MUNICIPAL CORPORATION
GUJRANWAPlan for
Institutionalization Procurement Plan and way forward
4th November 2017
DLI-1 (Resource Planning)
Activities / Status Institutionalization Way Forward
IDAMP. IDAMP Cell Functional, Projects identified and approved by the Technical Committee
Training of staff of MCG on preparation of the
IDAMP in 24 August 2017
Continued technical support is needed to MCG for carrying on the new planning and management tools.
Adoption of Framework on IDAMP Completed
GIS based assets inventory added in the online AMIS System
DLI-2 (Procurement)
Summary of PP 2017-18
Total Projects: 24Roads 14Building 5Street Lights 2Curb Stone 2Filtration Plants 10
73.301
18.075 15.594 22.22
189.679
318.869
0
50
100
150
200
250
300
350
1
Procurement Plan 2017-18, MC GujranwalaProject diversification
Building Street Lights Curb Stone Filteration Plants Roads & Street Total
REPAIR AND REPLACEMENT OF CONFERENCE HALL MUNICIPAL CORPORATION BUILDING GUJRANWALA.
Cost : Rs.36.117 MIDAMP Code: 03-01-01-01AMIS: 1200199790Completion Time : 6 MonthScope of work: P/ F Floor tilesWindows DoorsCeilingElectric work Sitting Arrangement Electric equipment lighting , air conditioning etc.
2.REPAIR AND REPLACEMENT OF MUNICIPAL CORPORATION BUILDING (BLOCK A&B) GUJRANWALA
Cost: Rs. 17.640 MIDAMP Code: 03-01-01-07AMIS : 1200199790Completion Time : 6 MonthScope of Work R&M Pipe railingFloor TilesDoor Window Water and Sanitation PaintParking area
3. Repair of street lights 50, 60 & 100 Watts on primary roads of MCG, Cost : 15.000 MIDAMP Code: 03-01-03-06Completion Time : 5 Month
Scope of WorkLED light 120 watt 100 NoLED light 100 watt 180 NoLED light 50 & 60 watt 360 NoNo of pools 5 No
Location1. U.C No. 2 ,2. U.C No. 15, 3. U.C No. 44,4. U.C No. 45. 5. Peoples colony 6. Satellite Town. 7. Model Town. 8. D.C Road
4. REPAIR AND REPLACEMENT OF RO FILTRATION PLANTS 10 NOS in Gujranwala.Cost 22.220 MillionIDAMP Code: 02-03-05-03Completion Time : 6 Month
Scope of WorkRepair and Replacement of filtration plant Repair of Pre fabricated room Deep boring 350- 400 feet
Location
U.C No. 2 , U.C No. 15, U.C No. 42, and others
5 Repair and Rehabilitation of 4 No bus bay (bus stop at G T ROAD GUJRANWALACost Rs. 6.594 MIDAMP Code: 03-01-01-09Completion Time : 4 Month
Scope of Work Repair of existing Bus BayTuff TilesSitting arrangement with bifurcation M/FShed
Location1. Chand Da Qila2. General Bus Stand 3. Gulshan –e-Iqbal Park 4. Sheikhupura More
6. REPAIR OF EXISTING 6 Nos TRAFFIC SIGNALS AND ROUTINE REPLACEMENTS.
Cost: 3. 075 MIDAMP Code: 03-01-03-05Completion Time : 3 Month
Location1 Kangni wala2 Nighar chowk3 General Buss Stand 4 Commissioner Office5 Peoples Colony6 DPS School
7. R&M OF GENERAL BUS STAND GUJRANWALA CITYCost: PKR 4.62 MillionAMIS:120050001 IDAMP Code: 03-01-01-10Completion Time : 3 MonthScope of Work R&R Boundary Wall and Main GateLaying of RCC SewerP/L RCC and Tuff TileR&R of Shops and office block R&R of shedRestoration of CCTV CamerasP/Fitting LED Lights
8. REPLACEMENT OF
KERB STONES, LANE MARKING, CAT EYES, ROAD SIGNAGE IN VARIOUS ROADS OF GUJRANWALA
Cost: PKR 9.00 MIDAMP Code: 03-01-03-06Completion Time : 5 Month Location
1. Sialkot Road. 2. Pesroor Road. 3. G.T Road. 4. Satellite Town. 5. Model Town. 6. Sheikhupura Road.
9. REPAIR and Replacement of Articles OF JINNAH LIBRARY TRUST PLAZA GUJRANWALACost: 4.500 M
AMIS 1200199793IDAMP Code: 03-01-01-08Completion Time : 3 MonthScope of Work Providing and fixing racks for recorded fileCarpeting PaintFloor LightingFurniture repair
10. Repair of ChakiWaliGround Satellite Town, Gujranwala
Cost: 10.423 MAMIS 1200199792IDAMP Code: 03-01-01-11Completion Time : 4 MonthScope of WorkInstallation of fence jogging trackgatesewerage pipeGutka
11. REPAIR & REPLACEMENT OF STREETS IN UC # 5,6,55 Length 3713 RFTCost: 13.451 MCompletion Time : 4 Month03-01-02-5, 03-01-02-6, 03-01-02-55
12 REPAIR & REPLACEMENT OF STREETS IN UC # 7,8,9.
COST: 14.760 MCompletion Time : 5 MonthLength 4265 RFT street
Length 500 RFT RoadCost
13 REPAIR & REPLACEMENT OF STREETS IN UC # 11,12, 13, 14. Completion Time : 5 Month
Length 6135 RFTCost: 15.613 M
14 REPAIR & REPLACEMENT OF STREETS IN UC # 16. Length 3475 RFTCompletion Time : 3 Month
Cost: 8.680 M
15REPAIR & REPLACEMENT OF STREETS IN UC # 17, 18, 19. Completion Time : 4.5 Month
Length 2797 RFT
Cost: 14.06 M
16 REPAIR & REPLACEMENT OF STREETS IN UC # 20, 21, 22, 23. Completion Time : 3 Month
Length 4895 RFT
Cost: 13.223 M
17 REPAIR & MAINTETNACE OF STREETS IN UC # 24, 25, 26. Completion Time : 4 Month
Length 6216 RFTCost: 13.30M
18 REPAIR & REPLACEMENT OF STREETS IN UC # 27, 28, 47,48. Completion Time : 4 Month
Length 5911 RFT
Cost: 13.401 M
19 REPAIR & REPLACEMENT OF STREETS IN UC # 29,30, 31, 32,33. Completion Time : 6 Month
Length 6830 RFTCost: 19.247 M
20 REPAIR & REPLACEMENT OF STREETS IN UC # 34, 35, 36, 37. Completion Time : 5 Month
Length 5152 RFTCost: 16.325 M
21 REPAIR & MAINTETNECE OF STREETS IN UC # 38, 39, 40, 41Completion Time : 4.5 Month
Length 4766 RFT
Cost : 15.005 M
22 REPAIR & REPLACEMENT OF STREETS IN UC # 42, 43, 44, 46. Completion Time : 4 Month
Length 3990 RFT
Cost: 10.148 M
23 REPAIR & REPLACEMENT OF STREETS IN UC # 51,52. Completion Time : 3 Month
Length 3060 Rft
Cost: 8.164 M
24 REPAIR & MAINTENECE OF STREETS IN UC # 50, 56, 57, 58, 59,60.Completion Time : 4.5 Month
Length 4810 RFTCost: PKR 14.305 M
DLI-4 (Revenue Collection System)
Activities Institutional development Way forward
Revision of Tariff
(Trade & Vocation)
The MC, Gujranwala has sent the Notification to the LG&CD
Department vide letter No. MCG/MOF/T.Suptt./ 49 dated 17-06-2017
for vetting. The LG&CD Department vide letter No. SOTAX(LG)1-
9/2017/(MC Grw) dated 04-07-2017 return the above Notification by
raising some objections.
The MC Grw again sent the said Notification vide letter No.
MCG/T.Suptt./80 dated 15-08-2017 & letter No. MCG/T.Suptt./90 dated
21-09-2017 after removal of objections.
Moreover the LG&CD Department vide letter No. SOTAX(LG)1-9/17
(MC Grw) dated 06-10-2017 again with objections on above quoted
Notification on return the MC, Gujranwala for removal of objections,
which is under process.
GIS android based
survey is in process
of finalization
regarding trade &
vocation for MCG
DLI-4 (Revenue Collection System)
Activities Institutional development Way forward
Surveys under OSR
Action Plan
• Survey on Trades & Vocations by MCG is in process:
• Units surveyed: 1537
• Existing Units: 1162
• New Units: 375
• Financial Impact: 10 Lac Approx.
• Survey on Land Use Notified Roads is completed:
• Units surveyed: 5439
• Legal Units: 168
• New Units: 5271
• No. of Notices issued: 323
• Financial Impact: 30,035,962
• Survey on Municipal Properties is completed:
• Municipal Properties surveyed: 570
• Properties in which the structural changes: 62
• Commercial units pointed out in which subletting is made:
100
GIS android based
survey is in process of
finalization regarding
trade & vocation for
MCG
DLI-6 (Public Disclosure and Access to Information)
Institutional Arrangement Way Forward
Website is developed and relevant
data as procurement plans, ADPs,
budgetary detail etc.is uploaded.
http://mc.gujranwala.gop.pk/
PIO for the MCG is nominated.
Instructions are issued to MO
Finance to upload Financial Data and
MO Infrastructure to upload the
Procurement data.
Hosting and trouble shooting services are provided by the Urban Unit
The target of DLI #6 require the MCG to develop and implement a mechanism for efficient and effect disclosure of information.
DLI-7 (Accountability)
• Grievance redress system established
• Regular Meetings to address the delays
Activities / Status Institutionalization Way Forward
Complaint Cell established with dedicated staff
Municipal Officer Planning is incharge
The Complaints system needs further downward integration and include the Building Inspectors and overseers in the online system.
Regular update of Complaint Categories
New Complaint Categories are added timely through the Urban Unit support
Regular Meetings for timely redressal of Complaints
Reminders and delinquency reports issued weekly
Environmental & Social Management Framework (ESMF)Activities Status Institutional
development
Way Forward
• Implementation of ESMF on 100 % EEPs and ADP schemes (2017-2018)
• Environmental and social Management Plans (ESMPs)
• Capacity building session
• Environmental and social screening is completed
• ESMP implementation cost included in estimates and procurement plan
• Preparation of ESMPs is in progress
• Training sessions regarding“ESMF” and experience sharing” was held on 17-08-2017. About 57 personals are being trained regarding ESMF.
• All ESMPs will be approved by EPD Punjab
• Notification of ESMF committee for effective implementation of ESMF
• Need permanent position of Environmentalist in MCG for ESMF sustainability
• ESMPs will be implemented during scheme execution.
• Environmental & Social Monitoring will be carried out to check compliance of Mitigation Measures proposed in ESMPs
• Capacity building sessions for officers, regarding effective implementation of ESMF
• Contractors & labor force trainings to follow health safety attributes at site
Thank You