Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ Task Group 4 Low Rate WPANS Closing Report ] Date Submitted: [January 16th - 2003] Source: [José A. Gutierrez] Company: [Eaton Corp] - PowerPoint PPT Presentation
Citation preview
Slide 1
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]Date Submitted: [January 16th - 2003]Source: [José A. Gutierrez] Company: [Eaton Corp]Address: [4201 North 27th Street Milwaukee WI. 53005]Voice:[414-4496525], FAX: [414-4496131], E-Mail:[[email protected]]
Re: [ Closing Report from Ft. Lauderdale Meeting ]
Abstract: [A summary of the comment resolution activities for Sponsor Ballot, status and plan for IEEE802.15 Task Group 4]
Purpose: [Closing Report - Ft. Lauderdale Meeting]
Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.
Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.
Slide 2
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
Task Group 4 Low Rate WPANSClosing Report
Ft. Lauderdale, FL
January 17, 2003
Slide 3
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
Task Group 4 Low Rate WPANS
TASK GROUP 4 OBJECTIVES FOR THIS MEETING
1. Comment Resolution for Sponsor Ballot
2. Planning for Sponsor Ballot recirculation
3. Planning for miscellaneous TG4 activities
4. Objectives for Dallas Meeting
Slide 4
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
Task Group 4 Low Rate WPANS
Approval: 97.9%
Sponsor Ballot Results:
YES 46NO 1
Abstain (Lack of Time) 6Did not vote 8
Total 61
Vote Count
365 Comments88.7%
Participation!
Slide 5
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
Comment Distribution by ClauseSummary
MAC59%
Global Edit11%
Annex8%
Clause 511%
PHY11%
Clause CommentsGlobal Edit 40Clause 5 41
PHY 39MAC 214
Annex 31Total 365
Comments by ClauseSummary
Sponsor Ballot
Slide 6
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
Comment Distribution by Comment Type
Editorial64%
Technical36%
Editorial 234Technical 131
Total 365
Type of Comments
Sponsor Ballot
Slide 7
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
Vote Count
Abstain (Lack of Time)6
NO1
Did not vote8
YES46
YES 46NO 1
Abstain (Lack of Time) 6Did not vote 8
Total 61
Vote Count
Sponsor Ballot
Slide 8
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
Comment Distribution by Commenter
0 20 40 60 80 100 120
Berger, Catherine*
Bose, Pratik
Bourgeois, Monique
Freedman, Avraham
Gifford, Ian
Gorday, Paul
Gubbi, Rajugopal
Gutierrez, Jose
Heile, Robert
Jamieson, Phil
Moridi, Said
Pardee, John B.
Van Leeuwen, Hans
Co
mm
en
ter
Number of comments
Berger, Catherine* 4Bose, Pratik 9Bourgeois, Monique 51Freedman, Avraham 3Gifford, Ian 102Gorday, Paul 25Gubbi, Rajugopal 1Gutierrez, Jose 19Heile, Robert 15Jamieson, Phil 104Moridi, Said 1Pardee, John B. 18Van Leeuwen, Hans 13
Total 365
Comments by Commenter
Commenter Comments
Slide 9
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
TG4 Performance
75.0%
80.0%
85.0%
90.0%
95.0%
100.0%
LB13 LB15 LB18 LB20 SB SB-Recirc.
802.15.4 Draft Approval
97.9%
100%
Projected!
Slide 10
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
Comment Resolution Progress
Slide 11
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
Revised Draft… Almost Done!Revised Draft… Almost Done!
Need to implement final 18 Technical Comment Resolutions (resolutions have been agreed
upon and documented) and various editorial comment
resolutions
Slide 12
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
WG Motion
Move that the 802.15 WG approve the comment resolutions to the P802.15.4/D17 draft standard and further that the 802.15 WG empower the TG4 editing team to implement all of the comment resolutions in compliance with the stated resolutions in the 03010r0P802-1_TG4-meeting-minutes to form the P802.15.4/D18 draft standard.
• Moved by Jose Gutierrez• Seconded by Phil Jamieson• Vote results =
Slide 13
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
When are we planning to go to recirculation?
Late-February
Slide 14
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
Technical Editing Team Focus
• Implementing Comment Resolution
• Go to sponsor ballot re-circulation
Slide 15
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
Activities Roadmap
February 27th10 Days Recirculation
March - 14th
Comment Resolution Done
March – 20th
RevCom Review
Late March
PARTY!
Slide 16
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
Goals for Dallas - 2003
• Sponsor Ballot recirculation comment resolution
• Final Edits to Draft 19
• Preparation for RevCom
Slide 17
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
Task Group 4 Low Rate WPANS
Project Timeline
11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3
Press Release xCall for application created by 11/09/00 xCall for intent for proposal created by 12/1/00 xCall for proposal by 01/17/00 xSelection criteria doc created by 01/01 xStart decision process by 03/01. xPresent proposals 03/01 x x xWorking proposal selected by the 07/01 x
Low rate pocket guide (book). x x x x =>Proposal draft completed by 12/01. x x x x x x1st letter ballot completed by 01/02. x x x
Resolution of comments completed by 03/02. x x xRe-circulation completed by 04/02. x
Resolve re-circulation comments x2nd re-circulation x
Resolve 2nd re-circulation comments. x3rd re-circulation x
Resolve 3rd re-circulation comments. xSponsor ballot completed by 11/02. x x
Sponsor ballot comment resolution. x x xRe-circulation completed by 03-03 x
RevCom Approval x
20032000 2001 2002
Slide 18
doc.: IEEE 802.15-03/020r0
Submission
José A. Gutierrez
Jan-03
• Sponsor Ballot with 97.9% approval
• Editorial comment resolution finished
• Draft 18 ready by Mid-February
• Recirculation planned for late February
• Anticipated release planned for March-2003
Summary