34
Production Planning and Control - 5 LIST OF ATTEMPTED QUESTIONS AND ANSWERS True/False Question When shop floor scheduling problem larger than 3 machines arise the analytical solution procedures leading to optimality are complex and difficult. Correct Answer True Your Answer True Multiple Choice Multiple Answer Question Total lead time is the summation of following factors :- Correct Answer Queue and transit time , Manufacturing time , Order preparation time Your Answer Manufacturing time , Delay time , Queue and transit time Select The Blank Question Labour efficiency depends upon ________ Correct Answer Training and experience Your Answer Training and experience Select The Blank Question The LOB technique is made more accurate and fast by using ________. Correct Answer Computers Your Answer Log-tables Select The Blank Question

Production Planning and Control-1

Embed Size (px)

DESCRIPTION

Assignment

Citation preview

Page 1: Production Planning and Control-1

Production Planning and Control - 5

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/FalseQuestion When shop floor scheduling problem larger than 3 machines arise the analytical solution procedures leading to optimality are complex and difficult.Correct Answer TrueYour Answer True

Multiple Choice Multiple AnswerQuestion Total lead time is the summation of following factors :-Correct Answer Queue and transit time , Manufacturing time , Order preparation timeYour Answer Manufacturing time , Delay time , Queue and transit time

Select The BlankQuestion Labour efficiency depends upon ________Correct Answer Training and experienceYour Answer Training and experience

Select The BlankQuestion The LOB technique is made more accurate and fast by using ________.Correct Answer ComputersYour Answer Log-tables

Select The BlankQuestion Process plan is the process of establishing the ________ and most economical path that each part is to follow from raw material stage to finished product stage.Correct Answer ShortestYour Answer Optimum

Select The Blank

Page 2: Production Planning and Control-1

Question ________reflects impact of money tied up in inventory.Correct Answer Inventory turnoverYour Answer Inventory turnover

Multiple Choice Multiple AnswerQuestion The check list approach comprises of following parameters :-Correct Answer Each department head concerned with efficiency of PPC function is given a set of questions to be answered. , The department head has to answer in "Yes/no" format only , Each "Yes" answer gives one negative scoreYour Answer Each department head concerned with efficiency of PPC function is given a set of questions to be answered. , The department head has to answer in "Yes/no" format only , Each "Yes" answer gives one negative score

Multiple Choice Single AnswerQuestion In ABC analysis, the classification is based on :-Correct Answer Cumulative costYour Answer Carrying cost

Multiple Choice Single AnswerQuestion Find EOQ in Rs from the following data :-Annual consumption = 20, 000 units, Ordering and receiving cost of material = Rs 20 per order, Annual carrying cost or storage cost = 10% of unit cost of material, Cost of material = Rs 50.Correct Answer 20000Your Answer 10000

Multiple Choice Single AnswerQuestion Spares without which the system will not work are categorized as :-Correct Answer VitalYour Answer Vital

Match The FollowingQuestionCorrect Answer

Page 3: Production Planning and Control-1

Your AnswerOrder quantityFactor influencing process planningFactor influencing process planningMachine capacity chartDimensional accuracySpecial purpose machinesMass productionSpecial purpose machinesGeneral purpose machines with special toolingsStandard elemental time dataCompare alternative processesBreak even analysis

True/FalseQuestion C type items would never be vital under VED analysis.Correct Answer FalseYour Answer False

True/FalseQuestion In replenishment system, the type of ordering is either according to "stock level" or "pre-fixed time scale".Correct Answer TrueYour Answer True

Multiple Choice Multiple AnswerQuestion At company's subsidiary stores /tool crib following tools are stored :-Correct Answer Consumable tools , Inspection fixtures , Instruments and gaugesYour Answer Consumable tools , Inspection fixtures , Instruments and gauges

True/FalseQuestion Exponential smoothening is weighted average method.Correct Answer TrueYour Answer True

Select The BlankQuestion

Page 4: Production Planning and Control-1

The administrative lead time e.g. time involved in processing the order, which may be in periodical review system including the period until next review is called ________ lead time.Correct Answer InternalYour Answer Cumulative

Select The BlankQuestion Heuristics methods involve drawing procedure diagram which indicates the ________ available for transferring tasks laterally from one column to another to arrive at most promising balance.Correct Answer FlexibilityYour Answer Flexibility

Multiple Choice Single AnswerQuestion The light engineering company has one special purpose facing & centering machine And one copying lathe. The foreman has five work orders for processing . The operation Sequence is fixed [ each job is first faced and centered and then copy turned ] . The standard Hours required for each machine to process each work order are shown in the following Table :- Work Order Processing Time [Hours ] Facing & centering machine Copying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to minimize requirements of machine hours.Correct Answer IV-I-II-V-IIIYour Answer II-III-IV-I-V

True/FalseQuestion In PERT, use of dummy activities is not much essential.Correct Answer FalseYour Answer True

True/FalseQuestion The make-or-buy decision is not taken only at starting of a factory but has to be reviewed continuously.Correct Answer TrueYour Answer True

Page 5: Production Planning and Control-1

Select The BlankQuestion Only satisfied customers get in ________ from new customers.Correct Answer BusinessYour Answer Business

Multiple Choice Multiple AnswerQuestion The following are salient features of the fixed order quantity system :-Correct Answer Reorder quantity is always the same which is usually economic order quantity , The time interval between deliveries varies. , Replenishment action is initiated when the stock on hand is just sufficient to meet demand during the lead time.Your Answer Reorder quantity is always the same which is usually economic order quantity , Replenishment action is initiated when the stock on hand is just sufficient to meet demand during the lead time. , Percent cumulative cost of item is taken into consideration.

Match The FollowingQuestionCorrect AnswerYour AnswerTool orderTo instruct tool crib to keep tools readyInstruct to issue toolsMove orderMovement of material from stores to first machineMovement of material from stores to first machineStores issue orderInstruction to stores to issue materialInstruction to stores to issue materialInspection orderReport inspection resultsReport inspection results

Multiple Choice Single AnswerQuestion Responsibility of smooth flow of work through different work centers or departments of company rests with :-Correct Answer Production control departmentYour Answer Production control department

Page 6: Production Planning and Control-1

Select The BlankQuestion ________ is the sum of set up time and run time.Correct Answer Manufacturing timeYour Answer Manufacturing time

Multiple Choice Single AnswerQuestion Detachable ticket, after filling in required information is :-Correct Answer Placed in a tray/boxYour Answer Given to progress section

Multiple Choice Multiple AnswerQuestion Subsidiary orders include :-Correct Answer Material Order , Shop order , Inspection orderYour Answer Material Order , Shop order , Inspection order

Multiple Choice Single AnswerQuestion Long termed forecasts are for the period of :-Correct Answer 5 to 10 yearsYour Answer One year

Multiple Choice Multiple AnswerQuestion If actual demand far exceeds forecast, it will result into :-Correct Answer Better utilization of equipment , Project margin , Higher material purchaseYour Answer Better utilization of equipment , Higher material purchase , Increase in labour productivity

Select The BlankQuestion Classification of items on basis of their capital lock up is called ________ analysis.Correct Answer XYZYour Answer VED

Page 7: Production Planning and Control-1

Multiple Choice Single AnswerQuestion Physical Count method of collecting information from manufacturing shops is applicable in following situation :-Correct Answer Workshops employing few machinesYour Answer Workshops producing small parts in huge quantities

Multiple Choice Multiple AnswerQuestion The expected time can be minimised by minimising following parameters :-Correct Answer Optimistic time , Pessimistic time , Most likely timeYour Answer Pessimistic time , Lead time

Multiple Choice Single AnswerQuestion In order to maintain precedence relationships, the most common approach is to make use of :-Correct Answer Precedence diagramsYour Answer Precedence diagrams

True/FalseQuestion There are five manufacturing systems. However, many manufacturers combines two or more systems to produce a final product.Correct Answer TrueYour Answer True

Multiple Choice Multiple AnswerQuestion HML Analysis helps to :-Correct Answer Access storage & security requirements , Keep control over departmental head level , Determine frequency of stock verificationYour Answer Access storage & security requirements , Determine frequency of stock verification , Controls carrying cost

Multiple Choice Single AnswerQuestion

Page 8: Production Planning and Control-1

The sourcing of vendors in case of 'B' type of items is :-Correct Answer MediumYour Answer Minimum

Select The BlankQuestion Production Planning and Control department acts as a link between company's sales and ________ department.Correct Answer ManufacturingYour Answer Manufacturing

Multiple Choice Multiple AnswerQuestion Move orders, released for material movement from stores to first work center are used for following types of organizations :-Correct Answer Big steel plants , Power plants , Heavy machinery manufacturersYour Answer Big steel plants , Heavy machinery manufacturers , High volume white goods manufacturers

Multiple Choice Multiple AnswerQuestion Smoothing performs following activities:-Correct Answer Reallocation of resources , Improving utilization of resources , Conducting Heuristic approachYour Answer Improving utilization of resources , Conducting Heuristic approach , Conducting Load flow analysis

Select The BlankQuestion ________ phase of PPC makes sure that the programmed production is constantly maintained.Correct Answer ControlYour Answer Control

Multiple Choice Multiple AnswerQuestion Process Sheet contains following information :-Correct Answer Material Specification , Sequence of operation , Skill of Labour

Page 9: Production Planning and Control-1

Your Answer Material Specification , Sequence of operation , Order Quantity

True/FalseQuestion The make-or-buy decision becomes necessary when the current source of supply is not able to supply the material in accordance with buyer's quality requirements.Correct Answer TrueYour Answer True

Multiple Choice Single AnswerQuestion Negative value of critical ratio :-Correct Answer Is meaninglessYour Answer Indicates shortfall in scheduled delivery period

Multiple Choice Multiple AnswerQuestion In linear programming method of line balancing, there are three types of constraints namely :-Correct Answer Cycle time constraint , Step or task constraint , Precedence constraintsYour Answer Cycle time constraint , Step or task constraint , Precedence constraints

Multiple Choice Single AnswerQuestion Let us suppose that activity M & N can not start until activity K & L are completed. Activities K &L are therefore :-Correct Answer PrecedingYour Answer Preceding

True/FalseQuestion XYZ analysis helps to identify few items which account for large amount of money locked up in the stock and take steps for liquidation / reduction.Correct Answer TrueYour Answer False

True/False

Page 10: Production Planning and Control-1

Question Overlapping of operations helps in compressing manufacturing time.Correct Answer TrueYour Answer False

at 4:57 AM 0 comments Links to this post  

Labels: Production Planning and Control (Set-2)

Production Planning and Control - 4

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple AnswerQuestion Purchase cost include :-Correct Answer Excise , Packing and forwarding , OctroiYour Answer Excise , Octroi

True/FalseQuestion Inspection operations is a part of process plan for a part.Correct Answer TrueYour Answer True

Multiple Choice Single AnswerQuestion Why customer is called the king?Correct Answer Customer's orders gives us workYour Answer Customer's orders gives us work

True/FalseQuestion To solve "n jobs - 3 machines" sequencing problem, the largest of time of any job on the second machine must be smaller than or equal to the smallest time of any job on first machine or third machine.Correct Answer TrueYour Answer True

Page 11: Production Planning and Control-1

True/FalseQuestion Line staff can assist PPC by manufacturing some of their needs in their own shops rather than making PPC to tool room or purchase.Correct Answer TrueYour Answer False

Multiple Choice Single AnswerQuestion Ordering of raw material is based on :-Correct Answer Sales forecastYour Answer Material availability

Multiple Choice Multiple AnswerQuestion The queue time is intended to compensate for the time for which the job has to :-Correct Answer Wait near the machines for its turn until other jobs ahead of it are completed. , Lie after its completion till is picked up and moved to next machine/work center. , Spend extra time due to emergent situationsYour Answer Wait near the machines for its turn until other jobs ahead of it are completed. , Lie after its completion till is picked up and moved to next machine/work center. , Wait until inspection and storage is completed.

Multiple Choice Multiple AnswerQuestion In an organization, poor material handling system may result in the following :-Correct Answer Damage to material/product , Delays in supply of material , Accidents while handlingYour Answer Damage to material/product , Delays in supply of material , Accidents while handling

True/FalseQuestion LOB is a manual planning and scheduling technique similar in nature to MRP [Material Resource Planning].Correct Answer TrueYour Answer False

Page 12: Production Planning and Control-1

Multiple Choice Multiple AnswerQuestion Standard time accounts for :-Correct Answer Contingency allowance , Operator's rating/efficiency , Tool change timeYour Answer Contingency allowance , Tool change time , Job splitting time

True/FalseQuestion As per a study on materials management practices, a typical firm spends almost half of its rupee sales on goods purchased from vendors.Correct Answer TrueYour Answer False

Select The BlankQuestion ________ analysis mainly helps to identify non-existing items for which store keeps bin cards, wastes computer memory or wastes computer stationary while preparing stores ledger.Correct Answer MNG AnalysisYour Answer SOS Analysis

Multiple Choice Single AnswerQuestion If more variety is to be manufactured, the manufacturing facilities would have to be :-Correct Answer CommonisedYour Answer Expanded

True/FalseQuestion Work measurement is not useful for choosing between two alternate methods of production.Correct Answer FalseYour Answer False

True/FalseQuestion On completion of work the job card is returned to production planning and

Page 13: Production Planning and Control-1

control department for reference and record.Correct Answer FalseYour Answer True

True/FalseQuestion Curve fitting method of statistical forecasting uses curve line approach.Correct Answer FalseYour Answer True

Select The BlankQuestion ________ is a production line made up of operations that form or change the physical or sometimes chemical characteristics of a product.Correct Answer Fabrication lineYour Answer Assembly line

Multiple Choice Single AnswerQuestion Keeping procurement cost and carrying cost constant, if annual usage of certain product becomes 4 times, the EOQ would be :-Correct Answer DoubledYour Answer Halved

Multiple Choice Single AnswerQuestion LOB technique was devised by US army in the year :-Correct Answer 1952Your Answer 1955

True/FalseQuestion Transit time for manufactured items should be considered only when it is insignificant.Correct Answer FalseYour Answer False

Page 14: Production Planning and Control-1

Multiple Choice Multiple AnswerQuestion 5 jobs are to be processed on machines M1 and M2 , first on M1 and then on M2. The processing times in hours are as follows.Find the sequence for 5 jobs that will minimize total elapsed time .also find idle time & total elapsed time. Job Processing time [ hours ] Machine M1 Machine M2 1 5 2 2 1 6 8 9 7 6 3 8 5 10 4Correct Answer 2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively.Your Answer 2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively.

Multiple Choice Multiple AnswerQuestion SDE analysis is based on problems of procurement namely :-Correct Answer Non-availability , Scarcity , Longer lead timeYour Answer Non-availability , Scarcity , Longer lead time

Multiple Choice Multiple AnswerQuestion In a mass production assembly shop following work measurement techniques are used :-Correct Answer Time study , Work sampling , Production studyYour Answer Time study , Production study , Analytical estimating

Multiple Choice Multiple AnswerQuestion Due to the following emergent events, the queue time has to compensate for the time for which the job has to undergo an extra time :-Correct Answer Tool breakage , Job split up , Change in prioritiesYour Answer Tool breakage , Job split up , Store inventory

Select The BlankQuestion Given the following data :- procurement cost per order = Rs 30 ; frequency of ordering per year =4 ; number of suppliers = 3 . Form the above data, total procurement cost would be Rs ________.Correct Answer 360Your Answer 40

Page 15: Production Planning and Control-1

Multiple Choice Multiple AnswerQuestion In replenishment system, the fixed order quantity system is also called by following names :-Correct Answer Fixed order system , Min-max system , Re-order point systemYour Answer Fixed order system , Min-max system , Re-order point system

Multiple Choice Single AnswerQuestion Given a decision for designing a line layout, major problem is subdividing a work so that smooth flow can result. The subdivision process is called :-Correct Answer Line balancingYour Answer Line balancing

True/FalseQuestion In CPM, use of dummy activities is much essential .Correct Answer FalseYour Answer False

Multiple Choice Multiple AnswerQuestion The commonly used network techniques other than PERT and CPM are as follows :-Correct Answer MOSS [ Multi Operation Scheduling System ] , PCS [ Project Control System ] , GERT [ Graphical Evaluation Review Techniques ]Your Answer MOSS [ Multi Operation Scheduling System ] , PCS [ Project Control System ] , GERT [ Graphical Evaluation Review Techniques ]

Match The FollowingQuestionCorrect AnswerYour AnswerWork elementSmallest portion of work identified during the breakdown analysis of the job.Smallest portion of work identified during the breakdown analysis of the job.Production lineArrangement of workstations where each workman performs a pre-

Page 16: Production Planning and Control-1

determined task on an incomplete unit which passes down the line of subsequent unit until it is finished.Arrangement of workstations where each workman performs a pre-determined task on an incomplete unit which passes down the line of subsequent unit until it is finished.Work StationAssigned location, zone, place or stage in assembly where designated work is performed on part component of product.Assigned location, zone, place or stage in assembly where designated work is performed on part component of product.Station work contentTime required to perform the designated amount of work at a given work station and is obtained by adding up time of work elements allotted to the work station.Time after which a finished product comes off the production line.

Multiple Choice Multiple AnswerQuestion Steps involved in process planning include the following :-Correct Answer Enlist feature influencing selection of manufacturing process , Prepare sequence of basic operation , Write down route sheetYour Answer Prepare sequence of basic operation , Write down route sheet , Indent requirement of tooling and fixtures

Multiple Choice Single AnswerQuestion Effective capacity per period is calculated as :-Correct Answer Multiplication of net capacity with labour efficiencyYour Answer Multiplication of net capacity by utilization index

Select The BlankQuestion Orders with ________ slack time remaining per operation are run first.Correct Answer ShortestYour Answer Longest

Match The FollowingQuestionCorrect AnswerYour AnswerTime taken by each job at each machineProcessing timeJob time

Page 17: Production Planning and Control-1

Time between starting of first job and completion of last jobElapsed timeProcessing timeNumber of stages the job has to passNumber of machinesNumber of machinesTime during which the machine is standstillIdle timeJob priority

Select The BlankQuestion LOB has advantage that it is more ________ oriented than MRP.Correct Answer CustomerYour Answer Practical

Multiple Choice Single AnswerQuestion A company has 10 machines, working in two shifts. Utilization index is 0.75 and shop efficiency is 80%. Effective capacity hours for loading and scheduling are :-Correct Answer 576Your Answer 576

Multiple Choice Single AnswerQuestion The cost involved in subcontracting some of the operations of item outside the home plant is called :-Correct Answer Outside operations costYour Answer Outdoor cost

Multiple Choice Multiple AnswerQuestion LOB deals with :-Correct Answer Identification of crucial operations in a job , Establishment of schedules of crucial operations , Attraction of attention of those who do not conform to the schedule.Your Answer Identification of crucial operations in a job , Establishment of schedules of crucial operations , Attraction of attention of those who do not conform to the schedule.

Page 18: Production Planning and Control-1

Select The BlankQuestion ________items should be excluded from ABC Analysis.Correct Answer Non-movingYour Answer Seasonal

Multiple Choice Single AnswerQuestion To keep facilities busy, waiting time due to non-availability of work should be kept at :-Correct Answer Minimum .Your Answer Minimum .

Multiple Choice Single AnswerQuestion Installed capacity :-Correct Answer Can be equal to or less than licensed capacityYour Answer Can be equal to or less than licensed capacity

Multiple Choice Single AnswerQuestion Scheduling can be considered as a process of :-Correct Answer Fitting shop order into uncommitted time available for a machineYour Answer Determining time required for each operation

Select The BlankQuestion Short term forecasts are for ________.Correct Answer Material PlanningYour Answer Material Planning

Select The BlankQuestion The ________ makes scheduling process simpler but does not provide economy in manufacture.Correct Answer First-come-first scheduledYour Answer First-come-first scheduled

Page 19: Production Planning and Control-1

Select The BlankQuestion Good quality and ________are the two main requirements to secure maximum business from a customer.Correct Answer Competitive ratesYour Answer Competitive rates

Select The BlankQuestion Generally for ________ flow system, Heuristic method is preferred.Correct Answer IntermittentYour Answer Continuous

Multiple Choice Single AnswerQuestion Sequencing helps management to determine the most economical job sequence the one that consumes minimum :-Correct Answer Elapsed timeYour Answer Lead time

at 4:55 AM 0 comments Links to this post  

Labels: Production Planning and Control (Set-2)

Production Planning and Control - 3

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/FalseQuestion Purchase department must keep PPC informed regarding lead time of different items specially where lead times are extended.Correct Answer TrueYour Answer True

True/FalseQuestion In order to complete a project on time, each critical activity need not be completed in time.Correct Answer

Page 20: Production Planning and Control-1

FalseYour Answer False

Select The BlankQuestion Because of uncertainty of activity timings, PERT acquired a shape of ________ model.Correct Answer ProbabilisticYour Answer Probabilistic

True/FalseQuestion Flexibility and product variety are not inter-related with each other.Correct Answer FalseYour Answer False

Multiple Choice Multiple AnswerQuestion The 'G' group of GOLF analysis covers items procurement from Government suppliers such as :-Correct Answer STC , MMTC , Public Sector UndertakingYour Answer STC , MMTC , Public Sector Undertaking

Select The BlankQuestion Buying for C quantities should be made in ________ quantities .Correct Answer LargeYour Answer Small

Select The BlankQuestion Of all the work measurement techniques the most widely used techniques is________.Correct Answer Time studyYour Answer Time study

Multiple Choice Single AnswerQuestion

Page 21: Production Planning and Control-1

Keeping available time per day constant, if the desired production rate per day is to be doubled ,cycle time will be reduced by :-Correct Answer 0.5Your Answer 0.5

Select The BlankQuestion In alternate routing, the delayed job may be routed to a ________ machine where rate of production is faster.Correct Answer CostlierYour Answer New

Multiple Choice Single AnswerQuestion Mass & flow production and process production are categorized under :-Correct Answer Continuous productionYour Answer Continuous production

Multiple Choice Single AnswerQuestion The earliest start time of an activity equals to earliest event time of :-Correct Answer Tail eventYour Answer Head event

Multiple Choice Single AnswerQuestion If efficiency is more, the manufacturing time required for completion of job would be generally :-Correct Answer LessYour Answer Less

Match The FollowingQuestionCorrect AnswerYour AnswerMove orderTransport material from and to required work centersTransport material from and to required work centersMaterials Order

Page 22: Production Planning and Control-1

Allocation of material required in connection with shop orderAllocation of material required in connection with shop orderWork OrderBird's eye view of production programmeOrder from contractor to execute jobProduction OrderReserve material required in connection with sales orderReserve material required in connection with sales order

Multiple Choice Single AnswerQuestion Development of additional vendors/suppliers depends upon :-Correct Answer Sales forecastYour Answer Sales forecast

Multiple Choice Single AnswerQuestion The assignment method is also called as :-Correct Answer Hungarian MethodYour Answer Hungarian Method

Multiple Choice Multiple AnswerQuestion Material control function embraces a following techniques :-Correct Answer Make -or -buy decision , Pareto's analysis , Replenishment systemYour Answer Make -or -buy decision , Replenishment system

Multiple Choice Multiple AnswerQuestion Overtime can be avoided in many ways and they are :-Correct Answer Unrealistic delivery date , Acceptance of too many rush order , Excessive machine breakdownYour Answer Acceptance of too many rush order , Excessive machine breakdown , Insufficient manpower or machines

Select The BlankQuestion Lead time is ________ for different items.Correct Answer DifferentYour Answer

Page 23: Production Planning and Control-1

Different

Multiple Choice Multiple AnswerQuestion The tooling data is prepared in respect of following measuring instruments :-Correct Answer Vernier caliper , Micrometer screw gauge , Strain gaugeYour Answer Vernier caliper , Micrometer screw gauge , Strain gauge

True/FalseQuestion The LOB technique is most appropriate for assembly operations involving number of distinct components.Correct Answer TrueYour Answer True

Select The BlankQuestion If number of work stations is 8 and work content of all stations is 32 , the cycle time would be ________.Correct Answer 4Your Answer 4

Multiple Choice Multiple AnswerQuestion The minimum requirements for application software for line balancing are as follows :-Correct Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows or equivalent operating system.Your Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows or equivalent operating system.

Multiple Choice Multiple AnswerQuestion Detachable Card contain following information :-Correct Answer Quantity produced , Operation , Date of completionYour Answer Quantity produced , Operation , Sequence of operation

Multiple Choice Single Answer

Page 24: Production Planning and Control-1

Question The assembly work content [ Wi ] of the i'th station having n work stations is given by :-Correct Answer å Wi from i=1 to nYour Answer Wi / n

True/FalseQuestion Production Planning and Control makes the supervisor ineffective.Correct Answer TrueYour Answer False

Select The BlankQuestion ________ are grouped so that their total time is preferably equal to or little lesser than the time available each work station.Correct Answer TasksYour Answer Assembly lines

Multiple Choice Single AnswerQuestion The work measurement and time study belong to the following school of management :-Correct Answer Scientific School of managementYour Answer Scientific School of management

Multiple Choice Multiple AnswerQuestion Economic indicator for forecasting fertilizer requirements are :-Correct Answer Land under cultivation , Trends of rainfall , Credit offered by banksYour Answer Land under cultivation , Trends of rainfall , Credit offered by banks

Multiple Choice Single AnswerQuestion As the quantity increases, the procurement cost :-Correct Answer ReducesYour Answer Also increases

Page 25: Production Planning and Control-1

Multiple Choice Multiple AnswerQuestion To minimize total throughout time we are required to minimize :-Correct Answer Queuing , Idle time , InventoryYour Answer Queuing , Idle time

Multiple Choice Multiple AnswerQuestion Following are the factors which influence tool life :-Correct Answer Type of tool , Material it is required to operate upon , Operators efficiencyYour Answer Type of tool , Material it is required to operate upon , Operators efficiency

Multiple Choice Single AnswerQuestion What are the customer's expectation from the supplier?Correct Answer Consistent good quality of productsYour Answer Consistent good quality of products

Multiple Choice Multiple AnswerQuestion While communicating to customer on delays in delivery following information should be given :-Correct Answer Information on identification of job , Reasons for delays , Revised date of deliveryYour Answer Reasons for delays , Revised date of delivery , Derailed production records

Select The BlankQuestion Job production requires ________ capital investment.Correct Answer LowestYour Answer High

Multiple Choice Multiple AnswerQuestion To operate fixed order quantity system, following parameters are required to be fixed:-Correct Answer Minimum stock , Re-order point , Standard reorder quantity

Page 26: Production Planning and Control-1

Your Answer Minimum stock , Re-order point , Breakeven point

Match The FollowingQuestionCorrect AnswerYour AnswerEnd piece allowanceMaterial insufficient to produce one pieceMaterial insufficient to produce one pieceStock allowanceQuantity to meet requirement of sparesQuantity to meet requirement of sparesMachining allowanceExtra material requirementExtra material requirementSpoilage allowanceProcess rejectionProcess rejection

Select The BlankQuestion Work sampling is ________Correct Answer Done at random intervalYour Answer Done continuously without interval

Select The BlankQuestion The information on the nature of tooling required for an item can be obtained from its ________.Correct Answer Route sheetYour Answer Route sheet

Multiple Choice Multiple AnswerQuestion The main characteristics of jobbing production are :-Correct Answer Small production runs , Discontinuous flow of materials , Disproportionate manufacturing cycle timeYour Answer Small production runs , Discontinuous flow of materials , Disproportionate manufacturing cycle time

Multiple Choice Single AnswerQuestion

Page 27: Production Planning and Control-1

Let us suppose that activity P & Q can not start until activity R& S are completed. Activities P &Q are therefore :-Correct Answer SucceedingYour Answer Succeeding

Multiple Choice Single AnswerQuestion Critical ratio equals to one indicates that :-Correct Answer Job is just on schedule and requires to be watched closely.Your Answer Job is just on schedule and requires to be watched closely.

True/FalseQuestion Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation.Correct Answer FalseYour Answer True

True/FalseQuestion Labour efficiency factor is applied after capacity requirement of equipment is calculated.Correct Answer FalseYour Answer True

Select The BlankQuestion ________ is the specific instant of time that marks start and end of activity.Correct Answer EventYour Answer Event

True/FalseQuestion Increase in inventory carrying cost increases EOQ.Correct Answer FalseYour Answer True

Page 28: Production Planning and Control-1

True/FalseQuestion A company where different personnel give conflicting delivery promises need to improve its scheduling and processing function.Correct Answer TrueYour Answer True

True/FalseQuestion A type items are always vital under VED analysis.Correct Answer FalseYour Answer True