Features :
provides a unique finished look to exposed roof surfaces. Patent pending.
Titanium dioxide white coating provides an energy saving emissive layer that reduces heat penetration.
Tear resistant high tensile strength woven PP substrate that does not distort or belly like spun-bonded sheets.
UV resistant.
More than 5 times lighter than 30 lbs felt.
Roll coverage is 4.6 times greater than felt.
Non-skid TPO coating with high coefficient of friction.
Printed nail pattern for easy installation.
20-year limited warranty.
Available in two energy efficient colors, white or tan.
Lighter colors reduce fabric cycling (expansion and contraction) thus reducing nail hole elongation.
Contains no asphalt.
þShingle print pattern
þ
þ
þ
þ
þ
þ
þ
þ
þ
þ
þ
Shingle Pattern TanDesert Shingle Pattern White
Installer Print White Installer Print TanDesert
The only roofing underlayment with the high performance of a synthetic underlayment, and the finished look of a shingled roof.
1. Product Name:
2. Manufacturer:
3. Product Description:
exclusive shingle-look print pattern
âAvailable in energy efficient white or tan,
outperforms felt, is installer friendly, and provides both durable temporary cover and long lasting water shedding protection .
âGrip-Rite ShingleLayment Synthetic Underlayment
PrimeSource Building Products, Inc.1321 Greenway Drive, Irving, TX 75038800-676-7777www.primesourcebp.comwww.grip-rite.com
Composition:â â Grip-Rite ShingleLayment synthetic underlayment is a
lightweight, woven polypropylene underlayment coated with a non-skid TPO. ShingleLayment possesses very high tensile and tear strength that resists tearing, ripping and blow offs from high wind exposure. ShingleLayment can be used in any code compliant mechanically attached roofing application.
Application:
Grip-Rite ShingleLayment synthetic underlayment is used on steep-slope roofs beneath shingles, battened tiles, metal roofing, slate, wood shake & shingle, and simulated slate/shake prepared roof coverings as an alternate to ASTM D226, Type I or II or ASTM D4869 asphalt felts.
Grip-Rite ShingleLayment synthetic underlayment is a water shedding device designed to reduce the occurrence of leaks caused by wind driven rain penetrating primary roof system coverings, as well as damaged roof coverings, and as temporary cover on exposed roof systems.
Grip-Rite ShingleLayment synthetic underlayment is available with standard installer print pattern or
(Patent Pending). Both print patterns feature installation and nailing grids for easy, accurate application.
Grip-Rite ShingleLayment synthetic underlayment increases applicator productivity thanks to its low weight per roll, and superior 10 sq. roll coverage .
Grip-Rite ShingleLayment synthetic underlayment can be exposed to natural UV for up to 180 days. Severe weather, jobsite damage, chemical exposure or other conditions may shorten exposure life.
ShingleLayment
GRSLBRO06/2012
®Grip-Rite ShingleLayment® is distributed by PrimeSource Building Products, Inc.
Grip-Rite ShingleLayment
OVERLAP LINE OVERLAP LINE OVERLAP LINE OVERLAP LINE OVERLAP LINE
11
0.7
44
mm
(4.3
6 in
)5
1.3
28
(2 in
.)5
1.3
28
(2 in
.)
Grip-Rite ShingleLayment
1016mm(40in.)
203.2mm(8in.)
203.2mm(8in.)
11
17
.6m
m (
44
in.)
12
19
.2 m
m (
48
in.)
SHINGLE PRINT PATTERN IS NOT INTENDED FOR USE AS AN INSTALLATION GRID FOR FINAL ROOFING SURFACE SHINGLES
SHINGLE PRINT PATTERN IS NOT INTENDED FOR USE AS AN INSTALLATION GRID FOR FINAL ROOFING SURFACE SHINGLES
Underwriters LaboratoriesVerified to ICC-ES AC10 and AC 304
Underwriters LaboratoriesVerified to ICC-ES AC10 and AC 304ICC-ES ESR #2945 ICC-ES ESR #2945
OVERLAP LINE OVERLAP LINE OVERLAP LINE OVERLAP LINE OVERLAP LINE
11
0.7
44
mm
(4.3
6 in
)5
1.3
28
(2 in
.)5
1.3
28
(2 in
.)
Underwriters LaboratoriesVerified to ICC-ES AC10 and AC 304
Underwriters LaboratoriesVerified to ICC-ES AC10 and AC 304
Grip-Rite ShingleLaymentGrip-Rite ShingleLayment
1016mm(40in.)
203.2mm(8in.)
203.2mm(8in.)
11
17
.6m
m (
44
in.)
12
19
.2 m
m (
48
in.)
SHINGLE PRINT PATTERN IS NOT INTENDED FOR USE AS AN INSTALLATION GRID FOR FINAL ROOFING SURFACE SHINGLES
SHINGLE PRINT PATTERN IS NOT INTENDED FOR USE AS AN INSTALLATION GRID FOR FINAL ROOFING SURFACE SHINGLES
ICC-ES ESR #2945 ICC-ES ESR #2945
11
0.7
44
mm
(4.3
6 in
)
51
.32
8 (2
in.)
51
.32
8 (2
in.)
11
0.7
44
mm
(4.3
6 in
)
1016mm(40in.)
203.2mm(8in.)
203.2mm(8in.)
11
17
.6m
m (
44
in.)
12
19
.2 m
m (
48
in.)
16.054”
2.133”
Underwriters LaboratoriesVerified to ICC-ES AC10
and AC 304Grip-Rite ShingleLaymentICC-ES ESR #2945
Underwriters LaboratoriesVerified to ICC-ES AC10
and AC 304Grip-Rite ShingleLaymentICC-ES ESR #2945
11
0.7
44
mm
(4.3
6 in
)
51
.32
8 (2
in.)
51
.32
8 (2
in.)
11
0.7
44
mm
(4.3
6 in
)
1016mm(40in.)
203.2mm(8in.)
203.2mm(8in.)
11
17
.6m
m (
44
in.)
12
19
.2 m
m (
48
in.)
16.054”
2.133”
Underwriters LaboratoriesVerified to ICC-ES AC10
and AC 304Grip-Rite ShingleLaymentICC-ES ESR #2945
Underwriters LaboratoriesVerified to ICC-ES AC10
and AC 304Grip-Rite ShingleLaymentICC-ES ESR #2945
Print Patterns
®
Synthetic Roofing Underlayment
®
GRC58A Cap StaplerGRC58A Cap Stapler
®ShingleLayment Rolls
SKU
Size
Print ColorWeight/
RollRolls/Pallet
Pallets/TruckloadArea Dimensions
SLW4100GRI 4 Square 4 ft. x 100 ft. Installer White 13 lb. 90 36
SLT4100GRI 4 Square 4 ft. x 100 ft. Installer Desert Tan 13 lb. 90 36
SLW4100GRS 4 Square 4 ft. x 100 ft. Shingle White 13 lb. 90 36
SLT4100GRS 4 Square 4 ft. x 100 ft. Shingle Desert Tan 13 lb. 90 36
SLW4250GRI 10 Square 4 ft. x 100 ft. Installer White 30 lb. 35 36
SLT4250GRI 10 Square 4 ft. x 100 ft. Installer Desert Tan 30 lb. 35 36
SLW4250GRS 10 Square 4 ft. x 100 ft. Shingle White 30 lb. 35 36
SLT4250GRS 10 Square 4 ft. x 100 ft. Shingle Desert Tan 30 lb. 35 36
800-676-7777www.grip-rite.comwww.primesourcebp.com
BUILDING PRODUCTS, INC.
© 2012 PrimeSource Building Products, Inc.
â âGrip-Rite ShingleLayment installed horizontally with the printed side up, and with 4-inch horizontal laps and 6-inch vertical laps. Horizontal laps shall be in a shingle pattern, running with the flow of water.
Single Layer; Roof Slope > 4:12:
Starting at the eave, fasten the eave edge 8-inch o.c. and vertical laps 8-inch o.c., and 24-inch o.c. down the center of the roll. Continue upslope in a similar manner, maintaining minimum 4-inch horizontal and minimum 6-inch vertical laps. Fasten 8-inch o.c. at horizontal laps and 8-inch o.c. at vertical laps and 24-inch o.c. down the center of the roll. Ensure all vertical laps are staggered at least 3-feet apart.
In high wind zones (> 110 mph 3-second gust design wind speed), increase the fastening schedule to 4-inch o.c. at horizontal laps, 4-inch o.c. at vertical laps, and 24-inch o.c. down the middle of the roll in the field of the roof.
Double Layer; 2:12 < Roof Slope < 4:12:
Starting at the eave, fasten the eave-edge of a half-width starter-strip 8-inch o.c. and vertical laps 8-inch o.c. Continue upslope in a similar manner, with minimum 24-inch horizontal laps and minimum 6-inch vertical laps. Fasten 8-inch o.c. along the low edge and 8-inch o.c. at vertical laps and 24-inch o.c. down the center of the roll. Ensure all vertical laps are staggered at least 3-feet apart. In high wind zones (> 110 mph 3-second gust design wind speed), increase the fastening schedule to 4-inch o.c. at horizontal laps, 4-inch o.c. at vertical laps, and 24-inch o.c. down the middle of the roll in the field of the roof.
synthetic underlayment shall be
6. Precautions & Limitations:þ
þ
þ
þ
þ
þ
þ
þ
Depending on roof pitch and surface conditions (wet, dusty, frost), the coefficient of friction may change, and can become slippery. Use Caution.
Use caution compliant fall protection.
Do not walk or stand on ShingleLayment until it is attached to roof deck according to Installation Instructions.
Shingle print pattern is not intended for use as an installation grid for final roofing surface shingles.
Grip-Rite ShingleLayment synthetic underlayment is not designed as a primary roof covering. Exposure beyond sixty days without final roof covering may subject the sheet to jobsite abuse, chemical exposure, and severe weather.
Grip-Rite ShingleLayment synthetic underlayment may not be used in any exposed application such as crickets, exposed valleys, or exposed roof to wall details.
Attic spaces must be property ventilated in accordance with the local Building Code.
Minimum roof pitch: 2:12 (9.4°).
when walking on roof deck and use OSHA
4. Standards and Approvals:þ
þ
þ
þ
þ
þ
þ
þ
5. Installation:
ICC-ESR #2945
Miami-Dade NOA 09-0527.01 8/26/09
Florida Statewide Product Approval File No. FL12510
AC 188
ASTM D226
ASTM D4869 Type IV
Class A Fire Tested
CAN CSA A123
â âGrip-Rite ShingleLaymentinstalled in compliance with the codified requirements for ASTM D226, D4869 or D6757 underlayment for the type of prepared roof covering to be installed.
Re-fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly to remove any dust and debris prior to application.
Corrosion resistant fasteners shall be plastic cap nails or staples with a minimum nominal 1-inch diameter head. The use of cap staples should be limited to installations that will be covered by the final roofing system within 60 days as the membrane will be less resistive to the elements which may result in blow-off.
âGrip-Rite fasteners are recommended. Ensure fasteners are installed at 90-degree angle to the deck with flush contact between the plastic cap and the upper surface of the underlayment. Where
âlocal code requires metal cap washers, Grip-Rite Tin-Caps are recommended.
synthetic underlayment shall be
For batten-secured roof cover installations:
When battens are installed over synthetic underlayment, the underlayment need only be preliminarily attached in advance of batten installation. Ensure preliminary underlayment attachment does not interfere with batten locations.
Where seams or joints require sealant or adhesive, use only high quality, low solvent asbestos free plastic roofing cement meeting ASTM D4586, Type I.
Install a leak barrier of ASTM D1970 or approved equal at vulnerable leak areas, including but not limited to eaves, valleys, rakes, skylights and dormers. At eaves and valleys, install the leak
âbarrier prior to installation of Grip-Rite . Along the rake, install âGrip-Rite ShingleLayment leaving 6 to 8-inch of the deck
âexposed, and then install the leak barrier over the Grip-Rite and exposed decking. At other areas, install the leak barrier over the
âGrip-Rite ShingleLayment .
â âGrip-Rite ShingleLayment
Synthetic Roofing Underlayment
®
â âPhysical Properties of Grip-Rite ShingleLayment Synthetic Underlayment
Properties Standard®Grip-Rite ASTM D226 Type II ASTM D4869 Type IV
Accelerated Aging AC188 Pass N/A N/A
UV Exposure AC188 Pass N/A N/A
Pliability D226 Pass Pass Pass
Liquid Water Transmissions ASTM D4869 Pass N/A Pass
Loss on Heating (%) ASTM D228 0.4 4 6
Thickness ASTM D3767 8.5 mils — —
Temperature Range AC188 -55° C (-67° F) – 110° C (230° F) — —
Permeance ASTM E 96 Desiccant method .03 PERMS — —
Tensile Strength (lb./ft./in.)
Control ASTM D828 116/113 N/A N/A
After Aging — 116/99 N/A N/A
After UV — 117/94 N/A N/A
Breaking Strength (lb./ft.)
Control ASTM D146 118/116 40/20 40/20
â âGrip-Rite ShingleLayment installed horizontally with the printed side up, and with 4-inch horizontal laps and 6-inch vertical laps. Horizontal laps shall be in a shingle pattern, running with the flow of water.
Single Layer; Roof Slope > 4:12:
Starting at the eave, fasten the eave edge 8-inch o.c. and vertical laps 8-inch o.c., and 24-inch o.c. down the center of the roll. Continue upslope in a similar manner, maintaining minimum 4-inch horizontal and minimum 6-inch vertical laps. Fasten 8-inch o.c. at horizontal laps and 8-inch o.c. at vertical laps and 24-inch o.c. down the center of the roll. Ensure all vertical laps are staggered at least 3-feet apart.
In high wind zones (> 110 mph 3-second gust design wind speed), increase the fastening schedule to 4-inch o.c. at horizontal laps, 4-inch o.c. at vertical laps, and 24-inch o.c. down the middle of the roll in the field of the roof.
Double Layer; 2:12 < Roof Slope < 4:12:
Starting at the eave, fasten the eave-edge of a half-width starter-strip 8-inch o.c. and vertical laps 8-inch o.c. Continue upslope in a similar manner, with minimum 24-inch horizontal laps and minimum 6-inch vertical laps. Fasten 8-inch o.c. along the low edge and 8-inch o.c. at vertical laps and 24-inch o.c. down the center of the roll. Ensure all vertical laps are staggered at least 3-feet apart. In high wind zones (> 110 mph 3-second gust design wind speed), increase the fastening schedule to 4-inch o.c. at horizontal laps, 4-inch o.c. at vertical laps, and 24-inch o.c. down the middle of the roll in the field of the roof.
synthetic underlayment shall be
6. Precautions & Limitations:þ
þ
þ
þ
þ
þ
þ
þ
Depending on roof pitch and surface conditions (wet, dusty, frost), the coefficient of friction may change, and can become slippery. Use Caution.
Use caution compliant fall protection.
Do not walk or stand on ShingleLayment until it is attached to roof deck according to Installation Instructions.
Shingle print pattern is not intended for use as an installation grid for final roofing surface shingles.
Grip-Rite ShingleLayment synthetic underlayment is not designed as a primary roof covering. Exposure beyond sixty days without final roof covering may subject the sheet to jobsite abuse, chemical exposure, and severe weather.
Grip-Rite ShingleLayment synthetic underlayment may not be used in any exposed application such as crickets, exposed valleys, or exposed roof to wall details.
Attic spaces must be property ventilated in accordance with the local Building Code.
Minimum roof pitch: 2:12 (9.4°).
when walking on roof deck and use OSHA
4. Standards and Approvals:þ
þ
þ
þ
þ
þ
þ
þ
5. Installation:
ICC-ESR #2945
Miami-Dade NOA 09-0527.01 8/26/09
Florida Statewide Product Approval File No. FL12510
AC 188
ASTM D226
ASTM D4869 Type IV
Class A Fire Tested
CAN CSA A123
â âGrip-Rite ShingleLaymentinstalled in compliance with the codified requirements for ASTM D226, D4869 or D6757 underlayment for the type of prepared roof covering to be installed.
Re-fasten any loose decking panels, and check for protruding nail heads. Sweep the substrate thoroughly to remove any dust and debris prior to application.
Corrosion resistant fasteners shall be plastic cap nails or staples with a minimum nominal 1-inch diameter head. The use of cap staples should be limited to installations that will be covered by the final roofing system within 60 days as the membrane will be less resistive to the elements which may result in blow-off.
âGrip-Rite fasteners are recommended. Ensure fasteners are installed at 90-degree angle to the deck with flush contact between the plastic cap and the upper surface of the underlayment. Where
âlocal code requires metal cap washers, Grip-Rite Tin-Caps are recommended.
synthetic underlayment shall be
For batten-secured roof cover installations:
When battens are installed over synthetic underlayment, the underlayment need only be preliminarily attached in advance of batten installation. Ensure preliminary underlayment attachment does not interfere with batten locations.
Where seams or joints require sealant or adhesive, use only high quality, low solvent asbestos free plastic roofing cement meeting ASTM D4586, Type I.
Install a leak barrier of ASTM D1970 or approved equal at vulnerable leak areas, including but not limited to eaves, valleys, rakes, skylights and dormers. At eaves and valleys, install the leak
âbarrier prior to installation of Grip-Rite . Along the rake, install âGrip-Rite ShingleLayment leaving 6 to 8-inch of the deck
âexposed, and then install the leak barrier over the Grip-Rite and exposed decking. At other areas, install the leak barrier over the
âGrip-Rite ShingleLayment .
â âGrip-Rite ShingleLayment
Synthetic Roofing Underlayment
®
â âPhysical Properties of Grip-Rite ShingleLayment Synthetic Underlayment
Properties Standard®Grip-Rite ASTM D226 Type II ASTM D4869 Type IV
Accelerated Aging AC188 Pass N/A N/A
UV Exposure AC188 Pass N/A N/A
Pliability D226 Pass Pass Pass
Liquid Water Transmissions ASTM D4869 Pass N/A Pass
Loss on Heating (%) ASTM D228 0.4 4 6
Thickness ASTM D3767 8.5 mils — —
Temperature Range AC188 -55° C (-67° F) – 110° C (230° F) — —
Permeance ASTM E 96 Desiccant method .03 PERMS — —
Tensile Strength (lb./ft./in.)
Control ASTM D828 116/113 N/A N/A
After Aging — 116/99 N/A N/A
After UV — 117/94 N/A N/A
Breaking Strength (lb./ft.)
Control ASTM D146 118/116 40/20 40/20
Features :
provides a unique finished look to exposed roof surfaces. Patent pending.
Titanium dioxide white coating provides an energy saving emissive layer that reduces heat penetration.
Tear resistant high tensile strength woven PP substrate that does not distort or belly like spun-bonded sheets.
UV resistant.
More than 5 times lighter than 30 lbs felt.
Roll coverage is 4.6 times greater than felt.
Non-skid TPO coating with high coefficient of friction.
Printed nail pattern for easy installation.
20-year limited warranty.
Available in two energy efficient colors, white or tan.
Lighter colors reduce fabric cycling (expansion and contraction) thus reducing nail hole elongation.
Contains no asphalt.
þShingle print pattern
þ
þ
þ
þ
þ
þ
þ
þ
þ
þ
þ
Shingle Pattern TanDesert Shingle Pattern White
Installer Print White Installer Print TanDesert
The only roofing underlayment with the high performance of a synthetic underlayment, and the finished look of a shingled roof.
1. Product Name:
2. Manufacturer:
3. Product Description:
exclusive shingle-look print pattern
âAvailable in energy efficient white or tan,
outperforms felt, is installer friendly, and provides both durable temporary cover and long lasting water shedding protection .
âGrip-Rite ShingleLayment Synthetic Underlayment
PrimeSource Building Products, Inc.1321 Greenway Drive, Irving, TX 75038800-676-7777www.primesourcebp.comwww.grip-rite.com
Composition:â â Grip-Rite ShingleLayment synthetic underlayment is a
lightweight, woven polypropylene underlayment coated with a non-skid TPO. ShingleLayment possesses very high tensile and tear strength that resists tearing, ripping and blow offs from high wind exposure. ShingleLayment can be used in any code compliant mechanically attached roofing application.
Application:
Grip-Rite ShingleLayment synthetic underlayment is used on steep-slope roofs beneath shingles, battened tiles, metal roofing, slate, wood shake & shingle, and simulated slate/shake prepared roof coverings as an alternate to ASTM D226, Type I or II or ASTM D4869 asphalt felts.
Grip-Rite ShingleLayment synthetic underlayment is a water shedding device designed to reduce the occurrence of leaks caused by wind driven rain penetrating primary roof system coverings, as well as damaged roof coverings, and as temporary cover on exposed roof systems.
Grip-Rite ShingleLayment synthetic underlayment is available with standard installer print pattern or
(Patent Pending). Both print patterns feature installation and nailing grids for easy, accurate application.
Grip-Rite ShingleLayment synthetic underlayment increases applicator productivity thanks to its low weight per roll, and superior 10 sq. roll coverage .
Grip-Rite ShingleLayment synthetic underlayment can be exposed to natural UV for up to 180 days. Severe weather, jobsite damage, chemical exposure or other conditions may shorten exposure life.
ShingleLayment
GRSLBRO06/2012
®Grip-Rite ShingleLayment® is distributed by PrimeSource Building Products, Inc.
Grip-Rite ShingleLayment
OVERLAP LINE OVERLAP LINE OVERLAP LINE OVERLAP LINE OVERLAP LINE
11
0.7
44
mm
(4.3
6 in
)5
1.3
28
(2 in
.)5
1.3
28
(2 in
.)
Grip-Rite ShingleLayment
1016mm(40in.)
203.2mm(8in.)
203.2mm(8in.)
11
17
.6m
m (
44
in.)
12
19
.2 m
m (
48
in.)
SHINGLE PRINT PATTERN IS NOT INTENDED FOR USE AS AN INSTALLATION GRID FOR FINAL ROOFING SURFACE SHINGLES
SHINGLE PRINT PATTERN IS NOT INTENDED FOR USE AS AN INSTALLATION GRID FOR FINAL ROOFING SURFACE SHINGLES
Underwriters LaboratoriesVerified to ICC-ES AC10 and AC 304
Underwriters LaboratoriesVerified to ICC-ES AC10 and AC 304ICC-ES ESR #2945 ICC-ES ESR #2945
OVERLAP LINE OVERLAP LINE OVERLAP LINE OVERLAP LINE OVERLAP LINE
11
0.7
44
mm
(4.3
6 in
)5
1.3
28
(2 in
.)5
1.3
28
(2 in
.)
Underwriters LaboratoriesVerified to ICC-ES AC10 and AC 304
Underwriters LaboratoriesVerified to ICC-ES AC10 and AC 304
Grip-Rite ShingleLaymentGrip-Rite ShingleLayment
1016mm(40in.)
203.2mm(8in.)
203.2mm(8in.)
11
17
.6m
m (
44
in.)
12
19
.2 m
m (
48
in.)
SHINGLE PRINT PATTERN IS NOT INTENDED FOR USE AS AN INSTALLATION GRID FOR FINAL ROOFING SURFACE SHINGLES
SHINGLE PRINT PATTERN IS NOT INTENDED FOR USE AS AN INSTALLATION GRID FOR FINAL ROOFING SURFACE SHINGLES
ICC-ES ESR #2945 ICC-ES ESR #2945
11
0.7
44
mm
(4.3
6 in
)
51
.32
8 (2
in.)
51
.32
8 (2
in.)
11
0.7
44
mm
(4.3
6 in
)
1016mm(40in.)
203.2mm(8in.)
203.2mm(8in.)
11
17
.6m
m (
44
in.)
12
19
.2 m
m (
48
in.)
16.054”
2.133”
Underwriters LaboratoriesVerified to ICC-ES AC10
and AC 304Grip-Rite ShingleLaymentICC-ES ESR #2945
Underwriters LaboratoriesVerified to ICC-ES AC10
and AC 304Grip-Rite ShingleLaymentICC-ES ESR #2945
11
0.7
44
mm
(4.3
6 in
)
51
.32
8 (2
in.)
51
.32
8 (2
in.)
11
0.7
44
mm
(4.3
6 in
)
1016mm(40in.)
203.2mm(8in.)
203.2mm(8in.)
11
17
.6m
m (
44
in.)
12
19
.2 m
m (
48
in.)
16.054”
2.133”
Underwriters LaboratoriesVerified to ICC-ES AC10
and AC 304Grip-Rite ShingleLaymentICC-ES ESR #2945
Underwriters LaboratoriesVerified to ICC-ES AC10
and AC 304Grip-Rite ShingleLaymentICC-ES ESR #2945
Print Patterns
®
Synthetic Roofing Underlayment
®
GRC58A Cap Stapler
®ShingleLayment Rolls
SKU
Size
Print ColorWeight/
RollRolls/Pallet
Pallets/TruckloadArea Dimensions
SLW4100GRI 4 Square 4 ft. x 100 ft. Installer White 13 lb. 90 36
SLT4100GRI 4 Square 4 ft. x 100 ft. Installer Desert Tan 13 lb. 90 36
SLW4100GRS 4 Square 4 ft. x 100 ft. Shingle White 13 lb. 90 36
SLT4100GRS 4 Square 4 ft. x 100 ft. Shingle Desert Tan 13 lb. 90 36
SLW4250GRI 10 Square 4 ft. x 100 ft. Installer White 30 lb. 35 36
SLT4250GRI 10 Square 4 ft. x 100 ft. Installer Desert Tan 30 lb. 35 36
SLW4250GRS 10 Square 4 ft. x 100 ft. Shingle White 30 lb. 35 36
SLT4250GRS 10 Square 4 ft. x 100 ft. Shingle Desert Tan 30 lb. 35 36
800-676-7777www.grip-rite.comwww.primesourcebp.com
BUILDING PRODUCTS, INC.
© 2012 PrimeSource Building Products, Inc.