PROFILE
Regd Office: Niraj House, Sunder Baug, Near Deonar Bus Depot, Chembur, Mumbai-400 088.
Tel: 022 – 6602 7100 Fax: 022-2551 8736E-mail: [email protected] Website: www.niraj.co.in
Concrete Ideas for Better Living
About Us
Promoted by Shri V.K Chopra and his family in 1972
Formerly Known as Niraj Cement Structurals
Nearly over 3 decades and an impressive track record of executing successful infrastructure project in India.
Class 1 (A) Registered Contractor under Public works Division in Maharashtra State.
Specializes in road highway project involving both Rigid & Flexible Pavement and Large Scale Formation.
Awarded Best Quality Trophy by L & T Ltd.
PAN INDIA Presence
OUR Vision, Mission & Values NIRAJ Vision
To contribute significantly to building the new India and become the world’s most valuable real estate company
NIRAJ Mission
To build world-class real-estate concepts across six business lines with the highest standards of professionalism, ethics, quality and customer service.
NIRAJ Values
Sustained efforts to enhance customer value and quality
Ethical and professional service
Compliance and respect for all community, environmental and legal requirements
PROMOTERS
Mr. Vijay Kumar Chopra
Chairman & Managing Director
Mr. Gulshan V. Chopra
Director
BOARD OF DIRECTOR
Name Designation
Mr. Vijay Kumar Chopra Chairman & Managing Director
Mr. Gulshan V. Chopra Director
Mr. Akash H. Madan Independent Director
Mr. G.R. Kamath Independent Director
Annual Turnover Chart in Rs. Millions
Financial Year (Rs. Millions)
2009 1428.70
2010 1877.80
2011 3122.50
2012 3189.40
2013 1167.98
2014 491.62
Bank Guarantee Limits
• State Bank of India : Rs.580.00 Millions
• Union Bank of India : Rs. 226.00 Millions
• Yes Bank : 80.00 Millions
• Axis Bank : 600.00 Millions
• Consortium Bank Limit : 4000.00 Millions
(FB and NFB)
SBI
Union Bank
Yes Bank
Axis Bank
Projects Executed and In Progress at a Glance in all over India
• Rewari Project: Rs. 980.40 Million• Hodal Project: Rs.1352.00 Million • Sidhwan Canal Project: Rs.3282.60 Million
• Lucknow-Kanpur: Rs. 543.50 Million• UP PWD Projects : Rs.700.00 Million
• BRTS Project under IDA Rs. 1369.10 Millions• BRTS Project under JDA Rs. 1044.10 Millions• BRTS Project Under JDA Rs. 546.10 Millions
• Orissa Projects Rs. 1126.90 Millions and Rs. 1121.10 Millons
Major Project ExecutedName of Project Widening to 4/6 Lanes
and Strengthening of Existing 2 Lane Carrageway of NH-60 in the State of Orissa from Km 31+000 to Km.53+410
Client Name Larson & Tourbro Ltd
Contract Value Rs. 1104.40 Millions
Commencement Date 21.12.2001
Completion Date 30.07.2007
Major Quantity Executed
•Earthwork•GSB•PQC- M 40•CD Concrete
Major Project ExecutedName of Project Construction of BRTS
Corridor and Development of Road (Package 1B: C-Zone Bypass to Panipech via Sikar Road
Client Name Jaipur Development Authority
Contract Value Rs. 582.50 Millions
Commencement Date 17.09.2007
JV Partners (51:49) NIRAJ-ARSS (JV)
Completion Date 31.12.2010
Major Quantity Executed
•Earthwork•GSB•WMM•BM
Major Project ExecutedName of Project Improvement to
Palasponga- Bamenari Road from RD 0.00 Km to 28.00Km In the Dist of Keonjhar, Orissa
Client Name Kronjhar Infrastructure Development Co. Ltd
Contract Value Rs. 314.70 Millions
Commencement Date 01.03.2008
Completion Date 31.01.2011
Major Quantity Executed
•Earthwork•GSB•DLC•PQC- M40
Major Project ExecutedName of Project Four Lanning of
various roads in Rewari Town & Construction of new roads in Rewari Distt
Client Name Haryana State Roads and Bridge Development Corporation Ltd
Contract Value Rs. 470.00 Millions
Commencement Date 30.01.2009
Completion Date 30.03.2012
Major Quantity Executed
•Earthwork•GSB•DLC•PQC- M40
Major Project ExecutedName of Project Improvement of Hodal
Punhana Nagina Roaf, Uttawar Sikarwar to Bhadas Road, Bori Kothi Punhana road in Mewat / Palwal District
Client Name Haryana State Roads and Bridge Development Corporation Ltd
Contract Value Rs. 1352.00 Millions
Commencement Date 30.01.2009
Completion Date 30.09.2013
Major Quantity Executed
•Earthwork•WMM•BM
Major Project ExecutedName of Project Improvement such as
providing double-lane rigid pavement carriage way with paved shoulders of 1.5m on both sides to Cuttack – Paradeep road (SH-12) from 43/0 to 82/0 Km
Client Name Engineer-In- Chief (Civil), Orissa
Contract Value Rs. 1121.10 Millions
Commencement Date 24.04.2007
Completion Date 30.03.2013
Major Quantity Executed
•Earthwork•GSB•DLC•PQC
Major Project In ExecutedName of Project Construction of Pilot
Corridor on A.B Road (Niranjanpur to Rajiv Gandhi Square) under Bus Rapid Transit System, Indore
Client Name Indore Development Authority
Contract Value Rs. 1369.10 Millions
Commencement Date 08.08.2007
Completion Date 30.03.2013
Major Quantity Executed
•Earthwork•GSB•PQC•Sewerage Work
Major Project In ExecutedName of Project IRQP in Km 87.00 to
113.00 NH-231 and Km 44.00 to 57.00 (Raebareilly-salone-Pratapgarh-Macchlisahar-Jaunpur Road)
Client Name National Highway Division, PWD,
Rae Bareli (U.P)
Contract Value Rs. 210.00 Millions
Commencement Date 14.09.2010
Completion Date 30.06.2014
Major Quantity Executed
•GSB•WMM•BM•SDBC
Major Project In ProgressName of Project Construction of BRTS
Coridor and evelopment of Road (Package IIB: Sanganer Airport to 22 Godam via Rambagh Crossing including Elevated road at Durgapur
Client Name Jaipur Development Authority
Contract Value Rs. 1044.10 Millions
Commencement Date 26.03.2008
Completion Date 30.10.2015
Major Quantity Executed
•Earthwork•WMM•BM
Major Project ExecutedName of Project Improvement such as
providing double-lane rigid pavement carraige way with paved shoulders of 1.5m on both sides to Cuttack – Paradeep road (SH-12) from 0/0 to 43/0 Km
Client Name Engineer-In- Chief (Civil), Orissa
Contract Value Rs. 1126.90 Milllions
Commencement Date 24.04.2007
Completion Date 30.12.2014
Major Quantity Executed
•Earthwork•GSB•DLC•PQC
Major Project In ProgressName of Project Construction of ROB
at Km 59.640 and an underpass at Km 59.160 along with their approaches from Km 58.848 to Km 60.200 of Lucknow –Kanpur section of Nh-25 in Uttar Pradesh Km
Client Name National Highway Authority of India
Contract Value Rs. 543.50 Millions
Commencement Date 15.10.2009
Completion Date 30.04.2015
Major Quantity Executed
•1 No of major Bridge•Earthwork•GSB•BM
Major Project ExecutedName of Project IRQP in Km 11.00 to
25.00 on NH 231and Km 51.80 to 61.800 NH 232A and Km 150.00 to 180.00 NH 232
Client Name National Highway Division, PWD,
Rae Bareli (U.P)
Contract Value Rs. 580.30 Millions
Commencement Date 10.11.2010
Completion Date 20.3.2015
Major Quantity Executed
•GSB•WMM•BM•SDBC
Major Project In Progress
Name of Project 4-Lanning of Road along Sidhwan Canal with Flyovers, Underpass, ROBs and Canal Lining (Doraha to Ludhiana-Ferozpur Road) i.e Southern Byw-Pass, Ludhiana (approx Length 26.900 Km.)
Client Name Chief Engineer (IP),
Pb.PWD B&R Branch,
Chandigarh
Contract Value Rs. 3281.60 Millions
Commencement Date
15.02.2010
Completion Date 30.09.2015
Major Quantity Executed
2 Nos Major Bridges
Earthwork•GSB•Bituminous Work•PQC•Canal Lining
Major Project In ProgressName of Project Mihona-Lahar-Daboh-
Bhander-Chirgaon Road: Package No.2 inder MPSRP-III
Client Name DGM (Procurement),
MPRDC, Bhopal.
Contract Value Rs. 870.84 Millions
Commencement Date
06.06.2011
Completion Date 06.06.2015
Major Quantity Executed
Asphalt Road
Major Project In ProgressName of Project Disposal of Rock Debris
from Construction site of Part A of Project for Strategic Storage of Crude Oil at Padur, Distt Udupi, Karnataka.
Client Name Indian Strategic Petroleum Reserve Ltd (ISPRL)
Contract Value Rs. 5000.00 Million
Commencement Date
19.03.2012
Completion Date 30.09.2019
Major Quantity Executed
Boulder Lifitng
(150 Lacs Tonne)
Major Equipment Base of Niraj Cement Structurals Ltd
Slipform Paver (S1000)
Concrete Paving Machinery
Slipform Paver (S600)
Major Equipment Base of Niraj Cement Structurals Ltd
Asphalt Paver Finisher (Titan 325)
Asphalt Paving Machinery
Asphalt Sensor Paver Finisher with Dual Application (AP-550)
Major Equipment Base of` Niraj Cement Structurals Ltd
Concrete Batching Plant
1.WETBETON 160 (125 Cum/hr)2.PM 1500 (60 Cum/hr)
Concrete & Asphalt Batching Plant
Hot Mix Plant ANP-1500 (120 T/hr)
Major Equipment Base of Niraj Cement Structurals Ltd
• Moter Grader (05 Nos)
• Dozer (05 Nos)
• Excavater(05 Nos)
• Bakhoe Loader (10 Nos)
• Vibratory Compactor (05 Nos)
• Tippers (52 Nos)
• Hydraulic Piling Rig (04 No)
• Tower Crane (04 No)
Earthwork & Building Construction Machinery