PROJECT DESCRIPTION ADA-SR 125-6.33 PID 102890 It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark in Adams County, Ohio. The project is located in a rural area of Tiffin Township. The existing structure is a 11’-7” x 7’-5” corrugated metal pipe (CMP) with half-height headwalls. The invert of the existing structure will be paved with concrete. The project will not require new right-of-way. No homes or businesses will be removed by the project. According to US census data an underserved populations (low income population) is adjacent to the project area. The low income population will not be directly impacted by the project. Humboldt Creek is an intermittent stream that is in the Ohio River drainage basin. Within the project area Humboldt Creek has drainage area of 0.64 mi². The roadway will be open during construction. The project was surveyed for running buffalo clover on May 22, 2019. The survey determined that potentially suitable habitat for this species was not present within the project limits. All quads around the project area are impacted by mowing, herbicidal spraying and other recent disturbances. The project will have a No Effect on the running buffalo clover. The funding for the project is 80% Federal and 20% State. The environmental commitment date is 6/26/2020. The project is currently expected to be awarded 1/25/2021.

PROJECT DESCRIPTION ADA-SR 125-6.33 PID 102890 125 6.33 Culvert Rehab.pdfADA-SR 125-6.33 . PID 102890 . It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT DESCRIPTION ADA-SR 125-6.33 PID 102890 125 6.33 Culvert Rehab.pdfADA-SR 125-6.33 . PID 102890 . It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark

PROJECT DESCRIPTION

ADA-SR 125-6.33

PID 102890

It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark in Adams County, Ohio. The project is located in a rural area of Tiffin Township.

The existing structure is a 11’-7” x 7’-5” corrugated metal pipe (CMP) with half-height headwalls. The invert of the existing structure will be paved with concrete.

The project will not require new right-of-way.

No homes or businesses will be removed by the project. According to US census data an underserved populations (low income population) is adjacent to the project area. The low income population will not be directly impacted by the project.

Humboldt Creek is an intermittent stream that is in the Ohio River drainage basin. Within the project area Humboldt Creek has drainage area of 0.64 mi².

The roadway will be open during construction.

The project was surveyed for running buffalo clover on May 22, 2019. The survey determined that potentially suitable habitat for this species was not present within the project limits. All quads around the project area are impacted by mowing, herbicidal spraying and other recent disturbances. The project will have a No Effect on the running buffalo clover.

The funding for the project is 80% Federal and 20% State. The environmental commitment date is 6/26/2020. The project is currently expected to be awarded 1/25/2021.

Page 2: PROJECT DESCRIPTION ADA-SR 125-6.33 PID 102890 125 6.33 Culvert Rehab.pdfADA-SR 125-6.33 . PID 102890 . It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark
chatton
Oval
chatton
Text Box
ADA-SR 125-6.33 PID 102890
chatton
Line
Page 3: PROJECT DESCRIPTION ADA-SR 125-6.33 PID 102890 125 6.33 Culvert Rehab.pdfADA-SR 125-6.33 . PID 102890 . It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark

ODOT District 9 Planning and Engineering Department

April 2020

Base Map: 7.5 Minute Topographic Quadrangle

West Union, Ohio 384-15-SE

ADA-SR 125-6.33

0 1,000 2,000500Feet

q

chatton
Text Box
PROJECT AREA
chatton
Line
chatton
Text Box
Humboldt Creek
chatton
Line
Page 4: PROJECT DESCRIPTION ADA-SR 125-6.33 PID 102890 125 6.33 Culvert Rehab.pdfADA-SR 125-6.33 . PID 102890 . It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark

ODOT District 9 Planning and Engineering Department

April 2020

Base Map: Bing Maps Hybrid

Aerial Location Map

ADA-SR 125-6.33

0 1,000 2,000500Feet

q

chatton
Text Box
PROJECT AREA
chatton
Line
chatton
Text Box
Humboldt Creek
chatton
Line
Page 5: PROJECT DESCRIPTION ADA-SR 125-6.33 PID 102890 125 6.33 Culvert Rehab.pdfADA-SR 125-6.33 . PID 102890 . It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark

ODOT District 9 Planning and Engineering Department

April 2020

Base Map: OSIP III

Aerial Location Map

ADA-SR 125-6.33

0 100 20050Feet

q

chatton
Text Box
PROJECT AREA
chatton
Line
chatton
Text Box
Humboldt Creek
chatton
Line
Page 6: PROJECT DESCRIPTION ADA-SR 125-6.33 PID 102890 125 6.33 Culvert Rehab.pdfADA-SR 125-6.33 . PID 102890 . It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark

ODOT District 9 Planning and Engineering Department

April 2020

Base Map: OSIP III

Photo Location Map

ADA-SR 125-6.33

0 100 20050Feet

q

chatton
Oval
chatton
Text Box
1
chatton
Line
chatton
Oval
chatton
Text Box
2
chatton
Line
chatton
Oval
chatton
Text Box
3
chatton
Line
chatton
Oval
chatton
Text Box
4
chatton
Line
chatton
Oval
chatton
Text Box
5
chatton
Line
chatton
Oval
chatton
Text Box
6
chatton
Line
chatton
Oval
chatton
Text Box
7
chatton
Line
chatton
Oval
chatton
Text Box
8
chatton
Line
chatton
Oval
chatton
Text Box
9
chatton
Line
chatton
Oval
chatton
Text Box
10
chatton
Line
Page 7: PROJECT DESCRIPTION ADA-SR 125-6.33 PID 102890 125 6.33 Culvert Rehab.pdfADA-SR 125-6.33 . PID 102890 . It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark
chatton
Text Box
1. LOOKING WEST
chatton
Text Box
2. LOOKING DOWNSTREAM
Page 8: PROJECT DESCRIPTION ADA-SR 125-6.33 PID 102890 125 6.33 Culvert Rehab.pdfADA-SR 125-6.33 . PID 102890 . It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark
chatton
Text Box
3. LOOKING SOUTHEAST
chatton
Text Box
4. LOOKING SOUTH
Page 9: PROJECT DESCRIPTION ADA-SR 125-6.33 PID 102890 125 6.33 Culvert Rehab.pdfADA-SR 125-6.33 . PID 102890 . It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark
chatton
Text Box
5. LOOKING EAST
chatton
Text Box
6. LOOKING EAST
Page 10: PROJECT DESCRIPTION ADA-SR 125-6.33 PID 102890 125 6.33 Culvert Rehab.pdfADA-SR 125-6.33 . PID 102890 . It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark
chatton
Text Box
7. LOOKING UPSTREAM
chatton
Text Box
8. LOOKING NORTH
Page 11: PROJECT DESCRIPTION ADA-SR 125-6.33 PID 102890 125 6.33 Culvert Rehab.pdfADA-SR 125-6.33 . PID 102890 . It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark
chatton
Text Box
9. LOOKING NORTHWEST
chatton
Text Box
10. LOOKING SOUTHEAST
Page 12: PROJECT DESCRIPTION ADA-SR 125-6.33 PID 102890 125 6.33 Culvert Rehab.pdfADA-SR 125-6.33 . PID 102890 . It is proposed to rehabilitate the structure on SR 125 at the 6.33 mile mark

DA

TE

ST

RU

CT

UR

E FIL

E

NU

MB

ER

ST

A.

ST

A.

CH

EC

KE

DR

EVIS

ED

DESIG

NE

DD

RA

WN

RE

VIE

WE

DD

ESIG

N

AG

EN

CY

PID

No.

I:\

Project

Data\

D09\10

2890_

D09_

CY_F

Y2021\

Desig

n\

Structures\

AD

A12

5_0633

C\

Sheets\12

5_0633

C_S

P001.dgn

Sheet 4/13/2020 3:17:5

6

PM jzic

kaf

o

12

19

1 1

SIT

E

PL

AN

JA

Z

XX

X

JA

ZX

XX

XX

X

MM/

DD/

YY

DESIGN TRAFFIC:

DIRECTIONAL DISTRIBUTION =

TYPE:

SPANS:

LOADING:

SKEW:

APPROACH SLABS:

ALIGNMENT:

CROWN:

STRUCTURAL FILE NUMBER:

DATE BUILT:

DISPOSITION:

ROADWAY:

COORDINATES: LATITUDE

LONGITUDE

WEARING SURFACE:

PROPOSED WORK

INVERT PAVING

EOP/EOP

REHABILITATION

N

`11'-7" x `7'-5" CMPA WITH HALF-HEIGHT

HEADWALLS AND 6" RIPRAP WITH CUTOFF WALL

`15.0'

`24'-0"

H15

`39°17'52" RIGHT FORWARD

ASPHALT

NONE

SUPERELEVATED

0103039

1964

2021 ADT = 2021 ADTT =

2041 ADT = 2041 ADTT =

BRID

GE

NO.

AD

A-12

5-0635

3,300

3,300

50%

33

33

OV

ER

HU

MB

OL

DT C

RE

EK

N 38° 48' 33"

W 83° 34" 46"

340

+58

340

+73

AD

AM

S C

OU

NT

Y

010

3039

OD

OT

DIS

TRIC

T 9

PL

AN

NIN

G

AN

D E

NGIN

EE

RIN

G1028

90

D09-

CR-F

Y2021

EXISTING STRUCTURE

Dc = `3°00'00" RIGHT

340

341

Lc = 1,086.67'

P.I. Sta. 348+34.93

¬

R = 1,909.86'

Ts = 876.19'

Ls = 300'

Es = 135.25'

¡s = 4° 30' 00"

Yc = 7.85'

Xc = 299.82'

EX. SPIRAL CURVE - S.R. 125

ELEV. 855.5

{ INLET

ELEV. 855.2

{ OUTLET

10'-0" EXTENSION`51'-0"`49'-0"

OF FIELD PAVING

1̀2'-0"

1̀2'-0"

| CONSTRUCTION S.R. 125

| CONSTRUCTION S.R. 125

`24'-0"

2̀0'-

0"

PLACE FIELD PAVING

EX. CONCRETE APRON AND

REMOVE 11'-7" x 10'-0" OF

PROPOSED CONSTRUCTION LIMITS

| HUMBOLDT CREEK `39°17'52" R.F.

855

865

845

OHWM = 856.5

PLAN

PROFILE ALONG | CHANNEL

`100'-0"

ITEM 611 - FIELD PAVING OF EXISTING PIPE (11'-7" x 7'-5")........110 FT.

ITEM 503 - COFFERDAMS AND EXCAVATION BRACING................LUMP

ITEM SPECIAL - PIPE CLEANOUT OVER 48"...........................100 FT.

ITEM 202 - CONCRETE SLOPE PROTECTION REMOVED...............13 SQ. YD.

TO THE GENERAL SUMMARY TO COMPLETE THIS WORK:

THE FOLLOWING QUANTITIES HAVE BEEN CARRIED