Project scope • Drilling for ground stabi- lization for light rail line, for minimization of vibra- tions in the ground • Number of holes: 160 • Depth: 18-25 m (59-82 ft.) • Scope of drilling/total meters: 3 440 m (11 300 ft.) • Why water-propelled drilling? With air drilling the surrounding sensible buildings and cars would have been damaged. Project Case Sweden, 2015 – The Light Rail Line gds geo drilling solutions ab Equipment • Hammer model/sizes: WAI 60i • Casing system: Symmetrix system with Ruukki RD Ø220 x 12.5 mm drilled steel casing piles • Pump: GDS 490 Diesel Pump, 490 lit/min @ 200 bar • Water source: Water hydrant • Drill rig: SPD DT145 • Geologic formation: Sea bed, thin layer of moraine, solid rock Main stakeholders • Commissioner: SL • Main contractor: Svevia • Sub-contractor: Foundation Drilling Sweden Project/drilling results Thanks to the water-propelled drilling, the project was realized without unnecessary costs for covering the surrounding house façades and without risking surrounding cars in car park to be affected.

Project Case WAI PPT The Light Rail Line Eng 2016-11-03gds.bohrwerkzeuge.com/wai_the-light-rail-line_2016-11-03.pdf · (892 oläst(a)) — beasmichae network-log02016.pdf gds_logo_text.pdf

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Case WAI PPT The Light Rail Line Eng 2016-11-03gds.bohrwerkzeuge.com/wai_the-light-rail-line_2016-11-03.pdf · (892 oläst(a)) — beasmichae network-log02016.pdf gds_logo_text.pdf

Project scope• Drilling for ground stabi-

lization for light rail line,for minimization of vibra-tions in the ground

• Number of holes: 160• Depth: 18-25 m (59-82 ft.)• Scope of drilling/total meters: 3 440 m (11 300 ft.)• Why water-propelled drilling? With air drilling the surrounding sensible buildings and cars would have been damaged.

Project Case Sweden, 2015– The Light Rail Line

gds geo drilling solutions ab

Equipment• Hammer model/sizes: WAI 60i• Casing system: Symmetrix system with Ruukki

RD Ø220 x 12.5 mm drilled steel casing piles• Pump: GDS 490 Diesel Pump, 490 lit/min @ 200 bar• Water source: Water hydrant• Drill rig: SPD DT145• Geologic formation: Sea bed, thin layer of moraine, solid rock

Main stakeholders• Commissioner: SL• Main contractor: Svevia• Sub-contractor: Foundation Drilling Sweden

Project/drilling resultsThanks to the water-propelled drilling, the project was realized without unnecessary costs for covering the surrounding house façades and without risking surrounding cars in car park to be affected.