    Purpose in brief :

    To prepare various estimates of a building.

    To issue bill of quantities to contractors for a tender.

    To compare various tenders, finalize and issue a work order to a contractor.

    To record measurements to prepare contractor running bills.

    To generate purchase requests, purchase orders and material receipt notes.

    To efficiently manage a project by accurate forecasting, executing, analyzing and controlling the expenditures in the

    estimated figures.

    Features of Estimator

    Works

    o Works with standard specifications, classified into Categories/Sub Heads.

    o Provision for editing Rates and Specifications for individual Projects.

    o Provision to change Measurements and Units.o Provision to add new works.

    Rate Analysis

    o Material, labour and machinery requirements for each work and its rates.

    o Material, labour and machinery rates can be set in a common screen.

    o Unit wise cost and split up costs can be extracted.

    o Provision for changing prices and coefficients for individual project

    Schedule of Quantities

    o Detailed Estimate with dimensions of each work in a project.

    Abstract Estimates

    o You can make reports on Actual cost, Market Rate and Confidential rates (3 levels) for each Estimate.

    o Split up of material, labour and machinery cost.

    Bill of Quantities

    o With detailed specifications and provision for entering rates for quote.

    Summary

    o Item wise summary of estimate without specifications.

    Floor Totals

    o Floor level summary of estimate.

    Material Estimates

    o This gives you the exact idea about the materials needed for each item (work) in a project.

    o Material wise and item wise report.

    o Summary report

    Labour Estimates

    o This gives you the exact details of Labour needed for each Item.

    o Labour wise and item wise report.

    o Summary report

    Project Rate Analysis

    o Split up of costs into materials, labours, machines, etc.

    o Unit cost and actual cost based on quantity is arrived.

    Schedule of Bars

    o Structure wise.

    o Bar wise.o Summary.

  • 8/4/2019 Profile Estimate

    2/7

    Tendering

    o Tender Creation You can make tender documents by splitting the estimate into various heads civil works,

    electrification, plumping, air conditioning etc. and issue to selected contractors.

    o Tender Receipts Provision for entering quoted rates of contractors for comparison, negotiation, adjusting

    and finalization.

    o Work Order - Provision for selecting a contractor for a tender and issuing the work order.

    Measurement Book

    o Date wise or weekly measurement for sites entered by site engineers that can be used in bills

    Cost Control

    o Consumption of materials, labour and machinery can be recorded and compared with expected figures.

    o This helps you to check date wise consumption of material, Labour etc which is very useful for project

    monitoring.

    Cost Abstract

    o Summery of actual cost. Which can be separated in to total cost,Cost per square meter, Percentage cost and

    Section wise cost.

    o Total cost of construction and unit cost can be arrived. Comparison of Estimates vs. Actual on Material, Labour and Cost

    o This helps you to check item wise consumption of material, Labour etc. which is very useful for management

    decisions and Cost control.

    Contractor's & Subcontractor's Billing

    o Measurement wise bills with previous quantities and payments.

    o Up to date, already billed and balance quantities and payments.

    Labour Billing

    o Additional bills including labour wages etc.

    Purchase Request

    o Material requests from sites by site engineer.

    Purchase Order

    o Compare material requests with estimated quantities and processed for order.

    Reception of Materials

    o Reception of materials on site.

    Data Dictionary

    o Data dictionary is provided for Clients, Contractors, Suppliers,Materials,Labours, Machineries, etc.

    o Mailing labels can be produced.

    Contractor's List

    o Here we can maintain a list of approved contractors and their up to date item rates or labour rates.

    Supplier List

    o Here we can maintain a list of approved suppliers and their up to date price list.

    o It is easy to find various suppliers for a material and their details and rates.

    Pricing

    The cost of Estimator is 99.95 USD($) per licence. The price indicated is excluding the tax & other service charges. Softlogic

    Innovations Pvt. Ltd has the right to change the pricing without notice. Estimator is also available as an ESD(Electronic

    Software Distribution).

    Service and Warranty

    Technical support is offered free through phone and email.

  • 8/4/2019 Profile Estimate

    3/7

    All upgraded releases come to you at a discounted rate. Each software kit Includes the latest version of Estimator2.0,

    Estimator2.0 User Guide, a license agreement, free technical support for one (1) year or 15 support incidents (whichever

    comes first), notification of new and updated products, low cost minor upgrades, and substantially reduced prices for major

    upgrades.

  • 8/4/2019 Profile Estimate

    4/7

    Disclaimer

    CMT Makes every effort to ensure that the information contained in thisprofile is accurate at the clime of printing

    Introduction

    Welcome to CMT

    CMT is a global leader in technical services. we provide best of breed technical &

    business services to the clients spread across the world our service offerings covers wide

    range of civil work ,telecommunication, electrical, electronics, A/c refrigerators,

    computers,Bio medical, Electronics (design & assemble) Road work Renovation & interior

    decoration work.

    GREETINGS FROM THE CEO

  • 8/4/2019 Profile Estimate

    5/7

    CMT is the pioneer company in Pakistan providing services in 24 technologies

    24hours. Our Aim is to solve all the technical problems and save maximum customers

    maintenance budget through CMT experts plans.

    CMT began its voyage in the midst of challenges posed by the ever growing demands

    emanating from the changing environment in the global economy. The trends in the worldseconomy were marked by the phenomena of diversification, relocations, mergers,

    restructuring, outsourcing, ever-increasing product market competition and deregulation of

    markets and the new era of technologies was driving and forcing every nation on the planet to

    innovate, transform and evolve itself to changing conditions. In this emerging scenario,

    organizations were driven to continually improve their performance by reducing costs,

    innovating products and processes, and improving quality, productivity and speed to market

    to compete effectively.

    CMT values integrity, our practices are honest, our conduct is legal and ethical.Although we are motivated by a fair return on our investment, we are always striving for win

    win partnerships with customers who share our desire to design and build memorial

    structures that add values to the communities in which they are built and assist cemetery

    owners in keeping the promise of perpetuity that have made to their lot holders. We will

    ensure that our customers receive real and measurable value from our experience working

    with Private and Government Sectors form around the Pakistan especially in Capital

    Territory.

    Our employees are our most important resource in achieving our mission, and our

    employees and technical experts are our valuable asset. We focus on recruiting, developing

    and retaining employees with the skills and competencies required to maintain a dynamic

    corporate culture driven by the values of quality, innovationed safety. We then provide our

    people with the most effective tools and technologies required to further ensure our

    customers are completely satisfied with every stage of their working partnership with CMT.

    OUR MISSION

    OUR VALUES

    OUR ASSET

    OUR HOPES

  • 8/4/2019 Profile Estimate

    6/7

    CMT hope and believe that this path will lead to excellence, to innovation, to

    adventure, and to the kind of uncertain, gutsy leadership that will allow both our employees

    and our client to realize their aspirations at least and may be a lot more.

    CMT is professionally managed by highly qualified management team with vast

    industry experience and superior leadership skills. We are financially strong from the data of

    inception. CMT have more than 26 high profile engineers and a numbers of diploma holders

    are hare by the company, these experts with exceptional experience in technical filed to solve

    the business critical problems of the clients.

    Our technical expertise and innovation delivers extraordinary results, our unique

    methodology and superior process helps in transforming the clients business to stay

    competitive and to attain the maximum results. We always work closely with the clients to

    understand the clients better and to achieve the objectives of the clients. In short our client is

    everything for us.

    ORGANIZATIONAL STRUCTURE

    CMT always strives to take part in the growth of the society. We strictly comply with

    the local laws of the society in which we con-exist. Our strategy to achieve the objective has

    the social aspects of business deep rooted in it. CMT maintains its activities inline with

    interest of the society.

    As a role model, we are always first in complying with changing demands of the

    society through constant monitoring. We always practice quality in employment that makes it

    WHY CMT

    OUR TEAM

    SOCIAL RESPONSIBILITIES

  • 8/4/2019 Profile Estimate

    7/7

    the world, best place to work. CMT enjoys the benefits and privileges of the society. CMT is

    always committed to give back benefits to the society.

    CMT recognize the importance of environment and its effect on the society. CMT has

    decided to make its future development centers to completely comply with green project

    norms due to the environmental factors. From the beginning, we are committed to eliminatethe usage of non-recyclable materials such as plastic objects, polythene bags and money more

    within our office environment.

    From the date of inception, we are supporting the under privileged sections of the

    society. We promote awareness about a social cause within our organization. CMT

    encourages employees in volunteering their time to support the local community. We also

    make a direct contribution in the form of cash to a charity.

    CMT never compromise on safety.

    SAFETY