31
Appendix A Prevailing Wage Rate Schedule

Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Appendix A

Prevailing Wage Rate Schedule

Page 2: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

State of Michigan [email protected]

Official Request #: 1250 Requestor: Wayne State University Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 Project Number: 083-304020 Wayne County Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 1 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Asbestos & Lead Abatement Laborer ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer $41.30 $55.23 $69.16 H H H X X X X D Y Apprentice Rates: Trainee 600 hours + 1 calendar year $30.22 $33.28 $41.73

comment 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Asbestos, Lead and Mold Abatement, Hazardous Material Handler ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ AS207 3/27/2017 Asbestos, Lead and Mold Abatement, Hazardous Material Handler $40.75 $54.25 $67.75 H H H X X X X D Y comment Four ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Boilermaker ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ BO169 2/17/2015 Boilermaker $54.70 $81.08 $107.45 H H H H H H H D Y Apprentice Rates: 1st 6 months $40.31 $59.49 $78.67 2nd 6 months $41.45 $61.21 $80.95 3rd 6 months $42.57 $62.88 $83.19 4th 6 months $43.69 $64.57 $85.43 5th 6 months $44.81 $66.24 $87.67 6th 6 months $48.63 $72.50 $96.36 7th 6 months $49.32 $73.01 $96.69 8th 6 months $51.58 $76.40 $101.21

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 1 of 30

Page 3: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 2 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Bricklayer ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ BR1 10/15/2014 Bricklayer, stone mason, pointer, cleaner, caulker $52.43 $78.65 $104.86 H H D H D D D D Y Apprentice Rates: First 6 months $31.87 $47.81 $63.74 2nd 6 months $33.72 $50.60 $67.44 3rd 6 months $35.57 $53.37 $71.14 4th 6 months $37.42 $56.14 $74.84 5th 6 months $39.27 $58.92 $78.54 6th 6 months $41.12 $61.70 $82.24 7th 6 months $42.97 $64.46 $85.94 8th 6 months $44.82 $67.24 $89.64

comment make up day allowed Saturday for 5 day 8 hour week Friday for 4 day 10 hour week Four 10 hour days allowed M-TH

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Carpenter ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ CA 687 D 7/5/2017 Diver $67.26 $87.51 $107.76 X X H X X H H D Y comment make up day allowed Saturday, Four 10s allowed M-Sat; double time due when over 12 hours worked per day

.................................................................................................................................................................................................................................. CA 687 DT 7/5/2017 Diver Tender $57.74 $73.67 $89.60 X X H X X H H D Y comment make up day allowed Saturday ..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 2 of 30

Page 4: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 3 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= CA1045 7/5/2017 Carpet and Resilient Floor Layer, (does not include installation of $51.94 $73.28 $94.62 X X H X X X X D Y prefabricated formica & parquet flooring which is to be paid carpenter rate) Apprentice Rates: 1st 6 months $25.87 $34.92 $43.98 2nd 6 months $29.86 $40.92 $51.96 3rd 6 months $32.07 $44.23 $56.38 4th 6 months $34.27 $47.52 $60.78 5th 6 months $36.47 $50.83 $65.18 6th 6 months $38.69 $54.16 $69.62 7th 6 months $40.90 $57.48 $74.04 8th 6 months $43.10 $60.77 $78.44

.................................................................................................................................................................................................................................. CA687Z1 7/5/2017 Carpenter $58.62 $74.55 $90.48 X X H X X H H D Y Apprentice Rates: 1st year $35.89 $44.65 $53.41 3rd 6 months $38.43 $47.99 $57.55 4th 6 months $40.94 $51.29 $61.65 5th 6 months $43.47 $54.62 $65.77 6th 6 months $46.01 $57.96 $69.91 7th 6 months $48.52 $61.27 $74.01 8th 6 months $51.04 $64.58 $78.12

comment make up day allowed Saturdays, four 10s allowed Mon-Sat; double time due when over 12 hours worked per day

.................................................................................................................................................................................................................................. CA687Z1P 7/5/2017 Piledriver $58.62 $74.55 $90.48 X X H X X H H D Y comment make up day allowed Saturday, Four 10s allowed Monday-Saturday; double time due when over 12 hours worked per day

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 3 of 30

Page 5: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 4 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Cement Mason ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ br1cm 10/15/2014 Cement Mason $50.05 $71.17 $92.28 X X H H H H H D N Apprentice Rates: 1st 6 months $29.13 $39.45 $49.77 2nd 6 months $31.20 $42.54 $53.87 3rd 6 months $35.31 $48.67 $62.01 4th 6 months $39.46 $54.85 $70.23 5th 6 months $41.52 $57.91 $74.30 6th 6 months $45.67 $64.10 $82.52

.................................................................................................................................................................................................................................. CE514 8/17/2016 Cement Mason $48.55 $68.40 $88.24 H H D H H H H D N Apprentice Rates: 1st 6 months $28.17 $38.03 $47.88 2nd 6 months $30.14 $40.98 $51.82 3rd 6 months $34.09 $46.91 $59.72 4th 6 months $38.03 $52.82 $67.60 5th 6 months $39.99 $55.75 $71.52 6th 6 months $43.94 $61.68 $79.42

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Drywall ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ PT-22-D 8/25/2016 Drywall Taper $45.91 $59.74 $73.56 H H D H D D D D Y Apprentice Rates: First 3 months $32.08 $38.99 $45.90 Second 3 months $34.85 $43.14 $51.44 Second 6 months $37.62 $47.30 $56.98 Third 6 months $40.38 $51.44 $62.50 4th 6 months $41.76 $53.51 $65.26

comment make up day allowed Four 10s allowed Monday-Thursday, Friday make-up day for bad weather or holidays

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 4 of 30

Page 6: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 5 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Electrician ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ EC-58-IW 7/5/2017 Journeyman Electrician - Inside Wireman $64.02 $84.47 $104.91 H H H H H H H D N Apprentice Rates: 0-1000 hours $42.08 $51.55 $61.03 1000-2000 hours $44.07 $54.54 $65.01 2000-3500 hours $46.07 $57.54 $69.01 3500-5000 hours $48.07 $60.54 $73.00 5000-6500 hours $50.06 $63.52 $76.98 6500-8000 hours $54.05 $69.52 $84.97

.................................................................................................................................................................................................................................. EC-58-SC 7/5/2017 Sound and Communication Installer $40.35 $54.45 $68.55 H H H H H H H D N Apprentice Rates: Period 1 $26.75 $34.05 $41.35 Period 2 $28.11 $36.09 $44.07 Period 3 $29.47 $38.13 $46.79 Period 4 $30.83 $40.17 $49.51 Period 5 $32.19 $42.21 $52.23 Period 6 $33.55 $44.25 $54.95

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Elevator Constructor ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ EL 36 8/7/2007 Elevator Constructor Mechanic $56.46 $94.99 D D D D D D D D Y Apprentice Rates: 1st Year Apprentice $37.74 $58.93 2nd Year Apprentice $41.90 $66.94 3rd Year Apprentice $43.98 $70.95 4th Year Apprentice $48.14 $78.96

make up day allowed

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 5 of 30

Page 7: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 6 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Glazier ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ GL-357 8/24/2016 Glazier $49.50 $65.23 $80.95 H H H H H H H D Y Apprentice Rates: 1st 6 months $33.77 $41.63 $49.49 2nd 6 months $35.35 $44.00 $52.65 3rd 6 months $38.49 $48.71 $58.93 4th 6 months $40.06 $51.07 $62.07 5th 6 months $41.64 $53.43 $65.23 6th 6 months $43.21 $55.79 $68.37 7th 6 months $44.78 $58.15 $71.51 8th 6 months $47.93 $62.87 $77.81

comment If a four 10 hour day workweek is scheduled, four 10s must be consecutive, M-F. .................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Heat and Frost Insulator ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ AS25S 3/31/2017 Spray Insulation - Qualified Senior Sprayer, application of all products $29.04 $42.35 X X X H H H H H N

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Heat and Frost Insulator and Asbestos Worker ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ AS25 6/3/2016 Heat and Frost Insulators and Asbestos Workers $62.65 $78.41 $94.16 H H H H H H H D Y Apprentice Rates: 1st Year $46.90 $54.78 $62.66 2nd Year $50.05 $59.50 $68.96 3rd Year $53.20 $64.23 $75.26 4th Year $56.35 $68.96 $81.56

comment Four 10s must be worked for a minimum of 2 consecutive weeks. OVERTIME is different on a four 10 week. OT is 2x for hours beyond 10. All hours on fifth day, M-F require time and one half. Sat first 8 hours, 1.5, all hours after 8 require double time.

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 6 of 30

Page 8: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 7 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Ironworker ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ IR-25-F1 2/1/2017 Fence, Sound Barrier & Guardrail erection/installation and Exterior $35.95 $48.05 $60.15 X X H X X X H D Y Signage work Apprentice Rates: 60% Level $25.39 $32.65 $39.91 65% Level $26.71 $34.58 $42.44 70% Level $28.03 $36.51 $44.98 75% Level $29.35 $38.42 $47.50 80% Level $30.67 $40.35 $50.03 85% Level $31.99 $42.28 $52.56

comment Four ten hour work days may be worked during Monday-Saturday. .................................................................................................................................................................................................................................. IR-25-GZ2 7/5/2017 Siding, Glazing, Curtain Wall $48.13 $59.92 $71.70 X X H H H H D D Y Apprentice Rates: Level 1 $31.20 $37.93 $44.65 Level 2 $33.31 $40.67 $48.02 Level 3 $35.42 $43.41 $51.39 Level 4 $37.54 $46.16 $54.77 Level 5 $39.66 $48.92 $58.17 Level 6 $41.78 $51.67 $61.55

comment make up day allowed Friday, 4 tens may be worked Monday thru Thursday @ straight time. .................................................................................................................................................................................................................................. IR-25-PE-Z1 3/31/2017 Pre-engineered Metal Work $48.09 $58.86 $69.63 X X H X X X X D Y Apprentice Rates: Probation 1st Year $26.83 $32.03 $37.23 1st Level $28.96 $34.92 $40.88 2nd Level $28.96 $34.92 $40.88 3rd Level $31.08 $37.79 $44.50 4th Level $33.21 $40.68 $48.15 5th Level $35.33 $43.55 $51.77 6th Level $37.46 $46.43 $55.41

comment make up day allowed 4 tens allowed M-Th with Saturday make up day ..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 7 of 30

Page 9: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 8 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= IR-25-RF 7/5/2017 Reinforced Iron Work $57.30 $85.66 $114.02 H H D H D D D D N Apprentice Rates: Level 1 $40.32 $59.89 $79.46 Level 2 $42.68 $63.43 $84.18 Level 3 $45.22 $67.24 $89.26 Level 4 $47.75 $71.04 $94.32 Level 5 $50.29 $74.84 $99.40 Level 6 $50.29 $74.84 $99.40

make up day allowed

.................................................................................................................................................................................................................................. IR-25-RIG 7/5/2017 Rigging Work $63.51 $95.00 $126.49 H H H H H H H D N Apprentice Rates: Level 1& 2 $38.22 $56.16 $74.85 Level 3 $41.05 $61.54 $82.01 Level 4 $43.87 $65.76 $87.65 Level 5 $46.70 $70.01 $93.31 Level 6 $49.53 $74.25 $98.97

.................................................................................................................................................................................................................................. IR-25-SD 7/5/2017 Decking $55.47 $82.87 $110.26 X X H H H H D D Y comment make up day allowed 4 tens may be worked Monday thru Thursday @ straight time. If bad weather, Friday may be a make up day. If holiday celebrated on a Monday, 4 10s may be worked Tuesday thru Friday. Work in excess of 12 hours per day must be paid @ double time.

.................................................................................................................................................................................................................................. IR-25-STR 7/5/2017 Structural, ornamental, welder and pre-cast $63.64 $95.12 $126.60 H H H H H H D D Y Apprentice Rates: Levels 1 & 2 $38.22 $56.99 $75.75 Level 3 $41.05 $61.24 $81.41 Level 4 $43.87 $65.46 $87.05 Level 5 $46.70 $69.71 $92.71 Level 6 $49.53 $73.95 $98.37 Level 7 $52.35 $78.18 $104.01 Level 8 $55.18 $82.43 $109.67

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 8 of 30

Page 10: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 9 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= comment make up day allowed 4 tens may be worked Monday thru Thursday @ straight time. If bad weather, Friday may be a make up day. If holiday celebrated on a Monday, 4 10s may be worked Tuesday thru Friday. Work in excess of 12 hours per day must be paid @ double time.

.................................................................................................................................................................................................................................. IR-25-STR-D 7/5/2017 Industrial Door erection & construction $43.74 $65.27 $86.80 H H H H H H D D Y comment make up day allowed Friday for bad weather when 4 tens scheduled for M-Th. If holiday celebrated on M, 4 tens may be worked T-F. Work in excess of 12 hours per day must be paid @ double time.

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Laborer ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ L33401-A-CC 5/31/2017 Construction laborer, demolition laborer, mason tender, carpenter $44.76 $63.69 $82.61 H H H H H H H D Y tender, drywall handler, concrete laborer, cement finisher tender, concrete chute, and concrete bucket handler, wall and ceiling material handler, plasterer tender, mortar mixer and plastering machine operator Apprentice Rates: 0-1,000 work hours $38.67 $54.55 $70.43 1,001 - 2,000 work hours $39.89 $56.38 $72.87 2,001 - 3,000 work hours $41.11 $58.21 $75.31 3,001 - 4,000 work hours $43.54 $61.86 $80.17

comment make up day allowed If conditions beyond the employer/employee's control prevent one or more hours of working during Mon-Fri, the employer may choose to work up to 10 hour straight time weekdays. Work may be scheduled up to 10 hours per Mon-Fri for the purpose of reaching 40 hours @ straight time. Make up days may also include 8 hours of work on Saturdays @ straight time.

.................................................................................................................................................................................................................................. L33401-B-SB 5/31/2017 Signal Man (on sewer & caisson work), Air, Electric or Gasoline Tool $45.04 $64.11 $83.17 H H H H H H H D Y Operator, Concrete Vibrator Operator, Acetylene Torch & Air Hammer Operator; Scaffold Builder, Caisson Worker comment make up day allowed If conditions beyond the employer/employee's control prevent one or more hours of working during Mon-Fri, the employer may choose to work up to 10 hour straight time weekdays. Work may be scheduled up to 10 hours per Mon-Fri for the purpose of reaching 40 hours @ straight time. Make up days may also include 8 hours of work on Saturdays @ straight time.

.................................................................................................................................................................................................................................. L33401-D-HH 5/31/2017 Furnace Battery Heater Tender, Burning Bar & Oxy-Acetylene Gun $45.28 $64.47 $83.65 H H H H H H H D Y

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 9 of 30

Page 11: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 10 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= comment make up day allowed If conditions beyond the employer/employee's control prevent one or more hours of working during Mon-Fri, the employer may choose to work up to 10 hour straight time weekdays. Work may be scheduled up to 10 hours per Mon-Fri for the purpose of reaching 40 hours @ straight time. Make up days may also include 8 hours of work on Saturdays @ straight time.

.................................................................................................................................................................................................................................. L33401-E-EX 5/31/2017 Expediter Man, Top Man and/or Bottom Man (Blast Furnace Work or $46.07 $65.65 $85.23 H H H H H H H D Y Battery Work) comment make up day allowed If conditions beyond the employer/employee's control prevent one or more hours of working during Mon-Fri, the employer may choose to work up to 10 hour straight time weekdays. Work may be scheduled up to 10 hours per Mon-Fri for the purpose of reaching 40 hours @ straight time. Make up days may also include 8 hours of work on Saturdays @ straight time.

.................................................................................................................................................................................................................................. L33401-F-CL 5/31/2017 Cleaner/sweeper laborer, furniture laborer - unloading of furniture to the $39.31 $55.51 $71.71 H H H H H H H D Y point of installation, the setting in place or relocation of furniture. comment make up day allowed If conditions beyond the employer/employee's control prevent one or more hours of working during Mon-Fri, the employer may choose to work up to 10 hour straight time weekdays. Work may be scheduled up to 10 hours per Mon-Fri for the purpose of reaching 40 hours @ straight time. Make up days may also include 8 hours of work on Saturdays @ straight time.

.................................................................................................................................................................................................................................. L334C 5/31/2017 Lansing Burner, Blaster & Powder Man; Air, Electric or Gasoline Tool $45.55 $64.87 $84.19 X X H X H H H D Y Operator (Blast Furance Work or Battery Work) comment make up day allowed Saturday .................................................................................................................................................................................................................................. LPT-1 6/17/2016 Plasterer Tender, Plastering Machine Operator $44.35 $63.10 $81.85 H H H H H H H D Y Apprentice Rates: 1,001 - 2,000 hours $39.53 $55.87 $72.21 2,001 - 3,000 hours $40.73 $57.67 $74.61 3,001 - 4,000 hours $43.15 $61.30 $79.45

comment make up day allowed f conditions beyond the employer/employee's control prevent one or more hours of working during Mon-Fri, the employer may choose to work up to 10 hour straight time weekdays. Work may be scheduled up to 10 hours per Mon-Fri for the purpose of reaching 40 hours @ straight time. Make up days may also include 8 hours of work on Saturdays @ straight time.

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 10 of 30

Page 12: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 11 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Laborer - Hazardous ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ LHAZ-Z1-A 11/7/2014 Class A performing work in conjunction with site preparation and other $43.54 $61.94 $80.33 H H H H H H H D Y preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or federal regulations; or a laborer performing work in conjunction with the removal, handling, or containment of hazardous waste substances when use of personal protective equipment level "D" is required. Apprentice Rates: 0-1,000 work hours $37.60 $53.03 $68.45 1,001-2,000 work hours $38.79 $54.81 $70.83 2,001-3,000 work hours $39.98 $56.60 $73.21 3,001-4,000 work hours $42.35 $60.15 $77.95

comment make up day allowed 4 10s allowed M-Th or T-F; inclement weather makeup day Friday .................................................................................................................................................................................................................................. LHAZ-Z1-B 11/7/2014 Class B performing work in conjunction with the removal, handling, or $44.54 $63.44 $82.33 H H H H H H H D Y containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required. Apprentice Rates: 0-1,000 work hours $38.36 $54.17 $69.97 1,001-2,000 work hours $39.59 $56.01 $72.43 2,001-3,000 work hours $40.83 $57.87 $74.91 3,001-4,000 work hours $43.30 $61.58 $79.85

comment make up day allowed 4 10s allowed M-Th or T-F; inclement weather makeup day Friday .................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Laborer Underground - Open Cut, Class I ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ LAUC-Z1-1 9/7/2017 Construction Laborer $38.92 $49.96 $60.99 X X X X X X X D Y Apprentice Rates: 0-1,000 work hours $34.04 $42.64 $51.23 1,001-2,000 work hours $35.02 $44.11 $53.19 2,001-3,000 work hours $35.99 $45.56 $55.13 3,001-4,000 work hours $37.94 $48.49 $59.03

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 11 of 30

Page 13: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 12 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Laborer Underground - Open Cut, Class II ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ LAUC-Z1-2 9/7/2017 Mortar and material mixer, concrete form man, signal man, well point $39.03 $50.12 $61.21 X X X X X X X D Y man, manhole, headwall and catch basin builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector. Apprentice Rates: 0-1,000 work hours $34.12 $42.76 $51.39 1,001-2,000 work hours $35.10 $44.23 $53.35 2,001-3,000 work hours $36.09 $45.72 $55.33 3,001-4,000 work hours $38.05 $48.66 $59.25

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Laborer Underground - Open Cut, Class III ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ LAUC-Z1-3 9/7/2017 Air, gasoline and electric tool operator, vibrator operator, drillers, pump $39.08 $50.20 $61.31 X X X X X X X D Y man, tar kettle operator, bracers, rodder, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars, etc.), cement finisher, welder, pipe jacking and boring man, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger man, and directional boring man. Apprentice Rates: 0-1,000 work hours $34.16 $42.82 $51.47 1,001-2,000 work hours $35.14 $44.29 $53.43 2,001-3,000 work hours $36.13 $45.78 $55.41 3,001-4,000 work hours $38.10 $48.73 $59.35

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Laborer Underground - Open Cut, Class IV ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ LAUC-Z1-4 9/7/2017 Trench or excavating grade man. $39.16 $50.32 $61.47 X X X X X X X D Y Apprentice Rates: 0-1,000 work hours $34.22 $42.91 $51.59 1,001-2,000 work hours $35.21 $44.40 $53.57 2,001-3,000 work hours $36.20 $45.88 $55.55 3,001-4,000 work hours $38.17 $48.84 $59.49

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 12 of 30

Page 14: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 13 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Laborer Underground - Open Cut, Class V ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ LAUC-Z1-5 9/7/2017 Pipe Layer $39.22 $50.41 $61.59 X X X X X X X D Y Apprentice Rates: 0-1,000 work hours $34.26 $42.97 $51.67 1,001-2,000 work hours $35.26 $44.47 $53.67 2,001-3,000 work hours $36.25 $45.96 $55.65 3,001-4,000 work hours $38.23 $48.92 $59.61

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Laborer Underground - Open Cut, Class VI ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ LAUC-Z1-6 9/7/2017 Grouting man, top man assistant, audio visual television operations and $36.67 $46.59 $56.49 X X X X X X X D Y all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work and the installation and repair of water service pipe and appurtenances. Apprentice Rates: 0-1,000 work hours $32.35 $40.10 $47.85 1,001-2,000 work hours $33.22 $41.41 $49.59 2,001-3,000 work hours $34.08 $42.70 $51.31 3,001-4,000 work hours $35.81 $45.30 $54.77

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Laborer Underground - Open Cut, Class VII ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ LAUC-Z1-7 9/7/2017 Restoration laborer, seeding, sodding, planting, cutting, mulching and $33.29 $41.52 $49.73 X X X X X X X D Y topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes, flagstones etc. Apprentice Rates: 0-1,000 work hours $29.82 $36.31 $42.79 1,001-2,000 work hours $30.51 $37.34 $44.17 2,001-3,000 work hours $31.21 $38.40 $45.57 3,001-4,000 work hours $32.60 $40.48 $48.35

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 13 of 30

Page 15: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 14 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Laborer Underground - Tunnel, Shaft & Caisson ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ LAUCT-Z1-1 9/7/2017 Class I - Tunnel, shaft and caisson laborer, dump man, shanty man, $39.07 $50.19 $61.29 X X X X X X X D Y hog house tender, testing man (on gas), and watchman. Apprentice Rates: 0-1,000 work hours $34.15 $42.80 $51.45 1,001-2,000 work hours $35.14 $44.29 $53.43 2,001-3,000 work hours $36.12 $45.76 $55.39 3,001-4,000 work hours $38.09 $48.72 $59.33

.................................................................................................................................................................................................................................. LAUCT-Z1-2 9/7/2017 Class II - Manhole, headwall, catch basin builder, bricklayer tender, $39.18 $50.35 $61.51 X X X X X X X D Y mortar man, material mixer, fence erector, and guard rail builder. Apprentice Rates: 0-1,000 work hours $34.24 $42.94 $51.63 1,001-2,000 work hours $35.22 $44.41 $53.59 2,001-3,000 work hours $36.21 $45.90 $55.57 3,001-4,000 work hours $38.19 $48.86 $59.53

.................................................................................................................................................................................................................................. LAUCT-Z1-3 9/7/2017 Class III - Air tool operator (jack hammer man, bush hammer man and $39.24 $50.44 $61.63 X X X X X X X D Y grinding man), first bottom man, second bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, concrete shoveler, conveyor man, floor man, gasoline and electric tool operator, gunnite man, grout operator, welder, heading dinky man, inside lock tender, pea gravel operator, pump man, outside lock tender, scaffold man, top signal man, switch man, track man, tugger man, utility man, vibrator man, winch operator, pipe jacking man, wagon drill and air track operator and concrete saw operator (under 40 h.p.). Apprentice Rates: 0-1,000 work hours $34.28 $43.00 $51.71 1,001-2,000 work hours $35.27 $44.48 $53.69 2,001-3,000 work hours $36.26 $45.97 $55.67 3,001-4,000 work hours $38.25 $48.96 $59.65

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 14 of 30

Page 16: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 15 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= LAUCT-Z1-4 9/7/2017 Class IV - Tunnel, shaft and caisson mucker, bracer man, liner plate $39.42 $50.71 $61.99 X X X X X X X D Y man, long haul dinky driver and well point man. Apprentice Rates: 0-1,000 work hours $34.42 $43.21 $51.99 1,001-2,000 work hours $35.42 $44.71 $53.99 2,001-3,000 work hours $36.42 $46.21 $55.99 3,001-4,000 work hours $38.42 $49.21 $59.99

.................................................................................................................................................................................................................................. LAUCT-Z1-5 9/7/2017 Class V - Tunnel, shaft and caisson miner, drill runner, keyboard $39.67 $51.08 $62.49 X X X X X X X D Y operator, power knife operator, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars) Apprentice Rates: 0-1,000 work hours $34.60 $43.48 $52.35 1,001-2,000 work hours $35.62 $45.01 $54.39 2,001-3,000 work hours $36.63 $46.52 $56.41 3,001-4,000 work hours $38.66 $49.57 $60.47

.................................................................................................................................................................................................................................. LAUCT-Z1-6 9/7/2017 Class VI - Dynamite man and powder man. $40.00 $51.58 $63.15 X X X X X X X D Y Apprentice Rates: 0-1,000 work hours $34.85 $43.86 $52.85 1,001-2,000 work hours $35.88 $45.40 $54.91 2,001-3,000 work hours $36.91 $46.94 $56.97 3,001-4,000 work hours $38.97 $50.04 $61.09

.................................................................................................................................................................................................................................. LAUCT-Z1-7 9/7/2017 Class VII - Restoration laborer, seeding, sodding, planting, cutting, $33.28 $41.50 $49.71 X X X X X X X D Y mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes and flagstones. Apprentice Rates: 0-1,000 work hours $29.81 $36.30 $42.77 1,001-2,000 work hours $30.50 $37.33 $44.15 2,001-3,000 work hours $31.20 $38.38 $45.55 3,001-4,000 work hours $32.59 $40.46 $48.33

.................................................................................................................................................................................................................................. ========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 15 of 30

Page 17: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 16 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Landscape Laborer ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ LLAN-Z1-A 10/13/2015 Landscape Specialist: includes air, gas, and diesel equipment operator, $28.98 $40.04 $51.09 X X H X X X H D Y skidsteer (or equivalent), lawn sprinkler installer on landscaping work where seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintenance of landscape projects occurs. comment Sundays paid at time & one half. Holidays paid at double time. .................................................................................................................................................................................................................................. LLAN-Z1-B 10/13/2015 Skilled Landscape Laborer: small power tool operator, lawn sprinkler $24.76 $33.71 $42.65 X X H X X X H D Y installers' tender, material mover, truck driver when seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintaining of landscape projects occurs comment Sundays paid at time & one half. Holidays paid at double time. .................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Marble Finisher ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ BR1-MF 10/20/2014 Marble Finisher $43.48 $54.29 $65.10 H H D H D D D D Y Apprentice Rates: Level 1 $19.04 $25.12 $31.20 Level 2 $20.24 $26.92 $33.60 Level 3 $27.01 $33.96 $40.90 Level 4 $28.47 $36.14 $43.82 Level 5 $29.99 $37.84 $45.70 Level 6 $31.61 $39.86 $48.10 Level 7 $33.30 $41.59 $49.87 Level 8 $34.79 $43.48 $52.17

comment A four ten workweek may be worked Monday thru Thursday or Tuesday thru Friday.

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 16 of 30

Page 18: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 17 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Marble Mason ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ BR1-MM 10/17/2014 Marble Mason $50.29 $64.51 $78.72 H H D H D D D D Y Apprentice Rates: Level 1 $25.14 $32.65 $40.15 Level 2 $28.20 $36.49 $44.78 Level 3 $33.41 $41.97 $50.53 Level 4 $36.15 $45.66 $55.17 Level 5 $38.42 $48.17 $57.92 Level 6 $42.07 $53.56 $65.05 Level 7 $42.74 $54.38 $66.02 Level 8 $43.67 $55.78 $67.88

comment A four ten workweek may be worked Monday thru Thursday or Tuesday thru Friday.

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Operating Engineer ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ EN-324-A120 6/7/2017 Crane with boom & jib or leads 120' or longer $59.36 $77.25 $95.13 X X H H D D D D Y comment Double time after 12 hours M-F .................................................................................................................................................................................................................................. EN-324-A140 6/7/2017 Crane with boom & jib or leads 140' or longer $60.18 $78.48 $96.77 X X H H D D D D Y comment Work in excess of 12 hours per day M-F shall be paid at double time. .................................................................................................................................................................................................................................. EN-324-A220 6/7/2017 Crane with boom & jib or leads 220' or longer $60.48 $78.93 $97.37 X X H H D D D D Y comment Work in excess of 12 hours per day M-F shall be paid at double time. .................................................................................................................................................................................................................................. EN-324-A300 6/7/2017 Crane with boom & jib or leads 300' or longer $61.98 $81.18 $100.37 X X H H D D D D Y comment Work in excess of 12 hours per day M-F shall be paid at double time. .................................................................................................................................................................................................................................. EN-324-A400 6/7/2017 Crane with boom & jib or leads 400' or longer $63.48 $83.43 $103.37 X X H H D D D D Y

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 17 of 30

Page 19: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 18 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= comment Work in excess of 12 hours per day M-F shall be paid at double time. .................................................................................................................................................................................................................................. EN-324-CW 6/7/2017 Compressor or welding machine $48.51 $60.97 $73.43 X X H H D D D D Y comment Work in excess of 12 hours per day M-F shall be paid at double time. .................................................................................................................................................................................................................................. EN-324-FL 6/7/2017 Forklift, lull, extend-a-boom forklift $55.82 $71.94 $88.05 X X H H D D D D Y comment Work in excess of 12 hours per day M-F shall be paid at double time. .................................................................................................................................................................................................................................. EN-324-FO 6/7/2017 Fireman or oiler $47.48 $59.43 $71.37 X X H H D D D D Y comment Work in excess of 12 hours per day M-F shall be paid at double time. .................................................................................................................................................................................................................................. EN-324-RC 6/7/2017 Regular crane, job mechanic, concrete pump with boom $58.50 $75.96 $93.41 X X H H D D D D Y comment Work in excess of 12 hours per day M-F shall be paid at double time. .................................................................................................................................................................................................................................. EN-324-RE 6/7/2017 Regular engineer, hydro-excavator, remote controlled concrete breaker $57.53 $74.50 $91.47 X X H H D D D D Y Apprentice Rates: 0-999 hours $46.53 $58.76 $70.97 1,000-1,999 hours $48.28 $61.38 $74.47 2,000-2,999 hours $50.02 $63.99 $77.95 3,000-3,999 hours $51.77 $66.62 $81.45 4,000-4,999 hours $53.51 $69.22 $84.93 5,000-5,999 hours $55.26 $71.85 $88.43

comment Work in excess of 12 hours per day M-F shall be paid at double time. .................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Operating Engineer - Marine Construction ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ GLF D 4/2/2014 Diver/Wet Tender/Tender/Rov Pilot/Rov Tender $52.80 $79.20 $105.60 H H H H H H H D N

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Statewide Page 18 of 30

Page 20: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 19 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= GLF-1 1/23/2017 Diver/Wet Tender, Engineer (hydraulic dredge) $72.32 $93.82 $115.32 X X H H H H H D Y comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county all Great Lakes, islands therein, & connecting & tributary waters .................................................................................................................................................................................................................................. GLF-2 1/23/2017 Crane/Backhoe Operator, 70 ton or over Tug Operator, $70.82 $91.57 $112.32 X X H H H H H D Y Mechanic/Welder, Assistant Engineer (hydraulic dredge), Leverman (hydraulic dredge), Diver Tender comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters .................................................................................................................................................................................................................................. GLF-2B 1/23/2017 Friction, Lattice Boom or Crane License Certification $72.32 $93.82 $115.32 X X H H H H H D Y comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands, therein, & connecting & tributary waters .................................................................................................................................................................................................................................. GLF-3 1/23/2017 Deck Equipment Operator, Machineryman, Maintenance of Crane (over $66.27 $84.75 $103.22 X X H H H H H D Y 50 ton capacity) or Backhoe (115,000 lbs or more), Tug/Launch Operator, Loader, Dozer on Barge, Deck Machinery comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters .................................................................................................................................................................................................................................. GLF-4 1/23/2017 Deck Equipment Operator, (Machineryman/Fireman), (4 equipment $60.07 $75.45 $90.82 X X H H H H H D Y units or more), Off Road Trucks, Deck Hand, Tug Engineer, & Crane Maintenance 50 ton capacity and under or Backhoe 115,000 lbs or less, Assistant Tug Operator comment make up day allowed Holiday pay = 2.5 times the straight hourly rate Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters .................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Operating Engineer Steel Work ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ EN-324-ef 6/8/2017 Forklift, 1 Drum Hoist $60.41 $79.00 $97.58 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SW120 6/7/2017 Crane w/ 120' boom or longer $63.11 $83.05 $102.98 H H D H H H D D Y

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 19 of 30

Page 21: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 20 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SW120-O 6/7/2017 Crane w/ 120' boom or longer w/ Oiler $64.11 $84.55 $104.98 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SW140 6/7/2017 Crane w/ 140' boom or longer $64.29 $84.82 $105.34 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SW140-O 6/7/2017 Crane w/ 140' boom or longer W/ Oiler $65.29 $86.32 $107.34 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SW220 6/7/2017 Boom & Jib 220' or longer $64.56 $85.22 $105.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SW220-O 6/7/2017 Crane w/ 220' boom or longer w/ Oiler $65.56 $86.72 $107.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SW300 6/7/2017 Boom & Jib 300' or longer $66.06 $87.47 $108.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SW300-O 6/7/2017 Crane w/ 300' boom or longer w/ Oiler $67.06 $88.97 $110.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SW400 6/7/2017 Boom & Jib 400' or longer $67.56 $89.72 $111.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather ..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 20 of 30

Page 22: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 21 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= EN-324-SW400-O 6/7/2017 Crane w/ 400' boom or longer w/ Oiler $68.56 $91.22 $113.88 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SWCO 6/7/2017 Crane Operator, Job Mechanic, 3 Drum Hoist & Excavator $62.75 $82.51 $102.26 H H D H H H D D Y Apprentice Rates: 0-999 hours $49.40 $63.26 $77.11 1,000-1,999 hours $51.38 $66.23 $81.07 2,000-2,999 hours $53.35 $69.19 $85.01 3,000-3,999 hours $55.33 $72.16 $88.97 4,000-4,999 hours $57.30 $75.11 $92.91 5,000 hours $59.28 $78.08 $96.87

comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SWCO-O 6/7/2017 Crane Operator w/ Oiler $63.75 $84.01 $104.26 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SWCW 6/7/2017 Compressor or Welder Operator $55.30 $71.33 $87.36 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SWHO 6/7/2017 Hoisting Operator, 2 Drum Hoist, & Rubber Tire Backhoe $62.11 $81.55 $100.98 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SWO 6/7/2017 Oiler $53.89 $69.22 $84.54 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. EN-324-SWTD50 6/7/2017 Tower Crane & Derrick where work is 50' or more $63.84 $84.14 $104.44 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather ..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 21 of 30

Page 23: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 22 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= EN-324-SWTD50-O 6/7/2017 Tower Crane & Derrick 50' or more w/ Oiler $64.84 $85.64 $106.44 H H D H H H D D Y comment make up day allowed 4 10s allowed M-Th with Friday makeup day because of bad weather .................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Operating Engineer Underground ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ EN-324A1-UC1 9/7/2017 Class I Equipment $55.54 $71.56 $87.57 H H H H H H H D Y Apprentice Rates: 0-999 hours $44.09 $55.30 $66.52 1,000-1,999 hours $45.68 $57.70 $69.70 2,000-2,999 hours $47.28 $60.09 $72.90 3,000-3,999 hours $48.88 $62.49 $76.10 4,000-4,999 hours $50.49 $64.91 $79.32 5,000-5,999 hours $52.09 $67.30 $82.52

.................................................................................................................................................................................................................................. EN-324A1-UC2 9/7/2017 Class II Equipment $50.81 $64.46 $78.11 H H H H H H H D Y

.................................................................................................................................................................................................................................. EN-324A1-UC3 9/7/2017 Class III Equipment $50.08 $63.37 $76.65 H H H H H H H D Y

.................................................................................................................................................................................................................................. EN-324A1-UC4 9/7/2017 Class IV Equipment $49.51 $62.52 $75.51 H H H H H H H D Y

.................................................................................................................................................................................................................................. EN-324A1-UMM 9/7/2017 Master Mechanic $55.79 $71.93 $88.07 H H H H H H H D Y

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 22 of 30

Page 24: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 23 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Painter ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ PT-22-P 10/3/2017 Painter $44.32 $57.60 $70.88 H H D H D D D D Y Apprentice Rates: Year 1 $31.04 $37.68 $44.32 Year 2 $33.70 $41.67 $49.64 Year 3 $36.35 $45.64 $54.94 Year 4 $40.34 $51.63 $62.92

comment make up day allowed Four 10s allowed Monday-Thursday with Friday makeup day if job down due to weather, holiday or other conditions beyond the control of the employer, 8 hours of repaint work performed on Sunday shall be paid time & one half rate

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Pipe and Manhole Rehab ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ TM247 4/17/2015 General Laborer for rehab work or normal cleaning and cctv work-top $28.20 $38.20 H H H H H H H H N man, scaffold man, CCTV assistant, jetter-vac assistant

.................................................................................................................................................................................................................................. TM247-2 4/17/2015 Tap cutter/CCTV Tech/Grout Equipment Operator: unit driver and $32.70 $44.95 H H H H H H H H N operator of CCTV; grouting equipment and tap cutting equipment

.................................................................................................................................................................................................................................. TM247-3 4/17/2015 CCTV Technician/Combo Unit Operator: unit driver and operator of $31.45 $43.07 H H H H H H H H N cctv unit or combo unit in connection with normal cleaning and

.................................................................................................................................................................................................................................. TM247-4 4/17/2015 Boiler Operator: unit driver and operator of steam/water heater units $33.20 $45.70 H H H H H H H H N and all ancillary equipment associated

.................................................................................................................................................................................................................................. TM247-5 4/17/2015 Combo Unit driver & Jetter-Vac Operator $33.20 $45.70 H H H H H H H H N

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Statewide Page 23 of 30

Page 25: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 24 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= TM247-6 4/17/2015 Pipe Bursting & Slip-lining Equipment Operator $34.20 $47.20 H H H H H H H H N

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Pipefitter ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ PF-636 7/12/2016 Pipefitter, Steamfitter, Refrigeration & Air Conditioning Service $69.83 $91.03 $108.23 H H D H D D D D Y Apprentice Rates: 1st & 2nd periods $29.93 $38.28 $45.28 3rd period $31.93 $41.28 $49.28 4th period $33.18 $43.16 $51.78 5th period $34.43 $45.03 $54.28 6th period $35.68 $46.90 $56.78 7th period $36.93 $48.78 $59.28 8th period $37.93 $50.28 $61.28 9th period $38.93 $51.78 $63.28 10th period $40.36 $53.92 $66.14

comment Four 10s allowed during the week preceding, following and/or the week of a holiday.

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Plasterer ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ BR1P 11/1/2012 Plasterer $45.04 $67.56 $90.08 H H H H H H H D N Apprentice Rates: 1st 6 months $32.11 $48.17 $64.22 2nd 6 months $33.40 $50.10 $66.80 3rd 6 months $34.69 $52.04 $69.38 4th 6 months $37.28 $55.92 $74.56 5th 6 months $39.87 $59.81 $79.74 6th 6 months $42.45 $63.68 $84.90

comment make up day allowed Saturday ..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 24 of 30

Page 26: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 25 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= PL67 9/8/2010 Plasterer $44.72 $60.11 $75.50 H H H X D D D D N Apprentice Rates: 1st 6 months $29.33 $37.02 $44.72 2nd 6 months $30.87 $39.34 $47.80 3rd 6 months $32.41 $41.64 $50.88 4th 6 months $35.49 $46.26 $57.04 5th 6 months $38.56 $51.16 $63.76 6th 6 months $41.64 $55.49 $69.34

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Plumber ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ PL-98 7/18/2013 Plumber $64.45 $84.87 $101.29 H H D H D D D D Y Apprentice Rates: Period 1 $19.93 $26.43 $32.93 Period 2 $23.90 $31.40 $38.90 Period 3 $30.60 $39.19 $47.77 Period 4 $31.23 $40.13 $49.03 Period 5 $32.39 $41.87 $51.35 Period 6 $33.54 $43.59 $53.65 Period 7 $34.69 $45.32 $55.95 Period 8 $35.86 $47.07 $58.29 Period 9 $37.01 $48.80 $60.59 Period 10 $38.16 $50.53 $62.89

comment 4 tens allowed M-Th or T-F; OT of time and one half required on 11th & 12th hour of any ten hour days

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 25 of 30

Page 27: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 26 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Roofer ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ RO-149-WOM 9/27/2016 Commercial Roofer $55.93 $70.93 $85.93 X X H X X H H D N Apprentice Rates: new apprentice $37.34 $45.07 $52.80 Apprentice 1 $41.85 $49.81 $57.77 Apprentice 2 $42.36 $50.57 $58.79 Apprentice 3 $43.87 $52.84 $61.81 Apprentice 4 $45.37 $55.09 $64.81 Apprentice 5 $46.88 $57.35 $67.83 Apprentice 6 $48.29 $59.47 $70.65 Apprentice 7 $49.90 $61.89 $73.87 Apprentice 8 $51.41 $64.15 $76.89

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Sewer Relining ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ SR-I 11/24/2015 Class I-Operator of audio visual CCTV system including remote in- $43.66 $59.01 $74.36 H H H H H H H D N ground cutter and other equipment used in conjunction with CCTV

.................................................................................................................................................................................................................................. SR-II 11/24/2015 Class II-Operator of hot water heaters and circulation system; water $42.13 $56.72 $71.30 H H H H H H H D N jetters; and vacuum and mechanical debris removal systems and those assisting.

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Sheet Metal Worker ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ SHM-80 7/27/2017 Sheet Metal Worker $65.75 $84.06 $102.36 H H D X D D D D Y Apprentice Rates: 1st & 2nd Periods $41.56 $49.80 $58.03 3rd & 4th Periods $43.39 $52.55 $61.69 5th & 6th Periods $45.21 $55.28 $65.33 7th & 8th Periods $47.06 $58.04 $69.03

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 26 of 30

Page 28: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 27 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= comment A 4 10 schedule may be worked, 4 consecutive days Monday thru Friday. .................................................................................................................................................................................................................................. SHM-80-A 10/4/2017 Architectural Sheet Metal Worker after 1,000 hours $44.98 $57.56 $70.13 H H D H D D D D Y Apprentice Rates: 1st 30 Working Days $26.67 $38.88 $51.08 >30 working days < 1000 hours $43.32 $55.53 $67.73

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Sprinkler Fitter ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ SP 704 7/31/2017 Sprinkler Fitter $68.92 $88.21 $107.49 H H D H D D D D Y Apprentice Rates: 1st Period $29.47 $38.22 $46.97 2nd Period $44.86 $54.71 $64.55 3rd Period $47.05 $57.99 $68.93 4th Period $49.24 $61.27 $73.31 5th Period $51.42 $64.55 $77.67 6th Period $53.61 $67.83 $82.05 7th Period $55.80 $71.11 $86.43 8th Period $57.99 $74.40 $90.81 9th Period $60.17 $77.67 $95.17 10th Period $62.36 $80.95 $99.55

comment 4 ten hour days allowed Monday-Friday Double time pay due after 12 hours worked M-F

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 27 of 30

Page 29: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 28 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Terrazzo ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ BR1-TRF 10/17/2014 Terrazzo Finisher $43.97 $55.03 $66.08 H H D H D D D D Y Apprentice Rates: Level 1 $19.04 $25.12 $31.20 Level 2 $20.24 $26.92 $33.60 Level 3 $27.01 $33.96 $40.90 Level 4 $28.47 $36.14 $43.82 Level 5 $29.99 $37.84 $45.70 Level 6 $31.61 $39.86 $48.10 Level 7 $33.30 $41.59 $49.87 Level 8 $34.79 $43.48 $52.17

comment A four ten workweek may be worked Monday thru Thursday or Tuesday thru Friday.

.................................................................................................................................................................................................................................. BR1-TRW 10/17/2014 Terrazzo Worker $49.73 $63.67 $77.60 H H D H D D D D Y Apprentice Rates: Level 1 $25.14 $32.65 $40.15 Level 2 $28.20 $36.49 $44.78 Level 3 $33.41 $41.97 $50.53 Level 4 $36.15 $45.66 $55.17 Level 5 $38.42 $48.17 $57.92 Level 6 $42.07 $53.56 $65.05 Level 7 $42.74 $54.38 $66.02 Level 8 $43.67 $55.78 $67.88

comment A 4 ten workweek may be worked Monday thru Thursday or Tuesday thru Friday. ..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 28 of 30

Page 30: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 29 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Tile ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ BR1-TF 10/17/2014 Tile Finisher $43.50 $54.32 $65.14 H H D H D D D D Y Apprentice Rates: Level 1 $19.04 $25.12 $31.20 Level 2 $20.24 $26.92 $33.60 Level 3 $27.01 $33.96 $40.90 Level 4 $28.47 $36.14 $43.82 Level 5 $29.99 $37.84 $45.70 Level 6 $31.61 $39.86 $48.10 Level 7 $33.30 $41.59 $49.87 Level 8 $34.79 $43.48 $52.17

comment A four ten workweek may be worked Monday thru Thursday or Tuesday thru Friday.

.................................................................................................................................................................................................................................. BR1-TL 10/17/2014 Tile Layer $49.68 $63.59 $77.50 H H D H D D D D Y Apprentice Rates: Level 1 $25.14 $32.65 $40.15 Level 2 $28.20 $36.49 $44.78 Level 3 $33.41 $41.97 $50.53 Level 4 $36.15 $45.66 $55.17 Level 5 $38.42 $48.17 $57.92 Level 6 $42.07 $53.56 $65.05 Level 7 $42.74 $54.38 $66.02 Level 8 $43.67 $55.78 $67.88

comment A four ten workweek may be worked Monday thru Thursday or Tuesday thru Friday.

.................................................................................................................................................................................................................................. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Truck Driver ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ TM-RB1 6/7/2016 on all trucks of 8 cubic yard capacity or less (except dump trucks of 8 $44.10 $48.81 H H H H H H H H Y cubic yard capacity or over, tandem axle trucks, transit mix and semis, euclid type equipment, double bottoms and low boys)

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 29 of 30

Page 31: Prevailing Wage Rate Schedule · Name Description Updated Hourly Half Time Provision ===== ~~~~~ Asbestos & Lead Abatement Laborer ~~~~~ MLDC 9/7/2017 Asbestos & Lead Abatement Laborer

Official 2017 Prevailing Wage Rates for State Funded Projects Issue Date: 10/31/2017 Contract must be awarded by: 1/29/2018 Page 30 of 30 Classification Last Straight Time and a Double Overtime Name Description Updated Hourly Half Time Provision ========================================================================================================= TM-RB1A 6/7/2016 of all trucks of 8 cubic yard capacity or over $44.20 $48.96 H H H H H H H H Y

.................................................................................................................................................................................................................................. TM-RB1B 6/7/2016 on euclid type equipment $44.35 $49.19 H H H H H H H H Y make up day allowed

..................................................................................................................................................................................................................................

========================================================================================================= Official Request #: 1250 Official Rate Schedule Requestor: Wayne State University Every contractor and subcontractor shall keep posted Project Description: FPM Men's Batting Cage Practice Mounts Pavilion 2017 on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe benefit rates Project Number: 083-304020 prescribed in a contract. County: Wayne Page 30 of 30