Progress All Schemes R&B Division Paderu

Embed Size (px)

Citation preview

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    1/15

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    2/15

    INDEX

    S. No Name of the Constituency Page No

    1 Special Repair Works 1 - 2

    2 12th Finance Commission 3

    3 NABARD 4

    4 Road Safety Engineering 5 - 6

    5 Road Safety Interventions 7 - 8

    6 Minor Works 9

    7 ST Plan ( Jerrilla) 10

    8 Core Net work 11

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    3/15

    ABTRACT

    Name of the Scheme Length Length Length Remarks

    1 2 3 4 5 6 7 8 9 10 11

    SR WORKS 10 61.08 720.10 7 25.88 329.55 3 35.20 390.55

    12th FINANCE 7 66.50 650.80 5 49.00 453.80 2 17.50 197.00

    NABARD 5 37.40 2248.00 2 10.80 323.00 3 26.60 1925.00

    ROAD SAFETY ENGINEERING 17 62.00 16 59.50 1 2.501 Work by 31-01-09

    Road Safety Engineering (ST) Area 5 -- 26.5 5 Works tenders

    to be received on

    9/1/2009

    26 161.10 23 95.00 3 66.1 2 Works completed.

    1 Work by 31-03-2009

    MINOR WORKS 17 17.00 17 17.00 0 0

    ST PLAN WORKS (Jerrila Project) 19 33.5 5334.00 0 0 19 33.50 5334.00

    16 works tenders to be

    CORE NET WORK Called for

    2 12.7 190.00 2 12.7 190.00 0 0 0

    Executive Engineer

    (R&B) PADERU

    No. of WorksSanctioned

    Estimate Amount(Rs in Lakhs)

    No of workscompleted

    EstimateAmount (Rs

    in Lakhs)

    No of worksin Progress

    EstimateAmount (Rs in

    Lakhs)

    1 Work by 30-09-091 works by 30-10-09

    1 Work by 30-04-092 Works Tenders

    received on 3-1-09

    ROAD SAFETY INTERVENTIONS(HUDCO)

    3 Works agency setteledby the Govt

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    4/15

    (R&B) DEPARTMENT ::

    (R&B) DIVISION :: PADERU

    Name of the work Remarks

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17SCHEME:: SR WORKS

    1 8.50 100.00 82.36 80.89 0.34 81.23 0.0 0.34

    2 3.30 55.00 52.90 0.00 55.36 55.36 55.36 23-1-07 22.10.07

    3 6.80 56.50 53.63 43.67 13.30 56.97 13.30 29-6-07 28.3.08

    4 Bridge 14.25 13.93 0.00 13.30 13.30 13.30 9-07-08

    5 6.60 83.80 81.05 83.56 7.70 91.26 7.70 19-1-07 18.9.07

    6 0.20 10.00 9.28 5.08 0.00 5.08 0.00 9-3-07 12.5.07

    7 0.48 10.00 9.27 7.76 0.00 7.76 2.24 2.24 9-3-07 8.5.07

    8 6.00 68.30 65.41 0.00 0.00 0.00 68.30 68.30 18.9.07 17.6.08 17.1.09

    SlNo

    Length inKms

    Sanction ref.No

    EstimateAmount (Rs

    in Lakhs)

    R.E/W.E Ref.

    No

    ContractValue

    Expdr. Upto 31-3-08

    Expdr.During theyear up to

    12/08

    CumulativeExpenditure

    Balancevalue of

    work

    Fundsrequireme

    nt for2008-09(9+11)

    Detailed stage ofwork

    Date ofcommence

    ment

    Date ofcompletion

    Expecteddate of

    completion

    S.Rs to NCS Road from km 30/0 to 30/8, 33/2to 36/0, 48/0 to 55/0 and CPL Branch Roadfrom km 0/0 to 0/900

    SRP 2006-07

    Work completedin all respects

    S.Rs to NCS (R&B) road to B.C.Colony (via)Laxmipuram, Nagaram from Km. 2/3 to 5/6

    SRP 2007-08

    Work completed.Final bill paid

    a) S.Rs to Kylasapatnam to Rachapalli road

    from Km. 0/0 to 6/0 and(b) S.Rs to Kotavuratla toGiduturu from Km.0/0 to 0/800

    SRP 2007-

    08

    Work completed.

    Final bill to bepaid

    Providing Revetment and protection work tothe bridge at Km.34/6 of Paderu-Araku road.

    SRP 2007-08

    Work completed.Final bill to bepaid.

    a) S.Rs to Narsipatnam-Tallapalem roadfromKM. 2/0 to 3/0, 5/0 to 7/0 10/4 to 12/0and(b) S.Rs Narsipatnam - Revupolavaram roadfrom Km. 7/0 to 9/0

    SRP 2006-07

    Work completed.Final bill paid

    S.Rs to Madugula (R&B) roat to Paderu (R&B)road (via) Dabbagunta, K.J.Puram from Km.4/2-4 in Visakhapatnam District

    SRP 2006-07

    Work completed.Final bill to bepaid.

    S.Rs to Madugula (R&B) road to Paderu (R&B)road (via) Dabbagunta, K.J.Puram from Km.4/720 to 5/200 in Visakhapatnam District

    SRP 2006-07

    Work completed.Final bill to bepaid.

    S.Rs to Lambasingi - Tagangi road from Km.0/0 to 6/0

    SRP 2007-08

    WBM completed.SDBC inprogress

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    5/15

    9 9.00 78.50 0.00 0.74 0.74 77.76 78.50 30-05-08 28-02-09 28-02-09

    10 12.00 124.50 0.00 1.20 1.20 123.30 124.50 30-05-08 28-02-09 28-02-09

    11 1.20 12.25 0.00 0.00 0.00 12.25 12.25

    12 7.00 107.00 0.00 0.00 0.00 107.00 107.00

    TOTAL 61.08 0.00 720.10 0.00 367.83 220.96 91.94 312.90 390.85 482.79

    S.Rs to Kothakota-Makavaram road from km14/0 to 18/0,N.R.Road from km 14/0 to 17/0& D.Yerravaram to Kothuru (via) Cherlopalemfrom km 4/0 to 6/0

    SRP 2007-08

    Work onKothakota-Makavaripalemroad completedRemaining workto be done

    S.Rs to Rachapalli to Koduru road from km0/0 to 4/0 (R&B) Road to L.V.K.Road from km12/0 to 14/0,Narsipatnam-RevupolavaramRoad from km 5/0 to 7/0 & D.Yerravaram toKothuru (via) Cheropalem from km 0/0 to 4/0in VSP Dist.

    SRP 2007-08

    Work is inprogress

    S.Rs to Narsipatnam- Chintapalli Sileru roadfrom Km. 75/0 to 78/4

    SRP 2005-06

    Tenders Received .Agency to be settled.

    TendersReceived .Agency to besettled.

    S.Rs to NCS Road from km 40/0 to 43/0,P.C.Road from km 41/0 to 42/0, K.D.Peta toChintapalli road from km 28/0 to 31/0 in VSPDist.

    SRP 2006-07

    Work differred.Revised estimatesubmitted forsanction.

    No responsefor tenders fortwice & workdiffered

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    6/15

    SCHEME:: 12th FINANCE1 10.00 71.80 69.35 58.35 15.00 73.35 15.00 23.1.07 22.10.07

    0.00 0.00

    2 11.60 76.00 53.77 23.45 77.22 23.45 29.6.07 28.3.08

    0.00 0.00

    0.00 0.00

    3 10.50 140.00 0.00 0.00 30-09-2009

    0.00 0.00

    0.00 0.00

    4 7.00 57.00 0.00 0.00 31-10-2009

    0.00 0.00

    0.00 0.00

    5 9.00 110.50 120.22 120.22 120.22 1.12.07 1.9.08

    6 8.00 100.00 97.46 1.11 88.14 89.25 10.75 98.89 1.12.07 1.9.08

    7 10.40 95.50 93.92 0.22 85.26 85.48 85.26 1.12.07 1.3.08

    TOTAL 66.50 0.00 650.80 0.00 260.73 113.45 332.07 445.52 10.75 342.82

    a) Repairs to N.C.S.Road from km 45/0 to48/0, 81/0 to 83/0 and 100/0 to 103/0

    12th Fin.2006-07

    Work completedfinal bill to bepaid

    b) Repairs to P.C.Road from 54/0 to 56/0 inVSP Dist.

    a)Repairs to Waddadi-Paderu road from km4/0 to 6/0,18/0 to 20/0 and 26/4 to 27/0

    12th Fin.2006-07

    Work completedfinal bill paid

    b) Ravikamathim-Kinthali road from km 0/0 to3/0

    c) B.N.Road from km 73/4 to 75/0,94/0 to 95/4in VSP Dist.

    a) Repairs to R&B Road to LVK Road fromkm 3/4 to 8/40

    12th Fin.2006-07

    Agreement to beconcluded

    No Response fortenders due toAgency area work.Conractor informedby telegram 22-12-2008 . Agreement tobe conlcuded.

    b) K.D.Peta Chintapalli road from km 21/0 to22/0 and 27/0 to 28/0 and 35/0 to 36/0

    c) Vemulapudi-Velagapudi road from km 0/0 to2/50 in VSP Dist.

    a) Repairs to Paderu-Arukuroad from km 16/0to 17/0 and 18/0 to 19/0

    12th Fin.2006-07

    Once workentrusted andcanelled dulyforfieting deposits

    T/S issued on23-12-2008 .Tenders to becalled for on27-12-2008.

    b) Paderu-Chintapalli road from km 11/0 to13/0 and

    c) Paderu-Sujanakota-Duduma road from km17/0 to 20/0 in VSP Dist.

    Repairs to Waddadi-Paderu road from km34/0 to 40/0 and km 42/0 to 43/0 andP.C.Road from km 0/0 to 1/0 and km 13/0 to14/0 in Visakhapatnam District.(By hot mixprocess)

    12th

    Fin.2007-08 Work completedfinal bill paid

    Repairs to Paderu-Aruku Road from km 13/0 to 16/0and Paderu-Sujanakota-Duduma road from km 5/0to 7/0, 35/0 to 36/0 and km 51/0 to 53/0 inVisakhapatnam District.(By hot mix process)

    12th Fin.2007-08

    Work completedfinal bill to bepaid

    Repairs to Waddadi-Kinthali road from km 0/0 to

    2/0,Waddadi-Kintali road (via) Gottivada from km3/0 to 8/4 and Waddadi-Paderu road from km 7/0 to10/0 in Visakhapatnam District.(By hot mix process)

    12th Fin.

    2007-08

    Work completed

    final bill paid

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    7/15

    SCHEME:: NABARD

    1 9.40 223.00 218.08 20.31 154.04 174.35 48.65 202.69 18.6.07 17.6.08

    2 1.40 100.00 93.75 37.93 37.93 62.07 100.00 9.7.08 8.4.09

    3 Building 125.00 115.5 28.51 28.51 86.99 115.50 27.12.07 26.12.08 30-04-2009

    4 10.00 400.00 0.00 0.00

    5 16.60 1400.00 0.00 0.00

    TOTAL 37.40 2248.00 427.33 20.31 220.48 240.79 197.71 418.19

    Improvements to Nathavaram- East GodavariDistrict limits from Km 0/0 to 10/0 (via) Chikkudupalem in Visakhapatnam district

    GOMs No.221T, R&B R-IIDept. dt.10-10--2005

    Work completedin all respects

    Improvements to Waddadi- Kinthali (R&B)road to Ravikamatham- Kinthali (R&B) road(via) Vommali, VJ puram from Km 1/4 to 5/0 in

    Visakhapatnam District

    Work completedin all respects

    Construction of Degree college at Chintapalliin VSP district

    G O Ms No777 dt13.12.2006

    Centering for theslab in progress

    Improvements to PL Road to Bangarumittafrom Km 41/0 to 51/0 in VisakhapatnamDistrict

    Tenders receivedon 03-01-2009

    TendersReceived on 3-1-09 and agency tobe finalised.

    Improvements to PL Road to Bangarumittafrom Km 23/4 to 40/0 in VisakhapatnamDistrict

    Tenders to becalled for

    Tenders to becalled for

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    8/15

    SCHEME:: ROAD SAFETY ENGINEERING1 4.50 4.99 4.37 0.67 5.04 0.00 0.67 3-3-08 2.5.08

    2 5.00 5.01 3.08 1.84 4.92 0.00 1.84 3-3-08 2.5.08

    3 5.00 5.03 0.00 5.09 5.09 0.00 5.09 3-3-08 5.2.08

    4 2.50 2.50 0.00 0.00 0.00 0.00 0.00 Work in Progress 0 31-01-09

    5 3.00 2.74 0.00 2.58 2.58 0.42 3.00 10-4-08

    6 2.00 1.89 1.76 0.14 1.90 0.00 0.14 8-3-08 5.7.08

    7 5.00 4.92 0.00 5.25 5.25 5.25 11-3-08 10.5.08

    8 4.50 3.89 0.64 1.33 1.97 2.53 3.86 3-3-08 2.5.08

    9 4.00 3.43 0.49 0.84 1.33 2.67 3.51 3-3-08 2.5.08

    10 3.00 2.42 0.00 2.35 2.35 2.35 26-2-08 25.4.08

    11 3.00 2.57 0.00 0.00 0.00 3.00 3.00 26-2-08 25.4.08

    12 4.00 3.22 1.76 1.56 3.32 1.56 26-2-08 25.4.08

    13 4.00 3.99 0.00 4.23 4.23 4.23 25-4-08 24.5.08

    RSE by improvements to the curve (accidentprone area) at Km 60/6 of Narsipatnam-Chintapalli- Sileru Road

    DR.No.150/07-08

    Work completedfinal bill paid.

    RSE by improvements to the curve (accidentprone area) at Km 73/6 of Narsipatnam-Chintapalli- Sileru Road

    DR.No.158/07-08

    Work completedfinal bill paid.

    RSE by Construction of Retaining wall and

    widening the formation (Ghat Portion) at Km13/6-10 of K.D.Peta -Chintapalli Road.

    DR.No.

    153/07-08

    Work completed

    final bill paid.

    RSE by repairs to Handrails to minor bridge atKm 10/2-4, 13/6-8, 40/8-10 18/0-2, 28/4-6 ofPaderu-Sujanakota-Duduma Road.

    DR.No.152/07-08

    RSE by providing soling to erroded berms inKm 3/456 to 5/0, 18/0 to 21/0 & 29/0 to 32/0,37/0 to 45/0 to 55/0-4 of Paderu- Sujanakota-Duduma Road.

    DR.No.156/07-08

    Work completedfinal bill to bepaid.

    RSE by Improvements to Road by widening

    and Strenghting carriageway at Km 4/4 ofPaderu - Sujanakota -Duduma Road.

    DR.No.

    164/07-08

    Work completed

    final bill paid.

    RSE by improvements to Curve at Km 18/4-8of Narsipatnam-Revupolavaram Road

    DR.No.148/07-08

    Work completedfinal bill paid.

    RSE by improvements to the Curve at km17/2-6 of Narsipatnam-Revupolavaram Road

    DR.No.151/07-08

    Work completedfinal bill to bepaid.

    RSE by improvements to the sight distance inGhat Portion (By widening) at Km 18/6-10 ofNarsipatnam- Revupolavaram Road

    DR.No.157/07-08

    Work completedfinal bill to bepaid.

    RSE by improvements to Junction at Km 13/0of Narsipatnam -Tallapalem Road.

    DR.No.159/07-08

    Work completedfinal bill paid.

    RSE by improvements to Junction at Km 11/8-10 of Narsipatnam -Revupolavaram Road.

    DR.No.160/07-08

    Work completedfinal bill paid tobe paid

    RSE by improvements to Junction at Km 8/8-10 of Narsipatnam -Revupolavaram Road.

    DR.No.161/07-08

    Work completedfinal bill paid.

    RSE by construction of Retaining Wall andwidening the formation (Ghat Portion) at Km24/2 of Paderu-Araku Road.

    DR.No.149/07-08

    Work completedfinal bill paid.

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    9/15

    14 4.00 3.94 0.00 3.67 3.67 0.33 4.00 8-3-08 5.7.08

    15 3.00 3.44 0.00 2.98 2.98 2.98 17-3-08

    16 2.00 0.00 1.85 0.00 1.85 1.15 1.15 3-3-08 5.2.08

    17 3.50 3.44 0.00 3.19 3.19 0.25 3.44 25.4.08 24.6.08

    TOTAL 62.00 57.42 13.95 35.72 49.67 10.35 46.07

    RSE by Providing Soling to the erroded bermsin Ghat section in Km 16/4 to 30/0 ofWaddadi - Paderu Road

    DR.No.154/07-08

    Work completedfinal bill to bepaid.

    RSE by Providing Soling to erroded berms inGhat Section in Km 30/0 to 40/0 of Waddadi-Paderu Road.

    DR.No.155/07-08

    Work completedfinal bill paid.

    RSE by providing Soling to erroded berms inGhat Section in km 4/0 to 7/0 of Paderu-

    Araku Raod.

    DR.No.162/07-08

    Work completedfinal bill to be

    paid.RSE by providing Soling to erroded berms inGhat Section in km 23/0 to 38/0 of Paderu-Araku Raod.

    DR.No.163/07-08

    Work completedfinal bill to bepaid.

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    10/15

    SCHEME:: ROAD SAFETY INTERVENTIONS (HUDCO)1 1.30 1.28 1.16 0.00 1.16 0.14 0.14 2.7.08 4.6.08

    2 5.00 5.04 2.80 2.52 5.32 2.52 22-02-08 21-04-08

    3 6.00 5.33 4.06 1.88 5.94 1.88 26-02-08 25.4.08

    4 10.00 10.06 0 6.48 6.48 6.48 26-02-08 25.4.08 31-12-08

    5 9.95 7.77 1.65 7.57 9.22 7.57 2.6.08 4.5.08

    6 2.00 1.99 0 2.11 2.11 2.11 26-02-08 25/04/08

    7 1.60 1.88 0.66 0.79 1.45 0.79 2.5.08 4.4.08

    8 1.90 1.88 0.67 1.17 1.84 1.17 2.10.08 4.9.08

    9 3.20 3.15 0 3.10 3.10 3.10 26-02-08 25-04-08

    10 2.00 1.93 0 2.05 2.05 2.05 22-02-08 21-04-08

    11 9.00 7.18 4.02 2.93 6.95 2.93 2.5.08 4.4.08

    12 5.30 4.67 3.58 1.37 4.95 1.37 2.5.08 4.4.08

    13 2.00 1.96 0 2.00 2.00 2.00 17-04-08 16.06.08

    Construction of Retaining wall at Km 23/4 ofPaderu Araku Road

    122/ 07-08

    Work completedfinal bill to bepaid.

    Widening the Culvert at Km 14/4 ofNarsipatnam - Thallapalem Road.

    123/ 07-08

    Work completedfinal bill paid.

    Widening the culvert at km 14/6 ofNarsipatnam - Thallapalem Road

    124/ 07-08

    Work completedfinal bill paid.

    Improvements to the bridge approaches at Km9/0-4 of Narsipatnam - Thallapalem Road.

    125/ 07-08

    Wideningcompleted. BT tobe laid

    Re-Decking to Minor Bridge at Km 16/4 ofNarsipatnam - Revupolavaram Road

    126/ 07-08

    Work completedfinal bill paid.

    Urgent Repairs to damaged culvert at Km 14/4of Narsipatnam - Revupolavaram Road.

    127/ 07-08

    Work completedfinal bill paid.

    Reconstruction of culvert at Km 1/4 ofD.Yerravaram to Thandava Project Road.

    128/ 07-08

    Work completedfinal bill paid.

    Reconstruction of culvert at km 90/2 ofBheemunipatnam - Narsipatnam Road.

    129/ 07-08

    Work completedfinal bill paid.

    Reconstruction of 800mm dia pipe culvert atKm 25/8 of Narsipatnam - Devipatnam Road.

    130/ 07-08

    Work completedfinal bill paid.

    Reconstruction of 1.00 m dia. Pipe culvert atKm 29/8 of Narsipatnam - Devipatnam Road

    131/ 07-08

    Work completedfinal bill paid.

    Providing Parapets in Ghat Portion from Km16/0 to 30/0 of Narsipatnam Chintapalli - SileruRoad.

    132/ 07-08

    Work completedfinal bill paid.

    Widening the slab culvert at Km 2/4 ofNarsipatnam - Chintapalli - Sileru Road.

    133/ 07-08

    Work completedfinal bill paid.

    Improvements to the Junction at Km 46 of

    Paderu - Chintapalli Road.

    134/ 07-

    08

    Work completed

    final bill to bepaid.

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    11/15

    14 5.80 5.81 4.01 0.22 4.23 0.22 15-02-08 14-04-08

    15 2.25 2.12 1.97 0.16 2.13 0.16 2.5.08 4.4.08

    16 2.30 2.11 1.97 0.58 2.55 0.58 2.5.08 4.4.08

    17 5.00 4.96 4.50 3.40 7.90 3.40 05-02-08 04-04-08

    18 5.60 5.38 2.00 0.00 2.00 0.00 22-02-08 21-04-08

    19 5.50 5.45 0 0.00 0.00 0.00 17.04.08 16.06.08

    20 9.00 8.92 0 0.00 0.00 0.00 3.8.08 5.7.08 31-12-2008

    21 8.10 8.04 3.66 4.65 8.31 4.65 26-02-08 25-04-08

    22 2.40 2.09 0 2.12 2.12 2.12 2.5.08 4.4.08

    23 2.40 1.65 1.33 0.33 1.66 0.33 25-02-08 24-04-08

    24 3.40 2.68 2.19 0.18 2.37 0.18 3.3.08 5.2.08

    25 1.60 1.07 0 1.01 1.01 1.01 3.8.08 5.7.08

    26 48.50 0 0.00 0.00 0.00 31-03-2009

    TOTAL 161.10 104.40 40.23 46.62 86.85 0.14 46.76

    Improvements to accident Prone area at Km42/6 of Narsipatnam - Chintapalli - SileruRoad.

    135/ 07-08

    Work completedfinal bill to bepaid.

    Improvements to accident Prone area at km54/2 of Narsipatnam Chintapalli - Sileru Road.

    136/ 07-08

    Work completedfinal bill to bepaid.

    Improvements to accident Prone area at Km61/8 of Narsipatnam - Chintapalli - SileruRoad.

    137/ 07-08

    Work completedfinal bill to bepaid.

    Providing Retaining wall at Km 43/2 on Rightside of Narsipatnam - Chintapalli - SileruRoad.

    138/ 07-08

    Work completedfinal bill to bepaid.

    Providing parapets in Ghat Portion from km95/0 to 115/0 Narsipatnam - Chintapalli -Sileru Road.

    139/ 07-08

    Work completedfinal bill to bepaid.

    Construction of retaining wall at Km 20 ofPaderu -Chintapalli Road.

    140/ 07-08

    Work completedfinal bill to bepaid.

    Improvements to Road at Km 10/6 to 11/4 ofPaderu - Chintapalli Road.

    141/ 07-08

    Wideningcompleted.Retaining wall tobe done

    Reconstruction and widening the weak andnarrow culvert at Km 88/2 88/6 and 89/2 ofBheemunipatnam Narsipatnam Road.

    142/ 07-08

    Work completedfinal bill paid.

    Construciton of Retaining wall at Km 21/6 ofPaderu - Araku Road.

    143/ 07-08

    Work completedfinal bill paid.

    Construction of Retaining wall at Km 4/2 to 5/2of Paderu - Araku Road.

    144/ 07-08

    Work completedfinal bill paid.

    Construction of Retaining wall at Km 5/10 to6/4 of Paderu - Araku Road

    145/ 07-08

    Work completedfinal bill paid.

    Improvements to road and culvert at Km 4/2 ofPaderu - Araku (R&B) Road to Bakuru Road.

    146/ 07-08

    Work completedfinal bill to bepaid.

    Widening and Reducking of Steel GirderBridge at Km 81/6 of BN Road.

    CR 10/2008-09

    Diversion road inProgress

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    12/15

    SCHEME:: MINOR WORKS1 1.00 0.95 0.00 0.00 0.00 0.95 0.95 26.2.08 25.4.08

    2 1.00 0.98 0.83 0.00 0.83 0.00 26.2.08 25.4.08

    3 1.00 0.98 0.00 0.96 0.96 0.96 26.2.08 25.4.08

    4 1.00 0.98 0.00 0.98 0.98 0.98 26.2.08 25.4.08

    5 1.00 0.97 0.00 0.94 0.94 0.94 26.2.08 25.4.08

    6 1.00 0.97 0.00 0.91 0.91 0.91 26.2.08 25.4.08

    7 1.00 1.00 0.00 0.00 0.00 1.00 1.00 26.2.08 25.4.08

    8 1.00 0.98 0.00 0.00 0.00 0.98 0.98 26.2.08 25.4.08

    9 1.00 0.97 0.00 0.00 0.00 0.97 0.97 26.2.08 25.4.08

    10 110/ 07-08 1.00 1.00 0.00 0.00 0.00 1.00 1.00 26.2.08 25.4.08

    11 111/ 07-08 1.00 1.00 0.00 0.00 0.00 1.00 1.00 26.2.08 25.4.08

    12 112/ 07-08 1.00 0.96 0.00 0.00 0.00 0.96 0.96 26.2.08 25.4.08

    13 116/ 07-08 1.00 1.01 0.77 0.21 0.98 0.21 26.2.08 25.4.08

    14 117/ 07-08 1.00 0.99 0.46 0.51 0.97 0.51 26.2.08 25.4.08

    15 118/ 07-08 1.00 0.99 0.00 0.00 0.00 0.99 0.99 26.2.08 25.4.08

    16 119/ 07-08 1.00 0.96 0.46 0.50 0.96 0.50 26.2.08 25.4.08

    17 1.00 1.00 0.00 0.95 0.95 0.95 26.2.08 25.4.08

    TOTAL 17.00 16.69 2.52 5.96 8.48 7.85 13.81

    Construction of Retaining wall at km 19 ofP.L.Road to Bhangarumetta Road.

    166/ 07-08

    Work completedfinal bill to be paid.

    Construction of Retaining wall at km 2/0 ofRachapalli to G.Koduru(Via) VenkatapuramRoad.

    167/ 07-08

    Work completedfinal bill paid.

    Construction fo Parapet walls at Km 29 ofWaddadi - Paderu Road

    169/ 07-08

    Work completedfinal bill paid.

    Construction of Retaining wall at Km 15/2 ofKothakota -Makavarapalem Road.

    168/ 07-08

    Work completedfinal bill paid.

    Construction of Retaining wall at Km 1/0 ofKylasapatnam- Giduturu Road.

    175/ 07-08

    Work completedfinal bill paid.

    Construction of Rt wall in km 4/0 to 5/0 ofSujanakota Branch Road

    174/ 07-08

    Work completedfinal bill paid.

    Construction of Retaining wall at Km15/2 ofNarsipatnam - Tallapalem Road

    176/ 07-08

    Work completedfinal bill to be paid.

    Construciton of Parapets of Paderu -

    Sujanakota - Duduma Road Km 6/0 to 7/0

    178/ 07-

    08

    Work completed

    final bill to be paid.

    Construciton of Parapets of Paderu -Sujanakota - Duduma Road km 42/0 to 45/2

    180/ 07-08

    Work completedfinal bill to be paid.

    Widening and Re-construction of culvert at km8/2-4 of Yendapalli to Kondala AgraharamRoad

    Work completedfinal bill to be paid.

    Widening and Re-construction of culvert at km4/0 of Rachapalli to G.Kodutur (via)Venkatapuram Road

    Work completedfinal bill to be paid.

    Construction of Parapet walls at Km 20 ofWaddadi -Paderu Road

    Work completedfinal bill to be paid.

    Widening and Re-construction of culvert at km65/10 of Narsipatnam-Chintapalli Road

    Work completedfinal bill paid.

    Widening and Reconstruction of culvert at km8/4 of Narsipatnam-Tallapalem road

    Work completedfinal bill paid.

    Widening and Re-construction of culvert at km1/2 of Kondala Agraharam to Rolugunta(via)Lachannapalem Road

    Work completedfinal bill to be paid.

    Widening and Reconstruction of culvertat km

    2/6 of Narsipatnam-Tallapalem Road.

    Work completed

    final bill paid.

    Widening and Re-construction of culvert at km57/6 of Narsipatnam-Chintapalli Road.

    120/ 07-08

    Work completedfinal bill paid.

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    13/15

    SCHEME:: FLOOD DAMAGE REPAIRS1 4.90 4.62 1.77 2.90 4.67 2.90 23-7-07 22-9-07

    2 15.00 14.99 0.00 14.02 14.02 14.02 09-01-07 8-4-07

    3 35.00 35.20 0.00 32.19 32.19 32.19 12-01-07 11-4-07

    4 7.00 6.21 4.90 0.73 5.63 0.73 9-2-07 8-4-07

    5 9.90 9.85 9.03 0.76 9.79 0.76 9-2-07 8-4-07

    6 3.30 2.14 1.44 0.19 1.63 0.19 1-2-07 30-3-07

    7 12.30 12.33 0.00 10.20 10.20 10.20 9-1-07 8-4-07

    8 2.30 1.47 1.47 0.12 1.59 0.12 1-2-07 30-3-07

    9 9.95 9.88 0.00 9.47 9.47 9.47 9-2-07 8-4-07

    10 3.10 2.24 1.51 0.11 1.62 0.11 1-2-07 30-3-07

    11 6.85 6.87 6.00 0.49 6.49 0.49 16-12-06 15-2-08

    12 4.00 2.67 2.68 0.19 2.87 0.19 1-2-07 30-3-07

    13 74/ 06-07 9.50 9.35 6.70 2.25 8.95 2.25 30-11-06 1-3-07

    14 3.20 2.09 1.37 0.11 1.48 0.11 1-2-07 30-3-08

    15 1.50 1.48 1.23 0.10 1.33 0.10 9-2-07 8-4-07

    16 4.95 4.84 1.68 2.96 4.64 2.96 23-7-07 27-9-07

    17 35.00 34.90 32.86 2.65 35.51 2.65 9-1-07 8-4-07

    TOTAL 167.75 161.13 72.64 79.44 152.08 0.00 79.44

    F.D.R.to the damaged road surface of Narsipatnam-Chintapalli-Sileru Road from km 120/0 to 122/0and 138/0 to 140/0 for the year 2006-07

    26/ 07-08

    Work completedFinal Bill paid

    CDRs to road surface damages toNarsipatnam-Chintpalli- Sileru road from Km54/0 to 65/0

    18/ 06-07

    Work completedFinal Bill to bepaid

    CDRs to road surface damages toNarsipatnam-Chintpalli-Sileru road from Km73/0 to 91/0

    19/ 06-07

    Work completedFinal Bill to bepaid

    C.D.Rs to culvert at km 9/6 of Paderu-Chintapalli road

    131/ 06-07

    Work completedFinal Bill paid

    C.D.Rs to culvert at km 16/8 of Paderu-Chintapalli road

    132/ 06-07

    Work completedFinal Bill paid

    C.D.Rs to culvert at km 17/6-8 of Paderu-Chintapalli road

    130/ 06-07

    Work completedFinal Bill paid

    C.D.Rs to culvert at km 34/6 of Paderu-

    Chintapalli road

    23/ 06-

    07

    Work completed

    Final Bill paidC.D.Rs to culvert at km 12/0 of P.L.Road toBangarumetta road

    124/ 06-07

    Work completedFinal Bill paid

    C.D.Rs to Scours at km 17/6-8 of Paderu-Chintapalli road

    133/ 06-07

    Work completedFinal Bill paid

    C.D.Rs to scours at km 1/4 of P.L.Road toBangarumetta road

    127/ 06-07

    Work completedFinal Bill paid

    CDRs to berms scoured in Km 39/40 ofPaderu-Sujanakota-Duduma road.

    134/ 06-07

    Work completedFinal Bill paid

    C.D.Rs to scours culvert at km 4/8-10 of

    P.L.Road to Bangarumetta road

    128/ 06-

    07

    Work completed

    Final Bill paidCDRs to damaged minor bridge at km 74/4-6of Narsipatnam-Chintpalli-Sileru road

    Work completedFinal Bill paid

    C.D.Rs to scours at km 7/2 of P.L.Road toBangarumetta road

    129/ 06-07

    Work completedFinal Bill paid

    C.D.R to damaged Road Surface from km0/0to9/6 of Kylasapatnam To Giduturu Road

    62/ 06-07

    Work completedFinal Bill paid

    U.Rs to damaged Road Surface due toCycloneic rains in NCS road from km 95/0 to

    140/0.

    26/ 07-08

    Work completedFinal Bill paid

    C.D.Rs to road surface damages to N.TL.Road fromkm 3/60 to 5/0 and NCS Road from km 15/0 to 16/0& K.D.peta Chintapalli Road from km 15/0 to 17/0 &Sarabannapalem branch Road from km 0/0 to 1/0

    20/ 06-07

    Work completedFinal Bill paid

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    14/15

    SCHEME:: ST PLAN WORKS (Jerrila Project)1 7.4 2000.00 0.00 0.00 0.00 2000.00

    2 Impts to N.C.S.Road from km 2/0 to 3/5 1.5 177.00 0.00 0.00 0.00 177.00

    3 Impts to N.C.S.Road from km 3/5 to 5/0 1.5 178.00 0.00 0.00 0.00 178.00

    4 Impts to N.C.S.Road from km 5/0 to 6/5 1.5 179.00 0.00 0.00 0.00 179.005 Impts to N.C.S.Road from km 6/5 to 8/0 1.5 182.00 0.00 0.00 0.00 182.00

    6 Impts to N.C.S.Road from km 8/0 to 9/5 1.5 185.00 0.00 0.00 0.00 185.007 Impts to N.C.S.Road from km 9/5 to 10/4 0.9 108.00 0.00 0.00 0.00 108.00

    8 Impts to N.C.S.Road from km 10/4 to 12/0 1.6 188.00 0.00 0.00 0.00 188.00

    9 Imptss to N.C.S.Road from km 12/0 to 13/5 1.5 183.00 0.00 0.00 0.00 183.00

    10 Impts to N.C.S.Road from km 13/5 to 15/0 1.5 184.00 0.00 0.00 0.00 184.00

    11 Impts to N.C.S.Road from km 30/5 to 31/5 1.5 200.00 0.00 0.00 0.00 200.0012 Impts to N.C.S.Road from km 31/5 to 33/0 1.5 200.00 0.00 0.00 0.00 200.00

    13 Impts to N.C.S.Road from km 33/0 to 34/5 1.5 200.00 0.00 0.00 0.00 200.00

    14 Impts to N.C.S.Road from km 34/5 to 36/0 1.5 200.00 0.00 0.00 0.00 200.00

    15Impts to N.C.S.Road from km 36/0 to 37/5

    1.5200.00

    0.00 0.00 0.00200.0016 Impts to N.C.S.Road from km 37/5 to 39/0 1.5 200.00 0.00 0.00 0.00 200.00

    17 Impts to N.C.S.Road from km 39/0 to 40/5 1.5 200.00 0.00 0.00 0.00 200.00

    18 Impts to N.C.S.Road from km 40/5 to 42/0 1.5 200.00 0.00 0.00 0.00 200.00

    19 Impts to N.C.S.Road from km 46/5 to 47/6 1.1 150.00 0.00 0.00 0.00 150.00

    20 10.00 0.00 0.00 0.00 10.00

    21 10.00 0.00 0.00 0.00 10.00

    TOTAL 33.5 5334.00 5334.00

    Formation of Byepass road from km 2/0 ofNCS Road to 2/2 of Narsipatnam-TallapalemRoad (via) B.N.Road

    Tenders to besettled

    Tenders to besettled

    Formation of Byepass Road to Chintapallifrom KM 48/0 of Narsipatnam - Chintapalli -Sileru road to 2/0 of Jerrilla road in VspDistrict

    Construction of 1000mm dia NP3 two pipe

    culvert at KM 0/400 of Chintapalli Bye passroad

  • 8/14/2019 Progress All Schemes R&B Division Paderu

    15/15

    SCHEME:: CORE NET WORK1 11 150.00 149.12 139.11 -- 139.11 24.30 24.30 30-6-07 29-06-08

    2 1.7 40.00 40.39 33.62 -- 33.62 4.15 4.15 18-9-07 18-3-08

    TOTAL 12.7 190.00

    Periodical maintenance to Narsipatnam-Deviptnam road from km 0/0 to 1/0, 12/0 to13/0 18/0 to 20/0, 21/0 to 24/0,26/0 to 28/0and 42/0 to 44/0 in Visakhapatnam District

    Work completed in allrespects. Final bill to

    be paid

    Final bill to bepaid

    Periodical maintenance to Narsipatnam-Tuni

    Road from km 0/0 to 1/6, 21/0 to 22/30 inVisakhpatnam District

    Work completed in allrespects. Final bill to

    be paid

    Final bill to be

    paid