Procedure for the Preparation of Project HSE Plan: Doc. No. KOC.GE.048 Purpose / Scope: This procedure describes the process of developing and implementing an HSE plan for projects. The purpose of this plan is to:- Enable an estimate of time and resources requirements to implement Project HSE objectives at early stage of the project. Ensure that the requirements and expectations of the KOC HSE Policy, 2020 Strategy, and Regulatory requirements are addressed. identify and assesses potential hazards and risks using appropriate tools. Identify key activities, roles and responsibilities, meeting project goals Ensure risks are mitigated through risk management techniques.

Project HSE Plan KOC.ge.048

Embed Size (px)

DESCRIPTION

Project HSE Plan KOC.ge.048

Citation preview

  • Procedure for the Preparation of Project HSE Plan: Doc. No. KOC.GE.048Purpose / Scope:

    This procedure describes the process of developing and implementing an HSE plan for projects. The purpose of this plan is to:- Enable an estimate of time and resources requirements to implement Project HSE objectives at early stage of the project. Ensure that the requirements and expectations of the KOC HSE Policy, 2020 Strategy, and Regulatory requirements are addressed. identify and assesses potential hazards and risks using appropriate tools. Identify key activities, roles and responsibilities, meeting project goals Ensure risks are mitigated through risk management techniques. Enable an estimate of time and resources (monetary and human) to implement Project HSE objectives at early stage of the project.

  • The following are the key deliverables indicated out of this procedure for the purpose of induction only, enabling contractor to estimate basic resource requirements (it does not mean that the other deliverables are not applicable):

    Develop further the original HSE plan that has been approved at conceptual stage. While developing further the following HSE issues and activities shall be taken into account from detail design stage through commissioning and handover which will be subject to execution and review (PHSER). Contractors; HSE organization, roles and responsibilities Project Description and project HSE philosophy (considering; Guiding Principles: KOC Guide to HSEMS & its documents, Industry standards & Practices, The Project Operations & Maintenance Philosophy, etc. HSE Objectives: Minimum manning, Reduction in manual handling, etc. HSE Performance Targets: Accident rates, Number of ASAs performed, Quantity of waste generated, Quantity of atmospheric emissions Summary of Regulatory requirements Description of Hazard identification, risk management and control (i.e. the tools such as QRA: Hazop, EIA, ETA, FMEA, Gas dispersion, Explosion impact study etc.) Description of Project HSE issues as per the table below but not limited to:

  • Specific Project HSE Issues

    SafetyHealth & OHEnvironmentSystem integrity levelHigh pressure/low pressure interfaces and overpressure protectionFire and explosion protectionFire, smoke & gas detectionFlare, vent, drains, samplingAccess to system & equip.Lifting, shifting/handlingWorking at heightsPTW, ExcavationsDriving & Vehicle Mgmt.ESD and blow-downSimultaneous operationsEODLOTO, Safe maintenanceEscape & EvacuationAccident/Incident Mgmt.Remote safety monitoringStorage & handling of hazardous materialsExposure to toxic & Hazardous substancesNoise pollutionErgonomics & manual handlingWorking hoursWorking in heat & coldVentilationLightingHouse KeepingSanitationFirst Aid and site clinic

    Emissions to airWastesWater supplyEffluent disposalLeaks & Spills containmentOil and chemical spillsWaste water treatment and disposalSite restoration Environment sensitive areasSoil contaminationNatural drainsPreservation of heritage/artifacts /monuments

  • Management of HSE Issues- The control or activity that addresses the issue- The timescale for any actions required- Allocation of responsibility for carrying out actionsProject HSE Management System- Roles and responsibilities - Schedule of regulatory submissions (e.g. EIA) - Schedule of HSE audits- Schedule of Project HSE reviews- Schedule of other HSE activities (see clause 5.2 below)- HSE resources requiredSummary of HSE Plan- Significant HSE issues, aspects, hazards and risks- Assessment of severity, if appropriate- Mitigation or management measures- Monitoring measures, if appropriate- Timescale for implementation- Responsibility - Project HSE Action Plan- Any further actions required- Timescale for completion- Responsibility Guidelines for min. cont. HSE requirements in FPLS