18
Machhakuta Coal Block Developer Mahaguj Collieries Limited , a JV of MSPGCL and GSECL Mine Capacity 30MTPA Location Talcher coalfields,Chhendipada,Angul,Orissa Geological Reserve 1400.65 Million Tonnes (considered for executlon-1231.88 MT),Mineable Reserve1170.34 Million tonnes Number of seams 24 Mode of Implementation OC Stripping ratio ( m3 / tonne) 2.5:1 Life of mine 46 years including construction period (2-years) Grade of Coal B/C/D/E/F/G Estimated cost Rs 3400 crores Type of mining Opencast by shovel dumper combination Month of achieving rated capacity - Man Power 2000 (Mine : 1800 & Coal Washery: 200) End Use for power generation at linked power plants at Koradi, Chandrapur, Parli, Paras and Bhusawal in Maharashtra and Ukai and Wanakbori in Gujarat Commercial Production - Approvals and Clearances S. No. Approval Particular Date of Approval 1. Approval of mining plan Accorded profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx 1 of 18 11/1/2012 10:53 AM

Profile Details of Machhaku

Embed Size (px)

DESCRIPTION

coal

Citation preview

Page 1: Profile Details of Machhaku

Machhakuta Coal Block

Developer Mahaguj Collieries Limited , a JV of MSPGCL and GSECL

Mine Capacity 30MTPA

Location Talcher coalfields,Chhendipada,Angul,Orissa

Geological Reserve 1400.65 Million Tonnes (considered for executlon-1231.88 MT),Mineable Reserve1170.34 Million tonnes

Number of seams 24

Mode of Implementation OC

Stripping ratio ( m3 / tonne) 2.5:1

Life of mine 46 years including construction period (2-years)

Grade of Coal B/C/D/E/F/G

Estimated cost Rs 3400 crores

Type of mining Opencast by shovel dumper combination

Month of achieving rated capacity -

Man Power 2000 (Mine : 1800 & Coal Washery: 200)

End Use for power generation at linked power plants at Koradi, Chandrapur, Parli, Paras and Bhusawal in Maharashtra

and Ukai and Wanakbori in Gujarat

Commercial Production -

Approvals and Clearances

S.No.

Approval Particular Date ofApproval

1. Approval of mining plan Accorded

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

1 of 18 11/1/2012 10:53 AM

Page 2: Profile Details of Machhaku

2. Environmental clearance by MOEF yet to be

achieved

3. Forest land clearance from MOEF Yet to be

achieved

Back Ground:

Ministry of Coal (MOC) has allotted Machhakuta coal block on February 6, 2006 to Maharashtra State Power Generation Company Limited (MSPGCL) and

Gujarat State Electricity Corporation Limited (GSECL) for developing an opencast coal mine for power generation at linked power plants at Koradi, Chandrapur,

Parli, Paras and Bhusawal in Maharashtra and Ukai and Wanakbori in Gujarat.Mahaguj Collieries Limited (MGCL), a Joint venture of MSPGCL and GSECL

signed a MOU on December 30, 2005 to extract coal from Machhakuta Coal Block, Talcher Coalfields, Machhakuta, Tehsil Chhendipara, District Angul,

Orissa.The total estimated cost of the integrated project is about Rs. 3400 Crores.

Salient Features of Coal Mine:

Coal Block Area 2043.00-ha

Lease Period 30-years

Ultimate Depth 320-m

Total Over Burden Generation

2926.52 million m3 (External 1-408.70- million m3, Internal -2517.82- million m3)

Upto 7th year only external dumping. From 8th to 16th year OB will be dumped internally as well as externally. Concurrent

backfilling will start from 17th year of operation. From 20th year re-handling of external dump will also start till 39th year of

operation

Total External Dump Area,

Height l and overall slope526.46-ha, 90-m in three stages of 30-m each. Around 26°

Average Seam Gradient 3°-5°

Maximum Bench Height 13-16-m

Bench Width Over Burden: 22-42-m Coal: 22-40- m

Water Requirement for Mine

Operation6800-m3/day excluding 7200-m3/day for Washery

Mine Discharge Till mine discharge Is available, ground water will be used for mining as well as washery projects

Power Requirement and

Source38-MW from Rengali sub-station, GRIDCO (22-km)

Manpower Requirement Total: 2000 (Mine : 1800 & Coal Washery: 200)

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

2 of 18 11/1/2012 10:53 AM

Page 3: Profile Details of Machhaku

Location MAP

Study Area MAP (10-KM Radius)

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

3 of 18 11/1/2012 10:53 AM

Page 4: Profile Details of Machhaku

Locational details:

Particulars Details

Nearest Highway

NH-42(42-km, SE)

SH-63 (2.0-km, E)

Nearest Railway Station Jarpada (20-km), Angul (42-km, SE)

Nearest Air Port Bhubaneswar (250-km, S)

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

4 of 18 11/1/2012 10:53 AM

Page 5: Profile Details of Machhaku

Nearest Major Town Chhendipada (5-km, E)

Reserved / Protected Forest

Debinagar PF (adjacent, S), Chhendipada RF (1.6-km,E),

Kanloi PF (3.0-km, W), Dungapal PF (6.5-km,NW),

Kankurupal RF (7.7-km,ENE), Nunmati PF (7.9-km.NW),

Kosala PF (8.1-km, SE)

National Parks, Wildlife Sanctuaries, Biospheres, Tiger Reserves, Elephant Habitat/Reserves None In 15-km

Water Bodies

Baosajura nala within ML area

Aunli river (2.6-km,NNW)

Gauduni nala (4.3, E)

Nuhurani nadi (5.9,NW)

Batshili / Singhoria nala (7.0-km, SSE)

Tikra river (8.6-km,NNE)

Other Mines or IndustriesChhendipada OCP (0.5-MTPA Capacity) of MCL

(5.0-km.SE)

Socio-Economic Factors

3531-families will be relocated In a phased manner,

compensation will be as per R&R Policy, 2006 of Govt. of

Orissa/National R&R Policy

Details of Machhakuta Coal Block:

Total Project Area and ML

Area

3023.00-ha and 2103.73-ha Approval of the concerned authorities will be obtained for diversion of

forest land and agricultural land as per law

Forest Land 53.0591-ha

N on-Forest Govt Land 321.0496-ha

Total Government Land 374.1087-ha

Total Private Land 2646.6913-ha

Villages In Mine Lease Area Bagadia, Machhakuta, Ghutuilposi, Sapoinali, Basantpur, Podapada, Simllipal and Machhakuta jungle

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

5 of 18 11/1/2012 10:53 AM

Page 6: Profile Details of Machhaku

Co-ordinates of Coal Block

Elevation

21° 06'26" N 21 °04'09"N 84 ° 48' 36" E 84 ° 47' 04"E 21 °03'U"N 21 °05 19" N 84° 50'18 E

84°50'22"E 145-m(NE}-210-m(SW)

Co-ordinates of Coal

Washery

21 ° 02'50" N 84° 49 03" E

21 ° 03' 22" N 84 ° 50' 10 "E (Elevation: 206-m)

Block Boundaries

East Western boundary of Battarani West Block

West New Patrapada Block by Balshi nala /Shagarhia nala

North District road from Chhendipada to Nuagaon and southern boundary of Mahanadi Block

South Surface trace of major fault F1-F1

Present Land Use (ha)

Government Land (Forest & Non-Forest Land) 374.1087

Forest Land 53.0591

Non-Forest Land 321.0496

Private Land 2648.8913

Total Project Area (ha) 3023.0000

Details of Projects Land Requirement (ha):

Particulars Forest Non-Forest Total

Mine Excavation 15.22 2088.12 2103.34

Land required for Safety Zone 0.71 49.86 50.57

External Dumps 14.95 511.51 526.46

Infrastructure including Work Shop, Project Office, Coal

Handling Plant, Railway Corridor22.1791 203.4809 225.66

Coal Washery (30-MTPA Capacity) - 87.00 87.00

Rationalization of Boundaries - 29.97 29.97

Total Project Area (ha) 53.0591 2969.9409 3023.00

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

6 of 18 11/1/2012 10:53 AM

Page 7: Profile Details of Machhaku

Proposed Production Programme:

Year Coal Production (in million tonnes) OB Production (in million m3) Stripping Ratio Cum / tonne

1st - - -

2nd - - -

3rd 2.0 7.54 3.77

4th 7.0 28.73 4.10

5th 14.0 36.84 2.63

6th 22.0 49.60 2.25

7th 30.0 82.15 2.74

8th year to end of Mine Life 1095.34 2721.66 2.49

Total 1170.34 2926.52 2.50

Grade-wise Coal Reserves:

Coal Grade Reserves (Million Tonnes)

B 1.58

C 10.81

D 92.85

E 227.06

F 497.35

G 340.69

Total 1170.34

Flow Sheet - Coal Mining:

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

7 of 18 11/1/2012 10:53 AM

Page 8: Profile Details of Machhaku

Topographical Plan-Mine Lease Area:

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

8 of 18 11/1/2012 10:53 AM

Page 9: Profile Details of Machhaku

Mine Lease Land Use Pattern:

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

9 of 18 11/1/2012 10:53 AM

Page 10: Profile Details of Machhaku

Geological Plan:

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

10 of 18 11/1/2012 10:53 AM

Page 11: Profile Details of Machhaku

Surface Plan of Mine Lease Area:

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

11 of 18 11/1/2012 10:53 AM

Page 12: Profile Details of Machhaku

Final Stage Dump Plan:

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

12 of 18 11/1/2012 10:53 AM

Page 13: Profile Details of Machhaku

Post Mining Landuse Plan:

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

13 of 18 11/1/2012 10:53 AM

Page 14: Profile Details of Machhaku

Coal Washery- Plant Layout:

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

14 of 18 11/1/2012 10:53 AM

Page 15: Profile Details of Machhaku

Process Flow Sheet - Coal Washery:

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

15 of 18 11/1/2012 10:53 AM

Page 16: Profile Details of Machhaku

Salient Feature of Coal Washery:

Total Rated Capacity 30-MTPA (ROM Coal)

Washery Capacity 425 TPH capacity of four parallel circuits of three identical units (each-10-MTPA capacity)

Land Requirement 87-ha (Non-Forest Land)

Capital Cost Rs.265 Crores

Process Wet process comprising crushing, screening, washing and materials handling

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

16 of 18 11/1/2012 10:53 AM

Page 17: Profile Details of Machhaku

Clean Coal 21.6-MTPA (Ash Content: About 32%)

Coal Rejects and Fines 8.4-MTPA (Ash Content: About 60%)

Shifts per day Three

Power Requirement &

Source17 MVA from Rengali sub-station, GRIDCO

Water Requirement 7200-m3/day

Wastewater GenerationWashery wilt be designed with closed water circuit, process water clarified in the thickener/slime ponds & circulated back in

process, zero effluent discharge.

Mode of Transport Coal transportation from CHP to washery by closed belt conveyor and washed coal to end users by rail

Railway Siding 20-km railway track to be laid up to Jarpada station (Angul - Sambalpur)

Washery Process

Raw Coal Receiving, Crushing and Storage Section

Receiving ROM coal through CHP and stocking in two stock yards of 25,000 Tonnes capacity each

Transportation of ROM coal to hoppers (2 no) of 1000 T capacity

Conveying of (-)100 mm raw coal by two parallel belts of 1200-mm width & 1000 TPH capacity each to screen-cum-crusher house to crush below

50-mm size & conveying to washery building

a.

Washery Section

Screening of (-) 50 mm raw coal at 13-mm & washing of 50-13 mm size fraction in two- product electronically controlled jigs to produce clean coal &

rejects

b.

Beneficiation & Recovery of Fines

Separation of coarser fines (-0.5 mm) from slurry in hydrocylones. Dewatering underflow slurry from hydrocylones in high frequency screens

Thickening or overflow slurry from hydrocylones in two 25 m dia thickeners.

Dewatering of thickened slurry in two nos. belt filter press

Recirculation of under & over flow waters from thickener / slime ponds in washery circuit

c.

Loading of Washed Coal

(-13mm) coal fraction and coarser fines will be mixed with & then conveyed to clean coal stock yard

d.

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

17 of 18 11/1/2012 10:53 AM

Page 18: Profile Details of Machhaku

Reclaiming & conveying clean coal from stock pile to loading point through Rapid loading system for dispatch by Rail

Disposal of Rejects

Conveying of rejects to 2 nos. of hoppers of 300 tonne capacity each for onward use in rejects based power plant

e.

profile details of Machhakuta coal block http://www.infraline.com/coal/captive/machhakuta.aspx

18 of 18 11/1/2012 10:53 AM