IM-A-SMA_Addendum_ID-53-1631_0 (Jan 2012) Introduction Three switches (SW5, SW6, and SW7), located on the "Input / Output" circuit board, see second photo, page 2 of this addendum, conduct sufficient current to require routine preventive maintenance. These switches, due to unusual atmospheric exposure, can develop low internal contact resistance. Contact resistance can cause heat build-up, which in turn reduces switch life. Routine exercising of the switch keeps the contacts clean and resistance free. : Maintenance Procedure : Maintenance Interval : Six months and/or when the unit is Out of Service. Tools required The three switches are easily identifiable (second photo, page 2). : Small screwdriver Remove power to unit. Verify zero voltage on L & N (Line & Neutral) in the Main Termination Chamber. Refer to first photo, page 2 of this addendum for L1 & L2 location. Note the switch positions 110 vs. 220 prior to maintenance in order to re-set properly later. Rotate "cycle" switches "Back and Forth" between 110 and 220 positions, (3) times. Re-set switches to their original required settings, (i.e. 110 or 220). Procedure completed Note (reference table 6-1, page 6-4 of manual). : Initial power up, subsequent to this procedure, must include a check of the flange block temperature and duty cycle, Product Instruction Addendum to Manual No. E65-76, Section 9-2 Smart Analyzer 90 - Type SMA Preventive Maintenance

Product Instruction Addendum to Manual No. E65-76, Section 9 -2 … · 2018-05-10 · Product Instruction Addendum to Manual No. E65-76, Section 9 -2 . Smart Analyzer 90 - Type SMA

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Product Instruction Addendum to Manual No. E65-76, Section 9 -2 … · 2018-05-10 · Product Instruction Addendum to Manual No. E65-76, Section 9 -2 . Smart Analyzer 90 - Type SMA

IM-A-SMA_Addendum_ID-53-1631_0 (Jan 2012)

Introduction

Three switches (SW5, SW6, and SW7), located on the "Input / Output" circuit board, see second photo, page 2 of this addendum, conduct sufficient current to require routine preventive maintenance. These switches, due to unusual atmospheric exposure, can develop low internal contact resistance. Contact resistance can cause heat build-up, which in turn reduces switch life. Routine exercising of the switch keeps the contacts clean and resistance free.

:

Maintenance Procedure:

Maintenance Interval: Six months and/or when the unit is Out of Service.

Tools required

The three switches are easily identifiable (second photo, page 2).

: Small screwdriver

Remove power to unit.

Verify zero voltage on L & N (Line & Neutral) in the Main Termination Chamber.

Refer to first photo, page 2 of this addendum for L1 & L2 location.

Note the switch positions 110 vs. 220 prior to maintenance in order to re-set properly later.

Rotate "cycle" switches "Back and Forth" between 110 and 220 positions, (3) times.

Re-set switches to their original required settings, (i.e. 110 or 220).

Procedure completed

Note

(reference table 6-1, page 6-4 of manual).

: Initial power up, subsequent to this procedure, must include a check of the flange block temperature and duty cycle,

Product Instruction Addendum to Manual No. E65-76, Section 9-2

Smart Analyzer 90 - Type SMA Preventive Maintenance

Page 2: Product Instruction Addendum to Manual No. E65-76, Section 9 -2 … · 2018-05-10 · Product Instruction Addendum to Manual No. E65-76, Section 9 -2 . Smart Analyzer 90 - Type SMA

IM-A-SMA_Addendum_ID-53-1631_0 (Jan 2012)

Product Instruction Addendum to Manual No. E65-76, Section 9-2

Page 2 of 2

______________________________________________________

L1 & L2 located in terminal chamber

SW5, SW6, SW7 location