Previous Projects: Project " Egypt " Owner Projects Client Consultant Consultant Fire Protection for Steel Structure, in CARREFOUR HYPER BOX ISMALIA Rowad Modern Engineering Pacer Consultants Fire Protection for GRB Doom , in MANSORA 4 New Alamaien Project Hassan Allam for Contracting & Construction ELGABALY CONSULTANT Fire Protection for Concret Walls, in Mostorod Refinery Project Hassan Allam for Contracting & Construction GS Engineering & Construction Fire Protection for Steel Structure, in Mall of TANTA Fas Construction Raafat Miller Consultanting Fire Protection for Steel Structure, in Mall of Arabia " Phase 3", 6th of October City Fas Construction ECG, Engineering Consultants Group Fire Protection Paints for whole Steel Structure, in ALMAZA CITY CENTER , Cairo Hassan allam Construction Moharam bakhoom consultant Fire Protection Paints for whole Steel Structure, in VINAVIL Factory Project , Suez City. Gama for Construction ECG, Engineering Consultants Group Fire Protection Paints for Steel Structure,ELMASA Conference Center & Theatre Project in New Capital , Cairo . Hassan Allam for Contracting & Construction ECG, Engineering Consultants Group Fire Protection Paints for Steel Structure, in Military Plant 63 Project , Helwan, Cairo . BIC for Contracting & Construction Moharam Bakhoom Consultant Fire Protection Paints for Steel Structure, in NA Conference Center Project , New Cairo . Orascom Construction Industries, OCI Ministry of Defence Fire Protection Paints for whole Steel Structure, in Wadi El Nile Hospital conection bridge Project , Hadayek El Kobba, Cairo . Wadi El Nile for Contracting El Shafie Sharif Office for Engineering Consultancy Fire Protection Paints for whole Steel Structure, in HENKEL Factory Project , Industrial Zone, 6th of October City. Gama for Trading & Contracting Co. SNC - Lavalin Fire Protection Paints for Carrefour, in Mall Of Egypt Project , 6th of October City. Gama for Trading & Contracting Co. Carrefour Egypt Fire Protection Paints for whole Steel Structure, in Unilever Factory Project , Industrial Zone, 6th of October City. Gama for Trading & Contracting Co. EHAF Consulting Engineers Fire Protection Paints for whole Steel Structure, in Police Mosque Project , New Cairo. Fekra Construction Company EL Afify Consultants " Dr. Hakim El Afify" Ritz Carlton Arab Construction Company " A.C.C " EHAF Consulting Engineers Sheraton Cairo Arab Construction Company " A.C.C " EHAF Consulting Engineers Fire Protection Paints for whole Steel Structure, in El Shamaya wharehouses Project " Phase 2 ", 10th of Ramadan, Cairo. El Shayea Company Cairo Consultants Group

Project Egypt Owner Projects Client Consultant · 2019-10-27 · Previous Projects: Project " Egypt " Owner Projects Client Consultant Fire Protection for Steel Structure, in CARREFOUR

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Egypt Owner Projects Client Consultant · 2019-10-27 · Previous Projects: Project " Egypt " Owner Projects Client Consultant Fire Protection for Steel Structure, in CARREFOUR

Previous Projects

Project Egypt Owner Projects Client Consultant Consultant

Fire Protection for Steel Structure in

CARREFOUR HYPER BOX ISMALIA Rowad Modern EngineeringPacer Consultants

Fire Protection for GRB Doom in

MANSORA 4 New Alamaien Project

Hassan Allam for Contracting amp

ConstructionELGABALY CONSULTANT

Fire Protection for Concret Walls in

Mostorod Refinery Project

Hassan Allam for Contracting amp

ConstructionGS Engineering amp Construction

Fire Protection for Steel Structure in

Mall of TANTA Fas Construction Raafat Miller Consultanting

Fire Protection for Steel Structure in

Mall of Arabia Phase 3 6th of

October City

Fas ConstructionECG Engineering Consultants

Group

Fire Protection Paints for whole Steel

Structure in ALMAZA CITY CENTER

Cairo

Hassan allam Construction Moharam bakhoom consultant

Fire Protection Paints for whole Steel

Structure in VINAVIL Factory Project Suez

City Gama for Construction

ECG Engineering Consultants

Group

Fire Protection Paints for Steel

StructureELMASA Conference Center amp

Theatre Project in New Capital Cairo

Hassan Allam for Contracting amp

Construction

ECG Engineering Consultants

Group

Fire Protection Paints for Steel Structure

in Military Plant 63 Project Helwan Cairo

BIC for Contracting amp

ConstructionMoharam Bakhoom Consultant

Fire Protection Paints for Steel Structure

in NA Conference Center Project New

Cairo

Orascom Construction Industries

OCIMinistry of Defence

Fire Protection Paints for whole Steel

Structure in Wadi El Nile Hospital

conection bridge Project Hadayek El

Kobba Cairo

Wadi El Nile for ContractingEl Shafie Sharif Office for

Engineering Consultancy

Fire Protection Paints for whole Steel

Structure in HENKEL Factory Project

Industrial Zone 6th of October City Gama for Trading amp Contracting

CoSNC - Lavalin

Fire Protection Paints for Carrefour in Mall

Of Egypt Project 6th of October City Gama for Trading amp Contracting

CoCarrefour Egypt

Fire Protection Paints for whole Steel

Structure in Unilever Factory Project

Industrial Zone 6th of October City

Gama for Trading amp Contracting

CoEHAF Consulting Engineers

Fire Protection Paints for whole Steel

Structure in Police Mosque Project New

Cairo

Fekra Construction CompanyEL Afify Consultants Dr Hakim El

Afify

Ritz CarltonArab Construction Company

ACC EHAF Consulting Engineers

Sheraton CairoArab Construction Company

ACC EHAF Consulting Engineers

Fire Protection Paints for whole Steel

Structure in El Shamaya wharehouses

Project Phase 2 10th of Ramadan Cairo

El Shayea Company Cairo Consultants Group

Fire Protection for Steel Structure in Mall

of Arabia Phase 2 6th of October City

Egyptian Centers for Real Estate

CompanyECG

Fire Protection Paints for Steel Structure

in El GALAA Hospital Garage Project Nasr

City Cairo

Armed Forces MCG Massoud Consulting Group

Fire Protection Paints for whole Steel

Structure in Gulsan Factory Project

Industrial Zone 6th of October City

HASSAN ALLAM Construction ECG

Fire Protection for the Steel Structure in

New Cargo City new Cairo Airport air

Cairo

Cairo Airport Cargo Company (

CACC )Hamzah amp Associates

Fire Protection Paints for whole Steel

Structure in Police Union Club Project

Jazirah

Unisafe CoEL Afify Consultants Dr Hakim El

Afify

Fire Protection Paints for whole Steel

Structure in AlShayaa wharehouses

Project Phase 1 10th of ramadan Cairo

El Shayea Company Cairo Consultants Group

Fire Protection Paints for whole Steel

Structure in Pegas Factory Project6th of

October City

Gama for Trading amp Contracting

Co

ECG Engineering Consultants

Group

Fire Protection Paints for whole Steel

Structure in KRAFT Factory Project Borg

Elarab Northcoast

Gama for Trading amp ContractingECG Engineering Consultants

Group

Fire Protection Paints for whole Steel

Structure in IKEA Mall Project CFC New

CairoEngineering Metal Construction

EMCON

ECG Engineering Consultants

Group

Fire Protection Paints for whole Steel

Structure and Space Frame in Cairo

Festival City Mall Project New CairoCarillion El-Futtaim amp OCI joint

ventureECG

Fire Protection Paints for whole Steel

Structure for the connection bridge in

Administration Ispection Building Project

Smart Village

HASSAN ALLAM Construction ECG

Fire Protection Paints for whole Steel

Structure in BETY Factory Project Cairo

Alexandria Road Yougurt planet

Gama Construction Company ECG

Fire Protection Paints for whole Steel

Structure in BETY Factory Project Cairo

Alexandria Road Juice planet

Zamil steel - protection

contractingECG

Fire Protection Paints for whole Steel

Structure in BETY Factory Project Cairo

Alexandria Roadstores

zamil steel - Siac contracting HOWEDY CONSULTANT

Fire Protection Paints for Steel Structure amp

Space Frame Tent area in Mall of Arabia

6th of October City

Egyptian Centers for Real Estate

CompanyECG

Fire Protection for the Cinema Complex

Steel Structure in Mall of Arabia Phase 1

6th of October City

Egyptian Centers for Real Estate

CompanyECG

Fire Protection Paints for Bely bees Steel

Structure in Mall of Arabia 6th of October

City

Egyptian Centers for Real Estate

CompanyECG

Fire Protection for Steel Staircase Eastern

Company for TobacoDetac for Contracting

Eastern Tobaco Company

Engineering Department

Fire Protection works in Housing amp

Devlopment Bank New Cairo

Orascom Construction Industries

OCIECG

Fire Protection for the Steel Structure of

Scib Factory 1 Industrial Zone 6th of

October City

Scib Scib Engineering Department

Fire Protection Paints for whole Steel

Structure in Mall of Arabia 6th of October

City

Egyptian Centers for Real Estate

CompanyECG

Fire Protection for the Steel Beams in the

repeated floors of new Cairo Airport air

traffic control tower OCI

Cairo Airport- OCI Dar ElHandasa

Fire Protection for the Steel Structure of

Scib Factory 2 Polaris Ind Zone 6th of

October City

Scib HOWEDY CONSULTANT

Fire Protection Paints for Steel Structure of

the Main Theater in Kafr ElSheikh

University

Kafr ElSheikh UniversityKafr ElSheikh University

Engineering Department

Fire Protection for Steel Structure of

Mobica Factory Ind Zone 6th of October

City

Mobica Mobica Engineering Department

Fire Protection Paints for colums Steel

Structure in OCL wharehouses Project

10th of Ramadan Cairo

One Chain Logistics (OCL) One Chain Logistics (OCL)

Fire Protection Paints for Steel Structure

in Mall ELSAFWA 6th of October City El Safwa Group for Development

Al Amar Consulting Group SAE

(AMG)

Page 2: Project Egypt Owner Projects Client Consultant · 2019-10-27 · Previous Projects: Project " Egypt " Owner Projects Client Consultant Fire Protection for Steel Structure, in CARREFOUR

Fire Protection for Steel Structure in Mall

of Arabia Phase 2 6th of October City

Egyptian Centers for Real Estate

CompanyECG

Fire Protection Paints for Steel Structure

in El GALAA Hospital Garage Project Nasr

City Cairo

Armed Forces MCG Massoud Consulting Group

Fire Protection Paints for whole Steel

Structure in Gulsan Factory Project

Industrial Zone 6th of October City

HASSAN ALLAM Construction ECG

Fire Protection for the Steel Structure in

New Cargo City new Cairo Airport air

Cairo

Cairo Airport Cargo Company (

CACC )Hamzah amp Associates

Fire Protection Paints for whole Steel

Structure in Police Union Club Project

Jazirah

Unisafe CoEL Afify Consultants Dr Hakim El

Afify

Fire Protection Paints for whole Steel

Structure in AlShayaa wharehouses

Project Phase 1 10th of ramadan Cairo

El Shayea Company Cairo Consultants Group

Fire Protection Paints for whole Steel

Structure in Pegas Factory Project6th of

October City

Gama for Trading amp Contracting

Co

ECG Engineering Consultants

Group

Fire Protection Paints for whole Steel

Structure in KRAFT Factory Project Borg

Elarab Northcoast

Gama for Trading amp ContractingECG Engineering Consultants

Group

Fire Protection Paints for whole Steel

Structure in IKEA Mall Project CFC New

CairoEngineering Metal Construction

EMCON

ECG Engineering Consultants

Group

Fire Protection Paints for whole Steel

Structure and Space Frame in Cairo

Festival City Mall Project New CairoCarillion El-Futtaim amp OCI joint

ventureECG

Fire Protection Paints for whole Steel

Structure for the connection bridge in

Administration Ispection Building Project

Smart Village

HASSAN ALLAM Construction ECG

Fire Protection Paints for whole Steel

Structure in BETY Factory Project Cairo

Alexandria Road Yougurt planet

Gama Construction Company ECG

Fire Protection Paints for whole Steel

Structure in BETY Factory Project Cairo

Alexandria Road Juice planet

Zamil steel - protection

contractingECG

Fire Protection Paints for whole Steel

Structure in BETY Factory Project Cairo

Alexandria Roadstores

zamil steel - Siac contracting HOWEDY CONSULTANT

Fire Protection Paints for Steel Structure amp

Space Frame Tent area in Mall of Arabia

6th of October City

Egyptian Centers for Real Estate

CompanyECG

Fire Protection for the Cinema Complex

Steel Structure in Mall of Arabia Phase 1

6th of October City

Egyptian Centers for Real Estate

CompanyECG

Fire Protection Paints for Bely bees Steel

Structure in Mall of Arabia 6th of October

City

Egyptian Centers for Real Estate

CompanyECG

Fire Protection for Steel Staircase Eastern

Company for TobacoDetac for Contracting

Eastern Tobaco Company

Engineering Department

Fire Protection works in Housing amp

Devlopment Bank New Cairo

Orascom Construction Industries

OCIECG

Fire Protection for the Steel Structure of

Scib Factory 1 Industrial Zone 6th of

October City

Scib Scib Engineering Department

Fire Protection Paints for whole Steel

Structure in Mall of Arabia 6th of October

City

Egyptian Centers for Real Estate

CompanyECG

Fire Protection for the Steel Beams in the

repeated floors of new Cairo Airport air

traffic control tower OCI

Cairo Airport- OCI Dar ElHandasa

Fire Protection for the Steel Structure of

Scib Factory 2 Polaris Ind Zone 6th of

October City

Scib HOWEDY CONSULTANT

Fire Protection Paints for Steel Structure of

the Main Theater in Kafr ElSheikh

University

Kafr ElSheikh UniversityKafr ElSheikh University

Engineering Department

Fire Protection for Steel Structure of

Mobica Factory Ind Zone 6th of October

City

Mobica Mobica Engineering Department

Fire Protection Paints for colums Steel

Structure in OCL wharehouses Project

10th of Ramadan Cairo

One Chain Logistics (OCL) One Chain Logistics (OCL)

Fire Protection Paints for Steel Structure

in Mall ELSAFWA 6th of October City El Safwa Group for Development

Al Amar Consulting Group SAE

(AMG)

Page 3: Project Egypt Owner Projects Client Consultant · 2019-10-27 · Previous Projects: Project " Egypt " Owner Projects Client Consultant Fire Protection for Steel Structure, in CARREFOUR

Fire Protection for the Steel Structure of

Scib Factory 2 Polaris Ind Zone 6th of

October City

Scib HOWEDY CONSULTANT

Fire Protection Paints for Steel Structure of

the Main Theater in Kafr ElSheikh

University

Kafr ElSheikh UniversityKafr ElSheikh University

Engineering Department

Fire Protection for Steel Structure of

Mobica Factory Ind Zone 6th of October

City

Mobica Mobica Engineering Department

Fire Protection Paints for colums Steel

Structure in OCL wharehouses Project

10th of Ramadan Cairo

One Chain Logistics (OCL) One Chain Logistics (OCL)

Fire Protection Paints for Steel Structure

in Mall ELSAFWA 6th of October City El Safwa Group for Development

Al Amar Consulting Group SAE