MUNICIPAL CORPORATION

GUJRANWAPlan for

Institutionalization Procurement Plan and way forward

4th November 2017

Page 3: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

DLI-1 (Resource Planning)

Activities / Status Institutionalization Way Forward

IDAMP. IDAMP Cell Functional, Projects identified and approved by the Technical Committee

Training of staff of MCG on preparation of the

IDAMP in 24 August 2017

Continued technical support is needed to MCG for carrying on the new planning and management tools.

Adoption of Framework on IDAMP Completed

GIS based assets inventory added in the online AMIS System

Page 4: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

DLI-2 (Procurement)

Summary of PP 2017-18

Total Projects: 24Roads 14Building 5Street Lights 2Curb Stone 2Filtration Plants 10

73.301

18.075 15.594 22.22

189.679

318.869

0

50

100

150

200

250

300

350

1

Procurement Plan 2017-18, MC GujranwalaProject diversification

Building Street Lights Curb Stone Filteration Plants Roads & Street Total

Page 5: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

REPAIR AND REPLACEMENT OF CONFERENCE HALL MUNICIPAL CORPORATION BUILDING GUJRANWALA.

Cost : Rs.36.117 MIDAMP Code: 03-01-01-01AMIS: 1200199790Completion Time : 6 MonthScope of work: P/ F Floor tilesWindows DoorsCeilingElectric work Sitting Arrangement Electric equipment lighting , air conditioning etc.

Page 6: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

2.REPAIR AND REPLACEMENT OF MUNICIPAL CORPORATION BUILDING (BLOCK A&B) GUJRANWALA

Cost: Rs. 17.640 MIDAMP Code: 03-01-01-07AMIS : 1200199790Completion Time : 6 MonthScope of Work R&M Pipe railingFloor TilesDoor Window Water and Sanitation PaintParking area

Page 7: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

3. Repair of street lights 50, 60 & 100 Watts on primary roads of MCG, Cost : 15.000 MIDAMP Code: 03-01-03-06Completion Time : 5 Month

Scope of WorkLED light 120 watt 100 NoLED light 100 watt 180 NoLED light 50 & 60 watt 360 NoNo of pools 5 No

Location1. U.C No. 2 ,2. U.C No. 15, 3. U.C No. 44,4. U.C No. 45. 5. Peoples colony 6. Satellite Town. 7. Model Town. 8. D.C Road

Page 8: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

4. REPAIR AND REPLACEMENT OF RO FILTRATION PLANTS 10 NOS in Gujranwala.Cost 22.220 MillionIDAMP Code: 02-03-05-03Completion Time : 6 Month

Scope of WorkRepair and Replacement of filtration plant Repair of Pre fabricated room Deep boring 350- 400 feet

Location

U.C No. 2 , U.C No. 15, U.C No. 42, and others

Page 9: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

5 Repair and Rehabilitation of 4 No bus bay (bus stop at G T ROAD GUJRANWALACost Rs. 6.594 MIDAMP Code: 03-01-01-09Completion Time : 4 Month

Scope of Work Repair of existing Bus BayTuff TilesSitting arrangement with bifurcation M/FShed

Location1. Chand Da Qila2. General Bus Stand 3. Gulshan –e-Iqbal Park 4. Sheikhupura More

Page 10: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

6. REPAIR OF EXISTING 6 Nos TRAFFIC SIGNALS AND ROUTINE REPLACEMENTS.

Cost: 3. 075 MIDAMP Code: 03-01-03-05Completion Time : 3 Month

Location1 Kangni wala2 Nighar chowk3 General Buss Stand 4 Commissioner Office5 Peoples Colony6 DPS School

Page 11: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

7. R&M OF GENERAL BUS STAND GUJRANWALA CITYCost: PKR 4.62 MillionAMIS:120050001 IDAMP Code: 03-01-01-10Completion Time : 3 MonthScope of Work R&R Boundary Wall and Main GateLaying of RCC SewerP/L RCC and Tuff TileR&R of Shops and office block R&R of shedRestoration of CCTV CamerasP/Fitting LED Lights

Page 12: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

8. REPLACEMENT OF

KERB STONES, LANE MARKING, CAT EYES, ROAD SIGNAGE IN VARIOUS ROADS OF GUJRANWALA

Cost: PKR 9.00 MIDAMP Code: 03-01-03-06Completion Time : 5 Month Location

1. Sialkot Road. 2. Pesroor Road. 3. G.T Road. 4. Satellite Town. 5. Model Town. 6. Sheikhupura Road.

Page 13: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

9. REPAIR and Replacement of Articles OF JINNAH LIBRARY TRUST PLAZA GUJRANWALACost: 4.500 M

AMIS 1200199793IDAMP Code: 03-01-01-08Completion Time : 3 MonthScope of Work Providing and fixing racks for recorded fileCarpeting PaintFloor LightingFurniture repair

Page 14: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

10. Repair of ChakiWaliGround Satellite Town, Gujranwala

Cost: 10.423 MAMIS 1200199792IDAMP Code: 03-01-01-11Completion Time : 4 MonthScope of WorkInstallation of fence jogging trackgatesewerage pipeGutka

Page 15: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

11. REPAIR & REPLACEMENT OF STREETS IN UC # 5,6,55 Length 3713 RFTCost: 13.451 MCompletion Time : 4 Month03-01-02-5, 03-01-02-6, 03-01-02-55

Page 16: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

12 REPAIR & REPLACEMENT OF STREETS IN UC # 7,8,9.

COST: 14.760 MCompletion Time : 5 MonthLength 4265 RFT street

Length 500 RFT RoadCost

Page 17: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

13 REPAIR & REPLACEMENT OF STREETS IN UC # 11,12, 13, 14. Completion Time : 5 Month

Length 6135 RFTCost: 15.613 M

Page 18: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

14 REPAIR & REPLACEMENT OF STREETS IN UC # 16. Length 3475 RFTCompletion Time : 3 Month

Cost: 8.680 M

Page 19: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

15REPAIR & REPLACEMENT OF STREETS IN UC # 17, 18, 19. Completion Time : 4.5 Month

Length 2797 RFT

Cost: 14.06 M

Page 20: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

16 REPAIR & REPLACEMENT OF STREETS IN UC # 20, 21, 22, 23. Completion Time : 3 Month

Length 4895 RFT

Cost: 13.223 M

Page 21: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

17 REPAIR & MAINTETNACE OF STREETS IN UC # 24, 25, 26. Completion Time : 4 Month

Length 6216 RFTCost: 13.30M

Page 22: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

18 REPAIR & REPLACEMENT OF STREETS IN UC # 27, 28, 47,48. Completion Time : 4 Month

Length 5911 RFT

Cost: 13.401 M

Page 23: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

19 REPAIR & REPLACEMENT OF STREETS IN UC # 29,30, 31, 32,33. Completion Time : 6 Month

Length 6830 RFTCost: 19.247 M

Page 24: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

20 REPAIR & REPLACEMENT OF STREETS IN UC # 34, 35, 36, 37. Completion Time : 5 Month

Length 5152 RFTCost: 16.325 M

Page 25: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

21 REPAIR & MAINTETNECE OF STREETS IN UC # 38, 39, 40, 41Completion Time : 4.5 Month

Length 4766 RFT

Cost : 15.005 M

Page 26: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

22 REPAIR & REPLACEMENT OF STREETS IN UC # 42, 43, 44, 46. Completion Time : 4 Month

Length 3990 RFT

Cost: 10.148 M

Page 27: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

23 REPAIR & REPLACEMENT OF STREETS IN UC # 51,52. Completion Time : 3 Month

Length 3060 Rft

Cost: 8.164 M

Page 28: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

24 REPAIR & MAINTENECE OF STREETS IN UC # 50, 56, 57, 58, 59,60.Completion Time : 4.5 Month

Length 4810 RFTCost: PKR 14.305 M

Page 29: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

DLI-4 (Revenue Collection System)

Activities Institutional development Way forward

Revision of Tariff

(Trade & Vocation)

The MC, Gujranwala has sent the Notification to the LG&CD

Department vide letter No. MCG/MOF/T.Suptt./ 49 dated 17-06-2017

for vetting. The LG&CD Department vide letter No. SOTAX(LG)1-

9/2017/(MC Grw) dated 04-07-2017 return the above Notification by

raising some objections.

The MC Grw again sent the said Notification vide letter No.

MCG/T.Suptt./80 dated 15-08-2017 & letter No. MCG/T.Suptt./90 dated

21-09-2017 after removal of objections.

Moreover the LG&CD Department vide letter No. SOTAX(LG)1-9/17

(MC Grw) dated 06-10-2017 again with objections on above quoted

Notification on return the MC, Gujranwala for removal of objections,

which is under process.

GIS android based

survey is in process

of finalization

regarding trade &

vocation for MCG

Page 30: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

DLI-4 (Revenue Collection System)

Activities Institutional development Way forward

Surveys under OSR

Action Plan

• Survey on Trades & Vocations by MCG is in process:

• Units surveyed: 1537

• Existing Units: 1162

• New Units: 375

• Financial Impact: 10 Lac Approx.

• Survey on Land Use Notified Roads is completed:

• Units surveyed: 5439

• Legal Units: 168

• New Units: 5271

• No. of Notices issued: 323

• Financial Impact: 30,035,962

• Survey on Municipal Properties is completed:

• Municipal Properties surveyed: 570

• Properties in which the structural changes: 62

• Commercial units pointed out in which subletting is made:

100

GIS android based

survey is in process of

finalization regarding

trade & vocation for

MCG

Page 31: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

DLI-6 (Public Disclosure and Access to Information)

Institutional Arrangement Way Forward

Website is developed and relevant

data as procurement plans, ADPs,

budgetary detail etc.is uploaded.

http://mc.gujranwala.gop.pk/

PIO for the MCG is nominated.

Instructions are issued to MO

Finance to upload Financial Data and

MO Infrastructure to upload the

Procurement data.

Hosting and trouble shooting services are provided by the Urban Unit

The target of DLI #6 require the MCG to develop and implement a mechanism for efficient and effect disclosure of information.

Page 32: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

DLI-7 (Accountability)

• Grievance redress system established

• Regular Meetings to address the delays

Activities / Status Institutionalization Way Forward

Complaint Cell established with dedicated staff

Municipal Officer Planning is incharge

The Complaints system needs further downward integration and include the Building Inspectors and overseers in the online system.

Regular update of Complaint Categories

New Complaint Categories are added timely through the Urban Unit support

Regular Meetings for timely redressal of Complaints

Reminders and delinquency reports issued weekly

Page 33: PROCUREMENT PLAN OF MUNICIPAL CORPORATION GUJRANWApcgip.urbanunit.gov.pk/D2017/U2018/UMC-Gujranwala.pdf · 2018-02-07 · DLI-2 (Procurement) Summary of PP 2017-18 Total Projects:

Environmental & Social Management Framework (ESMF)Activities Status Institutional

development

Way Forward

• Implementation of ESMF on 100 % EEPs and ADP schemes (2017-2018)

• Environmental and social Management Plans (ESMPs)

• Capacity building session

• Environmental and social screening is completed

• ESMP implementation cost included in estimates and procurement plan

• Preparation of ESMPs is in progress

• Training sessions regarding“ESMF” and experience sharing” was held on 17-08-2017. About 57 personals are being trained regarding ESMF.

• All ESMPs will be approved by EPD Punjab

• Notification of ESMF committee for effective implementation of ESMF

• Need permanent position of Environmentalist in MCG for ESMF sustainability

• ESMPs will be implemented during scheme execution.

• Environmental & Social Monitoring will be carried out to check compliance of Mitigation Measures proposed in ESMPs

• Capacity building sessions for officers, regarding effective implementation of ESMF

• Contractors & labor force trainings to follow health safety attributes at site