14
MTR* advertising Production Guideline Revision 1.1 Updated on 18-Nov-2016

Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

Embed Size (px)

Citation preview

Page 1: Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

MTR* advertising

Production GuidelineRevision 1.1

Updated on 18-Nov-2016

Page 2: Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

1/ Introduction 3

2/ Production Guideline

2.1 Panel Video Production 4

a. General Guideline

b. Creative Guideline

c. File Output Guideline

2.2 Video specification 5

2.3 DPZD Sticker Extension Production 6-8

a. Sticker Extension Production Guideline

Causeway Bay Station

Central Station

b. Sticker & Panel Mismatch Handling 9

2.4 DPZD Floor Sticker Production 10

a. Floor Sticker Production Guideline

2.5 DPZD Bunting Production 11-12

a. Bunting Production Guideline

3/ Censorship and File Delivery 13

4/ One-stop Service Solution 14

Table of Contents

2

Page 3: Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

1. Introduction

Digital Panel Zone Domination (DPZD) is placed at various strategic

locations in MTR System*. They allow motion within the panel and

offer creative flexibility which attracts the attention of MTR

passengers.

Product Features of DPZD:

• 2-3 pairs of HD Plasma Panel located in 2 high traffic stations

• Causeway Bay Station – Times Square, Sogo, Hysan Place

• Central Station – The Landmark, IFC

• Giant 65” panel in pairs to display animated images

• Accommodates animated ads, rotation of multiple visuals and image-flow execution

• Poster extension with bunting and floor vision enhance creative flexibility and domination

impact

Before proceeding to digital production, it is recommended to have a thorough understanding of the

following guidelines and specifications. All booking details should include advertisement duration

and locations and must be confirmed with the JCDecaux Sales Team before action.

3

*MTR System includes Island Line, Tsuen Wan Line, Kwun Tong Line, Tung Chung Line,

Tseung Kwan O Line and Disneyland Resort Line

Page 4: Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

2. Production Guideline

A. General GuidelineA1. The client / agency should provide all media files.

A2. Digital Panel Zone Domination does not accommodate audio support and sound effect.

B. Creative GuidelineB1. Digital Panel Zone Domination consists of 2 or 3 pairs of 65-inch TV panels installed vertically for

advertisement display.

B2. Digital Panel Zone Domination is designed for motion graphics / animation to be presented across

all screens.

B3. Key images such as a talent, a product or a brand displayed across separate panels are not

acceptable except background image.

B4. TVC is acceptable only when clause B3 and is conformed.

B5. Video should be displayed in full screen mode only.

B6. Strong light, flashing, sparking or rapid movement of image effect in the creative, visuals or image-

flow execution should be avoided.

B7. Digital Panel is designed for video, animation and image-flow presentation. All static images,

neither partial nor full visuals that compose the overall advertisement, are not accepted. Static

image is defined as any visual displayed at the same location on a single panel without any

movement for 2 seconds or above.

B8. Special visual which simulate technical failure (e.g. Snowy visual effect, signal lost) and may

mislead / irritate the audience should be avoided.

B9. Three different Panel Arrangements / Creative need to be submitted for each campaign.

C. File Output GuidelineC1 If the output file(s) consist more than one part or create in a self-looped format, a transition effect

in between each file conjunction is recommended for ease transition.

D2. Recommend to submit native HD file. Conversion from low-resolution sources to HD format should

be avoided. Cropping and enlarging video file should be avoided.

D3. It is recommended to round up the duration of all video files in second (1 second is equivalent to

25fps (e.g. 7 sec in 25 fps frame rate setting, the video duration should be 175 frames).

D4. Media file should be encoded by Adobe Premiere or Windows Expression Encoder 4.

The above guidelines are subject to change by JCDecaux Transport due to changes of the guidelines

from the MTR. For details, please refer to the Terms and Conditions from all our current rate cards and

sales materials. All the artwork and displays are subject to final approval and confirmation from the MTR

before posting.

4

2.1 Panel Video Production

Panel Production Guideline

Page 5: Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

Video Format:

Windows Media

Codec ID: Windows Media Video 9 (WMV9)

comply with main profile (MP) levels in VC-1 specification

Resolution: 1,080 x 1,920 Pixels

Bit Rate:

8,000 kbps (min.) - 9,000 kbps (max.)

(Including audio effects) in Variable Bitrates Mode

* Bitrates Value and mode may subject to modification based on the trial result for

optimized performance and visual quality

Remarks: a. Frame Rate: 25 fps

b. Code ID is WMV3.

c. Media file should be Encoded by Adobe Premiere or

Windows Expression Encoder 4 #1,2

#1 Higher version or compatible versions generated by other Windows Expression

Encoder is not be accepted#2 The media file encoded by encoder other than Windows Expression Encoder 4

is not recommended even if the encoder is designed by Microsoft.

2. Production Guideline2.2 Panel Video Production

Video Specification

5

Page 6: Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

2. Production Guideline

6

2.3 DPZD Sticker Extension Production

a. Sticker Extension Production Guideline

Location: Causeway Bay Station

Site: Jardine’s Crescent (Exit F)

Sticker extension needs to cover the right corner of VE panel

Digital Panel Sticker

Wall Skirting

1A 1B 1C 1D 1E 1F

Page 7: Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

2. Production Guideline

7

2.3 DPZD Sticker Extension Production

a. Sticker Extension Production Guideline

Location: Central Station

Site: Platform up to St. George’s Building (Exit F)

Digital Panel Sticker

Wall Skirting

Sticker extension need to cover the left corner of VE panel only.

NO sticker extension is needed for Right corner of VE panel.

1A 1B 1C 1D

Page 8: Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

2. Production Guideline

8

2.3 DPZD Sticker Extension Production

a. Sticker Extension Production Guideline

For the dimension of Digital Panel Zone Domination Sticker Extension, onsite

inspection and measurement are compulsory for contractor before installation.

Protection measures must be applied by contractor on the panels before

sticker installation.

Special attention should be given when die-cutting the sticker for the TV panel.

No scratch mark is accepted or the contractor will be subject to penalty.

Protection measures must

be applied

For details of the Site Inspection & Measurement, Method Statement,

Installation & Removal of Sticker Extension, please refer to “MTR Feature Ads

Installation Guideline for Contractor”

Page 9: Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

2. Production Guideline

9

2.3 DPZD Sticker Extension Production

b. Sticker & Panel Mismatch Handling

To ensure DPZD panel videos match with the sticker extension,

Production House shall arrange a site inspection on the launch day

and send the revised video file (if any) for the mismatched panel to

JCDecaux for rectification.

Matched Mismatched

Sticker

Extension

Panel

Page 10: Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

2. Production Guideline

10

2.4 DPZD Floor Sticker Production

a. Floor Sticker Production Guideline

All the tactile guide path shall leave 450mm clearance space

For details of the Site Inspection & Measurement, Method Statement, Installation &

Removal of DP Zone Domination Floor Sticker, please refer to “MTR Feature Ads

Installation Guideline for Contractor”

Page 11: Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

2. Production Guideline

11

2.5 DPZD Bunting Production

a. Bunting Production Guideline

Headroom clearance 2350mm/H

Bunting should not block MTR signage, Ventilation shaft, CCTV or Smoke

detector. (clearance space, 6m is recommended).

MTR will assess the weight of the bunting and confirm if the bunting can be

hanged on ceiling sub frame or otherwise anchor bolt fixing is required.

False Ceiling shall not be the fixing point(s) or supporting point(s) for any Feature

Ads installation unless written approval is received.

A Maximum number of 3 buntings can be installed on the specification location for

Causeway Bay Digital Panel Zone, stated as below:

For details of the Site Inspection & Measurement, Method Statement,

Installation & Removal of DP Zone Domination Buntings, please refer to “MTR

Feature Ads Installation Guideline for Contractor”

Causeway Bay Digital Panel Zone

Page 12: Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

2. Production Guideline

12

2.5 DPZD Bunting Production

a. Bunting Production Guideline

A Maximum number of 14 buntings can be installed on the specification location

for Central Digital Panel Zone, stated as below:

Central Digital Panel Zone

Page 13: Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

3. Censorship and File Delivery3.1 Censorship

Artwork must be submitted for approval and processing by JCDecaux Transport and OFNAA 12 working days

prior to commencement. No advertising material can be posted in the MTR station without artwork approval.

Late submission of artwork may result in delay of posting and forfeit of display time which the advertiser and/ or

its advertising agency will bear full responsibility. JCDecaux Transport will not be responsible for any resultant

delay.

Please send the finished artwork in CD/ DVD-ROM or via ftp to:

Ms. Winki Chow(Senior Traffic Officer)

JCDecaux Transport

14/F, Oxford House, TaiKoo Place, 979 King’s Road, Quarry Bay, Hong Kong

Email: [email protected]

Direct line: 2862 7295

* Output file for onsite trial is set of video based on the finalized & approved creative. Files are used for technical trial and

onsite actual deployment prior campaign launch.

# Final Output file is set of video with minor fine tuning / necessary modification based on the trial result and technical advise

Important Deadlines

Video submission for censorship - 12 days prior to campaign start date

Output file submission for onsite trial – 10 days prior to campaign start date

Final output file submission - 3 days prior to campaign start date

Submission deadline for the above material is set by 15:00 of each specified date.

For submission after 15:00 in the same day, material will be considered as submitted on the next working day.

On-site inspection for

POW & Panels

mismatch

Final Output file

submission#

On Air

Week 3Working Day 0Working Day 1Working Day 2

Working Day 3

Week 3

POW Color Test

** DPZD Trial booking subjected to campaign censorship progress and

MTR maintenance schedule**

DPZD Trial

Week 2Working Day 4Working Day 5Working Day 6Working Day 7

Working Day 8

Week 2

Video censorship

submission for

OFNAA

Week 1Working Day 9Working Day 10Working Day 11Working Day 12Week 1

Submission of bunting

fixing statement, floor

sticker and POW layout

SatFriThuWedTueMonSun

13

Output file

Submission for

Onsite trial*

Page 14: Production Guideline - JCDecaux- · PDF fileFloor Sticker Production Guideline ... JCDecaux for rectification. Matched Mismatched Sticker ... Method Statement,

4. One-stop Service Solution

14

Our “One-stop Solution” offers recommendations on the creative and production to client

who have limited knowledge in developing creative for Digital Panel Zone. Additional

services such as photography, video shooting and 3D rendering for source materials can be

provided upon request.

All the above services are subject to a separate quotation and will be considered on a case

by case basis.

If you have any queries, please do not hesitate to contact:

Mr. Mario So – Technical Enquiry

Assistant Manager, Digital & Innovate

Email: [email protected]

Direct line: 3960 3310

Ms. Ivy Wong – Production Enquiry

Senior Digital Production Officer

Email: [email protected]

Direct line: 3960 3300

Ms. Winki Chow – Censorship and File Delivery

Senior Traffic Officer

Email: [email protected]

Direct line: 2862 7295

JCDecaux Transport

14/F, Oxford House, TaiKoo Place, 979 King’s Road, Quarry Bay, Hong Kong