Project 2.1 (ESR7) : Optimization of trackbed design and maintenance

Project 2.1 (ESR7)Project 2.1 (ESR7) : Optimization of trackbed design and maintenance

Embed Size (px)

Citation preview

Page 1: Project 2.1 (ESR7)Project 2.1 (ESR7) : Optimization of trackbed design and maintenance

Project 2.1 (ESR7) : Optimization of trackbed design and maintenance

Page 2: Project 2.1 (ESR7)Project 2.1 (ESR7) : Optimization of trackbed design and maintenance

Project 2.1 (ESR7) : Optimization of trackbed design and maintenance

Bachelor and Master degrees in Civil Engineering (Structure) at University of Palermo

II Level Master degree in Railway Infrastructure and System Engineering at University of Rome

“La Sapienza”

PhD in Civil Engineering at the University of Nottingham

Page 3: Project 2.1 (ESR7)Project 2.1 (ESR7) : Optimization of trackbed design and maintenance

Aim

Propose ballast specifications that discriminate better between materials and allow re-use of old ballast particles

Understand, simulate and model the effect of stoneblowing

Investigate the potential for in-situ stabilization

Simulate and model the water regime in ballast

Simulate and model ballast settlement

Objectives

To increase the efficiency of maintenance management and associated design.

Project 2.1 (ESR7) : Optimization of trackbed design and maintenance

Page 4: Project 2.1 (ESR7)Project 2.1 (ESR7) : Optimization of trackbed design and maintenance

Period Highlight:12 Plan Actual % Complete Actual (beyond plan) % Complete (beyond plan)

Project: Optimization of Trackbed Design and Maintenance

ESR leaders:Dr. Nick Thom, UNOTT

Dr. Davide Lo Presti, UNOTTPLAN PLAN ACTUAL ACTUAL PERCENT

ACTIVITIES START DURATION START DURATIONCOMPLETE O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48

Task 1 Become acquainted with literature in the field UNOTT 9 6 10 1 0%

Task 2 Select 6 ballast sources and obtain samples UNOTT 11 2 0 0 0%

Task 3 Perform springbox/PUMA/ballast box tests on selected sources (if appropriate develop a larger springbox if appropriate)

UNOTT/URS 11 12 0 0 0%

Task 4 Degrade ballast samples UNOTT/URS 12 6 0 0 0%

Task 5 Degraded materials tests UNOTT/URS 13 10 0 0 0%

Task 6 Carry out Los Angeles Abrasion, Micro Deval Attrition, Flakiness Index, Particle lenght Index

URS 15 6 0 0 0%

Task 7 Tamping/Stoneblowing tests UNOTT 12 2 0 0 0%

Task 8 Use historical track data to assist in interpretation UNOTT/URS 13 10 0 0 0%

Summer School UNOTT 12 1 0 0 0%Workshop 15 1 0 0 0%Task 9 Source fouled ballast URS 20 2 0 0 0%

Task 10 Instigate site trials UNOTT/URS/IR 20 17 0 0 0%

Task 11 Stabilize fouled ballast UNOTT 22 6 0 0 0%

Task 12 Measure the mechanical properties of ballast UNOTT 24 6 0 0 0%

Task 13 Perform other ballast box tests UNOTT 26 4 0 0 0%

Spring School 19 1 0 0 0%Summer School 22 1 0 0 0%Task 14 Develop a 2D flownet UNOTT 28 4 0 0 0%

Task 15 Perform ballast box tests with moisture simulations UNOTT 29 5 0 0 0%

Task 16 Settlement simulation UNOTT/IR 28 14 0 0 0%

Task 17 Final report UNOTT 40 6 0 0 0%

Workshop 28 1 28 1 0%Summer School 34 1 34 1 0%Workshop 37 1 37 1 0%

ESR7 Timeline

2014 2015

Tasks year 2014

Tasks year 2015

Tasks year 2016 - 2017

2016 20172013

3 years plan

Page 5: Project 2.1 (ESR7)Project 2.1 (ESR7) : Optimization of trackbed design and maintenance

Contacts:

Giacomo D’AngeloGiacomo.d’[email protected]@live.it

Nick [email protected]

Davide Lo [email protected]