Product Profile: Product Profile: Skid Mounted Assemblies
Split of ScopeSplit of ScopeDescription Client BEV
Design, sizing, skid layout including piping, E&I √Detailed engineering of piping, structural skid frame √e a ed e g ee g o p p g, s uc u a s d a e √Procurement of piping, structural sections, E&I bulks, insulation √Procurement of manual valves, E&I catalogue items (e.g., JBs, Transmitters, Switches, Gauges etc.) √Procurement of special items such as flow meters, control l d l ( d ) √valves, actuated valves (motorised / pneumatic), non
catalogue items
√
Skid frame fabrication, piping: fabrication, hydro test,process cleaning painting assembling on skid leak test √process cleaning, painting, assembling on skid, leak test, installation of vessels and equipment, E&I installation, insulation, mechanical completion
Split of ScopeSplit of ScopeDescription Client BEV
√E&I loop checks, dry simulation of power / air operated items √Function Testing of complete skid (under supervision of client) √of client)
Dismantling for transportation (if any), packing, nitrogen blanketing, load out on trailer √PED C tifi ti √PED Certification:Fabrication and Assembly under NoBo (e.g., Mod. B1+F certification)
√
Design detailed engg procurement fabrication √Design, detailed engg, procurement, fabrication, testing & certification of vessels & heat exchangers on skid: U Stamp / PED Mod. H1 or H / AD 2000 HP0
√
O N BOur NoBoHartford Steam Boilers, UK
Skids Done So FarSkids Done So Far
Cli t T f kid Qt W k V lClient Type of skid Qty Work Volume
Gas / Oil / Condensate Daniel MeasurementSolutions
Gas / Oil / Condensate Filtration, Pressure Reduction & Metering
42 Skids
18,000 DiaInch
Solutions Skids
UOP PSA Piping & Valve Skid 1 1 512 Dia InchHoneywell PSA Piping & Valve Skid Skid 1,512 Dia Inch
d l k d 1 hLinde AG PSA Piping & Valve Skid 1 Skid 3,020 Dia Inch
Project ManagementProject ManagementPiping, Structural Sections, E&I Bulk Items, E&I Catalogue p g, , , gItems, Mech Valves, Insulation etc.
G t M t i l I d t / Generate Material Take Off Generate Material Indents / TDCs
Solicit Quotes from suppliers in Approved
Suppliers List
Evaluate Quotes, Place Purchase Orders pp
Expediting, Inspection befd t h l Receive goodsdespatch release g
Project ManagementProject ManagementPiping, Structural Sections, E&I Bulk Items, E&I Catalogue p g, , , gItems, Mech Valves, Insulation etc.
G d A t R l Inward Goods Inspection Goods Acceptance, Release for production
Fabrication of Pipe SpoolsFabrication of Skid Frame
NDE / Testing
Project ManagementProject ManagementPiping, Structural Sections, E&I Bulk Items, E&I Catalogue p g, , , gItems, Mech Valves, Insulation etc.
I t l Cl i f i Hydro test of pipe spools Internal Cleaning of pipe spools
Grit Blasting & Painting of pipe spools
Painting of Skid Frame, Supports, Stands etc.
Assembly of piping and Assembly of piping and equipment on skid
Project ManagementProject ManagementPiping, Structural Sections, E&I Bulk Items, E&I Catalogue p g, , , gItems, Mech Valves, Insulation etc.
E&I I t ll ti f JB E&I C bli (P / Si l E&I Installation of JBs, Instrument Stands
E&I Cabling (Power / Signal / Earthing)
Cable Terminations, Meggering / Continuity
Checks
Impulse Tubing, Terminations
E&I L h k L k T f l kidE&I Loop checks Leak Test of complete skid
Project ManagementProject ManagementPiping, Structural Sections, E&I Bulk Items, E&I Catalogue p g, , , gItems, Mech Valves, Insulation etc.
F ti T t f C l t Insulation (H/C/P)Function Tests of Complete Skid
Final Inspection / Punch Clearance
R l f D hRelease for Despatch
Photo GalleryPhoto Gallery
Photo GalleryPhoto Gallery
Photo GalleryPhoto Gallery
Photo GalleryPhoto Gallery
Photo GalleryPhoto Gallery
Photo GalleryPhoto Gallery
Thank youyIch danke Ihnen sehr für Ihre
Zeit