25
Giving you a clear edge Process Tool Exhaust Management Improvements Benefits of an integrated approach to sub-fab equipment Alan Chen – Edwards Taiwan Ltd. Andrew Chambers – Edwards Ltd. 2 nd September 2015

Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

Embed Size (px)

Citation preview

Page 1: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

Giving you a clear edge

Process Tool Exhaust Management Improvements Benefits of an integrated approach to sub-fab equipment

• Alan Chen – Edwards Taiwan Ltd.

• Andrew Chambers – Edwards Ltd.

2nd September 2015

Page 2: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Presentation content:

1. New processes and new challenges for process exhausts and POU abatement systems

2. Flammable gases in process exhausts

3. Mixed flammable gases and oxidants in process exhausts

4. Other hazardous gases in process exhausts

5. Control of condensation and blockage in process exhausts

6. Conclusions

Process Tool Exhaust Management Improvements

Process Tool Exhaust Management Improvements 2

Page 3: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

New Processes Bring Additional Risks

New processes for HVM: • New device structures need new

materials – III-Vs, Co, Al2O3, metal carbide films…..

• New manufacturing processes bring additional risk

– Epi, EUV… – Low temperature film growth

• High deposition rate for CVD – Increase process gas flow rate

• High etching rate – Increase process gas flow rate

Introduce additional risk: • New hazardous process materials

– Si2H6, AsH3, TMA, CCTBA….

• High flow rate of hazardous gas: – Pyrophoric gas (Si2H6, TMA….) – Flammable gas (H2….) – Toxic gas (AsH3,….) – Corrosive gas (ClF3, F2, HBr, Br2…)

• Condensation of liquids and solids in process exhaust pipes

– Exhaust blockage NH4Cl, AlCl3….

– Reactive materials and by-products Polysiloxanes, Br2, TEOS….

Process Tool Exhaust Management Improvements 3

Page 4: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Risk to fab and equipment

Leak of flammable or pyrophoric gas from exhaust pipes

Air leak into forelines or exhaust pipes containing flammable gas

Corrosion of pipework and gas leaks into the sub-fab

Increased Risk to Fab and Staff

Process Tool Exhaust Management Improvements 4

Risk to staff

Fire hazard

Toxic gas leak

Hazardous material in exhaust pipes

Exhaust pipe damaged by condensed acidic material

Condensation of explosive materials in exhausts

Page 5: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Risk to Production – Exhaust Blockage

5 Process Tool Exhaust Management Improvements

NH4Cl • LPCVD nitride

Metal carbide CVD • Unknown composition

Condensed by-products block exhaust pipes

AlCl3

• Metal etch

Page 6: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

• Flammable gas dilution for safety

• Impact on POU abatement TCOO

• An alternative method with reduced dilution

Control of Flammable Gases in Process Exhausts

Page 7: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Ignition source: • POU abatement • Dry pump

Flammable Gas Control by Dilution

Flammability

Triangle

Flammable

zone

Process gas: • H2

• SiH4

• Si2H6

• …etc.

LFL

Air leak

Process Tool Exhaust Management Improvements 7

Safety control: Remove fuel

• Cannot remove!

Remove ignition source

• Cannot remove!

Control fuel < LFL

Add dilution gas

Extra cost

More utilities

Inert

Note : LFL ( Lower Flammable Limit) LOC ( Limiting Oxidant Concentration )

Page 8: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

CVD process chamber

- New high-flow process

Bypass

POU abatement

system

Dilution of flammable

gases below LFL

Exhaust dilution > 600 slm

Max flow

SiH4 3.5 slm

N20 56 slm

NH3 45 slm

H2 25 slm

NF3 15 slm

4MS 5 slm

Dry pump purge

50 - 100 slm purge

Increased

flammable gas flow

High Dilution – Impact on POU Abatement

Total gas flow in POU abatement

~ 700 - 900 slm

Impact on POU abatement: • High total flow in POU abatement

• Extra POU abatement capacity required

• Reduced DRE due to high dilution

• Increased CAPEX

• Increased utilities consumption

• Increased footprint requirement

Process Tool Exhaust Management Improvements 8

Page 9: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Upwards TCOO trend

Reduce Dilution Impact on POU Abatement

TCOO reduction strategies

Flammable gas dilution strategy: • Dilute fuels below LFL…..

Increases total flow rate…..

Needs higher abatement capacity…..

Increases energy requirement….. Total utilities consumption

Sub-fab footprint requirement

Increased abatement TCOO

• Alternative flammable gas safety strategy – Reduces total gas flow

– Reduces abatement capacity requirement

• Intelligent dilution control – Apply dilution only when needed

– Enables energy-efficient abatement of GHGs, PFCs, F2, ClF3

• Process recipe-driven abatement operation – “Normal” abatement modes for flammable gas (silane, TEOS)

– “Energetic” abatement modes for GHGs, PFCs, F2, ClF3

Process Tool Exhaust Management Improvements 9

Page 10: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Reduce dilution flow

Safety control: Remove fuel

• Cannot remove!

Remove ignition source

• Cannot remove!

Control LOC

Eliminate air leaks

Double containment of exhaust pipe joints

Monitor O-seal condition

Ignition source: • POU abatement • Dry pump

Alternative Flammable Gas Risk Control

Flammability

Triangle

Flammable

zone

Process gas: • H2

• SiH4

• Si2H6

• …etc.

LFL

Process Tool Exhaust Management Improvements 10

Inert LOC control keeps operating point out of flammable zone

Page 11: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Key features:

• Double-contained process gas seal

• In-situ leak-checking after maintenance

– Non-invasive test

– Reduces MTTR

• Real-time O-seal condition monitoring

– Continuous monitoring of O-seal condition

– Early warning of seal damage

– Reduces unscheduled down-time

Key benefits:

Reduces the risk of hazardous gas leak out of the exhaust

Reduces the risk of air leak into exhaust

Allows exhaust pipe to run at pressure above atmosphere without increased risk

Increases MTBC

Double-contained O-seal system

Standard KF-style flanges

Stainless steel exhaust pipe

Monitoring system connection

Monitored Joint Concept

Process Tool Exhaust Management Improvements 11

Page 12: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Impact of Reduced Dilution on Abatement TCOO

Exhaust pipe

safety

strategy

POU

abatement

capacity

POU abatement unit

requirement

Relative

utilities

consumption

per chamber

Relative

abatement TCOO

per chamber

Dilute below

80% LFL ~ 400 slm

2 x POU abatement units

per process module 100% 100%

Dilute below

80% LFL ~ 700 slm

1 x POU abatement unit per

process module ~ 76% ~ 56%

Control LOC

(reduced

dilution)

~ 400 slm 1 x POU abatement unit per

two process modules ~ 28% ~ 25%

Control LOC

(Reduced

dilution)

~ 700 slm 1 x POU abatement unit per

three process modules ~ 25% ~ 19%

• Example based on high flow W-CVD process including SiH4, H2

Process Tool Exhaust Management Improvements 12

Page 13: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

• Standard dilution control for safety

• Impact on POU abatement TCOO

• An alternative method with reduced dilution

Control of Mixed Flammable Gases and Oxidants in Process Exhausts

Page 14: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Process gas: • H2

• SiH4

• TEOS • TMA • …etc.

Ignition source: • POU abatement • Dry pump

Processes Containing Fuels and Oxidants

Flammability Triangle

Flammable

zone LFL

Process gas: • O2

• O3

• N2O • NF3

• F2

• …etc.

Air leak Safety options: Remove fuel

• Cannot remove!

Remove ignition source

• Cannot remove!

Remove oxidant

• Cannot remove!

Control N2 dilution flow

N2 flow safety interlock

Process Tool Exhaust Management Improvements 14

Dilution keeps the operating point out of flammable zone

Inert

Page 15: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

“Safe to process”

Dry pump

3. Flame arrester system • Control / monitor total nitrogen flow

• Latch burning flammable mixtures caused by upstream air leaks

• Detect burning flammable mixtures

Integration of Monitored Joint into a System

1. System Controller

2. Exhaust pipe with monitored joints • Prevent inward air leaks

• Prevent outward toxic gas leak

• Detect leaks and degraded seals

• Locate leaking joint

• Pressure inputs • N2 flow inputs • Temperature inputs • Process tool inputs

• Permissive signals • Alarms • Warnings • Data

POU abatement

system

Inp

uts

Ou

tpu

ts

Process tool, CMS

Process Tool Exhaust Management Improvements 15

LOC control in exhaust pipe

Dilution control and monitoring, inlet combustion monitoring

Page 16: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

• Integrated system enclosures

• Monitored Joint reduces leak risk

• High pressure limit extend MTBC

Control of Other Hazardous Gases

Page 17: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Integrated Systems Reduce Gas Leak Impact

Process gas leak in standalone equipment • O-seal damage by corrosive process gas • Thermal degradation of O-seal (brittle) • Change in O-seal flexibility • Mis-assembled O-seal Leak of hazardous gas into sub-fab Risk to staff

!

Exhaust pipe

Exhaust pipe joint

O-seal

Pro

cess

gas

(C

lF3, F

2, C

l 2…

)

Pro

cess

gas

(C

lF3, F

2, C

l 2…

)

Integrated system including extracted enclosure

Leaking gas released in

sub-fab Leaking gas extracted to fab scrubber

Cabinet extraction

Integrated vacuum and abatement system Leaking gas extracted from enclosure Reduced risk to staff

Process Tool Exhaust Management Improvements 17

Page 18: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Monitored Joint Concept Extends MTBC

Incr

ease

d e

xhau

st p

ress

ure

o

per

atin

g w

ind

ow

Monitored Joint ensures safe operation:

• Double-contained process gas seal

• Real-time O-seal condition monitoring

– Continuous monitoring of O-seal status

– Early warning of seal damage

Process Tool Exhaust Management Improvements 18

• Reduces the risk of hazardous gas leak out of the exhaust

• Allows exhaust pipe to run at high pressure without increased risk

• Extends MTBC of the exhaust pipe

Page 19: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

• Efficient pipe heating avoids or delays blockage

• Reduces risk to service staff

• Extends MTBC and improves uptime

Control of Condensation and Blockage in Process Exhaust Pipes

Page 20: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Benefits of Exhaust Pipe Heating

Cold exhaust pipes lead to:

Corrosion by condensed liquid

Exhaust blockages

Process interruption and downtime

Build-up of hazardous materials

Risk to service staff

Exhaust pipe heating provides:

Reduced solids deposition

Reduced condensation of corrosive liquids

Extended MTBC / increased uptime

Reduced risk to service staff

Reduced maintenance time

Process Tool Exhaust Management Improvements 20 |

Page 21: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Efficient thermal insulation • High insulation efficiency • Eliminates need for heaters on elbows • Cut-to-shape insulation for straight pipe sections • Modules for special pipe section (flanges, tees, elbows)

Integrated Modular Pipe Heating Concept

Modular pipe heaters in standard sizes • Mix-and-match modules to fit pipe sections • Heaters are not required for elbows • Heater mat options for bypass valves

Process Tool Exhaust Management Improvements 21 |

Integrated modular heating systems have some specific advantages:

Modular flexible design improves turn-around time (supplier delay)

Custom case-by-case design is not needed

Separate heaters and insulation reduces service replacement costs

Supplier of integrated systems has global experience of processes

Easy to install and reconfigure

Page 22: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

Conclusions

Page 23: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Conclusions

Process Tool Exhaust Management Improvements 23

New materials and processes will increase risks in the sub-fab

– Impact of flammable / pyrophoric gas leak

– Toxic / corrosive gas leak

– Hazardous materials in exhaust pipes

– Exhaust pipe blockage

High flammable gas flow rates increases dilution gas cost significantly

– N2 dilution cost

– POU abatement utilities cost

– CAPEX / OPEX / footprint increase

Monitored Joint allows safe LOC control of flammable gases

– Eliminates air leaks into exhaust pipes

– Enables TCOO reduction (less N2, smaller POU abatement, less utilities consumption)

Monitored Joint reduces exhaust pipe leak risk

– Double-containment of O-seals in exhaust pipe joints

– Continuous real-time monitoring of O-seal condition in exhaust pipe joints

– Allows extended MTBC

Modular exhaust pipe Temperature Management System reduces blockage issues

– Eliminates risk to maintenance staff and fixes short MTBC issues

Page 24: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

R0 G1 B5

R0 G174 B239

R183 G204 B255

R247 G142 B30

R248 G248 B248

R113 G81 B146

R253 G200 B47

R0 G155 B72

R137 G150 B160

R137 G150 B160

Confidentiality Statement

This presentation has been prepared exclusively for the benefit and use of Edwards and is confidential in all respects. This presentation does not carry any right of publication or disclosure, in whole or in part, to any other party. This presentation is the property of Edwards. Neither this presentation nor any of its contents may be used for any purpose without the prior written consent of Edwards. This presentation includes certain statements, estimates, targets and projections as to anticipated future business performance. Such statements may reflect significant assumptions and subjective judgements by Edwards which may or may not prove to be correct. Edwards makes no representations as to the accuracy, completeness or fairness of this presentation and so far as is permitted by law, no responsibility or liability whatsoever is accepted by Edwards for the accuracy or sufficiency thereof or for any errors, omissions, or misstatements relating thereto. The contents of this presentation is confidential and should not be distributed.

Process Tool Exhaust Management Improvements 24

Page 25: Process Tool Exhaust Management · PDF file• Dry pump Flammable Gas Control by Dilution ... • Double-contained process gas seal ... Process Tool Exhaust Management Improvements

For more information , please contact us via

[email protected] or

[email protected]

Thanks for your Time

Process Tool Exhaust Management Improvements 25