PROJECT LIST Item Contract / Project Name Contract Value Contract Commencement Consultant Client (RM) Period Date Contract Actual 8 North - South Highway KM292.25 200,000.00 3 months 15-Jul-96 15-Oct-96 14-Oct-96 En. Abi Sufian Projek Lebuhraya Utara-Selatan Bhd. - Prevention Of Erosion At Bridge Piers And Protection Of Steel Piles At Sungai Semenyih 9 North - South Highway KM294.90 (North & South Bound) 305,000.00 3 months 15-Jul-96 15-Oct-96 10-Oct-96 En. Abi Sufian Projek Lebuhraya Utara-Selatan Bhd. - Prevention Of Erosion At Bridge Piers And Protection Of Steel Piles At Sungai Langgat. 60 Procurement, Construction And Commissioning For The Rehabilitation Of PDB Bulk Depot Jetty At Teluk Ewa, Pulau Langkawi, Kedah 900,000.00 20 weeks 9-Oct-01 28-Jan-02 25-Jan-02 Chiyoda Malaysia Sdn Bhd 68 Concrete Repair Bridges At Berths 1 & 2, Southpoint For Northport (Malaysia) Sdn Bhd. 654,980.00 6 months 11-Nov-02 9-May-03 8-May-03 Northport (Malaysia) Bhd 72 The Procurement, Construction And Commissioning Of The TTLR Structural Rectification Works At PDB Bulk Depot, Prai, Pulau Pinang 104,800.00 24/Feb/03 28-Feb-03 17-Mar-03 22-Mar-03 Petronas Dagangan Bhd 86 MEB Construction Sdn Bhd 110,755.00 6 weeks 10-Jan-05 20-Feb-05 27-Feb-05 Muhibbah Engineering (m) Bhd - Repair Work At Bridge No 6 89 Structure Repair And Anti-Chloride Coating Work To Protect Concrete Column For Above Water Bridge At Penang Bridge. 270,000.00 4 months 28-Feb-05 27-Jun-05 27-Jun-05 Plus -Penang Bridge 95 Proposed Design And Build Rectification Works To Entrance Ramps In CFS 2 And 3, Container Terminal, Westport, Pulau Indah, Port Klang, Selangor Darul Ehsan 154,000.00 4 months 4-Jul-05 4-Nov-05 4-Oct-05 Kelang Multi Terminal Sdn Bhd 104 Penang Bridges Concession 210,250.00 4 months 25-Aug-06 14-Dec-06 24-Nov-06 Soil Centralab Sdn Bhd - Concrete Structural Repair For Bridges Along Penang Bridge Concession Completion Date Page 1

Project List - Marine Structures

Embed Size (px)

DESCRIPTION

1

Citation preview

Page 1: Project List - Marine Structures

PROJECT LIST

Item Contract / Project Name Contract Value Contract Commencement Consultant Client(RM) Period Date Contract Actual

8 North - South Highway KM292.25 200,000.00 3 months 15-Jul-96 15-Oct-96 14-Oct-96 En. Abi Sufian Projek Lebuhraya Utara-Selatan Bhd.- Prevention Of Erosion At Bridge Piers And ProtectionOf Steel Piles At Sungai Semenyih

9 North - South Highway KM294.90 (North & SouthBound)

305,000.00 3 months 15-Jul-96 15-Oct-96 10-Oct-96 En. Abi Sufian Projek Lebuhraya Utara-Selatan Bhd.

- Prevention Of Erosion At Bridge Piers And ProtectionOf Steel Piles At Sungai Langgat.

60 Procurement, Construction And Commissioning ForThe Rehabilitation Of PDB Bulk Depot Jetty At TelukEwa, Pulau Langkawi, Kedah

900,000.00 20 weeks 9-Oct-01 28-Jan-02 25-Jan-02 Chiyoda Malaysia Sdn Bhd

68 Concrete Repair Bridges At Berths 1 & 2, SouthpointFor Northport (Malaysia) Sdn Bhd.

654,980.00 6 months 11-Nov-02 9-May-03 8-May-03 Northport (Malaysia) Bhd

72 The Procurement, Construction And CommissioningOf The TTLR Structural Rectification Works At PDBBulk Depot, Prai, Pulau Pinang

104,800.00 24/Feb/03 28-Feb-03 17-Mar-03 22-Mar-03 Petronas Dagangan Bhd

86 MEB Construction Sdn Bhd 110,755.00 6 weeks 10-Jan-05 20-Feb-05 27-Feb-05 Muhibbah Engineering (m) Bhd- Repair Work At Bridge No 6

89 Structure Repair And Anti-Chloride Coating Work ToProtect Concrete Column For Above Water Bridge AtPenang Bridge.

270,000.00 4 months 28-Feb-05 27-Jun-05 27-Jun-05 Plus -Penang Bridge

95 Proposed Design And Build Rectification Works ToEntrance Ramps In CFS 2 And 3, Container Terminal,Westport, Pulau Indah, Port Klang, Selangor DarulEhsan

154,000.00 4 months 4-Jul-05 4-Nov-05 4-Oct-05 Kelang Multi Terminal Sdn Bhd

104 Penang Bridges Concession 210,250.00 4 months 25-Aug-06 14-Dec-06 24-Nov-06 Soil Centralab Sdn Bhd- Concrete Structural Repair For Bridges Along PenangBridge Concession

Completion Date

Page 1

Page 2: Project List - Marine Structures

PROJECT LIST

Item Contract / Project Name Contract Value Contract Commencement Consultant Client(RM) Period Date Contract Actual

Completion Date

136 Proposed Replacement Of Broken Pile And AssociatedWorks At Wharf 2, Southpoint For Northport(Malaysia) Bhd

245,000.00 24 weeks 9-Jun-08 24-Dec-08 16-Dec-08 Northport (Malaysia) Berhad

153 Concrete Structure Repair At Interchanges AlongPenang Bridge Concession Area

228,392.42 1-Oct-08 31-Mar-09 1-Apr-09 Soil Centralab Sdb Bhd

156 Proposed Remedial Works To Damaged Piles AtMM5955, Slag Jetty, Dry Bulk Terminal 2, Westports,Pulau Indah

180,000.00 2 months 4-May-09 29-Jun-09 16-Jun-09 Amanmaju Construction Sdn Bhd

188 Proposed Remedial Work To Pejabat Daerah MaritimTanjung Sedili, Johor

283,313.39 20-Jun-10 15-Sep-10 Structural Repair (M) Sdn Bhd

193 Concrete Structural Repair Work For Bridge Along ThePenang Bridge Concession Area

314,846.53 1-Apr-10 30-Aug-10 Soil Centralab Sdn Bhd

197 Testing And Rectification Works To Bridge StructuresDamaged By Fire At Penang Bridge

178,092.00 15-Nov-10 13-Mar-11 1-Mar-11 Soil Centralab Sdn Bhd

200 Proposed Repair, Rehabilitation And Revival OfFloating Pontoon Jetty At Pangkalan TLDM, MukimLumut, Daerah Manjung, Lumut, Perak For Bousted

1,921,258.27 17-Sep-10 17-Mar-11 16-Jul-11 PJSI Consortium Sdn Bhd

208 Rectification Works To Bridge Structure Damaged ByFire At Penang Bridge Including IS-LLS MonitoringSystem - PBSB/MC-HR/LOA-001/2011

1,772,886.50 4-Feb-11 20-May-11 Soil Centralab Sdn Bhd

236 Proposed Repair, Rehabilitation And Revival OfFloating Pontoon Jetty No. 4 At Pangkalan TLDM,Lumut, Perak Darul Ridzuan For Boustead NavalShipyard Sdn Bhd

918,029.85 1-Feb-12 16-Jun-12 16-Jun-12 PJSI Consortium Sdn Bhd

257 Proposed Repair, Rehabilitation And Revival OfFloating Pontoon Jetties No. 1, No. 3 & No. 5 AtPangkalan TLDM, Lumut, Perak Darul Ridzuan ForBoustead Naval Shipyard Sdn Bhd

1,333,948.46 6 months 31-Jul-12 1-Feb-13 PJSI Consortium Sdn Bhd