21
to From 1 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-001 NAMPAP in Transition: Moving Ahead Beyond 24-Apr-09 25-Apr-09 The Manila Grand Opera Hotel 1.5 2 Philippine Society of Plumbing Engineers, Inc. (PSPE) 2009-002-002 3rd Joint Vismin Regional Conference & Trade Exhibit 10-Jul-09 11-Jul-09 Iloilo City 7 3 Philippine Society of Plumbing Engineers, Inc. (PSPE) 2009-002-003 3rd Luzon Regional Conference & Trade Exhibit 13-Nov-09 14-Nov-09 Manila Grand Opera Hotel, Sta. Cruz Manila 7 4 Philippine Society of Plumbing Engineers, Inc. (PSPE) 2009-002-004 6th Founding Anniversary and National Convention 26-Mar-10 27-Mar-10 Manila Grand Opera Hotel, Sta. Cruz Manila 7 5 Philippine Society of Plumbing Engineers, Inc. (PSPE) 2009-002-005 4th Visayas - Mindanao Conference 23-Jul-10 24-Jul-10 Pearlmont Inn, Cagayan de Oro City 7 6 Philippine Society of Plumbing Engineers, Inc. (PSPE) 2009-002-006 4th Luzon Regional Conference & Trade Exhibit 26-Nov-10 27-Nov-10 Supreme Hotel, Baguio 7 7 Philippine Society of Plumbing Engineers, Inc. (PSPE) 2009-002-007 7th Founding Anniversary / National Convention & Trade Exhibit 1-Apr-11 2-Apr-11 Manila Grand Opera Hotel, Sta. Cruz Manila 9 8 Philippine Society of Plumbing Engineers, Inc. (PSPE) 2009-002-008 5th Joint Visayas - Mindanao Conference & Trade Exhibit 21-Jul-11 22-Jul-11 Pearlmont Inn, Cagayan de Oro City 8 9 Philippine Society of Plumbing Engineers, Inc. (PSPE) 2009-002-009 5th Luzon Regional Conference & Trade Exhibit 25-Nov-11 26-Nov-11 Barcie International Center, Catmon, Malolos City, Bulacan 7 10 Philippine Society of Plumbing Engineers, Inc. (PSPE) 2009-002-010 8th Founding Anniversary & National Convention 30-Mar-12 31-Mar-12 Manila Grand Opera Hotel, Sta. Cruz Manila 7 11 Philippine Society of Plumbing Engineers, Inc. (PSPE) 2009-002-011 8th Founding Anniversary & National Convention 6-Aug-12 8-Aug-12 SMX Convention, Mall of Asia, Pasay City 5 12 Philippine Society of Plumbing Engineers, Inc. (PSPE) 2009-002-012 9th Founding Anniversary, National Convention and Trade Exhibit 19-Apr-13 20-Apr-13 Manila Grand Opera Hotel, Sta. Cruz Manila 5.5 13 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-013 Master Plumber on High Gear for Global Challenge 8-Nov-13 9-Nov-13 Microtel, Davao City 6.5 Date of Conduct Venue Credit Units No. Name of Provider Program Accreditation No. Title of Program

Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

to From

1

National Master

Plumbers Association

of the Philippines, Inc.

(NAMPAP) 2009-001-001

NAMPAP in

Transition: Moving

Ahead Beyond 24-Apr-09 25-Apr-09

The Manila Grand

Opera Hotel 1.5

2

Philippine Society of

Plumbing Engineers,

Inc. (PSPE) 2009-002-002

3rd Joint Vismin

Regional

Conference &

Trade Exhibit 10-Jul-09 11-Jul-09 Iloilo City 7

3

Philippine Society of

Plumbing Engineers,

Inc. (PSPE) 2009-002-003

3rd Luzon Regional

Conference & Trade

Exhibit 13-Nov-09 14-Nov-09Manila Grand Opera

Hotel, Sta. Cruz Manila 7

4

Philippine Society of

Plumbing Engineers,

Inc. (PSPE) 2009-002-004

6th Founding

Anniversary and

National Convention 26-Mar-10 27-Mar-10Manila Grand Opera

Hotel, Sta. Cruz Manila 7

5

Philippine Society of

Plumbing Engineers,

Inc. (PSPE) 2009-002-005

4th Visayas -

Mindanao

Conference 23-Jul-10 24-Jul-10Pearlmont Inn, Cagayan

de Oro City 7

6

Philippine Society of

Plumbing Engineers,

Inc. (PSPE) 2009-002-006

4th Luzon Regional

Conference & Trade

Exhibit 26-Nov-10 27-Nov-10 Supreme Hotel, Baguio 7

7

Philippine Society of

Plumbing Engineers,

Inc. (PSPE) 2009-002-007

7th Founding

Anniversary /

National Convention

& Trade Exhibit 1-Apr-11 2-Apr-11Manila Grand Opera

Hotel, Sta. Cruz Manila 9

8

Philippine Society of

Plumbing Engineers,

Inc. (PSPE) 2009-002-008

5th Joint Visayas -

Mindanao

Conference & Trade

Exhibit 21-Jul-11 22-Jul-11Pearlmont Inn, Cagayan

de Oro City 8

9

Philippine Society of

Plumbing Engineers,

Inc. (PSPE) 2009-002-009

5th Luzon Regional

Conference & Trade

Exhibit 25-Nov-11 26-Nov-11

Barcie International

Center, Catmon, Malolos

City, Bulacan 7

10

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-010

8th Founding

Anniversary &

National Convention 30-Mar-12 31-Mar-12Manila Grand Opera

Hotel, Sta. Cruz Manila 7

11

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-011

8th Founding

Anniversary &

National Convention 6-Aug-12 8-Aug-12SMX Convention, Mall of

Asia, Pasay City 5

12

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-012

9th Founding

Anniversary, National

Convention and

Trade Exhibit 19-Apr-13 20-Apr-13Manila Grand Opera

Hotel, Sta. Cruz Manila 5.5

13

National Master

Plumbers Association

of the Philippines, Inc.

(NAMPAP) 2009-001-013

Master Plumber on

High Gear for Global

Challenge 8-Nov-13 9-Nov-13 Microtel, Davao City 6.5

Date of ConductVenue Credit UnitsNo. Name of Provider

Program

Accreditation No. Title of Program

Page 2: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

14

Philippine Society of

Plumbing Engineers,

Inc. (PSPE) 2009-002-014

10th Founding

Anniversary, National

Convention & Trade

Exhibit 4-Apr-14 5-Apr-14Manila Grand Opera

Hotel, Sta. Cruz Manila 10.5

15

Philippine Society of

Plumbing Engineers,

Inc. (PSPE) 2009-002-015

11th Founding

Anniversary /

National Convention

and Trade Exhibit,

"Plumbing Engineers:

Moving towards

Sustainable Green 10-Apr-15 11-Apr-15

Manila Grand Opera

Hotel, Sta. Cruz,

Manila 10.5

16

National Master

Plumbers Association

of the Philippines, Inc.

(NAMPAP) 2009-001-016

Facing the

Challenges of

Globalization 20-Nov-15 21-Nov-15

Aloha Hotel, Roxas

Blvd., Manila 7.5

17

National Master

Plumbers Association

of the Philippines, Inc.

(NAMPAP) 2009-001-017 Luzon Conference 4/15/2016 4/16/2016

Starview Hotel, Naga

City 8

18MEPFS Engineers CPD

Provider 2017-010-018

Fire Sprinkler System

Design, Estimates

and FDAS 27-Aug-17 Quezon City 6

19MEPFS Engineers CPD

Provider 2017-010-019

Fire Sprinkler System

Design, Estimates

and FDAS 10-Sep-17 Imus City 6

20MEPFS Engineers CPD

Provider 2017-010-020

Construction Project

Management and

Estimates 23-Sep-17 Cebu City 6.5

21MEPFS Engineers CPD

Provider 2017-010-021

Construction Project

Management and

Estimates 1-Oct-17 Davao City 6.5

22MEPFS Engineers CPD

Provider 2017-010-022

Design and Cold

Water Distribution

System in Buildings

& Estimates 17-Sep-17 Quezon City 6.5

23MEPFS Engineers CPD

Provider 2017-010-023

Design and Cold

Water Distribution

System in Buildings

& Estimates 29-Sep-17 Davao City 6.5

24MEPFS Engineers CPD

Provider 2017-010-024

Design and Cold

Water Distribution

System in Buildings

& Estimates 1-Oct-17 Cebu City 6.5

25MEPFS Engineers CPD

Provider 2017-010-025

Construction Project

Management and

Estimates 26-Aug-17 Quezon City 6.5

26MEPFS Engineers CPD

Provider 2017-010-026

Construction Project

Management and

Estimates 2-Sep-17 Calamba City 6.5

27MEPFS Engineers CPD

Provider 2017-010-027

Construction Project

Management and

Estimates 9-Sep-17 Imus City 6.5

Page 3: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

28

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-028

6th Visayas

Technical

Symposium 1-Jul-17

Waterfront Hotel, Cebu

City 6

29 Deeds Construct Plus Co. 2017-020-029

Comprehensive

Plumbing System

Design for Multi

Level Structures 13-Jul-17 14-Jul-17

2nd Floor, Marsk Bldg.,

Aurora Blvd. Cor. Balete

Drive , Quezon City 10

30 Deeds Construct Plus Co. 2017-020-030

Comprehensive

Plumbing System

Design for Multi

Level Structures 20-Jul-17 21-Jul-17

2nd Floor, Marsk Bldg.,

Aurora Blvd. Cor. Balete

Drive , Quezon City 10

31 Deeds Construct Plus Co. 2017-020-031

Comprehensive

Plumbing System

Design for Multi

Level Structures 27-Jul-17 28-Jul-17

2nd Floor, Marsk Bldg.,

Aurora Blvd. Cor. Balete

Drive , Quezon City 10

32

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-032

Luzon Regional

Conference 9-Dec-16 10-Dec-16

Hotel Venezia ,

Legaspi Albay 8

33

National Master

Plumbers Association

of the Philippines, Inc.

(NAMPAP) 2009-001-033

Visayas-Mindanao

Conference 18-Aug-17 19-Aug-17 Microtel, Davao City 7.5

34

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-034

6th Luzon Technical

Symposium (under

the banner of Green

Philippines) 22-Sep-17 23-Sep-17

SMX Convention, Mall

of Asia, Pasay City 6.5

35

MEPFS Engineers

CPD Provider 2017-010-035

Construction Project

Management and

Estimates 28-Oct-17

Function Room, CBD

Plaza Hotel, Ninoy

and Cory Avenue CBD-

II Triangulo Naga City 9

36

MEPFS Engineers

CPD Provider 2017-010-036

Procurement and

Core Management in

Construction

Industry 18-Nov-17

MEFS Training

Center, 3/F Corner

Street Bldg., Palico IV,

Imus City 9

37

MEPFS Engineers

CPD Provider 2017-010-037

Fire Sprinkler System

Design, Estimates

and FDAS 29-Oct-17

Function Room, CBD

Plaza Hotel, Ninoy and

Cory Avenue CBD-II

Triangulo Naga City 9

38MEPFS Engineers CPD

Provider 2017-010-038

Plumbing Plan

Reading and

Estimates 17-Dec-17

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 9

39MEPFS Engineers CPD

Provider 2017-010-039

Plumbing Plan

Reading and

Estimates 21-Jan-17

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 9

40MEPFS Engineers CPD

Provider 2017-010-040

Plumbing Plan

Reading and

Estimates 3-Dec-18

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 9

41MEPFS Engineers CPD

Provider 2017-010-041

Plumbing Plan

Reading and

Estimates 14-Jan-18

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 9

42MEPFS Engineers CPD

Provider 2017-010-042

Plumbing Plan

Reading and

Estimates 12-Nov-17

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 9

43MEPFS Engineers CPD

Provider 2017-010-043

Plumbing Plan

Reading and

Estimates 7-Jan-18

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 9

44

National Master

Plumbers Association

of the Philippines, Inc.

(NAMPAP) 2009-001-044

Contiunuing

Professional

Development (CPD)

Seminar 28-Jul-17 29-Jul-17

CW Home Depot, Chino

Roces St.,Makati City 12

Page 4: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

45

National Master

Plumbers Association

of the Philippines, Inc.

(NAMPAP) 2009-001-045 Luzon Conference 28-Apr-17 Stone House Hotel 7

46MEPFS Engineers CPD

Provider 2017-010-046

Pump Sizing and

Selection 26-Nov-17

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8

47MEPFS Engineers CPD

Provider 2017-010-047

Pump Sizing and

Selection 28-Jan-18

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8

48MEPFS Engineers CPD

Provider 2017-010-048

Pump Sizing and

Selection 26-Nov-17

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8

49MEPFS Engineers CPD

Provider 2017-010-049

Pump Sizing and

Selection 26-Jan-17

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8

50MEPFS Engineers CPD

Provider 2017-010-050

Pump Sizing and

Selection 17-Dec-17

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8

51MEPFS Engineers CPD

Provider 2017-010-051

Pump Sizing and

Selection 21-Jan-18

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8

52MEPFS Engineers CPD

Provider 2017-010-052

Plumbing Plan

Reading and

Estimates 26-Nov-17

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 9

53MEPFS Engineers CPD

Provider 2017-010-053

Plumbing Plan

Reading and

Estimates 28-Jan-18

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 9

54

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-054

PSPE Seminar and

Workshop 18-Nov-17

154 Roosevelt Ave., cor.

SFDM, Quezon City 8

55

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-055

PSE Seminar and

Workshop 11-Nov-17

154 Roosevelt Ave., cor.

SFDM, Quezon City 8

56

National Master Plumbers

Association of the

Philippines, Inc.

(NAMPAP) 2009-001-056

82nd Anniversary

and National

Convention 17-Nov-17 18-Nov-17

Aloha Hotel, Roxas

Blvd., Manila 10.5

57MEPFS Engineers CPD

Provider 2017-010-057

Construction Project

Management and

Estimates 4-Nov-17

Function Room, Bohol

Plaza Resort and

Restaurant , Dauis ,

Bohol 10

58MEPFS Engineers CPD

Provider 2017-010-058

Pump Sizing and

Selection 12-Nov-17

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8

59MEPFS Engineers CPD

Provider 2017-010-059

Pump Sizing and

Selection 7-Jan-17

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8

60MEPFS Engineers CPD

Provider 2017-010-060

Design and Cold

Water Distribution

System in Buildings

& Estimates 13-Jan-18

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 6.5

61MEPFS Engineers CPD

Provider 2017-010-061

Design and Cold

Water Distribution

System in Buildings

& Estimates 10-Feb-18

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 6.5

Page 5: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

62MEPFS Engineers CPD

Provider 2017-010-062

Design and Cold

Water Distribution

System in Buildings

& Estimates 11-Mar-18

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 6.5

63MEPFS Engineers CPD

Provider 2017-010-063

Design and Cold

Water Distribution

System in Buildings

& Estimates 14-Apr-18

Manila Grand Opera

Hotel, 925 Doroteo Jose

St. cor. Rizal Avenue,

Sta. Cruz, Manila 6.5

64MEPFS Engineers CPD

Provider 2017-010-064

Design and Cold

Water Distribution

System in Buildings

& Estimates 12-May-18

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 6.5

65MEPFS Engineers CPD

Provider 2017-010-065

Design and Cold

Water Distribution

System in Buildings

& Estimates 9-Jun-18

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 6.5

66MEPFS Engineers CPD

Provider 2017-010-066

PERT/ CPM for

Project Scheduling &

Monitoring 16-Dec-17

Function Room, Crown

Regency Residences,

Guadalupe, Cebu City 9

67MEPFS Engineers CPD

Provider 2017-010-067

Automatic Fire

Sprinkler System

Design 17-Dec-17

Function Room, Crown

Regency Residences,

Guadalupe, Cebu City 8

68MEPFS Engineers CPD

Provider 2017-010-068

Automatic Fire

Sprinkler System

Design 2-Dec-17

MEFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 9

69MEPFS Engineers CPD

Provider 2017-010-069

Medical Gas Piping

System Design 9-Dec-17

Function Room, Crown

Regency Residences,

Guadalupe, Davao City 8

70MEPFS Engineers CPD

Provider 2017-010-070

Rain Water

Harvesting for Multi-

Storied Buildings 1-Dec-17

Function Room, Crown

Regency Residences,

Guadalupe, ILoilo City 8

71MEPFS Engineers CPD

Provider 2017-010-071

Automatic Fire

Sprinkler System

Design 10-Dec-17

Function Room, Crown

Regency Residences,

Guadalupe, Davao City 8

72

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-072

10th Luzon Regional

Conference & Trade

Exhibit 8-Dec-17 9-Dec-17Villa Caceres Hotel,

Naga City 9

73MEPFS Engineers CPD

Provider 2017-010-073

PERT/ CPM for

Project Scheduling &

Monitoring 30-Nov-17

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8

74MEPFS Engineers CPD

Provider 2017-010-074

How to Start And

Grown Construction

Business 5-Nov-17

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 4

75MEPFS Engineers CPD

Provider 2017-010-075

How to Start And

Grown Construction

Business 22-Oct-17

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 9

76MEPFS Engineers CPD

Provider 2017-010-076

How to Start And

Grown Construction

Business 29-Oct-17

CBD Plaza Hotel, Ninoy

AND Cory Avenue CBD-II

Triangulo Naga City 9

77MEPFS Engineers CPD

Provider 2017-010-077

Construction Project

Management and

Estimates 30-Nov-17

Highway 21 Hotel,

General Luna St., Iloilo

City 6.5

78MEPFS Engineers CPD

Provider 2017-010-078

Comprehensive

Construction Project

Management and

Estimates 11-Nov-17 12-Nov-17

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 14

Page 6: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

79MEPFS Engineers CPD

Provider 2017-010-079

Comprehensive

Construction Project

Management and

Estimates 25-Nov-17 26-Nov-17

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 14

80MEPFS Engineers CPD

Provider 2017-010-080

How to Start And

Grown Construction

Business 19-Nov-17

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 9

81MEPFS Engineers CPD

Provider 2017-010-081

Comprehensive

Construction Project

Management and

Estimates 9-Dec-17 10-Dec-17

Function Room, My

Hotel Davao, San Pedro

Street, Davao City 14

82MEPFS Engineers CPD

Provider 2017-010-082

Comprehensive

Construction Project

Management and

Estimates 13-Jan-18 14-Jan-18

Ritz Tower De Leyte,

Real St. , Tacloban City 14

83MEPFS Engineers CPD

Provider 2017-010-083

Comprehensive

Construction Project

Management and

Estimates 20-Jan-18 21-Jan-18

The VIP Hotel, Corner

Streets, Don Apolinar

Velez St. , Cagayan De

Oro City 14

84MEPFS Engineers CPD

Provider 2017-010-084

PERT/ CPM for

Project Scheduling &

Monitoring 13-Jan-18 14-Jan-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 12

85MEPFS Engineers CPD

Provider 2017-010-085

Comprehensive

Construction Project

Management and

Estimates 2-Feb-18 3-Feb-18

Function Room , Grand

Astoria Hotel, Mayor

Cimaco Ave., Zone II,

Zamboanga City 14

86MEPFS Engineers CPD

Provider 2017-010-086

Construction Project

Management and

Estimates 13-Jan-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 6.5

87MEPFS Engineers CPD

Provider 2017-010-087

Construction Project

Management and

Estimates 11-Mar-18

Manila Grand Opera

Hotel, 925 Doroteo Jose

St. cor. Rizal Avenue,

Sta. Cruz, Manila 6.5

88MEPFS Engineers CPD

Provider 2017-010-088

Construction Project

Management and

Estimates 12-May-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 6.5

89MEPFS Engineers CPD

Provider 2017-010-089

Medical Gas Piping

System Design 27-Jan-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8.5

90MEPFS Engineers CPD

Provider 2017-010-090

Medical Gas Piping

System Design 24-Mar-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8.5

91MEPFS Engineers CPD

Provider 2017-010-091

Medical Gas Piping

System Design 26-May-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8.5

92MEPFS Engineers CPD

Provider 2017-010-092

Automatic Fire

Sprinkler System

Design 24-Feb-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8.5

Page 7: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

93MEPFS Engineers CPD

Provider 2017-010-093

Automatic Fire

Sprinkler System

Design 28-Apr-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8.5

94MEPFS Engineers CPD

Provider 2017-010-094

Automatic Fire

Sprinkler System

Design 24-Jun-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8.5

95MEPFS Engineers CPD

Provider 2017-010-095

PERT/ CPM for

Project Scheduling &

Monitoring 6-Jan-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Imus City 8

96 Deeds Construct Plus Co. 2017-003-096

Construction Project

Management and

Estimating 5-Jan-18 6-Jan-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 16.75

97 Deeds Construct Plus Co. 2017-003-097

Sustainable (Green)

Plumbing System

and Domestic Water

Distribution System

Design for Highrise

Buildings 13-Jan-18

NorthWinds Hotel,

Lahug, Cebu City 8

98 Deeds Construct Plus Co. 2017-003-098

Sustainable (Green)

Plumbing System

and Domestic Water

Distribution System

Design for Highrise

Buildings 19-Jan-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

99 Deeds Construct Plus Co. 2017-003-099

Sustainable (Green)

Plumbing System

and Domestic Water

Distribution System

Design for Highrise

Buildings 29-Jan-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

100 Deeds Construct Plus Co. 2017-003-100

Automatic Fire

Sprinkler System

Design 7-Jan-18 8-Jan-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 13.75

101 Deeds Construct Plus Co. 2017-003-101

Automatic Fire

Sprinkler System

Design 12-Jan-18 14-Jan-18

NorthWinds Hotel,

Lahug, Cebu City 13.75

102

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-102

5th PSPE's Techno

Forum 9-Jan-18

SMX Convention Center,

Mall of Asia , Manila 6.75

103

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-103

PSPE's Seminar &

Workshop 13-Jan-18

Azia Suites &

Residences, Cebu City 8

104 Deeds Construct Plus Co. 2017-003-104

PERT/ CPM and

Labor Cost Analysis 11-Jan-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

105 Deeds Construct Plus Co. 2017-003-105

PERT/ CPM and

Labor Cost Analysis 25-Jan-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

106 Deeds Construct Plus Co. 2017-003-106

PERT/ CPM and

Labor Cost Analysis 1-Feb-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

107 Deeds Construct Plus Co. 2017-003-107

PERT/ CPM and

Labor Cost Analysis 15-Feb-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

Page 8: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

108 Deeds Construct Plus Co. 2017-003-108

PERT/ CPM and

Labor Cost Analysis 26-Feb-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

109

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-104

PSPE Seminar and

Workshop 25-Nov-17154 Roosevelt Ave., cor.

SFDM, Quezon City 8

110RBRK Consultancy and

Construction 2017-005-105

Cebu Cpd Seminar "

Master Plumber on

High Gear for Global

Challenge." 8-Dec-17 9-Dec-17 Castle Peak Hotel 13

111 Deeds Construct Plus Co. 2017-003-106

PERT/ CPM and

Labor Cost Analysis 1-Feb-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

112 Deeds Construct Plus Co. 2017-003-107

PERT/ CPM and

Labor Cost Analysis 15-Feb-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

113 Deeds Construct Plus Co. 2017-003-108

PERT/ CPM and

Labor Cost Analysis 26-Feb-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

114

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-104

PSPE Seminar and

Workshop 25-Nov-17154 Roosevelt Ave., cor.

SFDM, Quezon City 8

115RBRK Consultancy and

Construction 2017-005-105

Cebu Cpd Seminar "

Master Plumber on

High Gear for Global

Challenge." 8-Dec-17 9-Dec-17 Castle Peak Hotel 13

116 26-Dec-17 31-Dec-17

2018

117

National Master Plumbers

Association of the

Philippines, Inc.

(NAMPAP) 2009-001-106 CPD Seminar 24-Feb-18

Function Hall, City Hall,

Calamba City, Laguna 8.5

118 Deeds Construct Plus Co. 2017-003-107

Understanding

Sewage Treatment

Plant (STP) Stages-

3 Hours plus Storm

Drainage System /

Sewer, Waste and

Vent System Design

for Medium and 18-Jan-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 10

119 Deeds Construct Plus Co. 2017-003-108

Understanding

Sewage Treatment

Plant (STP) Stages-

3 Hours plus Storm

Drainage System /

Sewer, Waste and

Vent System Design

for Medium and 28-Jan-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 10

120

National Master Plumbers

Association of the

Philippines, Inc.

(NAMPAP) 2009-001-109

Continuing

Professional

Development -

Seminar 24-Mar-18

Iloilo Science and

Technology University

(ISTU)/ La Paz, Iloilo City 9

Page 9: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

121 Deeds Construct Plus Co. 2017-003-110

Sustainable (Green)

Plumbing System

and Domestic Water

Distribution System

Design for Highrise

Buildings 2-Mar-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 10

122

RBRK Consultancy and

Construction 2017-011-111

Davao CPD Seminar:

Master Plumbers

Increased Proficiency

for Stronger

Technological

Adavancement 13-Jan-18 Davao City 17

123 Deeds Construct Plus Co. 2017-003-112

Sustainable (Green)

Plumbing System

and Domestic Water

Distribution System

Design for Highrise

Buildings 5-Feb-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 10

124 Deeds Construct Plus Co. 2017-003-113

Sustainable (Green)

Plumbing System

and Domestic Water

Distribution System

Design for Highrise

Buildings 16-Feb-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 10

125 Deeds Construct Plus Co. 2017-003-114

Sustainable (Green)

Plumbing System

and Domestic Water

Distribution System

Design for Highrise

Buildings 22-Feb-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 10

126 Deeds Construct Plus Co. 2017-003-115

Understanding

Sewage Treatment

Plant (STP) Stages-

3 Hours plus Storm

Drainage System /

Sewer, Waste and

Vent System Design

for Medium and

Huge Structures 8-Feb-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 10

127 Deeds Construct Plus Co. 2017-003-116

Understanding

Sewage Treatment

Plant (STP) Stages-

3 Hours plus Storm

Drainage System /

Sewer, Waste and

Vent System Design

for Medium and

Huge Structures 17-Feb-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 10

128

MEPFS Engineers CPD

Provider 2017-010-118

Rain Water

Harvesting for Multi-

Storied Buildings 17-Feb-18

Function Room,

Manhattan Suite Inn,

South Road, Calindagan,

Dumaguete City 9

129

MEPFS Engineers CPD

Provider 2017-010-119

Sustainable and

Green Building

Design 18-Mar-18

Function Room, Hotel

Pier Cuatre, 3rd Avenue,

North Reclamation Area,

Cebu City 9

130

MEPFS Engineers CPD

Provider 2017-010-120

Comprehensive

Construction Project

Management and

Estimates 3-Mar-18 4-Mar-18

Hotel St. Ellis, Real St.,

Legaspi City 9

Page 10: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

131

MEPFS Engineers CPD

Provider 2017-010-121

Pump Sizing and

Selection 4-Feb-18

Function Room, Phela

Grande Convention

Center, General Santos

City 8

132

MEPFS Engineers CPD

Provider 2017-010-122

Automatic Fire

Sprinkler System

Design 3-Feb-18

Function Room, Phela

Grande Convention

Center, General Santos

City 8.5

133

MEPFS Engineers CPD

Provider 2017-010-123

PERT/ CPM for

Project Scheduling &

Monitoring 4-Mar-18

Function Room, My

Hotel Davao, San Pedro

Street, Davao City 9

134

MEPFS Engineers CPD

Provider 2017-010-124

PERT/ CPM for

Project Scheduling &

Monitoring 3-Feb-18

Function Room, Phela

Grande Convention

Center, General Santos

City 9

135

MEPFS Engineers CPD

Provider 2017-010-125

Sustainable Rain

Water Harvesting 3-Mar-18

Function Room, My

Hotel Davao, San Pedro

Street, Davao City 9

136

MEPFS Engineers CPD

Provider 2017-010-126

Medical Gas Piping

System Design 18-Mar-18

Function Room, Hotel

Pier Cuatre, 3rd Avenue,

North Reclamation Area,

Cebu City 8.5

137

MEPFS Engineers CPD

Provider 2017-010-127

Medical Gas Piping

System Design 18-Feb-18

MEPFS Training Center,

Rags Bldg., Brgy. Parian,

Calamba City 8.5

138

MEPFS Engineers CPD

Provider 2017-010-128

How to Prepare

Complete Plumbing

Plan and

Documentation 25-Feb-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 8

139

MEPFS Engineers CPD

Provider 2017-010-129

Construction Project

Management and

Estimates 18-Feb-18

Function Room,

Manhattan Suite Inn,

South Road, Calindagan,

Dumaguete City 8.5

140

MEPFS Engineers CPD

Provider 2017-010-130

Procurement and

Core Management in

Construction

Industry 4-Feb-18

Function Room, Phela

Grande Convention

Center, General Santos

City 9

141

MEPFS Engineers CPD

Provider 2017-010-131

PERT/ CPM for

Project Scheduling &

Monitoring 25-Feb-18

Function Room, North

View Hotel, Airport Rd,

Nalbo, Laoag City 9

142

MEPFS Engineers CPD

Provider 2017-010-132

Construction Project

Management and

Estimates 24-Feb-18

Function Room, North

View Hotel, Airport Rd,

Nalbo, Laoag City 8.5

143 16-Feb-18 9

144 9-Feb-18 10-Feb-18 16

145 1-Mar-18 10

146

MEPFS Engineers CPD

Provider 2017-010-136

How to Prepare

Complete Plumbing

Plan and

Documentation 4-Mar-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 8

147

MEPFS Engineers CPD

Provider 2017-010-137

Financial &

Operations

Management in

Construction Industry 17-Mar-18

Function Room, Hotel

Pier Cuatre, 3rd Avenue,

North Reclamation Area,

Cebu City 8

148

MEPFS Engineers CPD

Provider 2017-010-137

Financial &

Operations

Management in

Construction Industry 17-Mar-18

Function Room, Hotel

Pier Cuatre, 3rd Avenue,

North Reclamation Area,

Cebu City 9

149 26-Jan-18 27-Jan-18 9

150 11-Feb-18 12-Feb-18 9

151 18-Feb-18 19-Feb-18 9

Page 11: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

152 Deeds Construct Plus Co. 2017-003-141

Understanding

Sewage Treatment

Plant (STP) Stages-

3 Hours plus Storm

Drainage System /

Sewer, Waste and

Vent System Design

for Medium and

Huge Structures 12-Apr-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 10

153 Deeds Construct Plus Co. 2017-003-142

Understanding

Sewage Treatment

Plant (STP) Stages-

3 Hours plus Storm

Drainage System /

Sewer, Waste and

Vent System Design

for Medium and

Huge Structures 16-Apr-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 10

154 Deeds Construct Plus Co. 2017-003-143

Construction Project

Management and

Estimating 6-Apr-18 7-Apr-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 18

155

MEPFS Engineers CPD

Provider Deferred

Sustainable Rain

Water Harvesting &

Urban Drainage

Systems Design 19-May-18 20-May-18

Function Room , La

Carmela De Boracay,

Station 2, Balabag,

Boracay Island, Malay,

Aklan 18

156

National Master Plumbers

Association of the

Philippines, Inc.

(NAMPAP) 2009-001-145

Continuing

Professional

Development -

Seminar 26-May-18Grand Men Seng Hotel,

Davao City 7

157

National Master Plumbers

Association of the

Philippines, Inc.

(NAMPAP) 2009-001-146 Luzon Conference 21-Apr-18

Mariano Marcos State I

University/ Batac, Ilocos

Norte 9.5

158

National Master Plumbers

Association of the

Philippines, Inc.

(NAMPAP) 2009-001-147 Luzon Conference 28-Apr-18 Stone House Hotel 7.5

159 Deeds Construct Plus Co. 2017-002-148

Plummbing System

Design and Its

Alternative for a

Sustainable Building

Plus being more

attentive to

Reverberation Time

and Acoustics in

Plumbing Sytems 19-Apr-18

The Pinaccle Hotel, Sta.

Ana Ave., Poblacion

District, Davao City 8

160 Deeds Construct Plus Co. 2017-002-149

Plumbing System

Design and Its

Alternative for a

Sustainable Building

Plus being more

attentive to

Reverberation Time

and Acoustics in

Plumbing Sytems 20-Apr-18

The Pinaccle Hotel, Sta.

Ana Ave., Poblacion

District, Davao City 8

161 Deeds Construct Plus Co. 2017-003-150

Sustainable (Green)

Plumbing System

and Domestic Water

Distribution System

Design for Highrise

Buildings 23-Apr-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 10

162

MEPFS Engineers CPD

Provider 2017-010-151

Sustainable Rain

Water Harvesting &

Urban Drainage

Systems Design 5-May-18 6-May-18Function Room, Citystate

Asturia, Palawan City 18

Page 12: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

163 Deeds Construct Plus Co. 2017-003-152

PERT/CPM and

Labor Cost Analysis 22-Apr-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

164 Deeds Construct Plus Co. 2017-003-153

PERT/CPM and

Labor Cost Analysis 28-Apr-18NorthWinds Hotel,

Lahug, Cebu City 8

165

MEPFS Engineers CPD

Provider 2017-010-154

Sustainable Rain

Water Harvesting &

Urban Drainage

Systems Design 12-May-18 13-May-18

Function Room, Butuan

Grand Palace Hotel,

Capitol Drive Corner

Imadeja St. Butuan City 18

166

MEPFS Engineers CPD

Provider 2017-010-155

Comprehensive

Construction Project

Management and

Estimates 28-Apr-18 29-Apr-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 17

167

MEPFS Engineers CPD

Provider 2017-010-156

Comprehensive

Construction Project

Management and

Estimates 23-Jun-18 24-Jun-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 17

168 Deeds Construct Plus Co. 2017-003-157

Proper Drainage,

Waste and Vent

(DVV) System Pipe

Sizing, Layout &

Actual Installation

puls Proper Hot &

Cold Waterline

System Pipe Sizing,

Layout & Actual

Installation 9-Apr-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

169 Deeds Construct Plus Co. 2017-003-158

Proper Drainage,

Waste and Vent

(DVV) System Pipe

Sizing, Layout &

Actual Installation

puls Proper Hot &

Cold Waterline

System Pipe Sizing,

Layout & Actual

Installation 19-Apr-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

170

MEPFS Engineers CPD

Provider 2017-010-159

Comprehensive

Construction Project

Management and

Estimates 17-Jun-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 9

171

MEPFS Engineers CPD

Provider 2017-010-160

Comprehensive

Construction Project

Management and

Estimates 15-Jul-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 9

172

MEPFS Engineers CPD

Provider 2017-010-161

Comprehensive

Construction Project

Management and

Estimates 12-Aug-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 9

173

MEPFS Engineers CPD

Provider 2017-010-162

Comprehensive

Construction Project

Management and

Estimates 16-Sep-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 9

174

MEPFS Engineers CPD

Provider 2017-010-163

Comprehensive

Construction Project

Management and

Estimates 14-Oct-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 9

Page 13: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

175

MEPFS Engineers CPD

Provider 2017-010-164

Comprehensive

Construction Project

Management and

Estimates 18-Nov-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 9

176

MEPFS Engineers CPD

Provider 2017-010-165

Comprehensive

Construction Project

Management and

Estimates 16-Dec-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 9

177 Deeds Construct Plus Co. 2017-003-166

PERT/ CPM and

Labor Cost Analysis 15-Apr-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

178 Deeds Construct Plus Co. 2017-003-167

Sustainable (Green)

Plumbing System 8-Apr-18Units 508-509, The Boni

Tower, 602 Boni Avenue, 10

179

MEPFS Engineers CPD

Provider 2017-010-168

Construction Project

Management 5-Jun-18

Room 3B, 3/F Quedsa

Plaza Bldg., EDSA cor

Quezon Avenue, Quezon

City 4

180

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-169

PSPE's 7th Visayas

Technical

Symposium 30-Jun-18Waterfront Hotel and

Casino,Lahug Cebu City 6

181

MEPFS Engineers CPD

Provider 2017-010-170

Sustainable and

Green Building

Design 16-Jun-18

Function Room,

Manhattan Suite Inn,

South Road, Calindagan,

Dumaguete City 9

182

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-171

PSPE's 1st Visayas

Technoforum 9-Jun-18Waterfront Hotel &

Casino, Lhug 7

183

National Master Plumbers

Association of the

Philippines, Inc.

(NAMPAP) 2009-001-172 Visayas Conference 16-Jun-18Grand Xing Imperial

Hotel, Iloilo City 8.5

184 Deeds Construct Plus Co. 2017-003-173

PERT/CPM as an

Effective Tool Used

in Project

Management and

Realistic Productivity

Rates / Labor Cost 2-Jun-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

185 Deeds Construct Plus Co. 2017-003-174

Rainwater System

Design and

Drainage, Waste &

Venting (DWV)

System Design for

Huge Structures 3-Jun-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

186 Deeds Construct Plus Co. 2017-003-175

PERT/CPM as an

Effective Tool Used

in Project

Management and

Realistic Productivity

Rates / Labor Cost

Derivation 10-Jun-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

187 Deeds Construct Plus Co. 2017-003-176

Domestic Water

Distribution System

Design for High Rise

Buildings 9-Jun-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

188 Deeds Construct Plus Co. 2017-003-177

Rainwater System

Design and

Drainage, Waste &

Venting (DWV)

System Design for

Huge Structures 16-Jun-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

Page 14: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

189 Deeds Construct Plus Co. 2017-003-178

PERT/CPM as an

Effective Tool Used

in Project

Management and

Realistic Productivity

Rates / Labor Cost

Derivation 17-Jun-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

190

RBRK Consultancy and

Construction 2017-011-179

Manila CPD Seminar:

Master Plumbers

Increased Efficiency

for Stronger

Technological

Advancement 27-Feb-18 Metro Manila Area 7

191

RBRK Consultancy and

Construction 2017-011-180

Desalination Plant:

building & Design of

Reverse Osmosis

Water Purification

System 26-Mar-18Andy Hotel, Fortuna St.

Mandaue City 7

192

MEPFS Engineers CPD

Provider 2017-004-181

Automatic Fire

Sprinkler System

Design 26-Aug-18

Function Room, CBD

Plaza Hotel, Ninoy and

Cory Avenue CBD-II

Triangulo Naga City 8.33

193 Upswing Learning Center 2017-047-182

Sustainable Urban

Drainage Systems

Design and

Management 14-Jul-18 15-Jul-18

Function Room, Huat

Chan Resto, Mc Arthur

Highway, Sto. Cristo,

Tarlac City 18

194

RBRK Consultancy and

Construction 2017-005-183

CPD Seminar:

Expertise in

Plumbing Will

Increased Profiency

for Stronger

Technological

Advancement 23-Jun-18 24-Jun-18 Metro Park Hotel 15

195

RBRK Consultancy and

Construction 2017-005-184

CPD Seminar:

Expertise in

Plumbing Will

Increased Profiency

for Stronger

Technological

Advancement 24-Jul-18 Cuarto Hotel, Cebu City 15

196 Upswing Learning Center 2018-047-185

Sustainable and

Green Building

Design 1-Jul-18

Unit 3B, Quedsa Plaza,

Edsa cor Quezon

Avenue, Quezon City 10

197 Upswing Learning Center 2018-047-186

Sustainable Urban

Drainage Systems

Design and

Management 7-Jul-18

Unit 3B, Quedsa Plaza,

Edsa cor Quezon

Avenue, Quezon City 18

198 Deeds Construct Plus Co. 2017-003-187

Revisiting PERT/

CPM and Derivation

of a Realistic

Construction Activity

Labor Cost/

Productivity Rates 30-Jun-18

Atrium, Annex Bldg., Sm

City Davao, Bacoland,

Matina, Davao City 4

199 Deeds Construct Plus Co. 2017-003-188

PERT/CPM as an

Effective Tool Used

in Project

Management and

Realistic Productivity

Rates / Labor Cost

Derivation 2-Sep-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

Page 15: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

200 Upswing Learning Center 2018-047-189

Automatic Fire

Sprinkler System

Design 11-Aug-18

Unit 3B, Quedsa Plaza,

Edsa cor Quezon

Avenue, Quezon City 8.33

201 Upswing Learning Center 2018-047-190

Automatic Fire

Sprinkler System

Design 13-Oct-18

Unit 3B, Quedsa Plaza,

Edsa cor Quezon

Avenue, Quezon City 8.33

202 Upswing Learning Center 2018-047-191

Automatic Fire

Sprinkler System

Design 15-Dec-18

Unit 3B, Quedsa Plaza,

Edsa cor Quezon

Avenue, Quezon City 8.33

203 Deeds Construct Plus Co. 2017-003-192

Rainwater System

Design and Drainage,

Waste & Venting

(DWV) System

Design for Huge

Structures 4-Aug-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

204 Deeds Construct Plus Co. 2017-003-193

PERT/CPM as an

Effective Tool Used

in Project

Management and

Realistic Productivity

Rates / Labor Cost

Derivation 5-Aug-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

205 Upswing Learning Center 2018-047-194

Sustainable and

Green Building

Design 5-Aug-18

Unit 3B, Quedsa Plaza,

Edsa cor Quezon

Avenue, Quezon City 10

206 Upswing Learning Center 2018-047-195

Sustainable and

Green Building

Design 18-Aug-18

DAP Conference Center

and Hotel, Tagaytay-

Calamba Road, Barangay

Sungay East, Tagaytay 10

207 Upswing Learning Center 2018-047-196

Sustainable and

Green Building

Design 11-Aug-18

Function Room, Valley

Hotel, Alimannao Hills,

Penablanca,

Tuguegarao, Cagayan 10

208 Deeds Construct Plus Co. 2017-003-197

Domestic Water

Distribution System

Design for High Rise

Buildings 29-Jul-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

209 Deeds Construct Plus Co. 2017-003-198

Domestic Water

Distribution System

Design for High Rise

Buildings 21-Jul-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

210 Deeds Construct Plus Co. 2017-003-199

Rainwater System

Design and Drainage,

Waste & Venting

(DWV) System

Design for Huge

Structures 22-Jul-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

Page 16: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

211 Deeds Construct Plus Co. 2017-003-200

PERT/CPM as an

Effective Tool Used

in Project

Management and

Realistic Productivity

Rates / Labor Cost

Derivation 28-Jul-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

212

MEPFSS CPD PROVIDER &

KNOWLEDGE

EHNANCEMENT CENTER 2017-004-201

Automatic Fire

Sprinkler System

Design 18-Aug-18

DAP Conference Center

and Hotel, Tagaytay-

Calamba Road, Barangay

Sungay East, Tagaytay 8.33

213

MEPFSS CPD PROVIDER &

KNOWLEDGE

EHNANCEMENT CENTER 2017-004-202

Pump Sizing and

Selection 25-Aug-18

Function Room, CBD

Plaza Hotel, Ninoy and

Cory Avenue CBD-II

Triangulo Naga City 8

214 Upswing Learning Center 2018-047-203

Procurement and

Core Management in

Construction

Industry 25-Aug-18 Quezon City 9

215

MEPFSS CPD PROVIDER &

KNOWLEDGE

EHNANCEMENT CENTER 2017-004-204

Automatic Fire

Sprinkler System

Design 1-Sep-18

Function Room, Hotel

Supreme Convention

Plaza, Magsaysay

Avenue, Baguio City 8.33

216

MEPFSS CPD PROVIDER &

KNOWLEDGE

EHNANCEMENT CENTER 2017-004-205

Pump Sizing and

Selection 2-Sep-18

Function Room, Hotel

Supreme Convention

Plaza, Magsaysay

Avenue, Baguio City 8

217 Upswing Learning Center 2018-047-206

Sustainable and

Green Building

Design 2-Sep-18

Function Room, Hotel

Supreme Convention

Plaza, Magsaysay

Avenue, Baguio City 10

218 Deeds Construct Plus Co. 2017-003-207

SECRETS REVELED-

How to Design Green-

Domestic Water 29-Jul-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

219 Upswing Learning Center 2018-047-208

Sustainable Storm

Water Management,

Planning & Design 9-Sep-18

Unit 3B, Quedsa Plaza,

Edsa cor Quezon

Avenue, Quezon City 9

220 Upswing Learning Center 2018-047-209

Sustainable Storm

Water Management,

Planning & Design 23-Sep-18

Unit 3B, Quedsa Plaza,

Edsa cor Quezon

Avenue, Quezon City 9

221 Upswing Learning Center 2017-047-210

Sustainable and

Green Building

Design 16-Sep-18

Function Room, Queen

Margarette Hotel,

Diversion Road,

Barangay Domoit,

Lucena City 10

222 Upswing Learning Center 2018-047-211

Comprehensive

Construction Project

Management and

Estimates 16-Sep-18

Upswing Training Room,

Quedsa Plaza, Edsa cor

Quezon Avenue, Quezon

City 9

Page 17: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

223 Upswing Learning Center 2018-047-212

Pump Sizing and

Selection 15-Sep-18

Unit 3B, Quedsa Plaza,

Edsa cor Quezon

Avenue, Quezon City 9

224 Upswing Learning Center 2018-047-213

PERT/ CPM for

Project Scheduling &

Monitoring 23-Sep-18

Unit 3B, Quedsa Plaza,

Edsa cor Quezon

Avenue, Quezon City 9

225 Upswing Learning Center 2018-047-214

Financial &

Operations

Management in

Construction Industry 22-Sep-18

MEPFS Training Center,

3/F Corner Street Bldg.,

Palico IV, Quezon City 9

226 Upswing Learning Center 2018-047-215

Sustainable Storm

Water Management,

Planning & Design 12-Aug-18

Function Room, Vallley

Hotel, Alimannao Hills,

Penblanca, Tuguegarao,

Cagayan 9

227 Upswing Learning Center 2018-047-216

Sustainable Storm

Water Management,

Planning & Design 19-Aug-18

DAP Conference Center

and Hotel, Tagaytay-

Calamba Road,

Barangay Sungay East,

Tagaytay 9

228 Deeds Construct Plus Co. 2017-003-217

SECRETS REVELED-

How to Design Green-

Domestic Water 11-Aug-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

229 Upswing Learning Center 2017-047-218

Environmental

Impact Assessment

for Sustainable

Construction 4-Aug-18

Unit 3B, Quedsa Plaza,

Edsa cor Quezon

Avenue, Quezon City 9

230 Deeds Construct Plus Co. 2017-003-219

Rainwater System

Design and

Drainage, Waste &

Venting (DWV)

System Design for

Huge Structures 16-Sep-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

231 Deeds Construct Plus Co. 2017-003-220

PERT/CPM as an

Effective Tool Used

in Project

Management and

Realistic Productivity

Rates / Labor Cost

Derivation 18-Aug-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

232 Deeds Construct Plus Co. 2017-003-221

Rainwater System

Design and

Drainage, Waste &

Venting (DWV)

System Design for

Huge Structures 12-Aug-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

233 Deeds Construct Plus Co. 2017-003-222

Rainwater System

Design and

Drainage, Waste &

Venting (DWV)

System Design for

Huge Structures 1-Sep-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

234 Upswing Learning Center 2018-047-223

Sustainable and

Green Building

Design 2-Sep-18

Function Room, Hotel

Supreme Convention

Plaza, Magsaysay

Avenue, Baguio City 10

235

National Master Plumbers

Association of the

Philippines, Inc.

(NAMPAP) 2009-001-224

Mindanao

Conference 18-Aug-18 Butuan Grand Hotel 9

236 Upswing Learning Center 2018-047-225

Sustainable Storm

Water Management,

Planning & Design 13-Aug-18

Room 3B, 3/F Quedsa

Plaza Bldg., EDSA cor

Quezon Avenue, Quezon

City 8

Page 18: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

237 Upswing Learning Center 2018-047-226

Sustainable Storm

Water Management,

Planning & Design 15-Aug-18

Room 3B, 3/F Quedsa

Plaza Bldg., EDSA cor

Quezon Avenue, Quezon

City 8

238 Deeds Construct Plus Co. 2017-003-227

SECRETS

REVELED- How to

Design Green-

Domestic Water 15-Sep-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

239 Upswing Learning Center 2018-047-228

Sustainable Storm

Water Management,

Planning & Design 28-Oct-18

Function Room, Phela

Grande Convention

Center, General Santos

City 9

240 Upswing Learning Center 2018-047-229

Sustainable Storm

Water Management,

Planning & Design 30-Sep-18

Function Room, La

Piazza Hotel &

Convention Center,

Tahao Road, Legazpi

City 9

241 Upswing Learning Center 2018-047-230

Sustainable Storm

Water Management,

Planning & Design 3-Nov-18

Function Room, Bohol

Plaza Resort and

Restaurant , Dauis ,

Bohol 4

242 Upswing Learning Center 2018-047-231

Sustainable Storm

Water Management,

Planning & Design 4-Nov-18

Function Room, Crowne

Regency Residences, V.

Rama Avenue,

Guadalupe Cebu City 9

243 Upswing Learning Center 2018-047-232

Comprehensive

Construction Project

Management and

Estimates 13-Oct-18 14-Oct-18

Upswing Training Room,

Quedsa Plaza, Edsa cor

Quezon Avenue, Quezon

City 18

244 Upswing Learning Center 2018-047-233

Comprehensive

Construction Project

Management and

Estimates 15-Dec-18 16-Dec-18

Upswing Training Room,

Quedsa Plaza, Edsa cor

Quezon Avenue, Quezon

City 18

245

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-234

PSPE's 7th Luzon

Technical

Symposium 21-Sep-18 22-Sep-18SMX Convention Center,

Mall of Asia , Manila 7

246 Deeds Construct Plus Co. 2017-003-235

SECRETS

REVELED- How to

Design Green-

Domestic Water 19-Aug-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 8

247 Upswing Learning Center 2018-047-236

Comprehensive

Construction Project

Management and

Estimates 18-Nov-18

Upswing Training Room,

Quedsa Plaza, Edsa cor

Quezon Avenue, Quezon

City 9

248 Upswing Learning Center 2018-047-237

Sustainable Storm

Water Management,

Planning & Design 14-Oct-18

Function Room, Pan

Resort and Events

Place, Roman Super Hi-

way,Abucay, Bataan 9

249

National Master Plumbers

Association of the

Philippines, Inc.

(NAMPAP) 2009-001-238

Continuing

Professional

Development -

Seminar 12-Oct-18 19-Oct-18International Philippine

School, Al Khobar, KSA 14.5

250 Upswing Learning Center 2018-047-239

Environmental

Impact Assessment

for Sustainable

Construction 15-Sep-18

Function Roo, Queen

Margarette Hotel,

Diversion Road,

Barangay Domoit,

Lucena City 8

251

Philippine Society of

Plumbing Engineers, Inc.

(PSPE) 2009-002-240

PSPE's 7th

Mindanao Technical

Symposium 7-Sep-18 8-Sep-18

SMX Convention Center,

SMX Premier, Lanang,

Davao City 7

252

National Master

Plumbers Association of

the Philippines, Inc.

(NAMPAP) 2009-001-241

83rd Anniversary

and National

Convention 16-Nov-18 17-Nov-18 Atrium Hotel 10.25

Page 19: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

253

Philippine Society of

Plumbing Engineers

(PSPE), Inc. 2009-002-242

PSPE's 7th Luzon

Technical

Symposium 10-Nov-18

SMX Convention Center,

Mall of Asia , Manila 7.5

254 Upswing Learning Center 2018-047-243

Comprehensive

Construction Cost

Estimates 3-Nov-18

Function Room, Crown

Regency Residences, V.

Rama Avenue,

Guadalupe Cebu City 4.5

255 Upswing Learning Center 2018-047-244

Comprehensive

Construction Cost

Estimates 13-Oct-18

Function Room, Pan

Resort and Events

Place, Roman Super Hi-

way,Abucay, Bataan 4.5

256 Upswing Learning Center 2018-047-245

Comprehensive

Construction Cost

Estimates 4-Nov-18

Function Room, Bohol

Plaza Resort and

Restaurant , Dauis ,

Bohol 4.5

257 Upswing Learning Center 2018-047-246

PERT/CPM for

Project Scheduling &

Monitoring 7-Oct-18

Unit 3B, Quedsa Plaza,

Edsa cor Quezon

Avenue, Quezon City 9

258 Upswing Learning Center 2018-047-247

Sustainable Storm

Water Management,

Planning & Design 2-Dec-18

Function Room, VIP

Hotel, Don A. Velez St.,

Cagayan De Oro City 9

259 Upswing Learning Center 2018-047-248

Sustainable Storm

Water Management,

Planning & Design 11-Nov-18

Function Room,

Manhattan Suite Inn,

South Road, Calindagan,

Dumaguete City 9

260 Upswing Learning Center 2018-047-249

Sustainable

Stormwater Basin

and Pond Design 30-Nov-18

Unit 3B, Quedsa Plaza,

Edsa cor Quezon

Avenue, Quezon City 9

261 Upswing Learning Center 2018-047-250

Comprehensive

Construction Cost

Estimates 27-Oct-18

Function Room, Phela

Grande Convention

Center, General Santos

City 4.5

262 Upswing Learning Center 2018-047-251

Comprehensive

Construction Cost

Estimates 1-Dec-18

Function Room, VIP

Hotel, Don A. Velez St.,

Cagayan De Oro City 4.5

263 Deeds Construct Plus Co. 2017-003-252

PERT/ CPM as an

Effective Tool Used

in Project

Management and

Realistic Productivity

Rates/ Labor Cost

Derivation 23-Sep-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 7.5

264 Deeds Construct Plus Co. 2017-003-253

Construction Project

Management and

Estimating 20-Oct-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 10

265 Deeds Construct Plus Co. 2017-003-254

Construction Project

Management and

Estimating 27-Oct-18

Units 508-509, The Boni

Tower, 602 Boni Avenue,

Mandaluyong City 10

266 Upswing Learning Center 2018-047-255

Sustainable Storm

Water Management,

Planning & Design 13-Aug-18

Room 3B, 3/F Quedsa

Plaza Bldg., EDSA cor

Quezon Avenue, Quezon

City 8

267 Upswing Learning Center 2018-047-256

Sustainable Storm

Water Management,

Planning & Design 15-Aug-18

Room 3B, 3/F Quedsa

Plaza Bldg., EDSA cor

Quezon Avenue, Quezon

City 8

268 Upswing Learning Center 2018-047-257

Comprehensive

Construction Cost

Estimates 24-Nov-18

Function Room, Ritz

Tower De Leyte, Real

Street, Tacloban City 4.5

Page 20: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

269

MEPFSS CPD Provider &

Knowledge Enhancement

Center 2017-004-258

Automatic Fire

Sprinkler System

Plan Reading and

Estimates 25-Nov-18

Upswing Training Room,

Quedsa Plaza, Edsa cor

Quezon Avenue, Quezon

City 4.25

270

MEPFSS CPD Provider &

Knowledge Enhancement

Center 2017-004-259

Automatic Fire

Sprinkler System

Plan Reading and

Estimates 16-Dec-18

Upswing Training Room,

Quedsa Plaza, Edsa cor

Quezon Avenue, Quezon

City 4.25

271

MEPFSS CPD Provider &

Knowledge Enhancement

Center 2017-004-260

Design of Drainage,

Waste, Vent (DWV)

System & STP/

Septic Tank in

Buildings 4-Nov-18

Upswing Training Room,

Quedsa Plaza, Edsa cor

Quezon Avenue, Quezon

City 8

272

MEPFSS CPD Provider &

Knowledge Enhancement

Center 2017-004-261

Design of Cold Water

Distribution System

in Buildings 3-Nov-18

Upswing Training Room,

Quedsa Plaza, Edsa cor

Quezon Avenue, Quezon

City 9

273

MEPFSS CPD Provider &

Knowledge Enhancement

Center 2017-004-262

Plumbing Plan

Reading and

Estimates 11-Nov-18

Upswing Training Room,

Quedsa Plaza, Edsa cor

Quezon Avenue, Quezon

City 4.5

274

MEPFSS CPD Provider &

Knowledge Enhancement

Center 2017-004-263

Comprehensive

Construction Cost

Estimates 10-Nov-18

Function Room, Sierra

Hotel, Piapi Beach

Basketball Court,

Dumaguete City 4..5

275

MEPFSS CPD Provider &

Knowledge Enhancement

Center 2017-004-264

Comprehensive

Construction Cost

Estimates 1-Dec-18

Function Room, The VIP

Hotel, A. Velez St.,

Cagayan De Oro City 4.5

276

MEPFSS CPD Provider &

Knowledge Enhancement

Center 2017-004-265

Green Plumbing

Practice, Installation

& Maintenance 18-Nov-18

Upswing Training Room,

Quedsa Plaza, Edsa cor

Quezon Avenue, Quezon

City 4.75

277 Upswing Learning Center 2018-047-266

Financial &

Operations

Management in

Construction Industry 24-Nov-18

Upswing Training Room,

Quedsa Plaza, Edsa cor

Quezon Avenue, Quezon

City 4.25

278

Philippine Society of

Plumbing Engineers

(PSPE), Inc. 2009-002-267

PSPE's 11th

Regional Luzon

Conference & Trade

Exhibit 7-Dec-18 8-Dec-18 Tarlac City 9

279 Upswing Learning Center 2018-047-268

Comprehensive

Construction Cost

Estimates 9-Dec-18

Upswing Training Room,

Quedsa Plaza, Edsa cor

Quezon Avenue, Quezon

City 4.5

280 Upswing Learning Center 2018-047-269

Comprehensive

Construction Cost

Estimates 2-Dec-18

Function Room, Huat

Chan Resto, Mc Arthur

Highway, Sto. Cristo,

Tarlac City 4.5

281 Upswing Learning Center 2018-047-270

Construction

Equipment

Management: Cost

and Estimates 9-Dec-18

DAP Conference Center

and Hotel, Tagaytay-

Calamba Road,

Barangay Sungay East,

Tagaytay 3.4

282 Upswing Learning Center 2018-047-271

Comprehensive

Construction Cost

Estimates 15-Dec-18

Function Room, The

Mansion Iloilo, General

Luna St., Iloilo City 4.5

283 Upswing Learning Center 2018-047-272

Sustainable

Stormwater Basin

and Pond Design 25-Nov-18

Function Room, Ritz

Tower De Leyte, Real

Street, Tacloban City 8

284 Upswing Learning Center 2018-047-273

Construction/

Plumbing Equipment

Management: Cost

and Estimates 1-Dec-18

Function Room, Huat

Chan Resto, Mc Arthur

Highway, Sto. Cristo,

Tarlac City 3.4

Page 21: Program Date of Conduct No. · Globalization 20-Nov-15 21-Nov-15 Aloha Hotel, Roxas Blvd., Manila 7.5 17 National Master Plumbers Association of the Philippines, Inc. (NAMPAP) 2009-001-017

285 Upswing Learning Center 2018-047-274

Land Development

Planning: In

Reference to Green

Building Code 2-Dec-18

Unit 3B, Quedsa Plaza,

Edsa cor Quezon

Avenue, Quezon City 4.25

286 Upswing Learning Center 2018-047-275

Sustainable

Construction Project

Management 17-Nov-18

Upswing Training Room,

Quedsa Plaza, Edsa cor

Quezon Avenue, Quezon

City 4.25

287 Upswing Learning Center 2018-047-276

Sustainable

Stormwater Basin

and Pond Design 16-Dec-18

Function Room, The

Mansion Iloilo, General

Luna St., Iloilo City 8

288 Upswing Learning Center 2018-047-277

Procurement and

Core Management in

Construction

Industry 8-Dec-18

Upswing Training Room,

Quedsa Plaza, Edsa cor

Quezon Avenue, Quezon

City 4.5