Product Assurance CQSDI Break-Out Session
Presented By:
Mike Bath
Space & Missile Systems Division
March 27, 2007
2
ULO ($Bs)
Workload
0
50
100
150
200
250
FY90
FY92
FY94
FY96
FY98
FY00
FY02
FY04
FY06
FY08
0
5000
10000
15000
20000
25000
30000
Workload & Resources
FTE
ReorgReorg ProcessProcessRe-engineeringRe-engineering
TransformationTransformation
Stand-up Of DCMCWithin DLA
DCMAEstablished
144 Major Field Offices11 Intermediate HQs 24K People
47 Major Field Offices6 Divisions 10K People
Workload
PBMPBM
Customer Centered Culture
3
PA IPT Establishment
SQA/PA IPTAnalysis
Results Presented to Senior Leadership
IPT Members Included
Customer
IPT Members Included
Customer
Voice of the Customer
360 Review Data
4
Transition from QA to PA
PA Concept Development Recognized
Techniques
Address Distinct
Environments
AcquisitionFramework
Common Language
5
Transition from QA to PA
Policy Development
Instructions
Imperatives & Essential
Requirements to Ensure
Consistency
GuidanceBest Practices
and Recommended Approaches –
Optional to Promote
Flexibility
Complimentary
6
Transition from QA to PA
SQA/PA IPTAnalysis
PA Concept Development
Policy Development
Policy Deployment
FY2004
FY2006
7 System Development & Demonstration
System Integration
SystemDemonstration
Operations & SupportProduction & Deployment
LRIP / IOT&E
Item Managed Product Assurance
Program Managed PA
Focused on Supporting Customer Program Outcomes using Recurring Surveillance Techniques
CSI PA
Focused on Assuring Conformance of Product Critical Characteristics / Processes Using Continuous Surveillance Techniques. CSI Applies to Either Environment and is in Addition to Program Managed PA or Standard PA Requirements.
Standard PA
Focused on Maintaining a Level of Confidence in the Supplier’s
Performance Using Recurring Surveillance Techniques
Limited PA
Maintaining level of confidence on facility wide basis - product
conformity based on end item product examination. Dependent on agency negotiated outcomes- Exception basis used when there
are no outcomes
Sustainment
Program Managed Product Assurance
Disposal FRP
PDOS W/G
Product Assurance Approaches
Program Managed PA
Focused on Supporting Customer Program Outcomes and Performance
Commitments
Critical Safety Items
Focused on Assuring Conformity of Product Critical Characteristics / Processes Using Continuous Surveillance Techniques
Exception Based PA
Surveillance Limited to Product & Suppliers
with Known Performance Problems
Standard PA
Recurring Surveillance Focused on Agency
Performance Commitments &
Confidence in Supplier Performance
8
PA Relationship to Performance Based Management (PBM)
PBM is an Enterprise Process to Determine Customer Outcomes and Perform Cause & Effect Analysis to Identify Performance Commitments
PA Focuses Agency Technical Personnel And Support On Those Supplier Processes Necessary To Achieve Agreed Performance Commitments
9
Surveillance ConceptAgreed Performance
Commitments
Develop PA Surveillance Strategy
(Interdisciplinary teaming Approach)
System Elements
Surveillance Areas
Processes Product
Surveillance Methods/Techniques
Audits Examination
Determine Level of Effort and Interval for Surveillance
Documented PA Surveillance Strategy
Interdisciplinary Approach for Audits or Review (As Required)
-Inspect-Witness-Test-Verification
AdjustStrategyBased on
Data Analysis ofSurveillanc
eResults
Reviews
10
Program Managed Strategy
• Based on Agreed to Performance Commitments
• Negotiated with Program Office
• Critical Safety Items
• Includes Customer Directed Requirements (QALIs)
SystemAudits
ProcessReviews
ProductExamination
Typical Surveillance FlowProgram Managed
11
Item Managed Strategy
• Based Agreed to Performance Commitments
• Negotiated at Agency Level
• Critical Safety Items
• Standard PA Approach (52.246-11 Higher-level contract quality requirement)
• Critical Product
• Recurring Surveillance
• Exception Based PA Approach (52.246-2 Standard Inspection)
SystemAudits
ProcessReviews
ProductExamination
Typical Surveillance FlowItem Managed