Proc. of Stock Materials-Revised-2

Embed Size (px)

Citation preview

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    1/119

    Materials Management

    User manual

    Procurement Of Stock Materials

    Procurement

    OfStock Materials

    Prepared By

    M.Ramesh Kanna

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    2/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 1

    Icons

    Icon Meaning

    Caution

    Example

    Note

    Recommendation

    Syntax

    Typographic Conventions

    Type Style Description

    Example text Words or characters that appear on the screen. These include field names,screen titles, pushbuttons as well as menu names, paths and options.

    Cross-references to other documentation.

    Example text Emphasized words or phrases in body text, titles of graphics and tables.

    EXAMPLE TEXT Names of elements in the system. These include report names, program names,

    transaction codes, table names, and individual key words of a programming

    language, when surrounded by body text, for example, SELECT andINCLUDE.

    Example text Screen output. This includes file and directory names and their paths,messages, source code, names of variables and parameters as well as names ofinstallation, upgrade and database tools.

    EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the ENTERkey.

    Example text Exact user entry. These are words or characters that you enter in the systemexactly as they appear in the documentation.

    Variable user entry. Pointed brackets indicate that you replace these words andcharacters with appropriate entries.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    3/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 2

    Abbreviations

    R Required entry field

    (used in the end-user procedures)

    O Optional entry field

    (used in the end-user procedures)

    C Conditional field

    (used in the end-user procedures)

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    4/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 3

    ContentsProcurement of Stock Materials ........................................................................................................... 6

    1 Procurement of Stock Materials Raw Material Local / Return.......................................................... 6

    Purpose ..................................................................................................................................... 6

    Prerequisites .............................................................................................................................. 6

    1.1 Request for Quotation (RFQ) .................................................................................................47

    Use ..........................................................................................................................................47

    Procedure .................................................................................................................................47

    Result.......................................................................................................................................56

    Example ...................................................................................................................................56

    1.2 Message output: RFQ............................................................................................................57

    Use ..........................................................................................................................................57

    Procedure .................................................................................................................................57

    1.3 Maintaining Quotation ..........................................................................................................60

    Use ..........................................................................................................................................60

    Procedure .................................................................................................................................60

    Result.......................................................................................................................................66

    Example ...................................................................................................................................66

    1.4 Price Comparison .................................................................................................................67

    Use ..........................................................................................................................................67

    Procedure .................................................................................................................................67

    1.7 Creating Purchase Requisition ................................................................................................71Use ..........................................................................................................................................71

    Procedure .................................................................................................................................71

    Result.......................................................................................................................................74

    Example ...................................................................................................................................74

    1.8 Purchase Order.....................................................................................................................75

    Use ..........................................................................................................................................75

    Procedure .................................................................................................................................75

    Result.......................................................................................................................................79

    Example ...................................................................................................................................80

    1.9 Message Output....................................................................................................................80

    Use ..........................................................................................................................................80

    Procedure .................................................................................................................................80

    1.10 Goods Receipt for Purchase Order.........................................................................................83

    Use ..........................................................................................................................................83

    Prerequisites .............................................................................................................................83

    Procedure .................................................................................................................................83

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    5/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 4

    Result.......................................................................................................................................87

    Example ...................................................................................................................................87

    1.13 Logistics Invoice Verification...............................................................................................88

    Use ..........................................................................................................................................88

    Procedure .................................................................................................................................88

    Result.......................................................................................................................................92

    Example ...................................................................................................................................92

    1.14 Returning Delivery..............................................................................................................92

    Use ..........................................................................................................................................92

    Procedure .................................................................................................................................92

    Result.......................................................................................................................................97

    Example ...................................................................................................................................97

    1.15 Excise Invoice Other Movements..........................................................................................97

    Use ..........................................................................................................................................97

    Procedure .................................................................................................................................97

    Result.....................................................................................................................................100

    Example .................................................................................................................................100

    1.16 Posting and Printing the Excise Invoice................................................................................101

    Use ........................................................................................................................................101

    Prerequisites ...........................................................................................................................101

    Procedure ...............................................................................................................................101

    Result.....................................................................................................................................104

    1.17 Credit Memo....................................................................................................................105

    Use ........................................................................................................................................105

    Prerequisites ...........................................................................................................................105

    Procedure ...............................................................................................................................105

    Result.....................................................................................................................................109

    Example .................................................................................................................................109

    2 Procurement of Stock Materials from SSI Vendor............................... Error! Bookmark not defined.

    Purpose ....................................................................................... Error! Bookmark not defined.

    2.1 Master Data Maintenance for SSI Vendors .................................. Error! Bookmark not defined.

    Use ............................................................................................. Error! Bookmark not defined.

    2.3 Purchase Order........................................................................ Error! Bookmark not defined.

    Use ............................................................................................. Error! Bookmark not defined.Procedure .................................................................................... Error! Bookmark not defined.

    Result.......................................................................................... Error! Bookmark not defined.

    Example ...................................................................................... Error! Bookmark not defined.

    2.4 Message Output....................................................................... Error! Bookmark not defined.

    Use ............................................................................................. Error! Bookmark not defined.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    6/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 5

    Procedure .................................................................................... Error! Bookmark not defined.

    2.5 Goods Receipt for Purchase Order............................................. Error! Bookmark not defined.

    Use ............................................................................................. Error! Bookmark not defined.

    Procedure .................................................................................... Error! Bookmark not defined.

    Result.......................................................................................... Error! Bookmark not defined.

    Example ...................................................................................... Error! Bookmark not defined.

    2.6 Logistics Invoice Verification.................................................... Error! Bookmark not defined.

    Use ............................................................................................. Error! Bookmark not defined.

    Procedure .................................................................................... Error! Bookmark not defined.

    Result.......................................................................................... Error! Bookmark not defined.

    Example ...................................................................................... Error! Bookmark not defined.

    Procurement of Stock Materials for Depot......................................... Error! Bookmark not defined.

    Purpose ....................................................................................... Error! Bookmark not defined.

    3.1 Master Data Maintenance for Depot ........................................... Error! Bookmark not defined.

    Use ............................................................................................. Error! Bookmark not defined.

    Procedure .................................................................................... Error! Bookmark not defined.

    3.3 Purchase Order........................................................................ Error! Bookmark not defined.

    Use ............................................................................................. Error! Bookmark not defined.

    Procedure .................................................................................... Error! Bookmark not defined.

    Result.......................................................................................... Error! Bookmark not defined.

    Example ...................................................................................... Error! Bookmark not defined.

    3.4 Message Output....................................................................... Error! Bookmark not defined.

    Use ............................................................................................. Error! Bookmark not defined.

    Procedure .................................................................................... Error! Bookmark not defined.

    3.5 Goods Receipt for Purchase Order............................................. Error! Bookmark not defined.

    Use ............................................................................................. Error! Bookmark not defined.

    Procedure .................................................................................... Error! Bookmark not defined.

    Result.......................................................................................... Error! Bookmark not defined.

    Example ...................................................................................... Error! Bookmark not defined.

    3.6 Logistics Invoice Verification.................................................... Error! Bookmark not defined.

    Use ............................................................................................. Error! Bookmark not defined.

    Procedure .................................................................................... Error! Bookmark not defined.

    Result.......................................................................................... Error! Bookmark not defined.

    Example ...................................................................................... Error! Bookmark not defined.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    7/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 6

    Procurement of Stock Materials

    1 Procurement of Stock Materials Raw Material Local / Return

    PurposeThis process describes the procurement process of raw materials from indigenous source of supply withCountry Version India (CIN) relevant process like processing of Excise Duty (ED) and Sales Tax (ST) process.

    PrerequisitesThe following scenario specific master data must be created for operation of this building block.

    1. Material Master Record

    2. Vendor Master Record3. CIN Master Data

    Material Master record

    Menu Path Logistics Materials ManagementMaterial MasterMaterial Create (General)

    T Code

    MM01 Create

    MM02 ChangeMM03 Display

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    8/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 7

    Creation of Material Master

    Transaction Code: MM01

    Press Enter to see the pop-up window.

    Enter the Industry Sector

    Enter the Material Type

    Material No. has to given

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    9/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 8

    Select the required views and press Enter to input the organizational levels.

    This selection of Views differs from each material type, for Eg. Sales View are required for Trading goods

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    10/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 9

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    11/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 10

    Press Enter to input the details of the Material.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    12/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 11

    Enter Material Description

    Material Group as classified

    Base unit of Measurement

    If you have old material No. ,

    you can use it

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    13/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 12

    Enter Purchasing Group

    If material has to be used as MPN,

    then choose ZMPN profile

    If manufacturer is required,enter manufacturers name

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    14/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 13

    Note:MRP views are required for materials which are under BOM

    Put MRP type PD

    Choose 100 for 1000 Plant

    Put EX for lot size

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    15/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 14

    Proc. Type F- used for buying itemsE- used for Produced in-house

    X- both proc. types

    Put always 000

    Procurement Lead-time for material in

    days

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    16/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 15

    Put 10- Make to stock

    Put always 02

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    17/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 16

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    18/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 17

    If unit of issue differs from base

    unit of measure, enter relevant unit

    Enter max. Shelf life period ifit is managed

    Time unit of shelf life period

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    19/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 18

    Enter Profit Center as1000-for Genus overseas

    2000- For Genus Innovation

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    20/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 19

    Note: Refer QM user manual for doing this activity

    If Material is relevant,

    Inspection setup has to be

    done

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    21/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 20

    Important Note

    Please refer the sheet given below and use only related Valuation class as recommended by us.

    If Raw material is Imported use Valuation class-3001

    Raw Material is Local use Valuation class-3000

    Enter relevant

    valuation Class for

    each material type

    Enter moving average

    price for material

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    22/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 21

    Material Types - External Numbers

    Disc. Of material type Material

    Type

    Description Valuated/Non

    ValuatedValuation Class

    1 Electrical Raw MaterialROH

    Electrical Raw MaterialValuated

    3000/3001

    2 Electronics Raw MaterialZERM

    Electronics Raw MaterialValuated

    3000/3001

    3 Mechanical Raw materialZMRM

    Mechanical Raw materialValuated

    3000/3001

    4 Sheet Metal Raw MaterialZSMM

    Sheet Metal Raw MaterialValuated

    3000/3001

    5 Rubber Raw materialZRRM

    Rubber Raw materialValuated

    3000/3001

    6 Plastics MaterialZPRM

    PlasticsValuated

    3000/3001

    7 Packing Material-GenusZPAK Packing Material Valuated

    3000/3001

    8Final Packing MaterialVERB Final packing material Valuated

    3050

    9 Production ConsumableZPCO Production Consumable Valuated

    3002/3003

    10Production Resources ToolsFHMI

    Production Resources ToolsValuated

    3020

    11Other ConsumablesZOCO

    Other ConsumablesValuated

    3003

    12Printing and Stationery ItemsZPSI

    Printing and Stationery ItemsValuated

    3001/3002

    13SparesERSA Engineering Spares - Valuated Valuated

    3040

    14Trading GoodsHAWA

    Trading Goods-ProjectValuated

    3110

    15UtilitiesZUTL Utilities Valuated

    3004

    16Returnable Packing MaterialLEIH

    Returnable Packing MaterialNon-Valuated

    Nil

    17Scrap MaterialsZSCP Non-Valuated Non-Valuated

    Nil

    18AssetZASS Non Valuated Non-Valuated

    Nil

    19Semi Finished-Mech.Assembly HALB Semi Finished-Mech.Assembly Valuated 7900

    20Operating SuppliesHIBE

    Tools used as aid for ProductionValuated

    3300

    21Semi Finished-Elec.AssemblyZESF

    Semi Finished-Elec.AssemblyValuated

    7900

    22Finished GoodsFERT

    Finished GoodsValuated

    7920

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    23/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 22

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    24/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 23

    After entering all the details, press to save the Material.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    25/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 24

    System message of Material

    Successfully Created

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    26/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 25

    Vendor Master record

    Menu Path Logistics Materials Management PurchasingMaster Data Vendor Central

    T Code

    XK01 Create

    XK02 ChangeXK03 Display

    Press Enter to input the details of the vendor.

    Vendor No will be generated automatically

    Enter Company Code

    Enter Account Group

    Enter Purchasing Organization

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    27/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 26

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    28/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 27

    Note:

    For Domestic Vendors- 13110000

    For Import Vendors - 13111000

    Click here to enter Excise related

    Entries

    Enter reconciliation account

    for Domestic

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    29/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 28

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    30/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 29

    Press to save the Vendor master and the no is generated automatically.

    Note:

    For Domestic Vendors Use ZD

    For Import Vendors- Use ZI

    Put tick inGR based invoiceverification

    & Automatic PO

    Put tick, if vendor is

    Service Vendor

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    31/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 30

    System message of

    successfully creation of

    vendor master

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    32/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 31

    CIN Master Data

    To maintain Chapter Ids

    Transaction Code: J1ID

    Select Chapter ID and Press

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    33/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 32

    Press New Entries to go to the next screen.

    Press New Entries to Create New Cha ter ID

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    34/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 33

    Press to save the data.

    Enter the Chapter ID

    Enter the Description as per law

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    35/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 34

    Material ID and chapter ID combination

    Select Material and Chapter ID Combination and Press

    Select the Material and Chapter-Id Combination

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    36/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 35

    Press New Entries to Create New Material Number and Chapter ID Combination

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    37/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    38/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 37

    Vendor Excise Details

    Transaction Code: J1ID

    Select Material and Chapter ID Combination and Press

    Note: If you have already maintained in Vendor Master Data in Tab CIN details, you need not to do this

    activity

    Select the Vendor Excise Details

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    39/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 38

    Press to save the data.Note:

    1.Enter EXCISE details, put excise indicator 1 always

    Press New Entries to Create Vendor Master Excise Details

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    40/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 39

    Maintaining SSI Rates:

    Transaction Code: J1ID

    Select SSI Rates and Press

    Select the SSI Rates

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    41/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 40

    Note: This is need not to do, its one time activity.

    Press to save the data.

    Press New Entries to Create Vendor Master Excise Details

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    42/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 41

    o Excise Indicator for Plants

    Select Excise Indicator for Plant and Press

    Select the Excise Indicator for Plant

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    43/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 42

    Press to save the data.

    Press New Entries to Create Plant Excise Details

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    44/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 43

    Maintaining Tax conditions Records

    Transaction code: FV11

    Purpose: To capture taxes in Purchase order for excise duty & Sales taxes

    Warning:

    Pl. Dont use Vendor Key combination for any of Tax condition records

    Enter Tax conditions. For Eg.JMOP- Excise duty

    JMX1-Setoff on Exciseduty paid

    Combination for Tax

    records

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    45/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 44

    Then click Save Icon, to save conditions records

    Press to save the data.

    Plant Code

    Vendor code

    Enter material code

    Enter Excise duty of material

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    46/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 45

    Tax conditions for Inward Materials(For CENVAT Credit)

    Conditions Description of Tax Conditions Example

    JSVD IN: Service tax debit Service tax for Cenvat 10

    JEC3 IN: ECS ST setoff % Ecess on Service Tax for cenvat 2

    JSV2 IN: Serv.tax InputNVV Service tax for Non-Cenvat

    JEC4 IN: ECS ST Invent. % Ecess on Service Tax for Non-Cenvat

    JMOP IN: BED setoff % Basic Excise duty of Material -Percentage basis 16%

    JMOQ IN: BED setoff Qty Basic Excise duty of Material -Quantity basis Rs.0.46/Nos

    JAOP IN: AED setoff % Addit ional Excise duty of Material -Percentage basis

    JAOQ IN: AED setoff Qty Additional Excise duty of Material -Quantity basis

    JSOP IN: SED setoff % Special Excise duty of Material -Percentage basis

    JSOQ IN: SED setoff Qty Special Excise duty of Material -Quantity basisJMX1 IN: A/P BED setoff Credit on BED paid in % 100%

    JEC1 IN: ECESS Setoff % Ecess 2%

    JEX1 IN: A/P ECS setoff Credit on Ecess paid in % 100%

    JIPC IN C Sales tax inv. Central Sales Tax 4%

    JVRD A/P VAT RM Deductible VAT for Raw Materials with VAT credit 12.50%

    JVRN A/P VAT RM Non-Deduct VAT for Raw Materials without VAT credit

    JVCD A/P VAT CG Deductible VAT for Capital Materials with VAT credit 12.50%

    JVCN A/P VAT CG Non Deduct VAT for Capital Materials without VAT credit

    JIPL IN L Sales tax inv. Local Sales Tax 8%

    Note: Each Excise Condition Has to be Maintained for Combination of Plant/Vendor/ Material

    Service Taxes shall be maintained for Plant / Vendor combination

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    47/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 46

    This is required for Haridwar Plant

    Tax conditions for Inward Materials(Without CENVAT Credit)

    Conditions Description of Tax Conditions Example

    JSV2 IN: Serv.tax InputNVV Service tax for Non-Cenvat

    JEC4 IN: ECS ST Invent. % Ecess on Service Tax f or Non-Cenvat

    JMIP IN: BED inventory % Basic Excise duty of Material -Percentage basis 16%

    JMIQ IN: BED inventory Qt Basic Excise duty of Material -Quantity basis Rs.0.46/Nos

    JAIP IN AED inventory % Additional Excise duty of Material -Percentage basis

    JAIQ IN AED inventory Qty Additional Excise duty of Material -Quantity basis

    JSIP IN SED inventory % Special Excise duty of Material -Percentage basis

    JSIQ IN SED inventory Qty Special Excise duty of Material -Quantity basis

    JMX2 IN: A/P BED inventor Credit on BED paid in % 100%

    JAX2 IN: A/P AED inventor Credit on BED paid in %

    JSX2 IN: A/P SED inventor Credit on BED paid in %

    JEC2 IN: ECESS Inv setoff% Ecess 2%

    JEX2 IN: A/P ECS inventory Credit on Ecess paid in % 100%

    JIPC IN C Sales tax inv. Central Sales Tax 4%

    JVRD A/P VAT RM Deduct ible VAT for Raw Materials with VAT credit 12.50%

    JVRN A/P VAT RM Non-Deduct VAT for Raw Materials without VAT credit

    JVCD A/P VAT CG Deduct ible VAT for Capital Materials with VAT credit 12.50%

    JVCN A/P VAT CG Non Deduct VAT for Capital Materials without VAT credit

    JIPL IN L Sales tax inv. Local Sales Tax 8%

    Note: Each Excise Condition Has to be Maintained for Combination of Plant/Vendor/ Material

    Service Taxes shall be maintained for Plant / Vendor combination

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    48/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 47

    1.1 Request for Quotation (RFQ)

    UseRequest for Quotation is used to float enquiries in market to obtain quotations from prospective vendors.

    This transaction is optional for the process.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    SAP R/3 menu LogisticsMaterial ManagementPurchasingRFQ/quotationRequest for Quotation Create

    Transaction code ME41

    2. On the Create RFQ: Initial Screen, make the following entries:

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    49/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 48

    Field name Description R/O/C User action and values CommentRFQ Type Default is AN -

    standard RFQR Enter RFQ type

    RFQ Date Default is creation date R May be changed if required The RFQ can becreated for future

    issuance. Note

    that SAP willrelease it on that

    date without

    notification.

    Quotation

    Deadline

    The due date for vendor

    quotations

    R Enter the due date in the date

    format assigned in the system

    If the deadline is

    stated as a date

    after the required

    delivery date, theuser will be given

    an error message

    when the deliverydate is entered.

    RFQ Externally numbered

    RFQ numbers

    C If allowed, user can assign

    RFQ number. Note: each

    vendors RFQ is assigned a

    separate number.

    Not

    recommended.

    Collective

    number of

    subsequent screen

    is an effectivemeans to capture

    and track RFQs.

    PurchasingOrg.

    Purchasing Organizationresponsible for RFQ

    R Enter or select PurchasingOrg. from table

    GOPO

    Purchasinggroup

    Buyer or Buying groupIdentifier

    R Enter or select Purchasinggroup number from table

    Item Category Key defining how the

    procurement of amaterial or service itemis controlled.

    R Leave it blank for this scenario

    Delivery Date Date on which the goods

    are to be delivered or the

    service is to beperformed.

    O Enter delivery date

    Plant Key for a productionfacility or branch officewithin the company (that

    is, company code).

    O Enter Plant or select fromtable

    Storage

    Location

    Number of the storage

    location where the

    material is stored. A

    O Enter Storage Location or

    select from table.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    50/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 49

    plant may contain one or

    more storage locations.

    Material

    Group

    Key that you use to

    group together several

    materials or services

    with the same attributes,

    and to assign them to a

    particular material

    group.

    O Enter material group or use

    match code

    Defaulted from

    material master

    record

    Requirement

    Trackingnumber

    Number that facilitates

    monitoring of theprocurement process for

    required materials or

    services. This number

    can relate to an external

    "need note" (notice ofrequirements) that was

    not generated in the

    system.

    O Enter requirement tracking

    number

    Press Enter to go to the next screen.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    51/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 50

    3. On screen Create RFQ: Item Overview, enter information in the fields as specified in the table

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    52/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 51

    Field name Description R/O/C User action and values Comment

    Item Number that uniquelyidentifies an item within

    the RFQ

    R Defaults - Line items aredefined by the system inincrements of 10.

    No User Action

    I Item Category -

    determines if standard

    purchase or other such

    as Sub-Contracting

    Order, etc.

    R Enter or select from table.

    Default is

    blank - standard purchase

    No User Action

    Material Material Number R Enter material number

    100PG1All stock material

    must have materialnumbers

    Short Text Short Description ofMaterial

    N/A Defaulted in from materialmaster

    RFQ Quantity Quantity of Material

    requested for quotation

    R Must be numeric

    10

    C Category of delivery

    date (indicates whether

    the date format is day,week or month)

    R Select from the drop-down

    list

    Delivery Date Date required if ordered R Must be in correct date

    format

    Material

    Group

    Group of material

    which this material

    belongs

    N/A Defaulted in from material

    master

    Plant Plant where material is

    required

    O Enter or select Plant from

    table.

    Note: the material master

    must exist for that plant.

    Sloc Storage Location where

    material will

    be delivered and storedif ordered

    O Enter Storage Location or

    select from table

    Strictly optional.

    Storage Location

    may be enteredlater at the time ofP.O. creation

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    53/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 52

    4. Choose (header details icon) on the toolbar, then on screen Create RFQ: Header Data, enter

    information in the fields as specified in the table below:

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    54/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 53

    Field name Description R/O/C User action and values Comment

    RFQ RFQ number R System will display saved

    document number unless

    externally assigned

    Grayed out

    Company

    code

    Company code R Defaulted by the system Grayed out

    Purchasinggroup

    Purchasing group R Supplied from initial screen Grayed out

    RFQ type RFQ type R Supplied from initial screen Grayed out

    Purch. Org Purchase organization R Supplied from initial screen Grayed outVendor Vendor number C Will be displayed if vendor

    number was added before this

    step.

    Grayed out

    RFQ date RFQ date R Supplied from initial screen Grayed out

    Item interval Item interval R Supplied by system

    Coll. No. Collective number O Enter a number to track

    vendors of the same RFQ

    Language Language R Supplied from initial screen

    Qout. Dead. Quotation deadline R Supplied from initial screen

    Validity start Validity start O Enter date quotation will start

    Validity end Validity end O Enter date quotation will end.

    Applic. By Application date O Enter closing date of Bids

    Warranty Warranty O Enter warranty information

    Bindg. Per. Binding period O Enter date period is binding

    Target val Target Value O Enter total value of all

    materials that can be released.

    Your

    reference

    Your reference O Enter Vendors reference

    number/name

    Salesperson Salesperson O Enter Salesperson name

    Our reference Our reference O Enter your reference

    number/name

    Telephone Telephone O Enter telephone #

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    55/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 54

    5. Choose (vendor address button) on the toolbar, then on screen Create RFQ: Vendor Address, enter

    information in the fields as specified in the table below:

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    56/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    57/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 56

    6. Press to Save the RFQ. This will refresh the Create RFQ: Vendor Address screen to allow creation

    of the same RFQ data to a new vendor by following the steps outlined above.

    Result

    The system will display the message RFQ Created under the number.

    ExampleRFQ created under the number600000005

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    58/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 57

    1.2 Message output: RFQ

    UseA RFQ needs to be printed for transmitting to vendor.This transaction is optional for the process.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    SAP R/3 menu LogisticsMaterials ManagementPurchasingRFQ/QuotationRequest for QuotationMessagesPrint/Transmit

    Transaction code ME9A

    2. On theMessage Outputscreen, make the following entries:

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    59/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 58

    Field name Description R/O/C User action and values Comment

    Purch. Doc.

    Data

    Document

    Number

    RFQ # O Choose from drop down

    menu

    60000000##

    Vendor Vendor # O Choose from drop down

    menuPurchasing

    Organization

    Purchasing Organization

    #

    O Choose from drop down

    menu

    1000

    Purchasing

    Group

    Purchasing Group # O Choose from drop down

    menu

    PG1

    Document

    Type

    Identifier allowing

    differentiation between

    the various kinds of

    purchasing document inthe SAP system

    O Choose from drop down

    menu

    AN

    Document

    Date

    Date on which the

    purchasing documentwas created.

    O Enter Document date or

    choose from drop down menu

    Message Data

    Application Subdivides the usage of

    a condition for the use in

    different application

    areas

    R EA defaults for RFQ

    Message type Specifies the kind of

    output

    O Choose from drop down

    menu

    NEU

    Transmission

    time-spot

    You can process the

    message immediately or

    at a later time. If

    processing later youmust use report programRSNASST00

    O Choose from drop down

    menu

    Processing

    status

    Indicates the status-

    1 indicates the processwas successful.

    2 indicates an error

    C Default is 0

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    60/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 59

    0 indicates the process

    has not yet started

    Creation date Date the message is

    create

    O Enter date or choose the drop

    down menu

    Time created Displays the time the

    message was created

    C Defaults to time started

    3. Choose toExecute.

    4. On screenMessage Outputselect the appropriate Document number and perform the following:

    Choose Output Message and/or

    ChooseDisplay Message and/or

    ChooseMessage Detailand/or

    Choose Trial Printout

    Select the Check Box corresponding to the Document No.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    61/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 60

    1.3 Maintaining Quotation

    UseThis transaction is used to maintain the quotation, which is submitted by vendors. Vendor communicates price

    for material and as a result the RFQ (Request for Quotation) needs to be updated.

    This transaction is optional for the process.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    SAP R/3 menu LogisticsMaterials ManagementPurchasingRFQ/quotation QuotationMaintain

    Transaction code ME47

    2. On theMaintain Quotation: Initial Screen, make the following entries:

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    62/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    63/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 62

    5. Enter information in the fields as specified in the table below. Some fields will not be available for input,

    as they are reference fields only.

    1. Press to select the line item

    2. Press to enter the conditions

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    64/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    65/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 64

    entered in the purchasing

    document is fixed.

    Exchange Rate

    Fix

    Indicator: if you fix the

    exchange rate, the PO

    currency and exchange

    rate cannot be changed

    during Invoice

    Verification.

    O Check to fix exchange rate if

    appropriate.

    Incoterms Commonly-used trading

    terms that comply withthe standards established

    by the International

    Chamber of Commerce

    (ICC).

    O Enter appropriate value if

    necessary.

    Match code (F4)

    search help can beused to locate the

    appropriate value.

    Target Value Total value of all

    materials to be releasedagainst the contract.

    O Enter appropriate value if

    necessary.

    If the value

    entered isexceeded, the user

    will receive a

    system message

    when creating a

    contract release

    order.

    ReferenceData:

    Quotation

    Date

    Date quotation submitted O Enter date if desired.

    Quotation Number of vendorsquotation

    O Enter number if desired.

    Your reference Your reference O Enter Vendors reference

    number/name

    Salesperson Salesperson O Enter Salesperson name

    Our reference Our reference O Enter your reference

    number/name

    Telephone Telephone O Enter telephone #

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    66/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 65

    6. Once all necessary header data has been maintained, the user can then enter the price information in one of

    two fashions:

    a. Enter the price in theNet Price field on theMaintain Quotation: Item Overview screen by

    Choosing overview icon on toolbar.b. To enter more detailed information in addition to the net price, select the line item and

    choose the Item Details icon. Choose the green Back arrow to return to the Overview

    screen once data has been maintained.

    i. A vendors quoted price can be entered in one of two ways.

    Enter the Conditions iven b vendor.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    67/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 66

    ii. Enter the net price per unit in the Net price field. This price includes the vendor's

    normal discounts and surcharges only. Cash discounts (for prompt payment) and

    taxes are calculated separately.

    iii. Enter the gross price in the Net price field, and maintain the conditions for the item.

    Then the system automatically replaces the entered gross price with the calculated

    net price. If the net price for an item is entered for which pricing conditions havebeen maintained, the system always replaces the price entered with the calculated

    net price.

    iv. Enter the Tax Code for any relevant taxes (for example, Excise Duty, Sales Taxes

    etc.) in the Tax code field. If a purchase order is created by referencing an RFQ, this

    code facilitates the determination of the tax amount when the invoice is entered in

    the system.

    v. After entering tax code, after choosing this system may give an information

    message showing the effective price, Choose Enter to continue.

    7. Once all quotation information has been successfully entered, save the data by Choosing on the Save

    button, or Choose the keys. A message will be displayed that the data has been saved.

    ResultQuotation is maintained.

    ExampleQuotation for RFQ 600000009 maintained.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    68/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 67

    1.4 Price Comparison

    UseRequired to compare prices from all quotations received as a result of a competitive bidding process.

    This transaction is optional for the process.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    SAP R/3 menu LogisticsMaterials ManagementPurchasingRFQ/Quotation QuotationPrice Comparison

    Transaction code ME49

    2. On thePrice Comparison Listscreen, make the following entries:

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    69/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 68

    Field name Description R/O/C User action and values Comment

    Purch Org. Organization unit thatnegotiates the general

    conditions of purchase

    for several plants or a

    single plant

    R Enter Purchasing OrgGOPO / GIPO

    Quotation Purchasing document

    number

    R Choose either quotation or

    collective RFQ number in

    combination with Purchasing

    Org

    Coll.RFQ Call for bid number or

    bid invitation number

    R Choose either quotation or

    collective RFQ number in

    combination with Purchasing

    Org

    Number which

    you might have

    maintained in

    RFQ

    Vendor Vendor Number O Enter vendor number if

    Parameters included for Comparison

    Enter the Purchasin Or anization

    Enter the Quotations to be compared

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    70/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 69

    applicable

    Material Material Number O Enter material # if applicable

    Maximum # of

    Quotations perpage

    Shows the maximum

    amount of quotationsthat are displayed next to

    each other.

    R Defaults to 12, change if necessary.

    a. Choose the comparison values to be used:

    i. Reference quotation: You can compare the quotations within the list with a samplequotation. The system displays the percentage deviation between each quotation in the

    list and the sample quotation.

    ii. Mean/minimum value quotation: The price comparison list can also display a "fictitious"

    quotation reflecting the average or minimum value of all quotations. Select either the

    "Mean value" or "Minimum value" quotation field to choose the type of fictitious

    quotation.iii. Percentage basis: The price comparison list displays the percentage of each item in

    relation to the maximum, minimum, or average price. To determine the display type,

    enter one of the following:

    +: The highest value for each item is the 100% value

    -: The lowest value for each item is the 100% value

    _: The mean value for each item is the 100% value

    b. Select the desired price computations:

    i. Select the appropriate field to determine which of the following should be included in

    the determination of the comparison price:

    i. Include cash discounts

    ii. Include delivery costsiii. Determine effective price

    3. Once all entries have been made, Choose the Execute.

    4. On screen Price Comparison List in Currency INR, view the Price Comparison list.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    71/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 70

    5. To view any of the following information for a particular quote included in the comparison, Choose the

    RFQ number with the mouse to select it, then Choose the appropriate icon/button on the menu toolbar:

    6. Display Material: Allows the user to view the purchasing data in the material master record.

    7. Display Vendor: Allows the user to view the vendor master record.

    8. Additional Info: Allows the user to view payment terms, bid dates, currency information for all the

    vendor quotations in the list.

    9. If any information has been modified through the comparison list, save the RFQ before exiting. If changeshave been made and the user attempts to exit without saving, the system will return a message to verify

    action.

    10. To exit the transaction, choose the green Back arrow, the yellow Exit arrow, or Choose the F3 button.

    ResultPrice Comparison List in Currency INR is displayed on the screen.

    Rank is

    generated

    Mean and

    Effective Price is

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    72/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 71

    1.7 Creating Purchase Requisition

    UseA Purchase Requisition is created to indicate purchase department to procure materials or services with details

    like how much quantity is required, when required. In this process Purchase Requisition is created against

    Quantity Contract created in above step 1.1.4 with exact delivery / requirement date.

    This transaction is optional for the process.

    Procedure1. Access the transaction choosing one of the following navigation options:

    SAP R/3 menu LogisticsMaterials ManagementPurchasingPurchaseRequisition Create

    Transaction code ME51N

    2. On the Create Purchase Requisition screen, make the following entries:

    Enter Material No. Enter required

    Quantity

    Enter required

    Plant

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    73/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 72

    Field name Description R/O/C User action and values Comment

    Shopping cartsymbol

    Document Type R System defaults in StandardPurchase Reqisition. Use

    pull down to change if

    necessary

    Purchase

    requisition

    Number that uniquely

    identifies a requisition

    O Leave blank. Number

    assigned by system.

    Source

    determi-

    nation

    Flag that determines

    whether automatic

    sourcing of materials

    from a vendor is to beused

    O

    Item Overview Icon

    Item Serialized item numbers R Leave blank, systemdefaulted.

    Accountassignment

    key specifying whetheraccounting for an item is

    to be effected via an

    auxiliary Account

    O Leave blank for

    this process

    Item Category Denotes specific featuresof an item (example -

    material is consignment)

    O

    Material Name or number that

    uniquely identifies a

    material

    R Enter material code

    100PG10

    Short Text Description of Material O Required for materials with no

    material master

    Defaulted from

    material master

    Quantity Quantity requisitioned R Enter number of unitsrequired

    100

    Unit Unit of measure in which

    the requested material isto be ordered

    R Defaults from material master

    C Category of deliverydate (indicates whether

    the date format is day,

    week or month)

    R Select from the drop-downlist

    Defaulted by the

    system

    Delivery date Date on which the goodsare to be delivered. If

    R Enter the date on which

    material is required

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    74/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    75/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 74

    3. To assign the source of supply ChooseItem Details icon or Choose Control + F4 and select Source ofsupply tab on it.

    4. Here ChooseAssign source of supply on this tab and system will automatically assign source to this

    purchase requisition.

    5. Choose to Save or Choose Control + S.

    ResultPurchase Requisition with reference to contract is created,

    Example

    Purchase requisition number1000000##created.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    76/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    77/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 76

    2. If you want create purchase order with reference to the purchase requisition, on item details screen enterthe purchase requisition number and item number atPurch. Req. field. System will automatically adopt

    all the data from requisition.

    Click the

    Purchasing

    Requisitionsand Press Adopt

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    78/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    79/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 78

    Group

    Company

    Code

    Company code for

    purchase

    R Enter if not defaulted in from

    purchasing org or group

    1000 / 2000

    SelectDelivery / Invoice tab on Header data.

    Payment

    Terms

    Payment Terms of

    Vendor

    O 0001 This field is

    important to getbase line date in

    Invoice

    Verification.

    Item Overview Item Overview

    Item number Item number withindocument

    R Will default by system

    Acct.

    assignmentcategory

    Account where costs are

    allocatedFor a consumablematerial. For a stockmaterial it is not required

    C Leave blank

    Item category Type of purchase C Leave blank

    Material Material number R 1000001 External

    numbering is

    used.

    Short text Text from the material

    master record

    R Default from master record

    PO Quantity Required units / quantity R 10

    Unit of

    measure

    Unit that good or service

    is purchased

    R Enter unit of measure Defaulted from

    material master

    Category ofdelivery date

    Indicates whether thedelivery date is to be

    entered and displayed as

    a calendar day, week or

    month.

    R default

    Delivery Date Date material is required R Enter delivery date

    Net Price Vendor selling price for

    good or service

    R Enter price

    Currency Currency used for plant R Defaulted from vendor master

    Per Price per unit R Default

    Order unit The unit of measure for

    which material is

    purchased

    R Default

    Material group Grouping together of

    materials by

    characteristics

    R Enter material group Defaulted from

    material master

    Plant Facility where goods or

    services are produced orsold.

    R Enter plant or select from the

    table

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    80/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 79

    Storage

    Location

    Location where stock is

    stored

    R Enter storage location or select

    from the table

    Required for stock

    item

    tracking

    number

    Number that facilitates

    monitoring of the

    procurement of required

    materials

    O Enter if known Can be used in

    List display to list

    all POs created

    by a certain buyer.

    Potential entry is

    employee number.

    Requisitioner To whom material or

    service is ordered

    O

    Info Record Purchasing information

    record informal priceagreement that may be

    updated with each

    purchase

    O Default if goods was purchase

    from vendor previously or inforecord created by system

    Purchase req Reference documentnumber

    C Input the purchasingrequisities number which

    generated above

    Use tool barbutton to

    reference other

    purchasing

    documents

    Requisn. Item Purchase requisition item

    no

    C 10

    Outline

    Agreement

    Reference document

    number

    C Enter contract number if you

    want create Release Order.

    Use tool bar

    button to

    reference other

    purchasing

    documents

    Agreement

    Item

    Item number C Enter contract line item

    number for Release Order

    Item number

    within purchasingdocument

    Item Details Item Details

    Select Invoicetab

    Tax code Enter Tax code R V8

    Since the procurement is for1000 Mfg. Plant, which is located in Bangalore, Karnataka State and the Vendoris located in Hyderabad, Andhra Pradesh. This transaction attracts Central Sales Tax (CST) because this is

    inter state transaction. That is the reason it is advised to create condition record for central sales tax.

    GR-based IV Goods receipt based

    invoice verification

    O Tick this check box

    4. The Purchase Order may be posted by Choosing on the Save button or Choose Control + S for saving.

    ResultA message will be displayed stating that the purchase order was saved, with the purchase order number,

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    81/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    82/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 81

    Field name Description R/O/C User action and values Comment

    Purch. Doc.

    Data

    DocumentNumber

    Purchase Order # O Choose from drop downmenu

    4500000270

    Vendor Vendor # O Choose from drop downmenu

    Purchasing

    Organization

    Purchasing Organization

    #

    O Choose from drop down

    menuGOPO / GIPO

    PurchasingGroup

    Purchasing Group # O Choose from drop downmenu

    Document

    Type

    Identifier allowing

    differentiation betweenthe various kinds of

    purchasing document in

    the SAP system

    O Choose from drop down

    menu

    Document

    Date

    Date on which the

    purchasing document

    was created.

    O Enter Document date or

    choose from drop down menu

    Message Data

    Application Subdivides the usage ofa condition for the use in

    different application

    areas

    R EF defaults for PurchaseOrder

    Message type Specifies the kind of

    output

    O Choose from drop down

    menu

    NEU

    Transmission

    time-spot

    You can process the

    message immediately or

    at a later time. Ifprocessing later you

    must use report program

    RSNASST00

    O Choose from drop down

    menu

    Processingstatus

    Indicates the status-1 indicates the process

    was successful.

    2 indicates an error0 indicates the process

    has not yet started

    C Default is 0

    Creation date Date the message is O Enter date or choose the drop

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    83/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 82

    create down menu

    Time created Displays the time the

    message was created

    C Defaults to time started

    3. Choose toExecute.

    4. On screenMessage Outputselect the appropriate Document number and perform the following:

    Choose Output M essage

    Then go to Spool request, to take print out.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    84/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 83

    1.10 Goods Receipt for Purchase Order

    UseGoods are received from the Vendor as a result of a Purchase Order at the receiving plant. A goods movement

    is entered into the system referencing this PO and a goods receipt material document is posted. Appropriate

    general ledger accounts are also posted and stocks are updated.

    Prerequisites

    Purchase Order

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    SAP R/3 menu LogisticsMaterials Management Inventory ManagementGoods Movement Goods Receipt For Purchase Order PO

    Number Known

    Transaction code MIGO

    2. On the Goods Receipt Purchase Orderscreen, make the following entries:

    Check this tick, to take print out

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    85/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    86/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 85

    Delivery Note in Header O Delivery Number from

    VendorVendor Vendor R Defaulted from purchase order Grayed out

    Posting Date Posting date R Enter posting date

    Bill of lading Bill of lading O Enter bill of lading

    Header text Header text O Enter header text

    Close Header Detail data to enlarge the Detail data.

    SelectMaterial tab at Detailed Data.

    Material Material tab R Defaulted from PurchaseOrder

    Grayed out

    Select Quantity tab in Detail data.

    Qty in unit ofentry

    Quantity in unit of entry R Enter the quantity you havereceived from vendor. As a

    default system will give

    purchase order quantity

    Quantity defaultedfrom Purchase

    Order

    Qty in deliverynote

    Quantity in delivery note O Enter the quantity as per

    vendor delivery challan

    Select Where tab in Detail data.

    Movementtype

    Movement type R Defaulted from header screen

    Stock type Stock type R Defaulted from material

    master or purchase order

    Plant Plant R Defaulted from purchase order

    1000

    Storagelocation

    Storage location R Defaulted from purchase order

    if enteredRM01

    GoodsRecipient

    Goods Recipient O Enter the name of person whoreceived goods

    Unloading

    point

    Unloading point O

    Text Text O Enter the text if required

    SelectPurchase Ordertab in Detail data.

    PurchaseOrder

    Purchase Order R Defaulted from header data Grayed out

    Del. completed Delivery completion O Defaulted by system if PO Qty

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    87/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 86

    ind. indicator = GR Qty

    SelectPartnertab in Detail data.

    Vendor Vendor name O Grayed out

    For this material batch management is not active. Just for reference purpose the following data is given.

    SelectBatch tab in Detail data.

    This tab will come only if material is managed in batches.

    Proceed with the following steps if material is batch managed only.

    Batch Batch number R Enter batch number as date for

    batch managed materials

    Vendor batch Vendor batch O Enter vendor batch number for

    reference

    3. Select the Check boxItem OK, after entering all the data.

    You will getExcise Invoice tab at Header Data for capturing vendor excise invoice details and for

    posting Part I and Part II.

    4. On theExcise Invoice tab at Header Data make the following entries.

    Field name Description R/O/C User action and values Comment

    Capture &Post Excise

    invoice

    Capture & Post ExciseInvoice on Excise Action

    R Choose Capture & PostExcise Invoice from drop

    down list

    Defaulted

    Excise Group Excise Group R Defaulted by the system

    Excise Invoice Excise invoice R Enter the vendor ExciseInvoice number

    For example:

    APG1

    Excise Inv.Date

    Excise Invoice Date R Enter the excise invoice dateof vendor

    BED Basic Excise Duty R Defaulted from purchase order Grayed out

    AED Additional Excise Duty R Defaulted form purchase order Grayed out

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    88/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    89/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 88

    1.13 Logistics Invoice Verification

    UseIn this process of Logistics Invoice Verification all the Incoming Invoices are verified in terms of their content,

    prices and arithmetic. When the invoice is posted, the invoice data is saved in the system. The system updatesthe data saved in the invoice documents in Materials Management and Financial Accounting.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    SAP R/3 menu LogisticsMaterials Management Logistics invoice Verification

    Document Entry

    Enter InvoiceTransaction code MIRO

    2. If you are opening for the first time this transaction, system will ask forCompany Code,please give 1000 /

    2000 to go in side the transaction.

    3. On theEnter Incoming Invoice: Company Code 1000 / 2000 screen, make the following entries:

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    90/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 89

    Field name Description R/O/C User action and values Comment

    Transaction Invoice R Select Invoice from dropdown list

    Header Data Header data of Invoice R Defaulted by system

    Basic tab Basic information tab R Select basic information tab togive initial information

    Invoice Date Invoice Date R Enter the Vendor invoice date

    Reference Invoice reference O Enter the vendor invoicereference

    For ExampleASTRA01

    Posting date Posting Date R Enter the posting date ofdocument

    System will givecurrent date as

    default

    Amount Invoice Amount R Enter invoice gross amount Amount

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    91/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    92/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 91

    Layout Layout of invoice

    verification

    R Select All information from

    drop down listChoose Enter

    4. ChooseEnterto complete the document feeding part.

    5. To check the document credit and debit is balanced on the top right corner of your screen a traffic light isdisplayed. Beside thatBalance of the document is displayed.

    Ensure that the Balanceis ZERO before posting the document and the traffic light is green or yellow

    color.

    6. If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth row

    of your screen.

    8. Choose Saveposting the document.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    93/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    94/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    95/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    96/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    97/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 96

    externally maintained by you

    or system will allocate batch

    number

    Vendor batch Vendor batch O Enter vendor batch number for

    reference

    4. Select the Check boxItem OK, after entering all the data.

    To getExcise Invoice tab at Header Data Choose Checkpush button at third row at the top of thescreen.

    5. On theExcise Invoice tab at Header Data make the following entries.

    Choose No excise entry

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    98/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 97

    6. Choose Checkat the top of screen.

    7. ChoosePostto post the document.

    ResultMaterial document posted

    ExampleMaterial document 5000000422 posted

    1.15 Excise Invoice Other Movements

    UseIf the material returned to vendor is subject to Excise Duty, it is the legal requirement to in India to send the

    same with Excise Invoice.

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    SAP CIN R/3

    User menu

    Indirect taxes Sales / Outbound Movements Excise Invoice For

    Other Movements Excise Invoice for Other Movements

    Transaction code J1IS

    2. On theExcise Invoice Other Movements

    Main Menu screen, make the following entries:

    3. Choose Create Excise Invoice icon to start the transaction

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    99/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 98

    Field name Description R/O/C User action and values Comment

    Reference

    Ref.doc.type Reference Document Type R Enter MATDfor this process

    Doc Number Document Number R Enter the return delivery documentnumber which you have created in

    above step

    5000000422

    Doc Year Document year R Enter the year of document created

    Example: 2005

    Series Group Enter the Excise Series

    Group

    R Enter J1 for this transaction

    Excise Group Excise Group R Enter P1for this transaction

    Enter

    System will get vendor code as a default, please check is it corrects vendor code or not.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    100/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    101/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    102/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    103/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 102

    5. To take printout, select Goto from the top main menu and selectPrint Documentfrom the list. Or ChooseControl + P to get the access ofExcise Invoice Printingscreen.

    6. Choose Execute icon to get list of excise invoice ready to be printed.

    Choose excise

    invoice Number

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    104/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    105/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    106/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 105

    1.17 Credit Memo

    UseIn this process of Logistics Invoice Verification a credit memo is generated on vendor. Please be careful that

    during the total process after making logistics invoice verification you have made return delivery to vendor.To recover that money you need to do this credit memo transaction.

    Prerequisites

    Logistic Invoice Verification is already made

    Procedure

    1. Access the transaction choosing one of the following navigation options:

    SAP R/3 menu LogisticsMaterials Management Logistics invoice VerificationDocument Entry Enter Invoice

    Transaction code MIRO

    2. If you are opening for the first time this transaction, system will ask forCompany Code,please give 1000 /

    2000 to go in side the transaction.

    3. On theEnter Incoming Invoice: Company Code 1000 screen, make the following entries:

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    107/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 106

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    108/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    109/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 108

    Hide Header data for getting full screen of items if required.

    Purchase order /

    Schedule Agreement

    R Select Purchase order /

    Schedule Agreement in the

    reference document category

    from drop down list

    Defaulted for user

    Purchase order number R Enter the purchase ordernumber

    Goods / service items R Select Goods / Service itemsin indicator from drop down

    list

    Defaulted

    Layout Layout of invoiceverification

    R Select All information fromdrop down list

    Choose Enter

    4. ChooseEnterto complete the document feeding part.

    5. To check the document credit and debit is balanced on the top right corner of your screen a traffic light is

    displayed. Beside thatBalance of the document is displayed.

    Ensure that the Balanceis ZERO before posting the document and the traffic light is green or yellow

    color.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    110/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 109

    6. If you want to see the accounting postings in simulation mode, Choose Simulation on middle of fourth rowof your screen.

    7. Choose Saveposting the document.

    ResultLogistics Invoice verification document is posted.

    ExampleDocument no. 5105600055 created

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    111/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    112/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 111

    6.Enter Material Code you want to transfer and quantity also.

    7.Enter Receiving storage Location8.Enter Recipient name

    Then enter..

    9.Finally click save icon.

    Result:Material is transferred from ERM SL to MRM SL

    Note: In case of material transfer from one SL to another SL with

    reference, procedure is like this.

    1. Enter transaction Code MB1B2. PUT Movement type 311(Optional), then choose Reservation in Tool Bar3. New pop up will appear, enter reservation number of material then choose

    Adopt+Details4. System will defaults all details of a reservation items

    5. Check the items & then enter receiving Storage location

    6. Then enter & Save

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    113/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    114/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 113

    3.Then choose from list

    4.Select Reservation line item (s) then clickAdopt

    5.System will copy all values of selected Reservation(s)

    6.Then Click , then will copy

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    115/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    116/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 115

    Creation of Reservation (Manually)Transaction code- MR21

    In initial Screen enter details1. Enter transaction code MR21

    2. Enter Movement type- 201(For Goods Issue Request & Reservation)3. Enter Plant For E.g. 1000

    Then Press Enter

    5.Enter the relevant cost center, this vary based on dept. For E.G. 1201- for Purchasing

    6..Enter material code you want do reservation and quantity7.Recipient name

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    117/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    Confidential Page 116

    7.Press enter and Save

    8.Result ofNote: if you want to create Reservation w.r.t. Reservation, put reservation in initial screen

    itself and system will default all details of reference as shown below.

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    118/119

  • 7/27/2019 Proc. of Stock Materials-Revised-2

    119/119

    Materials ManagementUser manual

    Procurement Of Stock Materials

    It is necessary that stock type should be in same form of GR when material document