3
Your Company Logo Here Your Lean System Initials Here Title: Date: Rev: Page: Document No: XXX-PPS-7008 Training Overview Checklist for Process Problem Solving LDE’s September 27, 2013 1.0 Page 1 of 3 Approved by: H. R. Manager Starting Date: / / Trainee’s Name: (Please Print Legibly) Training Overview Checklist for Process Problem Solving LDE’s This training checklist is to be utilized in training Process Problem Solving LDE’s. Each item needs to be covered by the support personnel listed. As the trainee completes an item, the trainee (T) initials and dates the item. The Lean Manager/Coordinator (LMC) and Plant Manager (PM) initial to indicate the training is completed. When a section is completed the Trainee, the Lean Manager/Coordinator, and the plant manager initial that the section is complete and the trainee has attained the designated level of certification. 1. Lean Discipline Apprentice T LMC PM Date A. _____ ____ _ ____ _ ________ Participate in Process Problem Solving Overview Class B. _____ ____ _ ____ _ ________ Lean Overview Training C. _____ ____ _ ____ _ ________ Complete Standardized Work Overview Training T LMC PM Date Achieved Lean Discipline Apprentice Certification 2. Lean Discipline Generalist T LMC PM Date A. _____ ____ _ ____ _ ________ Complete PPS Training (8hr) B. _____ _____ _____ ________ Apply PPS tools in the following areas: Maintenance C. _____ ____ _ ____ _ ________ Quality D. _____ ____ _ ____ _ ________ Safety E. _____ ____ ____ ________ Production The electronic format is the official master version. Verify hard copies against the electronic version.

Process Problem Solving - Checklist

  • Upload
    skng

  • View
    4

  • Download
    0

Embed Size (px)

DESCRIPTION

Process Problem Solving - Checklist

Citation preview

Page 1: Process Problem Solving - Checklist

Your Company

Logo Here

Your Lean System Initials

Here

Title: Date: Rev: Page:Document No:XXX-PPS-7008

Training Overview Checklist for Process Problem Solving LDE’s

September 27, 2013 1.0 Page 1 of 3

Approved by:

H. R. Manager

Starting Date: / / Trainee’s Name:(Please Print Legibly)

Training Overview Checklist for Process Problem Solving LDE’s

This training checklist is to be utilized in training Process Problem Solving LDE’s. Each item needs to be covered by the support personnel listed. As the trainee completes an item, the trainee (T) initials and dates the item. The Lean Manager/Coordinator (LMC) and Plant Manager (PM) initial to indicate the training is completed.

When a section is completed the Trainee, the Lean Manager/Coordinator, and the plant manager initial that the section is complete and the trainee has attained the designated level of certification.

1. Lean Discipline Apprentice

T LMC PM Date

A. _____ _____ _____ ________ Participate in Process Problem Solving Overview Class

B. _____ _____ _____ ________ Lean Overview Training

C. _____ _____ _____ ________ Complete Standardized Work Overview Training

T LMC PM Date

Achieved Lean Discipline Apprentice Certification

2. Lean Discipline Generalist

T LMC PM Date

A. _____ _____ _____ ________ Complete PPS Training (8hr)

B. _____ _____ _____ ________Apply PPS tools in the following areas:

Maintenance

C. _____ _____ _____ ________ Quality

D. _____ _____ _____ ________ Safety

E. _____ _____ _____ ________ Production

F. _____ _____ _____ ________ Understand Lean Policy Deployment

G. _____ _____ _____ ________ Understand PPS mission statement, strategy and roles

T LMC PM Date

The electronic format is the official master version. Verify hard copies against the electronic version.

Page 2: Process Problem Solving - Checklist

Your Company

Logo Here

Your Lean System Initials

Here

Title: Date: Rev: Page:Document No:XXX-PPS-7008

Training Overview Checklist for Process Problem Solving LDE’s

September 27, 2013 1.0 Page 2 of 3

Approved by:

H. R. Manager

Achieved Lean Discipline Generalist Certification

3. Lean Discipline Specialist T LMC PM Date

A. _____ _____ _____ ________ Document, analyze, and present results of PPS activities

B. _____ _____ _____ ________ Complete overview training for Six Sigma and DOE

C. _____ _____ _____ ________ Understand PPS implementation process

D. _____ _____ _____ ________ Complete PPS Train-the-Trainer class

E. _____ _____ _____ ________ Obtain LDG level for 5S

F. _____ _____ _____ ________ Obtain LDG level for Standard Work

G. _____ _____ _____ ________ Utilize PPS problem solving tools (2 minimum)

T LMC PM Date

Achieved Lean Discipline Specialist Certification

4. Lean Discipline Expert

T LMC PM Date

A. _____ _____ _____ _____ Assist in the development of PPS strategies to support company goals and objectives

B. _____ _____ _____ _____ Act as a resource for PPS teams

C. _____ _____ _____ _____ Utilize PPS to effectively address a chronic issue

D. _____ _____ _____ ________Develop an expert understanding of the following:

Problem definition

E. _____ _____ _____ ________ Root cause analysis

F. _____ _____ _____ ________ Short and long term countermeasures

G. _____ _____ _____ ________Understand advanced problem solving tools:

Six Sigma

H. _____ _____ _____ ________ Design of Experiments

T LMC PMCORPApprvl Date

The electronic format is the official master version. Verify hard copies against the electronic version.

Page 3: Process Problem Solving - Checklist

Your Company

Logo Here

Your Lean System Initials

Here

Title: Date: Rev: Page:Document No:XXX-PPS-7008

Training Overview Checklist for Process Problem Solving LDE’s

September 27, 2013 1.0 Page 3 of 3

Approved by:

H. R. Manager

Achieved Lean Discipline Expert Certification

The electronic format is the official master version. Verify hard copies against the electronic version.