Prince William SoundRegional Citizen’s Advisory Committee
Board MeetingMay 4, 2007
Health, Safety & Environment
Safety VMT 1Q 2007
Days Away From Work Cases
0
Recordable 0
Environment VMT 1Q 2007
Spill Volume 3.03
Number of Spills 6
2007 VMT Major Focus Areas
• Safety– Process Safety Management– LPS– Trend analysis– Integration of “Lessons Learned”
• 90s Tank – Vapor Recovery System• Tank 55 and Tank 56• East Tank Farm – Internal Tank Inspections• Allison Creek turbidity• 2007 Corrosion Action Plan
2007 VMT Projects
• BWT Vapor Recovery• BWT Pilot Studies• Tank Program• Corrosion• Main Gate
Ballast Water Treatment Renovation Program
• Completed the installation of the Biological Treatment Tank (BTT) recycle pump – Currently undergoing the Functional Check Out phase
• Completed the final hookup to the Dissolved Air Floatation (DAF) BETX analyzer – Currently undergoing the Functional Check Out phase.
• Initiated testing on the Phase Extraction Technology (PET) air stripper pilot unit - Testing is ongoing
• Initiated testing on the PhotoCat pilot unit – The unit is offline awaiting resolution of reliability issues before further
testing resumes • Advanced the work on the oil/water analyzer and new DAF and BTT
sump re-route work - Project not yet completed • Continued working to install new Dissolved Oxygen and Salinity
probes throughout the BWT processes - Project on-going • Completed the tank 80 headspace nitrogen inerting system
VMT Operational Status
• BWT Tank 92 Spill– Temporary patch installed– Root Cause Analysis completed, and under review
• Smoking incident– Safety Stand-downs conducted– Investigation conducted
• Hydrotek steam cleaner incident– Investigation in process
• Otter Hospital– Set up completed in 48 hours; C-Plan compliance
requires 72 hours
VMT Operational Status Continued
• Power/Vapor “B” Boiler – Corrosion discovered during scheduled inspection– Extent of condition under evaluation
• The east potable water plant and VFF are fully operational– High turbidity from Allison Creek from the 2006 Flood
impacted the operation
• Berth 4 and Berth 5 quarterly maintenance was completed
• Fierce Conversations training