18
Project 423513-1-52-01 State Road 434 Outfall Ditch to the Little Wekiva River FDOT Project Manager: Dennisse Zornan Tuesday, May 17, 2011 Little Wekiva River SR 434 Outfall Ditch

Project 423513-1-52-01

  • Upload
    tivona

  • View
    25

  • Download
    1

Embed Size (px)

DESCRIPTION

Project 423513-1-52-01. Little Wekiva River. State Road 434 Outfall Ditch to the Little Wekiva River FDOT Project Manager: Dennisse Zornan. SR 434 Outfall Ditch. Tuesday, May 17, 2011. Civil Rights Statement. - PowerPoint PPT Presentation

Citation preview

Page 1: Project 423513-1-52-01

Project 423513-1-52-01State Road 434 Outfall Ditch to the Little

Wekiva RiverFDOT Project Manager: Dennisse Zornan

Tuesday, May 17, 2011

Little Wekiva River

SR 434 Outfall Ditch

Page 2: Project 423513-1-52-01

Civil Rights Statement

SR 434 Outfall Ditch FPID No. 423513-1-52-01

This meeting is being held to afford all citizens the right to understand the project and comment on concerns to the Florida Department of Transportation (FDOT). The meeting is being held to comply with Title VI of the Civil Rights Act of 1964, and Title VIII of the Civil Rights Act of 1968, as amended. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to FDOT compliance with Title VI and/or Title VIII may do so by contacting the FDOT, District Five, Title VI and VIII Coordinator Lorie Matthews, 719 South Woodland Boulevard, Deland, Florida 32720 or the Florida Equal Opportunity Office, 605 Suwannee Street, Room 260, Mail Station 65, Tallahassee, FL 32399-0450. All inquiries or complaints will behandled according to FDOT procedure and in an expeditious manner.

Page 3: Project 423513-1-52-01

Website Informationwww.cflroads.com

SR 434 Outfall Ditch FPID No. 423513-1-52-01

Page 4: Project 423513-1-52-01

Project LocationS

tate

Road

434 Rio Ala Mano Drive

Toledo Drive

SR 434 Outfall Ditch FPID No. 423513-1-52-01

Outfall Ditch

Exist

in

g

Page 5: Project 423513-1-52-01

Project HistoryRoutine Maintenance

Several Attempts Over the Past Decade to Correct/Prevent Further Erosion

Previous Project (Project No. 406407-1-52-01)Constructed in 2002 Included Plantings, Erosion Control Mats, Sand-Cement

Ditch Blocks, a Gabion Basket, and Rubble Rip-Rap

January 2006Removal of Overgrowth; Inclusion of Additional Sand-

Cement Bags

SR 434 Outfall Ditch FPID No. 423513-1-52-01

Page 6: Project 423513-1-52-01

Existing Conditions Ditch has Deepened, Causing Severe Bank Erosion on Both

Sides Erosion is Encroaching on the Surrounding Residents’ Backyards Neighbors have Built Retaining Walls Residential Fences are Beginning to Lean and Lose Stability

Ditch is Difficult for Florida Department of Transportation to Maintain Hard to Access Costly to Maintain

Headwall at SR 434 Concrete Block Wall Existing Vegetation Growth

SR 434 Outfall Ditch FPID No. 423513-1-52-01

Page 7: Project 423513-1-52-01

Existing Conditions (Additional Photos)

Steep Bank Slopes

Existing Ditch Block Slope Protection (Erosion Mats)

Slope Protection (Sand-Cement)

Active Stream Existing Fence Line

SR 434 Outfall Ditch FPID No. 423513-1-52-01

Page 8: Project 423513-1-52-01

Existing ConditionsSlope Protection

Provided at Various Ditch Bank Locations

Gabion BasketLast Structure Prior to

Discharge to Little Wekiva River

Structure is FailingPrimary Reason for

Current Design Project

SR 434 Outfall Ditch FPID No. 423513-1-52-01

Page 9: Project 423513-1-52-01

Proposed Design ImprovementsJanuary 2011

Design Project Underway Install Sheet Piling to Replace Existing Drainage

Structures Reduction in Soil Loss and Erosion Prevention Allows Ditch Bottom to Build Up Over Time Geotextile Improvements New Landscape/Maintenance Plan Minimization of Wetland Impacts Permitting Through St. John’s River Water

Management District

SR 434 Outfall Ditch FPID No. 423513-1-52-01

Page 10: Project 423513-1-52-01

Proposed Design Improvements

LEGEND:Sheet PilingErosion Protection

Toledo Drive

Lit

tle

We

kiv

a R

ive

r

Construct Sheet Piling

830

832836 834

816

820818

826824

828

814

805803

809807

811

817815

813

610

801

Sta

te R

oa

d 4

34

Rio Ala Mano Drive

SR 434 Outfall Ditch FPID No. 423513-1-52-01

Page 11: Project 423513-1-52-01

Proposed Design Improvements

2’

Geotextile

Existing Ground Line

Steel Sheet Piling

Articulating BlockArticulating Block

SR 434 Outfall Ditch FPID No. 423513-1-52-01

Page 12: Project 423513-1-52-01

Proposed Design ImprovementsSlope Protection – Landscape Plantings

Wiregrass (Aristida stricta) Sand Cord Grass (Spartina bakeri) Pickerel Weed (Pontedaria cordata)

Wiregrass Sand Cord Grass

Pickerel Weed

SR 434 Outfall Ditch FPID No. 423513-1-52-01

Page 13: Project 423513-1-52-01

Proposed Design ImprovementsSlope Protection - Geotextile Material

Articulating Block

Articulating Block Samples

SR 434 Outfall Ditch FPID No. 423513-1-52-01

Page 14: Project 423513-1-52-01

Proposed ChallengesAccess

Access from State Road 434 Potential Access via Existing Easements Construction Equipment Construction Material Delivery

SR 434 Outfall Ditch FPID No. 423513-1-52-01

Page 15: Project 423513-1-52-01

Construction Access Into Ditch

Toledo Drive

Lit

tle

We

kiv

a R

ive

r

830

832836 834

816

820

818

826 824

828

814

805803

809807

811

817

815

813

610

801

SR

434

Rio Ala Mano Dr

Page 16: Project 423513-1-52-01

Project ScheduleActivity Date

Begin Design Phase January 24, 2011

Public Information Meeting May 17, 2011

90% Plans Submittal June 24, 2011

Design Complete Spring 2012

Begin Construction Early 2012

Project CostsDesign Cost - $196,000Construction - $459,000

SR 434 Outfall Ditch FPID No. 423513-1-52-01

Page 17: Project 423513-1-52-01

We Want Your Input Please Turn in the Comments Cards

Tonight

Mail the completed card by

May 29, 2011

SR 434 Outfall Ditch FPID No. 423513-1-52-01

Page 18: Project 423513-1-52-01

Thank You For Attending!

Dennisse ZornanFDOT Project Management719 South Woodland BoulevardDeland, Florida 32720(386) [email protected]

Stephanie GhezziThe LPA Group Incorporated 615 Crescent Executive Court ,

Suite 200Lake Mary, Florida 32746(407) [email protected]

SR 434 Outfall Ditch FPID No. 423513-1-52-01

We appreciate all who attended tonight’s Public Information Meeting

The Website for the Project can be Located Under the “Future Projects” Tab

http://www.cflroads.com

For Additional about other FDOT Projects and Programs:

http://www.dot.state.fl.us