Project Concept Report

Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida)

Date: November 21, 2019

This is a conceptual report. The project features

and layouts will be further refined through planning

and design phases.

Page 2: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

1 | Page

Image above represents broad outline of the project area as shown in 2018 MOVEBR tax plan proposition

Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida)

MOVEBR Program ID: CEP-55 Project Length (feet): 14,000 Estimated Cost: $15,000,000 Funded from Proposition: $15,000,000

PROJECT OVERVIEW

This project proposes to enhance pedestrian and cyclist mobility by reducing the

extending the Complete Streets corridor from the Downtown Greenway project

eastward into the developed areas along North Blvd. Right-of-way space will be

considered for reconfiguring to create bicycle facility space as well as space for

enhancement features and continuous sidewalks through the corridor. High visibility

crosswalks at all intersections and pedestrian countdown signals at signalized

intersections will also be considered.

Current Condition: Four-lane undivided w/sidewalks

Proposed Condition: See Typical Sections for Preliminary Concept Alternates.

During later phases, other alternate improvements will be

developed and finalized with input from the public.

Page 3: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

2 | Page

PROJECT STATUS

This project is currently in the planning phase.

COMPLETE STREETS

The MOVEBR Program has developed design guidelines that aim to institutionalize the

Complete Streets policy by accommodating pedestrian, bicyclists, and transit users,

regardless of age and ability.

DRAINAGE AND GREEN INFRASTRUCTURE CONSIDERATIONS

Among the drainage considerations for this specific project are the following:

A portion or all of this project is located within flood zone AE, which is considered

a Special Flood Hazard Area (SFHA).

This project location is not in an area identified as an “estimated inundation area”

from the 2016 floods. This map can be viewed at

https://www.arcgis.com/home/webmap/viewer.html?webmap=cb332217bdab4572b4930e02d

6655f84

Existing drainage for this project area utilizes a closed (sub-surfaced) system.

The project budget considers funding for green infrastructure to improve water quality

and mitigate impacts of stormwater runoff. Examples of green infrastructure include but

are not limited to porous pavement, creation or maintenance of a tree canopy,

bioswales, planter boxes, rain gardens, and land conservation efforts.

ENVIRONMENTAL CONSIDERATIONS

Initial reviews support the following;

Minimal environmental considerations have been identified (potential Cultural

Resources) and must be reviewed and potentially addressed.

*Note that this is not exhaustive of possible future environmental considerations.

Page 4: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

3 | Page

TRAFFIC & SIGNALIZATION INTERSECTIONS

The Projected Average Daily Traffic (ADT) for year 2042 is 12,000.

The current concept supports turn lanes at major intersections for budget purposes.

Future traffic studies will identify locations for turn lanes, median openings and

connections (driveways, side streets etc.).

Signal systems will be upgraded as a part of future projects if required due to future

configurations.

UTILITIES CONSIDERATIONS

A preliminary assessment of the project area provides for the utilities listed below.

Potential utility relocation costs will be included in the project budget if the infrastructure

is located within the utility’s own servitude.

Possible Utilities Existing Adjust/Relocate

Overhead Electric TBD

Underground Electric TBD

Water TBD

Sanitary Sewer TBD

Telephone TBD

CATV/Fiber TBD

Gas Distribution TBD

RIGHT OF WAY CONSIDERATIONS

Minimal residential or commercial right of way acquisitions are anticipated at this time.

Page 5: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

4 | Page

PROJECT CONCEPT PLAN

The following pages provide a potential solution(s) for the proposed project. The project

features and layouts, shown within the typical section(s) and concept plans, will be

further refined through planning and design phases of the project.

Page 6: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

11/21/19

Page 7: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

11/21/19

Page 8: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

SCALE: 1" = 50'

0 50 100

NORTH BLVD.

NORTH BLVD.

SB I-1

10

NB I-1

10

S. 1

0T

H S

T.

N. 11T

H S

T.

S. 11T

H S

T.

S. 10T

H S

T.

N. 12T

H S

T.

N. 13T

H S

T.

S. 13T

H S

T.

S. 12T

H S

T.

BAPTIST CHURCHSHILOH MISSIONARY

1of9

MASONIC TEMPLEPRINCE HALL

11/12/19

Sheet No.NORTH BLVD. CORRIDOR ENHANCEMENT

(I-110 TO FOSTER/FLORIDA)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

11/21/19

Page 9: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

SCALE: 1" = 50'

0 50 100

PARKN. 14TH ST.

N. 14T

H S

T.

S. 18T

H S

T.

N. 18T

H S

T.

NORTH BLVD.

NORTH BLVD.

2of9

PARKNORTH BLVD. MINISTRIES

JIREHJEHOVAH

BRIC

E S

T.

S. 17T

H S

T.

S. 16T

H S

T.

S. 1

5TH S

T.

11/12/19

Sheet No.NORTH BLVD. CORRIDOR ENHANCEMENT

(I-110 TO FOSTER/FLORIDA)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

11/21/19

Page 10: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

11/12/19

Sheet No.NORTH BLVD. CORRIDOR ENHANCEMENT

(I-110 TO FOSTER/FLORIDA)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100

NORTH BLVD.

NORTH BLVD.

N. 19T

H S

T.

S. 19T

H S

T.

S. 20T

H S

T.

N. 20T

H S

T.

N. 21S

T S

T.

S. 21S

T S

T.

N. 22

ND S

T.

S. 22

ND S

T.

N.

BA

XT

ER S

T.

ACADEMYNEW SCHOOL

LOUISIANA

CHURCHBETHEL BAPTIST

GREATER NEW

3of9

FAMILY SUPPORTDCFS OFFICE OF

CEMETERYSWEET OLIVE

11/21/19

Page 11: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

SCALE: 1" = 50'

0 50 100

GOSPEL MINISTRYMACEDONIA FULL

NORTH BOULEVARDN. 23

RD S

T.

DE

LP

HIN

E S

T.

N. 24T

H S

T.

EV

ER

GR

EE

N D

R.

N. 25T

H S

T.

ST.

RO

SE A

VE.

S.

BA

XT

ER S

T.

N. 26T

H S

T.

N. E

UG

EN

E S

T.

N. E

UG

EN

E S

T.

AT

KIN

SO

N S

T.

NORTH BLVD.

NORTH BLVD.

SCHOOLMAGNET HIGHBATON ROUGE

NORTH BOULEVARDKIDNEY CARE

FRESENIUS

S. E

UG

EN

E S

T.

4of9

FOUNDATIONANEMIA

SICKLE CELLBATON ROUGE

BE

LL

EVIE

W D

R.

11/12/19

Sheet No.NORTH BLVD. CORRIDOR ENHANCEMENT

(I-110 TO FOSTER/FLORIDA)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

11/21/19

Page 12: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

SCALE: 1" = 50'

0 50 100

NORTH BLVD.

NORTH BLVD.

GO

TT

LIE

B S

T.

BE

DF

OR

D D

R.

OG

DE

N D

R.

GR

ET

A A

VE.

BE

VE

RL

Y D

R.

HE

AR

TS

TO

NE D

R.

KE

RN

AN A

VE.

S.

AC

ADIA

N T

HW

Y.

N.

AC

ADIA

N T

HW

Y.

SCHOOLMAGNET HIGHBATON ROUGE

5of9

RECYCLED READSEBRP LIBRARY

11/12/19

Sheet No.NORTH BLVD. CORRIDOR ENHANCEMENT

(I-110 TO FOSTER/FLORIDA)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

11/21/19

Page 13: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

11/12/19

Sheet No.NORTH BLVD. CORRIDOR ENHANCEMENT

(I-110 TO FOSTER/FLORIDA)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100L

OV

ER

S L

N.

PE

AC

HT

RE

E B

LV

D.

WE

ST D

R.

WE

ST

MO

RE

LA

ND D

R.

SCHOOL OF MEDICINETULANE UNIVERSITY

CAPITAL AREASERVICES OF THE

ALZHEIMER'S

JA

SMIN

E B

LV

D.

WA

BA

SH D

R.

ST

EE

LE B

LV

D.

EA

ST D

R.

NURSINGSCHOOL OF

BATON ROUGE

BATON ROUGEAMERICA OF GREATER

VOLUNTEERS OF

6of9

CARE CLINICOPEN HEALTH

BATON ROUGE GENERAL PHYSICIANS

11/21/19

Page 14: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

11/12/19

Sheet No.NORTH BLVD. CORRIDOR ENHANCEMENT

(I-110 TO FOSTER/FLORIDA)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100

RIC

HL

AN

D A

VE.

EDIS

ON S

T.

N. L

EO S

T.

S. L

EO S

T.

RA

Y S

T.

N.

BE

CK S

T.

S.

BE

CK S

T.

CENTERNURSING & REHAB

AFFINITY

CENTERHEALTHCARENORTH POINT

NORTH BLVD.

NORTH BLVD.

CLINICOAKS PETACADIAN

7of9

HEALTH CENTERBEHAVIORAL

BATON ROUGE

CENTERLEARNING

&INFANTSTEP

STEP BY

IN SCHOOLSHEALTH CENTERS

BL

VD.

OA

KLIV

E

11/21/19

Page 15: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

11/12/19

Sheet No.NORTH BLVD. CORRIDOR ENHANCEMENT

(I-110 TO FOSTER/FLORIDA)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100

NORTH BLVD.

WA

RD C

RE

EK

CL

OU

D C

AN

AL

HOUSING AUTHORITYBATON ROUGE

N. F

OS

TE

R D

R.

S. F

OS

TE

R D

R.

COLLEGECOMMUNITY

BATON ROUGE

8of9

MEMORIALROADSIDE

REGION TWO (HAART)HIV/ AIDS ALLIANCE COMPREHENSIVE TESTING

SOCIETY AND ADVANCEDBATON ROUGE AIDS

BATON ROUGECOUNTRY DAY SCHOOL OF

11/21/19

Page 16: Project Concept Report - Baton Rouge€¦ · Project Concept Report Project: North Blvd. Corridor Enhancement (I-110 to Foster/Florida) Date: November 21, 2019 This is a conceptual

SCALE: 1" = 50'

0 50 100

N. FOSTER DR.

CL

OU

D C

AN

AL

FL

ORID

A B

LV

D.

FL

ORID

A B

LV

D.

CHARTER ACADEMYLOUISIANA VIRTUAL

NO

RT

H B

LV

D.

9 of9

SECTIONENVIROMENTAL

LADOTD

11/12/19

Sheet No.NORTH BLVD. CORRIDOR ENHANCEMENT

(I-110 TO FOSTER/FLORIDA)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

11/21/19