Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
NOTES
1. Remove Kitchen Fixtures in a manner for resale by owner. Includes: Hood, Ranges, Fryer in Kitchen; Sinks in FirstFloor Main Area.
2. Fire Alarm, Extinguishers and Sprinkler System: Repair and test.
3. Fire Sprinkler System: Remove/replace improperly located and non-working heads.
4. Fire Extinguishers: Provide a minimum of 2A10BC Fire Extinguishers space @ or no less than 75 feet from any pointin the building. Permanently mount between 3-5 feet, visible and accessible.
5. Emergency Lighting: Repair/replace all emergency lighting. See specs.
6. Lighting: Remove/replace/relocate lighting per schedule. This include illuminating the path of egress.
7. Stairways: Remove/replace all unsafe elements. Add handrail. See specs.
8. All repairs/upgrades must meet Fire Rating of Occupancy Class on steel beams, floors and doors.
9. Ceiling: Remove, repair and patch. See specification for finish details.
10. Floor: Remove, repair and patch sub-floor. See specification for floor coverings.
11. Walls: Remove loose materials, patch and skim-coat.
12. Exit Doors: Replace. See Specifications.
13. Outlets per commercial code requirements.
14. Wireless router per owner specifications.
Architect:Kroll & Associates Architecture, LLC720 First Street, 1NHudson, WI 54016Dennis Kroll, RA, LEED AP715-381-1600
Drawing Index:T1 Title SheetA1.0 Site PlanA2.0 Level 0-BasementA2.1 Level 1 - First FloorA2.2 Level 2 - Second FloorA2.3 Roof PlanA3.0 Building ElevationsA3.1 Building ElevationsA4.0 Building Sections / DetailsA5.0 Level 0 - Basement RCPA5.1 Level 1 - First Floor RCPA5.2 Level 2 - Second Floor RCPA6.0 Restroom Elevation/DetailsA6.1 Stair Section / Ramp Section
GENERAL NOTES
1. CONTRACTOR shall obtain all necessary permits and schedule necessary inspections as required by State BuildingCodes.
2. Construction Work shall be performed in accordance with provisions of the Wisconsin State Commercial Code,current edition.
3. Provide PRESERVATIVE PRESSURE TREATED LUMBER where in contact with concrete or masonry.4. All GYPSUM BOARD shall be 5/8" thick FIRE CODE TYPE 'X', installed with "TYPE S" drywall screws, unless noted other.5. THRESHOLDS and other offsets in floor finish shall not exceed 1/2" at new construction, in accordance with State
Accessibility Code requirements.6. ELECTRICAL design and construction: Provided by the ELECTRICAL SUB-CONTRACTOR on a design-build basis. See
drawings and specs. for all requirements.7. MECHANICAL design and construction: Provided by the MECHANICAL SUB-CONTRACTOR on a design-build basis.
See drawings and specifications included here for all requirements.8. HVAC design and construction: Provided by the HVAC SUB-CONTRACTOR on a design-build basis. See drawings and
specifications included here for all requirements.9. SPRINKLER SYSTEM design and construction: Provided by the SPRINKLER SYSTEM SUB-CONTRACTOR on a design-build
basis. See drawings and specifications included here for all requirements.10. DETAILS are usually KEYED only ONCE (on the DRAWINGS where they first occur) and are TYPICAL for similar
conditions Unless Noted Otherwise.11. DRAWINGS are diagrammatic in nature indicating INTENDED final results of construction but are not installation
diagrams. DRAWINGS are generally to SCALE indicated, but deviations may occur. In case of doubt, contact theARCHITECT.
12. CONSTRUCTION DRAWINGS are not to be reproduced or used for any other purpose except as authorized in writingby the ARCHITECT.
PROJECT CODE DATA
APPLICABLE CODES:
Building: MSBC 2014 incorp.2012 IBCRepairs & Alterations: MN 2015 Conservation Code for Existing BuildingsPlumbing: MSBC 2015 Capt. 4715, incorp. Chapt. 29, 2012 IBCMechanical: MN 2015 Chapt. 1346, incorp. 2012 IMC & IFGCElectrical: NEC 2014Energy & Accessibility Codes: MN 1323, MN 1342 incorp. 2012 IBC, ANSIA117.1
Code Reference Ground Floor Upper FloorConstruction type: Type (3B)/5B Type (3B)/5BOccupancy type A3 Places of Worship BOccupancy Separations: A3 below: B above: 1 Hr FRBarrier req.Existing: Double Wood Floor (1 5/8”) over wood joists @ 16” o.c.
w/Plaster on Lathe ceiling below (verify)Sprinklers: Fully SprinkleredAllowed Areas: 18,000 SF 27,000 SFActual Areas: 4125 GSF 4125 GSFOccupant Loads: A3=163 B2/F2=28
Acc.=25Stage=23
Total 221 28
Exit Requirement: 2 Required each Level
Accessibility: 1 accessible building entranceAccessible to all prime functionsAccessible egress not required (1009.1, except 1)
Accessible Plmg. Facils: 1 Toilet & Lav. For each sex(MSBC 1035, 2902.1)
Business: 1 fixture/50 Male and 1:50 Female. 28 occs.~1 eachRequired: 1 Male/1 FemaleProvided: 2 Male/2 Female
Plumbing Fixture Count: Ground Level (Phase 1)
Religious: 1 Fixture/ 150 Male and 1:75 Female. 211 occs.: 2 each
Required: 3 RestroomsProvided: 3 Restrooms
T1.0
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06
Exhaust for Toilet Rooms, dryer vent, and range vent shall be provided byHeat Recovery Ventilation Unit, discharging/exchanging air through the roof.Shafts provided by Carpentry as required.Programable Space Thermostat (fan on, off - heat, cool, off) with nightsetback shall cycle the blower and control heating and cooling.Balance the all areas for a uniform temperature throughout in all seasons.Submit shop drawings.Provide Mechanical Design and Drawings as required by RegulatoryAgencies.
DIVISION 26. ELECTRICAL:It is intended that this Division shall provide for all electrical work. Thesubcontractor shall be responsible for an adequate and satisfactoryinstallation within the limits as generally outlined and will be responsible alsofor the procurement of permits and payment of all necessary fees.The drawings are not intended to be used as a design drawings. They areintended to show the Owner's lighting, power, and switching requirements.This specification is intended to establish performance criteria and a level ofquality. The electrical subcontractor shall be totally responsible for acomplete installation including design drawings where required by thegoverning agencies and codes.The subcontractors shall furnish brochures, information, diagrams and samplesas necessary or as requested for all equipment and material they propose tofurnish and install for the complete electrical installation.General: Meet the latest editions of the Wisconsin Commercial BuildingsCode and the National Electrical Code that are in effect at the time of work.Wiring: Copper conductor with THW or THWN insulation. Conduit: EMT orflexible metal conduit(if required). Panels and breakers are to be Square D,or equal. Submit shop drawings.
Electrical Service/Power:Provide 400 amp Electrical service. Provide receptacles and switches perWisconsin Commercial Buildings Code and the National Electrical Code.Provide 1 meter, and locate on the building exterior, near service entry, asrequired by Xcel. Provide one panel in Electrical Room for common areas,and one subpanel for the R&D Kitchen. Coordinate with Architect.Provide CAT 6 cable for computer, cable, and communicationsconnections/receptacles to each work area. Coordinate exact locationswith architectural drawings. Submit shop drawings.Connect power to all Mechanical, Elevator, and appliances. See Div. 11, 14,22 & 23. (Note: Restroom exhaust will be handled by a Heat RecoveryVentilator provided and installed by Mech.).
Lighting & Fixtures:Scope: The work under this section provides for furnishing all labor, materials,etc., necessary to install a complete lighting system, and provides all fixtures,conduit, and accessories required for a complete system.Provide general lighting as shown on drawings, or within the limits ofgoverning codes. Meet all requirements of the Wisconsin CommercialBuildings Code and the National Electrical Code. Coordinate with architectfor fixture types and locations. Submit shop drawings.
Furnish and Install the following:All fixtures are to be dimmable and LED type. LED bulbs will be provided inthe fixture allowances. Provide occupancy sensor controls in Restrooms andall common areas.
Exit Sign: Single face, self-powered exit sign with the following features:Diecast aluminum housing with hinged face plate and brushed aluminum finish.Universal pattern knockouts on rear for direct mounting to junction box. LEDlamp panel which provides uniform lighting of sign letters. 120 VAC, 60 Hz.,solid state voltage limited charger and solid state switching with sealed nickelcadmium battery. All batteries and electrical components enclosed withinthe housing. NFPA 101 compliant knockout chevrons. Red letters and testswitch. UL listed (UL 924) Sure-Lites CAX series, or equal.Exterior Lighting: Allow $400 for fixtures.Interior Lighting: Include an Allowance of $700 for common areas, $8000 allinterior unit lighting fixtures, which are to be selected by Owner/Architect.
DIVISION 31. EARTHWORK:Demolition: Remove remaining shed structure. Disconnect and cap existingutilities as required by the City of Hudson.Clearing: Remove trees as indicated to be removed, and brush in the cutarea.Earthwork: Excavate as required. Remove existing stumps and roots. Preparesite as recommended in Civil Drawings. Provide 1" crushed stone for drainagefill behind retaining walls (see drawings). Existing non-organic fill saved fromsite may be used for backfill. Backfill to finished conditions. See CivilDrawings.Erosion control: Comply with City standard requirements (see Civil Drawings).
DIVISION 32. EXTERIOR IMPROVEMENTS:Drain Tile: Furnish and Install 4" corrugated PVC drain tile with filter fabriccover at building perimeter, all sides.Landscaping: Furnish and install plantings, seeding & mulch as shown onLandscape Plan.Sidewalks: Concrete, 3,500 psi, unreinforced, on 6" granular base (see CivilSite Plan).Retaining walls: See Civil and Architectural Drawings for garageentry/courtyard area retaining walls.
DIVISION 33. UTILITIES:SCOPE: Provide new water and sanitary sewer service from City mains to 5'inside building. See Civil Drawings.
DIVISION 7. THERMAL & MOISTURE PROTECTION:Waterproofing: Furnish & Install Fluid applied Elastomeric ThermoplasticRubber waterproofing at foundation walls as mfgrd by Polyguard Products,Inc., Ennis, TX 75119 www.poly-wall.com. Install per mfgr's recommendationsto include surface preparation.Insulation: Roof: HD PolyIsocyanurate rigid tapered, with inorganicmattfacing, R-31 above deck. Sprayed Polyurethane, R-18 closed cell,below roof sheathing.Walls: R-21 Fiberglass batts @ exterior stud walls (24"o.c.), with R-5 XPSinsulation outside of sheathing/Air & Water Barrier, and R-10 XPS(2" )@concrete foundation walls. Insulate rim joist areas at truss level with SprayedUrethane Foam, closed cell, R-21 min.Vapor Barriers: 6 mil. PVC under Drywall. Alternate: vapor control latex paint(class III)at interior, see Div. 9.Ventilation:Water & Air (weather) Resitstive Barrier: Tyvek Commercial Wrap as mfgrd byDupont, or equal.Rainscreen: Provide 14" ( 6 mm), Polypropylene three-dimensional matrixRainscreen, as mfgrd by CavClear or approved equal. Install per mfgr'srecommendations.Alternate: Air and moisture barrier/rainscreen assembly composed of apolypropylene extruded monofilament bonded to a non-woven,spunbonded polyolefin sheet, to create drainage channels. ProvideTamlynWrap Drainable Housewrap, as mfgrd by Tamlyn or approved equal.Siding:#1: 24 ga. Metal siding, prefinished. Material: Zinc-coated steel sheet, ASTM A653 coating designation, structural quality, Grade 50, 24ga. min. thickness.Profile: TLC-1. Attachment: Concealed direct fastened panel.Surface Finish: PVDF (Kynar 500). Color: As selected by Architect frommanufacturer's standard colors. Warrantee: 45 years film integrity, 35 yearschalk and fading, as mfgr'd by Metal Sales, Inc. or equal. Provide all trim andcoping to match siding from mfgr's standard profiles modified as required toaccept 1" XPS under siding. Alternate: IC-72 profile with exposed fasteners.Install 1" XPS furnished by Insulation.
Roofing:Membrane Roofing: Thermoplastic Polyolefin (TPO) sheet roofing adhered tofiberglass mat-faced Rigid Insulation to be mechanically fastened to roofdeck. Provide roofing system that is listed on DOE's ENERGY STAR "RoofProducts Qualified Product List" for low-slope roof products. Solar ReflectanceIndex: Not less than 78.TPO Sheet: ASTM D6878, internally fabric or scrim reinforced, 1.5 mm (60 mils)thick, with fabric backing. Color: Cream.Install with mfgr's flashings and adhesives, as recommended by the mfgr.Alternate: PVC 50 mil Duralast with 20 yr. warantee on labor & materials.Metal Coping: Furnish & Install 26ga. prefinished (same as Siding #1 above),as shown on the drawings. Color as selected by Architect.
DIVISION 8. DOORS & WINDOWS:Exterior Doors: 1 3/4" insulated metal, primed with 3/4" Low E insulating glass.Overhead Garage Door: 2" Urethane Insulated 24 ga. Steel SectionalOverhead Door, R= 17.5, Lifetime Warrantee, as mfgrd by Overhead DoorCorp. w/3
4 hp. Belt drive Operator and card reader. Furnish & Install. Allow$2400 for Door, Operator, and controls materials.Interior Doors: 1 3/8" Wood solid core, wood veneer, flat 2 panel. 1 1/8" @closets with slabs less than 24" wide.
Finish Hardware: All hardware shall be as specified or equal.Butts: McKinney TB2314 Nrp, 4 ½"x 4 ½", at exterior. McKinney TB2714, 4 ½"x 4½"at other.Closer: Falcon SC81, or equal, brushed nickel finish color, meeting ADArequirements.Kick plates: Hiawatha 1/8" thick laminated plastic, 34"x 16", color selectedfrom manufacturer's standards.Locks/latches: Schlage F series, Accent lever, medium rose, 619 (US15) finish.Stops: Hiawatha concave W/C 1326R with grey bumper.Sweep: Reese 362.Threshold: Reese S476AU with thermal break, brushed aluminum finish.Weatherstrip: Reese 815, brushed aluminum finish.Finishes: 619 (US 15), satin nickel, unless noted other.Keying: Key cylinders to Owner's preference, TBD.Install all hardware in accordance with manufacturer's specifications. Adjustand lubricate.Schedule:Exterior doors: Entry function., 1 ½ pair NRP butts , closer w/stop, threshold,sweep, and weather stripping.Restrooms: Privacy function lock, 1 ½ pair butts, wall stop.Mechanical and Pantry: Latch, 11
2 pair butts.Mechanical/Electrical and Storage Rooms: Storeroom function lock, 1 ½ pairbutts, wall stop, threshold.Windows: Pulltruded Reinforced Fiberglass or Aluminum Clad Wood frame,3/4" low E2/Argon insulated double glazed with insect screens, All Ultrex andWood Ultrex as manufactured by Integrity Windows, or equal (approved byOwner/Architect). Color: Ebony exterior, Ebony or clear sealed interior, satinnickel hardware finish. Grilles: None. Each unit is to be complete standardjambs, casing, screen, and hardware. Refer to elevation drawings for type,sizes, location, and operation. Marvin/Intergrity references are used. Equalswill be considered for approval.SkyLights: Double Dome, 56"x56" clear/clear, Low E, with integral CCAM 16"curb, CJ2 frame, as mfgrd by Velux Corp. or equal. U=< 0.50, SHGC=< 0.40To be installed by Roofing Contractor.
OUTLINE SPECIFICATIONS
DIVISION 1. GENERALScope: This Contract covers the Removal of existing trees, site work, andConstruction of a 2+ story office building above enclosed undergroundparking. New construction will be of concrete foundations, pre-castconcrete first floor, wood framed walls, pre-engineered wood trusses,weather-tight barrier, doors, windows, membrane roofing, interior finishes,and all mechanical, plumbing & electrical systems.
General Conditions:The General Conditions of the Contract, A205, American Institute ofArchitects, latest edition, applies to these specifications. A copy may beobtained from the Architect upon request. The General Conditions apply toall work of each section of these specifications.
Permits: CONTRACTOR shall obtain all necessary permits and schedulenecessary inspections as required by governing Codes.
Governing regulations: All Construction Work shall be performed inaccordance with provisions of the Wisconsin State Building Code, currentedition.
Temporary Services: Temporary Water and Electrical power, andTemporary Sanitation facilities, if required, will be provided by the GeneralContractor.
Clean-up: General Contractor shall provide dumpster and removal for allconstruction waste. Each Subcontractor should provide daily cleaning ofthe site and all active work areas during construction.
Shop Drawings: Provide 3 copies, and sample if appropriate, to ConstructionManager, and Architect/Engineer for review and approval, a minimum of 14days, prior to installation if required (see each section).
Allowances: Allowances are listed in each specification section to establisha base value to be used in the Contract, when quantity or quality areuncertain at time of proposal, and are to be Provided in your proposal. TheContract will then be adjusted up or down to reflect the actual cost, whenthat is determined.
Warrantees: Furnish 1 year minimum warrantee on materials & labor unlessnoted other.
Contractor's Insurance: The General Contractor and all Subcontractorsmust: carry Comprehensive General Liability Insurance and Worker'sCompensation Insurance as required by state and federal law. "All-Risk"Builder's Risk Insurance, for the completed value of the building from thebeginning of construction, will be carried by the Owner. All insurancepolicies must be made available to the Architect/Owner.
Alternate Proposed Manufacturers/Products:Proprietary product manufacturers/names are used in this Specification toindicate acceptable standards of quality for products to be used on thisProject. Proposed Alternative Products are encouraged. Use approvedbrands. Submit product literature (and samples if appropriate) to theArchitect, prior to approval by Owner, for review and record.
DIVISION 2. EXISTING CONDITIONSExisting wood frame shed is to be salvaged, and removed from the site.Salvage will be coordinated by Owner prior to excavation.
DIVISION 3. CONCRETE:Provide clean smooth surfaces free of form release agents, and honeycombing. Knock off ties and fill flush with Portland Cement grout.Conerete mix requirements: See Structural.Concrete reinforcement: See Structural.Concrete Floor Topping: See Structural. (See Div. 9 for GypCrete).
DIVISION 4. MASONRY:Cultrured Stone: Furnish and Install thin stone, selected by Architect. Allow:$1600 for materials. (See Drawings).
DIVISION 5. METALS:Structural steel, see Structural. For Misc. Metal Fabrication refer to drawingsfor Stairs, and SS Rod Canopy supports.
DIVISION 6. WOOD & PLASTICS:Rough Carpentry: General: Construct Wood Framing as shown in theDrawings. Materials will be supplied by the GC. Wood in contact withconcrete or exposed to weather shall be AC2, .40 pcf treated SYP. SeeStructural Drawings. See Architectural Drawings for assemblies.Sheathing: 5/8" Fiberglass mat-faced gypsum sheathing, Dens-glass asmfgrd by G-P, or equal.Sub flooring: 3/4" T&G structural plywood, 24/0 APA EXT rated.Wood Floor Joists and Trusses: See Structural.
Finish Carpentry:Exterior: Trim shall be prefinished siding material as mfgrd by siding mfgr., orequal. Exterior window/door casing: none.Interior: Install materials furnished by Owner/GC. Door trim 9/16" x 2 1/4 "Bullnose jamb, 11
16"x 212" Flat Head. Base: 716"x 3 1/4" Bullnose Base. Trim:
Maple #2 & better . Alt: Clear Fir.(Walls are to be 5/8" gypsum board,"Type X". See Div. 9).
Architectural Woodwork:Cabinetry: Furnish & Install Kitchen Cabinets & Bath Vanity Cabinets asshown on drawings. Submit shop drawings.Solid Surfaces: Cambria, or equal solid surfaces. Furnish & Install KitchenCabinet countertops, and Bath Vanity tops. Mount sinks (by others) tounderside, and seal. Submit shop drawings.
DIVISION 9. FINISHES:GYPSUM WALLBOARD: Walls (and ceilings noted) as gypsum board shall be U.S.Gypsum, Gold Bond, or approved equal, 5/8" Type 'X' gypsum board at studs andjoists. Gypsum board shall have beveled edges and be installed with gypsumboard screws. Finish: Level 4. Tape all joints and fill all screw depressions with threecoats of joint cement, and sand, all per Gypsum Association Level 4 Standards.Tile Backer board: Furnish & Install 5 8" coated fiberglass matfaced water-resistantgypsum backer board below/behind tiled surfaces, taped and ready for tile.Provide "DensShield" as mfgrd by Georgia Pacific, or equal. Apply fluidwaterproofing to bottom edges and 8" up sides prior to installation.Ceramic Tile: Ceramic tile or dimension Stone, furnished & installed, to be thin-setwith dry set, latex/polymer modified portland cement mortar. Grout: polymermodified sanded tile grout. Stone/tile and grout colors to be selected byOwner/Architect. Provide a price for installation per square foot for additional work,and an allowance of $4000 for materials.Carpet: Install carpet and pad as selected by Owner in areas indicated on floorplans. Allow $23/sq. yd.Underlayment is gypcrete. Lay carpet per manufacturer's recommendations.Floor Topping: Provide 11
2" Self-leveling cementitious topping, Gyp-Creteunderlayment equal to FirmFill 4010 as manufactured by Hacker Industries or equal.Provide complete installation as recommended by Hacker Industries.Paint: Provide paints as manufactured by Benjamin Moore, Sherwin Williams, orequal; Low VOC. Colors as selected by Architect/Owner.Exterior metal doors: Factory primed: 2 coats of Sherwin Williams Alkyd Enamel paint,or approved equal on the exterior face and edges, and shall be finished the sameas interior trim on the interior face. Colors to be selected.Exterior trim: None. (Prefin. metal to match siding, color as selected by Arch.)Interior walls: Prime + 2 coats Acrylic Latex, satin finish.Restroom walls & ceilings, Kitchen wet areas: Prime + 2 coats Alkyd Enamel, satinfinish.Interior trim/wood doors: Wood doors, casing, base, misc. wood railings & trim: Seal+ 2 coats polyurethane, satin finish.Acoustic Ceilings:Sprayed: 1 coat spray applied cellulose based Acospray DC3, as mfgrd by StilAcoustics, or equal, 35 mm thick, class A flame spread rating, NRC=1.00, with trussesto remain clear.Lay in Tiles: 24x24x1 fiberglass Optima Tegular tiles, class A fire performance, .95NRC, 15
16" Prelude metal suspension system, as mfgrd by Armstrong, or equal.Washable at R&D Kitchen, and Pantry.
DIVISION 10. SPECIALITIES:Toilet & Bath accessories: Install all Mirrors (see drawings for size) with square edges,frameless, Toilet Paper Holders, Towel Bars, (1) 24" in each Restroom), and 1 coathook each door. Material furnished by Architect/Owner.Closet shelving: Install wood shelving furnished By Owner. See Drawings.
DIVISION 11. EQUIPMENT:Kitchen Appliances: Install Kitchen Appliances furnished by Owner.Range: gas/electric combination. Refrigerator: 23.3cf. Dishwasher: Microwave:above range w/exhaust ventilator; Clothes Washer & Dryer: electric.
DIVISION 12. FURNISHINGS:Window treatment: Furnish & Install 1" fabric blinds as mfgrd by Hunter Douglas.
DIVISION 14. CONVEYING SYSTEMS:Elevator: Shindler 3300, MRE, 3500 LB.(min.), 4 stop, traction drive, or equal. Submitshop drawings.
DIVISION 21. FIRE SUPPRESSION:The Fire Protection subcontractor shall be totally responsible for a completeinstallation including design drawings where required by the governing agenciesand codes.The subcontractors shall furnish brochures, information, diagrams and samples asnecessary or as requested for all equipment and material they propose to furnishand install for the complete Fire Protection installation. Provide a system complyingwith IBC 903.3.1.1.
DIVISION 22. PLUMBING:SCOPE: Design, Furnish and Install complete domestic water and sanitary systemsfrom 5' inside of building to fixtures. Provide required water meters @ Garage nearservice entry, and required gas meters on the exterior as required by Xcel. Furnishand Install plumbing fixtures in locations shown on the drawings. Plumbing fixturesare to be commercial grade. Allow $3,500 for sink & fixtures, to be selected byArchitect/Owner. Provide Plumbing Design and Drawings as required by RegulatoryAgencies. See Drawings for fixture locations.
PLUMBING MATERIALS (FYI, See Plmg.)Domestic water piping PEXWater shut off valvles Ball valves, 90 deg turn.Waste & Vent piping PVC schedule 40Water closets Floor set, tank type, white, vitreous china,
handicapped accessible at all Restrooms.Kitchen Sink Stainless steel undermounted.Lavs Vitreaous china undermounted or pedestals, as
shown on the drawings. Single lever faucets.Shower (if added) Ceramic tiled walls, solid composite unit base,
flow restricted fixtures.Water Heaters On demand with heat from the adjacent
mini-boiler for each Restroom, sink and Kitchen @1st Floor, and 1 additional @ each remote kitchette
and restroom. (combine 3rd Floor Kit/Restroom. 3 add'l.)
DIVISION 23: HEATING, VENTILATION & AIR CONDITIONING:SCOPE: Design, Furnish and Install Ventilation for Garage & Mechanical spaces(garage level) as required by code. Use CO & NO2 sensors for the control system.Furnish & Install Gas Fired Mini Boiler(s) for in-floor radiant heating and Mini Split typeheating and cooling (heat pump) system for 2 zones per floor (6 total). Furnish andinstall pex tubing for in-floor radiant heating system. T1.1
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
REV
0909
19
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06
1
1
18' Typ.
8'-8"Typ.
SITE:
1. Add fill to slope grade away from building.
2. Patch asphalt as required.
3. Overlay parking lot with 112" wearcourse. See spec.
4. Repaint parking stripes.
5. Add building numbers to Front Corner and Alley.
6. Add Firebox Keybox.
7. Verify St. Paul requirements for parking spaces.
8. Obtain site survey, 2nd row of parking may be available.
SCALE: 1/4"=1'-0"
Site PlanN
A1.0
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06
UP
UP
Walk in cooler
Elec
trica
l Ser
vice
Pan
els
HVAC SYSTEM
Crawlspace/D.B.Z.
Sprinkler System
3680
36803680
Open to Floor Joists Above
Basement/Level 01. Crawlspace: Install vapor barrier on grade in unexcavated crawl space area.
2. Provide and install approved directional exit signs. These must indicate both exits.
3. Exterminate and control insects, rodents and other pests. Documentation must be provided by licensed contractor.
4. Provide Fire Extinguisher with annual maintenance by a licensed contractor.
5. Repair and test fire sprinkler system. See specifications.
6. Provide locks for access control, i.e. Maintenance Access Only.
7. Provide a sprinkler head box including spare sprinkler heads and/or a wrench located and maintained at the main riser.
8. Remove obstruction (PVC drain pipe) to the fire sprinkler head. Piping or sprinkler head to be relocated. See specifications.
9. Structural joist and support repair. See Structural specifications.
10. Replace or sister floor joists with decayed ends.
11. Clean and remove all trash.
DOOR SCHEDULELEVEL 0 - BASEMENT/LOWER LEVELLocation Size (W&H) Quantity Type Materials Fire Finish ID#/Notes
Door FrameCenter 3'-0"x6'-8" 2 C Wood.H.M. 20 min. PaintCrwl Spc 3'-0"x6'-8" 1 C Wood.H.M. 20 min. Paint
WINDOW SCHEDULELEVEL 0 - BASEMENT/LOWER LEVELLocation Size (W&H) Quantity Type Materials Fire Finish ID #/Notes
Door FrameWindow 2'-0"x3'-0"
SCALE: 3/16"=1'-0"
Level 0 - BasementN
A2.0
2
8
1
2
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06
UPUP
DN
UP
UPDN
DN
Storage24-1x7-8
Education Area25-5x23-0
Office15'-0"x13'-5"
8' Ceiling
Stage28-11x11-5
Kitchen27-8x11-5
Assembly38-11x24-1
Social / Gathering26-10x18-10
Side entrance
Sideentrance
Mainentrance
East
7th
Stre
et
Duluth Street
CoatCloset
0.3639
Add Column
8'7"
10'-1078"
1'-712"
1626.3174
369.7998 180.7522 178.7717 12.3042 36.3240 36.1886 703.1319 109.0450
Restroom Restroom Restroom
Office15'-0"x13'-5"
8' Ceiling
36803680 3680 3680
3680
3680 3680
3680 3680
3680
3680
3680
3680
3680
MAIN LEVEL / FIRST FLOOR
1. 1st Floor Fire Alarm Room: Place 'FIRE ALARM PANEL' sign on door.
2. Kitchen
a.Provide 1 K Class Fire Extinguisher within cooking area.
b.Remove hood and store for resale by owner.
c. Appliance layout to be determined.
3. 1st Floor: Remove/replace water damaged drywall, plaster and studs.
4. Provide controlled Maintenance Access to basement at doorways.
DOOR SCHEDULELEVEL 1 - FIRST FLOORLocation Size (W&H) Quantity Type Materials Fire Finish ID#/Notes
Door FrameFront Entry 3'-0"x6'-8" 1 D Wood H.M. 20 min. PaintSide Entry 3'-0"x6'-8" 2 A Insl.Stl H.M. 20 min. PaintBathroom 3'-0"x6'-8" 3 C Sld Wood 20 min. PaintKitchen 3'-0"x6'-8" 1 C Sld Wood 20 min. PaintOffice 3'-0"x6'-8" 2 B Sld Wood 20 min. PaintStairway 3'-0"x6'-8" 4 C Sld Wood 20 min. PaintStorage 3'-0"x6'-8" 1 C Sld Wood 20 min. Paint
WINDOW SCHEDULE
SCALE: 3/16"=1'-0"
Level 1 - First FloorN
A2.1
1
4
2
4
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06
DNDN
DN
DN
DN
DN
Accessto
Roof
0.3639
8'
6"
7"
Railing: 36" high.See Railing Detail
Storage Restroom
Ramp
3680
3680
36803680 3680 3680
3680
3680
W2
W2W2
Level 2 / Second Floor
1. 2nd Floor Center Stairway: Provide approvedhandrail. Top of handrail must be between 34-38inches above tread and run entire length of stair
2. Add handrail to existing stairs.
3. Add ramp with handrails per drawing.
4. Patch flooring with 34" particle board.
5. Add drop ceiling.
DOOR SCHEDULELEVEL 2 - SECOND FLOORLocation Size (W&H) Quantity Type Materials Fire Finish ID#/Notes
Door FrameStairway 3'-0"x6'-8" 3 C Sld Wood 20 min. PaintBathrooms 3'-0"x6'-8" 2 C Sld Wood 20 min. PaintStorage 3'-0"x6'-8" 3 C Sld Wood 20 min. Paint
WINDOW SCHEDULE
SCALE: 3/16"=1'-0"
Level 2 - 2nd FloorN
A2.2
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06
HVAC SYSTEM-Remove existing
ExistingAccessHatch
W4
Roof
1. Repair roofing as needed. See Spec.
2. Remove Satellite Dish and other debris.
DOOR SCHEDULEROOFLocation Size (W&H) Quantity Type Materials Fire Finish ID#/Notes
Door FrameAccess Door 2'-0"x2'-0" 1 Wood Paint
WINDOW SCHEDULEROOFLocation Size (W&H) Quantity Type Materials Fire Finish ID#/Notes
Win. FrameSkylight 4'-0"x6'-0" 1
SCALE: 3/16"=1'-0"
Roof PlanN
A2.3
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06
Level 1 - Scheme 10' - 0"
Level 2
Level 3
Level 1
Level 2
Level 3
Provide and maintainproper grade to slopaway to minimizewater accumulation
Roof: Repair and replace as needed toensure weather tight. Clear all debris.
Exterior
1. Exterior Basement: Repair wood window openings/framing around basementwindows and foundation.
2. Exterior Doors: Replace all exterior doors. See specifications.
3. Exterior Walls: Repair all damaged brick and mortar. Tuck-point as needed.
4. Exterior Walls: Repair/replace all damaged wood. Paint. See specifications.
5. Exterior Walls: Remove and replace exterior siding on east side of building.Materials TBD.
6. Remove infilled brick or plywood at former window openings.
7. Windows: Install new windows and framing as required. See specifications.
8. Cap Chimney and wall.
SCALE: 1/8"=1'-0"
North Elevation
SCALE: 1/8"=1'-0"
South Elevation A3.0
5
StuccoAdd Column
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06
Level 1
Level 2
Level 3
Level 1
Level 2
Level 3
A GREAT PLACE TO HANG OUT >
Exterior
1. Exterior Basement: Repair wood window openings/framing around basementwindows and foundation.
2. Exterior Doors: Replace all exterior doors. See specifications.
3. Exterior Walls: Repair all damaged brick and mortar. Tuck-point as needed.
4. Exterior Walls: Repair/replace all damaged wood. Paint. See specifications.
5. Exterior Walls: Remove and replace exterior siding on east side of building.Materials TBD.
6. Remove infilled brick or plywood at former window openings.
7. Windows: Install new windows and framing as required. See specifications.
8. Cap Chimney and wall.
SCALE: 1/8"=1'-0"
East Elevation
SCALE: 1/8"=1'-0"
West Elevation
A3.1
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06
Level 10' - 0"
Level 210' - 0"
Level 320' - 0"
Level 0-10' - 0"
3'-4"
10'-012"
1'-5"
125'-10"HIGH ROOF
134" Lvl Rim @ Truss Brg.
(Elevator Only)2x4 Wood Truss
Wall Type 82X6 Studs 16" O.C.
Gyp Bd on Resil Channels
Membrane roofing on R-31rigid insulation on 3/4" T&Gsheathing on 2x Wood Framing,See Structural
(2) Layers 5 8"" Type 'X' Gyp. Bd.on Wood Framing @ 16" o.c.
Steel Beam (See Structural)
122'-0"
111'-0"SECOND FLOOR
ROOF/THIRD FLOOR
One Layer 1"x24" G-P GypsumType 'X' panel inserted btwn2 12" C-T steel studs @ 24" o.c.Contin. to Roof Deck Above2 Layers 1/2" Type 'C' Gyp.Bd.opposite side, to Deck Above,applied parallel to studs w/1" TypeS drywall screws 12"o.c.
SCALE: 1/2"=1'-0"
Stair Section
SCALE: 1/2"=1'-0"
Section
A4.0
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06
Basement/Level 01. Crawlspace: Install vapor barrier on grade in unexcavated crawl space area.
2. Provide and install approved directional exit signs. These must indicate both exits.
3. Exterminate and control insects, rodents and other pests. Documentation must be provided by licensed contractor.
4. Provide Fire Extinguisher with annual maintenance by a licensed contractor.
5. Repair and test fire sprinkler system. See specifications.
6. Provide locks for access control, i.e. Maintenance Access Only.
7. Provide a sprinkler head box including spare sprinkler heads and/or a wrench located and maintained at the main riser.
8. Remove obstruction (PVC drain pipe) to the fire sprinkler head. Piping or sprinkler head to be relocated. See specifications.
9. Structural joist and support repair. See Structural specifications.
10. Replace or sister floor joists with decayed ends.
11. Clean and remove all trash.
UP
UP
Walk in cooler
Elec
trica
l Ser
vice
Pan
els
HVAC SYSTEM
Crawlspace/D.B.Z.
LED
LED
LEDLED
LED
Sprinkler System
S2
S2
S2
S2S2
S2
3'-634"
LED LED LED
LED LED LED
LED
3680
36803680
Open to Floor Joists Above
SCALE: 3/16"=1'-0"
Level 0 - Basement Electrical PlanN
A5.0
2
8
1
2
PLAN NOTES:1. This Plan describes Ceiling Construction, and aConceptual Lighting Layout to meet the Owner'sLighting Requirements2. Electrical Design and Construction shall be providedby Electrical Contractor on a Design-Build basis.3. Suspended ceiling on 1st level to be 8' AFF, remainingceiling is 5/8" Gyp. Board on 1/2" RC channels onstructure4. Wireless Access Points - 2 Cat6 each5. Server Room - 20a dedicated circ.6. Contact Architect regarding any Discrepancies orConflicts in these Drawings
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06
UPUP
DN
UP
UPDN
DN
Storage24-1x7-8
Education Area25-5x23-0
Office15'-0"x13'-5"
8' Ceiling
Stage28-11x11-5
Kitchen27-8x11-5
Assembly38-11x24-1
Social / Gathering26-10x18-10
Side entrance
Sideentrance
Mainentrance
East
7th
Stre
et
Duluth Street
CoatCloset
0.3639
Add Column
8'7"
10'-1078"
1'-712"
1626.3174
369.7998 180.7522 178.7717 12.3042 36.3240 36.1886 703.1319 109.0450
B
B B
B
B
Restroom Restroom Restroom
LED LED
LEDLED
LED LED LED
LED
Office15'-0"x13'-5"
8' Ceiling
LED LED
LED LED
LED LED
LED
C C
C C
C
C
C
CCCCCC
AA
A A
36803680 3680 3680
3680
3680 3680
3680 3680
3680
3680
3680
3680
3680
MAIN LEVEL / FIRST FLOOR
1. 1st Floor Fire Alarm Room: Place 'FIRE ALARM PANEL' sign on door.
2. Kitchen
a.Provide 1 K Class Fire Extinguisher within cooking area.
b.Remove hood and store for resale by owner.
c. Appliance layout to be determined.
3. 1st Floor: Remove/replace water damaged drywall, plaster and studs.
4. Provide controlled Maintenance Access to basement at doorways.
SCALE: 3/16"=1'-0"
Level 1 - First Floor Electrical PlanN
A5.1
1
4
2
4
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06
DNDN
DN
DN
DN
DN
Accessto
Roof
0.3639
8'
6"
7"
Railing: 36" high.See Railing Detail
LED
B
B B
B
B
Storage24-1x7-8
LED
LED
LED
LED
LED
LED
LED
LED
LED
LED
LED
LED
LED
LED
LED
LED
LED
LED
Storage Restroom Restroom
Ramp
3680
3680
36803680 3680 3680
3680
3680
W2
W2W2
Level 2 / Second Floor
1. 2nd Floor Center Stairway: Provide approvedhandrail. Top of handrail must be between 34-38inches above tread and run entire length of stair
2. Add handrail to existing stairs.
3. Add ramp with handrails per drawing.
4. Patch flooring with 34" particle board.
5. Add drop ceiling.
SCALE: 3/16"=1'-0"
Level 2 - 2nd Floor Electrical PlanN
A5.2
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06
Restroom0.3639
96.007646.0475
Restroom0.3639
96.0076
SCALE: 1/2"=1'-0"
Bathroom DetailN
SCALE: 1/2"=1'-0"
Bathroom ElevationN
A6.0
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06
WINDOW SCHEDULELEVEL 0 - BASEMENT/LOWER LEVELLocation Size (W&H) Quantity Type Materials Fire Finish ID #/Notes
Door FrameWindow 2'-0"x3'-0" 5 W3
W3LEVEL 1 - FIRST FLOORLocation Size (W&H) Quantity Type Materials Fire Finish ID#/Notes
Win. FrameNorth Square 60"x60" 2 W1 Alum. H.M. PaintEast Arch 32"x64" 5 W2 Alum. H.M. PaintSouth Arch 32"x64" 2 W2 Alum. H.M. PaintWest Arch 32"x64" 12 W2 Alum. H.M. Paint
LEVEL 2 - SECOND FLOORLocation Size (W&H) Quantity Type Materials Fire Finish ID#/Notes
Win. FrameNorth Arch 32"x64" 3 W2 Alum. H.M. PaintEast Arch 32"x64" 8 W2 Alum. H.M. PaintSouth Arch 32"x64" 3 W2 Alum. H.M. PaintWest Arch 32"x64" 13 W2 Alum. H.M. Paint
ROOFLocation Size (W&H) Quantity Type Materials Fire Finish ID#/Notes
Win. FrameSkylight 4'-0"x6'-0" 1 W4
DOOR SCHEDULELEVEL 0 - BASEMENT/LOWER LEVELLocation Size (W&H) Quantity Type Materials Fire Finish ID#/Notes
Door FrameCenter 3'-0"x6'-8" 2 C Wood.H.M. 20 min. PaintCrwl Spc 3'-0"x6'-8" 1 C Wood.H.M. 20 min. Paint
LEVEL 1 - FIRST FLOORLocation Size (W&H) Quantity Type Materials Fire Finish ID#/Notes
Door FrameFront Entry 3'-0"x6'-8" 1 D Wood H.M. 20 min. PaintSide Entry 3'-0"x6'-8" 2 A Insl.Stl H.M. 20 min. PaintBathroom 3'-0"x6'-8" 3 C Sld Wood 20 min. PaintKitchen 3'-0"x6'-8" 1 C Sld Wood 20 min. PaintOffice 3'-0"x6'-8" 2 B Sld Wood 20 min. PaintStairway 3'-0"x6'-8" 4 C Sld Wood 20 min. PaintStorage 3'-0"x6'-8" 1 C Sld Wood 20 min. Paint
LEVEL 2 - SECOND FLOORLocation Size (W&H) Quantity Type Materials Fire Finish ID#/Notes
Door FrameStairway 3'-0"x6'-8" 3 C Sld Wood 20 min. PaintBathrooms 3'-0"x6'-8" 2 C Sld Wood 20 min. PaintStorage 3'-0"x6'-8" 3 C Sld Wood 20 min. Paint
ROOFLocation Size (W&H) Quantity Type Materials Fire Finish ID#/Notes
Door Frame
3'-0"
7'-0
"
3'-0"
7'-0
"
4"
2'-9
"
2'-0"
3'-0
"
3'-0"
2'-0"
3'-0
"
7'-0
"
A B C D
7'-0
"
PLUMBING SCHEDULELEVEL 0 - BASEMENT/LOWER LEVELLocation Size (W&H) Quantity Type Materials Fire Finish ID #/NotesJaniter Sink 3'-0"x2'-0" 1
LEVEL 1 - FIRST FLOORLocation Size (W&H) Quantity Type Materials Fire Finish ID#/NotesBathroom Sink 18" Round 3 Porc.Duel Flush Toilet 3 Porc. ADA CompliantKitchen Sink
LEVEL 2 - SECOND FLOORLocation Size (W&H) Quantity Type Materials Fire Finish ID#/NotesBathroom Sink 18" Round 3 Porc.Duel Flush Toilet 3 Porc. ADA Compliant
ROOFLocation Size (W&H) Quantity Type Materials Fire Finish ID#/NotesNONE
A6.2
Hud
son,
Wis
cons
in 5
4016
7
20 F
irst S
treet
612.
925.
3830
/ 71
5.38
1.16
00
DAT
E
SHEET
PRO
JEC
T10
.23.
19
REG
. NO
.D
ATE
34
& A
ssoc
iate
s
Arc
hite
ctur
e, L
LC
Kro
ll
Den
nis
R. K
roll
0822
19
ALL
ARC
HIT
ECTU
RAL
AN
D E
NG
INEE
RIN
G D
RAW
ING
SAR
E IN
CO
NFI
DEN
CE
AND
DIS
SEM
INAT
ION
MAY
NO
TBE
MAD
E W
ITH
OU
T PR
IOR
WR
ITTE
N C
ON
SEN
T O
F TH
EAR
CH
ITEC
T. A
LL C
OM
MO
N L
AW R
IGH
TS O
FC
OPY
RIG
HT
AND
OTH
ERW
ISE,
AR
E H
EREB
YSP
ECIF
ICAL
LY R
ESER
VED
. I H
EREB
Y C
ERTI
FY T
HAT
THIS
PLA
N, R
EPO
RT,
OR
SPE
CIF
ICAT
ION
WAS
PREP
ARED
BY
ME
OR
UN
DER
MY
DIR
ECT
SUPE
RVI
SIO
N A
ND
TH
AT I
AM A
DU
LY L
ICEN
SED
ARC
HIT
ECT
UN
DER
TH
E LA
WS
OF
THE
STAT
E O
FM
INN
ESO
TA.
1739
9
1179
Eas
t 7th
Stre
etSa
int P
aul,
MN
551
06