16
PROJECT WORK ON COLLING TOWER GUIDED BY: PREPARED BY: MR. H.K.PATEL (L.M.E) NAME ENROLL.NO MR. M.M.PATEL(L.M.E) CHINMAY S PATEL 106550319132 HARSHIL.V SHAH 106550319122 BRIJESH.P.PATEL 106550319069 KAUSHAL A. TANDEL 106550319080

Project -1 Ppt(Cooling Tower)

Embed Size (px)

Citation preview

Page 1: Project -1 Ppt(Cooling Tower)

PROJECT WORKON

 COLLING TOWER

GUIDED BY: PREPARED BY:MR. H.K.PATEL (L.M.E) NAME

ENROLL.NOMR. M.M.PATEL(L.M.E) CHINMAY S PATEL 106550319132 HARSHIL.V SHAH

106550319122 BRIJESH.P.PATEL

106550319069 KAUSHAL A. TANDEL

106550319080

Page 2: Project -1 Ppt(Cooling Tower)

DETAILED DESCRIPTION OF PROBLEM

Energy losses :-

Regardless of the type of system , be it open or closed, if it meets with any of the above problems, either the cooling tower nozzles are blocked resulting in reduced Delta “T” and/or the deposits/scales are formed on the heat transfer surfaces.

Drift loss:-

Now –a-days most of the end user specification calls for 0.02% drift loss.

Cooling Tower FansThe purpose of a cooling tower fan is to move a specified

quantity of air through the system, overcoming the system resistance which is defined as the pressure loss

Page 3: Project -1 Ppt(Cooling Tower)

EXPECTED OUTCOME OF INDUSTRY DEFINED PROBLEM (IDP) Feet soft water plant inlet of a cooling tower. Use of Fibre reinforced plastic blade for Energy

losses. Replacement of aluminum blades with light-weight

FRP blades reduces the load on cooling tower fan motors & brings down energy consumption 

Change blade angle for drip loss. Use eliminator for drip loss Correct excessive and/or uneven fan blade tip

clearance and poor fan balance. On old counter-flow cooling towers, replace old

spray type nozzles with new square spray ABS practically non-clogging nozzles.

Balance flow to cooling tower hot water basins.

Page 4: Project -1 Ppt(Cooling Tower)

INTRODUCTION Cooling towers are a very important part of many

chemical plants. The primary task of a cooling tower is to reject heat into the atmosphere. They represent a relatively inexpensive and dependable means of removing low-grade heat from cooling water. The make-up water source is used to replenish water lost to evaporation. Hot water from heat exchangers is sent to the cooling tower. The water exits the cooling tower and is sent back to the exchangers or to other units for further codling. Typical closed loop cooling tower system is shown in Figure

Page 5: Project -1 Ppt(Cooling Tower)
Page 6: Project -1 Ppt(Cooling Tower)

CLASSIFICATION OF COOLING TOWER

Page 7: Project -1 Ppt(Cooling Tower)

ADVANTAGES AND DISADVANTAGES

Page 8: Project -1 Ppt(Cooling Tower)
Page 9: Project -1 Ppt(Cooling Tower)

Range :- This is the difference between the cooling tower water inlet and outlet temperature.

Approach:- This is the difference between the cooling tower outlet coldwater temperature and ambient wet bulb temperature.

Page 10: Project -1 Ppt(Cooling Tower)

FORMULAE CAN BE USED L(T1 – T2) = G(h2 – h1) L/G = (h2 – h1) / (T1 – T2) 

Where: L/G = liquid to gas mass flow ratio (kg/kg) T1 = hot water temperature (0oC) T2 = cold-water temperature (0oC) h2 = enthalpy of air-water vapor mixture at

exhaust wet-bulb temperature (same units as above)

h1 = enthalpy of air-water vapor mixture at inlet wet-bulb temperature (same units as above)

Page 11: Project -1 Ppt(Cooling Tower)

COMPONENTS OF A COOLING TOWER Frame and casing: Support exterior

enclosures Fill: Facilitate heat transfer by maximizing

water / air contact Cold water basin: Receives water at bottom

of tower Drift eliminators: Capture droplets in air

stream Air inlet: Entry point of air Louvers: Equalize air flow into the fill and

retain water within tower Nozzles: Spray water to wet the fill Fans: Deliver air flow in the tower

Page 12: Project -1 Ppt(Cooling Tower)

FISHBONE DIAGRAM

Page 13: Project -1 Ppt(Cooling Tower)

5-S STRATEGY

Page 14: Project -1 Ppt(Cooling Tower)

7-S STRATEGY

Page 15: Project -1 Ppt(Cooling Tower)

OBJECTIVE OF THE MODEL (To analyze how well an organization is positioned to achieve its intended objective

Usage Improve the performance of a company Examine the likely effects of future changes

within a company Align departments and processes during a

merger or acquisition Determine how best to implement a

proposed strategy

Page 16: Project -1 Ppt(Cooling Tower)

BIBLIOGRAPHY

  www.spxcooling.com www.retscreen.net www.wikipedia.com/cooling tower   REFERENCES BOOK   ASHRAE Handbook NPC Case Studies Bureau of Energy Efficiency