12
Global EHS Process Safety Implementation in Huntsman Presentation by Dr Bill Brooks to the International Conference on Process Safety Performance Indicators Brussels, 1 st February 2012 1

Process Safety Implementation in Huntsmanevents/PSPI+Conference/_/Huntsman_Bi… · Presentation by Dr Bill Brooks to the International Conference on Process Safety Performance Indicators

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Process Safety Implementation in Huntsmanevents/PSPI+Conference/_/Huntsman_Bi… · Presentation by Dr Bill Brooks to the International Conference on Process Safety Performance Indicators

Global EHS

Process Safety Implementation in Huntsman

Presentation by Dr Bill Brooks

to the International Conference on Process Safety

Performance Indicators

Brussels, 1st February 2012

1

Page 2: Process Safety Implementation in Huntsmanevents/PSPI+Conference/_/Huntsman_Bi… · Presentation by Dr Bill Brooks to the International Conference on Process Safety Performance Indicators

Global EHS

What Stimulated Huntsman’s Current Programme?

Two major process safety events

one external, BP Texas City, March 2005

one internal, Port Arthur Fire, April 2006

2

Page 3: Process Safety Implementation in Huntsmanevents/PSPI+Conference/_/Huntsman_Bi… · Presentation by Dr Bill Brooks to the International Conference on Process Safety Performance Indicators

Global EHS

Fire - Port Arthur, TX, April 2006

Port Arthur, Texas; April 2006

3

No fatalities

No explosion – early ignition with jet fire

Ethylene cracked gas compressor feed line

ruptured due to corrosion under insulation

Page 4: Process Safety Implementation in Huntsmanevents/PSPI+Conference/_/Huntsman_Bi… · Presentation by Dr Bill Brooks to the International Conference on Process Safety Performance Indicators

Global EHS

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Beyond

Procedures/Training

Development

Pilot

High Hazard

Sites

Medium Hazard

Sites

Low Hazard

Sites

Gap Closure

Auditing

PS Procedure Roll Out and Implementation Time Line

IMP

LE

ME

NT

AT

ION

R

OL

L O

UT

4

Page 5: Process Safety Implementation in Huntsmanevents/PSPI+Conference/_/Huntsman_Bi… · Presentation by Dr Bill Brooks to the International Conference on Process Safety Performance Indicators

Global EHS 5

Risk Assessment

• Risk matrix • Process hazard

analysis • SIL assessment • Facility siting • Electrical area class • Fire risk assessment • EHS criticality • Network security

Administrative Safeguards ● Management of change ● Organizational MOC ● Qualified persons ● Operating procedures ● Incident investigation ● Mechanical integrity ● Design verification

Engineered Safeguards ● Pressure relief ● Process safety information ● Safety system design ● Safety instr. systems ● Alarm management ● Design of safety inst.

Functions

23 New PSM procedures

Page 6: Process Safety Implementation in Huntsmanevents/PSPI+Conference/_/Huntsman_Bi… · Presentation by Dr Bill Brooks to the International Conference on Process Safety Performance Indicators

Global EHS

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Beyond

Procedures/Training

Development

Pilot

High Hazard

Sites

Medium Hazard

Sites

Low Hazard

Sites

Gap Closure

Auditing

PS Procedure Roll Out and Implementation Time Line

IMP

LE

ME

NT

AT

ION

R

OL

L O

UT

6

Page 7: Process Safety Implementation in Huntsmanevents/PSPI+Conference/_/Huntsman_Bi… · Presentation by Dr Bill Brooks to the International Conference on Process Safety Performance Indicators

Global EHS

PS Incidents*: 2003-2010

7

0

40

80

120

160

200

0 0 0

Number of PS Incidents Number of Sites

12 sites 27 sites

40 sites

High Hazard Medium Hazard Low Hazard

* Internal definition; API-754 numbers would be about one third of these, or less

Page 8: Process Safety Implementation in Huntsmanevents/PSPI+Conference/_/Huntsman_Bi… · Presentation by Dr Bill Brooks to the International Conference on Process Safety Performance Indicators

Global EHS

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Beyond

Procedures/Training

Development

Pilot

High Hazard

Sites

Medium Hazard

Sites

Low Hazard

Sites

Gap Closure

Auditing

PS Procedure Roll Out and Implementation Time Line

IMP

LE

ME

NT

AT

ION

R

OL

L O

UT

8

Page 9: Process Safety Implementation in Huntsmanevents/PSPI+Conference/_/Huntsman_Bi… · Presentation by Dr Bill Brooks to the International Conference on Process Safety Performance Indicators

Global EHS

Risk Assessment

• Risk matrix • Process hazard

analysis • SIL assessment • Facility siting • Electrical area class • Fire risk assessment • EHS criticality • Network security

Administrative Safeguards ● Management of change ● Organizational MOC ● Qualified persons ● Operating procedures ● Incident investigation ● Mechanical integrity ● Design verification

Engineered Safeguards ● Pressure relief ● Process safety information ● Safety system design ● Safety instr. systems ● Alarm management ● Design of safety inst.

Functions

9

Closing the Gaps Reduces the Likelihood of an Accident

Page 10: Process Safety Implementation in Huntsmanevents/PSPI+Conference/_/Huntsman_Bi… · Presentation by Dr Bill Brooks to the International Conference on Process Safety Performance Indicators

Global EHS

PS Procedure Rollout Status 5 Yr Plan

10

0% 20% 40% 60% 80% 100%

Low Risk

Medium Risk

High Risk 11 out of 12 sites

23 out of 27 sites

5 out of 40 sites

Page 11: Process Safety Implementation in Huntsmanevents/PSPI+Conference/_/Huntsman_Bi… · Presentation by Dr Bill Brooks to the International Conference on Process Safety Performance Indicators

Global EHS

Progress Opposite the Baker Panel and CSB Recommendations

Topic Huntsman in 2006 Huntsman in 2012

Leadership Patchy PSM understanding

at Leadership level

Formal Executive training

package

Formal PSM governance

structure

Monthly review of KPI’s

PSM Management structure Global EHS Standards in

place – but inconsistent

interpretation of PSM

elements

New PSM management

system

Knowledge and expertise Insufficient in many parts of

Company

New Centres of PSM

Excellence

Qualified Person

appointments

Formalised Organisational

MoC process

Page 12: Process Safety Implementation in Huntsmanevents/PSPI+Conference/_/Huntsman_Bi… · Presentation by Dr Bill Brooks to the International Conference on Process Safety Performance Indicators

Global EHS

Progress Opposite the Baker Panel and CSB Recommendations

Topic Huntsman in 2006 Huntsman in 2012

Accountabilities Line management

accountabilities defined in

EHS Standards

Clearer line management

accountabilities

KPI’s Metrics database New KPI’s

Executive scorecard

PSM auditing Auditing against EHS

Standards and regulatory

requirements

+ audits against new

procedures

Board monitoring EHS but not PSM-specific Monthly reports to CEO and

Leadership Team

Updates to external directors

External Internal process only Industry body participation