17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED) Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution Instruction Sequences Current Capabilities Present Status On Behalf of: Carmen Gonzalez Gutierrez Roberto Campagnolo Roland Bramm Torsten Alt Kjetil Ullaland Jorgen Lien Are Martinsen Matthias Richter Heinz Tilsner Sebastian Bablok Christian Kofler

Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

  • Upload
    katina

  • View
    27

  • Download
    0

Embed Size (px)

DESCRIPTION

Overview. Architecture. Trigger and Clock Distribution. Instruction Sequences. Current Capabilities. Present Status. Progress on the RCU Prototyping Bernardo Mota CERN PH/ED. On Behalf of: Carmen Gonzalez Gutierrez Roberto Campagnolo Roland Bramm Torsten Alt Kjetil Ullaland - PowerPoint PPT Presentation

Citation preview

Page 1: Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED)

Progress on the RCU PrototypingBernardo Mota

CERN PH/EDOverview

Architecture

Trigger and Clock Distribution

Instruction Sequences

Current Capabilities

Present Status

On Behalf of:

Carmen Gonzalez GutierrezRoberto CampagnoloRoland BrammTorsten AltKjetil UllalandJorgen LienAre MartinsenMatthias RichterHeinz TilsnerSebastian BablokChristian Kofler

Page 2: Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED)

Overall Frontend System

Page 3: Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED)

ArchitectureF

EC

FE

CF

EC

FE

C

ALTRO bus

I2C bus

SIU InterfaceALTRO Interface

• Instruction MEM• Pattern MEM• Active channel list• Result MEM

Slow Control

Carmen GonzalezGutierrez

talk

DataAssembler32 <- 40

StatusRegisters

CommandInterpreter

&Bus Switch

DCS

DDL

RCU bus

FPGA

Page 4: Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED)

ALTRO Interface: Trigger ModesL1

-L2 RCU

L2

L1IF_L1

****External

-L1&L2 filter-

Final OperationMode

tw

SW

TR

G RCU L1 L2

drift time

programmableSWTRG

WAIT

exec via DCS

Data via DDL ****

L1 o

nly RCU L2L1

IF_L1

****External

-L1 filter-

Test BeamMode

Page 5: Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED)

0

4’h1

19

RS_STATUS 16’hxxxx

0

4’h2

19

RS_L1CNT 16’hxxxx

0

4’h3

19

RS_L2CNT 16’hxxxx

0

4’h9

19

END 16’hxxxx

0

4’h6

19

CHRDO 16’hxxxx

0

4’h7

19

PMREAD channel add.

15 12 1116

4’hx

0

4’h8

19

PMWRITEchann. add.

15 13 1116

3’hx

12

bcast

Instruction Codebook

0

4’ha

19

WAIT Nbr. Cycles CLK

16 15

0

4’h0

19

JUMP/LOOP Add.

15 8 716

N loops

0

4’hb

19

IF_TRIGGER 16’hxxxx

Page 6: Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED)

Examples of Instruction Sequences

RPINC

CHRDO (Readout)

WPINC (L2)

WAIT

SWTRG (L1)

*END*

Testing Multi-Event Buffer & Readout with software

trigger

From ALTROs to DAQw/ software trigger

Accessing in infinite loop a given

ALTRO Register

READ ‘N’ REG

WRITE ‘N’ REG

JUMP

Scope probing for electricalintegrity check

Page 7: Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED)

READ HWADD ‘i-1’

- - -

READ HWADD ‘0’

*END*

Cardio Test

Which cards are respondingto basic register access?

READ HWADD ‘1’

READ HWADD ‘i’

JUMP

RPINC

CHRDO (Readout)

IF_TRIGGER (L1)

Test Beam Mode

From ALTROs to DAQw/ external L1-trigger:

• ADC sampled data• Pattern stimuli

JUMP

Examples of Instruction Sequences

Page 8: Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED)

Pedestal Memory Test

*END*

PMREAD

PMWRITE

Checking ALTRO Pedestalmemory access in a fast way

Read Error register formismatch error

Examples of Instruction Sequences

Page 9: Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED)

Current Configuration Paths

ParameterExtraction ALTRO/BC/RCU

parameters

ParameterDatabase

Data BlockAssembler

FE

CF

EC

FE

CF

EC

RCU

Raw DataSoftware Hardware

‘N’ configurationblocks

Transporterto DAQscripts

Transporterto DCSscripts

buffer

buffer

Page 10: Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED)

Configuration and Readout TimeF

EC

FE

C

Transporterto DAQscripts

Transporterto DCSscripts

RCU FE

CF

EC

buffer

buffer

Overall configuration data: 7MByte/RCU - Worst case scenario:

• 3200 active channels• 1000 samples/channel 0.7s<1s

Bothpaths

3s

Readout: 3ms

Page 11: Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED)

Active Channel / FEC List

Improving readout efficiencyby storing the currentstatus of one channel or board

16bit = 1 ALTRO chip

1: Good0: Non-working

256

wor

ds

ActiveChannel

ListChannel not workingwill not be readout

Active FEC List

32bit = max number of FEC / RCU

Updated by Slow control

Page 12: Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED)

Current Trigger and Clock Distribution

RCUboard

PC TT

C V

X

TT

C V

I

P

roc

& P

CI-

VM

E

VME crate

ethernet

CO

RB

O M

odul

e

TriggerInput

• Clock• L1-trigger• Trig.Messages TTC chip

DCS board

FPGA

busy signal

10MHz

40MHz

Page 13: Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED)

Operation in High Trigger Rate

4.7KHz Event Rate 80MByte/s

Conditions:

• 100 samples/channel• 128 channels• 40MHz Readout clk• 10MHz Sampling clk

Exercise of full Readout Chainwas performed successfully atKHz range trigger

Page 14: Progress on the RCU Prototyping Bernardo Mota CERN PH/ED

17/05/04 ALICE TPC Meeting Bernardo Mota (CERN PH/ED)

Present Status

RCU Development

System fully tested and operational:

• 2 branches (12 + 13 frontend cards) in a total of 3200 channels• DCS board running Linux on ARM processor and Ethernet link (Torsten Alt talk)• DAQ with both DATE system and lower level script language for config.• Communication between RCU and HLT fully operational• Installed in the T10 Area, ready for beam (Roberto Campagnolo talk)

ALTRO Configuration tested using both the DCS board and the DDL link√

Improvement in readout time by a factor of 2: Replication of readout logic?

Configuration of the RCU firmware from the DCS Board close to completion√

Slow Control through I2C fully operational measuring To, Currents and Voltages(Carmen Gonzalez Gutierrez talk)