PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE JANUARY 1, 2013 Project # Project Description Project Type Page Reference C005461 OS Feeder Hardening Distribution Line Page 2 of 481 C005505 Distribution Line Transformer Upgrades Distribution Line Page 16 of 481 C005524 OS Cutout Replacements Distribution Line Page 51 of 481 C018593 Substation Damage Failure Reserve Distribution Substation Page 66 of 481 C022433 OS Storm (Weather) Capital Project Distribution Line Page 91 of 481 C025815 OS Insulators, SensDev, Surge Arrestors Distribution Substation Page 133 of 481 C026281 I&M - OS D-Line OH Work From Inspection Distribution Line Page 161 of 481 C032019 Batteries/Chargers OS - RI Distribution Substation Page 265 of 481 C032278 OS Substation Breakers & Reclosers Distribution Substation Page 273 of 481 C035586 Relay Replacement Strategy - RI Distribution Substation Page 310 of 481 C040644 Telecom Small Capital Work - RI Facilities/IT/Telcom Page 373 of 481 C049354 NEC Relay Replacement - SG157 Distribution Substation Page 378 of 481 C055392 RI UG Cable Replacement Program - Secondary Distribution Line Page 424 of 481 C059663 Cutout Mounted Recloser Program_RI Distribution Line Page 469 of 481 CD01257 Distribution Secondary Network Arc Distribution Line Page 475 of 481 C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey & Investigation charges from area studies. Project Costs are transferred out as capital projects resulting from the study are approved. Therefore, the project costs are approved within their new project, not the PS&I Project shown here. Therefore, the approval for the PS&I project here is N/A. The Narragansett Electric Company d/b/a National Grid RIPUC Docket No. 4770 Attachment PUC 1-16-3 (Electric) Page 1 of 481 Page 1 of 481Page 1 of 481 1

PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE JANUARY 1, 2013

Project # Project Description Project Type Page Reference

C005461 OS Feeder Hardening Distribution Line Page 2 of 481C005505 Distribution Line Transformer Upgrades Distribution Line Page 16 of 481C005524 OS Cutout Replacements Distribution Line Page 51 of 481C018593 Substation Damage Failure Reserve Distribution Substation Page 66 of 481C022433 OS Storm (Weather) Capital Project Distribution Line Page 91 of 481C025815 OS Insulators, SensDev, Surge Arrestors Distribution Substation Page 133 of 481C026281 I&M - OS D-Line OH Work From Inspection Distribution Line Page 161 of 481C032019 Batteries/Chargers OS - RI Distribution Substation Page 265 of 481C032278 OS Substation Breakers & Reclosers Distribution Substation Page 273 of 481C035586 Relay Replacement Strategy - RI Distribution Substation Page 310 of 481C040644 Telecom Small Capital Work - RI Facilities/IT/Telcom Page 373 of 481C049354 NEC Relay Replacement - SG157 Distribution Substation Page 378 of 481C055392 RI UG Cable Replacement Program - Secondary Distribution Line Page 424 of 481C059663 Cutout Mounted Recloser Program_RI Distribution Line Page 469 of 481CD01257 Distribution Secondary Network Arc Distribution Line Page 475 of 481C013967 PS&I Activity - Rhode Island ** Other N/A

** - The PS&I project is a temporary holding area for Preliminary Survey & Investigation charges from area studies. Project Costs are transferred out as capital projects resulting from the study are approved.Therefore, the project costs are approved within their new project, not the PS&I Project shown here. Therefore, the approval for the PS&I project here is N/A.

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 1 of 481

Page 1 of 481Page 1 of 481 1

Page 2: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

OS Feeder Hardening

C005461

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 2 of 481

Page 2 of 481Page 2 of 481 2

Page 3: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Project Revision Detail Report

Fund Project Number: USSC #:

Budget Version:

C005461 USSC-12-141 FY13 Progra

Revision: 11

Project Title: FH - OS Feeder Hardening

Project Description: 03250 FH - OS Feeder Hardening

Project Status:

Responsible Person: MOKEY, MICHAEL Initiator: Diconza, Glen L

Spending Rationale: System Capacity & Performance Funding Type:

Budget Class: Reliability

Capital by Category:

Program Code:

Project Risk Score: 40 Project Complexity Score: 15

Project Schedule / Expenditures

Revision Status:

Est Start Date: 4/1/2005 Est Complete Date: 3/31/2014

Est In-Service Date:

As Of: 10/10/2017TTD Actuals: $28,885,928

Credits

$0

Total Removal

$184,000

Expense

$530,000 $1,500,000

CapitalCost Breakdown

3/31/2010

Justification / Risk Identification:

This strategy sets forth a Feeder Hardening program to remediate deteriorated equipment and improve lightning protection on primarily overhead distribution feeders. This is a reliability-focused strategy designed to meet both state regulatory targets and

Project Alternatives Considered:

Project Scope:

<Enter data here>

Closed

PPM Project Authorizations

Approved

5360-Narragansett Electric and Gas

P Electric Distribution Line RI

$2,214,000

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 3 of 481

Page 3 of 481Page 3 of 481 3

Page 4: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

<Enter data here>

Additional Notes:

<Enter data here>

Related Projects:

Project Number: Project Name:

Approvals

Line 1: Date 10/31/2012 00:00:00 Approver pwrconv

ApproverDateLine 2:

Line 3: Date Approver

ApproverDateLine 4:

Line 5: Date Approver

SAP Default Approver

***Project Authorization is for Approved Revision Total Estimated Cost +10%***

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 4 of 481

Page 4 of 481Page 4 of 481 4

Page 5: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 5 of 481

Page 5 of 481Page 5 of 481 5

Page 6: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 6 of 481

Page 6 of 481Page 6 of 481 6

Page 7: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 7 of 481

Page 7 of 481Page 7 of 481 7

Page 8: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 8 of 481

Page 8 of 481Page 8 of 481 8

Page 9: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 9 of 481

Page 9 of 481Page 9 of 481 9

Page 10: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 10 of 481

Page 10 of 481Page 10 of 481 10

Page 11: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 11 of 481

Page 11 of 481Page 11 of 481 11

Page 12: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 12 of 481

Page 12 of 481Page 12 of 481 12

Page 13: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 13 of 481

Page 13 of 481Page 13 of 481 13

Page 14: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 14 of 481

Page 14 of 481Page 14 of 481 14

Page 15: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 15 of 481

Page 15 of 481Page 15 of 481 15

Page 16: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Distribution Line Transformer Upgrades

C005505

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 16 of 481

Page 16 of 481Page 16 of 481 16

Page 17: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Project Revision Detail Report

Fund Project Number: USSC #:

Budget Version:

C005505 FY17 Program RSN

Revision: 23

Project Title: IE - OS Dist Transformer Upgrades

Project Description: IE - OS Dist Transformer Upgrades

Project Status:

Responsible Person: CURLEY, JOSEPH Initiator: Diconza, Glen L

Spending Rationale: System Capacity & Performance Funding Type:

Budget Class: Load Relief

Capital by Category:

Program Code:

Project Risk Score: 40 Project Complexity Score: 15

Project Schedule / Expenditures

Revision Status:

Est Start Date: 3/31/2017 Est Complete Date: 3/31/2018

Est In-Service Date:

As Of: 10/10/2017TTD Actuals: $12,798,810

Credits

$0

Total Removal

$105,380

Expense

$114,960 $737,660

CapitalCost Breakdown

3/31/2018

Justification / Risk Identification:

1/9/07 - changed title from "EI - OS Distrib Xformer Upgrades"

Project Alternatives Considered:

Project Scope:

Replace and or upgrade 550 overhead distribution Transformers.

open

Approved

5360-Narragansett Electric and Gas

P Electric Distribution Line RI

$958,000

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 17 of 481

Page 17 of 481Page 17 of 481 17

Page 18: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

<Enter data here>

Additional Notes:

FY17 Re-Sanction $585K to $958K document attached. The burn rate for OLTs is higher this year causing the cost per unit to rise. This additional cost per unit can be attributed to the need for more pole sets than previous years. These sets are a requirement to bring the poles up to standard. The total cost for the FY17 OS Transformer Upgrade Program is 958K and is not expected to go over 1M.

Related Projects:

Project Number: Project Name:

Approvals

Line 1: Date 12/20/2016 09:44:40 Approver curljo

Diconza, Glen LApprover 12/20/2016 10:33:33DateLine 2:

Line 3: Date 12/22/2016 13:55:03 Approver

Approver 1/3/2017 11:48:08DateLine 4:

Line 5: Date 1/3/2017 15:46:20 Approver

Gelineau, Gary J

Cox, Roger D

LaBarre, Alan T DOA - Distribution Lev

DOA - Distribution Lev

DOA - Distribution Lev

DOA - Distribution Lev

DOA - Distribution Lev

***Project Authorization is for Approved Revision Total Estimated Cost +10%***

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 18 of 481

Page 18 of 481Page 18 of 481 18

Page 19: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 19 of 481

Page 19 of 481Page 19 of 481 19

Page 20: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Note: Fill data in the grey area and email form to Mario Carlino and the appropriate IP analyst. Electric - Janice Flynn

Gas - Karen Jasinowski

*Date:*Operating Company:*PowerPlant Project #: *Project Name: *Project Engineer:*Project/Program Manager:*DoA Type:

Latest Project Estimate*Date of Latest Sanction: 5/27/2016

Total Capex Opex Removal$585,000 $450,450 $70,200 $64,350

Revised Project EstimateTotal Capex Opex Removal$958,000 $737,660 $114,960 $105,380

Cash FlowsPrevious FY Capex Opex Removal$0

Current FY Capex Opex Removal$958,000 $737,660 $114,960 $105,380

FY+1 Capex Opex Removal$0

FY+2 Capex Opex Removal$0

Customer Contribution

Reason for Revision

3/31/2017

The below information is required and must be filled in

Reason for Change in Spend

Re-Sanction Joe Curley

Version 9.4

The Narragansett Electric Co.

Chris Montalto

C005505OS Dist Transformer Upgrades

Change in DOA Request Form (Less than Million)

New Project Estimated Completion Date:

12/15/2016

Revised forecast either exceeds or is lower than the Approved Amount - Project Still In Process

Actual Spending either exceeds or is lower than the Approved Amount – Project is Complete

1

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 20 of 481

Page 20 of 481Page 20 of 481 20

diconz
Rectangle
Page 21: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Change in DOA Request Form (Less than Million)

In-service Dates*Original In-service Date: 3/31/2017*Revised In-service Date: 3/31/2017

Project Alternatives Considered

Additional Notes

Justification/ Risk Identification

New/Changed Project Scope (Material, Labor or Other)

The burn rate for OLTs is higher this year causing the cost per unit to rise. This additional cost per unit can be attributed to the need for more pole sets than previous years. These sets are a requirement to bring the poles up to standard. The total cost for the FY17 OS Transformer Upgrade Program is 958K and is not expected to go over 1M.

2

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 21 of 481

Page 21 of 481Page 21 of 481 21

Page 22: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 22 of 481

Page 22 of 481Page 22 of 481 22

Page 23: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 23 of 481

Page 23 of 481Page 23 of 481 23

Page 24: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 24 of 481

Page 24 of 481Page 24 of 481 24

Page 25: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 25 of 481

Page 25 of 481Page 25 of 481 25

Page 26: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 26 of 481

Page 26 of 481Page 26 of 481 26

Page 27: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 27 of 481

Page 27 of 481Page 27 of 481 27

Page 28: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 28 of 481

Page 28 of 481Page 28 of 481 28

Page 29: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 29 of 481

Page 29 of 481Page 29 of 481 29

Page 30: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 30 of 481

Page 30 of 481Page 30 of 481 30

Page 31: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 31 of 481

Page 31 of 481Page 31 of 481 31

Page 32: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 32 of 481

Page 32 of 481Page 32 of 481 32

Page 33: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 33 of 481

Page 33 of 481Page 33 of 481 33

Page 34: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 34 of 481

Page 34 of 481Page 34 of 481 34

Page 35: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 35 of 481

Page 35 of 481Page 35 of 481 35

Page 36: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 36 of 481

Page 36 of 481Page 36 of 481 36

Page 37: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 37 of 481

Page 37 of 481Page 37 of 481 37

Page 38: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 38 of 481

Page 38 of 481Page 38 of 481 38

Page 39: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 39 of 481

Page 39 of 481Page 39 of 481 39

Page 40: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 40 of 481

Page 40 of 481Page 40 of 481 40

Page 41: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 41 of 481

Page 41 of 481Page 41 of 481 41

Page 42: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 42 of 481

Page 42 of 481Page 42 of 481 42

Page 43: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 43 of 481

Page 43 of 481Page 43 of 481 43

Page 44: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 44 of 481

Page 44 of 481Page 44 of 481 44

Page 45: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 45 of 481

Page 45 of 481Page 45 of 481 45

Page 46: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 46 of 481

Page 46 of 481Page 46 of 481 46

Page 47: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 47 of 481

Page 47 of 481Page 47 of 481 47

Page 48: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 48 of 481

Page 48 of 481Page 48 of 481 48

Page 49: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 49 of 481

Page 49 of 481Page 49 of 481 49

Page 50: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 50 of 481

Page 50 of 481Page 50 of 481 50

Page 51: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

OS Cutout Replacements

C005524

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 51 of 481

Page 51 of 481Page 51 of 481 51

Page 52: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Project Revision Detail Report

Fund Project Number: USSC #:

Budget Version:

C005524 FY16 Program

Revision: 13

Project Title: IE - OS Cutout Replacements

Project Description: EI - OS Cutout Replacements

Project Status:

Responsible Person: WYMAN, ANNE Initiator: Diconza, Glen L

Spending Rationale: System Capacity & Performance Funding Type:

Budget Class: Reliability

Capital by Category:

Program Code:

Project Risk Score: 40 Project Complexity Score: 15

Project Schedule / Expenditures

Revision Status:

Est Start Date: 4/1/2014 Est Complete Date: 12/1/2018

Est In-Service Date:

As Of: 10/10/2017TTD Actuals: $9,223,477

Credits

$0

Total Removal

$3,000

Expense

$3,000 $25,000

CapitalCost Breakdown

3/31/2018

Justification / Risk Identification:

5/3/11 - Updated base estimate to add 2nd year base estimate. Approx 3100 potted porcelin cutouts will be removed in the current year.

1/9/07 - changed title from "EI - OS Cutout Replacements"This project is the Ocean State portion of the FY 2006 Cutout Replacement Program. Approximately 900 potted porcelin cutouts will be replaced in OS.

Project Alternatives Considered:

Project Scope:

5/3/11 - Approx 3100 potted porcelin cutouts will be removed in the current year.

open

Default

Approved

5360-Narragansett Electric and Gas

P Electric Distribution Line RI

$31,000

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 52 of 481

Page 52 of 481Page 52 of 481 52

Page 53: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

<Enter data here>

Additional Notes:

5/3/11 - Updated base estimate to add 2nd year base estimate. Approx 3100 potted porcelin cutouts will be removed in the current year.

Related Projects:

Project Number: Project Name:

Approvals

Line 1: Date 4/21/2015 14:23:31 Approver curljo

Diconza, Glen LApprover 4/23/2015 09:05:20DateLine 2:

Line 3: Date 4/28/2015 09:03:57 Approver

Approver 4/28/2015 09:37:25DateLine 4:

Line 5: Date Approver

Constable, Ryan

Cox, Roger D

DOA - Distribution Lev

DOA - Distribution Lev

DOA - Distribution Lev

DOA - Distribution Lev

***Project Authorization is for Approved Revision Total Estimated Cost +10%***

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 53 of 481

Page 53 of 481Page 53 of 481 53

Page 54: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 54 of 481

Page 54 of 481Page 54 of 481 54

Page 55: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 55 of 481

Page 55 of 481Page 55 of 481 55

Page 56: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 56 of 481

Page 56 of 481Page 56 of 481 56

diconz
Rectangle
Page 57: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 57 of 481

Page 57 of 481Page 57 of 481 57

Page 58: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 58 of 481

Page 58 of 481Page 58 of 481 58

Page 59: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 59 of 481

Page 59 of 481Page 59 of 481 59

Page 60: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 60 of 481

Page 60 of 481Page 60 of 481 60

Page 61: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 61 of 481

Page 61 of 481Page 61 of 481 61

Page 62: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 62 of 481

Page 62 of 481Page 62 of 481 62

Page 63: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 63 of 481

Page 63 of 481Page 63 of 481 63

Page 64: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 64 of 481

Page 64 of 481Page 64 of 481 64

Page 65: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 65 of 481

Page 65 of 481Page 65 of 481 65

Page 66: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Substation Damage Failure Reserve

C018593

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 66 of 481

Page 66 of 481Page 66 of 481 66

Page 67: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Project Revision Detail Report

Fund Project Number: USSC #:

Budget Version:

C018593 USSC-12-106

Revision: 9

Project Title: DxT Substation Dmg/Fail Reserve C49

Project Description: 03204 DxT Substation Dmg/Fail Reserve C49

Project Status:

Responsible Person: PARENTEAU, STEVE Initiator: McGrath, James M

Spending Rationale: Damage/Failure Funding Type:

Budget Class: Damage/Failure

Capital by Category:

Program Code:

Project Risk Score: 49 Project Complexity Score: 15

Project Schedule / Expenditures

Revision Status:

Est Start Date: 10/16/2006 Est Complete Date: 3/31/2020

Est In-Service Date:

As Of: 10/10/2017TTD Actuals: $2,536,115

Credits

$0

Total Removal

$0

Expense

$0 $491,833

CapitalCost Breakdown

3/31/2020

Justification / Risk Identification:

03204 DxT Substation Dmg/Fail Reserve C49

Project Alternatives Considered:

Project Scope:

<Enter data here>

open

Default

Approved

5360-Narragansett Electric and Gas

P Dist by Transmission Sub RI

$491,833

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 67 of 481

Page 67 of 481Page 67 of 481 67

Page 68: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

<Enter data here>

Additional Notes:

<Enter data here>

Related Projects:

Project Number: Project Name:

Approvals

Line 1: Date 4/25/2008 00:00:00 Approver longshc

ApproverDateLine 2:

Line 3: Date Approver

ApproverDateLine 4:

Line 5: Date Approver

SAP Default Approver

***Project Authorization is for Approved Revision Total Estimated Cost +10%***

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 68 of 481

Page 68 of 481Page 68 of 481 68

Page 69: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 69 of 481

Page 69 of 481Page 69 of 481 69

Page 70: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 70 of 481

Page 70 of 481Page 70 of 481 70

jonesg1
Text Box
This document has been reviewed for Critical Energy Infrastructure Information (CEII). 12/10/2012
Page 71: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 71 of 481

Page 71 of 481Page 71 of 481 71

Page 72: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 72 of 481

Page 72 of 481Page 72 of 481 72

Page 73: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 73 of 481

Page 73 of 481Page 73 of 481 73

Page 74: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 74 of 481

Page 74 of 481Page 74 of 481 74

Page 75: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 75 of 481

Page 75 of 481Page 75 of 481 75

Page 76: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 76 of 481

Page 76 of 481Page 76 of 481 76

Page 77: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 77 of 481

Page 77 of 481Page 77 of 481 77

Page 78: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 78 of 481

Page 78 of 481Page 78 of 481 78

Page 79: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 79 of 481

Page 79 of 481Page 79 of 481 79

Page 80: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 80 of 481

Page 80 of 481Page 80 of 481 80

Page 81: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 81 of 481

Page 81 of 481Page 81 of 481 81

Page 82: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 82 of 481

Page 82 of 481Page 82 of 481 82

diconz
Rectangle
Page 83: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 83 of 481

Page 83 of 481Page 83 of 481 83

Page 84: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 84 of 481

Page 84 of 481Page 84 of 481 84

Page 85: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 85 of 481

Page 85 of 481Page 85 of 481 85

Page 86: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 86 of 481

Page 86 of 481Page 86 of 481 86

Page 87: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 87 of 481

Page 87 of 481Page 87 of 481 87

Page 88: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 88 of 481

Page 88 of 481Page 88 of 481 88

Page 89: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 89 of 481

Page 89 of 481Page 89 of 481 89

Page 90: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 90 of 481

Page 90 of 481Page 90 of 481 90

Page 91: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

OS Storm (Weather) Capital Project

C022433

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 91 of 481

Page 91 of 481Page 91 of 481 91

Page 92: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Project Revision Detail Report

Fund Project Number: USSC #:

Budget Version:

C022433 USSC-17-220

Revision: 8

Project Title: OSD Storm Cap Confirm Program Proj

Project Description: To accumulate the amount of time and material charged for the Storm Events in OSD - Company 49 -/ 5360

Project Status:

Responsible Person: WYMAN, ANNE Initiator: Hellmuth, Kevin J

Spending Rationale: Damage/Failure Funding Type:

Budget Class: Major Storms - Dist

Capital by Category:

Program Code:

Project Risk Score: 49 Project Complexity Score: 15

Project Schedule / Expenditures

Revision Status:

Est Start Date: 4/1/2013 Est Complete Date: 3/31/2018

Est In-Service Date:

As Of: 10/10/2017TTD Actuals: $23,312,520

Credits

$0

Total Removal

$310,000

Expense

$310,000 $1,550,000

CapitalCost Breakdown

3/31/2018

Justification / Risk Identification:

This project will capture charges associated with capital storm restoration in OS.

Project Alternatives Considered:

Project Scope:

<Enter data here>

open

Approved

5360-Narragansett Electric and Gas

P Electric Distribution Line RI

$2,170,000

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 92 of 481

Page 92 of 481Page 92 of 481 92

Page 93: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

<Enter data here>

Additional Notes:

Project C22433/PPM3608 was submitted for approval as a Program in FY12. J.Flynn

Related Projects:

Project Number: Project Name:

Approvals

Line 1: Date 5/25/2017 12:31:41 Approver monted

ApproverDateLine 2:

Line 3: Date Approver

ApproverDateLine 4:

Line 5: Date Approver

USSC Approver

***Project Authorization is for Approved Revision Total Estimated Cost +10%***

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 93 of 481

Page 93 of 481Page 93 of 481 93

Page 94: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 94 of 481

Page 94 of 481Page 94 of 481 94

Page 95: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 95 of 481

Page 95 of 481Page 95 of 481 95

Page 96: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 96 of 481

Page 96 of 481Page 96 of 481 96

Page 97: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 97 of 481

Page 97 of 481Page 97 of 481 97

Page 98: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 98 of 481

Page 98 of 481Page 98 of 481 98

Page 99: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 99 of 481

Page 99 of 481Page 99 of 481 99

Page 100: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 100 of 481

Page 100 of 481Page 100 of 481 100

Page 101: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 101 of 481

Page 101 of 481Page 101 of 481 101

Page 102: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 102 of 481

Page 102 of 481Page 102 of 481 102

Page 103: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 103 of 481

Page 103 of 481Page 103 of 481 103

Page 104: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 104 of 481

Page 104 of 481Page 104 of 481 104

Page 105: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 105 of 481

Page 105 of 481Page 105 of 481 105

Page 106: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 106 of 481

Page 106 of 481Page 106 of 481 106

Page 107: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 107 of 481

Page 107 of 481Page 107 of 481 107

Page 108: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 108 of 481

Page 108 of 481Page 108 of 481 108

Page 109: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 109 of 481

Page 109 of 481Page 109 of 481 109

Page 110: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 110 of 481

Page 110 of 481Page 110 of 481 110

Page 111: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 111 of 481

Page 111 of 481Page 111 of 481 111

Page 112: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 112 of 481

Page 112 of 481Page 112 of 481 112

Page 113: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 113 of 481

Page 113 of 481Page 113 of 481 113

Page 114: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 114 of 481

Page 114 of 481Page 114 of 481 114

Page 115: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 115 of 481

Page 115 of 481Page 115 of 481 115

Page 116: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 116 of 481

Page 116 of 481Page 116 of 481 116

Page 117: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 117 of 481

Page 117 of 481Page 117 of 481 117

Page 118: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 118 of 481

Page 118 of 481Page 118 of 481 118

Page 119: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 119 of 481

Page 119 of 481Page 119 of 481 119

Page 120: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 120 of 481

Page 120 of 481Page 120 of 481 120

Page 121: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 121 of 481

Page 121 of 481Page 121 of 481 121

Page 122: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 122 of 481

Page 122 of 481Page 122 of 481 122

Page 123: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 123 of 481

Page 123 of 481Page 123 of 481 123

Page 124: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 124 of 481

Page 124 of 481Page 124 of 481 124

Page 125: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 125 of 481

Page 125 of 481Page 125 of 481 125

Page 126: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 126 of 481

Page 126 of 481Page 126 of 481 126

Page 127: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 127 of 481

Page 127 of 481Page 127 of 481 127

Page 128: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 128 of 481

Page 128 of 481Page 128 of 481 128

Page 129: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 129 of 481

Page 129 of 481Page 129 of 481 129

Page 130: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 130 of 481

Page 130 of 481Page 130 of 481 130

Page 131: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 131 of 481

Page 131 of 481Page 131 of 481 131

Page 132: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 132 of 481

Page 132 of 481Page 132 of 481 132

Page 133: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

OS Insulators, SensDev, Surge Arrestors

C025815

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 133 of 481

Page 133 of 481Page 133 of 481 133

Page 134: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Project Revision Detail Report

Fund Project Number: USSC #:

Budget Version:

C025815 FY2018 Program

Revision: 11

Project Title: OS ARP Insul, SensDev, Surge Arrest

Project Description: Asset Replacement program: insulators, sensing devices & surge arresters.

Project Status:

Responsible Person: PENDRAKE, ROBERT Initiator: McGrail, Anthony

Spending Rationale: Asset Condition Funding Type:

Budget Class: Asset Replacement

Capital by Category:

Program Code:

Project Risk Score: 40 Project Complexity Score: 15

Project Schedule / Expenditures

Revision Status:

Est Start Date: 4/1/2017 Est Complete Date: 3/31/2018

Est In-Service Date:

As Of: 10/10/2017TTD Actuals: $1,496,236

Credits

$0

Total Removal

$15,000

Expense

$5,000 $250,000

CapitalCost Breakdown

3/30/2018

Justification / Risk Identification:

This is a replacement program to remove all GE butyl rubber insulated potential transformers that are rated 23kv, 34.5kv, and 46 kv from the system due to a high rate of failure. The PT's targeted for replacement are manufactured by GE and are types JVT-150, JVT-200, JVS-150 and JVS-200. The epoxy insulation is known to crack allowing moisture ingresss, which eventually causes the windings to fail. Due to a recent catastrophic failure at one of our substations, an Incident Analysis team determined that these type of PT's have a high rate of failure. This replacement program is in accordance with our approved GE Potential Transformer Asset Replacement Strategy and

Project Alternatives Considered:

Project Scope:

Replace the GE butyl rubber insulated PTs denoted above that are not fused with an oil-filled PT of similar size. Replacements may require and outage, minor steel structural modifications, and testing and will be determined on a site by site basis.

Revision 9 of this project is for the FY16 program.

open

Approved

5360-Narragansett Electric and Gas

P Electric Distribution Sub RI

$270,000

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 134 of 481

Page 134 of 481Page 134 of 481 134

Page 135: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

<Enter data here>

Additional Notes:

This is the full annual sanction of the GE Butyl Rubber PT Replacement Program.;

Related Projects:

Project Number: Project Name:

Approvals

Line 1: Date 4/12/2017 13:01:18 Approver labara

ApproverDateLine 2:

Line 3: Date Approver

ApproverDateLine 4:

Line 5: Date Approver

Approver 1

***Project Authorization is for Approved Revision Total Estimated Cost +10%***

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 135 of 481

Page 135 of 481Page 135 of 481 135

Page 136: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 136 of 481

Page 136 of 481Page 136 of 481 136

Page 137: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 137 of 481

Page 137 of 481Page 137 of 481 137

Page 138: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 138 of 481

Page 138 of 481Page 138 of 481 138

Page 139: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 139 of 481

Page 139 of 481Page 139 of 481 139

Page 140: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 140 of 481

Page 140 of 481Page 140 of 481 140

Page 141: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 1 of 20

C025815 - USSC GE PT Replacement_final

Title: GE Potential Transformer Replacement Sanction Paper #: USSC-12-450

Project #: Strategy Sanction Type: Strategy Operating Company:

All National Grid Jurisdictions Date of Request: November 14, 2012

Author: Eileen Duarte Sponsor: Cheryl A. Warren, VP Asset Management

Utility Service: Electric T&D Project Manager: Mark Phillips

1 Executive Summary

1.1 Sanctioning Summary:

This paper requests the endorsement of this strategy to replace all General Electric potential transformers with butyl rubber insulation rated 46 kV, 34.5 kV and 23 kV. The list of locations can be found in the Appendices. The proposed projects listed below will be used to account for the work required to implement Phase 1 of the strategy set forth within this document. It is expected that this program will occur over a ten-year period. An annual program of work will be sanctioned each year. C25813 Massachusetts Electric C25815 Narragansett Electric PPM# 19594 Niagara Mohawk

The proposed sanction amount is for Phase 1 of this strategy and pertains to the FY14 to FY18 Capital Plan. The expected sanction amount is broken down as follows: $4.64M Capex $0.09M Opex $0.46M Removal

A conceptual estimate has been developed using historical cost data, data from similar projects, other identified assumptions, and was created using Success Enterprise (SE). The accuracy of this study grade estimate is -25% to +50%.

1.2 Brief Description: Potential transformers (PTs) or voltage transformers (VTs) are used for metering and protection in high-voltage circuits. They are designed to present negligible load to the

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 141 of 481

Page 141 of 481Page 141 of 481 141

vansav
Text Box
This document has been redacted for Critical Energy Infrastructure Information (CEII).
Page 142: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 2 of 20

C025815 - USSC GE PT Replacement_final

supply being measured and to have a precise voltage ratio to accurately step down high voltages so that metering and protective relay equipment can be operated at a lower potential. This strategy recommends the replacement of the General Electric potential transformers (PT) with butyl rubber insulation rated 46 kV, 34.5 kV and 23 kV, Model Types JVT-150, JVT-200, JVS-150 and JVS-200 at 122 substations within all jurisdictions over a ten-year period. Six hundred and nineteen have been identified through Cascade. These particular instrument transformers are less reliable due to moisture ingress. The butyl rubber insulation is known to crack exposing the winding to moisture, which eventually leads to failure of the device. This potential device failed catastrophically at the Wood River Substation causing multiple customer outages As a result of analysis conducted during the Incident Analysis and similar failures at other substations, these instrument transformers exhibit an unacceptably high rate of failure in applications greater than 15 kV. These devices are recommended to be removed from service to prevent future failures leading to service interruptions.

1.3 Summary of Projects:

Project Number Project Title Estimate Amount (M)

C25813 Massachusetts Electric $1.75C25815 Narragansett Electric $0.67PPM# 19594 Niagara Mohawk $2.78

Total: $5.20

1.4 Associated Projects: N/A

1.5 Prior Sanctioning History (including relevant approved Strategies):

Date Governance Body

Sanctioned Amount

Paper Title Sanction Type

10/13/2010

DCIG

N/A

Sensing Devices (Instrument Transformers)

Strategy

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 142 of 481

Page 142 of 481Page 142 of 481 142

Page 143: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 3 of 20

C025815 - USSC GE PT Replacement_final

1.6 Next Planned Sanction Review:

Date (Month/Year) Purpose of Sanction Review March 1, 2013 Annual Program Sanction

1.7 Category:

Category Reference to Mandate, Policy, or NPV Assumptions

Mandatory

Policy- Driven

Justified NPV

Asset Condition - Reliability

1.8 Asset Management Risk Score

Asset Management Risk Score: 41

Primary Risk Score Driver: (Policy Driven Projects Only)

Reliability Environment Health & Safety Not Policy Driven

1.9 Complexity Level: (if applicable)

High Complexity Medium Complexity Low Complexity N/A

Complexity Score: 13

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 143 of 481

Page 143 of 481Page 143 of 481 143

Page 144: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 4 of 20

C025815 - USSC GE PT Replacement_final

1.10 Process Hazard Assessment A Process Hazard Assessment (PHA) is required for this project:

Yes No

1.11 Business Plan:

Business Plan Name & Period

Project included in approved Business Plan?

Over / Under Business Plan

Project Cost relative to approved Business Plan ($M)

Capital Investment Plan FY13-FY17 Yes No Over Under

$ 5.20

1.12 If cost > approved Business Plan how will this be funded?

The program will begin in FY14 and the cost of the program will be incorporated in the FY14-FY18 Capital Investment Plan.

1.13 Current Planning Horizon:

YR6+

Proposed Capex $0.00 $0.47 $0.47 $0.47 $0.47 $0.47 $2.31 $4.64

Proposed Opex $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.09 $0.09

Proposed Removal $0.00 $0.05 $0.05 $0.05 $0.05 $0.05 $0.21 $0.46

CIAC/Reimbursement $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total $0.00 $0.52 $0.52 $0.52 $0.52 $0.52 $2.61 $5.19

YR5 17/18 Total

Current Planning Horizon

$M Prior YR Spending

YR1 13/14

YR2 14/15

YR3 15/16

YR4 16/17

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 144 of 481

Page 144 of 481Page 144 of 481 144

Page 145: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 5 of 20

C025815 - USSC GE PT Replacement_final

1.14 Resources:

Resource Sourcing

Engineering & Design Resources to be provided

Internal Contractor Construction/Implementation Resources to be provided

Internal Contractor

Resource Delivery

Availability of internal resources to deliver project:

Red Amber Green Availability of external resources to deliver project:

Red Amber Green

Operational Impact

Outage impact on network system: Red Amber Green Procurement impact on network system:

Red Amber Green

1.15 Key Issues (include mitigation of Red or Amber Resources):

1 A bus outage will be required for replacement. Replacements will be coordinated with other construction projects, and outage planning will be coordinated early between the Program Manager and Outage Coordinator.

1.16 Key Milestones:

Milestone Target Date: (Month/Year)

Annual Sanction 03/13 Preliminary Engineering 06/13 Procurement 07/13 Construction Begin 11/13 Construction Complete 03/14 Closeout 06/14

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 145 of 481

Page 145 of 481Page 145 of 481 145

Page 146: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 6 of 20

C025815 - USSC GE PT Replacement_final

1.17 Climate Change:

Are financial incentives (e.g. carbon credits) available? Yes No Contribution to National Grid’s 2050 80% emissions reduction target: Neutral Positive Negative Impact on adaptability of network for future climate change: Neutral Positive Negative

1.18 List References:

1 Substation Maintenance Standard SMS 403.01.1 – Instrument Transformer 2 Doble Engineering Technical Report 82,326 Rev. 2, Partial Discharge Survey 3 Sensing Devices (Instrument Transformer) Strategy 4 Wood River IA #299179 5 Report of the Doble Client Committee on Bushings, Insulators and Instrument

Transformers Fall 2005, September 27, 2005

2 Decisions The US Sanctioning Committee (USSC) at a meeting held on November 14, 2012: (a) APPROVED this paper and endorse the potential investment of $5.20M over a ten-year period. (b) NOTED that Mark Phillips is the Project Manager and has the approved financial delegation. Signature………………………………………………..Date……………… Lee S. Eckert US Chief Financial Officer

Chairman, US Sanctioning Committee

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 146 of 481

Page 146 of 481Page 146 of 481 146

Page 147: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 7 of 20

C025815 - USSC GE PT Replacement_final

3 Sanction Paper Detail

Title: GE Potential Transformer Replacement Sanction Paper #: USSC-12-450

Project #: Strategy Sanction Type: Strategy Operating Company:

National Grid New England Date of Request: November 14, 2012

Author: Eileen Duarte Sponsor: Cheryl A. Warren, VP Asset Management

Utility Service: Electricity T&D Project Manager: Mark Phillips

3.1 Background

The General Electric (GE) potential transformer with butyl rubber insulation is known industry-wide to be less reliable. At the 2005 Doble Engineering Client Committee Meeting on Bushings, Insulators, and Instrument Transformers, Colorado Springs Utilities reported on catastrophic failures which occurred on the GE Type JVS and JVT 200, 34.5 kV potential transformers due to moisture ingress from the cracked butyl rubber insulation. New York State Electric and Gas has also experienced several failures. Both companies developed a program to replace these potential transformers. The butyl rubber insulation cracks and exposes the winding to moisture ultimately causing a failure. The previous strategy recommends the replacement of all instrument transformers which appear to be weeping or showing signs of cracked insulation, and to replace General Electric instrument transformers greater than 30 years of age. However, recent failures indicate the average age of failure to be 13.8 years for the 34.5 kV rated PTs and 19.25 years for the 23 kV rated PTs. In February 2012, a failure of a 34.5 kV GE Model Type JVS-200 with butyl rubber insulation failed at the Wood River Substation in Rhode Island causing the loss of the 115 kV system that impacted various substations and resulted in the loss of 65,000 customers. An Incident Analysis team was created and several action items pertaining to the GE butyl rubber PTs resulted in this strategy. A failure analysis was performed on all GE PTs with butyl rubber insulation in New England. The result indicated that the 34.5 kV PTs have an unacceptable failure rate of 2% and the 23 kV PTs have a failure rate of 0.7%. There were 6 failures of the 34.5 kV PTs and 12 of the 23 kV PTs within the past seven years. According to industry practice, these

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 147 of 481

Page 147 of 481Page 147 of 481 147

Page 148: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 8 of 20

C025815 - USSC GE PT Replacement_final

failure rates are high. The IEEE 493 “Design of Reliable Industrial and Commercial Power Systems” published failure rate for all liquid-filled transformers is 0.6%. As a result, a maintenance bulletin has been issued by Substation Work Methods indicating that 34.5 kV and 23 kV GE butyl rubber insulated PTs will no longer be installed for substation applications. New substations designs will install oil-filled voltage transformers as the substation standard. Presently there are 331 GE type butyl rubber insulated PTs in 86 substations throughout New York, 208 in 28 substations in MA and 80 in 8 substations in RI. Due to the high failure rate, a partial discharge survey was performed on the 34.5 kV PTs. Two stations - Wakefield 17 and East Beverly - indicated high levels of partial discharge and projects have already been initiated to replace these PTs. Further replacements will be prioritized using partial discharge results and voltage level. The higher voltage PTs with elevated partial discharge results will be targeted first. Replacement of these PTs will be incorporated into other construction projects. A partial discharge survey will be performed in two years or sooner if required on the potential transformers identified below. Sensing Devices are inspected during Visual and Operational (V&O) checks and through annual InfraRed (IR) inspections. The potential transformers targeted for replacement are GE Model Type JVS-200, JVS-150, JVT-200 and JVT-150 rated 46 kV (NY), 34.5 kV and 23 kV bus and line PTs inside the substation fence. There are over 700, 15 kV GE butyl rubber insulated PTs in our system and they will not be targeted at this time for replacement due to their reliable performance at this voltage level. However, we will continue to monitor and evaluate their performance.

3.2 Drivers Asset condition is the primary driver for the replacement of the GE butyl rubber type insulated potential transformers. The potential transformers have a high failure rate and are considered unreliable. The butyl rubber insulation can crack exposing the windings to moisture eventually resulting in failure. The secondary driver for replacement is safety. These potential transformers have been known to fail catastrophically posing a safety hazard to personnel in the substation.

3.3 Project Description All GE PTs rated 46 kV, 34.5 kV and 23 kV Model Type JVS-200, JVS-150, JVT-200 and JVT-150 will be replaced with an oil-filled PT. Presently, the devices are being

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 148 of 481

Page 148 of 481Page 148 of 481 148

Page 149: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 9 of 20

C025815 - USSC GE PT Replacement_final

replaced with an ABB SPOF PT. However, we will continue to explore other manufacturers and designs for the best retrofit. In most instances, replacement will be a one-for-one replacement and upfront engineering and design will not be necessary. However, because the dimensions of the replacement PT are not exact, some stations may require engineering and design. The scope may be expanded to include structure or mounting base changes, and possibly a relocation of the PTs.

3.4 Benefits Summary The recommended program will resolve asset condition issues associated with the GE type butyl rubber insulated PT at 122 substations throughout our system and will assist in maintaining reliable service to our customers. By removing these devices from our substations in a proactive manner, we will reduce the likelihood of catastrophic failure and improve safety in these substations.

3.5 Business Issues There are no significant business issues beyond what has been described elsewhere.

3.6 Alternatives

Alternative 1: (Recommended) This alternative proposes a program to replace the existing GE butyl rubber insulated PTs rated 46 kV, 34.5 kV, and 23 kV with oil-filled PTs throughout our system. This is the recommended alternative. Alternative 2: This alternative proposes that the existing GE butyl rubber insulated PTs rated 46 kV, 34.5 kV, and 23 kV be removed upon failure or only during other construction projects. This alternative is not recommended due to the prolonged risk of unreliable service and a potential safety hazard.

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 149 of 481

Page 149 of 481Page 149 of 481 149

Page 150: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 10 of 20

C025815 - USSC GE PT Replacement_final

3.7 Safety, Environmental and Project Planning Issues Safety Issues:

• All NG employees/contractors/vendors working on this project are to follow all company and OSHA safety rules and regulations, including daily tailboard safety briefs for all work tasks to be performed.

• A safety plan shall be submitted for all the work by each NG employee, contractor and/or subcontractor.

• Grounding and tagging all isolation points will be performed to ensure equipment is de-energized before work can begin.

Environmental Issues: There are no environmental issues associated with this strategy. Planning Issues:

• This work is recommended to be performed as a program and sanctioned annually,

• Distribution Asset Management will provide locations and input into the capital business plan,

• Substation O&M will perform the field work, • Substation Work Methods will procure the equipment, and provide all required

field support, • Substation Engineering and Design will update the station drawings, • A bus or line outage is necessary to perform this work, • Work will be combined with other program work or projects, • Coordination will occur between the departments performing the work and the

departments retrieving the data.

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 150 of 481

Page 150 of 481Page 150 of 481 150

Page 151: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 11 of 20

C025815 - USSC GE PT Replacement_final

3.8 Execution Risk Appraisal

Cost

Sche

dule

Cost

Sche

dule

1 Active 2 1 2 2 4 Mitigate Resources Delay of schedule

Coordinate early with Construction Manager

2 Active 2 1 2 2 4 Mitigate Cannot get and outage

Delay of schedule

Coordinate with other projects/Coordinate early with Construction Manager

3 Active 2 2 2 4 4 AcceptRequires Engineering and Design

Delay of schedule and increase in cost

Move to next location

Post Trigger Mitigation

Plan

Score

Strategy Pre-Trigger Mitigation

PlanResidual Risk

Num

ber Detailed

Description of Risk /

Opportunity Prob

abili

ty Impact

3.9 Permitting

Permit Name Probability

Required (Certain/ Likely/ Unlikely)

Duration Status (Complete/ In Progress Not Applied For)

Estimated Completion Date

Army Corps of Engineers

Unlikely

State Environmental Unlikely Local Conservation Commissions

Unlikely

Local Planning Commissions

Unlikely

3.10 Investment Recovery

3.10.1 Investment Recovery and Regulatory Implications

Investment recovery will be through standard rate recovery mechanisms approved by appropriate regulatory agencies.

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 151 of 481

Page 151 of 481Page 151 of 481 151

Page 152: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 12 of 20

C025815 - USSC GE PT Replacement_final

3.10.2 Customer Impact

3.10.3 CIAC / Reimbursement N/A

3.11 Financial Impact to National Grid

3.11.1 Cost Summary Table

YR6+

Project # Description Capex 0.000 0.157 0.157 0.157 0.157 0.157 0.750 1.535

C25813 Massachusetts Electric -25%+50% Opex 0.000 0.003 0.003 0.003 0.003 0.003 0.015 0.030

Removal 0 000 0.016 0.016 0.016 0.016 0.016 0.075 0.154

Total 0.000 0.176 0.176 0.176 0.176 0.176 0.840 1.719

Project # Description

C25815 Narragansett Electric -25%+50% Capex 0 000 0.150 0.150 0.150 0.150 0.000 0.000 0.600

Opex 0 000 0.003 0.003 0.003 0.003 0.000 0.000 0.012

Removal 0 000 0.015 0.015 0.015 0.015 0.000 0.000 0.060

Total 0.000 0.168 0.168 0.168 0.168 0.000 0.000 0.672Project # Description

PPM#19594 Niagara Mohawk -25%+50% Capex 0 000 0.248 0.248 0.248 0.248 0.248 1.240 2.478

Opex 0 000 0.005 0.005 0.005 0.005 0.005 0.025 0.050

Removal 0 000 0.025 0.025 0.025 0.025 0.025 0.125 0.249

Total 0.000 0.277 0.277 0.277 0.277 0.277 1.390 2.776

Total Proposed Sanction 0.000 0.621 0.621 0.621 0.621 0.453 2.230 5.166

YR5 17/18 Total

Current Planning Horizon

Strategy DescriptionEstimate

Level $M Prior YR Spending

YR1 13/14

YR2 14/15

YR3 15/16

YR4 16/17

3.11.2 Project Budget Summary Table This project will be incorporated into the next business plan.

3.11.3 Cost Assumptions

Material acquisition for all substations will be done on a yearly program plan. The overall substation program estimate ($5.20M) is a conceptual grade estimate with a targeted accuracy of -25% to +50% and was obtained from Substation Engineering NE using Success Enterprise.

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 152 of 481

Page 152 of 481Page 152 of 481 152

Page 153: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 13 of 20

C025815 - USSC GE PT Replacement_final

3.11.4 Net Present Value / Cost Benefit Analysis This project is not financially driven.

3.11.5 Additional Impacts There are none at this time.

3.12 Statements of Support

3.12.1 Supporters

Role Name Responsibilities Sponsor/ Asset Manager/ Asset Owner/ Process Owner

Robert Sheridan Endorses the project aligns with jurisdictional objectives

Investment Planning Glen DiConza Endorses relative to 5-year business plan or emergent work

Investment Planning Gregory Lundahl Endorses relative to 5-year business plan or emergent work

Investment Planning Antoinette Stores Endorses relative to 5-year business plan or emergent work

Resource Planning Mark Phillips Endorses Resources, cost estimate, schedule, and Portfolio Alignment

Engineering/Design Peter Altenburger Endorses scope, design, conformance with design standards

Engineering/Design John Gavin Endorses scope, design, conformance with design standards

Project Management Sonny Anand

Endorses constructability and schedule

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 153 of 481

Page 153 of 481Page 153 of 481 153

Page 154: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 14 of 20

C025815 - USSC GE PT Replacement_final

3.12.2 Reviewers

Reviewer List Name Finance Karen Hamel Regulatory Gideon Katsh Jurisdictional Delegates Jennifer Grimsley, Al Chieco

4 Appendices

4.1 List of Locations by Jurisdiction Massachusetts - Owning Company 5 – Distribution

Substation Location Quantity Model

BSS Chartley Pond 6 JVS-150 Crocker Pond 6 JVS-150 East Weymouth 6 JVS-150 Mink 3 JVS-150 Plainville 3 JVS-150 Read Street 3 JVS-150 South Wrentham 9 JVS-150 BSW Risingdale 6 JVS-150 Williamstown 6 JVS-150 Brown Street 9 JVS-150 Adams 12 JVS-150 Wakefield 9 JVS-200 East Beverly 6 JVS-200 NENG Billerica 70 6 JVS-150 East Beverly 10 JVS-150 Everett 6 JVS-150 Gloucester 24 6 JVS-150 Golden Rock 15 JVS-150 Lynn 21 6 JVS-150 Melrose 2 6 JVS-150 North Chelmsford 6 JVS-150 Railyard 6 JVS-150

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 154 of 481

Page 154 of 481Page 154 of 481 154

Page 155: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 15 of 20

C025815 - USSC GE PT Replacement_final

Revere 7 6 JVS-150 Salem Harbor ---ABB units South Broadway 6 JVS-150 Swampscott 6 JVS-150 Ward Hill 18 JVS-150 Water Street 6 JVS-150 West Methuen 12 JVS-150 West Salem 3 JVS-150

Rhode Island - Owning Company 49 – Distribution

Substation Location Quantity Model

NEOSAdmiral Street 9 JVS-150Chompist 6 JVS-150Drumrock 6 JVS-150Hope 15 11 JVS-150Johnston 18 6 JVS-150Sockonosett 24 6 JVS-150Warren 5 6 JVS-150Wolf Hill 3 JVS-150Kent County 9 JVS-200West Kingston 6 JVS-200Davisville 6 JVS-200Wood River 6 JVS-200

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 155 of 481

Page 155 of 481Page 155 of 481 155

Page 156: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 16 of 20

C025815 - USSC GE PT Replacement_final

Niagara Mohawk - Owning Company 36 – Sub T

Location Quantity Model Division

Black River Station 70 1 JVT-150 NYCDBlack River Station 70 13 JVS-150 NYCDBristol Hill Station 109 1 JVT-200 NYCDCarthage Station 717 3 JVT-150 NYCDCortland Station 502 1 JVS-200 NYCDCurtis Street Station 224 2 JVT-200 NYCDDeferiet Station 724 3 JVS-150 NYCDFay Street Station 103 1 JVT-200 NYCDIndian River Station 323 1 JVS-150 NYCDMill Street Station 748 3 JVS-150 NYCDS/C - Campion Road 1 JVS-200 NYCDSpringfield Station 167 1 JVS-200 NYCDTilden Station 73 3 JVS-200 NYCDTrenton Station 627 1 JVS-200 NYCDVarick Station 207 1 JVT-200 NYCDWhitesboro Station 632 3 JVT-200 NYCDBolton Station 284 1 JVS-200 NYEDBrook Road Station 369 5 JVS-200 NYEDCambridge Station 29 1 JVS-200 NYEDCement Mountain Station 455 1 JVS-200 NYEDColvin Avenue Station 313 5 JVS-200 NYEDGlens Falls Station 75 2 JVT-200 NYED

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 156 of 481

Page 156 of 481Page 156 of 481 156

Page 157: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 17 of 20

C025815 - USSC GE PT Replacement_final

Niagara Mohawk - Owning Company 36 – Sub T

Location Quantity Model Division

Indian River Station 323 1 JVT-150 NYEDLynn Street Station 320 4 JVS-200 NYEDMohican Station 247 4 JVS-200 NYEDNewark Station 300 1 JVS-200 NYEDNorth Creek Station 122 2 JVT-200 NYEDNorth Troy Station 123 4 JVS-200 NYEDPartridge Street Station 128 1 JVS-200 NYEDPatroon Station 323 3 JVS-200 NYEDRensselaer Station 132 3 JVS-200 NYEDRiverside Station 288 11 JVS-200 NYEDRosa Road Station 137 10 JVT-200 NYEDRotterdam Station 138 2 JVT-200 NYEDSaratoga Station 142 1 JVS-200 NYEDSchuylerville Station 39 1 JVT-200 NYEDSpier Falls Station 34 3 JVS-200 NYEDWarrensburg Station 321 2 JVS-200 NYEDWeaver Street Station 1 JVT-200 NYEDWoodlawn Station 188 3 JVT-200 NYEDWoodlawn Station 188 3 JVS-200 NYEDAlbion Station 80 1 JVS-200 NYWDAndover Station 09 3 JVS-200 NYWDAshville Station 3 JVS-200 NYWDBrockport Station 74 1 JVS-200 NYWDDake Hill Switch Structure 3 JVS-200 NYWDDewey Ave Storage Yard 11 JVS-150 NYWDDewey Ave Storage Yard 2 JVS-200 NYWD

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 157 of 481

Page 157 of 481Page 157 of 481 157

Page 158: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 18 of 20

C025815 - USSC GE PT Replacement_final

Niagara Mohawk - Owning Company 36 – Sub T

Location Quantity Model Division

Golah Station 1 JVT-200 NYWDMedina Station 1 JVT-200 NYWDNew Walden Station 9 JVT-200 NYWDNorth Angola Station 6 JVS-200 NYWDNorth Ashford Station 36 3 JVS-200 NYWDNorth LeRoy Station 1 JVS-200 NYWDOakfield Station 03 3 JVS-200 NYWDPhillips Road Switch Structure 3 JVS-200 NYWDRidge Station 142 3 JVS-200 NYWDShaleton Station 81 3 JVS-200 NYWDSouth Dow Station 10 JVT-200 NYWDSouth Wellsville Station 23 2 JVS-200 NYWDStation 022 12 JVS-150 NYWDStation 023 12 JVS-150 NYWDStation 024 27 JVS-150 NYWDStation 028 9 JVS-150 NYWDStation 033 12 JVS-150 NYWDStation 039 6 JVS-150 NYWDStation 043 9 JVS-150 NYWDStation 044 4 JVS-150 NYWDStation 046 4 JVS-150 NYWDStation 052 3 JVS-150 NYWDStation 056 3 JVS-150 NYWDStation 057 9 JVS-150 NYWDStation 063 6 JVS-150 NYWDStation 074 6 JVS-150 NYWDStation 077 2 JVS-150 NYWDStation 160 - Summer St 9 JVS-150 NYWDStation 161 - Short St 9 JVS-150 NYWDTelegraph Road Station 3 JVS-200 NYWDWest Salamanca Station 16 3 JVS-200 NYWD

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 158 of 481

Page 158 of 481Page 158 of 481 158

Page 159: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 19 of 20

C025815 - USSC GE PT Replacement_final

4.2 Photographs

Figure 1 – Failed GE 34.5 kV Butyl Rubber Insulated PT

4.3

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 159 of 481

Page 159 of 481Page 159 of 481 159

Page 160: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

US Sanction Paper

Page 20 of 20

C025815 - USSC GE PT Replacement_final

Figure 2 - GE Model JVS 200, 34.5 kV butyl rubber insulated potential transformer

Breakdown and cracking at the seam of the base and bushing housing allowing moisture ingress.

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 160 of 481

Page 160 of 481Page 160 of 481 160

Page 161: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

I&M - OS D-Line OH Work From Inspection

C026281

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 161 of 481

Page 161 of 481Page 161 of 481 161

Page 162: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Project Revision Detail Report

Fund Project Number: USSC #:

Budget Version:

C026281 USSC-17-047FY18Pr

Revision: 12

Project Title: I&M - OS D-Line OH Work From Insp.

Project Description: Capital and expense work associated with annual inspections of overhead distribution line facilities.

Project Status:

Responsible Person: WYMAN, ANNE Initiator: Suarez, Jacqueline

Spending Rationale: Asset Condition Funding Type:

Budget Class: Asset Replacement - I&M (NE)

Capital by Category:

Program Code:

Project Risk Score: 49 Project Complexity Score: 15

Project Schedule / Expenditures

Revision Status:

Est Start Date: 4/1/2017 Est Complete Date: 3/31/2018

Est In-Service Date:

As Of: 10/10/2017TTD Actuals: $31,864,366

Credits

$0

Total Removal

$160,000

Expense

$400,000 $1,600,000

CapitalCost Breakdown

3/31/2018

Justification / Risk Identification:

To replace assets that are found to be defective during the annual inspection. This work is in accordance with EOP D004.

Project Alternatives Considered:

Project Scope:

Capital and expense work associated with annual inspections of overhead distribution line facilities.

open

Approved

5360-Narragansett Electric and Gas

P Electric Distribution Line RI

$2,160,000

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 162 of 481

Page 162 of 481Page 162 of 481 162

Page 163: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

<Enter data here>

Additional Notes:

<Enter data here>

Related Projects:

Project Number: Project Name:

Approvals

Line 1: Date 4/13/2017 08:25:23 Approver monted

ApproverDateLine 2:

Line 3: Date Approver

ApproverDateLine 4:

Line 5: Date Approver

USSC Approver

***Project Authorization is for Approved Revision Total Estimated Cost +10%***

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 163 of 481

Page 163 of 481Page 163 of 481 163

Page 164: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 164 of 481

Page 164 of 481Page 164 of 481 164

Page 165: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 165 of 481

Page 165 of 481Page 165 of 481 165

Page 166: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 166 of 481

Page 166 of 481Page 166 of 481 166

Page 167: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 167 of 481

Page 167 of 481Page 167 of 481 167

Page 168: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 168 of 481

Page 168 of 481Page 168 of 481 168

Page 169: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 169 of 481

Page 169 of 481Page 169 of 481 169

Page 170: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 170 of 481

Page 170 of 481Page 170 of 481 170

Page 171: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 171 of 481

Page 171 of 481Page 171 of 481 171

Page 172: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 172 of 481

Page 172 of 481Page 172 of 481 172

Page 173: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 173 of 481

Page 173 of 481Page 173 of 481 173

Page 174: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 174 of 481

Page 174 of 481Page 174 of 481 174

Page 175: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 175 of 481

Page 175 of 481Page 175 of 481 175

Page 176: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 176 of 481

Page 176 of 481Page 176 of 481 176

Page 177: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 177 of 481

Page 177 of 481Page 177 of 481 177

Page 178: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 178 of 481

Page 178 of 481Page 178 of 481 178

Page 179: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 179 of 481

Page 179 of 481Page 179 of 481 179

Page 180: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 180 of 481

Page 180 of 481Page 180 of 481 180

Page 181: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 181 of 481

Page 181 of 481Page 181 of 481 181

Page 182: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 182 of 481

Page 182 of 481Page 182 of 481 182

Page 183: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 183 of 481

Page 183 of 481Page 183 of 481 183

Page 184: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 184 of 481

Page 184 of 481Page 184 of 481 184

Page 185: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 185 of 481

Page 185 of 481Page 185 of 481 185

Page 186: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 186 of 481

Page 186 of 481Page 186 of 481 186

Page 187: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 187 of 481

Page 187 of 481Page 187 of 481 187

Page 188: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 188 of 481

Page 188 of 481Page 188 of 481 188

Page 189: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 189 of 481

Page 189 of 481Page 189 of 481 189

Page 190: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 190 of 481

Page 190 of 481Page 190 of 481 190

Page 191: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 191 of 481

Page 191 of 481Page 191 of 481 191

Page 192: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 192 of 481

Page 192 of 481Page 192 of 481 192

Page 193: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 193 of 481

Page 193 of 481Page 193 of 481 193

Page 194: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 194 of 481

Page 194 of 481Page 194 of 481 194

Page 195: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 195 of 481

Page 195 of 481Page 195 of 481 195

Page 196: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 196 of 481

Page 196 of 481Page 196 of 481 196

Page 197: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 197 of 481

Page 197 of 481Page 197 of 481 197

Page 198: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 198 of 481

Page 198 of 481Page 198 of 481 198

Page 199: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 199 of 481

Page 199 of 481Page 199 of 481 199

Page 200: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 200 of 481

Page 200 of 481Page 200 of 481 200

Page 201: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 201 of 481

Page 201 of 481Page 201 of 481 201

Page 202: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 202 of 481

Page 202 of 481Page 202 of 481 202

Page 203: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 203 of 481

Page 203 of 481Page 203 of 481 203

Page 204: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 204 of 481

Page 204 of 481Page 204 of 481 204

Page 205: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 205 of 481

Page 205 of 481Page 205 of 481 205

Page 206: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 206 of 481

Page 206 of 481Page 206 of 481 206

Page 207: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 207 of 481

Page 207 of 481Page 207 of 481 207

Page 208: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 208 of 481

Page 208 of 481Page 208 of 481 208

Page 209: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 209 of 481

Page 209 of 481Page 209 of 481 209

Page 210: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 210 of 481

Page 210 of 481Page 210 of 481 210

Page 211: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 211 of 481

Page 211 of 481Page 211 of 481 211

Page 212: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 212 of 481

Page 212 of 481Page 212 of 481 212

Page 213: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 213 of 481

Page 213 of 481Page 213 of 481 213

Page 214: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 214 of 481

Page 214 of 481Page 214 of 481 214

Page 215: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 215 of 481

Page 215 of 481Page 215 of 481 215

Page 216: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 216 of 481

Page 216 of 481Page 216 of 481 216

Page 217: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 217 of 481

Page 217 of 481Page 217 of 481 217

Page 218: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 218 of 481

Page 218 of 481Page 218 of 481 218

Page 219: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 219 of 481

Page 219 of 481Page 219 of 481 219

Page 220: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 220 of 481

Page 220 of 481Page 220 of 481 220

Page 221: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 221 of 481

Page 221 of 481Page 221 of 481 221

Page 222: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 222 of 481

Page 222 of 481Page 222 of 481 222

Page 223: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 223 of 481

Page 223 of 481Page 223 of 481 223

Page 224: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 224 of 481

Page 224 of 481Page 224 of 481 224

Page 225: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 225 of 481

Page 225 of 481Page 225 of 481 225

Page 226: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 226 of 481

Page 226 of 481Page 226 of 481 226

Page 227: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 227 of 481

Page 227 of 481Page 227 of 481 227

Page 228: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 228 of 481

Page 228 of 481Page 228 of 481 228

Page 229: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 229 of 481

Page 229 of 481Page 229 of 481 229

Page 230: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 230 of 481

Page 230 of 481Page 230 of 481 230

Page 231: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 231 of 481

Page 231 of 481Page 231 of 481 231

Page 232: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 232 of 481

Page 232 of 481Page 232 of 481 232

Page 233: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 233 of 481

Page 233 of 481Page 233 of 481 233

Page 234: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 234 of 481

Page 234 of 481Page 234 of 481 234

Page 235: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 235 of 481

Page 235 of 481Page 235 of 481 235

Page 236: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 236 of 481

Page 236 of 481Page 236 of 481 236

Page 237: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 237 of 481

Page 237 of 481Page 237 of 481 237

Page 238: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 238 of 481

Page 238 of 481Page 238 of 481 238

Page 239: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 239 of 481

Page 239 of 481Page 239 of 481 239

Page 240: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 240 of 481

Page 240 of 481Page 240 of 481 240

Page 241: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 241 of 481

Page 241 of 481Page 241 of 481 241

Page 242: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 242 of 481

Page 242 of 481Page 242 of 481 242

Page 243: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 243 of 481

Page 243 of 481Page 243 of 481 243

Page 244: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 244 of 481

Page 244 of 481Page 244 of 481 244

Page 245: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 245 of 481

Page 245 of 481Page 245 of 481 245

Page 246: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 246 of 481

Page 246 of 481Page 246 of 481 246

Page 247: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 247 of 481

Page 247 of 481Page 247 of 481 247

Page 248: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 248 of 481

Page 248 of 481Page 248 of 481 248

Page 249: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 249 of 481

Page 249 of 481Page 249 of 481 249

Page 250: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 250 of 481

Page 250 of 481Page 250 of 481 250

Page 251: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 251 of 481

Page 251 of 481Page 251 of 481 251

Page 252: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 252 of 481

Page 252 of 481Page 252 of 481 252

Page 253: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 253 of 481

Page 253 of 481Page 253 of 481 253

Page 254: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 254 of 481

Page 254 of 481Page 254 of 481 254

Page 255: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 255 of 481

Page 255 of 481Page 255 of 481 255

Page 256: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 256 of 481

Page 256 of 481Page 256 of 481 256

Page 257: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 257 of 481

Page 257 of 481Page 257 of 481 257

Page 258: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 258 of 481

Page 258 of 481Page 258 of 481 258

Page 259: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 259 of 481

Page 259 of 481Page 259 of 481 259

Page 260: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 260 of 481

Page 260 of 481Page 260 of 481 260

Page 261: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 261 of 481

Page 261 of 481Page 261 of 481 261

Page 262: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 262 of 481

Page 262 of 481Page 262 of 481 262

Page 263: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 263 of 481

Page 263 of 481Page 263 of 481 263

Page 264: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 264 of 481

Page 264 of 481Page 264 of 481 264

Page 265: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Batteries/Chargers OS - RI

C032019

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 265 of 481

Page 265 of 481Page 265 of 481 265

Page 266: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Project Revision Detail Report

Fund Project Number: USSC #:

Budget Version:

C032019 FY18 Program

Revision: 10

Project Title: Batts/Chargers NE South OS RI

Project Description: 03062 Batts/Chargers NE South OS RI. Battery System asset replacement program.

Project Status:

Responsible Person: PENDRAKE, ROBERT Initiator: Pericola, Steven J

Spending Rationale: Asset Condition Funding Type:

Budget Class: Asset Replacement

Capital by Category:

Program Code:

Project Risk Score: 40 Project Complexity Score: 18

Project Schedule / Expenditures

Revision Status:

Est Start Date: 4/1/2017 Est Complete Date: 3/31/2018

Est In-Service Date:

As Of: 10/10/2017TTD Actuals: $1,763,641

Credits

$0

Total Removal

$14,000

Expense

$4,000 $199,000

CapitalCost Breakdown

3/30/2018

Justification / Risk Identification:

Battery systems provide the DC source for most substation and in inadequate DC power source will impact the substation protection, monitoring, and control capabilities. In accordance with our approved Substation Battery and Related Equipment Strategy, batteries are replaced when they reach 20 years of age or if they warrant replacement due to condition issues.

Project Alternatives Considered:

Project Scope:

This program will replace battery systems prior to a manufacture age of 20 years or sooner if the battery system is showing signs of deterioration. The charger will be replaced with the battery only if it is greater than 10 years of age or showing signs of deterioration. Chargers that have a manufacture age of 20 years will be replaced when the battery is considered new. A battery and charger system comprises of the battery, charger, battery rack, spill containment, fused safety switch, and mobile battery receptacle. When a battery and charger system has been identified for replacement the battery charger and rack will be replaced A spill containment and mobile battery

open

Approved

5360-Narragansett Electric and Gas

P Electric Distribution Sub RI

$217,000

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 266 of 481

Page 266 of 481Page 266 of 481 266

Page 267: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

<Enter data here>

Additional Notes:

This is the Fiscal Year 2016 annual program sanction.

DCIG0311p376

Related Projects:

Project Number: Project Name:

Approvals

Line 1: Date 4/12/2017 13:01:20 Approver labara

ApproverDateLine 2:

Line 3: Date Approver

ApproverDateLine 4:

Line 5: Date Approver

Approver 1

***Project Authorization is for Approved Revision Total Estimated Cost +10%***

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 267 of 481

Page 267 of 481Page 267 of 481 267

Page 268: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 268 of 481

Page 268 of 481Page 268 of 481 268

Page 269: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 269 of 481

Page 269 of 481Page 269 of 481 269

Page 270: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 270 of 481

Page 270 of 481Page 270 of 481 270

Page 271: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 271 of 481

Page 271 of 481Page 271 of 481 271

Page 272: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 272 of 481

Page 272 of 481Page 272 of 481 272

Page 273: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

OS Substation Breakers & Reclosers

C032278

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 273 of 481

Page 273 of 481Page 273 of 481 273

Page 274: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Project Revision Detail Report

Fund Project Number: USSC #:

Budget Version:

C032278 USSC-15-070 FY16Program

Revision: 8

Project Title: OS ARP Breakers & Reclosers

Project Description: 03567 OS ARP Breakers & Reclosers

Project Status:

Responsible Person: NEARY, ALEXANDER Initiator: Karzenski, Wayne

Spending Rationale: Asset Condition Funding Type:

Budget Class: Asset Replacement

Capital by Category:

Program Code:

Project Risk Score: 40 Project Complexity Score: 15

Project Schedule / Expenditures

Revision Status:

Est Start Date: 4/1/2013 Est Complete Date: 3/31/2018

Est In-Service Date:

As Of: 10/10/2017TTD Actuals: $9,326,080

Credits

$0

Total Removal

$20,000

Expense

$20,000 $1,000,000

CapitalCost Breakdown

3/31/2018

Justification / Risk Identification:

Project Alternatives Considered:

Project Scope:

open

Default

Approved

5360-Narragansett Electric and Gas

P Electric Distribution Sub RI

$1,040,000

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 274 of 481

Page 274 of 481Page 274 of 481 274

Page 275: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

Additional Notes:

Related Projects:

Project Number: Project Name:

Approvals

Line 1: Date 4/21/2015 09:50:49 Approver carlim

ApproverDateLine 2:

Line 3: Date Approver

ApproverDateLine 4:

Line 5: Date Approver

USSC Approver

***Project Authorization is for Approved Revision Total Estimated Cost +10%***

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 275 of 481

Page 275 of 481Page 275 of 481 275

Page 276: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 276 of 481

Page 276 of 481Page 276 of 481 276

Page 277: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 277 of 481

Page 277 of 481Page 277 of 481 277

Page 278: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 278 of 481

Page 278 of 481Page 278 of 481 278

Page 279: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 279 of 481

Page 279 of 481Page 279 of 481 279

Page 280: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 280 of 481

Page 280 of 481Page 280 of 481 280

Page 281: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 281 of 481

Page 281 of 481Page 281 of 481 281

Page 282: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 282 of 481

Page 282 of 481Page 282 of 481 282

Page 283: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 283 of 481

Page 283 of 481Page 283 of 481 283

Page 284: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 284 of 481

Page 284 of 481Page 284 of 481 284

Page 285: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 285 of 481

Page 285 of 481Page 285 of 481 285

Page 286: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 286 of 481

Page 286 of 481Page 286 of 481 286

Page 287: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 287 of 481

Page 287 of 481Page 287 of 481 287

Page 288: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 288 of 481

Page 288 of 481Page 288 of 481 288

Page 289: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 289 of 481

Page 289 of 481Page 289 of 481 289

Page 290: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 290 of 481

Page 290 of 481Page 290 of 481 290

Page 291: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 291 of 481

Page 291 of 481Page 291 of 481 291

Page 292: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 292 of 481

Page 292 of 481Page 292 of 481 292

Page 293: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 293 of 481

Page 293 of 481Page 293 of 481 293

Page 294: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 294 of 481

Page 294 of 481Page 294 of 481 294

Page 295: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 295 of 481

Page 295 of 481Page 295 of 481 295

Page 296: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 296 of 481

Page 296 of 481Page 296 of 481 296

Page 297: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 297 of 481

Page 297 of 481Page 297 of 481 297

Page 298: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 298 of 481

Page 298 of 481Page 298 of 481 298

Page 299: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &

The Narragansett Electric Companyd/b/a National Grid

RIPUC Docket No. 4770Attachment PUC 1-16-3 (Electric)

Page 299 of 481

Page 299 of 481Page 299 of 481 299

Page 300: PROGRAM PROJECTS WITH OVER $250k SPENDING SINCE … · C013967 PS&I Activity - Rhode Island ** Other N/A ** - The PS&I project is a temporary holding area for Preliminary Survey &