Project Completion Report
Project Summary
Client: WorleyParsons / FMG Contract No.: 510P-00000-PU-PC-0059
PROJECT DELIVERABLES TARGET ACTUAL
Safety Nil LTI NIL
Scope Fabricate and supply two dust collection and
disposal systems including associated
tippler cell plate work
As per target
Schedule PC 28/10/2011 PC 24/02/2012
Budget $9,869,999 $11,191,043
Margin $2,241,014 (22.7%) $4,138,308 (36.9%)
Quality (NCR) 0 1
Customer Satisfaction Score 80% or above >80%
Project Overview
The FMG 155Mtpa Port Expansion Project aimed to increase the current port capacity at Anderson Point, Port Hedland from 45 Mtpa to 155 Mtpa. The project included two train unloader stations TU602 and TU603, each capable of tipping two rail cars concurrently as part of the unloading operation.
The driving desire was to fast track the design and construction of TU602 and TU603 to gain initiatives typically associated with being early to market.
Project Overview
Parties Involved
• Primary Stakeholder: FMG• EPCM: WorleyParsons• Supply Contractor: Aerison
Aerison’s Scope
Design, fabricate & ready for transport……
• Two off dust collection and disposal systems• Two off forced air ventilation systems• Two off tippler cell and end ring dust enclosure systems• Two off trunnion level pressurisation systems• Two off compressed air supply systems
Project Overview
Project Overview
Design
Design
• Lycopodium• A repeat of TU601 (completed 2008)
Design Changes
• Agglomerator removed from dust slurrying system • Design upgrade of slurry hopper • Bin fogging system removed• Larger capacity ventilation and pressurisation fans • Two off compressed air supply systems• New layout of ventilation & pressurisation ducting
Fabrication – In House
• Baghouse• Lower wall seals• Lower ring seals• Upper ring seals• Fan access platform
Top Section Mid Section
Fabrication – In House
Lower Wall Seal
Hoppers Lower ring seal
Upper Ring Seal
Fabrication – In House
Fan Access Platforms
Fabrication – Sub Contractor
• Shedder panels Arch Engineering• Push air walls Arch Engineering• Slurry hoppers Arch Engineering• Batch hopper & chutes Arch Engineering• Hood wall Phillips Engineering• Trunnion wall Phillips Engineering• Dirty & clean air duct Sabre• Ventilation & pressurisation duct Unique Metals• Fans Turbo Air• Pumps Mining & Hydraulic • Compressors SullAir Australia• Conveyors Sanwest• Rotary & slide valves Ansac• Structural steel Fremantle Steel• Surface treatment Ferogalv
CapeNovacoatDRA
Fabrication – Sub Contractor
Push Air Wall - Arch
Shedder Panels - Arch
Push Air Wall Duct - Arch
Fabrication – Sub Contractor
Slurry Hopper - Arch
Batch Hoppers - Arch Chutes - Arch
Fabrication – Sub Contractor
Dirty Air Duct - Sabre
Trunnion Wall - Phillips Hood Wall - Phillips
Clean Air Stack - Sabre
Fabrication – Sub Contractor
Main ID Fans - TAT
Ventilation/Pressurisation Duct - Unique
Ventilation Fans - TAT
Fabrication – Sub Contractor
Conveyors - SanWest
Pump – MHS Compressor - SullAir
Rotary/Slide Valves - Ansac
Project Pictures – Commissioning
Pre-Assembled Plate Work
Trunnion Level Tippler Cell
Project Pictures – Commissioning
Installed Wall & Lower Ring Seals
Ground Level Overview Install of Tippler Cell
Project Pictures – Commissioning
Upper Level Construction
Project Pictures – Commissioning
TU602 System
Project Summary
Safety and Environment
Target – Nil Incident Actual – 1 (Lost load)
Note:
• Baghouse top section fell from trailer en route to site.• Transport under the control of WorleyParsons• Internal issue with use of incorrect bolts
Comments
• Safety and environment record for project excellent• No reported incidents from sub contractors
Project Summary
Scope of Works
Target - Original Contract Scope of Works Total Number of SCN’s 17 Total Approved 13
Comments
• 4 month extension of time • Over $1.2 million in variations • Installation assistance• Commissioning (no load)• Commissioning (load)
Project Summary
Schedule
Project Summary
Schedule
Project Summary
Schedule
Project Summary
Schedule
Original Contract Delivery 28/10/2011 Actual Practical Completion – 24/02/2012
Comments• Design delays at beginning of project• Delay in client issuing AFC drawings• Extension of time and costs negotiated and approved• Revised schedule of deliverables
Project Summary
Budget and MarginEq
uipm
ent
Gen
eral
Fab
Bagh
ouse
Fab
Cons
truc
t. M
gmt
Shop
Sup
ervi
sion
QA
/ D
oc C
ontr
ol
Dur
ation
Air
fare
s
Tran
spor
t / C
rane
s
Cour
ier
Bank
Gua
rant
ees
Engi
neer
ing
Engi
neer
ing
- Sub
cont
ract
Dra
ftin
g
Dra
ftin
g - S
ubco
ntra
ct
ND
T /
Wel
d Q
uals
Vari
ation
s
MA
RGIN
1-00 2-00 4-00 7-11 7-21 7-23 7-57 7-59 7-75 7-76 7-87 8-01 8-03 8-11 8-13 8-33 9-00 AAA
$0$500,000
$1,000,000$1,500,000$2,000,000$2,500,000$3,000,000$3,500,000$4,000,000$4,500,000
BudgetEstimated Final
Project Summary
Budget and Margin
Original Contract Sum $9,869,999 Expected Final $11,191,043Original Contract Margin $2,241,014 (22.7%) Expected Final $ 4,138,308 (36.9%)• Includes Site based income: $250,000 Margin: $62,000 (25%))
CommentsOver budget items were:-• QA / Doc Control (-$32,237)• Transport / Cranes (-$2,489)• Engineering subcontract (-$1,330)• Load cells (-$3,357)
Under budget items were:-• Fabrication• Compressors• Construction management• Engineering• Drafting
Project Summary
Quality
Target – Nil Quality Issues or NCR’s Actual – 1 NCR
• NCR issued by client for release breach (Due to client not managing transport –
signed by Aerison under protest)
Comments
• Internal fabrication checks• Sub contractor quality review documentation• Tracking
Issues
Unfinished Duct
• Invoice management – maintain upper hand• Progress reports / checks• Early identification of problems and implementation of controls
Sabre
Issues
Damaged Baghouse Top Section
• Transport readiness• Photographs • Quality documentation
Lost Load
Issues
• Bolt take offs• Trial fit outs• Painting – Sabre• Tagging• Conveyor not reversible• Batch hopper flexible• Rotary valve underspeeds• Plastic fittings on damaged baghouse• Forgotten items (Tracking sheet)
Project Summary
Human Resources
Comments
• Expeditor• QA• Engineering• Document Control• Safety• Management
Project Summary
Communications
Comments
• Internal• Sub contractor• Client• Site
Project Summary
Client Satisfaction
Project Summary
Lesson Learnt
• Expediting• Transport• Quality• Contract management – Sabre• Tracking sheet• At source inspections
Project Summary
Project Completion
Unfinished Business
Comments
• Thank You Letter
• Bank Guarantees
• Future Business or Related Projects - Training
• Aerison Procedures