Hunters Point Site Project Advisory Committee Meeting
August 20, 2013
1
2
Agenda
• Welcome and Introductions
• Safety Moment
• Site Update: Completed Work
• 2013/2014-Site Work
• Local Hiring
• Continued Communications
• Q&A
2
3
Introductions
• Project Advisory Committee Members
• PG&E
‐ David Harnish, Manager
‐ Rob Saur, Project Manager
‐ Andrea Gooden, Manager, External Affairs
‐ Dan Hughes, Consulting Project Manager
• Contractors
‐ JBR Partners – James Bryant (Principal)
‐ ERM – John Cavanaugh (Project Manager)
‐ Jacobson James – Jan Jacobson (Project Manager)
3
4
Committed to Safety
4
• Room Safety
• Daily Safety Briefing
• No lost-time due to injury
in 2012 or 2013 (YTD)
Morning Safety Briefing
5
Moving to the Next Phase
5
• Majority of soil cleanup work completed
• Groundwater cleanup, tunnel closure and shoreline improvement in progress
• Planning for streetscape improvement and interim use beginning
Before Dismantlement Now
Hunters Point Site Aerial
6
Site Update: Completed Work
7
Area A Soil Cleanup and Paving
Area B Soil and Groundwater Cleanup and Paving
(monitoring ongoing)
Area C/D Soil Cleanup and Paving, Basement Closure
Area H Soil Cleanup, Restoration and Re-Vegetation with
Native Plants
Area I Soil and Groundwater Cleanup and Paving
(monitoring ongoing)
Area J Soil Cleanup
8
2013/2014— Site Work
8
Groundwater Cleanup in Jennings Street and on White Cap
Property
In Progress
Cooling Water Tunnel Closure and Shoreline Improvement
In Progress
Shoreline Area Cleanup Investigation
In Progress
Streetscape Improvement and Interim Use Plan Development
In Progress
9
2013 Groundwater Cleanup
9
• Rounds I and II Complete
• Focused on “off-site” areas (White Cap property and Jennings Street) with small treatment area near lagoon in Area B-South
• Injection of treatment agent into groundwater with 2-inch wells
• Limited disruption to local traffic and businesses
• Majority of treatment completed by end of 2013
• Ongoing monitoring
10
Tunnel Closure and Shoreline Improvement Project
10
Cooling Water Tunnel Closure: • Five tunnels to be closed; to ensure
continued safety
• Work completed by December 2013 • Tunnels will be sealed at the ends
and filled with a concrete slurry mix
• Tunnels were used to convey water to cool the plant operations
11
Tunnel Closure and Shoreline Improvement Project
11
Dive teams cap tunnels Water removed from tunnels
Tunnels Filled
12
Tunnel Closure and Shoreline Improvement Project
12
Shoreline Improvement Activities 4-6 weeks of work Concrete structure and debris removal Pedestrian bridge removal, painting and
replacement Temporary trail closure; detours provided
Cranes and excavators will remove pieces of debris and concrete
13
Shoreline Area Cleanup
13
•Environmental field investigations complete •Data evaluation in progress; report available early 2014
•Cleanup plan, for recreational use, available for comment spring 2014
•Cleanup work anticipated to begin fall 2014.
14
Streetscape Improvement and Interim Uses
14
• Architects currently designing concepts for streetscape improvements and interim uses, based on community input
• Engaging community via one-on-one, small group, and
community meetings throughout design and planning process • Stakeholders will be consulted before final design decisions
are made
15
Committed to Local Hiring
15
• 2013 Local Hiring Goal: 30 percent • Coordinating with SF CityBuild program (415-701-4889)
• Continued use of local contractors when
possible
Local Worker Appreciation Event
16
Continued Communications
• Community Open House
• Email Updates
• Team available for questions
• Newsletters • Website updates (as needed) • Project Hotline/Email
16
For More Information:
• Environmental Remediation Response Line: 1-866-247-0581
• Project Email: [email protected]
• Project Website: www.pge.com/hunterspoint
California Department of Toxic Substances Control Contacts:
• Janet Naito: (510) 540-3833; [email protected]
• Wayne Hagen: (510) 540-3911; [email protected]
Bay Area Air Quality Management District Contact:
• Naomi Bernardo: (415) 749-4713
Contact Us
17
• Customer Service: 1-800-743-5000 (1-800-PGE-5000)
• Electric Outage Information: 1-800-743-5002
• IF YOU SMELL NATURAL GAS, see downed power lines, or suspect another emergency situation, leave the area immediately and then call 9-1-1 and PG&E at 1-800-743-5000.
PG&E CONTACTS
18
Thank You!