People Capability Maturit y Model P-CMM (People Capability Maturity Model) Presented By:- Pritesh Patel

Pritesh

Embed Size (px)

Citation preview

Page 1: Pritesh

People Capability Maturity Model

P-CMM (People Capability Maturity Model)

Presented By:- Pritesh Patel

Page 2: Pritesh

People Capability Maturity Model

Outline Why P-CMM ?

Introduction

Difference between P-CMM and CMM

Architecture of P-CMM

Process area and maturity levels

Page 3: Pritesh

People Capability Maturity Model

Why P-CMM??? People is one of the main aspects of any

organization.

Too much focus on technology and less on people.

Consideration on not only “hygiene factors” but whole person.

Page 4: Pritesh

People Capability Maturity Model

Introduction A framework that focuses on improving management

and development of human assets of an organization.

Provides an improvement path

Integrate workforce development with process improvement

Characterize the maturity of their workforce practices

Page 5: Pritesh

People Capability Maturity Model

Difference between CMM and P-CMM CMM is more generic and focused on

organization process.

P-CMM is more focused on the organization workforce.

P-CMM has a staged architecture then just maturity levels as in CMM.

Page 6: Pritesh

People Capability Maturity Model

P-CMM Architecture

Page 7: Pritesh

People Capability Maturity Model

Process Area & Maturity Levels

Page 8: Pritesh

People Capability Maturity Model

Process Goals & Process Practice Process goal is an organizational state

to be achieved by implementing the practices of a process area.

Process practice is a sub process within a process area that contributes to achieving a process area goal.

Page 9: Pritesh

People Capability Maturity Model

Implementation Practices& Institutionalization Practices

Page 10: Pritesh

People Capability Maturity Model

Summary Why P-CMM ?

Introduction

Difference between CMM and P-CMM

Architecture

Process area and maturity levels

Page 11: Pritesh

People Capability Maturity Model

References Curtis,B.;Hefley,B.;Miller,S.” People Capability Maturity Model(P-CMM)” Pittsburgh, PA:

Software Engineering Institute, Carnegie Mellon University, September 1995.

Curtis,B.;Paulk,M.;Weber,C.;Chrissis,M; “The Capability Maturity Model:Guidelines for Improving the Software Process” Software Engineering Institute, Carnegie Mellon University

Mohanadoss,B. “A People Capability Maturity Model (PCMM) Approach ” ECIL, Hyderabad on 20th July 2001

Mohanadoss,B. “People Capability Maturity Model– New Era People Framework

(SfA http://www.sei.cmu.edu/cmm-p/)

(SfA http://www2.umassd.edu/SWPI/processframework/cmm/pcmm.html)