Personal involvement in the following projects:
• Mitochondria Energy – Fuel cell installation, Chamber of Mines
• PTSI R&D – Bowman Turbo Compounding Power Generator
• Willard Batteries - Installation of a new AGM battery production line
• Willard Batteries - Fume capture and extraction system: battery charge-house.
• Palabora Mining Co. - Design, fabrication and installation of water-cooled, 45MW waste steam condenser
• Anglo Platinum - Standby diesel power generation, 22 diesel generators / 10 sites / 66 MVA
• Anglo Platinum – Diesel powered emergency ventilation surface fans, 5 shaft sites
• Impala Platinum - Smelter off-gas emissions control plant: Wet SO2 scrubbers, ESP, Wet ESP, Lime slaking plant, Gypsum dewatering plant, Sulfacid plant expansion
• Lafarge Gypsum - Gypsum plasterboard plant: Bulk materials handling, 3 x fabric filter plants (product recovery bag-houses)
• Feasibility study – KENGEN Kenia geothermal heat recovery plant by ORC power generation
• Feasibility study – Lonmin CaSOx slurry filtration plant • Feasibility study – Lonmin CaSOx oxidation and de-
watering plant • Feasibility study – Lonmin Sonic injection air supply plant • Feasibility study – Impala Platinum Springs 24MW
Hydrogen fuel cell plant
CV submitted by:
WYNAND MARAIS MECHANICAL ENGINEER
Mobile: 072 982 1941 email: [email protected]
CHAMBER OF MINES
• Natural gas fuelled Hydrogen fuel cell
• 100kW unit • Date: 2014