PROJECT LIST
Item Contract / Project Name Contract Value Contract Commencement Consultant Client(RM) Period Date Contract Actual
8 North - South Highway KM292.25 200,000.00 3 months 15-Jul-96 15-Oct-96 14-Oct-96 En. Abi Sufian Projek Lebuhraya Utara-Selatan Bhd.- Prevention Of Erosion At Bridge Piers And ProtectionOf Steel Piles At Sungai Semenyih
9 North - South Highway KM294.90 (North & SouthBound)
305,000.00 3 months 15-Jul-96 15-Oct-96 10-Oct-96 En. Abi Sufian Projek Lebuhraya Utara-Selatan Bhd.
- Prevention Of Erosion At Bridge Piers And ProtectionOf Steel Piles At Sungai Langgat.
60 Procurement, Construction And Commissioning ForThe Rehabilitation Of PDB Bulk Depot Jetty At TelukEwa, Pulau Langkawi, Kedah
900,000.00 20 weeks 9-Oct-01 28-Jan-02 25-Jan-02 Chiyoda Malaysia Sdn Bhd
68 Concrete Repair Bridges At Berths 1 & 2, SouthpointFor Northport (Malaysia) Sdn Bhd.
654,980.00 6 months 11-Nov-02 9-May-03 8-May-03 Northport (Malaysia) Bhd
72 The Procurement, Construction And CommissioningOf The TTLR Structural Rectification Works At PDBBulk Depot, Prai, Pulau Pinang
104,800.00 24/Feb/03 28-Feb-03 17-Mar-03 22-Mar-03 Petronas Dagangan Bhd
86 MEB Construction Sdn Bhd 110,755.00 6 weeks 10-Jan-05 20-Feb-05 27-Feb-05 Muhibbah Engineering (m) Bhd- Repair Work At Bridge No 6
89 Structure Repair And Anti-Chloride Coating Work ToProtect Concrete Column For Above Water Bridge AtPenang Bridge.
270,000.00 4 months 28-Feb-05 27-Jun-05 27-Jun-05 Plus -Penang Bridge
95 Proposed Design And Build Rectification Works ToEntrance Ramps In CFS 2 And 3, Container Terminal,Westport, Pulau Indah, Port Klang, Selangor DarulEhsan
154,000.00 4 months 4-Jul-05 4-Nov-05 4-Oct-05 Kelang Multi Terminal Sdn Bhd
104 Penang Bridges Concession 210,250.00 4 months 25-Aug-06 14-Dec-06 24-Nov-06 Soil Centralab Sdn Bhd- Concrete Structural Repair For Bridges Along PenangBridge Concession
Completion Date
Page 1
PROJECT LIST
Item Contract / Project Name Contract Value Contract Commencement Consultant Client(RM) Period Date Contract Actual
Completion Date
136 Proposed Replacement Of Broken Pile And AssociatedWorks At Wharf 2, Southpoint For Northport(Malaysia) Bhd
245,000.00 24 weeks 9-Jun-08 24-Dec-08 16-Dec-08 Northport (Malaysia) Berhad
153 Concrete Structure Repair At Interchanges AlongPenang Bridge Concession Area
228,392.42 1-Oct-08 31-Mar-09 1-Apr-09 Soil Centralab Sdb Bhd
156 Proposed Remedial Works To Damaged Piles AtMM5955, Slag Jetty, Dry Bulk Terminal 2, Westports,Pulau Indah
180,000.00 2 months 4-May-09 29-Jun-09 16-Jun-09 Amanmaju Construction Sdn Bhd
188 Proposed Remedial Work To Pejabat Daerah MaritimTanjung Sedili, Johor
283,313.39 20-Jun-10 15-Sep-10 Structural Repair (M) Sdn Bhd
193 Concrete Structural Repair Work For Bridge Along ThePenang Bridge Concession Area
314,846.53 1-Apr-10 30-Aug-10 Soil Centralab Sdn Bhd
197 Testing And Rectification Works To Bridge StructuresDamaged By Fire At Penang Bridge
178,092.00 15-Nov-10 13-Mar-11 1-Mar-11 Soil Centralab Sdn Bhd
200 Proposed Repair, Rehabilitation And Revival OfFloating Pontoon Jetty At Pangkalan TLDM, MukimLumut, Daerah Manjung, Lumut, Perak For Bousted
1,921,258.27 17-Sep-10 17-Mar-11 16-Jul-11 PJSI Consortium Sdn Bhd
208 Rectification Works To Bridge Structure Damaged ByFire At Penang Bridge Including IS-LLS MonitoringSystem - PBSB/MC-HR/LOA-001/2011
1,772,886.50 4-Feb-11 20-May-11 Soil Centralab Sdn Bhd
236 Proposed Repair, Rehabilitation And Revival OfFloating Pontoon Jetty No. 4 At Pangkalan TLDM,Lumut, Perak Darul Ridzuan For Boustead NavalShipyard Sdn Bhd
918,029.85 1-Feb-12 16-Jun-12 16-Jun-12 PJSI Consortium Sdn Bhd
257 Proposed Repair, Rehabilitation And Revival OfFloating Pontoon Jetties No. 1, No. 3 & No. 5 AtPangkalan TLDM, Lumut, Perak Darul Ridzuan ForBoustead Naval Shipyard Sdn Bhd
1,333,948.46 6 months 31-Jul-12 1-Feb-13 PJSI Consortium Sdn Bhd