Process & Quality Management. SystemInformation MeetingNovember 4, 2011

The Missouri Department of Transportation

Page 2: Process & Quality Management. System Information Meeting November 4, 2011 The Missouri Department of Transportation

Information MeetingDiscussion Leader Introductions

Perry Allen - DCMEBrian Kidwell – ADEBrian Iles - REEric Reents - SCIDave Ahlvers - SCMEJay Bestgen - ASCME

Page 3: Process & Quality Management. System Information Meeting November 4, 2011 The Missouri Department of Transportation

PQMS Philosophy

• Process & Quality Management Plan

• Pre-Construction Requirements• PQMP Development• PQMP Acceptance• Document Structure• Document Control• Process Quality

Mang.

• Construction Requirements

• Pre-activity Meetings

• Materials Tracking• Hold Points• NonConforming work

• Deficient Work• Offsite Material• 2-Week Look Ahead

Page 4: Process & Quality Management. System Information Meeting November 4, 2011 The Missouri Department of Transportation

PQMS DocumentsContract JSP

• Description, definition & hold points

Example PQMS Plan• Process System Procedure• Inspection & Test Plan• Inspection Checklists• Documentation Forms• Specification Table

Page 5: Process & Quality Management. System Information Meeting November 4, 2011 The Missouri Department of Transportation

Open Discussion & Questions

For More Information:

Perry Allen – 816-607-2102Warren Roberts – 816-607-2103

Page 6: Process & Quality Management. System Information Meeting November 4, 2011 The Missouri Department of Transportation

MO 13 – Warrensburg East Loop Pre-Bid Meeting

J4P1138, Johnson Ct.The Missouri Department of Transportation

Page 7: Process & Quality Management. System Information Meeting November 4, 2011 The Missouri Department of Transportation

Information MeetingDiscussion Leader Introductions

Wes Moore – PMPerry Allen - DCMEBrian Kidwell – ADEBrian Iles - REEric Reents - SCIDave Ahlvers - SCMEJay Bestgen - ASCME

Page 8: Process & Quality Management. System Information Meeting November 4, 2011 The Missouri Department of Transportation

Open Discussion & Questions

For More Information:

Wes Moore – 816-387-2499