Products, Case Studies and Resources
MTU ONSITE ENERGY
Jacquelyn Gotreau
International Account Manager
September 30, 2013
MTU Onsite Energy Product OfferingsDIESEL AND GAS SYSTEMS
• Gas Systems for Emergency and Continuous Power 30kw – 400kw
• Natural Gas and LPG Fueled Products
• Standard and Customized System Solutions
• Diesel Systems for Emergency and Continuous Power 30kw –3250kw
• Standard and Highly Customized System
• Certifications include: ICE, UL Listed, IBC/OSHPD and CSA Certification
• Automatic Transfer Switches Emergency Power 40A – 4000A
• Designed for easy service and operation
• Certifications include: ICE, UL Listed, IBC/OSHPD and CSA Certification
Environmental ConcernsAMBIENT CONSIDERATIONS
Dust Natural DisastersTemperature Altitude Corrosive Air
Case StudyVANTAGE DATA CENTER – SANTA CLARA, CA
• Vantage Data Center’s 73,000 square-foot V2 expansion uses six 20V 3,000kW generators for Standby Emergency Power
• Series 4000 generators were selected for superior load acceptance and transient performance
• Enclosures and generators are certified to IBC seismic standards due to the region’s earthquake potential, I=1.5
Case StudyMARSH CREEK LLC – ALASKA, USA
• Outputs from 50kW to 2,500kW serve remote communities and oilfield operations
• Equipment housed in module building-type power plants
• Generator sets power “off the grid” locations
Case StudyROYAL JUBILEE HOSPITAL – VICTORIA, CANADA
• Canada’s first "Pacific Green" hospital reduces fuel consumption, emissions and noise by choosing MTU Onsite Energy generator sets
• Two MTU Onsite Energy 3000kW generator sets were installed in the hospital’s new energy center
• The two 60 Hz units generate 50 percent more power with better fuel economy, fewer emissions and lower decibel output than the four units they replaced
• MTU generator sets certified with IBC Rating
Case StudyRURAL WATER DISTRICT – OKLAHOMA, USA
• Three MTU Onsite Energy 500kW units with DGC 2020 digital controllers at Washington County Rural Water District in Oklahoma
• MTU Onsite Energy generator sets at RWD #3 run in parallel without traditional free-standing switchgear and controls, saving the water district approximately $300,000
• All three generators sit on top of a single 7,500-gallon fuel tank that provides a 72-hour runtime and reduces hassles during refueling
MTU Onsite EnergyPROJECT CENTER
•The MTU Project Center has our full product listings along with the following:
• Technical Articles
• Case Studies
• Software Downloads
• Technical Library
• Tools (including PS-SPEC Power System Sizing & Spec Application)