20060601 <OTHER>
PERRIS RIV011229 SCAB 215 29.41 0 IN PERRIS ON I-215 AT THE PLACENTIA OVERCROSSING - CONSTRUCT NEW NB AND SB ON AND OFF RAMPS TO BECOME THE PLACENTIA INTERCHANGE
20081230 EXEMPT/TRAFFIC SIGNALIZATION
PERRIS RIV011227 SCAB 215 30.6 31.5 IN PERRIS ON I-215 AT THE RAMONA EXPRESSWAY INTERCHANGE - RECONSTRUCT RAMPS AND WIDEN RAMONA EXPRESSWAY FROM 4 TO 8 LANES
20060630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS RIVLS01 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN RIVERSIDE COUNTY, SAFETY PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS RIVLS02 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN RIVERSIDE COUNTY, ROADWAY PRESERVATION PROJECTS ( NON CAPACITY TYPE PROJECTS ONLY ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS_
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS RIVLS03 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN RIVERSIDE COUNTY, ROADSIDE PRESERVATION PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20060630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS RIVLS04 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN RIVERSIDE COUNTY, MOBILITY PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS RIVLS05 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN RIVERSIDE COUNTY FACILITIES PR0JECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20060630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS RIVLS06 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN RIVERSIDE COUNTY BRIDGE RESERVATIONS PROJECTS (NON CAPACITY TYPE PROJECTS AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS RIVLS08 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN RIVERSIDE COUNTY MINOR PROJECTS (NON CAPACITY TYPE PROJECTS AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 126
TIER 2RIVERSIDE COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CATHEDERAL CITY
RIV011212 SSAB 0 0 0 IN CATHEDRAL CITY ON RAMON RD - DATE PALM DR TO E. CITY LIMITS (1,500' E/O DA VALL) - WIDEN 4 TO 6 LNS & PAVEMENT REHAB, SIDEWALKS, SIGNAL INTERCONNECT, RETAINING WALLS, DRAIN IMP.
20060630 <OTHER>
CITIES & COUNTY
RIV32600 SSAB 0 0 0 FRED WARING DRIVE FROM FAIRHAVEN TO JEFFERSON - WIDEN FROM TWO TO SIX LANES
20061201 NON-FEDERAL/NON-REGIONAL
COACHELLA RIV011204 SSAB 0 0 0 IN COACHELLA ON DILLON RD - CONSTRUCT 4 LANE GRADE SEPARATION OVER UPRR TRACKS AND INDIO/GRAPEFRUIT BLVD (HWY 111) (PUC#: B613.0)
20070630 EXEMPT/TRAFFIC SIGNALIZATION
COACHELLA RIV011209 SSAB 0 0 0 IN COACHELLA - WIDEN DILLON ROAD FROM 2 TO 4 LANES FROM HWY 86 TO I-10, CONSTRUCT MEDIAN CURB, AND INSTALL/INTERCONNECT 2 SIGNALS (APPROX. .75 MILE)
20070630 <OTHER>
CORONA RIV010209 SCAB 0 0 0 FOOTHILL PARKWAY WESTERLY EXTENSION, CONSTRUCTION OF 4 LANE ROAD (GAP CLOSURE)
20081231 <OTHER>
CORONA RIV010228 SCAB 0 0 0 ENTRANCE STREET TO CORONA METROLINK STATION ON NORTH MAIN STREET
20061231 NON-FEDERAL/NON-REGIONAL
CORONA RIV011241 SCAB 0 0 0 IN CORONA ON AUTO CENTER DRIVE - CONSTRUCT 4 LANE OVERCROSSING (GRADE SEPARATION) OVER SANTA FE RAILROAD
20070630 EXEMPT/TRAFFIC SIGNALIZATION
MORENO VALLEY
RIV011205 SCAB 0 0 0 IN MORENO VALLEY/PERRIS - WIDEN PERRIS BLVD 2 TO 4 LANES & BRIDGE REPLACEMENT (PVSD-LAT B) FROM RAMONA EXPRESSWAY TO PERRIS VALLEY STORM DRAIN - LATERAL 'A' (APPROX. 2 MILES)
20060630 <OTHER>
MORENO VALLEY
RIV011210 SCAB 0 0 0 IN MORENO VALLEY/COUNTY - REALIGN RECHE VISTA DR (PERRIS BLVD TO 200' N/O CITY LIMITS - APPROX 2,000') & INSTALL SIGNALS (PERRIS/RECHE VISTA DR. & RECHE VISTA DR./RECHE VISTA CYN)
20060630 EXEMPT/TRAFFIC SIGNALIZATION
PALM DESERT RIV011201 SSAB 0 0 0 IN PALM DESERT/RANCHO MIRAGE - WIDEN MONTEREY AVE FROM 4 TO 6 LANES, INSTALL CURB/GUTTER & MEDIAN, AND UTLITY RELOCATION FROM DINAH SHORE DR TO GERALD FORD DR (APPROX. 1 MILE)
20060630 <OTHER>
PALM SPRINGS RIV62000 SSAB 0 0 0 ON GENE AUTRY TRAIL FROM VISTA CHINO TO TO SOUTH SIDE OF RAILROAD BRIDGE. (INCLUDING BRIDGE OVER WHITEWATER RIVER) WIDEN FROM 2 TO 6 LANES
20060601 <OTHER>
PALM SPRINGS RIV990727 SSAB 0 0 0 IN PALM SPRINGS WIDEN INDIAN CANYON DR 2 TO 6 LANES (INCLUDING UPRR BRIDGE (REPLACEMENT/WIDENING) FROM UPRR BRIDGE TO GARNET RD AT I-10 (BR#: 56C-0025) (TOT HBRR: $1,955)
20040630 NON-FEDERAL/NON-REGIONAL
RIVERSIDE COUNTY
RIV010211 SSAB 0 0 0 ON JEFFERSON AV BETWEEN HWY 111 AND INDIO, WIDEN JEFFERSON FROM 2 TO 6 LANES AND CONSTRUCT NEW BRIDGE ACROSS WHITEWATER RIVER (CURRENTLY AT GRADE LOW WATER CROSSING)
20060823 <OTHER>
RIVERSIDE COUNTY
RIV011206 SCAB 0 0 0 IN NORTH WESTERN RIVERSIDE COUNTY - WIDEN AND RECONSTRUCT LIMONITE AVE FROM 2 TO 4 LANES FROM HAMNER AVE TO ETIWANDA AVE (APPROX. 8,650 FEET)
20050630 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 127
TIER 2RIVERSIDE COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
RIVERSIDE COUNTY
RIV011236 SCAB 0 0 0 IN RIV COUNTY & MURRIETA - EXTEND/CONSTRUCT CLINTON KEITH ROAD (6 LANES TOTAL - APPROX 3.4 MILES) WITH 2 BRIDGES FROM I-215 TO WINCHESTER ROAD (SR79)
20080630 NON-FEDERAL/NON-REGIONAL
RIVERSIDE COUNTY
RIV62015 SCAB 0 0 0 RIVER ROAD BRIDGE OVER SANTA ANA RIVER REPLACE EXISTING 2 LANE BRIDGE WITH A 4 LANE BRIDGE
20051001 <OTHER>
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV62047 SCAB 0 0 0 RESERVE FOR SB45 PLANNING (UP TO 2%)
20070630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV990314 SCAB 0 0 0 INTEGRATED PLANNING STUDY - COUNTY GENERAL PLAN, CETAP, MSHCP
20021001 EXEMPT/TRAFFIC SIGNALIZATION
SAN JACINTO RIV011230 SCAB 0 0 0 IN SAN JACINTO WIDEN RAMONA EXPRESSWAY FROM 2 TO 4 LANES FROM MAIN ST TO THE WEST CITY LIMITS
20071230 NON-FEDERAL/NON-REGIONAL
TEMECULA 991203 SCAB 0 0 0 ON AVENIDA ALVARADO DESIGN & CONSTRUCT 4 LANE BRIDGE CROSSING OVER MURRIETA CREEK
20040630 NON-FEDERAL/NON-REGIONAL
TEMECULA 991204 SCAB 0 0 0 DESIGN & CONSTRUCT NEW 4 LANE BRIDGE CROSSING OVER MURRIETA CREEK BETWEEN WINCHESTER ROAD AND NORTHERN CITY LIMITS.
20040630 NON-FEDERAL/NON-REGIONAL
TEMECULA RIV991210 SCAB 0 0 0 ON PALA RD FROM SR79 TO PECHANGA RD, DESIGN AND CONSTRUCT FULL WIDTH (6 LANES) ST IMPS INCLUDING PAVEMENT, CURB, GUTTER, SIDEWALK, WIDEN FROM 2 TO 6 LANES
20030930 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 128
TIER 2RIVERSIDE COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CORONA RIV010510 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY IN THE CITY OF CORONA -- FY2002/03 - 05/06 OPERATING ASSISTANCE FIXED ROUTE
20060630 EXEMPT/TRAFFIC SIGNALIZATION
CORONA RIV010511 SCAB 0 0 0 CITY OF CORONA -- PURCHASE 3 EXPANSION VEHICLES -- RED LINE FIXED ROUTE
20030630 TCM
CORONA RIV011238 SCAB 0 0 0 ALONG SANTA ANA RIVER CONSTRUCT PEDESTRIAN/BICYCLE MULTIPURPOSE TRAIL MISSING GAPS FROM GREEN RIVER GOLF COURSE TO ALABAMA STREET IN SAN BERNARDINO (DESIGN AND ENGINEERING ONLY)
20060630 EXEMPT/TRAFFIC SIGNALIZATION
CORONA RIV020604 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY FOR THE CITY OF CORONA - PREVENTATIVE MAINTENANCE
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CORONA RIV030601 SCAB 0 0 0 IN THE CITY OF CORONA - PURCHASE 2 REPLACEMENT 16-18 PASSENGER DIAL-A-RIDE BUSES WITH LIFTS, TIEDOWNS, ACCESSORIES & COMMUNICATION EQUIPMENT (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
CORONA RIV030602 SCAB 0 0 0 IN THE CITY OF CORONA - PURCHASE/INSTALL MOBILE DATA TERMINAL (MDT) & AUTOMATIC VEHICLE LOCATOR (AVL) IN 14 TRANSIT VEHICLES & INTEGRATE W/ DISPATCHING SOFTWARE (FY 04 5307)
20050630 TCM
CORONA RIV030603 SCAB 0 0 0 IN THE CITY OF CORONA - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
CORONA RIV32145 SCAB 0 0 0 CITY OF CORONA PURCHASE 4 REPLACEMENT VANS/MINIBUS W/LIFTS & TIEDOWNS, RADIOS IN FY 02/03
20040630 EXEMPT/TRAFFIC SIGNALIZATION
INDIO R585TA SSAB 0 0 0 INDIO INTERMODAL TRANSPORTATION CENTER AT INTERSECTION OF INDIO & CIVIC CENTER DR. - ACQUIRE RIGHT OF WAY AND STATION CONSTRUCTION - ENGINEERING ONLY
20041201 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE CITY
RIV010905 SCAB 0 0 0 IN THE CITY OF RIVERSIDE FOR RIVERSIDE SPECIAL SERVICES - PURCHASE REPLACEMENT OFFICE EQUIPMENT, VEHICLE LOCATION EQUIPMENT AND SOFTWARE AT EXISTING FACILITY (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE CITY
RIV020605 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY FOR THE CITY OF RIVERSIDE SPECIAL SERVICES - PURCHASE 2 EXPANSION 25' TWELVE PASSENGER DIAL-A-RIDE VEHICLES
20040630 TCM
RIVERSIDE CITY
RIV030604 SCAB 0 0 0 CITY OF RIVERSIDE SPECIAL SERVICES - PURCHASE 1 REPLACEMENT ALT-FUEL MEDIUM DUTY 12-18 PASSENGER DIAL-A-RIDE VEHICLE WITH LIFT, TIEDOWNS, RADIO, AND FAREBOX (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE CITY
RIV030605 SCAB 0 0 0 CITY OF RIVERSIDE SPECIAL SERVICES - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE CITY
RIV030606 SCAB 0 0 0 CITY OF RIVERSIDE SPECIAL SERVICES - PURCHASE 1 EXPANSION 20 PASSENGER ALT-FUEL DIAL-A-RIDE VEHICLE WITH LIFT, TIEDOWNS, RADIO, AND FAREBOX (FY 04 5307)
20050630 TCM
2004 RTP * TECHNICAL APPENDIX I - 129
TIER 2RIVERSIDE COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
RIVERSIDE CITY
RIV32166 SCAB 0 0 0 CITY OF RIVERSIDE SPECIAL SERVICES - PURCHASE 8 REPLACEMENT 25 FOOT ALT FUEL VANS WITH LIFTS AND TIEDOWNS IN FY 02/03
20040630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY
RIV990712 SCAB 0 0 0 ZERO EMISSION MOBILE INDUSTRIAL EQUIPMENT (ZEMIE) BUY-DOWN PROGRAM
20021230 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV010514 SCAB 0 0 0 SCRRA CAPITAL -- REHABILITATION AND RENOVATION OF TRACK IMPROVEMENTS (RCTC FY 03 PORTION TO SCRRA PROJECT)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV010515 SCAB 0 0 0 RAIL PROGRAM OPERATING ASSISTANCE
20070630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV010516 SCAB 0 0 0 SCRRA INLAND EMPIRE MAINTENANCE FACILITY (RCTC'S PORTION)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV010908 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY FOR EXCEED, A DIVISION OF VALLEY RESOURCE CENTER - PURCHASE 6 EXPANSION MINIVANS AND 6 RADIOS - SECTION 5310 FY 2001/02 CYCLE
20030630 TCM
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV010909 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY FOR CORONA REGIONAL MEDICAL FOUNDATION - PURCHASE 2 REPLACEMENT MODIFIED VANS, 1 BASE STATION, AND 8 MOBILE RADIOS - SECTION 5310 FY 2001/02 CYCLE
20030630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV010910 SSAB 0 0 0 IN THE COACHELLA VALLEY AREA FOR THE FOUNDATION FOR THE RETARDED OF THE DESERT - PURCHASE 1 EXPANSION MINIVAN - SECTION 5310 FY 2001/02 CYCLE
20030630 TCM
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV010911 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY FOR TRANSPORTATION SPECIALISTS PURCHASE 1 REPLACEMENT BUS - SECTION 5310 FY 2001/2002 CYCLE
20030630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV010912 SSAB 0 0 0 IN THE COACHELLA VALLEY AREA FOR ANGEL VIEW CRIPPLED CHILDREN'S FOUNDATION, PURCHASE 1 EXPANSION MEDIUM BUS - SECTION 5310 FY 2001/2002 CYCLE
20030630 TCM
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV011211 SCAB 0 0 0 IN CORONA AT N. MAIN ST/E. GRAND BLVD - CONSTRUCT NEW 1,000 SPACE PARKING STRUCTURE AT NEW CORONA N. MAIN ST. METROLINK STATION (EA: CORSTN, PPNO: 0079D)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV020901 SSAB 0 0 0 IN THE COACHELLA VALLEY FOR THE FOUNDATION FOR THE RETARDED OF THE DESERT - PURCHASE 3 REPLACEMENT 16' MINIVANS - SECTION 5310 FY 02/03 CYCLE
20040630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV020902 SCAB 0 0 0 IN WEST RIV CO FOR EXCEED, A DIVISION OF VALLEY RESOURCE CENTER - PURCHASE 1 EXPANSION 20' MODIFIED VAN, 1 EXPANSION 22' MEDIUM BUS, AND 2 RADIOS - SECTION 5310 FY 02/03 CYCLE
20040630 TCM
2004 RTP * TECHNICAL APPENDIX I - 130
TIER 2RIVERSIDE COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV020903 SSAB 0 0 0 IN THE COACHELLA VALLEY AREA FOR ANGEL VIEW CRIPPLED CHILDREN'S FOUNDATION - PURCHASE 1 REPLACEMENT 22' MEDIUM BUS - SECTION 5310 FY 02/03 CYCLE
20040630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV020904 SSAB 0 0 0 IN COACHELLA VALLEY FOR COMMUNITY PARTNERSHIPS OF THE DESERT - PURCHASE 6 EXPANSION 22' MEDIUM BUSES AND COMMUNICATIONS/COMPUTER EQUIPMENT - SECTION 5310 FY 02/03 CYCLE
20040630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV020905 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY FOR CALIFORNIA DRUG CONSULTANTS, INC. - PURCHASE 2 REPLACEMENT 21' SMALL BUSES - SECTION 5310 FY 02/03 CYCLE
20040630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV030633 SCAB 0 0 0 SCRRA REHABILITATION AND RENOVATION OF TRACK IMPROVEMENTS (RCTC FY 04 PORTION TO SCRRA PROJECT LA9811025) (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV030634 SCAB 0 0 0 RCTC SHARE (to LA0C8369) TO CONSTRUCT SCRRA 23 ACRE EASTERN AREA MAINTENANCE FACILITY (EAMF) IN COLTON BETWEEN MILL ST & OAK ST ON BNSF LINE - PHASE 1: R/W ACQUISITION (FY 04 5307)
20050930 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV52008 SCAB 0 0 0 IN RIVERSIDE COUNTY CONSTRUCT PASSENGER OVERCROSSINGS AND SECURITY ENHANCEMENTS @ WEST CORONA, LA SIERRA, AND PEDLEY METROLINK/ PARK-N-RIDE STATIONS
20030630 TCM
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV520109 SCAB 0 0 0 RECONSTRUCT & UPGRADE SAN JACINTO BRANCH LINE FOR RAIL PASSENGER SERVICE
20080630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV520111 SCAB 0 0 0 REGIONAL RIDESHARE 20050630 TCM
RIVERSIDE COUNTY TRANS COMMISSION (RCTC)
RIV62044 SCAB 0 0 0 PEDLEY PLATFORM EXTENSION 20021231 TCM
RIVERSIDE TRANSIT AGENCY
RIV000605 SCAB 0 0 0 DEBT FINANCING FOR 57 TRANSIT COACHES, 25 REPLACEMENT, 32 EXPANSION (FY 02/03 PORTION) (FY 03 5307)
20040630 TCM
RIVERSIDE TRANSIT AGENCY
RIV010512 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY, PURCHASE 10 REPLACEMENT AND 2 EXPANSION 40' BUSES AND 20 BUS SHELTERS
20030630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV020601 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY PURCHASE TEN 30' EXPANSION ALT FUEL BUSES IN FY 02/03.
20040630 TCM
RIVERSIDE TRANSIT AGENCY
RIV020602 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY PURCHASE 5 REPLACEMENT SUPPORT VEHICLES IN FY 02/03 (FY 03 5307)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV020603 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY CAPITALIZED PREVENTATIVE MAINTENANCE (FY 03 5307)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 131
TIER 2RIVERSIDE COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
RIVERSIDE TRANSIT AGENCY
RIV030607 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY FOR FY 03/04 - OPERATING ASSISTANCE - FIXED ROUTE AND DIAL-A-RIDE (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV030608 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY - CAPITALIZED PREVENTATIVE MAINTENANCE (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV030609 SCAB 0 0 0 RTA FACILITY IMPROVEMENTS AT EXISTING FACILITIES INCLUDING PARKING LOT EXPANSION, DIESEL TANKS REMOVAL, WORK STATION UPGRADES & OTHER MISC. IMPROVEMENTS (FY 04 5307)
20051230 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV030610 SCAB 0 0 0 RTA BUS STOP AMENITIES - INSTALL APPROX. 45 NEW SHELTERS & REHAB APPROX 159 SHELTERS (PARTS, PAINT, SIGNS, POLES, BENCHES, TRASH RECEPTACLES & ANCILLARY HARDWARE) (FY 04 5307)
20050630 TCM
RIVERSIDE TRANSIT AGENCY
RIV030611 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY - PURCHASE REPLACEMENT OFFICE EQUIPMENT(E.G. COMPUTERS, PRINTERS, AND COPIERS, ETC.) (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV030612 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY - PURCHASE AERIAL MAPPING SOFTWARE IN SUPPORT OF SERVICE PLANNING UPDATE (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV030613 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY - INSTALL AUTOMATED TRAVELER INFORMATION SYSTEM (ATIS) AT APPROXIMATELY 48 BUS STOPS (INCLUDES UPGRADED SIGNAGE AND LIGHTING) (FY 04 5307)
20060630 TCM
RIVERSIDE TRANSIT AGENCY
RIV030614 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY - PURCHASE 5 EXPANSION 14 PASSENGER DIAL-A-RIDE VANS (FY 04 5307)
20060630 TCM
RIVERSIDE TRANSIT AGENCY
RIV030615 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY - PURCHASE 8 REPLACEMENT 14 PASSENGER DIAL-A-RIDE VANS (FY 04 5307)
20060630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV030616 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY - LEASE AND INSTALL AUTOMATIC PASSENGER COUNTING SYSTEM ON TEN 40 FOOT BUSES FOR BOARDING AND RIDERSHIP ANALYSIS (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV030617 SCAB 0 0 0 RTA PROJECT STUDIES ON (1) EMPLOYEE COMPENSATION & BENEFITS AND (2) FARE STUDY ANALYSIS (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV030618 SCAB 0 0 0 ADP SOFTWARE - PURCHASE ORACLE GRANT MANAGEMENT SOFTWARE MODULE, NETWORK MANAGEMENT SOFTWARE, TRAPEZE PASS SOFTWARE, PLUS ORACLE AND GFI SERVERS (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV030619 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY - PURCHASE MAINTENANCE SHOP EQUIPMENT INCLUDING A FOUR POST PORTABLE ELECTRIC LIFT AND A FALL PROTECTION I-BEAM SYSTEM (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV030620 SCAB 0 0 0 PURCHASE TRADE SHOW PRESENTATION EQUIPMENT AND SERVICES FOR PUBLIC OUTREACH EFFORTS (E.G. BOOTH ACCESSORIES, CONSULTING SERVICES, AND DISPLAY DESIGNS) (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 132
TIER 2RIVERSIDE COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
RIVERSIDE TRANSIT AGENCY
RIV030621 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY - PURCHASE 14 REPLACEMENT SUPPORT VEHICLES (CONSISTING OF 1 UTILITY TRUCK, 9 SUPPORT VEHICLES, AND 4 SUPERVISOR VANS) (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV030622 SCAB 0 0 0 PURCHASE/INSTALL UPGRADED SECURITY SURVEILLANCE EQUIPMENT (E.G. CAMERAS AND DIGITAL VIDEO RECORDERS) AT EXISTING RIVERSIDE AND HEMET FACILITIES (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV030623 SCAB 0 0 0 RTA TITLE VI COMPLIANCE ACTIVITIES (E.G. DATA COLLECTION, SERVICE PROFILE MAPS, OVERLAYS, CHARTS, & OTHER REQUIRED INFORMATION (FY 04 5307)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV030626 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY - DEBT FINANCING (FY 03/04 PORTION) FOR 57 TRANSIT COACHES, 25 REPLACEMENT, 32 EXPANSION (FY 04 5307)
20050630 TCM
RIVERSIDE TRANSIT AGENCY
RIV21303 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY FY 02/03 OPERATING ASSISTANCE, FIXED ROUTE & DIAL-A-RIDE
20040630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV32221 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY PURCHASE OFFICE EQUIPMENT
20040630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV32236 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY PURCHASE MAINT. SPARE COMPONENTS
20040630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV32237 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY PURCHASE BUS STOP AMENITIES AND OPERATIONS SUPPLIES
20040630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV32666 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY PURCHASE 10 EXPANSION 14 PASSENGER DAR VANS IN FY 02/03
20040630 TCM
RIVERSIDE TRANSIT AGENCY
RIV990722 SCAB 0 0 0 IN WESTERN RIVERSIDE COUNTY - RTA FACILITY IMPROVEMENTS DURING FY 02/03
20040630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV990724 SCAB 0 0 0 PURCHASE 10 EXPANSION SUPPORT VEHICLES IN FY 02/03
20040630 EXEMPT/TRAFFIC SIGNALIZATION
RIVERSIDE TRANSIT AGENCY
RIV990902 SCAB 0 0 0 PERRIS MULTIMODAL TRANSIT FACILITY @ 4TH AND D STREETS IN THE CITY OF PERRIS
20060630 EXEMPT/TRAFFIC SIGNALIZATION
SCAG RIV62103 SCAB 0 0 0 ITS TRANSIT PROJECT; INCLUDES AUTOMATED VEHICLE LOCATOR, GLOBAL POSTION SAT; MOBILE DATA TERMINALS;
20020901 EXEMPT/TRAFFIC SIGNALIZATION
SOUTHERN CALIF REGIONAL RAIL AUTHORITY
RIV010214 SCAB 0 0 0 PURCHASE/REHAB ROLLING STOCK - RIVERSIDE COUNTY SHARE (13 CARS IN FY02/03 AND 18 CARS IN FY 03/04)
20050630 TCM
SUNLINE TRANSIT AGENCY
62126 SSAB 0 0 0 IN COACHELLA VALLEY AREA - PURCHASE 12 REPLACEMENT CNG 40' (44 PASSENGER) BUSES FY 02/03 - 04/05: (3 IN 2/3, 4 IN 3/4, 5 IN 4/5)
20070630 EXEMPT/TRAFFIC SIGNALIZATION
SUNLINE TRANSIT AGENCY
990904 SSAB 0 0 0 CAPITAL FUNDS FOR PREVENTATIVE MAINTENANCE
20060603 EXEMPT/TRAFFIC SIGNALIZATION
SUNLINE TRANSIT AGENCY
RIV001102 SSAB 0 0 0 SUNLINK ITS TRAVELER INFORMATION SYSTEM - STATE PLANNING AND RESEARCH FUNDS
20040630 EXEMPT/TRAFFIC SIGNALIZATION
SUNLINE TRANSIT AGENCY
RIV001103 SSAB 0 0 0 PURCHASE 2 EXPANSION PARATRANSIT VEHICLES
20030630 <OTHER>
SUNLINE TRANSIT AGENCY
RIV010501 SSAB 0 0 0 IN COACHELLA VALLEY PURCHASE A MINIMUM OF 3 HYDROGEN FUEL CELL BUSES
20030630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 133
TIER 2RIVERSIDE COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SUNLINE TRANSIT AGENCY
RIV21241 SSAB 0 0 0 IN COACHELLA VALLEY AREA FIXED ROUTE AND DIAL-A-RIDE OPERATING ASSISTANCE FOR FISCAL YEARS 02/03 -04/05, INCLUDING CAP. FUNDS FOR VEH. MAINT.
20070630 EXEMPT/TRAFFIC SIGNALIZATION
SUNLINE TRANSIT AGENCY
RIV32254 SSAB 0 0 0 FACILITY IMPROVEMENTS RENOVATION OF STRUCTURES
20060630 EXEMPT/TRAFFIC SIGNALIZATION
SUNLINE TRANSIT AGENCY
RIV32255 SSAB 0 0 0 IN COACHELLA VALLEY AREA PURCHASE COMPUTER & OFFICE EQUIPMENT
20050630 EXEMPT/TRAFFIC SIGNALIZATION
SUNLINE TRANSIT AGENCY
RIV32257 SSAB 0 0 0 IN COACHELLA VALLEY AREA PURCHASE 9 REPLACEMENT NON-REVENUE VEHICLES FY 02/03-04/05 (3 IN 02/03, 3 IN 03/04, AND 3 IN 04/05)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
SUNLINE TRANSIT AGENCY
RIV32412 SSAB 0 0 0 IN COACHELLA VALLEY AREA LEASE/PURCHASE MOTOR COACHES FY 2002/03 - 05/06
20060630 EXEMPT/TRAFFIC SIGNALIZATION
SUNLINE TRANSIT AGENCY
RIV32420 SSAB 0 0 0 IN COACHELLA VALLEY AREA PURCHASE 12 REPLACEMENT ALT FUEL PARATRANSIT VEHICLES DURING FY 2003/04 - 04/05 (6 in 03/04 and 6 in 04/05)
20050630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 134
TIER 2SAN BERNARDINO COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SANBAG SBD59303 SCAB 0 0 0 ___SET ASIDES/RESERVATIONS FOR FUTURE SB45 -PLANNING,PROGRAMMING & MONITORING
20071201 EXEMPT/TRAFFIC SIGNALIZATION
ONTARIO 2002160 SCAB 10 5.2 0 I-10 AT 4TH STREET/I-10 GROVE INTERCHANGE IMPROVEMENTS - IMPROVE TURNING RADIUS AND ADD EASTBOUND AND WESTBOUND OFF RAMPS AT I-10 GROVE
20100601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031269 SCAB 10 10 13.5 IN FONTANA AT BEECH AVENUE CONSTRUCT OVERCROSSING__4 LANES
20060630 NON-FEDERAL/NON-REGIONAL
CALTRANS SBD031208 SCAB 10 12.5 13.8 IN FONTANA AT CHERRY AVENUE INTERCHANGE -RECONSTRUCTION INTERCHANGE AND WIDEN CHERRY FROM 2 TO 4 LANES FROM VALLEY TO SLOVER
20091101 <OTHER>
FONTANA SBD45000 SCAB 10 14.8 15.5 IN FONTANA -I-10 AT CITRUS AVE IC RECONSTRUCT IC WITH 6 THRU LANES; & REPLACE BRIDGE OVERCROSSING(O/C WIDEN FROM 2-6 LNS) AND WIDEN CITRUS FROM SLOVER TO VALLEY 4-6 LNS.
20070101 <OTHER>
FONTANA 34090 SCAB 10 16.9 17.9 IN FONTANA AT ALDER AVENUE CONSTRUCT INTERCHANGE
20080630 NON-FEDERAL/NON-REGIONAL
SAN BERNARDINO CO
SBD41339 SCAB 10 20.1 22 PEPPER AVE. AT I-10 MODIFICATION OF PEPPER AVE. INTERCHANGE WIDEN BRIDGE FROM 2-4 LANES AND ADD AUXILIARY LANES TO FREEWAY (POST MILES KILOMETERS -32.5-34.4) (T21-#499)
20041201 <OTHER>
COLTON 2002163 SCAB 10 23.5 0 AT I-10 AND SPERRY INTERCHANGE - CONSTRUCT AN ADDITIONAL LANE ON OFF RAMP
20071010 <OTHER>
SANBAG 44810 SCAB 10 25.3 27.3 I-10 TIPPECANOE INTERCHANGE INTERCHANGE RECONFIGURATION & ADD AUX LANES; IMPROVEMENTS AT I-10 BARTON & I-10/CAMPUS (T21-#1001 & 1366)
20090501 <OTHER>
CALTRANS 47440 SCAB 10 30.8 33.4 IN REDLANDS FROM ORANGE ST. TO FORD ST. - ADD ONE MIXED FLOW LANE IN EACH DIRECTION AND FULL WIDENING OF 11 BRIDGES ONE LANE IN EA DIRECTION
20061201 <OTHER>
RANCHO CUCAMONGA
200152 SCAB 15 3.05 6 ON I-15 FROM 200 FT. N. OF FOOTHILL BLVD. TO 2000 FT. SO. OF ARROW RTE.AND ON ARROW RT. FROM 1000 FT.W/TO 1000 FT. E/ OF I- 15-CONSTRUCT NEW I/C, AUX LANES, & OPERATN'L IMPROVMTS.
20071201 <OTHER>
RANCHO CUCAMONGA
200048 SCAB 15 6.4 7.2 I-15 AT BASELINE INTERCHANGE - ADD SB LOOP ON-RAMP IN NW QUADRANT, ADD NB LOOP ON-RAMP IN SE QUADRANT, WIDEN BASELINE RD TO 3 LANES EACH DIR BETWEEN THE NB AND SB RAMPS, CONSTRUCT AUXILIARY LANES (1 EACH DIR) BETWEEN BASELINE RD AND FOOTHILL BLVD RAMPS AND BETWEEN BASELINE RD AND I-210 CONNECTOR RAMPS
201102 NON-FEDERAL/NON-REGIONAL
HESPERIA SBD031279 MDAB 15 30.4 30.6 IN HESPERIA AT RANCHERO ROAD CONSTRUCT 6 LANE INTERCHANGE
20071201 NON-FEDERAL/NON-REGIONAL
HESPERIA SBD41288 MDAB 15 32.3 0 I-15 AND JOSHUA OFFRAMP - CONSTRUCT NORTHBOUND OFFRAMP AT JOSHUA - 2 LANE
20071201 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 135
TIER 2SAN BERNARDINO COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS 0172K MDAB 15 33.5 34.5 HESPERIA AT MAIN STREET RECONSTRUCT MAIN STREET INTERCHANGE TO PARTIAL CLOVERLEAF & WIDEN OVERCROSSING FROM 2 TO 6 LANES (T21-#883)
20050801 <OTHER>
VICTORVILLE SBD41446 MDAB 15 35.3 35.4 EUCALYPTUS AT I-15 CONSTRUCT INTERCHANGE 3 LANES IN EA DIR STANDARD I/C CONFIG.
20070601 NON-FEDERAL/NON-REGIONAL
VICTORVILLE 34170 MDAB 15 38.2 39.4 IN VICTORVILLE AT LA MESA ROAD/NISQUALLI ROAD CONSTRUCT I/C
20071001 <OTHER>
CALTRANS 35556 MDAB 15 41.9 45.4 IN VICTORVILLE FROM 0.3 KM N/O MOJAVE DR I/C TO STODDARD WELLS RD - ADD N/B MIXED FLOW LANE WITH AUX. LANE, RECONSTRUCT D ST. AND E ST. I/C AND STODDARD WELLS I/C (PHASE 2)
20081201 <OTHER>
HESPERIA SBD55026 MDAB 15 55 0 EUCALYPTUS STREET FROM I-15 TO PEACH AVENUE - RECONSTRUCT AND WIDEN FROM 2 TO 4 LANES AND CONSTRUCT RAILROAD CROSSING
20070630 NON-FEDERAL/NON-REGIONAL
VICTORVILLE SBD41445 MDAB 18 85 110 EAST/WEST HIGH DESERT CORRIDOR FROM 1.3 MI. S/O JOSHUA RD IN APPLE VALLEY TO US-395 IN ADELANTO, CONSTRUCT 4 LANE EXPRESSWAY AND NEW IC AT I/15 (PM 46.4)
2010 <OTHER>
VICTORVILLE 20020144 MDAB 18 85.05 110 EAST/WEST HIGH DESERT CORRIDOR -FROM 1.3 MILES SO OF JOSHUA RD. TO SR 395. CONSTRUCT 4 LN EXPRESWAY ON SR 18 & CONSTRUCT NEW I/C @I/15 & SR 18 (CONFIG.(NEW RD.)
20061201 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 011E0BB MDAB 40 28.3 0 NEAR BARSTOW AT DESERT OASIS SAFETY ROADSIDE REST AREA - ROADSIDE ECOLOGICAL VIEWING AREA PLAQUES
20021201 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 34770 MDAB 58 0 12.9 KERN CO LINE TO 7.5 MI EAST OF JCT RTE 395 -- CONSTRUCT 4 LANE EXPRESS WAY
20070401 <OTHER>
CALTRANS 4351 MDAB 58 21.8 31 NEAR HINKLEY FROM 1.4 MILES WEST OF VALLEY VIEW RD. TO 0.7 MILES EAST OF LENWOOD ROAD -- REALIGN AND WIDEN TO 4 LANE EXPRESSWAY (2-4 LANES) (PHASE 2)
20091201 <OTHER>
ONTARIO SBD59001 SCAB 60 5.1 0 AIRPORT GROUND ACCESS-SR 60 AR GROVE AVENUE WIDEN FREEWAY OFF RAMPS FROM 2 TO 3 LANES IN EACH DIRECTION (T21-#60)
20050630 <OTHER>
TWENTYNINE PALMS
SBD41426 MDAB 62 0 0 RTE. 62 AT UTAH TRAIL INSTALL TRAFFIC SIGNAL
20051201 EXEMPT/TRAFFIC SIGNALIZATION
RANCHO CUCAMONGA
20010133 SCAB 66 4.1 5.1 ON FOOTHILL BOULEVARD FROM GROVE TO VINEYARD- WIDEN FROM 4-6 LANES,MEDIAN ISLAND, TRAFFIC SIGNS,STORM DRAIN AND BIKE/PED BRIDGE(7,000 FT)
20040701 <OTHER>
RANCHO CUCAMONGA
20020138 SCAB 66 5.1 6.1 IN RANCHO CUCAMONGA ON FOOTHILL BLVD. FROM VINEYARD TO ARCHIBALD AVE. - WIDEN FROM 4 - 6 LANES
20070201 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
20020137 SCAB 66 6.1 7.3 IN RANCHO CUCAMONGA - ON FOOTHILL BOULEVARD-FROM ARCHIBALD TO HAVEN AVE. WIDEN PORTIONS OF AREA 4-6 LANES
20070101 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 136
TIER 2SAN BERNARDINO COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
RANCHO CUCAMONGA
SBD41205 SCAB 66 9.8 10.3 FOOTHILL BLVD. (66) I-15 TO ETIWANDA WIDEN NORTHSIDE FROM 2-3 LANES AND CONSTRUCT SIGNAL (Southside widening complete 2-3 lanes)
20070201 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
SBD41206 SCAB 66 10.3 10.8 FOOTHILL BLVD. (66) ETIWANDA TO EAST STREET WIDEN FROM 4-6 LANES ,INSTALL SIGNAL AND ADD MEDIAN ISLAND
20080701 NON-FEDERAL/NON-REGIONAL
UPLAND SBD41434 SCAB 83 11.5 0 EUCLID AVE. AT 8TH STREET INTERSECTION IMPROVEMENTS/MODIFI- CATIONS INCLUDING LEFT TURN POCKET AND PROTECTED LEFT PHASING
20041201 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 34011 SCAB 138 0 15.1 NEAR WRIGHTWOOD FROM LA COUNTY LINE TO I-15 IN SAN BERNARDINO COUNTY AND FROM SR18 TO LA/SBD COUNTY LINE - WIDEN FROM 2-4 LANES WITH CONTINUOUS LEFT TURN LANE
20081101 <OTHER>
GRAND TERRACE
SBD31850 SCAB 215 1.3 0 IN GRAND TERRACE AT BARTON ROAD INTERCHANGE WIDEN OVERCROSSING FROM 2 TO 4 LANE
20061201 <OTHER>
SAN BERNARDINO
SBD59204 SCAB 215 11.6 0 I-215 AT UNIVERSITY PARKWAY INTER- CHANGE - CONSTRUCT SOUTHBOUND UNIVERSITY PARKWAY RIGHT TURN LOOP
20061201 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS 34040 SCAB 395 4 48 WIDEN & CONSTRUCT IC'S: FROM I-15 TO SR-18 REALIGN & WIDEN TO 3 MF (FWY) EACH DIR (& IC AT I-15); FROM SR-18 TO PURPLE SAGE WIDEN TO 2 MF (FWY) EACH DIR; FROM PURPLE SAGE TO FARMINGTON WIDEN TO 2 MF (EXPWY) EACH DIR (& FWY IC AT FUTURE REALIGNED SR-58)
20111201 <OTHER>
CALTRANS SBDLS01 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN SAN BERNARDINO COUNTY, SAFETY PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20000604 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS SBDLS02 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN SAN BERNARDINO COUNTY , ROADWAY PRESERVATION PROJECTS (NON CAPACITY TYPE PROJECTS ONLY ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS SBDLS03 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN SAN BERNARDINO COUNTY, ROADSIDE PRESERVATION PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS SBDLS04 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN SAN BERNARDINO COUNTY MOBILITY PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL FUNDS OR STATE FUNDS)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS SBDLS05 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN SAN BERNARDINO COUNTY MINOR PROJECTS (NON CAPACITY TYPE PROJECTS ONLY AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS)
20040630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 137
TIER 2SAN BERNARDINO COUNTY
STATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY
PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS SBDLS06 VAR 999 0 0 LUMP SUM AT VARIOUS LOCATIONS IN SAN BERNARDINO COUNTY FACILITY PROJECTS (NON CAPACITY TYPE PROJECTS AND ELIGIBLE FOR ALL FEDERAL OR STATE FUNDS
20040630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 138
TIER 2SAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
ADELANTO 200009 MDAB 0 0 0 BELLFLOWER ST FROM AIR BASE RD TO (AUBURN)SR-395 - RESURFACE EXISTING ROADWAY (1.75 MILES, NO NEW LANES)
20061101 EXEMPT/TRAFFIC SIGNALIZATION
ADELANTO 200011 MDAB 0 0 0 ADELANTO RD FROM CRIPPEN TO COLUSA 0 PAVE EXISTING 2 LANE DIRT ROAD (3 MILES, NON-CAPACITY)
20060401 EXEMPT/TRAFFIC SIGNALIZATION
ADELANTO 200201 MDAB 0 0 0 IN ADELANTO, EL MIRAGE RD. FROM SR. 395 TO 1 MILE EAST TO ADELANTO RD. AND ON ADELANTO RD. FROM EL MIRAGE RD. TO 1 MILE SOUTH-AUBURN AVE. PAVE EXISTING 2 LANE RD.
20051201 EXEMPT/TRAFFIC SIGNALIZATION
ADELANTO SBD31727 MDAB 0 0 0 AIR BASE ROAD EAST CITY LIMITS TO STATE ROUTE 395 WIDEN FROM 2 TO 4 LANES
20020301 <OTHER>
APPLE VALLEY 200049 MDAB 0 0 0 MOJAVE RIVER BRIDGE CROSSING FROM TERMINUS OF YUCCA LOMA RD TO TERMINUS OF GREEN TREE BLVD - PRE. ENVIRONMENTAL REVIEW FOR CONSTRUCTION OF NEW 4 LANE BRIDGE
20051201 NON-FEDERAL/NON-REGIONAL
APPLE VALLEY SBD41213 MDAB 0 0 0 APPLE VALLEY ROAD EXTENSION FROM NORTHERN TERMINUS OF APPLE VALLEY RD. TO FALCHION RD. CONSTRUCT 4 LANE NEW ROAD
20060901 NON-FEDERAL/NON-REGIONAL
APPLE VALLEY SBD55000 MDAB 0 0 0 WAALEW ROAD FROM CORWIN ROAD TO JOSHUA RD. - REHABILITATION OF EXISTING 2 LANES OF PAVEMENT- TOTAL LENGTH OF REHAB 3.5 MILES
20061201 EXEMPT/TRAFFIC SIGNALIZATION
APPLE VALLEY SBD55002 MDAB 0 0 0 FLATHEAD ROAD FROM SHOSHONEE RD. TO SR 18 REHABILITATE EXISTING 2 LANES OF PAVEMENT (1 MILE IN LENGTH)
20081201 EXEMPT/TRAFFIC SIGNALIZATION
APPLE VALLEY SBD55003 MDAB 0 0 0 MONDAMON ROAD FROM APPLE VALLEY RD. TO SR 18 - REHAB. EXISTING 2 LANES OF PAVEMENT (1 MILE IN LENGTH)
20081201 EXEMPT/TRAFFIC SIGNALIZATION
APPLE VALLEY SBD55004 MDAB 0 0 0 NISQUALLI/SITTING BULL ROAD FROM RINCON ROAD TO CENTRAL RD. - REHAB. EXISTING 2 LANES OF PAVEMENT (3 MI)
20081201 EXEMPT/TRAFFIC SIGNALIZATION
APPLE VALLEY SBD55006 MDAB 0 0 0 TAO RD. FROM CORWIN RD. TO KAMANA RD. REHAB. OF EXISTING 2 LANES OF PAVEMENT (1 MILE)
20051201 EXEMPT/TRAFFIC SIGNALIZATION
APPLE VALLEY SBD55010 MDAB 0 0 0 APPLE VALLEY RD. FROM BEAR VALLEY RD. TO YUCCA LOMA RD. WIDEN EXISTING 2 LANE RD. TO 4 LANE RD. (2 LANES IN EACH DIRECTION) (1.5 MILES)
20031201 <OTHER>
APPLE VALLEY SBD55011 MDAB 0 0 0 YUCCA LOMA RD. FROM APPLE VALLEY RD. TO NAVAJO RD. WIDEN EXISTING 2 LANE RD. TO 4 LANE RD. (2 LANES IN EACH DIRECTION) (3 MILES)
20061201 <OTHER>
APPLE VALLEY SBD55012 MDAB 0 0 0 YUCCA LOMA RD. AT SR 18 CONNECTION NEW CONNECTION - CONNECTING YUCCA LOMA RD. AND SR 18 - NEW INTER- SECTION
20081201 EXEMPT/TRAFFIC SIGNALIZATION
APPLE VALLEY SBD55014 MDAB 0 0 0 TUSSING RANCH ROAD FROM KIOWA RD. TO CENTRAL RD. REHABILITATE EXISTING 2 LANE RD. (PAVEMENT REHAB) (2 MILES)
20081201 EXEMPT/TRAFFIC SIGNALIZATION
APPLE VALLEY SBD89102 MDAB 0 0 0 VARIOUS LOCATIONS - LUMP SUMS MAINTENANCE & REHABILITATION (NO ADDED CAPACITY)
20071201 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 139
TIER 2SAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
BARSTOW 200058 MDAB 0 0 0 IN BARSTOW AT WEST MAIN ST. AND SANDSTONE CT. - CONSTRUCT CNG/LNG FUELING STATION -
20030601 EXEMPT/TRAFFIC SIGNALIZATION
BARSTOW 980105 MDAB 0 0 0 1ST AV AT IRWIN RD - INTERSECTION REALIGNMENT AND RECONSTRUCTION
20020601 EXEMPT/TRAFFIC SIGNALIZATION
BARSTOW SBD31722 MDAB 0 0 0 WEST MAIN STREET OTIS AVENUE TO L STREET- RESURFACE 4 LANE ROAD
20060601 EXEMPT/TRAFFIC SIGNALIZATION
BARSTOW SBD41219 MDAB 0 0 0 WEST MAIN STREET AT COUNTRY CLUB DRIVE WIDEN ROADWAY AT INTERSECTION TO PROVIDE FOR LEFT TURN POCKET
20051201 EXEMPT/TRAFFIC SIGNALIZATION
CHINO 200202 SCAB 0 0 0 IN CHINO - ON CHINO AVENUE FROM MONTE VISTA TO SIXTH STREET-WIDEN EXISTING 2 LANES TO 4 LANES AND INSTALL SIGNAL AT INTERSECTION OF CHINO AVE. AND MONTE VISTA
20050601 EXEMPT/TRAFFIC SIGNALIZATION
CHINO 200204 SCAB 0 0 0 IN CHINO-ON KIMBALL AVE. FROM 600 FT. WEST OF MOUNTAIN AVE. TO EUCLID - WIDEN FROM 2 TO 4 LANES.
20020601 NON-FEDERAL/NON-REGIONAL
CHINO 200206 SCAB 0 0 0 IN CHINO - ON MOUNTAIN AVE. FROM KIMBALL AVE. TO BICKMORE AVE. -DESIGN AND CONSTRUCT NEW ROAD - ONE LANE IN EACH DIRECTION-DEVELOPER PROJECT
20020601 NON-FEDERAL/NON-REGIONAL
CHINO 200207 SCAB 0 0 0 IN CHINO - ON PINE AVE. FROM EL PRADO TO SR-71 - WIDEN BRIDGE FROM 2-4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
CHINO SBD031118 SCAB 0 0 0 EDISON AVENUE RAMONA TO CENTRAL WIDEN FROM 4 LANES TO 6 LANES & REHABILITATION (SPOT WIDENING)
20080601 NON-FEDERAL/NON-REGIONAL
CHINO SBD031152 SCAB 0 0 0 RIVERSIDE DRIVE AT SAN ANTONIO FLOOD CONTROL CHANNEL WIDEN BRIDGE FROM 4 LANES TO 6 LANES
20060601 NON-FEDERAL/NON-REGIONAL
CHINO SBD41228 SCAB 0 0 0 CHINO AVE BENSON AVE REALIGN & IMPROVE GEOMETRICS (NO ADDED CAPACITY)
20060601 EXEMPT/TRAFFIC SIGNALIZATION
CHINO SBD41233 SCAB 0 0 0 CENTRAL AVENUE AT RIVERSIDE DRIVE INTERSECTION IMPROVEMENT TO PROVIDE DUAL LEFT TURN LANES EAST/WEST
20060601 EXEMPT/TRAFFIC SIGNALIZATION
CHINO HILLS 200072 SCAB 0 0 0 GRAND AVENUE, PEYTON DRIVE, CHINO AVENUE AND CHINO HILLS PARKWAY - TRAFFIC SIGNAL SYNCHRONIZATION AND TRAFFIC OPERATION CENTER
20020329 EXEMPT/TRAFFIC SIGNALIZATION
CHINO HILLS SBD41238 SCAB 0 0 0 SOQUEL CANYON PARKWAY PEYTON DRIVE TO PIPELINE AVENUE CONSTRUCT NEW 6 LANE ROAD WITH MARKED BICYCLE LANES IN EACH DIRECT
20060101 NON-FEDERAL/NON-REGIONAL
CHINO HILLS SBD41240 SCAB 0 0 0 PIPELINE AVE AT LITTLE CHINO CREEK - WIDEN THE WESTSIDE OF BRIDGE ON PIPELINE AVE FROM 2-4 LANES (WILL INCLUDE BICYCLE LANES)
20050101 NON-FEDERAL/NON-REGIONAL
CHINO HILLS SBD41241 SCAB 0 0 0 PEYTON DRIVE/WOODVIEW ROAD TO SOQUEL CANYON PARKWAY CONSTRUCT NEW 4 LANE_ROAD INCLUDED ARE BICYCLE LANES MARKED IN EACH DIRECTION
20060101 NON-FEDERAL/NON-REGIONAL
COLTON 20020131 SCAB 0 0 0 ON VALLEY FROM PEPPER AVE. TO HERMOSA - INTERSECTION IMPROVEMTS, REALIGNMENT WIDENING FROM 2-4 LANES
20031201 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 140
TIER 2SAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
COLTON 2002164 SCAB 0 0 0 ON VALLEY BLVD. IN COLTON TO NORTH TO 10TH STREET CONNECTING TO ABANDONED RR CORRIDOR ON WEST SIDE OF COLTON AVE.-CONSTRUCT CLASS I BIKEWAY, LANDSCAPING AND LIGHTING
20030701 TCM
COLTON SBD031153 SCAB 0 0 0 RANCHO AVENUE NEAR M" STREET" REALIGN AND WIDEN THROUGH BOTTLENECK AREA
20061101 EXEMPT/TRAFFIC SIGNALIZATION
COLTON SBD031157 SCAB 0 0 0 MILL STREET BORDWELL TO RANCHO WIDEN ROADWAY AND BRIDGE FROM 2 LANES TO 4 LANES
20061201 NON-FEDERAL/NON-REGIONAL
COLTON SBD31788 SCAB 0 0 0 SHASTA AT IVY INSTALL TRAFFIC SIGNALS
20060601 EXEMPT/TRAFFIC SIGNALIZATION
COLTON SBD31797 SCAB 0 0 0 FOGG STREET SOUTH LA CADENA DRIVE TO CONGRESS RECONSTRUCT AND REALIGN & EXTEND, WIDEN FOR CENTER TURN LANE AND/OR PARKING (NO THROUGH LANE ADDITION)
20061201 EXEMPT/TRAFFIC SIGNALIZATION
COLTON SBD31798 SCAB 0 0 0 FOGG STREET 6TH STREET TO SOUTH LA CADENA DRIVE RECONSTRUCT GRADE SEPARATION, WIDEN FOR CENTER TURN LANE
20061101 EXEMPT/TRAFFIC SIGNALIZATION
COLTON SBD57019 SCAB 0 0 0 EUCALYPTUS AVENUE FROM SAN BERNARDINO AVENUE TO VALLEY BLVD. CONSTRUCT MISSING 4 LANE RD. (2,600 FT.)
20081201 NON-FEDERAL/NON-REGIONAL
COLTON SBD68222 SCAB 0 0 0 VARIOUS LOCATIONS - LUMP SUMS REHABILITATION & MAINTENANCE
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA 200006 SCAB 0 0 0 CITRUS AVENUE FROM JURUPA TO SLOVER - LEFT TURN LANES AT INTERSECTIONS (SLOVER, SANTA ANA AVE. & JURUPA-3 INTERSECTIONS)
20060630 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA 20020112 SCAB 0 0 0 IN FONTANA ON SIERRA AVE. FROM WALNUT TO S. HIGHLAND - WIDEN FROM 4-6 LANES. (PROJECT SPLIT FROM SBD031265).
20041201 <OTHER>
FONTANA SBD031165 SCAB 0 0 0 CHERRY AVENUE AT SANTA ANA AVENUE INSTALL TRAFFIC SIGNALS
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031176 SCAB 0 0 0 SAN BERNARDINO AVENUE AT JUNIPER INSTALL TRAFFIC SIGNALS
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031177 SCAB 0 0 0 RANDALL AVENUE AT JUNIPER INSTALL TRAFFIC SIGNALS
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031179 SCAB 0 0 0 RANDALL AVENUE AT PALMETTO AVENUE INSTALL TRAFFIC SIGNALS
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031180 SCAB 0 0 0 ARROW BOULEVARD AT OLEANDER AVENUE INSTALL TRAFFIC SIGNALS
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031181 SCAB 0 0 0 OLEANDER AVENUE AT BASELINE AVENUE TRAFFIC SIGNALS, WIDEN 5' TO PROVIDE FOR LEFT TURN LANES (1 IN EACH DIRECTION)
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031182 SCAB 0 0 0 VALLEY BOULEVARD ALDER AVENUE TO CITRUS AVENUE SIGNAL INTERCONNECT
20070601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031190 SCAB 0 0 0 CHERRY AVENUE BASELINE AVENUE TO HIGHLAND AVENUE WIDENING STREET FROM 2 LANES TO 6 LANES
20061201 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031199 SCAB 0 0 0 INLAND EMPIRE BOULEVARD AT SANTA ANA INTERSECTION IMPROVEMENTS
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031200 SCAB 0 0 0 TAMARIND AVENUE AT JURUPA AVENUE INTERSECTION IMPROVEMENTS
20060601 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 141
TIER 2SAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
FONTANA SBD031213 SCAB 0 0 0 CITRUS AVENUE AT SANTA FE RAILROAD CONSTRUCT UNDERCROSSING FOR EXISTING 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031215 SCAB 0 0 0 MILLER AVENUE BEECH TO CITRUS AVENUE WIDEN FROM 2 TO 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031217 SCAB 0 0 0 BEECH AVENUE STATE ROUTE 30 TO FOOTHILL BOULEVARD WIDEN FROM 2 LANES TO 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031218 SCAB 0 0 0 ALDER AVENUE STATE ROUTE 30 TO FOOTHILL BOULEVARD WIDEN 2 LANES TO 4 LANES W/TURN LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031220 SCAB 0 0 0 SANTA ANA AVENUE MULBERRY TO POPULAR AVENUE WIDEN FROM 2 TO 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031221 SCAB 0 0 0 PHILADELPHIA STREET MULBERRY TO ETIWANDA AVENUE CONSTRUCT 4 LANE ROAD (1.0 MILE)
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031225 SCAB 0 0 0 LOCUST AVENUE RIVERSIDE COUNTY LINE TO JURUPA AVENUE WIDEN FROM 2 LANES TO 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031227 SCAB 0 0 0 JURUPA AVENUE LIVE OAK TO SIERRA AVENUE CONSTRUCT 6 LANE ROAD
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031228 SCAB 0 0 0 ETIWANDA AVENUE RIVERSIDE COUNTY LINE TO INTERSTATE 10 WIDEN FROM 4 TO 6 LANES, LEFT TURN LANES & SIGNALS (2)
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031230 SCAB 0 0 0 CHERRY AVENUE JURUPA AVENUE TO SLOVER AVENUE WIDEN FROM 2 TO 4 LANES (1.0 MILE)
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031232 SCAB 0 0 0 BANANA AVENUE JURUPA AVENUE TO SLOVER AVENUE WIDEN 2 LANES TO 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031233 SCAB 0 0 0 ARROW BOULEVARD ALDER TO MAPLE AVENUE WIDEN 2 LANES TO 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031234 SCAB 0 0 0 ARROW BOULEVARD JUNIPER TO ALDER AVENUE WIDEN 2 LANES TO 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031235 SCAB 0 0 0 ARROW HIGHWAY CHERRY TO CITRUS AVENUE WIDEN 2 LANES TO 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031236 SCAB 0 0 0 ARROW BOULEVARD CITRUS TO JUNIPER AVENUE WIDEN 2 LANES TO 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031237 SCAB 0 0 0 ALDER AVENUE SAN BERNARDINO AVENUE TO FOOTHILL BOULEVARD STREET IMPROVEMENTS (4 LANES TO 4 LANES DIVIDED W/TURN LANES)
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031238 SCAB 0 0 0 ALDER AVENUE VALLEY TO SAN BERNARDINO AVENUE WIDEN 2 LANES TO 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031239 SCAB 0 0 0 BEECH AVENUE VALLEY TO ARROW BOULEVARD WIDEN FROM 2 LANES TO 4 LANES
20070601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031240 SCAB 0 0 0 BEECH AVENUE ARROW BOULEVARD TO FOOTHILL BLVD WIDEN FROM 2 TO 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031241 SCAB 0 0 0 BASELINE AVENUE FROM CITRUS TO MAPLE AVENUE ADD UP TO 5' SHOULDER & WIDEN FROM 2 TO 6 LANES (SCHEDULE DELAY ALSO)
20040601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031243 SCAB 0 0 0 CITRUS AVENUE FOOTHILL BOULEVARD TO BASELINE AVENUE ADD TURN LANES, WIDEN FROM 3 LANES TO 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 142
TIER 2SAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
FONTANA SBD031244 SCAB 0 0 0 CHERRY AVENUE MERRILL AVENUE TO FOOTHILL BOULEVARD CONSTRUCT RAILROAD GRADE SEPARATION & WIDEN 4-6 LANES
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031246 SCAB 0 0 0 FOOTHILL BOULEVARD CITRUS AVENUE TO MAPLE AVENUE WIDEN TO STATE STANDARDS FOR 6 LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031248 SCAB 0 0 0 FONTANA AVENUE VALLEY BOULEVARD TO MERRILL AVENUE___WIDEN SHOULDERS TO 5' IMPROVE TO 2 FULL LANES, LEFT TURN LANES AT INTERSECTIONS
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD031252 SCAB 0 0 0 MERRILL AVENUE CITRUS AVENUE TO ALDER AVENUE WIDEN FROM 2 LANES TO 4 LANES
20070601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031254 SCAB 0 0 0 MERRILL AVENUE ALDER TO MAPLE AVENUE WIDEN FROM 2 TO 4 LANES
20070601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031258 SCAB 0 0 0 RANDALL AVENUE CATAWABA AVENUE TO CITRUS AVENUE WIDEN FROM 2 TO 4 LANES
20070601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031259 SCAB 0 0 0 RANDALL AVENUE ALDER AVENUE TO MAPLE AVENUE WIDEN FROM 2 TO 4 LANES
20070601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031260 SCAB 0 0 0 SANTA ANA AVENUE SIERRA TO TAMARIND AVENUE WIDEN FROM 2 TO 4 LANES & INSTALL TRAFFIC SIGNALS (2)
20070601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031261 SCAB 0 0 0 SAN BERNARDINO POPLAR TO ALDER AVENUE SPOT WIDENING TO 4 LANES (TO ACCOMMODATE TRANSITIONS ON SIDE STREETS,
20070601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031264 SCAB 0 0 0 SAN BERNARDINO AVENUE ALDER TO LOCUST AVENUE WIDEN FROM 2 TO 4 LANES
20070601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031266 SCAB 0 0 0 SIERRA AVENUE FOOTHILL BOULEVARD TO BASELINE AVENUE- WIDEN FROM 4 TO 6 LANES
20080601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031271 SCAB 0 0 0 FOOTHILL BOULEVARD AT VILLAGE OF HERITAGE TO CHERRY WIDEN FROM 4 LANES TO 6 LANES
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD031272 SCAB 0 0 0 FOOTHILL BOULEVARD AT VILLAGE OF HERITAGE CONSTRUCT MEDIAN
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD41249 SCAB 0 0 0 BEECH AVE. INTERSECTION OF FOOTHILL BLVD. (66) INSTALL TRAFFIC AND ADD UP TO 5 FT. TO ALL SHOULDERS TO TO PROVIDE LEFT TURN LANES FOR ALL APPROACHES TO THE INTERSECTION
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD41251 SCAB 0 0 0 SLOVER AT BEECH INTERSECTION INSTALL TRAFFIC SIGNAL AND ADD UP TO 6 FT. TO ALL SHOULDERS FOR LEFT TURN LANES AT INTERSECTION
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD41252 SCAB 0 0 0 BASELINE AVE. AT PALMETTO INTERSECT INSTALL TRAFFIC SIGNAL AND ADD UP TO 8 FT. TO ALL SHOULDERS FOR LEFT TURN LANES AT INTERSECTION
20070601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD41262 SCAB 0 0 0 CHERRY AVE. AT BANANA INTERSECTION INSTALL TRAFFIC SIGNAL AND ADD UP TO 6 FT. TO ALL SHOULDERS FOR LEFT TURN LANES AT INTERSECTION
20070601 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 143
TIER 2SAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
FONTANA SBD41282 SCAB 0 0 0 CITRUS AVE. AT MILLER INTERSECTION INSTALL TRAFFIC SIGNAL_AND ADD UP TO 5 FT. TO THE SHOULDERS FOR ALL APPROACHES TO INTERSECTION
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD41283 SCAB 0 0 0 RANDALL AVE. AT OLEANDER INTERSECT. INSTALL TRAFFIC SIGNAL_AND ADD UP TO 5 FT. TO THE SHOULDERS FOR ALL APPROACHES TO INTERSECTION
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD41284 SCAB 0 0 0 MERRILL AVE AT MANGO INTERSECTION INSTALL TRAFFIC SIGNAL_AND ADD UP TO 5 FT. TO THE SHOULDERS FOR ALL APPROACHES TO INTERSECTION
20070601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD41285 SCAB 0 0 0 SAN BERNARDINO AVE. AT CYPRESS INTERSECTION INSTALL TRAFFIC SIGNAL_AND ADD UP TO 5 FT. TO THE SHOULDERS FOR ALL APPROACHES TO INTERSECTION
20060601 EXEMPT/TRAFFIC SIGNALIZATION
FONTANA SBD55022 SCAB 0 0 0 CYPRESS AVENUE FROM VALLEY BLVD. TO SLOVER AVENUE CONSTRUCT NEW FOUR LANE BRIDGE OVERCROSSING OVER I-10 WITH TRAFFIC SIGNALS & SAFETY LIGHTING
20060601 NON-FEDERAL/NON-REGIONAL
FONTANA SBD78024 SCAB 0 0 0 SANTA ANA AT LIVE OAK RAILROAD CROSSINGS AND SIGNALS
20070601 EXEMPT/TRAFFIC SIGNALIZATION
GRAND TERRACE
SBD55024 SCAB 0 0 0 MOUNT VERNON AVENUE FROM CANAL ST. TO WASHINGTON ST. ROADWAY RECONSTRUCTION FOR SEISMIC SAFETY
20061201 EXEMPT/TRAFFIC SIGNALIZATION
HESPERIA 200012 MDAB 0 0 0 MAPLE AVENUE FROM MARIPOSA TD. TO MAIN STREET - ROAD REHAB. - RESURFACING 2 EXISTING LANES (NO NEW LANES)
20081201 EXEMPT/TRAFFIC SIGNALIZATION
HESPERIA 200013 MDAB 0 0 0 MAPLE AVENUE FROM MAIN ST. TO 650' SOUTH OF CROMDALE STREET - REHABILITATION - RESURFACE 2 LANE RD. (NO NEW LANES)
20081201 EXEMPT/TRAFFIC SIGNALIZATION
HESPERIA 200209 MDAB 0 0 0 IN HESPERIA - PAVE ESCONDIDO ROAD FROM RANCHERO TO CEDAR (2.0 MILES). PAVE 4 LANES OF ROADWAY
20080630 NON-FEDERAL/NON-REGIONAL
HESPERIA 200210 MDAB 0 0 0 IN HESPERIA - ON BEAR VALLEY RD. FROM I-15 TO MOJAVE RIVER (CITY LIMITS) APPROX. 5.5 MILES - WIDEN SOUTHSIDE FROM 2-3 LANES
20050630 NON-FEDERAL/NON-REGIONAL
HESPERIA 200211 MDAB 0 0 0 IN HESPERIA ON I STREET FROM MAIN ST. TO BEAR VALLEY RD. APPROX. 4.4 MILES - WIDEN FROM 2-4 LANES
20080630 NON-FEDERAL/NON-REGIONAL
HESPERIA SBD031276 MDAB 0 0 0 RANCHERO ROAD 7TH AVENUE TO DANBURY REALIGN ROAD AND CONSTRUCT RAILROAD UNDERCROSSING
20060630 EXEMPT/TRAFFIC SIGNALIZATION
HESPERIA SBD031284 MDAB 0 0 0 'I" AVENUE FROM RANCHERO RD TO MAIN ST. WIDEN FROM 2 LANES TO 4 LANES
20070630 NON-FEDERAL/NON-REGIONAL
HESPERIA SBD41289 MDAB 0 0 0 RANCHO LAS FLORES PARKWAY -NO LANES CURRENTLY EXIST. DEVELOPER TO CONST RUCT HIGHWY 138 TO RANCHERO RD. 2 LANES IN EACH DIRECTION.
20071201 NON-FEDERAL/NON-REGIONAL
HESPERIA SBD55025 MDAB 0 0 0 MAIN STREET FROM ESCONDIDO TO 11TH AVE - WIDEN AND RECONSTRUCT FROM 4 - 6 LANES, INCLUDING WIDENING OF BRIDGE OVER CALIFORNIA AQUEDUCT (2.75 MILES)
20070630 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 144
TIER 2SAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
HESPERIA SBD55027 MDAB 0 0 0 SUMMIT VALLEY RD. FROM RANCHERO RD. TO SR138 - DESIGN, ACQUIRE ROW AND CONSTRUCT NEW 2 LANE RD. (6.00 MILES)
20081201 NON-FEDERAL/NON-REGIONAL
HESPERIA SBD55028 MDAB 0 0 0 RANCHERO RD. FROM DANBURY TO ARROWHEAD LAKE RD. - WIDEN FROM 2 TO 4 LANES (9.50 MILES)
20081201 NON-FEDERAL/NON-REGIONAL
HESPERIA SBD55029 MDAB 0 0 0 RANCHERO RD. FROM 7TH AVE. TO DANBURY RD WIDEN FROM 2 TO 4 LANES (3.00 MILES)
20071201 NON-FEDERAL/NON-REGIONAL
HESPERIA SBD55030 MDAB 0 0 0 RANCHERO RD. FROM I-15 TO 7TH ST. - WIDEN FROM 2 TO 4 LANES (5.50 MILES)
20071201 NON-FEDERAL/NON-REGIONAL
HIGHLAND 200018 SCAB 0 0 0 BOULDER AV ACROSS CITY CREEK S/O BASELINE - WIDEN EXISTING BRIDGE FROM 2 TO 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
HIGHLAND 200019 SCAB 0 0 0 BASELINE ACROSS CITY CREEK - RECONSTRUCT EXISTING BRIDGE TO INCREASE HYDRAULIC CAPACITY (NO CHANGE IN NUMBER OF LANES - STILL 4)
20080601 EXEMPT/TRAFFIC SIGNALIZATION
HIGHLAND 200212 SCAB 0 0 0 IN HIGHLAND- ON GREENSPOT RD. BRIDGE OVER SANTA ANA RIVER (.045)-CONSTRUCT A NEW 4 LANE BRIDGE AT SANTA ANA RIVER XING - REALIGN 2,400' OF GREENSPOT RD, CONSTRUCT CHANNEL IMPROVMTS
20050601 NON-FEDERAL/NON-REGIONAL
HIGHLAND 200213 SCAB 0 0 0 IN HIGHLAND - ON 3RD ST. FROM PALM AVE. TO 5TH ST. WIDEN 3RD ST. OF PALM AVE. FROM 2 TO 4 LANES AND EXTEND 3RD ST. EASTERLY TO CONNECT 5TH ST.
20080630 NON-FEDERAL/NON-REGIONAL
HIGHLAND SBD31886 SCAB 0 0 0 CUNNINGHAM STREET FROM NINTH STREET TO BASELINE - WIDEN FROM 2 TO 4 LANES
20051201 NON-FEDERAL/NON-REGIONAL
HIGHLAND SBD55031 SCAB 0 0 0 ALABAMA STREET FROM 3RD STREET TO SOUTH CITY LIMITS - WIDEN FROM 2 TO 4 LANES (0.25 MILES)
20070630 NON-FEDERAL/NON-REGIONAL
HIGHLAND SBD55032 SCAB 0 0 0 FIFTH STREET FROM BOULDER AVENUE TO SR30 - WIDEN FROM 2 TO 4 LANES (0.80 MILES)
20050630 NON-FEDERAL/NON-REGIONAL
HIGHLAND SBD55033 SCAB 0 0 0 BOULDER AVE. FROM 5TH ST. TO SOUTH CITY LIMITS - WIDEN FROM 2-4 LANES (0.60 MILES)
20080630 NON-FEDERAL/NON-REGIONAL
HIGHLAND SBD94142 SCAB 0 0 0 VARIOUS LOCATIONS MINOR IMPROVEMENTS
20080630 EXEMPT/TRAFFIC SIGNALIZATION
LOMA LINDA SBD031290 SCAB 0 0 0 MOUNTAIN VIEW AVENUE VAN LEUVAN TO PROSPECT WIDEN TWO EXISTING BRIDGES FROM 2 LANES TO 4 LANES
20060630 NON-FEDERAL/NON-REGIONAL
LOMA LINDA SBD031294 SCAB 0 0 0 REDLANDS BOULEVARD AT CALIFORNIA STREET WIDEN INTERSECTION AND INSTALL TRAFFIC SIGNALS AND DRAINAGE
20080530 EXEMPT/TRAFFIC SIGNALIZATION
LOMA LINDA SBD031295 SCAB 0 0 0 BARTON ROAD EAST CITY LIMITS TO WEST CITY LIMITS WIDEN FROM 4 LANES TO 6 LANES SPOT WIDENINGS
20081201 NON-FEDERAL/NON-REGIONAL
LOMA LINDA SBD031296 SCAB 0 0 0 REDLANDS BOULEVARD EAST CITY LIMITS TO WEST CITY LIMITS WIDEN FROM 4 LANES TO 6 LANES
20080601 NON-FEDERAL/NON-REGIONAL
LOMA LINDA SBD31875 SCAB 0 0 0 MOUNTAIN VIEW AVENUE PROSPECT AVENUE TO VAN LEUVAN AVENUE - ADD PEDESTRIAN WALKWAY TO OUTSIDE OF BRIDGE
20060330 EXEMPT/TRAFFIC SIGNALIZATION
LOMA LINDA SBD31876 SCAB 0 0 0 CALIFORNIA STREET BARTON ROAD TO REDLANDS BOULEVARD WIDEN FROM 2 TO 6 LANES
20080430 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 145
TIER 2SAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
MONTCLAIR SBD55034 SCAB 0 0 0 MISSION BLVD. FROM LA COUNTY LINE TO CENTRAL AVE (1.7 MILES) RECONSTRUCT RDWAY, LANDSCAPE MEDIAN ISLANDS, STORM DRAINS, UPGRADED SIGNALS (NO ADDTL LANES) (T21-#60)
20061201 <OTHER>
ONTARIO 2002161 SCAB 0 0 0 GROVE AVENUE WIDENING - FROM SOUTH OF 4TH ST. TO HOLT BLVD. - WIDEN FROM 4-6 LANES
20100601 NON-FEDERAL/NON-REGIONAL
ONTARIO 2002162 SCAB 0 0 0 PHILADELPHIA STREET WIDENING - FROM VINEYARD AVE. TO CUCAMONGA CREEK - WIDEN FROM 2-4 LANES, INCLUDING BRIDGE OVER CUCAMONGA CREEK
20061201 NON-FEDERAL/NON-REGIONAL
ONTARIO SBD031315 SCAB 0 0 0 MISSION BOULEVARD BENSON TO MILLIKEN WIDEN FORM 4 LANES TO 6 LANES (4.3 MILES-LENGTH)(SCOPE CHANGE) (T21-#60)
20061230 <OTHER>
ONTARIO SBD59002 SCAB 0 0 0 PHILADELPHIA ST. FROM CAMPUS TO 750' EAST OF GROVE AVENUE WIDEN FROM 2 TO 4 LANES (4,700 FT.)
20050630 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
200022 SCAB 0 0 0 6TH ST FROM HYSSOP DR TO 2500' EASTERLY - CONSTRUCT 2 LANES OF AN ULTIMATE 4 LANE ROAD
20061201 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
200023 SCAB 0 0 0 CHERRY AV FROM SOUTH CITY LIMITS TO WILSON AV - WIDEN FROM 2 TO 4 LANES
20050701 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
200029 SCAB 0 0 0 HERMOSA AV FROM FOOTHILL BL TO CHURCH ST - WIDEN FROM 2 TO 4 LANES
20061201 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
200032 SCAB 0 0 0 WILSON AV FROM AMETHYST ST TO HAVEN AV - WIDEN PORTIONS FROM 2 TO 4 LANES
20080201 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
200033 SCAB 0 0 0 WILSON AV FROM HAVEN AV TO CANISTEL AV - WIDEN FROM 2 TO 4 LANES
20060401 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
200034 SCAB 0 0 0 WILSON AV FROM ETIWANDA AV TO WARDMAN BULLOCK RD - CONSTRUCT NEW 4 LANE DIVIDED STREET
20080101 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
20020134 SCAB 0 0 0 IN RANCHO CUCAMONGA - ON ARROW RTE. FROM ETIWANDA AVENUE TO EAST STREET - WIDEN FROM 2-4 LANES (3,200 FEET)
20070501 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
20020135 SCAB 0 0 0 HERMOSA AVENUE FROM CHURCH TO BASELINE AVE. (3000 FT.) - WIDEN FROM 2-4 LANES, REHAB. AND STORM DRAIN
20021201 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
20020136 SCAB 0 0 0 ON HERMOSA FROM BASELINE TO ROUTE 30/210 (5400 FT) - WIDEN FROM 2-4 LANES AND CONSTRUCT STORM DRAINS
20061001 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
20020201 SCAB 0 0 0 PACIFIC ELECTRIC INLAND EMPIRE TRAIL - PHASE 1 - HAVEN AVENUE TO 1200' EAST OF ETIWANDA AVE(3.4 MILES) CONSTRUCT CLASS 1 BIKE TRAIL&ROW ACQ.ETIWANDA DEPOT
20041201
RANCHO CUCAMONGA
SBD031323 SCAB 0 0 0 ARCHIBALD AVENUE HILLSIDE ROAD TO SOUTH OF BANYON ROAD - WIDEN FROM 2 LANES TO 4 LANES
20080301 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
SBD031333 SCAB 0 0 0 CARNELIAN STREET HILLSIDE ROAD TO ALMOND STREET WIDEN FROM 2 LANES TO 4 LANES & REHABILITATION
20080701 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
SBD031335 SCAB 0 0 0 FOOTHILL BOULEVARD AT ARCHIBALD AVENUE INTERSECTION IMPROVEMENTS (ADD RIGHT TURN LANE)
20070201 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 146
TIER 2SAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
RANCHO CUCAMONGA
SBD031340 SCAB 0 0 0 FOOTHILL BOULEVARD ROCHESTER AVENUE TO INTERSTATE 15 WIDEN FROM 4 LANES TO 6 LANES, REHABILITATION AND SIGNALS
20040301 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
SBD031530 SCAB 0 0 0 CARNELIAN STREET FROM BASELINE ROAD TO 19TH STREET DRAINAGE IMPROVEMENTS & REHABILITATION
20061001 EXEMPT/TRAFFIC SIGNALIZATION
RANCHO CUCAMONGA
SBD20085 SCAB 0 0 0 ARCHIBALD AVENUE AT SAN BERNARDINO INSTALL TRAFFIC SIGNAL
20030701 EXEMPT/TRAFFIC SIGNALIZATION
RANCHO CUCAMONGA
SBD20086 SCAB 0 0 0 HELLMAN AVENUE AT SAN BERNARDINO ROAD INSTALL TRAFFIC SIGNAL
20040701 EXEMPT/TRAFFIC SIGNALIZATION
RANCHO CUCAMONGA
SBD20087 SCAB 0 0 0 SPRUCE AVENUE AT TERRA VISTA INSTALL TRAFFIC SIGNAL
20030701 EXEMPT/TRAFFIC SIGNALIZATION
RANCHO CUCAMONGA
SBD20088 SCAB 0 0 0 HELLMAN AVENUE AT CHURCH STREET INSTALL TRAFFIC SIGNAL
20041001 EXEMPT/TRAFFIC SIGNALIZATION
RANCHO CUCAMONGA
SBD41207 SCAB 0 0 0 GROVE AVE, 8TH TO SAN BERNARDINO RD WIDEN FROM 2-4 LANES, UPGRADE SIGNALS AND DRAINAGE.
20080501 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
SBD41208 SCAB 0 0 0 GROVE AVE, SAN BERNARDINO RD TO FOOTHILL BLVD. WIDEN FROM 2-4 LANES AND UPGRADE SIGNALS (700 FT.)
20080501 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
SBD59009 SCAB 0 0 0 HAVEN AVE FROM BASELINE RD TO SR30 (4800 FT.) - WIDEN WEST SIDE FROM 2-3 LANES, DRAINAGE AND UPGRADE SIGNALS. CURRENTLY 3 LANES N/B AND 2 LANES S/B.
20061001 NON-FEDERAL/NON-REGIONAL
RANCHO CUCAMONGA
SBD59010 SCAB 0 0 0 HAVEN AVE. FROM BASELINE RD. TO SR 30 (4,800 FT.) - EAST SIDE PAVEMENT REHABILITATION
20060701 EXEMPT/TRAFFIC SIGNALIZATION
REDLANDS 200035 SCAB 0 0 0 WABASH AV FROM 5TH ST TO I-10 - CONSTRUCT NEW 4 LANE STREET TO I-10 TO MATCH ON AND OFF RAMPS-CONSTRUCT MISSING LINK (1 LANE IN EACH DIRECTION)-1 MILE
20060601 NON-FEDERAL/NON-REGIONAL
REDLANDS 200036 SCAB 0 0 0 BROOKSIDE AV AT SAN MATEO ST - MODIFY EXISTING SIGNAL TO ADD ADDITIONAL PHASE
20030601 EXEMPT/TRAFFIC SIGNALIZATION
REDLANDS SBD31718 SCAB 0 0 0 ORANGE STREET AT SANTA ANA RIVER RECONSTRUCT ALL-WEATHER CROSSING OF RIVER, WIDEN FROM 2 TO 4 LANES
20031201 NON-FEDERAL/NON-REGIONAL
REDLANDS SBD31719 SCAB 0 0 0 ALABAMA STREET AT SANTA ANA RIVER RECONSTRUCT ALL-WEATHER CROSSING OF RIVER, WIDEN FROM 2 TO 4 LANES
20031201 NON-FEDERAL/NON-REGIONAL
REDLANDS SBD59013 SCAB 0 0 0 UNIVERSITY STREET AT I-10 ON AND OFF RAMPS TRAFFIC SIGNALS
20060601 EXEMPT/TRAFFIC SIGNALIZATION
REDLANDS SBD59014 SCAB 0 0 0 MOUNTAIN VIEW AVENUE FROM LUGONIA AVENUE TO SAN BERNARDINO WIDEN FROM 1 LANE TO 2 LANES FOR NORTHBOUND TRAFFIC (0.4 MILES)
20060601 NON-FEDERAL/NON-REGIONAL
REDLANDS SBD59015 SCAB 0 0 0 SAN BERNARDINO AVENUE FROM MOUNTAIN VIEW TO CALIFORNIA ST. WIDEN FROM 2 LANES TO 6 LANES (1 MILE)
20060601 NON-FEDERAL/NON-REGIONAL
REDLANDS SBD59016 SCAB 0 0 0 CALIFORNIA STREET FROM LUGONIA TO SAN BERNARDINO AVENUE. WIDEN FROM 2 LANES TO 6 LANES ( 3 IN EACH DIRECTION) WITH MEDIAN ISLAND (1/2 MILE)
20060601 NON-FEDERAL/NON-REGIONAL
RIALTO SBD031357 SCAB 0 0 0 RIALTO AVENUE LINDEN TO CACTUS WIDEN FROM 2 LANES TO 4 LANES
20070601 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 147
TIER 2SAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
RIALTO SBD031360 SCAB 0 0 0 RIVERSIDE AVENUE SANTA ANA TO AGUA MANSA CONTINUOUS LEFT TURN LANE;WIDEN WEST SIDE(FOR LEFT TURN LANE AND ADDING CURB AND GUTTER
20070601 EXEMPT/TRAFFIC SIGNALIZATION
RIALTO SBD031361 SCAB 0 0 0 AYALA DRIVE BASELINE ROAD TO HIGHLAND AVENUE WIDEN FROM 2 LANES TO 4 LANES
20080601 NON-FEDERAL/NON-REGIONAL
RIALTO SBD31800 SCAB 0 0 0 AYALA DRIVE AT BONNERT AVENUE INSTALL TRAFFIC SIGNALS & INTERSECTION IMPROVEMENTS
20040601 EXEMPT/TRAFFIC SIGNALIZATION
RIALTO SBD41310 SCAB 0 0 0 RIVERSIDE AVE. AT AYALA DRIVE INSTALL NEW TRAFFIC SIGNAL, HIGHWAY SAFETY LIGHTS AT THE INTERSECTION
20080601 EXEMPT/TRAFFIC SIGNALIZATION
RIALTO SBD41311 SCAB 0 0 0 VALLEY BLVD. AT CACTUS AVE. INSTALL NEW TRAFFIC SIGNAL, HIGHWAY SAFETY LIGHTS AT THE INTERSECTION
20080601 EXEMPT/TRAFFIC SIGNALIZATION
RIALTO SBD94155 SCAB 0 0 0 BLOOMINGTON AVENUE AT WILLOW AVENUE INSTALL TRAFFIC SIGNALS & INTERSECTION IMPROVEMENTS
20060601 EXEMPT/TRAFFIC SIGNALIZATION
RIALTO SBD94156 SCAB 0 0 0 CACTUS AVENUE BASELINE AVENUE TO MERRILL BLVD. WIDEN FROM 2 TO 4 LANES
20060601 NON-FEDERAL/NON-REGIONAL
RIALTO SBD97122 SCAB 0 0 0 RIVERSIDE AVENUE AT LOCUST AVENUE TRAFFIC SIGNALS, LIGHTS, AND STREET IMPROVEMENTS
20060601 EXEMPT/TRAFFIC SIGNALIZATION
RIALTO SBD97123 SCAB 0 0 0 RIVERSIDE AVENUE AT SIERRA AVENUE -ROADWAY REALIGNMENT (APPROX. 800')NO ADDITION LANES- TRAFFIC SIGNALS, LIGHTS, AND STREET IMPROVEMENTS
20060601 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
200051 SCAB 0 0 0 VISIONS 20/20 BRIDGE CROSSINGS ON 9TH, 2ND, 5TH, AND 'E' STREETS. VARIOUS LOCATIONS - BOX CULVERTS-TO ACCOMMODATE UNDERGROUND WATER SYSTEM. JOINT PROJECT W/IVDA & S.B.VALLEY WATER
20060601 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
2001012 SCAB 0 0 0 WASHINGTON STREET AND WATERMAN AVE TRAFFIC SIGNAL UPGRADE, CONSTRUCT LEFT TURN LANE
20020901 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
2001013 SCAB 0 0 0 KENDALL DRIVE/UNIVERSITY PARKWAY - TRAFFIC SIGNAL UPGRADE - SIGNALIZE INTERSECTION, DUAL LEFT TURN LANES
20020901 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
2001017 SCAB 0 0 0 CITY OF SAN BERNARDINO MAINTENANCE YARD-AT PERSHING ST. AND REDDICK. CONSTRUCT NEW CNG/LNG FUELING STATION
20031201 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
SBD31903 SCAB 0 0 0 FOOTHILL BOULEVARD (STATE ROUTE 66) AT FOURTH MODIFY SIGNALS, CHANNELIZE TRAFFIC
20051201 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
SBD59023 SCAB 0 0 0 PEPPER/LINDEN DRIVE EXTENSION FROM KENDALL TO I-215 FWY - CONSTRUCT (4) LANE ROADWAY - BETWEEN KENDALL DRIVE AND I-215, PARTIAL DIAMOND INTERCHANGE FOR N/B (2,000 FT)
20081201 NON-FEDERAL/NON-REGIONAL
SAN BERNARDINO
SBD59206 SCAB 0 0 0 4TH STREET FROM 5TH STREET TO MT. VERNON PAVEMENT REHAB.
20050701 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
SBD94118 SCAB 0 0 0 ARDEN AVENUE PACIFIC SOUTH TO SAND CREEK CONSTRUCT 2 LANE ROAD & BRIDGE OVER SAND CREEK
20061201 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 148
TIER 2SAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
SAN BERNARDINO CO
200052 MDAB 0 0 0 LARREA RD. FROM 300' SOUTH OF QUAIL BUSH RD. NORTH TO SH 247 - PAVE EXISTING DIRT ROAD - 1 LANE IN EACH DIRECTION
20031230 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
200053 MDAB 0 0 0 MESQUITE STREET FROM ESCONDIDO AVE. TO MAPLE AVE. - PAVE EXISTING DIRT RD. (1 LANE IN EACH DIRECTION)
20020430 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
2001018 SCAB 0 0 0 IN SAN BERNARDINO ON SAN BERNARDINO AVE, FROM FONTANA AVE. TO CEDAR AVE. MODIFY 7 INTERSECTIONS WITH NEW TRAFFIC SIGNALS/SYNCHRONIZATION SYSTEM
20050430 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
2001019 SCAB 0 0 0 TRANSFER POINT FACILITY IN THE CRESTLINE AREA AT FOREST SHADE AT LAKE DRIVE-TO FACILITATE 31 VEHICLES TO FACILITATE MARTA COMMUTERS
20040930 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
200154 SCAB 0 0 0 CEDAR AVENUE FROM SLOVER AVENUE NORTH TO BLOOMINGTON AVE. - DEVELOP PROJECT STUDY REPORT INCLUDING PSE AND DESIGN TO WIDEN CEDAR 5-7 LANES, INCLUDING ON/OFF RAMPS,E/B AUX. LANE
20040901 NON-FEDERAL/NON-REGIONAL
SAN BERNARDINO CO
68100 SCAB 0 0 0 PHELAN RD. FROM JOHNSON TO BALDY MESA - ROADWAY REHAB.
20020220 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
SBD031486 SCAB 0 0 0 CREST FOREST DRIVE AT STATE ROUTE 18 REALIGN ROAD
20050601 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO CO
SBD41408 SCAB 0 0 0 VARIOUS LOCATIONS - INDIVIDUAL TRAFFIC SIGNALS (NO SIGNAL INTER- CONNECT)-PHASED OUT OVER 6 YR. PERIOD
20061230 EXEMPT/TRAFFIC SIGNALIZATION
SANBAG 20010112 SCAB 0 0 0 LUMP SUM-IN VARIOUS LOCATIONS WITHIN SAN BERNARDINO COUNTY - 5 GRADE SEPARATION PROJECTS FROM TCRP FUNDING
20061201 EXEMPT/TRAFFIC SIGNALIZATION
SANBAG 2001014 SCAB 0 0 0 SAN BERNARDINO VALLEY COORDINATED TRAFFIC SIGNAL SYSTEM - TIER 2 - UPGRADE AND SYNCHRONIZE APPROX. 278 SIGNALS LOCATED ALONG 109 MILES OF ARTERIAL RDWY IN SAN BERNARDINO VALLEY
20050131 EXEMPT/TRAFFIC SIGNALIZATION
SANBAG 94163 SCAB 0 0 0 RIDESHARE ACTIVITIES FOR SOUTH COAST AIR BASIN
20070601 TCM
SANBAG 990401 MDAB 0 0 0 RIDESHARE ACTIVITIES FOR MOJAVE DESERT AIR BASIN
20070601 TCM
SANBAG SBD031505 SCAB 0 0 0 VARIOUS LOCATIONS - LUMP SUMS LTF, ARTICLE 3 BICYCLE/PEDESTRIAN PROJECTS
20041201 TCM
TWENTYNINE PALMS
SBD41427 MDAB 0 0 0 AMBOY ROAD - LEAR AVE TO ADOBE RD. (5.5 MILES) CONSTRUCT NEW 2 LANE ROAD (ONE LANE IN EACH DIRECTION)
20051201 NON-FEDERAL/NON-REGIONAL
TWENTYNINE PALMS
SBD41428 MDAB 0 0 0 TWO MILE ROAD - SUNRISE AVE. TO LEAR AVE. (2.5 MILES) WIDEN ROAD FROM 2-4 LANES
20041201 NON-FEDERAL/NON-REGIONAL
TWENTYNINE PALMS
SBD94173 MDAB 0 0 0 STATE ROUTE 62 LEE DRIVE TO LUPINE DRIVE WIDEN FROM 4 TO 5 LANES FOR CONTINUOUS LEFT TURN LANE
20041201 EXEMPT/TRAFFIC SIGNALIZATION
TWENTYNINE PALMS
SBD94174 MDAB 0 0 0 STATE ROUTE 62 MESQUITE SPRINGS RD/DESERT KNOLL WIDEN FROM 4 TO 5 LANES FOR CONINUOUS LEFT TURN LANE
20051201 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 149
TIER 2SAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
TWENTYNINE PALMS
SBD94175 MDAB 0 0 0 RTE 62 FROM DESERT KNOLL TO MOJAVE TO MOJAVE ROAD WIDEN TO CREATE LT. TURN POCKETS
20051201 EXEMPT/TRAFFIC SIGNALIZATION
TWENTYNINE PALMS
SBD94176 MDAB 0 0 0 STATE ROUTE 62 AT WILSHIRE AVENUE CONSTRUCT (RCB) BRIDGE AND BOX CULVERTS
20061201 EXEMPT/TRAFFIC SIGNALIZATION
TWENTYNINE PALMS
SBD94177 MDAB 0 0 0 STATE ROUTE 62 AT LARREA AVENUE & HATCH ROAD RECONFIGURE AND SIGNALIZATION (NO SYNCHRONIZATION)
20051201 EXEMPT/TRAFFIC SIGNALIZATION
UPLAND 2001015 SCAB 0 0 0 SP/PE RIGHT-OF-WAY BICYCLE AND PEDESTRIAN TRAIL - PHASE II (PART OF PACIFIC ELECTRIC TRAIL) CONSTRUCT 2.25 MILES OF BIKE/PED FROM EUCLID AVE TO ABANDONED ROW TO THE CLAREMONT AVE
20031201 EXEMPT/TRAFFIC SIGNALIZATION
UPLAND SBD41438 SCAB 0 0 0 CORNER: NWC OF A" ST. AND 3RD AVE." 52 STALL PARKING LOT FOR METROLINK
20081201 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
990801 SCAB 0 0 0 RIM OF THE WORLD RPD - RUNNING SPRINGS - VILLAGE TRAIL- IMPROVE RECREATIONAL TRAIL BETWEEN TWO MAJOR TRANSPORTATION FACILITIES.
20011230 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
990802 VAR 0 0 0 CHECKPOINT ENDURO MOTORCYCLE CLUB - 2W01 TRAIL MAINTENANCE
20021201 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
990803 VAR 0 0 0 SAN BERNARDINO NATIONAL FOREST ASSOCIATION - ADOPT-A-TRAIL MAINTENANCE PROJECT
20021201 EXEMPT/TRAFFIC SIGNALIZATION
VICTORVILLE 200050 MDAB 0 0 0 AMETHYST RD FROM SYCAMORE RD TO EUCALYPTUS RD - CONSTRUCT NEW 4 LANE ROAD
20051001 NON-FEDERAL/NON-REGIONAL
VICTORVILLE 200111 MDAB 0 0 0 VICTOR VALLEY COLLEGE TRANSFER POINT FACILITY - LOCATED 18422 BEAR VALLEY RD. IN VICTORVILLE
20030601 EXEMPT/TRAFFIC SIGNALIZATION
VICTORVILLE SBD031387 MDAB 0 0 0 APATITE ROAD AT BEAR VALLEY ROAD INSTALL TRAFFIC SIGNALS
20061201 EXEMPT/TRAFFIC SIGNALIZATION
VICTORVILLE SBD031394 MDAB 0 0 0 LA PAZ DRIVE MOJAVE DRIVE TO HOOK BOULEVARD WIDEN FROM 2 LANES TO 4 LANES
20070601 NON-FEDERAL/NON-REGIONAL
VICTORVILLE SBD031409 MDAB 0 0 0 VARIOUS LOCATIONS BOX CULVERTS & DRAINAGE IMPROVEMENTS
20031001 EXEMPT/TRAFFIC SIGNALIZATION
VICTORVILLE SBD031418 MDAB 0 0 0 AMETHYST ROAD PALMDALE ROAD TO HOPLAND STREET WIDEN EXISTING ROAD FROM 2 LANES TO 4 LANES, EXTEND ROAD WITH 4 LANES
20051001 NON-FEDERAL/NON-REGIONAL
VICTORVILLE SBD031419 MDAB 0 0 0 EL EVADO ROAD, PALMDALE RD TO AIR BASE ROAD PALMDALE TO HOPLAND (12/98) HOPLAND TO AIR BASE (12/96), WIDEN FROM 2 TO 4 WITH LEFT TURN LANES
20061001 NON-FEDERAL/NON-REGIONAL
VICTORVILLE SBD031422 MDAB 0 0 0 3RD AVENUE NISQUALLI ROAD TO GREEN TREE BOULEVARD WIDEN FROM 2 LANES TO 4 LANES
20051001 NON-FEDERAL/NON-REGIONAL
VICTORVILLE SBD41448 MDAB 0 0 0 VARIOUS LOCATION/ROADS REHABILITATION (OVERLAYS) - NO ADDITIONAL LANES-ON GOING PROJECT
20071201 EXEMPT/TRAFFIC SIGNALIZATION
VICTORVILLE SBD88113 MDAB 0 0 0 VARIOUS LOCATIONS REHABILITATION & MAINTENANCE - ON GOING PROJECT
20021001 EXEMPT/TRAFFIC SIGNALIZATION
VICTORVILLE SBD88124 MDAB 0 0 0 MARIPOSA ROAD BEAR VALLEY RD. TO PALMDALE RD. WIDEN FROM 2 TO 4 LANES
20041201 NON-FEDERAL/NON-REGIONAL
2004 RTP * TECHNICAL APPENDIX I - 150
TIER 2SAN BERNARDINO COUNTY
LOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
VICTORVILLE SBD97147 MDAB 0 0 0 GREEN TREE BLVD AT AT&SF RAILROAD CONSTRUCT 4-LANE BR & CONNECT TO HESPERIA & RIDGECREST RD
20081201 NON-FEDERAL/NON-REGIONAL
YUCAIPA 200042 SCAB 0 0 0 YUCAIPA BLVD. FROM 5TH TO 13TH STREET - WIDENING FROM 4-6 LANES
20050701 NON-FEDERAL/NON-REGIONAL
YUCAIPA 200043 SCAB 0 0 0 AVENUE E FROM 10TH TO 12TH STREET - WIDEN FROM 2-4 LANES, ALSO BOX CULVERT AT WILSON CREEK TO BE 4 LANES
20050901 NON-FEDERAL/NON-REGIONAL
YUCAIPA 200044 SCAB 0 0 0 5TH STREET FROM YUCAIPA BLVD TO OAK GLEN RD. - WIDEN FROM 2 TO 4 LANES
20020101 NON-FEDERAL/NON-REGIONAL
YUCAIPA 200045 SCAB 0 0 0 OAK GLEN RD. FROM BRYANT ST. TO 2ND STREET - WIDEN FROM 2-4 LANES, WIDEN CULVERT AT WILSON CREEK TO 4 LANES ALSO
20050701 NON-FEDERAL/NON-REGIONAL
YUCAIPA 200046 SCAB 0 0 0 OAK GLEN RD. FROM 2ND ST. TO YUCAIPA BLVD. - WIDEN FROM 2-4 LANES, TO ALSO INCLUDE BOX CULVERT AT WILSON CREEK
20020701 NON-FEDERAL/NON-REGIONAL
YUCAIPA 200047 SCAB 0 0 0 OAK GLEN RD. FROM YUCAIPA BLVD. TO AVENUE E - WIDEN FROM 2-4 LANES
20050701 NON-FEDERAL/NON-REGIONAL
YUCAIPA 20020301 SCAB 0 0 0 IN YUCAIPA - ON OAK GLEN ROAD INTERCONNECT BETWEEN CALIMESA AND COLORADO ST/WILSON CREEK CHANNEL
20031201 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 151
TIER 2SAN BERNARDINO COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
BARSTOW CITY/COUNTY TRANSIT
20010129 MDAB 0 0 0 PARATRANSIT VEHICLES 17 PASSENGER REPLACEMENT - ALT. FUEL - 1 IN FY 02
20061201 EXEMPT/TRAFFIC SIGNALIZATION
BARSTOW CITY/COUNTY TRANSIT
20010130 MDAB 0 0 0 BUS SYSTEM - 27 PASSENGER REPLACEMENT ALT. FUEL; 3 IN 02 AND 3 IN 03 FYS
20041201 EXEMPT/TRAFFIC SIGNALIZATION
BARSTOW CITY/COUNTY TRANSIT
20020101 MDAB 0 0 0 OFFICE EQUIPMENT - NEW COMPUTER SYSTEM FOR CLERICAL SUPPORT STAFF AND TRANSPORTATION COORDINATOR, DIGITAL CAMERA WITH PHOTO SOFTWARE
20041201 NON-FEDERAL/NON-REGIONAL
BARSTOW CITY/COUNTY TRANSIT
20020102 MDAB 0 0 0 OFFICE EQUIPMENT - OVERHEAD STORAGE EQUIPMENT, FILE CABINET AND OFFICE CHAIR
20041201 NON-FEDERAL/NON-REGIONAL
BARSTOW CITY/COUNTY TRANSIT
20020103 MDAB 0 0 0 OFFICE EQUIPMENT - ENCLOSED WALL-MOUNT SHELVING UNIT, FILE CABINET AND OFFICE CHAIR
20041201 NON-FEDERAL/NON-REGIONAL
BARSTOW CITY/COUNTY TRANSIT
20020140 MDAB 0 0 0 PARATRANSIT - VEHICLES 19 PASSENGER REPLACEMENT - ALT. FUEL; 05-01 - REPLACEMENT YEAR 2005-FY 2001 VEHICLE
20050601 EXEMPT/TRAFFIC SIGNALIZATION
BARSTOW CITY/COUNTY TRANSIT
20020141 MDAB 0 0 0 PARATRANSIT - VEHICLES 9 PASSENGER REPLACEMENT GAS/DIESEL - 04-2 - TRONA AREA TRANSIT;2000 CHAMPION;BIG RIVER TRANSIT
20040601 EXEMPT/TRAFFIC SIGNALIZATION
BARSTOW CITY/COUNTY TRANSIT
20020142 MDAB 0 0 0 PARATRANSIT - OPERATING EQUIPMENT - COMPUTER AIDED DISPATCHING SYSTEM
20040601 EXEMPT/TRAFFIC SIGNALIZATION
BARSTOW CITY/COUNTY TRANSIT
SBD31537 MDAB 0 0 0 OPERATING ASSISTANCE - GENERAL PUBLIC DIAL-A-RIDE AND FIXED ROUTE
20041001 EXEMPT/TRAFFIC SIGNALIZATION
BARSTOW CITY/COUNTY TRANSIT
SBD31559 MDAB 0 0 0 REPLACEMENT ALT FUEL PARATRANSIT , 1-22 PASSENGER ACCESS. ALT. FUEL PARATRANS VEH., 3-27 PASS. PARATRANS-02-1;03-2;06-1
20031201 EXEMPT/TRAFFIC SIGNALIZATION
BARSTOW CITY/COUNTY TRANSIT
SBD41044 MDAB 0 0 0 PARATRANSIT-VEHICLES REPLACEMENT PARATRANSIT VEHICLE GAS/DIESEL PURCHASE REPLACEMENT ACCESSIBLE MINI-VAN
20041201 EXEMPT/TRAFFIC SIGNALIZATION
MORONGO BASIN TRANSIT AUTHORITY
20020104 MDAB 0 0 0 SOLAR LIGHTED BUS STOPS (44) 20041201 NON-FEDERAL/NON-REGIONAL
MORONGO BASIN TRANSIT AUTHORITY
20020105 MDAB 0 0 0 YUCCA VALLEY TRANSFER SITE STUDY 20041201 EXEMPT/TRAFFIC SIGNALIZATION
MORONGO BASIN TRANSIT AUTHORITY
20020109 MDAB 0 0 0 SERVICE VEHICLE - HEAVY DUTY MAINTENANCE TRUCK - MAINTENANCE TRUCK FOR ROAD CALLS
20031201 NON-FEDERAL/NON-REGIONAL
MORONGO BASIN TRANSIT AUTHORITY
SBD31037 MDAB 0 0 0 BUS SYSTEM - OPERATING ASSISTANCE
20041201 EXEMPT/TRAFFIC SIGNALIZATION
MORONGO BASIN TRANSIT AUTHORITY
SBD31046 MDAB 0 0 0 PARATRANSIT VEHICLES - REPLACEMENT, ALT. FUEL 02-4, 03-4, 04-2
20041201 EXEMPT/TRAFFIC SIGNALIZATION
MORONGO BASIN TRANSIT AUTHORITY
SBD59251 MDAB 0 0 0 TRANSIT- ADMINISTRATION EQUIPMENT COMPUTER HARDWARE, SOFTWARE, AND OFFICE FURNITURE
20020930 EXEMPT/TRAFFIC SIGNALIZATION
MOUNTAIN REGIONAL TRANSIT AUTHORITY
20010120 SCAB 0 0 0 TRANSIT SERVICE EQUIPMENT - PURCHASE OF VARIOUS MAINTENANCE EQUIPMENT (ON-GOING PROJECT)
20061201 EXEMPT/TRAFFIC SIGNALIZATION
MOUNTAIN REGIONAL TRANSIT AUTHORITY
20010283 SCAB 0 0 0 BUS SYSTEM - EXPANSION ALT. FUEL NEW TROLLEY VEHICLE SERVICE TO OPERATE BIG BEAR VISITORS TROLLEY
20031201 TCM
2004 RTP * TECHNICAL APPENDIX I - 152
TIER 2SAN BERNARDINO COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
MOUNTAIN REGIONAL TRANSIT AUTHORITY
20020143 SCAB 0 0 0 MAINTENANCE FACILITIES - PAVE CRESTLINE FACILITY PARKING LOT - REHABILITATION
20030601 <OTHER>
MOUNTAIN REGIONAL TRANSIT AUTHORITY
SBD41055 SCAB 0 0 0 BUS SYSTEM - OPERATING ASSISTANCE
20061201 EXEMPT/TRAFFIC SIGNALIZATION
MOUNTAIN REGIONAL TRANSIT AUTHORITY
SBD41064 SCAB 0 0 0 BUS SYSTEM - PASSENGER FACILITY 20050601 EXEMPT/TRAFFIC SIGNALIZATION
MOUNTAIN REGIONAL TRANSIT AUTHORITY
SBD44006 SCAB 0 0 0 TRANSIT ADMINISTRATION EQUIPMENT OFFICE EQUIPMENT
20061201 EXEMPT/TRAFFIC SIGNALIZATION
NEEDLES 20020108 MDAB 0 0 0 PURCHASE AND INSTALLATION OF BUS STOP BENCHES AND SHELTERS
20041201 NON-FEDERAL/NON-REGIONAL
NEEDLES R589TA MDAB 0 0 0 INTERSTATE - LOS ANGELES/CHICAGO AT EL GARCES STATION MULTIMODAL - STATION - FACILITY
20051001 <OTHER>
NEEDLES SBD31612 MDAB 0 0 0 BUS SYSTEM - OPERATING ASSISTANCE
20061001 EXEMPT/TRAFFIC SIGNALIZATION
NEEDLES SBD44003 MDAB 0 0 0 PARATRANSIT VEHICLE REPLACEMENT 03-1, 06-1
20060601 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS 200088 SCAB 0 0 0 TRANSIT SERVICE EQUIPMENT -- PURCHASE MAINTENANCE EQUIPMENT FOR EAST AND WEST VALLEY FACILITIES.
20041001 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS 200089 SCAB 0 0 0 BUS REHABILITATION AND REPAIR 20051001 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS 200101 SCAB 0 0 0 BUS SYSTEM -- PASSENGER FACILITIES: DEVELOPMENT OF SAN BERNARDINO TERMINAL
20031201 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS 20020110 SCAB 0 0 0 PARATRANSIT VEHICLES - PURCHASE PARATRANSIT MINIBUSES FOR EXPANSION FY03-1;FY04-01 VEHICLES WILL BE LIFT EQUIPPED AND RUN ON CONVENTIONAL FUEL
20051201 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS 2002171 SCAB 0 0 0 (1) EXPANSION PARATRANSIT VAN 20031231 TCMOMNITRANS 2002172 SCAB 0 0 0 MID VALLEY FACILITY - NEW
MAINTENANCE & ADMINISTRATION FACILITY LOCATED IN RANCHO CUCAMONGA (ETIWANDA & ARROW)
20031231 <OTHER>
OMNITRANS 981111 SCAB 0 0 0 TRANSIT - ENHANCEMENTS: 1% TRANSIT ENHANCEMENTS TO INCREASE ACCESSIBILITY TO BUS STOPS
20060930 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS 981112 SCAB 0 0 0 TRANSIT - OPERATING EQUIPMENT: PURCHASE EQUIPMENT FOR FIXED-ROUTE
20040930 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS 981114 SCAB 0 0 0 TRANSIT - SECURITY CAPITALIZATION OF SECURITY COSTS
20031201 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS 981118 SCAB 0 0 0 BUS SYSTEM - PASSENGER FACILITIES: DESIGN AND BUILDING OF ONTARIO TRANSCENTER
20051201 TCM
OMNITRANS 981119 SCAB 0 0 0 TRANSIT INTERMODAL FACILITIES - FONTANA TRANSCENTER - EXPAND BUS BAYS, IMPROVE LANDSCAPING, SIGNALS AND PEDESTRIAN AND PASSENGER FACILITIES
20020930 TCM
OMNITRANS 981122 SCAB 0 0 0 CAPITALIZATION OF PREVENTIVE MAINT
20041201 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 153
TIER 2SAN BERNARDINO COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
OMNITRANS SBD20030 SCAB 0 0 0 BUS SYSTEM OPERATING ASSISTANCE
(Note: 'Other' funds are for Job Access Reverse Commute funds.
20041201 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS SBD31055 SCAB 0 0 0 TRANSIT ADMINISTRATION EQUIPMENT PURCHASE COMPUTER HARDWARE & SOFTWARE FOR MIS
20061201 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS SBD31073 SCAB 0 0 0 FACILITIES IMPROVEMENTS - EQUIPMENT AND FURNISHINGS - EAST/WEST VALLEY FACILITY PURCHASE OFFICE EQUIPMENT
20071201 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS SBD31075 SCAB 0 0 0 BUS SYSTEM - PASSENGER FACILITIES SERVICE/SUPPORT - EQUIPMENT PURCHASE EQUIPMENT FOR STOP AND ZONE IMPROVEMENTS
20041201 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS SBD31084 SCAB 0 0 0 SERVICES/SUPPORT EQUIPMENT VEHICLES, 01-18, 02-19, 03-3, 04-6
20060601 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS SBD31088 SCAB 0 0 0 BUS FLEET EXPANSION-PURCHASE 40' EXPANSION HEAVY DUTY COACHES & AUX. EQUIPMT, CNG 01-9, 03-1
(Note: The 'OTHER' FUNDS ARE CARL MAYER FUNDS)
20030930 TCM
OMNITRANS SBD41022 SCAB 0 0 0 PARATRANSIT - VEHICLES REPLACEMENT ALT. FUEL, 04-36
20041201 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS SBD43012 SCAB 0 0 0 CAPITALIZATION OF LEASES FOR CONTRACTORS/RADIO SITES
20041201 EXEMPT/TRAFFIC SIGNALIZATION
OMNITRANS SBD90105 SCAB 0 0 0 BUS SYSTEM-BUSES BUS REPLACEMENTS ALT. FUEL, 01-25, 02-16,
20040930 EXEMPT/TRAFFIC SIGNALIZATION
SAN BERNARDINO
41058 SCAB 0 0 0 METROLINK - REGIONAL COMMUTER RAIL AT SAN BERNARDINO STATION - REHABILITATE HISTORIC SANTA FE DEPOT (T21-#187)
20031201 EXEMPT/TRAFFIC SIGNALIZATION
SANBAG 20020106 SCAB 0 0 0 MONTCLAIR PEDESTRIAN UNDERCROSSING-CONSTRUCTION OF A 2ND PLATFORM CREATES NEED FOR CONSTRUCTION OF NEW UNDERCROSSING
20031201 TCM
SANBAG 990602 SCAB 0 0 0 METROLINK CAPITAL MAINTENANCE 20051201 EXEMPT/TRAFFIC SIGNALIZATION
SANBAG SBD41109 SCAB 0 0 0 METROLINK OPERATING ASSISTANCE SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY (METROLINK)
20041201 EXEMPT/TRAFFIC SIGNALIZATION
SANBAG SBD990808 SCAB 0 0 0 METROLINK - SB/REDLANDS EXTENSION REHABILITATION - DESIGN & CONSTRUCTION.
20031209 <OTHER>
SCRAA/LACMTA/SANBAG
991213 SCAB 0 0 0 SAN BERNARDINO LINE CAPACITY IMPROVEMENTS (TRACK IMPROVEMENTS)-FREMONT & MARENGO SIDINGS
20031201 TCM
VICTOR VALLEY TRANSIT AUTHORITY
200084 MDAB 0 0 0 TRANSIT -- ADMINISTRATION EQUIPMENT
20041001 EXEMPT/TRAFFIC SIGNALIZATION
VICTOR VALLEY TRANSIT AUTHORITY
200086 MDAB 0 0 0 BUS SYSTEM -- PASSENGER FACILITIES. PURCHASE BUS STOP SIGNS AND SHELTERS.
20061001 EXEMPT/TRAFFIC SIGNALIZATION
VICTOR VALLEY TRANSIT AUTHORITY
20010124 MDAB 0 0 0 BUS SYSTEM - EXPANSION-ALT FUEL 1 BUS FOR FY 02 - VEHICLE FOR ADELANTO TO MEET NEW HEADWAYS
20031201 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 154
TIER 2SAN BERNARDINO COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
VICTOR VALLEY TRANSIT AUTHORITY
20010127 MDAB 0 0 0 TRANSIT OPERATING EQUIPMENT - PURCHASE MOBILE DISPLAY EQUIPMENT, RADIOS, DISPATCH PHONE MONITOR
20031201 EXEMPT/TRAFFIC SIGNALIZATION
VICTOR VALLEY TRANSIT AUTHORITY
20010280 MDAB 0 0 0 BUS SYSTEM EXPANSION - ALT FUEL - FIXED ROUTE BUS EXPANSION-PURCHASE 1 BUS IN 2003 AND 1 IN 2004
20041201 EXEMPT/TRAFFIC SIGNALIZATION
VICTOR VALLEY TRANSIT AUTHORITY
20010281 SCAB 0 0 0 BUS SYSTEM - BUS EXPANSION - ALT. FUEL - 5 COMMUTER BUSES FOR COMMUTER DOWN THE HILL BUS SERVICE (IN MDAB & SCAB AIR BASIN)
20041203 TCM
VICTOR VALLEY TRANSIT AUTHORITY
981104 MDAB 0 0 0 TRANSIT - SECURITY EQUIPMENT 20061201 EXEMPT/TRAFFIC SIGNALIZATION
VICTOR VALLEY TRANSIT AUTHORITY
SBD31581 MDAB 0 0 0 BUS SYSTEM - OPERATING ASSISTANCE
20041201 EXEMPT/TRAFFIC SIGNALIZATION
VICTOR VALLEY TRANSIT AUTHORITY
SBD41073 MDAB 0 0 0 CAPITAL - PURCHASE OF LAND AND ARCHITECTURAL SERVICES & CONSTRUCT FOR ADMINISTRATIVE, MAINTENANCE, & OPERATIONS FACILITY (PH I & II)
20041201 <OTHER>
VICTOR VALLEY TRANSIT AUTHORITY
SBD41084 MDAB 0 0 0 BUS SYSTEM - BUSES REPLACEMENT - ALT FUEL, 03-1;04-2
20040601 EXEMPT/TRAFFIC SIGNALIZATION
VICTOR VALLEY TRANSIT AUTHORITY
SBD41114 MDAB 0 0 0 PARATRANSIT - VEHICLE REPLACEMENT ALT. FUEL, 01-7, 02-8
20030601 EXEMPT/TRAFFIC SIGNALIZATION
VICTOR VALLEY TRANSIT AUTHORITY
SBD41117 MDAB 0 0 0 BUS SYSTEM - PURCHASE SERVICE VEHICLES 04-1
20040301 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 155
TIER 2VENTURA COUNTYSTATE HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CALTRANS VEN011205 SCCAB 101 0.16 3 IN THOUSAND OAKS - IMPROVEMENTS FOR 101/23 INTERCHANGE: EXTEND AUXILIARY LANES L.A. COUNTY LINE / HAMPSHIRE, NEW NB LANE HAMPSHIRE/23; MEDIAN IMPR; SOUNDWALL, PE INC. ROW, CON SUP
20061231 <OTHER>
CALTRANS 18640K SCCAB 101 22.2 23.7 NEAR VENTURA AT SANTA CLARA RIVER BRIDGE - REPLACE BRIDGE
20060601 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS VEN991101 SCCAB 101 39.8 41.8 NEAR MUSSEL SHOALS & LA CONCHITA - OPERATIONAL IMPROVEMENTS AND PEDESTRIAN SEPARATION (STUDY) AND PED SEPARATION CONSTRUCTION - NH = STIP-IRR FUNDS
20061201 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS VEN011208 SCCAB 118 18.3 27.3 ADD ONE LANE EA DIR FROM RT 23 (NEW LA AVE) TO TAPO CYN RD
20091231 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 156
TIER 2VENTURA COUNTYLOCAL HIGHWAYS
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CAMARILLO VEN54019 SCCAB 0 0 0 IN CAMARILLO ADOLFO RD EXTENSION EXTEND ROAD EASTERLY TO CAMARILLO SPRINGS RD/US 101 (TWO-LANE UNDIVIDED ROAD)
20060630 <OTHER>
OJAI VEN021201 SCCAB 0 0 0 PEDESTRIAN IMPROVEMENTS ON OJAI AVE (RT 150) FROM SIGNAL TO MONTGOMERY, MONTGOMERY ST. FROM RTE 150 TO MATILIJA & MATILIJA AVE FROM MONTGOMERY TO SIGNAL
20031231 TCM
SAN BUENAVENTURA
VEN991207 SCCAB 0 0 0 FIGUEROA ST UNDERPASS AT RT 101 - BICYCLE & PEDESTRIAN ENHANCEMENTS, AESTHETIC IMPROVEMENTS
20030701 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY VEN011201 SCCAB 0 0 0 CENTRAL AVE FROM CAMARILLO CITY LIMIT TO SANTA CLARA AVE WIDEN FROM 2 TO 4 LANES
20060701 <OTHER>
VENTURA COUNTY VEN011204 SCCAB 0 0 0 EXTEND ROSE AVE FROM OXNARD CITY LIMIT TO HUENEME RD (2 LANES EA DIR)
20060701 <OTHER>
2004 RTP * TECHNICAL APPENDIX I - 157
TIER 2VENTURA COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
CAMARILLO VEN030607 SCCAB 0 0 0 TWO BUSES FOR REPLACEMENT 20051231MOORPARK VEN030608 SCCAB 0 0 0 BUS CAPITAL MAINTENANCE FOR
MOORPARK TRANSIT20041231
MOORPARK VEN030609 SCCAB 0 0 0 METROLINK STATION SECURITY WALL (TRANSIT ENHANCEMENT)
20041231
OJAI VEN34253 SCCAB 0 0 0 OPERATING ASSISTANCE - FIXED ROUTE & PARATRANSIT
20040701 EXEMPT/TRAFFIC SIGNALIZATION
SAN BUENAVENTURA
VEN030610 SCCAB 0 0 0 MILLS RD AT MAPLE ST - TWO BUS TURNOUTS WITH BUS SHELTERS, BIKE RACKS, BENCHES, & OTHER BUS STOP AMENITIES
20050701 <OTHER>
SIMI VALLEY VEN010604 SCCAB 0 0 0 BUS PARTS STORAGE MEZZANINE 20030630 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN011220 SCCAB 0 0 0 MAINTENANCE FACILITY EXPANSION 20040701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN011221 SCCAB 0 0 0 PAINT 4 CNG BUSES 20040701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN011222 SCCAB 0 0 0 FOUR (4) REPLACEMENT COMPUTERS 20040701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN011223 SCCAB 0 0 0 ONE (1) REPLACEMENT UTILITY VAN 20040701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN011224 SCCAB 0 0 0 REPLACE FOUR (4) COMPUTERS 20050701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN020901 SCCAB 0 0 0 FUEL TANK REMEDIATION - MTBE PROJECT
20031231 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN020902 SCCAB 0 0 0 FINANCIAL MANAGEMENT SYSTEM 20041231 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN020903 SCCAB 0 0 0 REPLACE TRANSIT RADIO SYSTEM 20061231 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN030605 SCCAB 0 0 0 ONE ALTERNATIVE-FUELED CNG TRANSIT BUS FOR EXPANSION
20040131 TCM
SIMI VALLEY VEN030606 SCCAB 0 0 0 COMPRESSED NATURAL GAS COMPRESSOR TECHNICAL DIAGNOSTIC SERVICE
20040701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN34206 SCCAB 0 0 0 OPERATING ASSISTANCE - FIXED ROUTE 20050701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN981107 SCCAB 0 0 0 ADA SERVICE - PARATRANSIT CAPITAL 20050701 EXEMPT/TRAFFIC SIGNALIZATION
SIMI VALLEY VEN981118 SCCAB 0 0 0 PREVENTIVE MAINTENANCE 20051230 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN030601 SCCAB 0 0 0 REBUILD ORION CNG BUS ENGINES 20041231 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN030602 SCCAB 0 0 0 UPGRADE/MODIFICATIONS TO CNG FUELING FACILITY
20050701 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN030603 SCCAB 0 0 0 REFURBISH TRANSIT BUSES 20041231 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN030604 SCCAB 0 0 0 PREVENTIVE MAINTENANCE - ADA PARATRANSIT
20040701 EXEMPT/TRAFFIC SIGNALIZATION
SOUTH COAST AREA TRANSIT
VEN991206 SCCAB 0 0 0 CNG SERVICE VEHICLES - REPLACE 6 VEHICLES
20040630 EXEMPT/TRAFFIC SIGNALIZATION
THOUSAND OAKS VEN030611 SCCAB 0 0 0 PREVENTIVE MAINTENANCE- THOUSAND OAKS TRANSIT FIXED-ROUTE BUSES AND FACILITIES INCLUDING TRANSIT CENTER
20040701
THOUSAND OAKS VEN030612 SCCAB 0 0 0 ADA SERVICE - CAPITAL LEASE COST 20040701
THOUSAND OAKS VEN030613 SCCAB 0 0 0 ELECTRONIC FARE BOXES FOR THOUSAND OAKS TRANSIT
20041231
THOUSAND OAKS VEN030614 SCCAB 0 0 0 THOUSAND OAKS TRANSPORTATION CENTER OPERATIONS BUILDING & CUSTOMER WAITING ROOM INCLUDING LANDSCAPING, OUTDOOR SEATING, AND SECURITY LIGHTING - PE ONLY
20050701
THOUSAND OAKS VEN030615 SCCAB 0 0 0 PROTECTIVE ACQUISITION FOR TRANSIT MAINTENANCE FACILITY EXPANSION
20031231
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN000604 SCCAB 0 0 0 VENTURA/SANTA BARBARA BUS SERVICE - THREE YEAR DEMO
20030701 TCM
2004 RTP * TECHNICAL APPENDIX I - 158
TIER 2VENTURA COUNTY
TRANSIT
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN011227 SCCAB 0 0 0 TUNNEL 26 COAST MAIN LINE SEISMIC IMPROVEMENTS
20041231 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN34348 SCCAB 0 0 0 TRANSIT PROGRAMMING & PLANNING 20050701 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN54036 SCCAB 0 0 0 IN VENTURA COUNTY VENTURA INTERCITY SERVICE TRANSIT AUTHORITY (VISTA) CAPITAL LEASE
20051230 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN54069 SCCAB 0 0 0 DIAL-A-ROUTE TRANSIT INFORMATION 20060630 EXEMPT/TRAFFIC SIGNALIZATION
VENTURA COUNTY TRANS COMMISSION (VCTC)
VEN54115 SCCAB 0 0 0 VISTA BUS SYSTEM PLANNING 20060630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 159
TIER 2VARIOUS AGENCIES
Appendix I * Project List
LEAD AGENCY PROJECT ID AIR BASIN
ROUTE PMB PMA DESCRIPTION COMPLETION DATE
CONFORMITY CATEGORY
VARIOUS AGENCIES
SCAG010 VAR 0 0 0 LUMP SUM FOR ROADWAY REHABILITATION ON INDIAN RESERVATION ROADS/BRIDGES IN SCAG REGION
20031230 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
SCAG011 VAR 0 0 0 SCENIC BYWAYS DISCRETIONARY PROGRAM - LUMP SUM FOR VARIOUS AGENCIES WITH THE SCAG REGION
20010630 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
SCAG012 VAR 0 0 0 RECREATIONAL TRAILS PROGRAM - LUMP SUM WITHIN THE SCAG REGION
20010630 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
SCAG013 SSAB 0 0 0 LUMP SUM FOR PUBLIC LAND HIGHWAY PROJECTS IN THE SCAG REGION (NON-CAPACITY INCREASING PROJECTS ONLY)
20080630 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
SCAG203 VAR 0 0 0 AT VARIOUS LOCATIONS, HIGHWAY BRIDGE REPLACEMENT AND REHABILITATION (HBRR) PROJECTS. NON-CAPACITY INCREASING PROJECTS ONLY (INCLUDES SEISMIC RETROFIT).
20030630 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
SCAG204 VAR 0 0 0 ALL VARIOUS LOCATIONS, HAZARD ELIMINATION SAFETY (HES) PROJECTS. NON-CAPACITY INCREASING PROJECT ONLY. INCLUDES SAFE ROUTE TO SCHOOL FUNDS IN 00/01 FOR SCAG REGION.
20050630 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
SCAG205 VAR 0 0 0 AT VARIOUS LOCATIONS, 130-RAILROAD GRADE CROSSING PROTECTION PROJECTS. NON-CAPACITY INCREASING PROJECTS ONLY
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS SCAG200 VAR 0 0 0 MINOR PROGRAM - INCLUDES ALL FHWA FUNDS (NOTE: EXCLUDES PARK & RIDE LOT MINOR PROJECTS) FOR SCAG REGION.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS SCAG201 VAR 0 0 0 AT VARIOUS LOCATIONS IN SCAG REGION NON ER FUNDED EMERGENCY REPAIR REPAIR PROGRAM (NON CAPACITY TYPE PROJECTS ONLY - INCLUDES ALL FHWA FUNDS).
20030630 EXEMPT/TRAFFIC SIGNALIZATION
CALTRANS SCAG202 VAR 0 0 0 PRELIMINARY ENGINEERING, RIGHT OF WAY ENGINEERING, AND CONSTRUCTION ENGINEERING FOR WORK FUNDED FROM THE STATE HIGHWAY ACCOUNT (SHA) - INCLUDES ALL FHWA FUNDS.
20030630 EXEMPT/TRAFFIC SIGNALIZATION
VARIOUS AGENCIES
SCAG207 VAR 0 0 0 LUMP SUM - SEISMIC RETROFIT INCLUDES ALL FHWA FUNDS
20030630 EXEMPT/TRAFFIC SIGNALIZATION
2004 RTP * TECHNICAL APPENDIX I - 160
Appendix I * Project List
2004 RTP - Plan ProjectsCO Category Route/Program From To Description Public Funding (02$) Private/Other Funding
(02$)Completion
YearRTP ID
IM Arterial SR-115 I-8 Evan Hewes Hwy Construct 4-lane extension $55,000,000 2012 6M0400E
IM Arterial SR-98 SR-111 Dogwood Rd/SR-98 Corridor improvements - widening and/or realignment $30,000,000 2012 6M04001
IM Arterial SR-78 at Proposed SDSU Campus in Brawley Access improvements $3,000,000 2012 6M04001A
IM Arterial SR-111 South of SR-98 Port of Entry Improvements $50,000,000 2012 6M01002
IM Mixed Flow SR-111 SR-98 I-8 Upgrade to 4-lane freeway with interchange(s) at several locations $90,000,000 2012 6M01003
IM Arterial SR-111 SR-78 (Brawley) SR-115 (Calipatria) Upgrade to 4-lane conventional $50,000,000 2012 6M01004
IM Arterial SR-98 West of SR-111 @ RR crossing Construct bridge structure $1,500,000 2022 6M01007
IM Arterial Dogwood Rd Corridor / I-8 Overpass SR-98 I-8 Corridor improvements - widen to 6 lanes from
McCabe to I-8; I-8 improvement to 6 lanes $90,000,000 2012 6M04018
IM O&M State Highway and Arterial Preservation Countywide State Highway and Arterial
Preservation/Maintenance $157,500,000 2030 6PL04
IM TDM TDM/Non-motorized Countywide TDM (Non-motorized, telecommute, etc.) $32,000,000 2030 6TDL04IM Total Imperial County $559,000,000 $0
LA Arterial Arterial Improvements CountywideRegional Surface Transportation Improvements - refer to separate Arterials project list
$583,200,000 2030 1AL04
LA Grade Crossing Grade Crossing Countywide Arterial Goods Movement - refer to separate
Grade Crossings project list $522,600,000 2030 1GL04
LA HOV I-5/SR-170 North to South/South to North HOV Connector $43,000,000 2025 1H0102
LA HOV I-5/I-405 North to South/South to North HOV Connector $85,000,000 2025 1H0103
LA HOV SR-60 Grand Ave Construct HOV drop ramps at Grand Ave $6,000,000 2025 1H0405LA HOV SR-14 Ave. P-8 Ave. L Add 1 HOV lane each dir $27,000,000 2015 1H0101
LA HOV I-710 I-10 Huntington Dr Construct 1 HOV lane each dir $100,000,000 2012 1H0104A
LA HOV I-710 Huntington Dr I-210 Construct 1 HOV lane each dir $150,000,000 2025 1H0104B
LA Mixed Flow I-710 I-10 Huntington Dr Construct 3 MF lanes each dir $300,000,000 2012 1M0101A
LA Mixed Flow I-710 Huntington Dr I-210 Construct 3 MF lanes each dir $450,000,000 2025 1M0101B
LA Mixed Flow I-5 Interchanges Orange County Line Rosemead Blvd Interchange improvements $209,000,000 2025 1M0103
LA Mixed Flow SR-57/SR-60 Interchange improvement $209,000,000 2025 1M0104
LA Mixed Flow Gerald Desmond Bridge replacement
Replacement of existing bridge connecting Terminal Island to I-710 $570,400,000 2009 1M0171
LA O&M State Highway and Arterial Preservation Countywide State Highway and Arterial
Preservation/Maintenance $3,030,000,000 2030 1PL04
2004 RTP * TECHNICAL APPENDIX I - 161
Appendix I * Project List
2004 RTP - Plan ProjectsCO Category Route/Program From To Description Public Funding (02$) Private/Other Funding
(02$)Completion
YearRTP ID
LA TDM Non-motorized Countywide Bikeway and Pedestrian Improvements, Transportation Enhancements $513,300,000 2030 1NL04
LA TDM TDM Countywide Transportation Demand Management $186,600,000 2030 1TDL04LA TDM Rideshare Countywide Rideshare Services $114,300,000 2030 1RL04
LA ITS ITS Countywide Signal Synchronization & Bus Speed Improvement $676,500,000 2030 1ITS04
LA Transit Metrolink Commuter Rail Countywide Service Expansion $388,000,000 2030 1CR04
LA Transit Countywide Bus System Improvement Countywide Countywide Bus System Improvement $2,197,000,000 2030 1TL104
LA Transit Transit Capital Project Funding Countywide Transit Capital Project Funding $293,000,000 2030 1TL204
LA Transit Tiered Transit System Countywide Implementation TBD 2030 1TL304
LA Transit Community Transit Service Countywide Community Transit Service (shuttles, local
circulators) TBD 2030 1TL404
LA Transit Green Line ExtensionMariposa@Nash to Century@Sepulveda (LAX Term.)
Light Rail $168,000,000 2020 1TR0101
LA Transit Crenshaw Corridor Transit Corridor (technology TBD) $201,000,000 2008 1TR0102
LA Transit Gold Line Extension Pasadena Claremont Light Rail $595,000,000 2012 UT103
LA Transit Metro Center Connector Blue Line/Exposition Line Gold Line Downtown Light Rail Connector $126,000,000 2012 1TR0404
LA Transit Red Line Extension Western Ave Fairfax Ave Subway $710,000,000 2012 UT101
LA Corridor El Camino Real (US-101) Corridor SR-23 in Ventura County SR-134/SR-170 User-Fee-Backed Capacity Enhancement $329,000,000 $4,100,000,000 2030 1T0401
LA Total Los Angeles County $12,044,500,000 $4,838,400,000
OR Arterial Arterial Improvements Countywide Smart Street and Other Improvements - refer to separate Arterials project list $326,600,000 $687,600,000 2030 2AL04
OR Arterial Arterial Improvements Countywide Measure M Regional/Local Projects & MOE $355,700,000 $276,800,000 2011 2L183
OR Arterial Arterial Improvements CountywideRegional Surface Transportation Program Projects - Capital and Maintenance Streets and Roads Projects
$661,000,000 2030 2L184
OR Arterial Arterial Improvements Countywide TCRP Subventions and Proposition 42 City/County Funding $781,000,000 2030 2L185
OR Arterial Arterial Improvements Countywide
Gas Tax Subventions for Street Projects/Maintenance (With projects, represents 100% of anticipated subventions for local jurisdictions)
$1,360,000,000 2030 2L186
OR Grade Crossing Grade Crossing Countywide Grade Crossing Improvements - refer to
separate Grade Crossings project list $318,400,000 2020 2GL04
OR Toll SR-91/SR-241Add direct toll-to-toll or HOV connection from north/south SR-241 to SR-91 toll lanes to/from the east
$65,000,000 2015 2T01135
OR Toll SR-91 SR-241 SR-71 Add toll lane and toll connection at SR-71 (RIV) (per Four Corners Study) $160,000,000 2020 2T04136
2004 RTP * TECHNICAL APPENDIX I - 162
Appendix I * Project List
2004 RTP - Plan ProjectsCO Category Route/Program From To Description Public Funding (02$) Private/Other Funding
(02$)Completion
YearRTP ID
OR HOV I-5 NB/SB Coast Highway Pico Add 1 HOV lane each direction $70,000,000 2020 2H01143
OR HOV SR-22/I-405 HOV Connector $75,000,000 2020 ORA000193
OR HOV I-405/I-605 HOV Connector $105,000,000 2020 2H01145
OR HOV I-405 at Von Karman HOV Drop Ramp $50,000,000 2020 2H01148
OR Mixed Flow SR-57 NB Orangethorpe Lambert MF or Aux Capacity $77,000,000 2010 2M01117
OR Mixed Flow SR-57 NB at SR-91 Add 4th through lane $1,000,000 2010 2M01118
OR Mixed Flow SR-91 EB/WB SR-55 Riverside County Line Add 1 MF lane each direction $250,000,000 2010 2M04121
OR Mixed Flow I-405 SR-73 Beach Add 1 MF lane each direction $130,000,000 2030 2M04132A
OR Mixed Flow Chokepoints Countywide Countywide Other Chokepoints $69,200,000 ongoing to 2030 2L133
OR Mixed Flow SR-91 EB/WB Truck scales Imperial Add storage lane at truck weigh in motion station $8,000,000 2007 2M01124
OR Auxiliary I-5 SB La Paz Road Oso Parkway Extend auxiliary lane through interchange $1,500,000 2030 2M01108
OR Auxiliary I-5 SB Alicia Parkway Extend auxiliary lane through interchange $5,000,000 2030 2M01110
OR Auxiliary SR-55 17th / 4th / I-5 area Add southbound auxiliary lane from SR-22 to I-5 to address lane drop/merge issues $10,000,000 2010 2M04114
OR Auxiliary SR-55 SB Dyer MacArthur Auxiliary lane $1,300,000 2010 2M04115
OR Auxiliary SR-57 NB Katella on-ramp Lincoln off-ramp Auxiliary lane, full standard median $18,100,000 2020 2M01119
OR Auxiliary SR-57 SB Ball off ramp Katella on ramp Add auxiliary lane $75,000,000 2030 2M01120
OR Auxiliary SR-91 WB SR-71 SR-241 Add auxiliary lane $10,000,000 2010 2M01122
OR Auxiliary SR-91 EB SR-241 SR-71 Add auxiliary lane EB which drops at Green River, another extends to SR-71 $36,000,000 2007 2M01123
OR Auxiliary SR-91 WB NB SR-55 WB SR-91 at Tustin Add auxiliary lane $35,000,000 2010 2M01125OR Auxiliary SR-91 WB SR-57 I-5 (WB Only) Add auxiliary lane $20,000,000 2010 2M01126
2004 RTP * TECHNICAL APPENDIX I - 163
Appendix I * Project List
2004 RTP - Plan ProjectsCO Category Route/Program From To Description Public Funding (02$) Private/Other Funding
(02$)Completion
YearRTP ID
OR Auxiliary I-405 NB SR-133 Sand Canyon Widen NB I-405 SR-133 to Sand Canyon, add aux lane $2,100,000 2004 2M0423
OR Auxiliary I-405 SB Irvine Center Drive Irvine Center Drive Add 2nd auxiliary lane $1,300,000 2010 2M04130OR Auxiliary I-405 NB Jeffrey Culver Add auxiliary lane $3,100,000 2010 2M04131
OR Auxiliary I-405 NB Sand Canyon Culver Tie auxiliary lanes together $2,500,000 2030 2M01132
OR Auxiliary I-405 SB Beach I-605 Continuous auxiliary lane, operational improvements $75,000,000 2030 2M04132B
OR IC/Ramps I-5 NB/SB La Paz Road Re-construct interchange to increase storage capacity of ramps $29,400,000 2010 2M01109
OR IC/Ramps I-5 Stonehill Dr Add southbound I-5 off-ramp at Stonehill $7,000,000 2020 2M04109A
OR IC/Ramps I-5 NB/SB Avery Parkway Avery parkway ramp relocation, reconfiguration, upgrades $13,900,000 2010 2M01111
OR IC/Ramps I-5 NB/SB Jamboree Road Provide two lanes off and widen terminal section of off-ramp, modify NB ramp $6,000,000 2010 2M01112
OR IC/Ramps I-5 NB/SB I-5/SR-74 Separation Rebuild interchange including widening of SR-74 overcrossing $50,000,000 2010 2M01113
OR IC/Ramps I-5 SB 1st and SR-55 Reconfigure to reduce weaving - interim project $50,000,000 2020 2M01107
OR IC/Ramps SR-91 Fairmont Drive Add intermediate access to 91 Express Lanes at Fairmont Drive to/from the east $70,000,000 2010 2T04128
OR IC/Ramps SR-91 Lakeview Interchange Construct barrier-separated on-ramp (2 lanes) from SB Lakeview to WB SR-91 $15,000,000 2010 2M01127
OR IC/Ramps I-405/SR-55 South Bristol Braid
Delete left turn access from NB Bristol to SB I-405. Provide right turn on-ramp from NB Bristol to SB I-405 via a new braid that also provides direct access to NB SR-55.
$40,000,000 2020 2M01129
OR O&M State Highway and Arterial Preservation Countywide State Highway and Arterial
Preservation/Maintenance $760,000,000 ongoing to 2030 2PL04
OR Other Motorist Services Countywide Freeway Service Patrol and Callbox Program $150,800,000 2030 2L149
OR Other Soundwalls Countywide Retrofit Soundwall Program $87,000,000 2030 2L150OR Other Project Development Countywide Project Development $84,000,000 2030 2L222OR Other Other TEA Countywide Transportation Enhancement Activities $45,200,000 2030 2L224
OR Other Cal Nevada HS Rail Anaheim Ontario Airport Study feasibility of adding high speed rail between Anaheim and Ontario Airport TBD 2S1
OR Other SR-57/Santa Ana River Corridor SR-22/SR-57/I-5 I-405 Regionally Significant Transportation
Investment Study (RSTIS) $1,007,000 2S2
OR Other SR-91 Orange County Riverside County Regionally Significant Transportation Investment Study (RSTIS) $2,250,000 2S3
OR Other I-405 Regionally Significant Transportation Investment Study (RSTIS) $1,150,000 2S4
OR Other I-5 South Regionally Significant Transportation Investment Study (RSTIS) $1,500,000 2006 2S5
2004 RTP * TECHNICAL APPENDIX I - 164
Appendix I * Project List
2004 RTP - Plan ProjectsCO Category Route/Program From To Description Public Funding (02$) Private/Other Funding
(02$)Completion
YearRTP ID
OR Other Other Studies Other studies included in FY 03-04 Work Program $2,690,000 2SL04
OR TDM Rideshare Countywide Regional Rideshare - Invest in transportation demand management programs $27,000,000 2030 2L219
OR TDM Non-motorized Countywide Build the Commuter Bikeways Strategic Plan $115,000,000 ongoing to 2030 2L220
OR ITS ITS Countywide Invest in Intelligent Transportation Systems Programs $29,000,000 2030 2L221
OR Transit Fixed Route Bus Countywide
Countywide Fixed Route, Express, Rail Feeder, Rapid Bus. Expand local service to achieve 10-minute headways in the core of the county. Expand to 2.5 million annual vsh by 2030.
$1,892,800,000 2030 2L206
OR Transit Express Bus Countywide (inter-county and intra-county)
Industry to Anaheim Resort (04); 4 rtes btwn OR to RV Co (03); Rancho Santa Margarita to Irvine Transp Ctr (10); Long Beach to South Coast Metro (04); San Clemente to South Coast Metro (04); Long Beach to Orange (07); Laguna Hills to Anaheim (04); Other
costs included in Fixed Route Bus category 2030 2L207
OR Transit Rail Feeder Bus Countywide Rail Feeder - Add StationLink service to an estimate 40,000 annual vsh
costs included in Fixed Route Bus category 2030 2L208
OR Transit Bus Rapid Transit Countywide
Add Bus Rapid Transit in mixed traffic with signal priority on the following lines: Harbor ('07), Westminster ('09), Katella ('13), Edinger ('17), Beach ('11), La Palma ('15)
costs included in Fixed Route Bus category 2030
2TR01209A, 2TR04209B, 2TR01209C, 2TR04209D, 2TR04209E, 2TR04209F
OR Transit Elderly & Handicapped Assistance Countywide
Paratransit - Expand specialized transit to meet ADA mandates - estimated from .400 million to .700 million annual vsh. Includes paratransit bus base ($12 million)
$274,580,000 2030 2L210
OR Transit Elderly & Handicapped Assistance Countywide Senior Mobility Program - Provide community
based senior transportation services $68,000,000 $25,500,000 2030 2L210A
OR Transit Bus Stops CountywideBus Stop Accessbility Program - Invest in making bus stops accessible for people with disabilities
$10,000,000 2011 2L211
OR Transit Metrolink Commuter Rail Orange Line/IEOC Line/91 Line
Expand service - Orange Line to 30 daily trains, IEOC to 21 daily trains, 91 line to 21 daily trains. Plan for midday intracounty service Laguna Niguel to Fullerton.
$266,300,000 2030 2TR01212
2004 RTP * TECHNICAL APPENDIX I - 165
Appendix I * Project List
2004 RTP - Plan ProjectsCO Category Route/Program From To Description Public Funding (02$) Private/Other Funding
(02$)Completion
YearRTP ID
OR Transit Track La Mirada Basta La Mirada DT Junction to La Mirada Triple Track cost included in Metrolink Commuter Rail category 2004 2TR01212
OR Transit Metrolink Commuter Rail Anaheim Stadium Parking Structures and Platform Extensions - Metrolink Station $73,200,000 TBD 2TR04217
OR Transit CenterLine Light RailFunding Reserve for Extensions (Extend CenterLine north to Fullerton or west along PE ROW) + Santa Ana College Link
$770,000,000 2030 2TR04218
OR Transit Transit Center Construct Intermodal Center at the Metrolink station in Santa Ana (CenterLine station) $50,000,000 2020 2TR04223
OR Truck Climbing SR-57 NB Lambert Tonner Canyon Road Truck Climbing Lane $68,300,000 2010 2TK01116
OR Total Orange County $7,740,677,000 $3,469,100,000
RV Arterial Arterial Improvements Coachella Valley Widen/construct regional arterials $628,000,000 2030 3AL104
RV Arterial Arterial Improvements Western County Widen/construct regional arterials $300,000,000 2030 3AL204
RV Arterial Arterial Improvements Countywide Countywide arterial improvements - refer to separate Arterials project list $1,971,000,000 $962,000,000 2030 3AL304
RV Grade Crossing Grade Crossing Countywide Grade Crossing Improvements - refer to
separate Grade Crossing projects list $672,995,000 2030 3GL04
RV Corridor CETAP - Cajalco/Ramona Hemet Corona/Lake Elsinore Cajalco/Ramona expressway (3 lanes each
dir) from Sanderson Ave to I-15 $466,000,000 2010 3C01MA01
RV CorridorCETAP - Moreno Valley to San Bernardino County
Moreno Valley San Bernardino County Construct new intercounty transporation corridor $181,000,000 $1,051,000,000 2030 3C01MA02
RV CorridorCETAP - Riverside County to Orange County
Riverside County Orange County Construct new intercounty transporation corridor $402,000,000 $2,348,000,000 2030 3C01MA03
RV Corridor CETAP - Temecula Corridor
Winchester (SR-79/SR-74) Temecula
On I-15, widen to 1 HOV & 6 MF each dir from I-215 to Winchester, 1 HOV & 5 MF each dir from Winchester to San Diego County Line; on I-215, widen to 1 HOV & 4 MF each dir from Newport Rd to I-15; improve I-15/I-215 interchange
$150,000,000 2030 3C01MA04
RV HOV SR-60/I-215 SR60/I-215 E. Jct East to SR-60 and South to I-215 HOV Connector $40,000,000 2025 3H01SH03
RV HOV I-15 San Diego County Line (R0.0) SR-60 (51.5) Add 1 HOV lane each direction (EA's 33790G,
33800G) $359,000,000 2025 3M01MA06
RV HOV SR-91/I-15 South to West/West to South HOV Connector $243,000,000 2025 3M04MA11
2004 RTP * TECHNICAL APPENDIX I - 166
Appendix I * Project List
2004 RTP - Plan ProjectsCO Category Route/Program From To Description Public Funding (02$) Private/Other Funding
(02$)Completion
YearRTP ID
RV Mixed Flow & HOV I-215 SR-60/SR-91/I-215 Jct San Bernardino County
LineAdd 1 MF and 1 HOV lane each direction (EA 467200) $231,000,000 2015 3M01MA08
RV Mixed Flow I-10 Monterey Ave (44.5) Dillon Rd (58.9) Add 1 MF lane each direction (EA 0A030K) $71,000,000 2025 3M01SH06
RV Mixed Flow I-10/SR-60 Construct new interchange $129,000,000 2030 3M04MA05
RV Mixed Flow I-215 Eucalyptus Ave (R37.4) I-15 (R8.9) Add 1 MF lane each direction (EA's 35380K, 35390K, 35370K) $210,000,000 2025 3M01MA07
RV Mixed Flow SR-71 SR-91 San Bernardino County Line Widen to 3 MF lanes each direction $68,000,000 2030 3M01MA09
RV Mixed Flow SR-91 Pierce Street Orange County Line Add 1 MF lane each direction $161,000,000 2015 3M04MA10
RV Mixed Flow SR-91/SR-71 Improve interchange $26,000,000 2030 3M04MA12
RV Mixed Flow SR-79 Ramona Expwy Domenigoni Parkway Realign highway (construct 4 lanes) $132,000,000 2015 3A01MA01
RV Mixed Flow SR-79 Hunter Ramona Expwy Widen from 4 to 6 lanes (note: RTIP#46460 widens to 6 lanes from Hunter to Domenigoni) $65,000,000 2025 3A04SH12
RV Auxiliary I-10 Calimesa @ County Line Rd (R4.0)
500 meters e/o Sandlwood Dr I/C (R4.3)
Replace Bridge, Ramps, Construct Auxiliary Lanes, and Realign Calimesa Rd (EA 0A710K) $60,000,000 2015 3M04SH05
RV Auxiliary SR-60 0.4 mi e/o I-15/SR-60 IC 0.2 mi e/o Main St Add auxiliary lanes both directions $5,000,000 2009 3M04SH11
RV Auxiliary SR-91 WB SR-71 Orange County Line Add auxiliary lane see Orange County listing 2010 2M01122
RV Auxiliary SR-91 EB Orange County Line SR-71 Add auxiliary lane EB which drops at Green River, another extends to SR-71 $29,120,000 2007 2M01123
RV IC/Ramps I-10 at SR-79/Beaumont Ave btwn 6th St & 1st St Reconstruct interchange/ramps $14,500,000 2020 3M04WT001
RV IC/Ramps I-10 at 8th St btwn Ramsey St & Lincoln St Reconstruct interchange/ramps $2,900,000 2020 3M04WT002
RV IC/Ramps I-10 at Ave 50 Construct new interchange $19,468,000 2006 3M01CV01
RV IC/Ramps I-10 at Calimesa Blvd/Sandalwood Dr
btwn 7th St & Sandalwood Dr Reconstruct interchange/ramps $29,000,000 2008 3M04WT003
RV IC/Ramps I-10McNaughton Pkwy (approx. 3.38 mi e/o Dillon Rd)
Construct interchange $20,000,000 2008 3M04SH07
RV IC/Ramps I-10 at Pennsylvania Ave btwn 6th St & 3rd St Reconstruct interchange/ramps $14,500,000 2020 3M04WT004
RV IC/Ramps I-10 at Portola Ave btwn Dinah Shore & Varner
Construct new IC (4 lanes) and ramps incl. bridge over UPRR & Varner realignment $19,750,000 2008 RIV031209
2004 RTP * TECHNICAL APPENDIX I - 167
Appendix I * Project List
2004 RTP - Plan ProjectsCO Category Route/Program From To Description Public Funding (02$) Private/Other Funding
(02$)Completion
YearRTP ID
RV IC/Ramps I-10 at Monterey Ave
Reconfigure IC, add 1 NB lane, construct new WB entry loop ramp from Monterey & WB entry ramp from Varner, realign/relocate WB exit ramp
$4,250,000 2005 RIV031208
RV IC/Ramps I-15 at 6th St btwn Hamner Ave & Sierra Ave Reconstruct interchange/ramps $14,500,000 2010 3M04WT005
RV IC/Ramps I-15 at Bellegrave Ave btwn Hamner Ave & Wineville Rd Add signals and ramps. 0.1 mi. $3,289,000 2025 3A04A26
RV IC/Ramps I-15 at Hidden Valley Pkwy btwn Hamner Ave & Beyond NB Exit Ramp Reconstruct interchange/ramps $2,900,000 2010 3M04WT007
RV IC/Ramps I-215 at SR-74/4th St btwn G St & San Jacinto Ave Reconstruct interchange/ramps $14,500,000 2008 3M04WT008
RV IC/Ramps I-215 at SR-74 (Matthews Rd) btwn Case Rd & Trumble Rd Reconstruct interchange/ramps $2,900,000 2025 3M04WT009
RV IC/Ramps I-215 at Cactus Ave btwn W. Frontage Rd & Elsworth St Reconstruct interchange/ramps $2,900,000 2009 3M04WT010
RV IC/Ramps I-215 at Center St btwn Stephens Ave & Iowa Ave Reconstruct interchange/ramps $13,000,000 2025 3M04WT011
RV IC/Ramps I-215 at Columbia Ave btwn Primer St & Brandywine Ave Reconstruct interchange/ramps $12,000,000 2020 3M04WT012
RV IC/Ramps I-215 at Ethanac Rd btwn Barnett Rd & Trumble Rd Reconstruct interchange/ramps $2,900,000 2012 3M01WT013
RV IC/Ramps I-215 at Garbani Rd btwn Haun Rd & Antelope Rd
Construct new interchange - add 4-lane overpass and ramps. 0.1 mi. $10,914,000 2025 3A04A27
RV IC/Ramps I-215 at Keller Rd bwn Zeiders Rd & Antelope Rd Construct 4-lane overcrossing and ramps $2,000,000 2030 3A04A28
RV IC/Ramps I-215 at Nuevo Rd btwn A St & E. Frontage Rd Reconstruct interchange/ramps $2,900,000 2013 3M04WT014
RV IC/Ramps I-215/SR-60 at Central Ave btwn Springs Blvd & Watkins Dr Reconstruct interchange/ramps $2,900,000 2006 3M04WT015
RV IC/Ramps I-215/SR-60 at University Ave btwn Iowa Ave & Canyon Crest Dr Reconstruct interchange/ramps $2,900,000 2020 3M04WT016
RV IC/Ramps SR-60 at Etiwanda Ave btwn San Sevaine Wy & Iberia St Widen ramps 1 to 2 lanes. 0.1 mi. $224,000 2015 3A04A29
RV IC/Ramps SR-60 at Heacock St btwn Hemlock Ave & Sunnymead Blvd Reconstruct interchange/ramps $2,900,000 2011 3M04WT017
RV IC/Ramps SR-60 at Main St btwn Russell St & Stoddard Ave Reconstruct interchange/ramps $2,900,000 2020 3M04WT018
RV IC/Ramps SR-60 at Milliken Ave btwn Etiwanda Ave & Wineville Rd Widen ramps 1 to 2 lanes. 0.1 mi. $75,000 2020 3A04A30
RV IC/Ramps SR-60 at Mission Blvd btwn WB On Ramp & Etiwanda Ave Reconstruct interchange/ramps $2,900,000 2025 3M01WT019
RV IC/Ramps SR-60 at Mission Blvd btwn Granite Hill Dr & Sevaine Way Reconstruct interchange/ramps $2,900,000 2025 3M01WT020
RV IC/Ramps SR-86 S at Ave 50 Construct interchange $9,276,000 2010 3M01CV02
RV IC/Ramps SR-86 S at Ave 52 btwn La Hernandez and Polk Construct new interchange $19,700,000 2015 3M04SH08
2004 RTP * TECHNICAL APPENDIX I - 168
Appendix I * Project List
2004 RTP - Plan ProjectsCO Category Route/Program From To Description Public Funding (02$) Private/Other Funding
(02$)Completion
YearRTP ID
RV IC/Ramps SR-86 at Ave 54 btwn SR-111 & Fillmore Construct bridge/interchange w new SR-86 $11,210,000 2030 3M01CV03
RV IC/Ramps SR-86 S at Airport Blvd/Ave 56 btwn Orange & Fillmore Construct new interchange (Spread-Diamond) $17,800,000 2008 3M04SH09
RV IC/Ramps SR-86 S at SR-195 (Avenue 66) R10.63/R11.43 Near Mecca, construct new interchange $19,350,000 2010 0E620K
RV IC/Ramps SR-86 S Tyler St w/o SR-86S Tyler St e/o SR-86S Construct new interchange $19,000,000 2015 3M04SH10
RV IC/Ramps SR-91 at 14th St btwn Olivewood Ave & Commerce St Reconstruct interchange/ramps $14,500,000 2010 3M01WT021
RV IC/Ramps SR-91 at Adams St btwn Diana Ave & Indiana Ave Reconstruct interchange/ramps $2,900,000 2020 3M01WT022
RV IC/Ramps SR-91 at Madison St btwn Garden St & Indiana Ave Reconstruct interchange/ramps $2,900,000 2020 3M01WT023
RV IC/Ramps SR-91 at Magnolia Ave btwn Merced Dr & Fillmore St Reconstruct interchange/ramps $2,900,000 2020 3M01WT024
RV IC/Ramps SR-91 at Serfas Club Dr btwn Frontage Rd & Wardlow Rd Reconstruct interchange/ramps $2,900,000 2015 3M01WT025
RV IC/Ramps SR-91 at Tyler St btwn Diana Ave & Indiana Ave Reconstruct interchange/ramps $2,900,000 2020 3M01WT026
RV IC/Ramps SR-91 at University Ave btwn Lemon St & Vine St Reconstruct interchange/ramps $2,900,000 2010 3M01WT027
RV O&M State Highway and Arterial Preservation Countywide State Highway and Arterial
Preservation/Maintenance $552,000,000 2030 3PL04
RV Other Economic Development Western County Infrastucture & facility improvements incentives $40,000,000 2030 3EL04
RV TDM Rideshare CountywideRCTC Commuter Assistance Program: rideshare and other incentive programs, TDM (telecommute, park and ride, etc.)
$66,400,000 2030 3RL04
RV TDM Non-motorized Countywide Non-motorized $50,000,000 2030 3NL04RV ITS ITS Countywide Intelligent Transportation Systems $25,000,000 2030 3ITS04
RV Transit Metrolink Commuter Rail Countywide Metrolink Improvements (track, rolling stock) $280,000,000 2030 3CR104
RV Transit Metrolink Commuter Rail IEOC & 91 Lines Metrolink Rail Station Improvements $20,000,000 2030 3CR204
RV Transit Metrolink Commuter Rail Metrolink Construct New Station At 3360 Van Buren Blvd In Riverside (Parking 550 Spaces) $9,500,000 2015 RIV011243
RV Transit Bus Rapid Transit Corona Moreno ValleyBus Rapid Transit (BRT): 65 Intersections Retrofitted for Signal Priority for Transit and Automated Travel Information at 15 Bus Stops
$850,000 2006 3TR04A, 3TR04B
RV Transit Bus Rapid Transit Coachella Valley Rapid Bus/BRT $10,000,000 2010 3TR04C
RV Transit Metrolink Commuter Rail & Intercity Bus Western County Metrolink & commuter bus services expansion $255,000,000 2030 3CR304
2004 RTP * TECHNICAL APPENDIX I - 169
Appendix I * Project List
2004 RTP - Plan ProjectsCO Category Route/Program From To Description Public Funding (02$) Private/Other Funding
(02$)Completion
YearRTP ID
RV Transit Elderly & Handicapped Assistance Coachella Valley Elderly & Handicapped Assistance $19,500,000 2015 3TL104
RV Transit Elderly & Handicapped Assistance Countywide Provide additional senior/special transit
services $85,000,000 2030 3TL204
RV Transit Local Transit Service Coachella Valley Operations and Maintenance - Local Transit Service $156,000,000 2015 3TL304
RV Transit Transit ITS Coachella Valley ITS/Consistency with Reg. Project; GFI, Bus Cameras, Smart Fare Boxes $2,000,000 2006 3TL404
RV Transit Bus Purchases Coachella Valley Purchase 3 Additional Expansion Hydrogen Buses, Routes TBD $1,000,000 2005 3TL504
RV Transit Bus Stops Western Riverside County area
Safety and Security Enhancements at Bus Stops (e.g. Lighted Shelters, Bus Benches, and Concrete Pads) 250 stops - specific implementation locations TBA
$976,000 $24,000 2005 3TL604
RV Transit Transit Center Banning/ Beaumont/ Calimesa area Transit Center $6,000,000 2007 3TC04TR1
RV Transit Transit Center City of Temecula Transit Center $6,000,000 2006 3TC04TR2
RV Transit Transit Center Coachella Valley Construct 3 Transit Centers in the Coachella Valley, locations TBD $15,000,000 2010 3TC04TR3
RV Transit Transit Center Downtown Riverside Transit Center $6,000,000 2006 3TC04TR4
RV Transit Transit Center Hemet/San Jacinto zone Transit Center $6,000,000 2006 3TC04TR5
RV Transit Transit Center Menifee (southwestern Riverside County) Transit Center $6,000,000 2008 3TC04TR6
RV Transit Transit Center Moreno Valley/ Perris Transit Center $6,000,000 2007 3TC04TR7
RV Transit Transit CenterNorthwest Riverside County zone - East Vale/ Norco
Transit Center $6,000,000 2008 3TC04TR8
RV Transit Transit Center South Corona/ Riverside County area Transit Center $6,000,000 2007 3TC04TR9
RV Transit Transit Center Southwest Lake Elsinore/ Murrieta Transit Center $6,000,000 2008 3TC04TR10
RV Transit Facility Acquisition/ Construction Thousand Palms Facility Acquisition/Construction $10,000,000 2007 3TC04TR11
RV Truck Climbing I-10 San Bernardino County
Line (R0.0)Banning City Limits (12.9) Add eastbound truck climbing lane $75,000,000 2015 3TK04MA12
RV Truck Climbing SR-60 Badlands area east of
Moreno ValleyBadlands area - west of SR-60/I-10 Jct Add eastbound truck climbing lane $26,000,000 2030 3TK04MA13
RV Total Riverside County $8,708,347,000 $4,361,024,000
SB Arterial Arterial Improvements Countywide Countywide arterial improvements - refer to separate Arterials project list $703,000,000 2030 4AL04
SB Grade Crossing Grade Crossing Countywide Grade Crossings - refer to separate Grade
Crossings project list $500,000,000 2020 4GL04
2004 RTP * TECHNICAL APPENDIX I - 170
Appendix I * Project List
2004 RTP - Plan ProjectsCO Category Route/Program From To Description Public Funding (02$) Private/Other Funding
(02$)Completion
YearRTP ID
SB HOV I-10 I-15 SR-38 Add 1 HOV lane each direction, widen UC's, reconstruct ramps $350,000,000 2020 4H01001
SB HOV I-10 SR-38 Yucaipa Bl Add 1 HOV lane each direction $0 2020 4H01002SB HOV I-10 Yucaipa Bl Riverside County Line Add 1 HOV lane each direction $23,000,000 2025 4H01003SB HOV I-15 Riverside County Line I-215 Add 1 HOV lane each direction $99,000,000 2025 4H01004SB HOV I-15 I-215 US-395 Add 1 HOV lane each direction $114,000,000 2020 4H01005SB HOV I-15 US-395 D St Add 1 HOV lane each direction $74,000,000 2020 4H01006SB HOV I-215 Riverside County Line I-10 Add 1 HOV lane each direction $86,500,000 2015 4H01007SB HOV I-215 SR-30 I-15 Add 1 HOV lane each direction $48,000,000 2025 4H01008
SB HOV I-10/I-215 South to East/East to South HOV Connector $15,000,000 2025 4H01009
SB HOV I-10/I-15 South to West/West to South HOV Connector $14,000,000 2025 4H01010
SB HOV I-10/I-15 North to West/West to North HOV Connector $14,000,000 2025 4H01011
SB Mixed Flow I-10 WB Yucaipa Bl Ford St Add 1 MF lane westbound $30,000,000 2015 4M04200
SB Mixed Flow I-215 Riverside County Line I-10 Add 1 MF lane each direction $86,500,000 2015 4M04001
SB Mixed Flow I-215 I-10 SR-30 Add 1 MF lane each direction (restriping) $500,000 2010 4M01002
SB Mixed Flow I-215 SR-30 I-15 Add 1 MF lane each direction $48,000,000 2025 4M01003
SB Mixed Flow SR-210 I-215 I-10 Add 1 MF lane each direction and widen UC's $120,000,000 2020 4M01005
SB Mixed Flow SR-18 Los Angeles County Line US 395 Widen from 1 to 2 lanes each dir $27,000,000 2020 4A01900
SB Mixed Flow SR-18 0.8 mi west of Orchard Dr (PM 79.9)
2.1 mi west of Orchard Dr (PM 81.2)
Construct Passing Lanes (PM 79.9/81.2) and Turn Lanes (PM 73.76/84.33) $13,600,000 2010 4A04902
SB Mixed Flow SR-38 (Orange/Lugonia) Redlands City Limit (W) Redlands City Limit (E) Widen from 1 to 2 lanes each dir $6,000,000 2020 4A01382
SB Mixed Flow SR-62 (Twentynine Palms Hwy) Fairway Dr SR-247 Widen from 2 to 3 lanes each dir $7,000,000 2020 4A01383
SB Mixed Flow SR-83 (Euclid) Merril Av Kimball Av Widen from 2 to 4 lanes each dir $1,000,000 2010 4A01384
SB Mixed Flow SR-142 (Chino Hills Pkwy) Carbon Canyon Rd Pipeline Dr Widen from 2 to 3 lanes each dir $3,000,000 2020 4A01385
SB Mixed Flow SR-247 (Old Woman Springs Rd) North of SR-62 Griffith Rd Widen from 1 to 2 lanes each dir $3,000,000 2020 4A01386
SB Auxiliary I-10 and I-215On I-10 from 0.1 km w/o I-215 (PM 23.6) to 0.9km e/o SR-38 (PM 31.4)
On I-215 from Riverside County Line (PM 0.0) to Jct I-10/I-215 (PM 4.03)
Install Fiber Optic Communications (FOC) backbone system, Changeable message signs (CMS), Ramp metering stations (RMS), modify existing communication hub, CCTV, VDS, TOS Cabinets; widen on-ramps on I-10 and I-215; add aux lanes on I-10 (various locations)
$9,500,000 2006 4M04021
2004 RTP * TECHNICAL APPENDIX I - 171
Appendix I * Project List
2004 RTP - Plan ProjectsCO Category Route/Program From To Description Public Funding (02$) Private/Other Funding
(02$)Completion
YearRTP ID
SB Auxiliary US-395
NB from 0.84mi s/o Desert Flower Rd to 2.84mi n/o Purple Sage St, and from 4mi n/o Shadow Mountain Ave to 6.07mi n/o Shadow Mountain Ave
SB from 2.72mi n/o Purple Sage St to 0.95mi s/o Desert Flower Rd, and from 5.95mi n/o Shadow Mountain Ave to 3.88mi n/o Shadow Mountain Ave
Add Passing Lanes in both directions and adjust vertical and horizontal alignments $26,000,000 2015 4M04009
SB Auxiliary I-10 Waterman Av (PM 25.5) Tippecanoe Ave (PM 26.27)
Add eastbound auxiliary lane (500m) and widen eastbound Tippecanoe off-ramp from 1 to 2 lanes
$740,000 2005 4M04053
SB IC/Ramps I-10 0.1 km e/o I-15 (PM 9.9) 0.4 km e/o I-215 (PM R24.5)
Install RMS, CCTV ESU; widen entrance ramps from 1 to 2 lanes at: EB & WB at Cherry Ave, Citrus Ave, Cedar Ave, Riverside Ave and Mt Vernon Ave; WB at Rancho Ave; EB at 9th St
$9,240,000 2008 4M04023
SB IC/Ramps I-10 0.8 km e/o Etiwanda Ave OC (PM 11.6)
1.5 km w/o Riverside Ave OC (PM 19.1)
In Fontana widen exit ramps from 1 to 2 lanes at Cherry Ave, Citrus Ave, & Cedar Ave IC to accommodate proposed aux lanes at Cherry Ave IC E/B aux lane PM 11.99/12.85, W/B Aux lane PM 13.38/13.68; Citrus Ave IC E/B aux lane only PM 14.58/14.88; Cedar Ave IC E/B aux lane PM 17.36/17.83, W/B aux lane PM 18.94/19.41
$19,000,000 2009 4M04024
SB IC/Ramps I-10 Alabama St Interchange $16,000,000 2025 4M01025
SB IC/Ramps I-10 Beech Av Interchange $25,000,000 2012 4M01026
SB IC/Ramps I-10 California St Interchange $16,000,000 2020 4M01027SB IC/Ramps I-10 Cedar Av Interchange $16,000,000 2020 4M01028SB IC/Ramps I-10 Live Oak Canyon Interchange $8,000,000 2006 4M04029SB IC/Ramps I-10 Mountain View Av Interchange $16,000,000 2020 4M01030SB IC/Ramps I-10 Mt Vernon Av Interchange $16,000,000 2020 4M01031SB IC/Ramps I-10 Wabash Av Interchange $16,000,000 2020 4M01032SB IC/Ramps I-10 Wildwood Canyon Interchange $11,000,000 2020 4M04033SB IC/Ramps I-15 6th Street Interchange $16,000,000 2025 4M01035SB IC/Ramps I-15 Cajon Jn/SR-138 Interchange $16,000,000 2020 4M01037
SB IC/Ramps I-15 Duncan Canyon Rd New Interchange $15,000,000 2012 4M01038
SB IC/Ramps I-15 Foothill Blvd (SR-66) Add 400m deceleration lane on NB I-15 and widen NB off-ramp from 1 to 2 lanes $725,000 2005 4M04054
SB IC/Ramps I-15 Mojave St Interchange $16,000,000 2020 4M01039SB IC/Ramps I-15 Oak Hill Rd Replace overcrossing $1,000,000 2010 4M01040SB IC/Ramps I-15 Sierra Av Interchange $16,000,000 2025 4M01041SB IC/Ramps I-15 Stoddard Wells Rd Interchange $16,000,000 2010 4M01042SB IC/Ramps I-215 Barton Road Widen over-crossing 2-4 lanes $1,000,000 2010 4M01043SB IC/Ramps I-215 Palm Av Interchange $16,000,000 2025 4M01044
2004 RTP * TECHNICAL APPENDIX I - 172
Appendix I * Project List
2004 RTP - Plan ProjectsCO Category Route/Program From To Description Public Funding (02$) Private/Other Funding
(02$)Completion
YearRTP ID
SB IC/Ramps I-215 Pepper-Linden Av Interchange $16,000,000 2025 4M01045SB IC/Ramps I-215 University Pkwy Interchange $16,000,000 2020 4M01046SB IC/Ramps SR-60 Central Av Upgrade Interchange $10,000,000 2020 4M04050SB IC/Ramps SR-60 Grove Av Interchange/Ramps $500,000 2005 4M04051SB IC/Ramps SR-30 (SR-210) Del Rosa Av Interchange $16,000,000 2025 4M01047SB IC/Ramps SR-30 (SR-210) Highland Av Interchange $16,000,000 2025 4M01048SB IC/Ramps SR-30 (SR-210) Waterman Av Interchange $16,000,000 2025 4M01049SB IC/Ramps I-10 and SR-60 Haven Av Interchange Improvements $30,000,000 2015 4M01052
SB O&M State Highway and Arterial Preservation Countywide State Highway and Arterial
Preservation/Maintenance $1,664,500,000 2030 4PL04
SB Other Project Development & Traffic Mitigation Countywide Project Development & Traffic Mitigation $64,000,000 2030 4PD04
SB OtherSouthern California Logistics Airport Rail Project
Track and intermodal yard improvements (Phases 1 through 4) $278,500,000 2030 4FR04
SB ITS ITS Countywide Intelligent Transportation Systems $48,500,000 2030 4ITS04SB TDM Rideshare Countywide Motorist Assistance Program $36,000,000 2030 4RL04SB TDM Non-motorized Countywide Non-motorized $39,000,000 2030 4NL04SB TDM TDM Countywide TDM (Telecommute, park and ride, etc.) $6,500,000 2030 4TDL04
SB Transit San Bernardino-Redlands Extension 4th St/Mt. Vernon Grove/Central Extend rail service to Redlands (10 miles); rail
technology TBD; 15-min. freq. daily $60,000,000 2014 4TR0101
SB Transit Gold Line Extension Claremont in Los Angeles County
Montclair in San Bernardino County Light Rail extension (1.5 miles) $76,000,000 2014 4TR0102
SB Transit Metrolink Commuter Rail CountywideService Expansion; SB Line 52 daily trains, Riverside line 40 daily trains, IEOC line 28 daily trains
$464,000,000 2030 4CR04
SB Transit Local Transit Service Countywide Local Transit Service $364,000,000 2030 4TL104
SB Transit Elderly & Handicapped Assistance Countywide Elderly & Handicapped Assistance $137,000,000 2030 4TL204
SB Truck Climbing I-15 Devore Summit Truck Climbing Lane $10,000,000 2010 4T01003
SB Total San Bernardino County $5,794,305,000 $278,500,000
VE Arterial Arterial Improvements CountywideMisc. Arterial System Improvements - refer to separate Arterials and Grade Crossings project lists
$135,000,000 2020 5AL04
VE Mixed Flow SR-33 (Casitas Bypass) Foster Park Creek Rd Expressway $120,000,000 2020 5A0101
VE Mixed Flow SR-118 SR-232 Moorpark Expressway $104,000,000 2015 5A0103
VE IC/Ramps US-101 La Conchita Mussel Shoals Interchange Improvement $17,000,000 2005 5M0104
VE IC/Ramps US-101 At Del Norte Blvd Interchange improvement and 4 lane overcrossing with left turn pocket $10,000,000 $10,000,000 2006 5M0405
VE O&M State Highway and Arterial Preservation Countywide State Highway and Arterial
Preservation/Maintenance $292,500,000 2025 5PL04
VE ITS ITS Countywide Misc. ITS Project Implementation $80,000,000 2025 5ITS04
2004 RTP * TECHNICAL APPENDIX I - 173
Appendix I * Project List
2004 RTP - Plan ProjectsCO Category Route/Program From To Description Public Funding (02$) Private/Other Funding
(02$)Completion
YearRTP ID
VE TDM TDM/Non-motorized Countywide TDM (Non-motorized, telecommute, etc.) $30,000,000 2025 5TDL04
VE TDM Non-motorized Montalvo Los Angeles County Line Santa Paula Branch Recreational Trail $35,000,000 2015 5N011
VE Transit Transit Service Expansion Countywide Transit Services $325,000,000 2025 5TL04
VE Transit Metrolink Commuter Rail Ventura Los Angeles County Line Service Expansion $131,000,000 2020 5CR104
VE Transit Tunnel 26 Rail Tunnel Reconstruction $12,000,000 $2,000,000 2005 5CR304
VE Transit Metrolink Commuter Rail Coast Main Line Enhanced Metrolink Capital Maintenance $45,000,000 2025 5CR204
VE Total Ventura County $1,336,500,000 $12,000,000
REG Maglev Maglev Regionwide By 2018 - IOS (West LA to Ontario); By 2030 - Total Regional System $29,400,000,000 2030 MAG
REG Corridor I-710 Corridor Port of Long Beach/Los Angeles SR-60 User Fee-Backed Capacity Improvement 2020 UFC1
REG CorridorEast-West Corridor (I-210, SR-210, I-10, SR-60, SR-91)
I-710 Corridor I-10/SR-60 Interchange User Fee-Backed Capacity Improvement$16,500,000,000
(includes I-710, East-West, and I-15 corridors)
2030 UFC2
REG Corridor I-15 Corridor East-West Corridor Barstow User Fee-Backed Capacity Improvement 2030 UFC3
REG Railroad Capacity
Regional rail capacity improvement program Regionwide Main line tracks and grade separation
improvements $3,400,000,000 2030 RRC
REG TOTAL SCAG $36,183,329,000 $62,259,024,000
2004 RTP * TECHNICAL APPENDIX I - 174
Appendix I * Project List
Major Plan Projects to Be Completed by 2010*CO Category Route/Program From To Description RTP ID
LA Mixed Flow Gerald Desmond Bridge replacement
Replacement of existing bridge connecting Terminal Island to I-710 1M0171
LA Transit Crenshaw Corridor Transit Corridor (technology TBD) 1TR0102
OR Mixed Flow SR-91 EB/WB Truck scales Imperial Add storage lane at truck weigh in motion station 2M01124
OR Mixed Flow SR-57 NB Orangethorpe Lambert MF or Aux Capacity 2M01117
OR Mixed Flow SR-57 NB at SR-91 Add 4th through lane 2M01118
OR Mixed Flow SR-91 EB/WB SR-55 Riverside County Line Add 1 MF lane each direction 2M04121
OR Transit Bus Rapid Transit Countywide
Add Bus Rapid Transit in mixed traffic with signal priority on the following lines: Harbor ('07), Westminster ('09)
2TR01209
OR Transit Track La Mirada Basta La Mirada DT Junction to La Mirada Triple
Track 2TR01212
OR Truck Climbing SR-57 NB Lambert Tonner Canyon Road Truck Climbing Lane 2TK01116
RV Corridor CETAP - Cajalco/Ramona Hemet Corona/Lake Elsinore
Cajalco/Ramona expressway (3 lanes each dir) from Sanderson Ave to I-15
3C01MA01
RV Transit Bus Rapid Transit Corona Moreno Valley
Bus Rapid Transit (BRT): 65 Intersections Retrofitted for Signal Priority for Transit and Automated Travel Information at 15 Bus Stops
3TR04A, 3TR04B
RV Transit Bus Rapid Transit Coachella Valley Rapid Bus/BRT 3TR04C
SB Mixed Flow I-215 I-10 SR-30 Add 1 MF lane each direction (restriping) 4M01002
SB Truck Climbing I-15 Devore Summit Truck Climbing Lane 4T01003
* For the complete Plan list, refer to page I-161 of the Technical Appendix. This listing is provided for informationpurposes only, to show plan implementation of major highway and transit projects in 5-year increments.
2004 RTP * TECHNICAL APPENDIX I - 175
Appendix I * Project List
Major Plan Projects to Be Completed by 2015*CO Category Route/Program From To Description RTP ID
IM Arterial SR-115 I-8 Evan Hewes Hwy Construct 4-lane extension 6M0400E
IM Arterial SR-98 SR-111 Dogwood Rd/SR-98 Corridor improvements - widening and/or realignment 6M04001
IM Arterial SR-78 at Proposed SDSU Campus in Brawley Access improvements 6M04001A
IM Arterial SR-111 South of SR-98 Port of Entry Improvements 6M01002IM Arterial SR-111 SR-78 (Brawley) SR-115 (Calipatria) Upgrade to 4-lane conventional 6M01004
IM ArterialDogwood Rd Corridor / I-8 Overpass
SR-98 I-8Corridor improvements - widen to 6 lanes from McCabe to I-8; I-8 improvement to 6 lanes
6M04018
IM Mixed Flow SR-111 SR-98 I-8 Upgrade to 4-lane freeway with interchange(s) at several locations 6M01003
LA HOV SR-14 Ave. P-8 Ave. L Add 1 HOV lane each dir 1H0101LA HOV I-710 I-10 Huntington Dr Construct 1 HOV lane each dir 1H0104A
LA Mixed Flow I-710 I-10 Huntington Dr Construct 3 MF lanes each dir 1M0101A
LA Transit Gold Line Extension Pasadena Claremont Light Rail UT103
LA Transit Metro Center Connector
Blue Line/Exposition Line Gold Line Downtown Light Rail Connector 1TR0404
LA Transit Red Line Extension Western Ave Fairfax Ave Subway UT101
OR Toll SR-91/SR-241
Add direct toll-to-toll or HOV connection from north/south SR-241 to SR-91 toll lanes to/from the east
2T01135
OR Transit Bus Rapid Transit Countywide
Add Bus Rapid Transit in mixed traffic with signal priority on the following lines: Beach ('11), Katella ('13), La Palma ('15)
2TR01209
RV Mixed Flow SR-91 Pierce Street Orange County Line Add 1 MF lane each direction 3M04MA10
RV Mixed Flow SR-79 Ramona Expwy Domenigoni Parkway Realign highway (construct 4 lanes) 3A01MA01
RV Mixed Flow & HOV I-215 SR-60/SR-91/I-215
JctSan Bernardino County Line
Add 1 MF and 1 HOV lane each direction (EA 467200) 3M01MA08
RV Truck Climbing I-10 San Bernardino
County Line (R0.0)Banning City Limits (12.9) Add eastbound truck climbing lane 3TK04MA12
SB HOV I-215 Riverside County Line I-10 Add 1 HOV lane each direction 4H01007
SB Mixed Flow I-215 Riverside County Line I-10 Add 1 MF lane each direction 4M04001
SB Mixed Flow I-10 WB Yucaipa Bl Ford St Add 1 MF lane westbound 4M04200
SB Transit San Bernardino-Redlands Extension 4th St/Mt. Vernon Grove/Central
Extend rail service to Redlands (10 miles); rail technology TBD; 15-min. freq. daily
4TR0101
SB Transit Gold Line Extension Claremont in Los Angeles County
Montclair in San Bernardino County Light Rail extension (1.5 miles) 4TR0102
VE Mixed Flow SR-118 SR-232 Moorpark Expressway 5A0103
* For the complete Plan list, refer to page I-161 of the Technical Appendix. This listing is provided for informationpurposes only, to show plan implementation of major highway and transit projects in 5-year increments.
2004 RTP * TECHNICAL APPENDIX I - 176
Appendix I * Project List
Major Plan Projects to Be Completed by 2020*CO Category Route/Program From To Description RTP ID
LA Transit Green Line Extension
Mariposa@Nash to Century@Sepulveda (LAX Term.)
Light Rail 1TR0101
OR HOV I-5 NB/SB Coast Highway Pico Add 1 HOV lane each direction 2H01143OR HOV SR-22/I-405 HOV Connector ORA000193OR HOV I-405/I-605 HOV Connector 2H01145OR HOV I-405 at Von Karman HOV Drop Ramp 2H01148
OR Toll SR-91 SR-241 SR-71Add toll lane and toll connection at SR-71 (RIV) (per Four Corners Study)
2T04136
OR Transit Bus Rapid Transit CountywideAdd Bus Rapid Transit in mixed traffic with signal priority on the following lines: Edinger ('17)
2TR01209
SB HOV I-10 I-15 SR-38 Add 1 HOV lane each direction, widen UC's, reconstruct ramps 4H01001
SB HOV I-10 SR-38 Yucaipa Bl Add 1 HOV lane each direction 4H01002SB HOV I-15 I-215 US-395 Add 1 HOV lane each direction 4H01005SB HOV I-15 US-395 D St Add 1 HOV lane each direction 4H01006
SB Mixed Flow SR-210 I-215 I-10 Add 1 MF lane each direction and widen UC's 4M01005
SB Mixed Flow SR-18 Los Angeles County Line US 395 Widen from 1 to 2 lanes each dir 4A01900
VE Mixed Flow SR-33 (Casitas Bypass) Foster Park Creek Rd Expressway 5A0101
REG Corridor I-710 Corridor Port of Long Beach/Los Angeles SR-60 User Fee-Backed Capacity
Improvement UFC1
REG Maglev LAX to March Inland Port Maglev MAG
* For the complete Plan list, refer to page I-161 of the Technical Appendix. This listing is provided for informationpurposes only, to show plan implementation of major highway and transit projects in 5-year increments.
2004 RTP * TECHNICAL APPENDIX I - 177
Appendix I * Project List
Major Plan Projects to Be Completed by 2025*CO Category Route/Program From To Description RTP ID
IM Arterial SR-98 West of SR-111 @ RR crossing Construct bridge structure 6M01007
LA HOV I-5/SR-170 North to South/South to North HOV Connector 1H0102
LA HOV I-5/I-405 North to South/South to North HOV Connector 1H0103
LA HOV SR-60 Grand Ave Construct HOV drop ramps at Grand Ave 1H0405
LA HOV I-710 Huntington Dr I-210 Construct 1 HOV lane each dir 1H0104B
LA Mixed Flow I-710 Huntington Dr I-210 Construct 3 MF lanes each dir 1M0101B
LA Mixed Flow I-5 Interchanges Orange County Line Rosemead Blvd Interchange improvements 1M0103
LA Mixed Flow SR-57/SR-60 Interchange improvement 1M0104
RV HOV SR-60/I-215 SR60/I-215 E. Jct East to SR-60 and South to I-215 HOV Connector 3H01SH03
RV HOV I-15 San Diego County Line (R0.0) SR-60 (51.5) Add 1 HOV lane each direction
(EA's 33790G, 33800G) 3M01MA06
RV HOV SR-91/I-15 South to West/West to South HOV Connector 3M04MA11
RV Mixed Flow I-10 Monterey Ave (44.5) Dillon Rd (58.9) Add 1 MF lane each direction (EA 0A030K) 3M01SH06
RV Mixed Flow I-215 Eucalyptus Ave (R37.4) I-15 (R8.9) Add 1 MF lane each direction (EA's
35380K, 35390K, 35370K) 3M01MA07
RV Mixed Flow SR-79 Hunter Ramona ExpwyWiden from 4 to 6 lanes (note: RTIP#46460 widens to 6 lanes from Hunter to Domenigoni)
3A04SH12
SB HOV I-10 Yucaipa Bl Riverside County Line Add 1 HOV lane each direction 4H01003
SB HOV I-15 Riverside County Line I-215 Add 1 HOV lane each direction 4H01004
SB HOV I-215 SR-30 I-15 Add 1 HOV lane each direction 4H01008
SB HOV I-10/I-215 South to East/East to South HOV Connector 4H01009
SB HOV I-10/I-15 South to West/West to South HOV Connector 4H01010
SB HOV I-10/I-15 North to West/West to North HOV Connector 4H01011
SB Mixed Flow I-215 SR-30 I-15 Add 1 MF lane each direction 4M01003
REG Maglev LAX to Palmdale Airport Maglev MAG
* For the complete Plan list, refer to page I-161 of the Technical Appendix. This listing is provided for informationpurposes only, to show plan implementation of major highway and transit projects in 5-year increments.
2004 RTP * TECHNICAL APPENDIX I - 178
Appendix I * Project List
Major Plan Projects to Be Completed by 2030*CO Category Route/Program From To Description RTP ID
LA Corridor El Camino Real (US-101) Corridor
SR-23 in Ventura County SR-134/SR-170 User-Fee-Backed Capacity
Enhancement 1T0401
OR Mixed Flow I-405 SR-73 Beach Add 1 MF lane each direction 2M04132A
OR Transit CenterLine Light Rail
Funding Reserve for Extensions (Extend CenterLine north to Fullerton or west along PE ROW) + Santa Ana College Link
2TR04218
RV CorridorCETAP - Moreno Valley to San Bernardino County
Moreno Valley San Bernardino County
Construct new intercounty transporation corridor 3C01MA02
RV CorridorCETAP - Riverside County to Orange County
Riverside County Orange County Construct new intercounty transporation corridor 3C01MA03
RV Corridor CETAP - Temecula Corridor
Winchester (SR-79/SR-74) Temecula
On I-15, widen to 1 HOV & 6 MF each dir from I-215 to Winchester, 1 HOV & 5 MF each dir from Winchester to San Diego County Line; on I-215, widen to 1 HOV & 4 MF each dir from Newport Rd to I-15; improve I-15/I-215 interchange
3C01MA04
RV Mixed Flow I-10/SR-60 Construct new interchange 3M04MA05
RV Mixed Flow SR-71 SR-91 San Bernardino County Line
Widen to 3 MF lanes each direction 3M01MA09
RV Mixed Flow SR-91/SR-71 Improve interchange 3M04MA12
RV Truck Climbing SR-60 Badlands area east
of Moreno ValleyBadlands area - west of SR-60/I-10 Jct Add eastbound truck climbing lane 3TK04MA13
SB OtherSouthern California Logistics Airport Rail Project
Track and intermodal yard improvements (Phases 1 through 4)
4FR04
REG CorridorEast-West Corridor (I-210, SR-210, I-10, SR-60, SR-91)
I-710 Corridor I-10/SR-60 Interchange
User Fee-Backed Capacity Improvement UFC2
REG Corridor I-15 Corridor East-West Corridor Barstow User Fee-Backed Capacity Improvement UFC3
REG MaglevLAX to Irvine Transportation Center
Maglev MAG
REG MaglevUnion Station to Central Orange County
Maglev MAG
REG Railroad Capacity
Regional rail capacity improvement program
Regionwide Main line tracks and grade separation improvements RRC
* For the complete Plan list, refer to page I-161 of the Technical Appendix. This listing is provided for informationpurposes only, to show plan implementation of major highway and transit projects in 5-year increments.
2004 RTP * TECHNICAL APPENDIX I - 179
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
LA Chatsworth Metrolink Access Rd (local) Interchange/Ramps $5,000,000 City of Los
Angeles 1M0108
LA I-5 Atlantic Blvd Interchange/Ramps $5,000,000 2010 Commerce 1M0106
LA I-5 Buena Vista St (PM 31.2) Interchange/Ramps $14,000,000 2020 Burbank 1M0127
LA I-5 Colorado Blvd (PM 25.8) Interchange/Ramps $3,000,000 2020 City of Los
Angeles 1M0128
LA I-5 Empire Ave San Fernando Blvd Interchange/Ramps $5,000,000 2020 Burbank 1M0126LA I-10 Del Mar Ave Reconfigure and signalize ramps $12,000,000 2011 San Gabriel 1M0410LA I-10 San Gabriel Blvd Reconfigure and signalize ramps $10,000,000 2010 San Gabriel 1M0411
LA I-105 Alameda St Interchange/Ramps $5,000,000 2020 City of Los Angeles 1M0112*
LA I-105 Western Ave Interchange/Ramps $5,000,000 2020 City of Los Angeles 1M0113*
LA I-110 Capitol Dr Interchange/Ramps $5,000,000 2030 City of Los Angeles 1M0114*
LA I-110 Gaffey St/Pacific Ave Interchange/Ramps $5,000,000 2030 City of Los Angeles 1M0115*
LA I-110 Pacific Coast Hwy Interchange/Ramps $5,000,000 2010 City of Los Angeles 1M0116*
LA I-110 Torrance Blvd Interchange/Ramps $11,000,000 2005 Carson 1M0117
LA I-110, SR-47, Harbor Blvd ramps
Vincent Thomas Bridge Harbor Blvd Interchange realignment and widening $50,000,000 2006 Port of Los
Angeles 1M0418*
LA I-405 Hawthorne Reconfigure ramps $5,000,000 2020 Lawndale 1M0452
LA I-405 Crenshaw Reconfigure ramps $5,000,000 2020 Torrance 1M0453
LA I-405 Prairie Reconfigure ramps $5,000,000 2020 Torrance 1M0454
LA I-405 Western Reconfigure ramps $5,000,000 2020 Torrance 1M0455
LA I-405 Avalon Blvd Construct new southbound on-ramp in southeast quadrant of interchange $6,000,000 2005 Carson 1M0119*
LA I-405 Beloit Ave (at Santa Monica Blvd) Interchange/Ramps $3,000,000 2010 City of Los
Angeles 1M0120*
LA I-405 Burbank Blvd Interchange/Ramps $11,000,000 2020 City of Los Angeles 1M0121*
LA I-405 Del Amo Blvd Interchange/Ramps $16,000,000 2030 Carson 1M0109
LA I-405 Sunset Blvd Interchange/Ramps $5,000,000 2030 City of Los Angeles 1M0122*
LA I-405 Wilshire Blvd Interchange/Ramps $5,000,000 2030 City of Los Angeles 1M0123*
LA I-405 Cherry Ave (northbound) Interchange/Ramps $5,000,000 2010 Long Beach 1M0124
LA I-405 Sepulveda Blvd (PM 34.8) Ventura Fwy (PM 39.4) Interchange/Ramps $5,000,000 2030 Culver City/City of
Los Angeles 1M0125
LA I-710 Slauson Ave Interchange/Ramps $5,000,000 2010 Bell/Commerce 1M0129*
2004 RTP * TECHNICAL APPENDIX I - 180
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
LA SR-14 Ave P Interchange improvements $1,000,000 2010 Palmdale 1M0445*
LANavy Way connector ramp to Seaside (SR-47)
Seaside Reeves Provide a 2 lane connector ramp for NB Navy Way to WB Seaside Ave $16,000,000 2005 Port of Los
Angeles 1M0430*
LA Pier B St/Terminal Island Fwy
Interchange improvement - new NB on-ramp to SR-103 $1,000,000 2005 Port of Long
Beach 1M0132*
LA SR-103 Anaheim St Interchange/Ramps $5,000,000 2010 City of Los Angeles 1M0133
LA SR-118 Zelzah St (PM 6.2) White Oak Ave (PM 6.8) Interchange/Ramps $5,000,000 2010 City of Los Angeles 1M0134
LA SR-134 Brand Blvd (PM 7.1) Interchange/Ramps $1,000,000 2010 Glendale 1M0135
LA SR-134 Glendale Blvd (PM 7.9) Interchange/Ramps $1,000,000 2010 Glendale 1M0136
LA SR-134 Pacific Ave (PM 6.6) Interchange/Ramps $1,000,000 2010 Glendale 1M0137LA SR-14 Ave G Interchange/Ramps $6,000,000 2005 Lancaster 1M0138*LA SR-14 Ave J Interchange/Ramps $11,000,000 2009 Lancaster 1M0139*LA SR-14 Ave K Interchange/Ramps $8,000,000 2011 Lancaster 1M0140*LA SR-60 Lemon Ave Construct on/off ramps $25,000,000 TBD Diamond Bar 1M0460LA SR-91 Wilmington Interchange/Ramps $5,000,000 2015 Compton 1M0450*LA SR-91 Central Interchange/Ramps $5,000,000 2015 Compton 1M0451*
LA US-101 Reyes Adobe Interchange/Ramps $5,000,000 2020 Westlake Village 1M0456*
LA US-101 Lindero Cyn Interchange/Ramps $5,000,000 2020 Agoura Hills 1M0458*LA US-101 Lost Hills Rd Interchange/Ramps $5,000,000 2020 Calabasas 1M0459*
LA US-101 Alameda St Interchange/Ramps $2,000,000 2020 City of Los Angeles 1M0105*
LA US-101 Canoga Ave (PM 24.9) New EB off-ramp at Canoga and add 2 lanes to De Soto and Canoga underpasses $15,000,000 2003 City of Los
Angeles 1M0107*
LA US-101 Fallbrook Ave (PM 26.3) Interchange/Ramps $5,000,000 2010 City of Los
Angeles 1M0143
LA US-101 Topanga Canyon Blvd (PM 25.3) Interchange/Ramps $5,000,000 2010 City of Los
Angeles 1M0144
LA US-101 Universal Center Drive Interchange/Ramps (SB on- and off-ramps) $5,000,000 2010 City of Los Angeles 1M0146*
LAI-710 Corridor between Alameda/Wilmington and Lakewood Blvd
Ports of Los Angeles and Long Beach SR-60 Widen various arterials to 6 lanes $825,000,000 2016 Gateway Cities
COG 1A04C710
LAUS-101 MIS Corridor Arterial Improvement Recommendations
Arterial $318,000,000 Various 1A01C101
LA Atlantic Blvd Ocean Blvd I-10 Arterial $93,000,000 Various 1A98R01*
LA Long Beach Blvd/Pacific Ave Ocean Blvd Vernon Ave/Santa Fe Arterial $67,000,000 Various 1A98R04
LA Firestone Blvd Alameda Blvd I-5 Arterial (TSM) $1,000,000 Various 1A98R05*
2004 RTP * TECHNICAL APPENDIX I - 181
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
LA La Cienega Blvd Sunset Blvd I-405 Arterial (TSM) $39,000,000 Various incl LA 1A98R03
LA SR-1 Pacific Coast Hwy Santa Monica Blvd Ventura County Line Arterial $121,000,000 Various incl LA 1A98R06
LA Barham/Cahuenga Corridor Corridor Development $12,000,000 City of Los
Angeles 1A01LA01
LA SR-1/Lincoln Blvd LAX I-10 Corridor Development $53,000,000 City of Los Angeles 1A01LA02
LA SR-2/Glendale Blvd Corridor Development $27,000,000 City of Los Angeles 1A01LA03
LA SR-27/Topanga Canyon Blvd SR-118 US-101 Corridor Development - widen to 4 lanes each
direction $16,000,000 City of Los Angeles 1A01LA04
LA Alameda St Olympic Blvd 25th St Arterial $22,000,000 City of Los Angeles 1A01LA05*
LA Alameda St/I-5 Alameda St Alameda St Arterial/By-pass $106,000,000 City of Los Angeles 1A01LA06
LA Bundy Dr Wilshire Blvd n/o Santa Monica Blvd Widen to mod. Major Hwy Standard $5,500,000 2015 City of Los Angeles 1A98LA08
LA Culver Blvd SR-90 I-405 Arterial $8,000,000 2010 City of Los Angeles 1A98LA13
LA Foothill Blvd LA Aqueduct w/o Balboa Blvd Bridge Widening $8,000,000 2015 City of Los
Angeles 1A01LA14
LA Olympic Blvd Centinela Ave Century Park East Arterial $10,000,000 2010 City of Los Angeles 1A98LA17
LA Robertson Blvd Sunset Blvd I-10 Arterial (TSM) $18,000,000
City of Los Angeles/West Hollywood/Beverly Hills
1A98LA18
LA Roscoe Blvd DeSoto Ave SR-170 Arterial (TSM) $3,000,000 2010 City of Los Angeles 1A98LA19
LA Saticoy St Woodman Ave Van Nuys Blvd Construct grade separation between street and RR tracks for improved safety $50,000,000 2020 City of Los
Angeles 1A01LA20*
LA Sepulveda Blvd Santa Monica Blvd Mulholland Drive Arterial $30,000,000 2015 City of Los Angeles 1A98LA21
LA Sepulveda Blvd Centinela Ave Intersection $496,000City of Los Angeles/Culver City
1A98LA23
LASierra Hwy/Old Rd/ Sepulveda/San Fernando
SR-118 SR-14 Arterial $30,000,000 2025 City of Los Angeles 1A98LA24
LA Slauson Ave Western Ave Jefferson Arterial (TSM) $1,000,000 2010 City of Los Angeles 1A98LA25
LA Venice Blvd Centinela Ave Robertson Blvd Arterial $12,000,000 2010 City of Los Angeles 1A98LA27
LA Western Ave Pico Blvd I-10 Arterial (no capacity increase) $2,000,000 2004 City of Los Angeles 1A01LA30
2004 RTP * TECHNICAL APPENDIX I - 182
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
LA Wilshire Blvd Comstock Ave Malcolm Ave Arterial (no capacity increase) $3,000,000 2003 City of Los Angeles 1A01LA31
LA SR-134/San Fernando Rd/ Doran St Grade separation and access program $21,000,000 Glendale 1A01AV01
LA Mt Ada Rd Edison Mt Ada Accept dedication; improve $1,500,000 2005 Avalon 1A04GC01
LA Stage Rd Vieudelou Zane Grey Accept dedication; improve $1,500,000 2006 Avalon 1A04GC02
LA 7th St San Gabriel River Cerritos Channel Bridge Arterial $12,000,000 2015 Long Beach 1A98GC04
LA Alamitos Ave Ocean Blvd Pacific Coast Hwy Arterial $13,000,000 2020 Long Beach 1A98GC05
LA Iron Triangle Intersection
Pacific Coast Highway/Lakewood Blvd/ Bellflower Blvd
Pacific Coast Highway/Lakewood Blvd/ Bellflower Blvd
Intersection $43,000,000 Long Beach 1A98GC06
LA Lakewood Blvd Spring St Conant St Arterial $12,000,000 2015 Long Beach 1A98GC07
LA Long Beach Traffic Circle
Pacific Coast Highway/Lakewood Blvd
Intersection $26,000,000 Long Beach 1A98GC08
LA Ocean Blvd Alamitos Ave Intersection $18,000,000 Long Beach 1A98GC09
LA 26th St Santa Fe Ave Atlantic BlvdRoad widening, bridge reconstruction, additional ROW, traffic signal upgrade, add 1 lane at signalized intersections
$11,000,000 2010 Vernon 1A04GC10
LA Atlantic Blvd Crossing the LA River Bridge Widening $12,000,000 Vernon 1A98GC11
LA Soto St Olympic Blvd Slauson AveRoad widening, bridge reconstruction, additional ROW, traffic signal upgrade, add 1 lane at signalized intersections
$22,000,000 2009 Vernon 1A04GC12
LA Kanan Rd Ventura County Line Pacific Coast Highway Arterial (TSM) $1,000,000Agoura Hills/Malibu/LA County
1A98LVM1
LA Agoura Rd Ventura County Line Las Virgenes Rd Arterial (TSM) $1,000,000 Calabasas 1A98LVM2
LA Las Virgenes Rd/Malibu Cyn Rd Ventura County Line Pacific Coast Highway Arterial (TSM) $1,000,000 Calabasas/Malibu
/LA County 1A98LVM3*
LA Mulholland Hwy Mulholland Drive Las Virgenes Rd Arterial (TSM) $1,000,000 Calabasas/LA County 1A98LVM4
LA Cornell Rd Kanan Rd Mulholland Hwy Arterial (TSM) $1,000,000 LA County 1A98LVM5
LA Hellman Ave Fremont Ave I-10 Arterial (no capacity increase) $1,000,000 2003 Alhambra 1A01SGV4
LA Valley Blvd Ramona San Gabriel Blvd Construct medians, intersection and signal improvements $1,500,000 2008 San Gabriel 1A04SGV5
LA Azusa Blvd/Hacienda Blvd I-10 SR-60 Arterial (TSM) $1,000,000 West Covina/La
Puente 1A98SGV6
2004 RTP * TECHNICAL APPENDIX I - 183
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
LA Walnut St Sunnyslope Kinneloa (in Pasadena) Extend Walnut St $300,000 2010 Pasadena 1A01SGV7*
LA Wilmington Ave 223rd St I-405 Add 1 lane to NB Wilmington Ave and widen I-405 SB on-ramp to 2 lanes $2,000,000 2005 Carson 1A01SB01*
LA Rosecrans Ave Sepulveda Blvd Hawthorne Blvd Arterial $11,000,000 2005
El Segundo/ Hawthorne/ Lawndale/ Manhattan Beach
1A01SB02*
LA Pacific Coast Highway Artesia Blvd Herondo Arterial $1,000,000 2015 Hermosa Beach 1A98SB03
LA Lomita Blvd Narbonne Ave Crenshaw Blvd Arterial $2,000,000 2010 Lomita 1A98SB04
LA SR-1 (Sepulveda Blvd) At Marine Ave Dual left turn lanes westbound $350,000 2008 Manhattan Beach 1A04SB05
LA SR-1 (Sepulveda Blvd) At Marine Ave Dual left turn lanes eastbound and westbound $600,000 2008 Manhattan Beach 1A04SB06
LA Artesia Blvd Vermont Ave Hawthorne Blvd Arterial $16,000,000 2015 Torrance/Gardena 1A98SB07*
LA Hawthorne Blvd Artesia Blvd Intersection $2,200,000 Torrance 1A98SB08
LA Hawthorne Blvd Pacific Coast Highway Intersection $2,200,000 Torrance 1A98SB09
LA SR-18 SR-138 San Bernardino County Line Widen from 1 to 2 lanes each dir $18,000,000 2020 LA County 1A01NLA01*
LA 10th St W SR-14 Avenue M Widen from 1 to 3 lanes each dir $21,000,000 2010 Palmdale 1A01NLA03*LA 20th St E Avenue G Avenue L Widen to 4 lanes each dir $8,000,000 2015 Lancaster 1A01NLA04*
LA 25th St E Pearblossom Highway Avenue P Widen to 4 lanes each dir $20,000,000 2020 Palmdale 1A98NLA05
LA 40th St E Pearblossom Highway Avenue P Widen to 4 lanes each dir $18,000,000 2025 Palmdale 1A98NLA06
LA 50th St W Avenue G Avenue L Widen to 4 lanes each dir $63,000,000 2015 Lancaster 1A98NLA07LA 60th St W Avenue G Avenue L Widen to 4 lanes each dir $8,000,000 2015 Lancaster 1A01NLA08LA Avenue G SR-14 20th St E Widen to 4 lanes each dir $3,000,000 2010 Lancaster 1A01NLA09LA Avenue H 37th St W Sierra Hwy Widen to 4 lanes each dir $37,000,000 2020 Lancaster 1A98NLA10LA Avenue H 60th St W 37th St W Widen to 4 lanes each dir $4,000,000 2010 Lancaster 1A01NLA11LA Avenue H Sierra Hwy 40th St E Widen to 4 lanes each dir $7,000,000 2010 Lancaster 1A01NLA12LA Avenue I 60th St W 30th St W Widen to 4 lanes each dir $5,000,000 2010 Lancaster 1A01NLA13LA Avenue J 50th St W 30th St W Widen to 4 lanes each dir $9,000,000 2020 Lancaster 1A98NLA14LA Avenue L 60th St W SR-14 Widen to 4 lanes each dir $7,000,000 2010 Lancaster 1A01NLA15*
LA Avenue L SR-14 50th St E Widen to 4 lanes each dir $10,000,000 2010 Lancaster/Palmdale 1A01NLA16*
LA Avenue M SR-14 10th St E Widen to 4 lanes each dir $4,000,000 2015 Lancaster/Palmdale 1A01NLA17*
LA Avenue M At Amargosa Creek Widen bridge $3,000,000 2010 Palmdale 1A04NLA18
2004 RTP * TECHNICAL APPENDIX I - 184
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
LA Avenue N At Amargosa Creek Construct new bridge $6,000,000 2009 Palmdale 1A04NLA19
LA Avenue O At Amargosa Creek Widen bridge $4,000,000 2007 Palmdale 1A04NLA20
LA Avenue P/ Rancho Vista Blvd Avenue N 50th St E Widen to 4 lanes each dir $49,000,000 2025 Palmdale 1A98NLA21*
LA Avenue S/ Ritter Ranch Rd Tierra Subida Elizabeth Lake Rd Widen to 3 lanes each dir $89,000,000 2025 Palmdale 1A98NLA22
LA Avenue S SR-138 Tierra SubidaWiden to 3 lanes each dir (note: RTIP#LA960134 widens to 3 lanes each dir from SR-14 to Downing)
$60,000,000 2025 Palmdale 1A98NLA23
LA Palmdale Blvd At Little Rock Wash Construct new bridge $20,000,000 2025 Palmdale 1A04NLA24
LA Palmdale Blvd SR-14 10th St W Widen to 4 lanes each dir $4,000,000 2025 Palmdale 1A98NLA25*LA Pearblossom Hwy SR-14 SR-138 Widen to 3 lanes each dir $12,000,000 2020 Palmdale 1A01NLA26*
LARailroad ROW Acquisition along Rte. 126
I-5 Ventura County Line Arterial $24,000,000 2025 LA County 1A98NLA27
LA Sierra Highway Avenue P Avenue M Widen to 4 lanes each dir $27,000,000 2015 Palmdale 1A98NLA28*
LA Sierra Highway Pearblossom Highway Avenue P Widen to 4 lanes each dir $25,000,000 2025 Palmdale 1A98NLA29*
LA Gateway Cities Goods Movement Network
100 Intersections AT 220/Int. Arterial $43,000,000 Gateway Cities
COG 1A98GC13
LA 10th St E Ave Q-10 10th St E Pedestrian overcrossing at multi-modal center $3,000,000 2006 Palmdale 1OT04NLA1
LA 37th St E At UPRR Pedestrian overcrossing $1,500,000 2007 Palmdale 1OT04NLA2
LA B Street Rail Realignment
Rail realignment along Harry Bridges new alignment $5,000,000 2006 Port of Los
Angeles 1OT04LA1
LA West Basin Rail Yard Expansion Expand rail yard $20,000,000 2008 Port of Los
Angeles 1OT04LA2
OR 17th Street Newport Blvd Irvine Blvd Intersection Improvements $2,200,000 2003 Costa Mesa 2A04152*
OR Adams Avenue Beach Blvd Harbor Blvd Smart Street Improvements $7,200,000 $14,300,000 2025 2A01153*
OR Alton Parkway Irvine Blvd Commercentre Drive Alton Extension $14,000,000 2004 County 2A04154*
OR Bolsa Avenue/First Street Bolsa Chica I-5 Smart Street Improvements $20,800,000 $41,700,000 2020 2A01156*
OR Brookhurst Street La Palma EB SR-91 Upgrade from secondary to major $8,000,000 2005 Anaheim 2A0444*
OR I-405 at Bolsa Chica Overcrossing Overcrossing Widen overcrossing to accommodate future Valley View Smart Street traffic $3,000,000 2005 2A04157*
OR Bristol Street Baker I-405 Widen to provide 7 lanes (4 NB) $2,700,000 2012 Costa Mesa 2A04158*
OR Cabot Road Bridge Cabot Rd Camino Capistranto Construct Cabot Road bridge to Camino Capistrano $7,000,000 2005 Laguna Niguel 2A04159*
OR Crown Valley Parkway Pacific Coast Highway Foothill Transportation Corridor Smart Street Improvements $18,300,000 $36,700,000 2020 2A01160*
2004 RTP * TECHNICAL APPENDIX I - 185
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
OR Edwards Street Widen overcrossing at I-405 from 2 to 4 lanes $2,500,000 2008 Westminster 2A04161*
OR El Toro Road Laguna Canyon Road Foothill Transportation Corridor Smart Street Improvements $18,300,000 $36,700,000 2020 2A01162*
OR El Toro Road Aliso Creek Rd Canyon Hills Dr Add 3rd lane SB $700,000 2004 Laguna Woods 2A04162B*
OR El Toro Road El Toro Road/Paseo de Valencia I-5
Increase left turn capacity of NE bound El Toro Rd to Paseo de Valencia and add 2nd left turn lane at intersection
$800,000 2004 Laguna Woods 2A01162A*
OR Goldenwest At I-405 Widen Overcrossing $3,500,000 2004 Westminster 2A04163*
OR Harbor Blvd I-5 I-405 Smart Street Widening from 4 to 6 lanes, operational improvements $6,000,000 2020 Garden Grove 2A01164*
OR Harbor Blvd Imperial Hwy SR-55 Gap Closure Smart Street Improvements $19,600,000 $39,100,000 2020 2A01165*
OR Irvine Blvd/ Trabuco Road El Toro Road SR-55 Smart Street Improvements $22,500,000 $45,000,000 2020 2A01166*
OR Jamboree Road Irvine Boulevard SR-73 Smart Street Improvements $12,800,000 $25,700,000 2020 2A01167*
OR Katella Avenue Humor 9th Smart Street Improvements $6,400,000 2006 2A0468*
OR Katella Avenue I-605 SR-55 Balance of Smart Street improvements (not already in RTIP) $8,300,000 $16,600,000 2020 2A01168*
OR Laguna Canyon Road (SR-133) Pacific Coast Highway I-405 Smart Street Improvements $13,300,000 $26,700,000 2020 2A01169*
OR La Paz Road Cabot Pradera Drive Upgrade from primary to major $7,500,000 $7,500,000 2015 2A04170*OR Lincoln Avenue State College Sunkist Widen from 4 to 6 lanes $600,000 $600,000 2A04171*
OR Moulton Parkway Main Street PCH Edinger, Moulton, Street of Golden Lantern - Balance of Smart Street Improvements $23,600,000 $47,200,000 2020 Santa Ana 2A01172*
OR Moulton Parkway Via Campo Verde Santa Maria Add dual left turn lanes on El Toro at Moulton Pkwy, add bike lanes and sidewalks $6,000,000 2005 Laguna Woods 2A04172A*
OR Newland Street Newland/I-405 Newland/I-405 Widen Newland Overcrossing $4,000,000 2004 2A04173*OR Newport Blvd 19th St 17th Street Widen to 8 lanes $5,100,000 2010 Costa Mesa 2A04174*
OR Newport Blvd 19th Street Finley Smart Street Improvements $3,300,000 $6,700,000 2020 2A01175*
OR Newport Avenue Current terminus Edinger
Phase II Newport Avenue extension to Edinger inclulding railroad underpass and widening Newport Avenue (3 lane each direction) from Tustin Grove Dr. to Myrtle Avenue
$200,000 $26,500,000 2005 Tustin 2A04176*
OR Orangethorpe Avenue Beach Blvd Imperial Hwy Smart Street Improvements $22,800,000 $45,700,000 2020 2A01177*
OR Pacific Coast Hwy San Juan Creek Warner Smart Street Improvements $49,800,000 $99,700,000 2020 2A01178*
OR State College SR-91 Imperial Hwy Smart Street Improvements $7,500,000 $15,000,000 2020 2A04179A*
2004 RTP * TECHNICAL APPENDIX I - 186
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
OR Tustin Ave/Rose Drive SR-91 Imperial Hwy Smart Street Improvements $7,000,000 $14,000,000 2020 2A01180*
ORValencia North Loop Rd and Armstrong Avenue within MCAS Tustin
Valencia North Loop Rd to Redhill Ave to Tustin Ranch Rd, Armstrong Ave from Barranca Pkwy to Valencia North Loop Rd, and West Connector from Valencia North Loop Rd to Edinger Ave
Construct 4-lane roads, utilities for development of former MCAS Tustin $27,500,000 2020 Tustin 2A04180A1
THRU 3*
OR Valley View SR-22 SR-91 Smart Street Improvements $16,000,000 $34,000,000 2020 2A01181*
OR Warner Avenue Harbor Blvd Pacific Coast Highway Smart Street Improvements $15,300,000 $30,700,000 2020 2A01182*
OR Ortega Hwy (SR74) I-5 Antonio Parkway Widen to 4 lanes $10,000,000 2030 2A01182A*
RV SR-74 Winchester Rd (SR-79) Warren Rd Widen from 4 to 6 lanes $6,127,000 2020 Hemet 3A04WT037*
RV SR-74 (Grand Ave) Riverside Dr (SR-74) Ortega Hwy (SR-74) Widen from 2 to 6 lanes $3,293,000 2023 Lake Elsinore 3A01WT045*
RV SR-74 (Riverside Dr) Lakeshore Dr Grand Ave Widen from 2 to 6 lanes $8,674,000 2015 Lake Elsinore 3A04WT046*
RV SR-74 (Riverside Dr/Collier Ave) I-15 Lakeshore Dr Widen from 2 to 6 lanes and reconstruct
IC/ramps at I-15 $39,398,000 2010 Lake Elsinore 3A04WT047*
RV SR-74 Matthews Rd SR-79 (Winchester) Widen from 4 to 6 lanes $11,488,000 2015 Riverside County 3A04WT190*
RV SR-74 I-15 Ethanac Rd Widen from 4 to 6 lanes $14,911,000 2015 Riverside County 3A04WT191*
RV SR-79 Sanderson Ave State St Widen from 2 to 4 lanes $5,797,000 2025 Riverside County 3A01WT192*
RV SR-79 (San Jacinto Bypass) Ramona Expwy SR-74 (Florida Ave) Construct 6 lane arterial $40,238,000 2025 Riverside County 3A01WT194*
RV SR-79 (Hemet Bypass) SR-74 (Florida Ave) Winchester Rd (SR79) (near Domenigoni Pkwy) Construct 6 lane arterial $43,055,000 2025 Riverside County 3A01WT194*
RV SR-79 (Eastern Bypass) SR79 (Winchester Rd near Scott Rd) I-15 Construct 4 lane arterial and IC/ramps at I-15
(part of CETAP corridor) $140,218,000 2025 Riverside County 3A01WT196*
RV SR-79 North Ramona Blvd 7th St Widen from 2 to 4 lanes $600,000 2005 San Jacinto 3A01WT213*RV SR-79 Gillman Springs Rd Quandt Ranch Rd Widen from 2 to 4 lanes $4,448,000 2008 San Jacinto 3A01WT214*RV SR-79 (Constance) I-15 Pala Rd Widen from 6 to 8 lanes $1,432,000 2010 Temecula 3A01WT218*
RV SR-79 (Winchester Rd) Murrieta Hot Springs Rd Jefferson Ave Reconstruct road and reconstruct IC/ramps at
I-15 $14,500,000 2009 Temecula 3A01WT219*
RV SR-79 Western Bypass Winchester Rd (SR-79) Margarita Rd Widen from 2 to 4 lanes (note: RTIP#62020) $4,447,000 2012 Temecula 3A01WT220*
RV SR-79 Western Bypass Margarita Rd Murrieta Creek Construct 4 lane arterial and IC/ramps at I-15 (note: RTIP#62020) $43,461,000 2008 Temecula 3A01WT221*
2004 RTP * TECHNICAL APPENDIX I - 187
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
RV SR-79 Western Bypass Murrieta Creek Rancho California Rd Construct 4 lane arterial (note: RTIP#62020) $17,368,000 2014 Temecula 3A01WT222*
RV SR-79 Western Bypass Rancho California Rd Old Town Front St Construct 4 lane arterial (note: RTIP#62019) $15,803,000 2006 Temecula 3A01WT223*
RV Hobsonway Arrowhead Blvd Carlton Ave Widen Existing Bridge at C-052 Canal from 2 to 4 Lanes $2,255,000 2015 Blythe 3A04A01*
RV Hobsonway Arrowhead Blvd Carlton Ave Widen Existing Bridge at C-Canal from 2 to 4 Lanes $2,255,000 2015 Blythe 3A04A02*
RV Hobsonway Arrowhead Blvd Carlton Ave Widen from 2 to 4 Lanes $3,075,000 2016 Blythe 3A04A03*
RV N. Lovekin Blvd 10th Ave 8th Ave Widen Existing Bridge at C-Canal from 2 to 4 Lanes $2,000,000 2018 Blythe 3A04A04*
RV 14th Ave River Valley Rd 7th St Widen Existing Bridge at D-Canal from 2 to 4 Lanes $1,780,000 2012 Blythe 3A04A05
RV Hobsonway Olive Lake Blvd Intake Blvd Widen Existing Bridge at C-Canal from 2 to 4 Lanes $2,255,000 2022 Blythe 3A04A06*
RV Riviera Dr 18th Ave 20th Ave Construct 2 Lane Overcrossing at the Lower Outfall Drain $1,475,000 2014 Blythe 3A04A07
RV 7th St Hobsonway Rice St Widen from 2 to 4 Lanes $750,000 2008 Blythe 3A04A08RV N. Lovekin Blvd Hobsonway 10th Ave Widen from 2 to 4 Lanes $4,060,000 2020 Blythe 3A04A09*RV Barnard St Date St Intake Blvd Construct/Extend 2 Lane Arterial $1,675,000 2018 Blythe 3A04A10
RV Nichols Rd Collier Ave Dexter Ave Widen from 2 to 6 lanes and Reconstruct IC/Ramps at I-15 $8,480,000 2023 Lake Elsinore 3A04A11
RV Olive St Mission Tr Grape St Widen from 2 to 4 Lanes and construct IC/Ramps at I-15 to become Olive St IC $5,814,000 2013 Lake Elsinore 3A04A12
RV Auto Center Dr (Casino Dr) Franklin St Diamond Dr (Railroad
Cyn Rd)Widen bridge over San Jacinto River from 2 to 4 lanes $3,311,000 2018 Lake Elsinore 3A04A13
RV Franklin St Avenue 6 Canyon Estates Dr Widen street and bridge over I-15 from 2 to 4 lanes $1,222,000 2018 Lake Elsinore 3A04A14
RV Malaga Rd Mission Tr Grape St Widen from 2 to 4 lanes and construct 4 lane bridge over I-15 $2,400,000 2023 Lake Elsinore 3A04A15
RV Second St (Chaney St) Collier Ave Camino del Norte Construct 4 lane arterial connection and 4 lane bridge over I-15 $1,882,000 2028 Lake Elsinore 3A04A16
RV Riverside Dr Collier Ave Dexter Ave Widen from 2 to 4 lanes and construct 4 lane bridge over I-15 $1,882,000 2030 Lake Elsinore 3A04A17*
RV Lemon St Mission Tr Grape St Widen street and structure under I-15 from 2 to 4 lanes $2,224,000 2018 Lake Elsinore 3A04A18
RV S. Palm Canyon Dr Andreas Creek Bogert Trail Construct 4 lane bridge $2,200,000 2010 Palm Springs 3A04A19
RV Araby Dr Anza Tr Stagecoach Rd Construct 2 lane bridge over Palm Canyon Wash $3,000,000 2010 Palm Springs 3A04A20
RV Salvia Rd Indian Canyon Dr Gene Autry Tr Construct 4 lane arterial connector $8,000,000 2025 Palm Springs 3A04A21
RV Sunrise Way Sunrise Way (North of San Rafael Dr) Indian Canyon Dr Construct/extend 4 lane arterial connector $2,500,000 2015 Palm Springs 3A04A22
RV "A" Street Nuevo Rd 4th St Widen from 2 to 4 Lanes $3,000,000 2012 Perris 3A04A23
RV Garbani Rd I-215 Menifee Rd Reconstruct and widen from 2 to 4 lanes $2,251,000 2025 Riverside County 3A04A31
2004 RTP * TECHNICAL APPENDIX I - 188
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
RV Garbani Rd Bradley Rd I-215 Construct 4-lane arterial $2,558,000 2020 Riverside County 3A04A32
RV Philadelphia Ave Wineville Rd Etiwanda Ave Widen from 1 EB existing to 2 lanes $1,018,000 2025 Riverside County 3A04A33
RV Philadelphia Ave Milliken Ave I-15 Widen from 1 EB existing to 2 lanes $938,000 2025 Riverside County 3A04A34
RV Riverside Dr Hamner Ave Etiwanda Ave Widen from 2 to 4 lanes $2,455,000 2025 Riverside County 3A04A35
RV Riverside Dr at Day Creek Wineville Rd Etiwanda Ave Widen bridge from 2 to 4 lanes $389,000 2025 Riverside County 3A04A36
RV Cottonwood Ave Warren Rd State St Widen from 2 to 4 Lanes $6,000,000 2012 San Jacinto 3A04A24
RV Main St Old Town Front St Pujol St Construct 2 lane bridge across Murrieta Creek $4,875,000 2006 Temecula 3A04A25
RV Date Palm Drive Vista Chino I-10 (IC & RR bridge) Widen from 4 to 6 lanes $22,520,000 2020 Cathedral City 3A01CV034*
RV Palm Canyon Dr 200 ft. west of Sungate Easterly City Limits Widen from 4 to 6 lanes $467,000 2015 Cathedral City 3A01CV074*
RV Palm Canyon Dr Westerly City Limits Cathedral Cyn Dr incl. Bridge over channel Widen from 2 to 4 lanes $1,763,000 2015 Cathedral City 3A04CV112*
RV Ramon Rd Landau Blvd Date Palm Drive Widen from 4 to 6 lanes $3,048,000 2020 Cathedral City 3A01CV079*RV Varner Rd Mountain View Date Palm Widen from 2 to 4 lanes $5,676,000 2015 Cathedral City 3A01CV090*
RV Vista Chino E. Bank Whitewater River Landau Blvd Widen from 4 to 6 lanes $2,839,000 2025 Cathedral City 3A01CV096*
RV Vista Chino Date Palm Da Vall Drive Gap closure - construct 4 lanes $6,713,000 2025 Cathedral City 3A01CV097
RV Avenue 50 Bridge at All American Canal Construct new bridge $816,000 2005 Coachella 3A01CV002*
RV Avenue 50 New SR-86 I-10 Widen from 2 to 4 lanes $8,622,000 2020 Coachella 3A01CV004*
RV Avenue 50 SR-111 New SR-86 incl bridge over Whitewater River Construct 4 lane bridge $2,054,600 2010 Coachella 3A04CV113*
RV Avenue 50 Van Buren SR-111 Widen from 2 to 4 lanes $1,739,000 2010 Coachella 3A01CV005*RV Avenue 52 SR-86 SR-111 Widen from 3 to 4 lanes $664,000 2015 Coachella 3A01CV007*
RV Avenue 52 SR-111 New SR-86 incl bridge Widen bridge from 2 to 4 lanes $1,148,000 2020 Coachella 3A01CV008*
RV Avenue 52 Fredrick SR-86 w/intersection improv. Widen from 3 to 4 lanes $1,421,000 2015 Coachella 3A01CV015*
RV Avenue 54 Van Buren Harrison (old 86) Widen from 2 to 4 lanes $2,553,000 2005 Coachella 3A01CV016RV Avenue 54 Harrison (old 86) Tyler Street Widen from 2 to 4 lanes $2,565,000 2015 Coachella 3A01CV017RV Avenue 54 Tyler St SR-111 Widen from 2 to 4 lanes $1,570,000 2015 Coachella 3A01CV018
RV Avenue 56/Airport Blvd 0.25 miles W. of Van Buren St Harrison Widen from 2 to 4 lanes $3,296,000 2010 Coachella 3A01CV023
RV Van Buren Street 52nd Ave 54th Ave Widen from 2 to 4 lanes $566,000 2015 Coachella 3A01CV087*
RV Van Buren Street 54th Ave Avenue 56/Airport Widen from 3 to 4 lanes $2,733,000 2010 Coachella/County 3A01CV088*
RV Avenue 52 Jackson Street Calhoun Street Widen from 2 to 4 lanes $1,307,000 2010 County 3A01CV013*
2004 RTP * TECHNICAL APPENDIX I - 189
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
RV Avenue 56/Airport Blvd Harrison Street Tyler Street Widen from 2 to 4 lanes $2,181,200 2010 County 3A04CV024
RV Avenue 56/Airport Blvd Jackson St 0.25 miles W. of Van Buren Widen from 2 to 4 lanes $1,578,600 2010 County 3A04CV022
RV Avenue 56/Airport Blvd Monroe Jackson Widen from 2 to 4 lanes $2,701,000 2015 County 3A01CV021
RV Avenue 56/Airport Blvd Tyler Street Polk Street Widen from 2 to 4 lanes $2,516,000 2030 County 3A01CV025
RV Avenue 56/Airport BlvdPolk St w/ SR-111 & SPRR Grade Sep. (56G/56H)
Widen from 2 to 4 lanes $3,778,000 2025 County 3A01CV026
RV Chase School Rd I-10 Ramon Rd Gap closure - construct 4 lanes $7,046,000 2030 County 3A01CV029RV Dillon Road I-10 Whitewater bridge Widen from 2 to 4 lanes $1,731,200 2010 County 3A04CV114*RV Dillon Road Indian Ave Palm Drive Widen from 2 to 4 lanes $6,226,000 2015 County 3A01CV035*
RV Dillon Road Bennette Rd Thousand Palms Canyon Rd Widen from 2 to 4 lanes $19,691,000 2025 County 3A01CV036*
RV Dillon Road Bridge over Whitewater Channel Widen from 2 to 4 lanes $6,781,000 2020 County 3A01CV037*
RV Dillon Road Whitewater Bridge SR-111 Widen from 2 to 4 lanes $1,972,000 2015 County 3A01CV038*RV Indian Ave Dillon 14th Ave Widen from 2 to 4 lanes $3,770,000 2015 County 3A01CV051RV Madison Street Ave 60 Ave 58 Widen from 2 to 4 lanes $3,460,000 2015 County 3A01CV055RV Monterey Avenue I-10 Ramon Rd Widen from 2 to 4 lanes $1,606,000 2015 County 3A01CV070RV Ramon Rd I-10 Monterey Ave road enhancement $23,000 2015 County 3A04CV115*RV Ramon Rd Los Alamos Bob Hope Widen from 2 to 6 lanes $2,585,300 2010 County 3A04CV080*RV Ramon Rd Monterey Ave Thousand Palms Widen from 2 to 4 lanes $9,169,000 2020 County 3A01CV082*RV Varner Rd Washington St Jefferson St road enhancement $1,141,000 2015 County 3A01CV102*RV Varner Rd Ramon Rd Monterey Ave Widen from 2 to 4 lanes $2,590,000 2020 County 3A01CV092*RV Varner Rd Monterey Av Chase School Rd Widen from 2 to 4 lanes $5,507,000 2025 County 3A01CV093*RV Varner Rd Chase School Rd Washington Street Widen from 2 to 4 lanes $9,775,000 2020 County 3A01CV094*RV Washington St 38th Avenue Ramon Rd Widen from 2 to 4 lanes $10,627,000 2025 County 3A01CV099
RV Mountain View 20th Ave Varner Road Widen from 2 to 4 lanes $3,270,000 2015 County/Cathedral City 3A01CV073
RV Varner Rd Palm Dr Mountain View Rd Widen from 2 to 4 lanes $4,251,000 2015 County/Cathedral City 3A01CV089*
RV Varner Rd Date Palm Ramon Rd Widen from 2 to 4 lanes $11,549,000 2020 County/Cathedral City 3A01CV091*
RV Avenue 52 Calhoun Street Fredrick Street Widen from 2 to 4 lanes $2,614,000 2015 County/Coachella 3A01CV014*
RV Avenue 56/Airport Blvd SPRR E. of Coa. Val. Storm Channel bridge Widen from 2 to 4 lanes $608,100 2030 County/Coachella 3A04CV027
RV Avenue 52 Madison Street Monroe Street Widen from 2 to 4 lanes $2,837,000 2010 County/Indio 3A01CV011*RV Avenue 52 Monroe Street Jackson St Widen from 2 to 4 lanes $2,595,000 2025 County/Indio 3A01CV012*
RV Avenue 56/Airport Blvd 0.5 mile east of Madison Monroe Widen from 2 to 4 lanes $1,344,000 2015 County/La Quinta 3A01CV020
2004 RTP * TECHNICAL APPENDIX I - 190
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
RV Country Club Drive Oasis Club Drive Washington Street Widen from 4 to 6 lanes $3,203,000 2030 County/Palm Desert 3A01CV031
RV Bob Hope Drive Dinah Shore Drive Ramon Road Widen from 2 to 4 lanes $3,286,000 2015 County/Rancho Mirage 3A01CV028
RV Hacienda Avenue Little Morongo Rd Palm Drive Widen from 2 to 4 lanes $5,271,000 2025 Desert Hot Springs 3A01CV047
RV Hacienda Avenue Palm Dr Mountain View Widen from 2 to 4 lanes $3,971,000 2025 Desert Hot Springs 3A01CV048
RV Hacienda Avenue Mountain View Dillon Road Widen from 2 to 4 lanes $6,879,000 2025 Desert Hot Springs 3A01CV049
RV Indian Ave Pierson Blvd Mission Lakes Widen from 2 to 4 lanes $2,772,000 2025 Desert Hot Springs 3A01CV053*
RV Indian Ave 14th Av Pierson Blvd Widen from 2 to 4 lanes $2,532,000 2020 Desert Hot Springs 3A01CV052*
RV Little Morongo Rd Pierson Blvd Two Bunch Palms Trail road enhancement $655,000 2015 Desert Hot Springs 3A01CV103
RV Little Morongo Rd Mission Lakes Blvd Pierson Blvd road enhancement $656,000 2020 Desert Hot Springs 3A01CV104
RV Little Morongo Rd Two Bunch Palms Dillon Road road enhancement $1,019,000 2025 Desert Hot Springs 3A01CV105
RV Mission Lakes Indian Little Morongo Rd Widen from 2 to 6 lanes $3,437,000 2025 Desert Hot Springs 3A01CV067
RV Mission Lakes Little Morongo East Verbena Dr Widen from 4 to 6 lanes $6,384,000 2025 Desert Hot Springs 3A01CV068
RV Mountain View Hacienda Av Dillon Road Widen from 2 to 4 lanes $5,158,000 2025 Desert Hot Springs 3A01CV071*
RV Mountain View Dillon Rd 20th Ave Widen from 2 to 4 lanes $3,710,000 2025 Desert Hot Springs 3A01CV072*
RV Pierson Blvd SR-62 Indian Avenue Widen from 2 to 6 lanes $8,083,000 2015 Desert Hot Springs 3A01CV075*
RV Pierson Blvd Indian Ave Little Morongo Rd Widen from 2 to 6 lanes $3,230,000 2020 Desert Hot Springs 3A01CV076*
RV Pierson Blvd Palm Dr Eastern Terminus of Desert View Widen from 4 to 6 lanes $3,009,000 2025 Desert Hot
Springs 3A01CV077*
RV Two Bunch Palms Indian Av Little Morongo Rd Gap closure - construct 6 lanes $4,805,000 2025 Desert Hot Springs 3A01CV084*
RV Two Bunch Palms Little Morongo Rd Palm Drive Widen from 2 to 6 lanes $5,019,000 2025 Desert Hot Springs 3A01CV085*
RV Two Bunch Palms Palm Dr Miracle Hill Widen from 2 to 6 lanes $3,846,000 2025 Desert Hot Springs 3A01CV086*
RV Fred Waring DriveIntersection of Eldorado & Fred Waring
Widen from 4 to 6 lanes $31,000 2007 Indian Wells 3A01CV044
RV Avenue 48 Jefferson Hjorth incl. bridge Widen from 2 to 4 lanes $4,328,000 2020 Indio 3A01CV001RV Indio Blvd Jackson SR-111 road enhancement $460,000 2010 Indio 3A01CV106*RV Indio Blvd Madison Monroe road enhancement $1,376,000 2015 Indio 3A01CV107*
2004 RTP * TECHNICAL APPENDIX I - 191
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
RV Indio Blvd Monroe Jackson road enhancement $1,346,000 2015 Indio 3A01CV108*RV Indio Blvd Jefferson/I-10 Madison road enhancement $818,000 2015 Indio 3A01CV109*RV Jackson St I-10 interchange 46th Ave road enhancement $1,653,000 2010 Indio 3A01CV110*RV Jackson St 46th Ave 48th Ave road enhancement $1,120,000 2020 Indio 3A01CV111*RV Jefferson St Ave 40 Ave 38 road enhancement $598,300 2020 Indio 3A04CV116RV Jefferson St Fred Waring Drive Indio Blvd Widen from 2 to 4 lanes $2,632,300 2010 Indio 3A04CV117RV Madison Street Ave 50 Ave 49 Gap closure - construct 4 lanes $2,061,000 2020 Indio 3A01CV060RV Madison Street Ave 49 SR-111 Widen from 2 to 4 lanes $3,625,000 2020 Indio 3A01CV061RV Madison Street SR-111 Miles Ave Widen from 2 to 4 lanes $3,496,000 2025 Indio 3A01CV062RV Madison Street Fred Waring Drive Indio Blvd Widen from 2 to 4 lanes $2,209,000 2015 Indio 3A01CV064
RV Madison Street I-10 Interchange and Bridge over RR Construct new IC and bridge $18,191,800 2015 Indio 3A04CV065
RV Miles Avenue Clinton Indio Blvd road enhancement $908,000 2015 Indio 3A01CV121RV Miles Avenue Jefferson Street Clinton road enhancement $1,166,000 2015 Indio 3A01CV122RV Monroe St I-10 Miles Ave road enhancement $1,475,900 2010 Indio 3A04CV118*RV Varner Rd Jackson Van Buren Blvd road enhancement $1,208,500 2020 Indio 3A04CV119*RV Jackson St 48th Ave 50th Ave Widen from 2 to 4 lanes $566,000 2006 Indio/Coachella 3A01CV054*RV Fred Waring Drive Silverwood Drive Indio Blvd Widen from 2 to 6 lanes $2,511,000 2010 Indio/County 3A01CV045*RV Jackson St 40th Ave I-10 interchange road enhancement $3,014,000 2010 Indio/County 3A01CV123*RV Madison Street Miles Fred Waring Gap closure - construct 4 lanes $2,021,000 2015 Indio/County 3A01CV063RV Avenue 50 Jefferson Madison Widen from 2 to 4 lanes $3,098,000 2025 Indio/La Quinta 3A01CV003
RV Jefferson St SR-111 Westward Ho w/Whitewater Bridge Widen from 2 to 6 lanes $8,192,700 2015 Indio/La Quinta 3A04CV120*
RV Madison Street Ave 52 Ave 50 w/BR AA Canal Widen from 2 to 4 lanes $4,102,000 2015 Indio/La Quinta 3A01CV059
RV Avenue 50 Washington Jefferson Street Widen from 2 to 4 lanes $4,366,000 2020 La Quinta 3A01CV006RV Avenue 52 Washington Street Jefferson Street Widen from 3 to 4 lanes $4,569,000 2025 La Quinta 3A01CV009*
RV Avenue 52 Jefferson Street Madison Street incl. All Amer. Canal Widen from 2 to 4 lanes $3,630,000 2010 La Quinta 3A01CV010*
RV Avenue 56/Airport Blvd Madison St 0.5 miles E. of Madison Widen from 2 to 4 lanes $1,216,200 2020 La Quinta 3A04CV019
RV Madison Street Ave 58 Ave 56 Widen from 2 to 4 lanes $3,115,000 2020 La Quinta 3A01CV056RV Madison Street Ave 56 Ave 54 Widen from 3 to 4 lanes $2,958,000 2025 La Quinta 3A01CV057RV Madison Street Ave 54 Ave 52 Gap closure - construct 4 lanes $4,016,000 2020 La Quinta 3A01CV058RV Miles Avenue Washington St Jefferson Street Widen from 2 to 4 lanes $4,171,000 2015 La Quinta 3A01CV066RV Washington St 50th Avenue Avenue 48 Widen from 4 to 6 lanes $4,801,000 2020 La Quinta 3A01CV100*RV Washington St Avenue 48 SR-111 Widen from 4 to 6 lanes $3,175,000 2020 La Quinta 3A01CV101*RV Country Club Drive El Dorado Drive Oasis Club Drive Widen from 4 to 6 lanes $3,135,000 2025 Palm Desert 3A01CV030RV Country Club Drive Portola Avenue Cook Street Widen from 4 to 6 lanes $3,049,000 2025 Palm Desert 3A01CV033RV Frank Sinatra Drive Cook St Tamarisk Row Dr Widen from 2 to 4 lanes $2,580,000 2025 Palm Desert 3A01CV040*RV Fred Waring Drive California Elkhorn Trail Widen from 4 to 6 lanes $2,071,000 2015 Palm Desert 3A04CV041*
2004 RTP * TECHNICAL APPENDIX I - 192
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
RV Fred Waring Drive Portola Phyllis Jackson/Portola & Fred Waring Widen from 4 to 6 lanes $2,078,100 2010 Palm Desert 3A04CV042*
RV Gerald Ford Drive Portola Avenue Cook Street Widen from 2 to 4 lanes $9,840,000 2025 Palm Desert 3A01CV046
RV Country Club Drive Monterey Avenue Portola Ave Widen from 4 to 6 lanes $3,371,000 2025 Palm Desert/County 3A01CV032
RV Indian Ave/Indian Canyon Dr UPRR bridge Tramview Rd Widen from 4 to 6 lanes (note:
RTIP#RIV011203 widens from 2 to 4 lanes) $3,324,000 2008 Palm Springs 3A04CV124
RV Ramon Rd Palm Canyon Dr Sunrise Way Widen from 4 to 6 lanes $4,035,000 2015 Palm Springs 3A01CV081*
RV Vista Chino Gene Autry Trail E. Bank of Whitewater River Widen from 4 to 6 lanes $18,938,000 2020 Palm Springs 3A01CV095*
RV Vista Chino Palm Canyon Dr Sunrise Way Widen from 4 to 6 lanes $3,475,000 2015 Palm Springs 3A01CV098*
RV Ramon Rd Gene Autry Trail E. Bank of Whitewater River Widen from 4 to 6 lanes $14,587,000 2010 Palm Springs/
Cathedral City 3A01CV078*
RV Indian Ave 19th Ave Dillon Road Widen from 2 to 4 lanes $2,839,000 2020 Palm Springs/County 3A01CV050
RV Monterey Avenue Country Club Frank Sinatra w/ intersections Widen from 4 to 6 lanes $3,182,000 2015
Rancho Mirage/County/Palm Desert
3A01CV069
RV Highland Springs Ave Cherry Valley Blvd 14th St Widen from 2 to 4 lanes $2,892,000 2020 Banning 3A04WT001*RV Highland Springs Ave 14th St Wilson St Widen from 2 to 4 Lanes $2,299,000 2020 Banning 3A04WT002*
RV Highland Springs Ave Wilson St Sun Lakes Blvd Widen from 4 to 6 Lanes and reconstruct IC/ramps at I-10 $16,376,000 2020 Banning 3A04WT003*
RV Ramsey St 8th St I-10 Widen from 2 to 4 lanes $4,860,000 2020 Banning 3A04WT004*
RV Ramsey St I-10 Fields Rd Construct 2 lane arterial and reconstruct IC/ramps at I-10 $18,463,000 2010 Banning 3A04WT005*
RV Sun Lakes Blvd Highland Home Rd Sunset Ave Construct 2 lane arterial $2,361,000 2010 Banning 3A04WT006
RV Sunset Ave Ramsey St Lincoln St Widen from 2 to 4 lanes and reconsturct IC/ramps at I-10 $23,272,000 2010 Banning 3A04WT007*
RV Wilson St Highland Springs Ave Highland Home Rd Widen from 2 to 4 lanes $2,393,000 2010 Banning 3A04WT008
RV 14th St Highland Springs Ave Pennsylvania Ave Construct 2 lane arterial $3,673,000 2020 Beaumont 3A04WT009*
RV 14th St Pennsylvania Ave Nancy Ave Widen from 2 to 4 lanes $3,081,000 2020 Beaumont 3A04WT010*
RV 14th St (Oak Valley Pkwy) I-10 Nancy Ave Widen from 4 to 6 lanes and reconstruct
IC/ramps at I-10 $16,634,000 2020 Beaumont 3A04WT011*
RV 1st St Viele Ave Pennsylvania Ave Widen from 2 to 4 lanes $3,097,000 2020 Beaumont 3A04WT012RV 1st St Pennsylvania Ave Highland Springs Ave Construct 2 lane arterial $2,674,000 2020 Beaumont 3A04WT013
RV Potrero Blvd 1st St SR-79 (Beaumont Ave) Construct 2 lane arterial $5,991,000 2020 Beaumont 3A04WT014
RV San Timoteo Canyon Rd Central Overland Rd I-10 Widen from 2 to 4 lanes $4,399,000 2020 Beaumont 3A01WT015*
RV Viele Ave 6th St 4th St Widen from 2 to 4 lanes incl. 4-lane grade separation over UPRR tracks $27,035,000 2020 Beaumont 3A04WT016
2004 RTP * TECHNICAL APPENDIX I - 193
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
RV Viele Ave 4th St 1st St Construct 4 lane arterial $1,525,000 2020 Beaumont 3A04WT017
RV Potrero Blvd Desert Lawn Dr 1st St Construct 4 lane arterial and UPRR grade separation (note: SR-60 IC in RTIP#34140) $68,686,000 2015 Beaumont 3A04WT018
RV Bryant St County Line Rd Singleton Rd Widen from 2 to 4 lanes $950,000 2010 Calimesa 3A04WT019
RV County Line Rd I-10 Bryant St Widen from 2 to 4 lanes and reconsturct IC/ramps at I-10 $16,579,000 2010 Calimesa 3A04WT020*
RV Desert Lawn Dr Cherry Valley Blvd San Timoteo Canyon Rd Widen from 2 to 4 lanes $4,214,000 2008 Calimesa 3A04WT021*
RV Singleton Rd Bryant St Condit Ave Construct 4 lane arterial $10,968,000 2010 Calimesa 3A01WT022
RV Singleton Rd Condit Ave Roberts Rd Widen from 2 to 4 lanes and reconsturct IC/ramps at I-10 $29,835,000 2010 Calimesa 3A01WT023
RV Goetz Rd Railroad Canyon Rd Newport Rd Widen from 2 to 4 lanes $3,439,000 2006 Canyon Lake 3A04WT024*
RV Railroad Canyon Rd Cottonwood Canyon Rd Goetz Rd Widen from 4 to 6 lanes $6,370,000 2006 Canyon Lake 3A04WT025*
RV Foothill Pkwy Paseo Grande Lincoln Ave Construct 4 lane arterial $28,377,000 2012 Corona 3A04WT026RV Magnolia Ave Ontario Ave 6th St Widen from 4 to 6 lanes $19,730,000 2010 Corona 3A04WT027*RV Magnolia Ave 6th St BNSF RR Widen from 4 to 6 lanes $5,831,000 2010 Corona 3A04WT028*RV Main St SR-91 Grand Blvd Widen from 4 to 6 lanes $2,542,000 2010 Corona 3A04WT029*RV Main St Grand Blvd Ontario Ave Widen from 2 to 4 lanes $1,718,000 2010 Corona 3A04WT030*RV McKinley St SR-91 Magnolia Ave Widen from 4 to 6 lanes $13,850,000 2015 Corona 3A04WT031RV Railroad St Sherman Ave Main St (at Grand) Widen from 2 to 4 lanes $3,270,000 2010 Corona 3A04WT032
RV Ontario Ave Main St I-15Widen from 4 to 6 lanes and reconstruct IC/ramps at I-15 (note: Compton Ave to State St and ramps in RTIP#RIV010207)
$5,199,000 2010 Corona 3A04WT033*
RV Domenigoni Pkwy Warren Rd Sanderson Ave Widen from 4 to 6 lanes $3,891,000 2020 Hemet 3A04WT034*RV Sanderson Ave Domenigoni Pkwy Stetson Ave Widen from 2 to 4 lanes $3,757,000 2008 Hemet 3A01WT035*
RV Sanderson Ave BNSF RR Crossing (near Stetson Ave) Acacia Ave Widen from 2 to 4 lanes $1,419,000 2008 Hemet 3A01WT036*
RV State St Domenigoni Pkwy Stetson Ave Widen from 2 to 4 lanes $4,383,000 2005 Hemet 3A01WT038*RV State St Johnston Ave Florida Ave (SR-74) Widen from 2 to 4 lanes $4,236,000 2005 Hemet 3A01WT039*RV Stetson Ave Warren Rd Cawston Ave Relocate and construct 4 lane arterial $3,034,000 2012 Hemet 3A01WT040RV Warren Rd Esplanade Ave Domenigoni Pkwy Widen from 2 to 4 lanes $11,946,000 2015 Hemet 3A01WT041RV Grand Ave Toft Dr SR-74 Widen from 2 to 4 lanes $1,847,000 2022 Lake Elsinore 3A04WT042*
RV Lake St I-15 Lincoln St Widen from 2 to 6 lanes and reconstruct IC/ramps at I-15 $29,308,000 2018 Lake Elsinore 3A04WT043*
RV Mission Tr Railroad Canyon Rd Bundy Canyon Rd Widen from 4 to 6 lanes $5,033,000 2009 Lake Elsinore 3A01WT044*
RV Railroad Canyon Rd Mission Trail Cottonwood Canyon RdWiden from 4 to 6 lanes and reconstruct IC/ramps at I-15 (note: ramp reconfiguration in RTIP#RIV010206)
$17,184,000 2008 Lake Elsinore 3A01WT048*
RV Alessandro Blvd I-215 Perris Blvd Widen from 4 to 6 lanes and reconstruct IC/ramps at I-215 $10,734,000 2012 Moreno Valley 3A01WT049*
RV Alessandro Blvd Perris Blvd Moreno Beach Dr Widen from 2 to 6 lanes $14,606,000 2009 Moreno Valley 3A01WT050*RV Alessandro Blvd Moreno Beach Dr Gillman Springs Rd Widen from 2 to 4 lanes $8,622,000 2012 Moreno Valley 3A01WT051*RV Eucalyptus Ave I-215 Frederick St Widen from 4 to 6 lanes $4,133,000 2013 Moreno Valley 3A04WT052*
2004 RTP * TECHNICAL APPENDIX I - 194
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
RV Gilman Springs Rd SR-60 Alessandro Blvd Widen from 2 to 4 lanes and reconstruct IC/ramps at SR-60 $18,554,000 2014 Moreno Valley 3A01WT053*
RV Heacock St Cactus Ave San Michele Rd Widen from 2 to 4 lanes $6,883,000 2008 Moreno Valley 3A04WT054*RV Indian Ave San Michele Rd Oleander Ave Widen from 2 to 4 lanes $1,905,000 2009 Moreno Valley 3A04WT055*
RV Ironwood Ave Morton Rd Redlands Blvd Widen from 2 to 4 lanes and reconstruct IC/ramps at SR-60 $34,594,000 2012 Moreno Valley 3A04WT056*
RV Lasselle St SR-60 Alessandro Blvd Widen from 2 to 4 lanes $3,671,000 2014 Moreno Valley 3A01WT057*
RV Moreno Beach Dr Reche Canyon Rd SR-60 Widen from 2 to 4 lanes and reconstruct IC/ramps at SR-60 $17,535,000 2012 Moreno Valley 3A01WT058*
RV Perris Blvd Cactus Ave Oleander Ave Widen from 2 to 4 lanes $9,320,000 2007 Moreno Valley 3A01WT061*RV Perris Blvd Reche Vista Dr Ironwood Ave Widen from 2 to 4 lanes $5,689,000 2007 Moreno Valley 3A01WT062*
RV Perris Blvd Ironwood Ave Sunnymead Blvd Widen from 2 to 4 lanes and reconstruct IC/ramps at SR-60 $15,762,000 2013 Moreno Valley 3A01WT063*
RV Pigeon Pass Rd Hidden Springs Dr Ironwood Ave Widen from 2 to 4 lanes $8,058,000 2014 Moreno Valley 3A04WT064*RV Reche Canyon Rd Reche Vista Dr Moreno Beach Dr Construct 2 lane arterial $11,438,000 2015 Moreno Valley 3A04WT065*RV Reche Vista Dr Reche Canyon Rd Heacock St Widen from 2 to 4 lanes $4,399,000 2007 Moreno Valley 3A01WT066*
RV Redlands Blvd Locust Ave Alessandro Blvd Widen from 2 to 4 lanes and reconstruct IC/ramps at SR-60 $33,773,000 2016 Moreno Valley 3A01WT067*
RV San Michele Rd Heacock St Indian Ave Widen from 2 to 4 lanes $1,098,000 2008 Moreno Valley 3A04WT068*RV Sunnymead Blvd Frederick St Perris Blvd Widen from 4 to 6 lanes $6,883,000 2016 Moreno Valley 3A04WT069*
RV Nason St Ironwood Ave Alessandro Blvd Widen from 2 to 4 lanes and reconstruct IC/ramps at SR-60 (note: IC in RTIP#32300) $19,278,000 2009 Moreno Valley 3A04WT070*
RV Clinton Keith Rd I-15 Nutmeg St Widen from 2 to 6 lanes $2,528,000 2020 Murrieta 3A01WT071*
RV Clinton Keith Rd Nutmeg St Toulon Dr Reconstruct road $521,000 2020 Murrieta 3A01WT072
RV Clinton Keith Rd I-215 Meadowlark Ln Widen from 4 to 6 lanes $1,417,000 2020 Murrieta 3A01WT073*RV Hunter Rd Los Alamos Rd Via Mira Mosa Construct 2 lane arterial $3,713,000 2020 Murrieta 3A04WT074RV Jefferson Ave Palomar St Nutmeg St Construct 4 lane arterial $3,627,000 2020 Murrieta 3A01WT075*
RV Jefferson Ave Nutmeg St Murrieta Hot Springs Rd Widen from 2 to 4 lanes $6,138,000 2020 Murrieta 3A01WT076*
RV Los Alamos Rd Jefferson Ave I-215 Widen from 2 to 4 lanes $6,143,000 2020 Murrieta 3A04WT077RV Menifee Rd Keller Rd Clinton Keith Rd Construct 4 lane arterial $8,358,000 2020 Murrieta 3A04WT078*RV Menifee Rd Holland Rd Garbani Rd Construct 4 lane arterial $4,718,000 2020 Murrieta 3A04WT079*RV Menifee Rd Garbani Rd Scott Rd Widen from 2 to 4 lanes $2,054,000 2020 Murrieta 3A04WT080*
RV Murrieta Hot Springs Rd I-215 Margarita Rd Widen from 4 to 6 lanes $3,546,000 2020 Murrieta 3A04WT081*
RV Nutmeg St Jefferson Ave Clinton Keith Rd Widen from 2 to 4 lanes $4,119,000 2020 Murrieta 3A04WT082
RV Clinton Keith Rd Toulon Dr I-215Widen from 2 to 6 lanes (note: RTIP#RIV010203 widens OC from 4 to 6 lanes)
$15,691,000 2010 Murrieta 3A01WT083*
RV Ivy St Hayes Ave New Clay St Construct bridge over Murrieta Creek $3,500,000 2005 Murrieta 3A04WT084RV Guava St Washington Ave Adams Ave Construct bridge over Murrieta Creek $3,800,000 2006 Murrieta 3A04WT085RV 1st St Parkridge Ave Hamner Ave Widen from 2 to 4 lanes $1,124,000 2012 Norco 3A04WT086
2004 RTP * TECHNICAL APPENDIX I - 195
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
RV 2nd St River Rd I-15 Widen from 2 to 4 lanes and reconstruct IC/ramps at I-15 $5,962,000 2015 Norco 3A04WT087*
RV Corydon Ave River Rd Norco Dr Widen from 2 to 4 lanes $3,691,000 2030 Norco 3A04WT088*RV Hamner Ave Santa Ana River Parkridge Ave Widen from 4 to 6 lanes $9,392,000 2018 Norco 3A04WT089*RV Hillside Ave 1st St Hidden Valley Pkwy Construct 2 lane arterial $1,030,000 2027 Norco 3A04WT090RV Norco Dr Corydon Ave Hamner Ave Widen from 2 to 4 lanes $2,922,000 2011 Norco 3A04WT091*RV 11th St/Case Rd Perris Blvd Goetz Rd Widen from 2 to 4 lanes $389,000 2007 Perris 3A04WT092
RV Ellis Ave SR-74 I-215 Construct 2 lane arterial incl. IC at I-215 and 2 lane grade separation over BNSF RR $49,184,000 2010 Perris 3A04WT093
RV Ethanac Rd Keystone Dr Goetz Rd Construct 4 lane arterial $9,313,000 2006 Perris 3A01WT094*RV Ethanac Rd Goetz Rd Murrieta Rd Widen from 2 to 4 lanes $2,328,000 2005 Perris 3A01WT095*RV Evans Rd Oleander Ave Ramona Expwy Widen from 2 to 4 lanes $2,090,000 2006 Perris 3A04WT096*RV Evans Rd Morgan St Ramona Expwy Widen from 2 to 4 lanes $1,374,000 2005 Perris 3A04WT097*RV Evans Rd Placentia Ave Morgan St Widen from 2 to 4 lanes $2,068,000 2006 Perris 3A04WT098*RV Evans Rd Placentia Ave Nuevo Rd Widen from 2 to 4 lanes $3,158,000 2010 Perris 3A04WT099*RV Evans Rd Nuevo Rd I-215 Construct 4 lane arterial $8,276,000 2010 Perris 3A01WT100*RV Goetz Rd Case Rd Ethanac Rd Widen from 2 to 4 lanes $4,515,000 2006 Perris 3A01WT101RV Goetz Rd Lesser Ln Ethanac Rd Widen from 2 to 4 lanes $3,270,000 2006 Perris 3A04WT102RV Nuevo Rd Murrieta Rd Dunlap Dr Widen from 2 to 4 lanes $2,032,000 2005 Perris 3A04WT103*
RV Oleander Ave I-215 Indian Ave Widen from 2 to 4 lanes and reconstruct IC/ramps at I-215 $6,166,000 2008 Perris 3A04WT059
RV Oleander Ave Indian Ave Evans Rd (Lasselle St) Coonstruct 4 lane arterial $7,412,000 2010 Perris 3A04WT060
RV Perris Blvd Oleander Ave Ramona Expwy Widen from 2 to 4 lanes $2,163,000 2006 Perris 3A04WT104*RV Perris Blvd Ramona Expwy Nuevo Rd Widen from 2 to 4 lanes $6,294,000 2006 Perris 3A01WT105*RV Perris Blvd Nuevo Rd 11th St Widen from 2 to 4 lanes $5,884,000 2006 Perris 3A01WT106*RV Placentia Ave Indian Ave Evans Rd Widen from 2 to 4 lanes $4,136,000 2011 Perris 3A01WT107
RV Ramona Expwy I-215 Perris BlvdWiden from 4 to 6 lanes and reconstruct IC/ramps at I-215 (note: RTIP#RIV011207 widens OC to 8 lanes)
$17,624,000 2006 Perris 3A01WT108*
RV Ramona Expwy Perris Blvd Evans Rd Widen from 4 to 6 lanes $2,165,000 2006 Perris 3A01WT109*RV Ramona Expwy Evans Rd Rider St Widen from 2 to 6 lanes $8,619,000 2006 Perris 3A01WT110*RV Alessandro Blvd Arlington Ave Trautwein Rd Widen from 4 to 6 lanes $7,762,000 2006 Riverside City 3A01WT111*
RV Arlington Ave Magnolia Ave Alessandro Blvd Widen from 4 to 6 lanes and reconstruct IC/ramps at SR-91 $23,715,000 2010 Riverside City 3A01WT112*
RV Canyon Crest Dr Central Ave Alessandro Blvd Widen from 2 to 4 lanes $6,743,000 2020 Riverside City 3A04WT113
RV Central Ave Magnolia Ave BNSF RRWiden from 4 to 6 lanes btwn SR-91 and Magnolia, and reconstruct IC/ramps at SR-91 btwn Neva Pl and BNSF RR
$4,653,000 2015 Riverside City 3A01WT114*
RV Iowa Ave Center St 3rd St Widen from 4 to 6 lanes $11,573,000 2020 Riverside City 3A04WT115
2004 RTP * TECHNICAL APPENDIX I - 196
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
RV La Sierra Ave SR-91 Victoria AveWiden from 2 to 4 lanes and reconstruct IC/ramps at SR-91 btwn Diana Ave and BNSF RR
$16,874,000 2010 Riverside City 3A01WT116*
RV Overlook Pkwy Chateau Ridge Ln Sandtrack Rd Construct 4 lane arterial $14,260,000 2005 Riverside City 3A04WT117RV Tyler St Wells Ave Arlington Ave Widen from 2 to 4 lanes $3,630,000 2020 Riverside City 3A04WT118RV Van Buren Blvd Wood Rd Orange Terrace Pkwy Widen from 4 to 6 lanes $3,859,000 2007 Riverside City 3A01WT119*RV Washington St Victoria Ave Hermosa Dr Widen from 2 to 4 lanes $4,967,000 2010 Riverside City 3A04WT120RV Wood Rd John F Kennedy Dr Krameria Ave Widen from 2 to 4 lanes $3,088,000 2007 Riverside City 3A04WT121
RV Van Buren Blvd Santa Ana River Mockingbird Canyon RdWiden from 4 to 6 lanes and reconstruct IC/ramps at SR-91 (note: overlaps RTIP#RIV011208 and RIV0084)
$32,243,000 2009 Riverside City 3A01WT122*
RV Alessandro Blvd Trautwein Rd I-215 Widen from 4 to 6 lanes $9,512,000 2025 Riverside County 3A01WT123*
RV Archibald Ave San Bernardino County Line River Rd Widen from 2 to 4 lanes $13,269,000 2025 Riverside County 3A01WT124*
RV Armstrong Rd San Bernardino County Line Valley Way Widen from 2 to 4 lanes $4,473,000 2025 Riverside County 3A04WT125
RV Baxter Rd I-15 Central St Widen from 2 to 4 lanes and reconstruct IC/ramps at I-15 $15,221,000 2025 Riverside County 3A04WT126
RV Bellgrave Ave Cantu-Galleano Ranch Rd Van Buren Blvd Widen from 2 to 4 lanes $778,000 2025 Riverside County 3A01WT127*
RV Benton Rd SR-79 Eastern Bypass Widen from 2 to 4 lanes $4,963,000 2025 Riverside County 3A01WT128
RV Briggs Rd SR-74 (Pinacate Rd) Simpson Rd Construct 4 lane arterial $11,321,000 2025 Riverside County 3A04WT129
RV Briggs Rd Simpson Rd Newport Rd Construct 4 lane arterial $7,409,000 2025 Riverside County 3A04WT130
RV Briggs Rd Newport Rd Scott Rd Widen from 2 to 4 lanes $6,285,000 2025 Riverside County 3A04WT131
RV Briggs Rd Scott Rd SR-79 (Winchester Rd) Construct 4 lane arterial $13,304,000 2025 Riverside County 3A04WT132
RV Bundy Canyon Rd I-15 Murrieta Rd Widen from 2 to 4 lanes and reconstruct IC/ramps at I-15 $23,688,000 2025 Riverside County 3A01WT133
RV Bundy Canyon Rd Mission Trail I-15 Widen from 2 to 4 lanes $2,337,000 2025 Riverside County 3A01WT134
RV Butterfield Stage Rd Rancho California Rd SR-79 (Constance) Widen from 2 to 4 lanes $15,596,000 2015 Riverside County 3A01WT135*
RV Butterfield Stage Rd+ Pourroy Rd
Murrieta Hot Springs Rd SR-79 (Winchester) Construct 4 lane arterial $25,091,000 2025 Riverside County 3A01WT136*
RV Cajalco Rd Temsecal Canyon Rd Harley John Rd Widen from 2 to 4 lanes $29,379,000 2025 Riverside County 3A04WT137*
RV Cajalco Rd Harley John Rd I-215 Widen from 2 to 6 lanes $25,090,000 2025 Riverside County 3A04WT138*
RV Cantarini Rd Reche Canyon Rd Pigeon Pass Rd Construct 2 lane arterial $5,659,000 2025 Riverside County 3A04WT139
2004 RTP * TECHNICAL APPENDIX I - 197
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
RV Cantu-Galleano Ranch Rd (aka Galena St) Wineville Rd Bellgrave Ave Construct 4 lane arterial and IC at I-15 $13,224,000 2010 Riverside County 3A04WT140*
RV Center St Mt Vernon Ave Reche Canyon Rd Construct 4 lane arterial $15,639,000 2025 Riverside County 3A04WT141
RV Central St Baxter Rd Palomar St Widen from 2 to 4 lanes $1,533,000 2025 Riverside County 3A04WT142
RV Central St Grand Ave Palomar St Widen from 2 to 4 lanes $1,244,000 2025 Riverside County 3A04WT143
RV Cherry Valley Blvd Desert Lawn Dr Noble St Widen from 2 to 4 lanes and reconstruct IC/ramps at I-10 $21,269,000 2025 Riverside County 3A04WT144
RV Cherry Valley Blvd Noble St Highland Springs Ave Construct 4 lane arterial $7,308,000 2025 Riverside County 3A04WT145
RV Clinton Keith Rd Meadowlark Ln SR-79 Construct 6 lane arterial $22,573,000 2010 Riverside County 3A04WT146*
RV Cloverdale Rd Archibald Ave Hamner Ave Widen from 2 to 4 lanes $4,126,000 2010 Riverside County 3A04WT147*
RV Domenigoni Pkwy SR-79 (Winchester Rd) Warren Rd Widen from 4 to 6 lanes $6,619,000 2025 Riverside County 3A04WT148*
RV El Cerrito Rd I-15 Ontario Ave Widen from 2 to 4 lanes $1,224,000 2025 Riverside County 3A04WT149
RV Ellis Ave Post Rd SR-74 Widen from 2 to 4 lanes $5,438,000 2025 Riverside County 3A04WT150
RV Ethanac Rd SR-74 Keystone Dr Construct 4 lane arterial $4,440,000 2025 Riverside County 3A01WT151
RV Ethanac Rd Sherman Rd Matthews Rd Widen from 2 to 4 lanes incl. grade separation over BNSF RR $27,162,000 2025 Riverside County 3A01WT152*
RV Gilman Springs Rd Alessandro Blvd Bridge St Widen from 2 to 4 lanes $14,549,000 2025 Riverside County 3A01WT153*
RV Gilman Springs Rd Bridge St Sanderson Ave Widen from 2 to 4 lanes $6,079,000 2025 Riverside County 3A01WT154*
RV Goetz Rd Newport Rd Juanita Dr Widen from 2 to 4 lanes $2,113,000 2025 Riverside County 3A04WT155
RV Goetz Rd Juanita Dr Lesser Ln Widen from 2 to 4 lanes $5,220,000 2025 Riverside County 3A04WT156
RV Grand Ave Ortega Hwy (SR-74) Central St Widen from 2 to 4 lanes $17,045,000 2025 Riverside County 3A04WT157
RV Hamner Ave Mission Blvd Bellegrave Ave Widen from 2 to 6 lanes $6,286,000 2025 Riverside County 3A01WT158*
RV Hamner Ave Bellegrave Ave Santa Ana River Widen from 2 to 6 lanes $22,934,000 2025 Riverside County 3A01WT159*
RV Harley John Rd Washington St Cajalco Rd Widen from 2 to 4 lanes $1,314,000 2025 Riverside County 3A04WT160*
RV Horsethief Canyon Rd Temescal Canyon Rd I-15 Widen from 2 to 4 lanes and reconstruct IC/ramps at I-15 $3,119,000 2025 Riverside County 3A04WT161
RV Indian Truck Trail Temescal Canyon Rd I-15 Widen from 2 to 4 lanes and reconstruct IC/ramps at I-15 $3,033,000 2025 Riverside County 3A04WT162
2004 RTP * TECHNICAL APPENDIX I - 198
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
RV Limonite Ave Etiwanda Ave Van Buren Blvd Widen from 2 to 4 lanes $5,648,000 2010 Riverside County 3A01WT163*
RV Limonite Ave Van Buren Blvd Clay St Widen from 4 to 6 lanes $1,636,000 2025 Riverside County 3A01WT164*
RV Market St Rubidoux Blvd Santa Ana River Widen from 2 to 4 lanes incl. bridge over Santa Ana River $7,798,000 2025 Riverside County 3A04WT165
RV McCall Blvd I-215 Aspel RdWiden from 4 to 6 lanes and reconstruct IC/ramps at I-215 between Bradley Rd and Encanto Dr
$17,032,000 2025 Riverside County 3A01WT166*
RV McCall Blvd Aspel Rd Menifee Rd Widen from 2 to 4 lanes $2,032,000 2025 Riverside County 3A01WT167*
RV McCall Blvd Menifee Rd SR-79 Construct 2 lane arterial incl. grade separation over BNSF RR $22,278,000 2025 Riverside County 3A04WT168
RV McCall Blvd SR-79 Warren Rd Construct 2 lane arterial incl. grade separation over BNSF RR $18,393,000 2025 Riverside County 3A04WT169
RV Menifee Rd Ramona Expwy SR-74 (Pinacate Rd) Widen from 2 to 4 lanes $13,582,000 2025 Riverside County 3A01WT170*
RV Menifee Rd SR-74 (Pinacate Rd) Simpson Rd Widen from 2 to 4 lanes $2,958,000 2025 Riverside County 3A01WT171*
RV Menifee Rd Simpson Rd Aldergate Dr Construct 4 lane arterial $4,217,000 2025 Riverside County 3A01WT172*
RV Murrieta Hot Springs Rd Pourroy Rd SR-79 (Eastern Bypass) Construct 4 lane arterial $6,777,000 2010 Riverside County 3A01WT173*
RV Murrieta Hot Springs Rd Margarita Rd SR-79 (Winchester) Widen from 4 to 6 lanes $2,154,000 2025 Riverside County 3A01WT174*
RV Murrieta Rd Ethanac Rd McCall Blvd Widen from 2 to 4 lanes $4,112,000 2025 Riverside County 3A04WT175
RV Newport Rd Goetz Rd Murrieta Rd Construct 6 lane arterial $11,274,000 2025 Riverside County 3A01WT176*
RV Newport Rd Murrieta Rd I-215 Widen from 4 to 6 lanes and reconstruct IC/ramps at I-215 $18,704,000 2025 Riverside County 3A04WT177*
RV Newport Rd I-215 Menifee Rd Widen from 4 to 6 lanes $1,072,000 2025 Riverside County 3A04WT178*
RV Nuevo Rd Dunlap Dr Menifee Rd Widen from 2 to 4 lanes $4,038,000 2025 Riverside County 3A04WT179
RV Palomar St Mission Trail Clinton Keith Rd Widen from 2 to 4 lanes $5,980,000 2025 Riverside County 3A01WT180
RV Palomar St Clinton Keith Rd Washington Ave Widen from 2 to 4 lanes $1,425,000 2025 Riverside County 3A01WT181
RV Ramona Expwy Rider St Pico Ave Widen from 4 to 6 lanes $2,092,000 2025 Riverside County 3A01WT182*
RV Ramona Expwy Pico Ave Bridge St Widen from 2 to 6 lanes $30,490,000 2025 Riverside County 3A01WT183*
RV Reche Canyon Rd San Bernardino Co Line Reche Vista Dr Widen from 2 to 4 lanes $10,088,000 2010 Riverside County 3A04WT184
RV Sanderson Ave Gillman Springs Rd (at SR-79) Ramona Expwy Widen from 4 to 6 lanes $9,152,000 2025 Riverside County 3A01WT185*
2004 RTP * TECHNICAL APPENDIX I - 199
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
RV Schleisman Rd San Bernardino County Line Harrison Ave Widen from 2 to 4 lanes $3,094,000 2025 Riverside County 3A04WT186*
RV Schleisman Rd Harrison Ave Cleveland Ave Construct 4 lane arterial $4,225,000 2025 Riverside County 3A04WT187*
RV Schleisman Rd Cleveland Ave 68th St Widen from 2 to 4 lanes $1,665,000 2025 Riverside County 3A04WT188*
RV Schleisman Rd 68th St Arlington Ave Construct 4 lane arterial and IC over I-15 and bridge over Santa Ana River $49,765,000 2025 Riverside County 3A04WT189*
RV Temescal Canyon Rd Ontario Ave Indian Truck Trail Widen from 2 to 4 lanes and reconstruct IC/ramps at I-15 $38,758,000 2025 Riverside County 3A04WT197
RV Temescal Canyon Rd Indian Truck Trail Lake St Widen from 2 to 4 lanes $11,716,000 2025 Riverside County 3A04WT198
RV Van Buren Blvd Mockingbird Canyon Rd Wood Rd Widen from 4 to 6 lanes $8,980,000 2015 Riverside County 3A01WT199*
RV Van Buren Blvd Orange Terrace Pkwy I-215 Widen from 4 to 6 lanes and reconstruct IC/ramps at I-215 $7,763,000 2025 Riverside County 3A01WT200*
RV Van Buren Blvd SR-60 Santa Ana River Widen from 4 to 6 lanes (note: overlaps RTIP#RIV011208) $17,379,000 2025 Riverside County 3A01WT201*
RV Washington St Hermosa Dr Harley John Rd Widen from 2 to 4 lanes $8,414,000 2025 Riverside County 3A04WT202
RV Wood Rd Krameria Ave Cajalco Rd Widen from 2 to 4 lanes $6,112,000 2025 Riverside County 3A04WT203
RV Valley Way SR-60 Mission Blvd Widen from 2 to 4 lanes and construct new WB ramp $4,000,000 2010 Riverside County 3A04WT224
RV Ramona Expwy Bridge St Warren Rd Widen from 2 to 6 lanes (note: RTIP#RIV011230 widens portions to 4 lanes) $6,865,000 2025 Riverside County 3A01WT206*
RV Scott Rd Murrieta Rd I-215Widen from 2 to 4 lanes and reconstruct IC/ramps at I-215 (note: RTIP#RIV011232 widens overcrossing from 2 to 6 Lanes)
$22,910,000 2025 Riverside County 3A01WT207*
RV Esplanade Ave Warren Rd State St Widen from 2 to 4 lanes $7,332,000 2006 San Jacinto 3A04WT208RV Ramona Expwy Warren Rd Sanderson Ave Widen from 2 to 6 lanes $8,742,000 2005 San Jacinto 3A01WT209*RV Ramona Expwy Sanderson Ave State St Widen from 2 to 6 lanes $11,791,000 2005 San Jacinto 3A01WT210*RV Sanderson Ave Menlo Ave Esplanade Ave Widen from 2 to 4 lanes $2,433,000 2005 San Jacinto 3A01WT211*RV Sanderson Ave Ramona Expwy Esplanade Ave Widen from 2 to 4 lanes $7,398,000 2005 San Jacinto 3A01WT212*RV Warren Rd Ramona Expwy Esplanade Ave Widen from 2 to 4 lanes $9,137,000 2005 San Jacinto 3A01WT215
RV Ramona Expwy Main St Cedar Construct 4 lane arterial (note: overlaps RTIP#RIV32337) $10,856,000 2005 San Jacinto 3A01WT216*
RV Rancho California Rd Jefferson Ave Margarita Rd Widen from 4 to 6 lanes and reconstruct IC/ramps at I-15 $21,012,000 2011 Temecula 3A01WT217*
SB Pine Ave (Four Corners) New arterial corridor linking Pine Ave, Schleisman Ave, Arlington Ave (Riv. Co.) $98,700,000 2025 4C01001
2004 RTP * TECHNICAL APPENDIX I - 200
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
SB Tonner Canyon (Four Corners)
New arterial corridor connecting Chino Hills with SR-57 (LA/OR Co.) with 2 lanes each dir, access to SR-57 at Brea Cyn Rd or Tonner Cyn Rd, connection to Grand Ave and Eucalyptus Ave, no connection to Valencia Ave
$190,600,000 2025 4C01002
SB Aster Rd Rancho Rd Air Expressway New road, 1 lane each dir $1,850,000 2010 Adelanto 4A04405SB Adelanto Rd Auburn Ave Colusa Rd New road, 2 lanes each dir $9,000,000 2015 Adelanto 4A04406SB Bellflower St Mojave Dr Bartlett Rd Widen from 2 to 4 lanes each dir $6,300,000 2015 Adelanto 4A04407*
SB Auburn/Adelanto Chamberlain Way (Crippen Rd) Jonathan St Widen from 2 to 4 lanes each dir $1,700,000 2020 Adelanto 4A04400
SB El Mirage Rd Richardson Rd US-395 Widen from 2 to 4 lanes each dir $7,400,000 2015 Adelanto 4A01004*
SB El Mirage Rd US-395 Adelanto Rd New road, 2 lanes each dir $3,600,000 2010 Adelanto 4A04408*SB Koala Rd Palmdale Rd Holly Rd New road, 2 lanes each dir $4,000,000 2030 Adelanto 4A04409SB Koala Rd Holly Rd El Mirage Rd Widen from 2 to 4 lanes each dir $7,181,000 2025 Adelanto 4A04410SB Koala Rd El Mirage Rd Desoto Rd New road, 1 lane each dir $1,850,000 2025 Adelanto 4A04411
SB Rancho Rd Koala Rd Caughlin Rd New road, 2 lanes each dir plus turning lane $7,200,000 2020 Adelanto 4A04412
SB Apple Valley Rd SR-18 Yucca Loma Rd Widen from 1 to 2 lanes each dir $4,439,000 2005 Apple Valley 4A01008SB Apple Valley Rd Stoddard Wells Rd Ohna Rd New road, 2 lanes each dir $3,000,000 2010 Apple Valley 4A01009*
SB Apple Valley Rd Yucca Loma Rd Bear Valley Rd Widen from 2 to 3 lanes each dir $2,500,000 2005 Apple Valley 4A01010*
SB Apple Valley Rd extension Northern terminus Falchion Rd New road, 1 lane each dir $5,000,000 2007 Apple Valley 200402
SB Bear Valley Rd West City Limits Navajo Rd Widen from 2 to 3 lanes each dir $6,469,000 2020 Apple Valley 4A01011SB Central Rd Stoddard Wells Rd Tussing Ranch Rd Widen from 1 to 2 lanes each dir $6,956,000 2010 Apple Valley 4A01012*SB Corwin Rd SR-18 Navajo Rd Widen from 1 to 2 lanes each dir $1,623,000 2010 Apple Valley 4A01013*SB Dale Evans Parkway Corwin Rd Waalew Rd Widen from 1 to 2 lanes each dir $811,000 2010 Apple Valley 4A01014*SB Dale Evans Parkway Thunderbird Rd Apple Valley Inn Widen from 1 to 2 lanes each dir $1,348,000 2010 Apple Valley 4A01015*SB Dale Evans Parkway Waalew Rd Thunderbird Rd Widen from 1 to 2 lanes each dir $1,681,000 2010 Apple Valley 4A01016*SB Kiowa Rd SR-18 Bear Valley Rd Widen from 1 to 2 lanes each dir $2,500,000 2010 Apple Valley 4A04017SB Thunderbird Rd Rancherias Rd Joshua Rd Widen from 1 to 2 lanes each dir $3,652,000 2010 Apple Valley 4A01018*SB Yates Rd Green Tree Bl Apple Valley Rd New road, 2 lanes each dir $1,741,000 2010 Apple Valley 4A01019*SB Yucca Loma Rd Havasu Rd Nisqually Rd New road, 2 lanes each dir, bridge $25,000,000 2015 Apple Valley 4A04020SB Apple Valley Rd Bear Valley Tussing Ranch Rd Widen from 1 to 3 lanes each dir $10,000,000 2015 Apple Valley 4A01021*SB Dale Evans Parkway I-15 Corwin RD Widen from 1 to 2 lanes each dir $9,758,000 2025 Apple Valley 4A01022SB Tussing Ranch Rd Deep Creek Rd Mojave River New road, 2 lanes each dir $4,852,000 2025 Apple Valley 4A01023SB 1st Ave Hutchison St Irwin Rd Replace 2 lane bridge with 4 lane brg $565,000 $90,000 2025 Barstow 4A04024SB Big Bear Bl West City Limits East City Limits Widen from 1 to 2 lanes each dir $18,634,000 2010 Big Bear Lake 4A01025*SB Central Av Francis Av Riverside Dr Widen from 3 to 4 lanes each dir $2,642,000 2020 Chino 4A01026*
2004 RTP * TECHNICAL APPENDIX I - 201
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
SB Central Av Riverside Dr SR-71Widen from 2 to 3 lanes each dir (note: overlaps RTIP#SBD41236 SBD31933 from SR-71 to El Prado)
$6,361,000 2020 Chino 4A01027*
SB Chino Av Central Av Mountain Av Widen from 1 to 2 lanes each dir $2,264,000 2020 Chino 4A01028*
SB Chino Av Central Av 600' East of Monte Vista Widen from 1 to 2 lanes each dir $2,714,000 2015 Chino 4A01029*
SB Chino Av Fern Av Euclid Av Widen from 1 to 2 lanes each dir $4,044,000 2010 Chino 4A01030*
SB Chino Av SR-71 East End Av Widen from 2 to 3 lanes each dir $1,977,000 2015 Chino 4A01031*
SB Edison Av Central Av Euclid Av Widen from 2 to 3 lanes each dir $3,989,000 2015 Chino 4A01032*SB Edison Av Pipeline Ramona Av Widen from 3 to 4 lanes each dir $2,372,000 2020 Chino 4A01033*SB Eucalyptus Av Central Av Euclid Av New road, 2 lanes each dir $5,000,000 2010 Chino 4A04034*SB Euclid Av Kimball Pine Widen from 2 to 4 lanes each dir $2,430,000 2020 Chino 4A04035*SB Euclid Av Pine SR71 Widen from 1 to 4 lanes each dir $4,200,000 2025 Chino 4A04036*SB Francis Av West City Limit Benson Av Widen from 1 to 2 lanes each dir $1,420,000 2020 Chino 4A01037SB Hellman Ave Kimball Chino Corona Rd Widen from 1 to 2 lanes each dir $4,300,000 2015 Chino 4A04038*SB Hellman Ave Merrill Ave Kimball Widen from 1 to 2 lanes each dir $2,735,000 2015 Chino 4A04039*SB Merrill Av Euclid Av East City Limit Widen from 1 to 2 lanes each dir $2,319,000 2015 Chino 4A01040*SB Mountain Av Philadelphia St Riverside Dr Widen from 2 to 3 lanes each dir $1,797,000 2020 Chino 4A01041*SB Philadelphia St Central Av Benson Av Widen from 2 to 3 lanes each dir $898,000 2020 Chino 4A01042*SB Philadelphia St LA County Line Central Av Widen from 1 to 2 lanes each dir $4,348,000 2015 Chino 4A01043SB Pine Av El Prado Rd Euclid Av Widen from 1 to 2 lanes each dir $1,100,000 2020 Chino 4A04044*SB Pine Av Euclid Av Hellman Widen from 1 to 3 lanes each dir $8,700,000 2015 Chino 4A04045*SB Riverside Dr Benson Av Magnolia Av Widen from 2 to 3 lanes each dir $854,000 2015 Chino 4A01046*
SB Riverside Dr Fern Av Euclid Av Widen from 1 to 3 lanes each dir $777,000 2015 Chino 4A01047*
SB Riverside Dr Mountain Av Magnolia Av Widen from 2 to 3 lanes each dir $466,000 2015 Chino 4A01048*SB Riverside Dr Mountain Av Fern Av Widen from 2 to 3 lanes each dir $1,348,000 2015 Chino 4A01049*SB Riverside Dr West City Limits Benson Av Widen from 2 to 3 lanes each dir $3,612,000 2020 Chino 4A01050*SB Schaefer Av Benson Av Euclid Av Widen from 1 to 2 lanes each dir $3,055,000 2020 Chino 4A01051*
SB Walnut Av Benson Av San Antonio Av Widen from 1 to 2 lanes each dir (note: Oaks to Magnolia widened by 2015, #4A01053) $2,175,000 2020 Chino 4A01052*
SB Walnut Av Oaks Av Magnolia Av Widen from 1 to 2 lanes each dir $318,000 2015 Chino 4A01053*SB Walnut Av Pipeline Av Central Av Widen from 1 to 2 lanes each dir $2,642,000 2020 Chino 4A01054SB Walnut Av West City Limits UP Rail Road Widen from 1 to 2 lanes each dir $57,000 2015 Chino 4A01055*SB Chino Av SR-71 Emerald Way New road, 3 lanes each dir $3,536,000 2010 Chino Hills 4A01056*SB Eucalyptus Av Chino Hills Pkwy Peyton Dr Widen from 1 to 2 lanes each dir $1,437,000 2025 Chino Hills 4A01057SB Eucalyptus Av Peyton Dr SR-71 Widen from 1 to 2 lanes each dir $1,779,000 2020 Chino Hills 4A01058*
SB Fairfield Ranch Rd extension
950 ft. s/o intersection w/Stanfield Ct Pine Ave New road, 2 lanes each dir parallel to SR-71
(approx. 5,000 ft) $3,976,000 2009 Chino Hills 200401
2004 RTP * TECHNICAL APPENDIX I - 202
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
SB Pine Av Butterfield Rnch Rd SR-71 New road, 2 lanes each dir $434,000 2010 Chino Hills 4A01059*SB Pipeline Av Chino Hills Pkwy Soquel Canyon Pkwy Widen from 1 to 2 lanes each dir $3,055,000 2025 Chino Hills 4A01060SB Pipeline Av SR-71 Chino Hills Pkwy Widen from 1 to 2 lanes each dir $290,000 2010 Chino Hills 4A01061*
SB Chino Hills Pkwy Ramona 600 ft. East of Ramona Widen from 2 to 3 lanes each dir $3,809,000 2020 Chino/Chino Hills 4A01062*
SB El Prado Rd Central Av Pine Ave Widen from 1 to 2 lanes each dir $1,473,000 2010 Chino/Ontario 4A01063
SB Barton Rd S. City Limits Waterman AvWiden from 2 to 3 lanes each dir (note: overlaps RTIP#200064 and SBD78022, Reche Cyn to Waterman)
$907,000 2010 Colton 4A01066*
SB Fairway Dr Sperry Dr City Limits Widen from 2 to 4 lanes each dir $1,222,000 2015 Colton 4A04067SB K and L Streets 3rd St 5th St Widen to 1 lane each dir $271,000 2010 Colton 4A01068*SB La Cadena Dr Rancho Av South City Limits Widen from 2 to 3 lanes each dir $2,911,000 2020 Colton 4A01069SB Meridian Av San Bernardino Av Valley Bl Widen from 2 to 3 lanes each dir $1,078,000 2010 Colton 4A01070*SB Mt Vernon Av La Cadena Dr I-10 Widen from 2 to 4 lanes each dir $2,004,000 2020 Colton 4A04071SB Pepper Av Agua Mansa Rd Slover Av New road, 2 lanes each dir $2,875,000 2025 Colton 4A01072SB Pepper Av I-10 Slover Av Widen from 1 to 2 lanes each dir $629,000 2020 Colton 4A01073SB Pepper Av N. City Limits Valley Bl Widen from 1 to 3 lanes each dir $3,246,000 2010 Colton 4A01074SB Rancho Av Valley Bl La Cadena Dr Widen from 2 to 3 lanes each dir $3,234,000 2025 Colton 4A01075SB Reche Canyon Rd Barton Rd City Limits Widen from 2 to 4 lanes each dir $765,000 2015 Colton 4A04077*SB Reche Canyon Rd Pepper Tree Ln City Limits Widen from 2 to 4 lanes each dir $1,465,000 2015 Colton 4A04078*
SB Riverside Av Riverside County Line North City Limit Widen from 2 to 3 lanes each dir $1,276,000 2025 Colton 4A01079
SB San Bernardino Av Pepper Av Meridian Av Widen from 1 to 2 lanes each dir $441,000 2010 Colton 4A01080*SB Valley Blvd Sycamore Av Mt. Vernon Av Widen from 2 to 3 lanes each dir $3,922,000 2020 Colton 4A01082
SB Baseline Rd South Heritage Cir Cherry Av Widen from 2 to 3 lanes each dir $3,617,000 2010 Fontana 4A01083*
SB Casa Grande Ave Lytle Creek Sierra Av New road, 2 lanes each dir $3,200,000 2010 Fontana 4A04084SB Casa Grande Ave Sierra Av Mango Av New road, 2 lanes each dir $550,000 2010 Fontana 4A04085
SB Casmalia Ave (Carter Ave) Sierra Av Mango Av New road, 2 lanes each dir $4,365,000 2010 Fontana 4A01086*
SB Cherry Av Baseline I-15Widen from 1 to 3 lanes each dir (note: RTIP#SBD031190 widens from Baseline to Highland)
$3,000,000 2010 Fontana 4A04087
SB Cherry Av Jurupa Av Slover Av Widen from 1 to 3 lanes each dir $3,207,000 2010 Fontana 4A01089*
SB Cherry Av Slover Av Valley Bl Widen from 2 to 3 lanes each dir and reconstruct IC at I-10 $773,000 2010 Fontana 4A01090
SB Cherry Av Valley Bl San Bernardino Av Widen from 2 to 3 lanes each dir $3,000,000 2015 Fontana 4A04091SB Citrus Av Baseline South Highland Av Widen from 1 to 2 lanes each dir $2,500,000 2010 Fontana 4A04092SB Citrus Av I-15 Summit Av Widen from 1 to 2 lanes each dir $1,797,000 2010 Fontana 4A01093SB Citrus Av San Bernardino Av Valley Bl Widen from 1 to 2 lanes each dir $1,247,000 2010 Fontana 4A01094*SB Citrus Av San Bernardino Av Foothill Blvd Widen from 1 to 2 lanes each dir $1,300,000 2010 Fontana 4A04095
SB Citrus Av Slover Av Jurupa Av Widen from 1 to 2 lanes each dir $4,507,000 2010 Fontana 4A01096*
2004 RTP * TECHNICAL APPENDIX I - 203
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
SB Cypress Av Jurupa Av Slover Av Widen from 2 to 4 lanes $2,000,000 2015 Fontana 4A04097
SB Cypress Av South Highland Av Sierra Lakes Parkway New overcrossing at 210, 2 lanes each dir $5,000,000 2015 Fontana 4A04098
SB Duncan Canyon Rd Citrus Av Sierra Av New road, 2 lanes each dir $1,147,000 2010 Fontana 4A01099*
SB Etiwanda Ave I-10 San Bernardino Av Widen from 1 to 2 lanes each dir $3,500,000 2010 Fontana 4A04100SB Fontana Av Valley Bl Merrill Widen from 1 to 2 lanes each dir $4,700,000 2015 Fontana 4A04101SB Foothill Bl Hemlock Citrus Widen from 2 to 3 lanes each dir $5,000,000 2010 Fontana 4A04102SB Frontage Rd (I-15) Cherry Av Beech Widen from 1 to 2 lanes each dir $1,500,000 2010 Fontana 4A04103SB Frontage Rd (I-15) Duncan Canyon Rd Riverside Av New road, 2 lanes each dir $4,500,000 2015 Fontana 4A01104*SB Frontage Rd (I-15) Highland Av Baseline Rd New road, 2 lanes each dir $2,500,000 2010 Fontana 4A01105*
SB Highland Av Cherry Av Palmetto Av New road, 2 lanes each dir $5,217,000 2010 Fontana 4A01106*
SB Jurupa Av Etiwanda Av Sierra AvWiden from 1 to 3 lanes each dir (note: RTIP#SBD31227 widens from Live Oak to Sierra)
$2,550,000 2010 Fontana 4A01107*
SB Jurupa Av Sierra Av Alder Av Widen from 1 to 2 lanes each dir $1,200,000 2010 Fontana 4A04108SB Live Oak Rd Jurupa Av Slover Av Widen from 1 to 2 lanes each dir $2,000,000 2010 Fontana 4A04109SB Live Oak Rd Valley Bl Merrill Widen from 1 to 2 lanes each dir $2,500,000 2015 Fontana 4A04110SB Locust Av San Bernardino Av Baseline Widen from 1 to 2 lanes each dir $2,500,000 2015 Fontana 4A04111
SB Mango Av Casmalia Casa Grande New road - industrial collector, 1 lane each dir $3,000,000 2010 Fontana 4A04112
SB Marlay Ave Etiwanda Mulberry Av Widen from 1 to 2 lanes each dir $1,500,000 2010 Fontana 4A04113SB Merrill Av Cherry Av Fontana Av Widen from 1 to 2 lanes each dir $5,000,000 2015 Fontana 4A04114SB Mulberry Jurupa Av Slover Av Widen from 1 to 2 lanes each dir $1,500,000 2010 Fontana 4A04401SB Mulberry Valley Bl San Bernardino Av Widen from 1 to 2 lanes each dir $1,000,000 2015 Fontana 4A04115SB Mulberry Slover Av Valley Bl Construct grade separation $20,000,000 2015 Fontana 4A04413SB Poplar Citrus Av Slover Av Widen from 1 to 2 lanes each dir $3,000,000 2010 Fontana 4A04116SB Poplar County Line Citrus New road, 2 lanes each dir $1,000,000 2015 Fontana 4A04117SB Poplar Slover Av Valley Bl Construct grade separation $14,000,000 2015 Fontana 4A04118SB San Bernardino Av Etiwanda Av Poplar Widen from 1 to 2 lanes each dir $4,500,000 2015 Fontana 4A04119
SB San Bernardino Av Fontana Av Alder Av Widen from 2 to 3 lanes each dir $3,249,000 2010 Fontana 4A01120*
SB Sierra Av Jurupa Av Slover Av Widen from 2 to 3 lanes each dir $1,275,000 2010 Fontana 4A01121*
SB Sierra Av San Bernardino Av Foothill Blvd Widen from 2 to 3 lanes each dir $16,000,000 2015 Fontana 4A04122SB Sierra Av Slover Av Valley Bl Widen from 3 to 4 lanes each dir $3,500,000 2010 Fontana 4A04123
SB Sierra Av SR-210 Summit Av Widen from 1 to 3 lanes each dir $2,714,000 2010 Fontana 4A01124*
SB Sierra Av Summit Av I-15 Widen from 1 to 3 lanes each dir $5,000,000 2010 Fontana 4A04125SB Sierra Av Valley Bl San Bernardino Av Widen from 2 to 3 lanes each dir $2,500,000 2010 Fontana 4A04126
SB Sierra Lakes Parkway Beech Citrus Widen from 1 to 2 lanes each dir $2,800,000 2010 Fontana 4A04127
2004 RTP * TECHNICAL APPENDIX I - 204
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
SB Sierra Lakes Parkway Cherry Av Beech New road, 2 lanes each dir $1,500,000 2010 Fontana 4A04128
SB Sierra Lakes Parkway Citrus Av Sierra Av New road, 2 lanes each dir $2,000,000 2010 Fontana 4A04129
SB Slover Av Cherry Av Mulberry Av Widen from 1 to 2 lanes each dir $2,203,000 2010 Fontana 4A01130*
SB Slover Av Cherry Av Sierra Av Widen from 1 to 2 lanes each dir $6,739,000 2010 Fontana 4A01131*
SB Slover Av Etiwanda Av Mulberry Av Widen from 1 to 2 lanes each dir $1,507,000 2010 Fontana 4A01132*SB Slover Av Sierra Av E. City Limits Widen from 2 to 3 lanes each dir $1,258,000 2025 Fontana 4A01133
SB Slover Av Tamarind Av Alder Av Widen from 1 to 2 lanes each dir $1,739,000 2010 Fontana 4A01134*
SB Valley Blvd I-10 Mulberry Av Widen from 2 to 3 lanes each dir $927,000 2015 Fontana 4A01135
SB Valley Blvd Mulberry Alder Av Widen from 2 to 3 lanes each dir $12,000,000 2015 Fontana 4A04136SB Walnut Av Citrus Av Sierra Widen from 1 to 2 lanes each dir $2,000,000 2010 Fontana 4A04137SB Walnut Av Knox Citrus New road, 2 lanes each dir $2,000,000 2010 Fontana 4A04138SB Barton Rd Honey Hills N.E. City Limits Widen from 1 to 2 lanes each dir $1,033,000 2010 Grand Terrace 4A01139SB Barton Rd I-215 West City Limits Widen from 1 to 2 lanes each dir $1,070,000 2020 Grand Terrace 4A01141*SB Commerce Wy Michigan St Main St New road, 2 lanes each dir $3,594,000 2020 Grand Terrace 4A01143SB Michigan Av Barton Rd Van Buren Bl Widen from 1 to 2 lanes each dir $898,000 2010 Grand Terrace 4A01144*SB Mt Vernon Av Barton Rd Main St Widen from 1 to 2 lanes each dir $723,000 2010 Grand Terrace 4A01145*SB Mt Vernon Av Canal St North City Limits Widen from 1 to 2 lanes each dir $560,000 2020 Grand Terrace 4A01146*SB 7th Av Ranchero Rd Bear Valley Rd Widen from 1 to 2 lanes each dir $10,665,000 2010 Hesperia 4A01147
SB Bear Valley Rd I-15 East City Limit Widen to 3 lanes each dir (note: RTIP#200210 widens south side) $4,897,000 2010 Hesperia 4A01148*
SB Escondido Av Main St Sultana St Widen from 1 to 2 lanes each dir $1,025,000 2010 Hesperia 4A01149SB Eucalyptus St I-15 Peach Av Widen from 1 to 2 lanes each dir $8,536,000 2010 Hesperia 4A01151*SB Hesperia Rd Bear Valley Yucca St Widen from 1 to 2 lanes each dir $5,449,000 2010 Hesperia 4A01152*SB Lemon St Mauna Loa Mohave River Widen from 1 to 2 lanes each dir $3,684,000 2025 Hesperia 4A01155SB Main St 7th Av I Av Widen from 2 to 3 lanes each dir $3,378,000 2020 Hesperia 4A01156*SB Main St I-15 US Hwy 395 Widen from 1 to 2 lanes each dir $2,767,000 2010 Hesperia 4A01157*SB Main St I-15 Escondido Av Widen from 2 to 3 lanes each dir $809,000 2010 Hesperia 4A01158*SB Maple Av Eucalyptus Av Main St Widen from 1 to 2 lanes each dir $3,684,000 2010 Hesperia 4A01159*SB Mariposa Rd Joshua Rd Eucalyptus Av Widen from 1 to 2 lanes each dir $7,511,000 2025 Hesperia 4A01160SB Mauna Loa 7th Av Lemon St New road, 2 lanes each dir $3,953,000 2025 Hesperia 4A01161SB Mauna Loa Maple Av 7th Av Widen from 1 to 2 lanes each dir $3,504,000 2025 Hesperia 4A01162SB Mesquite St Topaz Av Maple Av Widen from 1 to 2 lanes each dir $683,000 2025 Hesperia 4A01163
SB Mohave River Crossing at Lemon Street/Ridge New road, 2 lanes each dir $4,672,000 2025 Hesperia 4A01164
SB Mojave St I-15 Maple Av Widen from 1 to 2 lanes each dir $13,958,000 2010 Hesperia 4A01165SB Rock Springs Rd Arrowhead Lake Rd E City Limits Widen from 1 to 2 lanes each dir $1,797,000 2025 Hesperia 4A01168SB 5th St Victoria Av Palm Av Widen from 1 to 2 lanes each dir $1,900,000 2015 Highland 4A01387SB 5th St Tippecanoe Shirley Widen from 1 to 2 lanes each dir $1,565,000 2030 Highland 4A01388
2004 RTP * TECHNICAL APPENDIX I - 205
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
SB Central Av 3rd St 5th St Widen from 1 to 2 lanes each dir $250,000 2010 Highland 4A01172*
SB Greenspot Rd Boulder Av City Limits Widen from 1 to 2 lanes each dir (note: RTIP#200212 widens bridge portion) $3,304,000 2010 Highland 4A01173*
SB Highland Av SR-330 Church St Widen from 1 to 2 lanes each dir $2,300,000 2010 Highland 4A01174*SB Palm Av Baseline Pacific Av Widen from 1 to 2 lanes each dir $1,274,000 2020 Highland 4A01389SB Palm Av South City Limit Baseline Widen from 1 to 2 lanes each dir $1,003,000 2030 Highland 4A01340SB Palm Av Highland Av Pacific St Widen from 1 to 2 lanes each dir $809,000 2020 Highland 4A01176SB Victoria Av 3rd St 6th St Widen from 1 to 2 lanes each dir $357,000 2015 Highland 4A01341SB Campus St Barton Rd Redlands Bl New road, 2 lanes each dir $3,594,000 2010 Loma Linda 4A01178*
SB Evans St extension I-10 Barton Rd New road, 2 lanes each dir with left turn lane (approx. 5,600 ft) $26,100,000 2010 Loma Linda 200403
SB Central Av North City Limits South City Limits Widen from 2 to 3 lanes each dir $4,133,000 2020 Montclair 4A01180*SB Holt Av LA County Line Benson Av Widen from 2 to 3 lanes each dir $4,025,000 2025 Montclair 4A01181SB Mission Bl Pipeline Av Central Av Widen from 2 to 3 lanes each dir $2,534,000 2025 Montclair 4A01182SB Monte Vista Av San Bernardino St Arrow Hwy Widen from 2 to 3 lanes each dir $2,695,000 2025 Montclair 4A01183SB San Bernardino St LA County Line Benson Av Widen from 2 to 3 lanes each dir $3,325,000 2025 Montclair 4A01184SB 4th St Vineyard Av Archibald Av Widen from 2 to 3 lanes each dir $1,833,000 2010 Ontario 4A01185*SB Airport Dr Grove St Haven Av Widen from 3 to 4 lanes each dir $24,000,000 2015 Ontario 4A01186*SB Airport Dr Kettering Etiwanda Av Widen from 1 to 2 lanes each dir $220,000 2005 Ontario 4A04187*
SB Airport Dr Rochester Av Kettering Dr Widen from 1 to 2 lanes each dir $2,048,000 2015 Ontario 4A01188*
SB Archibald Ave Edison Av SCL Widen from 1 to 4 lanes each dir $10,430,000 2025 Ontario 4A04189*SB Archibald Ave Riverside Dr Edison Av Widen from 1 to 3 lanes each dir $11,040,000 2025 Ontario 4A04190*SB Archibald Ave Jurupa Av Mission Bl Widen from 1 to 3 lanes each dir $1,006,000 2020 Ontario 4A01191
SB Bellgrave Ave Merrill Ave Milliken Ave (Hamner Ave) Widen from 1 to 2 lanes each dir $16,210,000 2025 Ontario 4A04192
SB Campus Av Riverside Dr Merrill Ave Widen from 1 to 4 lanes each dir $9,820,000 2025 Ontario 4A04193*SB Chino Av Euclid Av Milliken Bl Widen from 1 to 2 lanes each dir $23,740,000 2025 Ontario 4A04194SB Cleveland Av Riverside Dr Bellegrave Av Widen from 1 to 2 lanes each dir $8,190,000 2025 Ontario 4A04195SB Edison Av Cleveland Milliken Bl Widen from 1 to 4 lanes each dir $4,080,000 2025 Ontario 4A04196*SB Edison Av Euclid Av Walker Av Widen from 1 to 3 lanes each dir $8,440,000 2025 Ontario 4A04197*SB Edison Av Vineyard Av Cleveland Widen from 1 to 4 lanes each dir $20,060,000 2025 Ontario 4A04198*SB Edison Av Walker Av Vineyard Av Widen from 1 to 4 lanes each dir $2,760,000 2025 Ontario 4A04199*SB Eucalyptus Av Euclid Av Walker Av Widen from 1 to 2 lanes each dir $4,340,000 2025 Ontario 4A04200*SB Euclid Av Riverside Dr Merrill Av Widen from 2 to 4 lanes each dir $3,860,000 2025 Ontario 4A04201*SB Euclid Av SR-60 Riverside Dr Widen from 2 to 3 lanes each dir $1,078,000 2020 Ontario 4A01202*SB Francis St Benson Av Mountain Av Widen from 1 to 2 lanes each dir $1,169,000 2020 Ontario 4A01203
SB Grove Av Mission Bl Belmont Dr Widen from 2 to 3 lanes each dir (note: RTIP#SBD94171 widens Belmont to Airport) $580,000 2003 Ontario 4A01204*
SB Grove Av Riverside Dr Merrill Av Widen from 1 to 2 lanes each dir $9,100,000 2025 Ontario 4A04206*
2004 RTP * TECHNICAL APPENDIX I - 206
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
SB Grove Av State St Holt Blvd Widen existing grade separation from 2 to 3 lanes each dir $1,976,000 2005 Ontario 4A04207
SB Haven Av Riverside Dr Bellegrave Av Widen from 1 to 2 lanes each dir $11,710,000 2025 Ontario 4A04208SB Haven Av SR-60 I-10 Widen from 3 to 4 lanes each dir $20,000,000 2015 Ontario 4A01209*SB Holt Bl Benson Av Vineyard Av Widen from 2 to 3 lanes each dir $37,501,000 2010 Ontario 4A01210*SB Inland Empire Bl Archibald Av Miliken Av Widen from 2 to 3 lanes each dir $4,637,000 2010 Ontario 4A01211*SB Inland Empire Bl Vineyard Av Archibald Av Widen from 2 to 3 lanes each dir $2,898,000 2010 Ontario 4A01212*
SB Jurupa St Turner Av Archibald Av Widen from 1 to 3 lanes each dir $2,898,000 2015 Ontario 4A01213*
SB Merrill Av Grove Ave Milliken Bl (Hamner) Widen from 1 to 2 lanes each dir $25,260,000 2025 Ontario 4A04214SB Milliken Av (Hamner) Edison Av SCL Widen from 1 to 3 lanes each dir $2,120,000 2025 Ontario 4A04215*SB Milliken Av Riverside Dr Edison Av Widen from 1 to 4 lanes each dir $3,820,000 2025 Ontario 4A04216*SB Ontario Ave Riverside Dr Bellegrave Av Widen from 1 to 2 lanes each dir $8,960,000 2025 Ontario 4A04218*SB Riverside Dr Euclid Av Milliken Bl Widen from 1 to 2 lanes each dir $19,350,000 2025 Ontario 4A04219*SB Schaefer Av Euclid Av Edison Av Widen from 1 to 2 lanes each dir $16,420,000 2025 Ontario 4A04220SB Turner Av Riverside Dr Schaefer Av Widen from 1 to 2 lanes each dir $690,000 2025 Ontario 4A04221*
SB Vineyard Av 4th St I-10 Widen from 2 to 3 lanes each dir $6,376,000 2015 Ontario 4A01222*
SB Vineyard Av Riverside Dr Edison Av Widen from 1 to 3 lanes each dir $6,690,000 2025 Ontario 4A04223*SB Walker Av Riverside Dr SCL Widen from 1 to 2 lanes each dir $7,900,000 2025 Ontario 4A04224
SB Arrow Hwy West City Limit Vineyard AvWiden from 1 to 2 lanes each dir (note: RTIP#SBD031324 widens from Grove to Baker)
$1,815,000 2020 R. Cucamonga 4A01225
SB Arrow Route I-15 Hickory Av?Widen from 1 to 2 lanes each dir (note: RTIP#20020134 widens from Etiwanda to East)
$2,516,000 2010 R. Cucamonga 4A01226*
SB Baseline Rd Rochester Av Etiwanda Av Widen from 1 to 2 lanes each dir $464,000 2010 R. Cucamonga 4A01227*SB Church St Millikan Av Etiwanda Av New road, 2 lanes each dir $1,739,000 2010 R. Cucamonga 4A01228*SB Foothill Bl at Southern Pac RR Widen from 2 to 3 lanes each dir $3,427,000 2010 R. Cucamonga 4A01229*
SB Foothill Bl Haven Rd East City LimitsWiden from 2 to 3 lanes each dir (note: RTIP#SBD031340 SBD41205 SBD41206 widens from Rochester to East City Limits)
$6,253,000 2020 R. Cucamonga 4A01231*
SB Hermosa Av 8th St N/O Metrolink Tracks Widen from 1 to 2 lanes each dir $2,706,000 2010 R. Cucamonga 4A01233*SB Highland Av 19th St East Av Widen from 1 to 2 lanes each dir $6,361,000 2020 R. Cucamonga 4A01235
SB Alabama 3rd St San Bernardino AvWiden from 1 to 2 lanes each dir (note: RTIP#SBD31719 widens bridge at Santa Ana River)
$11,468,000 2010 Redlands 4A01237*
SB California St Lugonia Av San Bernardino Av Widen from 1 to 2 lanes each dir $600,000 2010 Redlands 4A04238
SB Church St Colton Av Redlands Bl Widen from 1 to 2 lanes each dir (note: RTIP#SBD59012 widens from Colton to Clark) $811,000 2010 Redlands 4A01239*
2004 RTP * TECHNICAL APPENDIX I - 207
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
SB Citrus Av Dearborn St Wabash AvWiden from 1 to 2 lanes each dir (note: RTIP#SBD58044 widens from Auburn Ct to Wabash)
$800,000 2010 Redlands 4A04240
SB Cypress Av I-10 Citrus Av Widen from 1 to 2 lanes each dir $431,000 2020 Redlands 4A01241SB Dearborn Av San Bernardino Av Sessums Dr New road, 1 lane each dir $500,000 2005 Redlands 4A04242SB Ford St 5th Ave I-10 Widen from 1 to 2 lanes each dir $1,391,000 2010 Redlands 4A01243*SB Highland Av Redlands Bl Ford St Widen from 1 to 2 lanes each dir $1,097,000 2025 Redlands 4A01244SB Live Oak Cyn Rd San Timoteo Cyn Rd East CIty Limits Widen from 1 to 2 lanes each dir $4,057,000 2010 Redlands 4A01245*SB Lugonia Av Tenessee St Orange St Widen from 1 to 2 lanes each dir $2,336,000 2020 Redlands 4A01246*
SB Orange St N. City limits Pioneer AvWiden from 1 to 2 lanes each dir (note: RTIP#SBD31718 widens bridge at Santa Ana River)
$6,317,000 2010 Redlands 4A01247*
SB Orange St San Bernardino Av Lugonia Av Widen from 1 to 2 lanes each dir $881,000 2020 Redlands 4A01248*SB Redlands Bl West City Limits Alabama Widen from 2 to 3 lanes each dir $1,761,000 2020 Redlands 4A01249*SB San Bernardino Av Church St Wabash Av Widen from 1 to 2 lanes each dir $1,855,000 2010 Redlands 4A01250*SB San Bernardino Av Mt. View California St Widen from 1 to 2 lanes each dir $150,000 $1,200,000 2010 Redlands 4A04251SB San Bernardino Av Route 30 Orange St Widen from 1 to 2 lanes each dir $1,333,000 2010 Redlands 4A01252*SB San Timoteo Cyn Rd RR Crossing Live Oak Cyn Rd Widen from 1 to 2 lanes each dir $3,895,000 2010 Redlands 4A01254*SB Ayala Dr Highland Av Riverside Av Widen from 1 to 2 lanes each dir $2,084,000 2020 Rialto 4A01255SB Cactus Av Highland Av Baseline Rd Widen from 1 to 2 lanes each dir $1,348,000 2020 Rialto 4A01256SB Riverside Av Cactus Av Casmalia St Widen from 1 to 2 lanes each dir $1,456,000 2020 Rialto 4A01257SB Riverside Av South City Limit Slover Av Widen from 2 to 3 lanes each dir $3,809,000 2025 Rialto 4A01258
SB Riverside Av Valley Bl n/o Slover Av Widen from 2 to 4 lanes each dir (note: overlaps RTIP#SBD31808) $19,047,000 2010 Rialto 4A01259
SB Slover Av Cactus Av Riverside Av Widen from 1 to 2 lanes each dir $1,348,000 2020 Rialto 4A01260SB Valley Blvd Spruce Av Sycamore Av Widen from 1 to 2 lanes each dir $1,509,000 2020 Rialto 4A01261SB 5th Av Crafton Av Wabash Av Widen from 1 to 2 lanes each dir $1,797,000 2020 S. B. County 4A01262SB Amboy Rd Ironage Rd National Trails Hwy Reconstruct road, 1 lane each dir $850,000 2005 S. B. County 200415
SB Caliente Rd 0.08M s/o Oak Hill Rd 0.63M s/o Joshua Rd Widen from 1 to 2 lanes each dir $7,673,000 2025 S. B. County 4A01264
SB Cedar Av Riverside County Line Valley Bl Widen from 2 to 3 lanes each dir $4,619,000 2025 S. B. County 4A01265
SB Central Av Montclair City Limit Chino City Limit Widen from 2 to 3 lanes each dir $1,042,000 2020 S. B. County 4A01266*
SB Cherry Av Merrill Av Whittram Av At SCRRA RR, widen bridge from 1 to 2 lanes each dir $8,829,000 2010 S. B. County 200409
SB Cherry Av Whittram Av Foothill Bl Widen from 1 to 2 lanes each dir $2,791,000 2010 S. B. County 200410SB Crafton Mentone Sand Canyon Rd Widen from 1 to 2 lanes each dir $2,678,000 2025 S. B. County 4A01267
SB Cumberland Dr extension SR-18 north to Cumberland Dr Pave dirt road, 1 lane each dir $2,200,000 2008 S. B. County 200408
SB Day Creek Bl Summit Av SR-30 New road, 2 lanes each dir $811,000 2010 S. B. County 4A01268*
SB Duncan Rd Oasis Rd Baldy Mesa Rd Pave dirt road, 1 lane each dir $1,012,000 2008 S. B. County 4A01269*
2004 RTP * TECHNICAL APPENDIX I - 208
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
SB El Mirage Rd Koala Rd LA County Line
Widen from 1 to 2 lanes each dir (note: #4A01004 in Adelanto widens from Richardson to US-395 to 4 lanes each dir in 2015)
$24,042,000 2020 S. B. County 4A01270
SB Fort Irwin Rd I-15 Ft Irwin Boundary Widen from 1 to 2 lanes each dir $14,746,000 2010 S. B. County 4A01271SB Francis Av LA County Line Chino City Limit Widen from 1 to 2 lanes each dir $3,469,000 2020 S. B. County 4A01272SB Jurupa Av Tamarind Alder Av Pave dirt road, 1 lane each dir $523,000 2005 S. B. County 4A04273SB Mariposa Rd Oak Hill Rd Joshua St Widen from 1 to 2 lanes each dir $4,008,000 2025 S. B. County 4A01274SB Mesquite St Escondido Av Maple Av New road, 1 lane each dir $408,000 2010 S. B. County 4A01275*SB Mission Bl LA County Line Pipeline Av Widen from 2 to 3 lanes each dir $1,042,000 2020 S. B. County 4A01276*SB Nielson Rd Beekley Malpaso Pave dirt road, 1 lane each dir $491,000 2006 S. B. County 200411SB Phelan Rd Baldy Mesa Rd Hesperia W. City Limit Widen from 2 to 3 lanes each dir $3,181,000 2025 S. B. County 4A01277SB Phelan Rd Sheep Creek Rd Baldy Mesa Rd Widen from 1 to 3 lanes each dir $24,797,000 2020 S. B. County 4A01278SB San Antonio Av Edison Av Eucalyptus Av Widen from 1 to 2 lanes each dir $862,000 2025 S. B. County 4A01279SB San Bernardino Av SR-30 California St Widen from 1 to 2 lanes each dir $2,516,000 2025 S. B. County 4A01281SB Sand Canyon Rd Crafton Yucaipa City Limit Widen from 2 to 3 lanes each dir $2,354,000 2025 S. B. County 4A01282SB Sheep Creek Rd Phelan Rd SR-138 Widen from 1 to 2 lanes each dir $3,181,000 2010 S. B. County 4A01283
SB SH 247 Aberdeen Linn Widen within ROW to accommodate passing lanes $9,500,000 2008 S. B. County 4A04420
SB Sierra Av I-15 Lytle Creek Rd Widen from 1 to 2 lanes each dir $503,000 2020 S. B. County 4A01284SB Slover Av Alder Av Cactus Av Widen from 1 to 2 lanes each dir $4,420,000 2020 S. B. County 4A01285SB Summit Valley Rd SR-138 Hesperia City Limit Pave dirt road, 1 lane each dir $1,500,000 2006 S. B. County 4A04414SB Valley Av Alder Av Spruce Av Widen from 1 to 2 lanes each dir $3,433,000 2020 S. B. County 4A01286SB Valley Blvd Etiwanda @ San Sevaine New road, 2 lanes each dir $19,708,000 2010 S. B. County 4A01287SB Wright Mtn Rd Zermatt Dr SR-2 Pave new road, 1 lane each dir $556,000 2006 S. B. County 200413SB Lena Rd Mill St Central Av Extend roadway $481,960 2010 San Bernardino 4A04288
SB Mt View Av Riverview Dr Central Av Extend road and construct bridge over Santa Ana River $5,702,000 2010 San Bernardino 4A04289
SB Pepper Linden North Park Bl Kendall Dr New road, 1 lane each dir $2,319,000 2010 San Bernardino 4A01290*SB Tippecanoe Av 3rd St San Bernardino Av Widen from 2 to 3 lanes each dir $3,127,000 2025 San Bernardino 4A01291SB Waterman Av 5th St Baseline Av Widen from 2 to 3 lanes each dir $754,000 2010 San Bernardino 4A01292*
SB Lear Av/Sunfair Rd Poleline Rd MCAS New road, 2 lanes each dir $16,230,000 2010 Twentynine Palms 4A01293
SB Arrow Hwy San Antonio Av East City Limit Widen from 1 to 2 lanes each dir $3,325,000 2020 Upland 4A01294SB Campus Av 16th St 18th St Widen from 1 to 2 lanes each dir $740,000 2015 Upland 4A04295SB Central Av Foothill Bl Benson Av New road, 2 lanes each dir $4,637,000 2010 Upland 4A01296*SB Central Av South City Limits Arrow Route Widen from 2 to 3 lanes each dir $917,000 2025 Upland 4A01297SB Foothill Bl Benson Av East City Limit Widen from 2 to 3 lanes each dir $5,373,000 2025 Upland 4A01298
SB Mountain Av I-10 7th St Widen from 2 to 3 lanes each dir $1,120,000 2015 Upland 4A01299*
SB San Antonio Av I-10 11th St Widen from 1 to 2 lanes each dir $580,000 2010 Upland 4A01300*SB 7th St I-15 D St Widen from 2 to 3 lanes each dir $4,403,000 2025 Victorville 4A01301
2004 RTP * TECHNICAL APPENDIX I - 209
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
SB 9th St SR-18 Hesperia Rd Widen from 1 to 2 lanes each dir $881,000 2010 Victorville 4A01302SB Air Expressway George AFB National Trails Hwy Widen from 1 to 2 lanes each dir $3,130,000 2010 Victorville 4A01303*SB Air Expressway National Trails Hwy Village Dr Widen from 1 to 2 lanes each dir $2,600,000 2005 Victorville 200418SB Amargosa Rd Maricopa Rd Tawney Ridge Ln Widen from 1 to 2 lanes each dir $5,067,000 2010 Victorville 4A01304*SB Amargosa Rd Tawney Ridge Ln Rancho Rd New road, 2 lanes each dir $2,319,000 2010 Victorville 4A01305*SB Amethyst Rd Chisholm Tr Eucalyptus St New road, 2 lanes each dir $3,414,000 2010 Victorville 4A01306*SB Amethyst Rd Luna Rd Chisholm Tr Widen from 1 to 2 lanes each dir $6,648,000 2010 Victorville 4A01307*
SB Amethyst Rd Rancho Rd Luna Rd New road, 2 lanes each dir (note: overlaps RTIP#SBD031418 from Palmdale to Hopland) $8,445,000 2010 Victorville 4A01308*
SB Arrowhead Dr Green Tree Bl Nisqually Rd New road, 2 lanes each dir $3,306,000 2010 Victorville 4A01309*SB Baldy Mesa Rd Palmdale Rd La Mesa Rd Widen from 1 to 2 lanes each dir $1,977,000 2020 Victorville 4A01310SB Balsam Rd Nisqually Rd Bear Valley Widen from 1 to 2 lanes each dir $3,953,000 2010 Victorville 4A01311*SB Bear Valley Rd US Hwy 395 I-15 Widen from 2 to 3 lanes each dir $4,995,000 2010 Victorville 4A01312SB Bellflower St Duncan Rd Goodwin Dr Widen from 1 to 2 lanes each dir $1,617,000 2010 Victorville 4A01313SB Bellflower St Palmdale Rd Duncan Rd New road, 2 lanes each dir $8,984,000 2010 Victorville 4A01314SB Condor Rd Mojave Dr Hook Bl New road, 2 lanes each dir $1,797,000 2010 Victorville 4A01315*SB Duncan Rd Baldy Mesa Rd US-395 Widen from 1 to 2 lanes each dir $5,265,000 2010 Victorville 4A01316SB Eagle Ranch Pkwy US-395 Bear Valley New road, 1 lane each dir $2,156,000 2010 Victorville 4A01317*
SB El Evado Rd Nevada Av Rancho Rd New road, 2 lanes each dir (note: overlaps RTIP#SBD031419 from Air Base to Palmdale) $2,156,000 2010 Victorville 4A01318*
SB Eucalyptus St Bellflower St Cobalt Dr Widen from 1 to 2 lanes each dir $4,223,000 2010 Victorville 4A01319*SB Eucalyptus St Cobalt Dr Amargosa Rd New road, 2 lanes each dir $3,369,000 2010 Victorville 4A01320*
SB Eucalyptus St US-395 Amethyst Rd Widen to/construct 2 lanes each dir (1 each dir currently exists btwn Mesa Linda & Cloverly $2,800,000 2008 Victorville 200417
SB George Bvd Air Expwy Phantom St Widen from 1 to 2 lanes each dir $2,247,000 2010 Victorville 4A01321*SB Hesperia Rd 9Th St Verde St Widen from 1 to 2 lanes each dir $450,000 2010 Victorville 4A01322*SB Hesperia Rd Ottowa St Winona St Widen from 1 to 2 lanes each dir $359,000 2010 Victorville 4A01323*SB Hook Bl El Evado Rd Amargosa Rd Widen from 1 to 2 lanes each dir $1,708,000 2010 Victorville 4A01324*SB Hook Bl US-395 El Evado Rd New road, 2 lanes each dir $9,434,000 2010 Victorville 4A01325SB Industrial Bl Nisqually Rd Bear Valley Widen from 1 to 2 lanes each dir $1,977,000 2010 Victorville 4A01326*SB Industrial Bl Seneca Rd Nisqually Rd New road, 2 lanes each dir $5,391,000 2010 Victorville 4A01327*SB Jasmine St Hesperia Rd Industrial Bl Widen from 1 to 2 lanes each dir $1,258,000 2010 Victorville 4A01328*SB La Mesa Rd Koala Rd SR-395 New road, 2 lanes each dir $7,817,000 2010 Victorville 4A01329SB La Mesa Rd Topaz Rd Amargosa Rd Widen from 1 to 2 lanes each dir $4,133,000 2010 Victorville 4A01330*SB Mesa Linda Av Luna Rd Eagle Ranch Pkwy New road, 1 lane each dir $1,348,000 2010 Victorville 4A01331*SB Mojave Dr Armargosa Rd I-15 Widen from 2 to 3 lanes each dir $1,348,000 2010 Victorville 4A01332*SB Mojave Dr Caughlin Rd Koala Rd New road, 2 lanes each dir $7,044,000 2010 Victorville 4A01333*SB Mojave Dr US-395 Amargosa Rd New road, 3 lanes each dir $20,539,000 2010 Victorville 4A01334*SB Mojave St End of Mojave St Amargosa Rd Widen from 1 to 2 lanes each dir $2,120,000 2010 Victorville 4A01335*
2004 RTP * TECHNICAL APPENDIX I - 210
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
SB Mojave St US-395 End of Mojave St New road, 2 lanes each dir $5,858,000 2010 Victorville 4A01336*SB Monte Vista Rd Duncan Rd Goss Rd Widen from 1 to 2 lanes each dir $1,977,000 2010 Victorville 4A01337*SB Mustang St George Bvd Phantom St Widen from 1 to 2 lanes each dir $719,000 2010 Victorville 4A01338*
SB National Trails Hwy Mohave River I-15Widen from 1 to 2 lanes each dir (note: overlaps RTIP#SBD88140 from Air Expwy to I-15)
$1,207,000 2010 Victorville 4A01339*
SB Nevada Av George Bvd El Evado St Widen from 1 to 2 lanes each dir $898,000 2010 Victorville 4A01340*SB Nisqually Rd Mariposa Rd Industrial Bl Widen from 1 to 2 lanes each dir $927,000 2010 Victorville 4A01341*SB Ottawa St 3rd Av Hesperia Rd Widen from 1 to 2 lanes each dir $1,437,000 2010 Victorville 4A01342*SB Ottawa St Mariposa Rd 3rd Av New road, 2 lanes each dir $5,211,000 2010 Victorville 4A01343*SB Phantom St Nevada Av Air Expwy Widen from 1 to 2 lanes each dir $2,247,000 2010 Victorville 4A01344*SB Rancho Rd National Trails Hwy Stoddard Wells Rd New road, 2 lanes each dir $5,391,000 2010 Victorville 4A01362*SB Ridgecrest Rd Yates Rd Bear Valley Widen from 1 to 2 lanes each dir $4,312,000 2010 Victorville 4A01346SB Rodeo Dr Seneca Rd Green Tree Bl Widen from 1 to 2 lanes each dir $1,797,000 2010 Victorville 4A01347*SB Roy Rogers/La Paz Civic Dr Seneca Rd Widen from 2 to 3 lanes each dir $1,258,000 2025 Victorville 4A01348SB Sabre Bvd George Bvd Phantom St Widen from 1 to 2 lanes each dir $719,000 2010 Victorville 4A01349*SB Seneca Rd Amethyst Rd Amargosa Rd Widen from 1 to 2 lanes each dir $3,414,000 2010 Victorville 4A01350SB Seneca Rd La Paz Dr Lorene Dr Widen from 1 to 2 lanes each dir $359,000 2010 Victorville 4A01351SB Seneca Rd La Paz Dr Hesperia Rd Widen from 2 to 3 lanes each dir $1,437,000 2025 Victorville 4A01352SB Seneca Rd Lorene Dr Industrial Bl New road, 2 lanes each dir $1,797,000 2010 Victorville 4A01353SB Seneca Rd US-395 Amethyst Rd New road, 2 lanes each dir $7,187,000 2010 Victorville 4A01354SB Silica Dr Hesperia Rd Industrial Bl Widen from 1 to 2 lanes each dir $719,000 2010 Victorville 4A01355*SB Starfighter Bvd George Bvd Phantom St Widen from 1 to 2 lanes each dir $719,000 2010 Victorville 4A01356*SB Stoddard Wells Rd SR-18 I-15 (nr Saugus Rd) Widen from 1 to 2 lanes each dir $1,159,000 2010 Victorville 4A01357*SB Topaz Rd Bear Valley Eucalyptus St Widen from 1 to 2 lanes each dir $1,797,000 2010 Victorville 4A01358SB Topaz Rd Eucalyptus St Mojave St New road, 2 lanes each dir $5,930,000 2010 Victorville 4A01359SB Topaz Rd Palmdale Rd Bear Valley New road, 2 lanes each dir $8,984,000 2010 Victorville 4A01360SB Topaz Rd Seneca Rd Palmdale Rd Widen from 1 to 2 lanes each dir $989,000 2010 Victorville 4A01361SB Village Dr Air Expwy Mojave Dr Widen from 1 to 2 lanes each dir $6,109,000 2010 Victorville 4A01363*
SB Phantom East Air Expressway Phantom West Widen to 6 lanes including realignment of Phantom East/West intersection $6,825,000 2015 Victorville 4A04SCLA01
SB Phantom East @ Phantom West Traffic signal $250,000 2015 Victorville 4A04SCLA02
SB
Phantom East & Phase1&2 RR Access (future Innovation Way to the west)
Traffic signal $200,000 2015 Victorville 4A04SCLA03
SB Phantom East Phantom West Colusa Extend 6-lane road, including realign of Colusa & Hellendale $12,079,000 2020 Victorville 4A04SCLA04
SB Phantom East @ Colusa & Hellendale Traffic signal $250,000 2020 Victorville 4A04SCLA05
2004 RTP * TECHNICAL APPENDIX I - 211
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
SB Colusa Phantom East Adelanto Reconstruct existing 2 lanes and widen to 4 lanes $2,740,700 2025 Adelanto/Victorvill
e 4A04SCLA06
SB Hellendale Colusa north approx. 5,040 ft. Widen to 4 lanes $4,577,000 2025 Victorville 4A04SCLA07
SB Air Cargo Colusa north approx. 5,040 ft. Construct 4 lanes $3,200,000 2025 Victorville 4A04SCLA08
SB Colusa Adelanto US-395 Widen to 4 lanes $1,836,000 2025 Adelanto 4A04SCLA09
SB Unnamed collectors (4a, 4b, 4c) Construct 2 lanes $8,364,000 2025 Victorville 4A04SCLA10
SB Traffic signalsTraffic signals at Colusa@Adelanto, Hellendale@Colusa/Phantom, Air Cargo@Colusa
$650,000 2025 Adelanto/Victorville 4A04SCLA11
SB 14th St Yucaipa Bl Kentucky St Widen from 1 to 2 lanes each dir $1,393,000 2015 Yucaipa 4A04415
SB 14th St Kentucky St Oak Glen Rd New road, 1 lane each dir $2,000,000 2005 Yucaipa 4A01364
SB 5th St Yucaipa Bl County Line Rd Widen from 1 to 2 lanes each dir $3,248,000 2010 Yucaipa 4A01366SB Avenue E 14th St Bryant St Widen from 1 to 2 lanes each dir $9,085,000 2020 Yucaipa 4A04416SB Bryant St North City Limits County Line Rd Widen from 1 to 2 lanes each dir $6,636,000 2025 Yucaipa 4A04417SB California St Ave H County Line Rd Widen from 1 to 2 lanes each dir $520,000 2010 Yucaipa 4A01367*SB Calimesa Bl Oak Glen Rd County Line Rd Widen from 1 to 2 lanes each dir $1,820,000 2010 Yucaipa 4A01368*
SB Chapman Heights Sand Canyon Rd Oak Glen Rd New road, 1 lane each dir $2,550,000 2005 Yucaipa 4A01369*
SB County Line Rd I-10 California St Widen from 1 to 2 lanes each dir $1,675,000 2010 Yucaipa 4A01370*SB Live Oak Cyn Rd West City Limit I-10 Widen from 1 to 2 lanes each dir $1,528,000 2025 Yucaipa 4A01371SB Outer Hwy South Live Oak Canyon Rd County LIne Rd New road, 1 lane each dir $2,550,000 2015 Yucaipa 4A01373*
SB Wildwood Canyon Rd Calimesa Bl Colorado St Widen from 1 to 2 lanes each dir $649,000 2010 Yucaipa 4A01375
SB Wildwood Canyon Rd Nebraska St California St Widen from 1 to 2 lanes each dir $2,359,000 2015 Yucaipa 4A01376
SB Yucaipa Bl I-10 Bryant St Widen from 2 to 3 lanes each dir $12,074,000 2020 Yucaipa 4A04418SB Kickapoo trail SR-62 Yucca Trail New road, 1 lane each dir $185,000 2010 Yucca Valley 4A01377*SB Onaga Trail Kickapoo Camino del Cielo New road, 1 lane each dir $290,000 2010 Yucca Valley 4A01378*SB Santa Fe Trail Apache Acoma New road, 1 lane each dir $290,000 2010 Yucca Valley 4A01379*SB Sunnyslope Drive Mohawk Pioneertown Rd New road, 1 lane each dir $185,000 2010 Yucca Valley 4A01380*SB Sunnyslope drive Pioneertown Rd Camino del Cielo New road, 1 lane each dir $464,000 2010 Yucca Valley 4A01381*
VE Victoria Ave At Gonzales Rd Construct 4 lane flyover with left turn pockets $16,000,000 $4,000,000 Oxnard 5A0401*
VE Rose Ave At Gonzales Rd Construct 4 lane flyover with left turn pockets $16,000,000 $4,000,000 Oxnard 5A0402*
Note: SCAG sought input from the subregional agencies for the development of the RTP. As part of this input, local jurisdictions,
2004 RTP * TECHNICAL APPENDIX I - 212
Appendix I * Project List
2004 RTP - Arterial ProjectsCO Route/Corridor From To Description Public Funding
(02$)Private/Other Funding (02$)
Potential Completion Year
City/Agency RTP ID
subregions, and county transportation commissions provided SCAG with proposed arterial projects.
Since the RTP is a financially constrained plan, all of the arterials could not be modeled as part of the RTP.
Projects marked with an asterisk (*) indicate those projects that were modeled in the RTP analysis.
However, while the RTP must remain financially constrained, the implementing agencies will have the discretion to prioritize
arterial improvement projects from the list based on performance criteria to the extent that allocated funding is available.
2004 RTP * TECHNICAL APPENDIX I - 213
Appendix I * Project List
2004 RTP - Grade Crossing ProjectsCO Route/Corridor From To Description
Public Funding (02$)
Private/Other Funding (02$)
Completion Year RTP ID
LA Avalon Blvd A St Water St Provide 1 or 2 lane grade separation $20,000,000 2005 1A04GX1
LA Buena Vista/San Fernando/Metrolink Intersection/grade separation $17,000,000 2005 1A01GX4
LA Neptune Ave Harry Bridges Blvd Fries Ave Provide 1 or 2 lane grade separation $30,000,000 2005 1A04GX2
LAPier B Railyard/Alameda Corridor terminus overpass
Pier B St 9th/Anaheim $13,000,000 2006 1A01GX3
LA Verdugo Ave Grade separation $16,000,000 2010 1A01GX5
LA Rosecrans Ave/Marquardt Ave in Santa Fe Springs (BNSF/Pacific Surfliner) Grade separation with BNSF tracks (incl.
retaining walls, utility relocation, etc.) $47,000,000 2007 1A04GX6
LA Lakeland Rd in Santa Fe Springs (BNSF/Pacific Surfliner) Grade separation with BNSF tracks (incl. retaining walls, utility relocation, etc.) $14,000,000 2008 1A04GX7
LA Pioneer Blvd in Santa Fe Springs & LA County (BNSF/Pacific Surfliner)
Grade separation with BNSF tracks and Rivera Rd (incl. pedestrian walkway, utility relocation, etc.)
$27,000,000 2010 1A04GX8
OR Orangethorpe Corridor Lakeview Avenue Grade Crossing $38,000,000 2020 2G04189
OR Orangethorpe Corridor State College Avenue Grade Crossing $30,000,000 2015 2G01190
OR Orangethorpe Corridor Raymond Avenue Grade Crossing $28,000,000 2020 2G04191
OR Orangethorpe Corridor Acacia Avenue Grade Crossing $22,000,000 2020 2G04192
OR Orange/Olive Corridor Ball Road Grade Crossing $35,000,000 2020 2G04193
OR Orange/Olive Corridor Grand Avenue Overcrossing/Viaduct $17,300,000 2020 2G04194
OR Orange/Olive Corridor La Veta Undercrossing $14,000,000 2020 2G04195
OR Orange/Olive Corridor 17th Street Undercrossing $18,000,000 2020 2G04196
OR Orange/Olive Corridor Redhill Avenue Grade Crossing $30,500,000 2020 2G04197
OR Orange/Olive Corridor State College Undercrossing $19,100,000 2020 2G04198
OR Orange/Olive Corridor Santa Ana Blvd Undercrossing $15,400,000 2020 2G04199
OR Orange/Olive Corridor 4th Street Lane Widening $3,000,000 2020 2G04200
OR Orange/Olive Corridor Collins Avenue Lane Widening $4,000,000 2020 2G04201
OR Orange/Olive Corridor Tustin Avenue Undercrossing $23,200,000 2020 2G04202
2004 RTP * TECHNICAL APPENDIX I - 214
Appendix I * Project List
2004 RTP - Grade Crossing ProjectsCO Route/Corridor From To Description
Public Funding (02$)
Private/Other Funding (02$)
Completion Year RTP ID
OR Orange/Olive Corridor Walnut Avenue Lane Widening $3,700,000 2020 2G04203
OR Orange/Olive Corridor Sand Canyon Undercrossing $17,200,000 2020 2G04204
RV 3rd Street SR-91 Kansas Ave Grade Separation - 4 lanes over BNSF and UPRR Tracks $15,900,000 2010 3G01G01
RV Iowa Ave Spring St Palmyrita Ave Grade Separation - 4 lanes over BNSF RR Tracks $18,700,000 2010 3G01G02
RV Magnolia Ave Lincoln St Buchanan St Grade Separation - 4 lanes over BNSF RR Tracks $15,950,000 2010 3G01G04
RV Chicago Ave Thorton St Columbia Ave Grade Separation - 4 lanes over BNSF RR Tracks $26,100,000 2010 3G01G05
RV Streeter Ave Grand Ave Central Ave Grade Separation - 4 lanes over UPRR Tracks $15,700,000 2010 3G01G06
RV Spruce St SR-91 I-215 Grade Separation - 4 lanes over BNSF RR Tracks $15,900,000 2010 3G01G07
RV Magnolia Ave Central Ave Jurupa Ave Grade Separation - 4 lanes over UPRR Tracks $16,000,000 2010 3G01G08
RV Riverside Ave Central Ave Jurupa Ave Grade Separation - 3 lanes over UPRR Tracks $15,000,000 2010 3G01G09
RV Mary St SR-91 Marguerita Ave Grade Separation - 4 lanes over BNSF RR Tracks $15,700,000 2010 3G01G10
RV Columbia Ave Chicago Ave Palmyrita Ave Grade Separation - 4 lanes over BNSF RR Tracks $18,300,000 2010 3G01G11
RV Cridge St SR-91 Park Ave Grade Separation - 2 lanes over BNSF RR Tracks $15,300,000 2015 3G01G12
RV Avenue 52 Shady Ln Industrial Way Grade Separation - 4 lanes over UPRR Tracks and SR111 $15,700,000 2015 3G01G13
RV Auto Center Dr Railroad St Pomona Rd Grade Separation - 4 lanes over BNSF RR Tracks $15,700,000 2015 3G01G14
RV Sunset Ave I-10 Lincoln St Grade Separation - 4 lanes over UPRR Tracks $18,000,000 2015 3G01G15
RV Jurupa Rd Van Buren Blvd Pedley Rd Grade Separation - 3 lanes over UPRR Tracks $15,600,000 2015 3G01G16
RV Washington St Indiana Ave Marguerita Ave Grade Separation - 2 lanes over BNSF RR Tracks $14,800,000 2015 3G01G17
RV Center St Iowa Ave Garfield Ave Grade Separation - 4 lanes over BNSF RR Tracks $15,300,000 2021 3G01G18
RV Hargrave St I-10 Lincoln St Grade Separation - 4 lanes over UPRR $13,800,000 2021 3G01G19
RV Brockton Ave Central Ave Jurupa Ave Grade Separation - 4 lanes over UPRR Tracks $14,700,000 2012 3G01G20
RV Kansas Ave Spruce St Massachusetts Ave Grade Separation - 2 lanes over BNSF RR Tracks $14,000,000 2021 3G01G21
RV Tyler St SR-91 Comanche Ave Grade Separation - 4 lanes over BNSF RR Tracks $14,700,000 2021 3G01G22
2004 RTP * TECHNICAL APPENDIX I - 215
Appendix I * Project List
2004 RTP - Grade Crossing ProjectsCO Route/Corridor From To Description
Public Funding (02$)
Private/Other Funding (02$)
Completion Year RTP ID
RV Adams St Indiana Ave Lincoln St Grade Separation - 4 lanes over BNSF RR $14,700,000 2021 3G01G23
RV Madison St Indiana Ave Lincoln St Grade Separation - 4 lanes over BNSF RR Tracks $14,700,000 2021 3G01G24
RV San Timoteo Canyon Rd Entranz Blvd Hagen Rd Grade Separation - 2 lanes over UPRR Tracks $13,800,000 2012 3G01G25
RV California Ave 3rd St I-10 Grade Separation - 2 lanes over UPRR Tracks $13,800,000 2021 3G01G26
RV Smith Ave Wall Circle Railroad St Grade Separation - 4 lanes over BNSF RR Tracks $14,700,000 2021 3G01G27
RV 7th St/ Mission Inn Ave SR-91 Park Ave Grade Separation - 4 lanes over BNSF RR Tracks $15,300,000 2021 3G01G28
RV Railroad St Smith Ave Sherman Ave Grade Separation - 4 lanes over BNSF RR $14,900,000 2021 3G01G29
RV Broadway Main St Bonita Ave Grade Separation - 2 lanes over UPRR Tracks $14,000,000 2021 3G01G30
RV Pierce St Magnolia Ave Indiana Ave Grade Separation - 3 lanes over BNSF RR Tracks $14,700,000 2021 3G01G31
RV Buchanan St Magnolia Ave Elmview Dr Grade Separation - 2 lanes over BNSF RR Tracks $14,700,000 2021 3G01G32
RV Joy St SR-91 Harrison St Grade Separation - 2 lanes over BNSF RR Tracks $14,900,000 2021 3G01G33
RV Palm Ave Central Ave Jurupa Ave Grade Separation - 4 lanes over UPRR Tracks $14,700,000 2021 3G01G34
RV Jackson St Indiana Ave Lincoln Ave Grade Separation - 4 lanes over BNSF RR Tracks $14,700,000 2027 3G01G35
RV 22nd St I-10 Lincoln St Grade Separation - 2 lanes over UPRR Tracks $13,300,000 2027 3G01G36
RV Harrison St Indiana Ave Walnut Grove Ave Grade Separation - 2 lanes over BNSF RR Tracks $13,800,000 2027 3G01G37
RV Jefferson St Indiana Ave Lincoln Ave Grade Separation - 2 lanes over BNSF RR Tracks $13,800,000 2027 3G01G38
RV Cota St Railroad St McGrath Dr Grade Separation - 2 lanes over BNSF RR Tracks $14,700,000 2027 3G01G39
RV Bellgrave Ave Bain St Rutile St Grade Separation - 2 lanes over UPRR Tracks $13,800,000 2027 3G01G40
RV Clay St Van Buren Blvd Haven View Dr Grade Separation - 4 lanes over UPRR Tracks $14,700,000 2027 3G01G41
RV Pennsylvania Ave I-10 3rd St Grade Separation - 2 lanes over UPRR Tracks $13,800,000 2027 3G01G42
RV San Gorgonio Ave I-10 Lincoln St Grade Separation - 2 lanes over UPRR Tracks $13,800,000 2027 3G01G43
RV Airport Rd Polk St Orange St Grade Separation - 2 lanes over UPRR Tracks and SR111 $13,800,000 2027 3G04G44
2004 RTP * TECHNICAL APPENDIX I - 216
Appendix I * Project List
2004 RTP - Grade Crossing ProjectsCO Route/Corridor From To Description
Public Funding (02$)
Private/Other Funding (02$)
Completion Year RTP ID
RV Main St I-215 Michigan Ave Grade Separation - 2 lanes over BNSF and UP RR Tracks $13,800,000 2027 3G01G45
RV Avenue 54 Grade Separation at SR-111/SPRR Grade Separation $3,245,000 2030 3G01CV102
SB Ramona Av in Montclair (Alhambra) Roadway Widening (Low Option), Grade Separation (High Option) $15,347,000 4G0101
SB Monte Vista Av in Montclair (Alhambra) Spot Widening (Low Option), Grade Separation (High Option) $16,971,000 4G0102
SB San Antonio Av in Ontario (Alhambra) Spot Widening (Low Option), Grade Separation (High Option) $19,522,000 4G0103
SB Campus Av in Ontario (Alhambra) Spot Widening (Low Option), Grade Separation (High Option) $19,470,000 4G0104
SB Vineyard Av in Ontario (Alhambra) Safety Upgrade (Low Option), Grade Separation (High Option) $17,421,000 4G0105
SB Milliken Av in Ontario (Alhambra) Safety Upgrade (Low Option), Grade Separation (High Option) $31,932,000 4G0106
SB Ramona Av in Montclair (Los Angeles) Roadway Widening (Low Option), Grade Separation (High Option) $15,347,000 4G0107
SB Monte Vista Av in Montclair (Los Angeles) Spot Widening (Low Option), Grade Separation (High Option) $16,971,000 4G0108
SB San Antonio Av in Ontario (Los Angeles) Spot Widening (Low Option), Grade Separation (High Option) $19,522,000 4G0109
SB Vine Av in Ontario (Los Angeles) Safety Upgrade (Low Option), Grade Separation (High Option) $14,831,000 4G0110
SB Sultana Av in Ontario (Los Angeles) Safety Upgrade (Low Option), Grade Separation (High Option) $14,831,000 4G0111
SB Campus Av in Ontario (Los Angeles) Spot Widening (Low Option), Grade Separation (High Option) $19,470,000 4G0112
SB Bon View Av in Ontario (Los Angeles) Safety Upgrade (Low Option), Grade Separation (High Option) $14,831,000 4G0113
SB Grove Av in Ontario (Los Angeles) Roadway Widening (Low Option), Grade Separation (High Option) $19,964,000 4G0114
SB Vineyard Av in Ontario (Los Angeles) Spot Widening (Low Option), Grade Separation (High Option) $16,602,000 4G0115
SB Archibald Av in Ontario (Los Angeles) Roadway Widening (Low Option), Grade Separation (High Option) $21,068,000 4G0116
SB Milliken Av in Ontario (Los Angeles) Safety Upgrade (Low Option), Grade Separation (High Option) $15,130,000 4G0117
SB Central Av in Montclair (San Gabriel ) Spot Widening (Low Option), Grade Separation (High Option) $18,185,000 4G0118
SB Benson Ave in Upland (San Gabriel ) Safety Upgrade (Low Option), Spot Widening (High Option) $1,312,000 4G0119
SB Mountain Av in Upland (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $1,205,000 4G0120
SB San Antonio Av in Upland (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $438,000 4G0121
2004 RTP * TECHNICAL APPENDIX I - 217
Appendix I * Project List
2004 RTP - Grade Crossing ProjectsCO Route/Corridor From To Description
Public Funding (02$)
Private/Other Funding (02$)
Completion Year RTP ID
SB Euclid Av in Upland (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $1,205,000 4G0122
SB Second Av in Upland (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $844,000 4G0123
SB Campus Av in Upland (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $236,000 4G0124
SB Grove Av in Rancho Cucamonga (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $584,000 4G0125
SB Baker Av in Rancho Cucamonga (San Gabriel ) Safety Upgrade (Low Option), Spot Widening (High Option) $971,000 4G0126
SB Vineyard Av in Rancho Cucamonga (San Gabriel ) Safety Upgrade (Low Option), Grade Separation (High Option) $15,457,000 4G0127
SB Hellman Av in Rancho Cucamonga (San Gabriel ) Safety Upgrade (Low Option), Spot Widening (High Option) $1,822,000 4G0128
SB Archibald Av in Rancho Cucamonga (San Gabriel ) Safety Upgrade (Low Option), Grade Separation (High Option) $16,016,000 4G0129
SB Hermosa Av in Rancho Cucamonga (San Gabriel ) Safety Upgrade (Low Option), Spot Widening (High Option) $1,474,000 4G0130
SB Haven Av in Rancho Cucamonga (San Gabriel ) Safety Upgrade (Low Option), Grade Separation (High Option) $18,565,000 4G0131
SB Rochester Av in Rancho Cucamonga (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $730,000 4G0132
SB Etiwanda Av in Rancho Cucamonga (San Gabriel ) Roadway Widening (Low Option), Grade Separation (High Option) $18,537,000 4G0133
SB Beech Av in San Bernardino County (San Gabriel ) Safety Upgrade (Low Option), Roadway
Widening (High Option) $2,027,000 4G0134
SB Citrus Av in Fontana (San Gabriel ) Spot Widening (Low Option), Grade Separation (High Option) $16,376,000 4G0135
SB Juniper Av in Fontana (San Gabriel ) Safety Upgrade (Low Option), Spot Widening (High Option) $1,093,000 4G0136
SB Sierra Av in Fontana (San Gabriel ) Spot Widening (Low Option), Grade Separation (High Option) $16,076,000 4G0137
SB Mango Av in Fontana (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $818,000 4G0138
SB Palmetto Av in Fontana (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $236,000 4G0139
SB Alder Av in Fontana (San Gabriel ) Safety Upgrade (Low Option), Spot Widening (High Option) $1,328,000 4G0140
SB Locust Av in San Bernardino County (San Gabriel ) Safety Upgrade (Low Option), Spot Widening
(High Option) $1,036,000 4G0141
SB Cedar Av in Rialto (San Gabriel ) Safety Upgrade (Low Option), Grade Separation (High Option) $16,198,000 4G0142
SB Cactus Av in Rialto (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $1,022,000 4G0143
SB Lilac Av in Rialto (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $148,000 4G0144
2004 RTP * TECHNICAL APPENDIX I - 218
Appendix I * Project List
2004 RTP - Grade Crossing ProjectsCO Route/Corridor From To Description
Public Funding (02$)
Private/Other Funding (02$)
Completion Year RTP ID
SB Willow Av in Rialto (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $148,000 4G0145
SB Riverside Av in Rialto (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $730,000 4G0146
SB Sycamore Av in Rialto (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $148,000 4G0147
SB Acacia Av in Rialto (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $148,000 4G0148
SB Eucalyptus Av in Rialto/San Bernardino City (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade
(High Option) $148,000 4G0149
SB Pepper Av in San Bernardino City (San Gabriel ) Safety Upgrade (Low Option), Spot Widening (High Option) $1,239,000 4G0150
SB Rialto Av in San Bernardino City (San Gabriel ) Safety Upgrade (Low Option), Roadway Widening (High Option) $2,114,000 4G0151
SB Rancho Av in San Bernardino City (San Gabriel ) Safety Upgrade (Low Option), Safety Upgrade (High Option) $236,000 4G0152
SB Rialto Av in San Bernardino City (San Bernadino) Spot Widening (Low Option), Grade Separation (High Option) $15,938,000 4G0153
SB Laurel St in Colton (San Bernadino) Spot Widening (Low Option), Grade Separation (High Option) $16,631,000 4G0154
SB Olive St in Colton (San Bernadino) Spot Widening (Low Option), Grade Separation (High Option) $15,698,000 4G0155
SB E St in Colton (San Bernadino) Safety Upgrade (Low Option), Safety Upgrade (High Option) $236,000 4G0156
SB H St in Colton (San Bernadino) Safety Upgrade (Low Option), Safety Upgrade (High Option) $236,000 4G0157
SB Valley Bl in Colton (San Bernadino) Roadway Widening (Low Option), Grade Separation (High Option) $20,307,000 4G0158
SB State/University Pkwy in San Bernardino City (Cajon) Spot Widening (Low Option), Grade Separation (High Option) $16,255,000 4G0159
SB Palm Av in San Bernardino City (Cajon) Spot Widening (Low Option), Grade Separation (High Option) $15,537,000 4G0160
SB Glen Helen Pkwy in San Bernardino County (Cajon) Roadway Widening (Low Option), Grade
Separation (High Option) $18,196,000 4G0161
SB Hunts Ln in San Bernardino City/Colton (Yuma) Spot Widening (Low Option), Grade
Separation (High Option) $16,880,000 4G0162
SB Whittier Av in Loma Linda (Yuma) Safety Upgrade (Low Option), Grade Separation (High Option) $14,831,000 4G0163
SB Beaumont Av in Loma Linda (Yuma) Safety Upgrade (Low Option), Grade Separation (High Option) $14,831,000 4G0164
SB San Timoteo Rd in Redlands (Yuma) Spot Widening (Low Option), Spot Widening (High Option) $2,128,000 4G0165
SB Alessandro Rd in Redlands (Yuma) Spot Widening (Low Option), Grade Separation (High Option) $15,683,000 4G0166
SB Vista in San Bernardino County (Cajon) Spot Widening (low option), Grade Separation
(high option) $14,934,000 4G0167
2004 RTP * TECHNICAL APPENDIX I - 219
Appendix I * Project List
2004 RTP - Grade Crossing ProjectsCO Route/Corridor From To Description
Public Funding (02$)
Private/Other Funding (02$)
Completion Year RTP ID
SB Indian Trail in San Bernardino County (Cajon) Safety Upgrade (low option), Safety Upgrade
(high option) $148,000 4G0168
SB Hinkley in San Bernardino County (Cajon) Spot Widening (low option), Grade Separation
(high option) $14,934,000 4G0169
SB Lenwood in San Bernardino County (Cajon) Spot Widening (low option), Grade Separation
(high option) $14,934,000 4G0170
SB Ranchero Rd in San Bernardino County (Cut-Off) Spot Widening (low option), Grade Separation
(high option) $14,934,000 4G0171
SB Phelan in San Bernardino County (Cut-Off) Spot Widening (low option), Grade Separation
(high option) $14,934,000 4G0172
SB Johnson Rd in San Bernardino County (Cut-Off) Safety Upgrade (low option), Safety Upgrade
(high option) $148,000 4G0173
VE Rice Ave Grade separation in Oxnard $23,000,000 5G0101
VE SR-118 Grade separation in Ventura County $23,000,000 5G0102
VE SR-232 (Vineyard Ave) Oxnard Blvd Saint Mary's Dr Construct 6 lane grade separation over UPRR tracks $16,000,000 $4,000,000 5G0403
VE Rose Ave At SR-34 (E. Fifth St) Construct 4 lane grade separation with left turn pockets $16,000,000 $4,000,000 5G0404
VE Gonzales Rd SR-1 (Oxnard Blvd) UPRR tracksConstruct 6 lane grade separation at SR-1 (Oxnard Blvd) and UPRR tracks with left turn pockets
$16,000,000 $4,000,000 5G0405
Note: This list of grade crossing projects represents input from the subregional agencies provided during the development of the RTP.
This is not an exhaustive list of grade crossing projects; the implementing agencies have the discretion to prioritize
grade crossing improvement projects based on performance criteria to the extent that allocated funding is available.
2004 RTP * TECHNICAL APPENDIX I - 220
Appendix I * Project List
2004 RTP - ITS ProjectsSPONSOR MARKET PACKAGE
CATEGORYPROJECT DESCRIPTION PROJECT BENEFITS BUDGET
(millions)PRIMARY SECONDARY
City of Lancaster ATMS
Advanced Transportation Communications System (ATCS)
Will provide enhanced communication capability through deployment of fiber optics, microwave, software, etc.
Provide a means of centralizing traffic control, improve signal synchronization, improve traffic flow. 1.7
Caltrans District 7 ATMS Caltrans/CHP Collocated
TMC BuildingConstruction of a fully co-located Caltrans/CHP Los Angeles Regional Transportation Management Center (LARTMC)
Will provide co-managed critical transportation management services for the public in the Los Angeles and Ventura counties.
30.5
Caltrans District 7 ATMS TMC New Building, Central
Operational SystemBecause of the expansion of work area in the new LARTMC , additional hardware will need to be procured.
Will provide co-managed critical transportation management services for the public in the Los Angeles and Ventura counties.
10
Caltrans District 7 ATMS Field to New TMC Building
CutoverTo transition the computer systems and operational control of traffic management functions from the existing TMC to the new LARTMC.
Will provide co-managed critical transportation management services for the public in the Los Angeles and Ventura counties.
5
Caltrans District 7 ATMS
LA 1, 27 & 101 McClure Tunnel to Trancas Canyon Rd.
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, highway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public.
4.451
Caltrans District 7 ATMS LA 57 from Orange County
line to RTE 210
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
4.775
Caltrans District 7 ATMS LA 101 from RTE 27 to
Ventura County
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
5.16
Caltrans District 7 ATMS LA 10 from RTE 605 to San
Bernadino County Line
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
6.921
Caltrans District 7 ATMS Santa Monica Frwy CCTV
Rehab
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include improve office to field two-way communications as well as replacement of antiqua
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
0.85
Caltrans District 7 ATMS RTE 710 from RTE 105 to
RTE 10
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
5.673
2004 RTP * TECHNICAL APPENDIX I - 221
Appendix I * Project List
2004 RTP - ITS ProjectsSPONSOR MARKET PACKAGE
CATEGORYPROJECT DESCRIPTION PROJECT BENEFITS BUDGET
(millions)PRIMARY SECONDARY
Caltrans District 7 ATMS LA 1, 27, &101 from McClure
Tunnel to Trancas Canyon Rd
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
1.064
Caltrans District 7 ATMS LA-5 from RTE 14 to Kern
County Rd
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
4.125
Caltrans District 7 ATMS RTE 710 from RTE 1 to RTE
105
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public.
4.887
Caltrans District 7 ATMS LA 210 from RTE 2 to RTE
710
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade & complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance equi
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
4.78
Caltrans District 7 ATMS
VEN 101 from VEN 34 (Lewis Rd) to VEN 126; Install Traffic Monitoring System
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
2.79
Caltrans District 7 ATMS LA 5 from RTE 605 to RTE 14
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include improve office to field two-way communications as well as replacement of antiqua
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
4.725
Caltrans District 7 ATMS LA 14 from RTE 5 to Sand
Canyon Rd
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
2.3
Caltrans District 7 ATMS LA 210 from RTE 605 to RTE
210/57/10
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
5.25
Caltrans District 7 ATMS LA 47 from McArthur Ave to
Willow St.
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
2.31
2004 RTP * TECHNICAL APPENDIX I - 222
Appendix I * Project List
2004 RTP - ITS ProjectsSPONSOR MARKET PACKAGE
CATEGORYPROJECT DESCRIPTION PROJECT BENEFITS BUDGET
(millions)PRIMARY SECONDARY
Caltrans District 7 ATMS LA 2 from RTE 5 to RTE 210
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
4.233
Caltrans District 7 ATMS
VEN 101 from VEN 126 to Santa Barbara County Line; Install Traffic Monitoring Station
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
2.2
Caltrans District 7 ATMS LA 110 from RTE 47 to
Carson
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
1.893
Caltrans District 7 ATMS LA 210 from RTE 5 to RTE 2
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
7.269
Caltrans District 7 ATMS
LA 30, LA 60 & LA 71 (R1.0/R27; R25.4/R30.5; R0.33/R4.8)
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
3.2
Caltrans District 7 ATMS LA 14 from Sand Canyon to
Ave. S
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
3.265
Caltrans District 7 ATMS LA 14 from Ave. S to Ave D.
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
4.35
Caltrans District 7 ATMS VEN 118; To be Scoped (May
be Combined with VEN 23)
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
2.5
Caltrans District 7 ATMS VEN 126; To Be Scoped
(Minor A Project)
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
0.5
2004 RTP * TECHNICAL APPENDIX I - 223
Appendix I * Project List
2004 RTP - ITS ProjectsSPONSOR MARKET PACKAGE
CATEGORYPROJECT DESCRIPTION PROJECT BENEFITS BUDGET
(millions)PRIMARY SECONDARY
Caltrans District 7 ATMS VEN 23; To Be Scoped (May
be Combined with VEN 118)
This project is a portion of Caltrans 10 year Traffic Improvement Program to upgrade and complete the Urban Freeway Advanced Traffic Management System (ATMS) and will include such elements as office to field two-way communications, freeway surveillance eq
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
2.5
Caltrans District 7 ATMS RMS 2070 Conversion This project is to upgrade exsisting caltrans 170 controllers to 2070
ATMS NTCIP standards.
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
6
Caltrans District 7 ATMS Fiber Optic Network
Management
This project would provide over all management during phased implementation and installation of the Caltrans complete fiber optic network.
Will bring the existing infrastructure up to current and future communications standards and provide improved transportation management services for the public
1.5
Caltrans District 7 ATMS System Consolidation/
Integration
To provide system integration as well as the continuing application and development of State Traffic Operation Systems standards as new field elements are installed.
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
2
Caltrans District 7 ATMS Signal Synchronization with
Local AgenciesTo define and develop ATMS interface with arterial traffic signals maintained by local agencies.
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
1.5
Caltrans District 7 ATMS West San Fernando Valley
ATSAC Interties
This project would install fiber optic cable connecting the Ventura Fwy with the Simi Valley Freeway. This installation would provide a redundant communication routing of freeway ATMS as well as expansion and intertie with the City of Los Angeles ATSAC Sy
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
2.5
Caltrans District 7 ATMS Mid San Gabriel Valley
Interconnect
This project would install fiber optic cable connecting the Rte 10 Fwy with the Rte 210 Freeway. This installation would provide a redundant communication routing of freeway ATMS as well as expansion and future intertie with local agencies in the area.
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
1.8
Caltrans District 7 ATMS Regional Smart Corridor
This project will apply SMART Corridor technologies to various identified freeway & arterial corridors. These SMART technologies will include such elements as office to field two-way communications, freeway surveillance equipment, ramp meters, closed c
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public as well as improved inter-agency coordination.
24
Caltrans District 7 ATMS Urban Ramp Upgrade
Existing ramp meter installations in most urban areas were constructed on a retrofit basis, before the advent of design guidelines for meter placement. Storage capacity for vehicles waiting in queue was based on the amount of space available rather than
Will bring the existing infrastructure up to current and future standards and provide improved transportation facilities to the motoring public.
18
Caltrans District 7 ATMS System Bottleneck
Corrections
A cause of congestion on the freeway is the merging and weaving near on/off ramps. This project would add auxiliary lanes to locations to be determined after detailed study.
Will bring the existing infrastructure up to current and future standards and provide improved transportation facilities to the motoring public.
30
2004 RTP * TECHNICAL APPENDIX I - 224
Appendix I * Project List
2004 RTP - ITS ProjectsSPONSOR MARKET PACKAGE
CATEGORYPROJECT DESCRIPTION PROJECT BENEFITS BUDGET
(millions)PRIMARY SECONDARY
Caltrans District 7 ATMS Connector Metering This projects adds more freeway to freeway connector metering.
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
13.6
Caltrans District 7 ATMS Temporary Interdistrict
Communication Intertie
Caltran's long range concept is to provide a direct fiber optic connection between adjoining Caltrans TMC'S. In order to expedite the removal of dependence from leased, interim communication facilities, this project would provide a temporary microwave lin
Will facilitate much needed inter-district communication for cooperative traffic management activites as well as mutual aid response.
0.8
Caltrans District 7 ATMS Interim SONET Ring
Connection
Because of staged manner of filed construction, the primary ring configuaration of the SONET ring that will provide for emergency backup communications capability in the even t of severance of the fiber cable will not be completed for a number of years. T
Will provide a much needed emergency backup communications for the Caltrans office to field two way communications.
0.9
Caltrans District 7 ATMS CMS Technology Upgrade
This project provides a scheduled upgrade to changeable message signs (CMS) , at the conclusion of their projected useful life, to meet future standards.
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
10
Caltrans District 7 ATMS Communication Equipment
Technology Upgrade
This project provides a scheduled upgrade to communication equipment, at the conclusion of their projected useful life, to meet future standards.
Will bring the existing infrastructure up to current and future technology standards and provide improved transportation management services for the public
8.5
Caltrans District 7 EM EOC Expansion This project is to enhance the Caltrans Emergency Operations Center
(EOC) in the current TMC.
Will enhance the capabilities of the CaltransTMC to a true multi-agency emergency operations center and thereby provide better service to the public during major catastrophies.
1.2
City of Inglewood ATMS ITS Deployment Program Traffic Management Center with state of the art equipment, installing
CCTV, fiber optics and arterial Changeable Message Signs Reduce congestion and delays, improve vehicular and pedestrian safety. 6
SCRRA APTS Positive Train Separation Develop and implement technology necessary to provide enforceable positive train separation.
Provide strict schedule adherence, improve speed and reliability of freight carriers, improve safety and efficiency of rail infrastructure, provide timely rail health updates to SCRRA and FRA
8.13
SCRRA APTS Video RecognitionDevelop technology to automate Metrolink's ROW. Design and test video recognition system to record and inspect ties, ballast, road bed, grade crossing and bridges for maintenance.
Allow for consistent evaluation of each right of way maintenance issue, provide more accurate inspections. 0.2
SCRRA APTS GIS Create information data base with associated dynamic updates necessary to produce a GIS commitment for SCCRA
Provide management with dynamic locational updates, promote seamless information exchange and better coordination with other agencies, improve safety for workers on or around the right-of-way.
0.205
SCRRA APTS SCRRA Site Notification Network
Create a site notification network that will receive and directly notify appropriate maintenance staff of equipment problems on Metrolink Rail System
Immediate identification of equipment failure, improve response time to equipment problems, shorten duration of service outages.
2.045
2004 RTP * TECHNICAL APPENDIX I - 225
Appendix I * Project List
2004 RTP - ITS ProjectsSPONSOR MARKET PACKAGE
CATEGORYPROJECT DESCRIPTION PROJECT BENEFITS BUDGET
(millions)PRIMARY SECONDARY
SCRRA APTS ATIS GPS System for Metrolink trains.
Install GPS for all Metrolink trains. Create a real time vehicle location system to provide information through PA system, CMS, etc.
Provide passengers with information regarding schedule compliance. Provide real time location data to feeder services, host railroads and the Web. Improve operational safety through on board delivery of Forms A&B and grade crossing health check.
2.335
LACMTA APTS ATIS Project IMAJINE Phase II
Expand IMAJINE through addition of rideshare services, Modal Shift Management, adaptive signal control system for Caltrans state highway system, GPS, integrated regional and corridor rail services, traveler information via Cable TV
Reduce congestion and delays, improve air quality, introduce new ITS to improve traveler information, address CVO mobility needs in the Alameda Corridor.
4.263
LACMTA APTS Universal Fare System Open Architecture System which accepts multiple format fare cards.
More payment options & promotes seamless travel for passengers. Increased financial control and security, reduced sales commission costs, distributes passenger revenues to participating agencies on the basis of agreed upon formulas and actual usage.
26.55
LACMTA CVO APTS ATMS 1 - FoundationDevelop and install a GIS/GPS information database capable of supporting the needs of all ITS and MTA standard requirements in all vehicles.
Provide foundation for integrating numerous ITS technologies into a single unit. It will also provide a seamless interface with other information systems.
1.325
LACMTA APTS ATMS II - TRS Migration Migrate the legacy Transit Radio Systems into an open system architecture on all vehicles.
Provide foundation for integrating numerous ITS technologies into a single unit. It will also provide a seamless interface with other information systems.
35
LACMTA APTS ATMS III - IntegrationEnhance all interfaces of ATMS and MTA operating system, VMS, TOTS, MMS, EIS, ITS, Schedule Building system, for seamless integration using open system architecture
Provide foundation for integrating numerous ITS technologies into a single unit. It will also provide a seamless interface with other information systems.
42.5
LACMTA APTS ATMS IV Rail Incident Management
Expand Rail Incident Management System to include open system architecture & interface with vehicle & facilities maintenance, risk management applications and other ITS.
Provide foundation for integrating numerous ITS technologies into a single unit. It will also provide a seamless interface with other information systems.
1
LACMTA See Below See Below ATMS V - Freeway Service Patrol (FSP)
Enhance FSP and SAFE to improve vehicle location technology, upgrade operating system and radio communications for FSP and comply with ADA on call boxes and provide seamless integration using open system architecture
Provide foundation for integrating numerous ITS technologies into a single unit. It will also provide a seamless interface with other information systems.
62.3
LACMTA APTS FSP Radio Communication Upgrade
Hardware and software upgrade for FSP countywide communication system See 5.7 5
LACMTA APTS Automatic Vehicle Locator (AVL) System Enhancement GPS System installation for automatic tracking of 200 FSP trucks. See 5.7 2
LACMTA APTS FSP Operation System Upgrade
Upgrade the FSP operations system with software development that includes Graphical User Interface (GUI) See 5.7 5
SAFE EM Call Box Communication Upgrade
Upgrade the call box communications system using cellular, satellite or best alternative. See 5.7 6
SAFE EM Call Box System Replacement
Replace the entire call box system within five years (presently - 5 years into a 10 year life cycle). See 5.7 15
SAFE EM Call Box American Disabilities Act (ADA) Compliance
Retrofit and/or replace the existing 5000 call box sites for ADA Compliance. See 5.7 10
2004 RTP * TECHNICAL APPENDIX I - 226
Appendix I * Project List
2004 RTP - ITS ProjectsSPONSOR MARKET PACKAGE
CATEGORYPROJECT DESCRIPTION PROJECT BENEFITS BUDGET
(millions)PRIMARY SECONDARY
LACMTA ATISFreeway Incident Service Tracking System (FIRST) Dissemination
Provide real time information to media (i.e. radio, internet, etc.) by means of a CAD distribution system. See 5.7 5
LACMTA ATMS EMLA County Emergency Management Radio Communication System
Develop a common communication system amongst all Los Angeles Agencies. See 5.7 12
LACMTA EMRegional Portable Incident Command Package (Pic-Pac) for Emergency Responders
Provide field command units for on scene management. See 5.7 0.8
LACMTA ATMSFSP/SAFE/MIR Regional System-to-System Interface (Priority Corridor Compliance)
Interface FIRST, SAFE MIR and all other FSP systems into the Priority Corridor Network. See 5.7 1.5
LACMTA ATIS ATMS ATIS I - LA/Ventura Regional Deploy an Advanced Traveler Information System for the LA/Ventura Region
Provide travelers in the region with information to allow them to make more informed decision regarding travel time and modal choice.
4.125
LACMTA ATIS ATMS ATIS II - Initial Deployment To improve traveler information reliability and accuracyImprove control over external variables, enhance ability to respond to travel sensitive configuration changes more quickly.
1.1
LACMTA ATIS ATIS III Regional Deployment Improve traveler information through extended functionality by using modern telecommunication facilities
Improve control over external variables, improve information collection for planning. 0.4
LACMTA ATMS Railroad Crossing Safety Implement health monitoring system at Metro Blue line crossing, test street and rail traffic control system synchronization for safety.
Improve safety, reduce delay and congestion, exhibit successful traffic signal and railroad crossing equipment. Possibly avoid costly grade separation.
3.1
San Gabriel Valley COG ATMS Alameda Corridor -East Railroad signaling together with train detection and prediction
information to interface with existing ITS to improve safety and mobility. Reduce congestion and delays from rail traffic. 31
Los Angeles World Airports ATMS LAX Adaptive Signal Control
System Implement adaptive signal control systems , as well as CCTV Improve traffic flow, reduce travel demand in the area, 2.6
Los Angeles World Airports ATMS Multi-Modal Advanced Vehicle
Location System
Implement AVL system in combination with the deployment of a mapping system to provide information on the commercial vehicles accessing the Central Terminal area, as well as manage the demand at peak times of the day or week.
Improve traffic flow, manage commercial vehicles on the regional roadway network and Central Terminal area. 4
Los Angeles World Airports ATMS APTS, CVO Integration of LAX AVL
System to Network
Balance, integrate and coordinate different transportation modes, facilities and information sources so that the transportation systems works and responds as a unified system .
Improve traffic flow, coordinate with various agencies to better manage the traffic and multiple modes of transportation.
1.5
City of Palmdale ATIS North County ITS
Communication Project Install a regional traveler information system in the North County Area Reduce travel delays, improve air quality and safety. 2
City of Santa Clarita ATMS
Centralized Fiber Optic Signal Interconnect/ CCTV System
Install fiber optic communication network and surveillance along the City's congested regional arterial segments and intersections
Improve traffic flow and safety, provide an interface with other information systems. 1.34
2004 RTP * TECHNICAL APPENDIX I - 227
Appendix I * Project List
2004 RTP - ITS ProjectsSPONSOR MARKET PACKAGE
CATEGORYPROJECT DESCRIPTION PROJECT BENEFITS BUDGET
(millions)PRIMARY SECONDARY
Long Beach Transit APTS Area-Wide Bus Driving
Simulation SystemProvide facilities for transit properties in LA County to screen and train bus operators in an objective and cost-effective manner Improves driver training with new technologies and safety. 0.5213
Long Beach Transit APTS Automated Trip Planning Assist Long Beach Transit phone operators with quick, efficient trip
information to customersSpeed delivery and accuracy of telephone information, allow for easy accessibility for others to utilize information. 1.86
Long Beach Transit APTS Automatic Vehicle Location
and Monitoring System
The system will enable Long Beach Transit to maintain contact with groups of vehicles to track vehicle movement for performance and security.
Increase control of fleet, driver operations and fleet dispatch functions, provide on time performance, allow faster response for incidents.
3.05
Long Beach Transit APTS Countywide Integrated Fare
CollectionParticipate in countywide integrated fare collection system to provide seamless travel & transfers to transit customers.
More payment options & promotes seamless travel for passengers. Increased financial control and security, reduced sales commission costs.
2.096
Long Beach Transit CVO On-Bus Video Security
SystemThe on-bus video security system will increase the level of security for Long Beach Transit. Increases the level of security of transit. 2.033
Long Beach Transit APTS Automatic Passenger
Counting SystemAutomatic passenger counting system coupled with GPS provide information for planning.
Allow for accurate collection of data that can be used to determine trends or seasonal impacts for planning purposes.
0.4
SCAQMD ATMS Intelligent High Emitting Vehicle Detection System
A comprehensive intelligent system to detect high emitting vehicles and to provide opportunities for repair and/or scrappage.
Reduces emissions from high-emitting vehicles, and relief from inspection and maintenance requirement for vehicles not needing it.
63.15
LACDPW ATMS County and City of LA Traffic Control System Integration
Integrating the County's new Traffic Management System with LADOT's ATSAC
Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
2
LACDPW ATIS County of LADPW Advanced Traveler Information System Elevate the initial deployment of ATIS to a Countywide level Enables TMC to provide general public with county wide
real-time traffic information 5
LACDPW CVOCounty of LADPW Maintenance Management System ITS Enhancement
Allows for immediate retrieval of inventory databases and maintenance from a Department wide system.
Will allow more funds to be allocated for new or current ITS projects by maximizing effectiveness of operation and maintenance funds to help prevent the degradation of the current highway network
1.85
LACDPW ATMS ATIS County of LADPW Traffic Management Center
Project will provide a facility that will house and staff equipment needed to operate an advanced traffic management system
Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
1.677
LACDPW ATMS ATIS Gateway Cities Traffic Signal Corridors Project/Phase II
Design and implement multi-jurisdictional signal system improvements on regional arterial in the Gateway Cities area
Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
33
LACDPW ATMS ATIS Gateway Cities Traffic Signal Corridors Project/Phase III
Add more routes to the system and refining the grid system and its capabilities.
Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
54
LACDPW ATMS ATIS
I-5 Corridor Multi-Modal Capacity Enhancement Inter-County Arterial Highway Smart Street Feasibility Study
This study is to comprehensively address the infrastructure needs to improve mobility and air quality of the bi-County sub-region
Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
0.498
2004 RTP * TECHNICAL APPENDIX I - 228
Appendix I * Project List
2004 RTP - ITS ProjectsSPONSOR MARKET PACKAGE
CATEGORYPROJECT DESCRIPTION PROJECT BENEFITS BUDGET
(millions)PRIMARY SECONDARY
LACDPW ATMS ATISImperial Highway and Rosecrans Ave/Interstate 105 Smart Corridor
Optimize operation of Imperial Highway, Rosecrans Ave, Los & LAX by Smart Corridor elements for this area through use of ITS
Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
15.8
LACDPW ATMS ATIS
Pomona Valley Signal Synchronization and Bus Speed Improvement Project Phase II
Increase regional traffic mobility on surface arterials throughout Pomona Valley area of LA County through signal system improvements
Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
6.35
LACDPW ATMS ATIS
Pomona Valley Signal Synchronization Operation and Maintenance and Bus Speed Improvement Project Phase III
Increase regional traffic mobility on surface arterials throughout Pomona Valley area of LA County through signal system improvements
Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
14.03
LACDPW ATMS ATIS
San Gabriel Valley Signal Synchronization Operations and Maintenance Pilot Project Implementation
Uses elements of ITS to improve mobility and congestion.Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
10
LACDPW ATMS ATIS San Gabriel Valley Forum, Phase III
Continuation of project. 13.11 by implementing a multi-jurisdictional signal system on regional arterials.
Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
15.3
LACDPW ATMS ATIS San Gabriel Valley Forum, Phase IV
Continuation of project 13.11 by implementing "Smart Corridor" elements
Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
Total 14
LACDPW ATMS ATISSouth Bay Signal Synch and Bus Speed Improvement Project Phase III
Improve traffic mobility through South Bay area by designing and implementing multi-jurisdictional ITS projects
Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
9.536
LACDPW ATMS ATISSouth Bay Signal Synch and Bus Speed Improvement Project Phase IV
Fine tune traffic signal synchronization implemented in previous phasesImprove traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
22.387
LACDPW ATMS
West San Gabriel Valley Signal Synchronization Operation and Management and Bus Speed Improvement Project Phase II
Improve mobility and congestion by traffic signal synchronization, intersection improvements. designing and building a communications network between traffic signals, constructing a new TMC.
Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
8.572
LACDPW ATMS
West San Gabriel Valley Signal Synchronization Operation and Management and Bus Speed Improve. Project Phase III
Improve traffic mobility by continuing the design and implementation of "Smart Corridors", and fine tuning traffic signal synchronization improvements.
Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve traffic signal synchronization & bus priority system.
16.242
2004 RTP * TECHNICAL APPENDIX I - 229
Appendix I * Project List
2004 RTP - ITS ProjectsSPONSOR MARKET PACKAGE
CATEGORYPROJECT DESCRIPTION PROJECT BENEFITS BUDGET
(millions)PRIMARY SECONDARY
Arroyo Verdugo Traffic Forum / Glendale
ATMS Traffic Signal Coordination Monitor and manage traffic conditions within the region through application of advanced technology to increase the capacity of the traffic system.
Maximize traffic flow and efficiency in the region during both recurring and non-recurring congestion. 4
Arroyo Verdugo Traffic Forum / Glendale
ATMS Incident ManagementMonitoring and applying incident management techniques to the traffic system so that incidents can be identified, responded and cleared more quickly.
Incident management and the application of advanced technology (hardware) will provide a means of clearing incidents and managing traffic demand so that the capacity of the system, as a whole, is more efficiently utilized.
4.7
Arroyo Verdugo Traffic Forum / Glendale
ATIS Pre-Trip Traveler Information Provide information via kiosks and internet to travelers.Provide travelers in the region with information to allow them to make more informed decisions regarding travel time and modal choice.
7
Arroyo Verdugo Traffic Forum / Glendale
APTS Smart Transit and Ridesharing Install AVL system to provide real time transit schedule. Provide commuters with real time transit schedule
adherence information. 1.1
Arroyo Verdugo Traffic Forum / Glendale
ATMS Communication Infrastructure Expand communication infrastructure link to existing and future intersection through hardwire or wireless communication.
Maximize traffic flow and efficiency in the region during both recurring and non-recurring congestion. 6.3
Arroyo Verdugo Traffic Forum / Glendale
ATMS Variable Advisory Speed Signs
Displaying a variable advisory speed sign with dynamic message capability on Colorado Blvd., San Fernando Rd or Fair Oaks Ave
Allows TMC operators to vary traffic speeds in order to optimize signal timing plans and improve progression on high priority corridors.
Not Available
Arroyo Verdugo Traffic Forum / Glendale
ATMS Vehicle Tracking Use probe vehicles to provide a better sense of actual traffic flow through use of different technologies
Maximize traffic flow and efficiency in the region during both recurring and non-recurring congestion. Not Available
Arroyo Verdugo Traffic Forum / Glendale
ATMS Real-Time Route Guidance Signs
Install electronic signs which show several pre-determined routes in red, yellow and green. The colors indicate level of congestion.
Allows motorists to make informed decisions whether to continue on the current route or select an alternative route.
Not Available
Arroyo Verdugo Traffic Forum / Glendale
ATMS Real Time Travel Speed Signs
Install electronic signs which relay real time average speeds on freeways, freeway HOV lanes, and arterials to traveler
Provide information to travelers so that they may make informed decisions on route selection. Providing information on HOV lanes may also promote car pooling.
Not Available
Gateway Cities COG CVO
Advanced Traffic Management, Information and Commercial Vehicle Operations Systems
Use ITS technology to maximize the operating efficiency of freeways and arterial in the vicinity of the ports of Long Beach and Los Angeles.
Improve traffic flow, reduce air emissions, allow ports to accommodate future truck movement. 28
Gateway Cities COG ATMS
Inter-Subregional Arterial Traffic Operation Improvements
Compare and contrast the implemented, and yet to be implemented strategies along the arterial corridors in the juncture of the South Bay and Gateway Cities areas' common boundary to identify where further improvements and adjustments should be made.
Improve traffic flow, reduce air emissions. 3.6
2004 RTP * TECHNICAL APPENDIX I - 230
Appendix I * Project List
2004 RTP - ITS ProjectsSPONSOR MARKET PACKAGE
CATEGORYPROJECT DESCRIPTION PROJECT BENEFITS BUDGET
(millions)PRIMARY SECONDARY
I-5 Consortium Cities Joint Powers Authority
CVO
I-5 Commercial Vehicle Operations Intelligent Transportation Infrastructure System
Design and implement Commercial Vehicle Operations system improvements through use of ITS technologies.
Improve traffic flow, reduce air emissions, improve traveler information traveler services, improve incident management for truck related incidents.
8.9
LADOT ATMS 118 Freeway Corridor ATSAC System
Provide ATSAC control of all signalized intersections within the project limits for the purpose of improving the level of service to affected motorist and reducing air pollution to the general public.
Improve traffic flow, reduce air emissions. 7.272
LADOT ATMS San Diego Freeway Corridor-Phase 2 ATSAC System
Provide ATSAC control of all signalized intersections within the project limits for the purpose of improving the level of service to affected motorist and reducing air pollution to the general public.
Improve traffic flow, reduce air emissions. 7.509
LADOT ATMS Golden State Freeway Corridor ATSAC System
Provide ATSAC control of all signalized intersections within the project limits for the purpose of improving the level of service to affected motorist and reducing air pollution to the general public.
Improve traffic flow, reduce air emissions. 9.616
LADOT ATMS Hyde Park West ATSAC System
Provide ATSAC control of all signalized intersections within the project limits for the purpose of improving the level of service to affected motorist and reducing air pollution to the general public.
Improve traffic flow, reduce air emissions. 7.207
LADOT ATMS Hyde Park East ATSAC System
Provide ATSAC control of all signalized intersections within the project limits for the purpose of improving the level of service to affected motorist and reducing air pollution to the general public.
Improve traffic flow, reduce air emissions. 6.616
LADOT ATMS Eagle Rock ATSAC SystemProvide ATSAC control of all signalized intersections within the project limits for the purpose of improving the level of service to affected motorist and reducing air pollution to the general public.
Improve traffic flow, reduce air emissions. 6.07
LADOT ATMS North Hollywood ATSAC System
Provide ATSAC control of all signalized intersections within the project limits for the purpose of improving the level of service to affected motorist and reducing air pollution to the general public.
Improve traffic flow, reduce air emissions. 10.164
LADOT ATMS Reseda ATSAC SystemProvide ATSAC control of all signalized intersections within the project limits for the purpose of improving the level of service to affected motorist and reducing air pollution to the general public.
Improve traffic flow, reduce air emissions. 10.625
LADOT ATMS Canoga Park ATSAC SystemProvide ATSAC control of all signalized intersections within the project limits for the purpose of improving the level of service to affected motorist and reducing air pollution to the general public.
Improve traffic flow, reduce air emissions. 10.461
LADOT ATMS San Pedro ATSAC System
Provide ATSAC control of all signalized intersections within the project limits to aid motorists. Use available ITS technology to manage traffic accessing the Vincent Thomas Bridge and provide optimal route information for trucks accessing the Port of LA.
Improve traffic flow, reduce air emissions. 5.978
LADOT ATMS Wilmington ATSAC System
Provide ATSAC control of all signalized intersections within the project limits to aid motorists. Use available ITS technology to manage traffic accessing the Vincent Thomas Bridge and provide optimal route information for trucks accessing the Port of LA.
Improve traffic flow, reduce air emissions. 7.177
LADOT ATMS Harbor Gateway Phase 1 ATSAC System
Provide ATSAC control of all signalized intersections within the project limits for the purpose of improving the level of service to affected motorist and reducing air pollution to the general public.
Improve traffic flow, reduce air emissions. 10.809
2004 RTP * TECHNICAL APPENDIX I - 231
Appendix I * Project List
2004 RTP - ITS ProjectsSPONSOR MARKET PACKAGE
CATEGORYPROJECT DESCRIPTION PROJECT BENEFITS BUDGET
(millions)PRIMARY SECONDARY
LADOT ATMS Slauson-Florence Phase 2 ATSAC System
Provide ATSAC control of all signalized intersections within the project limits for the purpose of improving the level of service to affected motorist and reducing air pollution to the general public.
Improve traffic flow, reduce air emissions. 9.315
LADOT ATMS Eagle Rock ATSAC SystemProvide ATSAC control of all signalized intersections within the project limits for the purpose of improving the level of service to affected motorist and reducing air pollution to the general public.
Improve traffic flow, reduce air emissions. 6.441
LADOT ATMS Sunset ATSAC SystemProvide ATSAC control of all signalized intersections within the project limits for the purpose of improving the level of service to affected motorist and reducing air pollution to the general public.
Improve traffic flow, reduce air emissions. 3.873
LADOT ATMS Platt Ranch ATSAC SystemProvide ATSAC control of all signalized intersections within the project limits for the purpose of improving the level of service to affected motorist and reducing air pollution to the general public.
Improve traffic flow, reduce air emissions. 6.034
Orange County ATIS ATMS Travel Tip Traveler Information System Improve traffic flow and safety, provide an interface with other information systems. 6.926
Orange County ATMS ATIS Intertie ATMS Improve traffic flow and safety, provide an interface with other information systems. 13.085
Orange County ATMS ATIS Freeway MIS ATMS Improve freeway traffic flow and safety, provide an interface with other information systems. 12.86
Orange County ATMS ATIS Arterial MIS ATMS Improve arterial traffic flow and safety, provide an interface with other information systems. 37.3
Orange County ATIS Intertie Improve traffic flow and safety, provide an interface with other information systems. 201.327
Orange County ATMS ATIS AVL Incident detection and traffic monitoring. 2.016
Orange County ATMS ATIS Freeway Instrumentation Incident detection and traffic monitoring. 40.449
Orange County ATMS ATIS Arterial Instrumentation Incident detection and traffic monitoring. 74.844
Orange County ATMS TOC's/TMC's Traffic Operations Management Centers 24.78
Orange County ATMS Decision Support Systems Decision Support Systems 15.75
Orange County ATMS Emergency Priority System Emergency Systems 0.263
Orange County ATMS Rapid Incident Clearance Emergency Incident Clearance 36.908
Orange County ATMS Adaptive Control and Signal Synchronization Improved arterial traffic flow and safety. 22.607
Orange County ATMS Corridor Ramp Metering Improved freeway traffic flow and safety. 10.71
Orange County ATMS Integrated Signal/Ramp Metering Improved traffic flow and safety. 0.735
Orange County APTS ATIS Public Transit/Smart Bus Improved transit reliability and mode shift. 11.307
Orange County APTS ATIS Inter-ride Improved transit and ridesharing. 0.63
2004 RTP * TECHNICAL APPENDIX I - 232
Appendix I * Project List
2004 RTP - ITS ProjectsSPONSOR MARKET PACKAGE
CATEGORYPROJECT DESCRIPTION PROJECT BENEFITS BUDGET
(millions)PRIMARY SECONDARY
Orange County APTS ATIS Real Time Intermodal Travel Advisory Improved transit and ridesharing. 0.158
Orange County AVCS Advanced Vehicle Control System Development Improved traffic flow and safety. 217.35
Caltrans District 8 ATMS Ultimate TMC Improved traffic flow and safety. 17
Caltrans District 8 ATMS
Freeway Ops. Communications Infrastructure
Communications links for Freeway Ops. 43.6
Caltrans District 8 ATMS Ramp Metering Improved traffic flow and safety. 89.66
Caltrans District 8 ATIS Changeable Message Signs Traveler Information on traffic and safety conditions. 10.04
Caltrans District 8 ATMS Closed Circuit TV Incident detection and traffic monitoring. 23.76
Caltrans District 8 ATIS Highway Advisroy Radio
expansion Traveler Information on traffic and safety conditions. 1.05
Caltrans District 8 ATMS Environmental Sensing Units Environmental hazards detection. 0.825
Caltrans District 8 ATMS ATIS Advanced Weather Warning Weather monitoring and detection. 2.27
Caltrans District 8 ATMS Freeway Service Patrol Accident and incident removal and reduction. 0.16
Caltrans District 8 ATMS Systems Support
Development Systems Support Elements to TMC/Fwy Ops. 0.335
Caltrans District 7 ATMS InterCAD Interoperable Computer Aided Dispatch of Services 0.919
Fontana/ Ontario ATMS Fontana/Ontario Area TMC Improved arterial traffic flow and safety. 5.164
Inland Empire ITS ATMS Western Riverside TMC Improved arterial traffic flow and safety. Not Available
Inland Empire ITS ATMS San Bernardino West Valley
TMC Improved arterial traffic flow and safety. Not Available
Inland Empire ITS ATMS San Bernardino East Valley
TMC Improved arterial traffic flow and safety. Not Available
Inland Empire ITS ATMS Coachella Valley TMC Improved arterial traffic flow and safety. Not Available
Inland Empire ITS ATMS High Desert TMC Improved arterial traffic flow and safety. Not Available
Omnitrans APTS Transit Ops. Management Improved transit reliability and mode shift.
Omnitrans APTS Ops. Management Paratransit Improved transit reliability and mode shift.
Omnitrans APTS Automated Fare Management and Data Improved transit reliability and mode shift.
Omnitrans ATIS APTS Transit Traveler Information Improved transit information. 0.842
2004 RTP * TECHNICAL APPENDIX I - 233
Appendix I * Project List
2004 RTP - ITS ProjectsSPONSOR MARKET PACKAGE
CATEGORYPROJECT DESCRIPTION PROJECT BENEFITS BUDGET
(millions)PRIMARY SECONDARY
RTA/Sunline APTS ATISFully integrated Transit ops, management and traveler information system
Improved transit reliability and mode shift.
Sunline APTS ATIS Transit ITS Mobility Enhancement Improved transit reliability and mode shift. 0.2
ATIS Regional Mobility Manager Improved transit/rideshare information. 0.026Inland Empire ITS ATMS ATIS ITS RR Grade Crossing
Improvements Improved grade crossing safety reduced delay. 2.048
Inland Empire ITS ATMS ATIS ITS RR Grade Crossing
Variable Speed Warning Improved grade crossing safety reduced delay. 4.13
Inland Empire ITS CVO ATIS Electronic Clearance/Pre
Pass ProgramReduced delay trucks/increased compliance with truck safety 0.898
Inland Empire ITS CVO ATIS Oversize/weight permitting Reduced delay trucks/increased compliance with truck
safety 0.134
Inland Empire ITS CVO ATIS Truck Stop Kiosks Reduced delay trucks/increased compliance with truck
safety 0.246
Note: SCAG sought input from stakeholder agencies for the development of the RTP. As part of this inputSCAG was provided with proposed ITS projects. Since the RTP is a financially constrained plan,all of the ITS projects could not be funded as part of the RTP. However, while the RTP must remainfinancially constrained, the implementing agencies will have the discretion to prioritize ITS projects fromthe list based on performance criteria to the extent that allocated funding is available.
2004 RTP * TECHNICAL APPENDIX I - 234
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
IM Mixed Flow I-8 New North-South Facility along Forrester Rd corridor SR-111 Widening to 8 lanes $90,000,000
IM Corridor New East-West Facility New North-South Facility along Forrester Rd corridor SR-115 Construct new east-west facility along corridor between Aten Rd and Keystone
Rd $120,000,000
IM Corridor New North-South Facility SR-78 I-8 Construct new north-south facility along Forrester Rd corridor $120,000,000
IM Corridor New North-South Facility SR-98 I-8 Construct new North-South facility west of SR-111 $90,000,000
IM Mixed Flow I-8 At Austin Road Construct interchange $24,000,000
IM Arterial SR-78 SR-115 Riverside County Line Safety Improvements $50,000,000IM Arterial SR-111 SR-78 I-8 Interchange improvements $60,000,000IM Arterial SR-115 Brawley Bypass SR-78 Construct new 4-lane expressway $36,000,000IM Arterial SR-115 SR-78 SR-111 Widen to 4-lane expressway $70,000,000IM Arterial SR-115 Evan Hewes Hwy SR-78 Widen to 4-lane expressway $70,000,000IM Arterial SR-186 I-8/SR-186 and/or I-8 Port of Entry (2.1 miles) Widen to 4-lane conventional and/or interchange improvement $10,000,000
IM Arterial Westmoreland Bypass East of Westmoreland West of Westmoreland (at SR-78/86) 4-lane expressway $80,000,000
IM Arterial SR-7 Carr Rd 0.5 mi s/o Carr Rd Widen to 6 lanes (3 each dir) $1,061,000IM Arterial SR-86 Worthington Aten Rd Widen to 6 lanes (3 each dir) $3,183,000IM Arterial SR-86 Main St Ross Rd Widen to 6 lanes (3 each dir) $1,697,000IM Arterial SR-86 McCabe Rd Heber Rd Widen to 4 lanes (2 each dir) $3,183,000IM Arterial Anza Road New River (west) All American Canal Widen to 4 lanes with new bridge $275,000IM Arterial Aten Rd Clark Rd Dogwood Rd Widen to 4 lanes (2 each dir) $3,183,000IM Arterial Bennett Rd North of Evan Hewes Hwy Evan Hewes Hwy Widen to 2 lanes $1,061,000IM Arterial Best Road SR 78 Shank Road Repair $3,000,000IM Arterial Bowker Road International Border/Anza Road North of I-8 4-lane extension $2,000,000IM Arterial Carr Rd Menvielle Rd SR-7 Widen to 4 lanes (2 each dir) $1,697,000IM Arterial Clark Rd McCabe Rd SR-98 Widen to 4 lanes (2 each dir) $3,713,000IM Arterial Cole Rd Dogwood Rd SR-111 Widen to 4 lanes (2 each dir) $4,244,000IM Arterial Cole Rd SR-111 SR-98 Widen to 2 lanes $2,016,000IM Arterial Dogwood Rd McCabe Rd SR-86 Widen to 4 lanes (2 each dir) $3,183,000IM Arterial Dogwood Rd Mead Rd Harris Rd Widen to 4 lanes (2 each dir) $10,609,000IM Arterial Dogwood Rd Worthington Rd Aten Rd Widen to 4 lanes (2 each dir) $3,183,000IM Arterial Eddins Rd Kalin Rd Brandt Rd Widen to 2 lanes $1,061,000IM Arterial Forrester Rd I-8 SR-86 6-lane conventional highway $26,522,000IM Arterial La Brucherie McCabe Rd Wahl Rd Widen to 2 lanes $2,122,000IM Arterial La Vigne Road SR-98 East Barbara Worth to Carr Road Widen to 4 lanes with new bridge at A.A.C. $10,000,000IM Arterial Menvielle Cole Rd Carr Rd Widen to 2 lanes $1,061,000IM Arterial Ross Rd SR-86 Dogwood Rd Widen to 4 lanes (2 each dir) $2,122,000IM Arterial Ross Rd La Brucherie Rd Imperial Ave Widen to 2 lanes $530,000IM Arterial Willard Avenue Julia Drive Legion Road Pavement $3,000,000LA Arterial 1st St Olive Broadway Widen to add bus lane/turnout and queue jumper $2,000,000
2004 RTP * TECHNICAL APPENDIX I - 235
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
LA Arterial 3rd St access to Bunker Hill at Flower St Reconfigure intersection at 3rd and Flower to allow EB to NB left turn. $1,000,000
LA Arterial 6th St at Bixel St Widen SE corner of intersection $2,000,000
LA Arterial Alameda St Reconstruction Ph I US-101 I-10 Phase I - Rebuild street and repave to heavy duty vehicle standard $20,000,000
LA Arterial Alameda St Reconstruction Ph II US-101 I-10 Phase II - Install channelization and widen curb returns $2,000,000
LA Arterial Arlington Ave at Vernon Ave Remove raised island and increase capacity $1,000,000LA Arterial Avenue 40 at Eagle Rock Blvd Widen south leg to increase capacity $2,000,000LA Arterial Balboa Blvd at Ventura Blvd Widen to increase capacity $3,000,000LA Arterial Balboa Blvd s/o Devonshire St Widen east side to provide dual left turns for north/south $1,000,000LA Arterial Barham Blvd at Cahuenga Blvd West Increase intersection capacity $5,000,000
LA Arterial Barham Blvd bridge at US-101 Widen existing bridge to increase traffic capacity that matches a street widening project programmed in 2001 CFP $10,000,000
LA Arterial Barham Blvd Cahuenga Burbank City Limit Widen for additional capacity $20,000,000LA Arterial Beaudry Ave Temple St Sunset Blvd Widen to permit NB left turn and to have two full-time NB lanes $20,000,000LA Arterial Beverly Blvd Juanita Ave New Hampshire Ave Widen to accommodate left turn pockets $5,000,000LA Arterial Beverly Glen Blvd La Grange Ave Olympic Blvd Widen and realign street $2,000,000
LA Arterial Burbank Blvd at Hayvenhurst Add an additional left turn lane on WB Burbank Blvd to increase capacity $10,000,000
LA Arterial Burbank Blvd at Hayvenhurst Widen EB Burbank Blvd at Hayvenhurst to add right turn lanes $10,000,000
LA Arterial Burbank Blvd at Woodley Ave Add an additional left turn lane or extend the existing left turn lane pocket on EB Burbank Blvd to increase capacity $10,000,000
LA Arterial Burbank Blvd Balboa Blvd Sepulveda Blvd Elevate Burbank Blvd in the flood control basin to avoid closures during rainy season $20,000,000
LA Arterial Burbank Blvd Cleon Ave Clybourn Ave Widen to provide 2 lanes each way $10,000,000LA Arterial Cahuenga Blvd East Odin St Barham Blvd Add one lane northbound $20,000,000
LA Arterial Cahuenga Blvd West Highland Ave Barham BlvdWiden/cantilever over US-101 to provide two lanes each direction with pedestrian sidewalk and bicycle lane, and left turn lanes at Mulholland Dr and Oakcrest Dr
$20,000,000
LA Arterial Canoga Ave at Roscoe Widen to provide a NB right-turn lane, EB thru lane, WB dual left $2,000,000LA Arterial Canoga Ave Marilla St Nordoff St Widen industrial street to provide 2 lanes each direction; ROW required $2,500,000LA Arterial Centinela Ave Washington Blvd Jefferson Blvd Widen to Secondary/Major Highway standards $4,000,000LA Arterial Cesar Chavez Ave at Grand Ave Widen and restripe $1,500,000LA Arterial Cesar Chavez bridge at I-10 Move ramps away from Pleasant Ave and improve lateral clearance $2,000,000LA Arterial Chatsworth St De Soto Ave Topanga Cyn Blvd Widen to increase capacity $6,000,000LA Arterial Coldwater Cyn Ave at US-101 Widen to provide dual left-turns to two on-ramps $5,000,000LA Arterial Colfax Ave bridge at LA River Replacement with signature span; widen to Ventura Blvd $5,000,000
LA Arterial College St bridge at SR-110 Replace with wider bridge to improve capacity; raise the superstructure to resolve underclearance deficiency $6,000,000
LA Arterial Daly St I-5 NB off-ramp N Main St Increase curb returns on NW and SW corner of Daly and Main; acquire ROW as needed $1,500,000
LA Arterial De Soto Ave SR-118 Devonshire St Widen to 3 lanes each direction $2,000,000
2004 RTP * TECHNICAL APPENDIX I - 236
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
LA Arterial Equestrian Center bridge at Forest Lawn Dr near SR-134 Construct bridge over LA River and realign ramps to SR-134 $4,000,000
LA Arterial Figueroa St 146th St Redondo Beach Blvd Widen to Major Highway standard from 62' to 80' $2,000,000LA Arterial Figueroa St Cypress Ave I-5 Widen to add southbound capacity $5,000,000LA Arterial Fletcher Dr at Glendale Blvd Widen to increase capacity $10,000,000LA Arterial Fletcher St bridge at LA River Widen to increase capacity and add bike lanes and sidewalk $2,000,000LA Arterial Foothill Blvd Sierra Hwy Balboa Blvd Widen to provide increased capacity at intersections $5,000,000LA Arterial Fountan Ave Sunset Blvd Western Ave Widen to increase capacity $20,000,000LA Arterial Glendale Blvd at Glen Feliz Ave Modify island to provide longer northbound left turn lane $1,000,000LA Arterial Glenoaks Blvd at Sunland Blvd Widen east side of Glenoaks to eliminate bottleneck $500,000
LA Arterial Grand Ave bridge Cesar Chavez Ave Temple St Widen existing bridge to improve access to US-101 and SR-110 on-ramps, future school, and Grand Ave Plaza $6,000,000
LA Arterial Hayvenhurst Ave Magnolia Blvd Ventura Blvd Widen or realign the jutouts on the west side to City standards $10,000,000LA Arterial Hillhurst Ave at Los Feliz Blvd Remove portion of median to install left turn pocket $500,000LA Arterial Hyperion Ave bridge at I-5 Widen to include bike lanes, shoulders, and sidewalks $12,000,000LA Arterial Lindley Ave bridge at LA River Seismic retrofit and widening; add bikeway underpass and access $3,000,000
LA Arterial Los Angeles St bridge at US-101 Replace with longer bridge for increased lateral underclearance; cover NB on-ramp with a portal frame for increased open space for proposed park $8,000,000
LA Arterial Los Feliz Blvd at Riverside dr Widen south side of Los Feliz Blvd to add right turn lane $1,000,000LA Arterial Lucas Ave Emerald Dr 4th St 20' widening on east side $1,500,000LA Arterial Maclay St Fenton Ave I-210 Widen to increase capacity $3,000,000LA Arterial Magnolia Blvd Colfax Ave Laurel Cyn Blvd Widen to increase capacity $10,000,000LA Arterial Magnolia Blvd Haskell Ave Sepulveda Blvd Extend Magnolia Blvd from Haskell to Sepulveda $20,000,000LA Arterial Magnolia Blvd Hayvenhurst Ave Libbit Ave Extend Magnolia Blvd from Hayvenhurst to Libbit $20,000,000LA Arterial Magnolia Blvd Lankershim Blvd Tujunga Ave Widen to increase capacity $3,500,000
LA Arterial Melrose Ave Vermont Ave Western Ave Remove on-street parking; widen to have 1 left turn lane and 2 through lanes each direction with 10-foot sidewalks $20,000,000
LA Arterial Melrose Ave Western Ave US-101 Widen south side by 10 feet to increase capacity $10,000,000LA Arterial Mission Blvd Giffin Ave Workman Ave Widen to eliminate bottleneck $500,000LA Arterial Monterey Rd n/o Huntington Dr Widen and realign intersection, possibly close access to Browne Ave $10,000,000LA Arterial Mulholland Dr San Feliciano Dr Flamingo St Widen Mulholland Dr to reduce congestion $10,000,000LA Arterial Mulholland Dr west of Mulholland Hwy Widen to improve sight distances at intersection $1,500,000
LA Arterial N Main St bridge at LA RiverWiden bridge for an additional traffic lane in each direction; as an alternative, construct a grade separation above the existing bridge and over the RR tracks to improve safety
$50,000,000
LA Arterial N Spring St/ Cornfields Rondout St Baker St Widen to improve safety, traffic capacity, and provide access to future Cornfields Park and Recreation area $3,000,000
LA Arterial Osborne St Foothill Blvd San Fernando Rd Widen for pedestrian safety and improvement traffic capacity; enhances access to the Hansen Dam recreational area $12,000,000
LA Arterial Oxnard St west of Sepulveda Blvd Extend Oxnard St westerly to I-405 and build a half intechange for NB I-405 to reduce congestion at the Burbank Blvd/I-405 ramps $20,000,000
LA Arterial Oxnard St west of Sepulveda Blvd Extend Oxnard St from Sepulveda Blvd to Woodley Ave $20,000,000
2004 RTP * TECHNICAL APPENDIX I - 237
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
LA Arterial Penrose St Lehigh Ave I-5 Remove holdouts and install new signal at Penrose and NB off-ramp for I-5; increase curb returns $1,000,000
LA Arterial Pico Blvd Sepulveda Blvd Centinela Ave Widen to Major Highway standard $4,000,000LA Arterial Polk St Eldridge Ave Borden Ave Widen residential street to provide left turn pockets $1,000,000LA Arterial Riverside Dr bridge at SR-134 Replace with wider bridge to improve capacity and add bike lanes $2,000,000
LA Arterial Riverside Dr at SR-170 SB off-ramp Widen Riverside Dr to provide double right turns onto SB Tujunga Ave (freeway columns are in the way) $20,000,000
LA Arterial Riverside Dr Van Nuys Blvd Sepulveda Blvd Extend Riverside Dr from Van Nuys to Sepulveda $20,000,000LA Arterial Roscoe Blvd Woodlake Ave Valley Circle Blvd Widen to increase capacity; ROW required $2,000,000
LA Arterial Rowena Ave at Hyperion Ave Remove corner raised island and widen to increase intersection capacity $1,000,000
LA Arterial Roxford St/ Sepulveda Blvd at I-5 Widen for capacity enhancements for truck movement and mixed flow traffic $3,000,000
LA Arterial San Fernando Rd Astoria St Sayre St Widen to increase capacity $500,000LA Arterial San Fernando Rd Sierra Hwy Sepulveda Blvd/Roxford St Widen and install reversible lane $10,000,000
LA Arterial San Fernando Rd SR-2 I-5Widen to Major/Secondary Hwy Standard to improve traffic capacity and pedestrian safety; construct streetscape, lighting, and parking; ROW is required
$20,000,000
LA Arterial San Fernando Rd Tyburn St SR-2 Widen to Major Highway standard; ROW required $10,000,000
LA Arterial San Fernando Rd West at Brazil St and Doran St Widen and improve north and south sides of Brazil St to create additional lanes each direction; increase curb return to 45 ft as needed $3,000,000
LA Arterial San Pedro St at Florence Install NB and SB pockets on San Pedro $500,000LA Arterial Santa Fe Ave 8th St Olympic Blvd Widen to increase capacity and access to I-10 $10,000,000LA Arterial Sepulveda Blvd Olympic Blvd Pico Blvd Widen to Major Highway standard; ROW is required $10,000,000LA Arterial Sepulveda Blvd Pico Blvd National Blvd Widen to major highway standards $4,000,000LA Arterial Sepulveda Blvd National Blvd Venice Blvd Widen to major highway standards $4,000,000
LA Arterial Sepulveda Blvd tunnel at Mulholland Bridge Widen existing tunnel to provide additional bike and traffic lanes; may be funded by HBRR Program $30,000,000
LA Arterial Shoup Ave at Ventura Blvd Widen south leg by 4 feet to provide one left turn lane, one thru lane and one thru/right lane northbound $1,000,000
LA Arterial Soto St I-10 s/o 8th St Increase curb return and widen approaches $1,000,000LA Arterial Spring St Aliso St Temple St Widen to increase capacity $2,000,000LA Arterial Stocker St at Victoria Ave Widen to increase capacity $10,000,000
LA Arterial Sunset Blvd at Highland Widen existing street from 70' to 78' from Las Palmas Ave to Mansfield Ave $5,000,000
LA Arterial Sunset Blvd at La Brea Ave Widen to provide dual leeft turn lanes $10,000,000
LA Arterial Sunset Blvd at US-101 SB off-ramp Widen Van Ness St from the off-ramp to Sunset Blvd to add a right-turn-only lane $10,000,000
LA Arterial Sunset Blvd at Western Widen to add southbound right-turn pocket $2,000,000LA Arterial Sunset Blvd Virgil Ave Vermont Ave Widen to increase capacity $5,000,000LA Arterial Temple St I-110 Grand Ave Widen to increase capacity $3,000,000
LA Arterial Tujunga Ave bridge Widen bridge (HBRR project - design complete, construction postponed to FY 2007-08) $10,000,000
2004 RTP * TECHNICAL APPENDIX I - 238
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
LA Arterial Universal Center Dr at US-101 SB on-ramp Design a new on-ramp for southbound US-101 (design and environmental phase only) $20,000,000
LA Arterial Van Nuys Blvd SB Burbank Blvd US-101 Improve capacity southbound $10,000,000LA Arterial Vermont Ave at Pacific Coast Hwy Widen existing roadway from 50' to 84' and install catch basins $2,000,000LA Arterial Vermont Ave Washington Blvd I-10 WB off-ramp 10' widening on east side $1,500,000
LA Arterial Victory Blvd Topanga Cyn Blvd De Soto Ave Widen to Major Highway Class 1 standard to accommodate projected growth $20,000,000
LA Arterial Victory Blvd White Oak Ave Sepulveda Blvd Widen to add capacity $20,000,000LA Arterial Wells Dr Mecca Ave Vanalden Ave Reconstruct and widen roadway from 24' to 36' $1,000,000LA Arterial Western Ave Florence Ave 80th St Widen to provide left-turn channelization and right-turn pockets $2,000,000LA Arterial Wilbur Ave Parthenia St Roscoe Blvd Widen to 2 lanes each direction $2,500,000LA Arterial Wilmington Ave 115th St Imperial Hwy Widen and reconstruct roadway from 40' to 60' $2,000,000LA Arterial Wilshire Blvd at Sepulveda Blvd Widen to improve turning capacity $2,000,000LA Arterial Wilshire Blvd San Vicente Blvd Centinela Ave Widen to Major Highway standard $5,000,000LA Arterial York Blvd San Pascual Ave Ave 66 Widen north side to provide merging lane for SB to WB traffic $1,000,000LA Arterial Arterial Improvements Countywide Additional Regional Surface Transportation Improvements $219,000,000
LA Grade Crossing Grade Crossing Countywide Additional Arterial Goods Movement Improvements $222,000,000
LA HOV SR-2 Glendale Blvd (PM 13.6) SR-134 (PM 18.8) HOV Lanes $22,000,000LA HOV SR-2 SR-134 (PM 18.8) I-210 (PM 22.9) HOV Lanes $18,000,000LA HOV I-5 I-710 (PM 13.8) SR-60 (PM 16.4) HOV Lanes $231,000,000LA HOV I-5 SR-60 (PM 16.4) I-10 (PM18.4) HOV Lanes $792,000,000LA HOV I-5 I-10 (PM 18.4) SR-2 (PM 22.6) HOV Lanes $7,000,000LA HOV I-5 SR-2 (PM 22.6) SR-134 (PM 27.1) HOV Lanes $145,000,000LA HOV I-5 SR-14 SR-126 HOV Lanes $97,000,000LA HOV I-10 SR-1(PM. 2.16) I-405 (PM 5.5) HOV Lanes $55,000,000LA HOV I-10 I-405 (PM 5.5) I-110 (PM 14.8) HOV Lanes $458,000,000LA HOV I-10 I-110 (PM 14.8) I-5 (PM 18.4) HOV Lanes $18,000,000LA HOV SR-57 SR-60 (PM. 4.5) I-210 (7.7) HOV Lanes $46,000,000LA HOV SR-60 US-101 I-605 (PM 11.7) HOV Lanes $150,000,000LA HOV I-110 I-405 SR-91 HOV Lanes $7,000,000LA HOV I-605 I-10 (PM 20.2) I-210 (PM 25.8) HOV Lanes $46,000,000LA HOV I-5/I-605 west to south & west to north HOV Connector $135,000,000LA HOV I-5/SR-118 HOV Connector $67,000,000LA HOV I-5/SR-134 HOV Connector $67,000,000LA HOV I-10/I-605 east to south & west to south HOV Connector $135,000,000LA HOV SR-60/I-605 east to south & east to north HOV Connector $135,000,000LA HOV SR-91/I-605 all directions HOV Connector $270,000,000LA HOV SR-91/I-110 east to south & east to north HOV Connector TBDLA HOV I-105/I-405 HOV Connector $67,000,000LA HOV I-105/I-605 west to north & west to south HOV Connector $135,000,000LA HOV SR-118/I-405 HOV Connector $67,000,000LA HOV SR-134/SR-170 HOV Connector $67,000,000
LA Mixed Flow I-5 I-605 (PM 6.9) I-710 (PM. 13.8) Freeway: Mixed-Flow $31,000,000
2004 RTP * TECHNICAL APPENDIX I - 239
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
LA Mixed Flow I-5 SR-14 SR-126 Add 1 lane each direction $387,000,000
LA Mixed Flow SR-14 I-5 Kern County Line Add 1 lane each direction $773,000,000
LA Mixed Flow SR-90 Admiralty Way (PM 0.0) Culver Blvd. (PM 1.8) Freeway: Mixed Flow $42,000,000
LA Mixed Flow SR-126 I-5 SR-14Construct 6-lane expressway on new alignment northerly of existing facility (Caltrans District 7 Draft Transportation Concept Report for SR-126, July 2003)
TBD
LA Mixed Flow SR-138 I-5 San Bernardino Co Line Add 1 lane each direction $195,000,000
LA Mixed Flow I-210 I-605 (PM. 36.41) SR-30 (PM. 44.44) Freeway: Mixed Flow $27,000,000
LA Mixed Flow I-405 SR-90 I-105 Freeway: Mixed-Flow $53,000,000
LA Mixed Flow I-10 Bass Ave POC Replace / Raise Bridge. $1,500,000
LA Mixed Flow SR-71 Grier Ave POC Replace / Raise Bridge. $1,500,000
LA Mixed Flow I-710 Wardlow Road Reconstruct Connector Bridge. $3,000,000
LA Mixed Flow High Desert Freeway I-5 San Bernardino Co Line TBD TBD
LA Corridor
North LA County Combined Corridor Study Phase I (I-5, SR-14)
I-5/SR-14 Kern County Line
Final improvements and costs pending completion of corridor study; I-5 preferred strategy may include HOV, mixed flow, and truck lanes from SR-14 to SR-126W, and a truck climbing lane from SR-126 W to Kern County Line; SR-14 preferred strategy may include HOV and mixed flow lanes from I-5 to Ave L and mixed flow lanes from Ave L to Kern County Line
$1,530,000,000
LA Corridor
North LA County Combined Corridor Study Phase II (SR-138/High Desert Corridor)
I-5 San Bernardino Co Line Final improvements and costs pending completion of corridor study $2,323,000,000
LA Mixed Flow US-101 SB Glendale Blvd I-110/US-101 Widen Edgeware bridge $20,000,000
LA HOV SR-170 SB Extend HOV lane beyond Highland Ave $100,000,000LA HOV US-101 Topanga Cyn Blvd Ventura County Line Add 1 HOV lane each direction $200,000,000LA Auxiliary I-5 Burbank Blvd Buena Vista St Freeway: Auxiliary Lane $47,000,000LA Auxiliary I-10 I-405 La Cienaga Freeway: Auxiliary Lane $42,000,000LA Auxiliary US-101 SB Glendale Blvd I-110/US-101 Add auxiliary lane southbound $10,000,000LA Auxiliary US-101 NB Rampart Silver Lake Blvd Add auxiliary lane northbound $10,000,000LA Auxiliary US-101 NB Silver Lake Blvd Vermont Ave Add a full auxiliary lane $10,000,000
LA Auxiliary US-101 NB Ventura Blvd Vineland Ave (Campo de Cahuenga Wy) Add auxiliary lane between Ventura on-ramp and Vineland off-ramp $10,000,000
LA Auxiliary US-101 I-405 Valley Circle Blvd Add auxiliary lanes within existing right-of-way (1 lane each direction) $20,000,000
2004 RTP * TECHNICAL APPENDIX I - 240
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
LA IC/Ramps US-101/I-110 NB 110 connector to NB 101 Extend 2 lanes to Glendale Blvd off-ramp (eliminate merging of 2 lanes into 1 lane) $30,000,000
LA IC/Ramps US-101 NB at Cahuenga Blvd Construct a new NB on-ramp $20,000,000
LA IC/Ramps US-101 at Cahuenga Pass Construct a new SB on-ramp from Cahuenga Blvd West btwn Caltrans maintenance yard and Pilgrimage Bridge (fly-over or fly-under) $20,000,000
LA IC/Ramps US-101 at Hollywood Bowl Construct direct NB off-ramps to the Hollywood Bowl parking lots $40,000,000
LA IC/Ramps US-101 SB at Campo de Cahuenga Wy Build new SB on- and off-ramp at Campo de Cahuenga (Ventura Blvd exit from NB) $30,000,000
LA IC/Ramps US-101/SR-134/SR-170 Widen bridge structure to add third through lane from EB 101 to EB 134 $30,000,000
LA IC/Ramps US-101/SR-134/SR-170 Extend the three-lane connector from EB 101 to SB 101 to Lankershim Blvd $30,000,000
LA IC/Ramps US-101/SR-134/SR-170 Add connector from NB 101 to EB 134 $70,000,000
LA IC/Ramps US-101 WB at Van Nuys Blvd Reconfigure WB on- and off-ramps as hook ramps connecting to Riverside Dr just east of Van Nuys Blvd $30,000,000
LA IC/Ramps US-101/I-405 Rebuild SB 405 connector to EB and WB 101 to improve capacity and safety (being studied by Caltrans) $90,000,000
LA IC/Ramps US-101 at Hayvenhurst Ave Add new WB on-ramp and EB off-ramp $30,000,000LA IC/Ramps US-101 at Canoga Ave Add new WB on-ramp and EB off-ramp $40,000,000LA IC/Ramps US-101 at Canoga Ave Widen Canoga Ave under the bridge to provide more capacity $10,000,000LA IC/Ramps US-101 at Fallbrook Ave Add on- and off-ramps $50,000,000LA IC/Ramps SR-2/I-5 Interchange $127,000,000LA IC/Ramps I-5/I-10 Interchange; WB 10 connector to NB 5 TBDLA IC/Ramps I-5/SR-14 Interchange $127,000,000LA IC/Ramps I-5/SR-60 SB 5 connector to EB 60 $750,000,000LA IC/Ramps I-5/SR-134 Interchange (complete north-to-west connection) $127,000,000LA IC/Ramps I-5/SR-170 Interchange $53,000,000LA IC/Ramps I-5/I-405 Interchange $127,000,000LA IC/Ramps I-5/I-605 5 connector to 605 $1,000,000,000LA IC/Ramps I-5/I-710 NB 710 connector to NB 5 $500,000,000LA IC/Ramps I-10/I-405 Interchange $106,000,000LA IC/Ramps I-10/I-605 10 connector to 605 $1,000,000,000LA IC/Ramps I-10/I-710 Modify ramp/add capacity, NB 710 to WB 10 $250,000,000LA IC/Ramps SR-60/I-605 60 connector to 605 $1,000,000,000LA IC/Ramps SR-91/I-605 Modify ramp, EB 91 to NB 605 $250,000,000LA IC/Ramps US-101/SR-170 Interchange $127,000,000
LA IC/Ramps US-101/SR-134/SR-170 Interchange (complete two connections) $127,000,000
LA IC/Ramps US-101/I-405 Interchange TBDLA IC/Ramps I-105/I-605 105 connector to 605 $500,000,000LA IC/Ramps I-405/I-605 405 NB connector to I-605 $500,000,000LA Transit Metro Rapid Corridors Countywide Additional 14 lines $93,000,000
LA Transit Transit Capital Project Funding Countywide Additional Local Transit Assistance (transit capital project funding $146,000,000
LA Transit Community Transit Service Countywide Community Transit (shuttles, local circulators) $346,000,000
2004 RTP * TECHNICAL APPENDIX I - 241
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
LA Transit East Los Angeles Corridor Atlantic Norwalk/Whittier Transit technology TBD $507,000,000
LA Transit Vermont Corridor Vermont Green Line Station Hollywood Blvd Transit technology TBD $308,000,000
LA Transit Burbank/Glendale Corridor Union Station Burbank Transit Station Transit technology TBD $506,000,000
LA Transit Metro Green Line Marine/Redondo South Bay Galleria Transit technology TBD $110,000,000
LA Transit Transit Corridor Extensions/Upgrades Countywide Extensions and/or upgrades to transit corridor projects in constrained plan $292,000,000
LA Transit Transit Corridor Operating Costs Countywide Transit Corridor Operating Costs $726,000,000
LA Transit Metrolink Commuter Rail Countywide Additional Metrolink Expansion $263,000,000
LA ITS ITS Countywide Additional Signal Synchronization and Bus Speed Improvements $267,000,000
LA TDM/Non-motorized TDM Countywide Additional Transportation Demand Management $90,000,000
LA TDM/Non-motorized Non-motorized Countywide Additional Bikeway & Pedestrian Improvements $453,000,000
LA TDM/Non-motorized Rideshare Countywide Additional Rideshare Services $61,000,000
LA Truck I-5 SR-14 Kern Co Line Truck Climbing Lane TBD
LA Truck SR-91 I-710 Orange County Line Truck Lane (Caltrans District 7 Draft Transportation Concept Report for SR-91, July 2003) TBD
OR Arterial MPAH Buildout Countywide MPAH Buildout (829 lane miles) or comparable alts with focus on potential deficiency areas identified in MPAH assessment $1,000,000,000
OR Arterial Smart Streets Countywide Additional Smart Streets - priority corridors La Palma, Westminster, State College, Grand, Tustin $200,000,000
OR HOV I-5 SR-55 SR-57 HOV Chokepoint SR-55 to SR-57 $40,000,000OR HOV SR-55 Dyer I-5 HOV Chokepoint $45,000,000OR HOV SR-73 SJHTC Shadow tolls/subsidies for HOV 3+ (all facilities) TBD
OR HOV & Auxiliary SR-55 I-405 I-5 In the Cities of Santa Ana and Tustin. Add 2nd HOV + Aux lane TBD
OR Mixed Flow SR-91 Riverside County Line SR-55 Add 2 express MF lanes each direction with access to/from Imperial Hwy and SR-55 $1,660,000,000
OR Mixed Flow SR-91 SR-55 I-5 Add 1 MF lane each direction $225,000,000
OR Mixed Flow SR-91/SR-57 WB SR-91 to NB SR-57 Bridge #55-0418 $4,000,000
OR Mixed Flow I-405 SR-73 Beach Add 1 MF lane each direction $425,000,000
OR Mixed Flow I-405 Invest in access to and from I-405 $50,000,000
OR Mixed Flow Chokepoints Countywide Chokepoints/Interchange Improvement Program; includes I-5 @ SR-55, I-5 @ SR-57/SR-22, SR-91 @ SR-55 $500,000,000
OR Auxiliary I-405 I-605 Beach Punch through aux lanes southbound $50,000,000OR Auxiliary SR-55 NB Dyer Edinger In the NB direction add auxiliary lanes to facilitate truck movement. TBDOR Auxiliary SR-55 SB Dyer Edinger In the SB direction add auxiliary lanes to facilitate truck movement. TBD
2004 RTP * TECHNICAL APPENDIX I - 242
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
OR Auxiliary SR-57 Tonner Canyon Road Brea Canyon Road In the NB and SB directions construct truck climbing and auxiliary lanes. $5,000,000
OR Auxiliary SR-91 WB SR-57 I-5 In the City of Anaheim. Add auxiliary and truck acceleration lanes. $20,000,000
OR Auxiliary I-405 Euclid Brookhurst NB/SB I-405 in the City of Fountain Valley. Construct auxiliary/truck acceleration lanes. $4,500,000
OR Auxiliary I-405 Brookhurst Warner/Magnolia NB I-405 in the City of Fountain Valley. Construct NB auxiliary/truck acceleration lanes. $1,600,000
OR Auxiliary I-405 Magnolia Brookhurst SB I-405 in the City of Fountain Valley. Construct SB Auxiliary/Truck Acceleration lanes. $1,700,000
OR Auxiliary SR-73 NB La Paz Glenwood In the NB direction construct auxiliary and truck climbing lane $11,000,000OR O&M Street Maintenance Countywide Continue turnback funding to help meet street maintenance needs $600,000,000
OR O&M Operational Improvements Countywide Regional Interchange/Intersection/Signal Program $500,000,000
OR Other TLC Partner to encourage transit-oriented development/redevelopment projects - include pedestrian/safety elements $100,000,000
OR Other I-405/I-605 Software Development for Ramps and Surveillance of heavy and light vehicles. $1,500,000
OR TDM/Non-motorized I-5
Various location at 5 from PM 13.19 to 30.26 and at 55 from PM R5.99 to 10.45
Upgrade Fiber Optics to provide vehicle and truck traffic information on the regional system. $4,700,000
OR TDM/Non-motorized I-5 SR-91 LA County Line NB/SB I-5 in the Cities of Fullerton and Buena Park. Install Fiber Optics to
provide vehicle and truck traffic information on the regional system. $1,200,000
OR TDM/Non-motorized SR-73 I-5 Jamboree
In the Cities of San Juan Capistrano, Laguna Hills, Laguna Beach, Irvine, Newport Beach and Costa Mesa. CCTV and Fiber for truck and motorist information.
$3,900,000
OR TDM/Non-motorized SR-91 LA County Line I-5 In the City of La Palma and Buena Park. Install Fiber Optics and CCTV for
motorist and truck travel information. $1,600,000
OR TDM/Non-motorized SR-133 SR-1 I-5 NB/SB SR-133 in Laguna Beach. Install Fiber Optics and CCTV for motorist
and truck travel information. $4,700,000
OR TDM/Non-motorized I-405 I-5 SR-55 NB/SB I-405 in the City of Irvine. Upgrade Fiber Optics for motorist and truck
traffic information. $1,500,000
OR TDM/Non-motorized I-405 SR-55 Euclid NB/SB I-405 in the City of Costa Mesa. Install Fiber Optics and CCTV from
SR-55 to Euclid for motorist and truck traffic information. $1,600,000
OR TDM/Non-motorized I-605 I-405 LA County Line Install Fiber Optics and CCTV for motorist and truck traffic information. $900,000
OR Transit Fixed Route Transit Countywide Expand to 1.04 vsh/capita by 2020 $1,652,000,000
OR Transit Rapid Bus Countywide Higher Level Rapid Bus - portions in dedicated rights of way where feasible, faster operating speeds $500,000,000
OR Transit Specialized Transit Countywide Add funding for Senior Mobility program $100,000,000
OR Transit Metrolink Commuter Rail Countywide For ongoing operations $300,000,000
OR Transit Metrolink Commuter Rail Placentia Placentia Metrolink Station $10,000,000
OR Transit CenterLine Light Rail extension $900,000,000
2004 RTP * TECHNICAL APPENDIX I - 243
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
OR Truck I-5 NB & SB SR-1 Oso Creek In San Juan Capistrano. Dowel Retrofit Truck Lanes, slab replacement, grinding $6,230,000
OR Truck I-5 on Junipero Serra In the City of San Juan Capistrano. Widen undercrossing & provide truck acceleration lanes in both directions. $4,000,000
OR Truck I-5 NB Crown Valley Parkway Alton Parkway In the City of Mission Viejo. Dowel Retrofit truck lanes , slab replacement, grinding and seal. $12,654,000
OR Truck I-5 at La Paz Interchange Truck Acceleration Lane NB On-Ramp $1,000,000OR Truck I-5 At Culver Drive Interchange Construct Truck Acceleration Lanes in the SB/NB Directions $2,500,000OR Truck I-5 NB at Redhill Northbound on-ramp construct Truck Acceleration Lane $1,500,000
OR Truck I-5 NB & SB at Pico Ave On and Off in the City of San Clemente. Reconstruct Interchange and provide truck climbing lanes for heavy truck movements $30,000,000
OR Truck I-5 SB at Camino De Estrella In San Clemente. Widen S/B Off-ramp and Overcrossing Structure to accommodate truck turning movements. $3,600,000
OR Truck I-5 SB at Avenida De La Carlota Construct southbound on-ramp and off-ramp to handle heavy vehicle and goods movement. $32,100,000
OR Truck SR-39 at I-405In the City of Huntington Beach. Construct interchange and provide truck acceleration lanes in the NB/SB direction. Widen SR-39 to 4 through lanes & 1 auxiliary lane in both directions
$20,000,000
OR Truck SR-55 Finley SR-73 NB/SB SR-55 in the Cities of Newport Beach and Costa Mesa. Dowel retrofit for truck lanes , grind and AC Overlay (LL) $3,500,000
OR Truck SR-55 SR-73 Fairhaven Ave NB/SB SR-55 in the cities of Costa Mesa, Santa Ana, and Tustin. Dowel retrofit for truck lanes , grind and AC Overlay (LL) $52,500,000
OR Truck SR-57 Imperial Highway In the City of Brea. Interchange improvements and provide truck acceleration lanes NB/SB. $1,400,000
OR Truck SR-57 NBNB SR-57 on-ramp at Lambert in the City of Brea. Widen on-ramp and provide truck acceleration lane.
NB SR-57 on-ramp at Lambert in the City of Brea. Widen on-ramp and provide truck acceleration lane. $5,000,000
OR Truck SR-73 SB at Jamboree In the City of Irvine. Construct interchange improvements and SB Truck Acceleration Lane. $4,000,000
OR Truck SR-91 Tustin Lake View Truck bypass lane TBDOR Truck SR-91 Lake View Weir Canyon Auxiliary lanes for truck weigh station TBDOR Truck SR-91 WB Beach Blvd Magnolia In the WB direction construct Truck Acceleration Lane. $3,000,000OR Truck SR-91 WB at State College Blvd In the WB direction construct Truck Acceleration Lane. $2,000,000
OR Truck SR-91 SR-57/SR-91 Lakeview In the City of Anaheim. Dowel Retrofit for truck lanes, grinding and overlay. $10,000,000
OR Truck SR-91/SR-55Construct Truck Bypass Lanes by constructing WB SR-91 Flyover at Lakeview Interchange for SR-55 Truck Traffic and constructing flyover beginning at Kraemer Blvd and bypassing SR-55 Interchange.
$250,000,000
OR Truck SR-91 Weir Canyon Gypsum Canyon In the EB/WB Directions construct Truck Auxiliary Lanes for the Truck Weigh Station. TBD
OR Truck SR-241 SR-261 SR-91 NB/SB SR-241 in the City of Irvine. Provide truck escape ramp and weigh station truck bypass lanes. $37,000,000
OR Truck SR-241 Windy Ridge toll station SR-91 Truck escape ramp TBDOR Truck I-405 I-5 SR-133 Truck bypass connector improvements $1,300,000OR Truck I-405 Irvine Center Drive SR-133 Widen and extend the NB Truck Bypass $1,500,000OR Truck I-405 at Harbor Blvd at On-Ramps construct Truck Acceleration Lanes. $2,000,000
2004 RTP * TECHNICAL APPENDIX I - 244
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
OR Truck I-405 SR-39/Beach Blvd I-605NB/SB I-405 in the Cities of Westminster and Seal Beach. Dowel Retrofit outer two lanes for truck traffic, replace slabs and grind all lanes, shoulders, & seal coat.
$21,579,000
OR Truck I-605 SR-22 LA County Line NB/SB I-605 in the City of Seal Beach. Dowel Retrofit for truck lane, grinding and seal coat. $5,250,000
OR Truck I-605 at Katella Avenue at On-Ramps construct Truck Acceleration Lanes. TBD
ORTruck/TDM/
Non-motorized
I-405/I-605 Improve and Upgrade Ramp Metering System and Truck Bypass Lanes at Ramps. $4,000,000
OR Arterial SR-39 Edinger Modify Lane Configuration @ Beach / Edinger intersection $350,000OR Arterial SR-133 0 8.3 Smart Street Improvements $21,500,000
OR HOV I-5 0 3.5 Construct HOV Lanes on I-5 from Avenida Pico to the Orange/San Diego County Line continuing in San Diego County near the City of Del Mar. TBD
OR HOV I-5 6.7 17.9 Extend 2nd HOV lane from El Toro Road to SR-1 Pacific Coast Highway in each direction $220,000,000
OR HOV I-5 17.4 18.7 Extend NB HOV to restore 2nd NB HOV lane by wideningOR HOV SR-55 Dyer SR 91 Update HOV Signing $550,000OR HOV SR-73 10 0.04 Construct HOV Freeway to Freeway Direct Connectors $35,000,000OR HOV SR-73 10 25.5 Construct HOV Lanes on SR-73 from I-5 to Birch Street TBDOR HOV SR-133 8.2 13.6 Construct HOV Lanes on SR-133 from SR-241 to I-405 TBDOR HOV SR-241 0 14.5 Construct HOV Lanes on SR-241 from SR-91 to Oso Parkway TBDOR HOV SR-261 0 6.2 Construct HOV Lanes on SR-261 from SR-241 to Walnut Avenue TBDOR HOV I-405 20.75 22.64 Construct HOV Lanes on I-405 from SR-22 to I-605 TBDOR HOV SR-133/I-5 23.2 23.2 Construct HOV Direct Connectors at the SR-133/I-5 Interchange TBDOR HOV I-405/SR-73 27.8 27.8 Construct HOV Direct Connectors at the I-405/SR-73 Interchange TBDOR HOV SR-73/I-5 10 10.3 Construct HOV Direct Connectors at the SR-73/I-5 Interchange TBDOR HOV I-5 SR 55 SR 22/57 Add 2nd HOV lane each direction $40,000,000
OR Mixed Flow I-5 21.8 34.8 Construct 2-lane Branch Connector and extend # 6 through lane from SR-133 on to Culver Drive NB on-ramp. $23,600,000
OR Mixed Flow SR-57 I-5/SR-22/SR-57 Interchange SR-73/I-405 Interchange Extend SR-57 between identified project limits (Evaluate multi-modal options) TBD
OR Mixed Flow SR-57 Lambert Rd LA Co Line NB Climbing Lane widening $2,000,000
OR Mixed Flow SR-241 14.4 26.7 FTC-NORTH FINAL PHASE WIDENINGAdds two lanes each direction from Oso Parkway to ETC. $190,000,000
OR Mixed Flow I-405 0.9 2.2 Widen and extend Collector Distributor Road southerly to serve both SR-133 and Irvine Center Drive. $12,700,000
OR Mixed Flow SR-133 10 11 EAST LEG WIDENINGAdds one lane in each direction from Marine Way to Portola Parkway $30,000,000
OR Mixed Flow SR-241 18.5 22.5FTC SOUTHBOUND WIDENINGAdds one lane southbound from Melinda Road to Alton Parkway, and restablishes the northboune Aux. Lane.
$38,300,000
OR Mixed Flow SR-241 25 26.7SR 241/133 MERGE/DIVERGE Adds one lane in each direction and restripes lanes from Rte 133 through the Tomato Springs Toll Plaza.
$350,000
2004 RTP * TECHNICAL APPENDIX I - 245
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
OR Mixed Flow SR-241 35.8 36.4 WINDY RIDGE AVI LANESAdd one AVI lane in each direction. $3,000,000
OR Mixed Flow I-405/SR-133 3.1 4 Construct connector SB I-405 to NB & SB SR-133 $80,000,000
OR Mixed Flow SR-73 10 25.5 SJH FINAL PHASE WIDENINGAdds two lanes in each directionand direct connectors $134,000,000
OR Mixed Flow SR-73 21.1 23.8 SJH NB WIDENINGAdds one lane from Catalina View TP to Mac Arthur. $8,000,000
OR Mixed Flow SR-73 24.8 0 WIDEN JAMBOREE ROAD BRIDGE ocOVER SR 73 $1,500,000
ORMixed Flow,
HOV & Auxiliary
Freeways All All Freeway System Master Plan (Multimodal Strategies) TBD
OR Auxiliary I-5 15.5 16.5 Extend auxiliary lane to La Paz $1,500,000OR Auxiliary I-5 16.8 18.3 Extend auxiliary lane through interchange $3,903,000
OR Auxiliary I-5 21 33.6 Construct auxiliary lane to permit 2-lane off-ramp from the Collector Distributor Road to Bake Pkwy off-ramp $11,000,000
OR Auxiliary I-5 21.9 35.3 Construct auxiliary lane between the Collector Distributor Rd and Alton Pkwy off-ramp. $4,200,000
OR Auxiliary I-5 24 38.4 Construct auxiliary lane from Peters Cyn bridge to Sand Cyn off-ramp. Construct 2-lane off-ramp to Culver Drive. $30,500,000
OR Auxiliary I-405 0.95 1.5 Add 2nd SB Aux Lane and Ramp Improvements $2,500,000OR Auxiliary I-405 1.6 2.8 Add Aux lane $1,047,000
OR Auxiliary I-405 1.8 5.6Braid the SR-133 Connector with NB Sand Canyon Ave off-ramp, allowing 2-lane exit to Sand Canyon Ave. Extend # 5 lane from SR-133 to tie into # 5 lane @ at Culver Dr.
$82,700,000
OR Auxiliary I-405 2.8 3.7 Add Aux lane $1,860,000
OR Auxiliary I-405 3.1 4 Construct auxiliary lane between Jeffrey rd. on-ramp & Sand Canyon off-ramp to permit a two-lane off-ramp at San Canyon $8,100,000
OR Auxiliary I-405 3.9 5.4 Construct NB aux lane from Jeffrey to Culver $3,900,000OR Auxiliary I-405 Talbert Avenue Euclid Street Construct Auxiliary Lane $2,600,000
OR Auxiliary I-5/SR-133 23.1 37.2 Construct auxiliary lane and add 2nd off-ramp lane from SB I-5 Branch Connector to Barranca Pkwy. $8,000,000
OR IC/Ramps I-5 9.4 9.7 Reconstruct I-5/SDR-74 interchange $40,000,000OR IC/Ramps I-5 12.8 13.1 Reconstruct I-5/Avery interchange $28,000,000OR IC/Ramps I-5 21 33.6 Add turning lane at terminal section of Sand Canyon Avenue off-ramp $650,000OR IC/Ramps I-5 21.5 21.5 Construct southbound on-ramp and off-ramp at Alton Pkwy $2,000,000OR IC/Ramps I-5 22.6 22.6 Construct HOV Drop Ramps @ Barranca Pkwy. $10,000,000OR IC/Ramps I-5 22.6 23 Construct NB Off and SB On Drop Ramps at Barranca Parkway TBDOR IC/Ramps SR-55 R7.2 R8.0 Construct Drop Ramps At Alton Parkway on SR-55 TBD
OR IC/Ramps SR-73 14 17 GLENWOOD INTERCHANGE PHASE IIRamps to and from the south. $9,000,000
OR IC/Ramps SR-241 14.4 14.4 SR 241 / Const. Oso Parkway OC $5,000,000
OR IC/Ramps I-405 1.8 2.9 Construct Sand Cyn SB on-ramp with an auxiliary lane to the SR-133 Collector Distributor Road. $8,600,000
OR IC/Ramps I-405 9.9 10.5 Construct Drop Ramps at Bear Street on I-405 TBDOR IC/Ramps I-405 Talbert Beach Construct auxiliary lane & Replace bridges $15,000,000
2004 RTP * TECHNICAL APPENDIX I - 246
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
OR IC/Ramps SR-241 18.5 19SANTA MARGARITA RAMP WIDENINGWidens Arroyo Trabuco Bridges to Ultimate in both directions and adds one lane to ramps and across bridges..
$19,900,000
OR IC/Ramps SR-241 19 22.9FOOTHILL-NORTH RDWY WIDENINGAdds one lane northbound from Arroyo Trabuco Bridge to Bake Parkway and realigns Los Alisos northbound on-ramp.
$16,200,000
OR IC/Ramps SR-241 31 33.5 TRABUCO ROAD INTERCHANGE $20,000,000
OR IC/Ramps SR-241 36 0EAST ORANGE IC IMPROVEMENTSNew (relocated) SR 241 SB on-ramp, widening of Chapman Ave. and grading for future C-D roads and ramps at Handy Creek.
$900,000
OR IC/Ramps SR-241 37.2 37.8 WEIR CANYON ROAD INTERCHANGEAdd ramps to and from the south. $15,000,000
OR IC/Ramps All Freeway Routes Various Various Improve On and Off Ramps and provide additional storage capacity $63,000,000OR IC/Ramps I-5 15.1 16.4 Interchange Improvement $11,785,000
OR ITS All Freeway Routes Various Various
ITS/New Technology - Upgrade Fiber Optics to provide vehicle and truck traffic information on the regional system, new TMC Intertie, vehicle detection, software development, ATMS upgrade and upgrade system equipment in Orange County
$72,000,000
OR Other SR-91 6.12 6.12 Low Bridge WB91 to NB SR57 BR# 55-418 14'-10" Vertical Clearance $3,000,000OR Other SR-133 10 10 CALTRANS IRVINE MTNCE STATION $4,000,000OR Other SR-241 36 0 WINDY RIDGE SERVICE TUNNEL $900,000
OR Toll SR-133 9.6 12.6 EAST LEG FINAL PHASE WIDENINGAdds one median lane in each direction and direct connector ramps. $95,000,000
OR Toll SR-241/SR-133 13.6 13.6 Construct HOV Direct Connectors at the SR-241/SR-133 Interchange TBDOR Toll SR-241/SR-261 6.2 6.2 Construct HOV Direct Connectors at the SR-241/SR-261 Interchange TBD
RV Mixed Flow SR-91 Buchanan Street Replace both bridges. $2,318,000
RV Mixed Flow I-215 El Cerrito Drive Bridge Replace WB bridge. $2,623,000
RV Mixed Flow I-215 Box Spring Replace WB bridge. $2,140,000
RV Mixed Flow I-215 SB I-215 EB SR-60 Replace SB bridge. $6,420,000
RV Transit Intercity Rail City of Colton (San Bernardino County) City of Palm Springs Intercity Rail (AMTRAK) $150,000,000
SB Mixed Flow SR-18 and SR-330 various locations, SR-18 (PM31.9 to 42.35), SR-330 (PM30.63 to 44.11)
SR-18 intersection improvement at SR-330, realignment (E/O Green Valley Lake Rd), off-street parking; SR-330 add right turn into Running Springs; SR-18 add 1 lane (dir?) PM39-40.86, PM41.75-42.35; SR-330 add 1 lane (dir?) PM30.63-31.48, 32.03-32.76, 33.38-36.07, 36.5-37.75, 37.61-40.76
$67,000,000
SB Corridor CETAP North-South Study Areas
North-South Study Area East of I-215 and between I-215 and I-15 (Fontana/Rubidoux) $265,000,000
SB Mixed Flow US-395 0.6 mi N/O Desert Flower Rd 0.5 mi S/O Farmington Rd 6-lane highway $230,000,000
SB Mixed Flow US-395 0.5 mi S/O Farmington Rd Kern Co Line 6-lane highway $199,000,000
2004 RTP * TECHNICAL APPENDIX I - 247
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
SB Mixed Flow I-15 Bear Valley Cutoff Interchange $16,000,000
SB Mixed Flow SR-60 Pipeline Ave Replace one bridge. $2,755,000
SB Mixed Flow SR-60 Monte Vista Ave Replace EB Bridge. $3,314,000
SB Mixed Flow SR-60 Theodore Ave Replace EB bridge. $1,896,000
SB Mixed Flow I-215 Grand Terrace R/R Under Pass Replace both bridges. $2,851,000
SB Mixed Flow I-215 Barton Road Replace both bridges. $2,912,000
SB Mixed Flow I-215 5th StreeT Replace NB bridge. $1,821,000
SB Mixed Flow I-215 Newport Ave Replace both bridges. $1,421,000
SB Mixed Flow I-215 Washington/ Mt. Vernon Replace both bridges. $2,680,000
SB Mixed Flow I-215 High grove R/R Underpass Replace both bridges. $3,551,000
SB Other Aerial Tramway San Bernardino/Highland Area Big Bear Lake Area Aerial Tramway $319,000,000
SB Transit Metrolink Commuter Rail Additional Metrolink Expansion $176,000,000
SB Truck I-15 Afton Rd Basin Rd Southbound truck climbing lane TBDSB Truck I-15 E. Main St. Calico Ghost Town Rd Southbound truck climbing lane TBDSB Truck I-15 Wheaton Springs-Baily Road Yates Well Rd Northbound truck descending lane TBDSB Truck I-15 Baker Cima Rd Southbound truck descending lane TBDSB Truck I-15 Nevada State Line alternate Cajon Summit Commercial vehicle enforcement facility TBDSB Truck I-40 in Needles Truck weigh station TBD
VE Mixed Flow US-101 Los Angeles County Line SR-33 Add 1 lane each direction, interchange and ramp improvements, ITS TBD
VE Mixed Flow US-101 SR-33 Santa Barbara County Line Add 1 lane each direction (remains conventional highway) TBD
VE Mixed Flow SR-126 Within city limits of Fillmore Add 1 lane each direction TBD
VE Mixed Flow SR-23 SR-23/SR-188 Walnut Canyon New alignment TBD
VE IC/Ramps SR-126 Within city of Ventura Construct new southbound to US-101 connector TBD
VE Transit Santa Paula Branch Line US-101 Los Angeles County Line Bring track to class 4 standards and reconstruct track between Piru and Los
Angeles County Line TBD
VE Mixed Flow SR-23 SR-118 SR-126 Freeway: Mixed Flow $57,000,000
VE Mixed Flow SR-34 SR-1 SR-118 Widen conventional highway from 1 to 2 lanes each direction (Caltrans District 7 Draft Transportation Concept Report for SR-34, October 2003) TBD
VE Mixed Flow SR-118 SR-23 SR-232 Freeway: Mixed Flow $71,000,000
2004 RTP * TECHNICAL APPENDIX I - 248
Appendix I * Project List
Unconstrained ProjectsCO Category Route/Program From To Description Estimated Cost
(02$)
VE Mixed Flow SR-118 SR-232 SR-126 Freeway: Mixed Flow $7,000,000
VE Mixed Flow SR-232 SR-118 US-101 Freeway: Mixed Flow $16,000,000
VE Mixed Flow SR-118 Rocky Peak Rd Replace Bridge $2,000,000
VE Mixed Flow SR-118 Cochran Road Replace Bridge. $2,000,000
VE Truck SR-118 Jcn 23 & 34 in Moorpark Construct New Weight Station $19,800,000
REG O&M Additional system preservation
Additional State Highway, Arterial, and Transit System Preservation/Maintenance, regionwide $9,000,000,000
2004 RTP * TECHNICAL APPENDIX I - 249