Upload
others
View
8
Download
0
Embed Size (px)
Citation preview
Project Data SheetProject DataNote: More detailed statistics may be requested during review of the application.
Existing Use: Proposed Use:
Total lot area: Lot frontage: Lot depth m2 m m
Date of construction for existing building (if known):
Number of buildings Existing_________ Retained_________ Proposed_________ Total_________Ground Floor Area Existing ________m2 Retained_________m2 Proposed_________m2 Total________m2
Residential GFA Existing ________m2 Retained_________m2 Proposed_________m2 Total________m2
Non-residential GFA Existing ________m2 Retained_________m2 Proposed_________m2 Total________m2
Landscaped Open Space Existing ________m2 Retained_________m2 Proposed_________m2 Total________m2
Paved Surface Area Existing ________m2 Retained_________m2 Proposed_________m2 Total________m2
Height of Building(s) Existing____Storeys Retained____Storeys Proposed____Storeys Total____Storeys ____m ____m ____m ____m
Residential Units - Tenure and Quantity ____Units Freehold Condo
Freehold Condo Freehold Condo
Existing: Rental* Retained: Rental* Proposed: Rental Total: Rental Freehold Condo
Other:__________________ Other:__________________Other:__________________Other:__________________
11-0008 2015-12
Front Lot Line ____________Side Lot Line ____________Side Lot Line ____________Rear Lot Line ____________
Existing ________m Existing ________m Existing ________m Existing ________m
Retained _________ m Proposed _________m Retained _________ m Proposed _________m Retained _________ m Proposed _________m Retained _________ m Proposed _________m
Existing Generalized Land Use: Proposed Generalized Land Use:
Page 1 of 2
Total gross floor area of all buildings on site when project is complete: ___________________________________
____Units ____Units ____Units
____ Units ____ Units
____ Units ____ Units
____ Units ____ Units ____ Units ____ Units
____Units ____Units ____Units ____Units
Minimum Setbacks
*If Rental Units are selected for Existing and Retained conditions, a "Rental Housing Demolition and ConversionScreening and Declaration" form is required to be submitted with this Application.
Breakdown of Project Components - Part 1 of 2Total gross floor area of project:Lot coverage ratio (ground floor area÷lot area) Floor space ratio (gross floor area÷lot area)
Residential Retail Office Industrial Institutional/OtherType of use: Gross Floor Area (m2) _________m2 Percentage of Project (%) _________%
________ m2 ________ m2 _________ m2 _________m2
________% ________% _________% _________%
Breakdown of Residential Component Rooms Bachelor 1-Bedroom 2-Bedroom 3 or more BedroomsNumber of Units _______ _______ _______ _______ _______
Typical Unit Size _______m2 _______ m2 _______ m2 _______ m2 _______ m2
11-0008 2015-12 Page 2 of 2
Parking and Loading Data: Number of parking places provided in project:_______________ Breakdown of parking space allocation:for residential use___________ for residential visitors____________ for retail use_____________ for office use___________ for industrial use___________ for institutional/other use___________
Location and number of parking spaces:Open surface spaces______ Attached garage______Detached garage______Cash payment in lieu______Above grade parking deck______ Below grade parking structure______ Off-site lease_______Number of loading spaces provided in project:_________ Type of loading spaces provided (if applicable)_________ Access and Services:Road access Provincial Highway Municipal Street Private right-of-wayServicing: All of belowMunicipal Water Municipal Sanitory Sewers Municipal Storm Sewers Other (septic)available connected available connected available connected
Breakdown of Project Components - Part 2 of 2