2222 360 AUSTIN WEST LAKE HILLS OAK HILL G PARMER LN 183 183 1 35 PROJECT DESCRIPTION: A new tolled expressway with three lanes in each direction and up to three improved, non- tolled general-purpose lanes in each direction $25 Million worth of bicycle and pedestrian facilities, including 16 miles of bicycle lanes, 10 miles of shared use path, 7 miles of sidewalks, 4 pedestrian bridges, and connections to the regional trail system Landscaping and aesthetic enhancements A traffic monitoring system for improved traffic management and incident response PROJECT FACT SHEET PROJECT STATUS: Phase I (US 290 to Techni Center Drive) opened August 2019 Phase II (Techni Center Drive to SH71) opens early 2021 www.MobilityAuthority.com Keeping You Connected OVERVIEW: The Mobility Authority is upgrading US 183 to an expressway built for tolled and non-tolled travel, as well as bicycle and pedestrian use. The $743 million project will provide a key north-south alternative to I-35 and significant improvements to the corridor. When the project is complete, it will offer drivers a non-stop, signal-free route to get to their destination without delay.

PROJECT FACT SHEET...LAKE HILLS OAK DRIPPING HILL SPRINGS PARMER LN BASTROP 183 183 290 1826 1 35 35 130 TOLL 130 TOLL PROJECT DESCRIPTION: • A new tolled expressway with three lanes

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT FACT SHEET...LAKE HILLS OAK DRIPPING HILL SPRINGS PARMER LN BASTROP 183 183 290 1826 1 35 35 130 TOLL 130 TOLL PROJECT DESCRIPTION: • A new tolled expressway with three lanes

2222

1626

1TOLL

45TOLL

130TOLL

71

71

360

620

MANOR

CREEDMOOR

BUDAKYLE MUSTANG

RIDGE

PFLUGERVILLE

AUSTINWESTLAKEHILLS

OAKHILLDRIPPING

SPRINGS

PARMER LN

BASTROP

183

183

290

1826

1

35

35

130TOLL

130TOLL

PROJECT DESCRIPTION:• A new tolled expressway with three lanes in

each direction and up to three improved, non-tolled general-purpose lanes in each direction

• $25 Million worth of bicycle and pedestrian facilities, including 16 miles of bicycle lanes, 10 miles of shared use path, 7 miles of sidewalks, 4 pedestrian bridges, and connections to the regional trail system

• Landscaping and aesthetic enhancements

• A traffic monitoring system for improved traffic management and incident response

PROJECT FACT SHEET

PROJECT STATUS:• Phase I (US 290 to Techni Center

Drive) opened August 2019

• Phase II (Techni Center Drive to SH71) opens early 2021

www.MobilityAuthority.comKeeping You Connected

OVERVIEW:The Mobility Authority is upgrading US 183 to an expressway built for tolled and non-tolled travel, as well as bicycle and pedestrian use. The $743 million project will provide a key north-south alternative to I-35 and significant improvements to the corridor. When the project is complete, it will offer drivers a non-stop, signal-free route to get to their destination without delay.

Page 2: PROJECT FACT SHEET...LAKE HILLS OAK DRIPPING HILL SPRINGS PARMER LN BASTROP 183 183 290 1826 1 35 35 130 TOLL 130 TOLL PROJECT DESCRIPTION: • A new tolled expressway with three lanes

PAYMENT OPTIONS: Electronic Tags: Customers with an active electronic tag receive a 33 percent discount on their toll rates. The Mobility Authority accepts any of the following electronic tags:

Pay By Mail: If you don’t have a tag, just keep moving and we’ll bill you through the Pay By Mail Program. Pay By Mail customers are billed using a picture of their license plate, and are charged a $1.00 statement fee per bill.

Information on how to pay your Pay By Mail statement can be found at www.PayMobilityBill.com.

Pay in Person: Customers can visit our service center or one of many participating stores to pay in person. Visit www.PayMobilityBill.com/pay-in-person to see your options.

TOLLING: The 183 Toll Road utilizes all electronic, or cashless tolling. This means drivers do not have to stop — or even slow down — to pay their tolls.

By OTA

By NTTA

By KTABy HCTRA

By TxDOT

183South.com @183SOUTH 183South.com/contact

24/7 BILINGUAL HOTLINE: (512) 640-0060 or toll-free (855) 245-4272

www.MobilityAuthority.comKeeping You Connected

CONTACT US:

Toll Tag Toll Tag Toll Tag Toll Tag Toll Tag

$0.65

$1.21

$0.65

$1.21

$1.30

$2.42

$1.30

$2.42

$1.95

$3.63

$1.95

$3.63

$2.60

$4.84

$2.60

$4.84

$3.25

$6.05

$3.25

$6.05

Pay By Mail Pay By Mail Pay By Mail Pay By Mail Pay By Mail

$0.98

$1.82

$0.98

$1.82

$1.95

$3.63

$1.95

$3.63

$2.93

$5.45

$2.93

$5.45

$3.90

$7.26

$3.90

$7.26

$4.88

$9.08

$4.88

$9.08

51st Street SB Exit Ramp

2-AXLE VEHICLES

4-AXLE VEHICLES

3-AXLE VEHICLES

5-AXLE VEHICLES

6-AXLE VEHICLES

MLK Jr. Blvd. SB Mainline

51st Street NB Entry Ramp

51st Street NB Mainline

Sign up for alerts at 183South.com/alerts!