Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
in a multi-scale way in the ield of bioclimatic design and urbanism, optimizing
(Lab), the design ofand spaces (Architecture) deine the singular approach to urban design and
LPA was founded in 2002, in Las Palmas de Gran Canaria (Canary Islands), a city known by having the best weather in the world, and a privilege laboratory for
weather”, and its connection with the advance practice of urbanism. LPA has oices in Las Palmas de Gran Canaria and Madrid.
lutions: the emergence of an ecological era and the new possibilities ofered by Information Technologies (IT). With the social dynamics and environmental
tential of digital tools—as a processing tool—, LPA has developed its own work
. The work of the oice has
SPECIAL-NEEDS FIRENDLY PATHWAY
PROJECT_DOSSIER
CERTIFICACIONES DE CALIDAD Y MEDIOAMBIENTE
Dr. Verneau 1, 213
35001 Las Palmas de Gran Canaria. Spain
T +34 928 323 054
Orense, 85
28020 Madrid. Spain
T +34 915 678 409
EQUIPO REDACTOR Lab for Planning and Architecture
AUTOR DEL ENCARGO Las Palmas Municipality
l-p-a.orgl-p-a.org
l-p-a.org
in a multi-scale way in the ield of bioclimatic design and urbanism, optimizing
(Lab), the design ofand spaces (Architecture) deine the singular approach to urban design and
LPA was founded in 2002, in Las Palmas de Gran Canaria (Canary Islands), a city known by having the best weather in the world, and a privilege laboratory for
weather”, and its connection with the advance practice of urbanism. LPA has oices in Las Palmas de Gran Canaria and Madrid.
lutions: the emergence of an ecological era and the new possibilities ofered by Information Technologies (IT). With the social dynamics and environmental
tential of digital tools—as a processing tool—, LPA has developed its own work
. The work of the oice has
SPECIAL-NEEDS FRIENDLY PATHWAY
A brand new layout clever landscaping and a special_needs friendly
pathway
The main aim of the project is to solve the problems of universal accessibility and
mobility of the clients. The overall strategy is to provide not only a functional solution
for people with special needs but to ofer social inclusion, in a non-segregated
space. The project is made up of three components. The irst is a straight staircase
that connects the diferent levels. The second is a smooth ramp that gives direct
and universal access to the facilities and the solariums. The third element is a
triangular layout that integrates the walks into the surrounding landscape. The
whole layout ofers a 60% permeable surface that guarantees natural oxygenation
and watering of the soil.
PROJECTProyecto de acondicionamientos varios en las Piscinas de Julio Navarro y Roque Díaz
LOCATIONLas Palmas de Gran CanariaSpain
YEAR
2011
CLIENT
Las Palmas Municipality
STATUS
Built
SIZE
1.000 m²
SCOPE OF WORK
Landscape Architecture
Mobility Infrastructures
SERVICES
Landscape Design
Infrastructure Design
Execution DocumentationSite Supervision
Industrial/Digital Fabrication
PROJECT_DOSSIER
l-p-a.org
Lab for Planning and Architecture
CREDITS
Project DirectorsJuan Palop-CasadoFernando Portillo de Armenteras
Design PhaseIgnacio López Busón (Team Leader)Leah Cabrera FischerDiego Sáenz PenagosBentejuí Hernández Acosta
Execution & Construction PhaseLaura Rodríguez Cardona (Team Leader)Ignacio López Busón Manuel Arencibia Beautell
Elisa Chu González
COLLABORATORS
Construction ManagementEdward Lynch
ImagesMicael Löfgren
+ INFO
Architizer 2013 Finalist (Architecture+Mobility)
Special-Needs Friendly Pathway
l-p-a.org
REPORTREPORT
A brand new layout with clever landscaping and a special-needs friendly pathway .
Context
The Julio Navarro Swimming Club is in the heart of Las Palmas de Gran Canaria in the Canary
Islands (Spain). The club has gained a national reputation for its commitment to accommoda-ting people with special needs. The facilities, however, are dated and pathways inadequate to the new needs.
Objective
The main aim of the project is to solve the problems of universal accessibility and mobility of
the clients. The parameters of this project are aligned with the current Spanish legislation with
respect to universal pedestrian accessibility in outdoor areas, which includes, among other items, speciications with respect to steepness, slipperiness, width and elements of support, such as handrails, in the design.
Strategy & Function
The overall strategy is to provide not only a functional solution for people with special needs
but to ofer social inclusion, in a non-segregated space. The project is made up of three components. The irst is a straight staircase that connects the diferent levels. The second is a smooth ramp that gives direct and universal access to the facilities and the solariums.
Form
The third element is a triangular layout that integrates the walks into the surrounding
landscape. The layout is based on Denauay triangulation produced with civil engineering 3D
software allowing thereby to maximise the lesser angles together with the size of each triangle.
Reality & Innovation
Four diferent elements are used in the resulting triangular topography: pavement, drains, vegetation, and contention. The three irst are used in the lat areas and the slight slopes. They serve, respectively as pathways, drainage and tree spots. The fourth, the contention wall, is used in the area of steeper slopes. The wooden handrails and nets complete the project. The
whole layout ofers a 60% permeable surface that guarantees natural oxygenation and watering of the soil.
FACT SHEET
l-p-a.org
Lab for Planning and Architecture
CREDITS +INFOPROJECTProyecto de acondcionaminetos varios en las Piscinas de Julio Navarro y Roque Díaz
PROGRAMDesign Development Execution DocumentationSite SupervisionIndustrial/Digital Fabrication
TAGSUrban Design Public Space Landscape ArchitectureLight Infrastructure
LOCATIONLas Palmas de Gran CanariaSpain
SITE28º 07´ 17.28“ N15º 25´ 46.55” O
YEAR2011
CLIENTLas Palmas Municipality
STATUSBuilt
SIZE1000 m²
BUDGET463.322,25 €
SECTORMobility & Infrastructure
SCOPE OF WORKLandscape ArchitectureMobility Infrastructures
SERVICESLandscape DesignInfrastructure DesignExecution DocumentationSite SupervisionIndustrial/Digital Fabrication
TEAM
Project DirectorsJuan Palop-CasadoFernando Portillo de Armenteras
Design PhaseIgnacio López Busón (Team Leader)Leah Cabrera FischerDiego Sáenz PenagosBentejuí Hernández Acosta
Execution & Construction PhaseLaura Rodríguez Cardona (Team Leader)Ignacio López Busón Manuel Arencibia Beautell
Elisa Chu González
COLLABORATORS
Construction ManagementEdward Lynch
ImagesMicael Löfgren
Architizer 2013 Finalist (Architecture+Mobility)
Julio Navarro
Swimming Club
Doramas Park
Santa Catalina HotelN
l-p-a.org
EXECUTION
Special-Needs Friendly Pathway
entrance side
50 meters swimming pool side
25 meters swimming pool side
l-p-a.org
CONTEXT
+ +
topography
landscape envelope
staircaces
directaccessibility
ramps
universal accessibility+
leisure programs
strategy
l-p-a.org
Special-Needs Friendly Pathway
STRATEGY
l-p-a.org
STRATEGY
entrance₊21.82
restaurant₊19.50
restaurant₊18.30
gym₊16.37
pool store₊16.37
locker room₊16.37
offices₊19.25
swimming pool₊17.48
swimming pool₊17.48
exit₊14.25
swimming pool₊14.25
en
tra
nce
sid
e5
0 m
ete
rs s
wim
min
g p
oo
l si
de
25
me
ters
sw
imm
ing
po
ol
sid
e
scale 1:500
N
A
l-p-a.org
Special-Needs Friendly Pathway
PROPOSAL
l-p-a.org
PROPOSAL
l-p-a.org
Special-Needs Friendly Pathway
l-p-a.org
Special-Needs Friendly Pathway
PROPOSAL
l-p-a.org
EXECUTION
l-p-a.org
EXECUTION
Special-Needs Friendly Pathway
l-p-a.org
EXECUTION
l-p-a.org
Special-Needs Friendly Pathway
l-p-a.org
Special-Needs Friendly Pathway
AS BUILT
l-p-a.org
AS BUILT
l-p-a.org
Special-Needs Friendly Pathway
l-p-a.org
Special-Needs Friendly Pathway
AS BUILT
l-p-a.org
AS BUILT
l-p-a.org
Special-Needs Friendly Pathway
l-p-a.org
Special-Needs Friendly Pathway
AS BUILT
l-p-a.org
AS BUILT
l-p-a.org
Special-Needs Friendly Pathway
AS BUILT
l-p-a.org
AS BUILT
Canary Islands I Head Dr. Verneau 1, 213
35001 Las Palmas de GC. Spain T +34 928 323 054F +34 928 310 183
Orense 85
28020 Madrid. Spain T +34 915 678 409F +34 915 714 244