PROJECT: EDUCATION AND TRAINING QUALITY IMPROVEMENT PROJECT –
COUNTRY: NAMIBIA
PROJECT APPRAISAL REPORT - TECHNICAL ANNEXES (VOLUME II)
DATE: August 2017
Appraisal Team Team Leader: Mr. R. Besong, Senior Rural Infrastructure Specialist, RDGS.2
Team Members:
Mr. K. Banda, Social Development Specialist, COMW/RDGS.2
Ms. A. Rutebuka, Social Development Officer, RDGS4
Mr. Maurice Wanyama, Financial Management Specialist RDGS.4
Ms. Linet Miriti, Gender Specialist , RDGS.2
Ms. Pelotshweu Rammidi, Procurement Specialist, RDGS
Mr. Yusef Hatira, Environmental Officer , RDGS.4
Director General: Ms. Josephine Ngure, OIC, RDGS
Sector Director: Ms Oley Lucretia Clara Dibba-Wadda, Director, AHHD,
Sector Manager: Mr. Joseph Coompson, Officer-In-Charge , RDGS.2
Ms. Salamata Ilboudou, Officer-In-Charge, AHHD.1
Peer Reviewers
P. Ekoh, Education Analyst (RDGW.2); H. Chinokoro, Water and Sanitation Specialist
(RDGS.2/COZM); B. Foko, Education Economist (AHHD.1); K. Takei, Education
Economist (AHHD.1). J. Berndt, YP, AHHD; A. Valko-Celestino, Gender Specialist,
RDGS.2; R. Offei-Awuku, Poverty Economist, AHH2.
2
TABLE OF CONTENTS
ANNEX A. NAMIBIA’S DEVELOPMENT AGENDA AND SECTOR BRIEF 3 ANNEX B.1 – LESSONS LEARNED: LIST OF PROJECTS TAKEN INTO ACCOUNT 7 ANNEX B.2 DETAILED PROGRAM DESCRIPTION AND COSTS 8
ANNEX B.3 IMPLEMENTATION ARRANGEMENTS 56 ANNEX B.4 FINANCIAL MANAGEMENT AND DISBURSEMENT ARRANGEMENTS 58 ANNEX B.5 PROCUREMENT ARRANGEMENTS 65 ANNEX B.6 AUDIT ARRANGEMENTS 80 ANNEX B.7 ECONOMIC AND FINANCIAL ANALYSIS 81
ANNEX B.8 ENVIRONMENTAL AND SOCIAL ANALYSIS 86 ANNEX B.9: PROGRAM PREPARATION AND SUPERVISION 92
This document (Volume II of II) should be read together with the Project Appraisal Report
(Volume I of II) which has been presented under a separate cover. In case of contradictions
between the two documents, the Project Appraisal Report (Volume I of II) will prevail.
3
ANNEX A. NAMIBIA’S DEVELOPMENT AGENDA AND SECTOR BRIEF
The poverty level in Namibia, according to the 2016 Namibia Household Income and Expenditure
Survey, is estimated at 26.9 % (568,000 people) and the incidence of poverty is higher among
female-headed households (22%) compared to male-headed households (18%)1 with regional
disparities. Namibia has recorded a reduction in inequality in recent years, partly explained by the
huge investment in the social sectors through the government’s social safety net program for the
elderly, youth, people with disabilities, orphans, and vulnerable groups.
Women’s participation in the labor force is lower than that of men: 54.7 percent compared to 63.7
for men. Gender disparities can be found when comparing subsistence agriculture with wage
employment. It is evident that more females than males are employed as unpaid family workers
whether in subsistence or other activity.2 The Global Entrepreneurship Monitor (GEM)3 Namibia
Report (2012) shows that women are almost as likely as men to be involved in early-stage
entrepreneurship (18% and 19%, respectively). It also shows that whereas 32% of male
entrepreneurs cite necessity as having driven them into business, the figure rises to 43% for
women, suggesting that they see setting up their own business as a survival strategy. More male
entrepreneurs say they have entered business because they identified an opportunity in the market.
Challenges facing women entrepreneurs are4:
- Triple roles of women at the household and family versus employment;
- Inability to work long hours due to commitments to children and family;
- Lack of personal confidence in business matters;
- Operating in a traditionally male dominated industry;
- Less record to access financial institutions;
- Lower levels of income making it impossible to invest ; and
- Problems in developing networks with customers, suppliers and advisors.
The implication of the mismatch between male and female entrepreneurs raises concerns. Namibia
recognises the social and economic potential of encouraging men and women to see themselves as
equally competent in creating and running their own enterprises. The Government of Namibia has
put in place a robust policy framework to address social, economic, and gender disparities
challenges. These include the following:
National Development Plan 5
The Government of Namibia has developed the Fifth National Development Plan as its
overarching development strategy covering the period 2017/2022. The NDP5 outlines a
development strategy that aims to improve the living conditions of every Namibian. The NDP5 is
1 NSA 2012 2 Ibid 3 GEM is the largest single study of entrepreneurial activity in the world with the most geographically and economically diverse sample. It is
largely about measuring entrepreneurial activity within the adult population, entrepreneurial spirit, and attitudes to entrepreneurship. 4 An Evaluation of the Challenges Faced by Women Owned Small To Medium Enterprises and Their Impact On Organisational Performance: A Case Study Of Katter Incubation Centre, Thomas Region, Namibia, Kuwait Chapter of Arabian Journal of Business and Management Review Vol. 5, No.3, November 2015
4
the fifth in a series of national development five-year plans designed to achieve the country’s
Vision 2030. The NDP5 builds on the successes and achievements of the four previous five-year
plans from the Transitional National Development Plan (TNDP) to the Fourth National
Development Plan. It also recognizes the failures and challenges experienced during the
implementation of the previous plans and builds on lessons learnt. The NDP5 has four key goals,
namely; (i) Achieve Inclusive, Sustainable and Equitable Economic Growth; (ii) Build Capable
and Healthy Human Resources; (iii) Ensure Sustainable Environment and Enhance Resilience; and
(iv) Promote Good Governance through Effective Institutions. The NDP5 was developed through
extensive consultations with stakeholders, including community members at the local level,
regional and national representatives, members of civil society at large, the private sector and input
from Namibia’s development partners.
Harambee Prosperity Plan 2016/2020
The Government of Namibia also developed and adopted the Harambe Prosperity Plan
(2016/2020) being a targeted action plan designed to accelerate development in clearly defined
priority areas which lay the basis for attaining prosperity in the country. The plan focuses on four
pillars namely; (i) Effective governance; (ii) Economic advancement; (iii) Social progression; and
(iv) Infrastructure development.
These high level strategic documents recognise that a well-educated and appropriately skilled
population is a pre-condition for Namibia’s transition to an industrialised and knowledge-based
economy as envisioned in Vision 2030. Despite significant investment in basic and vocational
education and training under previous NDPs the training system is unable to meet the nation’s skill
needs which corresponds with a training provision of low quality and a mismatch of supply and
demand. This if not addressed properly, the negative impact will be lower completion rates,
graduates with low employability rates, higher unemployment rates and ultimately a slower pace
of economic growth and development.
New Equitable Economic Empowerment Framework (NEEEF) (2016): Aims to provide a
clear overarching policy framework for Government empowerment policies and private sector
initiatives with the goal of creating wealth among the poor. The Government reiterate the
creation of an equitable and socially just society for previously disadvantaged population,
namely women and people living with disabilities. Special reference would focus on two pillars
are of high relevant to this transaction: Management Control and Employment Equity Pillar
and Corporate Social Responsibility Pillar. The first emphasizes board-based empowerment
should benefiting as many persons as possible, while the latter is to broaden the CSR and that
it should not concentrated on a few locations and or a few activities. Furthermore, it needs to
be ensured that rural and urban poor communities benefit.
National Gender Policy (2010 – 2020): The revised Gender Policy seeks to create an enabling
environment for different sectors to mainstream gender including in the energy sector. It
focuses on 12 areas of concern, which include: (i) Poverty and Rural Development; (ii)
Education and Training; (iii) Reproductive health and HIV/AIDS; (iv) Gender Based Violence;
(v) Trade and Economic Empowerment; (vi) Gender Governance and Decision Making; (vii)
Research, Media, Information and Communication; (viii) Management of the Environment;
5
(ix) Issues of the Girl-child; (x) Gender, Peace Building, Natural Disaster and Conflict
Resolution; (xi) Gender Legal Affairs; and (xii) Human Rights. The clusters are primarily
responsible for ensuring the implementation of the National Gender Plan of Action.
Representation in clusters are established and comprises of gender focal persons,
representatives nominated by various government ministries, private sector, academic
institutions, development partners, NGOs and civil society
Growth at Home: This was developed by the Ministry of Trade, Industry and SME
Development to reinforce the importance of accelerating economic growth, reducing income
inequality and increasing employment. The strategy emphasises industrialization,
manufacturing and value addition. A number of training and technical support were given to
women entrepreneurs to enable them tap into new markets and increase their exports.
Moreover, ten Growth Strategies and associated value chains were developed, focusing on the
following industries: Cosmetics, See Food, Agribusiness, Metal Fabrication, Handicraft,
Leather, Jewellery and Colored Gemstone, Swakara Wool, and Taxidermy. Women constitute
a high proportion in most of these industries.
Basic Education Strategic Plan 2017/2022
In line with NDP5 the Ministry of Education Arts and Culture developed its Strategic Plan (2017-
2022) that envisages that Namibian learners will achieve better results in national examinations
because of the improved motivation, professional knowledge and skills of teachers. This implies
improved continuing professional development, the provision of sufficient textbooks and other
learning resources, including ICT, assistive technology for children with disabilities, and a
conducive learning environment. The Strategic Plan foresees that the education system will play
its part in redressing the imbalances of the past and ensure access of the estimated the estimated
10% of primary school age children who are currently out of school. The rollout of pre-primary
education in the regions will be equitable in the allocation of qualified teachers, teaching and
learning support materials and infrastructure. In order to achieve the strategic aspirations the
Government is implementing reforms in the basic education sub-sector. The core aspects of the
reforms include the following: reintroduction of prevocational/technical subjects in schools;
review of the promotion and language in education policies; strengthen learning support;
strengthen the teaching of Life Skills as subject and make provision for learners with special needs;
replacement of external National Junior Secondary school examinations at the end of grade 10
with semi-external examination at the end of grade 9 and the revision of the basic education
curriculum.
TVET Transformation and Expansion Strategy 2016/2032
The broad policy and strategic directions for the vocational education and training sector are
shaped by a number of key documents: Vision 2030, Education Sector Training Improvement
Programme (ESTIP), National Human Resources Plan (NHRP), Namibia’s Industrial Policy,
Namibia Growth at Home Strategy, Harambee Prosperity Plan (HPP) and the newly developed
fifteen year TVET Transformation and Expansion Strategy. Vision 2030 sets the broad direction
for skills formation in the country with the aim of transforming Namibia into an industrialised
economy. The NDP5, provide more detailed strategies for skills formation, including identification
6
of the key sectors of the economy earmarked for development and the associated need to boost the
provision, quality and access to vocational training. The National Human Resources Plan,
produced by the National Planning Commission (NPC), identifies in broad terms the skills needed
for Namibia to realise the objectives of Vision 2030 and the various NDPs.
Against this background the Namibia Training Authority (NTA), which has delegated authority
from the Ministry of Higher Education, Innovation and Training (MHETI) to regulate the national
VET system, has established and implemented a national TVET policy and a strategic plan that
envisages a shift from a supply to a demand-driven/ private-sector driven TVET system. Namibia's
policies and strategies for TVET reform are consistent with a number of continental and
international policies and commitments including Agenda 2030 for Sustainable Development
Goals SGDs.
7
ANNEX B.1 – LESSONS LEARNED: LIST OF PROJECTS TAKEN INTO
ACCOUNT
Lessons from CSP MTR
In April 2016 the Bank prepared a summary report of the Mid-Term review of
Namibia’s Country Strategy Paper for the period 2014/2018. This MTR report
highlights key lessons for the Bank to Namibia. The following are some of the lessons
and recommendations: (i) Bank business processes continue to be lengthy and rigid –
the Bank should excise speed, flexibility and pragmatism; (ii) Capacity challenges in
Namibia are a key hindrance for project planning, implementation and monitoring.
There is need to package each lending intervention with MIC Grants to build capacity
and fiduciary experts should continue being part of supervision missions; and (iii)
Knowledge of the Bank’s financial products and services remain modest within the
private sector, particularly for SMEs - the Bank should strengthen engagement and
explore innovative products for SMEs.
Lessons on Project Management and Implementation
Strong Monitoring and Evaluation systems should be included in Bank funded
projects to ensure that project implementation and performance is closely monitored
and is consistent with the project logframe outputs and outcomes.
Regular Bank supervision missions have contributed to the successful completion of
project. The success of this project also depends on strong and timely supervision of
the implementing agencies. This supervision should include fiduciary experts on
procurement, disbursements and financial management.
The deployment of adequately trained school managers is crucial to the proper
functioning of the schools. Generally low level of management skills of school head
teachers is a serious impediment to effective use of the educational resources provided
by the project. In those schools where the school managers are resourceful and better
organised, the schools functioned well and the facilities were better looked after.
Government would have to ensure that school management is enhanced and necessary
capacity building for school managers and teachers is provided on a regular basis to
enhance sustainability of the facilities to be constructed or rehabilitated.
Involvement of the community beneficiaries of schools is critical for ensuring
ownership of the facilities. Where there is a high level of commitment, incidences of
vandalism and theft from the schools are less frequent.
Short and long-term maintenance plans for facilities, equipment and furniture and
training of users in handling maintenance issues should be considered in Bank funded
projects to ensure durability and efficiency in their use.
8
ANNEX B.2 DETAILED PROGRAM DESCRIPTION AND COSTS
Background:
Namibia’s education sector can be characterized as a system that receives high financial
allocations averaging around 24% of total government expenditures, excluding statutory
expenditures, hence reflecting the high importance attached to education by the government.
However, the sector is characterised by low quality on account of inadequate teaching and
learning materials and deteriorating learning environment. High internal inefficiencies on
account of high repetition rates, high dropout and failure rates. Inequalities in the distribution
of quality education within districts and between districts. Since 2006 to 2011 the Government
of Namibia has been implementing an education program called “Education and Training
Sector Improvement Program” (ETSIP), Phase 1. In 2011 a review of the ETSIP was
undertaken to critically take stock of areas of good and under performance, so as to be able to
trace an updated way forward for the subsequent implementation phases. The review noted that
the education and training system suffers from various weaknesses despite high allocations
from the Government’s budget: from low overall quality and internal efficiency5 to poor
external efficiency6 of the tertiary level and of the vocational and training system, from
inequalities in the distribution of educational inputs and in learning achievements to the
negative impact of HIV/AIDS across the system.
Basic Education
NDP 5 envisages that learners in basic education will be equipped with the necessary education,
knowledge and skills needed for 21st century. Despite the great progress recorded in the Basic
Education sector, there are still challenges, which include low quality of educational outputs
and outcomes and the efficiency of the system in general.
In 2015, only 45% of Grade 5 students achieved proficiency in English while 63% of Grade 5
students achieved proficiency in Mathematics. Grade 7 students fared even worse with just
48% and 41% achieving proficiency in English and Mathematics respectively. More than one-
third of all students drop out by Grade 10. In the most remote, rural areas, drop-out rates are an
extreme concern. More than 20% of teachers have no teaching qualifications. The low
performance of students on end-of-year tests suggests that teaching is not having the intended
impact on student learning. The transition from secondary to higher education is very low
currently estimated at 19% of the grade 12 cohorts.
The strategies of NDP 5 to improve the Basic Education Sector are to: develop and maintain
education infrastructure; develop a strong framework to enhance core skills of literacy and
numeracy; develop comprehensive planning and administration systems and improve learners’
transition to higher education.
Namibia has made great strides in increasing access to basic education with access to education
estimated at above 95%. Notwithstanding this progress, the quality of teaching and the
performance of learners is still unsatisfactory, especially in urban and rural poverty areas with
many learners in primary school not achieving the desired levels of literacy and numeracy.
The following are core problems in the basic education sector:
5 Regular flow of students through the system 6 Relates to the acceptance by the labor market of the graduates of the tertiary and VET systems
9
2015 Standardised Achievement Tests for Grade 5 has shown that only 45% of learners
acquired sufficient competencies in English and 63% in Mathematics while in grade 7
performance is estimated at 48% in English, and 41% in Mathematics.
More than 10% of learners drop-out in grade 8 while more than one third (35%) drop-
out in grade 10. Drop-out is estimated at just below 5% for grade one.
In the most remote areas, only 49% of the learners in grade 1 reaches grade 5, and just
17% reaches grade 10, and only 1% reaches grade 12. Of the 86 226 learners, who
started Grade 1 in 1992 by 2003 only 12 636 reached grade 12 while of the 66 736 who
started Grade 1 in 2001 only 19 082 reached Grade 12 in 2012 indicating that the quality
of education need to be addressed.
Repetition rate is highest for Grade 5 (20%), Grade 8 (30%) and Grade 9 (22%). The
quality of education is affected by poverty, illness in the household, children being sent
to another household, extended family taking more children into the household;
maternal death and negative socio cultural practices such as gender based violence,
social crimes, fragmented family structures which hinders peace and stability within
homes and school environments.
Teachers’ skills and knowledge play an important role in teaching and learning. Out of
27 948 teachers, 21.5% of teachers do not have teaching qualifications. Most of
teachers who have no teaching qualifications teach in early grades (including pre-
primary education) of primary education.
Enrolment rates at tertiary education are low. In 2015 only 19% of grade 12 learners
who sat for examinations qualified for tertiary admission while completion rate stands
at 50%.
The educational infrastructure continues to affect the quality of teaching and learning
with many schools and hostels which have not been renovated since Independence and
the existence of classrooms made from temporary or traditional materials, representing
about 13% of the classrooms and affecting the quality of teaching and learning of close
to more than 100,000 learners.
Many schools do not have school libraries and school librarians, a situation affecting
equity of opportunity for learning and for developing the abilities needed to participate
in the knowledge society
It is against this background that this project aim at addressing systems inefficiencies by taking
into consideration the above issues in the creating of a conducive environment for teaching and
learning towards inclusive, equitable, quality education.
Ministry of Education, Arts and Culture Strategic Plan (2017-2022)
Strategic Plan envisages that Namibian learners will achieve much better results in national
examinations because of the improved motivation, professional knowledge and skills of
teachers. That implies improved continuing professional development, the provision of
sufficient textbooks and other learning resources, including ICT, assistive technology for
children with disabilities, and a conducive learning environment. The Strategic Plan foresees
that the education system will play its part in redressing the imbalances of the past and ensure
access of the estimated 10% of primary school age children who are currently out of school.
10
4. Curriculum Reform
As per the Cabinet Directives, based on the Education Conference of 2011, the Ministry of
Education embarked on the reform of the curriculum for basic education. The core aspects of
the curriculum reform include the following: reintroduction of prevocational/technical subjects
in schools; review of the promotion and language in education policies; strengthen learning
support; strengthen the teaching of Life Skills as subject and make provision for learners with
special needs; replacement of external National Junior Secondary school examinations at the
end of grade 10 with semi-external examination at the end of grade 9 and the revision of the
curriculum (pre-primary to grade 12).
5. The School Infrastructure Improvement
The Ministry has prioritized infrastructure improvement as per in NDP5 and its strategic plan
to address and seek strategically to meet the infrastructure needs at the twelve selected schools.
However, infrastructure improvement is only one section of focus in effort to improve the
quality of education in Namibia, it is important to look at the holistic picture of the education
system in relation to the expected outcome for quality education. It is therefore critical that
performance outcomes be measured in the twelve schools to gauge the school improvement in
the overall quality of education. In order to improve the quality of the learning outcomes at
the twelve selected schools, the following education inputs are regarded as key aspects in
improving the quality of teaching and learning: science labs and equipment, textbooks, and in-
service training of school principals and teachers. The improvement in the learning outcomes
will be monitored through the performance of learners in Standardized Achievement Tests
(SATS) in Science, Mathematics and English, and the Namibia Senior Secondary Certificate
Ordinary (NSSCO) in Physical Science, Mathematics and English.
The renovation of the 12 selected schools will mean attraction of enrolment in these schools due to opening up of many infrastructure that are currently not in use because they have been
labeled as not suitable. Opening up such space will cater for the increase of learners who will enter senior secondary phase in 2019, due to the revised curriculum. Currently, the new
entrance to senior secondary is at 54%, this percentage is expected to increase to 70% from
2019. The Ministry will ensure that these schools contribute maximally to school enrolment.
Learner Performance in Standardized Achievement Tests (SATS) and Namibia Senior
Secondary Certificate Ordinary (NSSCO)
SATS results of the two selected combined schools
Figure 1 below shows the SATS results for Ernst Meyer and Omuhonga combined schools.
School Name Subject by Grade Year Performance by
Levels (%)
Year Performance by Levels
(%)
Subject Grade National School National School
ERNST
MEYER C.S
English 2nd Lang.
5 2014 44 57 2015 54 75
Mathematics 2014 47 65 2015 63 87
English 2nd Lang.
7
2014 49 70 2015 41 59
Mathematics 2014 48 64 2015 48 65
Natural
Science
2014 58 80 2015 59 73
11
OMUHONGA C.S
English 2nd
Lang.
5 2014 44 57 2015 54 72
Mathematics 2014 47 60 2015 63 71
English 2nd
Lang.
7
2014 No
Results
No
Results
2015 No Results No Results
Mathematics 2014 No Results No Results
2015 No Results No Results
Natural
Science
2014 No Results No
Results
2015 No Results No Results
Figure 1: 2015 SATS Results for Ernst Meyer and Omuhonga Combined Schools
Figure 1 shows that Ernest Meyer combined school wrote the SATS for both grades 5 and 7 in
2015, while Omuhonga combined school wrote the SATS for grade 5 only in 2015. Figure 1
also indicates that both schools have improved theirgrade 5 SATS in both English and
Mathematics in 2015; compare to 2014. It is further indicated that grade 7 SATS in 2015 for
Ernest Meyer combined school declined in all the three subjects (Mathematics, English and
Science).
The Namibia Senior Secondary Certificate Ordinary (NSSCO) results of the ten senior
secondary schools selected
Figure 2 below shows percentage of learners (boys and girls) who obtained D symbol and
above in a specific NSSCO subject in 2015 and 2016 national examinations
School Gender Subject
English as a
Second Language
Mathematics Physical Science
2015 2016 2015 2016 2015 2016 Dr. Lemmer HS Boys 95.8% 88.0% 39.2% 36.8% 48.0% 40.7%
Girls 94.7% 79.1% 38.1% 36.2% 60.6% 41.4%
Augustineum SSS Boys 31.0% 18.9% 34.2% 18.9% 50.0% 55.6%
Girls 28.6% 34.6% 19.6% 28.9% 41.4% 46.2%
Epako HS Boys 29.0% 30.6% 29.0% 42.9% 40.0% 40.0%
Girls 54.2% 47.3% 20.8% 25.5% 50.0% 55.0%
Ashipala SS Boys 8.6% 3.1% 69.1% 44.8% 45.7% 34.1%
Girls 5.8% 6.3% 38.8% 51.6% 15.5% 25.7%
Andimba Toivo ya Toivo
SSS
Boys 13.8% 10.3% 33.8% 39.9% 50.0% 34.7%
Girls 18.0% 17.5% 31.1% 38.4% 42.9% 37.9%
Ongha SSS Boys 14.9% 18.8% 72.6% 83.3% 66.9% 83.8%
Girls 26.2% 32.4% 58.5% 73.0% 45.9% 83.5%
Nehale SSS Boys 13.0% 3.8% 56.9% 35.1% 61.3% 51.4
Girls 17.3% 21.6% 64.0% 58.0% 70.4% 65.6%
Himarwa Iithete SSS Boys 10.0% 10.5% 50.0% 44.7% 58.3% 65.0%
Girls 8.7% 20.8% 26.1% 41.7% 42.9% 60.0%
Linus Shashipapo SSS Boys 6.6% 3.7% 25.0% 41.5% 57.7% 70.8%
Girls 4.1% 9.3% 18.4% 24.1% 58.3% 46.7%
Caprivi SS Boys 39.9% 52.7% 52.2% 40.2% 60.0% 49.5%
Girls 56.8% 53.9% 45.1% 28.1% 38.2% 17.9%
Figure 2: NSSCO results of the ten senior secondary schools
It is clear from figure 2 that only two schools (Dr Lemmer High School and Caprivi Senior
Secondary School) where 50% and above learners obtained a D symbol and above in English
second language. The data shows that an average 56% of learners (in all ten schools) obtained
D symbol and above in English second language, while an average percentages of learners who
12
obtained D symbol and above in Mathematics and Physical Science are quite high (83.4 % in
Mathematics and 100% in Physical Science).
The data does not show a conclusive argument that boys have outperformed girls or vice
versa in a specific NSSCO subject.
School Performance in SATS and NSSCO Assessments
The project envisages that the SATS school performance will be improved from their current baseline in the next three years.
The project also envisages that NSSCO school performance will be improved from their current
performance especially in English second language and Mathematics in the next three years.
Schools are performing well in Physical Science. However, this has to be monitored to avoid declining in performance.
Physical Infrastructure improvement
The hostels and classrooms of the selected schools will be renovated and or extended in order
to be conducive environment for quality teaching and learning.
Provision of Science Labs and Equipment
In order to improve the learners’ performance in science subjects, the existing science labs at the ten secondary schools should be renovated to meet the standards as prescribed in the science
syllabuses in the revised curriculum.
Provision of textbooks
Textbooks remain the most cost effective of all education inputs on learner achievement. The
ministry will have to inject funds in addition to infrastructure development to improve the provision of teaching and learning materials.
In-service training of school principals and teachers
A programme for the training of teachers and schools principals will be developed aimed at
improving school leadership and management, and curriculum management and implementation in schools.
Gender Aspects
Deliberate efforts and measures will have to put in place to reduce teenage pregnancies in
many of these schools. Equally measures will be made to improve the enrolment of girls into
subject such as mathematics and Sciences where these are taught. There shall be deliberate
effort to ensure gender parity in the admission of learners at the twelve schools
6. National Archives & National Library Building Rehabilitation
The two institutions are housed in one building and are responsible to preserve and provide
access to national historic documents.
The National Archives is the only National institution offering permanent storage to the
Namibian Government Official Records which are irreplaceable (in the case of a disaster) as
13
they date back to the 1800s, and these are the only copies of Namibian history available of that
era. The Archives is the custodian of the Memory and Documentary Heritage of Namibia and
hosts records from all State Owned Enterprises (SOEs), Local Government, Magistrate Courts,
the High Court and all other Private Records that are of national value. The National Archives
of Namibia is mandated by an Act of Parliament (Act 12 of 1992) to ensure proper records
management in Government, parastatals and State Owned Enterprises (SOEs) and to preserve
Namibia’s documentary heritage and facilitate its use in research and education.
National Library of Namibia- is the only the Namibia research Library mandated by the
Information Service Act 4 of 2000 to serve as the national center for the conservation of
material emanating from Namibia or relating to Namibia; and the preservation of literary
manuscripts. It supports education and research through access to national and international
information resources, and collects and preserves the nation’s published intellectual heritage
through legal deposit and book purchases. It also renders bibliographic services and serves as
the national bibliographic agency e.g. facilitating the allocation of International Standard Serial
Number (ISSN) and International Serial Book Numbers (ISBN) to individuals and
publishers/producers.
The National Library of Namibia is also a designated depository library of the United Nations
documents and publications to users around the country. It has been a member of a network of
depository libraries around the world since 1991. The UN collection plays an important role in
promoting awareness and increasing knowledge of UN information among researchers,
governments and the general public. The National Library was designated a depository library
due to the following conditions:
The material received will be in the care of qualified professional staff;
Keep the material received in good conditions;
Make the material received accessible to the general public, free of charge, at
reasonable hours; and
Make the material received available through interlibrary loan, document delivery,
photocopying or other means to users who cannot easily visit the depositories concerned.
The UN collection enables the National Library of Namibia to provide expert reference and
research assistance and it facilitates the discovery of UN information via traditional and
electronic research tools.
The National Library and Archives building was completed in 1999 and was officially
inaugurated in April 2000 making the building almost 18 years old.
The National Library of Namibia has the largest collection of Namibian publications, including
a valuable collection of Namibian newspapers and journals dating back to the early 1900s. The
library also preserves the laws of the country from the same period till present amongst other
valuable, rare and historical materials related to Namibia.
The two institutions serves ± 35 000 users and researchers per year and the building has a staff
complement of sixty one (61) employees (including staff members from other two
subdivisions, Education Library Service and Community Library Service). This building
carries with it the soul of the nation’s historical and archival heritage and all these collections
are now at a risk of destruction or loss either through flooding, extreme temperatures, or even
fire due to the current physical conditions the building find itself in.
Rehabilitation:
The condition of the building has deteriorated substantially over the years to the extent that
historical records are in danger. This may result in dire consequences as the continuous
occupancy of this building is already a risk to users, staff and the resources being kept there.
14
Staff members are enduring a very hot working environment with no air circulation nor
ventilation as the air-conditioning system ceased working long ago. The water pipes are in such
a bad state that water leaks are a frequent occurrence. The building already has experienced
near disaster situations when sections of the building were flooded during a weekend due to a
leaking water pipe and staff members and contractors had to work overtime to save the
situation.
To compound the situation is the fact that the main part of the building was constructed with
no windows which can be opened. With the air-conditioning plant not working the Library and
Archives building is extremely hot and humid, and this has created an unbearable working
condition for the staff and users of the building. In addition, most of the rare and unique
collections housed in the building are deteriorating at a faster rate due to the hot and humid
conditions the resources are being kept under and there is a real danger of losing these materials
for the future generations if this situation is not addressed as a matter of emergency. This
development goes against the principles of archiving and preserving Namibia’s historical
heritage as stated in the principles of archiving a nation’s historical heritage and culture as
enunciated by the UNESCO guidelines on historical preservation of a nation’s heritage in
whatever format.
The Ministry commissioned a feasibility study ‘Upgrading of the National Archives and
National Library Building’ in 2011 to Hugo Scheepers Architects who recommended that the
building needed urgent renovations to avoid a national disaster which can be caused either by
faulty pipes or electrical wires and the situation gets worse with every rainy season. In most
cases the two institutions have to close its doors to the members of the public whilst waiting
for ad hoc repairs and piece jobs which in the long run proved to be more costly without wholly
addressing the issues.
The study recommended that, there is a need to replace all galvanised water pipes throughout
the building with polyethylene pipes as the galvanised pipes in the building were highly
corroded thereby placing the valuable and irreplaceable material stored in the building at risk
of flooding and destruction. Furthermore due to these corroded water pipes the water is unsafe
to drink for both staff and users alike.
The study also recommended that the Local Area Network (LAN) be rewired with new cables
and new switch equipment be installed to be able to cope with the bandwidth demands of digital
collections, which not only make the material more universally available but also protects
delicate original materials from further destruction.
The feasibility study also noted that the Uninterruptible power supply (UPS) was no longer
functional as the batteries had long reached the end of their life cycle. The spare parts were no
longer available for the UPS system that was installed, and thus a new UPS system was
required. With both institutions housed in the same building, any disaster that befalls the
building would wipe a very crucial and extensive chunk of the Namibian cultural and literary
heritage, which is irreplaceable, and this is something that should be avoided at all costs.
Expected Outcome and Impact & Assurance that the Facility will be Functional and
Sustainable
Once the National Library/ National Archives building is renovated, the following will be
expected:
1. Immediate public access to records resulting in increased number of users and
researchers, both local and international who make extensive use of the resources of both
institutions.
2. Promotion of efficient, accountable and transparent government through proper
management and care of government records.
15
3. Ensure preservation of national heritage information for future generations.
4. The National Library/ National Archives building has two conference rooms,
Amphitheatre and coffee shop, after the renovation, those facilities will be rent out to
generate funds for the sustenance of the building. Currently, this is not possible due to
extreme temperatures.
5. The National Library has got a computer lab which is used for training for staff members
and other Ministerial employees for a fee and is also an ICDL training Centre that
provides a crucial service in promoting ICTs to the public.
6. The National Library and Archives Building serves as a cultural place where book related
events such as book launches and other exhibitions are held regularly for the benefit of
users and visitors. All these can generate income to ensure sustenance of the building.
Technical Vocational education and training (TVET).
A 2016 study by UNESCO observes that Namibia’s TVET system is fragmented between
different types of providers and does not constitute a comprehensive and consistent network.
The system has poor linkages with basic education, with higher education and between its own
components. Key issues arise regarding quantity, quality and relevance, which explain why the
TVET system produces very small numbers of adequately skilled workers, reinforcing the dual
nature of Namibia’s labour market. In particular the system lacks capacity to enroll sufficient
numbers of trainees, given the large youth population of the country, and largely excludes
young people who did not complete basic education. Enrolment at TVET level is low and is
not consistent with the demography of the country. It is estimated that in 2014/15 enrolment
was at 7,877 students a year of which about 6,631 were enrolled in public institutions. An
estimated 4,509 students graduated during the same year.
Most of trainees lack foundation skills and face precarious living conditions, which hampers
their ability to learn. Initial qualifications and training of trainers appear inadequate. The
equipment of training centres is sometimes deficient and outdated. TVET does not guarantee a
smooth transition to employment or to entrepreneurship. Trainees face challenges finding job
placements, while formal firms complain that VET does not respond to their demand for skills.
Support for young entrepreneurs remains limited. The report makes mention of two reforms
that will need to be harmonized. Existing governance and financing arrangements, involving
MHETI, the Namibia Training Authority (NTA), the Namibia Qualifications Authority (NQA),
the National Training Fund (NTF) and the National Student Financial Assistance Fund
(NSFAF) are complex, with five key features: non-separation of key functions, duplication and
overlaps of mandates, difference between an institution’s legal mandate and actual
responsibilities, lack of capacities and actions regarding the evaluation of impact of TVET, and
lack of autonomy of TVET institutions. The involvement of the private sector in the TVET
system appears insufficient, in terms of governance, contribution to curriculum development
and contribution to delivery.
Description of the Project
2.1.1 The Project aims at contributing to the development of an efficient, effective
and sustainable TVET system in Namibia that is aligned with the current and future skills
needs of the labour market in the country. The Project will specifically contribute to
increasing access, attaining equity and improving the quality of TVET and general education
in Namibia.
16
2.1.2 The Project has the following 3 components: i) Education and TVET Infrastructure
Improvement; ii) Education and TVET System Strengthening; and iii) Project Management
Table 2.1 Project Components
N° Component
name
Cost (ZAR
million) Component description*
1 Education and
TVET
Infrastructure
Development
1,239.53 Subcomponent 1.1: Education Infrastructure Improvement:
Activities under this subcomponent include the rehabilitation
and extension of hostels, classrooms, technical workshops
and science laboratories in 11 secondary schools; 2 primary
schools and the National Library and Archives in 10 regions
of Namibia. The subcomponent equally includes the
equipping of the rehabilitated infrastructure as well as the
supply of laboratory equipment for science labs. The
equipment of workshops for pre-vocational and technical
subjects will equally be carried out under this subcomponent.
Subcomponent 1.2: TVET Infrastructure Development
This subcomponent includes the upgrade, expansion and
construction of Vocational Training Centres (VTCs) as part
of the Namibia TVET Transformation and Expansion
Strategy. Specifically this sub-component will entail
rehabilitation of existing facilities and construction of new
additional facilities including workshops, laboratories and
student hostels at four training institutions namely: Zambezi,
Keetmanshoop, and Hardap vocational training centres as
well as support to the University of Namibia’s School of
Veterinary Medicine with the construction of student hostels.
The project will also procure teaching and learning
equipment for the rehabilitated and newly constructed
facilities under this subcomponent.
2 Education and
TVET System
Strengthening
52.00 Subcomponent 2.1: Basic Education System Improvement.
This subcomponent includes the following activities:
o Syllabus review and development processes for 4
levels;
o Development, evaluation and procurement of
learning and teaching support materials (textbooks) for 4
levels;
o In-service training of 1000 school principals and
teachers on new curricula and syllabuses;
Subcomponent 2.2: TVET System Improvement: The objective of this subcomponent is to establish an
efficient, effective and sustainable TVET system aligned
with the skills needs of the labour market in all fourteen (14)
regions of Namibia. Activities will include the following: (a)
TVET curriculum review and standardization in the fields of
science, technology, engineering and information systems;
(b) Training of 1,500 TVET teachers and instructors; (c)
Development of a Funding Framework for the TVET sector
aimed at mobilising resources and promoting equity at both
public and private TVET institutions with a particular focus
on economically disadvantaged youth. (d) Development and
institutionalisation of a performance monitoring and
17
N° Component
name
Cost (ZAR
million) Component description*
evaluation system for the TVET sector; (e) Creating
partnerships between industry and training providers for in-
service training, including the implementation of a
coordinated approach to life-long learning.
3 Project
Management
8.48 The activities to be carried out under this component include
the monitoring of the implementation of the project by the
project management team and evaluation thereof; the conduct
of the procurement and financial management aspects of the
project and the quarterly and annual reporting of the project
implementation progress. The logistics for the field
monitoring of activities shall be procured under this
component.
18
Table B2.4: Summary of Program Costs by Component
Item N°
Description Units Q'ty Unit Cost Total Base
Cost Source of Financing
Component 1: Education and TVET Infrastructure Development
ZAR ZAR
Subcomponent 1.1:
Education Infrastructure
Improvement
1
Rahabilitation/Extension of Education Facilities in North Zone1 ( Ongha SS, Nehale SS, Linus Shashipapo SSS, Himarwa Lithete SS and Caprivi SSS)
u 1 211,816,995.40 211,816,995 ADB
2
Rahabilitation/Extension of Education Facilities in North Zone2 (Omuhonga PS, Ashipala SS and Andimba Toivo Ya Tivo)
u 1 226,124,365.40 226,124,365 ADB
3
Rahabilitation/Extension of Education Facilities in Central Zone (Erenst Meyer PS, EpukiroPost 3 JSS, Augustineum SS and National Library & Archives)
u 1 151,183,639.26 151,183,639 ADB
4 Equipment of Education Facilities (GRN contribution)
1 65,000,000.00 65,000,000 GRN
1 Subcomponent 1.2: TVET
Infrastructure
Development
5
Construction of TVET Facilities Lot 1: Zambezi Vocational Training Centre (Zambezi Region)
u 1 49,800,000.00 49,800,000 ADB
6
Contruction of TVET Facilities Lot 2: Keetmanshoop Vocational Training Centre (//Kharas Region) and Hardap Vocational Training Centre ( Hardap Region)
u 1 116,200,000.00 116,200,000 ADB
7
Rehabilitation/Extension of UNAM School of Veterinary Medicine (Lot 3)
u 1 50,000,000.00 50,000,000 ADB
19
Item N°
Description Units Q'ty Unit Cost Total Base
Cost Source of Financing
8
Land for Contruction/Extension of TVET Facilities (Gov't Contribution)
u 1 75,000,000.00 75,000,000 GRN
9 Supervision Consulting Firms - TVET and Basic Education Works
u 1 137,500,000.00 137,500,000 ADB
10 Equipment of TVET Facilities (GRN contribution)
LS 1 35,000,000.00 35,000,000 GRN
Base Cost - Component 1 1,117,625,000 -
Component 2: Education and TVET System Strengthening
Subcomponent 2.1:
Education System
Improvement
11
Syllabus review and
development processes;
Development, evaluation
and procurement of
learning and teaching
support materials
(textbooks); In-service
training of school
principals and teachers
(GRZ Contribution)
LS 1 35,000,000.00 35,000,000 GRN
Subcomponent 2.2: TVET
System Improvement
12
TVET curriculum review,
harmonisation and
strengthening in the fields
of science, technology,
engineering and
information systems.
Trainer skilling and up-
skilling (GRN
Contribution).
u 1 15,000,000.00 15,000,000 GRN
20
Item N°
Description Units Q'ty Unit Cost Total Base
Cost Source of Financing
13
Gender Activities in
Education and TVET: (i) a
community engagement
initiative to address
teenage pregnancy, and (ii)
Promoting girls’
participation in Science,
Technology and Math.
(MoU with FAWENA)
u 1 2,000,000.00 2,000,000 ADB
Base Cost - Component 2
52,000,000 -
Component 3 – Project Management
14 Individual Consultants -
Procurement Officer and
Project Accountant
month 48 52,083 2,500,000 ADB
15 1 Vehicle for Works
Supervision by PIU u 1 650,000 650,000 ADB
16
Monitoring of Works by
PIU (fuel, allowances,
communication, vehicle
maintenance, insurance
etc.)
u 1 500,000 500,000 ADB
17 Publication of Adverts,
Office Equipment and
Supplies
u 1 200,000 200,000 ADB
18
Preparation of Project
Manuals (Implementation
& Accounting) - Individual
Consultant
LS
1
130,000 130,000 ADB
19 Project Launching U 1 260,000 260,000 ADB
20 Environmentalist (ESMP
Implementation) yr 1 260,000 260,000 ADB
21 Financial Auditing of
Project - Consulting Firm u 1 550,000 550,000 ADB
22 Procurement Auditing of
Project - Consulting Firm u 1 195,000 195,000 ADB
23 Project Completion Report
Mission - Individual
Consultant
u
1
130,000 130,000 ADB
Base Cost - Component 3 5,375,000 -
Total Base Cost 1,175,000,000 -
Physical Contingency 75,000,000 GRN
21
Item N°
Description Units Q'ty Unit Cost Total Base
Cost Source of Financing
Price Contingency 50,000,000.00 ADB
TOTAL 1,300,000,000
22
Table B2.5: Estimated Costs for Rehabilitation of Schools from Bills of Quantities (NAD)
No. School Name Region Estimated Costs from Bills
of Quantities (NAD)
1 Linus Shashipapo SSS Kavango East 91,000,000.00
2 Himarwa Lithete SS Kavango West 33,454,004.50
3 Erenst Meyer PS Omaheke 59,415,142.50
4 EpukiroPost 3 JSS Omaheke 64,954,260.00
5 Ashipala SS Omusati 19,770,517.90
6 Andimba Toivo Ya Tivo Oshana 140,000,000.00
7 National Library & Archives Head Office 18,505,377.80
8 Caprivi SSS Zambezi 68,052,121.90
9 Omuhonga PS Kunene 76,353,847.50
10 Dr. Lemmer HS Hardap -
11 Concordia HS Khomas -
12 Augustineum SS Khomas 28,308,858.96
Ella du Plessis HS Khomas -
13 Nehale SS Oshikoto 14,000,000.00
14 Ongha SS Ohangwena 15,000,000.00
Cost of Works (sub-total) 628,814,131.06
23
Table B2.6: Indicative List of Equipment to be provided in Laboratories and Workshops
Science Lab Equipment
Item
N
Description of Goods Quantity
1 Aluminium Foil 1 packet
2 Alloys - solder, brass, bronze, steel, duralium, nichrome
wire
125 g
3 Ammeter 5
4 Ball and Ring Apparatus 5
5 Bar Magnets 20
6 Bathroom Scale - Digital 1
7 Batteries 20
8 Battery Holders 10
9 Beehive Shelf 5
10 Bell Jar 5
11 Benedict's Solution 500ml
12 Bicarbonate Indicator 500ml
13 Bimetallic Strip 2
14 Biuret Solution A 250ml
15 Biuret Solution B 250ml
16 Bleaching Powder (Liquid) 500ml
17 Bromine Water 500ml
18 Bulbs - Low Current Bulbs 20
19 Bulbs - With Inert Gases 5
20 Bulb Holders 15
21 Bunsen Burner 10
22 Burette 5
23 Burette Holder 5
24 Carbon Powder, Charcoal, Graphite 250g Each
25 Cathode Ray Oscilliscope 1
26 Charts - TB, HIV & Aids, Cholera, Periodict Table,
Respiratory System, Human Teeth, Reproductive
System, Nervous System, Lever, Kidney
1 Each
27 Circuit Board 10
28 Clips - Crocodile 10
29 Cloud Chamber 2
30 Cloud Chamber Light 2
31 Compasses - Magnetic & Plotting 10 Each
32 Compounds - HCL, H2SO4, HNO3, H202 1 litre Each
33 Compounds - NaCl, CaO, NaOH, Ca(OH)2, MgCl,
Manganese (IV) Oxide, Potassium Permanganate,
Copper (II) Sulphate
500g Each
34 Concave Lens 10
35 Conical Flask - 100ml, 250ml 10 Each
36 Connecting Wires - Black, Red 10 Each
37 Convex Lens 10
38 Cover Slips (Box of 100) 2 Boxes
39 Crucible Tongs 5
24
40 Crucible With Lid 5
41 Delivery tubes 5
42 Dessicator 2
43 Droppers 5
44 Dropping Pipette 5
45 Electric Bell 5
46 Electic Motor 2
47 Electrodes - Carbon, Copper, Platinum 5 Each
48 Electromagnetic Kit 1
49 Electronic Balance 1
50 Energy Conversion Kit 1
51 Eureka Can 10
52 Evaporating Dish - Porcelain 10
53 Filter Paper 5 boxes
54 Fire Extinguisher 2
55 First-Aid-Kit 1
56 Flat Bottom Flask 10
57 Forceps 2
58 Fractionating Column 1
59 Funnels, plastics - 100ml, 75ml 5 Each Size
60 Fuse - 1A, 10A 10 Each
61 Galvonometer 5
62 Gas Jars 10
63 Glass Beakers - 100ml, 250ml, 500ml, 1 000ml 9 Each
10 Size
64 Glucose 500g
65 G-M Tube 2
66 Gold Leaf Electroscope 5
67 Hand Lens 20
68 Horse Shoe Magnet 10
69 Hydrometer 5
70 Ice tongs 5
71 Ingenhous Tank 1
72 Iodine Solution 500ml
73 Iron Fillings 5 boxes
77 Liebeg Condenser 2
78 Light Microscope 5
79 Litmus Paper - Red, Blue 2 Boxes Each
80 Manometer 2
81 Mass Hanger 1 000g 10
82 Measuring Cylinder - 100ml, 250ml, 500ml, 1 000ml 10 Each Size
83 Metal Containers 2
84 Metals - Na, Li, Mg, Ca, Al, Cu, Pb, K, Fe, Zn 100g Each
85 Meter Rulers 10
86 Methylated Spirit, Ethanol 100ml Each
87 Micrometer Screw Guage 10
88 Milton's Reagent 500ml
25
89 Models - Human Ear, Skeleton, Brain, Skin, Heart,
Kidney, Lungs, Leaf
1 Each
90 Naphthalene 500g
91 Pair of Scissors 10
92 Pendulum bobs - Small, Big 10 Each
93 Pestle and Mortar 2
94 Petri Dish 20
95 pH Paper 1 Box
96 Pin Hole Camera Kit 2
97 Pipette - 5ml, 10ml, 25ml 5 Each
98 Pipette Filler 3
99 Plane Mirror 10
100 Potometer and Stand 1
101 Power Supply - a.c., d.c. 2 Each
102 Prepared Slides - Bacteria, Viruses, Fungi 10 Each
103 Prepared Slides of Specilized Cells - Sex, Nerve, Muscle,
Root Hairs, Xylem, Phloem
10 Each
104 Pulleys - Single, Double, Triple 5 Each
105 Radioactive Substances - Uranium, Radium, Cobalt,
Americium
1 Each
106 Ray Box 2
107 Rectangular Glass Block 10
108 Resistance Unit - 1 Ohm, 2 Ohms, 10 Ohms, 50 Ohms 2 Each
109 Retort Stand and Clamps 10 Each
110 Rheostat Sliding 5
111 Ripple Tank 1
112 Rods - Iron, Polythene, Steel, Glass, Cellulose Acetate,
Perspex
5 Each
113 Round Bottom Flasks 10
114 Rubber Bands 2 Boxes
115 Rubber Stoppers - Solid, 1 Hole, 2 Holes 1 Box Each
116 Safety Goggles 10
117 Scapel 10
118 Separating Funnel 5
119 Simple Barometer, Mercury Barometer 5 Each
120 Slinky Springs - Plastic and Metal 10 Each
121 Solar Paddle 3
122 Solenoid - Small and Big 5 Each
123 Spark Counter 2
124 Spatulas 5
125 Stains - Methylblue, Eosin 500ml Each
126 Starch Powder 500g
127 Steel Pins, Iron Nails 1 Box Each
128 Stethoscope 1
129 Stirring Rods 1 Box
130 Stop Watch 10
131 String 1 Roll
132 Sulphur Powder 250g
26
133 Syringes, Plastic - 2.5ml, 5 ml, 10ml, 20ml 5 Each
134 Switches 10
135 Tap Funnel 5
136 Test Tube Holders 10
137 Test tube Racks 10
138 Test Tubes - 100 x 16ml, 125 x 16ml, 150 x 25 ml
(packet of 100)
1 Packet Each Size
139 Thermometers - Clinical, Alcohol, Mercury 5 Each
140 Thermos Flask 1
141 Thistle Funnel 3
142 Ticker Timer Set 5
143 Triple Beam Balalane 10
144 Tripod Stand 10
145 Trough 3
146 Tuning Fork 10
147 Universal Indicator 500ml
148 Universal Indicator Solution 500ml
149 Van de Graaff Genegator 1
150 Vernier Callipers 10
151 Visking Tube 1 roll
152 Voltmeter 10
153 Wire Gauze 10
154 Wooden Blocks 10
155 Zoology Prepared Slides, Botany Prepared slides - Set of
10
1 Set Each
156 Aluminium Foil 1 packet
157 Alloys - solder, brass, bronze, steel, duralium, nichrome
wire
125 g
158 Ammeter 5
159 Ball and Ring Apparatus 5
160 Bar Magnets 20
161 Bathroom Scale - Digital 1
162 Batteries 20
163 Battery Holders 10
Technical Drawing Equipment
QUANTITY DESCRIPTION
Technical Drawing Office Equipment Comprising of:
20 Drawing Board, A2 size, White melamine surface
80 Drawing Board clips, Stainless Steel
1 Drafting Unit Complete
20 Compass set
20 Protractor 180o
20 Clear Plastic Ruler
2 Pencil Sharpener, Rotary, Heavy Duty
20 Set Square 45o 200mm,Clear Plastic, Beveled edge
20 Set Square 60o 200mm Clear Plastic, Beveled edge
20 T Square A2 size
27
20
Scale Rule
1:25, 1:5, 1:10, 1:20, 1:50, 1:100
10
Lettering stencils set
0.35, 0.5, 0.6mm
5 French Curves Transparent Plastic set of 3
10 Adjustable Angle, Set Squares
1 Overhead Projector
20 Automatic pencil, with spare 2H leads
4 Drawing pen sets
40 Pencil Putty Erasers
10 Paper set
1 Paper guillotine
20 Drawing Board
2 Steel Cabinet
Workshop Equipment
ITEM SPECIFICATION
Air Apparatus Demonstrating convection
Painted metal box
Sliding glass front
2 Detachable Glass chimneys
Chimneys mounted in spring clips
Ammeter
Mounted in either metal or plastic case.
Colour coded
Moving coil
D/C range triple scale,
0-50mA,0-500mA and 0 -5A .
Aspirator bottle Polythene
Heavy duty
Polythene screwed caps
Wide bore taps
25 litres capacity
Balance Electronic
Broad pan on top,
weighs 1gram to 3000g.
Reset zero
Mains adaptor
Balance Lever Arm
Mounted on heavy base and fitted with leveling screw.
2 weighing ranges
5gm and 1gm intervals
Balance Spring0 - 10N
Tubular or flat face with zero adjust,
low friction movement. Scale length approx.120mm.
Complete with hanger and hook.
0-10N
Balance Spring 0 – 200N
Tubular or flat face with zero adjust,
low friction movement. Scale length approx.120mm.
28
Complete with hanger and hook.
0-200N
Balance Spring 0 - 20N
Tubular or flat face with zero adjust,
low friction movement.scale length approx.120mm.
Complete with hanger and hook.
0-20N
Balance Spring 0 - 5N
Tubular or flat face with zero adjust,
low friction movement.scale length approx.120mm.
Complete with hanger and hook.
0-5N
Balance Triple Beam
Single steel pan 150mm,
3 Tiered beams with contrasting graduations for easy
readings
Front beam 0-10g,
Centre beam0-500g
Rear beam0-100g.
Each beam to slide weight plus 2x 1000g and 1x 500g
weight for suspension to end of beam
Base of balance cast steel.
Ball and Ring
Brass ball secured to Brass ring by a chain attached to
wooden handle
Ring is mounted on a rod with a wooden handle.
Sphere 22- 25mm diameter
Ring 32mm outside diameter
Bar and Gauge Bar of aluminium
Bar mounted at midpoint
Support rod fitted with wooden handle
Gauge
Barometer Aneroid
125mm diameter dial scaled 660mm to 810mm hg x
0.5mm
In Brass case or Hardwood frame for wall mounting.
Barometer tube
Borosilicate glass,
Heavy wall
900mm x 4mm straight bore with closed base.
Bathroom Scale
Platform type measuring 0-125kg
Battery Charger Internal thermal
Overload switch
Double insulation
6V and 12V
Battery Holder
To accept 4x 1.5v R6 cell
Has spring clips and 4mm sockets for 4 ranges of tappings.
29
Beaker Brushes
Bristle head,
galvanized iron wire stem,
wooden handle
Approx. 360mm length
Approx.130mm x 50mm head size.
Beaker Glass 1000ml
Borosilicate glass
Graduated with spot
1000ml capacity.
Beaker Glass 100ml
Borosilicate glass
Graduated with spot
100ml capacity.
Beaker Glass 250ml
Borosilicate glass
Graduated with spot
250ml capacity.
Beaker Glass 600ml
Borosilicate glass
Graduated with spot
600ml capacity.
Beaker plastic 1000ml
1000ml capacity
Graduated with spot
Beehive Shelf
Porcelain with hole in top and recess for glass tube.
75mm x 60mm high.
Bell Jar base-plate
300mm x 300mm x 4.5mm thick glazed slide for base of
bell jar.
Bell Jar Stoppered
High density glass 250mm x 180mm diameter.
Glass ground to fit ground flange not less than 20mm
width.
Stoppered
Bimetallic Strip Strip of Iron
Strip of copper
Riveted together
Fitted handle
Size approx. 150mm x 10mm x 0.6mm thick.
Blocks Rectangular
For density, hardness, appearance and texture
30 blocks
2 of each
(20mm x 20mmx 100mm) perspex, glass, slate,
30
aluminium, marble and softwood.
(50mm x 40mm x 30mm) softwood, iron paraffin wax,
aluminium, polystyrene and hardwood.
Brass 20mm x 20mm x 50mm,
Iron 40mm x 40mm x 20mm,
Aluminium 50 x 50 x 200mm.
Blow Pipe Constructed in Copper or Brass,
Replaceable jet
Approx. 200mm long.
Board forces Kit
To verify the relationship of forces acting at a point.
Comprises a board approximately 750mm x 300mm,
With 2 pulleys 50mm diameter, pulleys on clamps to
mount on any position mass hangers.
Complete with iron slotted masses comprising 100g ,
Bourdon Gauge
Circular gauge
Dial reads 0 – 250kPa presssure.
Circular pillar
Tubule projects from side of pillar
Pillar approx. 55mmx 25mm
Tubule 8mm
Boyles Law Apparatus
For demonstration of Boyle,s law,
With vertical glass tubes, 600mmx 15 mm
Connected to metal reservoir on which a bourdon
gauge(400kPa) is mounted in plastic or wooden case 230
x 140mm, scale 0-600mm
Brownian Motion Smoke
For class demonstration of Brownian motion, single cell
with cover held vertically in holder 90mm x 60mm x
30mm
2 banana plugs for 12volt supply.
Illuminated by filament bulb and cylindrical glass lens.
Bulb Holders Holders for small torch bulbs
Rolled shell of plated Brass
Moulded plastic base
2 screw connections
Fixing hole centres
Bulb Small
Torch size bulb for use in electrical circuits .
Bunsen Burner
Heavy gauge Brass
Tube 11mm with ailr regulator.
31
Brass inlet tube 10mm
Replaceable Brass jet
Steel base
LPG
Burette
Amber graduations
Stopcock
Moulded screw thread for adjustment
50ml capacity.
Burette Clamps High strength casting with plastic jaws
Spring is positive, allows easy operation without
damaging glassware
Suitable for burettes up to 100ml capacity
Bicycle Dynamo
Bicycle Dynamo
Painted sheet metal base
Two speed pulley system
Hand crank
Two 4mm socket terminals
Lampholder
1.25v-1.5v lamp
CADAC Gas Cylinder No 3
1.4kg
Standard blue gas bottle, unfilled
Calorimeter Cup 150mmX650mm Aluminium spun 150mm x 650mm diameter.
Calorimeter Cup
75mmX 50mm Aluminium spun 75mmx 50mm diameter.
Capillary Tube
Hard glass thick walled, 1mm bore x 200mm length.
Cathode Ray Tube
Established of the cathode ray gun (diode electron gun) the
Luminescent Tube comprises a simple diode electron gun
in cylindrical neck and three mica flags coated with
different phosphors mounted on a metal support and
located in the centre of an evacuated spherical glass bulb.
Filament connection is by two 4mm sockets and anode, the
phosphor flags are each connected to 4mm plugs mounted
on plastic side-caps. Polarizing supplies.
Anode voltage 2500-5000v DC.(6000v Max)
Filament voltage,7.5v
Anode current at 400v, 1.8mA. WITH INSTRUCTIONS.
Cell- Electrolytic Cylindrical Perspex vessel
Two Perspex lids
Two contact sockets
One lid with two carbon electrodes
One lid copper and zinc plate electrodes
32
Approx. 70mm high X 60mm
Charle's Law Appratus
Jolly’s apparatus
Mounted on metal base
Boxwood scale graduated in mm
Glass Air reservoir
Spring clips secure reservoir
Vertical clamping rod
Mercury leveling tube with open end
Jolly air thermometer bulb
WITH INSTRUCTIONS.
Circuit Board
Worcester for basic electrical instructions.
Size 30cm x 30cm with 12 brass terminal posts,
10 connectors, 3 bulb holders,
1 switch holder,
1 rheostat and holder,
3 leads with crocodile clips and banana plugs, blade cell
holder for cells in parallel and series.
Brass key to resistance and one 10ohm resistance.
Three Perspex boards with different resistance
nichrome wire.
WITH INSTRUCTIONS
Clamps-G
Malleable iron frame
Square cut thread clamping bolt
Adaptable swivel
Max .opening 75mm
Clinostat Electric
Cork table
\table rotates 4 times per hour
Perspex cover for cork table
Plastic container for cover
Container held on cork disc by elastic bands
Supplied with 1.5m core cable
Fitted with 3-pin 1.5A plug
Clips Crocodile
Metal spring loaded serrated jaw,with screw to clamp end
of lead held in tubular extension.
Black or red
Clips Hoffman Screw
Hoffman screw,
nickel plated steel
20mm between bars,
knurled screw top.
Clips Mohrs
Chrome plated steel
Pinch type
Flexible tubing up to 12mm
30mm-50mm length.
Cloud Chamber
Comprises a transparent plastic container 95mm x 102mm
daim.
With removable base & lid; black base of cloud chamber
located by cork ring approx. 140mm from top of container
33
Carries 2 metal screens for absorption of particles: lower
portion of container fitted with foam plastic
Cylinder removable to enable solid CO2 to be placed on it
before reinserting, thus forming a lagged cooling chamber.
Insoluble radium source of a strength not greater than
20nCi (748q) is plated onto a wire located in cork, inside
of cloud chamber.
Complete with three rubber leveling wedges.
With instructions.
Cloud Chamber light
Comprising matt-black lamp house 80mm x 63mm, length
x diameter, to house a 12v, 24w, B15 (SBC) bulb and
mounted on a stem, 80 x 10mm length x width.
A removable metal U-piece, fitting round the lamp house,
has grooves to accommodate a 50mm diameter spherical
lens or a 45mm wide cylindrical lens, the correct distance
from the bulb filament.
Sideways in front of the lens to accommodate a matt-black
aperture plate, positively located in either of the two
positions.
One end of the plate is pierced with a slot, 51mm x 9mm
length x width,
The other end with a 28mm diameter hole,
With instructions.
Communication Vessel/ Liquid level
apparatus 4 glass tubes of different shapes
Cross sectional area projecting vertically
From a common horizontal tube
Tubes mounted on a metal base
Compass Magnetic
35mm- 40mm diameter in metal case with ring.
All points to be indicated in white against a black
background.
Needle enclosed in rotable housing
North- South index lines
Compass plotting
16mm-25mm diameter
Mounted in Perspex clear top and bottom.
Dial marked with principal points of compass
Needle pivoted between top and bottom glass plates
Copper Plate Copper strip 50 x 75 x 3mm.
Cork Bark assorted
Packet of 50 good quality assorted sizes,
Bottom diameter of 8mm,10mm,14mm,16mm,
20mm,25mm and 40mm.
Cork borer
Set of 4 tubes with plain sharpened ends for making holes
in rubber stoppers and corks.
34
Cork Bark
Packet of 10 for 250ml round bottom flask.
Crucible Tongs
Black iron with bow and riffled tips,
Length approx. 250mm.
Flattened hinge
Crucible with lid
Porcelain,
Squat/tall form 30ml-50ml capacity.
Lids have a lifting loop.
Unglazed base
Glazed inside and outside
Cube metal (set)
Set consists of 1cmx1cm iron, brass, copper, aluminium,
lead, tin and zinc cubes.
Deflagrating spoon
Brass flange 50mm diameter with raised recessed hole to
have 1 bark cork lifting spoon approx. 16mm diameter.
Length of lifting rod is 30mm.
Deflection Tube
Electron deflection by magnetic and electric fields.
Beam divergence with an alternating magnetic field.
The filament terminations are 4mm sockets and
connections are made by 4mm plugs and sockets
Polarizing supplies anode voltage, 1500-5000v DC.
Maximum filament voltage 7.5v.
Typical Anode current 1mA. With instructions
Density bottle
Clear glass ground stopper with capillary capacity 25ml
(specific gravity bottles).
Desiccators
Hard glass, diameter 150mm,or 200mm or 300mm
Lid has a knob and ground to fit top of base
Includes a perforated zinc disc fitting firmly into
reservoir.
Dissecting Board
Clear soft pine size 350mmx250mm grain end
Reinforced with jointed cross trim.
Dissecting Kit
In PVC pouch with zip up front and pockets containing the
following steel items:
1 pair sharp-pointed scissors
1 pair blunt scissors
1pair sharp forceps
1 pair blunt forceps
1 dissecting needle,
1 probe
1 scalpel handle
35
3 scalpel blades
I needle with eye
1 fixed blade scalpel.
Distillation Apparatus
Quick fit type, made of borosilicate glass.
Comprises of 1L round bottom flask with B-24 socket, still
head with B-19 socket,
Cone receiver adapter with B-19 socket.
Dropping Bottle Amber 100ml
Amber glass TK patterned with grooved stopper
100ml capacity, ground to firmly fit cap.
Ideal for light sensitive solutions.
Dropping Bottle Amber 50ml
Amber glass TK patterned with grooved stopper
50ml capacity, ground to firmly fit cap.
Ideal for light sensitive solutions.
Dropping Bottle Clear 100ml
Clear glass TK patterned with grooved stopper
100ml capacity, ground to firmly fit cap.
Ideal for light sensitive solutions.
Dropping Bottle Clear 50ml
Clear glass TK patterned with grooved stopper
50ml capacity, ground to firmly fit cap.
Ideal for light sensitive solutions.
Electric Bell
Gong of plated steel
Diameter approximately 60mm
6-12Vd/c operation, mounted on base board.
Copper wound coils have removable cover.
Electric Motor
10v DC size 40mm mounted on board and connected to
black and red 4mm sockets.
Motor to have brass pulley wheel.
Electro Magnetic kits
Comprises the following:
2 Ticonal magnets, 1 reel of cotton,
2 Magnadur magnets,
6 plotting compasses,
1 Sprinkler for iron filings,
1 wooden rod for winding coils,
1 double core clips,
1 Armature,
1 mild steel yoke,
1 support base,
2 split pins,
4 rivets,
1 knitting needle,
1 shaft,
1 reel sellotape,
1Aluminium ring complete,
1 Aluminium ring split,
2x2 5v/03A lamp bulbs,
1 neon lamp,
36
2 lamp holders,
1 reel 26 gauge insulated wire,
1 compass holder,
1x 100 ohm carbon resistor 0.5w,
1 pair cards support and clamps blocks.
With instructions.
Electrodes Carbon
Carbon set of 2 rods 80mmx5.6mm set in carbon holder,
each rod to have a terminal.
Electrodes Copper
Copper strip 50mmx75mmx3mm with terminal at top.
Electrodes platinum Wire platinum 0.5mm x 100mm
Electroscope
2 Gold or aluminium leaves attached to central pole which
has plated discs 30mm diam.
Flask capacity 500cm3.
Electro-Statics kit
A set of materials to enable students to investigate various
aspects of electrostatic forces, CONTAINING:
1 Gold leaf electroscope,
insulated lid,
Earthing plug on filament,
wire stirrup support,
Polythene strip,
polythene tiles,
2 aluminium cans.
With instruction.
Energy Conversion kit
Kit has the following modules,
Steam engine with piston and drive pulley
Turbine
Head of water
Lamp
Switch
Flywheel
Line shaft
Friction calorimeter
Handwheel drive
Large Motor
Small motor pair
Spring
Storage battery
Complete with instruction.
Eureka Can
Metal 100mm x 50mm or 60mm diam. with projection
spout at top.
Evaporating Dish
Porcelain, round shallow bottom with pouring spout.
Capacity 100ml,125ml or 250ml.
37
Fire Extinguisher
Filled with CO2, lever operates, with discharge horn.
Capacity 3kg.
Flask Vacuum Silvered inner wall
Double Glass vessel
750ml to 1000ml
.
Flask Conical 100ml
Erlenmeyer borosilicate glass
standard neck
100ml capacity.
Flask Conical 250ml
Erlenmeyer borosilicate glass
standard neck
250ml capacity.
Flask Conical 250ml with side arm
Erlenmeyer borosilicate glass
standard neck
250ml capacity.
With side arm
Flask Distillation 250ml
Borosilicate glass standard neck
200mm - 250mm length
With outlet tube 80mm length
diam. 5mm-6mm
capacity 250ml.
Flask Boiling
Borosilicate glass standard neck (50mm-60mm)
Flat bottom
capacity 250ml.
Flask round bottom
Borosilicate glass standard neck (50mm-60mm)
capacity 250ml.
Flask Volumetric 1L
With one mark and ground glass neck
With stopper.
Capacity 1litre.
Flask Volumetric 250ml With one mark and ground glass neck
With stopper.
Capacity 250ml.
.
Flask Volumetric 500ml With one mark and ground glass neck
With stopper.
Capacity 500ml.
Forceps- Dissecting
Stainless steel
approx 115mm to 130mm long,
fine points.
Narrow flutes
Sharp or blunt
Fractionating Column
Pear shaped pattern distillation glass column 360mm.
Funnel Buchner 70mm diameter and 120ml capacity.
38
Porcelain with erforated plate
Funnel Dropping
Open top,
cylindrical shape with stopcock.
capacity 50ml.
Funnel Dropping 100ml
Open top,
cylindrical shape
with stopcock.
capacity 100ml.
Funnel Dropping 250ml
Open top,
cylindrical shape
with stopcock.
capacity 250ml.
Funnel Glass 75mm
75mm diameter hard glass with rim,
60mm to 70mm spout length,
6mm diameter of spout end.
Funnel Glass 100mm
100mm diameter hard glass with rim,
60mm to70mm spout length,
6mm diameter of spout end.
Funnel plastic 100mm 100mm diameter hard glass with rim,
60mm to70mm spout length,
6mm diameter of spout end.
Funnel plastic 75mm
75mm diameter hard glass with rim,
60mm to70mm spout length,
6mm diameter of spout end.
Funnel separating 125ml
125ml capacity
Glass
Conical or pear shaped
Interchangeable stopper
With stopcock
Funnel separating 250ml
250ml capacity
Glass
Conical or pear shaped
Interchangeable stopper
With stopcock
Funnel thistle
Clear hard glass,
300mm length,
reservoir not less than 30mm diameter.
Fuse 10 amp Quick acting 10amp,
32mm x 6.3mm
Fuse 1amp Quick acting 1amp,
20mm x 5mm
Galvanometer
Range 35-0-35mV
Moving coil for D/C use only 200µA per division.
Coil resistance 10 Ohms
Plastic case 100x90x100mm
With 2 colour coded 4mm socket terminals
Zero adjuster.
39
Gas Jar
Clear
150 x 50mm diameter,
Ground glass flanged.
Gas Jar Cover
Glass 50mm diameter
frosted one side,
Clean out edges.
Gas lighter Spring steel holder
Striking plate
Supplied with one flint
Gauze Wire
150mm x 150mm meshed with asbestos center
100mm diameter.
Glass Block
Clear glass free from striations,
Approx. 114mm x 73mm x 19mm,
Thick leveled edges and base only ground.
Glass Cutter
For tubular glass
30mm x 6-7 mm high,
Flat base and clear polished edges.
Zinc alloy, nickel plated
Glass Prism
Clear glass free from striations,
sides 55mm to 60mm,
60 degree angles.
Glass rod
Soda glass
30mm x 6-7mm diameter with polished edges.
Glass Trough
Clear hard glass
250mm - 300mm diameter x 110mm- 120mm height
Flat base and clear polished edges.
Glass Watch
75mm – 100mm diameter curved base and polished edges.
Gloves Latex
Disposable latex examination gloves
box of 100
small , medium or large
G-M tube
The Mullar type ZP1481 suitable for the detection of beta,
gamma & high energy alpha radiation.
The tube has a thin end window protected by a plastic
grille and requires a source of 300v to 500v.
G-M tube holder
Consists of suitable sockets for the G-M Tube itself
500mm of screened cable terminated by a P.E.T type
coaxial plug.
40
Helmholtz coil
Pair of magnetizing coils, when mounted on the Universal
Stand.
Each coil has 320 turns of 22swg
Enameled copper wire wounded on a boss ,
the terminations are 4mm sockets .
WITH INSTRUCTIONS
High Tension Powder Supply
DC power with the following output:
100V to 5KV DC short circuit protected
3mA -100v to 5KV DC current limited 60µA
-0 to +/- 2,5KV-6.3V AC at 2A
With 0 to 6KV meter
To operate on 220/240v AC 50Hz
Hopes Apparatus
To Show maximum density of water.
Consists of sheet iron cylinder 203mm x 50mm diameter
mounted on base and encircles along length by a gallery
63mm x 100mm diameter.
Thermometers are placed in the holes by means of rubber
stoppers and the tube is filled with water.
Hydrometer
Set of 3 glass shot poised
Length 180mm- 250mm
Subdivided
Range
0.70 – 1.00
1.00 – 1.50
1.50 – 2.00
Hydrostatic Pressure Apparatus Sprouting jar
Cylinder
Three different orifices at different heights down one side
Approx. 450mm High X 70mm
Immersion Heater
Heater for Joules meter
Totally enclosed 12v cartridge type.
With 2 leads, with banana plugs, must fit calorimeter
blocks.
Ingenhaus Tank
For comparing rates of heat conductivity.
Comprising steel tank with six equal metal rods each of a
different metal with rubber stoppers.
Insulated socket black or green Terminals 4mm panel mounting with 20mm banana plug
engagement black or green
Insulated socket Red
Terminals 4mm panel mounting with 20mm banana plug
engagement red
41
Jar – Bell [Baseplate] Baseplate and gauge
Sturdy design
Lab. Coat size 38
Size 38
White in colour
Lab. Coat size 40
Size 40
White in colour
Lab. Coat size 42
Size 42
White in colour
Lab. Coat size 44
Size 44
White in colour
Lab. Coat size 46
Size 46
White in colour
Lab. Coat size 48
Size 48
White in colour
Lens Biconcave 15cm Clear glass
50mm diameter
15cm focal length
Lens Biconcave 20cm Clear glass
50mm diameter
20cm focal length
Lens Biconvex 15cm
Clear glass
50mm diameter
15cm focal length
Lens Biconvex 20cm
Clear glass
50mm diameter
20cm focal length
Lens Hand (Magnifier) Plastic 50mm diameter,
Magnification of 3.4 x
With handle approximately 40mm
Lens Holder
Metal to accept lenses 50mm diameter and mounted on
wooden base.
Liebigs Condenser
Fused clear glass body
300mm x 30mm inner and tube 400mm x 10mm
Light Gate 12V operation
Infrared optics
Relay driven
Pre-aligned for simplicity
Magnet (bar)
Chrome steel painted red and blue with keepers
100mm length.
42
Magnet (Horse shoe)
Chrome steel painted red and blue with keepers
75mm or 100mm length.
Maltese Cross Tube
To demonstrate the straight line motion of cathode rays.
With metallic strip suspended in the path of cathode rays.
With phosphorescent surface screen.
To operate on DC, 2 to 5 KV
Manometer
Glass for pressure or vacuum measurement
Mounted on a stand with graduated scale background
Suitable for connection to a 6.5mm bore flexible tubing
Masking Tape
50mm diameter
PVC insulating tape
100 meter length.
Mass hanger 1000g
Slotted Metal Alloy,
Total mass 1000gms with mass hanger
Mass hanger 100g
Slotted brass diameter
Total mass 100gms with mass hanger
Measuring Cylinder 100ml Clear glass grade B with base and pouring spout.
Capacity 100ml
Measuring Cylinder 250ml Clear glass grade B with base and pouring spout.
Capacity 250ml
Measuring Cylinder 500ml Clear glass grade B with base and pouring spout.
Capacity 500ml
Measuring Cylinder 50ml Clear glass grade B with base and pouring spout.
Capacity 50ml
Measuring Tape
3 meter flexible,
13mm width, graduated in millimeter each cm,
Hooked end.
Medicine dropper
10ml glass pipette for drawing solutions from a reagent
bottle
With a rubber teat.
Meter Rule
Hardwood, vertical reading up down scale millimeter
divisions and marked every centimeter,
Permanently etched
100cm
Meter Rule (Half)
Hardwood, vertical reading up down scale millimeter
divisions and marked every centimeter,
Permanently etched
50cm
Micrometer Screw gauge
Steel scaled 0.25mm x 0.01mm with hardened ground
Micrometer Screw with setting key.
Thimble with ratchet
43
Lever lock to spindle
Frame fitted with heat-insulating cover
Satin chrome cover
Mirror
Plain 75mm x 25mm
clean cut edges
permanent silvering.
Molecular Models
Moulded plastic spheres
Flexible connections
Representing atoms and bonds
Connections have self gripping ends
Spheres are coloured to represent the different elements.
Connectors are two different lengths
Packed in a compartmented plastic tray
Multimeter Electrical
Analog multimeter for electrical measurements with
20000 Ohm/volt sensitivity.
Scale size approximately 100mm.
The following ranges are available DC volt 10mV to
1000V in 7 ranges. AC volt 2V in 6 ranges. DC currents
50µA to 5A ranges.
Capacitance 0 to 200µF in 4 ranges.
Complete with battery and case.
Test leads
With Instructions.
Needles Knitting Steel approx.360mm x 2mm fine edges
Needle Magnetic with stand Steel
Brass bearing
Approx. 50mm
Wooden base for stand
Supports magnetic needle
Newton Colour Disc
With three sets of Spectrum colours,
diameter of disc 300mm
with a central hole for mounting on disc rotator.
Newton’s Disc Rotator
Height 430mm on heavy base fitted with hand wheel and
belt drive to pulley with adaptor to accept 300mm disc.
Nylon Thread Reel of approximately 45m
Optical Bench
Contains apparatus to carry out listed experiments.
All markings in cm and mm.
The light source includes a low voltage light source
approximately 3v.
4 convex lenses focal length 50, 100,150,200mm
1 concave lens focal length 100mm
4 v-shaped wooden lens holders
1 candle holder
1 bulb holder
1 black screen with round gauze hole
1 white screen
44
Oscilloscope
For wave interpretation,
Vertical Amplifier 10mv / div or better DC – 5MHz (-
3DB)
Horizontal Amplifier 300mv /div or better DC- 250kHHz
with ECT.
Gain Control set at max.
Rates maximum input voltage 100vp.p
Sweep characteristics; 10Hz to 100Hz continuously
variable in 4 ranges within 4%
Internal; More than 1 div deflection on cathode ray tube
screen.
External; more than 2vp.p intensity modulation: 25Vp.p
Direct Deflection Terminals
Particle Model kit
To simulate scattering at Atomic Nuclei Ramp 110mm
height.
Curved to reduce energy of spheres
Nucleolus Model 280mm diameter with curved surface
rising to 52mm centre plus 2 steel spheres 12.7mm
diameter. With Instructions
Pendulum Bobs
Bob set 2 brass pear shape 19mm & 25mm diam.
Ring at the top and bob set of 2 lead ball 19mm & 25mm
diam. with split pin ring.
Pestle & Motor 15cm
Glazed porcelain 15cm diameter
Petri Dish Plastic 100mm diameter
pH Meter
Pocket size pH tester with electrode and LCD display,
Range 0 -14,
Pin Hole Camera Kit
Consists of:
8 cardboard boxes 150 x 100 x 100mm with hole, screen
and lid
50 sheets of block paper 200 x 250mm
1,200w lamp
mounted lamp holder with flex
1 packet of pins
Pins Optical
For plotting light rays length 70mm. approx. 200 per box
Pipe Clay Triangle
Pipe clay tubes on iron wire, length 150mm
Pipette 10ml
Bulb hard glass
Grade B with ground mouth piece and tip
45
Graduated with one mark
10ml capacity.
Pipette 25ml
Bulb hard glass
Grade B with ground mouth piece and tip
Graduated with one mark
10ml capacity.
Pipette 5ml
Bulb hard glass
Grade B with ground mouth piece and tip
Graduated with one mark
10ml capacity.
Pipette Filler
25ml polythene pipetting device.
For precise filling and emptying by depressing plunger.
Pipette Stand Polypropylene
Round and base
18 small holes
10 large holes
Circular base
PVC rod
Plastic Syringe 10ml Surgical quality with plunger 10ml
Plastic Syringe 2.5ml Surgical quality with plunger 2.5ml
Plastic Syringe 20ml Surgical quality with plunger 20ml
Plastic Syringe 5ml Surgical quality with plunger 5ml
Plugs Banana Black Entry with transverse hole
For 4mm socket (black)
Plugs Banana red Entry with transverse hole
For 4mm socket (red)
Polystyrene Spheres (12mm) Clean moulded without blow holes,
packets of 100 (12mm diameter)
for construction of atomic models
Polystyrene Spheres (25mm) Clean moulded without blow holes,
packets of 100 (25mm diameter)
for construction of atomic models
Polystyrene Spheres (38mm) Clean moulded without blow holes,
packets of 100 (38mm diameter)
for construction of atomic models
Polystyrene Spheres (50mm) Clean moulded without blow holes,
packets of 100 (50mm diameter)
for construction of atomic models
Polythene Bottle
Wide screw top and carrying handle.
25litre capacity for storage of distilled water.
Potentiometer Mounted on metal case
Three 4mm sockets[3Watts]
1 kOhm ,and 5 kOhm
Potometer and Stand Ganongs for investigation of plant transpiration
46
Graduated narrow bore tube, horizontal glass measure
with a vessel for plant shoot at one end and a vertical limb
with ground glass stopcock and funnel.
With stand mounting.
Porous Pot
Clay for leclanche cells diameter 50mm x 100mm
Pulley (double)
Plastic 50mm diameter mounted in hanging frame with
hook on top and bottom.(double)
Pulley (single)
Plastic 50mm diameter mounted in hanging frame with
hook on top and bottom. (single)
Pulley - Force Board Plastic pulley
With ball bearings
( dynamically run in)
Aluminium clamp for mounting of pulley on to board
Pump foot
Foot and adaptor and non return valve
gauge 0-100 with rubber connecting hose
Pump Lift Glass
Lift glass working model, height 350mm with plunger
mounted on board with base 430mm height, with plastic
trough 250cm3.
Pump Vacuum
Hand
Comprises metal barrel 200ml x 32mm ID and riffled
nozzle for tubing connection,
Handle and reversible piston and valve for conversion to
pressure pump.
Radiant Heater
To investigate nature of heat radiation 800w radiant 220v.
Heater in protective cage plus metal plate 150mm square
with hole 25mm diameter,
comprises 2 glass plates 200mm square,
aluminium foil,
1 pkt carbon black.
Ray Box
Optical comprises the following:
One ray box with 2m of flex, two 4mm plugs, one bulb 12v
24w B14 (SBC) and bulb holder 1 collimating lens,
biconvex, cylindrical f=75mm,
1 colour mixing set, 2 plastic blocks (one rectangular and
one semicircular),
3 triangular plastic prisms (equilateral, right angled (45o)
and right angled (60o).
3 Cylindrical lenses, biconcave and biconvex (2)
47
3 plane mirrors, cylindrical and parabolic.
8 filters: red, blue, green, cyan, magenta, yellow, violet
and orange.
6 coloured cards, and 2 slit plates.
WITH INSTRUCTIONS
Reagent Bottles 250ml
Clear glass,
narrow mouth with ground propylene stopper.
250ml capacity
Reel Solder
Wire 2mm diameter reel approx.10meter
Resistance Unit 1
Ohm
Mounted on former with, two 4mm socket
size 65mm x 10mm No-1
Resistance 1 ohm.
Resistance Unit 10 Ohms Mounted on former with , two 4mm socket
size 65mm x 10mm No-3
Resistance 10 ohm.
Resistance Unit 2 Ohms Mounted on former with, two 4mm socket
size 65mm x 10mm No-2
Resistance 2 ohm.
Resistance Unit 20 Ohms Mounted on former with , two 4mm socket
size 65mm x 10mm No-4
Resistance 20 ohm.
Resistance Unit 50 Ohms Mounted on former with, two 4mm socket
size 65mm x 10mm No-5
Resistance 50 ohm.
Retort Glass Ground glass
Stoppered
Capacity 250ml
Retort Ring
80mm x6mm for holding funnels,
fits onto a retort stand with boss head.
Diam 60mm
Retort Stand Base & Rod
Base cast iron 160mm x 100mm,
Rods approx. 450mm x 8mm BS
Threaded base centered & approx.40mm from 100mm end.
Retort Stand
Boss Head
Offset jaws with brass Tommy bar with grooves to grip
rods up to 16mm in either jaws.
Retort Stand Clamp
To accept article 2mm – 80mm diameter jars,
Brass Tommy Bar ,
Stem approximately 120mm.
Retort Stand set
Consisting of base and rod, clamp and boss head as
described individually below.
Rheostat Sliding Resistance wire wound on an insulating, heat resistant tube
48
Supported by cast-metal end cheeks
100 Ohms
Approx.250mm x 30mm diameter
With baselite slider
4mm banana sockets terminals
Ripple Tank
Perspex base
Plastic ripple tank, moulded in material of optical quality
supported in box section,
High-impact polystyrene frame recessed to locate and
hold 4 legs by fitted rubber and caps,
Legs terminated by leveling feet;
Tank edges formed into beaches to minimise unwanted
reflections;
Tank provided with drain hole closed by rubber bung.
Plastic tray provided to accommodate all fittings except
the legs.
Light alloy uprights are provided to carry a horizontal
rippler assembly, elastically suspended from the horizontal
support rod, consists of a low-voltage DC motor mounted
on a wooden beam.
The motor is fitted with an eccentric mass which causes the
beam to oscillate.
Additional point contacts are provided by two plastic
spheres each mounted on a right-angled rod which when
fitted to the beam, may be adjusted to any required
separation.
A light alloy rod fixes the frame and afford support for the
illuminant.
Overall size of tank is 580 x 500 x 80mm; window area
(legs attached) approx. 375mm rippler assembly; beam
dimensions 280 x 30 x 20mm, beam drilled to receive rods
of point sources and provided with two support hooks for
elastic bands.
Rippler motor 4 to 6v DC complete with two straight
obstacles 130mm long, one straight obstacle 40mm long
and curved reflector 200mm radius all in light alloy and
self-straight obstacle 40mm long and curved reflector
200mm radius all in light alloy and self-supporting;
Plastic refraction plate,
Wood hand wave roller,
Water dropper,
Pack of rubber bands and sponge.
With instructions
Rod – Iron
Iron –rod 300 x 12.5mm length x diameter
Rod – Polythene
Polythene rod 300 x 12.5mm length x diameter.
49
Rod – Steel
Steel rod 300 x 12.5mm length x diameter.
Rubber stopper
11mm (Solid) In pkt of 10 solid bottom 11mm diameter.
Rubber stopper
17mm (2Hole) In pkt of 10 2 hole bottom 17mm diameter
Rubber stopper
17mm (Solid)
In pkt of 10 solid bottom 17mm diameter
Rubber Stopper
21mm (1 Hole)
In pkt of 10 1 hole bottom 21mm diameter
Rubber stopper
21mm (2 Hole)
In pkt of 10 2 hole bottom 21mm diameter
Rubber stopper
21mm (Solid)
In pkt of 10 solid bottom 21mm diameter
Rubber stopper
25mm (1Hole) In pkt of 10 1 hole bottom 25mm diameter
Rubber stopper
25mm (2Hole) In pkt of 10 2 hole bottom 25mm diameter
Rubber stopper
32mm (1Hole) In pkt of 10 1 hole bottom 32mm diameter
Rubber stopper
32mm (2Hole) In pkt of 10 2 hole bottom 32mm diameter
Rubber stopper
32mm (Solid) In pkt of 10 solid bottom 32mm diameter
Rubber Teats pkt of 5
In pkt of 5,
1.5ml capacity with flanged inlet.
Safety Goggles
Made of clear plastic, designed to protect eyes during
experiments.
Scale Pan
Plastic 75mm diameter with 3 cords and one hook.
Scaler - Timer
For counting, Tuning, frequency and rate measurement.
Ideal for timing and motion experiments.
Sockets for light gate inputs and separate 12V supply
sockets for driving lamps.
For radioactivity: variable EHT output for powering GM
tube or solid state detector
Audible signals and the 4- digit LCD counter display count
each event
WITH INSTRUCTIONS IN ENGLISH
50
Scalpels
Disposable surgical sharp blade fixed on tough plastic
handle.
Scissors pair of
Sharp stainless steel 155mm for dissecting.
S-hooks Plated steel
Length 64mm
Slinky Spring
Wave form diameter 78mm helical coil,
Flat section tempered steel
Length 115mm extended to 5 meters.
Soil Test Kit (Solution)
Contains 5 test solution for over 50 different test,
Rapid filtering device
Graduated test tube
With instruction guide.
Soil Test Kit (Tablets)
Contains a variety of tablets enabling numerous different
tests
With instruction booklet.
Solenoid
360 turns copper wire on plastic former
Approximately 100 x 55mm
With 4 banana sockets.
.
Spatula
Nickel plated spoon one end.
Length 150mm.
Spirit Burner
Standard methylated spirit type,
Capacity 100ml
With wick and cap.
Spotting Tile 12 cavity
White ceramic/porcelain tile.
Springs
For hanging masses 300mm x 6.7mm with hook at top and
base.
Steam Engine SP4
For energy conversion kit
Super-heated double action oscillated cylinder type fuel
solid.
Copper boiler, whistle and flywheel with 25mm pulley to
accept belt drive.
Steel Wool Packet of 500g.
Stethoscope
With ear-piece to monitor heart beat
Stop-clock- Digital
Quartz battery
Digital display
Push button operation
Spring clip
Magnetic stand and mount
Measures lapse time up to 100 minutes
1 second accuracy
Stop Clock Analog With second and minute hands.
51
Winder is also the start.
Start ,stop and reset button
Switches
Knife or panel base,
Double /throw for voltage up to 50V AC to 75V DC
Single pole Bakelite grip.
Test Tubes 70x10mm
Clear borosilicate glass in pockets of 100, 70 x 16mm
diameter.
Test Tubes 100x16mm
Clear borosilicate glass in pockets of 100, 100 x 16mm
diameter.
Test Tubes 125x16mm
Clear borosilicate glass in pockets of 100, 125 x 16mm
diameter.
Test Tubes
150x25mm Clear borosilicate glass in pockets of 100, 150 x 25mm
diameter.
Test Tubes pyrex 125x16mm Pyrex test tubes in packets of 100, 125 x 16mm.
Test Tube brush with fan ended Bristle, with fan end, brush
100mm length
Test Tube brush without fan ended
Bristle, without fan end, brush
Approx.100mm length
Test Tube Holder
Brass with curved holders and wooden handle,
Approx.150mm overall length.
Test Tube Holder- wood
Wood rod
Different sized terry clip at ends
Approx.140mm in length
Test Tubes Stand
Hardwood, solid ends holes for 25mm tubes
Height 80mm with drying pegs.
80mm x 6.7mm holes,
6 pegs.
Thermometer Alcohol
-10oC to 110oC
Alcohol filled,
300mm length,
Reinforced reservoir and loop at top.
Thermometer Clinical
Stubby bulb,
35oC to 43oC
Constricted bore in plastic case
100mm x 4mm diameter.
Thermometer Mercury
-10oC to 110oC,
Mercury filled,
300mm length,
Reinforced reservoir and loop at top.
Ticker Timer Tape Clear 19mm x 100m roll
Ticker Timer
12 Volt AC housed in case,
Electromagnet with spring loaded armature which
vibrates above support platform.
Platform to have guide for Ticker Tape.
52
Plus vibrator arm to ensure clean dots on paper below
carbon disc.
Ticker Timer Dynamics Trolley
Metal construction
With release pin for 3 projection,
Must have facility for attaching ticker tape and 4 free
rolling ball bearing wheels,
Plastic wheels with bearings
Surfaces of trolley to have rubber sheeting.
Flat top for loading
Ticker Timer Set
Comprising a ticker timer, ticker time tape, a packet of
carbon disc and a dynamics trolley.
Ticker Timer Carbon disc 50mm in pockets of 100.
Timing Ball For determination of ‘g’ and general velocity experiments
Robust white baseball with a built in timing device and
digital display
When the ball is released the timer starts counting and
stops when it hits the floor or other surface.
The time elapsed is displayed for 4 seconds
Battery life 5 years
Torch 2 Cell R20
750mm length,
1.5 V bulb.
Trolley Runway
Track for dynamics trolley
Hard timber 2450 x300 x200mm
Reinforced side 40mm high
2 elevation pins of steel 100mm x 6mm with thumb screw
to lock.
Transformer
Multitap 240V AC.
Tapping 2,4,6,8,10 & 12 V
4mm banana plug entry.
Range to be clearly shown on face with thumb screw to
lock.
Triangular File
120mm to150mm,
slim type, second cut
With handle.
Tripod Stand
Mat black finish
120mm x 100mm height
Circular top or triangular top
Cast iron
Splayed legs for stability.
Trundle Wheel Wheel with handle for measuring distances in metres.
Tube Combustion Made of hard glass
Approx. 20mm X 200mm in length
Tube Delivery Open both ends
Glass
Tube U U clear hard glass,
53
150 x 20mm,
40mm between limbs.
Polished top.
Tube U with side arms
U clear hard glass,150 x 20mm ,
40mm between limbs.
Polished top with side arms.
Tubing 5mm polythene Polythene clear flexible strong wall 5mm diameter.
Tubing 6mm polythene Polythene clear flexible strong wall 6mm diameter.
Tubing – plastic 8mm diameter
Braided plastic
For Bunsen burner.
Not required Not applicable
Tubing Glass 12mm diameter pkt of
10
Borosilicate clear glass
diameter 12mm (in pockets of 10).
Tubing Glass 6.5mm diameter pkt of
10
Borosilicate clear glass
thick wall 1.9mm
diameter 6.5mm (in packets of 10).
Tubing Glass 8mm diameter pkt of 10
Borosilicate clear glass
diameter 8mm (in packets of 10).
Tubing red rubber pressure Red Rubber pressure tubing
5mm or 6.3mm bore wall
6mm or 8mm diameter.
Tubing-Dialysis- Visking
Viscose cellulose
Length 5 meter
Width 25mm when flat
Tuning Fork Set
Set of 4 steel forks.
Length of prong 80mm,
Frequency marked, C256, E320, G384 & C512
frequencies.
Tel - Universal Stand
Designed to accommodate a whole range of Teltron tubes
and accessories
Rubber feet
Tube mounting jaws.
Clamps on jaws
Base and arm cast in light alloy and stove enameled
Jaws are split lengthways to admit the side caps of the
tubes
Hollow Boss is secured in stand by rubber ‘O’ ring
Sockets in base accommodate Helmholtz coil supports and
locate the coils accurately either side of the tubes
4mm Earthing socket
WITH INSTRUCTION IN ENGLISH
Van Der Graff Generator
Hand operated,
600mm height,
54
150mm - 160mm metal sphere mounted on a 100mm
diameter Perspex column/ rod.
With 150mm driving wheel,
Driving belt sand spare belt.
Electric motor
Two insulated pulleys
Aluminium surface pulley
Polythene surface pulley
Vernier Calipers
Stainless-steel,
Precision type for very accurate measuring.0-150mm
With Vernier scale 0.1mm for inside, outside and depth
measurement.
Packed in a case.
Voltameter Hoffman’s
2 Limbs
Graduated glass
50ml
With carbon and platinum electrodes
Voltmeter Accuracy: Moving coil +-2.0%
Triple scale 1V to 3V, 15V to 15V, 100V to 300V
Scale length 65mm to 70mm
Internal resistance 50Ohm 50mV
Terminal: 4mm socket captive head suitable for wire or
pin-type test lead
Wash Bottle 125ml
Swan neck
Round
Graduated
125ml capacity.
Wash Bottle 250ml
Swan neck
Round
Graduated
250ml capacity.
Water Bath
Aluminium or Stainless steel bath with vertical sides and
side handle.
Circular type
Concentric rings
Bakelite feet
Approx. 127mm depth
Wire Connecting Black Black
Single
Multistranded copper
PVC insulated
To carry 5A
Supplied in multiples of 10m
55
Wire Connecting Red Red
Single
Multistranded copper
PVC insulated
To carry 5A
Supplied in multiples of 10m
Wire Copper
Polyurethane enameled
0.56mm diameter x 125g
Wire Nichrome
Bare Nickel-Chromium-Iron
0.9mm diameter x 100g
Wire Platinum 0.38mm diameter.
56
ANNEX B.3 IMPLEMENTATION ARRANGEMENTS
The Ministry of Education, Arts and Culture (MoEAC) will be the Executing Agency for
the Project. A three tier institutional arrangement will be set up to manage and implement the
Project. This will be set up in order to steer, manage and implement the Project and to ensure
proper coordination with other line institutions as they relate to national planning processes
and functions.
The Programme Steering Committee (PSC) established at National Level as a gender-
balanced committee, will be responsible for the overall policy and strategic direction of projects
in the country as well as approval of the work plans, budgets and progress reports of the
individual projects. The Ministry of Finance will provide the secretariat of the PSC. The
MoEAC and MHETI Permanent Secretaries shall be coopted when the PSC is deliberating
issues pertaining to the Education Sector.
The Project Implementation Support Unit (PISU) shall be established as the relevant
coordination structure comprising of key Offices/Ministries/Agencies to serve as the guiding
arm of the Project at implementation level. This will bring together key stakeholders with
implementation responsibilities for the project results namely; Ministry of Education, Arts and
Culture (MoEAC), Ministry of Higher Education, Training and Innovation, Namibia Training
Authority (NTA), Ministry of Works and Transport (MWT), National Planning Commission
(NPC), Ministry of Finance (MoF) and Forum for African Women Educationalists – Namibia
Chapter (FAWENA).
The Project Implementation Unit (PIU) to be established to serve as the relevant
management structure for the day-to-day management and implementation of the project
covering procurement, financial management, and monitoring and results reporting. The PIU
is responsible for both the PSC and PISU and will operate under the MoEAC. The PIU will
consist of a Project coordinator, an accountant, a procurement specialist, a gender specialist
and a monitoring and evaluation specialist. The PIU will be assisted by consulting engineering
firms for the supervision of works in the TVET subsector and in the Basic Education subsector.
The Government has already prepared bills of quantities for the education facilities to be
rehabilitated as well as structural and architectural designs for the TVET facilities to be
constructed. These documents will form the basis for the preparation of the bidding documents
by the PIU.
Through a Memorandum of Understanding, the Forum for African Women
Educationalists – Namibia Chapter (FAWENA) housed by the Ministry of Education,
Arts and Culture will implement the gender specific activities of the Project. FAWENA
has over 15 years’ experience in implementing gender activities in Namibia in collaboration
with the MoEAC and with resources from several development partners such as USAID and
the Global Fund. The institution has the comparative advantage to carry out the gender specific
57
activities under the Project, which are an extension of the activities it is already undertaking.
FAWENA’s achievements and experience in Namibia are considered unique and key to the
efficient implementation of the gender specific activities of the Project. The gender specific
activities to be implemented by FAWENA include (i) a community engagement initiative to
address teenage pregnancy; and (ii) an outreach intervention to promote girls’ participation in
Science, Technology and Math. This initiative will include capacity building activities for
teachers to demystify science, technology and math.
Implementation Schedule
The program will be implemented over a period of 5 years from fulfilment of conditions
for first disbursement in January 2018. Implementation of the Education and Training
Systems Strengthening component will begin from January 2018 and works will commence
during the third quarter of 2018. Program completion date is set for December 2022.
58
ANNEX B.4 FINANCIAL MANAGEMENT AND DISBURSEMENT
ARRANGEMENTS
4.1 Introduction
The FM assessment of the Ministry of Education, Arts and Culture (MEAC) that will be
responsible for the overall financial management of the project was carried out in accordance
with the Financial Management Policy in African Development Bank Group Financed
Operations (2014), the Financial Management manual for Bank Group Sector Operations
(2014). The objective of the assessment was to determine whether there are acceptable FM
arrangements in place, which will ensure: (1) the funds are used only for the intended purposes
in an efficient and economical way, (2) the preparation of accurate, reliable and timely periodic
financial reports, and (3) safeguard the entities’ assets. The assessment was done in July 2017
as part of the project’s appraisal. The assessment also took into account the latest Namibia
Country Fiduciary Risk Assessment (CFRA) in addition to the lessons learnt from the
implementation of previous projects.
4.2 Executive Summary
An assessment of the Ministry of Education, Arts and Culture (MEAC) as Project Executing
Agency (that included a review of the budgeting, accounting, treasury systems, internal
controls, reporting and external audit arrangements) was done to ascertain effective financial
management of the project. The department of finance headed by a Director of Finance within
the MEAC is responsible for the function of planning and budgeting at central and local levels
including recording expenditures and maintaining assets through the use of the Government
wide IFMIS. The overall internal control environment in the ministry’s processes from budget
preparation, execution, control and reporting is adequate and will also be applicable for the
project. The system has however not been configured to enable comprehensive project
reporting, therefore, a suitable system that will include the use of spreadsheets will be used for
supplementing the recording and reporting of the project transactions.
The ministry staff in finance department have been involved in implementation of other donor
(including World Bank, EU, KFW) funded projects. An accountant from the current ministry
staff force ministry has already been identified and nominated to handle the proposed project’s
financial management functions. The project Accountant will work together with other Project
Implementing Unit (PIU) members including the Project Coordinator, Monitoring and
Evaluation and Procurement Specialist. In addition, given the nature of the project to be
implemented there is provision for technical assistance in facilitating the effective financial
management of the project and also in capacity building of the existing finance department.
Training in Bank requirements regarding financial management will also be provided as part
of project launching and during implementation.
In accordance with the Bank’s financial reporting and audit requirements, the project will be
required to prepare and submit to the Bank Interim Quarterly Progress report (IQPR) with
financial information for the Bank loan and Government contribution not later than forty-five
(45) days after the end of each calendar quarter. The PIU will also prepare annual project
financial statements. The Ministry’s financial statements are audited annually by the Auditor
General of Namibia (AG) in line with their mandate. In this regard, the project financial
statements will also be subject to audit by the AG (or a private independent audit firm under
59
the oversight of the AG) with the audit done in accordance with a Bank approved Terms of
Reference. The audit reports (including management letter) will be submitted to the Bank
within six months after the end of the respective period covered by the audit with costs of the
audit as done by the private firm borne by the loan.
The overall conclusion of the assessment is that the MEAC’s current capacity to handle all the
FM aspects of the project, currently meets the Bank’s minimum requirements as laid out in the
Bank’s FM guidelines. In addition, with the implementation of the proposed FM actions, there
will be further improvement in the project financial management systems to ensure funds to be
made available to finance project activities would be used economically, efficiently and for the
purpose intended. The overall initial FM risk for the project is assessed as Moderate. This is
also in line with current country fiduciary risk levels that allow the use of existing systems
subject to their satisfactory assessment.
4.3 Disbursement arrangements: Disbursement of funds under the project shall be primarily
by the Direct Payment method for the activities under the project. The PIU will be responsible
for certification of invoices submitted and preparation of disbursement application which will
be reviewed and signed off by Government designated staff and submitted to the Bank for
payment. The Special Account method to be managed by the PIU will be limited to financing
the smaller and recurring operating expenses. The opening of the Special Account denominated
in ZAR together with the associated local currency account denominated in NAD will be “other
condition” to the loan. Other methods of disbursement including the Reimbursement method
will also be available with the agreement of the Bank. All disbursements under the Loan would
be made in accordance with the Bank’s rules and procedures as laid out in the Disbursement
handbook as applicable. In addition, the Bank will issue a Disbursement Letter of which the
content will be discussed and agreed during negotiations.
4.4 Summary Project Description
The objective of the Project is to contribute to increase equitable access and the efficiency of
the Basic and Technical, Vocational Education and Training (TVET) systems in Namibia. The
Project will contribute to the development of an efficient, effective and suitable TVET systems
in Namibia that is aligned with the current and future skills needs of the labour market in the
country. The Project specifically aims at increasing access, attaining equity and improving the
quality of TVET and basic Education in Namibia.
4.5 Use of Country systems
The overall conclusion of the updated CFRA diagnostic review is that Namibia has experienced
progress with regards to the implementation of public financial reforms over the years in the
areas of Revenue Management, Budget process, Public Debt Expenditure, Accountability and
Procurement. The ongoing reform efforts are however yet to address a number of areas
including weak capacity in fiscal planning, constraints in the national audit, delays in rolling
out IFMS to regions, weak internal controls system. The Bank recently provided Budget
support of ZAR 6 Million to the Government of Namibia to facilitate some of the PFM reforms.
In this regard, there is scope for the Bank to maintain an approach based on limited use of
country procedures and systems subject to their satisfactory assessment, while continuing to
support the country’s efforts for the system’s reform.
4.6 Executing Agency
60
The MEAC will be the Executing Agency for this project. To strengthen the EA, a Project
Implementing Unit (PIU) will be constituted within MEAC for day today implementation of
the project activities. The PIU will be made up of ministry staff designated to fully dedicate
their time on the project activities. The team will consist of (among others) a project
coordinator, Project Accountant, M&E Specialist and a Procurement Specialist.
Summary of Assessed Financial Management Arrangements
4.7 Budgeting and planning:
At the Ministry level, budgeting for resources is done as part of the national budgeting process
and coordinated with the Ministry of Finance. The MEAC, through the cost centre managers,
provide input for the ministry’s budget through the Ministry of Finance forms and the
Ministerial Budget Steering Committee. The National Planning Commission is responsible for
the National Development Plans. For this project, the work programs and budgets will be
prepared by the PIU in consultation with key stake holders including the Government staff.
The approved programs will be the guiding tool for the preparation of the Procurement plans
from which the annual budgets shall be prepared. The PIU will take all necessary steps to be
abreast with budget outruns and revisions and incorporate any available information in periodic
reports.
4.8 Accounting System:
The finance department at the MEAC are responsible for the function of planning and
budgeting including recording expenditures and maintaining assets using IFMIS. The system
has inbuilt controls and there is comprehensive chart of accounts with periodic reports
produced for expenditures and budgets. At each of the 14 regional offices, there are accounting
staff in charge of small recurring operating expenditures. For this project, the ministry has
designated an for project financial management. The designated Project Accountant will be
supervised by the Chief Accountant and based at the MEAC head office and will set up a
system of accounting and have a rigorous oversight environment with satisfactory procedures
in place to ensure sound financial management for the project. The Project Accountant will be
trained on Bank’s financial management requirements and disbursement procedures during
project launch and also supervisions. In addition, given the nature of the project to be
implemented there is provision for technical assistance in facilitating the effective financial
management of the project and also in capacity building of the existing finance department.
4.9 Internal Control System:
Internal control system is aimed at ensuring (i) the effectiveness and efficiency of operations
(ii) the reliability of financial reporting, and (iii) the compliance with applicable laws and
regulations.
MEAC finance department follow the Treasury Instructions and Treasury Operations Manual
in financial operations. However, the manuals do not fully include the project requirements,
therefore project administrative and procedures manual need to be developed to provide
adequate guidance to the operations of the project. The manual will be prepared to provide
sufficient guide on information flow, authorization, and timing, delegation of authority, job
segregation and compliance with project objectives. The application of the manual will be
mandatory within the project. Project staff will be trained on Bank requirements. Internal audit
function at the Ministry will cover the project, the reports resulting from the audits will be
61
shared with the Bank during supervisions. All deficiencies identified by internal audits will be
communicated in a timely manner to the overall project management for action. Bank
reconciliation will be done monthly and outstanding items resolved promptly.
4.10 Treasury Management (including Funds Flow and disbursement)
Currently funds flow in the MEAC is managed through IFMIS that has inbuilt controls with
the Ministry currently operating about 16 bank accounts. For this project, the disbursement of
funds shall be primarily by the Direct Payment method. The PIU will be responsible for
certification of invoices submitted by other service providers or contractors. In addition, the
PIU will prepare the disbursement application which will be reviewed and signed off by the
Government designated staff and submitted to the Bank for payment. A Special Account
denominated in ZAR and its associated NAD denominated project operating account shall also
be opened at the Bank of Namibia. The Special Account and project operating account will be
managed by the PIU and be limited to financing the smaller and recurring operating project
eligible expenses.
The opening of the Special account denominated in ZAR and its associated project operating
account denominated in NAD will form part of other condition to the loan. Other methods of
disbursements including Reimbursement method will also be available with the agreement of
the Bank. All disbursement under the Loan would be made in accordance with the Bank’s rules
and procedures as laid out in the Disbursement handbook as applicable. The PIU will timely
receive the statements of confirmed disbursement from the Bank for record keeping and
accounting purposes. The Bank will issue a Disbursement Letter of which the content will be
discussed and agreed during negotiation.
Funds Flow Diagram:
4.11 Financial Reporting:
The MEAC current financial reports follow the Government format generated using the IFMIS
which are currently not configured to provide reports that will meet the Bank requirement for
project accounting. Therefore, a separate suitable accounting system that will include the use
of spreadsheets will be used for supplementing the recording and reporting of the project
transactions and to generate project reports to provide quality and timely information on
project performance to the management and the Bank. A comparison of budgeted versus actual
expenditure will be done every quarter as part of the interim financial reports to enable
management to take relevant steps to address significant variances. The PIU will be required
to submit to the Bank, not later than 45 days from end of each quarter, the quarterly Interim
62
Financial Reports which will contain the financial information for the Bank Loan and the
Government contributions. In addition, the PIU shall prepare annual financial statements which
at a minimum shall include: (i)a statement of receipt and payments, (ii)a statement of uses of
funds by component (current and cumulative), (iii)a list of all capital assets, (iv) a list of
Disbursements and (v)any other material information.
4.12 External Audit
The MEAC audit is done by the Auditor General of Namibia. However, concern on the
timelines has been noted in the past and due to capacity constraints in the Auditor General’s
office, outsourcing of the audit service has been done in Bank funded projects. In this regard,
there is provision for the annual project external audit to be done by private auditors. The
external auditor will be recruited by the EA in liaison with the Auditor General as may be
necessary on a competitive basis and the audit carried in accordance with a Bank approved
TOR. The separate project financial statements will constitute the entry point for the external
auditor’s annual diligence. The PIU will be required to submit the project financial statements,
audit report and the management letter together with management comments to the Bank not
later than 6 months from the end of the financial period. The costs of the audit will be borne
by the Bank Loan.
Audit report submission Plan
Audit Report Due submission date
Separate Annual Audited
Financial Statements and
Management Letter
No later than 6 (six) months following the end of each
financial year, throughout project implementation
duration
4.13 Financial Management Action Plan
To further strengthen the FM system for the implementation of the project, the following
actions will be undertaken:
Actions Responsible
Entity
Timeline
Establishing suitable accounting system that
will include the use of spreadsheets to
supplement existing IFMIS system to record
project transactions and for financial reporting
MEAC Within six months after effectiveness.
Updating the existing Treasury Manuals to
include project administrative and financial
procedures.
MEAC Within six months after effectiveness.
Commence the process of recruitment of the
external auditor as required for project audit
PIU/MEAC/Ba
nk
Within 6 months after the first
disbursement
4.14 Other condition
Submit evidence of having opened a foreign currency Denominated ZAR Special Account
together with the equivalent local currency account denominated in NAD for the project.
4.15 Supervision Plan
63
The frequency of FM supervision is determined by the outcome of the assessed risk rating.
Given the current FM moderate risk rating, the project will be supervised at least once per year.
Other supervision activities would be desk reviews of the quarterly IFRs, annual audit reports
and management letters. The outcome of these reviews would inform the intensity of
subsequent FM supervisions.
4.16 Financial Management Risk Analysis
Risk Ris
k
Rat
ing
Risk Mitigation Measures Timing for
proposed
Mitigation
Measures
Conditi
onality
Inherent Risk
Country Level: Acknowledging achievements made
in PFM reforms, there remain
challenges in areas relating to fiscal
planning, budgeting, internal control
system, external audit and
systematic follow-up of related
recommendations as documented in
the PEFA 2015
M PFM reform ongoing aimed at addressing the
current weaknesses. N/A No
Entity Level:
Lack of experience in specific
Bank funded project
implementation.
S The project will be implemented by a PIU
established within the MEAC will consist of
experienced staff in donor funded projects.
The PIU staff will be fully dedicated to the
project.
Before loan
approval PIU
to be set-up
within the
Ministry
No
Project Level:
PIU staff lack experience in
Bank funded projects
S Training will be provided on Bank procedures
and continuous FM sessions throughout the
implementation. Administrative and financial
procedures manuals will provide guidelines.
No
Overall Inherent Risk S
Budgeting: Unrealistic budget with unreported
government operations, there are no
transparent rules for horizontal
budget allocations, instead
allocations are done based on needs
of region and local authority.
M Budget will be aligned to project
implementation schedule, the project annual
work plan and the budget developed by the
PIU will be cleared by the Steering Committee
and also the Bank.
N/A No
Accounting: Project accounting module of IFMIS
has not been fully utilized in
recording and generating project
reports per component and sub-
component as per Bank requirement.
M A suitable accounting system that will include
the use of spreadsheets accounting system to
supplement existing IFMIS system to record
project transactions and for financial reporting
and provide, in a timely manner, all the
required Financial Reports with acceptable
quality to the Bank’s requirements.
Within 6
months from
loan
effectiveness
No
Internal Control: Inadequate finance and
administrative procedure manual for
project management, there is no risk
policy. Internal audit standards are
below par and inadequate staffing
hence impacting negatively on
effectiveness.
M The Executing Agency will update the
existing Manual with Financial and
Administrative procedures for project
operations. The manual will provide
guidance on procedures and key internal
control mechanism to the PIU. The Bank
will pay a particular attention to internal
control during FM supervision. The
expectation of internal audit in the project
management will also be clarified as required.
Within 6
months from
effectiveness
No
Funds Flow: M Disbursement and FM training will be
conducted at the project launch. And the During project
Launch
No
64
EA has no experience in managing
AFDB disbursement. Risk of non-
compliance with Bank requirements
and procedures
Bank’s disbursement handbook will be
provided
Financial Reporting: EA has no experience in Bank
financial reporting hence risk of
financial reporting not being
compliant with the Bank
requirements.
M Financial reporting as per Bank’s
requirements will be covered during the
training scheduled at project launching.
Format of the financial reports will be clarified
and templates shared.
During Project
Launch
No
External Audit: There are delays in submission of
audit report, capacity constraints in
the national audit office.
S A private independent external auditor will be
recruited in a competitive selection process
under the Bank’s approved TOR and under
terms and conditions acceptable by the Bank.
External
auditor be
recruited
within 6 after
first
disbursement
No
Overall Control Risk: M
Overall Risk Assessment M
The FM risk rating is stated in terms of: High (H) or Substantial (S) or Modest (M), or Low (L)
65
ANNEX B.5 PROCUREMENT ARRANGEMENTS
B. 5.1 Summary of the main findings of the BANK PROCUREMENT ASSESSMENT
REPORT (BPAR)
Procurement Legal and Regulatory Framework
1. Procurement Law and Regulatory Framework. The procurement law and code have been
reviewed and the risk for its use in Bank-financed projects is rated at ‘moderate’ due to the
following reasons: (i) The Public Procurement Regulatory Framework (Public Procurement
Act No. 15 of 2015) is being implemented by Public Procurement Regulations No. 2016.
Regulations, Guidelines and User Manuals; (ii) The Act prescribes establishment of a
public procurement oversight agency (PPU) and the Central Tender Board these are being
put in place.; (iii) Sub-section 4 (2) allows the Minister to grant a general or specific
exemption to certain provisions of the Act that are not practical or appropriate for the
purpose for which such goods are let, hired or disposed of, including goods, works and
services being procured.
2. National Standard Bidding Documents. The National Standard Bidding document for
goods, works, and services, including General Conditions of Contracts (GCC) for public
sector contracts, and the dispute resolution mechanism and enforcement procedures of
outcome of the dispute resolution process, have been reviewed and the risk for its use in
Bank-financed projects is rated ‘substantial’ due to the following reasons: (i) Only a
limited number of bidding documents are issued so far; namely Informal Quotations;
Request for Sealed Quotation (Goods and Works); and Open International Bidding for
Goods. There are no national standard bidding documents for Consultancy Services and
Large Works.
3. Regulatory Function. According to the Act the Public Procurement Unit (PPU) is being
been set-up for (i) Oversight and monitoring of the implementation of the policies and
compliance with the law, regulations and directives; (ii) Issuing standard bidding
documents and other standard documents; (iii) Reviewing the procurement and disposal
system and making recommendations; (iv) Development and implementation of capacity
building strategies; (v) Monitor compliance to the Act; (vi) Development and
implementation of procurement professionalization; (vii) Liaison with international
organizations in matters of procurement; and (viii) Procurement audits and investigations
in respect of procurement contracts which fall under the Act. The regulatory body is not
responsible for any direct procurement operations and is therefore free from any possible
conflicts of interest with procurement process, therefore the risk for its use in Bank-
financed projects is rated at ‘low’.
4. Internal and External Controls. The legal framework, organization, policy, and procedures
provides for internal and external control and audit of public procurement which enforces
the proper application of laws, regulations and procedures, have been assessed and the risk
66
for its use is rated as ‘substantial’ for its use in Bank-financed projects due to the following
reasons: (i) the Public procurement in Namibia was so far governed by The Tender Board
of Namibia, Act 16 of 1996, the Tender Board Regulations of 1996 and the Tender Board
of Namibia Code of Procedure of 1997, however no evidences have been provided of any
procurement audits was being conducted in the past. Furthermore, there is no law for
Internal Audit in Namibia or any international standards which mandates Internal Audits
in the Country. Within the Act of 2015, the Public Procurement Unit is mandated to
institute: (i) contract audit in the course of the execution of an awarded contract; and (ii)
performance audit after the completion of the contract in respect of any procurement, when
it is necessary. In addition, in accordance to section 23 (1) of the Act, the Central
Procurement Board (CPB), with the consent of the Auditor-General, must appoint a person
registered as an auditor in terms of the Public Accountants’ and Auditors’ Act, 1951 (Act
51 of 1951), to annually audit its accounting records and financial statements and submit
an audited report to the Board which is more Administrative Audit of the working of CPB
and rather not the project procurement audits undertaken on behalf of the Procuring
Entities.
5. Complaints Redressal Mechanism. The existing complaints redressal system has been
reviewed with a view to ensure whether it sets out clear specific conditions that provide
for fairness, independent and due process, the ‘Act’ outlines a complaints redressal system
stating that when the Minister thinks it is necessary on account of any of grounds mentioned
under the ‘Application for review’, appoint a Review Panel (from a list of 15 qualified
persons who may hold office for a period of which the Minister may determine) which is
the highest body in terms of the complaints redressal system. However, the composition of
Review Panel has not been completed. Furthermore, for the ‘Review Panel’ to convene
over a request for review in each it requires approval of the Minister. This is not efficient
and undermines the independence of the ‘Review Panel’ meeting for requests directly from
the aggrieved parties. Due to these issues the risk for its use in Bank-financed projects is
rated as ‘high’.
Systemic Prohibited Practices
6. Prohibited Practices. The legal provisions, including those relating to the institutions in
charge of fighting against prohibited practices (corruption, fraud, conflict of interest, and
unethical behavior) in public procurement, as well as those which also define
responsibilities, accountabilities and penalties for prohibited practices, has been reviewed
and the risk for its use in Bank-financed projects is rated as ‘low’ due to the following
reasons: The Act and Regulations sufficiently address legal provisions on corruption, fraud,
conflict of interest related to public procurement; there is a separate Act, Anti-Corruption
Act No: 8 of 2003 which deals with investigations and punishment corrupt Activities and
established an Anti-Corruption Commission and provided for other matters incidental to
the prevention of corruption. In additional, published national standard bidding documents
have provision on fraud and corruption
Bank’s guidance on the use of BPS in Bank-financed operations.
67
7. Due to the above remaining issues identified within GRN Procurement System, the risk for
its use in Bank-financed project is globally rated as ‘substantial’. Therefore, the use of BPS
is only recommended for low risk transactions of works and goods based on case to case
basis, as indicated in paragraph B.5.3.1. Overall, the project will be implemented according
to the ‘Procurement Policy for Bank Group- Funded Operations’, dated October 2015,
utilizing available Bank’s Standard Solicitation Documents (SSDs).
B.5.2 Procurement Risk and Capacity Assessment (PRCA)
8. A Procurement Risk and Capacity Assessment (PRCA) was undertaken by the Bank to (i)
evaluate the risks associated with the Borrower procurement system (BPS), the sector
capacity which includes the capacity of the local industry, the project complexity and
design, and the procurement capacity of the Executing Agency; (ii) set up risk mitigation
to be exercised by the Bank and the Borrower; and (iii) form a judgment on the adequacy
of Procurement Methods and Procedures (PMPs), as well as controls being exercised by
the Borrower in the use of funds and contract management.
9. The outcomes of the PRCA revealed that the following considerations will contribute to
minimizing impact of risk: (i) country procurement information relevant to the project; (ii)
the outcomes of the sector market analysis; (iii) level project complexity (project design
risk, delivery quality risk) and the amount and complexity of transactions; (iv) the adequacy
of Bank and Borrower experience with similar project, (v) the procurement methods to be
used; (vi) the Bank’s oversight arrangements; and (vii) any other specific recommendations
to be taken at the level of the Executing Agency to ensure adequate overall capacity,
compliance performance, and operational track record to implement procurement actions
under the project in accordance to Bank Procurement Policy.
B.5.2.1 Country Procurement information relevant to the Project:
10. A review of the BPS has been performed and led to the conclusions that the BPS is not
adequately reliable for use in current the project due to its magnitude and complexity,
namely for LCB and OCB with international publication and all consultancy services
except Individual (ICs) Consultants. The review has also identified additional risks within
the procurement system which may affect the efficiency of procurement operations, such
as lack of integration of the procurement system with the budget formulation process,
payment delays, lack of proper system of collecting, producing and disseminating statistical
data of the system, and no standing ‘Review Panel’ for redress of complaints in place as
yet.
The following mitigation measures should be considered in order to address these issues:
N° Efficiency-related Risks identified Mitigation Measures
1. The national Standard Solicitation Documents
(SSDs) are not complete for major procurement
such as large works and consultancy
assignments. procurement.
(SDD
The PPU should finalize and adopt these SSDs.
68
B.5.2.2 Sector and Market Analysis
11. The Bank Group has gained useful experiences in the development of the education
sector in the country. Key lessons that have been learned include: (i) needs to take into
account institutional environment under which the project operates so as to avoid
unnecessary delays to project implementation in the areas of procurement and
disbursement procedures; It is thus envisaged that MoEAC will recruit for the services
of a supervising consultant working in collaboration with Ministry of Works and
Transport to supervise all the construction works. The Ministry has experience in donor
funded projects but in the area of procuring goods and services. The support to the
project will be augmented by the recruitment of a Procurement Specialist
12. The Bank also reviewed the overall capacity of the sector, and found there is capacity in
the country to undertake the construction. The Act has preferential treatment for local
contracts for contracts not more than NAD $30,000,000 under works and NAD $
10,000,000. For With higher value contracts, the local firms will be encouraged to have
joint ventures. The risk assessment in the sector is considered ‘low’
B.5.2.3 Project Design and Complexity
2. No ‘Review Panel’ setup as in accordance to
the ACT of 2015
The PPU should setup the ‘Review Panel’ in
accordance to the Act of 2015.
3. There is no law on Internal Audit or no Internal
Audit standards based on international
standards.
The Government should expedite enactment of
a law for Internal Audit and follow the
international standards which can help enforce
recommendations from internal audits.
undertaken 4. The External Audit of Central Procurement
Board is limited to only administrative
functions and does extend to the procurement
function performed by CPB on behalf different
of the Procuring Entities (PEs)
The Government should consider extending the
audit to cover procurement functions
undertaken by the CPB on behalf of PEs.
5. The Complaint Redressal Mechanism in not
efficient. In each case it requires approval of the
minister to setup the five members committee
of the ‘Review Panel’ subject to him finding the
request for review acceptable to him.
The law should be amended to constitute a
standing ‘Review Panel’ which can be
approached freely by a complainant
6. No Procedures for enforcement of international
arbitration awards in Namibia
The GRN should consider joining the New
York Convention on Enforcement of
International Arbitration Awards. This would
encourage foreign bidders to participate in the
International Tender invited by GRN and
improve the competition.
69
13. The design and complexity of the project have been reviewed from procurement
perspectives and they generate moderate procurement risks, especially due to; i) the
geographical spread of the schools under renovations; and (ii) Department of
Engineering Services which is mandated with the design and supervision of all buildings
under all line Ministries is already overstretched to meet the project objective. The PIU
will recruit a supervising firm to work under the supervision Building and Maintenance
(B & M) under the Ministry. In addition, the related infrastructure for all the buildings
has to be provided by the Government using their own procurement system. The
challenges posed is the Act is relatively new and delays are expected as this
implementation is currently ongoing with some areas still underway. Mitigation
measures are provided in in the table below:
B.5.2.4 Executing Agency (EA) Assessment
14. The Ministry of Education, Arts and Culture (MoEAC) will be the Executing Agency
for the Project. Ministry of Higher Education, and Training and Innovation (MHETI)
shall establish a Project Implementation Unit (PIU) dedicated to the day to day
implementation of the Project, which include procurement, financial management,
contract administration, monitoring and evaluation, etc. This Unit will be thin the
MoEAC’s internal structures. The PIU will be complemented by a Project
Implementation Support Unit (PISU) which comprises of all key entities with
implementation responsibilities and this includes MWT.
15. The PIU will be constituted of staff from the MoEAC and the Namibia Training
Authority (NTA). The Unit will have a Project coordinator, an accountant, a
procurement specialist, a gender specialist and a monitoring and evaluation specialist.
In addition, the Department of General Services (General Services), at the Ministry of
Works is mandated to design and supervise all building construction of all
government’s infrastructure. However, during assessment of the General Services, it was
noted that it is overstretched with work and have limited capacity to take on this
additional work from the project. Based on this notion, and to argument the gap, a
consulting engineering firm shall be recruited for the supervision of construction works
on the project. The Firm will be supervised by the Division Building and Maintenance
N° Efficiency-related Risks identified Mitigation Measures
1. Geographical spread of construction
works may cause poor monitoring
A car shall be procured to ensure regular visitation
to sites for supervision
2. Department of Engineering Services is
mandated to provide supervision
services for all constructions under Line
Ministries, however it is noted that they
are overstretched to meet the project
demands
The project will recruit a Supervising Consultant
to undertake supervision under the Division of
Building and Maintenance (B & M) under the
Ministry
70
(B&M) with the Ministry, in collaboration with Ministry of Works and Transport’s
regional staff under the Regional Councils. The Division of Building and Maintenance
headed is headed by a Deputy Director (a qualified Engineer). In addition, there is a
control works Inspector and a Works Inspector whose duties are to supervise the works
by professional consultants exist within the Ministry with a good track record of
successfully executing projects. The PIU shall be based at the MoEAC which shall
provide all the logistics for the team’s work.
16. Following the assessment of the Executing Agency; Ministry of Education, Arts and
Culture from a procurement perspective, it generated moderate risk. The risks mitigation
measures are provided in the table below:
N° Efficiency-related Risks identified Mitigation Measures
1. Lack of capacity at the Department of
General Services to oversee procurement
and supervision of the infrastructure
buildings.
A supervising consultant will be recruited to
supervise all the construction activities
under the project
B.5.2.5 Project Procurement Risks Rating (PPRR)
17. Procurement Risk Assessments were undertaken for this project by conducting an
exhaustive assessment covering the risks associated with the country, sector and project
environments as well as the Executing Agency responsible for the implementation of the
Project’s procurement activities.
The outcome of assessments provides the justifications to the risks indicated in the
Summary of PPRR as shown in the table below:
Item Assessment Rating
Risk factor #
Risk factor Low (L) / Moderate (M) / Substantial (S) /
High (H)
Project Procurement Risk Rating
Country Level
1.
Procurement Legal and
Regulations Framework
Moderate (M)
2. Systemic Prohibited
Practices
Low (L)
Sector Level
3. Capacity of the Sector Low (L)
4. Capacity of local industry Low (L)
Project Level
5. Project design risks Moderate (M)
6. Delivery risks Moderate (M)
Capacity Risk of the Executing Agency
7. Capacity Moderate (M)
8. Governance & Prohibited
Practices
Low (L)
71
Most of the issues/ risks associated with the procurement activities for implementation of the project
have been identified and mitigated. The mitigation measures have been discussed and agreed with the
Executing Agency Ministry of Education, Arts and Culture (MoEAC).
The overall Project Procurement Risk Rating (PPRR) is at time of Appraisal is:
Items H S M L
Overall Project Procurement Risk
Country Risks ✔
Sector Risks ✓
Project Specific risks ✔
Executing Agency (ies) Risks ✔
Other7 Risks if identified
B.5.3 Details of Procurement Methods & Procedures (PMPs) to be used under the Project8
B.5.3.1 Borrower Procurement System (BPS)
18. The following contracts will be carried out using the Borrower’s Procurement System
(BPS) in line with the Borrower’s The Public Procurement Regulatory Framework (Public
Procurement Act No. 15 of 2015), implemented by Public Procurement Regulations No.
2016. Regulations, Guidelines and User Manuals, utilizing available National Standard
Solicitation Documents (SSDs) or others SSDs as agreed: (1) Standard Bidding Documents
for Open International Bidding [Issued in terms of section 7(1)(i) of the Public Procurement
Act, 2015] (Goods); (2) ‘Standard Request For Proposal’ for Selection of Consultants
[Issued in terms of section 7(1)(i) of the Public Procurement Act, 2015] - Small/Individual
Assignments; (3) Standard Bidding Documents for Open National Bidding [Issued in terms
of section 7(1)(i) of the Public Procurement Act, 2015] (Works)
Civil Works
Each Contract for Civil Works valued equal or below NAD$ 40,000,000 (estimated UA
2,182,214.95) will be carried out using Open National Bidding (ONB)9 under the BPS.
Works procured under this method, would include: (i) Rehab /Extension of six different
Educ. Facilities (Central Zone) valued for UA 9,917,913.57; (ii) Rehabilitation / Extension
of TVET Facilities Lot 1: Zambezi Vocational Training Centre for the value of UA
2,716,857.61; (iii) Rehabilitation / Extension of UNAM School of Veterinary Medicine for
the value of UA 2,727,768.69
7 Other risks are specific to operations with special risks like those associated with Community-Based Investment
projects, fragile states, and emergency operations, etc. 8 Provide justification 9 All methods mentioned under § B.5.3.1 should reflect what is available in the BPS and then should be adapted
to the situation and reflected in Table 1: Summary of Procurement Arrangements.
72
Goods
Each Contract for goods valued equal or below NAD$ 25,000,000 (estimated UA
1,375,500) will be carried out using Open National Bidding (ONB)10. Goods procured
under this method would be: (i) a vehicle for Works supervision valued for UA 35,460.99.
The Education facilities equipment valued for UA 3,546,099.30; and (ii) TVET facilities
equipment valued for UA 1,909,438.08 shall be under GRN contribution to the project
Non-consulting Services
N/A
Consulting Services
The following consultancy services shall be procured using method for recruitment of
Individual Consultants. Services would include: (i) Procurement Officer and Financial
Accountant valued to the total UA 14,184.40 (ii) Environment Expert for ESMP
preparation valued for UA 14,184.40; (iii) Consultant to prepare project manuals valued
for UA 7,092.20; and (iv) Consultant for Project Completion Report valued for UA
7,092.20
Operating Cost
All expenses such as fuel; allowances; vehicle maintenance; insurance; office equipment and
supplies; including preparation for launching, shall use the Government of Namibia’s system
for such activities
B.5.3.2 Bank’s Procurement Methods and Procedures (Bank’s PMPs):
The following contracts will be carried out using the Bank’s PMPs in line with the Bank’s
“Procurement Policy and Methodology for Bank Group Funded Operations” (BPM), dated
October 2015, utilizing available Bank’s Standard Solicitation Documents (SSDs).
Civil Works
Each Contract for Civil Works valued equal or above UA 3,000,000 will be carried out
using Open Competitive Bidding - international (OCB) under the Bank’s PMPs. Works
procured under this method, would include: (i) Rehab/Extension of five different Educ.
facilities (North Zone 1) valued for a total UA 13,292,751.03; (ii) Rehab /Extension of
three different Educ. facilities (North Zone 2) valued for UA 11,245,191.78; (iii)
Construction of TVET facilities (Keetmanshoop Voc. Training) valued for UA
10 All methods mentioned under § B.5.3.1 should reflect what is available in the BPS and then should be adapted
to the situation and reflected in Table 1: Summary of Procurement Arrangements.
73
3,169,667.21; (iv) Construction of TVET facilities (Hardap Voc. Training centre) valued
for UA 3,169,667.21.
Consulting Services
The following consultancy services shall be procured using Quality Cost Based Selection
(QCBS) method includes: (i) Supervising Engineering consultant for the value of UA
6,764,866.34
The following consultancy services shall be procurement using Least-Cost Selection
method include: (i) Procurement audit for the value of UA 10,638.30; and (ii) Financial
audit for the value of UA 30,005.46
Memorandum of Understanding (MoU): Memorandum of Understanding (MoU) shall be
signed with the Forum for African Women Educationalists – Namibia Chapter (FAWENA)
housed by the Ministry of Education, Arts and Culture who will implement the gender specific
activities within the project to the value of UA 109,110.75. FAWENA has over 15 years’
experience in implementing gender activities in Namibia in collaboration with the MoEAC and
has resources from several development partners such as USAID and the Global Fund. The
institution has the comparative advantage to carry out the gender specific activities under the
Project, which are an extension of the activities it is already undertaking. FAWENA’s
achievements and experience in Namibia are considered unique and key to the efficient
implementation of the gender specific activities of the Project. The gender specific activities to
be implemented by FAWENA include (i) a community engagement initiative to address
teenage pregnancy; and (ii) an outreach intervention to promote girls’ participation in Science,
Technology and Math. This initiative will include capacity building activities for teachers to
demystify science, technology and math.
B. 5.4 Summary of the Procurement Arrangements for the Project
“The procurement arrangements for the various components, elements, and items, under the
different expenditure categories to be financed by the Loan and procured using BPS, and
Banks’ PMPs are summarized in Table 5.1 below. Large-value contracts, each group of similar
transactions/contracts, the different procurement regimes, estimated costs, oversight
requirements, and the timeframe as agreed between the Borrower and the Bank, are
documented in the Procurement Plan (Section B.5.6).”
74
Table 1: Summary of Procurement Arrangements
Project Categories
UA in million
BPS11 Bank’s PMPs Total
OCB LCB Other OCB LCB Other
1. Civil Works
Education Infra. Development:
1.1) Rehab/Exten Facilities (N. Zone - 1)
1.2) Rehab/Exten Facilities (N. Zone - 2)
1.3) Reha /Exten Facilities (Cen Zone)
TVET Infra. Development :
1.4) Rehab /Ext. of Zambezi Vac.
T.Centre
1.5) Constru. of TVET Keet. Vac. T.
Center
1.6) Constru. of TVET Hardap Voc. T
Center
1.6) Rehab/Ext of UNAM Sch. Of Vet
Medic
__________________________________
2. Goods
Education Equipment:
2.1) *** Equipment for Edu. Facilities
2.2) Vehicle for Supervision
TVET Equipment:
2.3) ***Equipment for TVET. Facilities
__________________________________
3. Consulting Services
3.1) Supervising Consultant
3.2) *** Syllabus review and Dev. Processes
3.3) *** TVET Curriculum Review
3.4) Consultant to dev. PIM
3.5) Environmentalist (ESMP)
3.6) Financial Audit
-
-
9,917,913.57
2,716,857.61
3,169,667.21
3,169,667.21
-
3,546,099
35,460.99
1,909,438
-
1,909,438.08
818,330.61
7,092.20
14,184.40
-
13,292,751.03
11,245,191.78
-
-
-
-
2,727,768.69
-
-
-
6,764,866.34
-
-
-
30,005.46
10,638.30
13,292,751.03
11,245,191.78
9,917,913.57
2,716,857.61
3,169,667.21
3,169,667.21
2,727,768.69
3,546,099
35,460.99
1,909,438
6,764,866.34
1,909,438.08
818,330.61
7,092.20
14,184.40
30,005.46
11 Procurement methods OCB, LCB and DP mentioned are indicative and should be aligned with what is
available in the BPS
75
3.7) Procurement Audit
3.8) Consultant for PCR
3.9) Project Consultants (Procurement officer
and Financial Accountant)
____________________________________
4. Operating expenses*
4.1) Maintenance and Monitoring
4.2) Office Supplies
4.3) Project Launching
TOTAL
-
7,092.20
2,841.40
27,277.68
10,911.07
14,184.40
-
2,841.40
-
-
-
10,638.30
7,092.20
2,841.40
27,277.68
10,911.07
14,184.40
+ Figures in brackets are amounts financed by the Bank. *** Figures fully GRN contribution. - this information is captured to match the total
amount of loan with the total on the table yet this is not part of the procurement arrangement.
B.5.5 Advertising
The text of a General Procurement Notice (GPN) has been agreed with ‘Ministry of Education, Arts
and Culture (MoEAC)’, and it will be issued for publication12 in UNDB online and in the Bank’s Internet
Website, upon approval by the Board of Directors of the Financing Proposal.
B.5.6 Bank’s Oversight of Borrower’s Procurement
The framework for the review of Borrowers’ procurement actions, documents, bid evaluation
and contract award recommendations, depends on whether the BPS, or Bank’s PMPs, are being
used.
B.5.6.1 Oversight under BPS:
Under BPS, procurement oversight is carried out according to national procurement laws and
regulations. National oversight institutions comprising the national Public Procurement Unit
and the Office of Auditor General (OAG) will be conducting their own audits as per national
laws and regulations. Monitoring transactions or groups of similar transactions under the
project will, however, be also carried out by independent auditors, relying on the national audit
reports13 as input to their independent reviews. The TORs of such audits are included in the
12 The General Procurement Notice is prepared by the Borrower and submitted to the Bank, which will arrange
for its publication in the United Nations Development Business (UNDB online) and in Bank’s Internet Website. 13 While the Bank recommends to have these procurement audits carried out on an annual basis, they should be
carried out in an efficient manner taking into account the number of contracts awarded during the concerned year of activities.
76
PIM and their costs financed under the project. The Borrower shall, based on these, compile
and submit annual audit reports to the Bank.
B.5.6.2 Oversight under Bank’s PMPs:
Procurement undertaken through Bank shall be subject to prior or post review, as well as IPRs.
Large-value, complex, innovative and\or high-risk transactions would normally be prior-
reviewed. The decision as to whether a procurement process shall be subject to prior or post
review is determined at the level of the transaction or group of similar transactions. It is a risk-
based assessment which drives the (Fit-for-Purpose) FfP decision for any particular
procurement transaction based on the EA and the project level assessments taking into account
the market and country circumstances. All contracts under the Bank’s PMPs will be prior
reviewed by the Bank based on the table below. In addition to prior review by the Bank, the
capacity assessment of the EA, its recommended two procurement supervision missions
annually, to undertake post review of the Borrower’ procurement actions.
The prior review thresholds are provided in the table below:
N° Procurement Method Prior-Review
Thresholds UA
Post-Review
Threshold UA
Frequency of Review
1. Works Above 3,0 million - All
2. Goods Above 300,000 - All
3.
Works
=> 3,0 mil < 0,5 mil
First (2) contracts
subject to prior review;
any further contracts
will be subject to post
review
4.
Goods
=> 300,000 < 0,5 mil
First (2) contracts
subject to prior review;
any further contracts
will be subject to post
review
5. Consultancy Services All - -
B.5.7 Procurement Plan
General: The Borrower, during project preparation and appraisal, is required to develop a
detailed Procurement Plan (PP) covering the entire scope of implementation of the project, and
which has provided the basis for the procurement arrangements in this project appraisal report
(PAR).
The PP has been agreed between the Borrower and the Bank on [date….] and is available at
[provide the office name and location]. It will also be available in the Project’s database and in
the Bank’s external website. The PP will be updated by the Borrower annually or as required
to reflect the actual project implementation needs and improvements in institutional capacity.
Any revisions proposed to the Procurement Plan shall be submitted to the Bank for its prior no
77
objection. The Borrower shall implement the PP in the manner in which it has been agreed with
the Bank.
78
1 General
Country/Organisation: Government of Republic of Namibia
Project/Programme Name: x
Project/Programme SAP Identification #: x
Loan Number: x
Executing Agency: Ministry of Education, Arts and Culture (MoEAC)
Approval Date of Procurement Plan: x
Date of General Procurement Notice:
Period Covered by this Proc. Plan: 18 months
2 Works: Prior/Post review Threshold
Procurement Method
Prior review
Threshold
(UA equiv.)
Post review
Threshold
(UA equiv.)
1. OCB - international =>3,0 mil All
2. OCB - National = >0,5 mil > 3.0 First two contracts
3.
4.
5.
6.
3. Procurement Packages: Methods and Time Schedule for 18 months
Package DescriptionLot
NumberLot Description
Estimated
Amount in UA
(000)
Lump sum or
Unit rate
Procurement
Method
Pre- or Post-
Qualification
Dom. or
Regional
Preference
Prior or Post
Review
SPN
Publication
Date
Contract
Start DateComments
Total Cost 36,321,901.00
1 25/06/20182,727,768 Lum sum OCB Post N/A Prior 05/10/2018
1 04/06/20182,716,857 Lump sum OCB Post N/A Prior 22/10/2018
1 04/06/20183,169,667 Lump sum OCB Post Regional Prior 22/10/2018
1 04/06/20183,169,667 Lump sum OCB Post Regional Prior 22/10/2018
3 07/05/201811,245,191 Lump sum OCB Post Regional Prior 21/09/2018
Reh/ Extension of Educ. Facilities (N. Zone -
2)
Constru. Of TVET Facilities (Keetmanshoop
Voc. Training Centre)
Constru. Of TVET Facilities (Hardap Voc.
Training Centre)
Reh/ Extension of TVET Facilitese ( Lot 1 -
Zambezi Voc. Training Center)
Reh/ Extension of UNAM School of Vet.
Medicine
Frequency of Review
PROCUREMENT PLAN
x
WORKS
5 13,292,751 Lump sum OCB Post Regional Prior 21/09/201807/05/2018
Reh/ Extension of Educ. Facilities (N. Zone -
1)
79
1 General
Country/Organisation: Government of Republic of Namibia
Project/Programme Name: x
Project/Programme SAP Identification #: x
Loan Number: x
Executing Agency: Ministry of Education, Arts and Culture (MoEAC)
Approval Date of Procurement Plan: x
Date of General Procurement Notice:
Period Covered by these Proc. Plans: 18 months
2 Consulting Services: Prior/Post review Threshold
Selection Method
Prior review
Threshold
(UA equiv.)
Post review
Threshold
(UA equiv.)
1. Quality & Cost Based Selection (QCBS) All
2. Least Cost Selection (LCS) All
3.
4.
5.
6.
3 Consulting Services: Selection Method and Time schedule for 18 Months
DescriptionSelection
Method
Lump sum or
Time-Based
Estimated
Amount in UA
Prior/Post
Review
EOI Publication
Date
Contract
Start DateComments
6,805,510.10 Total Cost
LCS Lumpsum 30,005.46 Prior 12/03/2018 10/09/2018
LCS Lumpsum 10,638.30 Prior2. Procurement Audit
3. Financial Audit
PROCUREMENT PLAN
x
CONSULTANTS
QCBS Time-Based 6,764,866.34 Prior
12/03/2018
05/02/2018 23/07/20181. Supervising Consulting Firm
Frequency of Review
10/09/2018
80
ANNEX B.6 AUDIT ARRANGEMENTS
In accordance with the Bank’s audit requirements, the project annual financial statements will be
subject to periodic audits conducted by an experienced and qualified external private audit firm. The
external auditor will be recruited by the Auditor General in a competitive basis, under Bank approved
TORs and under terms and conditions acceptable to the Bank. This audit will be carried out in
accordance with the International Standards on Auditing (ISA), and will include such tests and
controls, as the auditor considers necessary under the circumstances. Besides expressing an opinion
on the project’s financial statements in accordance with ISA, the auditors will be expected to prepare
management letters giving observations and comments, and providing recommendations for
improvements in accounting records, systems, controls and compliance with financial covenants of
the Bank. The audit report and opinions on the financial statements including the management letter
and management response shall be submitted to the Bank within six months from the end of the
financial period. The cost of the audit will be financed from the Loan.
81
ANNEX B.7 ECONOMIC AND FINANCIAL ANALYSIS
1. Analytical Framework
While review of appraisal literature reveals that no universally accepted evaluation framework
exists concerning the overall quantification and monetization of the benefits of such projects like
the Namibia Education and Training Quality Improvement Project and cost-benefit analysis is
rarely conducted, the analysis here attempts to look at measurable impacts of the project.
The analysis looks at the components of the proposed program that lend themselves to the
traditional cost-benefit assessment. Although these benefits of the individual components do not
represent the whole impact on the economy, they can be thought of as representing the minimum
satisfactory level of project impact that could reasonably be quantified. In this project, the direct
benefits of the project are expected to arise from interventional areas such incremental earnings
of labour resulting from the skills developed under the Project and increased productivity in the
labour market; cost savings resulting from significant internal efficiency gains resulting from
reduced drop-out and repetition rates and increased completion rates in response to more
appropriate curricula and syllabuses as well as increased availability of teaching/learning
materials under the Project; and increased private sector participation in skills development
resulting in increased cost recovery and the freeing up of government resources for investment
in other sectors – this benefit is expected to accrue from the improved regulation of the training
system and the partnership efforts to made under the project.
2. Estimation of Program Benefits
The project explicitly targets skills development for about 17,000 youth per year for a period of
20 years from project commencement. The benefits estimated are the incremental earnings
between a semi-skilled and a skilled technician in Namibia. It is assumed that 25% of the trained
skilled technicians find employment and increase their earnings per hour from the earnings of a
semi-skilled technician (ZAR 19.13) to the earnings of a skilled technician (ZAR 27.98) resulting
from her increased productivity and using electricians as a reference for the exercise with the
hourly wages obtained from the GRN Gazette N° 5372 of December 2013.
The next benefit considered is the cost savings resulting from internal efficiency gains in the
education system due to the interventions of the project (reduced dropout rates and repetition rates
caused by various inefficiency drivers to addressed under the project, such as teenage pregnancies
and low teacher competency in revised curricula and syllabuses, poor sanitation infrastructure and
inadequate teaching and learning materials). Starting with the 5,000 learners targeted in basic
education and considering that one-third of learners dropout between grade 1 and grade 10, it is
assumed that efficiency gains will result from preventing the estimated 150 learners that dropout
per year from dropping out. Also from the 2017/2018 annual budget allocated to the education
sector and the number of learners in the entire sector, it is estimated that it costs the Government
about ZAR 21,500 per year of schooling for each learner on average. This figure is used to
estimate the gains to Government by having the 150 learners stay in school until they obtain their
certificates at the end of grade 10 instead of dropping out of the system annually.
82
The final benefit considered is cost savings to the Government resulting from an incremental
participation of the private sector in skills development. Currently the private sector runs about
7% of education institutions in the country. It is assumed that the private sector will increase its
participation in the skills development sector by 5% over the implementation period of the Project
due to the interventions of the project in promoting partnerships and creating a conducive
environment for PPPs. This incremental participation of the private sector will enable the
Government to shift about 5% of the resources allocated to the higher education and training
sector to other sectors of the economy, where private sector funding is not possible. From the
2017/2018 budget, it is noted that the GRN allocated ZAR 3.07 billion to the higher education
and training sector.
3. Cost Assumptions
i. The operating life of the project is modelled for 20 years. Investment period is 5 years,
during which the project is being implemented and gains accrue.
ii. The base costs of the program is a ZAR 1 billion loan from the Bank and ZAR 300 million,
from the Government.
iii. All financial costs are converted to their equivalent economic prices by using appropriate
conversion factors (shadow prices). For tradable goods and services, a conversion factor
of 1.075 is used. Local professional labour is valued at 0.85 of the financial wage paid by
the project.
iv. The economic opportunity cost of capital is taken as 12 % real.
v. Taxes such as input duty and individual income taxes are excluded from the economic
cost estimates because in economic terms they are transfer of funds and as such do not
represent true resource cost.
vi. The Operation and Maintenance cost is reasonably set at 5% per year of the total original
investment outlay over the entire project. With time, the operation and maintenance cost
is assumed to decline by a rate of 5% per year because government operations shift to
other operations and to new programs.
vii. The exchange rate for the ZAR and the US dollar is set at ZAR 13/US$.
viii. A salvage value, which is 2% of the original cost is accounted as a benefit to the project
at the end of the project life, which is the 20th year. The small value of the salvage value
is expected as the effect of this program will ripple out with time while other similar
initiatives will take place during the 20 year period.
4. Economic Viability
The economic analysis combines all measured flows into the standard framework of cost-benefit
analysis. The inflows are the benefits that arise from incremental earnings of skilled labour
compared to semi-skilled labour related to the higher productivity of skilled labour; cost savings
to Government resulting from significant internal efficiency gains resulting from reduced drop-
out and repetition rates and increased completion rates in response to more appropriate curricula
and syllabuses as well as increased availability of teaching/learning materials and more competent
83
teachers under the Project; and cost savings to Government resulting from increased Private
Sector participation in skills development. The outflows are the cost of investment provided by
the Bank as well as the operating cost that the government of Namibia will incur in executing the
program. The economic net present value (ENPV) is estimated at ZAR 300 million using an
economic cost of capital of 12% real. The economic internal rate of return (EIRR) is 20% and is
higher than the opportunity cost of capital, indicating that the project is economically sustainable.
As a result, the country is better off with the proposed project because the expected benefits are
higher than the identified costs. The results of the analysis are presented in Table B7.1.
84
Table B7.1: Economic Resource Flow Statement (ZAR million 2017 prices)
5. Sensitivity Analysis
Further, sensitivity tests have been conducted to understand the impact of changes in the benefits and
costs of the project on the economic performance of the project. The results of the analysis indicate
that the program is resilient to decrease in benefits and increase in costs. The analysis, however, shows
that decrease in the earnings of the typical skilled technician could have some impact on the
sustainability of the project. Equally, effective implementation of the program will lead to significant
increased benefits to the typical skilled technician and to the Government.
Incremental
Earnings for
skilled works
trained under
the Project
(ZAR million)
Cost savings
from increased
efficiency
(reduced
dropouts) (ZAR
million)
Incremental
Cost savings
due to
increased PPP
in Skills
Development
(ZAR million)
Salvage Value
(ZAR million)
Investment Costs
(million ZAR) Operating and
Maintenance
Cost
2018 33.98 0.72 30.70 - (200.00) (10.00) (145)
2019 42.48 1.43 61.40 - (300.00) (25.00) (220)
2020 50.98 2.15 92.10 - (300.00) (40.00) (195)
2021 59.47 2.87 122.80 - (100.00) (45.00) 40
2022 67.97 3.58 153.50 - (100.00) (50.00) 75
2023 67.97 3.58 153.50 - (50.00) 175
2024 67.97 3.58 153.50 - (50.00) 175
2025 67.97 3.58 153.50 - (50.00) 175
2026 67.97 3.58 153.50 - (50.00) 175
2027 67.97 3.58 153.50 - (50.00) 175
2028 67.97 3.58 153.50 - (50.00) 175
2029 67.97 3.58 153.50 - (50.00) 175
2030 67.97 3.58 153.50 - (50.00) 175
2031 67.97 3.58 153.50 - (50.00) 175
2032 67.97 3.58 153.50 - (50.00) 175
2033 67.97 3.58 153.50 - (50.00) 175
2034 67.97 3.58 153.50 - (50.00) 175
2035 67.97 3.58 153.50 - (50.00) 175
2036 67.97 3.58 153.50 - (50.00) 175
2037 67.97 3.58 153.50 - (50.00) 175
2038 - - - 20.00 - 20
ENPV $303.59
EIRR 20%
Years
Outflows
Netflows
85
Table B7.2: Economic Sensitivity Analysis (ZAR million 2017 prices)
Scenario 0 Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 5
YearTotal
BenefitsTotal Costs Base case
10% increase in
costs
10% decrease
in costs
10% increase in
benefits
10%
decrease in
benefits
Skilled worker
earnings reduce
by 25%
2018 65.40 (210.00) (144.60) (165.60) (123.60) (138.06) (151.14) (153.10)
2019 105.31 (325.00) (219.69) (252.19) (187.19) (209.16) (230.22) (230.31)
2020 145.23 (340.00) (194.77) (228.77) (160.77) (180.25) (209.30) (207.52)
2021 185.14 (145.00) 40.14 25.64 54.64 58.65 21.62 25.27
2022 225.05 (150.00) 75.05 60.05 90.05 97.56 52.55 58.06
2023 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2024 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2025 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2026 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2027 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2028 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2029 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2030 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2031 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2032 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2033 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2034 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2035 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2036 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2037 225.05 (50.00) 175.05 170.05 180.05 197.56 152.55 158.06
2038 20.00 - 20.00 20.00 20.00 22.00 18.00 20.00
ENPV $303.59 $197.68 $409.49 $439.85 $167.32 $193.70
EIRR 20% 17% 24% 23% 16% 17%
86
ANNEX B.8 ENVIRONMENTAL AND SOCIAL ANALYSIS
B8.1 Environmental review: 1. To enhance the environmental performance and overall sustainability of the Namibia Education and
Training Quality Improvement Project, the Namibian Environmental Management Act (EMA, No. 7 of 2007)
and the African Development Bank’s Integrated Safeguards Policy (ISS) have been applied. Both have the
same overall objective to ensure environmentally sustainable development and improved quality of life. In line
with the Bank’s Environmental and Social Assessment Procedures (ESAP), this project is categorized as a
Category 2 due to the minimal and localized nature of the environmental impacts associated with it, which
requires the Ministry of Education, Arts and Culture (MoEAC) and the Ministry of Higher Education, Training
and Innovation (MHETI) represented by the Namibia Training Authority (NTA) to develop and implement an
Environmental and Social Management Plan (ESMP) to achieve the avoidance, minimization or mitigation of
adverse environmental and social impacts of the project and to ensure compliance with national laws and
regulations as well as the Operational Standards of the AfDB.
2. Among the guiding principles of the Namibian Constitution is for the Government to ensure the
protection of the country’s ecosystems, essential ecological processes and biological diversity, and to ensure
that natural resources are used in a sustainable manner for all Namibians, both present and future generations.
The Environmental Management Act’s objectives are to: (i) ensure that people consider the impact of activities
on the environment; (ii) ensure that all interested or affected people have a chance to participate in
environmental assessments; and (iii) ensure that finding of environmental assessment are considered before
any decision are made about activities which might affect the environment. That said, the national
environmental law of the Republic of Namibia does not require an environmental and social impact assessment
or the compilation of a management plan for projects of this nature, i.e. construction and rehabilitation of social
infrastructure. An Environmental Clearance Certificate will be needed, however, for one of the TVET
construction sites as it involves rezoning as per the Environmental Management Act and the list of activities
published by the Ministry of Environment and Tourism (MET) indicating which projects may not be
undertaken without an Environmental Clearance Certificate.
3. The objective of the Project is to contribute to increase equitable access to and the efficiency of the
Basic Education and Technical Vocational Education and Training (TVET) system in the country. The Project
will contribute to the development of an efficient, effective and sustainable education and TVET system in
Namibia that is aligned with the current and future skills needs of the labor market in the country. In addition
to strengthening the Basic Education and TVET systems (soft component including syllabus development,
learning and teaching support materials, and training), the Project aims to create a conducive teaching and
learning environment by building and/or rehabilitating education infrastructure including Vocational Training
Centers (VTCs), hostels, classrooms, technical workshops, science laboratories and the National Library and
87
Archives. The planned construction and renovation works are slated to engender significant positive impacts
on the health, safely, quality of life and academic performance of the student population, particularly given the
dire condition of much of the existing education infrastructure. Nevertheless, the construction, rehabilitation
and maintenance of the social infrastructure can result in direct and indirect environmental and social impacts,
including soil, water, air and noise pollution, waste generation and disposal, community health, safety and
security and labour and working conditions. Specifically, impacts include interruption of surface and
groundwater flows from excavation, ground clearance and construction; pollution of surface and ground water
from sewage effluent discharged during construction (workforce) and operation (staff and students); dust and
air emissions from construction and maintenance activities; noise and vibration from construction, operation
and maintenance equipment; inefficient waste management during construction, operation and maintenance
leading to excess consumption of materials, generation of waste and emissions, and pollution of soils and
water; adverse effects on safety, human health and well-being resulting from poor construction management
practices; increased occurrence of communicable diseases as a result of interaction between workforce and
local communities; and accidents, injuries and illnesses among workers as a result of poor management of
occupational health and safety.
4. These impacts are expected to be site-specific and can be minimized by applying appropriate
management and mitigation measures. Where negative impacts arise, mitigation will include careful site
selection of siting of all project components; careful planning of phasing and timing of
construction/rehabilitation activities; minimization of cleared areas and soil disturbance; adoption of a waste
management plan and use of authorized contractors for any hazardous or other wastes to ensure safe disposal;
abstraction to take place with approval of relevant authorities at all locations; promotion of water efficiency
and water recycling; good construction site housekeeping and management procedures; and training and
awareness raising for communities and workforce. Enhancement measures proposed include ensuring that new
and rehabilitated infrastructure adhere to green building standards in terms of energy efficiency and use of
renewable energy (i.e. solar, biomass) to the extent possible. The ESMP is to include the necessary
management measures to achieve its purpose in a timely manner as well as monitoring/supervision/reporting
requirements, implementation arrangements, institutional responsibilities, time schedule, costs and associated
consultation. The Government shall appoint an E&S Coordinator to be a member of the PMU in order to ensure
adequate environmental and social management during projects implementation, compliance with national
laws as well as AfDB safeguards requirements, and to monitor and report on ESMP implementation. The
MoEAC and NTA are also to identify any support requirements to address ESMP implementation capacity
gaps and environmental and social management needs more generally. Costs associated with ESMP
implementation are to be integrated in overall project costs.
88
5. Stakeholder consultations will be conducted as part of the ESMP development process. The ESMP
will be made available by MoEAC and NTA to local stakeholder and relevant communities and additional
impacts identified will be incorporated into the document. The ESMP summary will be posted on the AfDB
website and made available to the AfDB Board 30 days prior to project submission.
Climate Change: In the last decade, Namibia has experienced adverse changes in weather patterns
associated with climate change such as delayed commencement of rainy seasons causing shorter
growing seasons and reduced yields; overall changes in average seasonal temperature, increased
threat of drought and unusually severe flooding in parts of the country. The most vulnerable people
are the communities whose livelihoods depend on natural resources – such as subsistent agriculture.
Regarding the infrastructure investments to be carried out under the Project, climate resilience shall
be built into the methods and techniques to be used, in accordance with the Bank’s Climate Risk
Management Policy. Also the Project will promote the sensitization of learners on the risks of climate
change and the mitigation and adaptation measures to be taken at all levels. In 2014, Namibia adopted
the National Climate Change Strategy and Action Plan, 2013-2020 (NCCSAP), which lays out the
guiding principles responsive to climate change that are effective, efficient and identify priority action
areas for adaptation and mitigation.
A. SOCIAL ANALYSIS
The poverty level in Namibia, according to the 2016 Namibia Household Income and Expenditure
Survey, is estimated at 26.9 % (568,000 people) and the incidence of poverty is higher among female-
headed households (22%) compared to male-headed households (18%)14 with regional disparities.
Namibia has recorded a reduction in inequality in recent years, partly explained by the huge
investment in the social sectors through the government’s social safety net program for the elderly,
youth, people with disabilities, orphans, and vulnerable groups.
According to the 2016 Labour Force Survey Namibia has a high rate of unemployment estimated at
34% (38% female and 30% male) and the situation is worse for the youth with an estimated
unemployment rate of 43%. At the same time the incidence of poverty is high at 27%. It is of greater
concern that the unemployment rate for the youth has increased since 2014 from 204,828 to 246,262
youth population aged between 15 and 34 years. Poverty rates risk increasing if urgent measures to
curb the increasing unemployment rates are not taken. The Government has therefore prioritized
vocational training as one measure of reducing unemployment particularly amongst the youth. This
project will support the development of high quality and skilled human capital which is currently an
obstacle to youth employment. In turn, the project will support and increase employment
opportunities for the youth through its activities aimed at reducing skills mismatch between the
supply-side and the demand-side.
Gender: Namibia has set out ambitious goals for its development and gender equality is identified as
one of the drivers for the achievement of its Vision 2030 with a commitment to ensure that women
and men are equally heard and given equal opportunities, and that they are able to exercise their skills
and abilities in all aspects of life. Across all sectors, there is notable progress on gender equality. To
bridge gender gaps in leadership for example, the government is implementing a ‘zebra system’
14 NSA 2012
89
which automatically reserves the Deputy Minister position to a woman, if the Minister is a man and
vice versa. Furthermore, there is a remarkable increase in the representation in the National Assembly
from 24% in 2009 to 47% in 2015.
Gender equality in education is a key indicator of development as espoused in the SDGs as well as in
Namibian legislations. The Namibian Constitution provides for free education till the age of sixteen
or until completion of primary education. Namibia has also committed itself to “Education for All”
as part of a global movement and the sets of policies and strategies that accompany this commitment.
Additionally, Namibia is one of the countries championing the African Union Continental Education
Strategy for Africa (CESA 16-25) whose objective number five is to “accelerate processes leading to
gender parity and equity". One of the pillars of CESA include Gender equity, equality and sensitivity
throughout the education and training systems.
Against these commitments, the enrolment of girls in schools in Namibia now matches or surpasses
boys. There are 102 girls for every 100 boys in primary school. For every 100 boys in secondary
school, there are 113 girls. Table 1 below shows the number of female and male learners and teachers
by region in Namibia in 2016. This data shows that even though there is near parity in the number of
school-going girls and boys, this differs from region to region.
Source: UNICEF (2016)
Despite the positive trends in enrolment, some challenges still persist and the high enrollment of girls
alone is not necessarily leading to the desired education outcomes. A major challenge to girls’
education achievement is teenage pregnancies. The prevalence of teenage pregnancy is alarmingly
high, and is estimated to be up to 24% in some regions. Studies show that over 20% of women aged
15-19 have begun childbearing with some regions reporting proportions of more than 30%. Even
though there are policies which encourage pregnant girls to continue with their education learner
pregnancy continues to contribute to young girls dropping out of school.
The project appraisal mission established that most of the pregnancies happen as a result of
relationships with older men during school holidays. The government has in place a re-entry policy
for girls who fall pregnant, however their education remains disrupted. Furthermore, the high rates of
pregnancy also means that school girls are exposed to HIV /AIDS. According to the Surveillance
Report of the 2016 National HIV Sentinel Survey, 5.6% of pregnant girls aged 15-19 and 10.2% of
those aged 20-24 who attended ante natal clinics in 2016 tested positive for HIV.
In vocational training centres the enrollment of female students is still much lower than that of male
students. Furthermore fewer female students enroll in Science, Math and technology related fields
90
limiting their participation and employment in technology and engineering rerated work groups.
Female students dominate courses such as nursing at 59% while the enrollment of male students is
higher in sciences, agriculture and natural sciences at approximately 60%. This trend continues into
the labour market where males dominate science and technology based areas of work. The 2016
Labour Force Survey shows that men dominate sectors such as construction, transport, mining as
indicated in the table below.
Table 2. Employed persons by industry and sex
Source: Namibia Statistics Agency, 2017
To address the above challenges, the project will include (i) a community engagement initiative to
address teenage pregnancy, and (ii) outreach programme to promote girls’ participation in Science,
Technology and Math. This initiative will include capacity building activities for teachers to
demystify science and math. The two initiatives will be implemented by the Forum for African
Women Educationalists – Namibia Chapter (FAWENA) housed by the Ministry of Education, Arts
and Culture. The National Training Authority will set targets to increase the number of female
students enrolling in the agriculture mechanization training programme that will soon commence in
Zambezi and Kavango regions, linking with the Agriculture Mechanization and Seed Systems Project.
91
B. Summary ESMP
ANNEX I FORMAT
ENVIRONMENTAL SOCIAL MANAGEMENT PLAN
SUMMARY [ESMP published on the Bank’s
website on the 25 Oct. 2017 – Link hereunder]
PROJECT NUMBER: P-NA-I00-001
PROJECT TITLE: EDUCATION AND TRAINING QUALITY IMPROVEMENT
PROJECT (ETQIP)
COUNTRY: NAMIBIA
DEPARTMENT: HUMAN CAPITAL AND SKILLS DEVELOPMENT
DIVISION:
PROJECT STARTING DATE: JAN. 2018
PROJECT COMPLETION DATE: DEC 2022
DATE OF OPERATION: XXX
PERIOD COVERED BY THE PLAN: 5 YEARS
https://www.afdb.org/en/documents/document/namibia-namibia-education-and-training-
quality-improvement-project-esmp-summary-98588/
92
ANNEX B.9: PROGRAM PREPARATION AND SUPERVISION
The following is a schedule of the key milestones during the preparation of this program. In terms of
monitoring program implementation processes, the result indicators in the PAR Logical Framework
and other intermediate indicators will be tracked.
Table B9.1: Key milestones
Activity Date
1. Preparation Waived
2. PCN to Country Team Waived
4. Appraisal July 2017
5. PAR to Country Team August 2017
6. Negotiations October 2017
7. Board Approval December 2017
8. Planned Date of Effectiveness January 2017
9. Planned Date of Mid-Term Review June 2020
10. Planned Closing Date December 2022