EL-MF877-00 Page 1
Template Revision B
PSG instructions for this template are available at EL-MF877-01
Product End-of-Life Disassembly Instructions Product Category: Notebooks and Tablet PCs
Marketing Name / Model [List multiple models if applicable.]
HP ProBook 6460b Notebook PC
Name / Model #2
Name / Model #3
Name / Model #4
Name / Model #5
Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
1.0 Items Requiring Selective Treatment
1.1 Items listed below are classified as requiring selective treatment. 1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as applicable.
Item Description Notes
Quantity of items included in product
Printed Circuit Boards (PCB) or Printed Circuit Assemblies (PCA)
With a surface greater than 10 sq cm
6
Batteries All types including standard alkaline and lithium coin or button style batteries
2
Mercury-containing components For example, mercury in lamps, display backlights, scanner lamps, switches, batteries
0
Liquid Crystal Displays (LCD) with a surface greater than 100 sq cm
Includes background illuminated displays with gas discharge lamps
1
Cathode Ray Tubes (CRT) 0
Capacitors / condensers (Containing PCB/PCT) 0
Electrolytic Capacitors / Condensers measuring greater than 2.5 cm in diameter or height
0
External electrical cables and cords 0
Gas Discharge Lamps 0
Plastics containing Brominated Flame Retardants weighing > 25 grams (not including PCBs or PCAs already listed as a separate item above)
0
Components and parts containing toner and ink, including liquids, semi-liquids (gel/paste) and toner
Include the cartridges, print heads, tubes, vent chambers, and service stations.
0
Components and waste containing asbestos 0
EL-MF877-00 Page 2
Template Revision B
PSG instructions for this template are available at EL-MF877-01
Components, parts and materials containing refractory ceramic fibers
0
Components, parts and materials containing radioactive substances
0
2.0 Tools Required
List the type and size of the tools that would typically be used to disassemble the product to a point where components and materials requiring selective treatment can be removed.
Tool Description Tool Size (if applicable)
Description #1 Cross head of screwdriver
Description #2 TORX T8 (2.31mm)
Description #3
Description #4
Description #5
3.0 Product Disassembly Process
3.1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment:
1. Follow steps described in Disassembly instruction (file attached) 2. If parts can be removed without using a tool, remove it first. 3. Use correct screwdriver and torque value before unlock the screw. 4. 5. 6. 7. 8.
3.2 Optional Graphic. If the disassembly process is complex, insert a graphic illustration below to identify the items contained in the product that require selective treatment (with descriptions and arrows identifying locations).
MANUFACTURING PROCESS INSTRUCTIONS
MECHANICAL ASSEMBLY
0.10
Station Version Station Version Station Version Station Version Station Version Station Version
1 0.10 11 0.10 21 0.10 31 0.10 41 0.10
2 0.10 12 0.10 22 0.10 32 0.10 42 0.10
3 0.10 13 0.10 23 0.10 33 0.10 43 0.10
4 0.10 14 0.10 24 0.10 34 0.10 44 0.10
5 0.10 15 0.10 25 0.10 35 0.10 45 0.10
6 0.10 16 0.10 26 0.10 36 0.10 46 0.10
7 0.10 17 0.10 27 0.10 37 0.10 47 0.10
8 0.10 18 0.10 28 0.10 38 0.10 48 0.10
9 0.10 19 0.10 29 0.10 39 0.10 49 0.10
10 0.10 20 0.10 30 0.10 40 0.10
Station Ver.
ALL 0.1*
Revision:
Date: 2011/1/30 Page: 1 of 47
Written by:
Sub-assembly name: CT11 FA DIS ASS'Y B SOP
Document No.: CT11 FA DIS ASS'Y B SOP
Date Content Design
A.Current station version list:
B.Version Modify list:
牟世芹
2011/1/30 首份DIS SOP制作 Jin,Benny
审核: 制表: 牟世芹
MODEL : CT11
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble battery
1. Fetch battery from groove .Pull safe lock to left end ,make it unlocked(figure1)。
1(1/1)
0.10 2011/01/30
Security lock
figure1
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble Cover
1. Poke at cover Knob to right end ,disassemble it
2(1/1)
0.10 2011/01/30
Poke at cover Knob to left end and tighten it
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Pull down fan screw
1. Pull down fan screws * 2.
2. Pull down fan cable from M/B and fetch fan;
Torque:2.0 ± 0.2 Kgf.cm
3(1/1)
十字电动起子(1#) 1
0.10
1
2
gasket
2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Unlock Lower shell K/B screw
1. K/B SET screws * 3。 Torque:2.0 ± 0.2 Kgf.cm
Screw can’t strip and idle running,
Don’t allow the screw to fall inside machine.
4(1/1)
Electric cross screw driver(1#) 1
0.10
2
1
3
2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble Keyboard
1.Disassemble K/B all groove around and bosom
5(1/1)
0.10
图一
2011/01/30
figure1
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Pull down FFC
1. . Pull down insert K/B FPC in MB CNTR , picture 2 3 4.
K/B FPC need to pre-fold if not (figure4)
2.Pull down stick point FFC from K/B(figure1). For 4key button Top Case need to pull down FFC,
2key have no FFC
6(1/1)
0.10
图一
图四
2011/01/30
Pre-fold FFC
figure1
figure2
figure3
figure4
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Turn machine
1. Turn machine and open
7(1/1)
0.10
图一
2011/01/30
figure1
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble HDD and unlock screw
1.Unlock HDD SET *3.
Torque:2.0 ± 0.2 Kgf.cm
Screw can’t strip and idle running,
Don’t allow the screw to fall inside machine.
2.Fetch the label from HDD.
8(1/1)
十字电动起子 (0#) 1
0.10
1
2
3Fetch
2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Unlock screws
1. Unlock thermal SET screws 2 grains Torque:1.5 ± 0.2 kgf. cm
Screw can’t strip and idle running
9(1/1)
Electric cross screw driver(1#) 1
0.10 2011/01/30
Intel DIS 6043B0090001THERMAL MODULE,HURON RIVER,DISCRETE,45.0W,15.0W,CHIPSET DOWNWARD
Intel DIS
SIM card 1
figure1
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Unlock screws
1. Lock thermal SETscrews4grains Torque:2.0 ± 0.2 Kgf.cm
screws can’t be stripped and idle running, can’t drop in units.
10(1/1)
Electric cross screw driver(1#) 1
0.10 2011/01/30
Intel DIS 6043B0090001THERMAL MODULE,HURON RIVER,DISCRETE,45.0W,15.0W,CHIPSET DOWNWARD
Intel UMA6043B0090101
THERMAL MODULE,HURON RIVER,UMA,45.0W,CHIPSET DOWNWARD
AMD UMA 6043B0093401THERMAL MODULE,HURON RIVER,UMA,CHIPSET DOWNWARD
1
2
3
4 2
3
4
1
1 3
4 2
Intel UMA
AMD UMA
Intel DIS
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble CPU
1. Fetch Mylar from CPU (picture 2 3)Intel model Mylar material No: 6054B0944401AMD model Mylar material No :6054B0968001
2. Unlock scow and disassemble CPU from CPU SOCKET .
(Unlock and enclose counterclockwise
ONLY FOR INTEL 4core和 AMD all models, INTEL 2core not paste
3. Take CPU used the vacuum suction pen.
11(1/1)
One-line screw driver 1
Suction pen 1
Ion fan 1
0.10
图二
AMD model
triangle
figure2
Intel model
trianglefigure1
Four core
Double core
2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble WWAN Cable
1. Disassemble WWAN Cable * 2。(figure3)
Five pairs line MAIN , six pairs line AUX
12(1/1)
Routing chopstick 1
0.10 2011/01/30
figure3
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble WWAN card
13(1/1)
Electric cross screw driver(#0) 1
0.10 2011/01/30
1. Unlock screws (6052A0004501) * 2 Torque:2.0± 0.2Kgf.cm Screw can’t strip and idle running
no WLAN no station2.Disassemble WWAN card on M/B。3.Fetch label from WWAN card
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble WLAN Cable
1. Disassemble WLAN Cable*2(1fix black cable;2 fix white cable)
14(1/1)
Routing Chopstick 1
0.10 2011/01/30
CN0
CN1
CN2
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble WLAN card
1. Unlock screws (6052A0004501) * 2, torque:1.5 ± 0.2 kgf. cm Screw can’t strip and idle running
no WLAN need not the station
2. Disassemble WLAN card on M/B。
3. Fetch label from WLAN
15(1/1)
Electric cross screw driver(#0) 1
0.10 2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble HDD and unlock screws
1. . Unlock HDD SET screws * 3。 Torque:2.0 ± 0.2 Kgf.cm
Screw can’t strip and idle running .
allow the screw to fall inside machine.
2. Disassemble HDD from HDD groove of BTCB 3. Fetch label from HDD
16(1/1)
Electric cross screw driver(0#) 1
0.10
1
2
3stuff
2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble HDD
1. Disassemble HDD from HDD Bracket(6053B0665601), unlock screws (6052B0131801) * 4 on fixture
Torque:2.5 ± 0.2 Kgf.cm
Screw can’t strip and idle running , not drop into machine。
17(1/1)
Electric cross screw driver(1#) 1
screw provider 1
assemble HDD fixture 1
0.10 2011/01/30
figure1
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
1. Unlock screws (6052A0004501) * 3。
Torque:1.0 ± 0.2 Kg/cm
Screw can’t strip and idle running
Tighten screw by flowing water line
Disassemble Modem
Electric cross screw driver (0#) 1
18(1/1)
0.10
1
2
2011/01/30
3
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
1. Disassemble Modem from M/B.
label need to fold opposite and paste on Modem
2 . Fetch label from Modem.(figure 1)
Disassemble Modem
19(1/1)
0.10 2011/01/30
figure1
figure2
figure4figure3
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble Bluetooth
1. Pull down BT cable CNTR and bond M/B
2. Pull down Bluetooth and bond Cable(6017B0290301)
20(1/1)
0.10
INSERT CNTR
Bluetooth iron out
2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Unlock BTCB Screws
1.Unlock BTCB screw (6052B0067802) X1
1 NO. screw hole
Torque:1.0 ± 0.2 Kg/cm
Screw can’t strip and idle running 。
2. Unlock BTCB screw (6052A0004501) X2
2 3 NO. screw hole
Torque:1.0 ± 0.2 Kg/cm
Screw can’t strip and idle running 。
21(1/1)
0.10
如图一
123figure1
Electric cross screw driver 1
2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Unlock Hinge screw
1. Unlock Hinge screw (6052B0155201) X4
Torque:2.5 ± 0.2 Kg/cm
Screw can’t strip and be idle running 。
22(1/1)
0.10 2011/01/30
Electric plum blossom screw driver T8) 1
Support fixture 1
2
3
1
4
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Unlock Hinge screw
1. Tighten Hinge screw (6052B0155201) X4
Torque:2.5 ± 0.2 Kg/cm
Screw can’t strip and idle running 。
23(1/1)
0.10 2011/01/30
Electric plum blossom screw driver T8) 1
Support fixture 1
2
3
1
4
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Unlock BTCB screw
1.Unlock BTCB screws (6052B0155201) X4Torque:2.0± 0.2Kgf.cm Screw can’t strip and idle running
lock according to water line
24(1/1)
0.10
1
2
3
4
图一
2011/01/30
Electric plum blossom screw driver T8) 1
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Unlock BTCB screw
1. Unlock BTCB screws (6052B0155201) X4Torque:2.0± 0.2Kgf.cm Screw can’t strip and idle running
lock according to water line
25(1/1)
0.10
1
2
3
4
Electric plum blossom screw driver T8) 1
2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Unlock screws (For HDD Cradle models)
For HDD Cradle model
1. Unlock screws (6052B0131801)*4Torque:2.0± 0.2Kgf.cm Screw can’t strip and idle running
26(1/1)
Electric cross screw driver(1#) 1
0.10 2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble ODD and unlock screw
For HDD Cradle model as figure2 shows
1. Unlock SET screw*1 Torque:2.0 ± 0.2 Kgf.cm
Screw can’t strip and idle running
2. take HDD Cradle and pull out ODD groove
3. Take HDD Cradle, fetch nine compounded one label
For ODD model as figure1 shows
1. Unlock ODD SET screw *1 Torque:2.0 ± 0.2 Kgf.cm
Screw can’t strip and idle running2. Disassemble ODD and pull out ODD groove
3. Take ODD and fetch nine compounded one label.
27(1/1)
Electric cross screw driver(1#) 1
0.10 2011/01/30
figure1 figure2
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Unlock BTCB screw and fetch SPK CNTR
1. Fetch speaker CNTR from M/B,.2. Unlock ODD screws (6052B0101901)*2 Torque:2.0± 0.2Kgf.cm Screw can’t strip and idle running
28(1/1)
Electric cross screw driver (1#) 1
0.10 2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble BTCB
1. Disassemble BTCB , first disassemble left
angle ,picture1。
29(1/1)
0.10 2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
1. (For F/P model)Pull down F/P FFC (figure1)
Pull down F/P FFC 0.10 2011/01/30
30(1/1)
figure1
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble DDR
1. Disassemble all DDR on M/B
31(1/3)
0.10 2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Notice for take DDR
1. . Every time they can also take place 1PCS RAM, taking place at the time, can pinch your fingers on both sides of RAM, such as Figure 1.
31(2/3)
GOODfigure1
0.10 2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Notes to fetch DDR
1. RAM must be disassembled pinch with your fingers on both sides of the Finger. Tilted 45 degrees onto CNTR (Figure 1), so that unclamp SLOTRAM, can also be pulled with both hands tight to the inside (Figure 2).
31(3/3)
figure1
figure2
GOOD
GOOD
0.10 2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble Hall sensor /B
1,Disassemble Hall sensor Board from TPCB , as figure
2.Pull down acetic tape (6054A0076201)*1 from FFC
32(1/1)
0.10
圖一
2011/01/30
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble line
1.Insert Hall sensor/B FFC in CNTR
2 Assemble all lines in groove
33(1/1)
0.10 2011/01/30
FFC 90 degree angle
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble LCM cable and camera cable
1.Pull down LCM cable , disassemble it from the slot
2. Pull down camera cable
34(1/1)
0.10 2011/01/30
GOOD NG
figure2
figure1
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
1, Unlock screws (6052B0101901) * 2。Picture 1 Torque:2.0± 0.2Kgf.cm Screw can’t strip and idle running
Unlock them in line order
2.Pull down battery (picture2)
Disassemble little battery and unlock screws
35(1/1)
0.10 2011/01/30
12
Electric cross screw driver (1#) 1
figure1 figure2
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
1 . Unlock screws(6052A0004501)*1(picture3 )
Torque:1.0± 0.2Kgf.cm
2. Pull down orientation pole from M/B
3. Pull down Audio jack hole
Disassemble MB
36(1/1)
0.10 2011/01/30
圖二
1394 position
Audio jack
figure1
figure2
Electric cross screw driver(0#) 1
figure3
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
1. Pull down M/B label from DDR and flow card
Fetch M/B label
37(1/1)
0.10 2011/01/30
figure1
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble RJ11
1. Disassemble RJ11 cable(6017B0314901)
2. Disassemble line and pull down acetic tape(6054A0076201)*1 to fix it (figure1,figure2)
no RJ11 model disassemble RJ11 Dummy (6051B0628201)(figure3)
38(1/1)
0.10 2011/01/30
figure3figure2
figure1
Tape can not cover the groove
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble line
1.Disassemble cable and fetch acetic
tape(6054A0076201)*1 to pull down cable
2. Disassemble Speaker cable from groove, turn it over to back
39(1/1)
0.10 2011/01/30
figure1
Acetic tape
Cable is out on left up angle
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble Speaker and unlock screw
1. Take BTCB on fixture unlock screws(6052A0004501) * 2,as figure2 shows。
Torque:1.5 ± 0.2 Kgf.cm
Screw can’t strip and idle running 。
Tighten by water line direction
do not press speaker tympanum
2.Disassemble Speaker (6039B0045501) *1 from BTCB as figure1 shows
40(1/1)
0.10
figure1
figure2
1
2
2011/01/30
Electric cross screw driver (1#) 1
Speaker tightening support fixture 1
Do not press
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble ANTENNA CABLE
41(1/1)
0.10 2011/01/30
1,Disassemble red and blue cable from groove
Paste red and blue label
red line on left side
all lines are covered under boss
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassemble ANTENNA CABLE
42(1/1)
0.10 2011/01/30
1, Disassemble white and black label
Black and white lines on right groove Fetch black and white labels
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
1. Unlock (6052B0101901) * 2,below picture 2,3。 Torque:1.5 ± 0.2 kgf. cm
Screw can’t strip and idle running。
2. Use spanner to pull it out orientation holes
3. Put LCM and TPCB in support fixture
Pull Hinge and tight screw
43(1/1)
0.10 2011/01/30
support fixture 1
1
2
Figure1
Figure2 Figure3
Electric cross screw driver (1#) 1
spanner 1
Empty bridge 1
Notes ︰if finding anything uncommon, notice foreman or assistant at once.
Standard Operation Procedure
Document No. : CT11 FA DISASS'Y B SOP Station:
Name : Ver. : Date:
holding fixture list (holding fixture standard) Qty holding fixture list (holding fixture standard) Qty
Tabulator: Issuing department:
Step:
Mo Shi qing IE
Disassembly TPCB,LCM
1.Disassemble LCM from the TPCB(picture 2)
first put LCM in the latch hole
44(1/1)
0.10 2011/01/30
Figure1
Figure2
Latch 孔