INDEX
S. No Name of the Constituency Page No
1 Special Repair Works 1 - 2
2 12th Finance Commission 3
3 NABARD 4
4 Road Safety Engineering 5 - 6
5 Road Safety Interventions 7 - 8
6 Minor Works 9
7 ST Plan ( Jerrilla) 10
8 Core Net work 11
8/14/2019 Progress All Schemes R&B Division Paderu
3/15
ABTRACT
Name of the Scheme Length Length Length Remarks
1 2 3 4 5 6 7 8 9 10 11
SR WORKS 10 61.08 720.10 7 25.88 329.55 3 35.20 390.55
12th FINANCE 7 66.50 650.80 5 49.00 453.80 2 17.50 197.00
NABARD 5 37.40 2248.00 2 10.80 323.00 3 26.60 1925.00
ROAD SAFETY ENGINEERING 17 62.00 16 59.50 1 2.501 Work by 31-01-09
Road Safety Engineering (ST) Area 5 -- 26.5 5 Works tenders
to be received on
9/1/2009
26 161.10 23 95.00 3 66.1 2 Works completed.
1 Work by 31-03-2009
MINOR WORKS 17 17.00 17 17.00 0 0
ST PLAN WORKS (Jerrila Project) 19 33.5 5334.00 0 0 19 33.50 5334.00
16 works tenders to be
CORE NET WORK Called for
2 12.7 190.00 2 12.7 190.00 0 0 0
Executive Engineer
(R&B) PADERU
No. of WorksSanctioned
Estimate Amount(Rs in Lakhs)
No of workscompleted
EstimateAmount (Rs
in Lakhs)
No of worksin Progress
EstimateAmount (Rs in
Lakhs)
1 Work by 30-09-091 works by 30-10-09
1 Work by 30-04-092 Works Tenders
received on 3-1-09
ROAD SAFETY INTERVENTIONS(HUDCO)
3 Works agency setteledby the Govt
8/14/2019 Progress All Schemes R&B Division Paderu
4/15
(R&B) DEPARTMENT ::
(R&B) DIVISION :: PADERU
Name of the work Remarks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17SCHEME:: SR WORKS
1 8.50 100.00 82.36 80.89 0.34 81.23 0.0 0.34
2 3.30 55.00 52.90 0.00 55.36 55.36 55.36 23-1-07 22.10.07
3 6.80 56.50 53.63 43.67 13.30 56.97 13.30 29-6-07 28.3.08
4 Bridge 14.25 13.93 0.00 13.30 13.30 13.30 9-07-08
5 6.60 83.80 81.05 83.56 7.70 91.26 7.70 19-1-07 18.9.07
6 0.20 10.00 9.28 5.08 0.00 5.08 0.00 9-3-07 12.5.07
7 0.48 10.00 9.27 7.76 0.00 7.76 2.24 2.24 9-3-07 8.5.07
8 6.00 68.30 65.41 0.00 0.00 0.00 68.30 68.30 18.9.07 17.6.08 17.1.09
SlNo
Length inKms
Sanction ref.No
EstimateAmount (Rs
in Lakhs)
R.E/W.E Ref.
No
ContractValue
Expdr. Upto 31-3-08
Expdr.During theyear up to
12/08
CumulativeExpenditure
Balancevalue of
work
Fundsrequireme
nt for2008-09(9+11)
Detailed stage ofwork
Date ofcommence
ment
Date ofcompletion
Expecteddate of
completion
S.Rs to NCS Road from km 30/0 to 30/8, 33/2to 36/0, 48/0 to 55/0 and CPL Branch Roadfrom km 0/0 to 0/900
SRP 2006-07
Work completedin all respects
S.Rs to NCS (R&B) road to B.C.Colony (via)Laxmipuram, Nagaram from Km. 2/3 to 5/6
SRP 2007-08
Work completed.Final bill paid
a) S.Rs to Kylasapatnam to Rachapalli road
from Km. 0/0 to 6/0 and(b) S.Rs to Kotavuratla toGiduturu from Km.0/0 to 0/800
SRP 2007-
08
Work completed.
Final bill to bepaid
Providing Revetment and protection work tothe bridge at Km.34/6 of Paderu-Araku road.
SRP 2007-08
Work completed.Final bill to bepaid.
a) S.Rs to Narsipatnam-Tallapalem roadfromKM. 2/0 to 3/0, 5/0 to 7/0 10/4 to 12/0and(b) S.Rs Narsipatnam - Revupolavaram roadfrom Km. 7/0 to 9/0
SRP 2006-07
Work completed.Final bill paid
S.Rs to Madugula (R&B) roat to Paderu (R&B)road (via) Dabbagunta, K.J.Puram from Km.4/2-4 in Visakhapatnam District
SRP 2006-07
Work completed.Final bill to bepaid.
S.Rs to Madugula (R&B) road to Paderu (R&B)road (via) Dabbagunta, K.J.Puram from Km.4/720 to 5/200 in Visakhapatnam District
SRP 2006-07
Work completed.Final bill to bepaid.
S.Rs to Lambasingi - Tagangi road from Km.0/0 to 6/0
SRP 2007-08
WBM completed.SDBC inprogress
8/14/2019 Progress All Schemes R&B Division Paderu
5/15
9 9.00 78.50 0.00 0.74 0.74 77.76 78.50 30-05-08 28-02-09 28-02-09
10 12.00 124.50 0.00 1.20 1.20 123.30 124.50 30-05-08 28-02-09 28-02-09
11 1.20 12.25 0.00 0.00 0.00 12.25 12.25
12 7.00 107.00 0.00 0.00 0.00 107.00 107.00
TOTAL 61.08 0.00 720.10 0.00 367.83 220.96 91.94 312.90 390.85 482.79
S.Rs to Kothakota-Makavaram road from km14/0 to 18/0,N.R.Road from km 14/0 to 17/0& D.Yerravaram to Kothuru (via) Cherlopalemfrom km 4/0 to 6/0
SRP 2007-08
Work onKothakota-Makavaripalemroad completedRemaining workto be done
S.Rs to Rachapalli to Koduru road from km0/0 to 4/0 (R&B) Road to L.V.K.Road from km12/0 to 14/0,Narsipatnam-RevupolavaramRoad from km 5/0 to 7/0 & D.Yerravaram toKothuru (via) Cheropalem from km 0/0 to 4/0in VSP Dist.
SRP 2007-08
Work is inprogress
S.Rs to Narsipatnam- Chintapalli Sileru roadfrom Km. 75/0 to 78/4
SRP 2005-06
Tenders Received .Agency to be settled.
TendersReceived .Agency to besettled.
S.Rs to NCS Road from km 40/0 to 43/0,P.C.Road from km 41/0 to 42/0, K.D.Peta toChintapalli road from km 28/0 to 31/0 in VSPDist.
SRP 2006-07
Work differred.Revised estimatesubmitted forsanction.
No responsefor tenders fortwice & workdiffered
8/14/2019 Progress All Schemes R&B Division Paderu
6/15
SCHEME:: 12th FINANCE1 10.00 71.80 69.35 58.35 15.00 73.35 15.00 23.1.07 22.10.07
0.00 0.00
2 11.60 76.00 53.77 23.45 77.22 23.45 29.6.07 28.3.08
0.00 0.00
0.00 0.00
3 10.50 140.00 0.00 0.00 30-09-2009
0.00 0.00
0.00 0.00
4 7.00 57.00 0.00 0.00 31-10-2009
0.00 0.00
0.00 0.00
5 9.00 110.50 120.22 120.22 120.22 1.12.07 1.9.08
6 8.00 100.00 97.46 1.11 88.14 89.25 10.75 98.89 1.12.07 1.9.08
7 10.40 95.50 93.92 0.22 85.26 85.48 85.26 1.12.07 1.3.08
TOTAL 66.50 0.00 650.80 0.00 260.73 113.45 332.07 445.52 10.75 342.82
a) Repairs to N.C.S.Road from km 45/0 to48/0, 81/0 to 83/0 and 100/0 to 103/0
12th Fin.2006-07
Work completedfinal bill to bepaid
b) Repairs to P.C.Road from 54/0 to 56/0 inVSP Dist.
a)Repairs to Waddadi-Paderu road from km4/0 to 6/0,18/0 to 20/0 and 26/4 to 27/0
12th Fin.2006-07
Work completedfinal bill paid
b) Ravikamathim-Kinthali road from km 0/0 to3/0
c) B.N.Road from km 73/4 to 75/0,94/0 to 95/4in VSP Dist.
a) Repairs to R&B Road to LVK Road fromkm 3/4 to 8/40
12th Fin.2006-07
Agreement to beconcluded
No Response fortenders due toAgency area work.Conractor informedby telegram 22-12-2008 . Agreement tobe conlcuded.
b) K.D.Peta Chintapalli road from km 21/0 to22/0 and 27/0 to 28/0 and 35/0 to 36/0
c) Vemulapudi-Velagapudi road from km 0/0 to2/50 in VSP Dist.
a) Repairs to Paderu-Arukuroad from km 16/0to 17/0 and 18/0 to 19/0
12th Fin.2006-07
Once workentrusted andcanelled dulyforfieting deposits
T/S issued on23-12-2008 .Tenders to becalled for on27-12-2008.
b) Paderu-Chintapalli road from km 11/0 to13/0 and
c) Paderu-Sujanakota-Duduma road from km17/0 to 20/0 in VSP Dist.
Repairs to Waddadi-Paderu road from km34/0 to 40/0 and km 42/0 to 43/0 andP.C.Road from km 0/0 to 1/0 and km 13/0 to14/0 in Visakhapatnam District.(By hot mixprocess)
12th
Fin.2007-08 Work completedfinal bill paid
Repairs to Paderu-Aruku Road from km 13/0 to 16/0and Paderu-Sujanakota-Duduma road from km 5/0to 7/0, 35/0 to 36/0 and km 51/0 to 53/0 inVisakhapatnam District.(By hot mix process)
12th Fin.2007-08
Work completedfinal bill to bepaid
Repairs to Waddadi-Kinthali road from km 0/0 to
2/0,Waddadi-Kintali road (via) Gottivada from km3/0 to 8/4 and Waddadi-Paderu road from km 7/0 to10/0 in Visakhapatnam District.(By hot mix process)
12th Fin.
2007-08
Work completed
final bill paid
8/14/2019 Progress All Schemes R&B Division Paderu
7/15
SCHEME:: NABARD
1 9.40 223.00 218.08 20.31 154.04 174.35 48.65 202.69 18.6.07 17.6.08
2 1.40 100.00 93.75 37.93 37.93 62.07 100.00 9.7.08 8.4.09
3 Building 125.00 115.5 28.51 28.51 86.99 115.50 27.12.07 26.12.08 30-04-2009
4 10.00 400.00 0.00 0.00
5 16.60 1400.00 0.00 0.00
TOTAL 37.40 2248.00 427.33 20.31 220.48 240.79 197.71 418.19
Improvements to Nathavaram- East GodavariDistrict limits from Km 0/0 to 10/0 (via) Chikkudupalem in Visakhapatnam district
GOMs No.221T, R&B R-IIDept. dt.10-10--2005
Work completedin all respects
Improvements to Waddadi- Kinthali (R&B)road to Ravikamatham- Kinthali (R&B) road(via) Vommali, VJ puram from Km 1/4 to 5/0 in
Visakhapatnam District
Work completedin all respects
Construction of Degree college at Chintapalliin VSP district
G O Ms No777 dt13.12.2006
Centering for theslab in progress
Improvements to PL Road to Bangarumittafrom Km 41/0 to 51/0 in VisakhapatnamDistrict
Tenders receivedon 03-01-2009
TendersReceived on 3-1-09 and agency tobe finalised.
Improvements to PL Road to Bangarumittafrom Km 23/4 to 40/0 in VisakhapatnamDistrict
Tenders to becalled for
Tenders to becalled for
8/14/2019 Progress All Schemes R&B Division Paderu
8/15
SCHEME:: ROAD SAFETY ENGINEERING1 4.50 4.99 4.37 0.67 5.04 0.00 0.67 3-3-08 2.5.08
2 5.00 5.01 3.08 1.84 4.92 0.00 1.84 3-3-08 2.5.08
3 5.00 5.03 0.00 5.09 5.09 0.00 5.09 3-3-08 5.2.08
4 2.50 2.50 0.00 0.00 0.00 0.00 0.00 Work in Progress 0 31-01-09
5 3.00 2.74 0.00 2.58 2.58 0.42 3.00 10-4-08
6 2.00 1.89 1.76 0.14 1.90 0.00 0.14 8-3-08 5.7.08
7 5.00 4.92 0.00 5.25 5.25 5.25 11-3-08 10.5.08
8 4.50 3.89 0.64 1.33 1.97 2.53 3.86 3-3-08 2.5.08
9 4.00 3.43 0.49 0.84 1.33 2.67 3.51 3-3-08 2.5.08
10 3.00 2.42 0.00 2.35 2.35 2.35 26-2-08 25.4.08
11 3.00 2.57 0.00 0.00 0.00 3.00 3.00 26-2-08 25.4.08
12 4.00 3.22 1.76 1.56 3.32 1.56 26-2-08 25.4.08
13 4.00 3.99 0.00 4.23 4.23 4.23 25-4-08 24.5.08
RSE by improvements to the curve (accidentprone area) at Km 60/6 of Narsipatnam-Chintapalli- Sileru Road
DR.No.150/07-08
Work completedfinal bill paid.
RSE by improvements to the curve (accidentprone area) at Km 73/6 of Narsipatnam-Chintapalli- Sileru Road
DR.No.158/07-08
Work completedfinal bill paid.
RSE by Construction of Retaining wall and
widening the formation (Ghat Portion) at Km13/6-10 of K.D.Peta -Chintapalli Road.
DR.No.
153/07-08
Work completed
final bill paid.
RSE by repairs to Handrails to minor bridge atKm 10/2-4, 13/6-8, 40/8-10 18/0-2, 28/4-6 ofPaderu-Sujanakota-Duduma Road.
DR.No.152/07-08
RSE by providing soling to erroded berms inKm 3/456 to 5/0, 18/0 to 21/0 & 29/0 to 32/0,37/0 to 45/0 to 55/0-4 of Paderu- Sujanakota-Duduma Road.
DR.No.156/07-08
Work completedfinal bill to bepaid.
RSE by Improvements to Road by widening
and Strenghting carriageway at Km 4/4 ofPaderu - Sujanakota -Duduma Road.
DR.No.
164/07-08
Work completed
final bill paid.
RSE by improvements to Curve at Km 18/4-8of Narsipatnam-Revupolavaram Road
DR.No.148/07-08
Work completedfinal bill paid.
RSE by improvements to the Curve at km17/2-6 of Narsipatnam-Revupolavaram Road
DR.No.151/07-08
Work completedfinal bill to bepaid.
RSE by improvements to the sight distance inGhat Portion (By widening) at Km 18/6-10 ofNarsipatnam- Revupolavaram Road
DR.No.157/07-08
Work completedfinal bill to bepaid.
RSE by improvements to Junction at Km 13/0of Narsipatnam -Tallapalem Road.
DR.No.159/07-08
Work completedfinal bill paid.
RSE by improvements to Junction at Km 11/8-10 of Narsipatnam -Revupolavaram Road.
DR.No.160/07-08
Work completedfinal bill paid tobe paid
RSE by improvements to Junction at Km 8/8-10 of Narsipatnam -Revupolavaram Road.
DR.No.161/07-08
Work completedfinal bill paid.
RSE by construction of Retaining Wall andwidening the formation (Ghat Portion) at Km24/2 of Paderu-Araku Road.
DR.No.149/07-08
Work completedfinal bill paid.
8/14/2019 Progress All Schemes R&B Division Paderu
9/15
14 4.00 3.94 0.00 3.67 3.67 0.33 4.00 8-3-08 5.7.08
15 3.00 3.44 0.00 2.98 2.98 2.98 17-3-08
16 2.00 0.00 1.85 0.00 1.85 1.15 1.15 3-3-08 5.2.08
17 3.50 3.44 0.00 3.19 3.19 0.25 3.44 25.4.08 24.6.08
TOTAL 62.00 57.42 13.95 35.72 49.67 10.35 46.07
RSE by Providing Soling to the erroded bermsin Ghat section in Km 16/4 to 30/0 ofWaddadi - Paderu Road
DR.No.154/07-08
Work completedfinal bill to bepaid.
RSE by Providing Soling to erroded berms inGhat Section in Km 30/0 to 40/0 of Waddadi-Paderu Road.
DR.No.155/07-08
Work completedfinal bill paid.
RSE by providing Soling to erroded berms inGhat Section in km 4/0 to 7/0 of Paderu-
Araku Raod.
DR.No.162/07-08
Work completedfinal bill to be
paid.RSE by providing Soling to erroded berms inGhat Section in km 23/0 to 38/0 of Paderu-Araku Raod.
DR.No.163/07-08
Work completedfinal bill to bepaid.
8/14/2019 Progress All Schemes R&B Division Paderu
10/15
SCHEME:: ROAD SAFETY INTERVENTIONS (HUDCO)1 1.30 1.28 1.16 0.00 1.16 0.14 0.14 2.7.08 4.6.08
2 5.00 5.04 2.80 2.52 5.32 2.52 22-02-08 21-04-08
3 6.00 5.33 4.06 1.88 5.94 1.88 26-02-08 25.4.08
4 10.00 10.06 0 6.48 6.48 6.48 26-02-08 25.4.08 31-12-08
5 9.95 7.77 1.65 7.57 9.22 7.57 2.6.08 4.5.08
6 2.00 1.99 0 2.11 2.11 2.11 26-02-08 25/04/08
7 1.60 1.88 0.66 0.79 1.45 0.79 2.5.08 4.4.08
8 1.90 1.88 0.67 1.17 1.84 1.17 2.10.08 4.9.08
9 3.20 3.15 0 3.10 3.10 3.10 26-02-08 25-04-08
10 2.00 1.93 0 2.05 2.05 2.05 22-02-08 21-04-08
11 9.00 7.18 4.02 2.93 6.95 2.93 2.5.08 4.4.08
12 5.30 4.67 3.58 1.37 4.95 1.37 2.5.08 4.4.08
13 2.00 1.96 0 2.00 2.00 2.00 17-04-08 16.06.08
Construction of Retaining wall at Km 23/4 ofPaderu Araku Road
122/ 07-08
Work completedfinal bill to bepaid.
Widening the Culvert at Km 14/4 ofNarsipatnam - Thallapalem Road.
123/ 07-08
Work completedfinal bill paid.
Widening the culvert at km 14/6 ofNarsipatnam - Thallapalem Road
124/ 07-08
Work completedfinal bill paid.
Improvements to the bridge approaches at Km9/0-4 of Narsipatnam - Thallapalem Road.
125/ 07-08
Wideningcompleted. BT tobe laid
Re-Decking to Minor Bridge at Km 16/4 ofNarsipatnam - Revupolavaram Road
126/ 07-08
Work completedfinal bill paid.
Urgent Repairs to damaged culvert at Km 14/4of Narsipatnam - Revupolavaram Road.
127/ 07-08
Work completedfinal bill paid.
Reconstruction of culvert at Km 1/4 ofD.Yerravaram to Thandava Project Road.
128/ 07-08
Work completedfinal bill paid.
Reconstruction of culvert at km 90/2 ofBheemunipatnam - Narsipatnam Road.
129/ 07-08
Work completedfinal bill paid.
Reconstruction of 800mm dia pipe culvert atKm 25/8 of Narsipatnam - Devipatnam Road.
130/ 07-08
Work completedfinal bill paid.
Reconstruction of 1.00 m dia. Pipe culvert atKm 29/8 of Narsipatnam - Devipatnam Road
131/ 07-08
Work completedfinal bill paid.
Providing Parapets in Ghat Portion from Km16/0 to 30/0 of Narsipatnam Chintapalli - SileruRoad.
132/ 07-08
Work completedfinal bill paid.
Widening the slab culvert at Km 2/4 ofNarsipatnam - Chintapalli - Sileru Road.
133/ 07-08
Work completedfinal bill paid.
Improvements to the Junction at Km 46 of
Paderu - Chintapalli Road.
134/ 07-
08
Work completed
final bill to bepaid.
8/14/2019 Progress All Schemes R&B Division Paderu
11/15
14 5.80 5.81 4.01 0.22 4.23 0.22 15-02-08 14-04-08
15 2.25 2.12 1.97 0.16 2.13 0.16 2.5.08 4.4.08
16 2.30 2.11 1.97 0.58 2.55 0.58 2.5.08 4.4.08
17 5.00 4.96 4.50 3.40 7.90 3.40 05-02-08 04-04-08
18 5.60 5.38 2.00 0.00 2.00 0.00 22-02-08 21-04-08
19 5.50 5.45 0 0.00 0.00 0.00 17.04.08 16.06.08
20 9.00 8.92 0 0.00 0.00 0.00 3.8.08 5.7.08 31-12-2008
21 8.10 8.04 3.66 4.65 8.31 4.65 26-02-08 25-04-08
22 2.40 2.09 0 2.12 2.12 2.12 2.5.08 4.4.08
23 2.40 1.65 1.33 0.33 1.66 0.33 25-02-08 24-04-08
24 3.40 2.68 2.19 0.18 2.37 0.18 3.3.08 5.2.08
25 1.60 1.07 0 1.01 1.01 1.01 3.8.08 5.7.08
26 48.50 0 0.00 0.00 0.00 31-03-2009
TOTAL 161.10 104.40 40.23 46.62 86.85 0.14 46.76
Improvements to accident Prone area at Km42/6 of Narsipatnam - Chintapalli - SileruRoad.
135/ 07-08
Work completedfinal bill to bepaid.
Improvements to accident Prone area at km54/2 of Narsipatnam Chintapalli - Sileru Road.
136/ 07-08
Work completedfinal bill to bepaid.
Improvements to accident Prone area at Km61/8 of Narsipatnam - Chintapalli - SileruRoad.
137/ 07-08
Work completedfinal bill to bepaid.
Providing Retaining wall at Km 43/2 on Rightside of Narsipatnam - Chintapalli - SileruRoad.
138/ 07-08
Work completedfinal bill to bepaid.
Providing parapets in Ghat Portion from km95/0 to 115/0 Narsipatnam - Chintapalli -Sileru Road.
139/ 07-08
Work completedfinal bill to bepaid.
Construction of retaining wall at Km 20 ofPaderu -Chintapalli Road.
140/ 07-08
Work completedfinal bill to bepaid.
Improvements to Road at Km 10/6 to 11/4 ofPaderu - Chintapalli Road.
141/ 07-08
Wideningcompleted.Retaining wall tobe done
Reconstruction and widening the weak andnarrow culvert at Km 88/2 88/6 and 89/2 ofBheemunipatnam Narsipatnam Road.
142/ 07-08
Work completedfinal bill paid.
Construciton of Retaining wall at Km 21/6 ofPaderu - Araku Road.
143/ 07-08
Work completedfinal bill paid.
Construction of Retaining wall at Km 4/2 to 5/2of Paderu - Araku Road.
144/ 07-08
Work completedfinal bill paid.
Construction of Retaining wall at Km 5/10 to6/4 of Paderu - Araku Road
145/ 07-08
Work completedfinal bill paid.
Improvements to road and culvert at Km 4/2 ofPaderu - Araku (R&B) Road to Bakuru Road.
146/ 07-08
Work completedfinal bill to bepaid.
Widening and Reducking of Steel GirderBridge at Km 81/6 of BN Road.
CR 10/2008-09
Diversion road inProgress
8/14/2019 Progress All Schemes R&B Division Paderu
12/15
SCHEME:: MINOR WORKS1 1.00 0.95 0.00 0.00 0.00 0.95 0.95 26.2.08 25.4.08
2 1.00 0.98 0.83 0.00 0.83 0.00 26.2.08 25.4.08
3 1.00 0.98 0.00 0.96 0.96 0.96 26.2.08 25.4.08
4 1.00 0.98 0.00 0.98 0.98 0.98 26.2.08 25.4.08
5 1.00 0.97 0.00 0.94 0.94 0.94 26.2.08 25.4.08
6 1.00 0.97 0.00 0.91 0.91 0.91 26.2.08 25.4.08
7 1.00 1.00 0.00 0.00 0.00 1.00 1.00 26.2.08 25.4.08
8 1.00 0.98 0.00 0.00 0.00 0.98 0.98 26.2.08 25.4.08
9 1.00 0.97 0.00 0.00 0.00 0.97 0.97 26.2.08 25.4.08
10 110/ 07-08 1.00 1.00 0.00 0.00 0.00 1.00 1.00 26.2.08 25.4.08
11 111/ 07-08 1.00 1.00 0.00 0.00 0.00 1.00 1.00 26.2.08 25.4.08
12 112/ 07-08 1.00 0.96 0.00 0.00 0.00 0.96 0.96 26.2.08 25.4.08
13 116/ 07-08 1.00 1.01 0.77 0.21 0.98 0.21 26.2.08 25.4.08
14 117/ 07-08 1.00 0.99 0.46 0.51 0.97 0.51 26.2.08 25.4.08
15 118/ 07-08 1.00 0.99 0.00 0.00 0.00 0.99 0.99 26.2.08 25.4.08
16 119/ 07-08 1.00 0.96 0.46 0.50 0.96 0.50 26.2.08 25.4.08
17 1.00 1.00 0.00 0.95 0.95 0.95 26.2.08 25.4.08
TOTAL 17.00 16.69 2.52 5.96 8.48 7.85 13.81
Construction of Retaining wall at km 19 ofP.L.Road to Bhangarumetta Road.
166/ 07-08
Work completedfinal bill to be paid.
Construction of Retaining wall at km 2/0 ofRachapalli to G.Koduru(Via) VenkatapuramRoad.
167/ 07-08
Work completedfinal bill paid.
Construction fo Parapet walls at Km 29 ofWaddadi - Paderu Road
169/ 07-08
Work completedfinal bill paid.
Construction of Retaining wall at Km 15/2 ofKothakota -Makavarapalem Road.
168/ 07-08
Work completedfinal bill paid.
Construction of Retaining wall at Km 1/0 ofKylasapatnam- Giduturu Road.
175/ 07-08
Work completedfinal bill paid.
Construction of Rt wall in km 4/0 to 5/0 ofSujanakota Branch Road
174/ 07-08
Work completedfinal bill paid.
Construction of Retaining wall at Km15/2 ofNarsipatnam - Tallapalem Road
176/ 07-08
Work completedfinal bill to be paid.
Construciton of Parapets of Paderu -
Sujanakota - Duduma Road Km 6/0 to 7/0
178/ 07-
08
Work completed
final bill to be paid.
Construciton of Parapets of Paderu -Sujanakota - Duduma Road km 42/0 to 45/2
180/ 07-08
Work completedfinal bill to be paid.
Widening and Re-construction of culvert at km8/2-4 of Yendapalli to Kondala AgraharamRoad
Work completedfinal bill to be paid.
Widening and Re-construction of culvert at km4/0 of Rachapalli to G.Kodutur (via)Venkatapuram Road
Work completedfinal bill to be paid.
Construction of Parapet walls at Km 20 ofWaddadi -Paderu Road
Work completedfinal bill to be paid.
Widening and Re-construction of culvert at km65/10 of Narsipatnam-Chintapalli Road
Work completedfinal bill paid.
Widening and Reconstruction of culvert at km8/4 of Narsipatnam-Tallapalem road
Work completedfinal bill paid.
Widening and Re-construction of culvert at km1/2 of Kondala Agraharam to Rolugunta(via)Lachannapalem Road
Work completedfinal bill to be paid.
Widening and Reconstruction of culvertat km
2/6 of Narsipatnam-Tallapalem Road.
Work completed
final bill paid.
Widening and Re-construction of culvert at km57/6 of Narsipatnam-Chintapalli Road.
120/ 07-08
Work completedfinal bill paid.
8/14/2019 Progress All Schemes R&B Division Paderu
13/15
SCHEME:: FLOOD DAMAGE REPAIRS1 4.90 4.62 1.77 2.90 4.67 2.90 23-7-07 22-9-07
2 15.00 14.99 0.00 14.02 14.02 14.02 09-01-07 8-4-07
3 35.00 35.20 0.00 32.19 32.19 32.19 12-01-07 11-4-07
4 7.00 6.21 4.90 0.73 5.63 0.73 9-2-07 8-4-07
5 9.90 9.85 9.03 0.76 9.79 0.76 9-2-07 8-4-07
6 3.30 2.14 1.44 0.19 1.63 0.19 1-2-07 30-3-07
7 12.30 12.33 0.00 10.20 10.20 10.20 9-1-07 8-4-07
8 2.30 1.47 1.47 0.12 1.59 0.12 1-2-07 30-3-07
9 9.95 9.88 0.00 9.47 9.47 9.47 9-2-07 8-4-07
10 3.10 2.24 1.51 0.11 1.62 0.11 1-2-07 30-3-07
11 6.85 6.87 6.00 0.49 6.49 0.49 16-12-06 15-2-08
12 4.00 2.67 2.68 0.19 2.87 0.19 1-2-07 30-3-07
13 74/ 06-07 9.50 9.35 6.70 2.25 8.95 2.25 30-11-06 1-3-07
14 3.20 2.09 1.37 0.11 1.48 0.11 1-2-07 30-3-08
15 1.50 1.48 1.23 0.10 1.33 0.10 9-2-07 8-4-07
16 4.95 4.84 1.68 2.96 4.64 2.96 23-7-07 27-9-07
17 35.00 34.90 32.86 2.65 35.51 2.65 9-1-07 8-4-07
TOTAL 167.75 161.13 72.64 79.44 152.08 0.00 79.44
F.D.R.to the damaged road surface of Narsipatnam-Chintapalli-Sileru Road from km 120/0 to 122/0and 138/0 to 140/0 for the year 2006-07
26/ 07-08
Work completedFinal Bill paid
CDRs to road surface damages toNarsipatnam-Chintpalli- Sileru road from Km54/0 to 65/0
18/ 06-07
Work completedFinal Bill to bepaid
CDRs to road surface damages toNarsipatnam-Chintpalli-Sileru road from Km73/0 to 91/0
19/ 06-07
Work completedFinal Bill to bepaid
C.D.Rs to culvert at km 9/6 of Paderu-Chintapalli road
131/ 06-07
Work completedFinal Bill paid
C.D.Rs to culvert at km 16/8 of Paderu-Chintapalli road
132/ 06-07
Work completedFinal Bill paid
C.D.Rs to culvert at km 17/6-8 of Paderu-Chintapalli road
130/ 06-07
Work completedFinal Bill paid
C.D.Rs to culvert at km 34/6 of Paderu-
Chintapalli road
23/ 06-
07
Work completed
Final Bill paidC.D.Rs to culvert at km 12/0 of P.L.Road toBangarumetta road
124/ 06-07
Work completedFinal Bill paid
C.D.Rs to Scours at km 17/6-8 of Paderu-Chintapalli road
133/ 06-07
Work completedFinal Bill paid
C.D.Rs to scours at km 1/4 of P.L.Road toBangarumetta road
127/ 06-07
Work completedFinal Bill paid
CDRs to berms scoured in Km 39/40 ofPaderu-Sujanakota-Duduma road.
134/ 06-07
Work completedFinal Bill paid
C.D.Rs to scours culvert at km 4/8-10 of
P.L.Road to Bangarumetta road
128/ 06-
07
Work completed
Final Bill paidCDRs to damaged minor bridge at km 74/4-6of Narsipatnam-Chintpalli-Sileru road
Work completedFinal Bill paid
C.D.Rs to scours at km 7/2 of P.L.Road toBangarumetta road
129/ 06-07
Work completedFinal Bill paid
C.D.R to damaged Road Surface from km0/0to9/6 of Kylasapatnam To Giduturu Road
62/ 06-07
Work completedFinal Bill paid
U.Rs to damaged Road Surface due toCycloneic rains in NCS road from km 95/0 to
140/0.
26/ 07-08
Work completedFinal Bill paid
C.D.Rs to road surface damages to N.TL.Road fromkm 3/60 to 5/0 and NCS Road from km 15/0 to 16/0& K.D.peta Chintapalli Road from km 15/0 to 17/0 &Sarabannapalem branch Road from km 0/0 to 1/0
20/ 06-07
Work completedFinal Bill paid
8/14/2019 Progress All Schemes R&B Division Paderu
14/15
SCHEME:: ST PLAN WORKS (Jerrila Project)1 7.4 2000.00 0.00 0.00 0.00 2000.00
2 Impts to N.C.S.Road from km 2/0 to 3/5 1.5 177.00 0.00 0.00 0.00 177.00
3 Impts to N.C.S.Road from km 3/5 to 5/0 1.5 178.00 0.00 0.00 0.00 178.00
4 Impts to N.C.S.Road from km 5/0 to 6/5 1.5 179.00 0.00 0.00 0.00 179.005 Impts to N.C.S.Road from km 6/5 to 8/0 1.5 182.00 0.00 0.00 0.00 182.00
6 Impts to N.C.S.Road from km 8/0 to 9/5 1.5 185.00 0.00 0.00 0.00 185.007 Impts to N.C.S.Road from km 9/5 to 10/4 0.9 108.00 0.00 0.00 0.00 108.00
8 Impts to N.C.S.Road from km 10/4 to 12/0 1.6 188.00 0.00 0.00 0.00 188.00
9 Imptss to N.C.S.Road from km 12/0 to 13/5 1.5 183.00 0.00 0.00 0.00 183.00
10 Impts to N.C.S.Road from km 13/5 to 15/0 1.5 184.00 0.00 0.00 0.00 184.00
11 Impts to N.C.S.Road from km 30/5 to 31/5 1.5 200.00 0.00 0.00 0.00 200.0012 Impts to N.C.S.Road from km 31/5 to 33/0 1.5 200.00 0.00 0.00 0.00 200.00
13 Impts to N.C.S.Road from km 33/0 to 34/5 1.5 200.00 0.00 0.00 0.00 200.00
14 Impts to N.C.S.Road from km 34/5 to 36/0 1.5 200.00 0.00 0.00 0.00 200.00
15Impts to N.C.S.Road from km 36/0 to 37/5
1.5200.00
0.00 0.00 0.00200.0016 Impts to N.C.S.Road from km 37/5 to 39/0 1.5 200.00 0.00 0.00 0.00 200.00
17 Impts to N.C.S.Road from km 39/0 to 40/5 1.5 200.00 0.00 0.00 0.00 200.00
18 Impts to N.C.S.Road from km 40/5 to 42/0 1.5 200.00 0.00 0.00 0.00 200.00
19 Impts to N.C.S.Road from km 46/5 to 47/6 1.1 150.00 0.00 0.00 0.00 150.00
20 10.00 0.00 0.00 0.00 10.00
21 10.00 0.00 0.00 0.00 10.00
TOTAL 33.5 5334.00 5334.00
Formation of Byepass road from km 2/0 ofNCS Road to 2/2 of Narsipatnam-TallapalemRoad (via) B.N.Road
Tenders to besettled
Tenders to besettled
Formation of Byepass Road to Chintapallifrom KM 48/0 of Narsipatnam - Chintapalli -Sileru road to 2/0 of Jerrilla road in VspDistrict
Construction of 1000mm dia NP3 two pipe
culvert at KM 0/400 of Chintapalli Bye passroad
8/14/2019 Progress All Schemes R&B Division Paderu
15/15
SCHEME:: CORE NET WORK1 11 150.00 149.12 139.11 -- 139.11 24.30 24.30 30-6-07 29-06-08
2 1.7 40.00 40.39 33.62 -- 33.62 4.15 4.15 18-9-07 18-3-08
TOTAL 12.7 190.00
Periodical maintenance to Narsipatnam-Deviptnam road from km 0/0 to 1/0, 12/0 to13/0 18/0 to 20/0, 21/0 to 24/0,26/0 to 28/0and 42/0 to 44/0 in Visakhapatnam District
Work completed in allrespects. Final bill to
be paid
Final bill to bepaid
Periodical maintenance to Narsipatnam-Tuni
Road from km 0/0 to 1/6, 21/0 to 22/30 inVisakhpatnam District
Work completed in allrespects. Final bill to
be paid
Final bill to be
paid