Hunters Point Site Project Advisory Committee Meeting August 20, 2013 1

Project Advisory Committee Meeting - PG&E

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Advisory Committee Meeting - PG&E

Hunters Point Site Project Advisory Committee Meeting

August 20, 2013

1

Page 2: Project Advisory Committee Meeting - PG&E

2

Agenda

• Welcome and Introductions

• Safety Moment

• Site Update: Completed Work

• 2013/2014-Site Work

• Local Hiring

• Continued Communications

• Q&A

2

Page 3: Project Advisory Committee Meeting - PG&E

3

Introductions

• Project Advisory Committee Members

• PG&E

‐ David Harnish, Manager

‐ Rob Saur, Project Manager

‐ Andrea Gooden, Manager, External Affairs

‐ Dan Hughes, Consulting Project Manager

• Contractors

‐ JBR Partners – James Bryant (Principal)

‐ ERM – John Cavanaugh (Project Manager)

‐ Jacobson James – Jan Jacobson (Project Manager)

3

Page 4: Project Advisory Committee Meeting - PG&E

4

Committed to Safety

4

• Room Safety

• Daily Safety Briefing

• No lost-time due to injury

in 2012 or 2013 (YTD)

Morning Safety Briefing

Page 5: Project Advisory Committee Meeting - PG&E

5

Moving to the Next Phase

5

• Majority of soil cleanup work completed

• Groundwater cleanup, tunnel closure and shoreline improvement in progress

• Planning for streetscape improvement and interim use beginning

Before Dismantlement Now

Page 6: Project Advisory Committee Meeting - PG&E

Hunters Point Site Aerial

6

Page 7: Project Advisory Committee Meeting - PG&E

Site Update: Completed Work

7

Area A Soil Cleanup and Paving

Area B Soil and Groundwater Cleanup and Paving

(monitoring ongoing)

Area C/D Soil Cleanup and Paving, Basement Closure

Area H Soil Cleanup, Restoration and Re-Vegetation with

Native Plants

Area I Soil and Groundwater Cleanup and Paving

(monitoring ongoing)

Area J Soil Cleanup

Page 8: Project Advisory Committee Meeting - PG&E

8

2013/2014— Site Work

8

Groundwater Cleanup in Jennings Street and on White Cap

Property

In Progress

Cooling Water Tunnel Closure and Shoreline Improvement

In Progress

Shoreline Area Cleanup Investigation

In Progress

Streetscape Improvement and Interim Use Plan Development

In Progress

Page 9: Project Advisory Committee Meeting - PG&E

9

2013 Groundwater Cleanup

9

• Rounds I and II Complete

• Focused on “off-site” areas (White Cap property and Jennings Street) with small treatment area near lagoon in Area B-South

• Injection of treatment agent into groundwater with 2-inch wells

• Limited disruption to local traffic and businesses

• Majority of treatment completed by end of 2013

• Ongoing monitoring

Page 10: Project Advisory Committee Meeting - PG&E

10

Tunnel Closure and Shoreline Improvement Project

10

Cooling Water Tunnel Closure: • Five tunnels to be closed; to ensure

continued safety

• Work completed by December 2013 • Tunnels will be sealed at the ends

and filled with a concrete slurry mix

• Tunnels were used to convey water to cool the plant operations

Page 11: Project Advisory Committee Meeting - PG&E

11

Tunnel Closure and Shoreline Improvement Project

11

Dive teams cap tunnels Water removed from tunnels

Tunnels Filled

Page 12: Project Advisory Committee Meeting - PG&E

12

Tunnel Closure and Shoreline Improvement Project

12

Shoreline Improvement Activities 4-6 weeks of work Concrete structure and debris removal Pedestrian bridge removal, painting and

replacement Temporary trail closure; detours provided

Cranes and excavators will remove pieces of debris and concrete

Page 13: Project Advisory Committee Meeting - PG&E

13

Shoreline Area Cleanup

13

•Environmental field investigations complete •Data evaluation in progress; report available early 2014

•Cleanup plan, for recreational use, available for comment spring 2014

•Cleanup work anticipated to begin fall 2014.

Page 14: Project Advisory Committee Meeting - PG&E

14

Streetscape Improvement and Interim Uses

14

• Architects currently designing concepts for streetscape improvements and interim uses, based on community input

• Engaging community via one-on-one, small group, and

community meetings throughout design and planning process • Stakeholders will be consulted before final design decisions

are made

Page 15: Project Advisory Committee Meeting - PG&E

15

Committed to Local Hiring

15

• 2013 Local Hiring Goal: 30 percent • Coordinating with SF CityBuild program (415-701-4889)

• Continued use of local contractors when

possible

Local Worker Appreciation Event

Page 16: Project Advisory Committee Meeting - PG&E

16

Continued Communications

• Community Open House

• Email Updates

• Team available for questions

• Newsletters • Website updates (as needed) • Project Hotline/Email

16

Page 17: Project Advisory Committee Meeting - PG&E

For More Information:

• Environmental Remediation Response Line: 1-866-247-0581

• Project Email: [email protected]

• Project Website: www.pge.com/hunterspoint

California Department of Toxic Substances Control Contacts:

• Janet Naito: (510) 540-3833; [email protected]

• Wayne Hagen: (510) 540-3911; [email protected]

Bay Area Air Quality Management District Contact:

• Naomi Bernardo: (415) 749-4713

Contact Us

17

Page 18: Project Advisory Committee Meeting - PG&E

• Customer Service: 1-800-743-5000 (1-800-PGE-5000)

• Electric Outage Information: 1-800-743-5002

• IF YOU SMELL NATURAL GAS, see downed power lines, or suspect another emergency situation, leave the area immediately and then call 9-1-1 and PG&E at 1-800-743-5000.

PG&E CONTACTS

18

Page 19: Project Advisory Committee Meeting - PG&E

Thank You!

19