15
Project Completion Tiverton to Wolverton Road Upgrade

Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

Project Completion Tiverton to Wolverton Road Upgrade

Page 2: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

2

Page 3: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

3

• Location & Details

• Project achievements

• Customers and Stakeholders

• Project Performance

• Next steps

Project Completion Report

Page 4: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

4

Location

• The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The route extends from Wolverton Street along Tiverton Road and New Windsor Road to the intersection with Maioro Street.

• The project involved upgrading the capacity and infrastructure of the route, by expanding the two-lane sections to four-lane capacity.

Page 5: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

5

• Division: Capital Development Division - Roading Central

• Designer: Beca

• Contractor: Downer

• Cost: $42.2M

• Programme: 10 years (historic ACC project), construction 2yrs

• Key activities:

Project Summary

• 2.2 km of new road pavement • 350 power/light poles removed • 5 new signalised intersections • 5.6 km of new water main • 4 new pedestrian crossing points • 21.0 km new utility ducts • 10 new bus shelters • 3,100 m2 of new footpath • 143 new street lights • Significant retaining walls • 8.6 km of new underground power • 2 new stormwater filter structures

Page 6: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

6

Project Achievements

• Signalised intersections and CCTV upgrades: Improved flow and incident management

Page 7: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

7

Project Achievements

• New footpath: Improved walking access and pedestrian experience

Page 8: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

8

Project Achievements

• Upgrade of utilities: Improvement to visual amenity and future proofing of route

Page 9: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

9

Project Achievements

• New pedestrian crossing and refuges: improved pedestrian safety and access

Page 10: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

10

Project Achievements

• Lighting upgrade: Improved the visibility of route for pedestrians, drivers and residents

Page 11: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

11

Project Achievements

• Four lane the route: Improvements in travel time and reliability, reduction in fuel consumption and CO2

Page 12: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

12

• Early communication

• Resourced team during construction

• Clear communication of programme

Customers and Stakeholders

Page 13: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

13

Project Performance • Benefit

• Cost

• Risk

• Zero Harm

• Property & Planning

• Lessons Learnt

Page 14: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

14

Project Performance – Schedule

Actual Plan

AUC

KLAN

D C

ITY

CO

UN

CIL

AUC

KLAN

D T

RAN

SPO

RT

SCHEME ASSESMENT

CONSTRUCTION

FEASIBILITY

SCHEME ASSESMENT

DESIGN

CONSTRUCTION

2012 2013 2014 2015 2016

FEASIBILITY

2006 2007 2008 2009 2010 20112003 2004 2005

DESIGN

Page 15: Project Completion - Auckland Transport€¦ · • The Tiverton to Wolverton project relates to improvements to a key arterial route linking New Lynn to NZTA’s SH20 corridor. The

15

• Lessons learnt review (design and construction)

• Benefit realisation plan (set activities and deliverable details)

• Complete 1yr, 5yr and 10yr benefit realisation planning

• Post implementation traffic model review (due late 2014)

Next Steps